B. BAHAN
I. Semen
1 PC Warna Kg
2 Semen (50 kg) zak
3 Semen Abu-abu Kg
4 Semen Merah M3
5 Semen Merah/Bata Merah Tumbuk Kg
6 Semen Nat Kg
7 Semen Portland Kg
8 Semen Putih Kg
9 Semen Putih (40 kg) zak
10 Semen Tahan Asam Kg
11 Semen Warna Kg
X. Bahan Pengecatan
3 Ampelas Lbr
4 Cat Kg
5 Cat Air Kg
6 Cat Antara Kg
7 Cat Dasar Kg
8 Cat Menie Kg
9 Cat Penutup (Cat Air) Kg
10 Cat Penutup (Cat Minyak) Kg
11 Cat Vinil / Matex Kg
12 Cat Warna Kg
13 Dempul Kg
14 Dempul Jadi Kg
15 Dempul Wall Putih Kg
16 Flincote / Meni Besi Kg
22 Kuas Bh
25 Meni Besi Kg
26 Minyak Bekisting Ltr
27 Minyak Cat Kg
28 Minyak Pelumas Ltr
29 Pelumas ltr
30 Pengencer Ltr
31 Plamur Tembok Kg
32 Plastic Aerator Bh
33 Politur Ltr
34 Politur Jadi Ltr
35 Polytur Melamide Kg
36 Residu Kg
37 Residu Ltr
38 Residu Atau Ter Ltr
Page 9
AS PEKERJAAN UMUM
OTA PADANG PANJANG
tahun anggaran 2015
HARGA KETERANGAN
Rp. 79,000.00
Rp. 103,000.00
Rp. 100,000.00
Rp. 75,000.00
Rp. 75,000.00
Rp. 75,000.00
Rp. 75,000.00
Rp. 95,000.00
Rp. 95,000.00
Rp. 95,000.00
Rp. 95,000.00
Rp. 95,000.00
Rp. 95,000.00
Rp. 95,000.00
Rp. 95,000.00
Rp. 95,000.00
Rp. 95,000.00
Rp. 95,000.00
Rp. 2,250.00
Rp. 65,000.00
Rp. 1,300.00
Rp. 1,200,000.00 BJ (kg/m3) = 1,250
Rp. 2,350.00
Rp. 5,000.00
Rp. 1,300.00
Rp. 2,350.00
Rp. 94,000.00
Rp. 2,350.00
Rp. 5,000.00
Rp. 1,850.00
Rp. 6,250.00
Rp. 800.00
Rp. 600.00
Rp. 2,600.00
Page 11
HARGA KETERANGAN
Rp. 800.00
Rp. 574,919.15 Vol 1 bh : 0.0013915
Rp. 157,500.00
Rp. 3,500.00
Rp. 140,000.00
Rp. 100,000.00
Rp. 85,000.00
Rp. 700.00
Rp. 270,000.00 Dia 1 M
Rp. 500.00
Rp. 1,700.00
Rp. 150,000.00
Rp. 125,000.00
Rp. 90,000.00
Rp. 225,000.00
Rp. 125,000.00 BJ (kg/m3) = 1,350
Rp. 111.11
Rp. 3,585.19
Rp. 140,000.00 BJ (kg/m3) = 1,400
Rp. 100.00
Rp. 140,000.00
Rp. 93.33 BJ (kg/m3) = 1,500
Rp. 65,000.00
Rp. 2,000.00
Rp. 40,000.00
Rp. 150,000.00
Rp. 50,000.00
Rp. 140,000.00
Rp. 237,500.00 BJ (kg/m3) = 1,400
Rp. 169.64
Rp. 35,000.00
Rp. 62,500.00
Rp. 13,250.00
Rp. 15,000.00
Rp. 15,000.00
Rp. 2,500,000.00
Rp. 1,600,000.00
Rp. 2,500,000.00
Rp. 12,000.00
Rp. 2,500,000.00
Rp. 12,000.00
Rp. 1,600,000.00
Rp. 2,500,000.00
Rp. 35,000.00
Rp. 400,000.00
Page 12
HARGA KETERANGAN
Rp. 400,000.00
Rp. 4,400,000.00
Rp. 4,400,000.00
Rp. 4,400,000.00
Rp. 4,400,000.00
Rp. 4,400,000.00
Rp. 1,600,000.00
Rp. 20,000.00
Rp. 20,000.00
Rp. 20,000.00
Rp. 20,000.00
Rp. 4,000,000.00
Rp. 4,000,000.00
Rp. 4,400,000.00
Rp. 4,400,000.00
Rp. 2,500,000.00
Rp. 3,000,000.00
Rp. 2,500,000.00
Rp. 1,800,000.00
Rp. 3,000,000.00
Rp. 2,500,000.00
Rp. 2,500,000.00
Rp. 2,500,000.00
Rp. 1,800,000.00
Rp. 3,750.00
Rp. 6,650.00
Rp. 5,000.00
Rp. 7,500.00
Rp. 1,520.00
Rp. 3,000,000.00
Rp. 3,750.00
Rp. 25,000.00
Rp. 7,500.00
Rp. 500.00
Rp. 9,000.00
Rp. 9,000.00
Rp. 10,000.00
Rp. 5,000.00
Rp. 11,400.00
Rp. 9,000.00
Rp. 10,000.00
Rp. 8,000.00 1 btg = Rp. 45,000
Rp. 8,000.00
Rp. 17,500.00
Rp. 15,000.00
Page 13
HARGA KETERANGAN
Rp. 15,000.00
Rp. 15,000.00
Rp. 23,000.00
Rp. 12,000.00 1 rol = 120,000
Rp. 18,000.00
Rp. 18,000.00
Rp. 26,500.00
Rp. 22,500.00
Rp. 15,000.00
Rp. 14,500.00
Rp. 14,500.00
Rp. 14,500.00
Rp. 14,500.00
Rp. 14,500.00
Rp. 12,000.00
Rp. 12,000.00
Rp. 12,000.00
Rp. 13,000.00
Rp. 16,000.00
Rp. 16,000.00
Rp. 16,000.00
Rp. 16,000.00
Rp. 22,000.00 1 KTK
Rp. 100.00 1 KTK 8,000
Rp. 100.00
Rp. 16,000.00
Rp. 16,000.00
Rp. 14,000.00 1 KTK 16,000
Rp. 15,000.00
Rp. 200,000.00
Rp. 15,000.00
Rp. 800.00
Rp. 58,000.00 isi (bh) 50
Rp. 900.00
Rp. 900.00 Luas (M2) 0.02
Rp. 900.00
Rp. 1,000.00
Rp. 2,000.00
Rp. 61,000.00 isi (bh) 25
Rp. 62,500.00
Rp. 63,000.00 isi (bh) 20
Rp. 95,000.00 isi (bh) 11
Rp. 4,000.00
Rp. 46,000.00 isi (bh) 11
Rp. 58,000.00 isi (bh) 11
Page 14
HARGA KETERANGAN
Rp. 63,000.00 isi (bh) 6
Rp. 58,333.33 1 ktk 175,000
Rp. 450.00 Luas (M2) 0.01
Rp. 450.00
Rp. 12,500.00
Rp. 15,000.00
Rp. 20,000.00
Rp. 80,000.00
Rp. 80,000.00
Rp. 16,000.00
Rp. 125,000.00
Rp. 17,500.00
Rp. 65,000.00 Luas (M2) 2.98
Rp. 85,000.00
Rp. 117,500.00
Rp. 70,000.00
Rp. 37,882.65
Rp. 15,000.00
Rp. 70,000.00
Rp. 66,000.00
Rp. 85,000.00
Rp. 10,000.00
Rp. 10,000.00
Rp. 5,000.00
Rp. 15,000.00
Rp. 10,000.00
Rp. 24,000.00
Rp. 3,300.00
Rp. 75,000.00
Rp. 100,000.00
Rp. 125,000.00
Rp. 70,000.00
Rp. 85,000.00
Rp. 55,000.00
Rp. 50,000.00
Rp. 80,000.00
Rp. 60,000.00
Rp. 10,000.00
Rp. 12,000.00
Rp. 15,000.00
Rp. 80,000.00
Rp. 150,000.00
Rp. 55,000.00
Page 15
HARGA KETERANGAN
Rp. 50,000.00
Rp. 55,000.00
Rp. 400,000.00
Rp. 200,000.00
Rp. 450,000.00
Rp. 55,000.00
Rp. 5,000.00
Rp. 100,000.00
Rp. 500,000.00 Folding Gate
Rp. 800,000.00
Rp. 200,000.00
HARGA KETERANGAN
Rp. 23,000.00
Rp. 23,000.00
Rp. 23,000.00
Rp. 23,000.00
Rp. 70,625.00
Rp. 60,500.00 1.350.000,00/lmbr, excellent
Rp. 40,000.00
Rp. 55,000.00
Rp. 48,500.00
Rp. 46,000.00
Rp. 46,000.00
Rp. 68,000.00
Rp. 46,000.00
Rp. 55,000.00
Rp. 45,000.00
Rp. 16,000.00
Rp. 650.00
Rp. 600.00
Rp. 2,640.00
Rp. 26,500.00
Rp. 25,500.00
Rp. 23,000.00
Rp. 750.00
Rp. 650.00
Rp. 15,000.00
Rp. 170,000.00
Rp. 210,000.00
Rp. 335,000.00
Rp. 210,000.00
Rp. 10,000.00
Rp. 47,500.00
Rp. 475,000.00
Rp. 1,650,000.00
Rp. 185,000.00
Rp. 185,000.00
Rp. 185,000.00
Rp. 10,000.00
Rp. 25,000.00
Rp. 10,833.33 1 btg : 65,000
Rp. 13,750.00 1 btg : 82,500
Rp. 18,000.00 1 btg : 95,000
Rp. 26,000.00 1 btg : 132,000
Rp. 30,000.00 1 btg : 163,000
Rp. 46,500.00 1 btg : 279,000
Rp. 65,000.00 1 btg : 390,000
Page 17
HARGA KETERANGAN
Rp. 13,750.00
Rp. 26,000.00
Rp. 21,250.00
Rp. 4,250.00 1 btg : 17,000
Rp. 5,000.00 1 btg : 20,000
Rp. 6,000.00 1 btg : 24,000
Rp. 7,500.00 1 btg : 30,000
Rp. 9,500.00 1 btg : 38,000
Rp. 12,500.00 1 btg : 50,000
Rp. 16,375.00 1 btg : 65,500
Rp. 23,125.00 1 btg : 92,500
Rp. 2,000.00
Rp. 10,000.00
Rp. 650,000.00
Rp. 675,000.00 Lengkap
Rp. 35,000.00
Rp. 4,000.00
Rp. 45,000.00
Rp. 20,000.00
Rp. 42,000.00
Rp. 18,000.00
Rp. 19,000.00
Rp. 21,600.00
Rp. 45,000.00
Rp. 18,000.00
Rp. 45,000.00
Rp. 15,000.00
Rp. 15,000.00
Rp. 12,000.00
Rp. 15,000.00
Rp. 15,000.00
Rp. 22,500.00
Rp. 5,000.00
Rp. 15,000.00
Rp. 20,000.00
Rp. 20,000.00
Rp. 12,000.00
Rp. 15,000.00
Rp. 5,000.00
Rp. 15,000.00
Rp. 45,000.00
Rp. 50,000.00
Rp. 15,000.00
Rp. 10,000.00
Rp. 10,000.00
Page 18
HARGA KETERANGAN
Rp. 10,000.00
Rp. 50,000.00
Rp. 4,600.00
Rp. 13,500.00
Rp. 20,000.00
Rp. 17,500.00
Rp. 20,000.00
Rp. 7,600.00
Rp. 15,000.00
Rp. 15,000.00
Rp. 160,000.00
Rp. 10,000.00
Rp. 12,500.00
Page 19
NO URAIAN
NO URAIAN
NO URAIAN
NO URAIAN
NO URAIAN
NO URAIAN
NO URAIAN
NO URAIAN
294 Memasang pipa Penyalur Air Limbah Jenis Pipa Tanah, Diameter 15 cm
295 Memasang pipa Penyalur Air Limbah Jenis Pipa Tanah, Diameter 20 cm
296 Memasang Pipa Beton, Diameter 15 - 20 cm
297 Memasang Pipa Beton, Diameter 30 - 100 cm
298 Memasang Bak Kontrol Pasangan Batu Bata Ukuran (30 x 30) cm
299 Memasang Bak Kontrol Pasangan Batu Bata Ukuran (45 x 45) cm
300 Memasang Bak Kontrol Pasangan Batu Bata Ukuran (60 x 60) cm
301 Memasang Pipa Galvanis Diameter 1/2"
302 Memasang Pipa Galvanis Diameter 3/4"
303 Memasang Pipa Galvanis Diameter 1"
304 Memasang Pipa Galvanis Diameter 1 1/2"
305 Memasang Pipa Galvanis Diameter 3"
306 Memasang Pipa Galvanis Diameter 4"
307 Memasang Pipa PVC Tipe AW Diameter 1/2"
308 Memasang Pipa PVC Tipe AW Diameter 3/4"
309 Memasang Pipa PVC Tipe AW Diameter 1"
310 Memasang Pipa PVC Tipe AW Diameter 1 1/2"
311 Memasang Pipa PVC Tipe AW Diameter 2"
312 Memasang Pipa PVC Tipe AW Diameter 2 1/2"
313 Memasang Pipa PVC Tipe AW Diameter 3"
314 Memasang Pipa PVC Tipe AW Diameter 4"
315 Memasang Bak Cuci Piring Stainles Steel
316 Memasang Bak Cuci Piring Teraso
317 Memasang Kran Diameter 3/4" Atau 1/2"
318 Memasang Floor Drain
319 Bak Kontrol
320 Pekerjaan Septictank Kap. 50 Orang
321 Pekerjaan Septictank Kap. 25 Orang
322 Pekerjaan Septictank Kap. 15 Orang
Page 27
NO URAIAN
NO URAIAN
NO URAIAN
PEKERJAAN UMUM
PADANG PANJANG
un anggaran 2015
M1 Rp. 225,800.00
M1 Rp. 283,100.00
M1 Rp. 408,000.00
M1 Rp. 61,000.00
M2 Rp. 1,249,800.00
M2 Rp. 1,046,400.00
M2 Rp. 1,176,000.00
M2 Rp. 13,700.00
M2 Rp. 1,077,700.00
M2 Rp. 170,000.00
M2 Rp. 32,900.00
M2 Rp. 131,100.00
M3 Rp. 586,600.00
M3 Rp. 550,300.00
M2 Rp. 9,300.00
M2 Rp. 44,000.00
M2 Rp. 17,600.00
M2 Rp. 5,600.00
M2 Rp. 11,600.00
M2 Rp. 24,500.00
M3 Rp. 1,046,900.00
M2 Rp. 17,600.00
M3 Rp. 374,000.00
M2 Rp. 24,500.00
M2 Rp. 374,000.00
M1 Rp. 84,900.00
M1 Rp. 365,300.00
M3 Rp. 64,600.00
M3 Rp. 79,200.00
M3 Rp. 93,900.00
M3 Rp. 86,000.00
M3 Rp. 130,300.00
M3 Rp. 103,900.00
M2 Rp. 4,600.00
M3 Rp. 28,300.00
M3 Rp. 17,900.00
Page 31
M3 Rp. 46,700.00
M3 Rp. 111,600.00
M2 Rp. 113,000.00
M3 Rp. 208,100.00
M3 Rp. 772,900.00
M3 Rp. 722,500.00
M3 Rp. 687,600.00
M3 Rp. 663,100.00
M3 Rp. 625,900.00
M3 Rp. 686,200.00
M3 Rp. 572,400.00
M3 Rp. 548,600.00
M3 Rp. 352,600.00
M3 Rp. 2,042,200.00
M3 Rp. 720,500.00
BH Rp. 349,600.00
BH Rp. 464,600.00
BH Rp. 138,600.00
BH Rp. 154,800.00
BH Rp. 187,100.00
M3 Rp. 618,400.00
M3 Rp. 794,800.00
TTK Rp. 1,112,100.00
TTK Rp. 2,101,800.00
TTK Rp. 3,107,600.00
TTK Rp. 1,501,600.00
TTK Rp. 2,880,800.00
TTK Rp. 4,276,200.00
M3 Rp. 748,000.00
M3 Rp. 786,600.00
M3 Rp. 816,900.00
M3 Rp. 681,400.00
M3 Rp. 852,700.00
M3 Rp. 886,900.00
M3 Rp. 912,400.00
M3 Rp. 929,300.00
M3 Rp. 958,300.00
M3 Rp. 967,400.00
M3 Rp. 1,049,700.00
M3 Rp. 1,049,700.00
M3 Rp. 1,016,400.00
M1 Rp. 182,000.00
Page 32
M1 Rp. 241,600.00
M1 Rp. 277,300.00
Kg Rp. 12,000.00
Kg Rp. 12,700.00
Kg Rp. 12,000.00
M2 Rp. 146,300.00
M2 Rp. 154,600.00
M2 Rp. 233,900.00
M2 Rp. 238,000.00
M2 Rp. 431,100.00
M2 Rp. 237,500.00
M2 Rp. 315,300.00
M2 Rp. 110,500.00
M2 Rp. 273,600.00
M2 Rp. 260,200.00
M2 Rp. 251,400.00
M2 Rp. 246,600.00
M2 Rp. 244,400.00
M2 Rp. 227,800.00
M2 Rp. 132,500.00
M2 Rp. 126,200.00
M2 Rp. 122,600.00
M2 Rp. 120,300.00
M2 Rp. 119,000.00
M2 Rp. 116,500.00
M2 Rp. 115,700.00
M2 Rp. 128,500.00
M2 Rp. 105,800.00
M2 Rp. 205,400.00
M2 Rp. 227,900.00
M2 Rp. 188,900.00
M2 Rp. 187,300.00
M2 Rp. 139,100.00
M2 Rp. 137,200.00
M2 Rp. 2,041,600.00
M2 Rp. 1,709,100.00
M2 Rp. 211,100.00
M2 Rp. 194,600.00
M2 Rp. 362,500.00
M2 Rp. 200,600.00
M2 Rp. 374,500.00
M2 Rp. 485,200.00
M2 Rp. 541,000.00
M2 Rp. 144,500.00
Page 33
M2 Rp. 224,300.00
M2 Rp. 232,400.00
M2 Rp. 299,100.00
M2 Rp. 42,400.00
M2 Rp. 72,300.00
M2 Rp. 59,600.00
M2 Rp. 52,600.00
M2 Rp. 49,600.00
M2 Rp. 47,500.00
M2 Rp. 46,300.00
M2 Rp. 45,400.00
M2 Rp. 44,900.00
M2 Rp. 44,300.00
M2 Rp. 43,900.00
M2 Rp. 41,300.00
M2 Rp. 35,800.00
M2 Rp. 36,500.00
M2 Rp. 69,600.00
M2 Rp. 65,600.00
M2 Rp. 62,800.00
M2 Rp. 61,300.00
M2 Rp. 60,000.00
M2 Rp. 66,500.00
M2 Rp. 32,700.00
M2 Rp. 51,700.00
M2 Rp. 104,000.00
M2 Rp. 145,500.00
M2 Rp. 40,700.00
M2 Rp. 28,100.00
M2 Rp. 13,000.00
M2 Rp. 53,500.00
M2 Rp. 29,400.00
Page 34
M3 Rp. 8,205,000.00
M3 Rp. 5,972,000.00
M2 Rp. 285,100.00
M2 Rp. 263,100.00
M2 Rp. 526,000.00
M2 Rp. 386,200.00
M2 Rp. 654,900.00
M2 Rp. 399,500.00
M2 Rp. 436,900.00
M2 Rp. 344,000.00
M2 Rp. 758,700.00
M2 Rp. 265,600.00
M2 Rp. 1,118,600.00
M2 Rp. 584,600.00
M2 Rp. 177,300.00
M2 Rp. 423,800.00
M2 Rp. 107,700.00
M2 Rp. 685,000.00
M2 Rp. 311,100.00
M2 Rp. 163,100.00
M2 Rp. 163,100.00
M2 Rp. 535,000.00
M2 Rp. 47,100.00
M2 Rp. 266,300.00
Bh Rp. 239,700.00
Bh Rp. 114,500.00
Bh Rp. 108,500.00
Bh Rp. 141,500.00
Bh Rp. 45,000.00
Bh Rp. 23,400.00
Bh Rp. 42,400.00
Bh Rp. 84,600.00
Bh Rp. 29,600.00
Bh Rp. 73,300.00
Bh Rp. 41,400.00
Bh Rp. 73,300.00
Bh Rp. 17,900.00
Bh Rp. 184,700.00
Bh Rp. 44,300.00
M2 Rp. 79,100.00
M2 Rp. 115,400.00
M2 Rp. 152,700.00
Page 35
M2 Rp. 169,900.00
M2 Rp. 103,300.00
M2 Rp. 123,400.00
M2 Rp. 93,100.00
M2 Rp. 87,100.00
Kg Rp. 17,600.00
M3 Rp. 5,103,700.00
M3 Rp. 7,460,400.00
M3 Rp. 4,365,500.00
M2 Rp. 161,100.00
M2 Rp. 218,900.00
M2 Rp. 480,800.00
M2 Rp. 31,600.00
M2 Rp. 1,417,600.00
M2 Rp. 1,417,600.00
M2 Rp. 691,800.00
M2 Rp. 197,200.00
M2 Rp. 197,200.00
M2 Rp. 171,900.00
M2 Rp. 66,000.00
M2 Rp. 43,400.00
M2 Rp. 44,400.00
M2 Rp. 38,300.00
M2 Rp. 42,700.00
M2 Rp. 47,100.00
M2 Rp. 41,500.00
M2 Rp. 40,000.00
M2 Rp. 40,500.00
M2 Rp. 43,700.00
M2 Rp. 40,800.00
M2 Rp. 39,400.00
M2 Rp. 40,000.00
M2 Rp. 39,500.00
M2 Rp. 37,200.00
M1 Rp. 87,200.00
M1 Rp. 75,600.00
M1 Rp. 74,400.00
M1 Rp. 52,900.00
M1 Rp. 52,900.00
M1 Rp. 52,900.00
M1 Rp. 54,300.00
M1 Rp. 50,300.00
M2 Rp. 643,600.00
M2 Rp. 748,200.00
Page 36
M2 Rp. 121,800.00
M2 Rp. 3,396,200.00
M1 Rp. 181,200.00
M1 Rp. 255,600.00
M1 Rp. 101,600.00
M1 Rp. 90,800.00
M2 Rp. 60,100.00
M2 Rp. 44,000.00
M2 Rp. 156,100.00
M2 Rp. 146,000.00
M2 Rp. 82,500.00
M1 Rp. 69,600.00
M1 Rp. 68,900.00
M1 Rp. 203,700.00
M1 Rp. 130,900.00
M1 Rp. 153,300.00
M2 Rp. 232,290.85
M2 Rp. 163,846.35
M2 Rp. 94,500.00
M2 Rp. 100,400.00
M2 Rp. 53,300.00
M2 Rp. 50,200.00
M2 Rp. 53,300.00
M2 Rp. 217,900.00
M2 Rp. 135,800.00
M2 Rp. 140,200.00
M2 Rp. 47,100.00
M2 Rp. 192,100.00
M2 Rp. 66,500.00
M2 Rp. 463,000.00
M1 Rp. 15,200.00
Bh Rp. 958,700.00
Bh Rp. 2,328,800.00
Bh Rp. 640,400.00
Bh Rp. 505,100.00
Bh Rp. 1,148,900.00
Bh Rp. 1,120,200.00
Bh Rp. 512,700.00
Bh Rp. 938,700.00
Bh Rp. 1,551,700.00
Bh Rp. 123,100.00
Bh Rp. 1,291,600.00
Page 37
M1 Rp. 82,800.00
M1 Rp. 104,400.00
Bh Rp. 101,800.00
Bh Rp. 613,800.00
Bh Rp. 573,200.00
Bh Rp. 510,600.00
Bh Rp. 780,000.00
M1 Rp. 37,100.00
M1 Rp. 42,300.00
M1 Rp. 49,900.00
M1 Rp. 76,600.00
M1 Rp. 113,200.00
M1 Rp. 153,700.00
M1 Rp. 17,600.00
M1 Rp. 19,000.00
M1 Rp. 20,800.00
M1 Rp. 23,400.00
M1 Rp. 32,100.00
M1 Rp. 32,300.00
M1 Rp. 51,900.00
M1 Rp. 63,900.00
Bh Rp. 262,800.00
Bh Rp. 368,100.00
Bh Rp. 40,500.00
Bh Rp. 65,200.00
BH Rp. 844,900.00
BH Rp. 9,699,000.00
BH Rp. 6,573,400.00
BH Rp. 3,296,300.00
Page 38
Kg Rp. 17,600.00
Kg Rp. 72,900.00
CM Rp. 2,800.00
M2 Rp. 46,900.00
M2 Rp. 46,900.00
M2 Rp. 43,300.00
M2 Rp. 105,100.00
M2 Rp. 220,200.00
M2 Rp. 136,900.00
M2 Rp. 99,500.00
M2 Rp. 227,400.00
M2 Rp. 145,200.00
M2 Rp. 227,400.00
M2 Rp. 145,200.00
M2 Rp. 227,400.00
M2 Rp. 181,100.00
M2 Rp. 227,500.00
M2 Rp. 145,200.00
M2 Rp. 263,700.00
M2 Rp. 227,400.00
M2 Rp. 145,200.00
M2 Rp. 183,700.00
M2 Rp. 188,500.00
M2 Rp. 193,300.00
M2 Rp. 200,200.00
M2 Rp. 184,000.00
M2 Rp. 184,400.00
M1 Rp. 25,800.00
M1 Rp. 30,000.00
M1 Rp. 22,100.00
M1 Rp. 138,300.00
M2 Rp. 57,800.00
M2 Rp. 108,100.00
M2 Rp. 148,100.00
M2 Rp. 149,300.00
M2 Rp. 177,800.00
M2 Rp. 185,600.00
M2 Rp. 184,100.00
M2 Rp. 188,500.00
M2 Rp. 189,400.00
M2 Rp. 188,500.00
M2 Rp. 189,900.00
Page 39
M2 Rp. 207,000.00
M2 Rp. 118,000.00
M2 Rp. 118,000.00
M2 Rp. 75,500.00
M2 Rp. 137,600.00
M2 Rp. 106,900.00
M2 Rp. 23,400.00
M3 Rp. 34,300.00
M2 Rp. 72,800.00
Page 40
M2 Rp. 15,400.00
M2 Rp. 13,200.00
M2 Rp. 13,200.00
M2 Rp. 13,200.00
M2 Rp. 491,800.00
M2 Rp. 9,800.00
M2 Rp. 28,900.00
M2 Rp. 37,600.00
Rp. 44,800.00
M2
M2 Rp. 25,200.00
M2 Rp. 38,000.00
M2 Rp. 12,700.00
M2 Rp. 36,300.00
M2 Rp. 19,000.00
M2 Rp. 14,100.00
M2 Rp. 9,600.00
M2 Rp. 42,600.00
M2 Rp. 57,600.00
M2 Rp. 41,700.00
M2 Rp. 28,500.00
M2 Rp. 54,100.00
M2 Rp. 15,700.00
M2 Rp. 23,600.00
M2 Rp. 207,400.00
M2 Rp. 156,700.00
Page 41
DINAS PEKERJAAN
KOTA PADANG PANJ
tahun anggaran 2
NO URAIAN
NO URAIAN
0.0050 OH Mandor
0.0100 OH Kepala Tukang
0.1000 OH Tukang Kayu
0.1000 OH Pekerja
0.0120 M3 Kayu 5/7 Klas IV
0.0200 Kg Paku 5 cm - 10 cm
0.0070 M3 Kayu Klas III Papan
NO URAIAN
6 1 M2 Pembuatan Gudang Semen dan Alat-alat
0.0500 OH Mandor
0.2000 OH Kepala Tukang
2.0000 OH Tukang Kayu
1.0000 OH Pekerja
1.7000 Btg Kayu Dolken 8-10/400 cm
0.2100 M3 Kayu
0.3000 Kg Paku 5 cm - 10 cm
10.5000 Kg Semen Portland
0.0300 M3 Pasir Beton
0.0500 M3 Kerikil Beton
1.5000 Lbr Seng Gelombang BJLS 30
NO URAIAN
1.0000 Btg Kayu 5/7 (btg) Klas IV
NO URAIAN
15 1 M2 Bongkaran Lantai Beton
0.1000 OH Pekerja
0.0100 OH Mandor
NO URAIAN
23 1 M3 Bongkaran Pondasi
4.0000 OH Pekerja
0.4000 OH Mandor
24 1 M2 Bongkaran Kuzen
0.0600 OH Tukang Kayu
0.0060 OH Kepala Tukang
0.2000 OH Pekerja
0.0100 OH Mandor
25 1 M2 Bongkaran Jalan
4.0000 OH Pekerja
0.4000 OH Mandor
NO URAIAN
27 1 M1 Pasang Pagar Beton Pracetak (5 x 50 x 213) cm
0.0190 OH Mandor
0.0120 OH Kepala Tukang
0.1250 OH Tukang Batu
0.3750 OH Pekerja
0.9860 Lbr Panel Beton Pracetak
0.5250 Btg Kolom Beton Pracetak
0.0740 M3 Pasir Beton
0.1460 M3 Koral 2/3
45.0000 Kg Semen Abu-abu
NO URAIAN
0.0500 OH Pekerja
36 1 M3 Urugan Kembali
0.0190 OH Mandor
0.1920 OH Pekerja
38 1 M3 Urugan Pasir
0.0100 OH Mandor
0.3000 OH Pekerja
1.2000 M3 Pasir Urug
NO URAIAN
42 1 M3 Urugan Sirtu Padat untuk peninggian lantai bangunan
0.0250 OH Mandor
0.2500 OH Pekerja
1.2000 M3 Sirtu
NO URAIAN
0.0750 OH Mandor
0.0600 OH Kepala Tukang
0.6000 OH Tukang Batu
1.5000 OH Pekerja
1.2000 M3 Batu Kali
91.0000 Kg Semen Portland
0.5610 M3 Pasir Pasang
NO URAIAN
50 1 M3 Pasang Pondasi Batu Kali, 1/4 Pc : 1 Kp : 4 Ps
0.0750 OH Mandor
0.0600 OH Kepala Tukang
0.6000 OH Tukang Batu
1.5000 OH Pekerja
1.2000 M3 Batu Kali
41.0000 Kg Semen Portland
0.1310 Kg Kapur Pasang
0.5230 M3 Pasir Pasang
NO URAIAN
0.5000 M3 Pekerjaan Beton K 225
0.0575 M2 Pasang Bekisting untuk Pondasi
NO URAIAN
60 1 M3 Cyclopen Beton 1:2:3 + 40 % Batu Kali
0.6000 M3 Pekerjaan Beton K 225
0.4000 M3 Campuran Batu Kali + Stamp Beton 1:2:3
NO URAIAN
1.6500 OH Pekerja
247.0000 Kg Semen Portland
869.0000 Kg Pasir Beton (kg)
999.0000 Kg Kerikil Beton (kg)
NO URAIAN
70 1 M3 Pekerjaan Beton K 100 Lantai Kerja
0.0600 OH Mandor
0.0200 OH Kepala Tukang
0.2000 OH Tukang Batu
1.2000 OH Pekerja
230.0000 Kg Semen Portland
893.0000 Kg Pasir Beton (kg)
1,027.0000 Kg Kerikil Beton (kg)
NO URAIAN
NO URAIAN
78 1 M3 Pekerjaan Beton K 350
0.1050 OH Mandor
0.0350 OH Kepala Tukang
0.3500 OH Tukang Batu
2.1000 OH Pekerja
439.0000 Kg Semen Portland
670.0000 Kg Pasir Beton (kg)
1,006.0000 Kg Kerikil Beton (kg)
NO URAIAN
0.0070 OH Pekerja
1.0500 Kg Besi Beton (Polos / Ulir)
0.0150 Kg Kawat Beton
NO URAIAN
87 1 M2 Pasang Bekisting Untuk Sloof
0.0260 OH Mandor
0.0260 OH Kepala Tukang
0.2600 OH Tukang Besi
0.5200 OH Pekerja
0.0450 M3 Kayu Klas II Papan
0.3000 Kg Paku 5 cm - 10 cm
0.1000 Ltr Minyak Bekisting
NO URAIAN
NO URAIAN
93 1 M2 Pasangan Jembatan Pengecoran Beton
0.0080 OH Mandor
0.0050 OH Kepala Tukang
0.0500 OH Tukang Kayu
0.1500 OH Pekerja
0.0264 M3 Kayu Klas III Papan
0.6000 Kg Paku 5 cm - 12 cm
0.5000 Btg Kayu Dolken -8-10/4 m Galam
NO URAIAN
NO URAIAN
110 1 M2 Pasangan Batu Bata Tebal 1/2 Bata, 1 Pc : 3 Ps
0.0150 OH Mandor
0.0100 OH Kepala Tukang
0.1000 OH Tukang Batu
0.3000 OH Pekerja
70.0000 Bh Batu Bata
14.3700 Kg Semen Portland
0.0400 M3 Pasir Pasang
NO URAIAN
NO URAIAN
118 1 M2 Pasangan Dinding Hollowblock (HB.20), 1PC : 3PP
0.0150 OH Mandor
0.0150 OH Kepala Tukang
0.1500 OH Tukang Batu
0.3000 OH Pekerja
12.5000 Bh Hollow Block (HB.20)
13.5000 Kg Semen Portland
0.7280 M3 Pasir Pasang
0.2800 Kg Besi Beton Polos
NO URAIAN
0.3640 M3 Pasir Pasang
0.2800 Kg Besi Beton Polos
NO URAIAN
126 1 M2 Pasang Bata Berongga Ukuran (5 x 11 x 24) cm, 1PC : 3PP
0.0150 OH Mandor
0.0150 OH Kepala Tukang
0.1500 OH Tukang Batu
0.3000 OH Pekerja
70.0000 Bh Bata Berongga
14.0000 Kg Semen Portland
0.0320 M3 Pasir Pasang
NO URAIAN
0.3000 Kg Lem Kayu
1.0000 Lbr Teakwood Ukuran 90 x 220 x 4 mm
132 1 M2 Pasang Teakwood Rangkap Lapis Formica, Rangka Expose Kayu Klas II
0.0400 OH Mandor
0.2500 OH Kepala Tukang
2.5000 OH Tukang Kayu
0.8000 OH Pekerja
0.0250 M3 Kayu Klas II Papan
0.0300 Kg Paku 1 cm - 2,5 cm
0.8000 Kg Lem Kayu
1.0000 Lbr Teakwood Ukuran 90 x 220 x 4 mm
0.5000 Lbr Formica
NO URAIAN
0.6000 OH Pekerja
0.0070 M3 Kayu Klas I Balok
0.1000 Kg Paku 5 cm - 10 cm
0.1500 Kg Paku Skrup 10 cm
NO URAIAN
7.7760 Kg Semen Portland
0.0230 M3 Pasir Pasang
NO URAIAN
143 1 M2 Plesteran 1 Pc : 5 Ps, Tebal 15 mm
0.0100 OH Mandor
0.0150 OH Kepala Tukang
0.1500 OH Tukang Batu
0.2000 OH Pekerja
5.1840 Kg Semen Portland
0.0260 M3 Pasir Pasang
NO URAIAN
0.1200 OH Tukang Batu
0.2200 OH Pekerja
3.0000 Kg Semen Portland
0.0050 M3 Kapur Padam
0.0200 M3 Pasir Pasang
NO URAIAN
151 1 M2 Plesteran 1 Pc : 2 Ps, Tebal 20 mm
0.0130 OH Mandor
0.0200 OH Kepala Tukang
0.2000 OH Tukang Batu
0.2600 OH Pekerja
13.6320 Kg Semen Portland
0.0270 M3 Pasir Pasang
NO URAIAN
0.2860 OH Pekerja
0.0090 M3 Semen Merah
0.0090 M3 Kapur Padam
0.0180 M3 Pasir Pasang
NO URAIAN
160 1 M2 Plesteran Teraso, 1 Pc Warna : 2 Batu Teraso, Tebal 10 mm
0.0250 OH Mandor
0.0200 OH Kepala Tukang
0.2000 OH Tukang Batu
0.4500 OH Pekerja
10.0000 Kg PC Warna
15.0000 Kg Batu Granito
165 1 M2 Acian
0.0080 OH Mandor
0.0100 OH Kepala Tukang
0.1000 OH Tukang Batu
0.1500 OH Pekerja
Page 76
NO URAIAN
3.2500 Kg Semen Portland
NO URAIAN
169 1 M2 Pasang Pintu Klamp Sederhana Kayu Klas III
0.0180 OH Mandor
0.1050 OH Kepala Tukang
1.0500 OH Tukang Kayu
0.3500 OH Pekerja
0.0400 M3 Kayu Klas III Papan
0.0500 Kg Paku 5 cm - 7 cm
173 1 M2 Pasang Pintu Plywood Rangkap, Rangka Tertutup Kayu Klas II (lebar < 90 cm
0.0300 OH Mandor
0.2000 OH Kepala Tukang
2.0000 OH Tukang Kayu
0.6000 OH Pekerja
0.0196 M3 Kayu Klas II Papan
0.0300 Kg Paku 1 cm - 2,5 cm
0.5000 Kg Lem Kayu
1.0000 Lbr Plywood Ukuran 90 x 220 x 4 mm
NO URAIAN
0.2000 OH Kepala Tukang
2.0000 OH Tukang Kayu
0.8000 OH Pekerja
0.0256 M3 Kayu Klas II Papan
0.0300 Kg Paku 1 cm - 2,5 cm
0.5000 Kg Lem Kayu
1.0000 Lbr Plywood Ukuran 90 x 220 x 4 mm
176 1 M2 Pasang Jendela Besi Plat Baja Rangkap Tebal 2 mm Rangka Baja Siku
0.0520 OH Mandor
0.1050 OH Kepala Tukang
1.0500 OH Tukang Besi Konstruksi
1.0500 OH Pekerja
15.0000 Kg Besi Siku L.30.30.3
32.8000 Kg Besi Plat Baja
0.0500 Kg Kawat Las
Page 79
NO URAIAN
177 1 M2 Pasang Rangka Jendela Besi Scuare Tube (25 x 5) cm
0.0320 OH Mandor
0.0650 OH Kepala Tukang
0.6500 OH Tukang Besi Konstruksi
0.6500 OH Pekerja
4.7600 M1 Besi Scuare Tube
4.5220 M1 Besi Lis Kaca (1x1) cm
20.0000 CM Pengelasan Dengan Listrik
NO URAIAN
1.0000 Tube Sealent
NO URAIAN
186 1 M2 Pasang Vertikals Blinds
0.0018 OH Mandor
0.0350 OH Kepala Tukang
0.3500 OH Tukang Kayu
0.3500 OH Pekerja
1.0000 M2 Vertikals Blinds
NO URAIAN
0.5000 OH Tukang Kayu
0.0010 OH Pekerja
1.0000 Bh Kunci Tanam Biasa
NO URAIAN
195 1 Bh Pasang Engsel Jendela Kupu-kupu
0.0005 OH Mandor
0.0100 OH Kepala Tukang
0.1000 OH Tukang Kayu
0.0100 OH Pekerja
1.0000 Bh Engsel Jendela
NO URAIAN
201 1 Bh Pasang Pegangan Pintu / Door Holder
0.0025 OH Mandor
0.0500 OH Kepala Tukang
0.5000 OH Tukang Kayu
0.0500 OH Pekerja
1.0000 Bh Door Holder
NO URAIAN
205 1 M2 Pasang Kaca, Tebal 3 mm
0.0008 OH Mandor
0.0150 OH Kepala Tukang
0.1500 OH Tukang Kayu
0.0150 OH Pekerja
1.1000 M2 Kaca Tebal 3 mm
NO URAIAN
NO URAIAN
214 1 M3 Pasang Konstruksi Kuda-kuda Konvensional Kayu Klas II
0.2000 OH Mandor
1.2000 OH Kepala Tukang
12.0000 OH Tukang Kayu
4.0000 OH Pekerja
1.1000 M3 Kayu Klas II Balok
15.0000 Kg Besi Strip Tebal 5 mm
5.6000 Kg Paku 12 cm
NO URAIAN
NO URAIAN
8.0000 Kg Semen Portland
0.0320 M3 Pasir Pasang
NO URAIAN
NO URAIAN
232 1 M2 Pasang Atap Asbes Gelombang (3,00 x 1,05 m) x 4 mm
0.0070 OH Mandor
0.0070 OH Kepala Tukang
0.0700 OH Tukang Kayu
0.1400 OH Pekerja
0.3500 Lbr Asbes Gelombang (3,00 x 1,05 m) x 4 mm
0.1200 Kg Paku Pancing
NO URAIAN
0.1400 OH Pekerja
0.3700 Lbr Asbes Gelombang (3,00 x 1,08 m) x 6 mm
0.1200 Kg Paku Pancing
NO URAIAN
241 1 M2 Pasang Atap Asbes Gelombang (1,80 x 1,08m) x 6 mm
0.0070 OH Mandor
0.0070 OH Kepala Tukang
0.0670 OH Tukang Kayu
0.1400 OH Pekerja
0.5700 Lbr Asbes Gelombang (1,80 x 1,08 m) x 6 mm
0.1200 Kg Paku Pancing
NO URAIAN
0.0840 OH Pekerja
1.2000 Lbr Nok Paten 1,05 m
6.0000 Bh Paku sekrup 3,5"
NO URAIAN
250 1 M2 Pasang Atap Genteng Beton
0.0100 OH Mandor
0.0100 OH Kepala Tukang
0.1000 OH Tukang Kayu
0.2000 OH Pekerja
11.0000 Bh Genteng Beton
0.0300 Kg Paku 5 cm - 7 cm
NO URAIAN
NO URAIAN
258 1 M2 Pasang Atap Seng Gelombang
0.0060 OH Mandor
0.0060 OH Kepala Tukang
0.0600 OH Tukang Kayu
0.1200 OH Pekerja
0.7000 Lbr Seng Gelombang 3" x 6" BJLS 20
0.0200 Kg Paku 1 cm - 2,5 cm
NO URAIAN
0.0108 M3 Kayu Klas II Papan
0.1000 Kg Paku 5 cm - 7 cm
NO URAIAN
267 1 M1 Pasang Talang Miring, Seng Bjls 28
0.0013 OH Mandor
0.0250 OH Kepala Tukang
0.4000 OH Tukang Kayu
0.0400 OH Pekerja
0.5000 Lbr Seng Plat 3" x 6" BJLS 30
0.0150 Kg Paku 1 cm - 2,5 cm
0.0190 M3 Kayu Klas II Papan
0.3000 Kg Flincote / Meni Besi
NO URAIAN
0.0020 OH Mandor
0.0070 OH Kepala Tukang
0.0700 OH Tukang Kayu
0.0300 OH Pekerja
1.1000 Lbr Pelat Asbes Tebal 6 mm
0.0100 Kg Paku Triplek
NO URAIAN
278 1 M2 Langit-langit Plywood (120 x 240) cm, Tebal 4 mm
0.0040 OH Mandor
0.0100 OH Kepala Tukang
0.1000 OH Tukang Kayu
0.0700 OH Pekerja
0.3750 Lbr Plywood Ukuran 120 x 240 x 4 mm
0.0300 Kg Paku Triplek
NO URAIAN
0.1600 OH Mandor
0.0010 OH Kepala Tukang
1.1000 OH Tukang Batu
3.3000 OH Pekerja
1.0000 Bh Kloset Duduk / Monoblok
0.0600 Set Perlengkapan
NO URAIAN
286 1 Bh Memasang Kloset Jongkok Teraso
0.1100 OH Mandor
0.3000 OH Kepala Tukang
1.5000 OH Tukang Batu
1.0000 OH Pekerja
1.0000 Bh kloset Jongkok Teraso
7.0000 Bh Batu Bata
6.0000 Kg Semen Portland
0.0100 M3 Pasir Pasang
NO URAIAN
NO URAIAN
294 1 M1 Memasang pipa Penyalur Air Limbah Jenis Pipa Tanah, Diameter 15 cm
0.0025 OH Mandor
0.0030 OH Kepala Tukang
0.0300 OH Tukang Batu
0.0600 OH Pekerja
1.6000 Bh Pipa Tanah Dia. 15 cm
0.6800 Kg Semen Portland
0.0130 M3 Pasir Pasang
0.0110 M3 Pasir urug
295 1 M1 Memasang pipa Penyalur Air Limbah Jenis Pipa Tanah, Diameter 20 cm
0.0070 OH Mandor
0.0040 OH Kepala Tukang
0.0400 OH Tukang Batu
0.0800 OH Pekerja
1.6000 Bh Pipa Tanah Dia. 20 cm
0.8700 Kg Semen Portland
0.0140 M3 Pasir Pasang
0.0140 M3 Pasir urug
298 1 Bh Memasang Bak Kontrol Pasangan Batu Bata Ukuran (30 x 30) cm
0.0160 OH Mandor
0.0015 OH Kepala Tukang
1.0150 OH Tukang Batu
3.2000 OH Pekerja
Page 106
NO URAIAN
0.1450 M3 Batu Bata (M3)
44.0000 Kg Semen Portland
0.0700 M3 Pasir Pasang
0.0700 M3 Batu Kerikil
1.6000 Kg Besi Beton Polos
0.0600 M3 Pasir Beton
299 1 Bh Memasang Bak Kontrol Pasangan Batu Bata Ukuran (45 x 45) cm
0.0710 OH Mandor
0.0470 OH Kepala Tukang
0.4730 OH Tukang Batu
1.4200 OH Pekerja
0.2500 M3 Batu Bata (M3)
77.0000 Kg Semen Portland
0.1300 M3 Pasir Pasang
0.0200 M3 Batu Kerikil
2.6000 Kg Besi Beton Polos
0.0900 M3 Pasir Beton
300 1 Bh Memasang Bak Kontrol Pasangan Batu Bata Ukuran (60 x 60) cm
0.1080 OH Mandor
0.0720 OH Kepala Tukang
0.7200 OH Tukang Batu
0.1000 OH Tukang Gali
2.1600 OH Pekerja
0.3710 M3 Batu Bata (M3)
114.0000 Kg Semen Portland
0.1840 M3 Pasir Pasang
0.0330 M3 Batu Koral
4.8500 Kg Besi Beton Polos
0.1200 M3 Pasir Beton
Page 107
NO URAIAN
301 1 M1 Memasang Pipa Galvanis Diameter 1/2"
0.0270 OH Mandor
0.0090 OH Kepala Tukang
0.0900 OH Tukang Batu
0.0540 OH Pekerja
1.2000 M1 Pipa Galvanis Dia. 0,5"
0.3500 Set Perlengkapan
NO URAIAN
0.1350 OH Pekerja
1.2000 M1 Pipa Galvanis Dia. 4"
0.3500 Set Perlengkapan
NO URAIAN
310 1 M1 Memasang Pipa PVC Tipe AW Diameter 1 1/2"
0.0018 OH Mandor
0.0060 OH Kepala Tukang
0.0600 OH Tukang Batu
0.0360 OH Pekerja
1.2000 M1 Pipa PVC Dia. 1,5"
0.3500 Set Perlengkapan
NO URAIAN
0.0300 OH Pekerja
1.0000 Bh Bak Cuci Stainles Steel
1.0000 Set Water Drain + Asesories
NO URAIAN
319 1 BH Bak Kontrol
0.3000 OH Tukang Batu
0.0300 OH Kepala Tukang
1.0000 OH Pekerja
0.4500 OH Mandor
0.1000 M3 Pasang Pondasi Batu Kali, 1 Pc : 3 Ps
0.1000 M3 Pasir Urug
0.8333 M2 Pasangan Batu Bata Tebal 1/2 Bata, 1 Pc : 2 Ps
0.0500 M3 Pekerjaan Beton K 225
5.0000 Kg Pembesian Dengan Besi Polos Atau Besi Ulir
0.5000 M2 Pasang Bekisting Untuk Lantai
3.0000 M2 Plesteran 1 Pc : 2 Ps, Tebal 15 mm
0.4440 Kg Besi Beton Polos
NO URAIAN
2.2500 M2 Plesteran 1 Pc : 2 Ps, Tebal 15 mm
0.1400 M3 Pekerjaan Beton K 225
14.0000 Kg Pembesian Dengan Besi Polos Atau Besi Ulir
1.4000 M2 Pasang Bekisting Untuk Lantai
2.0000 M3 Kerikil Saring
2.0000 M3 Abu Batu / Pasir Saring
5.0000 M1 Pipa PVC Dia. 4"
3.0000 M1 Pipa PVC Dia. 0,75"
10.0000 Kg Ijuk Saringan
NO URAIAN
325 1 CM Pengelasan Dengan Listrik
0.0002 OH Mandor
0.0002 OH Kepala Tukang
0.0020 OH Tukang Besi
0.0040 OH Pekerja
0.0400 Kg Kawat Las
0.0300 Ltr BBM
0.0040 Ltr Minyak Pelumas
0.0170 Jam Sewa Alat Konsruksi
NO URAIAN
330 1 M2 Pasang Lantai Ubin PC Abu-abu Ukuran 40 x 40 cm
0.0130 OH Mandor
0.0120 OH Kepala Tukang
0.1200 OH Tukang Batu
0.2500 OH Pekerja
6.6300 Bh Ubin 40 x 40 cm Abu-abu
9.8000 Kg Semen Portland
0.0450 M3 Pasir Pasang
NO URAIAN
333 1 M2 Pasang Lantai Ubin Warna Ukuran 40 x 40 cm
0.0130 OH Mandor
0.0120 OH Kepala Tukang
0.1200 OH Tukang Batu
0.2500 OH Pekerja
6.6300 Bh Ubin 40 x 40 cm Warna
9.8000 Kg Semen Portland
0.0450 M3 Pasir Pasang
1.3000 Kg Semen Warna
NO URAIAN
0.0450 M3 Pasir Pasang
1.3000 Kg Semen Warna
NO URAIAN
0.0120 OH Kepala Tukang
0.1200 OH Tukang Batu
0.2500 OH Pekerja
6.6300 Bh Ubin 40 x 40 cm Teralux Marmer
9.8000 Kg Semen Portland
0.0450 M3 Pasir Pasang
1.3000 Kg Semen Warna
NO URAIAN
NO URAIAN
367 1 M2 Pasang Lantai Keramik 20 x 20 cm
0.0300 OH Mandor
0.0350 OH Kepala Tukang
0.3500 OH Tukang Batu
0.6200 OH Pekerja
26.5000 Bh Keramik 20 x 20 cm
10.4000 Kg Semen Portland
0.0450 M3 Pasir Pasang
1.6200 Kg Semen Warna
NO URAIAN
0.0015 M3 Pasir Pasang
0.0130 Kg Semen Warna
NO URAIAN
377 1 M2 Pasang Lantai Parquet
0.0330 OH Mandor
0.0350 OH Kepala Tukang
0.3500 OH Tukang Batu
0.6500 OH Pekerja
1.0500 M2 Parquet Jati
0.6000 Kg Lem Vinyl
NO URAIAN
NO URAIAN
385 1 M2 Pasang Dinding Keramik 20 x 20 cm
0.0300 OH Mandor
0.0450 OH Kepala Tukang
0.4500 OH Tukang Batu
0.6000 OH Pekerja
26.5000 Bh Keramik 20 x 20 cm
9.3000 Kg Semen Abu-abu
0.0180 M3 Pasir Pasang
1.9400 Kg Semen Warna
NO URAIAN
NO URAIAN
394 1 M3 Pasang Plint Kayu Klas II Ukuran 2 x 10 cm
0.0060 OH Mandor
0.0120 OH Kepala Tukang
0.1200 OH Tukang Batu
0.1200 OH Pekerja
0.0030 M3 Kayu Klas II Papan
0.0500 Bh Paku Sekrup 3,5"
398 1 M2 Mengorek Karat Cat Lama Permukaan Baja Dengan Cara Manual
0.0025 OH Mandor
0.1500 OH Pekerja
0.0500 Kg Sabun
400 1 M2 Mengorek Karat Atau Cat Lama Permukaan Baja Dengan Pancar Pasir (Sanbl
0.5000 OH Mandor
0.8000 OH Kepala Tukang
1.0000 OH Tukang Cat
Page 126
NO URAIAN
1.6000 OH Pekerja
40.0000 Kg Pasir Silika
10.0000 Ltr BBM
0.2000 Hari Kompresor, Blasting Pot, Selang Dan Nozzle
403 1 M2 Pengecatan Bidang Kayu Baru 1 Lapis Cat Dasar, 2 Lapis Cat Penutup
0.0025 OH Mandor
0.0075 OH Kepala Tukang
0.0750 OH Tukang Cat
0.0700 OH Pekerja
0.2000 Kg Cat Menie
0.1500 Kg Plamur Tembok
0.1700 Kg Cat Dasar
0.2600 Kg Cat Penutup (Cat Minyak)
404 1 M2 Pengecatan Bidang Kayu Baru (1 Lapis Plamir), 1 Lapis Cat Dasar, 3 Lapis Ca
0.0025 OH Mandor
0.0040 OH Kepala Tukang
0.1050 OH Tukang Cat
0.0700 OH Pekerja
0.2000 Kg Cat Menie
0.1500 Kg Plamur Tembok
0.1700 Kg Cat Dasar
0.3500 Kg Cat Penutup (Cat Minyak)
NO URAIAN
0.0025 OH Mandor
0.0630 OH Kepala Tukang
0.0630 OH Tukang Cat
0.0400 OH Pekerja
0.3600 Ltr Teak Oil
409 1 M2 Pengecatan Tembok Baru (1 Lapis Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penu
0.0025 OH Mandor
0.0063 OH Kepala Tukang
0.0630 OH Tukang Cat
0.0200 OH Pekerja
0.1000 Kg Plamur Tembok
0.1000 Kg Cat Dasar
0.2600 Kg Cat Penutup (Cat Air)
410 1 M2 Pengecatan Tembok Lama (1 Lapis Cat Dasar, 2 Lapis Cat Penutup)
0.0025 OH Mandor
0.0042 OH Kepala Tukang
0.0420 OH Tukang Cat
0.0280 OH Pekerja
0.1200 Kg Cat Dasar
Page 128
NO URAIAN
0.1800 Kg Cat Penutup (Cat Air)
NO URAIAN
413 1 M2 Melabur Tembok Lama Dengan Kapur Sirih (Untuk Pemeliharaan)
0.0025 OH Mandor
0.0005 OH Kepala Tukang
0.0050 OH Tukang Cat
0.0400 OH Pekerja
0.0020 M3 Kayu Perancah
0.3000 M3 Kapur Sirih
417 1 M2 Pengecatan Permukaan Baja Lapis Seng (Galbani) Secara Manual Sistem 4 L
0.0075 OH Mandor
0.0225 OH Kepala Tukang
0.0060 OH Tukang Cat
0.0060 OH Pekerja
0.1000 Kg Meni (Read Lead) A
0.1000 Kg Meni (Read Lead) B
0.0400 Kg Aluminium C
0.0400 Kg Aluminium B
0.0100 Ltr Pengencer
0.0020 M3 Kayu Perancah
Page 130
NO URAIAN
418 1 M2 Pengecatan Permukaan Baja Lapis Seng (Galbani) Secara Manual Sistem 1 L
0.0060 OH Mandor
0.0120 OH Kepala Tukang
0.0600 OH Tukang Cat
0.0060 OH Pekerja
0.3000 Kg Cat
Page 131
NO URAIAN
419 1 M2 Pengecatan Permukaan Baja Lapis Seng (Galbani) Secara Manual Sistem 3 L
0.5000 OH Mandor
0.8000 OH Kepala Tukang
0.3000 OH Tukang Cat
0.2000 OH Pekerja
0.1100 Kg Cat Dasar
0.1700 Kg Cat Antara
0.0800 Kg Cat Penutup (Cat Minyak)
420 1 M2 Pengecatan Permukaan Baja Lapis Seng (Galbani) Secara Semprot (Airless Spray) De
0.2000 OH Mandor
0.2000 OH Kepala Tukang
0.7000 OH Tukang Cat
0.4000 OH Pekerja
0.3000 Kg Cat Dasar
S PEKERJAAN UMUM
TA PADANG PANJANG
hun anggaran 2015
PERHITUNGAN
HSBGN PAGAR
GEDUNG PER-M2
KLAS SEDERHANA KLAS TIDAK SEDERHANA KLAS SEDERHANA KLAS TIDAK SEDERHANA
PAGAR PER-M1
GEDUNG
Diketahui Disetujui
Kepala Dinas Pekerjaan Umum Kabid. Perencanaan dan Pengawasan
Kota Padang Panjang Dinas Pekerjaan Umum Kota Padang Panjang
DEFRIAL, ST WELDA YUSAR, ST
NIP. 19561206 198103 1 009 NIP. 19720810 199903 2 008
HARGA SATUAN TERTINGGI BGN
KOTA PADANG PANJANG
SUMATERA BARAT
JANUARI / TRIWULAN I (SATU)
(DALAM RUPIAH)
GEDUNG PER-M2
RUMAH NEGARA
PAGAR PER-M1
RUMAH NEGARA
Dibuat oleh
bid. Perencanaan dan Pengawasan Kasi Perencanaan Bid. Keciptakaryaan
Pekerjaan Umum Kota Padang Panjang Bidang Perencanaan dan Pengawasan
Dinas Pekerjaan Umum Kota Padang Panjang
HENDRI YANI, ST, MT, MSc
NIP. 19780708 200212 2 005
KONVERSI SISTEM PERHITUNGAN HSBGN BARU KE SISTEM PERHITUNG
STANDAR HARGA SATUAN BANGUNAN GEDUNG NEGARA PER-M2 TERTI
MENU UTAMA
DATA HARGA BAHAN BANGUNAN DAN UPAH K
DATA HARGA BAHAN BANGUNAN
NO NAMA BAHAN SATUAN
A. BAHAN PASANGAN
1 PASIR BETON m3
2 PASIR PASANG m3
3 PASIR URUG m3
4 SEMEN PC (50 Kg) zak
5 KERIKIL BETON UK. 3 cm s/d 4 cm m3
6 KERIKIL KORAL m3
B. BAHAN PONDASI
7 BATU KALI / BATU BELAH / BATU GUNUNG m3
C. BAHAN LANTAI
8 KERAMIK 30 X 30 m2
D. BAHAN DINDING
9 BATAKO UK. 20 X 40 X 10 bh
10 BATU BATA UK. 5.5 X 11 X 23 bh
11 BATU TELA UK. 20 X 30 X 10 bh
12 BETON ROSTER / KERAWANG bh
E. BAHAN PENUTUP LANGIT-LANGIT
13 ETERNIT, UK. 100 X 100 lbr
14 KAYU LAPIS 4 MM UK 120 X 240 lbr
F. BAHAN PENUTUP ATAP
15 BUBUNGAN GENTENG PLENTONG "S" bh
16 GENTENG PLENTONG "S" bh
17 SENG DATAR BJLS 0.3 m
18 SENG GELOMBANG KECIL lbr
19 BUBUNGAN ASBES GELOMBANG m
20 ASBES GELOMBANG KECIL lbr
G. BAHAN KAYU
21 KAYU BALOK KLAS I m3
22 KAYU BALOK KLAS II m3
23 KAYU PAPAN KLAS II m3
24 KAYU PAPAN KLAS III m3
25 KAYU PAPAN KLAS IV m3
26 KAYU LAPIS 4 mm UK. 8" X 4" lbr
27 KAYU LAPIS 12 mm UK. 8" X 4" lbr
H. BAHAN BESI
28 BESI BETON POLOS DIA. 10 mm Kg
29 BESI BETON ULIR DIA. 13 mm Kg
30 KAWAT BENDRAT / BETON Kg
31 PAKU UK. 3 CM - 7 CM Kg
32 PAGAR BRC JADI (T 1M) m
33 BESI PROFIL C a PIPA BESI DIA. 2" m
I. BAHAN SANITAIR / SALURAN AIR
34 BAK MANDI FIBRE GLASS 70 X 70 X 66 bh
35 BAK RESERVOIR FIGRE GLASS KAP. 1000 ltr bh
36 BUIS BETON 1/2 DIA. 20 CM bh
37 PIPA GIP DIA. 1" m
38 PIPA GIP DIA. 1 1/2" m
39 PIPA GIP DIA. 2" m
40 PIPA PVC DIA. 1/2" m
41 PIPA PVC DIA. 3/4" m
42 PIPA PVC DIA. 2" m
43 PIPA PVC DIA. 3" m
44 PIPA PVC DIA. 4" m
44 KLOSET DUDUK KERAMIK bh
45 KLOSET JONGKOK KERAMIK STANDAR bh
46 URINOAR KERAMIK STANDAR bh
47 WASTAFEL GANTUNG KERAMIK bh
J BAHAN FINISHING
48 CAT BESI Kg
49 CAT DINDING Kg
50 CAT KAYU Kg
K. BAHAN LAIN - LAIN
51 KACA BENING 5 MM m2
52 POMPA TANGAN bh
53 INSTALASI LISTRIK titik
DATA UPAH KERJA
NO TENAGA KERJA SATUAN
1 MANDOR ORG
2 KEPALA TUKANG ORG
3 TUKANG BATU ORG
4 LADEN TUKANG BATU ORG
5 TUKANG BESI ORG
6 LADEN TUKANG BESI ORG
7 TUKANG KAYU ORG
8 LADEN TUKANG KAYU ORG
9 TUKANG CAT ORG
10 LADEN TUKANG CAT ORG
11 TUKANG BONGKAR ORG
12 PEKERJA GALIAN & URUG ORG
13 TUKANG LISTRIK ORG
14 TUKANG PIPA ORG
AN BANGUNAN DAN UPAH KERJA
HARGA SURVAI
(Rp)
KETERANGAN
140,000
140,000
65,000
65,000
125,000
125,000
157,500
58,000
0
55,000
0
0
4,400,000
2,500,000
2,500,000
2,500,000
1,800,000
66,000
85,000
9,000
9,000
15,000
13,000
80,000 x
30,000
335,000
1,200,000
40,000
18,000
26,000
30,000
4,250
5,000
9,500
16,375
23,125
1,650,000
185,000
650,000
675,000
45,000
20,000
45,000
80,000
125,000
150,000
HARGA SURVAI
(Rp)
100,000
103,000
95,000
75,000
95,000
75,000
95,000
75,000
95,000
75,000
75,000
75,000
95,000
95,000
PERHITUNGAN HARGA SATUAN TERTINGGI BANGUNAN GEDUNG NEGARA PE
KAB/KOTA : KOTA PADANG PANJANG
TANGGAL : 05 Januari 2015 MENU UTAMA
NO KEBUTUHAN SATUAN
1 2 3
KEBUTUHAN BAHAN DAN UPAH
BAHAN
A. BAHAN PASANGAN
1 PASIR BETON m3
2 PASIR PASANG m3
3 PASIR URUG m3
4 SEMEN PC (50 Kg) zak
5 KERIKIL BETON UK. 3 cm s/d 4 cm m3
6 KERIKIL KORAL m3
B. BAHAN PASANGAN
7 BATU KALI / BATU BELAH / BATU GUNUNG m3
C. BAHAN LANTAI
8 KERAMIK 30 X 30 m2
D. BAHAN DINDING
9 BATAKO UK. 20 X 40 X 10 bh
10 BATU BATA UK. 5.5 X 11 X 23 bh
11 BATU TELA UK. 20 X 30 X 10 bh
12 BETON ROSTER / KERAWANG bh
E. BAHAN PENUTUP LANGIT-LANGIT
13 ETERNIT, UK. 100 X 100 lbr
14 KAYU LAPIS 4 MM 120 X 240 bh
F. BAHAN PENUTUP ATAP
15 BUBUNGAN GENTENG PLENTONG "S" bh
16 GENTENG PLENTONG "S" bh
17 SENG DATAR BJLS 0.3 m
18 SENG GELOMBANG KECIL lbr
19 BUBUNGAN ASBES GELOMBANG m
20 ASBES GELOMBANG KECIL lbr
G. BAHAN KAYU
21 KAYU BALOK KLAS I m3
22 KAYU BALOK KLAS II m3
23 KAYU PAPAN KLAS II m3
24 KAYU PAPAN KLAS III m3
25 KAYU PAPAN KLAS IV m3
26 KAYU LAPIS 4 mm UK. 8" X 4" lbr
27 KAYU LAPIS 12 mm UK. 8" X 4" lbr
H. BAHAN BESI
28 BESI BETON POLOS DIA. 10 mm Kg
29 BESI BETON ULIR DIA. 13 mm Kg
30 KAWAT BENDRAT / BETON Kg
31 PAKU UK. 3 CM - 7 CM Kg
I. BAHAN SANITAIR / SALURAN AIR
32 BAK MANDI FIBRE GLASS 70 X 70 X 66 bh
33 BAK RESERVOIR FIGRE GLASS KAP. 1000 ltr bh
34 BUIS BETON 1/2 DIA. 20 CM bh
35 PIPA GIP DIA. 1" m
36 PIPA GIP DIA. 1 1/2" m
37 PIPA GIP DIA. 2" m
38 PIPA PVC DIA. 1/2" m
NO KEBUTUHAN SATUAN
1 2 3
39 PIPA PVC DIA. 3/4" m
40 PIPA PVC DIA. 2" m
41 PIPA PVC DIA. 3" m
42 PIPA PVC DIA. 4" m
NO KEBUTUHAN SATUAN
1 2 3
43 KLOSET DUDUK KERAMIK bh
44 KLOSET JONGKOK KERAMIK STANDAR bh
45 URINOAR KERAMIK STANDAR bh
46 WASTAFEL GANTUNG KERAMIK bh
J. BAHAN FINISHING
47 CAT BESI Kg
48 CAT DINDING Kg
49 CAT KAYU Kg
K. BAHAN LAIN - LAIN
50 KACA BENING 5 MM m2
51 POMPA TANGAN bh
52 INSTALASI LISTRIK titik
52 BAHAN LAIN - LAIN (5% dari total Bahan)
UPAH
1 MANDOR ORG
2 KEPALA TUKANG ORG
3 TUKANG BATU ORG
4 LADEN TUKANG BATU ORG
5 TUKANG BESI ORG
6 LADEN TUKANG BESI ORG
7 TUKANG KAYU ORG
8 LADEN TUKANG KAYU ORG
9 TUKANG CAT ORG
10 LADEN TUKANG CAT ORG
11 TUKANG BONGKAR ORG
12 TUKANG GALI & URUG ORG
13 TUKANG LISTRIK ORG
14 TUKANG PIPA ORG
1 2 3
I. SUB TOTAL BIAYA KONSTRUKSI FISIK
MENU UTAMA
594,063.60 535,751.00
1,297,538.10 1,432,333.30
30.45% 594,063.60 26.50% 535,751.00
(10% Upah Kerja) 59,406.36 (10% Upah Kerja) 53,575.10
1,951,008.06 2,021,659.40
195,100.81 202,165.94
234,120.97 242,599.13
39,020.16 40,433.19
195,100.81 202,165.94
2,380,229.83 2,466,424.47
74,138.31 76,823.06
58,530.24 60,649.78
9,755.04 10,108.30
5,853.02 6,064.98
29,265.12 30,324.89
19,510.08 20,216.59
9,755.04 10,108.30
64,876.90 71,616.67
23,802.30 24,664.24
RUMAH DINAS TIPE-70 GEDUNG TIDAK BERTINGKAT
HARGA
VOLUME JUMLAH VOLUME JUMLAH
4 5 6 9 10
2,572,312.46 2,669,853.33
2,572,000.00 2,670,000.00
3,086,000.00 3,738,000.00
GEDUNG
BERTINGKAT
VOLUME JUMLAH
13 14
0.1767 24,738.00
0.1520 21,280.00
0.1620 10,530.00
2.9988 194,922.00
1.3524 169,050.00
1.3524 169,050.00
-
0.0938 14,773.50
-
0.9702 56,271.60
-
8.0898 -
86.9734 69,578.72
10.7864 -
- -
-
0.8820 -
0.0915 6,039.00
-
0.0915 -
14.0182 -
0.0006 -
- -
0.0006 -
- -
-
0.0017 7,480.00
0.1660 415,000.00
0.0012 3,000.00
0.1001 250,250.00
0.0022 3,960.00
0.1728 11,404.80
0.0025 212.50
-
10.0361 90,324.90
19.8851 178,965.90
2.7362 41,043.00
0.2576 3,348.80
-
- -
0.0013 1,560.00
0.0615 2,460.00
0.1257 2,262.60
0.0014 36.40
0.3098 9,294.00
- -
GEDUNG
BERTINGKAT
VOLUME JUMLAH
13 14
- -
0.0041 38.95
- -
0.0082 189.63
GEDUNG
BERTINGKAT
VOLUME JUMLAH
13 14
0.0011 1,815.00
0.0021 388.50
0.0068 4,420.00
0.0012 810.00
-
0.0122 549.00
0.4456 8,912.00
0.2005 9,022.50
-
0.0525 4,200.00
0.0013 162.50
0.0013 195.00
- 98,303.91
-
- 1,885,842.70
-
-
0.2697 26,970.00
0.2617 26,955.10
0.3662 34,789.00
0.2946 22,095.00
1.0618 100,871.00
0.9910 74,325.00
1.8299 173,840.50
0.3183 23,872.50
0.3319 31,530.50
0.1041 7,807.50
0.9629 72,217.50
1.3715 102,862.50
0.0918 8,721.00
0.0086 817.00
707,674.10
1,885,842.70
26.56% 707,674.10
(20% Upah Kerja) 70,767.41
2,664,284.21
266,428.42
319,714.11
53,285.68
266,428.42
3,250,426.74
101,242.80
79,928.53
13,321.42
7,992.85
39,964.26
26,642.84
13,321.42
94,292.14
32,504.27
GEDUNG
BERTINGKAT
VOLUME JUMLAH
13 14
3,518,430.21
3,518,000.00
4,925,000.00
PERHITUNGAN HARGA SATUAN TERTINGGI PAGAR PER-M1 BGN
KAB/KODYA : KOTA PADANG PANJANG
MENU UTAMA
TANGGAL : 05 Januari 2015
1 2 3 4
KEBUTUHAN BAHAN DAN UPAH
BAHAN
A. BAHAN PASANGAN
1 PASIR BETON m3 140,000
2 PASIR PASANG m3 140,000
3 PASIR URUG m3 65,000
4 SEMEN PC (50 Kg) zak 65,000
5 KERIKIL BETON UK. 3 cm s/d 4 cm m3 125,000
6 KERIKIL KORAL m3 125,000
B. BAHAN PASANGAN
7 BATU KALI / BATU BELAH / BATU GUNUNG m3 157,500
C. BAHAN DINDING
9 BATAKO UK. 20 X 40 X 10 bh 0
10 BATU BATA UK. 5.5 X 11 X 23 bh 800
11 BATU TELA UK. 20 X 30 X 10 bh 0
12 BETON ROSTER / KERAWANG bh 50,000
D. BAHAN KAYU
21 KAYU BALOK KLAS I m3 4,400,000
22 KAYU BALOK KLAS II m3 2,500,000
23 KAYU PAPAN KLAS II m3 2,500,000
24 KAYU PAPAN KLAS III m3 2,500,000
25 KAYU PAPAN KLAS IV m3 1,800,000
26 KAYU LAPIS 4 mm UK. 8" X 4" lbr 66,000
27 KAYU LAPIS 12 mm UK. 8" X 4" lbr 85,000
E. BAHAN BESI
28 BESI BETON POLOS DIA. 10 mm Kg 9,000
29 BESI BETON ULIR DIA. 13 mm Kg 9,000
30 KAWAT BENDRAT / BETON Kg 15,000
31 PAKU UK. 3 CM - 7 CM Kg 13,000
32 PAGAR BRC JADI (T 1M) m 80,000
33 PAGAR PROFIL C a PIPA BESI DIA.. 2" m 30,000
F. BAHAN FINISHING
34 CAT BESI Kg 45,000
35 CAT DINDING Kg 20,000
36 CAT KAYU Kg 45,000
0.0608 8,512.00
0.6021 84,294.00
0.0835 5,427.50
3.0376 197,444.00
0.0000 -
0.1126 14,075.00
0.0000
0.3750 59,062.50
0.0000
0.0000 -
114.2857 91,428.57
0.0000 -
0.0000 -
0.0000
0.0000 -
0.0000 -
0.0000 -
0.0000 -
0.0107 19,200.00
0.0000 -
0.0000 -
0.0000
16.2249 146,024.10
0.0000 -
0.2922 4,383.00
0.3251 4,226.30
0.0000 -
0.0000 -
0.0000
0.0000 -
1.0436 20,872.00
0.0000 -
654,948.97
-
-
0.0699 6,994.06
0.0840 8,653.67
0.5756 54,682.09
0.3663 27,470.62
0.1992 18,924.00
0.0741 5,559.49
0.1425 13,541.33
0.0713 5,345.26
0.6937 65,905.39
0.5985 44,888.51
0.0133 997.88
0.1938 14,533.78
267,496.09
654,948.97
28.58% 267,496.09
(5% Upah Kerja) 13,374.80
935,819.87
93,581.99
112,298.38
18,716.40
93,581.99
1,141,700.24
35,561.16
28,074.60
4,679.10
2,807.46
14,037.30
9,358.20
4,679.10
32,747.45
11,417.00
1,235,463.14
1,235,000.00
1,359,000.00
P R
R O
O S
S E
E N
N T
T A
A S
S E
E
B
B I
PROSENTASE
I A
BIAYA PROSENTASE BIAYA PENGAWASAN PROSENTASE BIAYA PENGELOLAAN
A Y
PERENCANAAN
TABEL E1
Y A
a A
P
Klasifikasi :
E
N SEDERHANA A
A
N
1 2 3 4 5 6
CATATAN:
1. MASUKKAN NILAI BIAYA KONSTRUKSI PADA KOLOM BIAYA KONSTRUKSI FISIK (KOLOM 1) DALAM RIBUAN RUPIAH.
BIAYA KONSTRUKSI FISIK MERUPAKAN PERKALIAN HARGA STANDAR (KONSTRUKSI FISIK) YANG BERLAKU UNTUK KLASIFIKASI/TIPE BGN YANG BERSANGKUTAN DENGAN
TOTAL LUASNYA.
2. SECARA OTOMATIS PROGRAM AKAN MENGHITUNG NILAI KOMPONEN-KOMPONEN BIAYA LAINNYA, DALAM RIBUAN RUPIAH.
UNTUK BANGUNAN KLASIFIKASI SEDERHANA TIDAK ADA BIAYA MANAJEMEN KONSTRUKSI.
3. BIAYA KESELURUHAN YANG DIBUTUHKAN UNTUK PEMBANGUNAN BGN ADALAH PADA KOLOM (6) YAITU TOTAL BIAYA PEMBANGUNAN.
P
R
O
S
E
N
T
A
S
E
B
PROSENTASE
I
BIAYA PROSENTASE BIAYA PENGAWASAN PROSENTASE BIAYA PENGELOLAAN
A
PERENCANAAN
Y
A
b TABEL E2 M
A
DAFTAR BIAYA KOMPONEN KEGIATAN N
A
J
1 2 3 4 5
CATATAN:
1. MASUKKAN NILAI BIAYA KONSTRUKSI PADA KOLOM BIAYA KONSTRUKSI FISIK (KOLOM 1) DALAM RIBUAN RUPIAH.
BIAYA KONSTRUKSI FISIK MERUPAKAN PERKALIAN HARGA STANDAR (KONSTRUKSI FISIK) YANG BERLAKU UNTUK KLASIFIKASI/TIPE BGN YANG BERSANGKUTAN DENGAN TOTAL LUASNYA
2. SECARA OTOMATIS PROGRAM AKAN MENGHITUNG NILAI KOMPONEN-KOMPONEN BIAYA LAINNYA, DALAM RIBUAN RUPIAH.
3. UNTUK KLASIFIKASI TIDAK SEDERHANA, DIMUNGKINKAN PILIHAN MENGGUNAKAN KONSULTAN MANAJEMEN KONSTRUKSI ATAU KONSULTAN PENGAWAS,
TERGANTUNG PADA KRITERIA LUASAN, JUMLAH LANTAI, ATAU JUMLAH PENYEDIA JASA.
4. BIAYA KESELURUHAN YANG DIBUTUHKAN UNTUK PEMBANGUNAN BGN ADALAH PADA KOLOM (6) UNTUK YANG MENGGUNAKAN KONSULTAN MANAJEMEN KONSTRUKSI, ATAU KOLOM (7)
KONSULTAN PENGAWAS.
R
O
S
E
N
T
A
S
E
B
I
A
Y
A
P
E
N
G
MENU UTAMA
E
L
O
L
A
A
N TIDAK SEDERHANA
(dalam ribuan rupiah)
TOTAL BIAYA PEMBANGUNAN
DENGAN MANAJEMEN
DENGAN PENGAWASAN
KONSTRUKSI
6 7
#NAME? #NAME?
KONSULTAN PENGAWAS,
H. MAISUL, ST. MM D E F R I A L, ST
NIP. 19590402 198103 1 009 NIP. 19561206 198103 1 009
Padang Panjang, January/2015
Dibuat oleh
Kasi Perencanaan Bid. Keciptakaryaan
Bidang Perencanaan dan Pengawasan
Dinas Pekerjaan Umum Kota Padang Panjang