PRESUPUESTO DE LA OBRA

PA

DESCRIPCION UNID. MET.


RT
DI
A

01.00.00 OBRAS PRELIMINARES


01.01.00 TRAZOS,NIVELES Y REPLANTEOS M2 35.00
02.00.00 MOVIMIENTO DE TIERRAS
02.01.00 EXCAVACION DE ZANJAS PARA CIMIENTOS M3 16.80
02.02.00 NIVELACION Y COMPACTACION M 2
17.00
03.00.00 OBRAS DE CONCRETO SIMPLE
03.01.00 CIMIENTO CORRIDO MEZCLA 1:8 M3 12.65
03.02.00 CONCRETO 1:8+25% DE P.M. M3 1.14
03.03.00 ENCOFRADO Y DESENCOFRADO S/C M2 18.60
03.04.00 FALSO PISO DE 4" M 2
32.60
04.00.00 OBRAS DE CONCRETO ARMADO
04.01.00 ZAPATA
04.01.01 CONCRETO f' c=210 kg/cm2 M3 0.80
04.01.02 ACERO kg 9.18
PARCIAL
G.G Y U.U 15%
SUB.TOTAL
L.G.V.18%
TOTAL
LA OBRA
COSTOS
P.UNIT P.PARC SUB.TOTAL

S/.3.57 S/.124.95

S/.35.00 S/.588.00
S/.35.00 S/.595.00

S/.145.00 S/.1,834.25
S/.143.00 S/.163.02
S/.25.40 S/.472.44
S/.25.50 S/.831.30

S/.350.00 S/.280.00
S/.25.00 S/.229.50
PARCIAL S/.5,118.46
G.G Y U.U 15% S/.767.77
SUB.TOTAL S/.5,886.23
L.G.V.18% S/.1,059.52
TOTAL S/.6,177.98