NO URAIAN PEKERJAAN SAT VOLUME

G PEKERJAAN KONSTRUKSI BAJA

1 Kolom
- SC1, WF 350x175x7x11 kg 2,864.40
- SC2, WF 300x150x6.5x9 kg 14,263.46
2 Frame Penutup atap
- R1, WF 300x150x6,5x9 kg 14,536.87
- R2, WF 250x125x6x9 kg 12,479.36
- R3, WF 200x100x5,5x8 kg 2,505.73
- G1, WF 150x75x5x7 kg 5,040.00
Monitor / Jackroof
- SC3, WF 150x75x5x7 kg 441.00
- R4, WF 150x75x5x7 kg 1,881.60
- G1, WF 150x75x5x7 kg 2,184.00
3 Gording, CNP 150x50x20x2,3 kg 20,058.24
CNP 150x50x20x2,3 -> Monitor / Jackroof kg 3,229.95
4 Rangka Listplank, CNP 100x50x20x2,3 kg 7,967.81
CNP 100x50x20x2,3 -> Monitor / Jackroof kg 2,334.27
5 Rangka Cladding, CNP 100x50x20x2,3 kg 14,351.18
6 Trekstang dia. 12 mm kg 2,541.53
7 Ikatan Angin dia. 16 mm kg 2,813.83
8 Base plate, Plat Sambung, Stiffener kg 13,686.65
9 Baut-Baut HTB
- Baut M 22 mm bh 1,020.00
- Baut M 16 mm bh 3,132.00
- Baut Hitam utk gording M 12 mm bh 2,984.00
- Turn buckle 16 mm bh 128.00
10 Anchor Bolt
- Anchor Bolt dia. 22 mm bh 256.00
11 Semen grouting bawah plat kolom ex Combextra GP t=25 mm m3 0.53
12 Pengecatan dengan Zinchromate
- 1 lapis / 30 micron dengan Zinc Chromate Primer Green 113 ex. Kansai Paint
- 2 lapis / 60 micron dengan finish cat Ftalit White colour ex. Kansai Paint

Total Pekerjaan Konstruksi Baja

* Harga tidak termasuk Ppn 10%


*Harga sudah termasuk Material konsumable dan alat berat
* Harga sudah termasuk APD standard

Bill of QuantityProyek Pembangunan Warehouse & OfficePT. BEHN MEYER, Komplek Pergudangan Safe n Lock blok V2 - Jl. Lingkar Timur, SIDOARJO Hal : III / 1
Fab + Konsum Paint+konsum Kirim+erect JUMLAH HARGA
( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )

-
-

-
-
-
-

-
-
-
-
-
-
-
-
-
-
-

-
-
-
-

-
-

Bill of QuantityProyek Pembangunan Warehouse & OfficePT. BEHN MEYER, Komplek Pergudangan Safe n Lock blok V2 - Jl. Lingkar Timur, SIDOARJO Hal : III / 2
NO URAIAN PEKERJAAN SAT

L PEKERJAAN LAIN - LAIN

2 unit
Tangga Maintenance tinggi 7 mtr, tiang utama pipe black steel 3", step tangga pipe black steel 1"
Pengaman tangga plat strip 5 mm finish oil paints
3 Water Torn, uk 300x845x400cm
- Kolom type C, HB 150x150x7x10 kg
- Balok type G, WF 250x125x6x9 kg
- Balok type BG, WF 150x75x5x7 kg
- Balok type b, CNP 150x50x20x3.2 kg
- Bracing kolom type BR, 2L 50x50x5 kg
- Chequer plate 4mm kg
- Base plate, Plat Sambung, Stiffener kg
- Baut HTB M 16 mm bh
- Anchor Bolt / Dyna bolt dia. M16 bh
- Railing pipe black steel 1" & 2" fin Oil paint m'
- Tangga ladder, Pipe black steel 1" & 3" fin Oil paint m'
- Pengecatan dengan Zinchromate
- 1 lapis / 30 micron dengan Zinc Chromate Primer Green 113 ex. Kansai Paint
- 2 lapis / 60 micron dengan finish cat Ftalit Narvik blue KF 24 ex. Kansai Paint

Total Pekerjaan Lain - Lain

* Harga tidak termasuk Ppn 10%


*Harga sudah termasuk Material konsumable dan alat berat
* Harga sudah termasuk APD standard

Bill of QuantityProyek Pembangunan Warehouse & OfficePT. BEHN MEYER, Komplek Pergudangan Safe n Lock blok V2 - Jl. Lingkar Timur, SIDOARJO Hal : IV / 3
VOLUME Fab + Konsum Paint+konsum Kirim+erect JUMLAH HARGA
( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )

1.00

831.60 -
1,172.16 -
554.40 -
392.62 -
189.10 -
1,044.99 -
523.11 -
72.00 -
24.00 -
24.00 -
4.25 -

Bill of QuantityProyek Pembangunan Warehouse & OfficePT. BEHN MEYER, Komplek Pergudangan Safe n Lock blok V2 - Jl. Lingkar Timur, SIDOARJO Hal : IV / 4