Substation Project Planning and Monitoring Tool

Purpose:
This tool assists in organizing and monitoring project work. By using the task planning section, project milestones and tasks can accurately be planned out. Once the project begins, real-
time progress is tracked and the project is monitored against the set baselines.

Getting Started:
In chronological order, use the boxes below to navigate through the tool as the project progresses. Click the blue buttons to go directly to the section of choice, or use the worksheet tabs
along the bottom of the spreadsheet screen. Some of the column headings in the sections include comments that offer additional instructions. Hover the mouse over the column headings
to view these instructions.

1 DATA ENTRY PROJECT TASK PLANNING


2
This section requires some basic data entry to get the project started. Use this important section to plan out the project. Tasks should be
Information regarding project start and end dates, project team members entered, along with deadlines and task owners. Once hashed out and
and stakeholders, and non-work days is required. completed, copy and paste this plan into Tab 3 to begin monitoring project
progress.

Go to Data Entry Go to Project Task Planning

3
PROJECT MONITORING CHART ISSUE LOG

Copy and paste the project plan from Tab 2 into the first four columns of
this Gantt chart. By entering the actual start and end dates for tasks, this
4
If issues arise, use this area to log and ensure that problems are resolved.

chart allows you to view which tasks are on schedule, behind schedule or
ahead of schedule.

Go to Project Monitoring Go to the Issue Log

6
CUSTOMIZED PROGRESS REPORT INDENT STATUS TRACKING

5 Use this section to generate a custom progress report. Specify the time
period that you would like to view and tasks during this time, ordered by
Use this section to generate a custom progress report. Specify the time
period that you would like to view and tasks during this time, ordered by
task owner, will appear. This report is ideal for weekly meeting updates, or task owner, will appear. This report is ideal for weekly meeting updates, or
stakeholder progress reporting. stakeholder progress reporting.

Go to Task Report Go to List of Indents


Basic Data Entry Return to the Introduction

Project Name Substation Shifting and Erection Project

Estimated Project Start Date December 1, 2016

Estimated Project End Date May 31, 2017

Budget Allocated (Gross in Rs) 62,500,000

TRCP-1516/ TAPR-01-07 (in Rs) 6,500,000

TRCP-1617/TAPR-18 (in Rs) 56,000,000

1. Project Team Members, Vendor Groups 2. Holidays / Time Off Project

Name Date Holiday


Mr.Ajay Khandelwal 10-Apr-09 Good Friday
Mr.Mahesh Sole 13-Apr-09 Easter Monday
Mr.Dharamveer Sharma 15-Apr-09 All Day Dept Meeting April
Mr.Sandeep Middye 18-May-09 Canadian Victoria Day
Mr.Pradeep Chaubey (Purchase) 4-Jul-09 US Independence Day
Mr.Munish Saini (Purchase) 3-Jul-09 Non-Project Work Day
Mr.Sanjeev Patil 12-Oct-09 Canadian Thanksgiving
Mr.Premjeet Singh 26-Nov-09 US Thanksgiving
Mr.Prashant (KC Power) 25-Dec-09 Christmas Day
Mr.Vinit Rathore (Signet) 1-Jan-10 New Year's Day
Mr.Amit Sofat (CG)
Mr.Avinash (Hitech Eectricals)
Mr.Dilip Pawar
Mr.Santosh (ABB)
Mr.Joshi (Powertech)
Mr.Arun Gaikwad (Purchase)
Planning Return to the Introduction

Project Task Information (Broad Classification of the Tasks)

Estimated Task Owner


Estimated
Project Task Completion (MUST USE DROP DOWN
Start Date
Date MENU)

Project Defintion Mr.Sandeep Middye


Assign Resources Mr.Pradeep Chaubey

MSETCL/MSEDCL and othe Government Approvals. (For Shifting and Add.Load) Mr.Mahes Sole
Create Project Plan Mr.Ajay Khandelwal
Carrying out all Technical Deisgning Calculations Involved Mr.Sandeep Middye
Placing a draft Lay Mr.Mahes Sole

Project Kick-Off Meeting Mr.Ajay Khandelwal

Civil Foundation Drawing Approval Mr.Dharamveer Sharma


Foundation Bolts Mr.Prashant (KC Power)
Civil Job Order PO Mr.Dharamveer Sharma
Change Control Processes Mr.Sandeep Middye
VCB Room Foundation Work Mr.Dilip Pawar
Earthing Wire Structure Foundation Work. Mr.Dilip Pawar
Transformer-1 Foundation and Rail Work (Bay-1) Mr.Dilip Pawar
Lighting Arresstor (R Phase) Foundation Work Bay-1 1-Jan-17 4-Jan-17 Mr.Dilip Pawar
Lighting Arresstor (Y Phase) Foundation Work Bay-1 1-Jan-17 4-Jan-17 Mr.Dilip Pawar
Lighting Arresstor (B Phase) Foundation Work Bay-1 1-Jan-17 4-Jan-17 Mr.Dilip Pawar
CT (R Phase) Foundation Work Bay-1 5-Jan-17 8-Jan-17 Mr.Dilip Pawar
CT (Y Phase) Foundation Work Bay-1 5-Jan-17 8-Jan-17 Mr.Dilip Pawar
CT (B Phase) Foundation Work Bay-1 5-Jan-17 8-Jan-17 Mr.Dilip Pawar
SF6 Breaker Foundation Work Bay-1 5-Jan-17 8-Jan-17 Mr.Dilip Pawar
PT (R Phase) Foundation Work Bay-1 9-Jan-17 12-Jan-17 Mr.Dilip Pawar
PT (Y Phase) Foundation Work Bay-1 9-Jan-17 12-Jan-17 Mr.Dilip Pawar
PT (B Phase) Foundation Work Bay-1 9-Jan-17 12-Jan-17 Mr.Dilip Pawar
1250A Isolator Foundation Work Bay-1 (Bay-1 Incomer) 13-Jan-17 15-Jan-17 Mr.Dilip Pawar
Bus Post-1 Insualtor Foundation Work Bay-1 16-Jan-17 18-Jan-17 Mr.Dilip Pawar
Bus Post-2 Insualtor Foundation Work Bay-1 16-Jan-17 18-Jan-17 Mr.Dilip Pawar
Transformer-1 Foundation and Rail Work (Bay-1) Mr.Dilip Pawar
Transformer-2 Foundation and Rail Work (Bay-2) Mr.Dilip Pawar
Lighting Arresstor (R Phase) Foundation Work Bay-2 19-Jan-17 20-Jan-17 Mr.Dilip Pawar
Lighting Arresstor (Y Phase) Foundation Work Bay-2 19-Jan-17 20-Jan-17 Mr.Dilip Pawar
Lighting Arresstor (B Phase) Foundation Work Bay-2 19-Jan-17 20-Jan-17 Mr.Dilip Pawar
CT (R Phase) Foundation Work Bay-2 21-Jan-17 22-Jan-17 Mr.Dilip Pawar
CT (Y Phase) Foundation Work Bay-2 21-Jan-17 22-Jan-17 Mr.Dilip Pawar
CT (B Phase) Foundation Work Bay-2 21-Jan-17 22-Jan-17 Mr.Dilip Pawar
SF6 Breaker Foundation Work Bay-2 23-Jan-17 23-Jan-17 Mr.Dilip Pawar
PT (R Phase) Foundation Work Bay-2 24-Jan-17 26-Jan-17 Mr.Dilip Pawar
PT (Y Phase) Foundation Work Bay-2 24-Jan-17 26-Jan-17 Mr.Dilip Pawar
PT (B Phase) Foundation Work Bay-2 24-Jan-17 26-Jan-17 Mr.Dilip Pawar
1250A Isolator Foundation Work Bay-2 (Bay-2 Incomer) 27-Jan-17 Mr.Dilip Pawar
Bus Post-3 Insualtor Foundation Work Bay-2 Mr.Dilip Pawar
Bus Post-4 Insualtor Foundation Work Bay-2 Mr.Dilip Pawar
FH+FP Column Foundation Work Mr.Dilip Pawar
FH+FP Column Foundation Work Mr.Dilip Pawar
FH+FP Column Foundation Work Mr.Dilip Pawar
FF+FP Column Foundation Work Mr.Dilip Pawar
FG+FP Column Foundation Work Mr.Dilip Pawar
FG+FP Column Foundation Work Mr.Dilip Pawar
FG+FP Column Foundation Work Mr.Dilip Pawar
PT (R Phase) Main ABT Meter Foundation Work Mr.Dilip Pawar
PT (Y Phase) Main ABT Meter Foundation Work Mr.Dilip Pawar
PT (B Phase) Main ABT Meter Foundation Work Mr.Dilip Pawar
CT (R Phase) Main ABT Meter Foundation Work Mr.Dilip Pawar
CT (Y Phase) Main ABT Meter Foundation Work Mr.Dilip Pawar
CT (B Phase) Main ABT Meter Foundation Work Mr.Dilip Pawar
PT (R Phase) Check ABT Meter Foundation Work Mr.Dilip Pawar
PT (Y Phase) Check ABT Meter Foundation Work Mr.Dilip Pawar
PT (B Phase) Check ABT Meter Foundation Work Mr.Dilip Pawar
CT (R Phase) Check ABT Meter Foundation Work Mr.Dilip Pawar
CT (Y Phase) Check ABT Meter Foundation Work Mr.Dilip Pawar
CT (B Phase) Check ABT Meter Foundation Work Mr.Dilip Pawar
Metering Room Foundation Work Mr.Dilip Pawar
FH+FP Column Foundation Work Mr.Dilip Pawar
FH+FP Column Foundation Work Mr.Dilip Pawar
1250A Isolator Foundation Work (Metering Area Incomer) Mr.Dilip Pawar
Bus Post Insulator-5 Foundation Work Mr.Dilip Pawar
3150A Pass-1 Isolator Foundation Work Mr.Dilip Pawar
ABB Pass-1 Foundation Work Mr.Dilip Pawar
FG+FP Column Foundation Work (Pass Area) Mr.Dilip Pawar
FG+FP Column Foundation Work (Pass Area) Mr.Dilip Pawar
FG+FP Column Foundation Work (Pass Area) Mr.Dilip Pawar
Wave Trap (R Phase) Foundation Work (Line-1) Mr.Dilip Pawar
Wave Trap (B Phase) Foundation Work (Line-1) Mr.Dilip Pawar
Coupling Capacitor (R Phase) Foundation Work (Line-1) Mr.Dilip Pawar
Coupling Capacitor (B Phase) Foundation Work (Line-1) Mr.Dilip Pawar
Lighting Arresstor (R Phase) Foundation Work (Line-1) Mr.Dilip Pawar
Lighting Arresstor (Y Phase) Foundation Work (Line-1) Mr.Dilip Pawar
Lighting Arresstor (B Phase) Foundation Work (Line-1) Mr.Dilip Pawar
3150A Pass-2 Isolator Foundation Work Mr.Dilip Pawar
ABB Pass-2 Foundation Work Mr.Dilip Pawar
Wave Trap (R Phase) Foundation Work (Line-2) Mr.Dilip Pawar
Wave Trap (B Phase) Foundation Work (Line-2) Mr.Dilip Pawar
Coupling Capacitor (R Phase) Foundation Work (Line-2) Mr.Dilip Pawar
Coupling Capacitor (B Phase) Foundation Work (Line-2) Mr.Dilip Pawar
Lighting Arresstor (R Phase) Foundation Work (Line-2) Mr.Dilip Pawar
Lighting Arresstor (Y Phase) Foundation Work (Line-2) Mr.Dilip Pawar
Lighting Arresstor (B Phase) Foundation Work (Line-2) Mr.Dilip Pawar
Bus Post Insulator-6 Foundation Work Mr.Dilip Pawar
Bus Post Insulator-7 Foundation Work Mr.Dilip Pawar
FH+FP Column Foundation Work Mr.Dilip Pawar
FH+FP Column Foundation Work Mr.Dilip Pawar
Bus PT Isolator 1250A Foundation Work Mr.Dilip Pawar
Bus PT (R Phase) Foundation Work Mr.Dilip Pawar
Bus PT (Y Phase) Foundation Work Mr.Dilip Pawar
Bus PT (B Phase) Foundation Work Mr.Dilip Pawar
LILO Room Foundation Work Mr.Dilip Pawar
Placing of Transformer-2 at the Foundation Work Mr.Sandeep Middye
Earthing Mat Design Calculations Mr.Sandeep Middye
Earthing Mat Design Layout Approval Mr.Dharamveer Sharma
Earthing Mat Material Supply PO Mr.Pradeep Chaubey (Purchase)
Earthing Mat Erection Job Work PO Mr.Pradeep Chaubey (Purchase)
Earthing Mat Erection Mr.Prashant (KC Power)
VCB Switch Board PO Mr.Pradeep Chaubey (Purchase)
VCB Switch Board Drawing Approval Mr.Sandeep Middye
VCB Switch Board Delivery at Site Mr.Santosh (ABB)
VCB Switch Board Commissioing Job Work PO Mr.Munish Saini (Purchase)
Structure Material PO for VCB Trench
Structure Material delivery at Site
Structure Material for VCB Trench Fabrication Job Work PO
VCB Switch Board Layout Approved Drawing Mr.Sandeep Middye
VCB SwitchBoard Commissioing Work Mr.Joshi (Powertech)
HT Route Finaization from New Substation to Old Substation Mr.Mahesh Sole
Structure Designing and Layout Drawing Finalization for New Route Mr.Sandeep Middye
Structure Material PO Mr.Arun Gaikwad (Purchase)
Structure Material Fabrication Job Work PO
Structure Material Delivery at Site
HT Cable Laying Job Work PO Mr.Joshi (Powertech)
HT Cable Material Supply PO
HT Cable delivery at Site
HT Termination Kit Material Supply PO Mr.Munish Saini (Purchase)
HT Termination Kit delivery at Site
HT Cable 6 Run 3Cx240 SQMM from Old Substation to New Substation via
Temporary Path to be Laid and Terminated. Mr.Joshi (Powertech)
C&R Panel-1&2 PO Mr.Munish Saini (Purchase)
C&R Panel-1&2 Drawing Approval Mr.Sandeep Middye
C&R Panel-1&2 Delivery at Site Mr.Avinash (Hitech Eectricals)
C&R Panel-1&2 Commissioning Job Work PO Mr.Prashant (KC Power)
C&R Panel-1&2 Layout Approved Drawing Mr.Sandeep Middye
C&R Panel-1&2 Commissioning Work Mr.Prashant (KC Power)
ACDB Panel-1&2 PO Mr.Pradeep Chaubey (Purchase)
ACDB Panel-1&2 Drawing Approval Mr.Sandeep Middye
ACDB Panel-1&2 Delivery at Site Mr.Prashant (KC Power)
ACDB Panel-1&2 Commissioning Job Work PO Mr.Prashant (KC Power)
ACDB Panel-1&2 Layout Apporved Drawing Mr.Sandeep Middye
ACDB Panel-1&2 Commissioning Work Mr.Prashant (KC Power)
Transformer-2 Commissioning Work (Testing/Assembling)
Busduct-1&2 PO Mr.Pradeep Chaubey (Purchase)
Busduct-1&2 Drawing Approval Mr.Mahesh Sole
Busduct-1&2 Delivery at the Site Mr.Prashant (KC Power)
Busduct 1&2Commissioning Job Work PO Mr.Pradeep Chaubey (Purchase)
Busduct 1&2Laying Approved Drawing Mr.Mahesh Sole
Busduct-2 Commissioning Work from Transformer-2 to Incomer-2 VCB Mr.Prashant (KC Power)
Lighting Arrestor Strcuture Supply PO Mr.Pradeep Chaubey (Purchase)
Lighting Arrestor Structure Drawing Apporval Mr.Dharamveer Sharma
Lighting Arrestor Structure Delivery at Site Mr.Prashant (KC Power)
Lighting Arrestor Structure Erection Job Work PO Mr.Pradeep Chaubey (Purchase)
Lighting Arrestor Layout Approved GTP & Drawing 2-Feb-17 6-Feb-17 Mr.Dharamveer Sharma
Lighting Arresstor (R Phase) Structure Erection Bay-2 7-Feb-17 Mr.Prashant (KC Power)
Lighting Arresstor (Y Phase) Structure Erection Bay-2 Mr.Prashant (KC Power)
Lighting Arresstor (B Phase) Structure Erection Bay-2 Mr.Prashant (KC Power)
CT (R Phase,Y Phase,B Phase) Strcuture Supply PO Mr.Prashant (KC Power)
CT (R Phase,Y Phase,B Phase) Structure Drawing Approval Mr.Dharamveer Sharma
CT (R Phase,Y Phase,B Phase) Structure Deliavery at Site Mr.Prashant (KC Power)
CT (R Phase,Y Phase,B Phase) Structure Erection Job Work PO Mr.Prashant (KC Power)
CT (R Phase,Y Phase,B Phase) Layout Approved Drawing Mr.Mahesh Sole
CT (R Phase) Structure Erection Bay-2 Mr.Prashant (KC Power)
CT (Y Phase) Structure Erection Bay-2 Mr.Prashant (KC Power)
CT (B Phase) Structure Erection Bay-2 Mr.Prashant (KC Power)
SF6 Breaker Structure Supply PO Mr.Pradeep Chaubey (Purchase)
SF6 Breaker Structure Drawing Approval Mr.Mahesh Sole
SF6 Breaker Structure Delivery at the Site Mr.Vinit Rathore (Signet)
SF6 Breaker Structure Commissioning Job Work PO Mr.Prashant (KC Power)
SF6 Breaker Structure Erection Bay-2 Mr.Prashant (KC Power)
PT (R Phase,Y Phase,B Phase) Strcuture Supply PO Mr.Pradeep Chaubey (Purchase)
PT (R Phase,Y Phase,B Phase) Structure Drawing Apporval Mr.Mahesh Sole
PT (R Phase,Y Phase,B Phase) Structure Deliavery at Site Mr.Prashant (KC Power)
PT (R Phase,Y Phase,B Phase) Structure Erection Job Work PO Mr.Prashant (KC Power)
PT (R Phase,Y Phase,B Phase) Layout Approved Drawing Mr.Mahesh Sole
PT (R Phase) Structure Erection Bay-2 Mr.Prashant (KC Power)
PT (Y Phase) Structure Erection Bay-2 Mr.Prashant (KC Power)
PT (B Phase) Structure Erection Bay-2 Mr.Prashant (KC Power)
1250A Isolator Structure Supply PO Mr.Pradeep Chaubey (Purchase)
1250A Isolator Structure Drawing Approval Mr.Dharamveer Sharma
1250A Isolator Structure Delivery at the Site Mr.Vinit Rathore (Signet)
1250A Isolator Structure Commissioning Job Work PO Mr.Prashant (KC Power)
1250A Isolator-1 Structure Erection Bay-2 (Bay-2 Incomer) Mr.Prashant (KC Power)
1250A Isolator Structure Supply PO Mr.Pradeep Chaubey (Purchase)
1250A Isolator Structure Drawing Approval Mr.Dharamveer Sharma
1250A Isolator Structure Delivery at the Site Mr.Vinit Rathore (Signet)
1250A Isolator Structure Commissioning Job Work PO Mr.Prashant (KC Power)
1250A Isolator-2 Structure Erection Bay-1 (Bay-1 Incomer) Mr.Prashant (KC Power)
FG+FP Column Structure Supply PO Mr.Pradeep Chaubey (Purchase)
FG+FP Column Structure Drawing Approval Mr.Dharamveer Sharma
FG+FP Column Structure Delivery at the Site Mr.Prashant (KC Power)
FG+FP Column Structure Commissioning Job Work PO Mr.Pradeep Chaubey (Purchase)
FG+FP Column Erection Work Mr.Prashant (KC Power)
FG+FP Column Structure Supply PO Mr.Pradeep Chaubey (Purchase)
FG+FP Column Structure Drawing Approval Mr.Dharamveer Sharma
FG+FP Column Structure Delivery at the Site Mr.Prashant (KC Power)
FG+FP Column Structure Commissioning Job Work PO Mr.Pradeep Chaubey (Purchase)
FG+FP Column Erection Work Mr.Prashant (KC Power)
FB Beam Structure Supply PO Mr.Pradeep Chaubey (Purchase)
FB Beam Structure Drawing Approval Mr.Dharamveer Sharma
FB Beam Structure Delivery at the Site Mr.Prashant (KC Power)
FB Beam Structure Commissioning Job Work PO Mr.Pradeep Chaubey (Purchase)
FB Beam Erection Work Mr.Prashant (KC Power)
FG+FP Column Structure Supply PO Mr.Pradeep Chaubey (Purchase)
FG+FP Column Structure Drawing Approval Mr.Dharamveer Sharma
FG+FP Column Structure Delivery at the Site Mr.Prashant (KC Power)
FG+FP Column Structure Commissioning Job Work PO Mr.Pradeep Chaubey (Purchase)
FG+FP Column Erection Work Mr.Prashant (KC Power)
FF+FP Column Structure Supply PO Mr.Prashant (KC Power)
FF+FP Column Structure Drawing Approval Mr.Dharamveer Sharma
FF+FP Column Structure Delivery at the Site Mr.Prashant (KC Power)
FF+FP Column Structure Commissioning Job Work PO Mr.Pradeep Chaubey (Purchase)
FF+FP Column Erection Work Mr.Prashant (KC Power)
FB Beam Structure Supply PO Mr.Pradeep Chaubey (Purchase)
FB Beam Structure Drawing Approval Mr.Dharamveer Sharma
FB Beam Structure Delivery at the Site Mr.Prashant (KC Power)
FB Beam Structure Commissioning Job Work PO Mr.Pradeep Chaubey (Purchase)
FB Beam Erection Work Mr.Prashant (KC Power)
Lighting Arrester Supply PO Mr.Pradeep Chaubey (Purchase)
Lighting Arrester Drawing & GTP Approval 2-Feb-17 6-Feb-17 Mr.Dharamveer Sharma
Lighting Arrester Delivery at Site 7-Feb-17 10-Mar-17 Mr.Avinash (Hitech Eectricals)
Lighting Arrester Installation PO Mr.Pradeep Chaubey (Purchase)
Lighting Arrester Installation Work Mr.Prashant (KC Power)
0.2 ACSR Conductor GTP Approval Mr.Dharamveer Sharma
0.2 ACSR Conductor Delivery at Site Mr.Prashant (KC Power)
0.2 ACSR Conductor Termination Job Work PO Mr.Prashant (KC Power)
0.2 ACSR Single Bus System Installation Work Mr.Prashant (KC Power)
Silicone Polymer Suspension Insulator Supply PO Mr.Pradeep Chaubey (Purchase)
Silicone Polymer Suspension Insulator GTP Approval Mr.Dharamveer Sharma
Silcione Polyme Suspension Insulator Conductor Delivery at Site Mr.Prashant (KC Power)
Silicone Polymer Suspension Insulator Installation PO Mr.Pradeep Chaubey (Purchase)
Silicone Polymer Suspension Insulator Installation Work Mr.Prashant (KC Power)
1250A Isolator Structure Supply PO Mr.Pradeep Chaubey (Purchase)
1250A Isolator Structure Drawing Approval Mr.Dharamveer Sharma
1250A Isolator Structure Delivery at the Site Mr.Vinit Rathore (Signet)
1250A Isolator Structure Commissioning Job Work PO Mr.Pradeep Chaubey (Purchase)
1250A Isolator-5 Structure Erection Metering (Metering Incomer) Mr.Prashant (KC Power)
3150A Isolator Structure Supply PO Mr.Pradeep Chaubey (Purchase)
3150A Isolator Structure Drawing Approval Mr.Dharamveer Sharma
3150A Isolator Structure Delivery at the Site Mr.Vinit Rathore (Signet)
3150A Isolator Structure Commissioning Job Work PO Mr.Pradeep Chaubey (Purchase)
3150A Isolator-1 Structure Erection (Pass-1) Mr.Prashant (KC Power)
3150A Isolator Structure Supply PO Mr.Pradeep Chaubey (Purchase)
3150A Isolator Structure Drawing Approval Mr.Dharamveer Sharma
3150A Isolator Structure Delivery at the Site Mr.Vinit Rathore (Signet)
3150A Isolator Structure Commissioning Job Work PO Mr.Pradeep Chaubey (Purchase)
3150A Isolator-1 Structure Erection (Pass-1) Mr.Prashant (KC Power)
Dead End Tower Foundation Drawing Approval Mr.Dharamveer Sharma
Finalization of Rerouting Plan of Dead End Tower Mr.Dharamveer Sharma
Dead End Tower Foundation Job Work PO Mr.Pradeep Chaubey (Purchase)
Dead End Tower Foundation Work Material Supply PO Mr.Pradeep Chaubey (Purchase)
Dead End Tower Foundation Work Material delivery at Site Mr.Prashant (KC Power)
Dead End Tower Foundation Work Mr.Prashant (KC Power)
Grid Isolation Permission Approval (2-3 Days) Mr.Dharamveer Sharma
Isolating JSW Substation from Grid. Mr.Dharamveer Sharma
Disconnecting Control Wiring of LILO Panel Mr.Prashant (KC Power)
Disconnecting Control Wiring of ACDB Panel to be removed. Mr.Prashant (KC Power)
Disconnecting Control Wiring of 110VDC Battery Charger to be removed. Mr.Prashant (KC Power)
Disconnecting Control Wiring of 4VDC Battery Charger to be removed. Mr.Prashant (KC Power)
Disconnecting Control Wiring of Bus PT Mr.Prashant (KC Power)
Disconnecting Control Wire of Bus PT Isolator Mr.Prashant (KC Power)
Disconnecting Control Wire of Pass-1 Mr.Prashant (KC Power)
Disconnecting Control Wire of Pass-2 Mr.Prashant (KC Power)
Disconnecting Control Wiring of Transformer-1 Mr.Prashant (KC Power)
Disconnecting Control Wiring of RTCC Panel Mr.Prashant (KC Power)
Disconnecting Control Wiring of C&R Panel-1 Mr.Prashant (KC Power)
Shifting and Installation of LILO Panel Mr.Prashant (KC Power)
Shifting and Installation of 110VDC Battery Charger Panel Mr.Prashant (KC Power)
Shifting and Installation of 4VDC Battery Charger Panel Mr.Prashant (KC Power)
Disconnecting Control Wiring of CT R Phase Mr.Prashant (KC Power)
Disconnecting Control Wiring of CT Y Phase Mr.Prashant (KC Power)
Disconnecting Control Wiring of CT B Phase Mr.Prashant (KC Power)
Disconnecting Control Wiring of SF6 Breaker Mr.Prashant (KC Power)
Disconnecting Control Wiring of PT R Phase Mr.Prashant (KC Power)
Disconnecting Control Wiring of PT Y Phase Mr.Prashant (KC Power)
Disconnecting Control Wiring of PT B Phase Mr.Prashant (KC Power)
Disconnecting Control Wiring of Isolator Mr.Prashant (KC Power)
Disconnecting Control Wiring of Main Meter CT R Phase Mr.Prashant (KC Power)
Disconnecting Control Wiring of Main Meter CT Y Phase Mr.Prashant (KC Power)
Disconnecting Control Wiring of Main Meter CT B Phase Mr.Prashant (KC Power)
Disconnecting Control Wiring of Main Meter PT R Phase Mr.Prashant (KC Power)
Disconnecting Control Wiring of Main Meter PT Y Phase Mr.Prashant (KC Power)
Disconnecting Control Wiring of Main Meter PT B Phase Mr.Prashant (KC Power)
Disconnecting Control Wiring of Check Meter CT R Phase Mr.Prashant (KC Power)
Disconnecting Control Wiring of Check Meter CT Y Phase Mr.Prashant (KC Power)
Disconnecting Control Wiring of Check Meter CT B Phase Mr.Prashant (KC Power)
Disconnecting Control Wiring of Check Meter PT R Phase Mr.Prashant (KC Power)
Disconnecting Control Wiring of Check Meter PT Y Phase Mr.Prashant (KC Power)
Disconnecting Control Wiring of Check Meter PT B Phase Mr.Prashant (KC Power)
Disconnecting Control Wiring of Main Energy Meter (Apex) Mr.Prashant (KC Power)
Disconnecting Control Wiring of Check Energy Meter (Apex) Mr.Prashant (KC Power)
Shifting & Installation of Pass Gantry FG+FP "3 Columns" and FA Beam "2" Mr.Prashant (KC Power)
Shifting & Installation of Lighting Arrester Structure Only. Mr.Prashant (KC Power)
Shifting & Installation of Coupling Capacitor with Structure Mr.Prashant (KC Power)
Shifiting & Installation of Wave Trap with Structure. Mr.Prashant (KC Power)
Shifting & Installation of Pass Hybrid System-1 Mr.Prashant (KC Power)
Shifting & Installation of Pass Hybrid System-2 Mr.Prashant (KC Power)
Shifting & Installation of FH+FP Column with FB Beam Mr.Prashant (KC Power)
Shifting & Installation of Twin Bus Line Mr.Prashant (KC Power)
Shifting & Installation of Bus PT Isolator with Structure Mr.Prashant (KC Power)
Dismantalling of Bus PT from Structure Mr.Prashant (KC Power)
Shifting & Installation of Bus PT Structure Mr.Prashant (KC Power)
Dismantalling of Main Meter R Phase CT Mr.Prashant (KC Power)
Dismantalling of Main Meter Y Phase CT Mr.Prashant (KC Power)
Dismantalling of Main Meter B Phase CT Mr.Prashant (KC Power)
Dismantalling of Main Meter R Phase PT Mr.Prashant (KC Power)
Dismantalling of Main Meter Y Phase PT Mr.Prashant (KC Power)
Dismantalling of Main Meter B Phase PT Mr.Prashant (KC Power)
Dismantalling of Check Meter R Phase CT Mr.Prashant (KC Power)
Dismantalling of Check Meter Y Phase CT Mr.Prashant (KC Power)
Dismantalling of Check Meter B Phase CT Mr.Prashant (KC Power)
Dismantalling of Check Meter R Phase PT Mr.Prashant (KC Power)
Dismantalling of Check Meter Y Phase PT Mr.Prashant (KC Power)
Dismantalling of Check Meter B Phase PT Mr.Prashant (KC Power)
Shifting & Installation of of Main Meter R Phase CT Structure Mr.Prashant (KC Power)
Shifting & Installation of of Main Meter Y Phase CT Structure Mr.Prashant (KC Power)
Shifting & Installation of of Main Meter B Phase CT Structure Mr.Prashant (KC Power)
Shifitng & Instalallation of Main Meter R Phase PT Structure Mr.Prashant (KC Power)
Shifitng & Installation of Main Meter Y Phase PT Structure Mr.Prashant (KC Power)
Shifitng & Installation of Main Meter B Phase PT Structure Mr.Prashant (KC Power)
Shifting & Installationof of Check Meter R Phase CT Structure Mr.Prashant (KC Power)
Shifting & Installation of of Check Meter Y Phase CT Structure Mr.Prashant (KC Power)
Shifting & Installation of of Check Meter B Phase CT Structure Mr.Prashant (KC Power)
Shifitng & Installation of Check Meter R Phase PT Structure Mr.Prashant (KC Power)
Shifitng & Installation of Check Meter Y Phase PT Structure Mr.Prashant (KC Power)
Shifitng & Installation of Check Meter B Phase PT Structure Mr.Prashant (KC Power)
Shifting & Installtion of FG+FP "4" Column Structure with "2" FB Beam Mr.Prashant (KC Power)
Shifting & Installtion of Bus Post Insulator Strcuture All 7 Nos. Mr.Prashant (KC Power)
Dismantalling of R Phase PT Mr.Prashant (KC Power)
Dismantalling of Y Phase PT Mr.Prashant (KC Power)
Dismantalling of B Phase PT Mr.Prashant (KC Power)
Shifitng & Installation of R Phase PT Structure Mr.Prashant (KC Power)
Shifitng & Installation of Y Phase PT Structure Mr.Prashant (KC Power)
Shifitng & Installtion of B Phase PT Structure Mr.Prashant (KC Power)
Shifting & Installation of R Phase CT with Structure Mr.Prashant (KC Power)
Shifting & Installation of Y Phase CT with Structure Mr.Prashant (KC Power)
Shifting & Installtion of B Phase CT with Structure Mr.Prashant (KC Power)
Shifting & Installation of R Phase Lighting Arrester Mr.Prashant (KC Power)
Shifting & Installtion of Y Phase Lighting Arrester Mr.Prashant (KC Power)
Shifting & Installation of B Phase Lighting Arrester Mr.Prashant (KC Power)
Shifting & Installation of 40 MVA Transformer Mr.Prashant (KC Power)
Control Wiring of 110VDC Battery Charger Panel Mr.Prashant (KC Power)
Control Wiring of 4VDC Battery Charger Panel Mr.Prashant (KC Power)
Power Circuit Wiring from ACDB Panel to ABB Hybrid Pass-1 Mr.Prashant (KC Power)
Power Circuit Wiring from ACDB Panel to ABB Hybrid Pass-2 Mr.Prashant (KC Power)
Power Circuit Wiring from ACDB Panel to Bus PT Isolator Mr.Prashant (KC Power)
Control Wiring of ABB Hybrid Pass-1 Mr.Prashant (KC Power)
Control Wiring of ABB Hybrid Pass-2 Mr.Prashant (KC Power)
Control Wiring of Bus PT Isolator Mr.Prashant (KC Power)
Control Wiring of Bus PT Mr.Prashant (KC Power)
Power Circuit Wiring of 3150 Isolator Pass-1 Mr.Prashant (KC Power)
Power Circuit Wiring of 3150 Isolator Pass-2 Mr.Prashant (KC Power)
Power Circuit Wiring of 1250 Isolator Metering Incomer Mr.Prashant (KC Power)
Control Circuit Wiring of 3150 Isolator Pass-1 Mr.Prashant (KC Power)
Control Circuit Wiring of 3150 Isolator Pass-2 Mr.Prashant (KC Power)
Control Circuit Wiring of 1250 Isolator Metering Incomer Mr.Prashant (KC Power)
Control Circuit Wiring of PLCC Panel with W.T and C.C Mr.Prashant (KC Power)
Power Circuit Wiring of Main Meter R Phase CT Mr.Prashant (KC Power)
Power Circuit Wiring of Main Meter Y Phase CT Mr.Prashant (KC Power)
Power Circuit Wiring of Main Meter B Phase CT Mr.Prashant (KC Power)
Power Circuit Wiring of Main Meter R Phase PT Mr.Prashant (KC Power)
Power Circuit Wiring of Main Meter Y Phase PT Mr.Prashant (KC Power)
Power Circuit Wiring of Main Meter B Phase PT Mr.Prashant (KC Power)
Power Circuit Wiring of Check Meter R Phase CT Mr.Prashant (KC Power)
Power Circuit Wiring of Check Meter Y Phase CT Mr.Prashant (KC Power)
Power Circuit Wiring of Check Meter B Phase CT Mr.Prashant (KC Power)
Power Circuit Wiring of Check Meter R Phase PT Mr.Prashant (KC Power)
Power Circuit Wiring of Check Meter Y Phase PT Mr.Prashant (KC Power)
Power Circuit Wiring of Check Meter B Phase PT Mr.Prashant (KC Power)
Control Circuit Wiring of ABT Check Meter Mr.Prashant (KC Power)
Control Circuit Wiring of ABT Main Meter Mr.Prashant (KC Power)
Power Circuit Wring of 1250 A Isolator at Point of Supply Mr.Prashant (KC Power)
Power Circuit Wring of 1250 A Isolator at Bay Inomer Mr.Prashant (KC Power)
Power Circuit Wring of 1250 A Isolator at Bay-1 Mr.Prashant (KC Power)
Power Circuit Wring of 1250 A Isolator at Bay-2 Mr.Prashant (KC Power)
Control Circuit Wring of 1250 A Isolator at Point of Supply Mr.Prashant (KC Power)
Control Circuit Wring of 1250 A Isolator at Bay Inomer Mr.Prashant (KC Power)
Control Circuit Wring of 1250 A Isolator at Bay-1 Mr.Prashant (KC Power)
Control Circuit Wring of 1250 A Isolator at Bay-2 Mr.Prashant (KC Power)
Power Circuit Wiring of SF6 Breaker Bay-1 Mr.Prashant (KC Power)
Power Circuit Wiring of SF6 Breaker Bay-2 Mr.Prashant (KC Power)
Control Circuit Wiring of SF6 Breaker Bay-1 Mr.Prashant (KC Power)
Control Circuit Wiring of SF6 Breaker Bay-2 Mr.Prashant (KC Power)
Power Circuit Wiring of R Phase CT Mr.Prashant (KC Power)
Power Circuit Wiring of Y Phase CT Mr.Prashant (KC Power)
Power Circuit Wiring of B Phase CT Mr.Prashant (KC Power)
Power Circuit Wiring of R Phase PT Mr.Prashant (KC Power)
Power Circuit Wiring of Y Phase PT Mr.Prashant (KC Power)
Power Circuit Wiring of B Phase PT Mr.Prashant (KC Power)
Control Circuit Wiring of 40MVA Transformer Mr.Prashant (KC Power)
Work Schedule Monitoring Return to the Introduction

GANTT CHART LEGEND

Holiday / Vacation / No Work


IMPORTANT NOTICE:
It is very impo rta nt tha t tasks are e ntered w ith uni que n ame s. If task name s a re rep eated , the da ta will n ot carry o ver correctly. Ma ke sure to na me each task di ffere ntly. Planned Project Work Day

IMPORTANT NOTICE: Task Completed


Row s ca nno t be i nserted or del eted from th e tabl e bel ow. If ch ang es are ma de to th e pro ject pla n, ma ke th ese ch ang es in Tab 2 . Pla nni ng, and co py an d paste the
chan ges in to thi s sh ee t. Be awa re th at the a ctual start and e nd da tes will n ot upd ate whe n chan ges a re copy an d pasted i nto this she et, so make a dj ustments to the se COMPLETION STATUS LEGEND
last tw o colu mns as nece ssary. Task Completed Ahead of Schedule

Task Completed Behind Schedule

Project Task Information Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 Week 9 Week 10 Week 11 Week 12 Week 13 Week 14 Week 15 Week 16 Week 17 Week 18 Week 19 Week 20 Week 21 Week 22 Week 23 Week 24 Week 25 Week 26

Estima ted Actual 28-Nov 5-Dec 12-Dec 19-Dec 26-Dec 2-Jan 9-Jan 16-Jan 23-Jan 30-Jan 6-Feb 13-Feb 20-Feb 27-Feb 6-Mar 13-Mar 20-Mar 27-Mar 3-Apr 10-Apr 17-Apr 24-Apr 1-May 8-May 15-May 22-May
Estimate d Actual Sta rt
Project Task Star t D ate Completion Task Owner Da te C ompletion Comments 28 29 30 1 2 5 6 7 8 9 12 13 14 15 16 19 20 21 22 23 26 27 28 29 30 2 3 4 5 6 9 10 11 12 13 16 17 18 19 20 23 24 25 26 27 30 31 1 2 3 6 7 8 9 10 13 14 15 16 17 20 21 22 23 24 27 28 1 2 3 6 7 8 9 10 13 14 15 16 17 20 21 22 23 24 27 28 29 30 31 3 4 5 6 7 10 11 12 13 14 17 18 19 20 21 24 25 26 27 28 1 2 3 4 5 8 9 10 11 12 15 16 17 18 19 22 23 24 25 26
Da te Da te
M T W T F M T W T F M T W T F M T W T F M T W T F M T W T F M T W T F M T W T F M T W T F M T W T F M T W T F M T W T F M T W T F M T W T F M T W T F M T W T F M T W T F M T W T F M T W T F M T W T F M T W T F M T W T F M T W T F M T W T F M T W T F M T W T F

Project Defi ntion 2-Dec-16 3-Dec-16 Mr.Sandeep Middye 2-Dec-16 2-Dec-16 y

Assign Resources Mr.Pradeep Chaubey

MSETCL/MSEDCL and othe Government Approvals. (For Shifting and Add.Load) Mr.Dharamveer Sharma
Create Project Plan Mr.Ajay Khandelwal
Carrying out all Technical Deisgning Calculations Involved Mr.Sandeep Middye
Placing a draft Lay Mr.Mahes Sole

Project Kick-Off Meeting Mr.Ajay Khandelwal

Civil Foundation Drawing Approval 4-Dec-16 6-Dec-16 Mr.Dharamveer Sharma x x

Foundation Bolts Mr.Prashant (KC Power)


Civil Job Order PO 10-Dec-16 12-Dec-16 Mr.Pradeep Chaubey (Purchase) 12-Dec-16 12-Dec-16 y
Change Control Processes Mr.Sandeep Middye
VCB Room Foundation Work 20-Dec-16 20-Mar-17 Mr.Dilip Pawar 3-Jan-17 x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x

Earthing Wire Structure Foundation Work. 20-Dec-16 20-Mar-17 Mr.Dilip Pawar 1-Jan-17 x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x

Transformer-1 Foundation and Rail Work (Bay-1) 20-Dec-16 20-Mar-17 Mr.Dilip Pawar x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x
Lighting Arresstor (R Phase) Foundation Work Bay-1 20-Dec-16 20-Mar-17 Mr.Dilip Pawar 1-Jan-17 3-Jan-17 y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y
Lighting Arresstor (Y Phase) Foundation Work Bay-1 20-Dec-16 20-Mar-17 Mr.Dilip Pawar 1-Jan-17 3-Jan-17 y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y
Lighting Arresstor (B Phase) Foundation Work Bay-1 20-Dec-16 20-Mar-17 Mr.Dilip Pawar 3-Jan-17 5-Jan-17 y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y

CT (R Phase) Foundation Work Bay-1 20-Dec-16 20-Mar-17 Mr.Dilip Pawar x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x

CT (Y Phase) Foundation Work Bay-1 20-Dec-16 20-Mar-17 Mr.Dilip Pawar x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x


CT (B Phase) Foundation Work Bay-1 20-Dec-16 20-Mar-17 Mr.Dilip Pawar x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x
SF6 Breaker Foundation Work Bay-1 20-Dec-16 20-Mar-17 Mr.Dilip Pawar x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x
PT (R Phase) Foundation Work Bay-1 20-Dec-16 20-Mar-17 Mr.Dilip Pawar x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x

PT (Y Phase) Foundation Work Bay-1 20-Dec-16 20-Mar-17 Mr.Dilip Pawar x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x

PT (B Phase) Foundation Work Bay-1 20-Dec-16 20-Mar-17 Mr.Dilip Pawar x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x


1250A Isolator Foundation Work Bay-1 (Bay-1 Incomer) 20-Dec-16 20-Mar-17 Mr.Dilip Pawar x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x
Bus Post-1 Insualtor Foundation Work Bay-1 20-Dec-16 20-Mar-17 Mr.Dilip Pawar x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x
Bus Post-2 Insualtor Foundation Work Bay-1 20-Dec-16 20-Mar-17 Mr.Dilip Pawar x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x

Transformer-1 Foundation and Rail Work (Bay-1) 20-Dec-16 20-Mar-17 Mr.Dilip Pawar x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x

Transformer-2 Foundation and Rail Work (Bay-2) 20-Dec-16 20-Mar-17 Mr.Dilip Pawar x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x
Lighting Arresstor (R Phase) Foundation Work Bay-2 20-Dec-16 20-Mar-17 Mr.Dilip Pawar x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x
Lighting Arresstor (Y Phase) Foundation Work Bay-2 20-Dec-16 20-Mar-17 Mr.Dilip Pawar x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x
Lighting Arresstor (B Phase) Foundation Work Bay-2 20-Dec-16 20-Mar-17 Mr.Dilip Pawar x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x

CT (R Phase) Foundation Work Bay-2 20-Dec-16 20-Mar-17 Mr.Dilip Pawar x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x

CT (Y Phase) Foundation Work Bay-2 20-Dec-16 20-Mar-17 Mr.Dilip Pawar x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x


CT (B Phase) Foundation Work Bay-2 20-Dec-16 20-Mar-17 Mr.Dilip Pawar x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x
SF6 Breaker Foundation Work Bay-2 20-Dec-16 20-Mar-17 Mr.Dilip Pawar x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x
PT (R Phase) Foundation Work Bay-2 20-Dec-16 20-Mar-17 Mr.Dilip Pawar x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x

PT (Y Phase) Foundation Work Bay-2 20-Dec-16 20-Mar-17 Mr.Dilip Pawar x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x

PT (B Phase) Foundation Work Bay-2 20-Dec-16 20-Mar-17 Mr.Dilip Pawar x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x


1250A Isolator Foundation Work Bay-2 (Bay-2 Incomer) 20-Dec-16 20-Mar-17 Mr.Dilip Pawar x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x
Bus Post-3 Insualtor Foundation Work Bay-2 20-Dec-16 20-Mar-17 Mr.Dilip Pawar x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x
Bus Post-4 Insualtor Foundation Work Bay-2 20-Dec-16 20-Mar-17 Mr.Dilip Pawar x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x

FH+FP-1 Column Foundation Work 20-Dec-16 20-Mar-17 Mr.Dilip Pawar x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x

FH+FP-2 Column Foundation Work 20-Dec-16 20-Mar-17 Mr.Dilip Pawar x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x


FH+FP-3 Column Foundation Work 20-Dec-16 20-Mar-17 Mr.Dilip Pawar x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x
FF+FP-4 Column Foundation Work 20-Dec-16 20-Mar-17 Mr.Dilip Pawar x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x
FG+FP-5 Column Foundation Work 20-Dec-16 20-Mar-17 Mr.Dilip Pawar x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x

FG+FP-6 Column Foundation Work 20-Dec-16 20-Mar-17 Mr.Dilip Pawar x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x

FG+FP Column Foundation Work 20-Dec-16 20-Mar-17 Mr.Dilip Pawar x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x


PT (R Phase) Main ABT Meter Foundation Work 20-Dec-16 20-Mar-17 Mr.Dilip Pawar x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x
PT (Y Phase) Main ABT Meter Foundation Work 20-Dec-16 20-Mar-17 Mr.Dilip Pawar x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x
PT (B Phase) Main ABT Meter Foundation Work 20-Dec-16 20-Mar-17 Mr.Dilip Pawar x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x

CT (R Phase) Main ABT Meter Foundation Work 20-Dec-16 20-Mar-17 Mr.Dilip Pawar x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x

CT (Y Phase) Main ABT Meter Foundation Work 20-Dec-16 20-Mar-17 Mr.Dilip Pawar x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x
CT (B Phase) Main ABT Meter Foundation Work 20-Dec-16 20-Mar-17 Mr.Dilip Pawar x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x
PT (R Phase) Check ABT Meter Foundation Work 20-Dec-16 20-Mar-17 Mr.Dilip Pawar x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x
PT (Y Phase) Check ABT Meter Foundation Work 20-Dec-16 20-Mar-17 Mr.Dilip Pawar x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x

PT (B Phase) Check ABT Meter Foundation Work 20-Dec-16 20-Mar-17 Mr.Dilip Pawar x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x

CT (R Phase) Check ABT Meter Foundation Work 20-Dec-16 20-Mar-17 Mr.Dilip Pawar x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x
CT (Y Phase) Check ABT Meter Foundation Work 20-Dec-16 20-Mar-17 Mr.Dilip Pawar x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x
CT (B Phase) Check ABT Meter Foundation Work 20-Dec-16 20-Mar-17 Mr.Dilip Pawar x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x
Metering Room Foundation Work 20-Dec-16 20-Mar-17 Mr.Dilip Pawar x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x

FH+FP-1 Column Foundation Work 20-Dec-16 20-Mar-17 Mr.Dilip Pawar x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x

FH+FP Column Foundation Work 20-Dec-16 20-Mar-17 Mr.Dilip Pawar x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x


1250A Isolator Foundation Work (Metering Area Incomer) 20-Dec-16 20-Mar-17 Mr.Dilip Pawar x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x
Bus Post Insulator-5 Foundation Work 20-Dec-16 20-Mar-17 Mr.Dilip Pawar x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x
3150A Pass-1 Isolator Foundation Work 20-Dec-16 20-Mar-17 Mr.Dilip Pawar x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x

ABB Pass-1 Foundation Work 20-Dec-16 20-Mar-17 Mr.Dilip Pawar x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x

FG+FP Column Foundation Work (Pass Area) 20-Dec-16 20-Mar-17 Mr.Dilip Pawar x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x

FG+FP Column Foundation Work (Pass Area) 20-Dec-16 20-Mar-17 Mr.Dilip Pawar x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x
FG+FP Column Foundation Work (Pass Area) 20-Dec-16 20-Mar-17 Mr.Dilip Pawar x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x

Wave Trap (R Phase) Foundation Work (Line-1) 20-Dec-16 20-Mar-17 Mr.Dilip Pawar x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x

Wave Trap (B Phase) Foundation Work (Line-1) 20-Dec-16 20-Mar-17 Mr.Dilip Pawar x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x

Coupling Capacitor (R Phase) Foundation Work (Line-1) 20-Dec-16 20-Mar-17 Mr.Dilip Pawar x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x

Coupling Capacitor (B Phase) Foundation Work (Line-1) 20-Dec-16 20-Mar-17 Mr.Dilip Pawar x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x
Lighting Arresstor (R Phase) Foundation Work (Line-1) 20-Dec-16 20-Mar-17 Mr.Dilip Pawar x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x

Lighting Arresstor (Y Phase) Foundation Work (Line-1) 20-Dec-16 20-Mar-17 Mr.Dilip Pawar x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x

Lighting Arresstor (B Phase) Foundation Work (Line-1) 20-Dec-16 20-Mar-17 Mr.Dilip Pawar x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x

3150A Pass-2 Isolator Foundation Work 20-Dec-16 20-Mar-17 Mr.Dilip Pawar x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x

ABB Pass-2 Foundation Work 20-Dec-16 20-Mar-17 Mr.Dilip Pawar x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x


Wave Trap (R Phase) Foundation Work (Line-2) 20-Dec-16 20-Mar-17 Mr.Dilip Pawar x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x

Wave Trap (B Phase) Foundation Work (Line-2) 20-Dec-16 20-Mar-17 Mr.Dilip Pawar x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x

Coupling Capacitor (R Phase) Foundation Work (Line-2) 20-Dec-16 20-Mar-17 Mr.Dilip Pawar x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x

Coupling Capacitor (B Phase) Foundation Work (Line-2) 20-Dec-16 20-Mar-17 Mr.Dilip Pawar x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x

Lighting Arresstor (R Phase) Foundation Work (Line-2) 20-Dec-16 20-Mar-17 Mr.Dilip Pawar x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x
Lighting Arresstor (Y Phase) Foundation Work (Line-2) 20-Dec-16 20-Mar-17 Mr.Dilip Pawar x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x

Lighting Arresstor (B Phase) Foundation Work (Line-2) 20-Dec-16 20-Mar-17 Mr.Dilip Pawar x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x

Bus Post Insulator-6 Foundation Work 20-Dec-16 20-Mar-17 Mr.Dilip Pawar x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x

Bus Post Insulator-7 Foundation Work 20-Dec-16 20-Mar-17 Mr.Dilip Pawar x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x

FH+FP Column Foundation Work 20-Dec-16 20-Mar-17 Mr.Dilip Pawar x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x


FH+FP Column Foundation Work 20-Dec-16 20-Mar-17 Mr.Dilip Pawar x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x

Bus PT Isolator 1250A Foundation Work 20-Dec-16 20-Mar-17 Mr.Dilip Pawar x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x

Bus PT (R Phase) Foundation Work 20-Dec-16 20-Mar-17 Mr.Dilip Pawar x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x

Bus PT (Y Phase) Foundation Work 20-Dec-16 20-Mar-17 Mr.Dilip Pawar x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x

Bus PT (B Phase) Foundation Work 20-Dec-16 20-Mar-17 Mr.Dilip Pawar x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x


LILO Room Foundation Work 20-Dec-16 20-Mar-17 Mr.Dilip Pawar x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x
Placing of Transformer-2 at the Foundation Work 1-Jan-17 4-Jan-17 Mr.Dharamveer Sharma x x x
Earthing Mat Design Calculations Mr.Sandeep Middye
Earthing Mat Design Layout Approval Mr.Dharamveer Sharma
Earthing Mat Material Supply PO Mr.Pradeep Chaubey (Purchase)
Earthing Mat Erection Job Work PO Mr.Pradeep Chaubey (Purchase)
Earthing Mat Erection Mr.Prashant (KC Power)
VCB Switch Board PO Mr.Pradeep Chaubey (Purchase)
VCB Switch Board Drawing Approval Mr.Sandeep Middye
VCB Switch Board Delivery at Site Mr.Santosh (ABB)
VCB Switch Board Commissioing Job Work PO Mr.Munish Saini (Purchase)
Structure Material PO for VCB Trench
Structure Material delivery at Site
Structure Material for VCB Trench Fabrication Job Work PO
VCB Switch Board Layout Approved Drawing Mr.Sandeep Middye
VCB SwitchBoard Commissioing Work Mr.Joshi (Powertech)
HT Route Finaization from New Substation to Old Substation Mr.Mahesh Sole
Structure Designing and Layout Drawing Finalization for New Route Mr.Sandeep Middye
Structure Material PO Mr.Arun Gaikwad (Purchase)
Structure Material Fabrication Job Work PO
Structure Material Delivery at Site
HT Cable Laying Job Work PO Mr.Joshi (Powertech)
HT Cable Material Supply PO
HT Cable delivery at Site
HT Termination Kit Material Supply PO Mr.Munish Saini (Purchase)
HT Termination Kit delivery at Site
HT Cable 6 Run 3Cx240 SQMM f rom Old Substation t o New Substation
via Temporary Path to be L aid and Terminated. Mr.Joshi (Powertech)
C&R Panel-1&2 PO Mr.Munish Saini (Purchase)
C&R Panel-1&2 Drawing Approval Mr.Sandeep Middye
C&R Panel-1&2 Delivery at Site Mr.Avinash (Hitech Eectricals)
C&R Panel-1&2 Commissioning Job Work PO Mr.Prashant (KC Power)
C&R Panel-1&2 Layout Approved Drawing Mr.Sandeep Middye
C&R Panel-1&2 Commissioning Work Mr.Prashant (KC Power)
ACDB Panel-1&2 PO Mr.Pradeep Chaubey (Purchase)
ACDB Panel-1&2 Drawing Approval Mr.Sandeep Middye
ACDB Panel-1&2 Delivery at Site Mr.Prashant (KC Power)
ACDB Panel-1&2 Commissioning Job Work PO Mr.Prashant (KC Power)
ACDB Panel-1&2 Layout Apporved Drawing Mr.Sandeep Middye
ACDB Panel-1&2 Commissioning Work Mr.Prashant (KC Power)
Transformer-2 Commissioning Work (Testing/Assembling)
Busduct-1&2 PO Mr.Pradeep Chaubey (Purchase)
Busduct-1&2 Drawing Approval Mr.Mahesh Sole
Busduct-1&2 Delivery at the Site Mr.Prashant (KC Power)
Busduct 1&2Commissioning Job Work PO Mr.Pradeep Chaubey (Purchase)
Busduct 1&2Laying Approved Drawing Mr.Mahesh Sole
Busduct-2 Commissioning Work from Transformer-2 to Incomer-2 VCB Mr.Prashant (KC Power)
Lighting Arrestor Strcuture Supply PO Mr.Pradeep Chaubey (Purchase)
Lighting Arrestor Structure Drawing Apporval Mr.Dharamveer Sharma
Lighting Arrestor Structure Delivery at Site Mr.Prashant (KC Power)
Lighting Arrestor Structure Erection Job Work PO Mr.Pradeep Chaubey (Purchase)
Lighting Arrestor Layout Approved GTP & Drawing Mr.Dharamveer Sharma
Lighting Arresstor (R Phase) Structure Erection Bay-2 Mr.Prashant (KC Power)
Lighting Arresstor (Y Phase) Structure Erection Bay-2 Mr.Prashant (KC Power)
Lighting Arresstor (B Phase) Structure Erection Bay-2 Mr.Prashant (KC Power)
CT (R Phase,Y Phase,B Phase) Strcuture Supply PO Mr.Prashant (KC Power)
CT (R Phase,Y Phase,B Phase) Structure Drawing Approval Mr.Dharamveer Sharma
CT (R Phase,Y Phase,B Phase) Structure Deliavery at Site Mr.Prashant (KC Power)
CT (R Phase,Y Phase,B Phase) Structure Erection Job Work PO Mr.Prashant (KC Power)
CT (R Phase,Y Phase,B Phase) Layout Approved Drawing Mr.Mahesh Sole
CT (R Phase) Structure Erection Bay-2 Mr.Prashant (KC Power)
CT (Y Phase) Structure Erection Bay-2 Mr.Prashant (KC Power)
CT (B Phase) Structure Erection Bay-2 Mr.Prashant (KC Power)
SF6 Breaker Structure Supply PO Mr.Pradeep Chaubey (Purchase)
SF6 Breaker Structure Drawing Approval Mr.Mahesh Sole
SF6 Breaker Structure Delivery at the Site Mr.Vinit Rathore (Signet)
SF6 Breaker Structure Commissioning Job Work PO Mr.Prashant (KC Power)
SF6 Breaker Structure Erection Bay-2 Mr.Prashant (KC Power)
PT (R Phase,Y Phase,B Phase) Strcuture Supply PO Mr.Pradeep Chaubey (Purchase)
PT (R Phase,Y Phase,B Phase) Structure Drawing Apporval Mr.Mahesh Sole
PT (R Phase,Y Phase,B Phase) Structure Deliavery at Site Mr.Prashant (KC Power)
PT (R Phase,Y Phase,B Phase) Structure Erection Job Work PO Mr.Prashant (KC Power)
PT (R Phase,Y Phase,B Phase) Layout Approved Drawing Mr.Mahesh Sole
PT (R Phase) Structure Erection Bay-2 Mr.Prashant (KC Power)
PT (Y Phase) Structure Erection Bay-2 Mr.Prashant (KC Power)
PT (B Phase) Structure Erection Bay-2 Mr.Prashant (KC Power)
1250A Isolator Structure Supply PO Mr.Pradeep Chaubey (Purchase)
1250A Isolator Structure Drawing Approval Mr.Dharamveer Sharma
1250A Isolator Structure Delivery at the Site Mr.Vinit Rathore (Signet)
1250A Isolator Structure Commissioning Job Work PO Mr.Prashant (KC Power)
1250A Isolator-1 Structure Erection Bay-2 (Bay-2 Incomer) Mr.Prashant (KC Power)
1250A Isolator Structure Supply PO Mr.Pradeep Chaubey (Purchase)
1250A Isolator Structure Drawing Approval Mr.Dharamveer Sharma
1250A Isolator Structure Delivery at the Site Mr.Vinit Rathore (Signet)
1250A Isolator Structure Commissioning Job Work PO Mr.Prashant (KC Power)
1250A Isolator-2 Structure Erection Bay-1 (Bay-1 Incomer) Mr.Prashant (KC Power)
FG+FP Column Structure Supply PO Mr.Pradeep Chaubey (Purchase)
FG+FP Column Structure Drawing Approval Mr.Dharamveer Sharma
FG+FP Column Structure Delivery at the Site Mr.Prashant (KC Power)
FG+FP Column Structure Commissioning Job Work PO Mr.Pradeep Chaubey (Purchase)
FG+FP Column Erection Work Mr.Prashant (KC Power)
FG+FP Column Structure Supply PO Mr.Pradeep Chaubey (Purchase)
FG+FP Column Structure Drawing Approval Mr.Dharamveer Sharma
FG+FP Column Structure Delivery at the Site Mr.Prashant (KC Power)
FG+FP Column Structure Commissioning Job Work PO Mr.Pradeep Chaubey (Purchase)
FG+FP Column Erection Work Mr.Prashant (KC Power)
FB Beam Structure Supply PO Mr.Pradeep Chaubey (Purchase)
FB Beam Structure Drawing Approval Mr.Dharamveer Sharma
FB Beam Structure Delivery at the Site Mr.Prashant (KC Power)
FB Beam Structure Commissioning Job Work PO Mr.Pradeep Chaubey (Purchase)
FB Beam Erection Work Mr.Prashant (KC Power)
FG+FP Column Structure Supply PO Mr.Pradeep Chaubey (Purchase)
FG+FP Column Structure Drawing Approval Mr.Dharamveer Sharma
FG+FP Column Structure Delivery at the Site Mr.Prashant (KC Power)
FG+FP Column Structure Commissioning Job Work PO Mr.Pradeep Chaubey (Purchase)
FG+FP Column Erection Work Mr.Prashant (KC Power)
FF+FP Column Structure Supply PO Mr.Prashant (KC Power)
FF+FP Column Structure Drawing Approval Mr.Dharamveer Sharma
FF+FP Column Structure Delivery at the Site Mr.Prashant (KC Power)
FF+FP Column Structure Commissioning Job Work PO Mr.Pradeep Chaubey (Purchase)
FF+FP Column Erection Work Mr.Prashant (KC Power)
FB Beam Structure Supply PO Mr.Pradeep Chaubey (Purchase)
FB Beam Structure Drawing Approval Mr.Dharamveer Sharma
FB Beam Structure Delivery at the Site Mr.Prashant (KC Power)
FB Beam Structure Commissioning Job Work PO Mr.Pradeep Chaubey (Purchase)
FB Beam Erection Work Mr.Prashant (KC Power)
Lighting Arrester Supply PO Mr.Pradeep Chaubey (Purchase)
Lighting Arrester Drawing & GTP Approval Mr.Dharamveer Sharma
Lighting Arrester Delivery at Site Mr.Avinash (Hitech Eectricals)
Lighting Arrester Installation PO Mr.Pradeep Chaubey (Purchase)
Lighting Arrester Installation Work Mr.Prashant (KC Power)
0.2 ACSR Conductor GTP Approval Mr.Dharamveer Sharma
0.2 ACSR Conductor Delivery at Site Mr.Prashant (KC Power)
0.2 ACSR Conductor Termination Job Work PO Mr.Prashant (KC Power)
0.2 ACSR Single Bus System Installation Work Mr.Prashant (KC Power)
Silicone Polymer Suspension Insulator Supply PO Mr.Pradeep Chaubey (Purchase)
Silicone Polymer Suspension Insulator GTP Approval Mr.Dharamveer Sharma
Silcione Polyme Suspension Insulator Conductor Delivery at Site Mr.Prashant (KC Power)
Silicone Polymer Suspension Insulator Installation PO Mr.Pradeep Chaubey (Purchase)
Silicone Polymer Suspension Insulator Installation Work Mr.Prashant (KC Power)
1250A Isolator Structure Supply PO Mr.Pradeep Chaubey (Purchase)
1250A Isolator Structure Drawing Approval Mr.Dharamveer Sharma
1250A Isolator Structure Delivery at the Site Mr.Vinit Rathore (Signet)
1250A Isolator Structure Commissioning Job Work PO Mr.Pradeep Chaubey (Purchase)
1250A Isolator-5 Structure Erection Metering (Metering Incomer) Mr.Prashant (KC Power)
3150A Isolator Structure Supply PO Mr.Pradeep Chaubey (Purchase)
3150A Isolator Structure Drawing Approval Mr.Dharamveer Sharma
3150A Isolator Structure Delivery at the Site Mr.Vinit Rathore (Signet)
3150A Isolator Structure Commissioning Job Work PO Mr.Pradeep Chaubey (Purchase)
3150A Isolator-1 Structure Erection (Pass-1) Mr.Prashant (KC Power)
3150A Isolator Structure Supply PO Mr.Pradeep Chaubey (Purchase)
3150A Isolator Structure Drawing Approval Mr.Dharamveer Sharma
3150A Isolator Structure Delivery at the Site Mr.Vinit Rathore (Signet)
3150A Isolator Structure Commissioning Job Work PO Mr.Pradeep Chaubey (Purchase)
3150A Isolator-1 Structure Erection (Pass-1) Mr.Prashant (KC Power)
Dead End Tower Foundation Drawing Approval Mr.Dharamveer Sharma
Finalization of Rerouting Plan of Dead End Tower Mr.Dharamveer Sharma
Dead End Tower Foundation Job Work PO Mr.Pradeep Chaubey (Purchase)
Dead End Tower Foundation Work Material Supply PO Mr.Pradeep Chaubey (Purchase)
Dead End Tower Foundation Work Material delivery at Site Mr.Prashant (KC Power)
Dead End Tower Foundation Work Mr.Prashant (KC Power)
Grid Isolation Permission Approval (2-3 Days) Mr.Dharamveer Sharma
Isolating JSW Substation from Grid. Mr.Dharamveer Sharma
Disconnecting Control Wiring of LILO Panel Mr.Prashant (KC Power)
Disconnecting Control Wiring of ACDB Panel to be removed. Mr.Prashant (KC Power)
Disconnecting Control Wiring of 110VDC Battery Charger to be removed. Mr.Prashant (KC Power)
Disconnecting Control Wiring of 4VDC Battery Charger to be removed. Mr.Prashant (KC Power)
Disconnecting Control Wiring of Bus PT Mr.Prashant (KC Power)
Disconnecting Control Wire of Bus PT Isolator Mr.Prashant (KC Power)
Disconnecting Control Wire of Pass-1 Mr.Prashant (KC Power)
Disconnecting Control Wire of Pass-2 Mr.Prashant (KC Power)
Disconnecting Control Wiring of Transformer-1 Mr.Prashant (KC Power)
Disconnecting Control Wiring of RTCC Panel Mr.Prashant (KC Power)
Disconnecting Control Wiring of C&R Panel-1 Mr.Prashant (KC Power)
Shifting and Installation of LILO Panel Mr.Prashant (KC Power)
Shifting and Installation of 110VDC Battery Charger Panel Mr.Prashant (KC Power)
Shifting and Installation of 4VDC Battery Charger Panel Mr.Prashant (KC Power)
Disconnecting Control Wiring of CT R Phase Mr.Prashant (KC Power)
Disconnecting Control Wiring of CT Y Phase Mr.Prashant (KC Power)
Disconnecting Control Wiring of CT B Phase Mr.Prashant (KC Power)
Disconnecting Control Wiring of SF6 Breaker Mr.Prashant (KC Power)
Disconnecting Control Wiring of PT R Phase Mr.Prashant (KC Power)
Disconnecting Control Wiring of PT Y Phase Mr.Prashant (KC Power)
Disconnecting Control Wiring of PT B Phase Mr.Prashant (KC Power)
Disconnecting Control Wiring of Isolator Mr.Prashant (KC Power)
Disconnecting Control Wiring of Main Meter CT R Phase Mr.Prashant (KC Power)
Disconnecting Control Wiring of Main Meter CT Y Phase Mr.Prashant (KC Power)
Disconnecting Control Wiring of Main Meter CT B Phase Mr.Prashant (KC Power)
Disconnecting Control Wiring of Main Meter PT R Phase Mr.Prashant (KC Power)
Disconnecting Control Wiring of Main Meter PT Y Phase Mr.Prashant (KC Power)
Disconnecting Control Wiring of Main Meter PT B Phase Mr.Prashant (KC Power)
Disconnecting Control Wiring of Check Meter CT R Phase Mr.Prashant (KC Power)
Disconnecting Control Wiring of Check Meter CT Y Phase Mr.Prashant (KC Power)
Disconnecting Control Wiring of Check Meter CT B Phase Mr.Prashant (KC Power)
Disconnecting Control Wiring of Check Meter PT R Phase Mr.Prashant (KC Power)
Disconnecting Control Wiring of Check Meter PT Y Phase Mr.Prashant (KC Power)
Disconnecting Control Wiring of Check Meter PT B Phase Mr.Prashant (KC Power)
Disconnecting Control Wiring of Main Energy Meter (Apex) Mr.Prashant (KC Power)
Disconnecting Control Wiring of Check Energy Meter (Apex) Mr.Prashant (KC Power)
Shifting & Installation of Pass Gantry FG+FP "3 Columns" and FA Beam "2" Mr.Prashant (KC Power)
Shifting & Installation of Lighting Arrester Structure Only. Mr.Prashant (KC Power)
Shifting & Installation of Coupling Capacitor with Structure Mr.Prashant (KC Power)
Shifi ting & Installation of Wave Trap with Structure. Mr.Prashant (KC Power)
Shifting & Installation of Pass Hybrid System-1 Mr.Prashant (KC Power)
Shifting & Installation of Pass Hybrid System-2 Mr.Prashant (KC Power)
Shifting & Installation of FH+FP Column with FB Beam Mr.Prashant (KC Power)
Shifting & Installation of Twin Bus Line Mr.Prashant (KC Power)
Shifting & Installation of Bus PT Isolator with Structure Mr.Prashant (KC Power)
Dismantalling of Bus PT from Structure Mr.Prashant (KC Power)
Shifting & Installation of Bus PT Structure Mr.Prashant (KC Power)
Dismantalling of Main Meter R Phase CT Mr.Prashant (KC Power)
Dismantalling of Main Meter Y Phase CT Mr.Prashant (KC Power)
Dismantalling of Main Meter B Phase CT Mr.Prashant (KC Power)
Dismantalling of Main Meter R Phase PT Mr.Prashant (KC Power)
Dismantalling of Main Meter Y Phase PT Mr.Prashant (KC Power)
Dismantalling of Main Meter B Phase PT Mr.Prashant (KC Power)
Dismantalling of Check Meter R Phase CT Mr.Prashant (KC Power)
Dismantalling of Check Meter Y Phase CT Mr.Prashant (KC Power)
Dismantalling of Check Meter B Phase CT Mr.Prashant (KC Power)
Dismantalling of Check Meter R Phase PT Mr.Prashant (KC Power)
Dismantalling of Check Meter Y Phase PT Mr.Prashant (KC Power)
Dismantalling of Check Meter B Phase PT Mr.Prashant (KC Power)
Shifting & Installation of of Main Meter R Phase CT Structure Mr.Prashant (KC Power)
Shifting & Installation of of Main Meter Y Phase CT Structure Mr.Prashant (KC Power)
Shifting & Installation of of Main Meter B Phase CT Structure Mr.Prashant (KC Power)
Shifi tng & Instalallation of Main Meter R Phase PT Structure Mr.Prashant (KC Power)
Shifi tng & Installation of Main Meter Y Phase PT Structure Mr.Prashant (KC Power)
Shifi tng & Installation of Main Meter B Phase PT Structure Mr.Prashant (KC Power)
Shifting & Installationof of Check Meter R Phase CT Structure Mr.Prashant (KC Power)
Shifting & Installation of of Check Meter Y Phase CT Structure Mr.Prashant (KC Power)
Shifting & Installation of of Check Meter B Phase CT Structure Mr.Prashant (KC Power)
Shifi tng & Installation of Check Meter R Phase PT Structure Mr.Prashant (KC Power)
Shifi tng & Installation of Check Meter Y Phase PT Structure Mr.Prashant (KC Power)
Shifi tng & Installation of Check Meter B Phase PT Structure Mr.Prashant (KC Power)
Shifting & Installtion of FG+FP "4" Column Structure with "2" FB Beam Mr.Prashant (KC Power)
Shifting & Installtion of Bus Post Insulator Strcuture All 7 Nos. Mr.Prashant (KC Power)
Dismantalling of R Phase PT Mr.Prashant (KC Power)
Dismantalling of Y Phase PT Mr.Prashant (KC Power)
Dismantalling of B Phase PT Mr.Prashant (KC Power)
Shifi tng & Installation of R Phase PT Structure Mr.Prashant (KC Power)
Shifi tng & Installation of Y Phase PT Structure Mr.Prashant (KC Power)
Shifi tng & Installtion of B Phase PT Structure Mr.Prashant (KC Power)
Shifting & Installation of R Phase CT with Structure Mr.Prashant (KC Power)
Shifting & Installation of Y Phase CT with Structure Mr.Prashant (KC Power)
Shifting & Installtion of B Phase CT with Structure Mr.Prashant (KC Power)
Shifting & Installation of R Phase Lighting Arrester Mr.Prashant (KC Power)
Shifting & Installtion of Y Phase Lighting Arrester Mr.Prashant (KC Power)
Shifting & Installation of B Phase Lighting Arrester Mr.Prashant (KC Power)
Shifting & Installation of 40 MVA Transformer Mr.Prashant (KC Power)
Control Wiring of 110VDC Battery Charger Panel Mr.Prashant (KC Power)
Control Wiring of 4VDC Battery Charger Panel Mr.Prashant (KC Power)
Power Circuit Wiring from ACDB Panel to ABB Hybrid Pass-1 Mr.Prashant (KC Power)
Power Circuit Wiring from ACDB Panel to ABB Hybrid Pass-2 Mr.Prashant (KC Power)
Power Circuit Wiring from ACDB Panel to Bus PT Isolator Mr.Prashant (KC Power)
Control Wiring of ABB Hybrid Pass-1 Mr.Prashant (KC Power)
Control Wiring of ABB Hybrid Pass-2 Mr.Prashant (KC Power)
Control Wiring of Bus PT Isolator Mr.Prashant (KC Power)
Control Wiring of Bus PT Mr.Prashant (KC Power)
Power Circuit Wiring of 3150 Isolator Pass-1 Mr.Prashant (KC Power)
Power Circuit Wiring of 3150 Isolator Pass-2 Mr.Prashant (KC Power)
Power Circuit Wiring of 1250 Isolator Metering Incomer Mr.Prashant (KC Power)
Control Circuit Wiring of 3150 Isolator Pass-1 Mr.Prashant (KC Power)
Control Circuit Wiring of 3150 Isolator Pass-2 Mr.Prashant (KC Power)
Control Circuit Wiring of 1250 Isolator Metering Incomer Mr.Prashant (KC Power)
Control Circuit Wiring of PLCC Panel with W.T and C.C Mr.Prashant (KC Power)
Power Circuit Wiring of Main Meter R Phase CT Mr.Prashant (KC Power)
Power Circuit Wiring of Main Meter Y Phase CT Mr.Prashant (KC Power)
Power Circuit Wiring of Main Meter B Phase CT Mr.Prashant (KC Power)
Power Circuit Wiring of Main Meter R Phase PT Mr.Prashant (KC Power)
Power Circuit Wiring of Main Meter Y Phase PT Mr.Prashant (KC Power)
Power Circuit Wiring of Main Meter B Phase PT Mr.Prashant (KC Power)
Power Circuit Wiring of Check Meter R Phase CT Mr.Prashant (KC Power)
Power Circuit Wiring of Check Meter Y Phase CT Mr.Prashant (KC Power)
Power Circuit Wiring of Check Meter B Phase CT Mr.Prashant (KC Power)
Power Circuit Wiring of Check Meter R Phase PT Mr.Prashant (KC Power)
Power Circuit Wiring of Check Meter Y Phase PT Mr.Prashant (KC Power)
Power Circuit Wiring of Check Meter B Phase PT Mr.Prashant (KC Power)
Control Circuit Wiring of ABT Check Meter Mr.Prashant (KC Power)
Control Circuit Wiring of ABT Main Meter Mr.Prashant (KC Power)
Power Circuit Wring of 1250 A Isolator at Point of Supply Mr.Prashant (KC Power)
Power Circuit Wring of 1250 A Isolator at Bay Inomer Mr.Prashant (KC Power)
Power Circuit Wring of 1250 A Isolator at Bay-1 Mr.Prashant (KC Power)
Power Circuit Wring of 1250 A Isolator at Bay-2 Mr.Prashant (KC Power)
Control Circuit Wring of 1250 A Isolator at Point of Supply Mr.Prashant (KC Power)
Control Circuit Wring of 1250 A Isolator at Bay Inomer Mr.Prashant (KC Power)
Control Circuit Wring of 1250 A Isolator at Bay-1 Mr.Prashant (KC Power)
Control Circuit Wring of 1250 A Isolator at Bay-2 Mr.Prashant (KC Power)
Power Circuit Wiring of SF6 Breaker Bay-1 Mr.Prashant (KC Power)
Power Circuit Wiring of SF6 Breaker Bay-2 Mr.Prashant (KC Power)
Control Circuit Wiring of SF6 Breaker Bay-1 Mr.Prashant (KC Power)
Control Circuit Wiring of SF6 Breaker Bay-2 Mr.Prashant (KC Power)
Power Circuit Wiring of R Phase CT Mr.Prashant (KC Power)
Power Circuit Wiring of Y Phase CT Mr.Prashant (KC Power)
Power Circuit Wiring of B Phase CT Mr.Prashant (KC Power)
Power Circuit Wiring of R Phase PT Mr.Prashant (KC Power)
Power Circuit Wiring of Y Phase PT Mr.Prashant (KC Power)
Power Circuit Wiring of B Phase PT Mr.Prashant (KC Power)
Control Circuit Wiring of 40MVA Transformer Mr.Prashant (KC Power)
Issue Log

Date Issue

3-Jan-09 Sample Issue


Return to the Introduction

Comments Resolution
Progress Report Return to the Introduction

To create a customized progress report, insert the desired timeframe for analysis in the start and end date boxes below. For a progress report of the entire project, insert the project's start and end dates. Consider
running reports based on tasks for today, this week, or next week.

IMPORTANT NOTICE:
Task owner names must be selected from the drop down menus in Tabs 2 and 3 in order for this reporting page to work correctly. If errors occur on this page, return to the project planning stage and ensure that task
owner names were selected from the menus, rather than typed in manually.

Enter Date to Start Progress Report Thursday, December 01, 2016 Enter Date to End Progress Report Wednesday, May 31, 2017

Analysis of On-Schedule Tasks to Date Analysis of Task Completion to Date Analysis of Project Time Management

Behind Schedule
Tasks - Started Tasks Completed
Project Days
5% 2% Left

Behind Schedule
Tasks In Progress 51% 49%
Tasks - Not Yet
Started

Project Days
100% 93% Tasks Not Yet Passed
Regularly Started
Scheduled Tasks

0% 20% 40% 60% 80% 100%

Task Owner Task to be Completed During Specified Period Task Status Scheduled Due Date On Track Status

Mr.Dilip Pawar VCB Room Foundation Work Task In Progress March 20, 2017 Task is scheduled for work during this timeframe.

Earthing Wire Structure Foundation Work. Task In Progress March 20, 2017 Task is scheduled for work during this timeframe.

Transformer-1 Foundation and Rail Work (Bay-1) Task Not Yet Started March 20, 2017 Task is scheduled for work during this timeframe.

CT (R Phase) Foundation Work Bay-1 Task Not Yet Started March 20, 2017 Task is scheduled for work during this timeframe.

CT (Y Phase) Foundation Work Bay-1 Task Not Yet Started March 20, 2017 Task is scheduled for work during this timeframe.

CT (B Phase) Foundation Work Bay-1 Task Not Yet Started March 20, 2017 Task is scheduled for work during this timeframe.

SF6 Breaker Foundation Work Bay-1 Task Not Yet Started March 20, 2017 Task is scheduled for work during this timeframe.

PT (R Phase) Foundation Work Bay-1 Task Not Yet Started March 20, 2017 Task is scheduled for work during this timeframe.

PT (Y Phase) Foundation Work Bay-1 Task Not Yet Started March 20, 2017 Task is scheduled for work during this timeframe.

Page 11
Enter Date to Start Progress Report Thursday, December 01, 2016 Enter Date to End Progress Report Wednesday, May 31, 2017

Analysis of On-Schedule Tasks to Date Analysis of Task Completion to Date Analysis of Project Time Management

Behind Schedule
Tasks - Started Tasks Completed
Project Days
5% 2% Left

Behind Schedule
Tasks In Progress 51% 49%
Tasks - Not Yet
Started

Project Days
100% 93% Tasks Not Yet Passed
Regularly Started
Scheduled Tasks

0% 20% 40% 60% 80% 100%

Task Owner Task to be Completed During Specified Period Task Status Scheduled Due Date On Track Status

PT (B Phase) Foundation Work Bay-1 Task Not Yet Started March 20, 2017 Task is scheduled for work during this timeframe.

1250A Isolator Foundation Work Bay-1 (Bay-1 Incomer) Task Not Yet Started March 20, 2017 Task is scheduled for work during this timeframe.

Bus Post-1 Insualtor Foundation Work Bay-1 Task Not Yet Started March 20, 2017 Task is scheduled for work during this timeframe.

Bus Post-2 Insualtor Foundation Work Bay-1 Task Not Yet Started March 20, 2017 Task is scheduled for work during this timeframe.

Transformer-1 Foundation and Rail Work (Bay-1) Task Not Yet Started March 20, 2017 Task is scheduled for work during this timeframe.

Transformer-2 Foundation and Rail Work (Bay-2) Task Not Yet Started March 20, 2017 Task is scheduled for work during this timeframe.

Lighting Arresstor (R Phase) Foundation Work Bay-2 Task Not Yet Started March 20, 2017 Task is scheduled for work during this timeframe.

Lighting Arresstor (Y Phase) Foundation Work Bay-2 Task Not Yet Started March 20, 2017 Task is scheduled for work during this timeframe.

Lighting Arresstor (B Phase) Foundation Work Bay-2 Task Not Yet Started March 20, 2017 Task is scheduled for work during this timeframe.

CT (R Phase) Foundation Work Bay-2 Task Not Yet Started March 20, 2017 Task is scheduled for work during this timeframe.

CT (Y Phase) Foundation Work Bay-2 Task Not Yet Started March 20, 2017 Task is scheduled for work during this timeframe.

CT (B Phase) Foundation Work Bay-2 Task Not Yet Started March 20, 2017 Task is scheduled for work during this timeframe.

SF6 Breaker Foundation Work Bay-2 Task Not Yet Started March 20, 2017 Task is scheduled for work during this timeframe.

PT (R Phase) Foundation Work Bay-2 Task Not Yet Started March 20, 2017 Task is scheduled for work during this timeframe.

PT (Y Phase) Foundation Work Bay-2 Task Not Yet Started March 20, 2017 Task is scheduled for work during this timeframe.

PT (B Phase) Foundation Work Bay-2 Task Not Yet Started March 20, 2017 Task is scheduled for work during this timeframe.

Page 12
Enter Date to Start Progress Report Thursday, December 01, 2016 Enter Date to End Progress Report Wednesday, May 31, 2017

Analysis of On-Schedule Tasks to Date Analysis of Task Completion to Date Analysis of Project Time Management

Behind Schedule
Tasks - Started Tasks Completed
Project Days
5% 2% Left

Behind Schedule
Tasks In Progress 51% 49%
Tasks - Not Yet
Started

Project Days
100% 93% Tasks Not Yet Passed
Regularly Started
Scheduled Tasks

0% 20% 40% 60% 80% 100%

Task Owner Task to be Completed During Specified Period Task Status Scheduled Due Date On Track Status

1250A Isolator Foundation Work Bay-2 (Bay-2 Incomer) Task Not Yet Started March 20, 2017 Task is scheduled for work during this timeframe.

Bus Post-3 Insualtor Foundation Work Bay-2 Task Not Yet Started March 20, 2017 Task is scheduled for work during this timeframe.

Bus Post-4 Insualtor Foundation Work Bay-2 Task Not Yet Started March 20, 2017 Task is scheduled for work during this timeframe.

FH+FP-1 Column Foundation Work Task Not Yet Started March 20, 2017 Task is scheduled for work during this timeframe.

FH+FP-2 Column Foundation Work Task Not Yet Started March 20, 2017 Task is scheduled for work during this timeframe.

FH+FP-3 Column Foundation Work Task Not Yet Started March 20, 2017 Task is scheduled for work during this timeframe.

FF+FP-4 Column Foundation Work Task Not Yet Started March 20, 2017 Task is scheduled for work during this timeframe.

FG+FP-5 Column Foundation Work Task Not Yet Started March 20, 2017 Task is scheduled for work during this timeframe.

FG+FP-6 Column Foundation Work Task Not Yet Started March 20, 2017 Task is scheduled for work during this timeframe.

FG+FP Column Foundation Work Task Not Yet Started March 20, 2017 Task is scheduled for work during this timeframe.

PT (R Phase) Main ABT Meter Foundation Work Task Not Yet Started March 20, 2017 Task is scheduled for work during this timeframe.

PT (Y Phase) Main ABT Meter Foundation Work Task Not Yet Started March 20, 2017 Task is scheduled for work during this timeframe.

PT (B Phase) Main ABT Meter Foundation Work Task Not Yet Started March 20, 2017 Task is scheduled for work during this timeframe.

CT (R Phase) Main ABT Meter Foundation Work Task Not Yet Started March 20, 2017 Task is scheduled for work during this timeframe.

CT (Y Phase) Main ABT Meter Foundation Work Task Not Yet Started March 20, 2017 Task is scheduled for work during this timeframe.

Mr.Dharamveer Sharma Civil Foundation Drawing Approval Task Not Yet Started December 6, 2016 Task is scheduled for work during this timeframe.

Page 13
Enter Date to Start Progress Report Thursday, December 01, 2016 Enter Date to End Progress Report Wednesday, May 31, 2017

Analysis of On-Schedule Tasks to Date Analysis of Task Completion to Date Analysis of Project Time Management

Behind Schedule
Tasks - Started Tasks Completed
Project Days
5% 2% Left

Behind Schedule
Tasks In Progress 51% 49%
Tasks - Not Yet
Started

Project Days
100% 93% Tasks Not Yet Passed
Regularly Started
Scheduled Tasks

0% 20% 40% 60% 80% 100%

Task Owner Task to be Completed During Specified Period Task Status Scheduled Due Date On Track Status

Mr.Dilip Pawar PT (R Phase) Check ABT Meter Foundation Work Task Not Yet Started March 20, 2017 Task is scheduled for work during this timeframe.

PT (Y Phase) Check ABT Meter Foundation Work Task Not Yet Started March 20, 2017 Task is scheduled for work during this timeframe.

PT (B Phase) Check ABT Meter Foundation Work Task Not Yet Started March 20, 2017 Task is scheduled for work during this timeframe.

CT (R Phase) Check ABT Meter Foundation Work Task Not Yet Started March 20, 2017 Task is scheduled for work during this timeframe.

CT (Y Phase) Check ABT Meter Foundation Work Task Not Yet Started March 20, 2017 Task is scheduled for work during this timeframe.

CT (B Phase) Check ABT Meter Foundation Work Task Not Yet Started March 20, 2017 Task is scheduled for work during this timeframe.

Metering Room Foundation Work Task Not Yet Started March 20, 2017 Task is scheduled for work during this timeframe.

FH+FP-1 Column Foundation Work Task Not Yet Started March 20, 2017 Task is scheduled for work during this timeframe.

FH+FP Column Foundation Work Task Not Yet Started March 20, 2017 Task is scheduled for work during this timeframe.

1250A Isolator Foundation Work (Metering Area Incomer) Task Not Yet Started March 20, 2017 Task is scheduled for work during this timeframe.

Bus Post Insulator-5 Foundation Work Task Not Yet Started March 20, 2017 Task is scheduled for work during this timeframe.

3150A Pass-1 Isolator Foundation Work Task Not Yet Started March 20, 2017 Task is scheduled for work during this timeframe.

ABB Pass-1 Foundation Work Task Not Yet Started March 20, 2017 Task is scheduled for work during this timeframe.

FG+FP Column Foundation Work (Pass Area) Task Not Yet Started March 20, 2017 Task is scheduled for work during this timeframe.

FG+FP Column Foundation Work (Pass Area) Task Not Yet Started March 20, 2017 Task is scheduled for work during this timeframe.

FG+FP Column Foundation Work (Pass Area) Task Not Yet Started March 20, 2017 Task is scheduled for work during this timeframe.

Page 14
Enter Date to Start Progress Report Thursday, December 01, 2016 Enter Date to End Progress Report Wednesday, May 31, 2017

Analysis of On-Schedule Tasks to Date Analysis of Task Completion to Date Analysis of Project Time Management

Behind Schedule
Tasks - Started Tasks Completed
Project Days
5% 2% Left

Behind Schedule
Tasks In Progress 51% 49%
Tasks - Not Yet
Started

Project Days
100% 93% Tasks Not Yet Passed
Regularly Started
Scheduled Tasks

0% 20% 40% 60% 80% 100%

Task Owner Task to be Completed During Specified Period Task Status Scheduled Due Date On Track Status

Wave Trap (R Phase) Foundation Work (Line-1) Task Not Yet Started March 20, 2017 Task is scheduled for work during this timeframe.

Wave Trap (B Phase) Foundation Work (Line-1) Task Not Yet Started March 20, 2017 Task is scheduled for work during this timeframe.

Coupling Capacitor (R Phase) Foundation Work (Line-1) Task Not Yet Started March 20, 2017 Task is scheduled for work during this timeframe.

Coupling Capacitor (B Phase) Foundation Work (Line-1) Task Not Yet Started March 20, 2017 Task is scheduled for work during this timeframe.

Lighting Arresstor (R Phase) Foundation Work (Line-1) Task Not Yet Started March 20, 2017 Task is scheduled for work during this timeframe.

Lighting Arresstor (Y Phase) Foundation Work (Line-1) Task Not Yet Started March 20, 2017 Task is scheduled for work during this timeframe.

Lighting Arresstor (B Phase) Foundation Work (Line-1) Task Not Yet Started March 20, 2017 Task is scheduled for work during this timeframe.

3150A Pass-2 Isolator Foundation Work Task Not Yet Started March 20, 2017 Task is scheduled for work during this timeframe.

ABB Pass-2 Foundation Work Task Not Yet Started March 20, 2017 Task is scheduled for work during this timeframe.

Wave Trap (R Phase) Foundation Work (Line-2) Task Not Yet Started March 20, 2017 Task is scheduled for work during this timeframe.

Wave Trap (B Phase) Foundation Work (Line-2) Task Not Yet Started March 20, 2017 Task is scheduled for work during this timeframe.

Coupling Capacitor (R Phase) Foundation Work (Line-2) Task Not Yet Started March 20, 2017 Task is scheduled for work during this timeframe.

Coupling Capacitor (B Phase) Foundation Work (Line-2) Task Not Yet Started March 20, 2017 Task is scheduled for work during this timeframe.

Lighting Arresstor (R Phase) Foundation Work (Line-2) Task Not Yet Started March 20, 2017 Task is scheduled for work during this timeframe.

Lighting Arresstor (Y Phase) Foundation Work (Line-2) Task Not Yet Started March 20, 2017 Task is scheduled for work during this timeframe.

Lighting Arresstor (B Phase) Foundation Work (Line-2) Task Not Yet Started March 20, 2017 Task is scheduled for work during this timeframe.

Page 15
Enter Date to Start Progress Report Thursday, December 01, 2016 Enter Date to End Progress Report Wednesday, May 31, 2017

Analysis of On-Schedule Tasks to Date Analysis of Task Completion to Date Analysis of Project Time Management

Behind Schedule
Tasks - Started Tasks Completed
Project Days
5% 2% Left

Behind Schedule
Tasks In Progress 51% 49%
Tasks - Not Yet
Started

Project Days
100% 93% Tasks Not Yet Passed
Regularly Started
Scheduled Tasks

0% 20% 40% 60% 80% 100%

Task Owner Task to be Completed During Specified Period Task Status Scheduled Due Date On Track Status

Bus Post Insulator-6 Foundation Work Task Not Yet Started March 20, 2017 Task is scheduled for work during this timeframe.

Bus Post Insulator-7 Foundation Work Task Not Yet Started March 20, 2017 Task is scheduled for work during this timeframe.

FH+FP Column Foundation Work Task Not Yet Started March 20, 2017 Task is scheduled for work during this timeframe.

FH+FP Column Foundation Work Task Not Yet Started March 20, 2017 Task is scheduled for work during this timeframe.

Bus PT Isolator 1250A Foundation Work Task Not Yet Started March 20, 2017 Task is scheduled for work during this timeframe.

Bus PT (R Phase) Foundation Work Task Not Yet Started March 20, 2017 Task is scheduled for work during this timeframe.

Bus PT (Y Phase) Foundation Work Task Not Yet Started March 20, 2017 Task is scheduled for work during this timeframe.

Bus PT (B Phase) Foundation Work Task Not Yet Started March 20, 2017 Task is scheduled for work during this timeframe.

LILO Room Foundation Work Task Not Yet Started March 20, 2017 Task is scheduled for work during this timeframe.

Page 16
Enter Date to Start Progress Report Thursday, December 01, 2016 Enter Date to End Progress Report Wednesday, May 31, 2017

Analysis of On-Schedule Tasks to Date Analysis of Task Completion to Date Analysis of Project Time Management

Behind Schedule
Tasks - Started Tasks Completed
Project Days
5% 2% Left

Behind Schedule
Tasks In Progress 51% 49%
Tasks - Not Yet
Started

Project Days
100% 93% Tasks Not Yet Passed
Regularly Started
Scheduled Tasks

0% 20% 40% 60% 80% 100%

Task Owner Task to be Completed During Specified Period Task Status Scheduled Due Date On Track Status

Page 17
Variables> "Stats" Members Date
actual Not Yet Started Team--> Mr.Ajay Khandelwal 39913
completion In Progress Mr.Mahesh Sole 39916
status Completed Mr.Dharamveer Sharm 39918
Cancelled Mr.Sandeep Middye 39951
Mr.Pradeep Chaubey (P 39998
Mr.Munish Saini (Purch 39997
Mr.Sanjeev Patil 40098
Mr.Premjeet Singh 40143
Status Var> "Track" Mr.Prashant (KC Power 40172
Not Yet Started Mr.Vinit Rathore (Signet 40179
on track Completed On Time Mr.Amit Sofat (CG)
completion Completed Behind Schedule Mr.Avinash (Hitech Eect
status Completed Ahead of Schedule Mr.Dilip Pawar
In Progress Mr.Santosh (ABB)
Cancelled Mr.Joshi (Powertech)
Mr.Arun Gaikwad (Purc

#For Tab 5 - Schedule Plan


#NO WORK HOLIDAY DATES
Week of 28-Nov-16
Day Date 42702 42703 42704 42705 42706
HOLIDAY? No No No No No
39913
39916
39918
39951
39998
39997
40098
40143
40172
40179

SUM:
#REF! Today 3/4/2017

AMOUNT
82 Total tasks
Holiday Name
Good Friday Mr.Ajay Khandelwal
Easter Monday Mr.Mahesh Sole
All Day Dept MeetingMr.Dharamveer Sharma
Canadian Victoria DaMr.Sandeep Middye
US Independence DaMr.Pradeep Chaubey (Purchase)
Non-Project Work DaMr.Munish Saini (Purchase)
Canadian ThanksgiviMr.Sanjeev Patil
US Thanksgiving Mr.Premjeet Singh
Christmas Day Mr.Prashant (KC Power)
New Year's Day Mr.Vinit Rathore (Signet)
Mr.Amit Sofat (CG)
Mr.Avinash (Hitech Eectricals)
Mr.Dilip Pawar
Mr.Santosh (ABB)
Mr.Joshi (Powertech)
Mr.Arun Gaikwad (Purchase)

5-Dec-16
42709 42710 42711 42712 42713 42716
No No No No No No
For Pie chart 2 in Today's View - TOTAL PROJECT
CODE TASKS FOR THIS WEEK. UTasks Completed 5%
Tasks In Progress 2%
Tasks Not Yet Started 93%
95
QC 100%
LINK PROJECT START DATE TO THE MONDAY BEFORE (For Gantt Chart)
Which wkday is it?
Start Date 1-Dec-16 Thursday
The Monda 28-Nov-16 Monday

12-Dec-16 19-Dec-16
42717 42718 42719 42720 42723 42724 42725
No No No No No No No
For Pie chart 1 in Today - Today's Tasks For Time Line in Today
Behind Schedule Tasks - Started 0 Project Start 42705
Behind Schedule Tasks - Not Yet 0 Today 42798
Regularly Scheduled Tasks 1 Project End 42886
QC 1
For Gantt Chart)
Find what Convert it to Monday
Sunday
Monday
Tuesday
Wednesda
Thursday 42702
Friday
Saturday

19-Dec-16 26-Dec-16 2-Jan-17


42726 42727 42730 42731 42732 42733 42734 42737 42738 42739
No No No No No No No No No No
Not subtracting weekends & holidays Task is underway but is behind schedule.
Project Da 93 51% Task is late and has not yet been started.
Project Day 88 49%

QC 181
181
2-Jan-17 9-Jan-17 16-Jan-17
42740 42741 42744 42745 42746 42747 42748 42751 42752 42753
No No No No No No No No No No
ut is behind schedule.
not yet been started.
16-Jan-17 23-Jan-17 30-Jan-17
42754 42755 42758 42759 42760 42761 42762 42765 42766 42767
No No No No No No No No No No
30-Jan-17 6-Feb-17 13-Feb-17
42768 42769 42772 42773 42774 42775 42776 42779 42780 42781
No No No No No No No No No No
13-Feb-17 20-Feb-17 27-Feb-17
42782 42783 42786 42787 42788 42789 42790 42793 42794 42795
No No No No No No No No No No
27-Feb-17 6-Mar-17 13-Mar-17
42796 42797 42800 42801 42802 42803 42804 42807 42808 42809
No No No No No No No No No No
13-Mar-17 20-Mar-17 27-Mar-17
42810 42811 42814 42815 42816 42817 42818 42821 42822 42823
No No No No No No No No No No
27-Mar-17 3-Apr-17 10-Apr-17
42824 42825 42828 42829 42830 42831 42832 42835 42836 42837
No No No No No No No No No No
10-Apr-17 17-Apr-17 24-Apr-17
42838 42839 42842 42843 42844 42845 42846 42849 42850 42851
No No No No No No No No No No
24-Apr-17 1-May-17 8-May-17
42852 42853 42856 42857 42858 42859 42860 42863 42864 42865
No No No No No No No No No No
8-May-17 15-May-17 22-May-17
42866 42867 42870 42871 42872 42873 42874 42877 42878 42879
No No No No No No No No No No
22-May-17
42880 42881
No No
"Weekly" (or whatever) task view

start dat 1-Dec-16


End date 31-May-17

TASK
NUMBE "Rank" to Repeat Task for Estimated
R ID for Task list VLOOKUP TASK Start Date
1
2
3 Project Defintion 42706
4 Assign Resources
5
6 MSETCL/MSEDCL and othe Govern
7 Create Project Plan
8 Carrying out all Technical Deisgn
9 Placing a draft Lay
10
11 Project Kick-Off Meeting
12
13 13 1 Civil Foundation DCivil Foundation Drawing Approv 42708
14 Foundation Bolts
15 Civil Job Order PO 42714
16 Change Control Processes
17 17 2 VCB Room Founda VCB Room Foundation Work 42724
18 18 3 Earthing Wire StruEarthing Wire Structure Foundat 42724
19 19 4 Transformer-1 FouTransformer-1 Foundation and Ra 42724
20 Lighting Arresstor (R Phase) Fo 42724
21 Lighting Arresstor (Y Phase) Fo 42724
22 Lighting Arresstor (B Phase) Fo 42724
23 23 5 CT (R Phase) FouCT (R Phase) Foundation Work 42724
24 24 6 CT (Y Phase) FouCT (Y Phase) Foundation Work 42724
25 25 7 CT (B Phase) FouCT (B Phase) Foundation Work 42724
26 26 8 SF6 Breaker FounSF6 Breaker Foundation Work B 42724
27 27 9 PT (R Phase) FounPT (R Phase) Foundation Work 42724
28 28 10 PT (Y Phase) FounPT (Y Phase) Foundation Work 42724
29 29 11 PT (B Phase) FounPT (B Phase) Foundation Work 42724
30 30 12 1250A Isolator Fo 1250A Isolator Foundation Work 42724
31 31 13 Bus Post-1 Insual Bus Post-1 Insualtor Foundation 42724
32 32 14 Bus Post-2 Insual Bus Post-2 Insualtor Foundation 42724
33 33 15 Transformer-1 FouTransformer-1 Foundation and Ra 42724
34 34 16 Transformer-2 FouTransformer-2 Foundation and Ra 42724
35 35 17 Lighting Arresstor Lighting Arresstor (R Phase) Fo 42724
36 36 18 Lighting Arresstor Lighting Arresstor (Y Phase) Fo 42724
37 37 19 Lighting Arresstor Lighting Arresstor (B Phase) Fo 42724
38 38 20 CT (R Phase) FouCT (R Phase) Foundation Work 42724
39 39 21 CT (Y Phase) FouCT (Y Phase) Foundation Work 42724
40 40 22 CT (B Phase) FouCT (B Phase) Foundation Work 42724
41 41 23 SF6 Breaker FounSF6 Breaker Foundation Work B 42724
42 42 24 PT (R Phase) FounPT (R Phase) Foundation Work 42724
43 43 25 PT (Y Phase) FounPT (Y Phase) Foundation Work 42724
44 44 26 PT (B Phase) FounPT (B Phase) Foundation Work 42724
45 45 27 1250A Isolator Fo 1250A Isolator Foundation Work 42724
46 46 28 Bus Post-3 Insual Bus Post-3 Insualtor Foundation 42724
47 47 29 Bus Post-4 Insual Bus Post-4 Insualtor Foundation 42724
48 48 30 FH+FP-1 Column F H+FP-1 Column Foundation Wo 42724
49 49 31 FH+FP-2 Column F H+FP-2 Column Foundation Wo 42724
50 50 32 FH+FP-3 Column F H+FP-3 Column Foundation Wo 42724
51 51 33 FF+FP-4 Column FFF+FP-4 Column Foundation Wo 42724
52 52 34 FG+FP-5 Column FG+FP-5 Column Foundation Wo 42724
53 53 35 FG+FP-6 Column FG+FP-6 Column Foundation Wo 42724
54 54 36 FG+FP Column FoFG+FP Column Foundation Wor 42724
55 55 37 PT (R Phase) Mai PT (R Phase) Main ABT Meter F 42724
56 56 38 PT (Y Phase) MainPT (Y Phase) Main ABT Meter F 42724
57 57 39 PT (B Phase) MainPT (B Phase) Main ABT Meter F 42724
58 58 40 CT (R Phase) Mai CT (R Phase) Main ABT Meter F 42724
59 59 41 CT (Y Phase) Mai CT (Y Phase) Main ABT Meter F 42724
60 60 42 CT (B Phase) Mai CT (B Phase) Main ABT Meter F 42724
61 61 43 PT (R Phase) ChePT (R Phase) Check ABT Meter 42724
62 62 44 PT (Y Phase) ChePT (Y Phase) Check ABT Meter 42724
63 63 45 PT (B Phase) ChePT (B Phase) Check ABT Meter 42724
64 64 46 CT (R Phase) CheCT (R Phase) Check ABT Meter 42724
65 65 47 CT (Y Phase) CheCT (Y Phase) Check ABT Meter 42724
66 66 48 CT (B Phase) CheCT (B Phase) Check ABT Meter 42724
67 67 49 Metering Room FoMetering Room Foundation Work 42724
68 68 50 FH+FP-1 Column F H+FP-1 Column Foundation Wo 42724
69 69 51 FH+FP Column Fou FH+FP Column Foundation Wor 42724
70 70 52 1250A Isolator Fo 1250A Isolator Foundation Work 42724
71 71 53 Bus Post Insulato Bus Post Insulator-5 Foundation 42724
72 72 54 3150A Pass-1 Isol3150A Pass-1 Isolator Foundati 42724
73 73 55 ABB Pass-1 FoundABB Pass-1 Foundation Work 42724
74 74 56 FG+FP Column Fou FG+FP Column Foundation Work 42724
75 75 57 FG+FP Column Fou FG+FP Column Foundation Work 42724
76 76 58 FG+FP Column Fou FG+FP Column Foundation Work 42724
77 77 59 Wave Trap (R Phas Wave Trap (R Phase) Foundation 42724
78 78 60 Wave Trap (B Phas Wave Trap (B Phase) Foundation 42724
79 79 61 Coupling CapacitoCoupling Capacitor (R Phase) Fo 42724
80 80 62 Coupling CapacitoCoupling Capacitor (B Phase) Fo 42724
81 81 63 Lighting Arresstor Lighting Arresstor (R Phase) Fou 42724
82 82 64 Lighting Arresstor Lighting Arresstor (Y Phase) Fou 42724
83 83 65 Lighting Arresstor Lighting Arresstor (B Phase) Fou 42724
84 84 66 3150A Pass-2 Isol3150A Pass-2 Isolator Foundati 42724
85 85 67 ABB Pass-2 FoundABB Pass-2 Foundation Work 42724
86 86 68 Wave Trap (R Phas Wave Trap (R Phase) Foundation 42724
87 87 69 Wave Trap (B Phas Wave Trap (B Phase) Foundation 42724
88 88 70 Coupling CapacitoCoupling Capacitor (R Phase) Fo 42724
89 89 71 Coupling CapacitoCoupling Capacitor (B Phase) Fo 42724
90 90 72 Lighting Arresstor Lighting Arresstor (R Phase) Fou 42724
91 91 73 Lighting Arresstor Lighting Arresstor (Y Phase) Fou 42724
92 92 74 Lighting Arresstor Lighting Arresstor (B Phase) Fou 42724
93 93 75 Bus Post Insulato Bus Post Insulator-6 Foundation 42724
94 94 76 Bus Post Insulato Bus Post Insulator-7 Foundation 42724
95 95 77 FH+FP Column Fou FH+FP Column Foundation Wor 42724
96 96 78 FH+FP Column Fou FH+FP Column Foundation Wor 42724
97 97 79 Bus PT Isolator 1 Bus PT Isolator 1250A Foundati 42724
98 98 80 Bus PT (R Phase) Bus PT (R Phase) Foundation W 42724
99 99 81 Bus PT (Y Phase) Bus PT (Y Phase) Foundation W 42724
100 100 82 Bus PT (B Phase) Bus PT (B Phase) Foundation W 42724
101 101 83 LILO Room Founda LILO Room Foundation Work 42724
102 102 84 Placing of Transfo Placing of Transformer-2 at the 42736
103 Earthing Mat Design Calculation
104 Earthing Mat Design Layout Appr
105 Earthing Mat Material Supply PO
106 Earthing Mat Erection Job Work
107 Earthing Mat Erection
108 VCB Switch Board PO
109 VCB Switch Board Drawing Appr
110 VCB Switch Board Delivery at Sit
111 VCB Switch Board Commissioin
112 Structure Material PO for VCB Tr
113 Structure Material delivery at Sit
114 Structure Material for VCB Tren
115 VCB Switch Board Layout Appro
116 VCB SwitchBoard Commissioing
117 HT Route Finaization from New S
118 Structure Designing and Layout D
119 Structure Material PO
120 Structure Material Fabrication
121 Structure Material Delivery at Sit
122 HT Cable Laying Job Work PO
123 HT Cable Material Supply PO
124 HT Cable delivery at Site
125 HT Termination Kit Material Sup
126 HT Termination Kit delivery at Sit
127 HT Cable 6 Run 3Cx240 SQMM fro
128 C&R Panel-1&2 PO
129 C&R Panel-1&2 Drawing Approva
130 C&R Panel-1&2 Delivery at Site
131 C&R Panel-1&2 Commissioning
132 C&R Panel-1&2 Layout Approved
133 C&R Panel-1&2 Commissioning
134 ACDB Panel-1&2 PO
135 ACDB Panel-1&2 Drawing Approv
136 ACDB Panel-1&2 Delivery at Site
137 ACDB Panel-1&2 Commissioning
138 ACDB Panel-1&2 Layout Apporv
139 ACDB Panel-1&2 Commissionin
140 Transformer-2 Commissioning Wo
141 Busduct-1&2 PO
142 Busduct-1&2 Drawing Approval
143 Busduct-1&2 Delivery at the Site
144 Busduct 1&2Commissioning Job
145 Busduct 1&2Laying Approved Dr
146 Busduct-2 Commissioning Work f
147 Lighting Arrestor Strcuture Supp
148 Lighting Arrestor Structure Draw
149 Lighting Arrestor Structure Delive
150 Lighting Arrestor Structure Erec
151 Lighting Arrestor Layout Approv
152 Lighting Arresstor (R Phase) Str
153 Lighting Arresstor (Y Phase) Stru
154 Lighting Arresstor (B Phase) Stru
155 CT (R Phase,Y Phase,B Phase) S
156 CT (R Phase,Y Phase,B Phase) S
157 CT (R Phase,Y Phase,B Phase) St
158 CT (R Phase,Y Phase,B Phase) S
159 CT (R Phase,Y Phase,B Phase)
160 CT (R Phase) Structure Erectio
161 CT (Y Phase) Structure Erection
162 CT (B Phase) Structure Erection
163 SF6 Breaker Structure Supply P
164 SF6 Breaker Structure Drawing
165 SF6 Breaker Structure Delivery at
166 SF6 Breaker Structure Commiss
167 SF6 Breaker Structure Erection
168 PT (R Phase,Y Phase,B Phase) S
169 PT (R Phase,Y Phase,B Phase) S
170 PT (R Phase,Y Phase,B Phase) St
171 PT (R Phase,Y Phase,B Phase) S
172 PT (R Phase,Y Phase,B Phase)
173 PT (R Phase) Structure Erection
174 PT (Y Phase) Structure Erection
175 PT (B Phase) Structure Erection
176 1250A Isolator Structure Supply
177 1250A Isolator Structure Drawin
178 1250A Isolator Structure Delivery
179 1250A Isolator Structure Commi
180 1250A Isolator-1 Structure Erect
181 1250A Isolator Structure Supply
182 1250A Isolator Structure Drawin
183 1250A Isolator Structure Delivery
184 1250A Isolator Structure Commi
185 1250A Isolator-2 Structure Erect
186 FG+FP Column Structure Suppl
187 FG+FP Column Structure Drawin
188 FG+FP Column Structure Delivery
189 FG+FP Column Structure Commi
190 FG+FP Column Erection Work
191 FG+FP Column Structure Suppl
192 FG+FP Column Structure Drawin
193 FG+FP Column Structure Delivery
194 FG+FP Column Structure Commi
195 FG+FP Column Erection Work
196 FB Beam Structure Supply PO
197 FB Beam Structure Drawing App
198 FB Beam Structure Delivery at th
199 FB Beam Structure Commissioni
200 FB Beam Erection Work
201 FG+FP Column Structure Suppl
202 FG+FP Column Structure Drawin
203 FG+FP Column Structure Delivery
204 FG+FP Column Structure Commi
205 FG+FP Column Erection Work
206 FF+FP Column Structure Supply
207 FF+FP Column Structure Drawin
208 FF+FP Column Structure Delivery
209 FF+FP Column Structure Commis
210 FF+FP Column Erection Work
211 FB Beam Structure Supply PO
212 FB Beam Structure Drawing App
213 FB Beam Structure Delivery at th
214 FB Beam Structure Commissioni
215 FB Beam Erection Work
216 Lighting Arrester Supply PO
217 Lighting Arrester Drawing & GTP
218 Lighting Arrester Delivery at Site
219 Lighting Arrester Installation PO
220 Lighting Arrester Installation Wor
221 0.2 ACSR Conductor GTP Approv
222 0.2 ACSR Conductor Delivery at
223 0.2 ACSR Conductor Terminatio
224 0.2 ACSR Single Bus System Inst
225 Silicone Polymer Suspension Ins
226 Silicone Polymer Suspension Ins
227 Silcione Polyme Suspension Insul
228 Silicone Polymer Suspension Insu
229 Silicone Polymer Suspension Insu
230 1250A Isolator Structure Supply
231 1250A Isolator Structure Drawin
232 1250A Isolator Structure Delivery
233 1250A Isolator Structure Commi
234 1250A Isolator-5 Structure Erect
235 3150A Isolator Structure Supply
236 3150A Isolator Structure Drawin
237 3150A Isolator Structure Delivery
238 3150A Isolator Structure Commi
239 3150A Isolator-1 Structure Erecti
240 3150A Isolator Structure Supply
241 3150A Isolator Structure Drawin
242 3150A Isolator Structure Delivery
243 3150A Isolator Structure Commi
244 3150A Isolator-1 Structure Erecti
245 Dead End Tower Foundation Dra
246 Finalization of Rerouting Plan o
247 Dead End Tower Foundation Jo
248 Dead End Tower Foundation Wor
249 Dead End Tower Foundation Work
250 Dead End Tower Foundation Wor
251 Grid Isolation Permission Approv
252 Isolating JSW Substation from Gr
253 Disconnecting Control Wiring of
254 Disconnecting Control Wiring of
255 Disconnecting Control Wiring of
256 Disconnecting Control Wiring of
257 Disconnecting Control Wiring of
258 Disconnecting Control Wire of Bu
259 Disconnecting Control Wire of P
260 Disconnecting Control Wire of P
261 Disconnecting Control Wiring of
262 Disconnecting Control Wiring of
263 Disconnecting Control Wiring of
264 Shifting and Installation of LILO
265 Shifting and Installation of 110
266 Shifting and Installation of 4VD
267 Disconnecting Control Wiring of
268 Disconnecting Control Wiring of
269 Disconnecting Control Wiring of
270 Disconnecting Control Wiring of
271 Disconnecting Control Wiring of
272 Disconnecting Control Wiring of
273 Disconnecting Control Wiring of
274 Disconnecting Control Wiring of I
275 Disconnecting Control Wiring of
276 Disconnecting Control Wiring of
277 Disconnecting Control Wiring of
278 Disconnecting Control Wiring of
279 Disconnecting Control Wiring of
280 Disconnecting Control Wiring of
281 Disconnecting Control Wiring of
282 Disconnecting Control Wiring of
283 Disconnecting Control Wiring of
284 Disconnecting Control Wiring of
285 Disconnecting Control Wiring of
286 Disconnecting Control Wiring of
287 Disconnecting Control Wiring of
288 Disconnecting Control Wiring of
289 Shifting & Installation of Pass
290 Shifting & Installation of Lighting
291 Shifting & Installation of Couplin
292 Shifiting & Installation of Wave T
293 Shifting & Installation of Pass H
294 Shifting & Installation of Pass H
295 Shifting & Installation of FH+F
296 Shifting & Installation of Twin Bu
297 Shifting & Installation of Bus PT
298 Dismantalling of Bus PT from Str
299 Shifting & Installation of Bus PT
300 Dismantalling of Main Meter R
301 Dismantalling of Main Meter Y P
302 Dismantalling of Main Meter B P
303 Dismantalling of Main Meter R P
304 Dismantalling of Main Meter Y P
305 Dismantalling of Main Meter B P
306 Dismantalling of Check Meter R
307 Dismantalling of Check Meter Y
308 Dismantalling of Check Meter B
309 Dismantalling of Check Meter R
310 Dismantalling of Check Meter Y
311 Dismantalling of Check Meter B
312 Shifting & Installation of of Mai
313 Shifting & Installation of of Mai
314 Shifting & Installation of of Mai
315 Shifitng & Instalallation of Main
316 Shifitng & Installation of Main M
317 Shifitng & Installation of Main
318 Shifting & Installationof of Che
319 Shifting & Installation of of Che
320 Shifting & Installation of of Che
321 Shifitng & Installation of Check
322 Shifitng & Installation of Check
323 Shifitng & Installation of Check
324 Shifting & Installtion of FG+FP
325 Shifting & Installtion of Bus Post
326 Dismantalling of R Phase PT
327 Dismantalling of Y Phase PT
328 Dismantalling of B Phase PT
329 Shifitng & Installation of R Phas
330 Shifitng & Installation of Y Phas
331 Shifitng & Installtion of B Phase
332 Shifting & Installation of R Phas
333 Shifting & Installation of Y Phase
334 Shifting & Installtion of B Phase
335 Shifting & Installation of R Phase
336 Shifting & Installtion of Y Phase L
337 Shifting & Installation of B Phase
338 Shifting & Installation of 40 MVA
339 Control Wiring of 110VDC Batter
340 Control Wiring of 4VDC Battery
341 Power Circuit Wiring from ACDB
342 Power Circuit Wiring from ACDB
343 Power Circuit Wiring from ACDB
344 Control Wiring of ABB Hybrid Pa
345 Control Wiring of ABB Hybrid Pa
346 Control Wiring of Bus PT Isolator
347 Control Wiring of Bus PT
348 Power Circuit Wiring of 3150 Iso
349 Power Circuit Wiring of 3150 Iso
350 Power Circuit Wiring of 1250 Iso
351 Control Circuit Wiring of 3150 Is
352 Control Circuit Wiring of 3150 Is
353 Control Circuit Wiring of 1250 Is
354 Control Circuit Wiring of PLCC
355 Power Circuit Wiring of Main Me
356 Power Circuit Wiring of Main Me
357 Power Circuit Wiring of Main Me
358 Power Circuit Wiring of Main Me
359 Power Circuit Wiring of Main Me
360 Power Circuit Wiring of Main Me
361 Power Circuit Wiring of Check M
362 Power Circuit Wiring of Check M
363 Power Circuit Wiring of Check M
364 Power Circuit Wiring of Check M
365 Power Circuit Wiring of Check M
366 Power Circuit Wiring of Check M
367 Control Circuit Wiring of ABT Ch
368 Control Circuit Wiring of ABT Ma
369 Power Circuit Wring of 1250 A Iso
370 Power Circuit Wring of 1250 A Is
371 Power Circuit Wring of 1250 A Iso
372 Power Circuit Wring of 1250 A Iso
373 Control Circuit Wring of 1250 A Is
374 Control Circuit Wring of 1250 A I
375 Control Circuit Wring of 1250 A I
376 Control Circuit Wring of 1250 A I
377 Power Circuit Wiring of SF6 Bre
378 Power Circuit Wiring of SF6 Bre
379 Control Circuit Wiring of SF6 Br
380 Control Circuit Wiring of SF6 Br
381 Power Circuit Wiring of R Phase
382 Power Circuit Wiring of Y Phase
383 Power Circuit Wiring of B Phase
384 Power Circuit Wiring of R Phase
385 Power Circuit Wiring of Y Phase
386 Power Circuit Wiring of B Phase
387 Control Circuit Wiring of 40MVA
388
389
390
391
392
393
394
395
396
397
398
399
400
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429
430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
445
446
447
448
449
450
451
452
453
454
455
456
457
458
459
460
461
462
463
464
465
466
467
468
469
470
471
472
473
474
475
476
477
478
479
480
481
482
483
484
485
486
487
488
489
490
491
492
493
494
495
496
497
498
499
500
501
502
503
504
505
506
507
508
509
510
511
512
513
514
515
516
517
518
519
520
521
522
523
524
525
526
527
528
529
530
531
532
533
534
535
536
537
538
539
540
541
542
543
544
545
546
547
548
549
550
551
552
553
554
555
556
557
558
559
560
561
562
563
564
565
566
567
568
569
570
571
572
573
574
575
576
577
578
579
580
581
582
583
584
585
586
587
588
589
590
591
592
593
594
595
596
597
598
599
600
601
602
603
604
605
606
607
608
609
610
611
612
613
614
615
616
617
618
619
620
621
622
623
624
625
626
627
628
629
630
631
632
633
634
635
636
637
638
639
640
641
642
643
644
645
646
647
648
649
650
651
652
653
654
655
656
657
658
659
660
661
662
663
664
665
666
667
668
669
670
671
672
673
674
675
676
677
678
679
680
681
682
683
684
685
686
687
688
689
690
691
692
693
694
695
696
697
698
699
700
701
702
703
704
705
706
707
708
709
710
711
712
713
714
715
716
717
718
719
720
721
722
723
724
725
726
727
728
729
730
731
732
733
734
735
736
737
738
739
740
741
742
743
744
745
746
747
748
749
750
751
752
753
754
755
756
757
758
759
760
761
762
763
764
765
766
767
768
769
770
771
772
773
774
775
776
777
778
779
780
781
782
783
784
785
786
787
788
789
790
791
792
793
794
795
796
797
798
799
800
801
802
803
804
805
806
807
808
809
810
811
812
813
814
815
816
817
818
819
820
821
822
823
824
825
826
827
828
829
830
831
832
833
834
835
836
837
838
839
840
841
842
843
844
845
846
847
848
849
850
851
852
853
854
855
856
857
858
859
860
861
862
863
864
865
866
867
868
869
870
871
872
873
874
875
876
877
878
879
880
881
882
883
884
885
886
887
888
889
890
891
892
893
894
895
896
897
898
899
900
901
902
903
904
905
906
907
908
909
910
911
912
913
914
915
916
917
918
919
920
921
922
923
924
925
926
927
928
929
930
931
932
933
934
935
936
937
938
939
940
941
942
943
944
945
946
947
948
949
950
951
952
953
954
955
956
957
958
959
960
961
962
963
964
965
966
967
968
969
970
971
972
973
974
975
976
977
978
979
980
981
982
983
984
985
986
987
988
989
990
991
992
993
994
995
996
997
998
999
1000
Task Not Yet Started
Task Complete
Task In Progress

Estimated Actual Start


End Date Owner Owner for List Date Actual End Date

42707 Mr.Sandeep MidMr.Sandeep Mid 2-Dec-16 2-Dec-16 Task Complete


Mr.Pradeep ChaMr.Pradeep Cha Task Not Yet Starte

Mr.Dharamveer Mr.Dharamveer Task Not Yet Starte


Mr.Ajay KhandelMr.Ajay Khandel Task Not Yet Starte
Mr.Sandeep MidMr.Sandeep Mid Task Not Yet Starte
Mr.Mahes Sole Mr.Mahes Sole Task Not Yet Starte

Mr.Ajay KhandelMr.Ajay Khandel Task Not Yet Starte

42710 Mr.Dharamveer Mr.Dharamveer Task Not Yet Starte


Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
42716 Mr.Pradeep ChaMr.Pradeep Cha 12-Dec-16 12-Dec-16 Task Complete
Mr.Sandeep MidMr.Sandeep Mid Task Not Yet Starte
42814 Mr.Dilip Pawar Mr.Dilip Pawar 3-Jan-17 Task In Progress
42814 Mr.Dilip Pawar Mr.Dilip Pawar 1-Jan-17 Task In Progress
42814 Mr.Dilip Pawar Mr.Dilip Pawar Task Not Yet Starte
42814 Mr.Dilip Pawar Mr.Dilip Pawar 1-Jan-17 3-Jan-17 Task Complete
42814 Mr.Dilip Pawar Mr.Dilip Pawar 1-Jan-17 3-Jan-17 Task Complete
42814 Mr.Dilip Pawar Mr.Dilip Pawar 3-Jan-17 5-Jan-17 Task Complete
42814 Mr.Dilip Pawar Mr.Dilip Pawar Task Not Yet Starte
42814 Mr.Dilip Pawar Mr.Dilip Pawar Task Not Yet Starte
42814 Mr.Dilip Pawar Mr.Dilip Pawar Task Not Yet Starte
42814 Mr.Dilip Pawar Mr.Dilip Pawar Task Not Yet Starte
42814 Mr.Dilip Pawar Mr.Dilip Pawar Task Not Yet Starte
42814 Mr.Dilip Pawar Mr.Dilip Pawar Task Not Yet Starte
42814 Mr.Dilip Pawar Mr.Dilip Pawar Task Not Yet Starte
42814 Mr.Dilip Pawar Mr.Dilip Pawar Task Not Yet Starte
42814 Mr.Dilip Pawar Mr.Dilip Pawar Task Not Yet Starte
42814 Mr.Dilip Pawar Mr.Dilip Pawar Task Not Yet Starte
42814 Mr.Dilip Pawar Mr.Dilip Pawar Task Not Yet Starte
42814 Mr.Dilip Pawar Mr.Dilip Pawar Task Not Yet Starte
42814 Mr.Dilip Pawar Mr.Dilip Pawar Task Not Yet Starte
42814 Mr.Dilip Pawar Mr.Dilip Pawar Task Not Yet Starte
42814 Mr.Dilip Pawar Mr.Dilip Pawar Task Not Yet Starte
42814 Mr.Dilip Pawar Mr.Dilip Pawar Task Not Yet Starte
42814 Mr.Dilip Pawar Mr.Dilip Pawar Task Not Yet Starte
42814 Mr.Dilip Pawar Mr.Dilip Pawar Task Not Yet Starte
42814 Mr.Dilip Pawar Mr.Dilip Pawar Task Not Yet Starte
42814 Mr.Dilip Pawar Mr.Dilip Pawar Task Not Yet Starte
42814 Mr.Dilip Pawar Mr.Dilip Pawar Task Not Yet Starte
42814 Mr.Dilip Pawar Mr.Dilip Pawar Task Not Yet Starte
42814 Mr.Dilip Pawar Mr.Dilip Pawar Task Not Yet Starte
42814 Mr.Dilip Pawar Mr.Dilip Pawar Task Not Yet Starte
42814 Mr.Dilip Pawar Mr.Dilip Pawar Task Not Yet Starte
42814 Mr.Dilip Pawar Mr.Dilip Pawar Task Not Yet Starte
42814 Mr.Dilip Pawar Mr.Dilip Pawar Task Not Yet Starte
42814 Mr.Dilip Pawar Mr.Dilip Pawar Task Not Yet Starte
42814 Mr.Dilip Pawar Mr.Dilip Pawar Task Not Yet Starte
42814 Mr.Dilip Pawar Mr.Dilip Pawar Task Not Yet Starte
42814 Mr.Dilip Pawar Mr.Dilip Pawar Task Not Yet Starte
42814 Mr.Dilip Pawar Mr.Dilip Pawar Task Not Yet Starte
42814 Mr.Dilip Pawar Mr.Dilip Pawar Task Not Yet Starte
42814 Mr.Dilip Pawar Mr.Dilip Pawar Task Not Yet Starte
42814 Mr.Dilip Pawar Mr.Dilip Pawar Task Not Yet Starte
42814 Mr.Dilip Pawar Mr.Dilip Pawar Task Not Yet Starte
42814 Mr.Dilip Pawar Mr.Dilip Pawar Task Not Yet Starte
42814 Mr.Dilip Pawar Mr.Dilip Pawar Task Not Yet Starte
42814 Mr.Dilip Pawar Mr.Dilip Pawar Task Not Yet Starte
42814 Mr.Dilip Pawar Mr.Dilip Pawar Task Not Yet Starte
42814 Mr.Dilip Pawar Mr.Dilip Pawar Task Not Yet Starte
42814 Mr.Dilip Pawar Mr.Dilip Pawar Task Not Yet Starte
42814 Mr.Dilip Pawar Mr.Dilip Pawar Task Not Yet Starte
42814 Mr.Dilip Pawar Mr.Dilip Pawar Task Not Yet Starte
42814 Mr.Dilip Pawar Mr.Dilip Pawar Task Not Yet Starte
42814 Mr.Dilip Pawar Mr.Dilip Pawar Task Not Yet Starte
42814 Mr.Dilip Pawar Mr.Dilip Pawar Task Not Yet Starte
42814 Mr.Dilip Pawar Mr.Dilip Pawar Task Not Yet Starte
42814 Mr.Dilip Pawar Mr.Dilip Pawar Task Not Yet Starte
42814 Mr.Dilip Pawar Mr.Dilip Pawar Task Not Yet Starte
42814 Mr.Dilip Pawar Mr.Dilip Pawar Task Not Yet Starte
42814 Mr.Dilip Pawar Mr.Dilip Pawar Task Not Yet Starte
42814 Mr.Dilip Pawar Mr.Dilip Pawar Task Not Yet Starte
42814 Mr.Dilip Pawar Mr.Dilip Pawar Task Not Yet Starte
42814 Mr.Dilip Pawar Mr.Dilip Pawar Task Not Yet Starte
42814 Mr.Dilip Pawar Mr.Dilip Pawar Task Not Yet Starte
42814 Mr.Dilip Pawar Mr.Dilip Pawar Task Not Yet Starte
42814 Mr.Dilip Pawar Mr.Dilip Pawar Task Not Yet Starte
42814 Mr.Dilip Pawar Mr.Dilip Pawar Task Not Yet Starte
42814 Mr.Dilip Pawar Mr.Dilip Pawar Task Not Yet Starte
42814 Mr.Dilip Pawar Mr.Dilip Pawar Task Not Yet Starte
42814 Mr.Dilip Pawar Mr.Dilip Pawar Task Not Yet Starte
42814 Mr.Dilip Pawar Mr.Dilip Pawar Task Not Yet Starte
42814 Mr.Dilip Pawar Mr.Dilip Pawar Task Not Yet Starte
42814 Mr.Dilip Pawar Mr.Dilip Pawar Task Not Yet Starte
42814 Mr.Dilip Pawar Mr.Dilip Pawar Task Not Yet Starte
42814 Mr.Dilip Pawar Mr.Dilip Pawar Task Not Yet Starte
42814 Mr.Dilip Pawar Mr.Dilip Pawar Task Not Yet Starte
42814 Mr.Dilip Pawar Mr.Dilip Pawar Task Not Yet Starte
42814 Mr.Dilip Pawar Mr.Dilip Pawar Task Not Yet Starte
42814 Mr.Dilip Pawar Mr.Dilip Pawar Task Not Yet Starte
42814 Mr.Dilip Pawar Mr.Dilip Pawar Task Not Yet Starte
42814 Mr.Dilip Pawar Mr.Dilip Pawar Task Not Yet Starte
42814 Mr.Dilip Pawar Mr.Dilip Pawar Task Not Yet Starte
42814 Mr.Dilip Pawar Mr.Dilip Pawar Task Not Yet Starte
42814 Mr.Dilip Pawar Mr.Dilip Pawar Task Not Yet Starte
42814 Mr.Dilip Pawar Mr.Dilip Pawar Task Not Yet Starte
42814 Mr.Dilip Pawar Mr.Dilip Pawar Task Not Yet Starte
42814 Mr.Dilip Pawar Mr.Dilip Pawar Task Not Yet Starte
42739 Mr.Dharamveer Mr.Dharamveer Task Not Yet Starte
Mr.Sandeep MidMr.Sandeep Mid Task Not Yet Starte
Mr.Dharamveer Mr.Dharamveer Task Not Yet Starte
Mr.Pradeep ChaMr.Pradeep Cha Task Not Yet Starte
Mr.Pradeep ChaMr.Pradeep Cha Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Pradeep ChaMr.Pradeep Cha Task Not Yet Starte
Mr.Sandeep MidMr.Sandeep Mid Task Not Yet Starte
Mr.Santosh (ABBMr.Santosh (ABB Task Not Yet Starte
Mr.Munish Saini Mr.Munish Saini Task Not Yet Starte
Unassigned Task Not Yet Starte
Unassigned Task Not Yet Starte
Unassigned Task Not Yet Starte
Mr.Sandeep MidMr.Sandeep Mid Task Not Yet Starte
Mr.Joshi (PowerMr.Joshi (Power Task Not Yet Starte
Mr.Mahesh SoleMr.Mahesh Sole Task Not Yet Starte
Mr.Sandeep MidMr.Sandeep Mid Task Not Yet Starte
Mr.Arun GaikwadMr.Arun Gaikwad Task Not Yet Starte
Unassigned Task Not Yet Starte
Unassigned Task Not Yet Starte
Mr.Joshi (PowerMr.Joshi (Power Task Not Yet Starte
Unassigned Task Not Yet Starte
Unassigned Task Not Yet Starte
Mr.Munish Saini Mr.Munish Saini Task Not Yet Starte
Unassigned Task Not Yet Starte
Mr.Joshi (PowerMr.Joshi (Power Task Not Yet Starte
Mr.Munish Saini Mr.Munish Saini Task Not Yet Starte
Mr.Sandeep MidMr.Sandeep Mid Task Not Yet Starte
Mr.Avinash (HiteMr.Avinash (Hite Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Sandeep MidMr.Sandeep Mid Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Pradeep ChaMr.Pradeep Cha Task Not Yet Starte
Mr.Sandeep MidMr.Sandeep Mid Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Sandeep MidMr.Sandeep Mid Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Unassigned Task Not Yet Starte
Mr.Pradeep ChaMr.Pradeep Cha Task Not Yet Starte
Mr.Mahesh SoleMr.Mahesh Sole Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Pradeep ChaMr.Pradeep Cha Task Not Yet Starte
Mr.Mahesh SoleMr.Mahesh Sole Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Pradeep ChaMr.Pradeep Cha Task Not Yet Starte
Mr.Dharamveer Mr.Dharamveer Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Pradeep ChaMr.Pradeep Cha Task Not Yet Starte
Mr.Dharamveer Mr.Dharamveer Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Dharamveer Mr.Dharamveer Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Mahesh SoleMr.Mahesh Sole Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Pradeep ChaMr.Pradeep Cha Task Not Yet Starte
Mr.Mahesh SoleMr.Mahesh Sole Task Not Yet Starte
Mr.Vinit Rathore Mr.Vinit Rathore Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Pradeep ChaMr.Pradeep Cha Task Not Yet Starte
Mr.Mahesh SoleMr.Mahesh Sole Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Mahesh SoleMr.Mahesh Sole Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Pradeep ChaMr.Pradeep Cha Task Not Yet Starte
Mr.Dharamveer Mr.Dharamveer Task Not Yet Starte
Mr.Vinit Rathore Mr.Vinit Rathore Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Pradeep ChaMr.Pradeep Cha Task Not Yet Starte
Mr.Dharamveer Mr.Dharamveer Task Not Yet Starte
Mr.Vinit Rathore Mr.Vinit Rathore Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Pradeep ChaMr.Pradeep Cha Task Not Yet Starte
Mr.Dharamveer Mr.Dharamveer Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Pradeep ChaMr.Pradeep Cha Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Pradeep ChaMr.Pradeep Cha Task Not Yet Starte
Mr.Dharamveer Mr.Dharamveer Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Pradeep ChaMr.Pradeep Cha Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Pradeep ChaMr.Pradeep Cha Task Not Yet Starte
Mr.Dharamveer Mr.Dharamveer Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Pradeep ChaMr.Pradeep Cha Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Pradeep ChaMr.Pradeep Cha Task Not Yet Starte
Mr.Dharamveer Mr.Dharamveer Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Pradeep ChaMr.Pradeep Cha Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Dharamveer Mr.Dharamveer Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Pradeep ChaMr.Pradeep Cha Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Pradeep ChaMr.Pradeep Cha Task Not Yet Starte
Mr.Dharamveer Mr.Dharamveer Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Pradeep ChaMr.Pradeep Cha Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Pradeep ChaMr.Pradeep Cha Task Not Yet Starte
Mr.Dharamveer Mr.Dharamveer Task Not Yet Starte
Mr.Avinash (HiteMr.Avinash (Hite Task Not Yet Starte
Mr.Pradeep ChaMr.Pradeep Cha Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Dharamveer Mr.Dharamveer Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Pradeep ChaMr.Pradeep Cha Task Not Yet Starte
Mr.Dharamveer Mr.Dharamveer Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Pradeep ChaMr.Pradeep Cha Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Pradeep ChaMr.Pradeep Cha Task Not Yet Starte
Mr.Dharamveer Mr.Dharamveer Task Not Yet Starte
Mr.Vinit Rathore Mr.Vinit Rathore Task Not Yet Starte
Mr.Pradeep ChaMr.Pradeep Cha Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Pradeep ChaMr.Pradeep Cha Task Not Yet Starte
Mr.Dharamveer Mr.Dharamveer Task Not Yet Starte
Mr.Vinit Rathore Mr.Vinit Rathore Task Not Yet Starte
Mr.Pradeep ChaMr.Pradeep Cha Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Pradeep ChaMr.Pradeep Cha Task Not Yet Starte
Mr.Dharamveer Mr.Dharamveer Task Not Yet Starte
Mr.Vinit Rathore Mr.Vinit Rathore Task Not Yet Starte
Mr.Pradeep ChaMr.Pradeep Cha Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Dharamveer Mr.Dharamveer Task Not Yet Starte
Mr.Dharamveer Mr.Dharamveer Task Not Yet Starte
Mr.Pradeep ChaMr.Pradeep Cha Task Not Yet Starte
Mr.Pradeep ChaMr.Pradeep Cha Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Dharamveer Mr.Dharamveer Task Not Yet Starte
Mr.Dharamveer Mr.Dharamveer Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
Mr.Prashant (KCMr.Prashant (KC Task Not Yet Starte
ot Yet Started Task is underway but is behind schedule.
Task is late and has not yet been started.
Task is scheduled for work during this timeframe.

Task Reg
should be Task Should Scheduled Unique Rank
done - be done - Not Task during for Owners, by
On Track Status Started Yet Started this time Sum task
No 1 41
No 3 1
No No No 6 2
No No No 10 3
No 15 4
No No No 21 5
No No No 28 6
No No No 36 7
No No No 45 8
No 55 9
No No No 66 10
No 78 11
Task is scheduled for No No Yes 91 12
No No No 105 13
No No No 120 14
No No No 136 15
Task is scheduled for No No Yes 153 16
Task is scheduled for No No Yes 171 17
Task is scheduled for No No Yes 190 18
No No No 210 19
No No No 231 20
No No No 253 21
Task is scheduled for No No Yes 276 22
Task is scheduled for No No Yes 300 23
Task is scheduled for No No Yes 325 24
Task is scheduled for No No Yes 351 25
Task is scheduled for No No Yes 378 26
Task is scheduled for No No Yes 406 27
Task is scheduled for No No Yes 435 28
Task is scheduled for No No Yes 465 29
Task is scheduled for No No Yes 496 30
Task is scheduled for No No Yes 528 31
Task is scheduled for No No Yes 561 32
Task is scheduled for No No Yes 595 33
Task is scheduled for No No Yes 630 34
Task is scheduled for No No Yes 666 35
Task is scheduled for No No Yes 703 36
Task is scheduled for No No Yes 741 37
Task is scheduled for No No Yes 780 38
Task is scheduled for No No Yes 820 39
Task is scheduled for No No Yes 861 40
Task is scheduled for No No Yes 903 41
Task is scheduled for No No Yes 946 42
Task is scheduled for No No Yes 990 43
Task is scheduled for No No Yes 1035 44
Task is scheduled for No No Yes 1081 45
Task is scheduled for No No Yes 1128 46
Task is scheduled for No No Yes 1176 47
Task is scheduled for No No Yes 1225 48
Task is scheduled for No No Yes 1275 49
Task is scheduled for No No Yes 1326 50
Task is scheduled for No No Yes 1378 51
Task is scheduled for No No Yes 1431 52
Task is scheduled for No No Yes 1485 53
Task is scheduled for No No Yes 1540 54
Task is scheduled for No No Yes 1596 55
Task is scheduled for No No Yes 1653 56
Task is scheduled for No No Yes 1711 57
Task is scheduled for No No Yes 1770 58
Task is scheduled for No No Yes 1830 59
Task is scheduled for No No Yes 1891 60
Task is scheduled for No No Yes 1953 61
Task is scheduled for No No Yes 2016 62
Task is scheduled for No No Yes 2080 63
Task is scheduled for No No Yes 2145 64
Task is scheduled for No No Yes 2211 65
Task is scheduled for No No Yes 2278 66
Task is scheduled for No No Yes 2346 67
Task is scheduled for No No Yes 2415 68
Task is scheduled for No No Yes 2485 69
Task is scheduled for No No Yes 2556 70
Task is scheduled for No No Yes 2628 71
Task is scheduled for No No Yes 2701 72
Task is scheduled for No No Yes 2775 73
Task is scheduled for No No Yes 2850 74
Task is scheduled for No No Yes 2926 75
Task is scheduled for No No Yes 3003 76
Task is scheduled for No No Yes 3081 77
Task is scheduled for No No Yes 3160 78
Task is scheduled for No No Yes 3240 79
Task is scheduled for No No Yes 3321 80
Task is scheduled for No No Yes 3403 81
Task is scheduled for No No Yes 3486 82
Task is scheduled for No No Yes 3570 42
Task is scheduled for No No Yes 3655 41
Task is scheduled for No No Yes 3741 2
Task is scheduled for No No Yes 3828 #VALUE!
Task is scheduled for No No Yes 3916 1
Task is scheduled for No No Yes 4005
Task is scheduled for No No Yes 4095
Task is scheduled for No No Yes 4186
Task is scheduled for No No Yes 4278
Task is scheduled for No No Yes 4371
Task is scheduled for No No Yes 4465
Task is scheduled for No No Yes 4560
Task is scheduled for No No Yes 4656
Task is scheduled for No No Yes 4753
Task is scheduled for No No Yes 4851
Task is scheduled for No No Yes 4950
Task is scheduled for No No Yes 5050
Task is scheduled for No No Yes 5151
Task is scheduled for No No Yes 5253
No No No 5356
No No No 5460
No No No 5565
No No No 5671
No No No 5778
No No No 5886
No No No 5995
No No No 6105
No No No 6216
No No No 6328
No No No 6441
No No No 6555
No No No 6670
No No No 6786
No No No 6903
No No No 7021
No No No 7140
No No No 7260
No No No 7381
No No No 7503
No No No 7626
No No No 7750
No No No 7875
No No No 8001
No No No 8128
No No No 8256
No No No 8385
No No No 8515
No No No 8646
No No No 8778
No No No 8911
No No No 9045
No No No 9180
No No No 9316
No No No 9453
No No No 9591
No No No 9730
No No No 9870
No No No 10011
No No No 10153
No No No 10296
No No No 10440
No No No 10585
No No No 10731
No No No 10878
No No No 11026
No No No 11175
No No No 11325
No No No 11476
No No No 11628
No No No 11781
No No No 11935
No No No 12090
No No No 12246
No No No 12403
No No No 12561
No No No 12720
No No No 12880
No No No 13041
No No No 13203
No No No 13366
No No No 13530
No No No 13695
No No No 13861
No No No 14028
No No No 14196
No No No 14365
No No No 14535
No No No 14706
No No No 14878
No No No 15051
No No No 15225
No No No 15400
No No No 15576
No No No 15753
No No No 15931
No No No 16110
No No No 16290
No No No 16471
No No No 16653
No No No 16836
No No No 17020
No No No 17205
No No No 17391
No No No 17578
No No No 17766
No No No 17955
No No No 18145
No No No 18336
No No No 18528
No No No 18721
No No No 18915
No No No 19110
No No No 19306
No No No 19503
No No No 19701
No No No 19900
No No No 20100
No No No 20301
No No No 20503
No No No 20706
No No No 20910
No No No 21115
No No No 21321
No No No 21528
No No No 21736
No No No 21945
No No No 22155
No No No 22366
No No No 22578
No No No 22791
No No No 23005
No No No 23220
No No No 23436
No No No 23653
No No No 23871
No No No 24090
No No No 24310
No No No 24531
No No No 24753
No No No 24976
No No No 25200
No No No 25425
No No No 25651
No No No 25878
No No No 26106
No No No 26335
No No No 26565
No No No 26796
No No No 27028
No No No 27261
No No No 27495
No No No 27730
No No No 27966
No No No 28203
No No No 28441
No No No 28680
No No No 28920
No No No 29161
No No No 29403
No No No 29646
No No No 29890
No No No 30135
No No No 30381
No No No 30628
No No No 30876
No No No 31125
No No No 31375
No No No 31626
No No No 31878
No No No 32131
No No No 32385
No No No 32640
No No No 32896
No No No 33153
No No No 33411
No No No 33670
No No No 33930
No No No 34191
No No No 34453
No No No 34716
No No No 34980
No No No 35245
No No No 35511
No No No 35778
No No No 36046
No No No 36315
No No No 36585
No No No 36856
No No No 37128
No No No 37401
No No No 37675
No No No 37950
No No No 38226
No No No 38503
No No No 38781
No No No 39060
No No No 39340
No No No 39621
No No No 39903
No No No 40186
No No No 40470
No No No 40755
No No No 41041
No No No 41328
No No No 41616
No No No 41905
No No No 42195
No No No 42486
No No No 42778
No No No 43071
No No No 43365
No No No 43660
No No No 43956
No No No 44253
No No No 44551
No No No 44850
No No No 45150
No No No 45451
No No No 45753
No No No 46056
No No No 46360
No No No 46665
No No No 46971
No No No 47278
No No No 47586
No No No 47895
No No No 48205
No No No 48516
No No No 48828
No No No 49141
No No No 49455
No No No 49770
No No No 50086
No No No 50403
No No No 50721
No No No 51040
No No No 51360
No No No 51681
No No No 52003
No No No 52326
No No No 52650
No No No 52975
No No No 53301
No No No 53628
No No No 53956
No No No 54285
No No No 54615
No No No 54946
No No No 55278
No No No 55611
No No No 55945
No No No 56280
No No No 56616
No No No 56953
No No No 57291
No No No 57630
No No No 57970
No No No 58311
No No No 58653
No No No 58996
No No No 59340
No No No 59685
No No No 60031
No No No 60378
No No No 60726
No No No 61075
No No No 61425
No No No 61776
No No No 62128
No No No 62481
No No No 62835
No No No 63190
No No No 63546
No No No 63903
No No No 64261
No No No 64620
No No No 64980
No No No 65341
No No No 65703
No No No 66066
No No No 66430
No No No 66795
No No No 67161
No No No 67528
No No No 67896
No No No 68265
No No No 68635
No No No 69006
No No No 69378
No No No 69751
No No No 70125
No No No 70500
No No No 70876
No No No 71253
No No No 71631
No No No 72010
No No No 72390
No No No 72771
No No No 73153
No No No 73536
No No No 73920
No No No 74305
No No No 74691
No No No 75078
No 75466
No 75855
No 76245
No 76636
No 77028
No 77421
No 77815
No 78210
No 78606
No 79003
No 79401
No 79800
No 80200
No 80601
No 81003
No 81406
No 81810
No 82215
No 82621
No 83028
No 83436
No 83845
No 84255
No 84666
No 85078
No 85491
No 85905
No 86320
No 86736
No 87153
No 87571
No 87990
No 88410
No 88831
No 89253
No 89676
No 90100
No 90525
No 90951
No 91378
No 91806
No 92235
No 92665
No 93096
No 93528
No 93961
No 94395
No 94830
No 95266
No 95703
No 96141
No 96580
No 97020
No 97461
No 97903
No 98346
No 98790
No 99235
No 99681
No 100128
No 100576
No 101025
No 101475
No 101926
No 102378
No 102831
No 103285
No 103740
No 104196
No 104653
No 105111
No 105570
No 106030
No 106491
No 106953
No 107416
No 107880
No 108345
No 108811
No 109278
No 109746
No 110215
No 110685
No 111156
No 111628
No 112101
No 112575
No 113050
No 113526
No 114003
No 114481
No 114960
No 115440
No 115921
No 116403
No 116886
No 117370
No 117855
No 118341
No 118828
No 119316
No 119805
No 120295
No 120786
No 121278
No 121771
No 122265
No 122760
No 123256
No 123753
No 124251
No 124750
No 125250
No 125751
No 126253
No 126756
No 127260
No 127765
No 128271
No 128778
No 129286
No 129795
No 130305
No 130816
No 131328
No 131841
No 132355
No 132870
No 133386
No 133903
No 134421
No 134940
No 135460
No 135981
No 136503
No 137026
No 137550
No 138075
No 138601
No 139128
No 139656
No 140185
No 140715
No 141246
No 141778
No 142311
No 142845
No 143380
No 143916
No 144453
No 144991
No 145530
No 146070
No 146611
No 147153
No 147696
No 148240
No 148785
No 149331
No 149878
No 150426
No 150975
No 151525
No 152076
No 152628
No 153181
No 153735
No 154290
No 154846
No 155403
No 155961
No 156520
No 157080
No 157641
No 158203
No 158766
No 159330
No 159895
No 160461
No 161028
No 161596
No 162165
No 162735
No 163306
No 163878
No 164451
No 165025
No 165600
No 166176
No 166753
No 167331
No 167910
No 168490
No 169071
No 169653
No 170236
No 170820
No 171405
No 171991
No 172578
No 173166
No 173755
No 174345
No 174936
No 175528
No 176121
No 176715
No 177310
No 177906
No 178503
No 179101
No 179700
No 180300
No 180901
No 181503
No 182106
No 182710
No 183315
No 183921
No 184528
No 185136
No 185745
No 186355
No 186966
No 187578
No 188191
No 188805
No 189420
No 190036
No 190653
No 191271
No 191890
No 192510
No 193131
No 193753
No 194376
No 195000
No 195625
No 196251
No 196878
No 197506
No 198135
No 198765
No 199396
No 200028
No 200661
No 201295
No 201930
No 202566
No 203203
No 203841
No 204480
No 205120
No 205761
No 206403
No 207046
No 207690
No 208335
No 208981
No 209628
No 210276
No 210925
No 211575
No 212226
No 212878
No 213531
No 214185
No 214840
No 215496
No 216153
No 216811
No 217470
No 218130
No 218791
No 219453
No 220116
No 220780
No 221445
No 222111
No 222778
No 223446
No 224115
No 224785
No 225456
No 226128
No 226801
No 227475
No 228150
No 228826
No 229503
No 230181
No 230860
No 231540
No 232221
No 232903
No 233586
No 234270
No 234955
No 235641
No 236328
No 237016
No 237705
No 238395
No 239086
No 239778
No 240471
No 241165
No 241860
No 242556
No 243253
No 243951
No 244650
No 245350
No 246051
No 246753
No 247456
No 248160
No 248865
No 249571
No 250278
No 250986
No 251695
No 252405
No 253116
No 253828
No 254541
No 255255
No 255970
No 256686
No 257403
No 258121
No 258840
No 259560
No 260281
No 261003
No 261726
No 262450
No 263175
No 263901
No 264628
No 265356
No 266085
No 266815
No 267546
No 268278
No 269011
No 269745
No 270480
No 271216
No 271953
No 272691
No 273430
No 274170
No 274911
No 275653
No 276396
No 277140
No 277885
No 278631
No 279378
No 280126
No 280875
No 281625
No 282376
No 283128
No 283881
No 284635
No 285390
No 286146
No 286903
No 287661
No 288420
No 289180
No 289941
No 290703
No 291466
No 292230
No 292995
No 293761
No 294528
No 295296
No 296065
No 296835
No 297606
No 298378
No 299151
No 299925
No 300700
No 301476
No 302253
No 303031
No 303810
No 304590
No 305371
No 306153
No 306936
No 307720
No 308505
No 309291
No 310078
No 310866
No 311655
No 312445
No 313236
No 314028
No 314821
No 315615
No 316410
No 317206
No 318003
No 318801
No 319600
No 320400
No 321201
No 322003
No 322806
No 323610
No 324415
No 325221
No 326028
No 326836
No 327645
No 328455
No 329266
No 330078
No 330891
No 331705
No 332520
No 333336
No 334153
No 334971
No 335790
No 336610
No 337431
No 338253
No 339076
No 339900
No 340725
No 341551
No 342378
No 343206
No 344035
No 344865
No 345696
No 346528
No 347361
No 348195
No 349030
No 349866
No 350703
No 351541
No 352380
No 353220
No 354061
No 354903
No 355746
No 356590
No 357435
No 358281
No 359128
No 359976
No 360825
No 361675
No 362526
No 363378
No 364231
No 365085
No 365940
No 366796
No 367653
No 368511
No 369370
No 370230
No 371091
No 371953
No 372816
No 373680
No 374545
No 375411
No 376278
No 377146
No 378015
No 378885
No 379756
No 380628
No 381501
No 382375
No 383250
No 384126
No 385003
No 385881
No 386760
No 387640
No 388521
No 389403
No 390286
No 391170
No 392055
No 392941
No 393828
No 394716
No 395605
No 396495
No 397386
No 398278
No 399171
No 400065
No 400960
No 401856
No 402753
No 403651
No 404550
No 405450
No 406351
No 407253
No 408156
No 409060
No 409965
No 410871
No 411778
No 412686
No 413595
No 414505
No 415416
No 416328
No 417241
No 418155
No 419070
No 419986
No 420903
No 421821
No 422740
No 423660
No 424581
No 425503
No 426426
No 427350
No 428275
No 429201
No 430128
No 431056
No 431985
No 432915
No 433846
No 434778
No 435711
No 436645
No 437580
No 438516
No 439453
No 440391
No 441330
No 442270
No 443211
No 444153
No 445096
No 446040
No 446985
No 447931
No 448878
No 449826
No 450775
No 451725
No 452676
No 453628
No 454581
No 455535
No 456490
No 457446
No 458403
No 459361
No 460320
No 461280
No 462241
No 463203
No 464166
No 465130
No 466095
No 467061
No 468028
No 468996
No 469965
No 470935
No 471906
No 472878
No 473851
No 474825
No 475800
No 476776
No 477753
No 478731
No 479710
No 480690
No 481671
No 482653
No 483636
No 484620
No 485605
No 486591
No 487578
No 488566
No 489555
No 490545
No 491536
No 492528
No 493521
No 494515
No 495510
No 496506
No 497503
No 498501
No 499500
No 500500
Owner List of Est End Date - Completi
Rank Task Owner tasks Task Name Est Start Date DUE DATE on Status
2 Mr.Dharamvee 1 Civil Foundatio 42708 42710 Task Not Ye
1 Mr.Dilip Pawar 2 VCB Room Foun 42724 42814 Task In Pr
1 Mr.Dilip Pawar 3 Earthing Wire S 42724 42814 Task In Pr
1 Mr.Dilip Pawar 4 Transformer-1 F 42724 42814 Task Not Ye
1 Mr.Dilip Pawar 5 CT (R Phase) F 42724 42814 Task Not Ye
1 Mr.Dilip Pawar 6 CT (Y Phase) F 42724 42814 Task Not Ye
1 Mr.Dilip Pawar 7 CT (B Phase) F 42724 42814 Task Not Ye
1 Mr.Dilip Pawar 8 SF6 Breaker Fo 42724 42814 Task Not Ye
1 Mr.Dilip Pawar 9 PT (R Phase) F 42724 42814 Task Not Ye
1 Mr.Dilip Pawar 10 PT (Y Phase) Fo 42724 42814 Task Not Ye
1 Mr.Dilip Pawar 11 PT (B Phase) Fo 42724 42814 Task Not Ye
1 Mr.Dilip Pawar 12 1250A Isolator 42724 42814 Task Not Ye
1 Mr.Dilip Pawar 13 Bus Post-1 Insu 42724 42814 Task Not Ye
1 Mr.Dilip Pawar 14 Bus Post-2 Insu 42724 42814 Task Not Ye
1 Mr.Dilip Pawar 15 Transformer-1 F 42724 42814 Task Not Ye
1 Mr.Dilip Pawar 16 Transformer-2 F 42724 42814 Task Not Ye
1 Mr.Dilip Pawar 17 Lighting Arress 42724 42814 Task Not Ye
1 Mr.Dilip Pawar 18 Lighting Arress 42724 42814 Task Not Ye
1 Mr.Dilip Pawar 19 Lighting Arress 42724 42814 Task Not Ye
1 Mr.Dilip Pawar 20 CT (R Phase) F 42724 42814 Task Not Ye
1 Mr.Dilip Pawar 21 CT (Y Phase) F 42724 42814 Task Not Ye
1 Mr.Dilip Pawar 22 CT (B Phase) F 42724 42814 Task Not Ye
1 Mr.Dilip Pawar 23 SF6 Breaker Fo 42724 42814 Task Not Ye
1 Mr.Dilip Pawar 24 PT (R Phase) F 42724 42814 Task Not Ye
1 Mr.Dilip Pawar 25 PT (Y Phase) Fo 42724 42814 Task Not Ye
1 Mr.Dilip Pawar 26 PT (B Phase) Fo 42724 42814 Task Not Ye
1 Mr.Dilip Pawar 27 1250A Isolator 42724 42814 Task Not Ye
1 Mr.Dilip Pawar 28 Bus Post-3 Insu 42724 42814 Task Not Ye
1 Mr.Dilip Pawar 29 Bus Post-4 Insu 42724 42814 Task Not Ye
1 Mr.Dilip Pawar 30 FH+FP-1 Column 42724 42814 Task Not Ye
1 Mr.Dilip Pawar 31 FH+FP-2 Column 42724 42814 Task Not Ye
1 Mr.Dilip Pawar 32 FH+FP-3 Column 42724 42814 Task Not Ye
1 Mr.Dilip Pawar 33 FF+FP-4 Column 42724 42814 Task Not Ye
1 Mr.Dilip Pawar 34 FG+FP-5 Column 42724 42814 Task Not Ye
1 Mr.Dilip Pawar 35 FG+FP-6 Column 42724 42814 Task Not Ye
1 Mr.Dilip Pawar 36 FG+FP Column F 42724 42814 Task Not Ye
1 Mr.Dilip Pawar 37 PT (R Phase) M 42724 42814 Task Not Ye
1 Mr.Dilip Pawar 38 PT (Y Phase) M 42724 42814 Task Not Ye
1 Mr.Dilip Pawar 39 PT (B Phase) M 42724 42814 Task Not Ye
1 Mr.Dilip Pawar 40 CT (R Phase) M 42724 42814 Task Not Ye
1 Mr.Dilip Pawar 41 CT (Y Phase) M 42724 42814 Task Not Ye
1 Mr.Dilip Pawar 42 CT (B Phase) M 42724 42814 Task Not Ye
1 Mr.Dilip Pawar 43 PT (R Phase) C 42724 42814 Task Not Ye
1 Mr.Dilip Pawar 44 PT (Y Phase) C 42724 42814 Task Not Ye
1 Mr.Dilip Pawar 45 PT (B Phase) C 42724 42814 Task Not Ye
1 Mr.Dilip Pawar 46 CT (R Phase) C 42724 42814 Task Not Ye
1 Mr.Dilip Pawar 47 CT (Y Phase) C 42724 42814 Task Not Ye
1 Mr.Dilip Pawar 48 CT (B Phase) C 42724 42814 Task Not Ye
1 Mr.Dilip Pawar 49 Metering Room 42724 42814 Task Not Ye
1 Mr.Dilip Pawar 50 FH+FP-1 Column 42724 42814 Task Not Ye
1 Mr.Dilip Pawar 51 FH+FP Column F 42724 42814 Task Not Ye
1 Mr.Dilip Pawar 52 1250A Isolator 42724 42814 Task Not Ye
1 Mr.Dilip Pawar 53 Bus Post Insula 42724 42814 Task Not Ye
1 Mr.Dilip Pawar 54 3150A Pass-1 Is 42724 42814 Task Not Ye
1 Mr.Dilip Pawar 55 ABB Pass-1 Fou 42724 42814 Task Not Ye
1 Mr.Dilip Pawar 56 FG+FP Column F 42724 42814 Task Not Ye
1 Mr.Dilip Pawar 57 FG+FP Column F 42724 42814 Task Not Ye
1 Mr.Dilip Pawar 58 FG+FP Column F 42724 42814 Task Not Ye
1 Mr.Dilip Pawar 59 Wave Trap (R Ph 42724 42814 Task Not Ye
1 Mr.Dilip Pawar 60 Wave Trap (B Ph 42724 42814 Task Not Ye
1 Mr.Dilip Pawar 61 Coupling Capaci 42724 42814 Task Not Ye
1 Mr.Dilip Pawar 62 Coupling Capaci 42724 42814 Task Not Ye
1 Mr.Dilip Pawar 63 Lighting Arresst 42724 42814 Task Not Ye
1 Mr.Dilip Pawar 64 Lighting Arresst 42724 42814 Task Not Ye
1 Mr.Dilip Pawar 65 Lighting Arresst 42724 42814 Task Not Ye
1 Mr.Dilip Pawar 66 3150A Pass-2 Is 42724 42814 Task Not Ye
1 Mr.Dilip Pawar 67 ABB Pass-2 Fou 42724 42814 Task Not Ye
1 Mr.Dilip Pawar 68 Wave Trap (R Ph 42724 42814 Task Not Ye
1 Mr.Dilip Pawar 69 Wave Trap (B Ph 42724 42814 Task Not Ye
1 Mr.Dilip Pawar 70 Coupling Capaci 42724 42814 Task Not Ye
1 Mr.Dilip Pawar 71 Coupling Capaci 42724 42814 Task Not Ye
1 Mr.Dilip Pawar 72 Lighting Arresst 42724 42814 Task Not Ye
1 Mr.Dilip Pawar 73 Lighting Arresst 42724 42814 Task Not Ye
1 Mr.Dilip Pawar 74 Lighting Arresst 42724 42814 Task Not Ye
1 Mr.Dilip Pawar 75 Bus Post Insula 42724 42814 Task Not Ye
1 Mr.Dilip Pawar 76 Bus Post Insula 42724 42814 Task Not Ye
1 Mr.Dilip Pawar 77 FH+FP Column F 42724 42814 Task Not Ye
1 Mr.Dilip Pawar 78 FH+FP Column F 42724 42814 Task Not Ye
1 Mr.Dilip Pawar 79 Bus PT Isolator 42724 42814 Task Not Ye
1 Mr.Dilip Pawar 80 Bus PT (R Phas 42724 42814 Task Not Ye
1 Mr.Dilip Pawar 81 Bus PT (Y Phas 42724 42814 Task Not Ye
1 Mr.Dilip Pawar 82 Bus PT (B Phas 42724 42814 Task Not Ye
1 Mr.Dilip Pawar 83 LILO Room Foun 42724 42814 Task Not Ye
2 Mr.Dharamvee 84 Placing of Trans 42736 42739 Task Not Ye
TO ORDER BY TASK OWNER

On Track Status Possible Owner Task Number


Task is scheduled for work during this timeframe. Unassigned 0
Task is scheduled for work during this timeframe. Mr.Ajay Khandelwal 0
Task is scheduled for work during this timeframe. Mr.Mahesh Sole 0
Task is scheduled for work during this timeframe. Mr.Dharamveer Sh 2
Task is scheduled for work during this timeframe. Mr.Sandeep Middy 0
Task is scheduled for work during this timeframe. Mr.Pradeep Chaube 0
Task is scheduled for work during this timeframe. Mr.Munish Saini (P 0
Task is scheduled for work during this timeframe. Mr.Sanjeev Patil 0
Task is scheduled for work during this timeframe. Mr.Premjeet Singh 0
Task is scheduled for work during this timeframe. Mr.Prashant (KC P 0
Task is scheduled for work during this timeframe. Mr.Vinit Rathore (Si 0
Task is scheduled for work during this timeframe. Mr.Amit Sofat (CG) 0
Task is scheduled for work during this timeframe. Mr.Avinash (Hitech 0
Task is scheduled for work during this timeframe. Mr.Dilip Pawar 82
Task is scheduled for work during this timeframe. Mr.Santosh (ABB) 0
Task is scheduled for work during this timeframe. Mr.Joshi (Powertec 0
Task is scheduled for work during this timeframe. Mr.Arun Gaikwad ( 0
Task is scheduled for work during this timeframe. 0
Task is scheduled for work during this timeframe. 0
Task is scheduled for work during this timeframe. 0
Task is scheduled for work during this timeframe. 0
Task is scheduled for work during this timeframe. 0
Task is scheduled for work during this timeframe. 0
Task is scheduled for work during this timeframe. 0
Task is scheduled for work during this timeframe. 0
Task is scheduled for work during this timeframe. 0
Task is scheduled for work during this timeframe. 0
Task is scheduled for work during this timeframe. 0
Task is scheduled for work during this timeframe. 0
Task is scheduled for work during this timeframe. 0
Task is scheduled for work during this timeframe. 0
Task is scheduled for work during this timeframe. 0
Task is scheduled for work during this timeframe. 0
Task is scheduled for work during this timeframe. 0
Task is scheduled for work during this timeframe. 0
Task is scheduled for work during this timeframe. 0
Task is scheduled for work during this timeframe. 0
Task is scheduled for work during this timeframe. 0
Task is scheduled for work during this timeframe. 0
Task is scheduled for work during this timeframe. 0
Task is scheduled for work during this timeframe. 0
Task is scheduled for work during this timeframe.
Task is scheduled for work during this timeframe.
Task is scheduled for work during this timeframe.
Task is scheduled for work during this timeframe.
Task is scheduled for work during this timeframe.
Task is scheduled for work during this timeframe.
Task is scheduled for work during this timeframe.
Task is scheduled for work during this timeframe.
Task is scheduled for work during this timeframe.
Task is scheduled for work during this timeframe.
Task is scheduled for work during this timeframe.
Task is scheduled for work during this timeframe.
Task is scheduled for work during this timeframe.
Task is scheduled for work during this timeframe.
Task is scheduled for work during this timeframe.
Task is scheduled for work during this timeframe.
Task is scheduled for work during this timeframe.
Task is scheduled for work during this timeframe.
Task is scheduled for work during this timeframe.
Task is scheduled for work during this timeframe.
Task is scheduled for work during this timeframe.
Task is scheduled for work during this timeframe.
Task is scheduled for work during this timeframe.
Task is scheduled for work during this timeframe.
Task is scheduled for work during this timeframe.
Task is scheduled for work during this timeframe.
Task is scheduled for work during this timeframe.
Task is scheduled for work during this timeframe.
Task is scheduled for work during this timeframe.
Task is scheduled for work during this timeframe.
Task is scheduled for work during this timeframe.
Task is scheduled for work during this timeframe.
Task is scheduled for work during this timeframe.
Task is scheduled for work during this timeframe.
Task is scheduled for work during this timeframe.
Task is scheduled for work during this timeframe.
Task is scheduled for work during this timeframe.
Task is scheduled for work during this timeframe.
Task is scheduled for work during this timeframe.
Task is scheduled for work during this timeframe.
Task is scheduled for work during this timeframe.
Task is scheduled for work during this timeframe.
Task is scheduled for work during this timeframe.
Actual lis

Unique RA Owner
Yes to tasks Rank NK Owner for Tab
Mr.Ajay Khandelwal 1 Mr.Dilip PaMr.Dilip Pawar
Mr.Mahesh Sole 2 Mr.Dilip Pa
Mr.Dharamveer Shar 3 Mr.Dilip Pa
2 2 Mr.Sandeep Middye 4 Mr.Dilip Pa
Mr.Pradeep Chaubey 5 Mr.Dilip Pa
Mr.Munish Saini (Pur 6 Mr.Dilip Pa
Mr.Sanjeev Patil 7 Mr.Dilip Pa
Mr.Premjeet Singh 8 Mr.Dilip Pa
Mr.Prashant (KC Pow 9 Mr.Dilip Pa
Mr.Vinit Rathore (Sign 10 Mr.Dilip Pa
Mr.Amit Sofat (CG) 11 Mr.Dilip Pa
Mr.Avinash (Hitech Ee 12 Mr.Dilip Pa
Mr.Dilip Pawar 13 Mr.Dilip Pa
82 1 Mr.Santosh (ABB) 14 Mr.Dilip Pa
Mr.Joshi (Powertech) 15 Mr.Dilip Pa
Mr.Arun Gaikwad (Pu 16 Mr.Dilip Pa
0 17 Mr.Dilip Pa
0 18 Mr.Dilip Pa
0 19 Mr.Dilip Pa
0 20 Mr.Dilip Pa
0 21 Mr.Dilip Pa
0 22 Mr.Dilip Pa
0 23 Mr.Dilip Pa
0 24 Mr.Dilip Pa
0 25 Mr.Dilip Pa
0 26 Mr.Dilip Pa
0 27 Mr.Dilip Pa
0 28 Mr.Dilip Pa
0 29 Mr.Dilip Pa
0 30 Mr.Dilip Pa
0 31 Mr.Dilip Pa
0 32 Mr.Dilip Pa
0 33 Mr.Dilip Pa
0 34 Mr.Dilip Pa
0 35 Mr.Dilip Pa
0 36 Mr.Dilip Pa
0 37 Mr.Dilip Pa
0 38 Mr.Dilip Pa
0 39 Mr.Dilip Pa
0 40 Mr.Dilip Pa
0 41 Mr.DharamMr.Dharamveer Sh
42 Mr.Dilip PaMr.Dilip Pawar
43 Mr.Dilip Pa
44 Mr.Dilip Pa
45 Mr.Dilip Pa
46 Mr.Dilip Pa
47 Mr.Dilip Pa
48 Mr.Dilip Pa
49 Mr.Dilip Pa
50 Mr.Dilip Pa
51 Mr.Dilip Pa
52 Mr.Dilip Pa
53 Mr.Dilip Pa
54 Mr.Dilip Pa
55 Mr.Dilip Pa
56 Mr.Dilip Pa
57 Mr.Dilip Pa
58 Mr.Dilip Pa
59 Mr.Dilip Pa
60 Mr.Dilip Pa
61 Mr.Dilip Pa
62 Mr.Dilip Pa
63 Mr.Dilip Pa
64 Mr.Dilip Pa
65 Mr.Dilip Pa
66 Mr.Dilip Pa
67 Mr.Dilip Pa
68 Mr.Dilip Pa
69 Mr.Dilip Pa
70 Mr.Dilip Pa
71 Mr.Dilip Pa
72 Mr.Dilip Pa
73 Mr.Dilip Pa
74 Mr.Dilip Pa
75 Mr.Dilip Pa
76 Mr.Dilip Pa
77 Mr.Dilip Pa
78 Mr.Dilip Pa
79 Mr.Dilip Pa
80 Mr.Dilip Pa
81 Mr.Dilip Pa
82 Mr.Dilip Pa
83 #N/A #N/A
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
Actual list for Tab

Task
Task Status Due Date Completion Status
VCB Room Found Task In Pro 20-Mar-17 Task is scheduled for work during this timeframe.
Earthing Wire StTask In Pro 20-Mar-17 Task is scheduled for work during this timeframe.
Transformer-1 FTask Not Ye 20-Mar-17 Task is scheduled for work during this timeframe.
CT (R Phase) FTask Not Ye 20-Mar-17 Task is scheduled for work during this timeframe.
CT (Y Phase) F Task Not Ye 20-Mar-17 Task is scheduled for work during this timeframe.
CT (B Phase) FTask Not Ye 20-Mar-17 Task is scheduled for work during this timeframe.
SF6 Breaker FouTask Not Ye 20-Mar-17 Task is scheduled for work during this timeframe.
PT (R Phase) FoTask Not Ye 20-Mar-17 Task is scheduled for work during this timeframe.
PT (Y Phase) FoTask Not Ye 20-Mar-17 Task is scheduled for work during this timeframe.
PT (B Phase) FoTask Not Ye 20-Mar-17 Task is scheduled for work during this timeframe.
1250A Isolator Task Not Ye 20-Mar-17 Task is scheduled for work during this timeframe.
Bus Post-1 Insu Task Not Ye 20-Mar-17 Task is scheduled for work during this timeframe.
Bus Post-2 Insu Task Not Ye 20-Mar-17 Task is scheduled for work during this timeframe.
Transformer-1 FTask Not Ye 20-Mar-17 Task is scheduled for work during this timeframe.
Transformer-2 FTask Not Ye 20-Mar-17 Task is scheduled for work during this timeframe.
Lighting Arresst Task Not Ye 20-Mar-17 Task is scheduled for work during this timeframe.
Lighting Arresst Task Not Ye 20-Mar-17 Task is scheduled for work during this timeframe.
Lighting Arresst Task Not Ye 20-Mar-17 Task is scheduled for work during this timeframe.
CT (R Phase) FTask Not Ye 20-Mar-17 Task is scheduled for work during this timeframe.
CT (Y Phase) F Task Not Ye 20-Mar-17 Task is scheduled for work during this timeframe.
CT (B Phase) FTask Not Ye 20-Mar-17 Task is scheduled for work during this timeframe.
SF6 Breaker FouTask Not Ye 20-Mar-17 Task is scheduled for work during this timeframe.
PT (R Phase) FoTask Not Ye 20-Mar-17 Task is scheduled for work during this timeframe.
PT (Y Phase) FoTask Not Ye 20-Mar-17 Task is scheduled for work during this timeframe.
PT (B Phase) FoTask Not Ye 20-Mar-17 Task is scheduled for work during this timeframe.
1250A Isolator Task Not Ye 20-Mar-17 Task is scheduled for work during this timeframe.
Bus Post-3 Insu Task Not Ye 20-Mar-17 Task is scheduled for work during this timeframe.
Bus Post-4 Insu Task Not Ye 20-Mar-17 Task is scheduled for work during this timeframe.
FH+FP-1 Column Task Not Ye 20-Mar-17 Task is scheduled for work during this timeframe.
FH+FP-2 Column Task Not Ye 20-Mar-17 Task is scheduled for work during this timeframe.
FH+FP-3 Column Task Not Ye 20-Mar-17 Task is scheduled for work during this timeframe.
FF+FP-4 ColumnTask Not Ye 20-Mar-17 Task is scheduled for work during this timeframe.
FG+FP-5 Column Task Not Ye 20-Mar-17 Task is scheduled for work during this timeframe.
FG+FP-6 Column Task Not Ye 20-Mar-17 Task is scheduled for work during this timeframe.
FG+FP Column F Task Not Ye 20-Mar-17 Task is scheduled for work during this timeframe.
PT (R Phase) MaTask Not Ye 20-Mar-17 Task is scheduled for work during this timeframe.
PT (Y Phase) MaTask Not Ye 20-Mar-17 Task is scheduled for work during this timeframe.
PT (B Phase) MaTask Not Ye 20-Mar-17 Task is scheduled for work during this timeframe.
CT (R Phase) MaTask Not Ye 20-Mar-17 Task is scheduled for work during this timeframe.
CT (Y Phase) MaTask Not Ye 20-Mar-17 Task is scheduled for work during this timeframe.
Civil Foundation Task Not Ye 6-Dec-16 Task is scheduled for work during this timeframe.
PT (R Phase) ChTask Not Ye 20-Mar-17 Task is scheduled for work during this timeframe.
PT (Y Phase) ChTask Not Ye 20-Mar-17 Task is scheduled for work during this timeframe.
PT (B Phase) ChTask Not Ye 20-Mar-17 Task is scheduled for work during this timeframe.
CT (R Phase) ChTask Not Ye 20-Mar-17 Task is scheduled for work during this timeframe.
CT (Y Phase) ChTask Not Ye 20-Mar-17 Task is scheduled for work during this timeframe.
CT (B Phase) ChTask Not Ye 20-Mar-17 Task is scheduled for work during this timeframe.
Metering Room Task Not Ye 20-Mar-17 Task is scheduled for work during this timeframe.
FH+FP-1 Column Task Not Ye 20-Mar-17 Task is scheduled for work during this timeframe.
FH+FP Column FTask Not Ye 20-Mar-17 Task is scheduled for work during this timeframe.
1250A Isolator FTask Not Ye 20-Mar-17 Task is scheduled for work during this timeframe.
Bus Post InsulatTask Not Ye 20-Mar-17 Task is scheduled for work during this timeframe.
3150A Pass-1 IsTask Not Ye 20-Mar-17 Task is scheduled for work during this timeframe.
ABB Pass-1 FouTask Not Ye 20-Mar-17 Task is scheduled for work during this timeframe.
FG+FP Column F Task Not Ye 20-Mar-17 Task is scheduled for work during this timeframe.
FG+FP Column F Task Not Ye 20-Mar-17 Task is scheduled for work during this timeframe.
FG+FP Column F Task Not Ye 20-Mar-17 Task is scheduled for work during this timeframe.
Wave Trap (R PhTask Not Ye 20-Mar-17 Task is scheduled for work during this timeframe.
Wave Trap (B PhTask Not Ye 20-Mar-17 Task is scheduled for work during this timeframe.
Coupling CapacitTask Not Ye 20-Mar-17 Task is scheduled for work during this timeframe.
Coupling CapacitTask Not Ye 20-Mar-17 Task is scheduled for work during this timeframe.
Lighting Arresst Task Not Ye 20-Mar-17 Task is scheduled for work during this timeframe.
Lighting Arresst Task Not Ye 20-Mar-17 Task is scheduled for work during this timeframe.
Lighting Arresst Task Not Ye 20-Mar-17 Task is scheduled for work during this timeframe.
3150A Pass-2 IsTask Not Ye 20-Mar-17 Task is scheduled for work during this timeframe.
ABB Pass-2 FouTask Not Ye 20-Mar-17 Task is scheduled for work during this timeframe.
Wave Trap (R PhTask Not Ye 20-Mar-17 Task is scheduled for work during this timeframe.
Wave Trap (B PhTask Not Ye 20-Mar-17 Task is scheduled for work during this timeframe.
Coupling CapacitTask Not Ye 20-Mar-17 Task is scheduled for work during this timeframe.
Coupling CapacitTask Not Ye 20-Mar-17 Task is scheduled for work during this timeframe.
Lighting Arresst Task Not Ye 20-Mar-17 Task is scheduled for work during this timeframe.
Lighting Arresst Task Not Ye 20-Mar-17 Task is scheduled for work during this timeframe.
Lighting Arresst Task Not Ye 20-Mar-17 Task is scheduled for work during this timeframe.
Bus Post InsulatTask Not Ye 20-Mar-17 Task is scheduled for work during this timeframe.
Bus Post InsulatTask Not Ye 20-Mar-17 Task is scheduled for work during this timeframe.
FH+FP Column FTask Not Ye 20-Mar-17 Task is scheduled for work during this timeframe.
FH+FP Column FTask Not Ye 20-Mar-17 Task is scheduled for work during this timeframe.
Bus PT Isolator Task Not Ye 20-Mar-17 Task is scheduled for work during this timeframe.
Bus PT (R PhaseTask Not Ye 20-Mar-17 Task is scheduled for work during this timeframe.
Bus PT (Y PhaseTask Not Ye 20-Mar-17 Task is scheduled for work during this timeframe.
Bus PT (B PhaseTask Not Ye 20-Mar-17 Task is scheduled for work during this timeframe.
LILO Room FounTask Not Ye 20-Mar-17 Task is scheduled for work during this timeframe.