Process:

1 Identify value adding strategies in each reservoir (as in the Screening Worksheet)
2 Quick screen strategies to get short lists of wells (using DSS, Cross-sections, other basic data)
3 Team review -- reservoir team review the short-lists which come from screening; highgrade opportunities for further
4 For each prospect, outline what information will likely be needed for the decision support package (DSP); anticipate
5 Do initial ranking of new prospect, CPDEP Ph I level of detail
6 Develop the outlined information, needed for the DSP.
7 Team review -- reservoir team review the prospect
8 Lock in to a wellwork strategy and job scope
9 Update rank and priority
10 Finalize technical proposal (scope, procedure, profile, economics)
11 Peer Review -- present to DRB. This review should be CPDEP Phase II, precision and level of detail.
12 Followup DRB requests for more information.
13 Obtain DRB sign-off before proceeding
14 Initiate permitting
15 Schedule work with Drilling
e opportunities for further work
package (DSP); anticipate requirement of the Peer Review.
Screening Fault Screening Actual well values
Strategies Block measures How to screen from screen data

CFB
All wells with water production greater than DSS
All wells with wcut greater than DSS
All wells with Comp_CF less than DSS
All wells with GOR greater than
All wells currently shut in for Hi GOR
All wells with unshot pay in C4X and C3X-M Cross sections

EFB
All wells in EFB Norm with unshot pay Cross sections

NFB

C2
LL-3080 was showing some apparent WF response. Well LL-2397 has cold spot across the C2. Do we have enough reservoir
Wells on
short list Comments

450 BOPD shut in Hi GOR


3 wells in C3X_M with unshot pay

. Do we have enough reservoir to put in a little flood pattern?


<-- User entry cells --> l-m-h factors 1.00 0.50 0.10

success ratio for similar


Production risk (BOPD)
Selection Criteria

Expected development

barrel of new reserves


Total Job Incremental

cost per incremental


Non discretionary

Mechanical risk

Technical risk

opportuntiies
Other similar

available?
Job
Objective

work.
Well No. Code
Peak
BRIEF statement of job incremental Benchmark
type, and scope BOPD Y N L M H L M H BOPD YN = $3.5/BO 0 to 1.0
Importance weighting --> 3 3 3 1 1 1
LL-3606 WSO Shut off C4X water zone 40 N L H 0 Y 1.00 0.50
LL-3639 AP Add perfs in C3X-M 50 N L M 20 Y 1.71 0.50

LL-0846 ACZ Acidize existing perfs in B9 20 N L M 0 Y 3.70 0.75


Temp Aband B9 and AP in
LL-0846 ACZ&AP B8 100 N H M 40 Y 2.50 0.25
-
-
-
-
-
-
-
-
-
-
-
-
-
-

* Job objectie codes


AP = add pay, PB = Plug Back, ST_ACZ = Stimulation acidize, ST_FRAC = stimulation fracture, WSO = water shut off
1

3
1
1
Time to achieve peak

12
Months
2

Y
Y
Y

N
Short lead time

YN
Other criteria 1

Other criteria 2

Other criteria 3

Priority rank

91
36
82
66
1
1
CPDEP Phase

Job cost $M
60
50

New reserves MBO

Owner
35 WOLI

1 250 100 FCED


1 200 54 FCED
50 LMUN
For a typical workover opportunity, guidelines for information needed in the decision support package (DSP)
Analysis of similar work done in the same reservoir
Estimate of incremental production profile, with justification
Reserves estimate
Production plot, annotated
Cross section
PLT, if applicable
MDT, if available
Geologic maps -- isopach, structure, etc.
Latest welltest data, to supplement DSS data.
Wellbore diagram
Wellwork history
Assessment of project risks -- mechanical, technical, potential loss/deferral of current production
Assessment of similar opportunities

Additional data that will in many cases, be needed to support the proposal
Nodal analysis
Original log data
Pressure buildup or falloff analyses
Fillup analysis
Consult best practices (w/PdVSA and others)
Determine facilites impacts
Check cement bond logs
Check FMI log

Other..
PDVSA Glossary of Well Work Acronyms
Descripti
Job Tipo de
on /
Type trabajo
Descripci
Codes Cdigo
n
ABAN ABAN Abandoned / Abandonado
AP AAA Open adicional sands or Add perforations / Abrir arenas adicionales
CO CO Clean out / Limpieza
CPIA CPIA Convert producer into injector / Convertir productor en inyector
FRAC FRAC Fracture / Fractura
GSO RAG Gas Shut Off / Reparar arenas de Gas
IC CI Initial completion / Completacin Inicial
IGL IGL Install gas lift / Instalar gas lift
MGL RIGL Modify gas lift / Reinstalar gas lift
PERF C Perforarate / Caonear
RCMP R/C Recomplete other Reservoir / Recompletar en otro yacimiento
RPRF RC Reperforate / Reperforar intervalos
STIM STIM Stimulation / Estimulacin
WSO RAA Water Shut Off / Reparar arenas de agua