Priority of Location of

CE Contract No Type1 Type2 Code Material ID Name of Material Main Field Material Category Related to T-Spec Ref General Description Use Location of usage Sample Remarks
Submission Inspection

Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which Composition for use in sealing joints in concrete members
CE NNNA MS C 15 1 Joint Sealant Civil Sealant Substation 3 Seal Joints Internal joint (Horizontal & vertical) No Site
ever is applicable to respective project) and block works

Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which


CE NNNA MS C 15 4 UV Resistant Joint Sealant Civil Sealant Substation 3 Sealant with excellent resistant to UV Seal gaps externally External gaps No Site
ever is applicable to respective project)

Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which Fire resistant acrylic sealant .A fire rating of up to 2 hours to
CE NNNA MS C 15 5 Fire Resistant Sealant Civil Sealant Substation 3 Joint Sealant Internal perimeter pointing around door & window frames No Site
ever is applicable to respective project) be achieved.

Aluminum Channel Size 20x10 mm & Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which
CE NNNA MS C 15 6 Civil ALuminum Substation 3 To define architectural elements Grooves and Louvers External Surface & Parapet Yes Site
Aluminum Box Section thic 50mm ever is applicable to respective project)

Aluminum profile section of maximum opening size 40mm


with powder coating to approved color shade supported by
Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which
CE NNNA MS C 15 8 Aluminum Claustra with Galvanized Mesh Civil ALuminum Substation 3 aluminum panel frame. Architectural Element IDT ,ET & Reactor front enclusure Yes Site
ever is applicable to respective project)
Galvanized mesh fencing of opening size not more than 25 x
25 mm of 3.2 mm dia rod to be fixed behind Claustra

Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which


CE NNNA MS C 15 9 Aluminum Works Civil ALuminum Substation 3 Suitable aluminum sections for Windows and Doors Door and window opening Substation Building Yes Site
ever is applicable to respective project)

Steel Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which Insulated Polyurethane sandwich aluminum panels with
CE NNNA MS C 15 10 Insulated Overhead Door Civil Substation 2 overhead door in GIS room 132kV GIS room Yes Site
(Sandwich Panel) ever is applicable to respective project) electrical/manual operation

Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which Suitable aluminum profile section of 10-12.4 cm width,
CE NNNA MS C 15 11 Aluminum Threshold Civil ALuminum Substation 3 Stop ingress of sand and dust Fixed to the bottom of aluminum door frame Yes Site
ever is applicable to respective project) powder coated to the same color of the door.

Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which


CE NNNA MS C 15 12 Aluminium Profile Sheeting Civil ALuminum Substation 3 0.7mm thick aluminum sheet Saw tooth roofing for IDT & ET bays ET & IDT Roof Yes Site
ever is applicable to respective project)

An upright, cupboard like repository with shelves, drawers, or


Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which
CE NNNA MS C 15 13 Aluminium Cabinet Civil ALuminum Substation 3 compartments for the safe keeping or display of objects made Cabinet for storage Kitchen & Pantry Yes Site
ever is applicable to respective project)
of aluminum sheets.

Epoxy painted galvanised steel door of Proprietary. Shall be in


accordance with NFPA 80 and fire barrriers rated for
Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which
CE NNNA MS C 15 14 Fire rated steel door Civil Metalic Substation 2 minimum 2 hours fitted with vision panel. The door shall be Fire rated door Intranal Rooms Yes Site
ever is applicable to respective project)
provided with cutout and required reiforcement to recive
ironmongery.

Suitable profile with a smoke seal, of approximitlay 12cm


Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which
CE NNNA MS C 15 15 Smoke Sealed Threshold Civil Steel Substation 2 width, powder coated to the same color shade as the steel To seal agaist smoke Steel Doors frame in Basement Yes Site
ever is applicable to respective project)
door.
Square floor hatch door 914x914 mm . Provided with
Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which
CE NNNA MS C 15 16 Fire Rated Floor Hatches Civil Steel Substation 2 emergancy exit facilities in accordance with NFPA 80 , Fire escape exit from Basement to the Ground floor Basement of 11kV Switchgear & 132kV GIS Room No Site
ever is applicable to respective project)
having fire rating for minimum 2 hours

Ironmongery shall indicate the fittings to the doors such as


Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which
CE NNNA MS C 15 17 Ironmongery Civil Steel Substation 2 pull/push door handles, panic door closure, locks etc from Fixed to the Steel / Aluminum Doors Subsation Buildings Yes Site
ever is applicable to respective project)
internationally reputed manufacturer.

Woven fence usually made from coated steel wire, having


Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which
CE NNNA MS C 15 18 Chain Link fence Civil Metalic Substation 2 maximum opening 30mm fixied to the panel frame of GI Isolate capacitor Banks Capacitor Room Yes Site
ever is applicable to respective project)
pipes

Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which Trench Cover
CE NNNA MS C 15 19 GI Gratings / GI Chequered Plate Civil Steel Substation 2 Hot dip galvanized Industrial type heavy section with non Transformer Bays, Basement & other openings. Yes Site
ever is applicable to respective project) Openings Cover
slippery tooth.

Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which


CE NNNA MS C 15 20 Brass Divider Strips Civil Metalic Substation 2 Metal Panels Divide the floor screed beds cable basement Yes Site
ever is applicable to respective project)

Polypropylene step Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which
CE NNNA MS C 15 21 Civil Steel Substation 1 Galvanised (Hot Dipped) Iron steps with polypropylene coverFacilitate access for maintenance and inspection. Manholes, cable pits and IDT/ET/Reactor sump pits. No Site
reinforced with 16mm dia. steel. ever is applicable to respective project)

Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which


CE NNNA MS C 15 22 Mesh Fabric ( Non galvanized) Civil Steel Substation 2 Square Mesh Fabric Skin reinforcement in secondary concrete 132kV Switchgear room No Site
ever is applicable to respective project)

Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which


CE NNNA MS C 15 23 Rush Coat Civil Plastering Substation 2 Background for Cement Plaster. Surface preparation for for plastering RCC vertical surface and ceiling No Site
ever is applicable to respective project)

Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which Internal wall surface of substation building
CE NNNA MS C 15 24 Internal Plaster Civil Plastering Substation 2 Retarded semihydrate gypsum-plaster. Background to recive internal paint No Site
ever is applicable to respective project) (block work & RCC)

Cement , mortar mix ratio 1:4 , added with a waterproofing


External wall Sufrace,pump housewalls, capacitor room &
Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which agent. Background to recive external paint
CE NNNA MS C 15 25 External Plaster Civil Plastering Substation 2 IDT (block work & RCC) No Site
ever is applicable to respective project) Consists of portland cement, expanded perlite, processed sand - Provide insulation to external surfaces of concrete cloumns
- External Cloumn & Beams
and chemical additives.

Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which Coating formulated and recommended for application to Concrete surface for vertical members (walls/columns) &
CE NNNA MS C 15 26 Curing Compound Civil Plastering Substation 1 Retard the evaporation of water No Site
ever is applicable to respective project) freshly placed concrete. RCC ceiling

A colored liquid mixture, used as protection coating Internally


& Externally
Emulsion Paints
High quality pure acrylic copolymer based washable emulsion
paint containing fungicides to prevent fungus growth used
along with compatible primer
Primer Coat
Light textured acrylic copolymer base emulsion coat
Under Coat (Compound)
Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which Internal (Walls, Columns, Beams & Ceilings) & External
CE NNNA MS C 15 27 Paint Civil Painting Substation 2 spray applied acrylic emulsion based textured compound Protect concrete serface Yes Site
ever is applicable to respective project) (Wall & Columns )
Texterd coat
light texturuling textured acrylic copolymer based texture
compond
Two coats(External)
high quality two component polyurethane isocyanite cured
paint giving a high glossy and color stable surface.
Oil Paints
Best quality high gloss alkyd based enamel paint with
compactible primer resistant to corrosion, water, and fungus.

Page 1 of 8

Issue-4, Rev-0
All structural steel works shall be hot Dip galvanized.
Painting system : 1x Primer Coat+1x Under Coat+2x Top
Coat
The painting system shall comprise of:
1-Two component inorganic zinc silicate prime -75 micron
DFT.
2-Two component polyamide cured epoxy with natural
micceous iron oxide - 100 micron DFT.
Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which 3-Two component polyurethane finishing coat - 40micron
CE NNNA MS C 15 28 System for structural steel protection Civil Painting Substation 2 Protect Structural Steel works Handrail, Spiral staircase, cat Ladders, other steel metal No Site
ever is applicable to respective project) DFT
Protection for galvanized steel
Epoxy polyamide cured primer (solids by volume 50% to
60%)
Followed by epoxy polyamide cured high build (solids by
volume 50% to 60%) under coat
topped with a 2- component polyurethane isocyanite cured
paint with excellent color and gloss retention properties and
resistant to abrasion, impact, chemical attacks and corrosion.

Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which


CE NNNA MS C 15 29 Black Bitumen Emulsion Paint Civil Painting Substation 3 High Quality moisture resistant bitumen paint in black color Protect concrete serface from moisture Above Suspended ceiling No Site
ever is applicable to respective project)
Material for treating the concrete surface which will not Concrete surface under raised flooring in LVAC room,
Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which
CE NNNA MS C 15 30 Dust Proofer/Surface Hardner Civil Painting Substation 3 receive any subsequent finishes, shall comprise of a epoxy Dust proofing seal coat control/protection room. Telecom room, DC charger & No Site
ever is applicable to respective project)
based sealer and hardner. corridor

Raised access flooring system that can range in height.


Flooring consist of floor panels supported continuously on all
four edges on easily removable snap-on metal stringers
Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which supported on steel adjustable pedestals or supports, with Corridor, LVAC, control, protection, charger & telecom
CE NNNA MS C 15 31 Raised Floor System Civil Floor Finishing Substation 2 Construct a cable basement below floor level Yes Site
ever is applicable to respective project) arrangment to resist side sway(letaral movement). rooms

Raised floor system can above stable frame supporting system


as well.

Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which Sub base consisting of well graded natural sands, gravels or
CE NNNA MS C 15 32 Road Base Civil Soil Improvement Substation 1 Prepare formation for load bearing serface Below structural foundation and internal road No Site
ever is applicable to respective project) rock

Solvent free epoxy resin mortar screed comprise a three 11kV Switchgear room, Transformer plinth, capacitor bank,
Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which
CE NNNA MS C 15 33 Internal Epoxy Screed Civil Floor Finishing Substation 2 cpmponent system of epoxy resin, hardner and mineral Floor Finishing record, workshop, fire pump house, air lock room, Nitrogen Yes Site
ever is applicable to respective project)
aggregates. room, Stair case steps and loading corridor in first floor

Aliphatic Acrylic-Polyester Polyurethane, high build, low


sheen finish that has excellent resistance to corrosion,
chemicals and abrasion.Suitable for application over a
Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which
CE NNNA MS C 15 34 External Epoxy Screed Civil Floor Finishing Substation 2 number of Carboline primers and intermediates, this material Floor Finishing External Area, off -loading platfroms, External steps etc., Yes Site
ever is applicable to respective project)
provides very good weathering performance in a broad range
of colors.Capable to withstand alternate heat and cold
Prevailed externally

Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which 100mm High block in color polyvinyl chloride membrane Form a waterproof seal between the floor and the wall, and
CE NNNA MS C 15 35 PVC Skirting Civil Finishing Substation 3 Raised floor area Yes Site
ever is applicable to respective project) with coving provide a neat, attractive join between the wall and the floor.

Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which


CE NNNA MS C 15 36 Stone chips Civil Finishing Substation 3 Coarse crashed aggregate of size 16-40 mm Surface dressing Yard area No Site
ever is applicable to respective project)
Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which
CE NNNA MS C 15 37 Cobble Stones Civil Finishing Substation 3 35-50 mm size cobble stone, non flake in shape Create void in the thrench to accommodate oil\ water Transformer trench No Site
ever is applicable to respective project)
Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which
CE NNNA MS C 15 38 Tile Sealant Civil Sealant Substation 3 High performance waterproof tile Sealant Fix ceramic tile Wall & Floor in Battery rooms,Toilet & Pantry No Site
ever is applicable to respective project)
Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which
CE NNNA MS C 15 39 Tile Grout Mortar Civil Grout Substation 3 Waterproof tile grout Fill the joints of tiles where the joint width not exceed 4mm Wall & Floor in Battery rooms,Toilet & Pantry No Site
ever is applicable to respective project)
Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which
CE NNNA MS C 15 40 Precast Concrete Tile Civil Tiles Substation 3 Precast Tile with chamfer at top edge Roof Finishing Roof Terrace Yes Site
ever is applicable to respective project)
Interlocking concrete block
paving shall be 60mm thick for footpath, 80mm for internal
Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which
CE NNNA MS C 15 41 Interlock blocks & kerb stone Civil Tiles Substation 3 road. Paving and footpath blocks External Area (Road & surfacing) No Site
ever is applicable to respective project)
Kerb
Pre-cast concrete

Carrara marbel threshold single piece with edge coving


Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which
CE NNNA MS C 15 42 Marbel threshold & Sill Civil Tiles Substation 2 Carrara marbel sill with cutout at outer edge to accommodate Stop/ adjust gap between floor and bottom of shutter. Threshold: Steel Door threshold, Sill: Windows Yes Site
ever is applicable to respective project)
aluminum window frame flashing external, with wall face

Glazed in Wall:
Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which A vitrified covering which is practically impermeable.
CE NNNA MS C 15 43 Ceramic Tile Civil Tiles Substation 3 Wall & Floor finishing Battery room, Kitchen, Pantry,Toilet, Bathroom Yes Site
ever is applicable to respective project) Non slipery in Floor:
A clay-based covering with a mat finish

Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which


CE NNNA MS C 15 44 Ceramic Skirting Civil Tiles Substation 3 clay-based covering with a mat finish Finish wall and floor joints Battery room Yes Site
ever is applicable to respective project)

Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which Polymer based used in mortar and concrete as an admixture
CE NNNA MS C 15 52 Integral Waterproofing Agent Civil Water Proofing Substation 2 Waterproofing additive for sand -cement plastering works External & Internal wall No Site
ever is applicable to respective project) and bonding agent to increase water resistivity and durability.

Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which


CE NNNA MS C 15 54 Waterproofing Protection Paint Civil Water Proofing Substation 2 Liquid bitumen based paint Water Proofing Protection Paint Block work and manholes below ground level No Site
ever is applicable to respective project)

Reinforcement Steel of Dia: 8, 10,12, 14, 16, 18, 20, 22, 25, 28, 30 & 32 mm
Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which
CE NNNA MS C 15 57 BS : 460GR. Civil Reinforcement Substation 1 Mild steel and high yield steel bars (Hot rolled) Provide required strength to the structural concrete members All Structural members (substructur and superstructur) No Site
ever is applicable to respective project)
ASTM : 425 GR 60

Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which Portland cement (OPC), Sulphate-resisting Portland and
CE NNNA MS C 15 58 Cement Civil Cement Substation 1 RCC works, Block works, plaster and screed Substation Building No Site
ever is applicable to respective project) supersulphated

A composite building material made from the combination of


Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which aggregate and cement binder. The most common form of
CE NNNA MS C 15 59 Concrete mix design Civil Design Substation / Cable Laying 1 Substructure & Superstructure Works and screed(PCC) Substructure and superstructure members No Site
ever is applicable to respective project) concrete consists of Portland cement, mineral aggregates
(generally gravel and sand) and water.

Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which Insulation Board with maximum Density of 24-26 kg/m^3 ,
CE NNNA MS C 15 60 Cavity Insulation Board Civil Insulation Board Substation 2 Reduce thermal conductivity of external wall External Walls Yes Site
ever is applicable to respective project) 50 mm thick with lapping cut out.

Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which Bitumen sheeting, laid under walls above floor level so as to
CE NNNA MS C 15 61 Damp Proof Course (DPC) of minimum thickness 3mm. Civil Water Proof Substation 2 Arrest capillary action Above first layer of soild blook work Yes Site
ever is applicable to respective project) exclude rising moisture.

Block work & plastering accessories shall be as following:


Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which Reinforced plastering and block work joints against possible
CE NNNA MS C 15 62 Block work & Plastering accessories Civil Construction Substation 2 All accessories used externally shall be of stainless steel. Internal & external Plastering and Block works Yes Site
ever is applicable to respective project) cracks
All accessories used internally shall be of galvanized steel.

Page 2 of 8

Issue-4, Rev-0
WaterStop Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which Profile of impervious material placed in the middle of At joint of RC virtical and horizontal member Below ground
CE NNNA MS C 15 63 Civil Water Proof Substation 1 Prevent water penetration through the substructural member Yes Site
(PVC Water stop 250mm widh) ever is applicable to respective project) concrete member level
Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which Increse bonding strength of mortor for plastering and screed
CE NNNA MS C 15 64 Bonding Agent for plastrering and floor screed. Civil Admixture Substation 2 Polyvinyl acetate emulsion type Floor and wall Yes Site
ever is applicable to respective project) for flooring
Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which Fiber gypsum board with aluminum backing, and 9 mm thick
CE NNNA MS C 15 65 Gypsum Board Civil Bulk Head Substation 3 Hide A/C & vetilation ducts 11kV SWGR Room Yes Site
ever is applicable to respective project) for bulkhead
Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which
CE NNNA MS C 15 66 Polyethylene Flexible Board Civil Expansion Board Substation 2 Polyuthelene pased filler board 20mm thick Fill expansion joint Concrete & block work No Site
ever is applicable to respective project)

composite material consisting of a matrix of graded high


Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which
CE NNNA MS C 15 67 GRC Civil Achitectural Substation 3 quality silica sand, cement, microionised fillers and alkali- Architectural Elements Substation building Faade Yes Site
ever is applicable to respective project)
resistant glass fibres moulded to approved pattern

Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which


CE NNNA MS C 15 68 Non Shrinkage cementations Grout Civil Grout Substation 2 High Strength, non shrink cementitious grout Fill gabs under load bearing plates Equipment foundations, pre-cast concrete, bearing plates, etc. No Site
ever is applicable to respective project)
Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which A mixture of lime or cement or a combination of both with
CE NNNA MS C 15 69 Cementitious Mortar Civil Construction Substation 2 Fill tie rod hole, RCC Wall No Site
ever is applicable to respective project) sand and water

Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which A substance applied to the inside surfaces and seams of a
CE NNNA MS C 15 70 Mould and Shutter Release Agent Civil Construction Substation 1 Mould release - oil Shutter release agent Formwork for concrete works No Site
ever is applicable to respective project) mold to prevent the casting from adhering to the mold

Silver anodized aluminum Name Plates with Black Paint


Text engraved
Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which
CE NNNA MS C 15 71 Sign Board Civil Others Substation 3 Stainless Steel 316-L Door Name Plates with Black Paint Sign board Substation Building Yes Site
ever is applicable to respective project)
Text engraved
Main sign Board 1x5x.03m aluminum sheet
Ceiling system supspended by ajustable hanger and Ceiling of LVAC, control & relay, telecom, charger, record,
Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which
CE NNNA MS C 15 72 False Ceiling System Civil Ceiling Substation 2 aluminum grid either conceled or exposed with Hide service lines such as ducts , wires, etc.. store, workshop room & corridor (Mineral), Toilet & No Site
ever is applicable to respective project)
mineral/aluminum tiles Bathroom (Aluminum)
Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which
CE NNNA MS C 15 73 Indication Label Civil Others Substation 3 Signs indicating various hazards and precautions. To ensure fire containment Substation Building No Site
ever is applicable to respective project)

Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which Precast concrete blocks types: Hollow, Solid & Thermo
CE NNNA MS C 15 75 Blocks Civil Construction Substation 2 Block works Walls No Site
ever is applicable to respective project) blocks size 100mm, 150mm & 200mm
Roof top packaged units is having all its components Air conditioning of 132 kV GIS/ 11 kV Switchgear, In the factory of
CE NNNA MS M 16 77 Air Conditioning - Roof top packaged AC MEP HVAC Substation 1 Volume III, 1.5.3.1.0.04, Rev. 6 to 8 assembled in a single box/compartment. Its major parts are Air Conditioning Equipment Capacitor room and Control rooms. No manufacturer. Saudi
compressor , evaporator , condensor , expansion device , Installed on Roof top. Arabia / Mexico.
A Ventillation fans to extract the design volume of air from Ventillation of Basement , Fire pump room , Battery
CE NNNA MS M 16 78 Fans (Ventillation and Smoke Extract) MEP HVAC Substation 1 Volume III, 1.5.3.1.0.04, Rev. 6 to 8 enclosed area such as toilet , pantry , battery room & Ventilation and smoke extraction room,Nitrogen room & Toilet / Pantry.Smoke extraction of No Not required
basements and Smoke extract fans for removal of smoke in Cable basement.
Located in LVAC room. It is a panel indicating all the Controlling & monitoring of HVAC system including
CE NNNA MS M 16 79 HVAC control panel, Field devices and Instruments MEP HVAC Substation 2 Volume III, 1.5.3.1.0.04, Rev. 6 to 8 functions/status of Airconditioning & Ventilation system in a managing fail recovery & duty sharing of equipments for best LVAC Room No Dubai
substation. System 1 for First floor control rooms have 3 performance & energy management and reporting

CE NNNA MS M 16 80 Electric Duct Heaters MEP HVAC Substation 3 Volume III, 1.5.3.1.0.04, Rev. 6 to 8 Heater located in duct for control of humidity. Humidity Control in LVAC/ Control / Charger rooms Roof No Not required

CE NNNA MS M 16 81 Air Terminals.(Diffuser, Grille, Sand trap louvers). MEP HVAC Substation 3 Volume III, 1.5.3.1.0.04, Rev. 6 to 8 Used for supply/return/extract air for AC system. Supply/Return/Extract Air Basement , Ground Floor , First Floor YES Not required

CE NNNA MS M 16 82 Refrigerant copper piping MEP HVAC Substation 3 Volume III, 1.5.3.1.0.04, Rev. 6 to 8 Used for connecting the indoor & outdoor unit of split units. To connect Indoor and Outdoor unit Fire pump room , Security room No Not required

Used for thermal / accoustic protection of air supplied to all


CE NNNA MS M 16 83 Duct Insulation(Thermal & Accoustic) MEP HVAC Substation 3 Volume III, 1.5.3.1.0.04, Rev. 6 to 8 Thermal insulation of AC ducts Ground Floor , First Floor & Roof YES Not required
rooms.

Duct Finishes and Accessories.(Vapour barrier,adhesive, sealant, Al cladding,Access Adhesive, Vapour barrier, Sealant,Al Cladding and Access
CE NNNA MS M 16 84 MEP HVAC Substation 3 Volume III, 1.5.3.1.0.04, Rev. 6 to 8 Used for applying and protection of duct insulation. Ground Floor , First Floor & Roof YES Not required
doors). doors.

Used to control the volume of air in each room as per design


CE NNNA MS M 16 85 Control Dampers (Volume control damper,Motorised damper, Non return damper) MEP HVAC Substation 3 Volume III, 1.5.3.1.0.04, Rev. 6 to 8 Control of conditoned air. Ground Floor , First Floor & Roof YES Not required
requirement
Used to prevent the spread of fire from one room to another
Fire damper(Fusible link fire damper, Motorised fire damper, Motorised smoke To prevent spread of Fire/Smoke between different rooms /
CE NNNA MS M 16 86 MEP HVAC Substation 3 Volume III, 1.5.3.1.0.04, Rev. 6 to 8 Installed in air conditioning duct or opening. Normally open Basement , Ground Floor , First Floor & Roof YES Not required
damper). zones.
& will close during fire condition
Used for communicating all signals from AC units to HVAC
Used for communication and power supply for HVAC
CE NNNA MS M 16 87 Control & Power Cables. MEP HVAC Substation 3 Volume III, 1.5.3.1.0.04, Rev. 6 to 8 control panel. 16 Multiple Location. No Not required
equipements.
AWG Control cable ( 2 , 4 & 7 core for volt free contact
Used for supply/return/extract air for AC system. Made of
CE NNNA MS M 16 88 Ducts.(Prefabricated AC ducts, Fire rated smoke extract ducts) MEP HVAC Substation 3 Volume III, 1.5.3.1.0.04, Rev. 6 to 8 Duct for Air Distribution and Smoke extraction. Basement , Ground Floor , First Floor & Roof YES Not required
Galvanized iron and fabricated as per duct layout.

Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which


CE NNNA MS C 15 92 Copper Hot Water Pipes, Fittings & Valves. Civil Plumbing Substation 2 Pipes made of copper for supply of domestic water. Pantry / Toilet Domestic water supply No Site
ever is applicable to respective project)

Transfer pump located in ground floor is used for transfer of


Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which
CE NNNA MS C 15 93 Water Transfer Pumps set ( one duty / one standby ) MEP Plumbing Substation 3 water to roof water storage tank. Consists of two pumps Roof & External area Domestic water supply No Not required
ever is applicable to respective project)
located on a common skid with one duty & one standby.

Booster pumps is same as transfer pump except that it is


Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which
CE NNNA MS C 15 94 Booster Pumps ( one duty / one standby ) MEP Plumbing Substation 3 located on roof & used to maintain the supply pressure to the Roof & External area Domestic water supply No Not required
ever is applicable to respective project)
farthest water tap.

Submersible Pump Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which Pump completely immersed in water for pumping out deluge /
CE NNNA MS C 15 95 MEP Drainage Substation 3 Basements & External area External Drainage System No Not required
Capacity: 25 cu.m/hr at 8 m head ever is applicable to respective project) oil water to respective areas.

Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which


CE NNNA MS C 15 97 Rain Water Outlet. Civil Drainage Substation 2 Roof water outlet loacted on roof for draining rain water Roof Rain water outlet No Site
ever is applicable to respective project)

Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which


CE NNNA MS C 15 98 Vitrified clay pipes & fittings / GRE Civil Drainage Substation 1 Clay pipes for removal of oily water in IDT & ET IDT & ET Oily waste water discharge No Site
ever is applicable to respective project)

Sanitary Wares ( wash basin , water closet , shower tray, wall mounted mirror, paper Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which Includes all bath room / toilet fittings used in
CE NNNA MS C 15 99 Civil Plumbing Substation 3 Pantry / Toilet Plumbing No Site
holder, towel rail, nobe hook, hot air drier etc Acessories ever is applicable to respective project) plumbing/drainage.

Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which


Trigger Spray & Angle Valve Civil Plumbing Substation 3 Part of Plumbing Plumbing Security Toilet / pantry No Site
ever is applicable to respective project)

Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which


Single hole mixer Civil Plumbing Substation 3 Part of Plumbing Plumbing Security Toilet / pantry No Site
ever is applicable to respective project)

It is a small basin located in battery room for washing eye


Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which
CE NNNA MS C 15 100 Eye Wash & Sink Civil Plumbing Substation 2 during emergency. It consists of two jets which provide water Battery rooms Emergency eye wash No Site
ever is applicable to respective project)
at a high pressure to clean the eye.

Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which


CE NNNA MS C 15 102 Manhole Cover & Channel Grating Civil Drainage Substation 2 Part of drainage system. External Storm/Sewer water drainage No Site
ever is applicable to respective project)

Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which


CE NNNA MS C 15 104 UPVC Drainage pipes & fittings Civil Drainage Substation 1 UPVC Drainage pipes & fittings (BS 4660/4514/5255) External Storm/Sewer water drainage No Site
ever is applicable to respective project)

Page 3 of 8

Issue-4, Rev-0
Sensors have time and light level adjustment and it works on Automatic switching on/off of lights by closing and opening Basements, 11 KV rooms, 132 KV GIS room , LVAC room,
CE NNNA MS M 16 106 Passive infrared movement sensor (PIR) MEP Small Power & Lighting Substation 2 Volume III, 1.5.3.1.0.01, Rev.12, & Volume III 1.5.3.1.0.02, Rev-0 No Not required
infrared principle. of circuits by detecting movement of personnel. Control room , Corridors

Includes all surface, pendant and recessed mounted high bay


and low bay light fixtures. Fixtures use fluorescent, HPMV,
MH, HPSV lamps depending on application areas. Normal
CE NNNA MS M 16 107 Light fixtures MEP Small Power & Lighting Substation 1 Volume III, 1.5.3.1.0.01, Rev.12, & Volume III 1.5.3.1.0.02, Rev-0 Illuminating the areas as required. All areas (Indoor & outdoor) No Not required
and emergency light fixtures are used in all areas which
operate on either 230 V AC or 110 V DC or on self contained
battery.

Wiring devices include normal and weatherproof type switch, On/off control of lights by switching, convenient socket outlet
CE NNNA MS M 16 108 Wiring devices (Switches and Sockets) MEP Small Power & Lighting Substation 3 Volume III, 1.5.3.1.0.01, Rev.12, & Volume III 1.5.3.1.0.02, Rev-0 All areas (Indoor & outdoor) No Not required
sockets, ceiling rose etc and wiring ancillaries

Low voltage DBs contain one incomer isolator and outgoing Distributing power supply to various lighting and small LVAC Room , 132 KV GIS Room , 11KV rooms & Security
CE NNNA MS M 16 109 LV Distribution Boards for small power & lighting MEP Small Power & Lighting Substation 2 Volume III, 1.5.3.1.0.01, Rev.12, & Volume III 1.5.3.1.0.02, Rev-0 No Not required
circuit breakers. It also includes timer, contactor as required. power circuits. Room.

Wiring for lighting & small power circuits and cabling for LV
CE NNNA MS M 16 110 Wires & cables MEP Small Power & Lighting Substation 3 Volume III, 1.5.3.1.0.01, Rev.12, & Volume III 1.5.3.1.0.02, Rev-0 450/750 V grade wires and 1000 V grade cables All areas No Not required
power distribution

CE NNNA MS M 16 111 GI Conduit & accessories MEP Small Power & Lighting Substation 2 Volume III, 1.5.3.1.0.01, Rev.12, & Volume III 1.5.3.1.0.02, Rev-0 Heavy duty galvanized conduits, fittings, boxes & accessories Surface containment for lighting & small power wiring All areas No Not required

Insulation provided on refrigerant copper piping between


CE NNNA MS M 16 114 Insulation for split units refrigerant piping MEP HVAC Substation 3 Volume III, 1.5.3.1.0.04, Rev. 6 to 8 Thermal insulation for refrigerant piping Fire pump room , Security room No Not required
indoor and outdoor units.

Split unit is a packaged unit split into an indoor unit & an


CE NNNA MS M 16 115 Split Units - Decorative type MEP HVAC Substation 1 Volume III, 1.5.3.1.0.04, Rev. 6 to 8 Air Conditioning Equipment Fire pump room , Security room No Not required
outdoor unit.

Nitrogen gas flooding system for capacitor banks including Used as clean agant system in capacitor banks and as per
Capacitor rooms, as per DCD requrirement for Control room, At manufacturer
CE NNNA MS M 18 153 Nitrogen Flooded System FFP Nitrogen Flooded System Substation 1 Volume III, 1.5.1.9.0.08, Rev 9, Clause 4.2 nitrogen cylinders, nozzles, releasing panel, detectors, manual DCD requirement for control room, telecom room, LVAC No
Telecom room, LVAC room and Charger room factory
release, selector switch & isolation switch. room and charger room

Aluminium Fire Water Tank of capacity as per hydraulic


calculation, powder coated sheet with stainless steel
CE NNNA MS M 18 155 Aluminum Fire Water Tanks FFP Fire fighting system Substation 1 Volume III, 1.5.1.9.0.08, Rev 9, Clause 5 Used as source of water for the system Beside Fire Pump Room No At site
installation acccessories & suction, test return, over flow,
drain & infill flanges.

Flexible connector and Isolators between Ducts and


CE NNNA MS M 16 173 Flexible Duct Connector and Vibration Isolators. MEP HVAC Substation 3 Volume III, 1.5.3.1.0.04, Rev. 6 to 8 Used to isolate vibrations from equipment. Roof and Basement. No Not required
Equipements.

C oncealed / embedded containment for lighting & small


CE NNNA MS M 16 175 PVC Conduits & accessories MEP Small Power & Lighting Substation 1 Volume III, 1.5.3.1.0.01, Rev.12, & Volume III 1.5.3.1.0.02, Rev-0 Heavy gauge PVC conduit, accessories & back boxes Concealed areas in concrete slab / wall / floor No Not required
power wiring

Fire resistant cable can sustain fire for a certain period and Fire resistant cable used for wiring of emergency lights and
CE NNNA MS M 16 176 Fire resistant and Heat resistant cable MEP Small Power & Lighting Substation 2 Volume III, 1.5.3.1.0.01, Rev.12, & Volume III 1.5.3.1.0.02, Rev-0 heat resistant cable can sustain designated high emperature in heat resistant cable used for final connection to light fitting All areas (not succeptible to mechanical damage) No Not required
normal environment. Cables are of 300/500 V grade from fixed wiring installation.

Galvanized light pole with arm to hold road light or area flood
CE NNNA MS M 16 177 Street lighting pole & Cut-out box MEP Small Power & Lighting Substation 2 Volume III, 1.5.3.1.0.01, Rev.12, & Volume III 1.5.3.1.0.02, Rev-0 Illuminating the outdoor areas External areas No Not required
light

CE NNNA MS M 16 178 Filters(Aluminum and Synthetic). MEP HVAC Substation 3 Volume III, 1.5.3.1.0.04, Rev. 6 to 8 Filters for Fresh air intake. Filtering Fresh Air intake to S/s Roof and Basement. YES Not required

This is a sub-main DB and contains one incomer isolator and


CE NNNA MS M 16 179 Distribution board for fire pumps MEP Small Power & Lighting Substation 2 Volume III, 1.5.3.1.0.01, Rev.12, & Volume III 1.5.3.1.0.02, Rev-0 outgoing circuit breakers. It also includes indicator, selector Distributing power supply to fire pumps Fire pump room No Not required
switch, ammeter, voltmeter etc.

Heavy duty metal clad TPN+E power socket with matching Power socket for supplying power to HV equipment testing
CE NNNA MS M 16 181 Heavy duty socket outlet with plug MEP Small Power & Lighting Substation 1 Volume III, 1.5.3.1.0.01, Rev.12, & Volume III 1.5.3.1.0.02, Rev-0 GIS room, IDT rooms and ET room No Not required
plug rated 200 A & 300 A machines

Undergorund structural member other than basement and oil


CE NNNA MS C 15 182 Water proofing System at Basement Civil Water Proofing Substation Protection membrane to substructural member Yes Site
water tank

Cable Basement/ Main Building Substructure, Oil/Water


Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which 4mm thick SBS bituminous membrane, having non-woven
Water Proofing Membrane (Basement) Civil Membrane Substation 1 Stop ingress of water in the basement Tank Yes Site
ever is applicable to respective project) polyester, reinforcement with minimum 260 g/sq .m.
Kitchen/Toilet

Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which Undergorund structural member other than basement and oil
WaterProofing Self Adhesive membrane Civil Water Proofing Substation 1 1.5mm thick self adhesive waterproofing membrane Protection membrane to substructural member Yes Site
ever is applicable to respective project) water tank

Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which Enhances adhesion of bituminous waterproofing membranes
Water Proofing Primer Civil Water Proofing Substation 1 A solvent-based bituminous penetrating primer Basement/Undergorund No Site
ever is applicable to respective project) to substrates

Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which


Water Proofing Protection Baord Civil Protection Board Substation 1 Bitumen based, 3.2mm thick protection board Protect waterproofing membrane from benching and damage Basement/Undergorund oil water tank Yes Site
ever is applicable to respective project)
Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which Basement/Underground oil water tank and grooves in parapet
Water Proofing Sealant Civil Sealant Substation 1 Bitumen based semi soild sealant (Non slump sealant) Termination of waterproofing membrane No Site
ever is applicable to respective project) for tucking of membrane

CE NNNA MS C 15 183 Water proofing System at Roof Civil Substation Site

lighthweight material combining good mechanical strength


Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which
Foam Concrete Civil Water Proofing Substation 2 with low thermal conductivity and ease of working. Density Achieve slope required for roof water drainage Roof Terrace No Site
ever is applicable to respective project)
of 1200kg/m^3

Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which Enhances adhesion of bituminous waterproofing membranes
Water Proofing Primer Civil Water Proofing Substation 2 A solvent-based bituminous penetrating primer Basement/Undergorund No Site
ever is applicable to respective project) to substrates

4mm thick APP bituminous membrane, reinforced with


Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which minimum 260 g/sq.m. stable non-woven polyester, finished
Water Proofing Membrane (Roof) Civil Water Proofing Substation 2 Treat roof slab to prevent the passage of water Roof Terrace Yes Site
ever is applicable to respective project) on both sides with a macro perforated torch off film allowing
laying by torch. The laps are to be fully torched and seamed.
Page 4 of 8

Issue-4, Rev-0
Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which
Roofing Insulation Board Civil Water Proofing Substation 2 Extruded polystyrene of minimum density 35 kg/m^3 Roofing Insulation Board Roof Terrace Yes Site
ever is applicable to respective project)
Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which
Roofing Separation layer Civil Water Proofing Substation 2 A 100 gm/sq.m. geotextile separation layer Roofing Separation Layer Roof Terrace Yes Site
ever is applicable to respective project)
Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which
Roof Concrete Tile Civil Tiles Substation 2 Precast Tile with chamfer at top edge Roof Finishing Roof Terrace Yes Site
ever is applicable to respective project)
Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which
Aluminum Flashing Civil Metalic Substation 2 Aluminum Roof Flashing To protect Termination of WP membrane Roof Terrace Yes Site
ever is applicable to respective project)

Horizontal splitcase fire pump set of rated capacity 1500


GPM, UL/FM Apprpoved, design as per NFPA20, complete At manufacturer
CE NNNA MS M 18 184 Fire Pump Set FPS Fire Pump Set Substation 1 Volume III, 1.5.1.9.0.08, Rev.10. Use to maintain a constant system pressure Fire Pump room No
with electric motor, diesel engine, jockey pump, controllers factory of pumps
and accessories.

At manufacturer
Jockey Pump Set FPS Fire Pump Set Substation 1 Volume III, 1.5.1.9.0.08, Rev.10. Clause 5.1.4 Multi stage vertical pump with 3/50/400 V electric motor Use to maintain a constant system pressure Fire Pump room No
factory of pumps

Horizontal split case Electric Fire Pump Set, UL/FM At manufacturer


Electric Motor Pump Set FPS Fire Pump Set Substation 1 Volume III, 1.5.1.9.0.08, Rev.10. Clause 5.1.4 Used as duty source of flow demand for fire fighting system Fire Pump room No
Approved with 3/50/400 V UL Listed electric motor factory of pumps

Horizontal split case Diesel Fire Pump Set, UL/FM Used as standby source of flow demand for fire fighting At manufacturer
Disel Pump Set FPS Fire Pump Set Substation 1 Volume III, 1.5.1.9.0.08, Rev.10. Clause 5.1.4 Fire Pump room No
Approved, UL/FM Approved Diesel engine system factory of pumps

Electric pump, Diesel pump & Jockey pump controllers with


IP56/NEMA 4 protection rating. 12VDC charger for diesel To control & switch ON the pumps at required setted At manufacturer
Fire Pump Set Controllers FPS Fire Pump Set Substation 1 Volume III, 1.5.1.9.0.08, Rev.10. Clause 5.1.4 Fire Pump room No
engine controller, electric pump & jockey pump controller pressure. factory of pumps
with 3/50/400 V rating. UL/FM Approved.

Flow Meter, 8" dia for the flow range of maximum demand of To measure the flow demand of pump during pump testing & At manufacturer
Flow Meter & accessories FPS Fire Pump Set Substation 1 Volume III, 1.5.1.9.0.08, Rev.10. Clause 5.1.4 Fire Pump room No
pump, wafer type maintanance. factory of pumps

CE NNNA MS E 18 186 Fire Alarm System FPS Fire Alarm System Substation Volume III, 1.5.1.9.0.08, Rev 10 Addressable fire alarm system To detect the fire in terms of heat and smoke In whole substation building No As mentioned below

2 Loop Addressable Main Fire Alarm Control Panel, c/w 600


character display, programming & operation key pad, control To monitor & control the fire alarm system devices & give At manufacturer
Main Fire Alarm Control Panel FPS Fire Alarm System Substation 2 Volume III, 1.5.1.9.0.08, Rev 10 Control & Relay Room No
relays, sounder circuit & battery charger with address, output signals as per programming. factory
standard LEDs, LED switches for control relays.
Addressable Fire Extinguishing Control Panel, min. two
loops, c/w min. 160 character display, programming &
To monitor & control the fire extinguishing system devices & At manufacturer
Fire Extinguishing Control Panel FPS Fire Alarm System Substation 2 Volume III, 1.5.1.9.0.08, Rev 10 operation key pad, control relays, sounder circuit & battery Nitrogen Room No
give output signals as per programming. factory
charger with address, standard LEDs, LED switches for
control relays
Fire Alarm Repeater panel of same LCD as main panel with
Fire Alarm Repeater Panel FPS Fire Alarm System Substation 2 Volume III, 1.5.1.9.0.08, Rev 10 To repeat the same message of any event of system operation. 132kV GIS room, 11 kV Switchgear room & Secuirty room No At site
all operating facilities.

Smoke Detector FPS Fire Alarm System Substation 2 Volume III, 1.5.1.9.0.08, Rev 10 Addressable Optical Smoke Detector, c/w standard base. To detect the smoke caused by fire in early stage In whole substation building No At site

Duct detector FPS Fire Alarm System Substation 2 Volume III, 1.5.1.9.0.08, Rev 10 Addressable Duct Smoke Detector, c/w Housing and tube. To detect the smoke in HVAC Duct HVAC Return Air Duct No At site

Monitor Module to interface conventional device to


Module FPS Fire Alarm System Substation 2 Volume III, 1.5.1.9.0.08, Rev 10 To inteface the conventional devices with addressable system. In whole substation building No At site
addressable system

Fire Alarm printer desk to print the sequence to operation To get the printed out put information of all the event from
Fire Alarm Printer FPS Fire Alarm System Substation 2 Volume III, 1.5.1.9.0.08, Rev 10 Control room No At site
from fire alarm control panel main fire alarm control panel

Addressable Rate of rise & fixed temp heat detector, c/w


Heat Detector FPS Fire Alarm System Substation 2 Volume III, 1.5.1.9.0.08, Rev 10 To detect the heat caused by fire in early stage. Battery room & kitchen/pantry room No At site
standard base.

Addressable recessed/surface mounted Manual Break In cas eof emergency the break galss unit can be used to alert
Manual Call Point FPS Fire Alarm System Substation 2 Volume III, 1.5.1.9.0.08, Rev 10 In whole substation building No At site
glass/Manual pull station, Red colour. the peoples by sounder/strobe

Weatherproof Sounder/Strobe, Recessed/Surface mounted


Sounder/Strobe FPS Fire Alarm System Substation 2 Volume III, 1.5.1.9.0.08, Rev 10 Used as indicating devices in case of fire event In whole substation building No At site
type.

Conventional weatherproof Probe type heat detector for


Probe Heat Detector FPS Fire Alarm System Substation 2 Volume III, 1.5.1.9.0.08, Rev 10 To detect the heat caused by fire in early stage. IDT/ET & Reactor room No At site
outdoor use.

Recessed type Remote indicator with Red colour LED flashes Used as indication of sensing device which is invisible for the
Remote Indicator FPS Fire Alarm System Substation 2 Volume III, 1.5.1.9.0.08, Rev 10 In control Building No At site
in case of detector activated. user.

Battery FPS Fire Alarm System Substation 2 Volume III, 1.5.1.9.0.08, Rev 10 Fire Alarm contro Panel Batteries Fire Alarm System Control room No At site

Enclosures for fire alarm equipments FPS Fire Alarm System Substation 2 Volume III, 1.5.1.9.0.08, Rev 10 Weatherproof enclosure for fire alarm modules, IP65 Fire Alarm System In whole substation building No At site

Isolator Module FPS Fire Alarm System Substation 2 Volume III, 1.5.1.9.0.08, Rev 10 Loop isolator module Fire Alarm System In whole substation building No At site

Linear Heat Sensor cable, digital type, 2 core, indoor/outdoor


LHS Cable FPS Fire Alarm System Substation 2 Volume III, 1.5.1.9.0.08, Rev 10 Fire Detection & Alarm System In 132/11kV Basements No At site
use, braided type. 85deg temp.

Fire Resistance Cabl;e - 2hr FPS Fire Alarm System Substation 2 Volume III, 1.5.1.9.0.08, Rev 10 MICC cable, orange colour, 2coreX1.5 Sqrmm. Fire Detection & Alarm System In whole substation building No At site

Flame Detector UV/IR2 or UV/IR3 or IR3 FPS Fire Alarm System Substation 2 Volume III, 1.5.1.9.0.08, Rev 10 UV/IR2 or UV/IR3 or IR3 Fire Detection & Alarm System Transformer area No At site

Manual Release Pull Station, Agent Release wording, Dual action, Yellow Color FPS Fire Alarm System Substation 2 Volume III, 1.5.1.9.0.08, Rev 10 Agent Release wording, Dual action, Yellow Color Fire Extinguishing System Near door of Nitrogen Fire Suppression protected room No At site

Basements, 11 KV rooms, 132 KV GIS room , LVAC room,


Aspirating Smoke Detector, Laser type FPS Fire Alarm System Substation 2 Volume III, 1.5.1.9.0.08, Rev 10 Laser type Fire Detection & Alarm System Control room , DC Charger Room, Telecom Room, Corridors No At site
floor void

Page 5 of 8

Issue-4, Rev-0
CE NNNA MS E 18 187 Fire Fighting System FPS Fire Fighting System Substation Volume III, 1.5.1.9.0.08, Rev 10, Clause 5,6

Deluge valve, Flanged ends, external resetting, c/w wet pilot


Deluge valve FPS Fire fighting system Substation 2 Volume III, 1.5.1.9.0.08, Rev 10, Clause 4.1 Used in deluge system for total flooding of water IDT/ET/Reactor, 132/11kV Basements No At site
trim, water motor gong

Water mist system FPS Fire fighting system Substation 2 Volume III, 1.5.1.9.0.08, Rev 10, Clause 5 Selector valve c/w wet pilot Trim Used in Water Mist System for IDTs,Ets and Reactors No At site

Wet Pilot Sprinkler FPS Fire fighting system Substation 2 Volume III, 1.5.1.9.0.08, Rev 10, Clause 5.1.18 Wet Pilot for Sprinkler Deluge / Mist system IDTs,Ets and Reactors, cable basement No At site

High velocity solid cone water spray nozzle, 3/4",1/2' NPT, Used to spray the water to cover all the hazard area like
Spray Nozzles FPS Fire fighting system Substation 2 Volume III, 1.5.1.9.0.08, Rev 10, Clause 5.1.18 132kV Basements/IDT/ET/Reactor No At site
Brass body IDT/ET/Reactor, Basements as per design.

Test & Drain valve FPS Fire fighting system Substation 2 Volume III, 1.5.1.9.0.08, Rev 10, Clause 7.1.1 Test & Drain valve, 25mm dia, threaded end, brass body. Used to drain the water in the pipe of wet pilot system IDT/ET/Basement/Pump room/First Floor No At site

Deluge alarm pressure switch, 1/2" NPT connection, dual Used to transfer the signals that the water is flow in the
Pressure Switch FPS Fire fighting system Substation 2 Volume III, 1.5.1.9.0.08, Rev 10, Clause 5.1.10 Deluge valve & Fire Pump set No At site
SPDT type with weatherproof cover. system with high pressure.

Pressure relief valve, threaded ends, angle type, field


Pressure relief valve FPS Fire fighting system Substation 2 Volume III, 1.5.1.9.0.08, Rev 10, Clause 5.1.11 Used to release the high pressure in the system at set pressure. Wet Pilot pipe & Deluge Manifold No At site
adjustable type.

Dry Chemical Powder Fire Extinguisher, 10 LBS capacity,


DCP Fire Extinguisher FPS Fire fighting system Substation 2 Volume III, 1.5.1.9.0.08, Rev 10, Clause 8 Used to fight small fire manually In whole substation building No At site
UL/FM Approved.

CO2 Fire Extinguisher FPS Fire fighting system Substation 2 Volume III, 1.5.1.9.0.08, Rev 10, Clause 8 CO2 Fire Extinguisher, 10 LBS capacity UL/FM Approved. Used to fight small fire manually In whole substation building No At site

CO2/DCP Trolley Fire Extinguisher FPS Fire fighting system Substation 2 Volume III, 1.5.1.9.0.08, Rev 10, Clause 8 Dry Chemical Powder Fire Extinguisher, 50 LBS capacity Used to fight small fire manually Outside Transformers No At site

Trolley Foam Fire Extinguisher FPS Fire fighting system Substation 2 Volume III, 1.5.1.9.0.08, Rev 10, Clause 8 Trolley Foam Fire Extinguisher, 135 Lts capacity Used to fight small fire manually Fire Pump Room Yes At site

Fire Extinguisher cabinet recessed type, M.S Red powder


coated back box, stainless steel architrave & door with wired
Fire Extinguisher Cabinets FPS Fire fighting system Substation 1 Volume III, 1.5.1.9.0.08, Rev 10, Clause 8 Used to keep the fire extinguishers safely First Floor, Ground Floor rooms No At site
glass for indoor use. For out door use, the cabinet will be
weatherproof surface mounted type.

Antivibration liquid filled type pressure gauge with stainless


Pressure Gauge FPS Fire fighting system Substation 2 Volume III, 1.5.1.9.0.08, Rev 10 Clause 5.1.6 stell body, 100mm dia, 1/2" NPT connection, reading scale in Used to measure the water pressure at perticular position. Pump room No At site
PSI & Bar.

Used to transfer the signals that the water is flow in the


Flow Switch FPS Fire fighting system Substation 2 Volume III, 1.5.1.9.0.08, Rev 10 Water Flow switch, 65mm dia, suitable for 24VDC. Pump room No At site
system

Swing check valve, Flanged ends, bronze disc & seat with
Swing Check Valve FPS Fire fighting system Substation 2 Volume III, 1.5.1.9.0.08, Rev 10, Used in Pump delivery pipe Pump room No At site
removable cover .

Butterfly Valve FPS Fire fighting system Substation 2 Volume III, 1.5.1.9.0.08, Rev 10 Supervised Butterfly valve Used in fire pump room sprinkler system Pump room No At site

4way Breeching inlet connection, flanged end connection,


Breeching Inlet - 4 Way FPS Fire fighting system Substation 2 Volume III, 1.5.1.9.0.08, Rev 10, Clause 5.4 65mm dia infill connection with in built non return clapper, Used to feed water by Civil defence Beside Main gate of substation at easy accessible location No At site
c/w drain valve suitable to local civil defence requirement.

Pipe Hangers & Clips FPS Fire fighting system Substation 2 Volume III, 1.5.1.9.0.08, Rev 10, Clause 7.2.3 G.I. Pipe hanger, adjustable type Used to support the pipes IDT/ET/Basement/Pump room No At site

2 coats of primer of 150 micron, 1 coat of top coat red paint of


Paints for fire fighting pipes FPS Fire fighting system Substation 2 Volume III, 1.5.1.9.0.08, Rev 10, Clause 5.1.13 Used to paint the pipe IDT/ET/Basement/Pump room/External No At site
100 micron

Semless, Sch40, ASTM, A53 Grade B pipe. 1/2" to 2-1/2"


Carbon steel Pipe ASTM-A53, Gr.B Sch-40 FPS Fire fighting system Substation 2 Volume III, 1.5.1.9.0.08, Rev 10, Clause 5.1.13 pipe should be factory galvanized & above 2-1/2" should be Used in the fire fighting system piping IDT/ET/Basement/Pump room/External No At Site
local hot dip galvanized after fabrication.

Stainless Pipe SS 316 FPS Fire fighting system Substation 2 Volume III, 1.5.1.9.0.08, Rev 10, Clause 5.1.13 SS 316 Fire pump sensing line Pump Room No At site

Used in fire pump room, deluge manifold & fire main ring
OS & Gate Valve FPS Fire fighting system Substation 2 Volume III, 1.5.1.9.0.08, Rev 10, Clause 5.1.13 OS & Y gate valve, Flanged ends. Deluge Manifold, Fire Main Pipe & Fire Pump room No At site
pipe to isolate the system

Strainer FPS Fire fighting system Substation 2 Volume III, 1.5.1.9.0.08, Rev 10, Clause 5.1.5 "Y" strainer, Flanged end, c/w ss strainer Used to filter the water in the discharge pipe Fire Pump Room No At site

Air release valve, 25mm dia, thread end connection brass


Air Release Valve FPS Fire fighting system Substation 2 Volume III, 1.5.1.9.0.08, Rev 10, Clause 5.1.11 Used to release air from the piping network Deluge Manifold/Fire Main Ring/Fire Pump room Yes At site
body.
Fire Hose Cabinet, surface mounted, weather rproof type to
Fire Hose Cabinet FPS Fire fighting system Substation 3 Volume III, 1.5.1.9.0.08, Rev 10, Clause 5.4.3 Used to keep the fire hoses & nozzles External area No At site
accommodate 2nos, of fire hose & nozzles.
Buit in Pressure regulating type fire hydrant landing valve,
Fire Hydrant FPS Fire fighting system Substation 3 Volume III, 1.5.1.9.0.08, Rev 10, Clause 5 To fight the fire manually In fire main ring No At site
flanged ends, c/w cap & chain, bib nose type.

Sprinkler Guard FPS Fire fighting system Substation 2 Volume III, 1.5.1.9.0.08, Rev 10, Hard wire cage designed to encase sprinkler To protect sprinkler from damage Fire Pump Room, IDT/Basement No At site

Substation and Cable Fire Sealant & Fire Proof coating of cables used to avoid the
Fire Sealant & Cable Coating FPS Fire fighting system 3 Volume III, 1.5.1.9.0.08, Rev 10, Clause 10.7 To ensure fire containment Substation Building No At site
projects penetration of fire from one compartment to another.
132kV GIS, 11kV Switchgear room, control room and
Breathing Appparatus FPS Others Substation 3 Volume III, 1.5.1.9.0.08, Rev 10, Clause 9 Breathing apparatus of 45 mins duration Safty of personnel No At site
security room
Globe Valve FPS Fire fighting system Substation 2 Volume III, 1.5.1.9.0.08, Rev 10, Clause 5 Globe valve, flanged end, Cast iron body. For Fire Pump Performance Test Fire Pump Room Yes At site

Galvanised Threaded Fittings FPS Fire fighting system Substation 2 Volume III, 1.5.1.9.0.08, Rev 10, Clause 5.1.13 Factory Galvanized Fittings as per BS 143, PN25. Fire Fighting System In whole substation building Yes At site

Grooved Factory galvanized fittings with long radius elbow &


Galvanised Grooved Fittings FPS Fire fighting system Substation 2 Volume III, 1.5.1.9.0.08, Rev 10, Clause 5.1.13 Fire Fighting System In whole substation building No At site
concentric reducing coupings

Black Flanges FPS Fire fighting system Substation 2 Volume III, 1.5.1.9.0.08, Rev 10, Clause 5.1.13 Black steel welded type, slip on flange, Class 150, ANSI. Fire Fighting System In whole substation building No At site

Fire Hose FPS Fire fighting system Substation 2 Volume III, 1.5.1.9.0.08, Rev 10, Clause 5.4.3 Fire Hose Fire Fighting System Out side yard area No At site

Branch Pipe Nozzle FPS Fire fighting system Substation 2 Volume III, 1.5.1.9.0.08, Rev 10, Clause 5.4. Branch pipe Nozzle Fire Fighting System Out side yard area Yes At site

Breathing Appparatus Cabinet FPS Others Substation 2 Volume III, 1.5.1.9.0.08, Rev 10, Clause 9 Breathing Appparatus Cabinet Fire Fighting System In whole substation building Yes At site

Recessed Breeching Inlet Cabinet FPS Fire Fighting System Substation 2 Volume III, 1.5.1.9.0.08, Rev 10, Clause 5.4. Breeching inlet Cabinet Fire Fighting System Out side yard area No At site

Fire Hose Reel FPS Fire Fighting System Substation 2 Volume III, 1.5.1.9.0.08, Rev 10, Clause 5.3 25mmX30 metre long Autimatic Fire Hose Reel Fire Fighting System Staircase landing area Yes At site

Page 6 of 8

Issue-4, Rev-0
5T EOT is provided with three movements in 132 KV room.
Long travel , Cross travel & Hoist , ie it can travel in all three
directions X , Y , Z. Each movement is operated by an
CE NNNA MS M 16 189 5 MT EOT CRANE MEP Crane & Monorail Substation 3 Volume III, 1.5.3.1.0.01, Rev.9, Clause 24 independent motor and all controls are operated from a Lifting of equipment in GIS room GIS No Dubai
hanging pendent moving along with the crane. All have both
high & low speeds and are equipped with brakes & limit
switches.

CE NNNA MS C 15 194 PLUMBING AND DRAINAGE MEP Substation

Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which Consists of an heating element inside a shell with thermal
Electric Water Heater. 50 Ltr capacity. MEP Plumbing Substation 3 Pantry Water heater No Not required
ever is applicable to respective project) protection to provide cut off at set temp.

Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which Storage of domestic water.
Domestic water storage tank MEP Plumbing Substation 3 Roof & External area Water storage No Not required
ever is applicable to respective project) Capacity: 600 Gallons & 1000 Gallons

Transfer pump located in ground floor is used for transfer of


Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which
Water Transfer Pumps set ( one duty / one standby ) MEP Plumbing Substation 2 water to roof water storage tank. Consists of two pumps Roof & External area Domestic water supply No Not required
ever is applicable to respective project)
located on a common skid with one duty & one standby.

Booster pumps is same as transfer pump except that it is


Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which
Booster Pumps ( one duty / one standby ) MEP Plumbing Substation 2 located on roof & used to maintain the supply pressure to the Roof & External area Domestic water supply No Not required
ever is applicable to respective project)
farthest water tap.

Submersible Pump Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which Pump completely immersed in water for pumping out deluge /
MEP Drainage Substation 2 Basements & External area External Drainage System No Not required
Capacity: 25 cu.m/hr at 8 m head ever is applicable to respective project) oil water to respective areas.

Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which


Gate Valves MEP Plumbing Substation 3 Valves used for control of water supply. Pantry / Toilet Domestic water supply No Not required
ever is applicable to respective project)

Floor trap 75 mm diameter with stainless steel grating & Polypropylene road gully 568 Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which Floor drains & floor cleanout covers (Stainless steel)
MEP Drainage Substation 3 Pantry/Toilet Plumbing No Not required
mm x 920 mm ever is applicable to respective project) Part of drainage system.

Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which


UPVC Pressure pipes & fittings (BS 3505, Class E) MEP Plumbing Substation 1 Water supply pipes burried underground. External Water supply / Burried pipes No Not required
ever is applicable to respective project)

Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which


UPVC Road Gully, Floor Traps & Gully Traps MEP Drainage Substation 1 UPVC Road Gully, Floor Traps & Gully Traps External Drainage No Not required
ever is applicable to respective project)

Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which


Level alert alarm / sounder MEP Plumbing Substation 3 Part of Plumbing Plumbing Security Toilet / pantry No Not required
ever is applicable to respective project)

Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which


Level alert alarm for holding tank MEP Plumbing Substation 3 Drainage system Oilwater tank and security room Not required
ever is applicable to respective project)

Glass for vission panel (2 hrs fire rated) Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which
CE NNNA MS C 15 195 Civil Glass Substation 2 Mark of origin/make to be embossed on the Glass. To see other side of door without openning the door. In the steel doors of Intranal Rooms Yes Site
(25mmx30mm) ever is applicable to respective project)

Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which


CE NNNA MS C 15 196 Aluminium Expansion Joint Cover Civil Metalic Substation 3 Vertical and Hoarizontal cover on expansion joint. Vertical and Hoarizontal cover on expansion joint. Cover on the expansion joint. Yes Site
ever is applicable to respective project)

High visibility paint in dark, based on solvent born acrylic


and special fluorescent pigments.

Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which Colours: In line with Civil Defense regulation. To see the route easily in dark to escape during fire or if there
CE NNNA MS C 15 197 Fluorescent paint (for fire escape route) Civil Painting Substation 3 On the floor along the fire escape route. No Site
ever is applicable to respective project) is no light.
Top Coats: Minimum two coats of Fuorescent Paint and
Clear Coat over the same for protection.

Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which


CE NNNA MS C 15 198 Door name Plates Civil Metalic Substation 3 To identify the room. To identify the room. On the door screen. Yes Site
ever is applicable to respective project)

Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which


CE NNNA MS C 15 199 GRP Lining (4 mm thick) for fire water tank Civil Water Proofing Substation 3 For water proofing. For water proofing. In side the concrete water tank. No Site
ever is applicable to respective project)

Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which Oil water tank and
CE NNNA MS C 15 200 40mm wide GRP Ladder for oil water tank and basement sump pits Civil Others Substation 3 To access during mentainance. To access during mentainance. Yes Site
ever is applicable to respective project) Sump Pits at basement

Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which To stop entering to the DEWA premises over the boundary
CE NNNA MS C 15 201 Galvanized steel spikes Civil Metalic Substation 3 To stop intrusion. At the boundary wall top. Yes Site
ever is applicable to respective project) wall by the intruder.

Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which


CE NNNA MS C 15 202 Car parking Shed Civil Others Substation 3 To protect car from sun/rain. To provide shed for Cars. In the car parking area. No Site
ever is applicable to respective project)

CE NNNA MS E 18 229 Alarm Check Valve FPS Fire Fighting System Substation 2 Volume III, 1.5.1.9.0.08, Rev.9, Clause 7.7 Flanged ends, Rubber seat disc For Sprinkler System Ground Floor No At site

Upright/Pendent- Brass; Concealed type-White Chrome Water fire suppression system for Pump Room, Contorl
CE NNNA MS E 18 230 Sprinklers (Upright/Pendent/Concelead) FPS Fire Fighting System Substation 2 Volume III, 1.5.1.9.0.08, Rev.9, Clause 7.18 IDT/ET/Basement/Pump room/First Floor No At site
plated: 1/2", Temp-68, 79, 93 building Corridors, Workshop, Record Room.

MS Red powder coated cabinet with minimum 6 numbers of


CE NNNA MS E 18 231 Spare Sprinklers Cabinet FPS Fire Fighting System Substation 2 Volume III, 1.5.1.9.0.08, Rev.9, Clause 7.18 each type and temperature rating of sprinkler head with To store spare Sprinklers and its Tools. IDT/ET/Basement/Pump room No At site
sprinkler wrenches.

CE NNNA MS E 18 232 CO2 Trolley Fire Extinguisher FPS Fire Fighting System Substation 2 Volume III, 1.5.1.9.0.08, Rev 9, Clause 3 CO2 Fire Extinguisher, 50 LBS capacity Used to fight small fire manually 132/11kV Switchgear room No At site

CE NNNA MS E 18 233 Gate Valve NRS FPS Fire Fighting System Substation 2 Volume III, 1.5.1.9.0.08, Rev 9, Clause 7.4 Threaded ends.Bronze construction. Below 2".Isolation purpose. Deluge Manifold & Fire Pump room No At site

CE NNNA MS E 18 234 Tamper (Supervisory) Switch FPS Fire Fighting System Substation 2 Volume III, 1.5.1.9.0.08, Rev 9, Clause 4.1.2 Double Switch - Two sets of SPDT Monitoring Isolation Valves (open/close). OS&Y Valves No At site

CE NNNA MS E 18 235 Carbon Steel Butweld Fittings FPS Fire Fighting System Substation 2 Volume III, 1.5.1.9.0.08, Rev 9, Clause 7.10 ASME B16.9 Fire Fighting System In whole substation building No At site

CE NNNA MS E 18 236 Forged Threaded Fittings FPS Fire Fighting System Substation 2 Volume III, 1.5.1.9.0.08, Rev 9, Clause 4.4.1 ASME B16.11, Class 3000 Forged Steel Fittings Nitrogen Fire Suppression System Nitrogen Fire Suppression System Piping No At site

CE NNNA MS E 18 237 Fire Water Tank FPS Fire Fighting Substation 1 Volume III, 1.5.1.9.0.08, Rev 9 Aluminum construction Fire Fighting System Near Fire Pump Room No At site

Heavy duty AC utlity pump with manual nozzle and 3/4" x


CE NNNA MS E 18 239 Fuel Filling Pump FPS Others Substation 2 Volume III, 1.5.1.9.0.08, Rev.9, Clause 6. To fill diesel in fuel tank of diesel fire pump. Fire pump room No At site
12' hose. 20 GPM

Galvanized and epoxy coated painted wire mesh fencing of


Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which
CE NNNA MS C 15 240 GI Mesh (if there is no Aluminum Claustra) Civil ALuminum Substation 3 opening size not more than 25 x 25 mm and the mesh shall Architectural Element IDT ,ET & Reactor front enclusure Yes Site
ever is applicable to respective project)
be of 3.5 mm dia rods in removable frames.

For cable entry/exit throgh the concrete duct by open cut


UPVC PIPE-Class C: (Dia-168mm/Thick-6.6mm & 114mm/Thick 4.5mm) Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which
CE NNNA MS C 15 241 Civil Sleeve Cable Laying 1 ever is applicable to respective project)
method for cable route profile DUCT BANK Cable crossings by open cut inside the duct bank. Yes Site

Page 7 of 8

Issue-4, Rev-0
Cable route marker tapes for use during installation shall be
HDPE PIPE: (Dia-160mm/Thick-9.5mm & Dia-110mm/Thick 6.6mm) Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which continuously installed 300 mm
CE NNNA MS C 15 242 Civil Sleeve/Pipes Cable Laying 1 ever is applicable to respective project) directly above the cable or cable covers.
To use as a sleeve near waterline crossing On the route of cable route profile Yes Site

Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which


CE NNNA MS C 15 243 Polythene Sheet 1000 G Civil Water froofing Cable Laying 1 Provided to stop penetration of water of fresh concrete to soil. Under the fresh concrete Mass conctreting works. Yes Site
ever is applicable to respective project)

During installation shall be continuously installed 300 mm


Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which
CE NNNA MS C 15 244 Warning Tape (Yellow&Red with printing ) Civil Warning sign Cable Laying 1 ever is applicable to respective project)
directly above the cable or cable covers. Safety of cable Above the cables/cable-covers. Yes Site

Route Markers (Pole type for link box,unmade&grass area.Surface route marker in
Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which For the route of the cable profile a wooden small posts are
CE NNNA MS C 15 245 tiles) Civil Pole/Post Cable Laying 2 ever is applicable to respective project) installed to identify the cable route profile
Identification of cable route profile Above cable route. Site

Both substation and cable


CE NNNA MS E 18 246 Linear heat Sensor cable, digital type FPS Fire Alarm System
laying
2 As heat sensor. As heat sensor. 132/11kV Basements No At Site

Both substation and cable


CE NNNA MS M 18 247 Fire Retardant paint for power, control cables FPS Passive fire protection system
laying
2 Painting for fire protection on power/control cables. On power / control cables 132/11kV Basements No At Site

Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which Pile caps, sealing around cutouts of pipe encasement, casting
CE NNNA MS C 15 248 Swellable water bar Civil Piling / RCC structures Substation 1 ever is applicable to respective project)
Integral sealing for construction joints in concrete cast in situ.
around old concrete.
Piling,OWMH, FMH & SMH manholes No Site

Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which High performance pile top fairing grout and cementitious void
CE NNNA MS C 15 249 Pile Grout Civil Piling Substation 1 ever is applicable to respective project) filler
Pile cap reprofiling Substructure No Site

Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which Elastomeric cementitious coating with inherent crack-
CE NNNA MS C 15 250 Elastomeric waterproof coating Civil Piling Substation 1 ever is applicable to respective project) bridging ability
Pile head treatment Substructure No Site

A road marking paint based on combination of special alkyd


Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which resin and chlorinated rubber. High build paint pigmented with
CE NNNA MS C 15 251 Kerbstone and road marker painting system Civil Painting Substation 1 ever is applicable to respective project) light fast weather resistant pigment with tough inert
For better visibility and provide information to vehicle users. Interlock tiles & Kerbstone No Site

extenders.

Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which Reinforcing the water retaining capability and resistant to
CE NNNA MS C 15 252 GRE lining Civil Waterproofing Substation 3 ever is applicable to respective project) high temperature.
Oil and chemical tanks/manholes U/G Oil water tank, holding tank and other deep structures. No Site

Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which External SMH, FMH, OWMH, Sump pits, GT and other
CE NNNA MS C 15 253 Painting system for manhole covers Civil Painting Substation 3 ever is applicable to respective project)
Epoxy coated painting system Protection against rust and corrosion.
manholes.
No Site

Sealing of cable ducts ( basement sleeves with waterproof system Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which Basement sleeves with waterproof system from external and sealing of all spare sleeves, earthing cable sleeves and all
CE NNNA MS C 15 254 Civil Waterproof / fire proof Substation 3 ever is applicable to respective project) fire proof system from internal. basement sleeves from inside
Main building basement RCC walls and transformer rooms Yes Site
from external and fire proof system from internal)
A two part acrylic modified cementitious coating dries to a
Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which
CE NNNA MS C 15 255 Liquid waterproof Civil Waterproof coating Substation 3 ever is applicable to respective project)
tough flexible layer of modified cement with an excellent Prevent passage of water Battery room, Pantry and toilet No Site
waterproofing properties

Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which


CE NNNA MS C 15 256 Stainless steel ladder inside fire water tank Civil Others Substation 2 ever is applicable to respective project)
To access during mentainance. To access during mentainance. Fire water tank Yes Site

Surface containment for lighting & small power wiring /


CE NNNA MS M 16 276 GI trunking & accessories MEP Small Power & Lighting Substation 2 Volume III, 1.5.3.1.0.01, Rev.12, & Volume III 1.5.3.1.0.02, Rev-0 Galvanized trunking with cover and fittings & accessories All areas No Not required
cabling

Surface containment for lighting & small power wiring /


CE NNNA MS M 16 277 Flexible metallic conduit & accessories MEP Small Power & Lighting Substation 2 Volume III, 1.5.3.1.0.01, Rev.12, & Volume III 1.5.3.1.0.02, Rev-0 PVC coated galvanized mettalic conduit and accessories All areas No Not required
cabling

Surface containment for lighting & small power cables used


CE NNNA MS M 16 278 Cable tray & accessories MEP Small Power & Lighting Substation 3 Volume III, 1.5.3.1.0.01, Rev.12, & Volume III 1.5.3.1.0.02, Rev-0 Galvanized perforated tray with cover & accessories All areas No
for power distribution.

CE NNNA MS M 16 279 Isolator MEP Small Power & Lighting Substation 3 Volume III, 1.5.3.1.0.01, Rev.12, & Volume III 1.5.3.1.0.02, Rev-0 TPN, TP, DP or SP Metal clad or moulded case isolator To use as isolator or safety isolator in the power circuit All areas No Not required

CE NNNA MS M 16 280 Cable gland, lugs & accessories MEP Small Power & Lighting Substation 3 Volume III, 1.5.3.1.0.01, Rev.12, & Volume III 1.5.3.1.0.02, Rev-0 Brass cable gland set and tinned cooper lugs. End termination and connection of cables. All areas No Not required

To use as junction box for the small power & lighting


CE NNNA MS M 16 281 Junction box / enclosure MEP Small Power & Lighting Substation 3 Volume III, 1.5.3.1.0.01, Rev.12, & Volume III 1.5.3.1.0.02, Rev-0 Metal / GRP / PVC junction box / enclosure All areas No Not required
installations

CE NNNA MS M 16 282 Batteries for Uninterruptible power supply (UPS) MEP Small Power & Lighting Substation Vol III, 1.5.3.1.0.01, Rev 10 Power supply for CCTV Power supply for CCTV Telecom Room Not required

CE NNNA MS M 16 283 HVAC Miscellaneous items. MEP HVAC Substation 3 Volume III, 1.5.3.1.0.04, Rev. 6 to 8 Miscellaneous Items. Miscellaneous Items. Miscellaneous Items. No Not required

Page 8 of 8

Issue-4, Rev-0