HOJA DE METRADOS
02.06.00 ACCESORIOS
02.06.01 COMPUERTA METALICA C/TIMON Y DISEO INC. INSTAL UND 1.00 1.00 1.00 1.00
HOJA DE METRADOS
03.03.03 ACERO FY=4200 KG/CM2 KG 1.00 (ver planilla acero) 27.75 27.75
03.05.00 ACCESORIOS
03.05.01 COMPUERTA METALICA T/IZAJE CON DISEO INC. INSTAL UND 1.00 1.00 1.00 1.00
03.05.02 REJILLA FIERRO 1/2" (0.30 DE ANCHO ) UND 1.00 1.00 1.00 1.00
04.04.00 ACCESORIOS
04.04.01 CURVAS PVC UF S-25 =6"x22.5 UND 60.00 1.00 1.00 60.00
05.03.03 ACERO FY=4200 KG/CM2 KG 1.00 (ver planilla acero) 204.37 204.37
HOJA DE METRADOS
05.05.00 ACCESORIOS
05.05.01 TUBERIA PVC SAP C-7.5 4" (LIMPIA Y REBOSE) M 6.00 1.00 1.50 1.50 9.00
05.05.02 TAPA METALICA 0.6M X 0.6M UND 6.00 1.00 1.00 6.00
05.05.03 REJILLA FIERRO 1/2" (0.30 DE ANCHO ) UND 6.00 1.00 1.00 6.00
08.00.00 FLETE
08.01.00 FLETE TERRESTRE GLB 1.00 1.00 1.00 1.00
08.02.00 FLETE RURAL GLB 1.00 1.00 1.00 1.00
SUSTENTO METRADO DE ACEROS
"CONSTRUCCIN CANAL DE RIEGO
MUNICIPALIDAD DISTRITAL DE LAMBRAMA
LAMBRAMA - ABANCAY - APURIMAC
Peso en kilogramos por metro lineal 0.25 0.56 1.02 1.60 2.26 4.04 Total en
Longitud total por en metros lineales 49.55 Kg.
Total en kilogramos por 27.75 27.75
Peso en kilogramos por metro lineal 0.25 0.56 1.02 1.60 2.26 4.04 Total en
Longitud total por en metros lineales 364.95 Kg.
Total en kilogramos por 204.37 204.37