Está en la página 1de 13

From: (b) (6)

To: (b) (6)


Cc: (b) (6)
Subject: RE: Updated spreadsheet showing the 14 buffer miles
Date: Monday, March 31, 2008 7:40:02 PM

Right. We will add a column into the Master Data itself tomm.
(b) (6) we also need to add all the info that was updated in this spreadsheet to the master data.
(b) (2)

Thanks!

(b) (6)
Ops & Reporting Business Manager
(b) (6)

From: (b) (6)


Sent: Monday, March 31, 2008 7:38 PM
To: (b) (6)
Subject: RE: Updated spreadsheet showing the 14 buffer miles

We need to show priority also. Thanks almost done.

From: (b) (6)


Sent: Monday, March 31, 2008 7:37 PM
To: (b) (6)
Subject: Updated spreadsheet showing the 14 buffer miles

(b) – here’s the updated spreadsheet that shows the 14 “buffer” miles (out of the 27) highlighted in
(6)
tan. If you mouse over the legend at the bottom of the sheet, there’s an embedded comment that
explains “In the VF CY08 Core miles, there are 27 buffer miles. 13 are to compensate for the 13 miles
of legacy VF being converted to VF. The rest of the 14 are identified above in the tan highlight.”

(b) (6)
Business Manager, Operations and Reporting
SBI - Tactical Infrastructure Program (PF225, VF300)
U.S. Customs and Border Protection
(b) (6)

PLEASE NOTE NEW EMAIL ADDRESS ****


Warning: This document is FOR OFFICIAL USE ONLY. It contains information that may be exempt from public release under the
Freedom of Information Act (5U.S.C. 552). This document is to be controlled, handled, transmitted, distributed, and disposed of in
accordance with DHS policy relating to Sensitive But Unclassified (SBU) information and is not to be released to the public or other
personnel who do not have a valid "need-to-know" without prior approval from the originator. If you are not the intended recipient ,
please contact the originator for disposition instructions.
1/2/2009
DOI-
Impacted
Total Land
(Alignment,
Congressi Continge Planne Access Rd, or
Non-DOI
USACE onal SBI ncy d Cum. Actual Fence Constr. Constr. Staging area on Impacted ESA Environmental
Map ID # State Sector Station District Location Project # Mileage Mileage Mileage Type Start Date End Date Updates and Issues DOI Land) Land Impacted Status
PV-1

Initial Assessments
Pack and Evaluations are
A-1 CA SDC BRF 51 Truck Trail 2001-1 3.58 4/15/08 7/13/08 underway 3.58 0 3.58 Draft FINAL EIS.
PV-1

Initial Assessments
W of and Evaluations are
A-2 CA SDC BRF 51 Tecate 2001-2 0.77 9/18/08 11/18/08 underway 0.77 0.77 Draft FINAL EIS.
PV-1

Initial Assessments
and Evaluations are
A-2 CA SDC ECJ 51 Ceti's Hill 2002-1 0.57 9/18/08 11/2/08 underway 0.57 0.57 Draft FINAL EA
PV-1
East
Brickyard
to Initial Assessments
Gunsight and Evaluations are
A-2 CA SDC ECJ 51 Drainage 2002-2 0.58 9/18/08 11/2/08 underway 0.58 0.58 Draft FINAL EA
PV-1

W. Initial Assessments
Horseshoe and Evaluations are
A-2 CA SDC ECJ 51 Canyon 2002-3 0.89 9/18/08 11/27/08 underway 0.89 0.89 Draft FINAL EA
PV-1

Initial Assessments
East Bell and Evaluations are
A-2 CA SDC ECJ 51 Valley 2002-4 0.12 9/18/08 10/5/08 underway 0.12 0.12 Draft FINAL EA
PV-1

Initial Assessments
and Evaluations are
A-2 CA SDC ECJ 51 Ag Loop 2002-5 1.02 9/18/08 12/8/08 underway 1.02 1.02 Draft FINAL EA
Soutwest PV-1
Rim of Initial Assessments
Smith and Evaluations are
A-2 CA SDC CAO 51 Canyon 2003-1 0.17 0.0 9/18/08 10/15/08 underway 0.17 0.17 Draft FINAL EA
PV-1
Rattlesnak
e Ridge to
Larry Initial Assessments
Pierce and Evaluations are
A-2 CA SDC CAO 51 Road 2003-2 1.06 0.0 9/18/08 12/11/08 underway 1.06 1.06 Draft FINAL EA
PV-1

West edge
of Initial Assessments
Boundary and Evaluations are
A-2 CA SDC CAO 51 Peak 2003-3 0.09 0.0 9/18/08 9/27/08 underway 0.09 0.09 Draft FINAL EA
PV-1

Initial Assessments
Willows and Evaluations are
A-2 CA SDC BLV 51 Access #1 2004-1 1.63 0.0 9/18/08 12/2/08 underway 1.63 1.63 Draft FINAL EA
PV-1

Initial Assessments
Willows and Evaluations are
A-2 CA SDC BLV 51 Access #2 2004-2 2.01 0.0 9/18/08 12/19/08 underway 2.01 2.01 Draft FINAL EA
PV-1

Initial Assessments
Airport and Evaluations are
A-2 CA SDC BLV 51 Mesa 2004-3 0.05 0.0 9/18/08 10/29/08 underway 0.05 0.05 Draft FINAL EA
O'Neil PV-1 and Evaluations are
A-2 CA SDC BLV 51 Valley 2004-4 1.47 0.0 9/18/08 11/25/08 underway 1.47 1.47 Draft FINAL EA
PV-1

Mon 224
to ELS Initial Assessments
West and Evaluations are
B-2 CA ELC ELS 51 Checks 2005-3 2.4 8/26/08 11/14/08 underway 2.4 2.4 Draft FINAL EA
PV-1

Initial Assessments
CAX East and Evaluations are
B-4 CA ELC CAX 51 Checks 2006-1 8.59 6/18/08 10/15/08 underway 8.59 8.59 Draft FINAL EA
PV-1

Initial Assessments
and Evaluations are
B-5A CA ELC CAX 51 2006-5 19.2 8/27/08 11/15/08 underway 19.2 19.2 Draft FINAL EA
Special and Evaluations are
B-5B CA ELC CAX 51 2006-2 2.85 Design 6/18/08 8/6/08 underway 2.85 2.85 Draft FINAL EA
Andrade PV-1 &
POE: Special
Imperial Design
sand Initial Assessments
CAX/YU dunes to and Evaluations are
C-1 CA YUM S 51 CA-AZ line 2007-1 10.28 7/24/08 1/4/09 underway 10.28 10.28 Draft FINAL EA
of PF70 PV-2 and Evaluations are
C-2B AZ YUM YUS 7 project to 2007-2 3.70 7/17/08 9/14/08 underway 3.70 0 Draft FINAL EA
Phase 1 Final Walkthrough
E-2B AZ TCA NCO 8 Naco 6.90 Design- Complete 20 Nov, 6.90 0 waiver
AJO 2mi Phase 1
east of Design-
D-2 AZ TCA AJO 7 POE 2008-1 3.10 Build 5/8/08 7/20/08 Est Const. Start date1/25/2008 3.10 3.10 FONSI 2008

AJO 2mi Phase 1


west of Design-
D-2 AZ TCA AJO 7 POE 2008-2 2.10 Build 4/24/08 9/10/08 Est Const. Start date1/ 5.20 2.10 7.30 FONSI 2008

1mi W to
3mi W of Phase 1 Const. Start 3 Dec
Mariposa Design- 07. Clearing and
D-5A AZ TCA NGL 7 POE 2010-1 2.08 Build 3/25/08 7/12/08 grubbing underway. 2.08 2.08 FONSI 2007

NGL 1mi Initial Assessments


E to 6mi E and Evaluations are
D-5B AZ TCA NGL 7 of POE 2010-2 5.16 PV-1 8/27/08 11/24/08 underway 5.16 5.16 Draft EA
E Initial Assessments
Deconcini and Evaluations are
D-6 AZ TCA NGL 7 POE 2010-3 2.23 PV-1 8/28/08 10/11/08 underway 2.23 2.23 Draft EA

NCO
17.75mi W
to San Initial Assessments
Pedro and Evaluations are
E-2A AZ TCA NCO 8 River 2011-1 6.44 PV-1 7/6/08 10/23/08 underway 6.44 6.44 Initiating EA
NCO
3.4mi E to Phase 1 Feb 08 Pending Start
12.4mi E Design- Cultural &
E-3 AZ TCA NCO 8 of POE 2011-2 5.07 Build 3/29/08 6/26/2008 Environmental 5.07 5.07 FONSI 2008
From Initial Assessments
F-1 AZ TCA NCO 8 existing 2012-1 0.97 PV-1 7/1/08 8/19/2008 and Evaluations are 0.00
17 miles
2
West of
COL POE
beginning
3 miles Initial Assessments
West of and Evaluations are
H-2A NM EPT DNM COL POE 2013-3 14.1 PV-2 7/24/08 10/12/08 underway 14.1 5.07 Final Draft EA
2

DNM
1.5mi E to Phase 1 Est. const. start 24
3mi E of Design- Jan 08 (Mods pending
I-1A NM EPT DNM POE 2013-2 2.56 Build 7/27/08 10/14/08 for fence gauge) 2.56 0 FONSI 2007
2

3mi E of
POE to
Luna Initial Assessments
DNM/ST County and Evaluations are
I-1B NM EPT N Line 2013-4 9.9 PV-2 7/16/08 10/4/08 underway 9.9 0 Draft Final EA
2

Phase 1 Est Const Start 24 Jan


STN 1mi Design- 08 (Mods pending for
J-1 NM EPT STN W of POE 2014-1 1.15 Build 4/18/08 5/17/08 Fence gauge & VF) 1.15 0 FONSI 2007
2

Phase 1 Est Const Start 24 Jan


STN 1mi E Design- 08 (Mods pending for
J-1 NM EPT STN of POE 2014-2 1.15 Build 6/29/08 7/28/08 Fence gauge & VF) 1.15 0 FONSI 2007
2
West side
of
blackie’s
gate to
west side Initial Assessments
of the and Evaluations are
J-2 NM EPT STN cattlepens 2014-4 3.49 PV-2 9/12/08 11/5/08 underway 3.49 0 FONSI 2007
2 STN
Blackie's
Gate to W Phase 1 Est Const Start 24 Jan
end Design- 08 (Mods pending for
J-3 NM EPT STN Sunland 2014-3 1.08 Build 6/29/08 8/7/08 Fence gauge & VF) 1.08 0 FONSI 2007
16
EPS
Pumphous
e to end of
fence at
Roadside
K-1 TX EPT EPS Park 2015-1 1.07 PV-2 6/13/08 8/1/08 Est Const start 7 Apr 08 1.07 0 FONSI 2007
16 EPS End
of fence at
Roadside
K-1 TX EPT EPS Park to 2015-2 0.65 P-3A-15 6/25/08 8/23/08 Est Const start 7 Apr 08 0.65 0 FONSI 2007
16 EPS
Headgates
to West
K-1 TX EPT EPS RR bridge 2015-3 1.26 P-3A-18 6/25/08 8/16/08 Est Const start 7 Apr 08 1.26 0 FONSI 2007
16
1mi E of
US 54 to Initial Assessments
Socorro and Evaluations are
K-2A TX EPT YST Headgates 2016-2 9.60 PV-2 9/24/08 12/7/08 underway 9.60 0 Draft EA
16
Socorro
Headgates
to 1 mi W Initial Assessments
of FAB and Evaluations are
K-2B&C TX EPT YST POE 2016-1 19.42 PV-2 9/24/08 1/1/2009 underway 19.42 0 Draft EA
23

FAB 1mi Initial Assessments


W to 3mi and Evaluations are
K-3 TX EPT FBN E of POE 2017-1 9.03 PV-2 6/27/08 9/4/08 underway 9.03 0 Draft EA
23
3 mi E of
Fabens to
1.5mi W of Initial Assessments
Fort and Evaluations are
K-4 TX EPT FBN Hancock 2017-2 13.5 PV-2 9/20/08 12/9/08 underway 13.5 0 Draft EA
23 FHT 1.5mi Initial Assessments
K-5 TX EPT FHT W to 1.5mi 2018-1 5.21 PV-2 8/21/08 11/13/08 and Evaluations are 5.21 0 Draft EA

Initial Assessments
Neely's and Evaluations are
L-1 TX MAR SBT 23 Crossing 2019-1 4.63 P-3A-15 9/18/08 12/7/08 underway 4.63 0 Draft FINAL EA

Presidio
POE to Conc. Initial Assessments
3.2mi E of Retaining and Evaluations are
L-1A TX MAR PRS 23 POE 2020-1 3.28 Wall 9/24/08 12/7/08 underway 3.28 0 Draft FINAL EA
L-1B TX MAR PRS 23 POE to 2020-2 2.87 Retaining 9/24/08 11/12/08 and Evaluations are 2.87 0 Draft FINAL EA
DRS San
Felipe &
Rio
Grande to
Cienegas
Creek & Initial Assessments
Rio and Evaluations are
M-1 TX DRT DRS 23 Grande 2021-1 2.36 Ameristar 6/27/08 9/25/08 underway 2.36 0 Draft FINAL EA

EGT 2.3mi
upstream Initial Assessments
to 1mi No and Evaluations are
M-2A TX DRT EGT 23 of POE 2022-1 0.75 Ameristar 9/12/08 10/21/08 underway 0.75 0 Draft FINAL EA
M-2B TX DRT EGT 23 to North of 2022-2 1.06 Ameristar 9/12/08 10/31/08 and Evaluations are 1.06 0 Draft FINAL EA
28

Near P-1, P-2 Initial Assessments


Roma and P-3B- and Evaluations are
O-1 TX RGV RGC POE 2023-1 3.76 15 9/20/08 11/24/08 underway 3.76 3.76 Draft FINAL EA
28

P-1, P-2 Initial Assessments


Near RGC and P-3B- and Evaluations are
O-2 TX RGV RGC POE 2023-2 8.75 15 9/24/08 12/28/08 underway 8.75 8.75 Draft FINAL EA
28

Los Initial Assessments


Ebanos P-2 and P- and Evaluations are
O-3 TX RGV MCS POE 2024-1 1.85 3B-15 9/12/08 11/25/08 underway 1.85 1.85 Draft FINAL EA
28

From Initial Assessments


Penitas to and Evaluations are
O-4 TX RGV MCS Abram 2024-2 4.35 P-2 9/20/08 12/4/08 underway 4.35 4.35 Draft FINAL EA
28

Future Initial Assessments


Anzalduas and Evaluations are
O-5 TX RGV MCS POE 2024-3 1.73 P-2 9/19/08 11/28/08 underway 1.73 0.00 Draft FINAL EA
28

Initial Assessments
Hidalgo P-2 and P- and Evaluations are
O-6 TX RGV MCS POE 2024-4 3.86 3B-15 9/20/08 11/24/08 underway 3.86 3.86 Draft FINAL EA
15

Proposed Initial Assessments


Donna and Evaluations are
O-7 TX RGV MER POE 2024-5 0.90 P-1 9/19/08 11/3/08 underway 0.90 0.90 Draft FINAL EA
15

Initial Assessments
Retamal and Evaluations are
O-8 TX RGV MER Dam 2024-6 3.24 P-1, P-2 9/20/08 11/19/08 underway 3.24 3.24 Draft FINAL EA
15

Initial Assessments
Progresso and Evaluations are
O-9 TX RGV MER POE 2025-1 3.86 P-1, P-2 9/20/08 11/24/08 underway 3.86 3.86 Draft FINAL EA
15

Initial Assessments
Progresso and Evaluations are
O-10 TX RGV MER POE 2025-2 2.33 P-1, P-2 9/19/08 12/18/08 underway 2.33 2.33 Draft FINAL EA
27

Joe's Bar- Initial Assessments


Nemo and Evaluations are
O-11 TX RGV HRL Road 2025-3 2.33 P-2 9/18/08 12/17/08 underway 2.33 2.33 Draft FINAL EA
27

Initial Assessments
Weaver's P-2 and P- and Evaluations are
O-12 TX RGV HRL Mountain 2025-4 0.96 3B-15 9/19/08 11/3/08 underway 0.96 0.96 Draft FINAL EA
27

W Los Initial Assessments


Indios and Evaluations are
O-13 TX RGV HRL POE 2025-5 1.59 P-2 9/19/08 11/23/08 underway 1.59 1.59 Draft FINAL EA
27

E Los Initial Assessments


Indios P-2 and P- and Evaluations are
O-14 TX RGV HRL POE 2026-1 3.59 3B-15 9/20/08 11/24/08 underway 3.59 3.59 Draft FINAL EA
27

Initial Assessments
Triangle - and Evaluations are
O-15 TX RGV HRL La Paloma 2026-2 1.93 P-2 9/19/08 12/3/08 underway 1.93 1.93 Draft FINAL EA
27

Ho Chi Initial Assessments


Minh - and Evaluations are
O-16 TX RGV HRL Estero 2026-3 2.45 P-2 9/19/08 12/18/08 underway 2.45 2.45 Draft FINAL EA
27 Proposed
Carmen
Road
Feight Initial Assessments
Train P-1 and P- and Evaluations are
O-17 TX RGV BRP Bridge 2026-4 1.63 3B-15 9/19/08 12/3/08 underway 1.63 1.63 Draft FINAL EA
27
Proposed
Flor De
Mayo POE Initial Assessments
to Garden and Evaluations are
O-18 TX RGV BRP Park 2026-5 3.58 P-1 9/20/08 11/24/08 underway 3.58 3.58 Draft FINAL EA
27

B&M POE Initial Assessments


to Los P-1 and P- and Evaluations are
O-19 TX RGV BRP Tomates 2026-6 3.37 3B-15 9/19/08 11/18/08 underway 3.37 3.37 Draft FINAL EA
27
Initial Assessments
and Evaluations are
O-20 TX BRP Tomates Y 2027-1 0.91 P-1 9/19/08 11/3/08 underway 0.91 0.91 Draft FINAL EA
27 Internation
al POE to Initial Assessments
Sea Shell P-2 and P- and Evaluations are
O-21 TX RGV FTB Inn 2027-2 12.98 3B-15 9/26/08 12/15/08 underway 12.98 12.98 Draft FINAL EA
DOI- Non-DOI ESA FONSI
Impacted Impacted Impacted NO FONSI Compl
RGV SECTOR TOTALS 0.0 69.94 0.0 CORE 55.97 162.28 135.32 181.40 31.65
TOTALS 59.00 #REF! #REF! CONTINGENCY 0.00 59.00 26.59 59.00 0.00
Total by Category 55.97 221.28 161.90 240.39 31.65
Total PF Managed 277.25 272.04
contingency does not include 3 buffer miels
PV-VF Master Data DOI vs NON-DOI by segment 3-31-08.xls

Mileage in Waiver Mileage in Waiver xls -


DOI xls - Column H Column J
(Cum.) Military Comm. Non-Fed
Congressi Planned Mileage mileage Real Fed Miles Miles Left
onal Contingen Core left to left to Fence Estate Non-Fed Left to to DOI Land ESA
Map ID SBI Project # Sector Station Location State District cy Mileage Mileage construct construct Type Detailed Location Description Status Environmental Fed Miles Miles Complete Complete Impacted Affected
CA 1.5mi W of Pinto Wash to Mon 225
BV-1 2248-1 ELC/ELS ELC ELS 51 11.3 0.0 6.3 Normandy F no fonsi 10.3 1 10.3 1 6.3 6.3

River Post on
CV-1a 2201-1 YUM/YUM YUM YUM Corridor AZ 7 5.00 0.00 5.00 Rail Moralas Dam south 7 miles F no fonsi 5 0.00 5 5
Cabeza Post on Eastern edge of BMGR, East 14
CV-2 1053-4 YUM/WEL YUM WEL Prieta AZ 7 10.62 0.00 10.62 Rail miles F no fonsi 10.62 0 10.62 10.62
Project runs 2.18 miles west of B
Pima 138 and runs east in segments for a F
DV-6 TBD TCA County AZ 2.33 2.33 total of 2.32 miles no fonsi 2.33 2.33
EV-2A TCA/NCO TCA NCO SPNWR AZ 8 0.25 0.25 NF Waiver 0.25 Waiver
Starting at 0.07 miles west of
Border Monument 83. FV-1A runs
for 2.35 miles east along the border
to Monument 81. FV-1B runs from
Border Monument 81 east along the
Post on border for 21.41 miles, through the F / NF
Rail/ San Bernardino National Wildlife (State, BLM,
FV-1b 2203-2 TCA/DGL TCA DGL Douglas AZ 8 15.73 0.00 15.73 Normandy Refuge, to the Ne Private) no fonsi 15.73 15.73

EA compl 2007.
PVB Zone VF From 0.25 Miles East of BM39 Some 404 work
IV-2 EPT/DNM EPT DNM 9 AZ 2 12.79 12.79 Normandy East Past BM 33 - 12.8 Miles required 12.79 LOC

PVB Zone VF From East Side of AR#6 East to


JV-1 2207-1 EPT/STN EPT STN 13 NM 2 18.06 18.06 Normandy 413 Road [CR004] - 18.06 Miles no fonsi 18.06 no

PVB Zone VF from 413 Road [CR004] East to


JV-2 2208-1 EPT/STN EPT STN 14 NM 2 11.82 11.82 Normandy BM7 - 11.82 Miles F no fonsi 11.82 no
Normandy
| Post on
Rail 9.82 Miles of VF West of STN POE
PVB Zone (Eastern 4 [Starting 1.15 Miles West of POE to
JV-3 2209-1 EPT/STN EPT STN 15 NM 2 10.04 10.04 Miles) BM7] no fonsi 10.04 no
93 0 93 93 40

Mileage in
Mileage in Waiver No NEPA Waiver xls - ESA
Contingency mileage xls - Column H NEPA Coverage Coverage Column J Affected

Printer: 4/13/2010 Page 10 of 12


PV-VF Master Data DOI vs NON-DOI by segment 3-31-08 xls

Use mileage rom columns K


Mileage in Waiver Waiver xls - or L on this sheet if there is an X
Non-DOI Land xls - Column I Column J in this column.
Proposed (Cum.) Military Comm. Non-Fed
Congressi Mileage Planned Mileage mileage Real Fed Miles Miles Left
onal FY09 and Contingen Core left to left to Fence Estate Environme Non-Fed Left to to DOI Land
Map ID SBI Project # Sector Station Location State District beyond cy Mileage Mileage construct construct Type Detailed Location Description Status ntal Fed Miles Miles Complete Complete Impacted ESA Affected
River Post on
CV-1b 2201-2 YUM/YUM YUM YUM Corridor AZ 7 8 30 0 00 8.30 Rail County 18 Street north 6.5 miles NF no fonsi 8.3 0 00 0 8.30

Post on
Cabeza Rail/ International Border and Yuma
CV-3 1053-3 YUM/WEL YUM WEL Prieta AZ 7 22.48 0 00 18.79 Normandy County Line 22 miles west F fonsi 2005 22.48 0 0 18.79
West Edge of Organ Pipe 15.5
Cabeza Post on miles to Yuma County Line
DV-1 2202-1 TCA/AJO TCA AJO Prieta AZ 7 12.99 0 00 0.00 Rail (Yuma PDT) fonsi 2005 0 0.00
Starting at .87 miles east of
Border Monument 160.
Continuing east along the
border for 1.29 miles. On the
Tohono O'odham Indian
Sierra De Post on Reservation, between the Sierra
La Nariz Rail/ la Nariz Mountains and the
DV-2 2205-1 TCA/AJO TCA AJO Mtn. AZ 7 1 52 0 00 1.52 Normandy Santa Rosa Mountains. no fonsi 12.99 0 0 0 0 1.52
Starting at 1.52 miles east of
Border Monument 159.
Continuing east along the
border for 15.26 miles, On the
Tohono O'odham Indian
Reservation, between the Santa
Papago Rosa Mountains and the La
DV-3a 1023-4 TCA/AJO TCA AJO Farms AZ 7 15.48 0 00 10.69 Bollard Lesna Mountains. F fonsi 2006 0 1 52 0 1.52 0 10.69
La Lesna Mountain Drive
Through Area EA done on
0.41 miles,
need envir
Normandy work done for
Papago / Post on 0.08 mile
DV-3b 1023-5 TCA/AJO TCA AJO Farms AZ 7 0.49 0.49 0.0 Rail NF section. 0 15 36 0 10.57 0 0.49
Starting at 0.37 miles east of
Border Monument 153.
Continuing east along the
border for 20 84 miles, On the
Tohono O'odham Indian
Reservation between the La
Tohono Post on Lesna Mountains and the
O'Odham Rail/ eastern edge of Morena
DV-4a 1024-3 TCA/CAG TCA CAG Nation AZ 7 19.36 0 00 19.36 Normandy Mountain. NF fonsi 2006 0 0.49 0 0.49 0 19.36
Starting at 0.29 miles west of
Border Monument 145.
Continuing east along the
border for 11 55 miles, On the
Tohono Post on Tohono O'odham Indian
O'Odham Rail/ Reservation between corral and
DV-4b 1024-4 TCA/CAG TCA CAG Nation AZ 7 11.02 2.73 0.00 Normandy the Presumido Canyon. NF fonsi 2006 0 19 36 0 19.36 0 2.73
Tohono
O'Odham
DV-4C TCA/CAG TCA CAG Nation AZ 7 0.40 0.40 0.00 F no fonsi 0 11 02 0 2.73 0 0.40

Printed:4/13/2010 page 11 of 12
PV-VF Master Data DOI vs NON-DOI by segment 3-31-08 xls

Starting at 5.214 miles east of


Border Monument 142A.
Continuing east along the
border for 3.03 miles,. Along
the eastern edge of the Tohono
O'odham Indian Reservation
Post on and along the Pozo Verde
Baboquiva Rail/ Mountains, ending 2.48 miles
DV-5 2206-1 TCA/TUC TCA TUC ri AZ 7 1 82 0 00 1.82 Normandy west of the Sasabe POE. no fonsi 0 1.82
Project Starts .28 miles east of
BM 136 and runs east in
Pima/Sant segments for a total of 10.1
a Cruz miles to the edge of Flat Top
DV-7 TBD TCA Counties AZ 10.10 10.10 Mountain Forestry no fonsi 0 10.10
Santa VF starts .65 miles west of BM
Cruz 116 and runs east for 5.3 miles
DV-8 TBD TCA County AZ 2.90 2.90 along the border. Forestry no fonsi 0 2.90
Starting at 0.38 miles east of
Border Monument 114.
Continuing east along the
border for 24.37 miles. In fonsi 1.89
Coronado National Forest, from 2005 for
Mt Washington (Patagonia
TVB no
Mountains) to Yaqui Canyon
fonsi for
and Montezuma Pass.
EV-1A 2204-1 TCA/SON TCA SON Sonoita AZ 8 10.94 1 89 0.0 Normandy NF PVB 0.86 2.17 0 86 2.17 0

EV-1B TCA/SON TCA SON Sonoita AZ 9 2 94 2.94 no fonsi 0 2.94

Starting at 0.07 miles west of


Border Monument 83. FV-1A
runs for 2.35 miles east along
the border to Monument 81. FV-
1B runs from Border Monument
81 east along the border for
21.41 miles, through the San
Post on
Bernardino National Wildlife
Rail/ NF=2.17 fonsi
Refuge, to the Ne
FV-1a 2203-1 TCA/DGL TCA DGL Douglas AZ 8 3.10 2 37 0.00 Normandy F= 0.86 2003 0 2.37
VF from 0.7 Miles West of
PVB Zone BM69 and continues East to
HV-1 2212-1 EPT/LOB EPT LOB 1 NM 2 3.79 3.79 Normandy BM68 - 3.79 Miles F no fonsi 10 0 10 00 0 0 3.79
PVB Zone VF from BM68 to 1.7 Miles East
HV-2 2211-1 EPT/LOB EPT LOB 2 NM 2 6 65 6.65 Normandy of BM66 - 6.65 Miles F no fonsi 0 6.65
VF starting at 1.5 Miles West of
PVB Zone BM64 to 0.15 Miles West of
HV-3a 2215-1 EPT/LOB EPT LOB 3 NM 2 3 50 3.50 Normandy BM62 - 5.8 Miles F no fonsi 0 3.50
PVB Zone
HV-3b 2215-2 EPT/LOB EPT LOB 4 NM 2 2 30 2.30
Antelope Wells POE 6 Miles of
PVB Zone VF - 2.99 Miles East, 2.99 Miles
HV-4 2210-1 EPT/LOB EPT LOB 4 NM 2 5 98 5.98 Normandy West F no fonsi 0 5.98
5.69 Miles of PVF East of
Columbus POE [Starting 7 Miles
PVB Zone Post on East of POE to East side of fonsi
IV-4 1005-1 EPT/DNM EPT DNM 12 NM 2 5 69 3 83 Rail AR#6] ? 2007 0 LOC

Jersey
Barrier Jersey 180 LF VF Under Ysleta POE CATEX
KV-1 1052-2 EPT/YST EPT YST POE TX 16 0 04 0 04 Barrier Bridge F 2006 0 no
110 60 51 104
Mileage in
Mileage in Waiver NEPA No NEPA Waiver xls -
Contingency mileage CY08 Core "buffer" miles (lower operational priority) xls - Column I Coverage Coverage Column J

Printed:4/13/2010 page 12 of 12