Costos Imp
Costos Imp
PRELIMINARES
PROYECTO:
PRECIO UNITARIO: OFICINAS
RENDIMIENTO EN 8
HRS: 12 M2/8HRS
APORTE: 0.6667 HRS/M2
CANTIDA
MANO DE OBRA UNIDAD D COSTO APORTE SUBTOTAL
ESPECIALISTA H-H 0.00 0.00 0.67 0.00
CAPATAZ H-H 0.10 20.79 0.67 1.39
OPERARIO H-H 1.00 18.08 0.67 12.05
OFICIAL H-H 0.00 14.81 0.67 0.00
PEON H-H 1.00 13.62 0.67 9.08
TOTAL MO 22.52
CANTIDA SUBTOTA
MATERIALES UNIDAD D COSTO L
SEGURIDAD 10% MO 0.10 22.52 2.25
Cemento Bls 3.50 14.12 49.42
Hormigon M3 5.30 38.14 202.14
MATERIAL 3 M3 0.00 0.00 0.00
Agua M3 0.50 1.83 0.92
Madera Tornillo P2 1.34 3.00 4.01
Clavos para Madera KG 0.25 4.66 1.17
Calamina PLN 0.82 18.00 14.76
Triplay Lupuna PLN 0.89 23.00 20.49
MATERIAL 9 M3 0.00 0.00 0.00
MATERIAL 10 M3 0.00 0.00 0.00
MATERIAL 11 M3 0.00 0.00 0.00
TOTAL
MAT 295.16
CANTIDA
COMB. Y LUB. UNIDAD D COSTO APORTE SUBTOTAL
GASOLINA GLN 0.00 0.00 0.67 0.00
PETROLEO GLN 0.00 0.00 0.67 0.00
ACEITE Y FILTROS GLN 0.00 0.00 0.67 0.00
GRASA KG 0.00 0.00 0.67 0.00
GASOLINA GLN 0.00 0.00 0.67 0.00
TOTAL
COMB 0.00
CANTIDA
EQUIPOS UNIDAD D COSTO APORTE SUBTOTAL
H-M 0.00 1.00 0.67 0.00
H-M 0.00 1.00 0.67 0.00
H-M 0.00 1.00 0.67 0.00
H-M 0.00 1.00 0.67 0.00
TOTAL
EQUIP 0.00
VARIOS UNIDAD CANTIDA COSTO APORTE SUBTOTAL
ALUMNO: BERMEO QUIROZ AURELIO COD:2011171261
D
0.6667 0.00
0.6667 0.00
0.6667 0.00
TOTAL
VAR 0.00
TOTAL
P.U. 317.68
PROYECT
O:
PRECIO UNITARIO: TRAZO Y REPLANTEO
RENDIMIENTO EN 8
HRS: 300 M2/8HRS
APORTE: 0.027 HRS/M2
MANO DE OBRA UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
ESPECIALISTA
(TOPOGRAFO) H-H 1 23.91 0.03 0.64
CAPATAZ H-H 0.10 20.79 0.03 0.06
OPERARIO H-H 1.00 18.08 0.03 0.48
OFICIAL H-H 0.00 14.81 0.03 0.00
PEON H-H 2.00 13.62 0.03 0.73
TOTAL MO 1.90
MATERIA SUBTOTA
LES UNIDAD CANTIDAD COSTO L
SEGURIDA
D 10% MO 0.10 1.90 0.19
MATERIAL
1 M2 0.00 0.00 0.00
MATERIAL
2 KG 0.00 0.00 0.00
Cal KG 0.05 0.50 0.02
MATERIAL
4 M3 0.00 0.00 0.00
Madera Tornillo P2 0.02 3.00 0.06
MATERIAL
6 M3 0.00 0.00 0.00
MATERIAL
7 M3 0.00 0.00 0.00
MATERIAL
8 M3 0.00 0.00 0.00
Cordel ML 0.30 2.80 0.84
MATERIAL
10 M3 0.00 0.00 0.00
MATERIAL
11 M3 0.00 0.00 0.00
TOTAL
MAT 1.11
COMB. Y
LUB. UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
GASOLINA GLN 0.00 0.00 0.03 0.00
PETROLEO GLN 0.00 0.00 0.03 0.00
ACEITE Y FILTROS GLN 0.00 0.00 0.03 0.00
MOVIMIENTO DE
TIERRAS
PROYECT
O: EXAMEN PARCIAL
PRECIO UNITARIO: CORTE MANUAL DE TERRENO
RENDIMIENTO EN 8
HRS: 9 M3/8HRS
APORTE: 0.8889 HRS/M3
MANO DE OBRA UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
ESPECIALI
STA H-H 0.00 0.00 0.89 0.00
ALUMNO: BERMEO QUIROZ AURELIO COD:2011171261
CAPATAZ H-H 0.10 20.79 0.89 1.85
OPERARIO H-H 0.00 18.08 0.89 0.00
OFICIAL H-H 0.00 14.81 0.89 0.00
PEON H-H 1.00 13.62 0.89 12.11
TOTAL MO 13.95
MATERIAL
ES UNIDAD CANTIDAD COSTO SUBTOTAL
SEGURIDA
D 10% MO 0.10 13.95 1.40
MATERIAL
1 M2 0.00 0.00 0.00
MATERIAL
2 KG 0.00 0.00 0.00
MATERIAL
3 P2 0.00 0.00 0.00
MATERIAL
4 M3 0.00 0.00 0.00
MATERIAL
5 M3 0.00 0.00 0.00
MATERIAL
6 M3 0.00 0.00 0.00
MATERIAL
7 M3 0.00 0.00 0.00
MATERIAL
8 M3 0.00 0.00 0.00
MATERIAL
9 M3 0.00 0.00 0.00
MATERIAL
10 M3 0.00 0.00 0.00
MATERIAL
11 M3 0.00 0.00 0.00
TOTAL
MAT 1.40
COMB. Y
LUB. UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
GASOLINA GLN 0.00 0.00 0.89 0.00
PETROLEO GLN 0.00 0.00 0.89 0.00
ACEITE Y FILTROS GLN 0.00 0.00 0.89 0.00
GRASA KG 0.00 0.00 0.89 0.00
GASOLINA GLN 0.00 0.00 0.89 0.00
TOTAL
COMB 0.00
EQUIPOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
H-M 0.00 0.00 0.89 0.00
H-M 0.89 0.00
H-M 0.89 0.00
H-M 0.89 0.00
TOTAL
EQUIP 0.00
VARIOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
0.8889 0.00
0.8889 0.00
0.8889 0.00
PROYECT
O: EXAMEN PARCIAL
ACARREO DE MATERIAL
PRECIO UNITARIO: EXCEDENTE
RENDIMIENTO EN 8
HRS: 9 M3/8HRS
APORTE: 0.8889 HRS/M3
MANO DE OBRA UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
ESPECIALI
STA H-H 0.00 0.00 0.89 0.00
CAPATAZ H-H 0.10 20.79 0.89 1.85
OPERARIO H-H 0.00 18.08 0.89 0.00
OFICIAL H-H 0.00 14.81 0.89 0.00
PEON H-H 1.00 13.62 0.89 12.11
TOTAL
MON. 13.95
MATERIA SUBTOTA
LES UNIDAD CANTIDAD COSTO L
SEGURIDA
D 10% MO 0.10 13.95 1.40
MATERIAL
1 M2 0.00 0.00 0.00
MATERIAL
2 KG 0.00 0.00 0.00
MATERIAL
3 P2 0.00 0.00 0.00
MATERIAL
4 M3 0.00 0.00 0.00
MATERIAL
5 M3 0.00 0.00 0.00
MATERIAL
6 M3 0.00 0.00 0.00
MATERIAL
7 M3 0.00 0.00 0.00
MATERIAL
8 M3 0.00 0.00 0.00
MATERIAL
9 M3 0.00 0.00 0.00
MATERIAL
10 M3 0.00 0.00 0.00
MATERIAL
11 M3 0.00 0.00 0.00
TOTAL
MAT 1.40
COMB. Y
LUB. UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
GASOLINA GLN 0.00 0.00 0.89 0.00
PETROLEO GLN 0.00 0.00 0.89 0.00
ACEITE Y FILTROS GLN 0.00 0.00 0.89 0.00
GRASA KG 0.00 0.00 0.89 0.00
ALUMNO: BERMEO QUIROZ AURELIO COD:2011171261
GASOLINA GLN 0.00 0.00 0.89 0.00
TOTAL
COMB 0.00
EQUIPOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
Buggy H-M 1.00 7.50 0.89 6.67
H-M 0.89 0.00
H-M 0.89 0.00
H-M 0.89 0.00
TOTAL
EQUIP 6.67
VARIOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
0.8889 0.00
0.8889 0.00
0.8889 0.00
TOTAL
VAR 0.00
TOTAL
P.U. 22.02
PROYECT
O: EXAMEN PARCIAL
PRECIO UNITARIO: ELIMINACION DE DESMONTE CON EQUIPO
RENDIMIENTO EN 8
HRS: 50 M3/8HRS
APORTE: 0.1600 HRS/M3
MANO DE OBRA UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
ESPECIALI
STA H-H 0.00 0.00 0.16 0.00
CAPATAZ H-H 0.10 20.79 0.16 0.33
OPERARIO H-H 0.00 18.08 0.16 0.00
OFICIAL H-H 0.00 14.81 0.16 0.00
PEON H-H 5.00 13.62 0.16 10.90
TOTAL MO 11.23
MATERIA SUBTOTA
LES UNIDAD CANTIDAD COSTO L
SEGURIDA
D 10% MO 0.10 11.23 1.12
MATERIAL
1 M2 0.00 0.00 0.00
MATERIAL
2 KG 0.00 0.00 0.00
MATERIAL
3 P2 0.00 0.00 0.00
MATERIAL
4 M3 0.00 0.00 0.00
MATERIAL
5 M3 0.00 0.00 0.00
MATERIAL
6 M3 0.00 0.00 0.00
MATERIAL
7 M3 0.00 0.00 0.00
MATERIAL
8 M3 0.00 0.00 0.00
ALUMNO: BERMEO QUIROZ AURELIO COD:2011171261
MATERIAL
9 M3 0.00 0.00 0.00
MATERIAL
10 M3 0.00 0.00 0.00
MATERIAL
11 M3 0.00 0.00 0.00
TOTAL
MAT 1.12
COMB. Y
LUB. UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
GASOLINA GLN 1.00 8.40 0.16 1.34
PETROLEO GLN 0.00 0.00 0.16 0.00
ACEITE Y FILTROS GLN 0.00 0.00 0.16 0.00
GRASA KG 0.00 0.00 0.16 0.00
GASOLINA GLN 0.00 0.00 0.16 0.00
TOTAL
COMB 1.34
EQUIPOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
CAMION VOLQUETE DE
6 M3 H-M 1.00 91.20 0.16 14.59
H-M 0.16 0.00
H-M 0.16 0.00
H-M 0.16 0.00
TOTAL
EQUIP 14.59
VARIOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
0.16 0.00
0.16 0.00
0.16 0.00
TOTAL
VAR 0.00
TOTAL
P.U. 28.29
PROYECT
O: EXAMEN PARCIAL
PRECIO UNITARIO: RELLENO CON MATERIAL PROPIO C/PISON
RENDIMIENTO EN 8
HRS: 8 M3/8HRS
APORTE: 1.00 HRS/M3
MANO DE OBRA UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
ESPECIALI
STA H-H 0.00 0.00 1.00 0.00
CAPATAZ H-H 0.10 20.79 1.00 2.08
OPERARIO H-H 0.00 18.08 1.00 0.00
OFICIAL H-H 0.00 14.81 1.00 0.00
PEON H-H 1.00 13.62 1.00 13.62
TOTAL MO 15.70
MATERIA SUBTOTA
LES UNIDAD CANTIDAD COSTO L
SEGURIDA
D 10% MO 0.10 15.70 1.57
ALUMNO: BERMEO QUIROZ AURELIO COD:2011171261
MATERIAL
1 M2 0.00 0.00 0.00
MATERIAL
2 KG 0.00 0.00 0.00
MATERIAL
3 P2 0.00 0.00 0.00
MATERIAL
4 M3 0.00 0.00 0.00
MATERIAL
5 M3 0.00 0.00 0.00
MATERIAL
6 M3 0.00 0.00 0.00
MATERIAL
7 M3 0.00 0.00 0.00
MATERIAL
8 M3 0.00 0.00 0.00
MATERIAL
9 M3 0.00 0.00 0.00
MATERIAL
10 M3 0.00 0.00 0.00
MATERIAL
11 M3 0.00 0.00 0.00
TOTAL
MAT 1.57
COMB. Y
LUB. UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
GASOLINA GLN 0.00 0.00 1.00 0.00
PETROLEO GLN 0.00 0.00 1.00 0.00
ACEITE Y FILTROS GLN 0.00 0.00 1.00 0.00
GRASA KG 0.00 0.00 1.00 0.00
GASOLINA GLN 0.00 0.00 1.00 0.00
TOTAL
COMB 0.00
EQUIPOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
H-M 0.00 0.00 1.00 0.00
H-M 0.00 0.00 1.00 0.00
H-M 0.00 0.00 1.00 0.00
H-M 0.00 0.00 1.00 0.00
TOTAL
EQUIP 0.00
VARIOS UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
1.00 0.00
1.00 0.00
1.00 0.00
TOTAL
VAR 0.00
TOTAL
P.U. 17.27
PROYECT
O: EXAMEN PARCIAL
RELLENO COMPACTADO CON MATERIAL DE
PRECIO UNITARIO: PRESTAMO
RENDIMIENTO EN 8
HRS: 4 M3/8HRS
OBRAS DE CONCRETO
SIMPLE
PROYECTO: EXAMEN PARCIAL
SOLADO DE 2" MEZCLA 1:12 CEMENT.
PRECIO UNITARIO: HORMIGON
RENDIMIENTO EN 8 M2/8HR
HRS: 90.00 S
APORTE: 0.0889 HRS/M2
CANTID
MANO DE OBRA UNIDAD AD COSTO APORTE SUBTOTAL
ESPECIALISTA (Op. De Eq.
Liv.) H-H 1.00 23.91 0.09 2.13
CAPATAZ H-H 0.40 20.79 0.09 0.74
OPERARIO H-H 3.00 18.08 0.09 4.82
OFICIAL H-H 0.00 14.81 0.09 0.00
PEON H-H 8.00 13.62 0.09 9.69
TOTAL
MO 17.37
CANTID SUBTOT
MATERIALES UNIDAD AD COSTO AL
SEGURIDAD 10% MO 0.10 17.37 1.74
Cemento BLS 0.15 14.12 2.12
Arena Gruesa KG 0.00 0.00 0.00
PROYECT
O: EXAMEN PARCIAL
ACERO GRADO 60 EN LOSAS
PRECIO UNITARIO: ALIGERADAS
RENDIMIENTO EN 8
HRS: 240 KG/8HRS
APORTE: 0.0333 HRS/KG
COST
MANO DE OBRA UNIDAD CANTIDAD O APORTE SUBTOTAL
ESPECIALISTA H-H 0.00 0.00 0.03 0.00
CAPATAZ H-H 0.10 20.79 0.03 0.07
OPERARIO H-H 1.00 18.08 0.03 0.60
OFICIAL H-H 0.00 14.81 0.03 0.00
PEON H-H 1.00 13.62 0.03 0.45
TOTAL
MO 1.13
MATERIA COST SUBTOT
LES UNIDAD CANTIDAD O AL
SEGURIDA
D 10% MO 0.10 1.13 0.11
Fierro Corrugardo KG 1.07 2.49 2.66
Alambre Negro N16 KG 0.04 3.09 0.12
MATERIAL
3 P2 0.00 0.00 0.00
MATERIAL
4 M3 0.00 0.00 0.00
MATERIAL
5 M3 0.00 0.00 0.00
MATERIAL
6 M3 0.00 0.00 0.00
MATERIAL
7 M3 0.00 0.00 0.00
MATERIAL
8 M3 0.00 0.00 0.00
MATERIAL
9 M3 0.00 0.00 0.00
MATERIAL
10 M3 0.00 0.00 0.00
MATERIAL
11 M3 0.00 0.00 0.00
TOTAL
MAT 2.90
COMB. Y LUB. UNIDAD CANTIDAD COST APORTE SUBTOTAL
ALUMNO: BERMEO QUIROZ AURELIO COD:2011171261
O
GASOLINA GLN 0.00 0.00 0.03 0.00
PETROLE
O GLN 0.00 0.00 0.03 0.00
ACEITE Y FILTROS GLN 0.00 0.00 0.03 0.00
GRASA KG 0.00 0.00 0.03 0.00
GASOLINA GLN 0.00 0.00 0.03 0.00
TOT.
COMB 0.00
COST
EQUIPOS UNIDAD CANTIDAD O APORTE SUBTOTAL
CIZALLA
ELECTRICA H-M 1.00 1.55 0.03 0.05
H-M 0.03 0.00
H-M 0.03 0.00
H-M 0.03 0.00
TOT.
EQUIP 0.05
COST
VARIOS UNIDAD CANTIDAD O APORTE SUBTOTAL
0.0333 0.00
0.0333 0.00
0.0333 0.00
TOTAL
VAR 0.00
TOTAL
P.U. 4.08
PROYECTO
: EXAMEN PARCIAL
ACERO GRADO 60 EN LOSAS
PRECIO UNITARIO: MACIZAS
RENDIMIENTO EN 8
HRS: 240 KG/8HRS
APORTE: 0.0333 HRS/KG
MANO DE OBRA UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
ESPECIALISTA H-H 0.00 0.00 0.03 0.00
CAPATAZ H-H 0.10 20.79 0.03 0.07
OPERARIO H-H 1.00 18.08 0.03 0.60
OFICIAL H-H 0.00 14.81 0.03 0.00
PEON H-H 1.00 13.62 0.03 0.45
TOTAL
MO 1.13
MATERIAL SUBTOT
ES UNIDAD CANTIDAD COSTO AL
SEGURIDAD 10% MO 0.10 1.13 0.11
Fierro Corrugardo KG 1.07 2.49 2.66
Alambre Negro N16 KG 0.04 3.09 0.12
MATERIAL 3 P2 0.00 0.00 0.00
MATERIAL 4 M3 0.00 0.00 0.00
ENCOFRADOS -
DESENCOFRADOS
ALUMNO: BERMEO QUIROZ AURELIO COD:2011171261
PROYECTO: EXAMEN PARCIAL
PRECIO UNITARIO: ENCOFRADO Y DESENCOFRADO NORMAL PARA SOBRECIMIENTO
RENDIMIENTO EN M2/8HR
8 HRS: 22 S
APORTE: 0.3636 HRS/M2
CANTID
MANO DE OBRA UNIDAD AD COSTO APORTE SUBTOTAL
ESPECIALISTA H-H 0.00 0.00 0.36 0.00
CAPATAZ H-H 0.10 20.79 0.36 0.76
OPERARIO H-H 1.00 18.08 0.36 6.57
OFICIAL H-H 0.00 14.81 0.36 0.00
PEON H-H 1.00 13.62 0.36 4.95
TOTAL
MO 12.28
CANTID SUBTOT
MATERIALES UNIDAD AD COSTO AL
SEGURIDAD 10% MO 0.10 12.28 1.23
Madera Tornillo P2 2.80 3.00 8.40
Alambre Negro N
8 KG 0.20 4.66 0.93
Clavos Para
Madera KG 0.10 4.66 0.47
MATERIAL 4 M3 0.00 0.00 0.00
MATERIAL 5 M3 0.00 0.00 0.00
MATERIAL 6 M3 0.00 0.00 0.00
MATERIAL 7 M3 0.00 0.00 0.00
MATERIAL 8 M3 0.00 0.00 0.00
MATERIAL 9 M3 0.00 0.00 0.00
MATERIAL 10 M3 0.00 0.00 0.00
MATERIAL 11 M3 0.00 0.00 0.00
TOTAL
MAT 11.03
CANTID
COMB. Y LUB. UNIDAD AD COSTO APORTE SUBTOTAL
GASOLINA GLN 0.00 0.00 0.36 0.00
PETROLEO GLN 0.00 0.00 0.36 0.00
ACEITE Y FILTROS GLN 0.00 0.00 0.36 0.00
GRASA KG 0.00 0.00 0.36 0.00
GASOLINA GLN 0.00 0.00 0.36 0.00
TOT.
COMB 0.00
CANTID
EQUIPOS UNIDAD AD COSTO APORTE SUBTOTAL
H-M 0.00 0.00 0.36 0.00
H-M 0.36 0.00
H-M 0.36 0.00
H-M 0.36 0.00
TOT.
EQUIP 0.00
VARIOS UNIDAD CANTID COSTO APORTE SUBTOTAL
ALUMNO: BERMEO QUIROZ AURELIO COD:2011171261
AD
0.3636 0.00
0.3636 0.00
0.3636 0.00
TOTAL
VAR 0.00
TOTAL
P.U. 23.31
PROYECT
O: EXAMEN PARCIAL
ENCOFRADO Y DESENCOFRADO NORMAL EN MUROS TABIQUES Y
PRECIO UNITARIO: PLACAS
RENDIMIENTO EN 8
HRS: 14 M2/8HRS
APORTE: 0.5714 HRS/M2
MANO DE OBRA UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
ESPECIALISTA H-H 0.00 0.00 0.57 0.00
CAPATAZ H-H 0.10 20.79 0.57 1.19
OPERARIO H-H 1.00 18.08 0.57 10.33
OFICIAL H-H 0.00 14.81 0.57 0.00
PEON H-H 1.00 13.62 0.57 7.78
TOTAL
MO 19.30
MATERIA SUBTOTA
LES UNIDAD CANTIDAD COSTO L
SEGURIDA
D 10% MO 0.10 19.30 1.93
Madera Tornillo P2 3.80 3.00 11.40
Alambre Negro N
8 KG 0.08 4.66 0.37
Clavos Para
Madera KG 0.27 4.66 1.26
MATERIAL
4 M3 0.00 0.00 0.00
MATERIAL
5 M3 0.00 0.00 0.00
MATERIAL
6 M3 0.00 0.00 0.00
MATERIAL
7 M3 0.00 0.00 0.00
MATERIAL
8 M3 0.00 0.00 0.00
MATERIAL
9 M3 0.00 0.00 0.00
MATERIAL
10 M3 0.00 0.00 0.00
MATERIAL
11 M3 0.00 0.00 0.00
TOTAL
MAT 14.96
COMB. Y LUB. UNIDAD CANTIDAD COSTO APORTE SUBTOTAL
GASOLINA GLN 0.00 0.00 0.57 0.00
PETROLE
O GLN 0.00 0.00 0.57 0.00
PROYECT
O: EXAMEN PARCIAL
ENCOFRADO Y DESENCOFRADO EN LOSA
PRECIO UNITARIO: ALIGERADA
RENDIMIENTO EN 8
HRS: 22 M2/8HRS
APORTE: 0.3636 HRS/M2
COST
MANO DE OBRA UNIDAD CANTIDAD O APORTE SUBTOTAL
ESPECIALISTA H-H 0.00 0.00 0.36 0.00
CAPATAZ H-H 0.10 20.79 0.36 0.76
OPERARIO H-H 1.00 18.08 0.36 6.57
OFICIAL H-H 0.00 14.81 0.36 0.00
PEON H-H 1.00 13.62 0.36 4.95
CARPINTERIA DE MADERA O
METALICA
PROYECTO: EXAMEN PARCIAL
PUERTA PRINCIPAL DE CEDRO DE 0.80 M DE
PRECIO UNITARIO: ANCHO
UND/8HR
RENDIMIENTO EN 8 HRS: 5.00 S
APORTE: 1.6000 HRS/UND
CANTID SUBTOT
MANO DE OBRA UNIDAD AD COSTO APORTE AL
ESPECIALISTA H-H 0.00 0.00 1.60 0.00
CAPATAZ H-H 0.20 20.79 1.60 6.65
OPERARIO H-H 1.00 18.08 1.60 28.93
OFICIAL H-H 0.00 14.81 1.60 0.00
PEON H-H 2.00 13.62 1.60 43.58
TOTAL
MO 79.16
CANTID SUBTOT
MATERIALES UNIDAD AD COSTO AL
10%
SEGURIDAD MO 0.10 79.16 7.92
Puerta de Cedro con marco de
0.80x2.10m UND. 1.00 980.00 980.00
Bisagras Tipo Capuchinas Aluminizada
4" X 4" UND. 4.00 12.00 48.00
Cerradura exterior puerta principal Acero
Inox. UND. 1.00 125.00 125.00
Puerta Contraplacada con marco de
0.65x2.10m UND. 0.00 0.00 0.00
Bisagras Tipo Capuchina Acero I. 3.5"
X 3.5" UND. 0.00 0.00 0.00
Cerradura Tipo perilla llave/ botn
Acero Inox. UND. 0.00 0.00 0.00
Puerta Contraplacada con marco de
1.80 x 1.80m UND. 0.00 0.00 0.00
Rieles para Puerta Corrediza UND. 0.00 0.00 0.00
Sistema DUCASSE para Puerta
Corrediza UND. 0.00 0.00 0.00