REINFORCEMENT SCHEDULE

DIAMETER = 0.60 m
LENGTH= 20.00 m

COLUMN AND TIE BEAM TAGUAN

BAR SHAPE

DIMENSIONS (OUT TO OUT) LENGTH


BAR SIZE SPACING BAR
ITEM QTY EACH BAR
MARK (mm) (mm) SHAPE
a b c d e f (mm)
P1 25 14 shown A 150 240 11610 12000
P2 25 14 shown C 300 11020 11320
P3 12 67 - O 400 100 1300
COLUMN (1
P4 12 42 - O 400 150 1300
PC.)
P5 12 41 - O 400 200 1300
P6 16 20 Q 326 1030
P7 16 78 1500 H 100 160 150 160 100 670

PC1a 25 16 as shown C 500 8500 9000


PC1b 25 8 as shown C 500 5400 5900
PC1c 25 8 as shown C 500 6600 7100
TIE BEAM (1
PC2a 25 10 as shown C 300 6700 7000
PC.)
PC2b 25 10 as shown C 200 7300 7500
PC3 25 5 as shown C 300 2700 3000
PC4 16 134 as shown G 630 900 150 1680 3360
PC5 16 67 as shown G 900 500 150 1550 3100
PC6 16 6 as shown G 900 470 150 1520 3040
UNIT
TOTAL TOTAL WEIGHT
WEIGHT VOLUME (m3)
LENGTH (m) (kg)
(kg/m)
168.00 3.853 647.36
158.48 3.853 610.68
87.10 0.888 77.33
54.60 0.888 48.47
5.65
53.30 0.888 47.32
20.60 1.578 32.51
52.26 1.578 82.48
TOTAL: 1546.17
GRAND TOTAL= 10823.16 39.58
144.00 3.853 554.88
47.20 3.853 181.88
56.80 3.853 218.87
70.00 3.853 269.74
75.00 3.853 289.00
12.00
15.00 3.853 57.80
450.24 1.578 710.63
12.00

207.70 1.578 327.82


18.24 1.578 28.79
TOTAL: 2639.41