LEVEL 28 - DECK SLAB

SECONDARY STEEL BEAM SCHEDULE (S355)

Mark Section Length (m) kg/m Total kg

SB1 UB 457x191x89kg/m. 151 89 13439

SB1A UB 203x133x25kg/m. 16.6 25 415

SB1B UB 406x178x54kg/m. 22.7 54 1225.8

SB2 UB 457x191x74kg/m. 249.3 74 18448.2

SB3 UB 406x178x54kg/m. 27.3 54 1474.2

SB4 UB 254x146x31kg/m. 4.1 31 127.1

SB5 UB 356x171x45kg/m. 11.9 45 535.5

SB6 UB 610x305x179kg/m. 11.3 179 2022.7

SB7 UB 610x229x101kg/m. 0 101 0

SB8 UB 610x229x101kg/m. 0 101 0

TR1 UB 178x102x19kg/m. 142.51 19 2707.69

TR2 UB 254x102x25kg/m. 0 25 0

TR3 UB 254x146x31kg/m. 4.93 31 152.83

PRIMARY STEEL BEAM SCHEDULE (S355)

PB1 UB 610x229x101kg/m. 71.32 101 7203.32

PB2 UB 610x324x241kg/m. 46 241 11086

PB2B UB 762x267x246kg/m. 0 246 0

PB2C UB 762x267x246kg/m. 0 246 0

PB3 UB 610x229x125kg/m. 0 125 0

PB4 UB 762x267x246kg/m. 0 246 0

PB5 UB 457x191x98kg/m. 0 98 0

PB6 UB 610x324x217kg/m. 0 217 0

PB7 UB 762x267x246kg/m. 0 246 0

TOTAL (KG) 58837.34

AREA (M2) 1403.1

WEIGHT IN KG/M2 41.9


LEVEL 45 - DECK SLAB

SECONDARY STEEL BEAM SCHEDULE (S355)

Mark Section Length (m) kg/m Total kg

SB1 UB 457x191x89kg/m. 330 89 29370

SB1A UB 203x133x25kg/m. 15.58 25 389.5

SB1B UB 406x178x54kg/m. 0 54 0

SB2 UB 457x191x74kg/m. 129 74 9546

SB3 UB 406x178x54kg/m. 46 54 2484

SB4 UB 254x146x31kg/m. 0 31 0

SB5 UB 356x171x45kg/m. 50.4 45 2268

SB6 UB 610x305x179kg/m. 0 179 0

SB7 UB 610x229x101kg/m. 0 101 0

SB8 UB 610x229x101kg/m. 0 101 0

TR1 UB 178x102x19kg/m. 130 19 2470

TR2 UB 254x102x25kg/m. 3.3 25 82.5

TR3 UB 254x146x31kg/m. 0 31 0

PRIMARY STEEL BEAM SCHEDULE (S355)

PB1 UB 610x229x101kg/m. 79 101 7979

PB2 UB 610x324x241kg/m. 56 241 13496

PB2B UB 762x267x246kg/m. 0 246 0

PB2C UB 762x267x246kg/m. 0 246 0

PB3 UB 610x229x125kg/m. 0 125 0

PB4 UB 762x267x246kg/m. 0 246 0

PB5 UB 457x191x98kg/m. 0 98 0

PB6 UB 610x324x217kg/m. 0 217 0

PB7 UB 762x267x246kg/m. 0 246 0

TOTAL (KG) 68085

AREA (M2) 1615

WEIGHT IN KG/M2 42.2


LEVEL 31 - DECK SLAB

SECONDARY STEEL BEAM SCHEDULE (S355)

Mark Section Length (m) kg/m Total kg

SB1 UB 457x191x89kg/m. 153 89 13617

SB1A UB 203x133x25kg/m. 15.58 25 389.5

SB1B UB 406x178x54kg/m. 13.3 54 718.2

SB2 UB 457x191x74kg/m. 273.6 74 20246.4

SB3 UB 406x178x54kg/m. 13 54 702

SB4 UB 254x146x31kg/m. 6.95 31 215.45

SB5 UB 356x171x45kg/m. 32.4 45 1458

SB6 UB 610x305x179kg/m. 34.6 179 6193.4

SB7 UB 610x229x101kg/m. 0 101 0

SB8 UB 610x229x101kg/m. 0 101 0

TR1 UB 178x102x19kg/m. 130 19 2470

TR2 UB 254x102x25kg/m. 3.3 25 82.5

TR3 UB 254x146x31kg/m. 0 31 0

PRIMARY STEEL BEAM SCHEDULE (S355)

PB1 UB 610x229x101kg/m. 62.05 101 6267.05

PB2 UB 610x324x241kg/m. 20.55 241 4952.55

PB2B UB 762x267x246kg/m. 0 246 0

PB2C UB 762x267x246kg/m. 0 246 0

PB3 UB 610x229x125kg/m. 0 125 0

PB4 UB 762x267x246kg/m. 0 246 0

PB5 UB 457x191x98kg/m. 0 98 0

PB6 UB 610x324x217kg/m. 0 217 0

PB7 UB 762x267x246kg/m. 0 246 0

TOTAL (KG) 57312.05

AREA (M2) 1460

WEIGHT IN KG/M2 39.3