The Exploration Systems Architecture Study (ESAS) Integrated Master Schedule (IMS) is an
integrated, logically connected set of activities and milestones. There are 22 separate individual
schedule networks that make up the IMS. The major individual logic schedule networks are:
• ESAS Systems Engineering and Integration (SE&I),
• Crew Exploration Vehicle (CEV),
• Crew Launch Vehicle (CLV),
• Cargo Launch Vehicle (CaLV),
• In-Space Transportation Systems (includes the Earth Departure Stage (EDS) and Lunar
Surface Access Module (LSAM)),
• In-Space Support Systems (includes communication and navigation activities),
• Launch Operations and Ground Support Systems, and
• Mission Operations.
Key Ground Rules and Assumptions (GR&As) are listed below:
• The ESAS IMS reflects the recommended launch scenario for the ISS and lunar missions/
flights.
• The ESAS IMS includes all activities from the test and evaluation plan outlined in
Section 10, Test and Evaluation.
• The ESAS IMS includes activities associated with all CEV Block options.
• The CEV Crew Module (CM) is reusable.
• The Automated Rendezvous and Docking (AR&D) module is reusable.
• The CEV Service Module (SM) is expendable.
• The CEV Launch Escape System (LES) is expendable.
• Design, manufacturing, assembly, and test for CEV will continue until the first crewed
CEV mission to the International Space Station (ISS) (ISS–1).

11. Integrated Master Schedule 667


11.2 Summary IMS
The schedule shown in Figure 11-1 summarizes the activities/milestones associated with the
ISS flights/missions and the initial lunar landing flights/missions in 2018. The more detailed
ESAS IMS is provided in Appendix 11A, Detailed Integrated Master Schedule.

Name 05 06 07 08 09 10 11 12 13 14 15 16 17 18
LES-1 LES-2 LES-3
Flight Test/Mission Milestones RRF-2 Con-2 Con-4
RRF-1 ISS-1 Con-1
RRF-3 Con-3
ISS Recurring Missions UCM-1

Down
Select PDR CDR Manuf I&T 2&3 Ship #7 to KSC
3.0 Crew Exploration Vehicle (CEV) ATP
SRR #1 #4 #5 #6 ISS1
RRF1 RRF2 RRF3
CDR
CEV Block 2 Ready for Con-1 Integ
Ship to KSC
Gov't
Led SRR PDR CDR DCR
4.3 Crew Launch Vehicle

Booster (4-Segment) "UCA/JOFOC" CDR DCR Set 2


Ship Set 3 to KSC
SRR PDR Set 1
Gov't Led PDR CDR MPTA RRF3
Upper Stage ISS1
SRR US Fab, I&T RRF2

PDR CDR CaLV Component Fab & Qual


4.4 Cargo Vehicle Shuttle Derived In-Line ATP Ship to KSC
SRR

5.0 In-Space Transportation Systems SRR PDR CDR EDS-1 to KSC


ATP Ready for Integ
Earth Departure Stage (EDS)
w/ J-2S Engine SRR PDR CDR MEIT
ATP Ready for Integ
Lunar Surface Access Module (LSAM) LSAM-1 to KSC

6.0 In-Space Support Systems ATP


SRR PDR CDR SAT Flts
IOC
Comm and Nav

Inc1 Inc3 Inc4 CEV CaLV EDS


8.0 Launch Site Command & Control LSAM
Inc2 SRB US

Figure 11-1.
Summary IMS