Está en la página 1de 4

PERT AJUSTADO

16.894 13.584 30.478


0 014 0
16.894 13.584 30.478

1 0.485 1.485 7.9935 1.54 9.5335 16.894 0.832 17.726


5.58 001 5.58 0 004 0 0 015 0
6.58 0.485 7.065 7.9935 1.54 9.5335 16.894 0.832 17.726
0 1 1 7.065 0.9285 7.9935
0 000 0 0 003 0
0 1 1 7.065 0.9285 7.9935
1 6.065 7.065 7.9935 0.8295 8.823 9.5335 2.9615 12.495 12.495 0.071 12.566 12.566 0.3175 12.884 13.006 2.875 15.881 15.881 1.0125 16.894 16.894 1.26 18.154
0 002 0 0.7105 005 0.7105 0 006 0 0 007 0 0 009 0 0 011 0 0 012 0 0 016 0
1 6.065 7.065 8.704 0.8295 9.5335 9.5335 2.9615 12.495 12.495 0.071 12.566 12.566 0.3175 12.884 13.006 2.875 15.881 15.881 1.0125 16.894 16.894 1.26 18.154

1 1.0125 2.0125 12.566 0.44 13.006 2.0125 1.5 3.5125 16.894 0.741 17.635
9.4935 008 9.4935 0 010 0 9.4935 013 9.4935 0 017 0
10.494 1.0125 11.506 12.566 0.44 13.006 11.506 1.5 13.006 16.894 0.741 17.635

16.894 0.071 16.965


0 021 0
16.894 0.071 16.965

PERT POR SEMANAS O ACTIVIDADES

LEVANTAMIENTO DE
MUROS(PRIMER NIVEL)

HABILITADO Y
IMPERMEABILIZACION
LIMPIEZA Y TRAZO ARMADO DE
PARA CIMENTACION
ACERO(CASTILLOS)
HECHURA Y CIMBRADO
INICIO DE LA OBRA
PARA CIMENTACION
CEPAS PARA LA HABILITADO Y COLOCACION DE
COLADO EN RELLENO PARA COLOCACION DE HECHURA DE
REALIZACION DE ARMADO DE LINEAS COLADO EN FIRME
CIMENTACION CIMENTACION ACERO (FIRME) CIMBRA(CASTILLOS)
ZAPATAS ACERO(CIMENTACION) HIDROSANITARIAS

EXCAVACION PARA LA
IMPERMEABILIZACION COLOCACION DE COLOCACION DE
REALIZACION DEL
(FIRME) LINEAS ELECTRICAS CIMBRA(CASTILLOS)
FIRME

HECHURA DE
CIMBRA(TRABES
PRIMER NIVEL)
21.094 0.0418 21.136 52.293 0.832
0 024 0 0 032
21.094 0.0418 21.136 52.293 0.832

17.635 1.6055 19.24 19.24 0.116 19.356 21.094 8.1705 29.264 30.478 2.875 33.353 33.353 2.4385 35.791 35.791 2.918 38.709 38.709 13.584 52.293 52.293 1.5
0 018 0 0 019 0 1.2133 025 1.2133 0 027 0 0 028 0 0 029 0 0 031 0 0 030
17.635 1.6055 19.24 19.24 0.116 19.356 22.307 8.1705 30.478 30.478 2.875 33.353 33.353 2.4385 35.791 35.791 2.918 38.709 38.709 13.584 52.293 52.293 1.5

19.356 1.6645 21.021 21.021 0.0418 21.062 21.062 0.0315 21.094 21.094 1.5445 22.638 52.293 1.26
0 020 0 0 022 0 0 023 0 0 026 0 1.175 033
19.356 1.6645 21.021 21.021 0.0418 21.062 21.062 0.0315 21.094 21.094 1.5445 22.638 53.468 1.26

HABILITADO Y
DECIMBRADO(TRABES
ARMADO DE
PRIMER NIVEL)
ACERO(CASTILLOS

HECHURA Y COLOCACION COLOCACION DE LEVANTAMIENTO DE


COLADO(LOSA DE DECIMBRADO(LOSA DE COLOCACION DE
COLADO(CASTILLOS) DECIMBRADO(CASTILLOS) DE CIMBRA(LOSA DE LINEAS MUROS(SEGUNDO
ENTREPISO) ENTREPISO) LINEAS ELECTRICAS
ENTREPISO) HIDROSANITARIAS NIVEL)

HABILITADO Y COLOCACION DE HABILITADO DE


COLADO(TRABES HECHURA DE
ARMADO DE CIMBRA(TRABES HACERO(LOSA DE
PRIMER NIVEL) CIMBRA(CASTILLOS)
ACERO(TRABES) PRIMER NIVEL) ENTREPISO)
53.125 53.125 0.741 53.866 53.866 0.168 54.034 54.034 0.741 54.775 55.96 1.454 57.414 64.211 2.2955 66.507 66.507 2.9465 69.453 69.453 1.4155 70.869
0 0 034 0 0 035 0 0 036 0 6.797 044 6.797 0 045 0 3.3685 046 3.3685 3.3685 047 3.3685
53.125 53.125 0.741 53.866 53.866 0.168 54.034 54.034 0.741 54.775 62.757 1.454 64.211 64.211 2.2955 66.507 69.875 2.9465 72.822 72.822 1.4155 74.237

53.793 54.775 0.0315 54.807 54.898 1.0625 55.96 55.96 8.251 64.211 69.453 4.784 74.237
0 0 037 0 0 042 0 0 043 0 5.5785 048 5.5785
53.793 54.775 0.0315 54.807 54.898 1.0625 55.96 55.96 8.251 64.211 75.032 4.784 79.816

53.553 53.553 0.0785 53.632 54.807 0.0595 54.866 54.866 0.0315 54.898 54.898 0.0595 54.957 66.507 2.783 69.29
1.175 1.175 038 1.175 0 039 0 0 040 0 1.003 041 1.003 0 049 0
54.728 54.728 0.0785 54.807 54.807 0.0595 54.866 54.866 0.0315 54.898 55.901 0.0595 55.96 66.507 2.783 69.29

COLOCACION DE HABILITADO DE COLOCACION DE


COLADO(CASTILLOS) DECIMBRADO(CASTILLOS) COLADO(LOSA) DECIMBRADO(LOSA)
CIMBRA(CASTILLOS) HACERO(LOSA) DOMOS

HABILITADO Y ARMADO HECHURA Y COLOCACION


COLOCACION DE CAJAS CONSTRUCCION DE
DE ACERO(TRABES DE CIMBRA(LOSA DE
PARA LA LUZ TECHUMBRE
SEGUNDO NIVEL) AZOTEA)

HECHURA DE COLOCACION DE DECIMBRADO(TRABES COLOCACION DE


COLADO(TRABES)
CIMBRA(TRABES) CIMBRA(TRABES) PRIMER NIVEL) VENTANAS
74.237 2.8735 77.111
0 053 0
74.237 2.8735 77.111

79.816 9.4735 89.289 89.289 2.25 91.539 91.539 6.6665 98.206 98.206 6.6668 104.87
0 052 0 0 051 0 0 054 0 0 055 0
79.816 9.4735 89.289 89.289 2.25 91.539 91.539 6.6665 98.206 98.206 6.6668 104.87

69.29 10.526 79.816


0 050 0
69.29 10.526 79.816

COLOCACION DE
VARANDAL EN
ESCALERA

EMPLASTE DE PRIMER Y COLOCACION DE APLICACIN DE COLOCACION DE


FIN DE OBRA
SEGUNDO NIVEL PUERTAS PINTURA LOSETAS

REPELLADOS DE
MUROS