02 MOVIMIENTO DE TIERRAS
02.01 CORTE EN TERRENO NORMAL NIVELACION Y COMP./MANUAL m3
Zona de corral de espera 2.00 AREA= 78.95 0.40
Zona corral de escurrimiento 2.00 8.80 7.20 0.30
02.08 ENROCADO m3
Zona de Cimentacion 1.00 15.20 0.40 0.20
Zona de zapatas 13.00 0.90 0.85 0.35
Zona de poza baadero 1.00 8.79 0.70 0.20
Pozo ciego 1.00 AREA= 8.49 2.50
03 CONCRETO SIMPLE
03.01 CONCRETO F'C=100 KG/CM2 +30% P.G. CIMIENTOS CORRIDOS m3 1.00 95.56 0.40 0.70
03.03 CONCRETO F'C=140 KG/CM2 + 25% PM. EN SOBRECIMIENTO m3 1.00 105.60 0.15 0.25
04 CONCRETO ARMADO
04.01 CONCRETO F'c= 175 KG/CM2 PARA ZAPATAS m3 41.00 0.90 0.85 0.30
4.00 1.05 1.00 0.30
04.02 ACERO Fy= 4,200 KG/CM2 EN ZAPATAS kg
07 PISOS Y PAVIMENTOS
07.01 EMPEDRADO CON PIEDRA GRANDE E= 12" m3
Zona de corral de espera 2.00 AREA= 78.95 0.35
Zona corral de escurrimiento 2.00 8.80 7.20 0.20
Zona de Vereda 2.00 9.70 0.80 0.15
07.03 CONCRETO F'C=175 KG/CM2 PARA VEREDA m3 2.00 9.70 0.80 0.08
08 CONTRAZOCALO
08.01 CONTRAZOCALO DE CEMENTO MEZCLA 1:5 C:A m2 2.00 114.00 0.25
09 PINTURA
09.01 PINTURA LATEX EN MUROS INTERIORES Y EXTERIORES 2 MANOS m2
Zona de corral de espera 40.00 2.80 1.10
Zona de corral de escurrimiento 38.00 2.75 1.10
10 VARIOS
10.01 TUBERIA PVC SAP 4" ml 1.00 30.00
10.02 TUBERIA PVC SAL 4" ml 1.00 30.00
PLANILLA DE SUSTENTACION DE METRADOS
PROYECTO: "CONSTRUCCIN BAADERO MIXTO PARA GANADO EN EL SECTOR DE RIJCHARI HUAYNA"
PROPIETARIO: MUNICIPALIDAD DISTRITAL DE ANTAUTA
1.00
495.00 495.00
495.00 495.00
75.00 75.00
150.00 150.00
26.88 26.88
101.18
63.16
38.02
20.51
15.04
5.47
41.68
24.40
3.47
12.39
1.42
14.55 14.55
21.21 37.41
16.20
35.75
11.83
1.71
4.90
0.57
1.62
15.12
42.90
27.14
1.22
3.48
1.23
21.21
26.76 26.76
35.57
PARCIAL TOTAL
31.37
4.20
3.96 3.96
52.79 52.79
8.60
7.95
0.64
39.77 39.77
0.50
0.16
0.34
1.56 1.56
9.41 10.67
1.26
124.78
2.84
2.84
540.07
51.53
26.33
25.20
2.38
2.38
237.51
31.67
31.67
1.60 17.48
1,457.00 10.93
1.02 1457.00
12.00 1,428.90
119.08
PARCIAL TOTAL
61.60
57.48
195.80
120.96
27.34
47.51
27.16
27.16
138.16
95.04
43.12
601.60
601.60
82.94
55.27
25.34
2.33
22.77
12.63
10.14
1.25 1.25
8.24 8.24
57.00 57.00
238.15
123.20
114.95
70.34
27.34
43.00
30.00 30.00
30.00 30.00
PARCIAL TOTAL
2.00 2.00
2.00 2.00
1.00 1.00
1.00 1.00
4.00 4.00
37.50 37.50
18.75 18.75
6.15
4.50
1.40
0.25
2.25 2.25
1.62
0.11
0.23
0.16
0.03
0.12
0.05
0.05
0.04
0.84
14.96
4.32
1.44
0.80
8.40
14.48
4.86
1.43
2.00
0.18
1.00
0.25
4.76
PLANILLA DE METRADO DE A
0.75
3/8 41 6.00 0.75 184.50
Zapatas (Z-3)(Z-5)(Z-5')
0.85
3/8 04 6.00 0.85 20.40
0.10
1/4" 45 12.00 0.62 334.80
0.15
OSTURA"
1.05 112.36
1.05 12.42
540.07
540.07
1.03 86.21
237.51
237.51
1.03 188.30
1.03 49.21