Documentos de Académico
Documentos de Profesional
Documentos de Cultura
The Utah Department of Transportation is proposing how it would like to spend $1 billion from
upcoming bonding. A12few
th S of the key new or accelerated projects are shown here:
.
DAVIS/WEBER COUNTY S A L T TAYLOSRVILLE
LAKE COUNTY MURRY
Vin
700 W.
210 5900 So. eS
0 S. Freeway
6200 S. interchange MURRAY
OGDEN
.
0W
at 6200 S.
State St.
HOOPER
470
4Make full
Bangerter Hwy.
000
interchange Salt Lake
S.
.
7000 S.
0W
Airport #2 MIDVALE
at 24th Street
Airport
410
3200 W.
550
0 S. 15
15 7800 So. Elevated
Rd.
ROY lanes on
4000 W.
Main St.
180 WEST NB I-15
0N 84
JORDAN
.
Redwood Rd.
West Davis y
Corridor Hill Air Hw
a m Another 9000 So.
Force in gh 9000 S.
dB
SB lane
CLEARFIELD Ol on I-15
Base
SANDY
1300 W.
Widen I-15/
Ant Freeway
State St.
elop addition of
interchange
Blu
eD carpool lane
r.
at 10400 S.
ff R
10400 S.
10600 S.
d.
300 E.
12600 S. at 12600 S.
0 4
2700 W.
3600 W.
MILES 15 RIVERTON 0 1
FARMING TON 13400 S. MILES
interchange ne improvements
r
Main Street
Source: Utah Department of Transportation The Salt Lake Tribune