Está en la página 1de 21

CRONO

CONVENIO N 115-2015-AQP/VMVU/PNVR

FECHA 8/27/2016

N PARTIDAS COSTO TOTAL S/. MES 1 MES-MAYO

SEMANA 1 2 3

01 OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES

01.01 TRAZO NIVELES Y REPLANTEO PRELIMINAR

PROG. 100.00 920.00 920.40


01.01.01 LIMPIEZA, TRAZO, NIVELES (REPLANTEO PRELIMINAR) 1940.40
EJEC.

01.02 SEGURIDAD Y SALUD

PROG. 800.00 1500.00


01.02.01 EQUIPO DE SEGURIDAD INDIVDUAL 4980.00
EJEC.

PROG. 140.00
01.02.02 SEGURIDAD COLECTIVA 140.00
EJEC.

PROG. 500.00 500.00


01.02.03 SEALIZACION TEMPORAL DE SEGURIDAD 1362.00
EJEC.

PROG. 640.00 1000.00


01.02.04 CAPACITACION EN SALUD Y SEGURIDAD 2400.00
EJEC.

02 MOVIMIENTOS DE TIERRAS

02.01 EXCAVACIONES
N PARTIDAS COSTO TOTAL S/. MES 1 MES-MAYO

SEMANA 1 2 3

PROG. 2000.00 500.00


02.01.01 EXCAVACION DE ZANJA HASTA H = 1.00 m 6946.56
EJEC.

03 OBRAS DE CONCRETO SIMPLE

03.01 CIMIENTOS CORRIDOS

PROG. 8000.00 3000.00


03.01.01 CIMIENTO CORRIDO MEZCLA 1:12 + 30 % P.G. (MANUAL) 39281.76
EJEC.

03.02 SOBRECIMIENTOS

PROG. 2699.97 2000.00


03.02.01 CONCRETO SOBRECIMIENTO MEZCLA 1:8 + 25 % P.M. 20280.54
EJEC.

ENCOFRADO Y DESENCOFRADO SOBRECIMIENTOS H = PROG. 800.00 280.54


03.02.02 15499.97
0.25 m EJEC.

04 ESTRUCTURAS DE MADERA

04.01 VIGAS DE MADERA

PROG.
04.01.01 VIGAS COLLAR DE MADERA DE 4" X 4" 75604.17
EJEC.

PROG.
04.01.02 DINTEL DE MADERA DE 4" X 8" 27346.98
EJEC.

04.02 TIJERALES Y RETICULADOS

PROG.
04.02.01 TIJERALES DE MADERA DE 2" X 4" 72730.80
EJEC.
N PARTIDAS COSTO TOTAL S/. MES 1 MES-MAYO

SEMANA 1 2 3

PROG.
04.02.02 CORREAS DE MADERA 2" X 2" 45014.14
EJEC.

05 COBERTURAS

05.01 COBERTURAS DE PLANCHAS CORRUGADAS GALVANIZADAS

PROG.
05.01.01 COBERTURA CALAMINA 0.30 mm, 11 CANALES 72234.96
EJEC.

PROG.
05.01.02 CANALETA DE FG Y BAJADA DE AGUA DE LLUVIAS 40078.80
EJEC.

DADO DE CONCRETO PARA PROTECCION MONTANTE DE PROG.


05.01.03 1578.00
CANALETA CONCRETO SIMPLE EJEC.

06 MUROS Y TABIQUES DE ALBAILERIA

06.01 MUROS

PROG. 10000.00
06.01.01 ELABORACION DE ADOBES 0.38 X 0.38 X 0.10 m (APORTE) 32729.18
EJEC.

PROG. 4432.00
06.01.02 MURO DE ADOBE e = 0.40 m 58221.27
EJEC.

07 REVOQUES Y REVESTIMIENTOS

07.01 ENLUCIDO DE YESO

PROG.
07.01.01 ENLUCIDO CON YESO MUROS DE ADOBE INC./VANOS 92960.11
EJEC.

08 CIELO RASOS
N PARTIDAS COSTO TOTAL S/. MES 1 MES-MAYO

SEMANA 1 2 3

08.01 FALSO CIELO RASO

PROG.
08.01.01 CIELO RASO TERMICO CON POLIESTIRENO Y TRIPLAY 64857.24
EJEC.

09 PISOS Y PAVIMENTOS

09.01 PISOS

NIVELACION, RELLENO Y APISONADO C/MAT PROPIO INT. PROG.


09.01.01 1687.20
(APORTE) EJEC.

PISO DE MADERA MACHIHEMBRADO 1" X 4" + DURMIENTE PROG.


09.01.01 148100.64
DE 2" X 4" EJEC.
09.02 VEREDAS

NIVELACION, RELLENO Y APISONADO E = 4" C/MAT DE PROG.


09.02.01
PRESTAMO VEREDA (APORTE)
1085.40
EJEC.

VEREDA DE PIEDRA EMBOQUILLADA E = 4" (CONCRETO PROG.


09.02.02
1:6 + PM 40 %)
10650.01
EJEC.

PROG.
09.02.03 ENCOFRADO Y DESENCOFRADO VEREDAS 528.61
EJEC.

10 ZOCALOS Y CONTRAZOCALOS

10.01 ZOCALOS

ZOCALO DE CEMENTO SOBRE MURO DE ADOBE H = 90 CM PROG.


10.01.01 27410.40
INC/BRUAS EJEC.
N PARTIDAS COSTO TOTAL S/. MES 1 MES-MAYO

SEMANA 1 2 3

11 CARPINTERIA DE MADERA

11.01 PUERTAS

PUERTA CON AISLANTE TERMICO APANELADA PROG.


11.01.01 36000.00
INC/INSTALACION EJEC.

11.02 VENTANAS

VENTANA DE MAD. ESTRUCTURAL 0.40 X 0.74 PROG.


11.02.01 21600.00
INC/INSTALACION EJEC.

12 INSTALACIONES ELECTRICAS ADOSADAS

12.01 INSTALACIONES ELECTRICAS INTERIORES

PROG.
12.01.01 INSTALACION ELECTRICA EN MODULO 4947.60
EJEC.

13 OTROS

PROG.
13.01 MITIGACION DEL IMPACTO AMBIENTA (APORTE) 1005.00
EJEC.

ACARREO MATERIAL EXCEDENTE Y LIMPIEZA DE OBRA PROG.


13.02
FINAL (APORTE)
2010.00
EJEC.

14 FLETES

14.01 FLETE NEC

PROG.
14.01.01 COSTO FLETE NEC 0.00
EJEC.

14.02 FLETE NE
N PARTIDAS COSTO TOTAL S/. MES 1 MES-MAYO

SEMANA 1 2 3

PROG.
14.02.01 COSTO FLETE NE 33459.97
EJEC.

14.03 FLETE RURAL TAMBO A PUNTO DE TRANSFERENCIA R1

PROG. 17500.00 3700.00


14.03.01 COSTO FLETE RURAL A PUNTO TRANSFERENCIA R1 21521.00
EJEC.

14.04 FLETE RURAL DE PUNTO R1 A VIVIENDA R2

COSTO FLETE RURAL DE PUNTO R1 A VIVIENDA R2 PROG.


14.04.01 68064.40
(APORTE) EJEC.

TOTAL COSTO DIRECTO 1054257.11


PROGRAMADO 100.00 33999.97 27832.94
SUMATORIA SEMANAL
EJECUTADO 0.00 0.00 0.00
PROGRAMADO 79162.09
SUMATORIA MENSUAL
EJECUTADO 0.00

PROGRAMADO 7.51
AVANCE MENSUAL %
EJECUTADO 0.00
PROGRAMADO 7.51
AVANCE ACUMULADO %
EJECUTADO 0.00

TRANSFERENCIAS FECHA TRAMITE FECHA RECEPCION MONTO

MONTO FINANCIADO POR EL PNVR 12/18/2015 12/21/2015 1135810.00


N PARTIDAS COSTO TOTAL S/. MES 1 MES-MAYO

SEMANA 1 2 3
FORMATO N 23

CRONOGRAMA INICIAL DE AVANCE DE OBRA PROGRAMADO

MONTO TOTAL PRESUPUESTO

PERIODO

O 2 MES-JUNIO 3 MES-JULIO

4 1 2 3 4 1 2 3

1000.00 602.00 1000.00 78.00

300.00 62.00

200.00 560.00
PERIODO

O 2 MES-JUNIO 3 MES-JULIO

4 1 2 3 4 1 2 3

500.00 2000.00 1946.56

7919.46 16000.00 4362.30

1800.00 9000.00 4780.57

280.54 8000.00 6138.89

3318.00 18824.02 20298.00 14210.00 10183.50 8770.65

20000.00 7346.98

10183.50 9428.35 22000.00


PERIODO

O 2 MES-JUNIO 3 MES-JULIO

4 1 2 3 4 1 2 3

1500.00 1973.98

14107.00 17561.00 12810.00 11110.00 9663.00 6983.96

4908.04 9186.00

5000.00 6000.00 11729.18

1729.18 3765.00 10270.82 5674.00 5876.00 8795.00 7654.00 6121.00

17897.00 25432.00 6543.00 5674.00 6342.00


PERIODO

O 2 MES-JUNIO 3 MES-JULIO

4 1 2 3 4 1 2 3

12345.00 13457.00 8765.00 5643.00 6543.00

447.00 351.00 889.20

22715.40 25001.39 21443.00

1085.40

5325.01

528.61

3456.00 1234.00 1432.00


PERIODO

O 2 MES-JUNIO 3 MES-JULIO

4 1 2 3 4 1 2 3
PERIODO

O 2 MES-JUNIO 3 MES-JULIO

4 1 2 3 4 1 2 3

321.00

9559.00 1500.00 6321.00 12234.00 12500.00 14900.00 18908.00

17229.18 93570.00 85062.32 76792.00 82670.00 95479.00 92226.00 99273.98


0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
338094.32 390461.25
0.00 0.00

32.07 37.04
0.00 0.00
39.58 76.61
0.00 0.00
AMPLIACION DE PLAZO

MONTO FECHA N DIAS PLAZO DE VIGENCIA

1135810.00
PERIODO

O 2 MES-JUNIO 3 MES-JULIO

4 1 2 3 4 1 2 3
1 251673.64

O 4 MES-AGOSTO

4 1 2 3 4
O 4 MES-AGOSTO

4 1 2 3 4

28418.00 2700.95
O 4 MES-AGOSTO

4 1 2 3 4

22643.05 18897.11

11103.00 10092.00 4789.76

1578.00

3904.27

6453.00 7654.00 10342.00 6623.11


O 4 MES-AGOSTO

4 1 2 3 4

9876.00 5643.00 2585.24

20636.00 15347.00 16110.40 14757.20 12090.26

5325.01

4567.00 5463.00 8765.00 2493.40


O 4 MES-AGOSTO

4 1 2 3 4

14339.00 13297.00 8364.00 0.00

7190.00 14410.00

2342.00 2605.60

543.00 462.00

2010.00
O 4 MES-AGOSTO

4 1 2 3 4

13200.00 5000.00 3621.40 2000.00 1780.97

103482.27 88882.00 79985.91 44312.71 33358.83


0.00 0.00 0.00 0.00 0.00
246539.45
0.00

23.39
0.00
100.00
0.00
LAZO

FIN DE OBRA OBSERVACIONES


O 4 MES-AGOSTO

4 1 2 3 4