OBRAS

PRELIMINARES
PROYECTO:
PRECIO UNITARIO: OFICINAS
RENDIMIENTO EN 8
HRS: 12 M2/8HRS
APORTE: 0.6667 HRS/M2
CANTIDA
MANO DE OBRA UNIDAD D COSTO APORTE SUBTOTAL
ESPECIALISTA H-H 0.00 0.00 0.67 0.00
CAPATAZ H-H 0.10 20.79 0.67 1.39
OPERARIO H-H 1.00 18.08 0.67 12.05
OFICIAL H-H 0.00 14.81 0.67 0.00
PEON H-H 1.00 13.62 0.67 9.08
TOTAL MO 22.52
CANTIDA SUBTOTA
MATERIALES UNIDAD D COSTO L
SEGURIDAD 10% MO 0.10 22.52 2.25
Cemento Bls 3.50 14.12 49.42
Hormigon M3 5.30 38.14 202.14
MATERIAL 3 M3 0.00 0.00 0.00
Agua M3 0.50 1.83 0.92
Madera Tornillo P2 1.34 3.00 4.01
Clavos para Madera KG 0.25 4.66 1.17
Calamina PLN 0.82 18.00 14.76
Triplay Lupuna PLN 0.89 23.00 20.49
MATERIAL 9 M3 0.00 0.00 0.00
MATERIAL 10 M3 0.00 0.00 0.00
MATERIAL 11 M3 0.00 0.00 0.00
TOTAL
MAT 295.16
CANTIDA
COMB. Y LUB. UNIDAD D COSTO APORTE SUBTOTAL
GASOLINA GLN 0.00 0.00 0.67 0.00
PETROLEO GLN 0.00 0.00 0.67 0.00
ACEITE Y FILTROS GLN 0.00 0.00 0.67 0.00
GRASA KG 0.00 0.00 0.67 0.00
GASOLINA GLN 0.00 0.00 0.67 0.00
TOTAL
COMB 0.00
CANTIDA
EQUIPOS UNIDAD D COSTO APORTE SUBTOTAL
H-M 0.00 1.00 0.67 0.00
H-M 0.00 1.00 0.67 0.00
H-M 0.00 1.00 0.67 0.00
H-M 0.00 1.00 0.67 0.00
TOTAL
EQUIP 0.00
VARIOS UNIDAD CANTIDA COSTO APORTE SUBTOTAL
ALUMNO: BERMEO QUIROZ AURELIO COD:2011171261
D
0.6667 0.00
0.6667 0.00
0.6667 0.00
TOTAL
VAR 0.00
TOTAL
P.U. 317.68

PROYECT
O:
PRECIO UNITARIO: TRAZO Y REPLANTEO
RENDIMIENTO EN 8
HRS: 300 M2/8HRS
APORTE: 0.027 HRS/M2
MANO DE OBRA UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
ESPECIALISTA
(TOPOGRAFO) H-H 1 23.91 0.03 0.64
CAPATAZ H-H 0.10 20.79 0.03 0.06
OPERARIO H-H 1.00 18.08 0.03 0.48
OFICIAL H-H 0.00 14.81 0.03 0.00
PEON H-H 2.00 13.62 0.03 0.73
TOTAL MO 1.90
MATERIA SUBTOTA
LES UNIDAD CANTIDAD COSTO L
SEGURIDA
D 10% MO 0.10 1.90 0.19
MATERIAL
1 M2 0.00 0.00 0.00
MATERIAL
2 KG 0.00 0.00 0.00
Cal KG 0.05 0.50 0.02
MATERIAL
4 M3 0.00 0.00 0.00
Madera Tornillo P2 0.02 3.00 0.06
MATERIAL
6 M3 0.00 0.00 0.00
MATERIAL
7 M3 0.00 0.00 0.00
MATERIAL
8 M3 0.00 0.00 0.00
Cordel ML 0.30 2.80 0.84
MATERIAL
10 M3 0.00 0.00 0.00
MATERIAL
11 M3 0.00 0.00 0.00
TOTAL
MAT 1.11
COMB. Y
LUB. UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
GASOLINA GLN 0.00 0.00 0.03 0.00
PETROLEO GLN 0.00 0.00 0.03 0.00
ACEITE Y FILTROS GLN 0.00 0.00 0.03 0.00

ALUMNO: BERMEO QUIROZ AURELIO COD:2011171261


GRASA KG 0.00 0.00 0.03 0.00
GASOLINA GLN 0.00 0.00 0.03 0.00
TOTAL
COMB 0.00
EQUIPOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
Teodolito H-M 1.00 8.80 0.03 0.23
Mira topografica H-M 1.00 1.50 0.03 0.04
H-M 0.00 0.00 0.03 0.00
H-M 0.00 0.00 0.03 0.00
TOTAL
EQUIP 0.27
VARIOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
0.03 0.00
0.03 0.00
0.03 0.00
TOTAL
VAR 0.00
TOTAL
P.U. 3.29
CAPATAZ EXAMEN PARCIAL
TRAZO DE NIVELES Y REPLANTEO DURANTE EL
PRECIO UNITARIO: PROCESO
RENDIMIENTO EN 8
HRS: 300 M2/8HRS
APORTE: 0.0267 HRS/M2
MANO DE OBRA UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
ESPECIALI
STA H-H 0.00 0.00 0.03 0.00
CAPATAZ H-H 0.10 20.79 0.03 0.06
OPERARIO H-H 1.00 18.08 0.03 0.48
OFICIAL H-H 1.00 14.81 0.03 0.39
PEON H-H 2.00 13.62 0.03 0.73
TOTAL
MO 1.66
MATERIA SUBTOTA
LES UNIDAD CANTIDAD COSTO L
SEGURIDA
D 10% MO 0.10 1.66 0.17
MATERIAL
1 M2 0.00 0.00 0.00
MATERIAL
2 KG 0.00 0.00 0.00
Cal KG 0.03 0.50 0.02
MATERIAL
4 M3 0.00 0.00 0.00
MATERIAL
5 M3 0.00 0.00 0.00
MATERIAL
6 M3 0.00 0.00 0.00
MATERIAL
7 M3 0.00 0.00 0.00
MATERIAL
8 M3 0.00 0.00 0.00
Cordel ML 0.30 2.80 0.84
ALUMNO: BERMEO QUIROZ AURELIO COD:2011171261
MATERIAL
10 M3 0.00 0.00 0.00
MATERIAL
11 M3 0.00 0.00 0.00
TOTAL
MAT 1.02
COMB. Y
LUB. UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
GASOLINA GLN 0.00 0.00 0.03 0.00
PETROLEO GLN 0.00 0.00 0.03 0.00
ACEITE Y FILTROS GLN 0.00 0.00 0.03 0.00
GRASA KG 0.00 0.00 0.03 0.00
GASOLINA GLN 0.00 0.00 0.03 0.00
TOTAL
COMB 0.00
EQUIPOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
H-M 0.03 0.00
H-M 0.03 0.00
H-M 0.03 0.00
H-M 0.03 0.00
TOTAL
EQUIP 0.00
VARIOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
0.03 0.00
0.03 0.00
0.03 0.00
TOTAL
VAR 0.00
TOTAL
P.U. 2.68

MOVIMIENTO DE
TIERRAS

PROYECTO: EXAMEN PARCIAL


EXCAVACION DE
PRECIO UNITARIO: ZANJAS
RENDIMIENTO EN 8
HRS: 4 M3/8HRS
APORTE: 2.0000 HRS/M3
CANTIDA APO SUBTOTA
MANO DE OBRA UNIDAD D COSTO RTE L
ESPECIALISTA H-H 0.00 0.00 2.00 0.00
CAPATAZ H-H 0.10 20.79 2.00 4.16
OPERARIO H-H 0.00 18.08 2.00 0.00
OFICIAL H-H 0.00 14.81 2.00 0.00
PEON H-H 1.00 13.62 2.00 27.24
TOTAL
MON. 31.40
MATERIALES UNIDAD CANTIDA COSTO SUBTOTA
ALUMNO: BERMEO QUIROZ AURELIO COD:2011171261
D L
SEGURIDAD 10% MO 0.10 31.40 3.14
MATERIAL 1 M2 0 0 0.00
MATERIAL 2 KG 0.00 0.00 0.00
MATERIAL 3 P2 0.00 0.00 0.00
MATERIAL 4 M3 0.00 0.00 0.00
MATERIAL 5 M3 0.00 0.00 0.00
MATERIAL 6 M3 0.00 0.00 0.00
MATERIAL 7 M3 0.00 0.00 0.00
MATERIAL 8 M3 0.00 0.00 0.00
MATERIAL 9 M3 0.00 0.00 0.00
MATERIAL 10 M3 0.00 0.00 0.00
MATERIAL 11 M3 0.00 0.00 0.00
TOTAL
MAT 3.14
CANTIDA
COMB. Y LUB. UNIDAD D COSTO APORTE SUBTOTAL
GASOLINA GLN 0.00 0.00 2.00 0.00
PETROLEO GLN 0.00 0.00 2.00 0.00
ACEITE Y FILTROS GLN 0.00 0.00 2.00 0.00
GRASA KG 0.00 0.00 2.00 0.00
GASOLINA GLN 0.00 0.00 2.00 0.00
TOT.
COMB 0.00
CANTIDA
EQUIPOS UNIDAD D COSTO APORTE SUBTOTAL
H-M 0.00 0.00 2.00 0.00
H-M 2.00 0.00
H-M 2.00 0.00
H-M 2.00 0.00
TOTAL
EQUIP 0.00
CANTIDA
VARIOS UNIDAD D COSTO APORTE SUBTOTAL
2.0000 0.00
2.0000 0.00
2.0000 0.00
TOTAL
VAR 0.00
TOTAL
P.U. 34.54

PROYECT
O: EXAMEN PARCIAL
PRECIO UNITARIO: CORTE MANUAL DE TERRENO
RENDIMIENTO EN 8
HRS: 9 M3/8HRS
APORTE: 0.8889 HRS/M3
MANO DE OBRA UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
ESPECIALI
STA H-H 0.00 0.00 0.89 0.00
ALUMNO: BERMEO QUIROZ AURELIO COD:2011171261
CAPATAZ H-H 0.10 20.79 0.89 1.85
OPERARIO H-H 0.00 18.08 0.89 0.00
OFICIAL H-H 0.00 14.81 0.89 0.00
PEON H-H 1.00 13.62 0.89 12.11
TOTAL MO 13.95
MATERIAL
ES UNIDAD CANTIDAD COSTO SUBTOTAL
SEGURIDA
D 10% MO 0.10 13.95 1.40
MATERIAL
1 M2 0.00 0.00 0.00
MATERIAL
2 KG 0.00 0.00 0.00
MATERIAL
3 P2 0.00 0.00 0.00
MATERIAL
4 M3 0.00 0.00 0.00
MATERIAL
5 M3 0.00 0.00 0.00
MATERIAL
6 M3 0.00 0.00 0.00
MATERIAL
7 M3 0.00 0.00 0.00
MATERIAL
8 M3 0.00 0.00 0.00
MATERIAL
9 M3 0.00 0.00 0.00
MATERIAL
10 M3 0.00 0.00 0.00
MATERIAL
11 M3 0.00 0.00 0.00
TOTAL
MAT 1.40
COMB. Y
LUB. UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
GASOLINA GLN 0.00 0.00 0.89 0.00
PETROLEO GLN 0.00 0.00 0.89 0.00
ACEITE Y FILTROS GLN 0.00 0.00 0.89 0.00
GRASA KG 0.00 0.00 0.89 0.00
GASOLINA GLN 0.00 0.00 0.89 0.00
TOTAL
COMB 0.00
EQUIPOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
H-M 0.00 0.00 0.89 0.00
H-M 0.89 0.00
H-M 0.89 0.00
H-M 0.89 0.00
TOTAL
EQUIP 0.00
VARIOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
0.8889 0.00
0.8889 0.00
0.8889 0.00

ALUMNO: BERMEO QUIROZ AURELIO COD:2011171261


TOTAL
VAR 0.00
TOTAL
P.U. 15.35

PROYECT
O: EXAMEN PARCIAL
ACARREO DE MATERIAL
PRECIO UNITARIO: EXCEDENTE
RENDIMIENTO EN 8
HRS: 9 M3/8HRS
APORTE: 0.8889 HRS/M3
MANO DE OBRA UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
ESPECIALI
STA H-H 0.00 0.00 0.89 0.00
CAPATAZ H-H 0.10 20.79 0.89 1.85
OPERARIO H-H 0.00 18.08 0.89 0.00
OFICIAL H-H 0.00 14.81 0.89 0.00
PEON H-H 1.00 13.62 0.89 12.11
TOTAL
MON. 13.95
MATERIA SUBTOTA
LES UNIDAD CANTIDAD COSTO L
SEGURIDA
D 10% MO 0.10 13.95 1.40
MATERIAL
1 M2 0.00 0.00 0.00
MATERIAL
2 KG 0.00 0.00 0.00
MATERIAL
3 P2 0.00 0.00 0.00
MATERIAL
4 M3 0.00 0.00 0.00
MATERIAL
5 M3 0.00 0.00 0.00
MATERIAL
6 M3 0.00 0.00 0.00
MATERIAL
7 M3 0.00 0.00 0.00
MATERIAL
8 M3 0.00 0.00 0.00
MATERIAL
9 M3 0.00 0.00 0.00
MATERIAL
10 M3 0.00 0.00 0.00
MATERIAL
11 M3 0.00 0.00 0.00
TOTAL
MAT 1.40
COMB. Y
LUB. UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
GASOLINA GLN 0.00 0.00 0.89 0.00
PETROLEO GLN 0.00 0.00 0.89 0.00
ACEITE Y FILTROS GLN 0.00 0.00 0.89 0.00
GRASA KG 0.00 0.00 0.89 0.00
ALUMNO: BERMEO QUIROZ AURELIO COD:2011171261
GASOLINA GLN 0.00 0.00 0.89 0.00
TOTAL
COMB 0.00
EQUIPOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
Buggy H-M 1.00 7.50 0.89 6.67
H-M 0.89 0.00
H-M 0.89 0.00
H-M 0.89 0.00
TOTAL
EQUIP 6.67
VARIOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
0.8889 0.00
0.8889 0.00
0.8889 0.00
TOTAL
VAR 0.00
TOTAL
P.U. 22.02

PROYECT
O: EXAMEN PARCIAL
PRECIO UNITARIO: ELIMINACION DE DESMONTE CON EQUIPO
RENDIMIENTO EN 8
HRS: 50 M3/8HRS
APORTE: 0.1600 HRS/M3
MANO DE OBRA UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
ESPECIALI
STA H-H 0.00 0.00 0.16 0.00
CAPATAZ H-H 0.10 20.79 0.16 0.33
OPERARIO H-H 0.00 18.08 0.16 0.00
OFICIAL H-H 0.00 14.81 0.16 0.00
PEON H-H 5.00 13.62 0.16 10.90
TOTAL MO 11.23
MATERIA SUBTOTA
LES UNIDAD CANTIDAD COSTO L
SEGURIDA
D 10% MO 0.10 11.23 1.12
MATERIAL
1 M2 0.00 0.00 0.00
MATERIAL
2 KG 0.00 0.00 0.00
MATERIAL
3 P2 0.00 0.00 0.00
MATERIAL
4 M3 0.00 0.00 0.00
MATERIAL
5 M3 0.00 0.00 0.00
MATERIAL
6 M3 0.00 0.00 0.00
MATERIAL
7 M3 0.00 0.00 0.00
MATERIAL
8 M3 0.00 0.00 0.00
ALUMNO: BERMEO QUIROZ AURELIO COD:2011171261
MATERIAL
9 M3 0.00 0.00 0.00
MATERIAL
10 M3 0.00 0.00 0.00
MATERIAL
11 M3 0.00 0.00 0.00
TOTAL
MAT 1.12
COMB. Y
LUB. UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
GASOLINA GLN 1.00 8.40 0.16 1.34
PETROLEO GLN 0.00 0.00 0.16 0.00
ACEITE Y FILTROS GLN 0.00 0.00 0.16 0.00
GRASA KG 0.00 0.00 0.16 0.00
GASOLINA GLN 0.00 0.00 0.16 0.00
TOTAL
COMB 1.34
EQUIPOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
CAMION VOLQUETE DE
6 M3 H-M 1.00 91.20 0.16 14.59
H-M 0.16 0.00
H-M 0.16 0.00
H-M 0.16 0.00
TOTAL
EQUIP 14.59
VARIOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
0.16 0.00
0.16 0.00
0.16 0.00
TOTAL
VAR 0.00
TOTAL
P.U. 28.29

PROYECT
O: EXAMEN PARCIAL
PRECIO UNITARIO: RELLENO CON MATERIAL PROPIO C/PISON
RENDIMIENTO EN 8
HRS: 8 M3/8HRS
APORTE: 1.00 HRS/M3
MANO DE OBRA UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
ESPECIALI
STA H-H 0.00 0.00 1.00 0.00
CAPATAZ H-H 0.10 20.79 1.00 2.08
OPERARIO H-H 0.00 18.08 1.00 0.00
OFICIAL H-H 0.00 14.81 1.00 0.00
PEON H-H 1.00 13.62 1.00 13.62
TOTAL MO 15.70
MATERIA SUBTOTA
LES UNIDAD CANTIDAD COSTO L
SEGURIDA
D 10% MO 0.10 15.70 1.57
ALUMNO: BERMEO QUIROZ AURELIO COD:2011171261
MATERIAL
1 M2 0.00 0.00 0.00
MATERIAL
2 KG 0.00 0.00 0.00
MATERIAL
3 P2 0.00 0.00 0.00
MATERIAL
4 M3 0.00 0.00 0.00
MATERIAL
5 M3 0.00 0.00 0.00
MATERIAL
6 M3 0.00 0.00 0.00
MATERIAL
7 M3 0.00 0.00 0.00
MATERIAL
8 M3 0.00 0.00 0.00
MATERIAL
9 M3 0.00 0.00 0.00
MATERIAL
10 M3 0.00 0.00 0.00
MATERIAL
11 M3 0.00 0.00 0.00
TOTAL
MAT 1.57
COMB. Y
LUB. UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
GASOLINA GLN 0.00 0.00 1.00 0.00
PETROLEO GLN 0.00 0.00 1.00 0.00
ACEITE Y FILTROS GLN 0.00 0.00 1.00 0.00
GRASA KG 0.00 0.00 1.00 0.00
GASOLINA GLN 0.00 0.00 1.00 0.00
TOTAL
COMB 0.00
EQUIPOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
H-M 0.00 0.00 1.00 0.00
H-M 0.00 0.00 1.00 0.00
H-M 0.00 0.00 1.00 0.00
H-M 0.00 0.00 1.00 0.00
TOTAL
EQUIP 0.00
VARIOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
1.00 0.00
1.00 0.00
1.00 0.00
TOTAL
VAR 0.00
TOTAL
P.U. 17.27
PROYECT
O: EXAMEN PARCIAL
RELLENO COMPACTADO CON MATERIAL DE
PRECIO UNITARIO: PRESTAMO
RENDIMIENTO EN 8
HRS: 4 M3/8HRS

ALUMNO: BERMEO QUIROZ AURELIO COD:2011171261


APORTE: 2.0000 HRS/M3
MANO DE OBRA UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
ESPECIALI
STA H-H 0.00 0.00 2.00 0.00
CAPATAZ H-H 0.10 20.79 2.00 4.16
OPERARIO H-H 0.00 18.08 2.00 0.00
OFICIAL H-H 0.00 14.81 2.00 0.00
PEON H-H 1.00 13.62 2.00 27.24
TOTAL MO 31.40
MATERIA SUBTOTA
LES UNIDAD CANTIDAD COSTO L
SEGURIDA
D 10% MO 0.10 31.40 3.14
MATERIAL
1 M2 0.00 0.00 0.00
MATERIAL
2 KG 0.00 0.00 0.00
MATERIAL
3 P2 0.00 0.00 0.00
MATERIAL
4 M3 0.00 0.00 0.00
MATERIAL
5 M3 0.00 0.00 0.00
MATERIAL
6 M3 0.00 0.00 0.00
MATERIAL
7 M3 0.00 0.00 0.00
MATERIAL
8 M3 0.00 0.00 0.00
MATERIAL
9 M3 0.00 0.00 0.00
Afirmado M3 1.40 12.00 16.80
MATERIAL
11 M3 0.00 0.00 0.00
TOTAL
MAT 19.94
COMB. Y
LUB. UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
GASOLINA GLN 1.00 8.40 2.00 16.80
PETROLEO GLN 0.00 0.00 2.00 0.00
ACEITE Y FILTROS GLN 0.00 0.00 2.00 0.00
GRASA KG 0.00 0.00 2.00 0.00
GASOLINA GLN 0.00 0.00 2.00 0.00
TOTAL
COMB 16.80
EQUIPOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
Compactadora H-M 1.00 6.25 2.00 12.50
H-M 0.00 0.00 2.00 0.00
H-M 0.00 0.00 2.00 0.00
H-M 0.00 0.00 2.00 0.00
TOTAL
EQUIP 12.50
VARIOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
ALUMNO: BERMEO QUIROZ AURELIO COD:2011171261
2.0000 0.00
2.0000 0.00
2.0000 0.00
TOTAL
VAR 0.00
TOTAL
P.U. 80.64
PROYECT
O: EXAMEN PARCIAL
PRECIO UNITARIO: NIVELACION INTERIOR Y COMPACTACION
RENDIMIENTO EN 8
HRS: 80 M2/8HRS
APORTE: 0.1000 HRS/M2
MANO DE OBRA UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
ESPECIALI
STA H-H 0.00 0.00 0.10 0.00
CAPATAZ H-H 0.10 20.79 0.10 0.21
OPERARIO H-H 1.00 18.08 0.10 1.81
OFICIAL H-H 0.00 14.81 0.10 0.00
PEON H-H 1.00 13.62 0.10 1.36
TOTAL MO 3.38
MATERIA SUBTOTA
LES UNIDAD CANTIDAD COSTO L
SEGURIDA
D 10% MO 0.10 3.38 0.34
MATERIAL
1 M2 0.00 0.00 0.00
MATERIAL
2 KG 0.00 0.00 0.00
MATERIAL
3 P2 0.00 0.00 0.00
MATERIAL
4 M3 0.00 0.00 0.00
MATERIAL
5 M3 0.00 0.00 0.00
MATERIAL
6 M3 0.00 0.00 0.00
MATERIAL
7 M3 0.00 0.00 0.00
MATERIAL
8 M3 0.00 0.00 0.00
MATERIAL
9 M3 0.00 0.00 0.00
MATERIAL
10 M3 0.00 0.00 0.00
MATERIAL
11 M3 0.00 0.00 0.00
TOTAL
MAT 0.34
COMB. Y
LUB. UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
GASOLINA GLN 1.00 8.40 0.10 0.84
PETROLEO GLN 0.00 0.00 0.10 0.00
ACEITE Y FILTROS GLN 0.00 0.00 0.10 0.00

ALUMNO: BERMEO QUIROZ AURELIO COD:2011171261


GRASA KG 0.00 0.00 0.10 0.00
GASOLINA GLN 0.00 0.00 0.10 0.00
TOTAL
COMB 0.84
EQUIPOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
Compactadora H-M 1.00 6.50 0.10 0.65
H-M 0.10 0.00
H-M 0.10 0.00
H-M 0.10 0.00
TOTAL
EQUIP 0.65
VARIOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
0.1000 0.00
0.1000 0.00
0.1000 0.00
TOTAL
VAR 0.00
TOTAL
P.U. 5.21
ARQUITECTURA
PROYECTO: EXAMEN PARCIAL
PRECIO UNITARIO: LIMPIEZA GENERAL DE OBRA
RENDIMIENTO EN 8
HRS: 80 M2/8HRS
APORTE: 0.1000 HRS/M2
CANTIDA
MANO DE OBRA UNIDAD D COSTO APORTE SUBTOTAL
ESPECIALISTA H-H 0.00 0.00 0.10 0.00
CAPATAZ H-H 0.10 20.79 0.10 0.21
OPERARIO H-H 0.00 18.08 0.10 0.00
OFICIAL H-H 0.00 14.81 0.10 0.00
PEON H-H 2.00 13.62 0.10 2.72
TOTAL MO 2.93
CANTIDA SUBTOTA
MATERIALES UNIDAD D COSTO L
SEGURIDAD 10% MO 0.10 2.93 0.29
MATERIAL 1 M2 0.00 0.00 0.00
MATERIAL 2 KG 0.00 0.00 0.00
MATERIAL 3 P2 0.00 0.00 0.00
MATERIAL 4 M3 0.00 0.00 0.00
MATERIAL 5 M3 0.00 0.00 0.00
MATERIAL 6 M3 0.00 0.00 0.00
MATERIAL 7 M3 0.00 0.00 0.00
MATERIAL 8 M3 0.00 0.00 0.00
MATERIAL 9 M3 0.00 0.00 0.00
MATERIAL 10 M3 0.00 0.00 0.00
MATERIAL 11 M3 0.00 0.00 0.00
TOTAL
MAT 0.29
ALUMNO: BERMEO QUIROZ AURELIO COD:2011171261
CANTIDA
COMB. Y LUB. UNIDAD D COSTO APORTE SUBTOTAL
GASOLINA GLN 0.00 0.00 0.10 0.00
PETROLEO GLN 0.00 0.00 0.10 0.00
ACEITE Y FILTROS GLN 0.00 0.00 0.10 0.00
GRASA KG 0.00 0.00 0.10 0.00
GASOLINA GLN 0.00 0.00 0.10 0.00
TOTAL
COMB 0.00
CANTIDA
EQUIPOS UNIDAD D COSTO APORTE SUBTOTAL
H-M 0.00 0.00 0.10 0.00
H-M 0.10 0.00
H-M 0.10 0.00
H-M 0.10 0.00
TOTAL
EQUIP 0.00
CANTIDA
VARIOS UNIDAD D COSTO APORTE SUBTOTAL
0.1000 0.00
0.1000 0.00
0.1000 0.00
TOTAL
VAR 0.00
TOTAL
P.U. 3.23

OBRAS DE CONCRETO
SIMPLE
PROYECTO: EXAMEN PARCIAL
SOLADO DE 2" MEZCLA 1:12 CEMENT.
PRECIO UNITARIO: HORMIGON
RENDIMIENTO EN 8 M2/8HR
HRS: 90.00 S
APORTE: 0.0889 HRS/M2
CANTID
MANO DE OBRA UNIDAD AD COSTO APORTE SUBTOTAL
ESPECIALISTA (Op. De Eq.
Liv.) H-H 1.00 23.91 0.09 2.13
CAPATAZ H-H 0.40 20.79 0.09 0.74
OPERARIO H-H 3.00 18.08 0.09 4.82
OFICIAL H-H 0.00 14.81 0.09 0.00
PEON H-H 8.00 13.62 0.09 9.69
TOTAL
MO 17.37
CANTID SUBTOT
MATERIALES UNIDAD AD COSTO AL
SEGURIDAD 10% MO 0.10 17.37 1.74
Cemento BLS 0.15 14.12 2.12
Arena Gruesa KG 0.00 0.00 0.00

ALUMNO: BERMEO QUIROZ AURELIO COD:2011171261


Piedra Chancada P2 0.00 0.00 0.00
Hormigon M3 0.06 38.14 2.44
Agua M3 0.12 1.83 0.22
Madera Tornillo M3 0.10 5.70 0.57
Ladrillo M3 0.00 0.00 0.00
Clavo M3 0.00 0.00 0.00
Arena Fina M3 0.00 0.00 0.00
Ceramica M3 0.00 0.00 0.00
Fragua M3 0.00 0.00 0.00
TOTAL
MAT 7.09
CANTID
COMB. Y LUB. UNIDAD AD COSTO APORTE SUBTOTAL
GASOLINA GLN 1.00 8.40 0.09 0.75
PETROLEO GLN 0.00 0.00 0.09 0.00
ACEITE Y FILTROS GLN 0.00 0.00 0.09 0.00
GRASA KG 0.00 0.00 0.09 0.00
GASOLINA GLN 0.00 0.00 0.09 0.00
TOT.
COMB 0.75
CANTID
EQUIPOS UNIDAD AD COSTO APORTE SUBTOTAL
MEZCLADORA DE 9-11
P3 H-M 1.00 15.00 0.09 1.33
H-M 0.09 0.00
H-M 0.09 0.00
H-M 0.09 0.00
TOT.
EQUIP 1.33
CANTID
VARIOS UNIDAD AD COSTO APORTE SUBTOTAL
Cal 0.0889 0.00
0.0889 0.00
0.0889 0.00
TOTAL
VAR 0.00
TOTAL
P.U. 26.54
PROYECTO: EXAMEN PARCIAL
PRECIO UNITARIO: FALSO CIMIENTO
RENDIMIENTO EN
8 HRS: 21 M3/8HRS
APORTE: 0.3810 HRS/M3
MANO DE OBRA UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
ESPECIALISTA H-H 0.00 0.00 0.38 0.00
CAPATAZ H-H 0.10 20.79 0.38 0.79
OPERARIO H-H 1.00 18.08 0.38 6.89
OFICIAL H-H 1.00 14.81 0.38 5.64
PEON H-H 1.00 13.62 0.38 5.19
ALUMNO: BERMEO QUIROZ AURELIO COD:2011171261
TOTAL
MO 18.51
SUBTOT
MATERIALES UNIDAD CANTIDAD COSTO AL
SEGURIDAD 10% MO 0.10 18.51 1.85
Cemento BLS 7.20 14.12 101.66
MATERIAL 2 KG 0.00 0.00 0.00
MATERIAL 3 P2 0.00 0.00 0.00
Hormigon M3 0.42 38.14 16.02
Agua M3 0.08 1.83 0.15
MATERIAL 6 M3 0.00 0.00 0.00
MATERIAL 7 M3 0.00 0.00 0.00
MATERIAL 8 M3 0.00 0.00 0.00
MATERIAL 9 M3 0.00 0.00 0.00
MATERIAL 10 M3 0.00 0.00 0.00
MATERIAL 11 M3 0.00 0.00 0.00
TOTAL
MAT 119.68
COMB. Y LUB. UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
GASOLINA GLN 1.00 8.40 0.38 3.20
PETROLEO GLN 0.00 0.00 0.38 0.00
ACEITE Y FILTROS GLN 0.00 0.00 0.38 0.00
GRASA KG 0.00 0.00 0.38 0.00
GASOLINA GLN 0.00 0.00 0.38 0.00
TOT.CO
MB 3.20
EQUIPOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
MEZCLADORA DE 9-11
P3 H-M 0.32 15.00 0.38 1.83
VIBRADOR H-M 0.80 3.75 0.38 1.14
H-M 0.00 0.00 0.38 0.00
H-M 0.00 0.00 0.38 0.00
TOT.EQU
IP 2.97
VARIOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
0.3810 0.00
0.3810 0.00
0.3810 0.00
TOTAL
VAR 0.00
TOTAL
P.U. 144.36
PROYECTO: EXAMEN PARCIAL
CONCRETO Fc=100 kg/cm2 PARA
PRECIO UNITARIO: CIMIENTOS
RENDIMIENTO EN
8 HRS: 25 M3/8HRS
APORTE: 0.3200 HRS/M3
MANO DE OBRA UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
ALUMNO: BERMEO QUIROZ AURELIO COD:2011171261
ESPECIALISTA (Op. De Eq.
Liv.) H-H 1.00 23.91 0.32 7.65
CAPATAZ H-H 0.10 20.79 0.32 0.67
OPERARIO H-H 3.00 18.08 0.32 17.36
OFICIAL H-H 0.00 14.81 0.32 0.00
PEON H-H 6.00 13.62 0.32 26.15
TOTAL
MO 51.82
SUBTOT
MATERIALES UNIDAD CANTIDAD COSTO AL
SEGURIDAD 10% MO 0.10 51.82 5.18
Cemento BLS 2.20 14.12 31.06
MATERIAL 2 KG 0.00 0.00 0.00
Piedra Grande M3 0.50 20.00 10.00
Hormigon M3 0.91 38.14 34.71
Agua M3 0.14 1.83 0.26
MATERIAL 6 M3 0.00 0.00 0.00
MATERIAL 7 M3 0.00 0.00 0.00
MATERIAL 8 M3 0.00 0.00 0.00
MATERIAL 9 M3 0.00 0.00 0.00
MATERIAL 10 M3 0.00 0.00 0.00
MATERIAL 11 M3 0.00 0.00 0.00
TOTAL
MAT 81.21
COMB. Y LUB. UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
GASOLINA GLN 1.00 8.40 0.32 2.69
PETROLEO GLN 0.00 0.00 0.32 0.00
ACEITE Y FILTROS GLN 0.00 0.00 0.32 0.00
GRASA KG 0.00 0.00 0.32 0.00
GASOLINA GLN 0.00 0.00 0.32 0.00
TOT.CO
MB 2.69
EQUIPOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
MEZCLADORA DE 9-11
P3 H-M 1.00 15.00 0.32 4.80
H-M 0.32 0.00
H-M 0.32 0.00
H-M 0.32 0.00
TOT.
EQUIP 4.80
VARIOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
0.3200 0.00
0.3200 0.00
0.3200 0.00
TOTAL
VAR 0.00
TOTAL
P.U. 140.52
PROYECTO: EXAMEN PARCIAL
ALUMNO: BERMEO QUIROZ AURELIO COD:2011171261
CONCRETO Fc=120 kg/cm2 PARA
PRECIO UNITARIO: SOBRECIMIENTO
RENDIMIENTO EN
8 HRS: 15 M3/8HRS
APORTE: 0.5333 HRS/M3
MANO DE OBRA UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
ESPECIALISTA (Op. De Eq.
Liv.) H-H 1.00 23.91 0.53 12.75
CAPATAZ H-H 0.30 20.79 0.53 3.33
OPERARIO H-H 3.00 18.08 0.53 28.93
OFICIAL H-H 0.00 14.81 0.53 0.00
PEON H-H 6.00 13.62 0.53 43.58
TOTAL
MO 88.59
SUBTOT
MATERIALES UNIDAD CANTIDAD COSTO AL
SEGURIDAD 10% MO 0.10 88.59 8.86
Cemento BLS 3.50 14.12 49.42
MATERIAL 2 KG 0.00 0.00 0.00
Piedra Chancada M3 0.42 31.50 13.23
Hormigon M3 0.85 38.14 32.42
Agua M3 0.12 2.00 0.24
MATERIAL 6 M3 0.00 0.00 0.00
MATERIAL 7 M3 0.00 0.00 0.00
MATERIAL 8 M3 0.00 0.00 0.00
MATERIAL 9 M3 0.00 0.00 0.00
MATERIAL 10 M3 0.00 0.00 0.00
MATERIAL 11 M3 0.00 0.00 0.00
TOTAL
MAT 104.17
COMB. Y LUB. UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
GASOLINA GLN 1.00 8.40 0.53 4.48
PETROLEO GLN 0.00 0.00 0.53 0.00
ACEITE Y FILTROS GLN 0.00 0.00 0.53 0.00
GRASA KG 0.00 0.00 0.53 0.00
GASOLINA GLN 0.00 0.00 0.53 0.00
TOT.
COMB 4.48
EQUIPOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
MEZCLADORA DE 9-11
P3 H-M 1.00 15.00 0.53 8.00
H-M 0.53 0.00
H-M 0.53 0.00
H-M 0.53 0.00
TOT.EQU
IP 8.00
VARIOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
0.5333 0.00
0.5333 0.00

ALUMNO: BERMEO QUIROZ AURELIO COD:2011171261


0.5333 0.00
TOTAL
VAR 0.00
TOTAL
P.U. 205.24

PROYECTO: EXAMEN PARCIAL


CONCRETO EN FALSO PISO MEZCLA 1:8 C-
PRECIO UNITARIO: H (E=4")
RENDIMIENTO EN
8 HRS: 120 M2/8HRS
APORTE: 0.0667 HRS/M2
MANO DE OBRA UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
ESPECIALISTA (Op. De Eq.
Liv.) H-H 1.00 23.91 0.07 1.59
CAPATAZ H-H 0.30 20.79 0.07 0.42
OPERARIO H-H 3.00 18.08 0.07 3.62
OFICIAL H-H 0.00 14.81 0.07 0.00
PEON H-H 8.00 13.62 0.07 7.26
TOTAL
MO 12.89
SUBTOT
MATERIALES UNIDAD CANTIDAD COSTO AL
SEGURIDAD 10% MO 0.10 12.89 1.29
Cemento M3 0.48 14.12 6.78
MATERIAL 2 KG 0.00 0.00 0.00
MATERIAL 3 P2 0.00 0.00 0.00
Hormigon M3 0.127 38.14 4.84
Agua M3 0.017 1.83 0.03
MATERIAL 6 M3 0.00 0.00 0.00
MATERIAL 7 M3 0.00 0.00 0.00
MATERIAL 8 M3 0.00 0.00 0.00
MATERIAL 9 M3 0.00 0.00 0.00
MATERIAL 10 M3 0.00 0.00 0.00
MATERIAL 11 M3 0.00 0.00 0.00
TOTAL
MAT 12.94
COMB. Y LUB. UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
GASOLINA GLN 1.00 8.40 0.07 0.56
PETROLEO GLN 0.00 0.00 0.07 0.00
ACEITE Y FILTROS GLN 0.00 0.00 0.07 0.00
GRASA KG 0.00 0.00 0.07 0.00
GASOLINA GLN 0.00 0.00 0.07 0.00
TOT.
COMB 0.56
EQUIPOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
MEZCLADORA DE 9-11
P3 H-M 1.00 15.00 0.07 1.00
H-M 0.07 0.00

ALUMNO: BERMEO QUIROZ AURELIO COD:2011171261


H-M 0.07 0.00
H-M 0.07 0.00
TOT.
EQUIP 1.00
VARIOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
0.0667 0.00
0.0667 0.00
0.0667 0.00
TOTAL
VAR 0.00
TOTAL
P.U. 27.39
OBRAS DE CONCRETO ARMADO
PROYECTO: EXAMEN PARCIAL
CONCRETO EN MUROS TABIQUEZ Y PLACAS Fc=175
PRECIO UNITARIO: KG/CM2
RENDIMIENTO EN 8 HRS: 10 M3/8Hrs
APORTE: 0.8000 HRS/M3
CANTID
MANO DE OBRA UNIDAD AD COSTO APORTE SUBTOTAL
ESPECIALISTA (Op. De Eq. Liv.) H-H 1.00 23.91 0.80 19.13
CAPATAZ H-H 0.30 20.79 0.80 4.99
OPERARIO H-H 3.00 18.08 0.80 43.39
OFICIAL H-H 0.00 14.81 0.80 0.00
PEON H-H 6.00 13.62 0.80 65.38
TOTAL
MO 132.89
CANTID SUBTOT
MATERIALES UNIDAD AD COSTO AL
SEGURIDAD 10% MO 0.10 132.89 13.29
Cemento BLS 8.43 14.12 119.03
Arena Gruesa M3 0.54 38.14 20.60
Piedra Chancada M3 0.55 31.50 17.33
MATERIAL 4 M3 0.00 0.00 0.00
Agua M3 0.18 2.00 0.36
MATERIAL 6 M3 0.00 0.00 0.00
MATERIAL 7 M3 0.00 0.00 0.00
MATERIAL 8 M3 0.00 0.00 0.00
MATERIAL 9 M3 0.00 0.00 0.00
MATERIAL 10 M3 0.00 0.00 0.00
MATERIAL 11 M3 0.00 0.00 0.00
TOTAL
MAT 170.60
CANTID
COMB. Y LUB. UNIDAD AD COSTO APORTE SUBTOTAL
GASOLINA GLN 1.00 8.40 0.80 6.72
PETROLEO GLN 0.00 0.00 0.80 0.00
ACEITE Y FILTROS GLN 0.00 0.00 0.80 0.00
GRASA KG 0.00 0.00 0.80 0.00

ALUMNO: BERMEO QUIROZ AURELIO COD:2011171261


GASOLINA GLN 0.00 0.00 0.80 0.00
TOT.
COMB 6.72
CANTID
EQUIPOS UNIDAD AD COSTO APORTE SUBTOTAL
MEZCLADORA 9-11P3 H-M 1.00 15.00 0.80 12.00
VIBRADOR H-M 1.00 3.75 0.80 3.00
WINCHE ELECTRICO H-M 1.00 11.87 0.80 9.50
H-M 0.80 0.00
TOT.
EQUIP 24.50
CANTID
VARIOS UNIDAD AD COSTO APORTE SUBTOTAL
0.8000 0.00
0.8000 0.00
0.8000 0.00
TOTAL
VAR 0.00
TOTAL
P.U. 334.70

PROYECTO: EXAMEN PARCIAL


CONCRETO VIGAS Fc=175
PRECIO UNITARIO: KG/CM2
RENDIMIENTO EN
8 HRS: 16 M3/8HRS
APORTE: 0.5000 HRS/M3
MANO DE OBRA UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
ESPECIALISTA (Op. De Eq.
Liv.) H-H 1.00 23.91 0.50 11.96
CAPATAZ H-H 0.30 20.79 0.50 3.12
OPERARIO H-H 3.00 18.08 0.50 27.12
OFICIAL H-H 0.00 14.81 0.50 0.00
PEON H-H 6.00 13.62 0.50 40.86
TOTAL
MO 83.05
SUBTOT
MATERIALES UNIDAD CANTIDAD COSTO AL
SEGURIDAD 10% MO 0.10 83.05 8.31
Cemento BLS 8.43 14.12 119.03
Arena Gruesa M3 0.54 38.14 20.60
Piedra Chancada M3 0.55 31.50 17.33
MATERIAL 4 M3 0.00 0.00 0.00
Agua M3 0.18 2.00 0.36
MATERIAL 6 M3 0.00 0.00 0.00
MATERIAL 7 M3 0.00 0.00 0.00
MATERIAL 8 M3 0.00 0.00 0.00
MATERIAL 9 M3 0.00 0.00 0.00
MATERIAL 10 M3 0.00 0.00 0.00
MATERIAL 11 M3 0.00 0.00 0.00
ALUMNO: BERMEO QUIROZ AURELIO COD:2011171261
TOTAL
MAT 165.62
COMB. Y LUB. UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
GASOLINA GLN 1.00 8.40 0.50 4.20
PETROLEO GLN 0.00 0.00 0.50 0.00
ACEITE Y FILTROS GLN 0.00 0.00 0.50 0.00
GRASA KG 0.00 0.00 0.50 0.00
GASOLINA GLN 0.00 0.00 0.50 0.00
TOT.
COMB 4.20
EQUIPOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
MEZCLADORA 9-
11P3 H-M 1.00 15.00 0.50 7.50
VIBRADOR H-M 1.00 3.75 0.50 1.88
WINCHE
ELECTRICO H-M 1.00 11.87 0.50 5.94
H-M 0.50 0.00
TOT.
EQUIP 15.31
VARIOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
0.5000 0.00
0.5000 0.00
0.5000 0.00
TOTAL
VAR 0.00
TOTAL
P.U. 268.18

PROYECTO: EXAMEN PARCIAL


CONCRETO VIGAS Fc=280
PRECIO UNITARIO: KG/CM2
RENDIMIENTO EN
8 HRS: 16 M3/8HRS
APORTE: 0.5000 HRS/M3
MANO DE OBRA UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
ESPECIALISTA (Op. De Eq.
Liv.) H-H 1.00 23.91 0.50 11.96
CAPATAZ H-H 0.30 20.79 0.50 3.12
OPERARIO H-H 3.00 18.08 0.50 27.12
OFICIAL H-H 0.00 14.81 0.50 0.00
PEON H-H 6.00 13.62 0.50 40.86
TOTAL
MO 83.05
SUBTOT
MATERIALES UNIDAD CANTIDAD COSTO AL
SEGURIDAD 10% MO 0.10 83.05 8.31
Cemento BLS 13.34 14.12 188.36
Arena Gruesa M3 0.45 38.14 17.16
Piedra Chancada M3 0.51 31.50 16.07
MATERIAL 4 M3 0.00 0.00 0.00
ALUMNO: BERMEO QUIROZ AURELIO COD:2011171261
Agua M3 0.18 2.00 0.36
MATERIAL 6 M3 0.00 0.00 0.00
MATERIAL 7 M3 0.00 0.00 0.00
MATERIAL 8 M3 0.00 0.00 0.00
MATERIAL 9 M3 0.00 0.00 0.00
MATERIAL 10 M3 0.00 0.00 0.00
MATERIAL 11 M3 0.00 0.00 0.00
TOTAL
MAT 230.25
COMB. Y LUB. UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
GASOLINA GLN 1.00 8.40 0.50 4.20
PETROLEO GLN 0.00 0.00 0.50 0.00
ACEITE Y FILTROS GLN 0.00 0.00 0.50 0.00
GRASA KG 0.00 0.00 0.50 0.00
GASOLINA GLN 0.00 0.00 0.50 0.00
TOT.CO
MB 4.20
EQUIPOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
MEZCLADORA 9-
11P3 H-M 1.00 15.00 0.50 7.50
VIBRADOR H-M 1.00 3.75 0.50 1.88
WINCHE
ELECTRICO H-M 1.00 11.87 0.50 5.94
H-M 0.50 0.00
TOT.EQU
IP 15.31
VARIOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
0.5000 0.00
0.5000 0.00
0.5000 0.00
TOTAL
VAR 0.00
TOTAL
P.U. 332.82
PROYECTO: EXAMEN PARCIAL
CONCRETO DE F'c=175 KG/m2, CON 10 CM DE
PRECIO UNITARIO: ESPESOR
RENDIMIENTO EN
8 HRS: 38 M2/8HRS
APORTE: 0.2105 HRS/M2
MANO DE OBRA UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
ESPECIALISTA (Op. De Eq.
Liv.) H-H 1.00 23.91 0.21 5.03
CAPATAZ H-H 0.30 20.79 0.21 1.31
OPERARIO H-H 3.00 18.08 0.21 11.42
OFICIAL H-H 0.00 14.81 0.21 0.00
PEON H-H 8.00 13.62 0.21 22.94
TOTAL
MO 40.70
SUBTOTA
MATERIALES UNIDAD CANTIDAD COSTO L
ALUMNO: BERMEO QUIROZ AURELIO COD:2011171261
SEGURIDAD 10% MO 0.10 40.70 4.07
Cemento BLS 5.40 14.12 76.25
Arena Gruesa M3 0.45 38.14 17.16
Piedra Chancada M3 0.00 0.00 0.00
MATERIAL 4 M3 0.00 0.00 0.00
Agua M3 0.18 2.00 0.36
MATERIAL 6 M3 0.00 0.00 0.00
MATERIAL 7 M3 0.00 0.00 0.00
MATERIAL 8 M3 0.00 0.00 0.00
MATERIAL 9 M3 0.00 0.00 0.00
MATERIAL 10 M3 0.00 0.00 0.00
MATERIAL 11 M3 0.00 0.00 0.00
TOTAL
MAT 97.84
COMB. Y LUB. UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
GASOLINA GLN 1.00 8.40 0.21 1.77
PETROLEO GLN 0.00 0.00 0.21 0.00
ACEITE Y FILTROS GLN 0.00 0.00 0.21 0.00
GRASA KG 0.00 0.00 0.21 0.00
GASOLINA GLN 0.00 0.00 0.21 0.00
TOT.
COMB 1.77
EQUIPOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
MEZCLADORA 9-
11P3 H-M 1.00 15.00 0.21 3.16
VIBRADOR H-M 1.00 3.75 0.21 0.79
WINCHE
ELECTRICO H-M 1.00 11.87 0.21 2.50
H-M 0.21 0.00
TOT.
EQUIP 6.45
VARIOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
0.2105 0.00
0.2105 0.00
0.2105 0.00
TOTAL
VAR 0.00
TOTAL
P.U. 146.76
PROYECTO: EXAMEN PARCIAL
CONCRETO LOSA ALIGERADA Fc=175
PRECIO UNITARIO: KG/CM2
RENDIMIENTO EN
8 HRS: 24 M3/8HRS
APORTE: HRS/M3
0.3333
MANO DE OBRA UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
ESPECIALISTA (Op. De Eq.
Liv.) H-H 1.00 23.91 0.33 7.97
CAPATAZ H-H 0.30 20.79 0.33 2.08
OPERARIO H-H 3.00 18.08 0.33 18.08
ALUMNO: BERMEO QUIROZ AURELIO COD:2011171261
OFICIAL H-H 0.00 14.81 0.33 0.00
PEON H-H 6.00 13.62 0.33 27.24
TOTAL
MO 55.37
SUBTOT
MATERIALES UNIDAD CANTIDAD COSTO AL
SEGURIDAD 10% MO 0.10 55.37 5.54
Cemento BLS 8.43 14.12 119.03
Arena Gruesa M3 0.54 38.14 20.60
Piedra Chancada M3 0.55 31.50 17.33
MATERIAL 4 M3 0.00 0.00 0.00
Agua M3 0.18 1.83 0.33
MATERIAL 6 M3 0.00 0.00 0.00
MATERIAL 7 M3 0.00 0.00 0.00
MATERIAL 8 M3 0.00 0.00 0.00
MATERIAL 9 M3 0.00 0.00 0.00
MATERIAL 10 M3 0.00 0.00 0.00
MATERIAL 11 M3 0.00 0.00 0.00
TOTAL
MAT 162.82
COMB. Y LUB. UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
GASOLINA GLN 1.00 8.40 0.33 2.80
PETROLEO GLN 0.00 0.00 0.33 0.00
ACEITE Y FILTROS GLN 0.00 0.00 0.33 0.00
GRASA KG 0.00 0.00 0.33 0.00
GASOLINA GLN 0.00 0.00 0.33 0.00
TOT.
COMB 2.80
EQUIPOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
MEZCLADORA 9-
11P3 H-M 1.00 15.00 0.33 5.00
VIBRADOR H-M 1.00 3.75 0.33 1.25
WINCHE
ELECTRICO H-M 1.00 11.87 0.33 3.96
H-M 0.33 0.00
TOT.
EQUIP 10.21
VARIOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
0.3333 0.00
0.3333 0.00
0.3333 0.00
TOTAL
VAR 0.00
TOTAL
P.U. 231.19
PROYECTO: EXAMEN PARCIAL
CONCRETO LOSA MACIZA Fc=175
PRECIO UNITARIO: KG/CM2
RENDIMIENTO EN
8 HRS: 18 M3/8HRS
ALUMNO: BERMEO QUIROZ AURELIO COD:2011171261
APORTE: 0.4444 HRS/M3
MANO DE OBRA UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
ESPECIALISTA (Op. De Eq.
Liv.) H-H 1.00 23.91 0.44 10.63
CAPATAZ H-H 0.30 20.79 0.44 2.77
OPERARIO H-H 3.00 18.08 0.44 24.11
OFICIAL H-H 0.00 14.81 0.44 0.00
PEON H-H 6.00 13.62 0.44 36.32
TOTAL
MO 73.83
SUBTOT
MATERIALES UNIDAD CANTIDAD COSTO AL
SEGURIDAD 10% MO 0.10 73.83 7.38
Cemento BLS 8.43 14.12 119.03
Arena Gruesa M3 0.54 38.14 20.60
Piedra Chancada M3 0.55 31.50 17.33
MATERIAL 4 M3 0.00 0.00 0.00
Agua M3 0.18 1.83 0.33
MATERIAL 6 M3 0.00 0.00 0.00
MATERIAL 7 M3 0.00 0.00 0.00
MATERIAL 8 M3 0.00 0.00 0.00
MATERIAL 9 M3 0.00 0.00 0.00
MATERIAL 10 M3 0.00 0.00 0.00
MATERIAL 11 M3 0.00 0.00 0.00
TOTAL
MAT 164.66
COMB. Y LUB. UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
GASOLINA GLN 1.00 8.40 0.44 3.73
PETROLEO GLN 0.00 0.00 0.44 0.00
ACEITE Y FILTROS GLN 0.00 0.00 0.44 0.00
GRASA KG 0.00 0.00 0.44 0.00
GASOLINA GLN 0.00 0.00 0.44 0.00
TOT.
COMB 3.73
EQUIPOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
MEZCLADORA 9-
11P3 H-M 1.00 15.00 0.44 6.67
VIBRADOR H-M 1.00 3.75 0.44 1.67
WINCHE
ELECTRICO H-M 1.00 11.87 0.44 5.28
H-M 0.44 0.00
TOT.
EQUIP 13.61
VARIOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
0.4444 0.00
0.4444 0.00
0.4444 0.00
TOTAL
VAR 0.00

ALUMNO: BERMEO QUIROZ AURELIO COD:2011171261


TOTAL
P.U. 255.83
PROYECTO: EXAMEN PARCIAL
CONCRETO LIQUIDO EN
PRECIO UNITARIO: MUROS
RENDIMIENTO EN
8 HRS: 8 M3/8HRS
APORTE: 1.0000 HRS/M3
MANO DE OBRA UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
ESPECIALISTA H-H 0.00 0.00 1.00 0.00
CAPATAZ H-H 0.10 20.79 1.00 2.08
OPERARIO H-H 1.00 18.08 1.00 18.08
OFICIAL H-H 0.00 14.81 1.00 0.00
PEON H-H 1.00 13.62 1.00 13.62
TOTAL
MO 33.78
SUBTOT
MATERIALES UNIDAD CANTIDAD COSTO AL
SEGURIDAD 10% MO 0.10 33.78 3.38
Cemento BLS 7.84 14.12 110.70
Arena Gruesa M3 0.00 0.00 0.00
Piedra Chancada M3 0.00 0.00 0.00
MATERIAL 4 M3 0.25 0.00 0.00
Agua M3 0.25 1.83 0.46
MATERIAL 6 M3 0.00 0.00 0.00
MATERIAL 7 M3 0.00 0.00 0.00
MATERIAL 8 M3 0.00 0.00 0.00
Arena Fina M3 0.71 38.14 27.08
MATERIAL 10 M3 0.00 0.00 0.00
MATERIAL 11 M3 0.00 0.00 0.00
TOTAL
MAT 141.62
COMB. Y LUB. UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
GASOLINA GLN 1.00 8.40 1.00 8.40
PETROLEO GLN 0.00 0.00 1.00 0.00
ACEITE Y FILTROS GLN 0.00 0.00 1.00 0.00
GRASA KG 0.00 0.00 1.00 0.00
GASOLINA GLN 0.00 0.00 1.00 0.00
TOT.
COMB 8.40
EQUIPOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
MEZCLADORA 9-
11P3 H-M 0.40 15.00 1.00 6.00
vibrador H-M 0.40 3.75 1.00 1.50
H-M 1.00 0.00
H-M 1.00 0.00
TOT.EQU
IP 7.50
VARIOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL

ALUMNO: BERMEO QUIROZ AURELIO COD:2011171261


1.0000 0.00
1.0000 0.00
1.0000 0.00
TOTAL
VAR 0.00
TOTAL
P.U. 191.29
PROYECTO: EXAMEN FINAL
MURO DE LADRILLO DE CABEZA KING
PRECIO UNITARIO: KONG
RENDIMIENTO EN
8 HRS: 6.45 M2/8HRS
APORTE: 1.2403 HRS/M2
MANO DE OBRA UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
ESPECIALISTA H-H 0.00 23.91 1.24 0.00
CAPATAZ H-H 0.10 20.79 1.24 2.58
OPERARIO H-H 1.00 18.08 1.24 22.42
OFICIAL H-H 0.00 14.81 1.24 0.00
PEON H-H 1.00 13.62 1.24 16.89
TOTAL
MO 41.90
SUBTOT
MATERIALES UNIDAD CANTIDAD COSTO AL
SEGURIDAD 10% MO 0.10 41.90 4.19
Cemento BLS 0.41 14.12 5.76
Arena Gruesa M3 0.06 38.14 2.21
MATERIAL 3 P2 0.00 0.00 0.00
MATERIAL 4 M3 0.00 0.00 0.00
Agua M3 0.03 1.83 0.05
MATERIAL 6 M3 0.00 0.00 0.00
Ladrillo UND 66.00 0.50 33.00
Clavo KG 0.08 3.62 0.29
MATERIAL 9 P2 0.00 0.00 0.00
MATERIAL 10 M3 0.00 0.00 0.00
MATERIAL 11 M3 0.00 0.00 0.00
TOTAL
MAT 45.51
COMB. Y LUB. UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
GASOLINA GLN 0.00 0.00 1.24 0.00
PETROLEO GLN 0.00 0.00 1.24 0.00
ACEITE Y FILTROS GLN 0.00 0.00 1.24 0.00
GRASA KG 0.00 0.00 1.24 0.00
GASOLINA GLN 0.00 0.00 1.24 0.00
TOT.
COMB 0.00
EQUIPOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
Andamio De Madera H-M 1.00 5.70 1.24 7.07
H-M 1.24 0.00
H-M 1.24 0.00
ALUMNO: BERMEO QUIROZ AURELIO COD:2011171261
H-M 1.24 0.00
TOT.
EQUIP 7.07
VARIOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
1.2403 0.00
1.2403 0.00
1.2403 0.00
TOTAL
VAR 0.00
TOTAL
P.U. 94.47
PROYECTO: EXAMEN PARCIAL
MURO DE LADRILLO DE SOGA
PRECIO UNITARIO: KING KONG
RENDIMIENTO EN
8 HRS: 9.46 M2/8HRS
APORTE: 0.8457 HRS/M2
MANO DE OBRA UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
ESPECIALISTA H-H 0.00 0.00 0.85 0.00
CAPATAZ H-H 0.10 20.79 0.85 1.76
OPERARIO H-H 1.00 18.08 0.85 15.29
OFICIAL H-H 0.00 14.81 0.85 0.00
PEON H-H 1.00 13.62 0.85 11.52
TOTAL
MO 28.57
SUBTOT
MATERIALES UNIDAD CANTIDAD COSTO AL
SEGURIDAD 10% MO 0.10 28.57 2.86
Cemento BLS 0.22 14.12 3.08
Arena Gruesa M3 0.03 38.14 1.18
MATERIAL 3 P2 0.00 0.00 0.00
MATERIAL 4 M3 0.00 0.00 0.00
Agua M3 0.03 1.83 0.05
MATERIAL 6 M3 0.00 0.00 0.00
Ladrillo UND 39.00 0.50 19.50
Clavo KG 0.08 3.62 0.29
MATERIAL 9 P2 0.00 0.00 0.00
MATERIAL 10 M3 0.00 0.00 0.00
MATERIAL 11 M3 0.00 0.00 0.00
TOTAL
MAT 26.96
COMB. Y LUB. UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
GASOLINA GLN 0.00 0.00 0.85 0.00
PETROLEO GLN 0.00 0.00 0.85 0.00
ACEITE Y FILTROS GLN 0.00 0.00 0.85 0.00
GRASA KG 0.00 0.00 0.85 0.00
GASOLINA GLN 0.00 0.00 0.85 0.00
TOT.
COMB 0.00

ALUMNO: BERMEO QUIROZ AURELIO COD:2011171261


EQUIPOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
Andamio De Madera H-M 1.00 5.70 0.85 4.82
H-M 0.85 0.00
H-M 0.85 0.00
H-M 0.85 0.00
TOT.EQU
IP 4.82
VARIOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
0.8457 0.00
0.8457 0.00
0.8457 0.00
TOTAL
VAR 0.00
TOTAL
P.U. 60.35
ARQUITECTURA
PROYECTO: EXAMEN PARCIAL
MURO CON LADRILLO PANDERETA DE
PRECIO UNITARIO: CABEZA
RENDIMIENTO EN M2/8HR
8 HRS: 8 S
APORTE: 1.0000 HRS/M2
CANTID
MANO DE OBRA UNIDAD AD COSTO APORTE SUBTOTAL
ESPECIALISTA H-H 0.00 0.00 1.00 0.00
CAPATAZ H-H 0.10 20.79 1.00 2.08
OPERARIO H-H 1.00 18.08 1.00 18.08
OFICIAL H-H 0.00 14.81 1.00 0.00
PEON H-H 1.00 13.62 1.00 13.62
TOTAL
MO 33.78
CANTID SUBTOT
MATERIALES UNIDAD AD COSTO AL
SEGURIDAD 10% MO 0.10 33.78 3.38
Cemento BLS 0.45 14.12 6.35
Arena Gruesa M3 0.06 38.14 2.44
MATERIAL 3 P2 0.00 0.00 0.00
MATERIAL 4 M3 0.00 0.00 0.00
Agua M3 0.03 1.83 0.05
MATERIAL 6 M3 0.00 0.00 0.00
Ladrillo UND 68.00 0.50 34.00
Clavo KG 0.08 3.62 0.29
MATERIAL 9 P2 0.00 0.00 0.00
MATERIAL 10 M3 0.00 0.00 0.00
MATERIAL 11 M3 0.00 0.00 0.00
TOTAL
MAT 46.52
CANTID
COMB. Y LUB. UNIDAD AD COSTO APORTE SUBTOTAL

ALUMNO: BERMEO QUIROZ AURELIO COD:2011171261


GASOLINA GLN 0.00 0.00 1.00 0.00
PETROLEO GLN 0.00 0.00 1.00 0.00
ACEITE Y FILTROS GLN 0.00 0.00 1.00 0.00
GRASA KG 0.00 0.00 1.00 0.00
GASOLINA GLN 0.00 0.00 1.00 0.00
TOT.
COMB 0.00
CANTID
EQUIPOS UNIDAD AD COSTO APORTE SUBTOTAL
Andamio De Madera H-M 1.00 5.70 1.00 5.70
H-M 1.00 0.00
H-M 1.00 0.00
H-M 1.00 0.00
TOT.
EQUIP 5.70
CANTID
VARIOS UNIDAD AD COSTO APORTE SUBTOTAL
1.0000 0.00
1.0000 0.00
1.0000 0.00
TOTAL
VAR 0.00
TOTAL
P.U. 86.00
PROYECTO: EXAMEN PARCIAL
MURO CON LADRILLO PANDERETA DE
PRECIO UNITARIO: SOGA
RENDIMIENTO EN
8 HRS: 11 M2/8HRS
APORTE: 0.7273 HRS/M2
MANO DE OBRA UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
ESPECIALISTA H-H 0.00 0.00 0.73 0.00
CAPATAZ H-H 0.10 20.79 0.73 1.51
OPERARIO H-H 1.00 18.08 0.73 13.15
OFICIAL H-H 0.00 14.81 0.73 0.00
PEON H-H 1.00 13.62 0.73 9.91
TOTAL
MO 24.57
SUBTOT
MATERIALES UNIDAD CANTIDAD COSTO AL
SEGURIDAD 10% MO 0.10 24.57 2.46
Cemento BLS 0.16 14.12 2.30
Arena Gruesa M3 0.02 38.14 0.88
MATERIAL 3 P2 0.00 0.00 0.00
MATERIAL 4 M3 0.00 0.00 0.00
Agua M3 0.03 1.83 0.05
MATERIAL 6 M3 0.00 0.00 0.00
Ladrillo UND 35.00 0.50 17.50
Clavo KG 0.08 3.62 0.29
MATERIAL 9 P2 0.00 0.00 0.00
ALUMNO: BERMEO QUIROZ AURELIO COD:2011171261
MATERIAL 10 M3 0.00 0.00 0.00
MATERIAL 11 M3 0.00 0.00 0.00
TOTAL
MAT 23.48
COMB. Y LUB. UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
GASOLINA GLN 0.00 0.00 0.73 0.00
PETROLEO GLN 0.00 0.00 0.73 0.00
ACEITE Y FILTROS GLN 0.00 0.00 0.73 0.00
GRASA KG 0.00 0.00 0.73 0.00
GASOLINA GLN 0.00 0.00 0.73 0.00
TOT.CO
MB 0.00
EQUIPOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
Andamio De Madera H-M 1.00 5.70 0.73 4.15
H-M 0.73 0.00
H-M 0.73 0.00
H-M 0.73 0.00
TOT.
EQUIP 4.15
VARIOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
0.7273 0.00
0.7273 0.00
0.7273 0.00
TOTAL
VAR 0.00
TOTAL
P.U. 52.19
PROYECTO: EXAMEN PARCIAL
PRECIO UNITARIO: TARRAJEO PRIMARIO O RAYADO
RENDIMIENTO EN
8 HRS: 18 M2/8HRS
APORTE: 0.4444 HRS/M2
MANO DE OBRA UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
ESPECIALISTA H-H 0.00 0.00 0.44 0.00
CAPATAZ H-H 0.10 20.79 0.44 0.92
OPERARIO H-H 1.00 18.08 0.44 8.04
OFICIAL H-H 0.00 14.81 0.44 0.00
PEON H-H 1.00 13.62 0.44 6.05
TOTAL
MO 15.01
SUBTOT
MATERIALES UNIDAD CANTIDAD COSTO AL
SEGURIDAD 10% MO 0.10 15.01 1.50
Cemento BLS 0.12 14.12 1.65
MATERIAL 2 M3 0.000 0.00 0.00
MATERIAL 3 P2 0.00 0.00 0.00
MATERIAL 4 M3 0.00 0.00 0.00
Agua M3 0.03 1.83 0.05
MATERIAL 6 M3 0.00 0.00 0.00
ALUMNO: BERMEO QUIROZ AURELIO COD:2011171261
MATERIAL 7 UND 0.00 0.00 0.00
Clavo KG 0.08 3.62 0.29
Arena Fina M3 0.02 38.14 0.61
MATERIAL 10 P2 0.00 0.00 0.00
MATERIAL 11 M3 0.00 0.00 0.00
TOTAL
MAT 4.11
COMB. Y LUB. UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
GASOLINA GLN 0.00 0.00 0.44 0.00
PETROLEO GLN 0.00 0.00 0.44 0.00
ACEITE Y FILTROS GLN 0.00 0.00 0.44 0.00
GRASA KG 0.00 0.00 0.44 0.00
GASOLINA GLN 0.00 0.00 0.44 0.00
TOT.
COMB 0.00
EQUIPOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
Andamio De Madera H-M 1.00 5.70 0.44 2.53
Regla De Madera H-M 1.00 2.80 0.44 1.24
H-M 0.44 0.00
H-M 0.44 0.00
TOTAL
EQUIP 3.78
VARIOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
0.4444 0.00
0.4444 0.00
0.4444 0.00
TOTAL
VAR 0.00
TOTAL
P.U. 22.90
PROYECTO: EXAMEN PARCIAL
TARRAJEO EN
PRECIO UNITARIO: INTERIORES
RENDIMIENTO EN
8 HRS: 18 M2/8HRS
APORTE: 0.4444 HRS/M2
MANO DE OBRA UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
ESPECIALISTA H-H 0.00 0.00 0.44 0.00
CAPATAZ H-H 0.10 20.70 0.44 0.92
OPERARIO H-H 1.00 15.92 0.44 7.08
OFICIAL H-H 0.00 13.65 0.44 0.00
PEON H-H 2.00 12.31 0.44 10.94
TOTAL
MO 18.94
SUBTOT
MATERIALES UNIDAD CANTIDAD COSTO AL
SEGURIDAD 10% MO 0.10 18.94 1.89
Cemento BLS 0.12 14.12 1.65
MATERIAL 2 M3 0.00 0.00 0.00

ALUMNO: BERMEO QUIROZ AURELIO COD:2011171261


MATERIAL 3 P2 0.00 0.00 0.00
MATERIAL 4 M3 0.00 0.00 0.00
Agua M3 0.03 1.83 0.05
MATERIAL 6 M3 0.00 0.00 0.00
MATERIAL 7 UND 0.00 0.00 0.00
Clavo KG 0.08 3.62 0.29
Arena Fina M3 0.02 38.14 0.61
MATERIAL 10 P2 0.00 0.00 0.00
MATERIAL 11 M3 0.00 0.00 0.00
TOTAL
MAT 4.50
COMB. Y LUB. UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
GASOLINA GLN 0.00 0.00 0.44 0.00
PETROLEO GLN 0.00 0.00 0.44 0.00
ACEITE Y FILTROS GLN 0.00 0.00 0.44 0.00
GRASA KG 0.00 0.00 0.44 0.00
GASOLINA GLN 0.00 0.00 0.44 0.00
TOT.
COMB 0.00
EQUIPOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
Andamio De Madera H-M 1.00 5.70 0.44 2.53
Regla De Madera H-M 1.00 2.80 0.44 1.24
H-M 0.44 0.00
H-M 0.44 0.00
TOT.
EQUIP 3.78
VARIOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
0.4444 0.00
0.4444 0.00
0.4444 0.00
TOTAL
VAR 0.00
TOTAL
P.U. 27.22
PROYECTO: EXAMEN PARCIAL
MESA DE CONCRETO PARA
PRECIO UNITARIO: COCINA
RENDIMIENTO EN
8 HRS: 2.00 UND/8HRS
APORTE: 4.0000 HRS/UND
MANO DE OBRA UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
ESPECIALISTA H-H 0.00 0.00 4.00 0.00
CAPATAZ H-H 0.10 20.79 4.00 8.32
OPERARIO H-H 1.00 18.08 4.00 72.32
OFICIAL H-H 0.00 14.81 4.00 0.00
PEON H-H 1.00 13.62 4.00 54.48
TOTAL
MO 135.12
MATERIALES UNIDAD CANTIDAD COSTO SUBTOT

ALUMNO: BERMEO QUIROZ AURELIO COD:2011171261


AL
SEGURIDAD 10% MO 0.10 135.12 13.51
Cemento BLS 2.80 14.12 39.54
Arena Gruesa M3 0.02 38.14 0.92
Piedra Chancada M3 0.18 31.50 5.70
MATERIAL 4 M3 0.00 0.00 0.00
Agua M3 0.03 2.00 0.06
Madera P2 1.88 3.00 5.64
MATERIAL 7 M3 0.00 0.00 0.00
MATERIAL 8 M3 0.00 0.00 0.00
MATERIAL 9 M3 0.00 0.00 0.00
MATERIAL 10 M3 0.00 0.00 0.00
MATERIAL 11 P2 0.00 0.00 0.00
TOTAL
MAT 65.36
COMB. Y LUB. UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
GASOLINA GLN 1.00 8.40 4.00 33.60
PETROLEO GLN 0.00 0.00 4.00 0.00
ACEITE Y FILTROS GLN 0.00 0.00 4.00 0.00
GRASA KG 0.00 0.00 4.00 0.00
GASOLINA GLN 0.00 0.00 4.00 0.00
TOT.
COMB 33.60
EQUIPOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
MEZCLADORA 9-
11P3 H-M 0.40 15.00 4.00 24.00
H-M 4.00 0.00
H-M 4.00 0.00
H-M 4.00 0.00
TOT.
EQUIP 24.00
VARIOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
1.0000 0.00
1.0000 0.00
1.0000 0.00
TOTAL
VAR 0.00
TOTAL
P.U. 258.08
PROYECTO: EXAMEN PARCIAL
CONTRAPISO DE
PRECIO UNITARIO: 50mm
RENDIMIENTO EN
8 HRS: 70 M2/8HRS
APORTE: 0.1143 HRS/M2
CANTIDA
MANO DE OBRA UNIDAD D COSTO APORTE SUBTOTAL
ESPECIALISTA (Op. De Eq.
Liv.) H-H 1.00 23.91 0.11 2.73
CAPATAZ H-H 0.03 20.79 0.11 0.06
ALUMNO: BERMEO QUIROZ AURELIO COD:2011171261
OPERARIO H-H 3.00 18.08 0.11 6.20
OFICIAL H-H 0.00 14.81 0.11 0.00
PEON H-H 8.00 13.62 0.11 12.45
TOTAL
MO 21.44
CANTIDA SUBTOT
MATERIALES UNIDAD D COSTO AL
SEGURIDAD 10% MO 0.10 21.44 2.14
Cemento BLS 0.46 14.12 6.42
MATERIAL 2 M3 0.00 0.00 0.00
MATERIAL 3 P2 0.00 0.00 0.00
MATERIAL 4 M3 0.00 0.00 0.00
Agua M3 0.03 1.83 0.05
MATERIAL 6 M3 0.00 0.00 0.00
MATERIAL 7 UND 0.00 0.00 0.00
MATERIAL 8 KG 0.00 0.00 0.00
Arena Fina M3 0.06 38.14 2.33
MATERIAL 10 P2 0.00 0.00 0.00
MATERIAL 11 M3 0.00 0.00 0.00
TOTAL
MAT 10.95
CANTIDA
COMB. Y LUB. UNIDAD D COSTO APORTE SUBTOTAL
GASOLINA GLN 1.00 8.40 0.11 0.96
PETROLEO GLN 0.00 0.00 0.11 0.00
ACEITE Y FILTROS GLN 0.00 0.00 0.11 0.00
GRASA KG 0.00 0.00 0.11 0.00
GASOLINA GLN 0.00 0.00 0.11 0.00
TOT.CO
MB 0.96
CANTIDA
EQUIPOS UNIDAD D COSTO APORTE SUBTOTAL
MEZCLADORA 9-
11P3 H-M 1.00 15.00 0.11 1.71
Regla De Madera H-M 1.00 2.80 0.11 0.32
H-M 0.11 0.00
H-M 0.11 0.00
TOT.
EQUIP 2.03
CANTIDA
VARIOS UNIDAD D COSTO APORTE SUBTOTAL
0.1143 0.00
0.1143 0.00
0.1143 0.00
TOTAL
VAR 0.00
TOTAL
P.U. 35.39
PROYECTO: EXAMEN PARCIAL
PRECIO UNITARIO: CONTRAPISO DE

ALUMNO: BERMEO QUIROZ AURELIO COD:2011171261


35mm
RENDIMIENTO EN
8 HRS: 100 M2/8HRS
APORTE: 0.0800 HRS/M2
MANO DE OBRA UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
ESPECIALISTA (Op. De Eq.
Liv.) H-H 1.00 23.91 0.08 1.91
CAPATAZ H-H 0.03 20.79 0.08 0.04
OPERARIO H-H 3.00 18.08 0.08 4.34
OFICIAL H-H 0.00 14.81 0.08 0.00
PEON H-H 8.00 13.62 0.08 8.72
TOTAL
MO 15.01
SUBTOT
MATERIALES UNIDAD CANTIDAD COSTO AL
SEGURIDAD 10% MO 0.10 15.01 1.50
Cemento BLS 0.39 14.12 5.51
MATERIAL 2 M3 0.00 0.00 0.00
MATERIAL 3 P2 0.00 0.00 0.00
MATERIAL 4 M3 0.00 0.00 0.00
Agua M3 0.03 1.83 0.05
MATERIAL 6 M3 0.00 0.00 0.00
MATERIAL 7 UND 0.00 0.00 0.00
MATERIAL 8 KG 0.00 0.00 0.00
Arena Fina M3 0.05 38.14 1.95
MATERIAL 10 P2 0.00 0.00 0.00
MATERIAL 11 M3 0.00 0.00 0.00
TOTAL
MAT 9.01
COMB. Y LUB. UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
GASOLINA GLN 1.00 8.40 0.08 0.67
PETROLEO GLN 0.00 0.00 0.08 0.00
ACEITE Y FILTROS GLN 0.00 0.00 0.08 0.00
GRASA KG 0.00 0.00 0.08 0.00
GASOLINA GLN 0.00 0.00 0.08 0.00
TOT.CO
MB 0.67
EQUIPOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
MEZCLADORA 9-
11P3 H-M 1.00 15.00 0.08 1.20
Regla De Madera H-M 1.00 2.80 0.08 0.22
H-M 0.08 0.00
H-M 0.08 0.00
TOT.
EQUIP 1.42
VARIOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
0.0800 0.00
0.0800 0.00
0.0800 0.00
ALUMNO: BERMEO QUIROZ AURELIO COD:2011171261
TOTAL
VAR 0.00
TOTAL
P.U. 26.11
PROYECTO: EXAMEN PARCIAL
PISO CERAMICO
PRECIO UNITARIO: 20X20
RENDIMIENTO EN
8 HRS: 20 M2/8HRS
APORTE: 0.4000 HRS/M2
MANO DE OBRA UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
ESPECIALISTA H-H 0.00 0.00 0.40 0.00
CAPATAZ H-H 0.10 20.79 0.40 0.83
OPERARIO H-H 1.00 18.08 0.40 7.23
OFICIAL H-H 0.00 14.81 0.40 0.00
PEON H-H 1.00 13.62 0.40 5.45
TOTAL
MO 13.51
SUBTOT
MATERIALES UNIDAD CANTIDAD COSTO AL
SEGURIDAD 10% MO 0.10 13.51 1.35
Cemento BLS 0.19 14.12 2.64
MATERIAL 2 M3 0.00 0.00 0.00
MATERIAL 3 P2 0.00 0.00 0.00
MATERIAL 4 M3 0.00 0.00 0.00
Agua M3 0.03 1.83 0.05
MATERIAL 6 M3 0.00 0.00 0.00
MATERIAL 7 UND 0.00 0.00 0.00
MATERIAL 8 KG 0.00 0.00 0.00
Arena Fina M3 0.03 38.14 1.03
Ceramica M2 1.05 17.50 18.38
MATERIAL 11 KG 0.00 0.00 0.00
TOTAL
MAT 23.45
COMB. Y LUB. UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
GASOLINA GLN 0.00 0.00 0.40 0.00
PETROLEO GLN 0.00 0.00 0.40 0.00
ACEITE Y FILTROS GLN 0.00 0.00 0.40 0.00
GRASA KG 0.00 0.00 0.40 0.00
GASOLINA GLN 0.00 0.00 0.40 0.00
TOT.
COMB 0.00
EQUIPOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
H-M 0.00 0.00 0.40 0.00
H-M 0.40 0.00
H-M 0.40 0.00
H-M 0.40 0.00
TOT.
EQUIP 0.00

ALUMNO: BERMEO QUIROZ AURELIO COD:2011171261


VARIOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
1.0000 0.00
1.0000 0.00
1.0000 0.00
TOTAL
VAR 0.00
TOTAL
P.U. 36.96
PROYECTO: EXAMEN PARCIAL
PISO CEMENTO PULIDO Y
PRECIO UNITARIO: BRUADO
RENDIMIENTO EN
8 HRS: 100 M2/8HRS
APORTE: 0.0800 HRS/M2
MANO DE OBRA UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
ESPECIALISTA (Op. De Eq.
Liv.) H-H 1.00 23.91 0.08 1.91
CAPATAZ H-H 0.40 20.79 0.08 0.67
OPERARIO H-H 4.00 18.08 0.08 5.79
OFICIAL H-H 0.00 14.81 0.08 0.00
PEON H-H 8.00 13.62 0.08 8.72
TOTAL
MO 17.08
SUBTOT
MATERIALES UNIDAD CANTIDAD COSTO AL
SEGURIDAD 10% MO 0.10 17.08 1.71
Cemento BLS 0.45 14.12 6.35
Arena Gruesa M3 0.021 38.14 0.80
Piedra Chancada M3 0.027 31.50 0.85
MATERIAL 4 M3 0.00 0.00 0.00
Agua M3 0.03 2.00 0.06
MATERIAL 6 M3 0.00 0.00 0.00
MATERIAL 7 UND 0.00 0.00 0.00
MATERIAL 8 KG 0.00 0.00 0.00
Arena Fina M3 0.06 38.14 2.33
MATERIAL 10 P2 0.00 0.00 0.00
MATERIAL 11 M3 0.00 0.00 0.00
TOTAL
MAT 12.10
COMB. Y LUB. UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
GASOLINA GLN 1.00 8.40 0.08 0.67
PETROLEO GLN 0.00 0.00 0.08 0.00
ACEITE Y FILTROS GLN 0.00 0.00 0.08 0.00
GRASA KG 0.00 0.00 0.08 0.00
GASOLINA GLN 0.00 0.00 0.08 0.00
TOT.
COMB 0.67
EQUIPOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
MEZCLADORA 9-
11P3 H-M 1.00 15.00 0.08 1.20
ALUMNO: BERMEO QUIROZ AURELIO COD:2011171261
Regla De Madera H-M 1.00 2.80 0.08 0.22
H-M 0.08 0.00
H-M 0.08 0.00
TOT.
EQUIP 1.42
VARIOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
0.0800 0.00
0.0800 0.00
0.0800 0.00
TOTAL
VAR 0.00
TOTAL
P.U. 31.28
PROYECTO: EXAMEN PARCIAL
PRECIO UNITARIO: CONTRAZOCALO CEMENTO SIN COLOREAR H=20 cm PULIDO
RENDIMIENTO EN
8 HRS: 25 ML/8HRS
APORTE: 0.3200 HRS/ML
MANO DE OBRA UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
ESPECIALISTA H-H 0.00 0.00 0.32 0.00
CAPATAZ H-H 0.10 20.79 0.32 0.67
OPERARIO H-H 1.00 18.08 0.32 5.79
OFICIAL H-H 0.00 14.81 0.32 0.00
PEON H-H 2.00 13.62 0.32 8.72
TOTAL
MO 15.17
SUBTOT
MATERIALES UNIDAD CANTIDAD COSTO AL
SEGURIDAD 10% MO 0.10 15.17 1.52
Cemento BLS 0.03 14.12 0.42
MATERIAL 2 M3 0.00 0.00 0.00
MATERIAL 3 M3 1.00 0.00 0.00
MATERIAL 4 M3 2.00 0.00 0.00
Agua M3 0.03 1.83 0.05
MATERIAL 6 M3 0.00 0.00 0.00
MATERIAL 7 UND 0.00 0.00 0.00
MATERIAL 8 KG 0.00 0.00 0.00
Arena Fina M3 0.04 38.14 1.53
MATERIAL 10 P2 0.00 0.00 0.00
MATERIAL 11 M3 0.00 0.00 0.00
TOTAL
MAT 3.52
COMB. Y LUB. UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
GASOLINA GLN 1.00 8.40 0.32 2.69
PETROLEO GLN 0.00 0.00 0.32 0.00
ACEITE Y FILTROS GLN 0.00 0.00 0.32 0.00
GRASA KG 0.00 0.00 0.32 0.00
GASOLINA GLN 0.00 0.00 0.32 0.00
TOT.CO 2.69
ALUMNO: BERMEO QUIROZ AURELIO COD:2011171261
MB
EQUIPOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
MEZCLADORA 9-
11P3 H-M 1.00 15.00 0.32 4.80
H-M 0.32 0.00
H-M 0.32 0.00
H-M 0.32 0.00
TOT.
EQUIP 4.80
VARIOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
0.3200 0.00
0.3200 0.00
0.3200 0.00
TOTAL
VAR 0.00
TOTAL
P.U. 26.18
PROYECTO: EXAMEN PARCIAL
PRECIO UNITARIO: ZOCALO DE CERAMICO 20X20
RENDIMIENTO EN
8 HRS: 7.0 M2/8HRS
APORTE: 1.1429 HRS/M2
MANO DE OBRA UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
ESPECIALISTA H-H 0.00 0.00 1.14 0.00
CAPATAZ H-H 0.10 20.79 1.14 2.38
OPERARIO H-H 1.00 18.08 1.14 20.66
OFICIAL H-H 0.00 14.81 1.14 0.00
PEON H-H 1.00 13.62 1.14 15.57
TOTAL
MO 38.60
SUBTOT
MATERIALES UNIDAD CANTIDAD COSTO AL
SEGURIDAD 10% MO 0.10 38.60 3.86
Cemento BLS 0.187 14.12 2.64
MATERIAL 2 M3 0.00 0.00 0.00
MATERIAL 3 M3 1.00 0.00 0.00
MATERIAL 4 M3 2.00 0.00 0.00
Agua M3 0.03 1.83 0.05
MATERIAL 6 M3 0.00 0.00 0.00
MATERIAL 7 UND 0.00 0.00 0.00
MATERIAL 8 KG 0.00 0.00 0.00
Arena Fina M3 0.02 38.14 0.92
Ceramica M2 1.05 17.50 18.38
MATERIAL 11 KG 0.00 0.00 0.00
TOTAL
MAT 25.85
COMB. Y LUB. UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
GASOLINA GLN 0.00 0.00 1.14 0.00
PETROLEO GLN 0.00 0.00 1.14 0.00
ALUMNO: BERMEO QUIROZ AURELIO COD:2011171261
ACEITE Y FILTROS GLN 0.00 0.00 1.14 0.00
GRASA KG 0.00 0.00 1.14 0.00
GASOLINA GLN 0.00 0.00 1.14 0.00
TOT.
COMB 0.00
EQUIPOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
H-M 0.00 0.00 1.14 0.00
H-M 1.14 0.00
H-M 1.14 0.00
H-M 1.14 0.00
TOT.
EQUIP 0.00
VARIOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
1.0000 0.00
1.0000 0.00
1.0000 0.00
TOTAL
VAR 0.00
TOTAL
P.U. 64.45
PROYECTO: EXAMEN PARCIAL
PRECIO UNITARIO: ZOCALO DE CEMENTO SIMPLE MEZCLA CEMENTO ARENA
RENDIMIENTO EN
8 HRS: 16 M2/8HRS
APORTE: 0.5000 HRS/M2
MANO DE OBRA UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
ESPECIALISTA H-H 0.00 0.00 0.50 0.00
CAPATAZ H-H 0.10 20.79 0.50 1.04
OPERARIO H-H 1.00 18.08 0.50 9.04
OFICIAL H-H 0.00 14.81 0.50 0.00
PEON H-H 1.00 13.62 0.50 6.81
TOTAL
MO 16.89
SUBTOT
MATERIALES UNIDAD CANTIDAD COSTO AL
SEGURIDAD 10% MO 0.10 16.89 1.69
Cemento BLS 0.20 14.12 2.82
MATERIAL 2 M3 0.00 0.00 0.00
MATERIAL 3 M3 0.00 0.00 0.00
MATERIAL 4 M3 0.00 0.00 0.00
Agua M3 0.03 1.83 0.05
MATERIAL 6 M3 0.00 0.00 0.00
MATERIAL 7 UND 0.00 0.00 0.00
Clavo KG 0.08 3.62 0.29
Arena Fina M3 0.03 38.14 1.11
MATERIAL 10 P2 0.00 0.00 0.00
MATERIAL 11 M3 0.00 0.00 0.00
TOTAL
MAT 5.96
ALUMNO: BERMEO QUIROZ AURELIO COD:2011171261
COMB. Y LUB. UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
GASOLINA GLN 0.00 0.00 0.50 0.00
PETROLEO GLN 0.00 0.00 0.50 0.00
ACEITE Y FILTROS GLN 0.00 0.00 0.50 0.00
GRASA KG 0.00 0.00 0.50 0.00
GASOLINA GLN 0.00 0.00 0.50 0.00
TOT.
COMB 0.00
EQUIPOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
Regla De Madera H-M 1.00 2.80 0.50 1.40
H-M 0.50 0.00
H-M 0.50 0.00
H-M 0.50 0.00
TOT.
EQUIP 1.40
VARIOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
0.5000 0.00
0.5000 0.00
0.5000 0.00
TOTAL
VAR 0.00
TOTAL
P.U. 24.25
ACEROS DE REFUERZO
PROYECTO: EXAMEN PARCIAL
PRECIO ACERO EN SOBRECIMIENTO REFORZADO
UNITARIO: GRADO 60
RENDIMIENTO EN KG/8HR
8 HRS: 240 S
APORTE: 0.0333 HRS/KG
CANTID
MANO DE OBRA UNIDAD AD COSTO APORTE SUBTOTAL
ESPECIALISTA H-H 0.00 0.00 0.03 0.00
CAPATAZ H-H 0.10 20.79 0.03 0.07
OPERARIO H-H 1.00 18.08 0.03 0.60
OFICIAL H-H 0.00 14.81 0.03 0.00
PEON H-H 1.00 13.62 0.03 0.45
TOTAL
MO 1.13
CANTID SUBTOT
MATERIALES UNIDAD AD COSTO AL
SEGURIDAD 10% MO 0.10 1.13 0.11
Fierro Corrugardo KG 1.05 2.49 2.61
Alambre Negro
N16 KG 0.04 3.09 0.12
MATERIAL 3 P2 0.00 0.00 0.00
MATERIAL 4 M3 0.00 0.00 0.00
MATERIAL 5 M3 0.00 0.00 0.00
MATERIAL 6 M3 0.00 0.00 0.00

ALUMNO: BERMEO QUIROZ AURELIO COD:2011171261


MATERIAL 7 M3 0.00 0.00 0.00
MATERIAL 8 M3 0.00 0.00 0.00
MATERIAL 9 M3 0.00 0.00 0.00
MATERIAL 10 M3 0.00 0.00 0.00
MATERIAL 11 M3 0.00 0.00 0.00
TOTAL
MAT 2.85
CANTID
COMB. Y LUB. UNIDAD AD COSTO APORTE SUBTOTAL
GASOLINA GLN 0.00 0.00 0.03 0.00
PETROLEO GLN 0.00 0.00 0.03 0.00
ACEITE Y FILTROS GLN 0.00 0.00 0.03 0.00
GRASA KG 0.00 0.00 0.03 0.00
GASOLINA GLN 0.00 0.00 0.03 0.00
TOT.
COMB 0.00
CANTID
EQUIPOS UNIDAD AD COSTO APORTE SUBTOTAL
CIZALLA
ELECTRICA H-M 1.00 1.55 0.03 0.05
H-M 0.03 0.00
H-M 0.03 0.00
H-M 0.03 0.00
TOT.
EQUIP 0.05
CANTID
VARIOS UNIDAD AD COSTO APORTE SUBTOTAL
0.0333 0.00
0.0333 0.00
0.0333 0.00
TOTAL
VAR 0.00
TOTAL
P.U. 4.03
PROYECT
O: EXAMEN PARCIAL
ACERO GRADO 60 EN MUROS -TABIQUEZ Y
PRECIO UNITARIO: PLACAS
RENDIMIENTO EN 8
HRS: 200 KG/8HRS
APORTE: 0.0400 HRS/KG
MANO DE OBRA UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
ESPECIALISTA H-H 0.00 0.00 0.04 0.00
CAPATAZ H-H 0.10 20.79 0.04 0.08
OPERARIO H-H 1.00 18.08 0.04 0.72
OFICIAL H-H 0.00 14.81 0.04 0.00
PEON H-H 1.00 13.62 0.04 0.54
TOTAL
MO 1.35
MATERIA SUBTOT
LES UNIDAD CANTIDAD COSTO AL

ALUMNO: BERMEO QUIROZ AURELIO COD:2011171261


SEGURIDA
D 10% MO 0.10 1.35 0.14
Fierro Corrugardo KG 1.07 2.49 2.66
Alambre Negro N16 KG 0.04 3.09 0.12
MATERIAL
3 P2 0.00 0.00 0.00
MATERIAL
4 M3 0.00 0.00 0.00
MATERIAL
5 M3 0.00 0.00 0.00
MATERIAL
6 M3 0.00 0.00 0.00
MATERIAL
7 M3 0.00 0.00 0.00
MATERIAL
8 M3 0.00 0.00 0.00
MATERIAL
9 M3 0.00 0.00 0.00
MATERIAL
10 M3 0.00 0.00 0.00
MATERIAL
11 M3 0.00 0.00 0.00
TOTAL
MAT 2.92
COMB. Y LUB. UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
GASOLINA GLN 0.00 0.00 0.04 0.00
PETROLE
O GLN 0.00 0.00 0.04 0.00
ACEITE Y FILTROS GLN 0.00 0.00 0.04 0.00
GRASA KG 0.00 0.00 0.04 0.00
GASOLINA GLN 0.00 0.00 0.04 0.00
TOT.
COMB 0.00
EQUIPOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
CIZALLA
ELECTRICA H-M 1.00 1.55 0.04 0.06
H-M 0.04 0.00
H-M 0.04 0.00
H-M 0.04 0.00
TOT.
EQUIP 0.06
VARIOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
0.0400 0.00
0.0400 0.00
0.0400 0.00
TOTAL
VAR 0.00
TOTAL
P.U. 4.34
PROYECT
O: EXAMEN PARCIAL
PRECIO UNITARIO: ACERO GRADO 60 EN VIGAS
RENDIMIENTO EN 8
HRS: 260 KG/8HRS
ALUMNO: BERMEO QUIROZ AURELIO COD:2011171261
APORTE: 0.0308 HRS/KG
COST
MANO DE OBRA UNIDAD CANTIDAD O APORTE SUBTOTAL
ESPECIALISTA H-H 0.00 0.03 0.00
CAPATAZ H-H 0.10 20.79 0.03 0.06
OPERARIO H-H 0.00 18.08 0.03 0.00
OFICIAL H-H 1.00 14.81 0.03 0.46
PEON H-H 1.00 13.62 0.03 0.42
TOTAL
MO 0.94
MATERIA COST SUBTOT
LES UNIDAD CANTIDAD O AL
SEGURIDA
D 10% MO 0.10 0.94 0.09
Fierro Corrugardo KG 1.07 2.49 2.66
Alambre Negro N16 KG 0.04 3.09 0.12
MATERIAL
3 P2 0.00 0.00 0.00
MATERIAL
4 M3 0.00 0.00 0.00
MATERIAL
5 M3 0.00 0.00 0.00
MATERIAL
6 M3 0.00 0.00 0.00
MATERIAL
7 M3 0.00 0.00 0.00
MATERIAL
8 M3 0.00 0.00 0.00
MATERIAL
9 M3 0.00 0.00 0.00
MATERIAL
10 M3 0.00 0.00 0.00
MATERIAL
11 M3 0.00 0.00 0.00
TOTAL
MAT 2.88
COST
COMB. Y LUB. UNIDAD CANTIDAD O APORTE SUBTOTAL
GASOLINA GLN 0.00 0.00 0.03 0.00
PETROLE
O GLN 0.00 0.00 0.03 0.00
ACEITE Y FILTROS GLN 0.00 0.00 0.03 0.00
GRASA KG 0.00 0.00 0.03 0.00
GASOLINA GLN 0.00 0.00 0.03 0.00
TOT.CO
MB 0.00
COST
EQUIPOS UNIDAD CANTIDAD O APORTE SUBTOTAL
CIZALLA
ELECTRICA H-M 1.00 1.55 0.03 0.05
H-M 0.03 0.00
H-M 0.03 0.00
H-M 0.03 0.00
TOT. 0.05
ALUMNO: BERMEO QUIROZ AURELIO COD:2011171261
EQUIP
COST
VARIOS UNIDAD CANTIDAD O APORTE SUBTOTAL
0.0308 0.00
0.0308 0.00
0.0308 0.00
TOTAL
VAR 0.00
TOTAL
P.U. 3.87

PROYECT
O: EXAMEN PARCIAL
ACERO GRADO 60 EN LOSAS
PRECIO UNITARIO: ALIGERADAS
RENDIMIENTO EN 8
HRS: 240 KG/8HRS
APORTE: 0.0333 HRS/KG
COST
MANO DE OBRA UNIDAD CANTIDAD O APORTE SUBTOTAL
ESPECIALISTA H-H 0.00 0.00 0.03 0.00
CAPATAZ H-H 0.10 20.79 0.03 0.07
OPERARIO H-H 1.00 18.08 0.03 0.60
OFICIAL H-H 0.00 14.81 0.03 0.00
PEON H-H 1.00 13.62 0.03 0.45
TOTAL
MO 1.13
MATERIA COST SUBTOT
LES UNIDAD CANTIDAD O AL
SEGURIDA
D 10% MO 0.10 1.13 0.11
Fierro Corrugardo KG 1.07 2.49 2.66
Alambre Negro N16 KG 0.04 3.09 0.12
MATERIAL
3 P2 0.00 0.00 0.00
MATERIAL
4 M3 0.00 0.00 0.00
MATERIAL
5 M3 0.00 0.00 0.00
MATERIAL
6 M3 0.00 0.00 0.00
MATERIAL
7 M3 0.00 0.00 0.00
MATERIAL
8 M3 0.00 0.00 0.00
MATERIAL
9 M3 0.00 0.00 0.00
MATERIAL
10 M3 0.00 0.00 0.00
MATERIAL
11 M3 0.00 0.00 0.00
TOTAL
MAT 2.90
COMB. Y LUB. UNIDAD CANTIDAD COST APORTE SUBTOTAL
ALUMNO: BERMEO QUIROZ AURELIO COD:2011171261
O
GASOLINA GLN 0.00 0.00 0.03 0.00
PETROLE
O GLN 0.00 0.00 0.03 0.00
ACEITE Y FILTROS GLN 0.00 0.00 0.03 0.00
GRASA KG 0.00 0.00 0.03 0.00
GASOLINA GLN 0.00 0.00 0.03 0.00
TOT.
COMB 0.00
COST
EQUIPOS UNIDAD CANTIDAD O APORTE SUBTOTAL
CIZALLA
ELECTRICA H-M 1.00 1.55 0.03 0.05
H-M 0.03 0.00
H-M 0.03 0.00
H-M 0.03 0.00
TOT.
EQUIP 0.05
COST
VARIOS UNIDAD CANTIDAD O APORTE SUBTOTAL
0.0333 0.00
0.0333 0.00
0.0333 0.00
TOTAL
VAR 0.00
TOTAL
P.U. 4.08

PROYECTO
: EXAMEN PARCIAL
ACERO GRADO 60 EN LOSAS
PRECIO UNITARIO: MACIZAS
RENDIMIENTO EN 8
HRS: 240 KG/8HRS
APORTE: 0.0333 HRS/KG
MANO DE OBRA UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
ESPECIALISTA H-H 0.00 0.00 0.03 0.00
CAPATAZ H-H 0.10 20.79 0.03 0.07
OPERARIO H-H 1.00 18.08 0.03 0.60
OFICIAL H-H 0.00 14.81 0.03 0.00
PEON H-H 1.00 13.62 0.03 0.45
TOTAL
MO 1.13
MATERIAL SUBTOT
ES UNIDAD CANTIDAD COSTO AL
SEGURIDAD 10% MO 0.10 1.13 0.11
Fierro Corrugardo KG 1.07 2.49 2.66
Alambre Negro N16 KG 0.04 3.09 0.12
MATERIAL 3 P2 0.00 0.00 0.00
MATERIAL 4 M3 0.00 0.00 0.00

ALUMNO: BERMEO QUIROZ AURELIO COD:2011171261


MATERIAL 5 M3 0.00 0.00 0.00
MATERIAL 6 M3 0.00 0.00 0.00
MATERIAL 7 M3 0.00 0.00 0.00
MATERIAL 8 M3 0.00 0.00 0.00
MATERIAL 9 M3 0.00 0.00 0.00
MATERIAL1
0 M3 0.00 0.00 0.00
MATERIAL1
1 M3 0.00 0.00 0.00
TOTAL
MAT 2.90
COMB. Y LUB. UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
GASOLINA GLN 0.00 0.00 0.03 0.00
PETROLEO GLN 0.00 0.00 0.03 0.00
ACEITE Y FILTROS GLN 0.00 0.00 0.03 0.00
GRASA KG 0.00 0.00 0.03 0.00
GASOLINA GLN 0.00 0.00 0.03 0.00
TOT.
COMB 0.00
EQUIPOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
CIZALLA ELECTRICA H-M 1.00 1.55 0.03 0.05
H-M 0.03 0.00
H-M 0.03 0.00
H-M 0.03 0.00
TOT.
EQUIP 0.05
VARIOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
0.0333 0.00
0.0333 0.00
0.0333 0.00
TOTAL
VAR 0.00
TOTAL
P.U. 4.08
PROYECT
O: EXAMEN PARCIAL
ACERO EN MURO DE ALBAILERIA
PRECIO UNITARIO: ARMADA
RENDIMIENTO EN 8
HRS: 200 KG/8HRS
APORTE: 0.0400 HRS/KG
COST
MANO DE OBRA UNIDAD CANTIDAD O APORTE SUBTOTAL
ESPECIALISTA H-H 0.00 0.00 0.04 0.00
CAPATAZ H-H 0.10 20.79 0.04 0.08
OPERARIO H-H 1.00 18.08 0.04 0.72
OFICIAL H-H 0.00 14.81 0.04 0.00
PEON H-H 1.00 13.62 0.04 0.54
TOTAL
MO 1.35
MATERIAL UNIDAD CANTIDAD COST SUBTOT
ALUMNO: BERMEO QUIROZ AURELIO COD:2011171261
ES O AL
SEGURIDA
D 10% MO 0.10 1.35 0.14
Fierro Corrugardo KG 1.07 2.49 2.66
Alambre Negro N16 KG 0.04 3.09 0.12
MATERIAL
3 P2 0.00 0.00 0.00
MATERIAL
4 M3 0.00 0.00 0.00
MATERIAL
5 M3 0.00 0.00 0.00
MATERIAL
6 M3 0.00 0.00 0.00
MATERIAL
7 M3 0.00 0.00 0.00
MATERIAL
8 M3 0.00 0.00 0.00
MATERIAL
9 M3 0.00 0.00 0.00
MATERIAL1
0 M3 0.00 0.00 0.00
MATERIAL1
1 M3 0.00 0.00 0.00
TOTAL
MAT 2.92
COST
COMB. Y LUB. UNIDAD CANTIDAD O APORTE SUBTOTAL
GASOLINA GLN 0.00 0.00 0.04 0.00
PETROLEO GLN 0.00 0.00 0.04 0.00
ACEITE Y FILTROS GLN 0.00 0.00 0.04 0.00
GRASA KG 0.00 0.00 0.04 0.00
GASOLINA GLN 0.00 0.00 0.04 0.00
TOT.
COMB 0.00
COST
EQUIPOS UNIDAD CANTIDAD O APORTE SUBTOTAL
CIZALLA ELECTRICA H-M 1.00 1.55 0.04 0.06
H-M 0.04 0.00
H-M 0.04 0.00
H-M 0.04 0.00
TOT.
EQUIP 0.06
COST
VARIOS UNIDAD CANTIDAD O APORTE SUBTOTAL
0.0400 0.00
0.0400 0.00
0.0400 0.00
TOTAL
VAR 0.00
TOTAL
P.U. 4.34

ENCOFRADOS -
DESENCOFRADOS
ALUMNO: BERMEO QUIROZ AURELIO COD:2011171261
PROYECTO: EXAMEN PARCIAL
PRECIO UNITARIO: ENCOFRADO Y DESENCOFRADO NORMAL PARA SOBRECIMIENTO
RENDIMIENTO EN M2/8HR
8 HRS: 22 S
APORTE: 0.3636 HRS/M2
CANTID
MANO DE OBRA UNIDAD AD COSTO APORTE SUBTOTAL
ESPECIALISTA H-H 0.00 0.00 0.36 0.00
CAPATAZ H-H 0.10 20.79 0.36 0.76
OPERARIO H-H 1.00 18.08 0.36 6.57
OFICIAL H-H 0.00 14.81 0.36 0.00
PEON H-H 1.00 13.62 0.36 4.95
TOTAL
MO 12.28
CANTID SUBTOT
MATERIALES UNIDAD AD COSTO AL
SEGURIDAD 10% MO 0.10 12.28 1.23
Madera Tornillo P2 2.80 3.00 8.40
Alambre Negro N
8 KG 0.20 4.66 0.93
Clavos Para
Madera KG 0.10 4.66 0.47
MATERIAL 4 M3 0.00 0.00 0.00
MATERIAL 5 M3 0.00 0.00 0.00
MATERIAL 6 M3 0.00 0.00 0.00
MATERIAL 7 M3 0.00 0.00 0.00
MATERIAL 8 M3 0.00 0.00 0.00
MATERIAL 9 M3 0.00 0.00 0.00
MATERIAL 10 M3 0.00 0.00 0.00
MATERIAL 11 M3 0.00 0.00 0.00
TOTAL
MAT 11.03
CANTID
COMB. Y LUB. UNIDAD AD COSTO APORTE SUBTOTAL
GASOLINA GLN 0.00 0.00 0.36 0.00
PETROLEO GLN 0.00 0.00 0.36 0.00
ACEITE Y FILTROS GLN 0.00 0.00 0.36 0.00
GRASA KG 0.00 0.00 0.36 0.00
GASOLINA GLN 0.00 0.00 0.36 0.00
TOT.
COMB 0.00
CANTID
EQUIPOS UNIDAD AD COSTO APORTE SUBTOTAL
H-M 0.00 0.00 0.36 0.00
H-M 0.36 0.00
H-M 0.36 0.00
H-M 0.36 0.00
TOT.
EQUIP 0.00
VARIOS UNIDAD CANTID COSTO APORTE SUBTOTAL
ALUMNO: BERMEO QUIROZ AURELIO COD:2011171261
AD
0.3636 0.00
0.3636 0.00
0.3636 0.00
TOTAL
VAR 0.00
TOTAL
P.U. 23.31
PROYECT
O: EXAMEN PARCIAL
ENCOFRADO Y DESENCOFRADO NORMAL EN MUROS TABIQUES Y
PRECIO UNITARIO: PLACAS
RENDIMIENTO EN 8
HRS: 14 M2/8HRS
APORTE: 0.5714 HRS/M2
MANO DE OBRA UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
ESPECIALISTA H-H 0.00 0.00 0.57 0.00
CAPATAZ H-H 0.10 20.79 0.57 1.19
OPERARIO H-H 1.00 18.08 0.57 10.33
OFICIAL H-H 0.00 14.81 0.57 0.00
PEON H-H 1.00 13.62 0.57 7.78
TOTAL
MO 19.30
MATERIA SUBTOTA
LES UNIDAD CANTIDAD COSTO L
SEGURIDA
D 10% MO 0.10 19.30 1.93
Madera Tornillo P2 3.80 3.00 11.40
Alambre Negro N
8 KG 0.08 4.66 0.37
Clavos Para
Madera KG 0.27 4.66 1.26
MATERIAL
4 M3 0.00 0.00 0.00
MATERIAL
5 M3 0.00 0.00 0.00
MATERIAL
6 M3 0.00 0.00 0.00
MATERIAL
7 M3 0.00 0.00 0.00
MATERIAL
8 M3 0.00 0.00 0.00
MATERIAL
9 M3 0.00 0.00 0.00
MATERIAL
10 M3 0.00 0.00 0.00
MATERIAL
11 M3 0.00 0.00 0.00
TOTAL
MAT 14.96
COMB. Y LUB. UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
GASOLINA GLN 0.00 0.00 0.57 0.00
PETROLE
O GLN 0.00 0.00 0.57 0.00

ALUMNO: BERMEO QUIROZ AURELIO COD:2011171261


ACEITE Y FILTROS GLN 0.00 0.00 0.57 0.00
GRASA KG 0.00 0.00 0.57 0.00
GASOLINA GLN 0.00 0.00 0.57 0.00
TOT.
COMB 0.00
EQUIPOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
H-M 0.00 0.00 0.57 0.00
H-M 0.57 0.00
H-M 0.57 0.00
H-M 0.57 0.00
TOT.
EQUIP 0.00
VARIOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
0.5714 0.00
0.5714 0.00
0.5714 0.00
TOTAL
VAR 0.00
TOTAL
P.U. 34.26
PROYECT
O: EXAMEN PARCIAL
ENCOFRADO Y DESENCOFRADO NORMAL
PRECIO UNITARIO: EN VIGAS
RENDIMIENTO EN 8
HRS: 14 M2/8HRS
APORTE: 0.5714 HRS/M2
COST
MANO DE OBRA UNIDAD CANTIDAD O APORTE SUBTOTAL
ESPECIALISTA H-H 0.00 0.00 0.57 0.00
CAPATAZ H-H 0.10 20.79 0.57 1.19
OPERARIO H-H 1.00 18.08 0.57 10.33
OFICIAL H-H 0.00 14.81 0.57 0.00
PEON H-H 1.00 13.62 0.57 7.78
TOTAL
MO 19.30
MATERIA COST SUBTOT
LES UNIDAD CANTIDAD O AL
SEGURIDA
D 10% MO 0.10 19.30 1.93
Madera Tornillo P2 4.60 3.00 13.80
Alambre Negro N
8 KG 0.30 4.66 1.40
Clavos Para
Madera KG 0.15 4.66 0.70
MATERIAL
4 M3 0.00 0.00 0.00
MATERIAL
5 M3 0.00 0.00 0.00
MATERIAL
6 M3 0.00 0.00 0.00
MATERIAL
7 M3 0.00 0.00 0.00
ALUMNO: BERMEO QUIROZ AURELIO COD:2011171261
MATERIAL
8 M3 0.00 0.00 0.00
MATERIAL
9 M3 0.00 0.00 0.00
MATERIAL
10 M3 0.00 0.00 0.00
MATERIAL
11 M3 0.00 0.00 0.00
TOTAL
MAT 17.83
COST
COMB. Y LUB. UNIDAD CANTIDAD O APORTE SUBTOTAL
GASOLINA GLN 0.00 0.00 0.57 0.00
PETROLE
O GLN 0.00 0.00 0.57 0.00
ACEITE Y FILTROS GLN 0.00 0.00 0.57 0.00
GRASA KG 0.00 0.00 0.57 0.00
GASOLINA GLN 0.00 0.00 0.57 0.00
TOT.
COMB 0.00
COST
EQUIPOS UNIDAD CANTIDAD O APORTE SUBTOTAL
H-M 0.00 0.00 0.57 0.00
H-M 0.57 0.00
H-M 0.57 0.00
H-M 0.57 0.00
TOT.
EQUIP 0.00
COST
VARIOS UNIDAD CANTIDAD O APORTE SUBTOTAL
0.5714 0.00
0.5714 0.00
0.5714 0.00
TOTAL
VAR 0.00
TOTAL
P.U. 37.13

PROYECT
O: EXAMEN PARCIAL
ENCOFRADO Y DESENCOFRADO EN LOSA
PRECIO UNITARIO: ALIGERADA
RENDIMIENTO EN 8
HRS: 22 M2/8HRS
APORTE: 0.3636 HRS/M2
COST
MANO DE OBRA UNIDAD CANTIDAD O APORTE SUBTOTAL
ESPECIALISTA H-H 0.00 0.00 0.36 0.00
CAPATAZ H-H 0.10 20.79 0.36 0.76
OPERARIO H-H 1.00 18.08 0.36 6.57
OFICIAL H-H 0.00 14.81 0.36 0.00
PEON H-H 1.00 13.62 0.36 4.95

ALUMNO: BERMEO QUIROZ AURELIO COD:2011171261


TOTAL MO 12.28
MATERIA COST
LES UNIDAD CANTIDAD O SUBTOTAL
SEGURIDA
D 10% MO 0.10 12.28 1.23
Madera Tornillo P2 3.10 3.00 9.30
Alambre Negro N
8 KG 0.10 4.66 0.47
Clavos Para
Madera KG 0.10 4.66 0.47
MATERIAL
4 M3 0.00 0.00 0.00
MATERIAL
5 M3 0.00 0.00 0.00
MATERIAL
6 M3 0.00 0.00 0.00
MATERIAL
7 M3 0.00 0.00 0.00
MATERIAL
8 M3 0.00 0.00 0.00
MATERIAL
9 M3 0.00 0.00 0.00
MATERIAL
10 M3 0.00 0.00 0.00
MATERIAL
11 M3 0.00 0.00 0.00
TOTAL MAT 11.46
COST
COMB. Y LUB. UNIDAD CANTIDAD O APORTE SUBTOTAL
GASOLINA GLN 0.00 0.00 0.36 0.00
PETROLE
O GLN 0.00 0.00 0.36 0.00
ACEITE Y FILTROS GLN 0.00 0.00 0.36 0.00
GRASA KG 0.00 0.00 0.36 0.00
GASOLINA GLN 0.00 0.00 0.36 0.00
TOTAL
COMB 0.00
COST
EQUIPOS UNIDAD CANTIDAD O APORTE SUBTOTAL
H-M 0.00 0.00 0.36 0.00
H-M 0.36 0.00
H-M 0.36 0.00
H-M 0.36 0.00
TOTAL
EQUIP 0.00
COST
VARIOS UNIDAD CANTIDAD O APORTE SUBTOTAL
0.3636 0.00
0.3636 0.00
0.3636 0.00
TOTAL VAR 0.00
TOTAL P.U. 23.74

ALUMNO: BERMEO QUIROZ AURELIO COD:2011171261


PROYECT
O: EXAMEN PARCIAL
ENCOFRADO Y DESENCOFRADO EN LOSA
PRECIO UNITARIO: MACIZA
RENDIMIENTO EN 8
HRS: 25 M2/8HRS
APORTE: 0.3200 HRS/M2
COST
MANO DE OBRA UNIDAD CANTIDAD O APORTE SUBTOTAL
ESPECIALISTA H-H 0.00 0.00 0.32 0.00
CAPATAZ H-H 0.10 20.79 0.32 0.67
OPERARIO H-H 1.00 18.08 0.32 5.79
OFICIAL H-H 0.00 14.81 0.32 0.00
PEON H-H 1.00 13.62 0.32 4.36
TOTAL
MO 10.81
MATERIA COST SUBTOT
LES UNIDAD CANTIDAD O AL
SEGURIDA
D 10% MO 0.10 10.81 1.08
Madera Tornillo P2 3.00 3.00 9.00
Alambre Negro N
8 KG 0.10 4.66 0.47
Clavos Para
Madera KG 0.14 4.66 0.65
MATERIAL
4 M3 0.00 0.00 0.00
MATERIAL
5 M3 0.00 0.00 0.00
MATERIAL
6 M3 0.00 0.00 0.00
MATERIAL
7 M3 0.00 0.00 0.00
MATERIAL
8 M3 0.00 0.00 0.00
MATERIAL
9 M3 0.00 0.00 0.00
MATERIAL
10 M3 0.00 0.00 0.00
MATERIAL
11 M3 0.00 0.00 0.00
TOTAL
MAT 11.20
COST
COMB. Y LUB. UNIDAD CANTIDAD O APORTE SUBTOTAL
GASOLINA GLN 0.00 0.00 0.32 0.00
PETROLE
O GLN 0.00 0.00 0.32 0.00
ACEITE Y FILTROS GLN 0.00 0.00 0.32 0.00
GRASA KG 0.00 0.00 0.32 0.00
GASOLINA GLN 0.00 0.00 0.32 0.00
TOT.
COMB 0.00
COST
EQUIPOS UNIDAD CANTIDAD O APORTE SUBTOTAL
ALUMNO: BERMEO QUIROZ AURELIO COD:2011171261
H-M 0.00 0.00 0.32 0.00
H-M 0.32 0.00
H-M 0.32 0.00
H-M 0.32 0.00
TOT.
EQUIP 0.00
COST
VARIOS UNIDAD CANTIDAD O APORTE SUBTOTAL
0.3200 0.00
0.3200 0.00
0.3200 0.00
TOTAL
VAR 0.00
TOTAL
P.U. 22.01

CARPINTERIA DE MADERA O
METALICA
PROYECTO: EXAMEN PARCIAL
PUERTA PRINCIPAL DE CEDRO DE 0.80 M DE
PRECIO UNITARIO: ANCHO
UND/8HR
RENDIMIENTO EN 8 HRS: 5.00 S
APORTE: 1.6000 HRS/UND
CANTID SUBTOT
MANO DE OBRA UNIDAD AD COSTO APORTE AL
ESPECIALISTA H-H 0.00 0.00 1.60 0.00
CAPATAZ H-H 0.20 20.79 1.60 6.65
OPERARIO H-H 1.00 18.08 1.60 28.93
OFICIAL H-H 0.00 14.81 1.60 0.00
PEON H-H 2.00 13.62 1.60 43.58
TOTAL
MO 79.16
CANTID SUBTOT
MATERIALES UNIDAD AD COSTO AL
10%
SEGURIDAD MO 0.10 79.16 7.92
Puerta de Cedro con marco de
0.80x2.10m UND. 1.00 980.00 980.00
Bisagras Tipo Capuchinas Aluminizada
4" X 4" UND. 4.00 12.00 48.00
Cerradura exterior puerta principal Acero
Inox. UND. 1.00 125.00 125.00
Puerta Contraplacada con marco de
0.65x2.10m UND. 0.00 0.00 0.00
Bisagras Tipo Capuchina Acero I. 3.5"
X 3.5" UND. 0.00 0.00 0.00
Cerradura Tipo perilla llave/ botn
Acero Inox. UND. 0.00 0.00 0.00
Puerta Contraplacada con marco de
1.80 x 1.80m UND. 0.00 0.00 0.00
Rieles para Puerta Corrediza UND. 0.00 0.00 0.00
Sistema DUCASSE para Puerta
Corrediza UND. 0.00 0.00 0.00

ALUMNO: BERMEO QUIROZ AURELIO COD:2011171261


Escalera Metalica 25 Pasos Incluye
Barandas UND. 0.00 0.00 0.00
Ventana Con Vidrio Doble Transparente
3mm incl. estructura aluminio 4 cm y
accesorios UND. 0.00 0.00 0.00
TOTAL
MAT 1160.92
CANTID SUBTOT
COMB. Y LUB. UNIDAD AD COSTO APORTE AL
GASOLINA GLN 0.00 0.00 1.60 0.00
PETROLEO GLN 0.00 0.00 1.60 0.00
ACEITE Y FILTROS GLN 0.00 0.00 1.60 0.00
GRASA KG 0.00 0.00 1.60 0.00
GASOLINA GLN 0.00 0.00 1.60 0.00
TOT.CO
MB 0.00
CANTID SUBTOT
EQUIPOS UNIDAD AD COSTO APORTE AL
TALADRO DE MANO H-M 1.00 6.50 1.60 10.40
H-M 1.60 0.00
H-M 1.60 0.00
H-M 1.60 0.00
TOT.EQ
UIP 10.40
CANTID SUBTOT
VARIOS UNIDAD AD COSTO APORTE AL
1.0000 0.00
1.0000 0.00
1.0000 0.00
TOTAL
VAR 0.00
TOTAL
P.U. 1250.48
PROYECTO: EXAMEN PARCIAL
PUERTA P0STERIOR CONTRAPLACADA DE 0.65 M DE
PRECIO UNITARIO: ANCHO
RENDIMIENTO EN 8 HRS: 5.00 UND/8HRS
APORTE: 1.6000 HRS/UND
UNIDA COST
MANO DE OBRA D CANTIDAD O APORTE SUBTOTAL
ESPECIALISTA H-H 0.00 0.00 1.60 0.00
CAPATAZ H-H 0.20 20.79 1.60 6.65
OPERARIO H-H 1.00 18.08 1.60 28.93
OFICIAL H-H 0.00 14.81 1.60 0.00
PEON H-H 1.00 13.62 1.60 21.79
TOTAL
MO 57.37
UNIDA COST SUBTOT
MATERIALES D CANTIDAD O AL
10%
SEGURIDAD MO 0.10 57.37 5.74
MATERIAL 1 UND. 0.00 0.00 0.00

ALUMNO: BERMEO QUIROZ AURELIO COD:2011171261


MATERIAL 2 UND. 0.00 0.00 0.00
MATERIAL 3 UND. 0.00 0.00 0.00
Puerta Contraplacada con marco de 260.0
0.65x2.10m UND. 1.00 0 260.00
Bisagras Tipo Capuchina Acero I.
3.5" X 3.5" UND. 3.00 8.43 25.29
Cerradura Tipo perilla llave/ botn
Acero Inox. UND. 1.00 56.00 56.00
MATERIAL 7 UND. 0.00 0.00 0.00
MATERIAL 8 UND. 0.00 0.00 0.00
MATERIAL 9 UND. 0.00 0.00 0.00
MATERIAL 10 UND. 0.00 0.00 0.00
MATERIAL 11 UND. 0.00 0.00 0.00
TOTAL
MAT 347.03
UNIDA COST
COMB. Y LUB. D CANTIDAD O APORTE SUBTOTAL
GASOLINA GLN 0.00 0.00 1.60 0.00
PETROLEO GLN 0.00 0.00 1.60 0.00
ACEITE Y FILTROS GLN 0.00 0.00 1.60 0.00
GRASA KG 0.00 0.00 1.60 0.00
GASOLINA GLN 0.00 0.00 1.60 0.00
TOT.
COMB 0.00
UNIDA COST
EQUIPOS D CANTIDAD O APORTE SUBTOTAL
TALADRO DE MANO H-M 1.00 6.50 1.60 10.40
H-M 1.60 0.00
H-M 1.60 0.00
H-M 1.60 0.00
TOT.EQU
IP 10.40
UNIDA COST
VARIOS D CANTIDAD O APORTE SUBTOTAL
1.0000 0.00
1.6000 0.00
1.6000 0.00
TOTAL
VAR 0.00
TOTAL
P.U. 414.80
PROYECTO: EXAMEN PARCIAL
PUERTA INTERIOR CONTRAPLACADA DE 0.65 M DE
PRECIO UNITARIO: ANCHO
RENDIMIENTO EN 8 HRS: 4.00 UND/8HRS
APORTE: 2.0000 HRS/UND
UNIDA COST
MANO DE OBRA D CANTIDAD O APORTE SUBTOTAL
ESPECIALISTA H-H 0.00 0.00 2.00 0.00
CAPATAZ H-H 0.20 20.79 2.00 8.32
OPERARIO H-H 1.00 18.08 2.00 36.16
ALUMNO: BERMEO QUIROZ AURELIO COD:2011171261
OFICIAL H-H 0.00 14.81 2.00 0.00
PEON H-H 1.00 13.62 2.00 27.24
TOTAL
MO 71.72
UNIDA COST SUBTOT
MATERIALES D CANTIDAD O AL
10%
SEGURIDAD MO 0.10 71.72 7.17
MATERIAL 1 UND. 0.00 0.00 0.00
MATERIAL 2 UND. 0.00 0.00 0.00
MATERIAL 3 UND. 0.00 0.00 0.00
Puerta Contraplacada con marco de 260.0
0.65x2.10m UND. 1.00 0 260.00
Bisagras Tipo Capuchina Acero I.
3.5" X 3.5" UND. 3.00 8.43 25.29
Cerradura Tipo perilla llave/ botn
Acero Inox. UND. 1.00 56.00 56.00
MATERIAL 7 UND. 0.00 0.00 0.00
MATERIAL 8 UND. 0.00 0.00 0.00
MATERIAL 9 UND. 0.00 0.00 0.00
MATERIAL 10 UND. 0.00 0.00 0.00
MATERIAL 11 UND. 0.00 0.00 0.00
TOTAL
MAT 348.46
UNIDA COST
COMB. Y LUB. D CANTIDAD O APORTE SUBTOTAL
GASOLINA GLN 0.00 0.00 2.00 0.00
PETROLEO GLN 0.00 0.00 2.00 0.00
ACEITE Y FILTROS GLN 0.00 0.00 2.00 0.00
GRASA KG 0.00 0.00 2.00 0.00
GASOLINA GLN 0.00 0.00 2.00 0.00
TOT.CO
MB 0.00
UNIDA COST
EQUIPOS D CANTIDAD O APORTE SUBTOTAL
TALADRO DE MANO H-M 1.00 6.50 2.00 13.00
H-M 2.00 0.00
H-M 2.00 0.00
H-M 2.00 0.00
TOT.
EQUIP 13.00
UNIDA COST
VARIOS D CANTIDAD O APORTE SUBTOTAL
1.0000 0.00
2.0000 0.00
2.0000 0.00
TOTAL
VAR 0.00
TOTAL
P.U. 433.18
PROYECTO: EXAMEN PARCIAL
ALUMNO: BERMEO QUIROZ AURELIO COD:2011171261
PUERTA CORREDIZA DE 180
PRECIO UNITARIO: X1.80 M
RENDIMIENTO EN 8 HRS: 4.00 UND/8HRS
APORTE: 2.0000 HRS/UND
UNIDA COST
MANO DE OBRA D CANTIDAD O APORTE SUBTOTAL
ESPECIALISTA H-H 0.00 0.00 2.00 0.00
CAPATAZ H-H 0.20 20.79 2.00 8.32
OPERARIO H-H 1.00 18.08 2.00 36.16
OFICIAL H-H 0.00 14.81 2.00 0.00
PEON H-H 1.00 13.62 2.00 27.24
TOTAL
MO 71.72
UNIDA COST SUBTOT
MATERIALES D CANTIDAD O AL
10%
SEGURIDAD MO 0.10 71.72 7.17
MATERIAL 1 UND. 0.00 0.00 0.00
MATERIAL 2 UND. 0.00 0.00 0.00
MATERIAL 3 UND. 0.00 0.00 0.00
MATERIAL 4 UND. 0.00 0.00 0.00
MATERIAL 5 UND. 0.00 0.00 0.00
MATERIAL 6 UND. 0.00 0.00 0.00
Puerta Contraplacada con marco de 145.0
1.80 x 1.80m UND. 1.00 8 145.08
Rieles para Puerta Corrediza UND. 1.00 44.90 44.90
Sistema DUCASSE para Puerta
Corrediza UND. 1.00 42.00 42.00
MATERIAL 10 UND. 0.00 0.00 0.00
MATERIAL 11 UND. 0.00 0.00 0.00
TOTAL
MAT 239.15
UNIDA COST
COMB. Y LUB. D CANTIDAD O APORTE SUBTOTAL
GASOLINA GLN 0.00 0.00 2.00 0.00
PETROLEO GLN 0.00 0.00 2.00 0.00
ACEITE Y FILTROS GLN 0.00 0.00 2.00 0.00
GRASA KG 0.00 0.00 2.00 0.00
GASOLINA GLN 0.00 0.00 2.00 0.00
TOT.
COMB 0.00
UNIDA COST
EQUIPOS D CANTIDAD O APORTE SUBTOTAL
TALADRO DE MANO H-M 1.00 6.50 2.00 13.00
H-M 2.00 0.00
H-M 2.00 0.00
H-M 2.00 0.00
TOT.
EQUIP 13.00
UNIDA COST
VARIOS D CANTIDAD O APORTE SUBTOTAL

ALUMNO: BERMEO QUIROZ AURELIO COD:2011171261


1.0000 0.00
2.0000 0.00
2.0000 0.00
TOTAL
VAR 0.00
TOTAL
P.U. 323.87
PROYECTO: EXAMEN PARCIAL
ESCALERA METALICA DE 25
PRECIO UNITARIO: PASOS
UND/8HR
RENDIMIENTO EN 8 HRS: 1.00 S
APORTE: 8.0000 HRS/UND
UNIDA CANTIDA COST
MANO DE OBRA D D O APORTE SUBTOTAL
ESPECIALISTA H-H 0.00 0.00 8.00 0.00
CAPATAZ H-H 0.20 20.79 8.00 33.26
OPERARIO H-H 1.00 18.08 8.00 144.64
OFICIAL H-H 0.00 14.81 8.00 0.00
PEON H-H 1.00 13.62 8.00 108.96
TOTAL
MO 286.86
UNIDA CANTIDA COST SUBTOT
MATERIALES D D O AL
10%
SEGURIDAD MO 0.10 286.86 28.69
MATERIAL 1 UND. 0.00 0.00 0.00
MATERIAL 2 UND. 0.00 0.00 0.00
MATERIAL 3 UND. 0.00 0.00 0.00
MATERIAL 4 UND. 0.00 0.00 0.00
MATERIAL 5 UND. 0.00 0.00 0.00
MATERIAL 6 UND. 0.00 0.00 0.00
MATERIAL 7 UND. 0.00 0.00 0.00
MATERIAL 8 UND. 0.00 0.00 0.00
MATERIAL 9 UND. 0.00 0.00 0.00
Escalera Metalica 25 Pasos Incluye 1420.0
Barandas UND. 1.00 0 1420.00
MATERIAL 11 UND. 0.00 0.00 0.00
TOTAL
MAT 1448.69
UNIDA CANTIDA COST
COMB. Y LUB. D D O APORTE SUBTOTAL
GASOLINA GLN 0.00 0.00 8.00 0.00
PETROLEO GLN 0.00 0.00 8.00 0.00
ACEITE Y FILTROS GLN 0.00 0.00 8.00 0.00
GRASA KG 0.00 0.00 8.00 0.00
GASOLINA GLN 0.00 0.00 8.00 0.00
TOT.CO
MB 0.00
UNIDA CANTIDA COST
EQUIPOS D D O APORTE SUBTOTAL
ALUMNO: BERMEO QUIROZ AURELIO COD:2011171261
TALADRO DE MANO H-M 1.00 6.50 8.00 52.00
H-M 8.00 0.00
H-M 8.00 0.00
H-M 8.00 0.00
TOT.
EQUIP 52.00
UNIDA CANTIDA COST
VARIOS D D O APORTE SUBTOTAL
1.0000 0.00
8.0000 0.00
8.0000 0.00
TOTAL
VAR 0.00
TOTAL
P.U. 1787.55

PROYECTO: EXAMEN PARCIAL


VENTANA PRINCIPAL DE 1.80 X 0.90 M DE 2
PRECIO UNITARIO: HOJAS
RENDIMIENTO EN 8 HRS: 5.00 UND/8HRS
APORTE: 1.6000 HRS/UND
UNIDA COST
MANO DE OBRA D CANTIDAD O APORTE SUBTOTAL
ESPECIALISTA H-H 0.00 0.00 1.60 0.00
CAPATAZ H-H 0.20 20.79 1.60 6.65
OPERARIO H-H 1.00 18.08 1.60 28.93
OFICIAL H-H 0.00 14.81 1.60 0.00
PEON H-H 1.00 13.62 1.60 21.79
TOTAL
MO 57.37
UNIDA COST SUBTOT
MATERIALES D CANTIDAD O AL
10%
SEGURIDAD MO 0.10 57.37 5.74
MATERIAL 1 UND. 0.00 0.00 0.00
MATERIAL 2 UND. 0.00 0.00 0.00
MATERIAL 3 UND. 0.00 0.00 0.00
MATERIAL 4 UND. 0.00 0.00 0.00
MATERIAL 5 UND. 0.00 0.00 0.00
MATERIAL 6 UND. 0.00 0.00 0.00
MATERIAL 7 UND. 0.00 0.00 0.00
MATERIAL 8 UND. 0.00 0.00 0.00
MATERIAL 9 UND. 0.00 0.00 0.00
MATERIAL 10 UND. 0.00 0.00 0.00
Ventana Con Vidrio Doble
Transparente 3mm incl. estructura 185.2
aluminio 4 cm y accesorios UND. 1.00 0 185.20
TOTAL
MAT 190.94
COMB. Y LUB. UNIDA CANTIDAD COST APORTE SUBTOTAL
ALUMNO: BERMEO QUIROZ AURELIO COD:2011171261
D O
GASOLINA GLN 0.00 0.00 1.60 0.00
PETROLEO GLN 0.00 0.00 1.60 0.00
ACEITE Y FILTROS GLN 0.00 0.00 1.60 0.00
GRASA KG 0.00 0.00 1.60 0.00
GASOLINA GLN 0.00 0.00 1.60 0.00
TOT.CO
MB 0.00
UNIDA COST
EQUIPOS D CANTIDAD O APORTE SUBTOTAL
TALADRO DE MANO H-M 1.00 6.50 1.60 10.40
H-M 1.60 0.00
H-M 1.60 0.00
H-M 1.60 0.00
TOT.
EQUIP 10.40
UNIDA COST
VARIOS D CANTIDAD O APORTE SUBTOTAL
1.0000 0.00
1.6000 0.00
1.6000 0.00
TOTAL
VAR 0.00
TOTAL
P.U. 258.71
PROYECTO: EXAMEN PARCIAL
VENTANA POSTERIOR DE 1.20 X 0.90 M DE 2
PRECIO UNITARIO: HOJAS
RENDIMIENTO EN 8 HRS: 5.00 UND/8HRS
APORTE: 1.6000 HRS/UND
UNIDA COST
MANO DE OBRA D CANTIDAD O APORTE SUBTOTAL
ESPECIALISTA H-H 0.00 0.00 1.60 0.00
CAPATAZ H-H 0.20 20.79 1.60 6.65
OPERARIO H-H 1.00 18.08 1.60 28.93
OFICIAL H-H 0.00 14.81 1.60 0.00
PEON H-H 1.00 13.62 1.60 21.79
TOTAL
MO 57.37
UNIDA COST SUBTOT
MATERIALES D CANTIDAD O AL
10%
SEGURIDAD MO 0.10 57.37 5.74
MATERIAL 1 UND. 0.00 0.00 0.00
MATERIAL 2 UND. 0.00 0.00 0.00
MATERIAL 3 UND. 0.00 0.00 0.00
MATERIAL 4 UND. 0.00 0.00 0.00
MATERIAL 5 UND. 0.00 0.00 0.00
MATERIAL 6 UND. 0.00 0.00 0.00
MATERIAL 7 UND. 0.00 0.00 0.00

ALUMNO: BERMEO QUIROZ AURELIO COD:2011171261


MATERIAL 8 UND. 0.00 0.00 0.00
MATERIAL 9 UND. 0.00 0.00 0.00
MATERIAL 10 UND. 0.00 0.00 0.00
Ventana Con Vidrio Doble
Transparente 3mm incl. estructura 184.3
aluminio 4 cm y accesorios UND. 1.00 3 184.33
TOTAL
MAT 190.07
UNIDA COST
COMB. Y LUB. D CANTIDAD O APORTE SUBTOTAL
GASOLINA GLN 0.00 0.00 1.60 0.00
PETROLEO GLN 0.00 0.00 1.60 0.00
ACEITE Y FILTROS GLN 0.00 0.00 1.60 0.00
GRASA KG 0.00 0.00 1.60 0.00
GASOLINA GLN 0.00 0.00 1.60 0.00
TOT.
COMB 0.00
UNIDA COST
EQUIPOS D CANTIDAD O APORTE SUBTOTAL
TALADRO DE MANO H-M 2.00 6.50 1.60 20.80
H-M 1.60 0.00
H-M 1.60 0.00
H-M 1.60 0.00
TOT.
EQUIP 20.80
UNIDA COST
VARIOS D CANTIDAD O APORTE SUBTOTAL
1.0000 0.00
1.6000 0.00
1.6000 0.00
TOTAL
VAR 0.00
TOTAL
P.U. 268.24
PROYECTO: EXAMEN PARCIAL
VENTANAS EN DORMITORIOS DE 1.50 X .90 M DE 2
PRECIO UNITARIO: HOJAS
RENDIMIENTO EN 8 HRS: 5.00 UND/8HRS
APORTE: 1.6000 HRS/UND
UNIDA COST
MANO DE OBRA D CANTIDAD O APORTE SUBTOTAL
ESPECIALISTA H-H 0.00 0.00 1.60 0.00
CAPATAZ H-H 0.20 20.79 1.60 6.65
OPERARIO H-H 1.00 18.08 1.60 28.93
OFICIAL H-H 0.00 14.81 1.60 0.00
PEON H-H 1.00 13.62 1.60 21.79
TOTAL
MO 57.37
UNIDA COST SUBTOT
MATERIALES D CANTIDAD O AL
SEGURIDAD 10% 0.10 57.37 5.74

ALUMNO: BERMEO QUIROZ AURELIO COD:2011171261


MO
MATERIAL 1 UND. 0.00 0.00 0.00
MATERIAL 2 UND. 0.00 0.00 0.00
MATERIAL 3 UND. 0.00 0.00 0.00
MATERIAL 4 UND. 0.00 0.00 0.00
MATERIAL 5 UND. 0.00 0.00 0.00
MATERIAL 6 UND. 0.00 0.00 0.00
MATERIAL 7 UND. 0.00 0.00 0.00
MATERIAL 8 UND. 0.00 0.00 0.00
MATERIAL 9 UND. 0.00 0.00 0.00
MATERIAL 10 UND. 0.00 0.00 0.00
Ventana Con Vidrio Doble
Transparente 3mm incl. estructura 184.3
aluminio 4 cm y accesorios UND. 1.00 3 184.33
TOTAL
MAT 190.07
UNIDA COST
COMB. Y LUB. D CANTIDAD O APORTE SUBTOTAL
GASOLINA GLN 0.00 0.00 1.60 0.00
PETROLEO GLN 0.00 0.00 1.60 0.00
ACEITE Y FILTROS GLN 0.00 0.00 1.60 0.00
GRASA KG 0.00 0.00 1.60 0.00
GASOLINA GLN 0.00 0.00 1.60 0.00
TOT.
COMB 0.00
UNIDA COST
EQUIPOS D CANTIDAD O APORTE SUBTOTAL
TALADRO DE MANO H-M 1.00 6.50 1.60 10.40
H-M 1.60 0.00
H-M 1.60 0.00
H-M 1.60 0.00
TOT.
EQUIP 10.40
UNIDA COST
VARIOS D CANTIDAD O APORTE SUBTOTAL
1.0000 0.00
1.6000 0.00
1.6000 0.00
TOTAL
VAR 0.00
TOTAL
P.U. 257.84
PROYECTO: EXAMEN PARCIAL
VENTANA CORREDIZA DE 1.55 X .90 M DE 2
PRECIO UNITARIO: HOJAS
RENDIMIENTO EN 8 HRS: 5.00 UND/8HRS
APORTE: 1.6000 HRS/UND
UNIDA COST
MANO DE OBRA D CANTIDAD O APORTE SUBTOTAL
ESPECIALISTA H-H 0.00 0.00 1.60 0.00

ALUMNO: BERMEO QUIROZ AURELIO COD:2011171261


CAPATAZ H-H 0.20 20.79 1.60 6.65
OPERARIO H-H 1.00 18.08 1.60 28.93
OFICIAL H-H 0.00 14.81 1.60 0.00
PEON H-H 1.00 13.62 1.60 21.79
TOTAL
MO 57.37
UNIDA COST SUBTOT
MATERIALES D CANTIDAD O AL
10%
SEGURIDAD MO 0.10 57.37 5.74
MATERIAL 1 UND. 0.00 0.00 0.00
MATERIAL 2 UND. 0.00 0.00 0.00
MATERIAL 3 UND. 0.00 0.00 0.00
MATERIAL 4 UND. 0.00 0.00 0.00
MATERIAL 5 UND. 0.00 0.00 0.00
MATERIAL 6 UND. 0.00 0.00 0.00
MATERIAL 7 UND. 0.00 0.00 0.00
MATERIAL 8 UND. 0.00 0.00 0.00
MATERIAL 9 UND. 0.00 0.00 0.00
MATERIAL 10 UND. 0.00 0.00 0.00
Ventana Con Vidrio Doble
Transparente 3mm incl. estructura 184.3
aluminio 4 cm y accesorios UND. 1.00 3 184.33
TOTAL
MAT 190.07
UNIDA COST
COMB. Y LUB. D CANTIDAD O APORTE SUBTOTAL
GASOLINA GLN 0.00 0.00 1.60 0.00
PETROLEO GLN 0.00 0.00 1.60 0.00
ACEITE Y FILTROS GLN 0.00 0.00 1.60 0.00
GRASA KG 0.00 0.00 1.60 0.00
GASOLINA GLN 0.00 0.00 1.60 0.00
TOT.
COMB 0.00
UNIDA COST
EQUIPOS D CANTIDAD O APORTE SUBTOTAL
TALADRO DE MANO H-M 1.00 6.50 1.60 10.40
H-M 1.60 0.00
H-M 1.60 0.00
H-M 1.60 0.00
TOT.
EQUIP 10.40
UNIDA COST
VARIOS D CANTIDAD O APORTE SUBTOTAL
1.0000 0.00
1.6000 0.00
1.6000 0.00
TOTAL
VAR 0.00
TOTAL
P.U. 257.84
ALUMNO: BERMEO QUIROZ AURELIO COD:2011171261
PROYECTO: EXAMEN PARCIAL
PRECIO UNITARIO: LAVATORIO DE PARED BLANCO
RENDIMIENTO EN 8
HRS: 8.00 PZA/8HRS
APORTE: 1.0000 HRS/PZA
MANO DE OBRA UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
ESPECIALISTA H-H 0.00 0.00 1.00 0.00
CAPATAZ H-H 0.10 20.79 1.00 2.08
OPERARIO H-H 1.00 18.08 1.00 18.08
OFICIAL H-H 0.00 14.81 1.00 0.00
PEON H-H 1.00 13.62 1.00 13.62
TOTAL
MO 33.78
SUBTOT
MATERIALES UNIDAD CANTIDAD COSTO AL
SEGURIDAD 10% MO 0.10 33.78 3.38
Tubo de abasto 1/2" x
5/8" UND 1.00 8.73 8.73
Trampa 1 1/2" PAVCO UND 1.00 5.18 5.18
Lavatorio de pared
blanco UND 1.00 180.00 180.00
Cinta Teflon UND 0.15 1.20 0.18
MATERIAL 5 UND 0.00 0.00 0.00
MATERIAL 6 UND 0.00 0.00 0.00
MATERIAL 7 UND 0.00 0.00 0.00
MATERIAL 8 UND 0.00 0.00 0.00
MATERIAL 9 UND 0.00 0.00 0.00
Codo d/90 PVC SAL 1 1/2" UND 1.00 3.60 3.60
MATERIAL 11 UND 0.00 0.00 0.00
TOTAL
MAT 201.07
COMB. Y LUB. UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
GASOLINA GLN 0.00 0.00 1.00 0.00
PETROLEO GLN 0.00 0.00 1.00 0.00
ACEITE Y FILTROS GLN 0.00 0.00 1.00 0.00
GRASA KG 0.00 0.00 1.00 0.00
GASOLINA GLN 0.00 0.00 1.00 0.00
TOT.
COMB 0.00
EQUIPOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
H-M 0.00 0.00 1.00 0.00
H-M 1.00 0.00
H-M 1.00 0.00
H-M 1.00 0.00
TOT.EQU
IP 0.00
VARIOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
1.0000 0.00

ALUMNO: BERMEO QUIROZ AURELIO COD:2011171261


1.0000 0.00
1.0000 0.00
TOTAL
VAR 0.00
TOTAL
P.U. 234.85
PROYECTO: EXAMEN PARCIAL
LAVADERO DE ACERO
PRECIO UNITARIO: INOXIDABLE
RENDIMIENTO EN 8
HRS: 6.00 PZA/8HRS
APORTE: 1.3333 HRS/PZA
MANO DE OBRA UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
ESPECIALISTA H-H 0.00 0.00 1.33 0.00
CAPATAZ H-H 0.10 20.79 1.33 2.77
OPERARIO H-H 1.00 18.08 1.33 24.11
OFICIAL H-H 0.00 14.81 1.33 0.00
PEON H-H 1.00 13.62 1.33 18.16
TOTAL
MO 45.04
SUBTOT
MATERIALES UNIDAD CANTIDAD COSTO AL
SEGURIDAD 10% MO 0.10 45.04 4.50
Tubo de abasto 1/2" x
5/8" UND 1.00 8.73 8.73
Trampa 1 1/2" PAVCO UND 1.00 5.18 5.18
Lavadero de acero
Inox. UND 1.00 210.00 210.00
Cinta Teflon UND 0.15 1.20 0.18
MATERIAL 5 UND 0.00 0.00 0.00
MATERIAL 6 UND 0.00 0.00 0.00
MATERIAL 7 UND 0.00 0.00 0.00
MATERIAL 8 UND 0.00 0.00 0.00
MATERIAL 9 UND 0.00 0.00 0.00
Codo d/90 PVC SAL 1 1/2" UND 1.00 3.60 3.60
MATERIAL 11 UND 0.00 0.00 0.00
TOTAL
MAT 232.19
COMB. Y LUB. UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
GASOLINA GLN 0.00 0.00 1.33 0.00
PETROLEO GLN 0.00 0.00 1.33 0.00
ACEITE Y FILTROS GLN 0.00 0.00 1.33 0.00
GRASA KG 0.00 0.00 1.33 0.00
GASOLINA GLN 0.00 0.00 1.33 0.00
TOT.CO
MB 0.00
EQUIPOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
H-M 0.00 0.00 1.33 0.00
H-M 1.33 0.00
H-M 1.33 0.00
ALUMNO: BERMEO QUIROZ AURELIO COD:2011171261
H-M 1.33 0.00
TOT.
EQUIP 0.00
VARIOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
1.3333 0.00
1.3333 0.00
1.3333 0.00
TOTAL
VAR 0.00
TOTAL
P.U. 277.23

PROYECTO: EXAMEN PARCIAL


LAVADERO DE
PRECIO UNITARIO: GRANITO
RENDIMIENTO EN 8
HRS: 4.00 PZA/8HRS
APORTE: 2.0000 HRS/PZA
SUBTOTA
MANO DE OBRA UNIDAD CANTIDAD COSTO APORTE L
ESPECIALISTA H-H 0.00 0.00 2.00 0.00
CAPATAZ H-H 0.10 20.79 2.00 4.16
OPERARIO H-H 1.00 18.08 2.00 36.16
OFICIAL H-H 0.00 14.81 2.00 0.00
PEON H-H 1.00 13.62 2.00 27.24
TOTAL
MO 67.56
SUBTOT
MATERIALES UNIDAD CANTIDAD COSTO AL
SEGURIDAD 10% MO 0.10 67.56 6.76
Tubo de abasto 1/2" x
5/8" UND 1.00 8.73 8.73
Trampa 1 1/2" PAVCO UND 1.00 5.18 5.18
Lavadero de Granito UND 1.00 165.00 165.00
Cinta Teflon UND 0.15 1.20 0.18
MATERIAL 5 UND 0.00 0.00 0.00
MATERIAL 6 UND 0.00 0.00 0.00
MATERIAL 7 UND 0.00 0.00 0.00
MATERIAL 8 UND 0.00 0.00 0.00
MATERIAL 9 UND 0.00 0.00 0.00
Codo d/90 PVC SAL 1 1/2" UND 1.00 3.60 3.60
MATERIAL 11 UND 0.00 0.00 0.00
TOTAL
MAT 189.45
SUBTOTA
COMB. Y LUB. UNIDAD CANTIDAD COSTO APORTE L
GASOLINA GLN 0.00 0.00 2.00 0.00
PETROLEO GLN 0.00 0.00 2.00 0.00
ACEITE Y FILTROS GLN 0.00 0.00 2.00 0.00
GRASA KG 0.00 0.00 2.00 0.00
ALUMNO: BERMEO QUIROZ AURELIO COD:2011171261
GASOLINA GLN 0.00 0.00 2.00 0.00
TOT.
COMB 0.00
SUBTOTA
EQUIPOS UNIDAD CANTIDAD COSTO APORTE L
H-M 0.00 0.00 2.00 0.00
H-M 2.00 0.00
H-M 2.00 0.00
H-M 2.00 0.00
TOT.
EQUIP 0.00
SUBTOTA
VARIOS UNIDAD CANTIDAD COSTO APORTE L
2.0000 0.00
2.0000 0.00
2.0000 0.00
TOTAL
VAR 0.00
TOTAL
P.U. 257.00

PROYECTO: EXAMEN PARCIAL


DUCHA SIMPLE CROMADA 1 LLAVE INCLUYE
PRECIO UNITARIO: ACCESORIOS
RENDIMIENTO EN 8
HRS: 8 PZA/8HRS
APORTE: 1.0000 HRS/PZA
MANO DE OBRA UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
ESPECIALISTA H-H 0.00 0.00 1.00 0.00
CAPATAZ H-H 0.10 20.79 1.00 2.08
OPERARIO H-H 1.00 18.08 1.00 18.08
OFICIAL H-H 0.00 14.81 1.00 0.00
PEON H-H 1.00 13.62 1.00 13.62
TOTAL
MO 33.78
SUBTOT
MATERIALES UNIDAD CANTIDAD COSTO AL
SEGURIDAD 10% MO 0.10 33.78 3.38
Tubo de abasto 1/2" x
5/8" UND 1.00 8.73 8.73
Trampa 1 1/2" PAVCO UND 1.00 5.18 5.18
Ducha simple c/grif. y brazo M UND 1.00 125.23 125.23
Cinta Teflon UND 0.15 1.20 0.18
MATERIAL 5 UND 0.00 0.00 0.00
MATERIAL 6 UND 0.00 0.00 0.00
MATERIAL 7 UND 0.00 0.00 0.00
MATERIAL 8 UND 0.00 0.00 0.00
MATERIAL 9 UND 0.00 0.00 0.00
Codo d/90 PVC SAL 1 1/2" UND 1.00 3.60 3.60
MATERIAL 11 UND 0.00 0.00 0.00
ALUMNO: BERMEO QUIROZ AURELIO COD:2011171261
TOTAL
MAT 146.30
COMB. Y LUB. UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
GASOLINA GLN 0.00 0.00 1.00 0.00
PETROLEO GLN 0.00 0.00 1.00 0.00
ACEITE Y FILTROS GLN 0.00 0.00 1.00 0.00
GRASA KG 0.00 0.00 1.00 0.00
GASOLINA GLN 0.00 0.00 1.00 0.00
TOTAL
COMB 0.00
EQUIPOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
H-M 0.00 0.00 1.00 0.00
H-M 1.00 0.00
H-M 1.00 0.00
H-M 1.00 0.00
TOTAL
EQUIP 0.00
VARIOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
1.0000 0.00
1.0000 0.00
1.0000 0.00
TOTAL
VAR 0.00
TOTAL
P.U. 180.08
PROYECTO: EXAMEN PARCIAL
JUNTA DE
PRECIO UNITARIO: POLIURETANO
RENDIMIENTO EN 8
HRS: 18 ML/8HRS
APORTE: 0.4444 HRS/ML
MANO DE OBRA UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
ESPECIALISTA H-H 0.00 0.00 0.44 0.00
CAPATAZ H-H 0.10 20.79 0.44 0.92
OPERARIO H-H 1.00 18.08 0.44 8.04
OFICIAL H-H 0.00 14.81 0.44 0.00
PEON H-H 1.00 13.62 0.44 6.05
TOTAL
MO 15.01
SUBTOT
MATERIALES UNIDAD CANTIDAD COSTO AL
SEGURIDAD 10% MO 0.10 15.01 1.50
MATERIAL 1 UND 0.00 0.00 0.00
MATERIAL 2 UND 0.00 0.00 0.00
MATERIAL 3 UND 0.00 0.00 0.00
MATERIAL 4 UND 0.00 0.00 0.00
MATERIAL 5 BLS 0.00 0.00 0.00
MATERIAL 6 M3 0.00 0.00 0.00
Poliuretano M 1.00 0.09 0.09

ALUMNO: BERMEO QUIROZ AURELIO COD:2011171261


MATERIAL 8 UND 0.00 0.00 0.00
MATERIAL 9 UND 0.00 0.00 0.00
MATERIAL 10 UND 0.00 0.00 0.00
MATERIAL 11 UND 0.00 0.00 0.00
TOTAL
MAT 1.59
COMB. Y LUB. UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
GASOLINA GLN 0.00 0.00 0.44 0.00
PETROLEO GLN 0.00 0.00 0.44 0.00
ACEITE Y FILTROS GLN 0.00 0.00 0.44 0.00
GRASA KG 0.00 0.00 0.44 0.00
GASOLINA GLN 0.00 0.00 0.44 0.00
TOTAL
COMB 0.00
EQUIPOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
H-M 0.00 0.00 0.44 0.00
H-M 0.44 0.00
H-M 0.44 0.00
H-M 0.44 0.00
TOTAL
EQUIP 0.00
VARIOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
0.4444 0.00
0.4444 0.00
0.4444 0.00
TOTAL
VAR 0.00
TOTAL
P.U. 16.60
PROYECTO: EXAMEN PARCIAL
PRECIO UNITARIO: BRUAS EN MUROS
RENDIMIENTO EN 8
HRS: 26 ML/8HRS
APORTE: 0.3077 HRS/ML
MANO DE OBRA UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
ESPECIALISTA H-H 0.00 0.00 0.31 0.00
CAPATAZ H-H 0.10 20.79 0.31 0.64
OPERARIO H-H 1.00 18.08 0.31 5.56
OFICIAL H-H 0.00 14.81 0.31 0.00
PEON H-H 1.00 13.62 0.31 4.19
TOTAL
MO 10.39
SUBTOT
MATERIALES UNIDAD CANTIDAD COSTO AL
SEGURIDAD 10% MO 0.10 10.39 1.04
MATERIAL 1 M2 0.00 0.00 0.00
MATERIAL 2 KG 0.00 0.00 0.00
MATERIAL 3 P2 0.00 0.00 0.00
MATERIAL 4 M3 0.00 0.00 0.00
ALUMNO: BERMEO QUIROZ AURELIO COD:2011171261
MATERIAL 5 M3 0.00 0.00 0.00
MATERIAL 6 M3 0.00 0.00 0.00
MATERIAL 7 M3 0.00 0.00 0.00
MATERIAL 8 M3 0.00 0.00 0.00
MATERIAL 9 M3 0.00 0.00 0.00
MATERIAL 10 M3 0.00 0.00 0.00
MATERIAL 11 M3 0.00 0.00 0.00
TOTAL
MAT 1.04
COMB. Y LUB. UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
GASOLINA GLN 0.00 0.00 0.31 0.00
PETROLEO GLN 0.00 0.00 0.31 0.00
ACEITE Y FILTROS GLN 0.00 0.00 0.31 0.00
GRASA KG 0.00 0.00 0.31 0.00
GASOLINA GLN 0.00 0.00 0.31 0.00
TOTAL
COMB 0.00
EQUIPOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
H-M 0.00 0.00 0.31 0.00
H-M 0.31 0.00
H-M 0.31 0.00
H-M 0.31 0.00
TOTAL
EQUIP 0.00
VARIOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
0.3077 0.00
0.3077 0.00
0.3077 0.00
TOTAL
VAR 0.00
TOTAL
P.U. 11.43
PROYECTO: EXAMEN PARCIAL
RED DE DISTRIBUCION TUBERIA DE 1/2
PRECIO UNITARIO: PVC-SAP
RENDIMIENTO EN 8
HRS: 22 ML/8HRS
APORTE: 0.3636 HRS/ML
MANO DE OBRA UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
ESPECIALISTA H-H 0.00 0.00 0.36 0.00
CAPATAZ H-H 0.10 20.70 0.36 0.75
OPERARIO H-H 1.00 15.92 0.36 5.79
OFICIAL H-H 1.00 13.65 0.36 4.96
PEON H-H 0.00 12.31 0.36 0.00
TOTAL
MO 11.51
SUBTOT
MATERIALES UNIDAD CANTIDAD COSTO AL
SEGURIDAD 10% MO 0.10 11.51 1.15

ALUMNO: BERMEO QUIROZ AURELIO COD:2011171261


MATERIAL 1 M2 0.00 0.00 0.00
MATERIAL 2 KG 0.00 0.00 0.00
MATERIAL 3 P2 0.00 0.00 0.00
Cinta Teflon UND 0.15 1.20 0.18
MATERIAL 5 M3 0.00 0.00 0.00
MATERIAL 6 M3 0.00 0.00 0.00
MATERIAL 7 M3 0.00 0.00 0.00
Pegamen. P/Tubo PVC
1/4GL ENV. 0.01 20.50 0.10
Tuberia PVC 1/2" C-10 TUB. 1.10 4.93 5.42
MATERIAL 10 M3 0.00 0.00 0.00
MATERIAL 11 M3 0.00 0.00 0.00
TOTAL
MAT 6.86
COMB. Y LUB. UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
GASOLINA GLN 0.00 0.00 0.36 0.00
PETROLEO GLN 0.00 0.00 0.36 0.00
ACEITE Y FILTROS GLN 0.00 0.00 0.36 0.00
GRASA KG 0.00 0.00 0.36 0.00
GASOLINA GLN 0.00 0.00 0.36 0.00
TOTAL
COMB 0.00
EQUIPOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
H-M 0.00 0.00 0.36 0.00
H-M 0.36 0.00
H-M 0.36 0.00
H-M 0.36 0.00
TOTAL
EQUIP 0.00
VARIOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
0.3636 0.00
0.3636 0.00
0.3636 0.00
TOTAL
VAR 0.00
TOTAL
P.U. 18.36
PROYECTO: EXAMEN PARCIAL
SALIDA DE AGUA FRIA
PRECIO UNITARIO: DE 1/2
RENDIMIENTO EN 8
HRS: 4.00 PTO./8HRS
APORTE: 2.0000 HRS/PTO.
MANO DE OBRA UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
ESPECIALISTA H-H 0.00 0.00 2.00 0.00
CAPATAZ H-H 0.10 20.79 2.00 4.16
OPERARIO H-H 1.00 18.08 2.00 36.16
OFICIAL H-H 0.00 14.81 2.00 0.00
PEON H-H 1.00 13.62 2.00 27.24
ALUMNO: BERMEO QUIROZ AURELIO COD:2011171261
TOTAL
MO 67.56
SUBTOT
MATERIALES UNIDAD CANTIDAD COSTO AL
SEGURIDAD 10% MO 0.10 67.56 6.76
MATERIAL 1 M2 0.00 0.00 0.00
MATERIAL 2 KG 0.00 0.00 0.00
MATERIAL 3 P2 0.00 0.00 0.00
Cinta Teflon UND 0.15 1.20 0.18
MATERIAL 5 M3 0.00 0.00 0.00
MATERIAL 6 M3 0.00 0.00 0.00
MATERIAL 7 M3 0.00 0.00 0.00
Pegamen. P/Tubo PVC
1/4GL ENV 0.01 20.50 0.10
Tuberia PVC 1/2" C-10 TUB 2.00 4.93 9.86
Codo PVC 1/2" UND 1.00 1.10 1.10
TE E PVC 1/2" UND 1.00 1.53 1.53
TOTAL
MAT 19.53
COMB. Y LUB. UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
GASOLINA GLN 0.00 0.00 2.00 0.00
PETROLEO GLN 0.00 0.00 2.00 0.00
ACEITE Y FILTROS GLN 0.00 0.00 2.00 0.00
GRASA KG 0.00 0.00 2.00 0.00
GASOLINA GLN 0.00 0.00 2.00 0.00
TOTAL
COMB 0.00
EQUIPOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
H-M 0.00 0.00 2.00 0.00
H-M 2.00 0.00
H-M 2.00 0.00
H-M 2.00 0.00
TOTAL
EQUIP 0.00
VARIOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
2.0000 0.00
2.0000 0.00
2.0000 0.00
TOTAL
VAR 0.00
TOTAL
P.U. 87.09
PROYECTO: EXAMEN PARCIAL
VALVULAS DE COMPUERTAS DE
PRECIO UNITARIO: BRONCE DE 1/2"
RENDIMIENTO EN 8
HRS: 11 PZA/8HRS
APORTE: 0.7273 HRS/PZA
SUBTOTA
MANO DE OBRA UNIDAD CANTIDAD COSTO APORTE L

ALUMNO: BERMEO QUIROZ AURELIO COD:2011171261


ESPECIALISTA H-H 0.00 0.00 0.73 0.00
CAPATAZ H-H 0.10 20.79 0.73 1.51
OPERARIO H-H 1.00 18.08 0.73 13.15
OFICIAL H-H 0.00 14.81 0.73 0.00
PEON H-H 1.00 13.62 0.73 9.91
TOTAL
MO 24.57
SUBTOT
MATERIALES UNIDAD CANTIDAD COSTO AL
SEGURIDAD 10% MO 0.10 24.57 2.46
MATERIAL 1 M2 0.00 0.00 0.00
MATERIAL 2 KG 0.00 0.00 0.00
MATERIAL 3 P2 0.00 0.00 0.00
Cinta Teflon UND 0.15 1.20 0.18
VALVULA ESFERICA DE
1/2" UND. 1.00 20.00 20.00
UNION UNIVERSAL DE
1/2" UND. 2.00 5.90 11.80
MATERIAL 7 M3 0.00 0.00 0.00
Pegamen. P/Tubo PVC
1/4GL M3 0.00 0.00 0.00
MATERIAL 9 M3 0.00 0.00 0.00
MATERIAL 10 M3 0.00 0.00 0.00
MATERIAL 11 M3 0.00 0.00 0.00
TOTAL
MAT 34.44
SUBTOTA
COMB. Y LUB. UNIDAD CANTIDAD COSTO APORTE L
GASOLINA GLN 0.00 0.00 0.73 0.00
PETROLEO GLN 0.00 0.00 0.73 0.00
ACEITE Y FILTROS GLN 0.00 0.00 0.73 0.00
GRASA KG 0.00 0.00 0.73 0.00
GASOLINA GLN 0.00 0.00 0.73 0.00
TOT.
COMB 0.00
SUBTOTA
EQUIPOS UNIDAD CANTIDAD COSTO APORTE L
H-M 0.00 0.00 0.73 0.00
H-M 0.73 0.00
H-M 0.73 0.00
H-M 0.73 0.00
TOT.EQU
IP 0.00
SUBTOTA
VARIOS UNIDAD CANTIDAD COSTO APORTE L
1.0000 0.00
1.0000 0.00
0.7273 0.00
TOTAL
VAR 0.00
TOTAL 59.00
ALUMNO: BERMEO QUIROZ AURELIO COD:2011171261
P.U.
PROYECTO: EXAMEN PARCIAL
PRECIO UNITARIO: RED DE DESAGUE DE 4" EN PVC
RENDIMIENTO EN 8
HRS: 16 ML/8HRS
APORTE: 0.5000 HRS/ML
MANO DE OBRA UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
ESPECIALISTA H-H 0.00 0.00 0.50 0.00
CAPATAZ H-H 0.10 20.79 0.50 1.04
OPERARIO H-H 1.00 18.08 0.50 9.04
OFICIAL H-H 0.00 14.81 0.50 0.00
PEON H-H 0.50 13.62 0.50 3.41
TOTAL
MO 13.48
SUBTOT
MATERIALES UNIDAD CANTIDAD COSTO AL
SEGURIDAD 10% MO 0.10 13.48 1.35
MATERIAL 1 M2 0.00 0.00 0.00
MATERIAL 2 KG 0.00 0.00 0.00
MATERIAL 3 P2 0.00 0.00 0.00
MATERIAL 4 M3 0.00 0.00 0.00
MATERIAL 5 M3 0.00 0.00 0.00
MATERIAL 6 M3 0.00 0.00 0.00
MATERIAL 7 M3 0.00 0.00 0.00
Pegamen. P/Tubo PVC
1/4GL ENV 0.064 20.50 1.31
Tuberia PVC SAL 4" x
3M TUB 1 18.93 18.93
Codo d/90 PVC SAL 4" UND 1.00 8.50 8.50
MATERIAL 11 M3 0.00 0.00 0.00
TOTAL
MAT 30.09
COMB. Y LUB. UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
GASOLINA GLN 0.00 0.00 0.50 0.00
PETROLEO GLN 0.00 0.00 0.50 0.00
ACEITE Y FILTROS GLN 0.00 0.00 0.50 0.00
GRASA KG 0.00 0.00 0.50 0.00
GASOLINA GLN 0.00 0.00 0.50 0.00
TOTAL
COMB 0.00
EQUIPOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
H-M 0.00 0.00 0.50 0.00
H-M 0.50 0.00
H-M 0.50 0.00
H-M 0.50 0.00
TOTAL
EQUIP 0.00
VARIOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
0.5000 0.00
ALUMNO: BERMEO QUIROZ AURELIO COD:2011171261
0.5000 0.00
0.5000 0.00
TOTAL
VAR 0.00
TOTAL
P.U. 43.57
PROYECTO: EXAMEN PARCIAL
PRECIO UNITARIO: RED DE DESAGUE DE 2" EN PVC
RENDIMIENTO EN 8
HRS: 14 ML/8HRS
APORTE: 0.5714 HRS/ML
MANO DE OBRA UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
ESPECIALISTA H-H 0.00 0.00 0.57 0.00
CAPATAZ H-H 0.10 20.79 0.57 1.19
OPERARIO H-H 1.00 18.08 0.57 10.33
OFICIAL H-H 0.00 14.81 0.57 0.00
PEON H-H 1.00 13.62 0.57 7.78
TOTAL
MO 19.30
SUBTOT
MATERIALES UNIDAD CANTIDAD COSTO AL
SEGURIDAD 10% MO 0.10 19.30 1.93
MATERIAL 1 M2 0.00 0.00 0.00
MATERIAL 2 KG 0.00 0.00 0.00
MATERIAL 3 P2 0.00 0.00 0.00
MATERIAL 4 M3 0.00 0.00 0.00
MATERIAL 5 M3 0.00 0.00 0.00
MATERIAL 6 M3 0.00 0.00 0.00
MATERIAL 7 M3 0.00 0.00 0.00
Pegamen. P/Tubo PVC
1/4GL ENV 0.01 20.50 0.16
Tuberia PVC SAL 2" x
3M TUB 1.00 18.93 18.93
Codo d/90 PVC SAL 4" UND 1.00 8.50 8.50
MATERIAL 11 M3 0.00 0.00 0.00
TOTAL
MAT 29.52
COMB. Y LUB. UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
GASOLINA GLN 0.00 0.00 0.57 0.00
PETROLEO GLN 0.00 0.00 0.57 0.00
ACEITE Y FILTROS GLN 0.00 0.00 0.57 0.00
GRASA KG 0.00 0.00 0.57 0.00
GASOLINA GLN 0.00 0.00 0.57 0.00
TOTAL
COMB 0.00
EQUIPOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
H-M 0.00 0.00 0.57 0.00
H-M 0.57 0.00
H-M 0.57 0.00

ALUMNO: BERMEO QUIROZ AURELIO COD:2011171261


H-M 0.57 0.00
TOTAL
EQUIP 0.00
VARIOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
0.5714 0.00
0.5714 0.00
0.5714 0.00
TOTAL
VAR 0.00
TOTAL
P.U. 48.83
PROYECTO: EXAMEN PARCIAL
TUBERIA DE DESAGUE DE PVC SAL DE 2" PARA
PRECIO UNITARIO: VENTILACION
RENDIMIENTO EN 8
HRS: 12 ML/8HRS
APORTE: 0.6667 HRS/ML
MANO DE OBRA UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
ESPECIALISTA H-H 0.00 0.00 0.67 0.00
CAPATAZ H-H 0.10 20.79 0.67 1.39
OPERARIO H-H 1.00 18.08 0.67 12.05
OFICIAL H-H 0.00 14.81 0.67 0.00
PEON H-H 1.00 13.62 0.67 9.08
TOTAL
MO 22.52
SUBTOT
MATERIALES UNIDAD CANTIDAD COSTO AL
SEGURIDAD 10% MO 0.10 22.52 2.25
MATERIAL 1 M2 0.00 0.00 0.00
Trampa 2" PAVCO UND 1.00 7.23 7.23
MATERIAL 3 P2 0.00 0.00 0.00
MATERIAL 4 M3 0.00 0.00 0.00
MATERIAL 5 M3 0.00 0.00 0.00
MATERIAL 6 M3 0.00 0.00 0.00
MATERIAL 7 M3 0.00 0.00 0.00
Pegamen. P/Tubo PVC
1/4GL ENV 0.01 20.50 0.16
Tuberia PVC SAL 2" x
3M TUB 1.00 18.93 18.93
Codo d/90 PVC SAL 4" UND 1.00 8.50 8.50
MATERIAL 11 M3 0.00 0.00 0.00
TOTAL
MAT 37.08
COMB. Y LUB. UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
GASOLINA GLN 0.00 0.00 0.67 0.00
PETROLEO GLN 0.00 0.00 0.67 0.00
ACEITE Y FILTROS GLN 0.00 0.00 0.67 0.00
GRASA KG 0.00 0.00 0.67 0.00
GASOLINA GLN 0.00 0.00 0.67 0.00
TOT. 0.00

ALUMNO: BERMEO QUIROZ AURELIO COD:2011171261


COMB
EQUIPOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
H-M 0.00 0.00 0.67 0.00
H-M 0.67 0.00
H-M 0.67 0.00
H-M 0.67 0.00
TOT.EQU
IP 0.00
VARIOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
0.6667 0.00
0.6667 0.00
0.6667 0.00
TOTAL
VAR 0.00
TOTAL
P.U. 59.60
PROYECTO: EXAMEN PARCIAL
SALIDA DE DESAGUE
PRECIO UNITARIO: DE 4"
RENDIMIENTO EN 8
HRS: 4.00 PTO/8HRS
APORTE: 2.0000 HRS/PTO
MANO DE OBRA UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
ESPECIALISTA H-H 0.00 0.00 2.00 0.00
CAPATAZ H-H 0.10 20.79 2.00 4.16
OPERARIO H-H 1.00 18.08 2.00 36.16
OFICIAL H-H 0.00 14.81 2.00 0.00
PEON H-H 1.00 13.62 2.00 27.24
TOTAL
MO 67.56
SUBTOT
MATERIALES UNIDAD CANTIDAD COSTO AL
SEGURIDAD 10% MO 0.10 67.56 6.76
MATERIAL 1 M2 0.00 0.00 0.00
Trampa 4" PAVCO UND 1.00 20.10 20.10
MATERIAL 3 P2 0.00 0.00 0.00
MATERIAL 4 M3 0.00 0.00 0.00
MATERIAL 5 M3 0.00 0.00 0.00
MATERIAL 6 M3 0.00 0.00 0.00
MATERIAL 7 M3 0.00 0.00 0.00
Pegamen. P/Tubo PVC
1/4GL ENV 0.06 20.50 1.31
Tuberia PVC 4" x 3M TUB 1.00 7.41 7.41
Codo d/90 PVC SAL 4" UND 1.00 8.50 8.50
TEE Sanitaria S/PVC de 4" UND 1.00 11.73 11.73
TOTAL
MAT 55.81
COMB. Y LUB. UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
GASOLINA GLN 0.00 0.00 2.00 0.00

ALUMNO: BERMEO QUIROZ AURELIO COD:2011171261


PETROLEO GLN 0.00 0.00 2.00 0.00
ACEITE Y FILTROS GLN 0.00 0.00 2.00 0.00
GRASA KG 0.00 0.00 2.00 0.00
GASOLINA GLN 0.00 0.00 2.00 0.00
TOTAL
COMB 0.00
EQUIPOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
H-M 0.00 0.00 2.00 0.00
H-M 2.00 0.00
H-M 2.00 0.00
H-M 2.00 0.00
TOTAL
EQUIP 0.00
VARIOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
1.0000 0.00
1.0000 0.00
1.0000 0.00
TOTAL
VAR 0.00
TOTAL
P.U. 123.37
PROYECTO: EXAMEN PARCIAL
SALIDA DE DESAGUE DE
PRECIO UNITARIO: 2"
RENDIMIENTO EN 8
HRS: 8 PTO/8HRS
APORTE: 1.0000 HRS/PTO
MANO DE OBRA UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
ESPECIALISTA H-H 0.00 0.00 1.00 0.00
CAPATAZ H-H 0.10 20.79 1.00 2.08
OPERARIO H-H 1.00 18.08 1.00 18.08
OFICIAL H-H 0.00 14.81 1.00 0.00
PEON H-H 1.00 13.62 1.00 13.62
TOTAL
MO 33.78
SUBTOT
MATERIALES UNIDAD CANTIDAD COSTO AL
SEGURIDAD 10% MO 0.10 33.78 3.38
MATERIAL 1 M2 0.00 0.00 0.00
Trampa 2" PAVCO UND 1.00 7.230 7.23
MATERIAL 3 P2 0.00 0.00 0.00
MATERIAL 4 M3 0.00 0.00 0.00
MATERIAL 5 M3 0.00 0.00 0.00
MATERIAL 6 M3 0.00 0.00 0.00
MATERIAL 7 M3 0.00 0.00 0.00
Pegamen. P/Tubo PVC
1/4GL ENV 0.06 20.50 1.31
Tuberia PVC 2" x 3M TUB 1.00 7.41 7.41
Codo d/90 PVC SAL 2" UND 1.00 4.80 4.80

ALUMNO: BERMEO QUIROZ AURELIO COD:2011171261


TEE Sanitaria S/PVC de 2" UND 1.00 4.50 4.50
TOTAL
MAT 28.63
COMB. Y LUB. UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
GASOLINA GLN 0.00 0.00 1.00 0.00
PETROLEO GLN 0.00 0.00 1.00 0.00
ACEITE Y FILTROS GLN 0.00 0.00 1.00 0.00
GRASA KG 0.00 0.00 1.00 0.00
GASOLINA GLN 0.00 0.00 1.00 0.00
TOTAL
COMB 0.00
EQUIPOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
H-M 0.00 0.00 1.00 0.00
H-M 1.00 0.00
H-M 1.00 0.00
H-M 1.00 0.00
TOTAL
EQUIP 0.00
VARIOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
1.0000 0.00
1.0000 0.00
1.0000 0.00
TOTAL
VAR 0.00
TOTAL
P.U. 62.41
PROYECTO: EXAMEN PARCIAL
CAJA DE REGISTRO DEALBAILERIA
PRECIO UNITARIO: DE 10" X 20"
RENDIMIENTO EN 8
HRS: 4.00 PZA/8HRS
APORTE: 2.0000 HRS/PZA
SUBTOTA
MANO DE OBRA UNIDAD CANTIDAD COSTO APORTE L
ESPECIALISTA H-H 0.00 0.00 2.00 0.00
CAPATAZ H-H 0.10 20.79 2.00 4.16
OPERARIO H-H 1.00 18.08 2.00 36.16
OFICIAL H-H 0.00 14.81 2.00 0.00
PEON H-H 1.00 13.62 2.00 27.24
TOTAL
MO 67.56
SUBTOT
MATERIALES UNIDAD CANTIDAD COSTO AL
SEGURIDAD 10% MO 0.10 67.56 6.76
MATERIAL 1 UND 0.00 0.00 0.00
MATERIAL 2 UND 0.00 0.00 0.00
Caja de regist. desag.
4" UND 1.00 35.00 35.00
MATERIAL 4 UND 0.00 0.00 0.00
Cemento BLS 1.00 14.32 14.32

ALUMNO: BERMEO QUIROZ AURELIO COD:2011171261


Arena Fina M3 0.80 20.00 16.00
MATERIAL 7 UND 0.00 0.00 0.00
MATERIAL 8 UND 0.00 0.00 0.00
MATERIAL 9 UND 0.00 0.00 0.00
MATERIAL 10 UND 0.00 0.00 0.00
MATERIAL 11 UND 0.00 0.00 0.00
TOTAL
MAT 72.08
SUBTOTA
COMB. Y LUB. UNIDAD CANTIDAD COSTO APORTE L
GASOLINA GLN 0.00 0.00 2.00 0.00
PETROLEO GLN 0.00 0.00 2.00 0.00
ACEITE Y FILTROS GLN 0.00 0.00 2.00 0.00
GRASA KG 0.00 0.00 2.00 0.00
GASOLINA GLN 0.00 0.00 2.00 0.00
TOT.
COMB 0.00
SUBTOTA
EQUIPOS UNIDAD CANTIDAD COSTO APORTE L
H-M 0.00 0.00 2.00 0.00
H-M 2.00 0.00
H-M 2.00 0.00
H-M 2.00 0.00
TOT.
EQUIP 0.00
SUBTOTA
VARIOS UNIDAD CANTIDAD COSTO APORTE L
2.0000 0.00
2.0000 0.00
2.0000 0.00
TOTAL
VAR 0.00
TOTAL
P.U. 139.63
PROYECTO: EXAMEN PARCIAL
REGISTRO ROSCADO DE
PRECIO UNITARIO: BRONCE DE 2"
RENDIMIENTO EN 8
HRS: 14 PZA/8HRS
APORTE: 0.5714 HRS/PZA
MANO DE OBRA UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
ESPECIALISTA H-H 0.00 0.00 0.57 0.00
CAPATAZ H-H 0.10 20.79 0.57 1.19
OPERARIO H-H 1.00 18.08 0.57 10.33
OFICIAL H-H 0.00 14.81 0.57 0.00
PEON H-H 0.00 13.62 0.57 0.00
TOTAL
MO 11.52
SUBTOT
MATERIALES UNIDAD CANTIDAD COSTO AL

ALUMNO: BERMEO QUIROZ AURELIO COD:2011171261


SEGURIDAD 10% MO 0.10 11.52 1.15
MATERIAL 1 M2 0.00 0.00 0.00
MATERIAL 2 KG 0.00 0.00 0.00
Registro de bronce de 2" UND 1.00 8.55 8.55
MATERIAL 4 M3 0.00 0.00 0.00
MATERIAL 5 M3 0.00 0.00 0.00
MATERIAL 6 M3 0.00 0.00 0.00
MATERIAL 7 M3 0.00 0.00 0.00
MATERIAL 8 M3 0.00 0.00 0.00
MATERIAL 9 M3 0.00 0.00 0.00
MATERIAL 10 M3 0.00 0.00 0.00
MATERIAL 11 M3 0.00 0.00 0.00
TOTAL
MAT 9.70
COMB. Y LUB. UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
GASOLINA GLN 0.00 0.00 0.57 0.00
PETROLEO GLN 0.00 0.00 0.57 0.00
ACEITE Y FILTROS GLN 0.00 0.00 0.57 0.00
GRASA KG 0.00 0.00 0.57 0.00
GASOLINA GLN 0.00 0.00 0.57 0.00
TOTAL
COMB 0.00
EQUIPOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
H-M 0.00 0.00 0.57 0.00
H-M 0.57 0.00
H-M 0.57 0.00
H-M 0.57 0.00
TOTAL
EQUIP 0.00
VARIOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
0.5714 0.00
0.5714 0.00
0.5714 0.00
TOTAL
VAR 0.00
TOTAL
P.U. 21.22
PROYECTO: EXAMEN PARCIAL
REGISTRO ROSCADO DE
PRECIO UNITARIO: BRONCE DE 4"
RENDIMIENTO EN 8
HRS: 12.00 PZA/8HRS
APORTE: 0.6667 HRS/PZA
MANO DE OBRA UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
ESPECIALISTA H-H 0.00 0.00 0.67 0.00
CAPATAZ H-H 0.10 20.79 0.67 1.39
OPERARIO H-H 1.00 18.08 0.67 12.05
OFICIAL H-H 0.00 14.81 0.67 0.00
PEON H-H 0.00 13.62 0.67 0.00
ALUMNO: BERMEO QUIROZ AURELIO COD:2011171261
TOTAL
MO 13.44
SUBTOT
MATERIALES UNIDAD CANTIDAD COSTO AL
SEGURIDAD 10% MO 0.10 13.44 1.34
MATERIAL 1 M2 0.00 0.00 0.00
MATERIAL 2 KG 0.00 0.00 0.00
Registro de bronce de 4" P2 1.00 26.14 26.14
MATERIAL 4 M3 0.00 0.00 0.00
MATERIAL 5 M3 0.00 0.00 0.00
MATERIAL 6 M3 0.00 0.00 0.00
MATERIAL 7 M3 0.00 0.00 0.00
MATERIAL 8 M3 0.00 0.00 0.00
MATERIAL 9 M3 0.00 0.00 0.00
MATERIAL 10 M3 0.00 0.00 0.00
MATERIAL 11 M3 0.00 0.00 0.00
TOTAL
MAT 27.48
COMB. Y LUB. UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
GASOLINA GLN 0.00 0.00 0.67 0.00
PETROLEO GLN 0.00 0.00 0.67 0.00
ACEITE Y FILTROS GLN 0.00 0.00 0.67 0.00
GRASA KG 0.00 0.00 0.67 0.00
GASOLINA GLN 0.00 0.00 0.67 0.00
TOTAL
COMB 0.00
EQUIPOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
H-M 0.67 0.00
H-M 0.67 0.00
H-M 0.67 0.00
H-M 0.67 0.00
TOTAL
EQUIP 0.00
VARIOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
0.6667 0.00
0.6667 0.00
0.6667 0.00
TOTAL
VAR 0.00
TOTAL
P.U. 40.92