Package Allocation
WORKPACK APPROVAL
Name
PLANNER / JOB PACKAGE DEVELOPER
LEAD TA PLANNER
ASSET INTEGRITY
TECHNICAL SERVICE
MECHANICAL
ELECTRICAL/ INSTRUMENTATION
CIVIL
TA MANAGER
Comments:
VIDED
Signed Date
GURU GOBIND SINGH REFINERY
Workpack Revison Page (Section-B)
Work pack Information
Planner Approver
GURU GOBIND SINGH REFINERY
Workpack Content (Section-C)
Work pack Information
Section Description
Section - A
Section - B
Section - C
Section - D
Section - E
Section - F
Section - G
Section - H
Section - I
Attachments
Attachment - 1.2
Attachment - 1.3
Attachment - 1.4
Attachment - 1.5
Attachment - 1.6
Attachment 2 Cetificates
Attachment - 2.1
Attachment - 2.2
Attachment - 2.3
Attachment - 2.4
Attachment - 2.5
Attachment - 2.6
Attachment - 2.7
Attachment - 2.8
Attachment - 3.2
Attachment - 3.3
Attachment - 3.4
Attachment - 3.5
Attachment - 3.6
Attachment - 3.7
Attachment - 3.8
Attachment - 3.9
Attachment - 3.9
Description Status
Work pack Cover Page Included
Work pack revision
Electircal Requirement
Attachments
Cetificates Status
Cleaning Acceptance Certificate Included
Pressure Test Certificate Not Applicable
Calibration / Test Certificate (Control Valves, PRV & PSV) Not Applicable
Rescue Plan
Method statement
: 509-E-001G
Equip Tag
Activit
y Responsibility Phase
ID
1 Pre TA
2 Pre TA
3 Pre TA
4 Pre TA
1 Operation Shutdown
2 Operation Shutdown
3 Operation Shutdown
1 Engineering Window
2 Engineering Window
3 Engineering Window
4 Engineering Window
5 Engineering Window
6 Engineering Window
8 Engineering Window
9 Engineering Window
10 Engineering Window
11 Engineering Window
13 Engineering Window
14 Engineering Window
15 Engineering Window
16 Engineering Window
17 Engineering Window
18 Engineering Window
19 Engineering Window
1 Post TA
2 Post TA
3 Post TA
4 Post TA
5 Post TA
Activity description
Pre TA
External Scaffolding, wherever required
Tagging of the Blinds, valves .
Shifting of temporary blinds (For isolation) / Shell / New Tube bundles on site
Fabrication of temporary supports / spools and shifting at site
Operation Shutdown
Removal of Insulation, wherever required
Engineering Window
Piping dismantling & Blinding (____ IND)
Positioning of Crane As per required Capacity at designated area if reqd.
Dome cover bolts opening & dropping
Tube bundle pulling
Floating head cover bolts opening & dropping
Shift the tube bundle at Hydro jetting yard for cleaning
Clean the Shell & dome cover
Offer for inspection to check the clean Shell & Segments
Carryout minor repair and NDT test of Shell & Segments
Blasting & painting and cold compound application of Segments, if required
Replacement of new tube bundle
Box up Channel Cover, Channel Head with Shell Flange Ring and Floating Head Cover
Perform Tube test ( ____ Kg/cm2)
Removal of Channel Head with Shell Flange Ring
Box up Channel Head & Channel Cover
Preform Shell side Hydrotest ( ____ Kg/cm2)
Piping box-up and Deblinding
Commissioning
Post TA
Clean tube bundle by Hydro jetting
Offer for inspection to check the clean tube bundle, Shell & Segments
Shift the old tube bundle to designated area
Removal of Scaffolding
House keeping of the Area
Duration in Hrs.
Predecessors
Relationship
Supervisor
Gen Fitter
Maint Rigger
Maint Helper
Scaffolder
Fabrication
Supervisor
Fabricator
Welder
Grinder
Gas Cutter
Fab. Rigger
Manpower
Job Scope
GUR
Fab. Helper
Manpower
Hydrojetter
Torqueing
Technician
Bundle puller
operator
Crane operator
Hydra/Forklift
operator
P & M Helper
Insulation
Technician/Sup
GURU GOBIND SINGH REFINERY
Ele. Technician
Inst. Technician
Job Scope and Responsibility Matrix (Section - D)
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Maint. Supervisor
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Gen Fitter
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Maint Rigger
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Maint Helper
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
Man-hours
Crane operator
Hydra/Forklift
Bundle puller
P & M Helper
Fab. Helper
Fab. Rigger
Fabrication
Hydrojetter
Supervisor
Technician
Gas Cutter
Scaffolder
Fabricator
Torqueing
operator
operator
Grinder
Welder
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
Equipment Resources
Inst. Technician
Technician/Sup
Ele. Technician
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
Equipment Resources
Rigging Plan
Reqd. -Yes
Hydro jetting Welding or No
Bundle puller
Machine Machine
GURU GOBIND SINGH REFINERY
Equipment,Tools & Tackles Provision List (Sect
Requirements
S.No. Qty's
1 Limited
2 Un-Limited
3 Un-Limited
4 Limited
5 Limited
6 Limited
7 Un-Limited
8 Un-Limited
9 Un-Limited
10 Limited
11 Limited
12 Limited
13 Un-Limited
14 Limited
15 Limited
16 Limited
17 Limited
18 Limited
19 Limited
20 Limited
21 Limited
22 Limited
23 Limited
24 Un-Limited
25 Limited
26 Limited
27 Limited
28 Limited
29 Limited
30 Un-Limited
31 Un-Limited
32 Un-Limited
33 Un-Limited
34 Un-Limited
35 Un-Limited
36 Un-Limited
37 Un-Limited
38 Un-Limited
39 Un-Limited
40 Un-Limited
41 Un-Limited
42 Un-Limited
43 Limited
44 Limited
45 Limited
46 Limited
47 Limited
48 Un-Limited
49 Un-Limited
50 Un-Limited
51 Limited
52 Un-Limited
53 Un-Limited
53 Limited
Note-1 Coverall, Helmet, safety shoes, Goggles, Ear protection, Hand Gloves, Chin Strap
Note-2 Personal Fall Arrestor System, Disposable Coverall,Hotwork PPE,Gloves(PVC,NITRILE,LATEX) Refer: JSA &
Note-3 Respirators,Self Containing Breathing Apparatus (SCBA)
Note-4 To Be Mentioned by Job Co-Ordinator (Company & Contractor)
Note-5 Line Insert Spades Contractor To Fabricate, As per Required Size & Company will be Provide Enough Steel
SAP Wo # : N/A
GURU GOBIND SINGH REFINERY
Equipment,Tools & Tackles Provision List (Section - E)
Requirements Responsibility
Description Company Main
Contractor
General Consumables
Area lighting - General
Hand lamps ( 24V EX rated)
Electrical testing equipment for contractor equipments
Half Drums (For Re-Usable Stud Bolt Storage & Cleaning)
Wooden Pallet
Manual / Hydraulic Pallet Lifter
Tarpaulins
fire blankets for hot works
Hoses, manifolds and fittings for operation requirement
Air-conditioning Equipment (For Confined Space)
Scaffold material
Refractory / Insulation & Cladding materials
Blasting / Painting Equipment
Valve, PSV etc. Testing equipment & Work Bench
Air movers / ventilation fans/ Eductor with required accessories and hoses
Service water, Plant Air, Nitrogen & Low Pressure Steam (LPS)
Waste handling + Empty Drums
Hydro test / pneumatic test Tools & Equipment's
Heat Exchanger Chemical Cleaning
Personal H2S & O2 detector with distress alarm
Rescue Equipment like tripod
safety shoes, Goggles, Ear protection, Hand Gloves, Chin Strap
estor System, Disposable Coverall,Hotwork PPE,Gloves(PVC,NITRILE,LATEX) Refer: JSA & MSDS
Containing Breathing Apparatus (SCBA)
by Job Co-Ordinator (Company & Contractor)
s Contractor To Fabricate, As per Required Size & Company will be Provide Enough Steel Plates
Equipment Tag No#: 509-E-001G
Other Not applicable
Contractor
electrical to confirm
GURU GOBIND SINGH REFINERY
Consumables / Materials List (Section - F)
Driver:-
2 TS Driven
3 Inspection driven
4 Maintenance driven
5 Operation Driven
SCAFFOLDING
INTERNAL INSPECTION
EXTERNAL INSPECTION
VISUAL
IN-Situ metallography
Sandblasting, painting
S no Activity Description
1
3
4
History of Equipment:-
Marked Drawing:-
Planner/Executor
GURU GOBIND SINGH REFINERY
Inspection Requirement (Section - G)
Equipment Tag No:-
Time required in
on
Hours
AI
Please Tick( wherever
applicable)
Status
GURU GOBIND SINGH
Blind Checklist- (Sec
S No Blind No P & ID no Equipment /Pipeline No Blind Size Blind Type (End, Location FLANGE SIZE (INCH) RATING
Tail, Spec)
1 24" 900
2 12" 900
3 24" 900
4
5
6
7
8
9
10
11
12
13
14
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
SAP Wo # : N/A
GURU GOBIND SINGH REFINERY
Blind Checklist- (Section - H)
ACTIVITY STATUS
Equipment No
Sno Items Required Required Not required
1 Flood light
2 Hand lamp, 24V
3 Extension board
4 Blower
5 1-phase welding machine
6 3-phase welding machine
7 1-phase grinding/ buffing machine
8 Stress relieving machine
9 Hydrojetting machine
10 Air conditioning
11 Air compressor (electric operated)
12 Oven
REFINERY
ection- I
EQUIPMENT DETAIL
EQIPMENT
EQUIPMENT NUMBER 507-R-001 DESCRIPTION
CLEANING TYPE
CLEANING AREA
RESULT
COMMENTS
Comment No:01
Comment No:02
Mech AI
SIGNATURE
NAME
DESIGNATION
COMPANY NAME
SINGH REFINERY
e Report (TA-2016)
ment-2.1)
DHDT
DHDT Reactor
MEL INSPECTION
TS OPR
GURU GOBIND SINGH REFIN
Catalyst Loading Certificate (TA-201
(Attachment - 2.4)
DATE
EQUIPMENT DETAIL
SAP WORK ORDER NUMBER N/A
EQUIPMENT / LINE NUMBER 507-R-001
EQUIPMENT / LINE NAME DHDT Reactor
UNIT NAME DHDT
CHECK LIST
ACTIVITY
Others ( If Any )
CLEARANCE
CONTRACTOR INSPECTION MECH
SIGN
NAME
DESIGNATION
AND ALL TRAYS / INTERNALS ARE IN GOOD CONDITION AND PROPERLY FIXED.
DESIGNATION
T
ACCEPTED NOT ACCEPTED NOT APPLICABLE
E
AI TS OPR
HMEL OPERATION
GURU GOBIND SINGH REFI
Boxup Certificate (TA-2016)
(Attachment - 2.5)
DATE
EQUIPMENT DETAIL
SAP WORK ORDER NUMBER N/A
EQUIPMENT / LINE NUMBER 507-R-001
EQUIPMENT / LINE NAME DHDT Reactor
UNIT NAME DHDT
ACTIVITY
All Debris Removed From Inside
All Nozzles inspected
All Trays, Valves/Bubble Cap & Clamps In Place
All Internals Installed
All Repairs And Hot Work Completed
All Trays Manways Boxed-Up
Gaskets Replaced as per spec
Bolts And Nuts as per spec
Internal Lighting Removed
Equipment has been internally cleaned and cheked
Internals Scaffolding Removed
Others ( If Any )
REMARKS
BOX-UP CLEARANCE
CONTRACTOR INSPECTION
AI
SIGN
NAME
DESIGNATION
IL
HMEL INSPECTION
TS MECH OPR
GURU GOBIND SINGH REFINERY
Flange joint Checklist
Attachment 2.6
Flange joint STUDS
SR No. LINE NO/ISO NO.
No SIZE RATING SIZE SPEC
10
CONTRACTOR INSPECTION
AI
SIGN
NAME
DESIGNATION
HMEL INSPECTION
MECH OPR
GURU GOBIND SINGH REFINERY
Torquing / Bolt Tensioning Checklist (TA-2016)
(Attachment - 2.7)
EQUIPMENT DETAIL
SAP WORK ORDER NUMBER
UNIT NAME
14
15
16
17
18
19
20
21
22
23
24
25
DESIGNATION
N/A
507-R-001
DHDT Reactor
DHDT
ST
Final Torquing Tag No ACC Not- ACC N / A
Check
able
Verified
HMEL INSPECTION (MECH)
GURU GOBIND SINGH REF
Job Completion Certificate (TA-201
(Attachment - 2.8)
EQUIPMENT DETAIL
SAP WORK ORDER NUMBER
UNIT NAME
JOB TYPE
CIVIL
STRUCTURAL
MECHANICAL
PIPING
ELECTRICAL
INSTRUMENTATION
AUTHORITIES
EXECUTED BY (Performing Party)
SIGN
NAME
DESIGNATION
INSPECTED / VERIFIED BY
AI TS
SIGN
NAME
DESIGNATION
ACCEPTED BY
(Operation Engineer)
SIGN
NAME
DESIGNATION
Date:-
PMENT DETAIL
N/A
507-R-001
DHDT Reactor
DHDT
OB TYPE
INSPECTION
SCAFFOLDING
INSULATION & REFRACTORY
PAINTING
HVAC
OTHERS ( IF ANY )
THORITIES
) VERIFIED BY (Execution engineer)
TS
1)Site preparation
2 2) Shifting of materials
(Note: JSA to be done by issuer and acceptor of work permit. In case required, represent
GURU GOBIND SINGH REFINERY
Job safety analysis (Risk Hazard Identification)
Attachment- 3.2
Hazards
(Both Existing as well as
potential)Against each task list the Hazards that
could cause injury/damage to people, equipment
or the
environment.
Collapse of scaffold
Designation
of work permit. In case required, representative from other discipline can also join the team for JSA)
507-R-001 DHDT Reactor
Ensure that Tool box talk is being carried out about the
execution of the jobs and about right tools by the
contractor supervisors
Signature
A JOB DESCRIPTION
1 Section/Department
2 Sub section/Unit
3 Exact Location
4 Equipment
5 Lifting Part Description
C/C Hz Distance
C/C Hz Distance
UOM/
Options Qty./ Measurement/Remarks
OFFSITE maintenance
mechanical
offsite area
minitruck
plate
2x1x4
MT 500 kg
-
Mtr.
site
Yes/No yes
Yes/No yes
NA/Yes no
HMEL CONTRACTOR
MT
Date: Time:
Date: Time:
Hrs
Date: Time:
Name: Name:
Mobile No: Mobile No:
Yes/No NO
Yes/No YES
Yes/No YES
Yes/No NO
Yes/No YES
Yes/No YES
Yes/No YES
Nos 3
OK/NA OK
OK/NA OK
OK/NA OK
OK/NA OK
OK/NA OK
OK/NA OK
OK/NA NA
OK/NA NA
OK/NA OK
OK/NA NA
OK/NA NA
OK/NA OK
OK/NA OK
Mtr. NA
Mtr.
Deg.
Mtr.
MT
Mtr.
Nos.
MT
Nos.
Yes/
NO{NA)
d usage. User must request for pre-assessment of job if in doubt and must present th
of site incharge or empowered nominee.
f prior cancellation and /or extension is not done.
the job with starting and closing time [Put Sign. with
H
LOAD:55MT
ei
gh
t
fr
o
m
Hz
Pl
an
e
Date:
Actual
Observation
*
*
H
ei
gh
t
fr
o
m
Hz
Pl
an
e