NOS. OF TOTAL
FOR DRAWING NO:13C09-008-DWG-C-RM06
DIMENSION ( mm ) Bend/ TOTAL LENGTH ( m )
NOS. BARS NOS. LENGTH
BAR BAR HOOK BAR DIA (mm) WEIGHT
TYPE OF PER OF PART NAME /LOCATION OF EACH
MARK DIA. A B C D E F G H J ALLO (MT)
UNITS UNIT BARS BAR-L 8 10 12 16 20 25 28 32
W.
a1 3 20 2 74 148 COMBINED FOOTING - F2 500 3300 500 -6 4180 0 0 0 0 618.64 0 0 0 1.525
a10 4 12 2 132 264 COMBINED FOOTING - F2 2876 1376 2876 1376 24 8792 0 0 2321.09 0 0 0 0 0 2.060
a11 4 12 2 396 792 COMBINED FOOTING - F2 2876 480 2876 480 24 7000 0 0 5544 0 0 0 0 0 4.920
b5 15 12 2 12 24 ISOLATED FOOTING - F1 300 718 900 718 300 -12 2792 0 0 67.008 0 0 0 0 0 0.059
1 of 2
Project : 650 (1200) TPD CEMENT PLANT
Client : SHAYONA CEMENT LIMITED, MALAWI, AFRICA
NOS. OF TOTAL
FOR DRAWING NO:13C09-008-DWG-C-RM06
DIMENSION ( mm ) Bend/ TOTAL LENGTH ( m )
NOS. BARS NOS. LENGTH
BAR BAR HOOK BAR DIA (mm) WEIGHT
TYPE OF PER OF PART NAME /LOCATION OF EACH
MARK DIA. A B C D E F G H J ALLO (MT)
UNITS UNIT BARS BAR-L 8 10 12 16 20 25 28 32
W.
e3 3 10 1 13 13 ISOLATED FOOTING - F5 300 2500 300 -6 3040 0 39.52 0 0 0 0 0 0 0.024
e5 15 12 1 12 12 ISOLATED FOOTING - F5 300 768 900 768 300 -12 2892 0 0 34.704 0 0 0 0 0 0.031
0 0 0 0 0 0 0 0 0.000
f5 15 12 2 12 24 ISOLATED FOOTING - F6 300 668 900 686 300 -12 2710 0 0 65.04 0 0 0 0 0 0.058
0 0 0 0 0 0 0 0 0.000
0 0 0 0 0 0 0 0 0.000
h5 15 12 1 12 12 ISOLATED FOOTING - F8 300 668 900 686 300 -12 2710 0 0 32.52 0 0 0 0 0 0.029
Bending Allowance for 900 bend = - 3 (Upto 25Dia. Bars) Total Length IN M 0 2307.1 8590.06 780.116 798.32 1453.64 0 656.32 --
Bending Allowance for 900 bend = - 4 (Above 25Dia. Bars) @ Kg/m 0.394384 0.6162 0.88736 1.577536 2.4649 3.85141 4.8312 6.31014 --
Hook Allowance for Stirrups = +24 WEIGHT IN MT 0.000 1.422 7.623 1.231 1.968 5.599 0.000 4.141 21.983
ADD 5% WASTAGE 0 1.4928 8.00363 1.292194 2.06617 5.87849 0 4.34855 23.0817995