Documentos de Académico
Documentos de Profesional
Documentos de Cultura
(RAB)
:PEKERJAAN
P EM B A N G U N A N R U M A H TO K O & K O S T
JA LA N G N . C ER M A I S A M A R IN D A
-TAHUN 2014-
:PEKERJAAN
A N R U M A H TO K O & K O S T
N G N . C ER M A I S A M A R IN D A
NO
2015
URAIAN PEKERJAAN
PEKERJAAN PENDAHULUAN
8,011,872.00
II
PEKERJAAN TANAH
III
PEKERJAAN PONDASI
167,842,036.98
IV
415,530,387.97
172,963,487.14
VI
619,015,199.26
VII
631,442,663.11
VIII
134,536,265.40
IX
144,200,952.71
114,931,808.35
XI
148,446,450.00
39,450,163.50
JUMLAH
2,596,371,286.41
JUMLAH PEMBULATAN
2,596,371,000.00
Terbilang : (Tiga Milyar Empat Ratus Lima Puluh Dua Juta Lima Ratus Empat Puluh Sembilan Ribu Rupiah)
Samarinda, Oktober 2014
:Dibuat Oleh
P E M I L I K
P E M I L I K
LOKASI
TAHUN
: 2015
URAIAN KEGIATAN
SATUAN
KODE
ANALISA
VOLUME
M2
M1
A1
A2
300.00
102.00
M3
M3
M3
M3
B1
B3
B4 + B5
B6
132.72
33.18
195.00
22.46
Ttk
M3
Ttk
M3
M3
B7
B7A
Bc
B9
B10
138.00
2.39
120.00
12.24
44.88
I.
PEKERJAAN PENDAHULUAN
1 Pembersihan Lokasi Bangunan
2 Pemasangan Bowplank
JUMLAH I
II. PEKERJAAN TANAH
1 Galian Tanah Pondasi Poor Plate dan Pondasi Menerus
2 Urugan Tanah Kembali
3 Urugan Tanah dan Pemadatan Peninggian Lantai Bangunan
4 Urugan Pasir Bawah Pondasi
JUMLAH II
III. PEKERJAAN PONDASI
1 Pek. Cerucuk Kayu Ulin 10/10 - 2 m'
2 Kalang Ulin 5/10 dan Kalang Ulin 5/10 Setempat
3 Pek. Pancang Kayu Ulin 10/10 - 12 m' Poor Plate
4 Pas Aanstamping Batu Gunung
5 Pas Batu Gunung 1 : 4
JUMLAH III
RAB RUMAH
LOKASI
TAHUN
: 2015
URAIAN KEGIATAN
1
IV. PEKERJAAN STRUKTUR KONSTRUKSI BETON
PEKERJAAN COR BETON BERTULANG K.250
1 Beton Lantai Kerja Bawah Foot Plat dan Bawah Lantai
2 Beton Foot Plat 1.20x1.20
3 Beton Sloof 20 x 30
4 Beton Sloof 15 x 20
5 Beton Kolom 30 x 30 utama Elevasi -1.00 ke +3.60
6 Beton Kolom 13 x 13 praktis Elevasi +0.00 - ke +3.60
7 Beton Balok Elevasi +3.60 (25 x 35)
8 Beton Balok Elevasi +3.60 (20 x 30)
9 Beton Untuk Plat Lantai tebal 12 cm Elevasi +3.60
10 Beton Kolom 25 x 25 utama Elevasi +3.60 ke +7.20
11 Beton Kolom 13 x 13 praktis Elevasi +3.60 - ke +7.20
12 Beton Balok Elevasi +7.20 (20 x 30)
13 Beton Balok Elevasi +7.20 (15 x 20) Ring Balk
14 Beton Untuk Plat Duck tebal 10 cm Elevasi + 7.20
15 Beton Untuk Tangga
JUMLAH IV
RAB RUMAH
SATUAN
KODE
ANALISA
VOLUME
M3
M3
M3
M3
M3
M3
M3
M4
M3
M3
M3
M3
M3
M3
M3
C15
C16
C17
C18
C22
C23
C19
C20
C24
C22
C23
C20
C20
C25
16.88
10.37
7.56
2.07
7.15
0.73
9.23
2.64
13.08
5.40
0.85
2.22
8.40
2.10
3.24
LOKASI
TAHUN
: 2015
URAIAN KEGIATAN
1
V.
PEKERJAAN KUDA-KUDA, ATAP dan LISTPLANG
1 Kuda-Kuda Baja Ringan & rangka Atap
2 Pasang Atap Genteng Metal
3 Pasang Nok Metal
4 Listplang Papan GRC Finishing Cat
JUMLAH V
VI. PEKERJAAN DINDING PAS. BATA, PLESTERAN & ORNAMEN
LANTAI 1
1 Pasangan Dinding 1/2 bata 1:4
2 Pasangan Dinding 1/2 bata 1:2 Saluran Keliling
3 Plesteran Dinding 1 : 4
4 Plesteran Dinding 1 : 2
5 Plesteran Ornamen
LANTAI 2
1 Pasangan Dinding 1/2 bata 1:4
2 Plesteran Dinding 1 : 4
3 Plesteran Ornamen
LANTAI 3
1 Pasangan Dinding 1/2 bata 1:4
2 Plesteran Dinding 1 : 4
RAB RUMAH
SATUAN
KODE
ANALISA
VOLUME
M2
M2
M1
M1
I1
I3
I4
I2
375.00
375.00
15.00
108.00
M2
M2
M2
M2
Ls
E2
E1
E4
E3
679.24
87.75
1,358.48
175.50
1.00
M2
M2
Ls
E2
E4
884.76
1,769.52
1.00
M2
M2
E2
E4
650.21
1,300.42
LOKASI
TAHUN
: 2015
URAIAN KEGIATAN
SATUAN
2
Ls
3 Plesteran Ornamen
JUMLAH VI
RAB RUMAH
KODE
ANALISA
VOLUME
4
1.00
10
LOKASI
TAHUN
: 2015
URAIAN KEGIATAN
1
VII. PEKERJAAN LANTAI, PLAFOND
PEKERJAAN LANTAI KERAMIK UNTUK LANTAI 1
1 Cor Rabat Parkir Area
2 Lantai Keramik 40/40
3 Keramik tangga 30/30
4 Lantai Keramik 20/20 U KM/WC
5 Dinding Keramik 20/25 u km/wc
PEKERJAAN LANTAI KERAMIK UNTUK LANTAI 2
1 Lantai Keramik 40/40
2 Keramik tangga 30/30
3 Lantai Keramik 20/20 U KM/WC
4 Dinding Keramik 20/25 u km/wc
PEKERJAAN LANTAI KERAMIK UNTUK LANTAI 3
1 Lantai Keramik 40/40
2 Lantai Keramik 20/20 U KM/WC
3 Dinding Keramik 20/25 u km/wc
PEKERJAAN PLAFOND UNTUK LANTAI 1
1 Pasang Rangka plafond Hollow
2 Pasang bahan plafond gipsum
3 Pasang list plafon
RAB RUMAH
SATUAN
KODE
ANALISA
VOLUME
M3
M2
M2
M2
M2
C1
D2
D2
D3
8.50
434.65
72.20
17.85
107.80
M2
M2
M2
M2
D2
D2
D2
D3
426.50
72.20
26.00
97.60
M2
M2
M2
D2
D2
D3
294.75
26.00
97.60
M2
M2
M1
E.001
G2
G4
434.65
434.65
905.00
11
LOKASI
TAHUN
: 2015
URAIAN KEGIATAN
1
PEKERJAAN PLAFOND UNTUK LANTAI 2
1 Pasang Rangka plafond Hollow
2 Pasang bahan plafond gipsum
3 Pasang list plafon
PEKERJAAN PLAFOND UNTUK LANTAI 3
1 Pasang Rangka plafond Hollow
2 Pasang bahan plafond gipsum
3 Pasang list plafon
JUMLAH VII
RAB RUMAH
SATUAN
KODE
ANALISA
VOLUME
M2
M2
M1
E.001
G2
G4
426.50
426.50
905.00
M2
M2
M1
E.001
G2
G4
294.75
294.75
589.50
12
LOKASI
TAHUN
: 2015
URAIAN KEGIATAN
1
VIII.PEKERJAAN KUSEN, DAUN PINTU JENDELA DAN KACA
PEKERJAAN KUSEN, DAUN PINTU, JENDELA & KACA UNTUK LANTAI 1
1 Pasang Folding Gate Ruko
2 Pasang Kusen, pintu, jendela Kayu
3 Pasang Pintu Panel Rangka Kayu bengkirai/kapur
4 Pasang Daun Jendela kaca Rangka Kayu
5 Pasang kaca Bening 5 mm
6 Pasang Kunci Pintu 2x putar setara SES
7 Pasang Engsel Pintu
8 Pasang Engsel Jendela
9 Pasang Grendel Jendela
10 Pasang Hak angin
PEKERJAAN KUSEN, DAUN PINTU, JENDELA & KACA UNTUK LANTAI 2
1 Pasang Kusen, pintu, jendela Kayu
2 Pasang Pintu Panel Rangka Kayu bengkirai/kapur
3 Pasang Daun Jendela kaca Rangka Kayu
4 Pasang kaca Bening 5 mm
5 Pasang Kunci Pintu 2x putar setara SES
6 Pasang Engsel Pintu
7 Pasang Engsel Jendela
8 Pasang Grendel Jendela
RAB RUMAH
SATUAN
KODE
ANALISA
VOLUME
M2
M'
M2
M2
M2
Bh
BH
BH
BH
BH
M'
M2
M2
M2
Bh
BH
BH
BH
F.001
F.002
F.003
K10
K4
K5
K6
K9
F.001
F.002
F.003
K10
K4
K5
K6
22.50
104.20
22.47
3.25
4.88
14.00
42.00
10.00
10.00
10.00
170.80
35.70
3.90
5.85
22.00
66.00
12.00
12.00
13
LOKASI
TAHUN
: 2015
URAIAN KEGIATAN
SATUAN
KODE
ANALISA
2
BH
3
K9
4
12.00
M'
M2
M2
M2
Bh
BH
BH
BH
BH
F.001
F.002
F.003
K10
K4
K5
K6
104.20
22.47
3.25
4.88
14.00
42.00
10.00
10.00
10.00
RAB RUMAH
K9
VOLUME
14
LOKASI
TAHUN
: 2015
URAIAN KEGIATAN
1
IX. PEKERJAAN PENGECATAN, BATU ALAM & ORNAMEN PAGAR BESI
1 Cat Dinding Tembok dan Plafond
2 Cat Minyak Kusen, Pintu, Jendela, Lisplank
3 Batu Alam atau Finishing Dinding dengan cat motif
4 Pagar Besi Hollow Galvanis Finishing Cat (Tangga + Balkon)
JUMLAH IX
X.
PEKERJAAN SANITASI & SEPTICTANK
1 Kloset Dudukk + Acsesoris Lengkap (Ex. Toto)
2 Bak Mandi fiber Lapis Keramik
3 Septicktang Beton dan Pasangan Bata
1. Pengukuran dan Bowplang
2. Galian Tanah biasa
3. Urugan Tanah Kembali
4. Urugan Pasir
5. Cor Beton Bertulang Konstruksi
6. Cor Beton Bertulang Plat Lantai Penutup (Bawah & Atas)
7. Pemasangan Peresapan Buis Beton diameter 50 cm + Acsesoris
8. Pasangan Bata Dinding 1 : 2
9. Plesteran Dinding 1 : 2
10. Pemasangan Pipa PVC 4"
11. Pemasangan Pipa Udara PVC 2" + Acsesorisnya
RAB RUMAH
SATUAN
KODE
ANALISA
VOLUME
M2
M2
M2
M1
F1
F3
4,428.42
654.18
32.00
134.00
Bh
Bh
M1
16.00
4.00
M1
M3
M3
M3
M3
M3
Bh
M2
M2
M1
M1
A2
B1
B3
B6
C18
C25
24.00
24.26
7.28
1.00
1.82
2.11
4.00
41.60
83.20
48.00
16.00
15
LOKASI
TAHUN
: 2015
URAIAN KEGIATAN
SATUAN
KODE
ANALISA
VOLUME
JUMLAH X
RAB RUMAH
16
LOKASI
TAHUN
: 2015
URAIAN KEGIATAN
XI.
1
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
SATUAN
KODE
ANALISA
VOLUME
A PEKERJAN ELEKTRIKAL
1 Pek Sekring Listrik
1(. Sekring 2 Group
unit
bh
bh
bh
bh
bh
bh
8.00
8.00
100.00
50.00
112.00
50.00
50.00
S
3 Pek Instalasi
1(. Instalasi penerangan
2(. Instalasi stop kontak
Ttk
Ttk
258.00
112.00
RAB RUMAH
17
LOKASI
TAHUN
: 2015
URAIAN KEGIATAN
SATUAN
KODE
ANALISA
VOLUME
B PEKERJAAN MEKANIKAL
a Pek,Instalasi Air Bersih
B.a,1 Pek Air Bersih Lantai I
2(. Pipa PVC 1/2" AW
m
Bh
Ls
150.00
17.00
1.00
m
m
Bh
Ls
60.00
60.00
17.00
1.00
m
Bh
Ls
88.00
8.00
1.00
JUMLAH
RAB RUMAH
18
LOKASI
TAHUN
: 2015
URAIAN KEGIATAN
SATUAN
KODE
ANALISA
VOLUME
JUMLAH PEMBANGUNAN
RAB RUMAH
19
HARGA SAT.
(Rp.)
JUMLAH (Rp.)
6
15,950.00
31,636.00
4,785,000.00
3,226,872.00
8,011,872.00
69,575.00
19,613.00
135,410.00
140,690.00
9,233,994.00
650,759.34
26,404,950.00
3,160,460.16
39,450,163.50
176,451.00
7,189,600.00
671,451.00
477,906.00
889,503.42
24,350,238.00
17,147,196.00
80,574,120.00
5,849,569.44
39,920,913.54
167,842,036.98
RAB RUMAH
20
HARGA SAT.
(Rp.)
JUMLAH (Rp.)
6
1,180,461.33
4,069,955.90
5,159,904.33
5,571,009.33
5,784,209.33
6,403,416.00
6,081,244.72
4,917,591.25
4,796,882.21
5,784,209.33
6,403,416.00
4,917,591.25
5,784,209.33
4,796,882.21
5,784,209.33
RAB RUMAH
19,927,367.77
42,197,302.82
39,008,876.76
11,531,989.32
41,357,096.73
4,675,005.95
56,099,482.56
12,982,440.90
62,743,219.29
31,234,730.40
5,454,173.61
10,917,052.58
48,587,358.40
10,073,452.64
18,740,838.24
415,530,387.97
21
HARGA SAT.
(Rp.)
JUMLAH (Rp.)
6
317,340.00
120,450.79
157,063.50
59,592.50
119,002,500.00
45,169,044.64
2,355,952.50
6,435,990.00
172,963,487.14
127,128.16
138,407.50
67,103.18
75,330.03
5,000,000.00
86,350,529.97
12,145,258.13
91,158,333.69
13,220,419.62
5,000,000.00
127,128.16
67,103.18
5,000,000.00
112,477,908.98
118,740,426.52
5,000,000.00
127,128.16
67,103.18
82,659,999.54
87,262,322.81
RAB RUMAH
22
HARGA SAT.
(Rp.)
5
5,000,000.00
RAB RUMAH
JUMLAH (Rp.)
6
5,000,000.00
619,015,199.26
23
HARGA SAT.
(Rp.)
JUMLAH (Rp.)
6
1,025,706.00
211,592.53
211,592.53
211,592.53
216,629.37
8,718,501.00
91,968,691.56
15,276,980.40
3,776,926.59
23,352,645.92
211,592.53
211,592.53
211,592.53
216,629.37
90,244,212.47
15,276,980.40
5,501,405.68
21,143,026.36
211,592.53
211,592.53
216,629.37
62,366,897.13
5,501,405.68
21,143,026.36
95,575.00
50,127.00
41,156.50
41,541,673.75
21,787,700.55
37,246,632.50
RAB RUMAH
24
HARGA SAT.
(Rp.)
JUMLAH (Rp.)
6
95,575.00
50,127.00
41,156.50
40,762,737.50
21,379,165.50
37,246,632.50
95,575.00
50,127.00
41,156.50
28,170,731.25
14,774,933.25
24,261,756.75
631,442,663.11
RAB RUMAH
25
HARGA SAT.
(Rp.)
JUMLAH (Rp.)
6
750,000.00
83,859.58
654,335.00
481,591.00
117,917.25
325,580.75
51,092.25
37,361.50
15,000.00
19,676.25
16,875,000.00
8,738,168.17
14,702,907.45
1,565,170.75
574,846.59
4,558,130.50
2,145,874.50
373,615.00
150,000.00
196,762.50
83,859.58
654,335.00
481,591.00
117,917.25
325,580.75
51,092.25
37,361.50
15,000.00
14,323,216.16
23,359,759.50
1,878,204.90
689,815.91
7,162,776.50
3,372,088.50
448,338.00
180,000.00
RAB RUMAH
26
HARGA SAT.
(Rp.)
JUMLAH (Rp.)
6
19,676.25
236,115.00
83,859.58
654,335.00
481,591.00
117,917.25
325,580.75
51,092.25
37,361.50
15,000.00
19,676.25
8,738,168.17
14,702,907.45
1,565,170.75
574,846.59
4,558,130.50
2,145,874.50
373,615.00
150,000.00
196,762.50
134,536,265.40
RAB RUMAH
27
HARGA SAT.
(Rp.)
JUMLAH (Rp.)
6
15,661.25
20,248.80
250,000.00
400,000.00
69,354,592.73
13,246,359.98
8,000,000.00
53,600,000.00
144,200,952.71
4,586,056.32
500,000.00
73,376,901.05
2,000,000.00
31,636.00
69,575.00
19,613.00
140,690.00
5,571,009.33
4,796,882.21
250,000.00
138,407.50
75,330.03
63,250.00
31,500.00
759,264.00
1,687,889.50
142,743.41
140,690.00
10,128,094.97
10,131,015.22
1,000,000.00
5,757,752.00
6,267,458.19
3,036,000.00
504,000.00
RAB RUMAH
28
HARGA SAT.
(Rp.)
JUMLAH (Rp.)
6
114,931,808.35
RAB RUMAH
29
HARGA SAT.
(Rp.)
JUMLAH (Rp.)
6
1,000,000.00
Sub Total, A,a, I
750,000.00
150,000.00
150,000.00
50,750.00
43,350.00
50,750.00
Sub Total,A, a, III
225,000.00
225,000.00
Sub Total,A, a, IV
TOTAL, A
RAB RUMAH
8,000,000.00
8,000,000.00
6,000,000.00
15,000,000.00
7,500,000.00
5,684,000.00
2,167,500.00
2,537,500.00
38,889,000.00
58,050,000.00
25,200,000.00
83,250,000.00
130,139,000.00
30
HARGA SAT.
(Rp.)
JUMLAH (Rp.)
6
14,600.00
78,500.00
750,000.00
Sub Total, B,a, I
2,190,000.00
1,334,500.00
750,000.00
4,274,500.00
63,250.00
31,500.00
103,950.00
750,000.00
Sub Total, B.b, I
3,795,000.00
1,890,000.00
1,767,150.00
750,000.00
8,202,150.00
34,600.00
254,500.00
750,000.00
JUMLAH TOTAL, A , B.
RAB RUMAH
3,044,800.00
2,036,000.00
750,000.00
5,830,800.00
18,307,450.00
148,446,450.00
31
HARGA SAT.
(Rp.)
JUMLAH (Rp.)
2,596,371,286.41
RAB RUMAH
32
ANALISA PEKERJAAN
NO
URAIAN
KOEF
SAT
HARGA SAT
HARGA BAHAN
HARGA UPAH
6=(3X5)
7=(3X5)
A2
SNI
6.4
03-2835-2002
A3
1 M2 Pembersihan Lahan
Pekerja
Mandor
Jumlah
0.1000
0.0500
org
org
88,000.00
143,000.00
0.00
0.0120
0.0200
0.0070
0.100
0.100
0.010
0.0050
1.700
0.210
0.300
10.500
0.030
0.050
1.500
1.0000
2.0000
0.2000
0.0500
M
kg
M
org
org
org
org
2,200,000.00
14,850.00
2,200,000.00
88,000.00
104,500.00
121,000.00
143,000.00
26,400.00
297.00
15,400.00
42,097.00
Btg
M3
Kg
Kg
m3
m3
Lbr
org
org
org
org
14,850.00
2,200,000.00
14,850.00
1,650.00
202,631.58
407,000.00
39,996.00
88,000.00
104,500.00
121,000.00
143,000.00
8,800.00
7,150.00
15,950.00
8,800.00
10,450.00
1,210.00
715.00
21,175.00
25,245.00
462,000.00
4,455.00
17,325.00
6,078.95
20,350.00
59,994.00
595,447.95
88,000.00
209,000.00
24,200.00
7,150.00
328,350.00
33
NO
URAIAN
KOEF
SAT
HARGA SAT
HARGA BAHAN
HARGA UPAH
6=(3X5)
7=(3X5)
B3
B4
B5
B6
B7
org
org
88,000.00
143,000.00
0.00
66,000.00
3,575.00
69,575.00
org
org
88,000.00
143,000.00
79,200.00
6,435.00
85,635.00
0.1920
0.0190
0.0000
org
org
lot
88,000.00
143,000.00
25,000.00
16,896.00
2,717.00
0.00
19,613.00
1 M3 URUGAN TANAH
Tanah urug
Pekerja / buruh tak terlatih
Mandor
Jumlah
1.2000
0.300
0.010
PEMADATAN TANAH
Pekerja / buruh tak terlatih
Mandor
Jumlah
0.500
0.050
1 M3 URUGAN PASIR
Pasir urug
Pekerja
Mandor
Jumlah
1.2000
0.3000
0.0100
0.00
m3
org
org
org
org
m3
org
org
47,025.00
88,000.00
143,000.00
56,430.00
56,430.00
26,400.00
1,430.00
27,830.00
0.00
44,000.00
7,150.00
51,150.00
88,000.00
143,000.00
94,050.00
88,000.00
143,000.00
112,860.00
112,860.00
0.0200
m3
4,950,000.00
26,400.00
1,430.00
27,830.00
99,000.00
34
NO
URAIAN
KOEF
SAT
HARGA SAT
4
org
5
88,000.00
Tukang Kayu
0.2700
org
104,500.00
28,215.00
0.1500
org
121,000.00
18,150.00
Mandor
0.0900
org
143,000.00
12,870.00
Jumlah
6=(3X5)
HARGA UPAH
3
0.2070
Pekerja
B7A
HARGA BAHAN
99,000.00
7=(3X5)
18,216.00
77,451.00
1.0000
1.0000
5.0000
15.0000
1.5000
0.2500
m3
Kg
org
org
org
org
4,950,000.00
14,850.00
88,000.00
104,500.00
121,000.00
143,000.00
4,950,000.00
14,850.00
4,964,850.00
440,000.00
1,567,500.00
181,500.00
35,750.00
2,224,750.00
35
NO
URAIAN
1
B8
2
1 M3 Sloop dan Gelagar Ulin
Balok Ulin Uk. 10/10
Paku Ulin
Pekerja
Tukang Kayu
Ka. Tukang Kayu
Mandor
Jumlah
B8A
Bc
B9
SNI
6.14
03-2836-2002
B10
SNI
KOEF
SAT
HARGA SAT
HARGA BAHAN
HARGA UPAH
6=(3X5)
7=(3X5)
1.1000
1.0000
5.0000
15.0000
1.5000
0.2500
4,950,000.00
22,500.00
88,000.00
104,500.00
121,000.00
143,000.00
5,445,000.00
22,500.00
5,467,500.00
1.1000
2.0000
5.0000
15.0000
1.5000
0.2500
m3
Kg
org
org
org
org
4,950,000.00
22,500.00
88,000.00
104,500.00
121,000.00
143,000.00
0.1200
0.2070
0.2700
0.1500
0.0900
1.2000
0.3000
0.7800
0.3900
0.0390
0.0390
m3
org
org
org
org
4,950,000.00
88,000.00
104,500.00
121,000.00
143,000.00
275,000.00
94,050.00
88,000.00
104,500.00
121,000.00
143,000.00
m3
275,000.00
18,216.00
28,215.00
18,150.00
12,870.00
77,451.00
330,000.00
28,215.00
358,215.00
1.1000
440,000.00
1,567,500.00
181,500.00
35,750.00
2,224,750.00
594,000.00
594,000.00
m3
m3
org
org
org
org
440,000.00
1,567,500.00
181,500.00
35,750.00
2,224,750.00
5,445,000.00
45,000.00
5,490,000.00
m3
Kg
org
org
org
org
68,640.00
40,755.00
4,719.00
5,577.00
119,691.00
302,500.00
36
NO
URAIAN
1
6.9
03-2836-2002
2
PC ( 50 kg )
Pasir pasang
Pekerja
Tukang batu
Kepala tukang batu
Mandor
Jumlah
KOEF
3
163.0000
0.5200
1.5000
0.6000
0.0600
0.0750
SAT
HARGA SAT
4
kg
m3
org
org
org
org
5
1,650.00
202,631.58
88,000.00
104,500.00
121,000.00
143,000.00
HARGA BAHAN
6=(3X5)
268,950.00
105,368.42
676,818.42
HARGA UPAH
7=(3X5)
132,000.00
62,700.00
7,260.00
10,725.00
212,685.00
37
NO
URAIAN
KOEF
SAT
HARGA SAT
HARGA BAHAN
HARGA UPAH
6=(3X5)
7=(3X5)
C6
SNI
7394:2008
C8
SNI
6.20
7394:2008
C9
SNI
6.21
7394:2008
kg
m3
m3
org
org
org
org
0.0450
0.3000
0.1000
0.5200
0.2600
0.0260
359,700.00
126,126.00
354,090.00
839,916.00
1,650.00
242,550.00
407,000.00
88,000.00
104,500.00
121,000.00
143,000.00
M
kg
Ltr
org
org
org
17,050.00
15,840.00
88,000.00
104,500.00
121,000.00
143,000.00
17,902.50
237.60
18,140.10
1,800,000.00
15,000.00
15,750.00
88,000.00
104,500.00
121,000.00
143,000.00
616.00
731.50
84.70
42.90
1,475.10
72,000.00
4,500.00
1,575.00
78,075.00
BAHAN 2X PAKAI
1,800,000.00
15,000.00
15,750.00
88,000.00
104,500.00
121,000.00
145,200.00
26,125.00
3,025.00
11,440.00
185,790.00
45,760.00
27,170.00
3,146.00
3,718.00
79,794.00
81,000.00
4,500.00
1,575.00
45,760.00
27,170.00
3,146.00
38
NO
URAIAN
2
Mandor
Jumlah
KOEF
3
0.0260
SAT
4
org
HARGA SAT
5
143,000.00
HARGA BAHAN
6=(3X5)
87,075.00
BAHAN 2X PAKAI
HARGA UPAH
7=(3X5)
3,718.00
79,794.00
39
NO
1
C10
SNI
6.22
7394:2008
C11
C12
URAIAN
2
1 M2 BEKESTING UNTUK KOLOM
Kayu Kelas III papan meranti begesting
paku 5 cm-10 cm
minyak begesting
Balok Kayu Meranti kayu kelas II
Plywood tebal 9 mm
Dolken kayu galam d8-10 / 4 m
Pekerja
Tukang kayu
Kepala tukang kayu
Mandor
Jumlah
KOEF
SAT
HARGA SAT
HARGA BAHAN
HARGA UPAH
6=(3X5)
7=(3X5)
0.0400
0.4000
0.2000
0.0150
0.3500
2.0000
0.6600
0.3300
0.0330
0.0330
M
kg
Ltr
M
Lbr
Btg
org
org
org
org
1,800,000.00
15,000.00
15,750.00
88,000.00
150,000.00
17,000.00
88,000.00
104,500.00
121,000.00
143,000.00
72,000.00
6,000.00
3,150.00
1,320.00
52,500.00
34,000.00
168,970.00
BAHAN 2X PAKAI
M
kg
Ltr
org
org
org
org
M
kg
Ltr
M
Btg
Lbr
org
org
org
org
0.0400
0.4000
0.2000
0.0140
6.0000
0.3500
0.3200
0.3300
0.0330
0.0060
1,800,000.00
15,000.00
15,750.00
88,000.00
104,500.00
121,000.00
143,000.00
81,000.00
4,500.00
1,575.00
87,075.00
BAHAN 2X PAKAI
15,000.00
15,750.00
2,200,000.00
14,850.00
111,375.00
88,000.00
104,500.00
121,000.00
143,000.00
58,080.00
34,485.00
3,993.00
4,719.00
101,277.00
26,400.00
27,170.00
3,146.00
715.00
57,431.00
0.00
6,000.00
3,150.00
30,800.00
89,100.00
38,981.25
168,031.25
BAHAN 2X PAKAI
28,160.00
34,485.00
3,993.00
858.00
67,496.00
40
NO
1
C12a
C13
URAIAN
2
1 M2 BEKESTING UNTUK LANTAI PLAT DECKER
papan begesting
paku
minyak begesting
Balok Kayu Meranti
Dolken ( kayu perancah )
Plywood Tebal 12 mm
Pekerja
Tukang kayu
Kepala tukang kayu
Mandor
Jumlah
1 M2 BEKESTING UNTUK BALOK
papan begesting
paku
minyak begesting
Balok Kayu Meranti
Dolken ( kayu perancah )
Plywood Tebal 12 mm
Pekerja
Tukang kayu
Kepala tukang kayu
Mandor
Jumlah
C15
1 M3 BETON K-250
SNI 7394:2008 PC ( 50 kg )
Pasir beton
Split pecah mesin 2/3
Pekerja
Tukang batu
Kepala tukang batu
Mandor
Jumlah
SNI 7394:2008
C16
1 M3 BETON BERTULANG PONDASI
KOEF
SAT
HARGA SAT
HARGA BAHAN
HARGA UPAH
6=(3X5)
7=(3X5)
0.0400
0.4000
0.2000
0.0140
0.3500
0.3200
0.3300
0.0330
0.0060
M
kg
Ltr
M
Btg
Lbr
org
org
org
org
15,000.00
15,750.00
2,200,000.00
14,850.00
111,375.00
88,000.00
104,500.00
121,000.00
143,000.00
0.00
6,000.00
3,150.00
30,800.00
0.00
38,981.25
78,931.25
BAHAN 2X PAKAI
0.0400
0.4000
0.2000
0.0180
2.0000
0.3500
0.3200
0.3300
0.0330
0.0060
M
kg
Ltr
M
Btg
Lbr
org
org
org
org
1,800,000.00
15,000.00
15,750.00
1,800,000.00
14,850.00
111,375.00
88,000.00
104,500.00
121,000.00
143,000.00
72,000.00
6,000.00
3,150.00
32,400.00
29,700.00
38,981.25
182,231.25
BAHAN 2X PAKAI
384.000
0.499
0.582
1.650
0.275
0.028
0.083
kg
m3
m3
org
org
org
org
1,650.00
242,550.00
407,000.00
88,000.00
104,500.00
121,000.00
143,000.00
28,160.00
34,485.00
3,993.00
858.00
67,496.00
28,160.00
34,485.00
3,993.00
858.00
67,496.00
633,600.00
120,928.50
236,738.33
991,266.83
145,200.00
28,737.50
3,388.00
11,869.00
189,194.50
41
NO
1
C17
URAIAN
2
Begesting untuk pondasi
Besi beton polos/Ulir
Cor Beton K-250
jumlah
KOEF
3
42.0000
1,911.0000
14.7000
SAT
4
m2
Kg
m3
jadi untuk 1 m3 beton bertulang adalah jumlah total dibagi volume cor beton
1 M3 BETON BERTULANG SLOOP 20/30
Begesting untuk Sloof
114.6000
m2
Besi beton polos/Ulir
1,604.4000
Kg
Cor Beton K-250
11.4600
m3
jumlah
jadi untuk 1 m3 beton bertulang adalah jumlah total dibagi volume cor beton
HARGA SAT
HARGA BAHAN
5
118,831.50
19,615.20
1,180,461.33
6=(3X5)
4,990,923.00
37,484,647.20
17,352,781.60
59,828,351.80
123,331.50
19,615.20
1,180,461.33
14,133,789.90
31,470,626.88
13,528,086.88
59,132,503.66
HARGA UPAH
7=(3X5)
42
NO
1
C18
C19
C19.A
C20
C21
C22
URAIAN
2
1 M3 BETON BERTULANG SLOOP 15/20
Begesting untuk Sloof
Besi beton polos/Ulir
Cor Beton K-250
jumlah
KOEF
SAT
HARGA SAT
HARGA BAHAN
HARGA UPAH
6=(3X5)
7=(3X5)
44.0000
462.0000
3.3000
m2
Kg
m3
jadi untuk 1 m3 beton bertulang adalah jumlah total dibagi volume cor beton
1 M3 BETON BERTULANG BALOK EL. 3.40 25/45
Begesting untuk Balok
305.1625
m2
Besi beton polos/Ulir
4,394.3400
Kg
Cor Beton K-250
27.4646
m3
jumlah
jadi untuk 1 m3 beton bertulang adalah jumlah total dibagi volume cor beton
1 M3 BETON BERTULANG BALOK EL. 3.40 20/30
Begesting untuk Balok
152.4125
m2
Besi beton polos/Ulir
1,170.5280
Kg
Cor Beton K-250
7.3158
m3
jumlah
jadi untuk 1 m3 beton bertulang adalah jumlah total dibagi volume cor beton
1 M3 BETON BERTULANG BALOK EL. 6.00 15/20
Begesting untuk Balok
45.1000
m2
Besi beton polos/Ulir
480.2057
Kg
Cor Beton K-250
2.4600
m3
jumlah
jadi untuk 1 m3 beton bertulang adalah jumlah total dibagi volume cor beton
1 M3 BETON BERTULANG BALOK GEWEL15/20
Begesting untuk Balok
19.3600
m2
Besi beton polos/Ulir
206.1371
Kg
Cor Beton K-250
1.0560
m3
jumlah
jadi untuk 1 m3 beton bertulang adalah jumlah total dibagi volume cor beton
1 M3 BETON BERTULANG KOLOM UTAMA 40/40
Begesting untuk Balok
176.0000
m2
Besi beton polos/Ulir
2,464.0000
Kg
123,331.50
19,615.20
1,180,461.33
5,426,586.00
9,062,222.40
3,895,522.40
18,384,330.80
158,611.63
19,615.20
1,180,461.33
48,402,320.01
86,195,857.97
32,420,927.85
167,019,105.83
28,737.50
19,615.20
1,180,461.33
4,379,954.22
22,960,140.83
8,636,019.02
35,976,114.07
158,611.63
19,615.20
1,180,461.33
7,153,384.29
9,419,330.19
2,903,934.88
19,476,649.36
158,611.63
19,615.20
1,180,461.33
3,070,721.06
4,043,419.79
1,246,567.17
8,360,708.02
185,762.00
19,615.20
32,694,112.00
48,331,852.80
43
NO
URAIAN
C23
C24
KOEF
3
17.6000
SAT
4
m3
HARGA SAT
HARGA BAHAN
5
1,180,461.33
6=(3X5)
20,776,119.47
101,802,084.27
185,762.00
19,615.20
1,180,461.33
9,473,862.00
10,503,939.60
4,515,264.60
24,493,066.20
151,511.63
19,615.20
1,180,461.33
18,635,929.88
34,742,442.24
17,423,609.28
70,801,981.40
HARGA UPAH
7=(3X5)
44
NO
URAIAN
KOEF
SAT
HARGA SAT
HARGA BAHAN
HARGA UPAH
6=(3X5)
7=(3X5)
D3
D5
1.0000
11.3800
0.0420
1.5000
0.6200
0.3500
0.0350
0.0300
1.0000
11.3800
0.0180
1.5000
0.6000
0.4500
0.0450
0.0300
m2
kg
m3
kg
org
org
org
org
71,280.00
1,650.00
202,631.58
8,910.00
88,000.00
104,500.00
121,000.00
143,000.00
71,280.00
18,777.00
8,510.53
13,365.00
111,932.53
m2
kg
m3
kg
org
org
org
org
71,280.00
1,650.00
202,631.58
8,910.00
88,000.00
104,500.00
121,000.00
143,000.00
71,280.00
18,777.00
3,647.37
13,365.00
107,069.37
1.0500
11.7500
0.0350
0.6200
0.3500
0.0350
0.0300
m2
kg
m3
kg
org
org
org
org
150,000.00
1,650.00
202,631.58
8,910.00
88,000.00
104,500.00
121,000.00
143,000.00
54,560.00
36,575.00
4,235.00
4,290.00
99,660.00
52,800.00
47,025.00
5,445.00
4,290.00
109,560.00
157,500.00
19,387.50
7,092.11
0.00
183,979.61
54,560.00
36,575.00
4,235.00
4,290.00
99,660.00
45
NO
URAIAN
KOEF
SAT
HARGA SAT
HARGA BAHAN
HARGA UPAH
6=(3X5)
7=(3X5)
E1
55.0000
18.9500
0.0380
0.3200
0.1000
0.0100
0.0150
55.0000
11.5000
0.0430
0.3200
0.1000
0.0100
0.0150
E2
E2.a
SNI
6.4
03-2837-2002
E3
bh
kg
m3
org
org
org
org
1,045.00
1,650.00
202,631.58
88,000.00
104,500.00
121,000.00
143,000.00
57,475.00
31,267.50
7,700.00
96,442.50
bh
kg
m3
org
org
org
org
1,045.00
1,650.00
202,631.58
88,000.00
104,500.00
121,000.00
143,000.00
57,475.00
18,975.00
8,713.16
85,163.16
101.7500
21.2750
0.0796
0.5920
0.1850
0.0185
0.0278
bh
kg
m3
org
org
org
org
1,045.00
1,650.00
202,631.58
88,000.00
104,500.00
121,000.00
143,000.00
1,650.00
202,631.58
88,000.00
104,500.00
121,000.00
28,160.00
10,450.00
1,210.00
2,145.00
41,965.00
106,328.75
35,103.75
16,119.34
157,551.84
kg
m3
org
org
org
28,160.00
10,450.00
1,210.00
2,145.00
41,965.00
52,096.00
19,332.50
2,238.50
3,968.25
77,635.25
23,562.00
4,660.53
22,000.00
20,900.00
2,420.00
46
NO
URAIAN
2
Mandor
Jumlah
KOEF
3
0.0125
SAT
4
org
HARGA SAT
5
143,000.00
HARGA BAHAN
6=(3X5)
28,222.53
HARGA UPAH
7=(3X5)
1,787.50
47,107.50
47
NO
1
E4
E5
E6
URAIAN
KOEF
2
3
1 M2 PLESTERAN DINDING / SIAR 1 : 4 + ACIAN tebal 20 cm
PC ( 50 kg )
8.6800
Pasir pasang
0.0280
Pekerja
0.2500
Tukang batu
0.2000
Kepala tukang batu
0.0200
Mandor
0.0125
Jumlah
1 M' Plesteran Sponing 1 : 2
PC ( 50 kg )
Pasir pasang
Pekerja
Tukang batu
Kepala tukang batu
Mandor
Jumlah
0.0250
0.0001
0.0029
0.0019
0.0019
0.0001
4.3200
0.0160
0.2500
0.1000
0.0100
0.0150
SAT
HARGA SAT
HARGA BAHAN
HARGA UPAH
6=(3X5)
7=(3X5)
kg
m3
org
org
org
org
1,650.00
202,631.58
88,000.00
104,500.00
121,000.00
143,000.00
14,322.00
5,673.68
19,995.68
kg
m3
org
org
org
org
1,650.00
202,631.58
88,000.00
104,500.00
121,000.00
143,000.00
41.25
20.26
61.51
kg
m3
org
org
org
org
1,650.00
202,631.58
88,000.00
104,500.00
121,000.00
143,000.00
22,000.00
20,900.00
2,420.00
1,787.50
47,107.50
250.80
198.55
229.90
14.30
693.55
7,128.00
3,242.11
10,370.11
22,000.00
10,450.00
1,210.00
2,145.00
35,805.00
48
NO
URAIAN
KOEF
SAT
HARGA SAT
HARGA BAHAN
HARGA UPAH
6=(3X5)
7=(3X5)
F2
F3
1 M2 PENGECATAN TEMBOK BARU BAGIAN DALAM ( 1 LAPIS PLAMIR, 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP )
Plamir Tembok
0.1000
kg
47,520.00
4,752.00
Cat Dasar morilex
0.1000
kg
47,520.00
4,752.00
Cat Penutup dalam morilex 2x
0.2600
kg
47,520.00
12,355.20
Pekerja
0.0200
org
88,000.00
Tukang cat
0.0630
org
104,500.00
Kepala tukang cat
0.0063
org
121,000.00
Mandor
0.0025
org
143,000.00
Jumlah
21,859.20
1,760.00
6,583.50
762.30
357.50
9,463.30
1 M2 PENGECATAN TEMBOK BARU BAGIAN LUAR ( 1 LAPIS PLAMIR, 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP )
Alkali
0.1000
kg
47,520.00
4,752.00
Cat Dasar morilex
0.1000
kg
47,520.00
4,752.00
Cat Penutup Luar morilex 2x
0.2600
kg
64,350.00
16,731.00
Pekerja
0.0200
org
88,000.00
Tukang cat
0.0630
org
104,500.00
Kepala tukang cat
0.0063
org
121,000.00
Mandor
0.0025
org
143,000.00
Jumlah
26,235.00
1,760.00
6,583.50
762.30
357.50
9,463.30
6,160.00
940.50
726.00
357.50
8,184.00
23,760.00
47,520.00
47,520.00
47,520.00
88,000.00
104,500.00
121,000.00
143,000.00
4,752.00
7,128.00
8,078.40
12,355.20
32,313.60
49
NO
1
F4
F5
URAIAN
2
1 M2 MENDEMPUL DAN MENGGOSOK KAYU
Dempul
Minyak cat
Amplas
Pekerja
Tukang cat
Kepala tukang cat
Mandor
Jumlah
1 M2 MELAMIN / DECO
Clear Doof
Wood Filler
Wood Fstain (Pewarna)
Ampelas
Sanding Sailer
Tinner A
Pekerja
Tukang cat
Kepala tukang cat
Mandor
Jumlah
KOEF
SAT
HARGA SAT
HARGA BAHAN
HARGA UPAH
6=(3X5)
7=(3X5)
0.0800
0.0200
2.0000
0.0400
0.0400
0.0040
0.0025
kg
Ltr
Lbr
org
org
org
org
9,108.00
24,750.00
3,960.00
88,000.00
104,500.00
121,000.00
143,000.00
728.64
495.00
7,920.00
9,143.64
0.6667
0.4000
0.4000
0.8000
0.6667
1.4000
0.1600
0.1600
0.0160
0.0025
Ltr
kg
kg
Lbr
Kg
Ltr
org
org
org
org
99,000.00
34,650.00
37,125.00
3,960.00
34,650.00
24,750.00
88,000.00
104,500.00
121,000.00
143,000.00
3,520.00
4,180.00
484.00
357.50
8,541.50
66,003.30
13,860.00
14,850.00
3,168.00
23,101.16
34,650.00
155,632.46
14,080.00
16,720.00
1,936.00
357.50
33,093.50
50
NO
URAIAN
KOEF
SAT
HARGA SAT
HARGA BAHAN
HARGA UPAH
6=(3X5)
7=(3X5)
G2
G4
1.1000
0.0100
0.0500
0.0500
0.0050
0.0030
Lbr
kg
org
org
org
org
27,500.00
24,750.00
88,000.00
104,500.00
121,000.00
143,000.00
35,000.00
7,500.00
42,500.00
13,200.00
26,125.00
3,025.00
10,725.00
53,075.00
30,096.00
2,722.50
32,818.50
8,800.00
6,792.50
786.50
929.50
17,308.50
30,250.00
247.50
30,497.50
4,400.00
5,225.00
605.00
429.00
10,659.00
51
NO
URAIAN
KOEF
SAT
HARGA SAT
HARGA BAHAN
HARGA UPAH
6=(3X5)
7=(3X5)
1.1000
1.2500
1.0000
7.0000
21.0000
2.1000
0.3500
M3
Kg
Kg
OH
OH
OH
OH
4,950,000.00
14,850.00
22,770.00
88,000.00
104,500.00
121,000.00
143,000.00
Jumlah
F.002
0.0400
0.5000
1.0000
3.0000
0.3000
0.0500
M3
kg
OH
OH
OH
OH
4,950,000.00
22,770.00
88,000.00
104,500.00
121,000.00
143,000.00
Jumlah
5,486,332.50
3,114,650.00
102.56
0.01
198,000.00
11,385.00
88,000.00
313,500.00
36,300.00
7,150.00
209,385.00
444,950.00
H5
616,000.00
2,194,500.00
254,100.00
50,050.00
F.003
5,445,000.00
18,562.50
22,770.00
Jumlah
1 M2 JALUSI PAPAN BANGKIRAI
Papan Bangkirai
Paku Biasa
Pekerja
Tukang kayu
0.0240
0.3000
0.8000
2.4000
0.2400
0.0400
M3
kg
OH
OH
OH
OH
4,950,000.00
22,770.00
88,000.00
104,500.00
121,000.00
143,000.00
118,800.00
6,831.00
70,400.00
250,800.00
29,040.00
5,720.00
125,631.00
0.0600
0.1500
0.5000
2.0000
m3
Kg
org
org
66,000.00
24,750.00
88,000.00
104,500.00
355,960.00
3,960.00
44,000.00
209,000.00
52
NO
URAIAN
2
Kepala tukang kayu
Mandor
Jumlah
KOEF
3
0.2000
0.0250
SAT
4
org
org
HARGA SAT
5
121,000.00
143,000.00
HARGA BAHAN
6=(3X5)
3,960.00
HARGA UPAH
7=(3X5)
24,200.00
3,575.00
280,775.00
53
NO
URAIAN
KOEF
SAT
HARGA SAT
HARGA BAHAN
HARGA UPAH
6=(3X5)
7=(3X5)
I2
I3
I4
6.5000
9.0000
1.0000
0.680
0.680
0.068
0.034
0.3850
0.0500
0.1000
0.2000
0.0250
0.0050
1.7857
0.0500
0.1315
0.0700
0.0080
0.0080
m1
m1
ls
kg
org
org
org
12,500.00
9,500.00
6,600.00
88,000.00
104,500.00
121,000.00
143,000.00
81,250.00
85,500.00
6,600.00
59,840.00
233,190.00
M2
kg
org
org
org
org
66,000.00
14,850.00
88,000.00
104,500.00
121,000.00
143,000.00
25,410.00
742.50
26,152.50
Bh
Kg
org
org
org
org
55,000.00
24,750.00
88,000.00
104,500.00
121,000.00
143,000.00
Bh
kg
org
org
org
org
32,670.00
24,750.00
88,000.00
104,500.00
121,000.00
143,000.00
8,800.00
20,900.00
3,025.00
715.00
33,440.00
98,214.29
1,237.50
99,451.79
3.0000
0.0100
0.4000
0.2000
0.0200
0.0020
71,060.00
8,228.00
4,862.00
84,150.00
11,572.00
7,315.00
968.00
1,144.00
20,999.00
98,010.00
247.50
35,200.00
20,900.00
2,420.00
286.00
54
NO
URAIAN
KOEF
SAT
HARGA SAT
Jumlah
HARGA BAHAN
6=(3X5)
98,257.50
HARGA UPAH
7=(3X5)
58,806.00
55
NO
URAIAN
KOEF
SAT
HARGA SAT
HARGA BAHAN
HARGA UPAH
6=(3X5)
7=(3X5)
K2
K3
K4
K5
1 BH PASANG GERENDEL
Gerendel
Pekerja
Tukang
Kepala tukang
Mandor
Jumlah
1.0000
0.0150
0.1500
0.0150
0.00075
1.0000
0.0050
0.5000
0.0050
0.00025
1.0000
0.0050
0.5000
0.0050
0.00025
1.0000
0.0050
0.5000
0.0050
0.00025
bh
org
org
org
org
24,750.00
88,000.00
104,500.00
121,000.00
143,000.00
24,750.00
24,750.00
bh
org
org
org
org
173,250.00
88,000.00
104,500.00
121,000.00
143,000.00
173,250.00
173,250.00
bh
org
org
org
org
168,300.00
88,000.00
104,500.00
121,000.00
143,000.00
272,250.00
88,000.00
104,500.00
121,000.00
143,000.00
32,175.00
88,000.00
440.00
52,250.00
605.00
35.75
53,330.75
272,250.00
272,250.00
bh
org
440.00
52,250.00
605.00
35.75
53,330.75
168,300.00
168,300.00
bh
org
org
org
org
1,320.00
15,675.00
1,815.00
107.25
18,917.25
440.00
52,250.00
605.00
35.75
53,330.75
32,175.00
1,320.00
56
NO
URAIAN
2
Tukang
Kepala tukang
Mandor
Jumlah
KOEF
3
0.1500
0.0150
0.00075
SAT
4
org
org
org
HARGA SAT
5
104,500.00
121,000.00
143,000.00
HARGA BAHAN
6=(3X5)
32,175.00
HARGA UPAH
7=(3X5)
15,675.00
1,815.00
107.25
18,917.25
57
NO
1
K6
K7
K8
K9
K10
URAIAN
KOEF
2
3
1 BH PASANG ENGSEL JENDELA KUPU - KUPU KECIL
Engsel jendela
1.0000
Pekerja
0.0100
Tukang
0.1000
Kepala tukang
0.0100
Mandor
0.00050
Jumlah
1 BH PASANG KAIT / HAK ANGIN
kait angin
Pekerja
Tukang
Kepala tukang
Mandor
Jumlah
1.0000
0.0150
0.0150
0.0015
0.00075
SAT
HARGA SAT
HARGA BAHAN
HARGA UPAH
6=(3X5)
7=(3X5)
bh
org
org
org
org
24,750.00
24,750.00
bh
org
org
org
org
16,500.00
88,000.00
104,500.00
121,000.00
143,000.00
bh
org
org
org
org
bh
org
org
org
org
1.0000
0.0150
0.1500
0.0150
0.00075
68,310.00
88,000.00
104,500.00
121,000.00
143,000.00
m2
org
org
org
99,000.00
88,000.00
104,500.00
121,000.00
4,400.00
52,250.00
6,050.00
357.50
63,057.50
24,750.00
24,750.00
1.0000
0.0150
0.1500
0.0150
1,320.00
1,567.50
181.50
107.25
3,176.25
68,310.00
68,310.00
24,750.00
88,000.00
104,500.00
121,000.00
143,000.00
880.00
10,450.00
1,210.00
71.50
12,611.50
16,500.00
16,500.00
24,750.00
88,000.00
104,500.00
121,000.00
143,000.00
1,320.00
15,675.00
1,815.00
107.25
18,917.25
99,000.00
1,320.00
15,675.00
1,815.00
58
NO
URAIAN
2
Mandor
Jumlah
KOEF
3
0.0008
SAT
4
org
HARGA SAT
5
143,000.00
HARGA BAHAN
6=(3X5)
99,000.00
HARGA UPAH
7=(3X5)
107.25
18,917.25
59
NO
URAIAN
KOEF
SAT
HARGA SAT
HARGA BAHAN
HARGA UPAH
6=(3X5)
7=(3X5)
M4
M5
M7
1.0000
6.0000
0.0100
1.0000
1.5000
1.5000
0.1600
1.0000
0.0250
0.0100
0.1000
0.0100
0.0050
1.0000
6.0000
0.0100
2.1000
0.7500
0.0700
0.1100
bh
kg
m3
org
org
org
org
4,125,000.00
1,650.00
202,631.58
88,000.00
104,500.00
121,000.00
143,000.00
4,125,000.00
9,900.00
2,026.32
4,136,926.32
bh
Bh
org
org
org
org
84,150.00
1,980.00
88,000.00
104,500.00
121,000.00
143,000.00
84,150.00
49.50
84,199.50
bh
Kg
M3
org
org
org
org
247,500.00
1,650.00
202,631.58
88,000.00
104,500.00
121,000.00
143,000.00
m'
Bh
org
org
org
org
3,960.00
1,386.00
88,000.00
104,500.00
121,000.00
143,000.00
880.00
10,450.00
1,210.00
715.00
13,255.00
247,500.00
9,900.00
2,026.32
259,426.32
1.2000
1.0000
0.0360
0.0600
0.0060
0.0018
88,000.00
156,750.00
181,500.00
22,880.00
449,130.00
184,800.00
78,375.00
8,470.00
15,730.00
287,375.00
4,752.00
1,386.00
3,168.00
6,270.00
726.00
257.40
60
NO
URAIAN
KOEF
SAT
HARGA SAT
Jumlah
M8
1.0000
0.0250
0.0100
0.1000
0.0100
0.0050
Bh
Bh
org
org
org
org
84,150.00
1,980.00
88,000.00
104,500.00
121,000.00
143,000.00
HARGA BAHAN
6=(3X5)
6,138.00
HARGA UPAH
7=(3X5)
10,421.40
84,150.00
49.50
84,199.50
880.00
10,450.00
1,210.00
715.00
13,255.00
61
NO
URAIAN
KOEF
SAT
HARGA SAT
HARGA BAHAN
HARGA UPAH
1
M10
6=(3X5)
7=(3X5)
M11
M12
M13
1.0000
0.0100
0.1000
0.0100
0.0050
1.0000
0.0250
0.0100
0.1000
0.0100
0.0050
1.2000
1.0000
0.0810
0.1350
0.0135
0.0041
1.2000
1.0000
0.0810
0.1350
0.0135
0.0041
Bh
org
org
org
org
103,950.00
88,000.00
104,500.00
121,000.00
143,000.00
103,950.00
103,950.00
bh
Bh
org
org
org
org
84,150.00
1,980.00
88,000.00
104,500.00
121,000.00
143,000.00
84,150.00
49.50
84,199.50
m'
Bh
org
org
org
org
40,342.50
14,119.88
88,000.00
104,500.00
121,000.00
143,000.00
56,925.00
19,923.75
88,000.00
104,500.00
121,000.00
143,000.00
880.00
10,450.00
1,210.00
715.00
13,255.00
48,411.00
14,119.88
62,530.88
m'
Bh
org
org
org
org
880.00
10,450.00
1,210.00
715.00
13,255.00
7,128.00
14,107.50
1,633.50
586.30
23,455.30
68,310.00
19,923.75
88,233.75
7,128.00
14,107.50
1,633.50
586.30
23,455.30
62
ANALISA PEKERJAAN
JUMLAH
8=(6+7)
26,400.00
297.00
15,400.00
8,800.00
10,450.00
1,210.00
715.00
63,272.00
25,245.00
462,000.00
4,455.00
17,325.00
6,078.95
20,350.00
59,994.00
88,000.00
209,000.00
24,200.00
7,150.00
923,797.95
63
JUMLAH
8=(6+7)
99,000.00
64
JUMLAH
8=(6+7)
18,216.00
28,215.00
18,150.00
12,870.00
176,451.00
4,950,000.00
14,850.00
440,000.00
1,567,500.00
181,500.00
35,750.00
7,189,600.00
65
JUMLAH
8=(6+7)
5,445,000.00
22,500.00
440,000.00
1,567,500.00
181,500.00
35,750.00
7,692,250.00
5,445,000.00
45,000.00
440,000.00
1,567,500.00
181,500.00
35,750.00
7,714,750.00
594,000.00
18,216.00
28,215.00
18,150.00
12,870.00
671,451.00
330,000.00
28,215.00
68,640.00
40,755.00
4,719.00
5,577.00
477,906.00
302,500.00
66
JUMLAH
8=(6+7)
268,950.00
105,368.42
132,000.00
62,700.00
7,260.00
10,725.00
889,503.42
67
JUMLAH
8=(6+7)
17,902.50
237.60
616.00
731.50
84.70
42.90
19,615.20
72,000.00
4,500.00
1,575.00
45,760.00
27,170.00
3,146.00
3,718.00
157,869.00
118,831.50
81,000.00
4,500.00
1,575.00
45,760.00
27,170.00
3,146.00
68
JUMLAH
8=(6+7)
3,718.00
166,869.00
123,331.50
69
JUMLAH
8=(6+7)
72,000.00
6,000.00
3,150.00
1,320.00
52,500.00
34,000.00
58,080.00
34,485.00
3,993.00
4,719.00
270,247.00
185,762.00
81,000.00
4,500.00
1,575.00
26,400.00
27,170.00
3,146.00
715.00
144,506.00
100,968.50
0.00
6,000.00
3,150.00
30,800.00
89,100.00
38,981.25
28,160.00
34,485.00
3,993.00
858.00
235,527.25
151,511.63
70
JUMLAH
8=(6+7)
0.00
6,000.00
3,150.00
30,800.00
0.00
38,981.25
28,160.00
34,485.00
3,993.00
858.00
146,427.25
106,961.63
72,000.00
6,000.00
3,150.00
32,400.00
29,700.00
38,981.25
28,160.00
34,485.00
3,993.00
858.00
249,727.25
158,611.63
633,600.00
120,928.50
236,738.33
145,200.00
28,737.50
3,388.00
11,869.00
1,180,461.33
71
JUMLAH
8=(6+7)
4,990,923.00
37,484,647.20
17,352,781.60
59,828,351.80
4,069,955.90
14,133,789.90
31,470,626.88
13,528,086.88
59,132,503.66
5,159,904.33
72
JUMLAH
8=(6+7)
5,426,586.00
9,062,222.40
3,895,522.40
18,384,330.80
5,571,009.33
48,402,320.01
86,195,857.97
32,420,927.85
167,019,105.83
6,081,244.72
4,379,954.22
22,960,140.83
8,636,019.02
35,976,114.07
4,917,591.25
7,153,384.29
9,419,330.19
2,903,934.88
19,476,649.36
7,917,337.14
3,070,721.06
4,043,419.79
1,246,567.17
8,360,708.02
7,917,337.14
32,694,112.00
48,331,852.80
73
JUMLAH
8=(6+7)
20,776,119.47
101,802,084.27
5,784,209.33
9,473,862.00
10,503,939.60
4,515,264.60
24,493,066.20
6,403,416.00
18,635,929.88
34,742,442.24
17,423,609.28
70,801,981.40
4,796,882.21
74
JUMLAH
8=(6+7)
71,280.00
18,777.00
3,647.37
13,365.00
52,800.00
47,025.00
5,445.00
4,290.00
216,629.37
157,500.00
19,387.50
7,092.11
0.00
54,560.00
36,575.00
4,235.00
4,290.00
283,639.61
75
JUMLAH
8=(6+7)
57,475.00
18,975.00
8,713.16
28,160.00
10,450.00
1,210.00
2,145.00
127,128.16
106,328.75
35,103.75
16,119.34
52,096.00
19,332.50
2,238.50
3,968.25
235,187.09
23,562.00
4,660.53
22,000.00
20,900.00
2,420.00
76
JUMLAH
8=(6+7)
1,787.50
75,330.03
77
JUMLAH
8=(6+7)
14,322.00
5,673.68
22,000.00
20,900.00
2,420.00
1,787.50
67,103.18
41.25
20.26
250.80
198.55
229.90
14.30
755.06
7,128.00
3,242.11
22,000.00
10,450.00
1,210.00
2,145.00
46,175.11
78
JUMLAH
8=(6+7)
79
JUMLAH
8=(6+7)
728.64
495.00
7,920.00
3,520.00
4,180.00
484.00
357.50
17,685.14
66,003.30
13,860.00
14,850.00
3,168.00
23,101.16
34,650.00
14,080.00
16,720.00
1,936.00
357.50
188,725.96
80
JUMLAH
8=(6+7)
30,250.00
247.50
4,400.00
5,225.00
605.00
429.00
41,156.50
81
JUMLAH
8=(6+7)
82
JUMLAH
8=(6+7)
24,200.00
3,575.00
284,735.00
83
JUMLAH
8=(6+7)
25,410.00
742.50
8,800.00
20,900.00
3,025.00
715.00
59,592.50
98,214.29
1,237.50
11,572.00
7,315.00
968.00
1,144.00
120,450.79
98,010.00
247.50
35,200.00
20,900.00
2,420.00
286.00
84
JUMLAH
8=(6+7)
157,063.50
85
JUMLAH
8=(6+7)
173,250.00
440.00
52,250.00
605.00
35.75
226,580.75
168,300.00
440.00
52,250.00
605.00
35.75
221,630.75
272,250.00
440.00
52,250.00
605.00
35.75
325,580.75
32,175.00
1,320.00
86
JUMLAH
8=(6+7)
15,675.00
1,815.00
107.25
51,092.25
87
JUMLAH
8=(6+7)
24,750.00
880.00
10,450.00
1,210.00
71.50
37,361.50
16,500.00
1,320.00
1,567.50
181.50
107.25
19,676.25
68,310.00
4,400.00
52,250.00
6,050.00
357.50
131,367.50
24,750.00
1,320.00
15,675.00
1,815.00
107.25
43,667.25
99,000.00
1,320.00
15,675.00
1,815.00
88
JUMLAH
8=(6+7)
107.25
117,917.25
89
JUMLAH
8=(6+7)
84,150.00
49.50
880.00
10,450.00
1,210.00
715.00
97,454.50
247,500.00
9,900.00
2,026.32
184,800.00
78,375.00
8,470.00
15,730.00
546,801.32
4,752.00
1,386.00
3,168.00
6,270.00
726.00
257.40
90
JUMLAH
8=(6+7)
16,559.40
84,150.00
49.50
880.00
10,450.00
1,210.00
715.00
97,454.50
91
JUMLAH
8=(6+7)
103,950.00
880.00
10,450.00
1,210.00
715.00
117,205.00
84,150.00
49.50
880.00
10,450.00
1,210.00
715.00
97,454.50
48,411.00
14,119.88
7,128.00
14,107.50
1,633.50
586.30
85,986.18
68,310.00
19,923.75
7,128.00
14,107.50
1,633.50
586.30
111,689.05
92
NO.
01
A.
1
2
3
4
5
6
7
8
9
10
11
B.
1
2
3
4
5
6
7
MACAM TENAGA
Kepala Tukang Kayu
Kepala Tukang Batu
Kepala Tukang Besi
Mandor
Operator
Pekerja Batu
Pekerja Besi
Pekerja Kayu
Tukang Batu
Tukang Besi
Tukang Kayu
MACAM ALAT
Bar Bender
Bar Cutter
Concrete Mixer
Concrete Pump
Concrete Vibrator
Curing Beton
Alat Pancang Beton
SATUAN
03
Orang
Orang
Orang
Orang
Orang
Orang
Orang
Orang
Orang
Orang
Orang
Per
Per
Per
Per
Per
Per
Per
Per
Per
Per
Per
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
HARGA
SATUAN Rp.
04
121,000.00
121,000.00
121,000.00
143,000.00
132,000.00
88,000.00
88,000.00
88,000.00
104,500.00
104,500.00
104,500.00
12,870.00
12,870.00
74,250.00
247,500.00
50,490.00
39,600.00
148,500.00
93
MACAM
BAHAN/ALAT
02
NO.
01
C.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
MACAM BAHAN
Alkali
Amplas / ampril / kertas gosok
Baja Profil
Bak Mandi teraso
Bak Cuci Stainliss
Batchup
Batu Bata Merah
Batu gunung ( gebal/besar )
Batu Alam
Batu Apung
Bendrad
Besi beton polos/Ulir
Besi strip
Besi profil
Besi / Kawat Berduri
Box Meteran Listrik
Cincin Pipa Besi 4" Tebal 5mm-20cm
Cat tembok dalam setara mowilex
Cat tembok luar setara mowilex
Cat tembok dasar setara mowilex
Cat kayu besi setara aftelak
Cat kayu besi setara mowilex
Cat M e n y kayu / besi setara nippon
Cat M e n y kayu setara nippon
Cat Clear Doof
Closet jongkok ex toto
Closet duduk ex toto
Urinoir Ex toto
Wastafel komplit kaca & asesories Ex Toto
Dempul
Engsel jendela 3"
Engsel pintu 4"
SATUAN
03
Per Kg
Per Lbr
Per Kg
Per bh
Per bh
Per bh
Per bh
Per m3
Per M2
Per Kg
Per kg
Per kg
Per kg
Per kg
Per kg
Per Bh
Per Bh
Per kg
Per kg
Per kg
Per kg
Per kg
Per kg
Per kg
Per lt
Per bh
Per bh
Per bh
Per bh
Per kg
Per bh
Per bh
HARGA
SATUAN Rp.
04
50,490.00
3,960.00
19,250.00
247,500.00
742,500.00
1,485,000.00
1,045.00
275,000.00
148,500.00
24,750.00
15,840.00
17,050.00
20,592.00
18,304.00
24,750.00
29,700.00
29,700.00
47,520.00
64,350.00
47,520.00
31,680.00
47,520.00
23,760.00
8,538.75
99,000.00
247,500.00
4,125,000.00
2,722,500.00
3,217,500.00
9,108.00
24,750.00
32,175.00
94
MACAM
BAHAN/ALAT
02
NO.
01
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
Fiber Bergelombang
Floor drain
Genteng Keramik
Genteng Nok Metal
Genteng Metal 2 susun setara sakura elang
Gerendel jendela / bouvenlist
Gypsum Board 9 mm
Gypsum List
GRC BOARD
Kabel NYY 2,5 mm
Kaca bening t = 5 mm
Kaca bening Frameless t = 12 mm
Kaca riben t = 5 mm
Kait Angin / Hak Angin
Kasa
Kayu bangkirai Papan 2/10
Kayu Bangkirai Balok 5/7, 6/12, 8/12
Kayu Bangkirai Listpalnk
Kayu Kapur Papan 2/10
Kayu Kapur Balok 5/7, 6/12, 8/12
Kayu Kapur / Bangkirai Lumber Siring
Kayu meranti Balok 5/7
Kayu Meranti Papan 3/20, 2/20
Kayu Meranti Bouwplank / Begesting
( Kayu perancah / perancah d 8 cm panjang 4 m )
Kayu Ulin Balok 10/10
Kayu Ulin Papan 3/30
Keramik Dinding 20 x 25 cm ex. Roman
Keramik lantai 20 x 20 cm ex. Roman
Keramik lantai 30 x 30 cm ex. Roman
Keramik lantai 40 x 40 cm ex. Roman
Keramik list dinding 10 x 20 cm ex. Roman
Keramik list dinding 10 x 40 cm ex. Roman
Keramik lantai 40 x 40 cm ex. Ezenza
Keramik lantai 30 x 30 cm ex. Ezenza
SATUAN
03
Per Lbr
Per bh
Per Bh
Per Bh
Per Lbr
Per bh
Per Lbr
Per M'
Per Lbr
Per Rol
Per m2
Per m2
Per m2
Per bh
Per M'
Per m3
Per m3
Per m'
Per m3
Per m3
Per Lbr
Per m3
Per m3
Per m3
Per Btg
Per m3
Per m3
Per m2
Per m2
Per m2
Per m2
Per bh
Per bh
Per m2
Per m2
HARGA
SATUAN Rp.
04
74,250.00
103,950.00
16,335.00
32,670.00
55,000.00
24,750.00
99,000.00
27,500.00
66,000.00
196,020.00
99,000.00
198,000.00
123,750.00
16,500.00
3,465.00
5,280,000.00
4,950,000.00
38,500.00
3,300,000.00
3,190,000.00
41,250.00
2,310,000.00
2,420,000.00
2,200,000.00
14,850.00
4,950,000.00
5,500,000.00
71,280.00
71,280.00
71,280.00
71,280.00
11,385.00
22,770.00
193,050.00
193,050.00
95
MACAM
BAHAN/ALAT
02
NO.
01
68
69
70
71
Koral Beton
Kran air / stop k 1/2"
Kuas 2,5"
Kunci Tanam 1 putaran untuk wc/km
SATUAN
03
Per m3
Per bh
Per bh
Per bh
HARGA
SATUAN Rp.
04
407,000.00
84,150.00
4,950.00
168,300.00
96
NO.
01
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
MACAM
BAHAN/ALAT
02
Kunci Tanam 2 putaran
Kunci Silinder sekualitas ELT
Kusen pintu/jendela aluminium
Lampu TL Philips 2 x 20 Watt
Lampu Gantung TL Philips 2 x 20 Watt
Lampu TL Philips 2 x 40 Watt
Lampu XL Philips 10 Watt
Lampu XL Philips 18 Watt
Lem Kayu (Fox)
Minyak Begesting
Minyak Cat / Tiner A
Nok/kerpus atap multi roof
Nok/kerpus atap Fiberglass
Paku Biasa
Paku Baut
Paku Gypsum ( Paku sekrup )
Paku Genteng Metal
Paku Plywood 1,5 mm
Pasir beton / palu
Pasir pasang Tenggarong
Pasir urug Mahakam
Paving Blok
Pegangan / Handle Jendela
Pegangan / Door Holder
Penyekat Urinoir
Pipa pralon PVC dia. 4" AW
Pipa pralon PVC dia. 3" AW
Pipa pralon PVC dia. 2" AW
Pipa pralon PVC dia. 3/4" AW
Pipa pralon PVC dia. 1/2"
Pipa pralon untuk listrik
Plamir kayu
Plastik cor
Plywood/ tripleks tb. 4 mm
Plywood/ tripleks tb. 9 mm
SATUAN
03
Per bh
Per bh
Per m'
Per bh
Per bh
Per bh
Per bh
Per bh
Per Kg
Per lt
Per lt
Per bh
Per bh
Per kg
Per Bh
Per kg
Per kg
Per kg
Per m3
Per m3
Per m3
Per Bh
Per bh
Per bh
Per bh
Per m'
Per m'
Per m'
Per m'
Per m'
Per m'
Per kg
Per m2
Per lb
Per lb
HARGA
SATUAN Rp.
04
272,250.00
173,250.00
209,880.00
148,500.00
198,000.00
247,500.00
24,750.00
34,650.00
22,770.00
15,592.50
24,750.00
25,740.00
34,650.00
14,850.00
7,425.00
24,750.00
24,750.00
17,325.00
242,550.00
202,631.58
94,050.00
2,970.00
24,750.00
68,310.00
704,880.00
56,925.00
40,342.50
23,760.00
8,910.00
3,960.00
1,980.00
47,520.00
4,950.00
49,500.00
111,375.00
97
NO.
01
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
MACAM
BAHAN/ALAT
02
Plywood/ tripleks tb. 12 mm
Plywood/ tripleks sungkai
Rangka Atap Baja Ringan
Residu
Saklar Tunggal
Saklar Double
Saklar Triple
Sambungan Tiang Pancang Kayu / Shock 4"
Sambungan Tiang Pancang Beton / Las
Sanding Sailer
Seal Tape
Sekring Lokal
Semen Portland @ 50 Kg
Semen Portland
Semen warna
Seng gelombang 0,8 x 2,10 BJLS 30 ( Zincalume )
Seng gelombang 0,8 x 2,10 BJLS 20
Seng gelombang 0,8 x 2,10 BJLS 18
Stop Kontak
Talang seng t=0.2 mm, L=60 cm
T Dos
T a n a h Urug
Tiang Pancang 20 x 20 K-450
Water Proofing
Wood Filler
Wood Stain (pewarna)
SATUAN
03
Per lb
Per lb
Per M2
Per ltr
Per bh
Per bh
Per bh
Per bh
Per Titik
Per Kg
Per bh
Per bh
Per kg
Per Zak
Per kg
Per lb
Per lb
Per lb
Per bh
Per m'
Per bh
Per m3
Per m'
Per m2
Per kg
Per kg
HARGA
SATUAN Rp.
04
148,500.00
99,000.00
396,000.00
7,920.00
24,750.00
29,700.00
34,650.00
44,550.00
141,570.00
34,650.00
1,980.00
42,075.00
1,650.00
82,500.00
8,910.00
72,270.00
39,996.00
35,640.00
29,700.00
24,750.00
7,425.00
47,025.00
59,400.00
130,680.00
34,650.00
37,125.00
98
v
10
2.5
6.5
18.75
18.5
15
10
18.125
3
0
0
1
1
1
0
3
30
0
0
18.75
18.5
15
0
54.375
244.13
DINDING LT 1
h
14.7
4
1.5
19
4
2.7
3
29
5
2
29
2
1
1
1
1
1
1
1
1
1
1
29.4
4
1.5
19
4
2.7
3
29
5
2
29
10
2.5
6.5
18.75
18.5
15
10
18.125
V
10
3.35
3.075
2.23
6.35
1.425
4.3
2.1
3.3
3.2
6
4
5
12
128.6
DINDING LT 2
h
15.7
12
1
1
15.7
12
V
10
6.5
2.5
4
29
16
8
29
1
3
1
1
1
1
1
1
1
6.5
7.5
4
29
16
8
29
0
0
3.8
6.35
3.925
7
12
7.8
17
2.3
2.2
127.7
DINDING LT 3
h
14
12
6.5
2.5
4
14
8
2.5
16
1
1
1
3
1
1
1
1
1
1
1
14
12
6.5
7.5
4
14
8
2.5
16
0
0
84.5
V
18
3.8
6.35
11
8.5
14
31.25
0
19.75
34.8
17.125
0
1
1
0
0
0
1
0
0
2.5
6.5
0
0
0
10
0
121.93
1
1
2
1
1
1
2
1
1
1
1
4
1
1
10
3.35
6.15
2.23
6.35
1.425
8.6
2.1
3.3
3.2
6
16
5
12
85.705
10
PINTU
8
15.12
7
11.76
26.88
PINTU FG
22.5
49.38
214.305 M1
16
PINTU
30.24
6
1
4
1
1
1
1
1
1
22.8
6.35
15.7
7
12
7.8
17
2.3
2.2
103.15
1
5
1
1
2
1
18
19
6.35
11
17
14
85.35
8.4
38.64
230.85 M1
11
5
PINTU
20.79
8.4
29.19
169.85 M1