Está en la página 1de 30

CALCULO DE ARMADURA DE RESERVORIO

EXPEDIENTE: "INSTALACIN DEL SISTEMA DE ACERO MUROS

AGUA POTABLE Y ACERO VERTICAL = 3/8 Pulg.

SANEAMIENTO EN LAS DIAMETRO = 0.953 Cms.


LOCALIDADES DE HUATAPAMPA, AREA = 0.713 Cms2.
ALCAMARINI, CHICURUNI Y PESO = 0.560 Kg/ml
CCOLLPATIRA, DISTRITO DE ACERO HORIZONTAL = 3/8 Pulg.
CRUCERO - CARABAYA - PUNO" DIAMETRO = 0.953 Cms.

CARACTERISTICAS GEOMETRICAS AREA = 0.713 Cms2.


VOLUMEN RESERVORIO = 5.00 m3 PESO = 0.560 Kg/ml
ALTURA UTIL RESERVORIO = 1.25 mts.
LADO UTIL RESERVORIO = 2.00 mts. ACERO LOSA DE TECHO
ESPECIFICACIONES ACERO HORIZONTAL = 3/8 Pulg.
CONCRETO f'c = 210 Kg/cm2 DIAMETRO = 0.953 Cms.
SOBRECARGA EN LOSA = 200 Kg/m2 AREA = 0.713 Cms2.
ACERO fy = 4,200 Kg/cm2 PESO = 0.560 Kg/ml
RESISTENCIA DEL SUELO = 1.61 Kg/cm2 ACERO LOSA DE FONDO
COEF. SISMICO = 0.12 ACERO HORIZONTAL = 3/8 Pulg.
RECUBRIMIENTO r = = 7.00 Cm DIAMETRO = 0.953 Cms.

fs = 2,100 Kg/cm2 AREA = 0.713 Cms2.

fc = 94.5 Kg/cm2 PESO = 0.560 Kg/ml

0.20 0.15 1.00

1.35

1.35

Sc Wc
SL
A' B'

WL NIVEL DE AGUA

S1

Ea

1.85 1.80 W1 0.417

0.98 Wa

A B

S2
0.10
C D

W2

0.28

0.68

0.85
0.10

0.30

1.25

0.20
CALCULOS

W1= Pc x V1 558.00 Kg
W2 = Pc x V2 648.00 Kg
Wa = Pa x Va 1250.00 Kg
WL = Pc x VL 276.00 Kg
Ws = Sc x A 230.00 Kg
S1 = 0,12 x W1 100.44 Kg
S2 = 0,12 x W2 116.64 Kg
SL = 0,12 x WL 49.68 Kg
Ss = 0,12 x Ws 49.68 Kg
Ea = 1,12 x 0,5 x Pa x H12 1312.50 Kg

VERIFICACION DEL ESFUERZO CORTANTE EN LA BASE AB

V = Fh / A 1.01 Kg/cm2

Vc = 0,29 ( f'c )^1/2 4.20 Kg/cm2

V= 1.01 Kg/cm2 < Vc = 4.20 Kg/cm2 BIEN !!

CALCULO DE LA ARMADURA

ACERO VERTICAL CARA B'-B

MOMENTO MAXIMO EN LA BASE A-B

Mu 786.18 Kg-mts.
d = t1 - r - D/2 7.52 Cms.

AREA DE ACERO
As1 = 61.05 Cms2
As2 = 2.90 Cms2 SE ASUME : 2.90 Cms2

CUANTIA = As / t1 x b 0.00193

CUANTIA MINIMA POR FLEXION 0.0012 < 0.0019 BIEN!!

USAR : 1 3/8 @ 0.25 mts.

ACERO HORIZONTAL B'B

ASUMIR CUANTIA MINIMA PARA EL ACERO HORIZONTAL, CONSIDERANDO P = 0,0018

As = P x b x t1 2.70 Cms2

USAR : 1 3/8 @ 0.26 mts.

ACERO EN LA ZAPATA
ASUMIR EL AREA DE ACERO HALLADA PARA LA BASE DE MURO

USAR : 1 3/8 @ 0.25 mts.

ACERO EN LA LOSA DE FONDO

P1 1904.4
P2 3850.2
P3 3348.00
P4 5248.80
P5 7500.00

LUEGO: WuD : 4130.70


WuL : 360.00

Wu : 4490.70
CALCULO DEL MOMENTO ULTIMO

Mu = 0,0513 * Wu * L2 1218.67 Kg--mts


d = t1 - r - D/2 12.52 Cms.
AREA DE ACERO
As1 = 103.81 Cms2
As2 = 2.64 Cms2 SE ASUME : 2.64 Cms2

CUANTIA = As / t1 x b 0.00132

CUANTIA MINIMA POR FLEXION 0.0011 < 0.0013 BIEN!!

USAR : 1 3/8 @ 0.25 mts.

ACERO EN LA LOSA DE TECHO

WuD = 2400 * t1 * 1,5 360


WuL = SC * 1,8 360
Wu = 720

CALCULO DEL MOMENTO ULTIMO

Mu = 0,0479 * Wu * L2 137.95 Kg--mts


d = t1 - r - D/2 2.72 Cms.
AREA DE ACERO
As1 = 21.69 Cms2
As2 = 1.43 Cms2 SE ASUME : 1.43 Cms2

CUANTIA = As / t1 x b 0.00143

CUANTIA MINIMA POR FLEXION 0.0011 < 0.0014 BIEN!!

Cms2

USAR : 1 3/8 @ 0.20 mts


2.70

0.15 0.30

0.20 0.15 TUB. FG 3/4"


@ 0,30 Mts.

0.15

1.5 UNIONES
ELECTROSOLDADAS

0.10

2.00

ESCALINES FG
VER DETALLE
DETALLE DE ESCALINES

BUZON 0,60 x 0,60 Mts.


TAPA SANITARIA METALICA

ESPECIFICACIONES TECNICAS
0.15 RESISTENCIA DEL CONCRETO f'c = 210 Kg/cm2

FLUENCIA DEL ACERO fy = 4200 Kg/cm2

0.20 TRASLAPE MINIMO DE VARILLAS = 30 cm

0.20 0.15 2.00 0.15 0.20


0
RESERVORIO APOYADO 5 M3
0
Mar-17
ELECTROSOLDADAS
TAPA SANITARIA METALICA 3/8 @ 0.20 TUBERIA DE VENTILACION FG 2"
0,60 x 0,60 mts.

0.10


0.30

NIVEL DE AGUA

3/8 @ 0.25

3/8 @ 0.26 TARRAJEO C / IMPERMEABILIZANTE 1.55


1.25

3/8 @ 0.25


3/8 @ 0.25 PENDIENTE DE FONDO 1%

3/8 @ 0.25



0.20

0.075

0.67 SOLADO DE CONCRETO

0.20 0.15 2.00 0.15 0.20


0
RESERVORIO APOYADO
CORTE A-A
Mar-17
0
RESERVORIO APOYADO 5 M3
CORTE A-A
Mar-17
3/8 @ 0.20

2.30

2 3/8

ESPECIFICACIONES TECNICAS
RESISTENCIA DEL CONCRETO f'c = 210

FLUENCIA DEL ACERO fy = 4200

TRASLAPE MINIMO DE VARILLAS = 30

2.30 0
RESERVORIO APOYADO
ARMADURA DE LOSA DE TECHO
Mar-17
ESPECIFICACIONES TECNICAS
Kg/cm2

Kg/cm2

cm

0
5 M3
ARMADURA DE LOSA DE TECHO
Mar-17
PLANILLA DE ARMADURA RESERVORIO 5 M3

ARMADURA LOSA DE TECHO LONGITUD VECES PESO

2.24

0.07 3/8 2.38 25 33.32

2.24

3/8 2.24 4 5.02

ARMADURA LOSA DE FONDO LONGITUD VECES PESO

1.02

0.17 3/8 1.19 47.72 31.71

2.64

3/8 2.64 14.80 21.87

ARMADURA DE MURO LONGITUD VECES PESO

0.08

1.68 3/8 1.84 41.25 42.50

0.15
2.15 3/8 4.75 13.92 37.04

1.15

PESO TOTAL EN Kg 171.46


HOJA DE METRADOS DE RESERVORIO

CAPACIDAD :

SANEAMIENTO
PROYEC.:
EN LAS LOCALIDADES DE HUATAPAMPA, ALCAMARINI, CHICURUNI Y CCOLLPATIRA, DISTRITO
EVALUADOR:
DE CRUCERO - CARABAYA - PUNO"
EXPED.: 0 FECHA:

PARTIDA DESCRIPCION VECES LONG. ANCHO ALTURA SUB-TOTAL

6.00 RESERVORIO 5.00 M3


6.01 TRAZO Y REPLANTEO 1.00 2.70 2.70 7.29
6.02 EXCAVACION MANUAL 1.00 2.70 2.70 0.80 5.83
6.03 SOLADO DE CONCRETO E= 0.05 Mts. 1.00 2.70 2.70 7.29
6.04 CONCRETO F'C= 175 KG/CM2 1.00 2.70 2.70 0.20 1.46
2.00 2.30 0.15 1.55 1.07
2.00 2.00 0.15 1.55 0.93
1.00 2.30 2.30 0.10 0.53
6.05 CONFOR. DE PENDIENTE DE FONDO C F'C= 175 KG 1.00 2.00 2.00 4.00
6.06 ENCOFRADO Y DESENCOFRADO 4.00 2.30 1.65 15.18
4.00 2.00 1.55 12.40
1.00 2.00 2.00 4.00
6.07 ACERO FY= 4,200 KG/CM2 1.00 171.46 171.46
6.08 ESCALINES DE FIERRO GALVANIZADO 2.00 2.05 4.10
4.00 0.30 1.20

6.09 TARRAJEO INTERIOR CON IMPERMEABILIZANTE 4.00 2.00 1.55 12.40


1.00 2.00 2.00 4.00
6.10 TARRAJEO EXTERIOR MEZCLA 1:5 4.00 2.30 1.65 15.18
1.00 2.30 2.30 5.29
6.11 TAPA SANITARIA METALICA 0,60 x 0,60 Mts. 1.00 1.00
6.12 TUBERIA DE VENTILACION FG D= 2" 1.00 1.00
6.13 PRUEBA HIDRAULICA Y DESINFEC. RESERVORIO 1.00 1.00
6.14 SUMINISTRO Y COLOCACION DE HIPOCLORADOR 1.00 1.00
6.15 PINTADO DE MUROS EXTERIORES 4.00 2.30 1.65 15.18
1.00 2.30 2.30 5.29

TIEMPO DE EJECUCION DE OBRA

PARTIDA DESCRIPCION UNID METRADO RENDI. PERSONAL PERSONAL BASE

6.00 RESERVORIO 5.00 M3


6.01 TRAZO Y REPLANTEO m2 7.29 200.00 1.00 1.00
6.02 EXCAVACION MANUAL m3 5.83 3.00 1.00 5.00
6.03 SOLADO DE CONCRETO E= 0.05 Mts. m3 7.29 70.00 2.00 2.00
6.04 CONCRETO F'C= 175 KG/CM2 m3 3.99 9.00 2.00 2.00
6.05 CONFOR. DE PENDIENTE DE FONDO C F'C= 175 KG m2 4.00 70.00 2.00 2.00
6.06 ENCOFRADO Y DESENCOFRADO m2 31.58 10.00 1.00 5.00
6.07 ACERO FY= 4,200 KG/CM2 kg 171.46 250.00 1.00 1.00
6.08 ESCALINES DE FIERRO GALVANIZADO ml 5.30 15.00 1.00 1.00
6.09 TARRAJEO INTERIOR CON IMPERMEABILIZANTE m2 16.40 6.00 1.00 2.00
6.10 TARRAJEO EXTERIOR MEZCLA 1:5 m2 20.47 10.00 1.00 2.00
6.11 TAPA SANITARIA METALICA 0,60 x 0,60 Mts. und 1.00 5.00 1.00 1.00
6.12 TUBERIA DE VENTILACION FG D= 2" und 1.00 10.00 1.00 1.00
6.13 PRUEBA HIDRAULICA Y DESINFEC. RESERVORIO glb 1.00 10.00 1.00 1.00
6.14 SUMINISTRO Y COLOCACION DE HIPOCLORADOR und 1.00 10.00 1.00 1.00
6.15 PINTADO DE MUROS EXTERIORES m2 20.47 25.00 1.00 1.00
TIEMPO APROX. EJECUCION RESERVORIO.
5 M3

0
3/29/2017

TOTAL UNID.

7.29 m2
5.83 m3
7.29 m2
3.99 m3
m3
m3
m3
4.00 m2
31.58 m2
m2
m2
171.46 kg
5.30 ml

16.40 m2
m2
20.47 m2
m2
1.00 unid
1.00 unid
1.00 glb
1.00 unid
20.47 m2

TIEMPO

0.29 Hrs.
3.11 Hrs.
0.83 Hrs.
3.54 Hrs.
0.46 Hrs.
5.05 Hrs.
5.49 Hrs.
2.83 Hrs.
10.93 Hrs.
8.19 Hrs.
1.60 Hrs.
0.80 Hrs.
0.80 Hrs.
0.80 Hrs.
6.55 Hrs.
6.41 Dias
VOLUMEN ALTURA LADO INTER VOLUMEN ASUMIDO
3.00 1.25 1.55 5.00 M3
4.00 1.25 1.80
5.00 1.25 2.00 ALTURA LADO
6.00 1.25 2.20 1.25 2.00
7.00 1.25 2.40
8.00 1.30 2.50
9.00 1.30 2.65
10.00 1.35 2.75
11.00 1.40 2.85
12.00 1.45 2.90
13.00 1.50 2.95
14.00 1.55 3.05
15.00 1.55 3.15
16.00 1.60 3.20
17.00 1.65 3.25
18.00 1.65 3.35
19.00 1.70 3.35
20.00 1.70 3.45
21.00 1.75 3.50
22.00 1.75 3.55
23.00 1.80 3.60
24.00 1.85 3.65
25.00 1.85 3.70
26.00 1.85 3.75
27.00 1.90 3.80
28.00 1.90 3.85
29.00 1.95 3.90
30.00 1.95 3.95
31.00 2.00 3.95
32.00 2.00 4.00
33.00 2.05 4.05
34.00 2.05 4.10
35.00 2.05 4.15
36.00 2.10 4.15
37.00 2.10 4.20
38.00 2.15 4.25
39.00 2.15 4.30
40.00 2.15 4.35
41.00 2.20 4.35
42.00 2.20 4.40
43.00 2.20 4.45
44.00 2.25 4.45
45.00 2.25 4.50
46.00 2.25 4.55
47.00 2.30 4.55
48.00 2.30 4.60
49.00 2.30 4.65
50.00 2.35 4.65
51.00 2.35 4.70
52.00 2.45 4.65
53.00 2.40 4.70
54.00 2.40 4.75
55.00 2.40 4.80
56.00 2.40 4.85
57.00 2.45 4.85
58.00 2.45 4.90
59.00 2.55 4.85
60.00 2.45 4.95
1 2 3
PARTIDADESCRIPCION UNID. R 2 m3 R 8 m3 R 10 m3

6 RESERVORIO
6.01 TRAZO Y REPLANTEO m2 3.38 10.24 11.90
6.02 EXCAVACION MANUAL m3 2.70 8.19 9.52
6.03 SOLADO DE CONCRETO E= 0.05 Mts. m2 3.38 10.24 11.90
6.04 CONCRETO F'C= 175 KG/CM2 m3 1.96 5.38 6.18
6.05 CONFOR. DE PENDIENTE DE FONDO C F'C= 175 KG/CMm2 1.60 6.25 7.56
6.06 ENCOFRADO Y DESENCOFRADO m2 16.15 41.29 47.06
6.07 ACERO FY= 4,200 KG/CM2 kg 77.19 216.46 259.88
6.08 ESCALINES DE FIERRO GALVANIZADO ml 3.53 5.40 5.50
6.09 TARRAJEO INTERIOR CON IMPERMEABILIZANTE m2 8.01 22.25 25.71
6.1 TARRAJEO EXTERIOR MEZCLA 1:5 m2 10.42 26.88 30.65
6.11 TAPA SANITARIA METALICA 0,60 x 0,60 Mts. unid 1.00 1.00 1.00
6.12 TUBERIA DE VENTILACION FG D= 2" unid 1.00 1.00 1.00
6.13 PRUEBA HIDRAULICA Y DESINFEC. RESERVORIO glb 1.00 1.00 1.00
6.14 SUMINISTRO Y COLOCACION DE HIPOCLORADOR unid 1.00 1.00 1.00
6.15 PINTADO DE MUROS EXTERIORES m2 10.42 26.88 30.65
4 5
R 8 m3 R 5 m3 Total

10.24 7.29 43.05


8.19 5.83 34.44
10.24 7.29 43.05
5.38 3.99 22.88
6.25 4.00 25.66
41.29 31.58 177.37
216.46 151.76 921.74
5.40 5.30 25.13
22.25 16.40 94.62
26.88 20.47 115.30
1.00 1.00 5.00
1.00 1.00 5.00
1.00 1.00 5.00
1.00 1.00 5.00
26.88 20.47 115.30

También podría gustarte