Está en la página 1de 102

RENCANA ANGGARAN BIAYA

(RAB)
:PEKERJAAN

P EM B A N G U N A N R U M A H TO K O & K O S T
JA LA N G N . C ER M A I S A M A R IN D A

-TAHUN 2014-

:PEKERJAAN

A N R U M A H TO K O & K O S T

N G N . C ER M A I S A M A R IN D A

REKAPITULASI RENCANA ANGGARAN BIAYA (RAB)


PEKERJAAN
LOKASI
TAHUN

: PEMBANGUNAN RUMAH TEMPAT TINGGAL


: Jl. ......................................, Samarinda
:

NO

2015

URAIAN PEKERJAAN

JUMLAH HARGA (Rp)

PEKERJAAN PENDAHULUAN

8,011,872.00

II

PEKERJAAN TANAH

III

PEKERJAAN PONDASI

167,842,036.98

IV

PEKERJAAN STRUKTUR KONSTRUKSI BETON

415,530,387.97

PEKERJAAN KUDA-KUDA, ATAP dan LISTPLANG

172,963,487.14

VI

PEKERJAAN DINDING PAS. BATA, PLESTERAN & ORNAMEN

619,015,199.26

VII

PEKERJAAN LANTAI, PLAFOND

631,442,663.11

VIII

PEKERJAAN KUSEN, DAUN PINTU JENDELA DAN KACA

134,536,265.40

IX

PEKERJAAN PENGECATAN, BATU ALAM & ORNAMEN PAGAR BESI

144,200,952.71

PEKERJAAN SANITASI & SEPTICTANK

114,931,808.35

XI

PEKERJAAN MEKANIKAL DAN ELEKTRIKAL

148,446,450.00

39,450,163.50

JUMLAH

2,596,371,286.41

JUMLAH PEMBULATAN

2,596,371,000.00

Terbilang : (Tiga Milyar Empat Ratus Lima Puluh Dua Juta Lima Ratus Empat Puluh Sembilan Ribu Rupiah)
Samarinda, Oktober 2014
:Dibuat Oleh

P E M I L I K

P E M I L I K

RENCANA ANGGARAN BIAYA (RAB)


PEKERJAAN

: PEMBANGUNAN RUMAH TEMPAT TINGGAL

LOKASI

: Jl. ......................................, Samarinda

TAHUN

: 2015

URAIAN KEGIATAN

SATUAN

KODE
ANALISA

VOLUME

M2
M1

A1
A2

300.00
102.00

M3
M3
M3
M3

B1
B3
B4 + B5
B6

132.72
33.18
195.00
22.46

Ttk
M3
Ttk
M3
M3

B7
B7A
Bc
B9
B10

138.00
2.39
120.00
12.24
44.88

I.

PEKERJAAN PENDAHULUAN
1 Pembersihan Lokasi Bangunan
2 Pemasangan Bowplank
JUMLAH I
II. PEKERJAAN TANAH
1 Galian Tanah Pondasi Poor Plate dan Pondasi Menerus
2 Urugan Tanah Kembali
3 Urugan Tanah dan Pemadatan Peninggian Lantai Bangunan
4 Urugan Pasir Bawah Pondasi
JUMLAH II
III. PEKERJAAN PONDASI
1 Pek. Cerucuk Kayu Ulin 10/10 - 2 m'
2 Kalang Ulin 5/10 dan Kalang Ulin 5/10 Setempat
3 Pek. Pancang Kayu Ulin 10/10 - 12 m' Poor Plate
4 Pas Aanstamping Batu Gunung
5 Pas Batu Gunung 1 : 4
JUMLAH III

RAB RUMAH

RENCANA ANGGARAN BIAYA (RAB)


PEKERJAAN

: PEMBANGUNAN RUMAH TEMPAT TINGGAL

LOKASI

: Jl. ......................................, Samarinda

TAHUN

: 2015

URAIAN KEGIATAN
1
IV. PEKERJAAN STRUKTUR KONSTRUKSI BETON
PEKERJAAN COR BETON BERTULANG K.250
1 Beton Lantai Kerja Bawah Foot Plat dan Bawah Lantai
2 Beton Foot Plat 1.20x1.20
3 Beton Sloof 20 x 30
4 Beton Sloof 15 x 20
5 Beton Kolom 30 x 30 utama Elevasi -1.00 ke +3.60
6 Beton Kolom 13 x 13 praktis Elevasi +0.00 - ke +3.60
7 Beton Balok Elevasi +3.60 (25 x 35)
8 Beton Balok Elevasi +3.60 (20 x 30)
9 Beton Untuk Plat Lantai tebal 12 cm Elevasi +3.60
10 Beton Kolom 25 x 25 utama Elevasi +3.60 ke +7.20
11 Beton Kolom 13 x 13 praktis Elevasi +3.60 - ke +7.20
12 Beton Balok Elevasi +7.20 (20 x 30)
13 Beton Balok Elevasi +7.20 (15 x 20) Ring Balk
14 Beton Untuk Plat Duck tebal 10 cm Elevasi + 7.20
15 Beton Untuk Tangga
JUMLAH IV

RAB RUMAH

SATUAN

KODE
ANALISA

VOLUME

M3
M3
M3
M3
M3
M3
M3
M4
M3
M3
M3
M3
M3
M3
M3

C15
C16
C17
C18
C22
C23
C19
C20
C24
C22
C23
C20
C20
C25

16.88
10.37
7.56
2.07
7.15
0.73
9.23
2.64
13.08
5.40
0.85
2.22
8.40
2.10
3.24

RENCANA ANGGARAN BIAYA (RAB)


PEKERJAAN

: PEMBANGUNAN RUMAH TEMPAT TINGGAL

LOKASI

: Jl. ......................................, Samarinda

TAHUN

: 2015

URAIAN KEGIATAN
1
V.
PEKERJAAN KUDA-KUDA, ATAP dan LISTPLANG
1 Kuda-Kuda Baja Ringan & rangka Atap
2 Pasang Atap Genteng Metal
3 Pasang Nok Metal
4 Listplang Papan GRC Finishing Cat
JUMLAH V
VI. PEKERJAAN DINDING PAS. BATA, PLESTERAN & ORNAMEN
LANTAI 1
1 Pasangan Dinding 1/2 bata 1:4
2 Pasangan Dinding 1/2 bata 1:2 Saluran Keliling
3 Plesteran Dinding 1 : 4
4 Plesteran Dinding 1 : 2
5 Plesteran Ornamen
LANTAI 2
1 Pasangan Dinding 1/2 bata 1:4
2 Plesteran Dinding 1 : 4
3 Plesteran Ornamen
LANTAI 3
1 Pasangan Dinding 1/2 bata 1:4
2 Plesteran Dinding 1 : 4
RAB RUMAH

SATUAN

KODE
ANALISA

VOLUME

M2
M2
M1
M1

I1
I3
I4
I2

375.00
375.00
15.00
108.00

M2
M2
M2
M2
Ls

E2
E1
E4
E3

679.24
87.75
1,358.48
175.50
1.00

M2
M2
Ls

E2
E4

884.76
1,769.52
1.00

M2
M2

E2
E4

650.21
1,300.42

RENCANA ANGGARAN BIAYA (RAB)


PEKERJAAN

: PEMBANGUNAN RUMAH TEMPAT TINGGAL

LOKASI

: Jl. ......................................, Samarinda

TAHUN

: 2015

URAIAN KEGIATAN

SATUAN

2
Ls

3 Plesteran Ornamen
JUMLAH VI

RAB RUMAH

KODE
ANALISA

VOLUME

4
1.00

10

RENCANA ANGGARAN BIAYA (RAB)


PEKERJAAN

: PEMBANGUNAN RUMAH TEMPAT TINGGAL

LOKASI

: Jl. ......................................, Samarinda

TAHUN

: 2015

URAIAN KEGIATAN
1
VII. PEKERJAAN LANTAI, PLAFOND
PEKERJAAN LANTAI KERAMIK UNTUK LANTAI 1
1 Cor Rabat Parkir Area
2 Lantai Keramik 40/40
3 Keramik tangga 30/30
4 Lantai Keramik 20/20 U KM/WC
5 Dinding Keramik 20/25 u km/wc
PEKERJAAN LANTAI KERAMIK UNTUK LANTAI 2
1 Lantai Keramik 40/40
2 Keramik tangga 30/30
3 Lantai Keramik 20/20 U KM/WC
4 Dinding Keramik 20/25 u km/wc
PEKERJAAN LANTAI KERAMIK UNTUK LANTAI 3
1 Lantai Keramik 40/40
2 Lantai Keramik 20/20 U KM/WC
3 Dinding Keramik 20/25 u km/wc
PEKERJAAN PLAFOND UNTUK LANTAI 1
1 Pasang Rangka plafond Hollow
2 Pasang bahan plafond gipsum
3 Pasang list plafon
RAB RUMAH

SATUAN

KODE
ANALISA

VOLUME

M3
M2
M2
M2
M2

C1
D2
D2
D3

8.50
434.65
72.20
17.85
107.80

M2
M2
M2
M2

D2
D2
D2
D3

426.50
72.20
26.00
97.60

M2
M2
M2

D2
D2
D3

294.75
26.00
97.60

M2
M2
M1

E.001
G2
G4

434.65
434.65
905.00

11

RENCANA ANGGARAN BIAYA (RAB)


PEKERJAAN

: PEMBANGUNAN RUMAH TEMPAT TINGGAL

LOKASI

: Jl. ......................................, Samarinda

TAHUN

: 2015

URAIAN KEGIATAN
1
PEKERJAAN PLAFOND UNTUK LANTAI 2
1 Pasang Rangka plafond Hollow
2 Pasang bahan plafond gipsum
3 Pasang list plafon
PEKERJAAN PLAFOND UNTUK LANTAI 3
1 Pasang Rangka plafond Hollow
2 Pasang bahan plafond gipsum
3 Pasang list plafon
JUMLAH VII

RAB RUMAH

SATUAN

KODE
ANALISA

VOLUME

M2
M2
M1

E.001
G2
G4

426.50
426.50
905.00

M2
M2
M1

E.001
G2
G4

294.75
294.75
589.50

12

RENCANA ANGGARAN BIAYA (RAB)


PEKERJAAN

: PEMBANGUNAN RUMAH TEMPAT TINGGAL

LOKASI

: Jl. ......................................, Samarinda

TAHUN

: 2015

URAIAN KEGIATAN
1
VIII.PEKERJAAN KUSEN, DAUN PINTU JENDELA DAN KACA
PEKERJAAN KUSEN, DAUN PINTU, JENDELA & KACA UNTUK LANTAI 1
1 Pasang Folding Gate Ruko
2 Pasang Kusen, pintu, jendela Kayu
3 Pasang Pintu Panel Rangka Kayu bengkirai/kapur
4 Pasang Daun Jendela kaca Rangka Kayu
5 Pasang kaca Bening 5 mm
6 Pasang Kunci Pintu 2x putar setara SES
7 Pasang Engsel Pintu
8 Pasang Engsel Jendela
9 Pasang Grendel Jendela
10 Pasang Hak angin
PEKERJAAN KUSEN, DAUN PINTU, JENDELA & KACA UNTUK LANTAI 2
1 Pasang Kusen, pintu, jendela Kayu
2 Pasang Pintu Panel Rangka Kayu bengkirai/kapur
3 Pasang Daun Jendela kaca Rangka Kayu
4 Pasang kaca Bening 5 mm
5 Pasang Kunci Pintu 2x putar setara SES
6 Pasang Engsel Pintu
7 Pasang Engsel Jendela
8 Pasang Grendel Jendela
RAB RUMAH

SATUAN

KODE
ANALISA

VOLUME

M2
M'
M2
M2
M2
Bh
BH
BH
BH
BH
M'
M2
M2
M2
Bh
BH
BH
BH

F.001
F.002
F.003
K10
K4
K5
K6
K9
F.001
F.002
F.003
K10
K4
K5
K6

22.50
104.20
22.47
3.25
4.88
14.00
42.00
10.00
10.00
10.00
170.80
35.70
3.90
5.85
22.00
66.00
12.00
12.00

13

RENCANA ANGGARAN BIAYA (RAB)


PEKERJAAN

: PEMBANGUNAN RUMAH TEMPAT TINGGAL

LOKASI

: Jl. ......................................, Samarinda

TAHUN

: 2015

URAIAN KEGIATAN

SATUAN

KODE
ANALISA

2
BH

3
K9

4
12.00

M'
M2
M2
M2
Bh
BH
BH
BH
BH

F.001
F.002
F.003
K10
K4
K5
K6

104.20
22.47
3.25
4.88
14.00
42.00
10.00
10.00
10.00

9 Pasang Hak angin


PEKERJAAN KUSEN, DAUN PINTU, JENDELA & KACA UNTUK LANTAI 3
1 Pasang Kusen, pintu, jendela Kayu
2 Pasang Pintu Panel Rangka Kayu bengkirai/kapur
3 Pasang Daun Jendela kaca Rangka Kayu
4 Pasang kaca Bening 5 mm
5 Pasang Kunci Pintu 2x putar setara SES
6 Pasang Engsel Pintu
7 Pasang Engsel Jendela
8 Pasang Grendel Jendela
9 Pasang Hak angin
JUMLAH VIII

RAB RUMAH

K9

VOLUME

14

RENCANA ANGGARAN BIAYA (RAB)


PEKERJAAN

: PEMBANGUNAN RUMAH TEMPAT TINGGAL

LOKASI

: Jl. ......................................, Samarinda

TAHUN

: 2015

URAIAN KEGIATAN
1
IX. PEKERJAAN PENGECATAN, BATU ALAM & ORNAMEN PAGAR BESI
1 Cat Dinding Tembok dan Plafond
2 Cat Minyak Kusen, Pintu, Jendela, Lisplank
3 Batu Alam atau Finishing Dinding dengan cat motif
4 Pagar Besi Hollow Galvanis Finishing Cat (Tangga + Balkon)
JUMLAH IX
X.
PEKERJAAN SANITASI & SEPTICTANK
1 Kloset Dudukk + Acsesoris Lengkap (Ex. Toto)
2 Bak Mandi fiber Lapis Keramik
3 Septicktang Beton dan Pasangan Bata
1. Pengukuran dan Bowplang
2. Galian Tanah biasa
3. Urugan Tanah Kembali
4. Urugan Pasir
5. Cor Beton Bertulang Konstruksi
6. Cor Beton Bertulang Plat Lantai Penutup (Bawah & Atas)
7. Pemasangan Peresapan Buis Beton diameter 50 cm + Acsesoris
8. Pasangan Bata Dinding 1 : 2
9. Plesteran Dinding 1 : 2
10. Pemasangan Pipa PVC 4"
11. Pemasangan Pipa Udara PVC 2" + Acsesorisnya
RAB RUMAH

SATUAN

KODE
ANALISA

VOLUME

M2
M2
M2
M1

F1
F3

4,428.42
654.18
32.00
134.00

Bh
Bh

M1

16.00
4.00

M1
M3
M3
M3
M3
M3
Bh
M2
M2
M1
M1

A2
B1
B3
B6
C18
C25

24.00
24.26
7.28
1.00
1.82
2.11
4.00
41.60
83.20
48.00
16.00

15

RENCANA ANGGARAN BIAYA (RAB)


PEKERJAAN

: PEMBANGUNAN RUMAH TEMPAT TINGGAL

LOKASI

: Jl. ......................................, Samarinda

TAHUN

: 2015

URAIAN KEGIATAN

SATUAN

KODE
ANALISA

VOLUME

JUMLAH X

RAB RUMAH

16

RENCANA ANGGARAN BIAYA (RAB)


PEKERJAAN

: PEMBANGUNAN RUMAH TEMPAT TINGGAL

LOKASI

: Jl. ......................................, Samarinda

TAHUN

: 2015

URAIAN KEGIATAN

XI.

1
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL

SATUAN

KODE
ANALISA

VOLUME

A PEKERJAN ELEKTRIKAL
1 Pek Sekring Listrik
1(. Sekring 2 Group

unit

2 Pek Lampu Penerangan


1(. Lampu RMI 20 Watt
2(. Lampu Down Light,1 x 18 Watt
3(. Lampu XL 18 Watt
4(. Stop kontak, 10 A
5(. Saklar tunggal
6(. Saklar seri

bh
bh
bh
bh
bh
bh

8.00

8.00
100.00
50.00
112.00
50.00
50.00

S
3 Pek Instalasi
1(. Instalasi penerangan
2(. Instalasi stop kontak

Ttk
Ttk

258.00
112.00

RAB RUMAH

17

RENCANA ANGGARAN BIAYA (RAB)


PEKERJAAN

: PEMBANGUNAN RUMAH TEMPAT TINGGAL

LOKASI

: Jl. ......................................, Samarinda

TAHUN

: 2015

URAIAN KEGIATAN

SATUAN

KODE
ANALISA

VOLUME

B PEKERJAAN MEKANIKAL
a Pek,Instalasi Air Bersih
B.a,1 Pek Air Bersih Lantai I
2(. Pipa PVC 1/2" AW

m
Bh
Ls

150.00
17.00
1.00

B.b,1 Pek Air Kotor & Bekas Lantai I


1(. Pipa PVC 4" AW
2(. Pipa PVC 2" AW
4(. Floor Drain
6(. Fitting - Fitting ) Elbow, Tee, Reduser,etc (

m
m
Bh
Ls

60.00
60.00
17.00
1.00

B.c Pek Air Hujan


1(. Pipa PVC 2 1/2 "
2(. Roof Drain
3(. Fitting - Fitting ) Elbow, Tee, Reduser,etc (

m
Bh
Ls

88.00
8.00
1.00

3(. Kran 1/2 "


5(. Fitting - Fitting ) Elbow, Tee, Reduser,etc (

Pek,Instalasi Air Kotor & Bekas

JUMLAH
RAB RUMAH

18

RENCANA ANGGARAN BIAYA (RAB)


PEKERJAAN

: PEMBANGUNAN RUMAH TEMPAT TINGGAL

LOKASI

: Jl. ......................................, Samarinda

TAHUN

: 2015

URAIAN KEGIATAN

SATUAN

KODE
ANALISA

VOLUME

JUMLAH PEMBANGUNAN

RAB RUMAH

19

NGGARAN BIAYA (RAB)

HARGA SAT.

(Rp.)

JUMLAH (Rp.)
6

15,950.00
31,636.00

4,785,000.00
3,226,872.00
8,011,872.00

69,575.00
19,613.00
135,410.00
140,690.00

9,233,994.00
650,759.34
26,404,950.00
3,160,460.16
39,450,163.50

176,451.00
7,189,600.00
671,451.00
477,906.00
889,503.42

24,350,238.00
17,147,196.00
80,574,120.00
5,849,569.44
39,920,913.54
167,842,036.98

RAB RUMAH

20

NGGARAN BIAYA (RAB)

HARGA SAT.

(Rp.)

JUMLAH (Rp.)
6

1,180,461.33
4,069,955.90
5,159,904.33
5,571,009.33
5,784,209.33
6,403,416.00
6,081,244.72
4,917,591.25
4,796,882.21
5,784,209.33
6,403,416.00
4,917,591.25
5,784,209.33
4,796,882.21
5,784,209.33

RAB RUMAH

19,927,367.77
42,197,302.82
39,008,876.76
11,531,989.32
41,357,096.73
4,675,005.95
56,099,482.56
12,982,440.90
62,743,219.29
31,234,730.40
5,454,173.61
10,917,052.58
48,587,358.40
10,073,452.64
18,740,838.24
415,530,387.97

21

NGGARAN BIAYA (RAB)

HARGA SAT.

(Rp.)

JUMLAH (Rp.)
6

317,340.00
120,450.79
157,063.50
59,592.50

119,002,500.00
45,169,044.64
2,355,952.50
6,435,990.00
172,963,487.14

127,128.16
138,407.50
67,103.18
75,330.03
5,000,000.00

86,350,529.97
12,145,258.13
91,158,333.69
13,220,419.62
5,000,000.00

127,128.16
67,103.18
5,000,000.00

112,477,908.98
118,740,426.52
5,000,000.00

127,128.16
67,103.18

82,659,999.54
87,262,322.81

RAB RUMAH

22

NGGARAN BIAYA (RAB)

HARGA SAT.

(Rp.)

5
5,000,000.00

RAB RUMAH

JUMLAH (Rp.)
6
5,000,000.00
619,015,199.26

23

NGGARAN BIAYA (RAB)

HARGA SAT.

(Rp.)

JUMLAH (Rp.)
6

1,025,706.00
211,592.53
211,592.53
211,592.53
216,629.37

8,718,501.00
91,968,691.56
15,276,980.40
3,776,926.59
23,352,645.92

211,592.53
211,592.53
211,592.53
216,629.37

90,244,212.47
15,276,980.40
5,501,405.68
21,143,026.36

211,592.53
211,592.53
216,629.37

62,366,897.13
5,501,405.68
21,143,026.36

95,575.00
50,127.00
41,156.50

41,541,673.75
21,787,700.55
37,246,632.50

RAB RUMAH

24

NGGARAN BIAYA (RAB)

HARGA SAT.

(Rp.)

JUMLAH (Rp.)
6

95,575.00
50,127.00
41,156.50

40,762,737.50
21,379,165.50
37,246,632.50

95,575.00
50,127.00
41,156.50

28,170,731.25
14,774,933.25
24,261,756.75
631,442,663.11

RAB RUMAH

25

NGGARAN BIAYA (RAB)

HARGA SAT.

(Rp.)

JUMLAH (Rp.)
6

750,000.00
83,859.58
654,335.00
481,591.00
117,917.25
325,580.75
51,092.25
37,361.50
15,000.00
19,676.25

16,875,000.00
8,738,168.17
14,702,907.45
1,565,170.75
574,846.59
4,558,130.50
2,145,874.50
373,615.00
150,000.00
196,762.50

83,859.58
654,335.00
481,591.00
117,917.25
325,580.75
51,092.25
37,361.50
15,000.00

14,323,216.16
23,359,759.50
1,878,204.90
689,815.91
7,162,776.50
3,372,088.50
448,338.00
180,000.00

RAB RUMAH

26

NGGARAN BIAYA (RAB)

HARGA SAT.

(Rp.)

JUMLAH (Rp.)
6

19,676.25

236,115.00

83,859.58
654,335.00
481,591.00
117,917.25
325,580.75
51,092.25
37,361.50
15,000.00
19,676.25

8,738,168.17
14,702,907.45
1,565,170.75
574,846.59
4,558,130.50
2,145,874.50
373,615.00
150,000.00
196,762.50
134,536,265.40

RAB RUMAH

27

NGGARAN BIAYA (RAB)

HARGA SAT.

(Rp.)

JUMLAH (Rp.)
6

15,661.25
20,248.80
250,000.00
400,000.00

69,354,592.73
13,246,359.98
8,000,000.00
53,600,000.00
144,200,952.71

4,586,056.32
500,000.00

73,376,901.05
2,000,000.00

31,636.00
69,575.00
19,613.00
140,690.00
5,571,009.33
4,796,882.21
250,000.00
138,407.50
75,330.03
63,250.00
31,500.00

759,264.00
1,687,889.50
142,743.41
140,690.00
10,128,094.97
10,131,015.22
1,000,000.00
5,757,752.00
6,267,458.19
3,036,000.00
504,000.00

RAB RUMAH

28

NGGARAN BIAYA (RAB)

HARGA SAT.

(Rp.)

JUMLAH (Rp.)
6
114,931,808.35

RAB RUMAH

29

NGGARAN BIAYA (RAB)

HARGA SAT.

(Rp.)

JUMLAH (Rp.)
6

1,000,000.00
Sub Total, A,a, I
750,000.00
150,000.00
150,000.00
50,750.00
43,350.00
50,750.00
Sub Total,A, a, III
225,000.00
225,000.00
Sub Total,A, a, IV
TOTAL, A

RAB RUMAH

8,000,000.00

8,000,000.00
6,000,000.00
15,000,000.00
7,500,000.00
5,684,000.00
2,167,500.00
2,537,500.00

38,889,000.00
58,050,000.00
25,200,000.00

83,250,000.00
130,139,000.00

30

NGGARAN BIAYA (RAB)

HARGA SAT.

(Rp.)

JUMLAH (Rp.)
6

14,600.00
78,500.00
750,000.00
Sub Total, B,a, I

2,190,000.00
1,334,500.00
750,000.00
4,274,500.00

63,250.00
31,500.00
103,950.00
750,000.00
Sub Total, B.b, I

3,795,000.00
1,890,000.00
1,767,150.00
750,000.00
8,202,150.00

34,600.00
254,500.00
750,000.00

JUMLAH TOTAL, A , B.
RAB RUMAH

3,044,800.00
2,036,000.00
750,000.00
5,830,800.00

18,307,450.00
148,446,450.00

31

NGGARAN BIAYA (RAB)

HARGA SAT.

(Rp.)

JUMLAH (Rp.)

2,596,371,286.41

RAB RUMAH

32

ANALISA PEKERJAAN
NO

URAIAN

KOEF

SAT

HARGA SAT

HARGA BAHAN

HARGA UPAH

6=(3X5)

7=(3X5)

A. ANALISA PEKERJAAN PERSIAPAN / PENDAHULUAN


A1
SNI
6.8
03-2835-2002

A2
SNI
6.4
03-2835-2002

A3

1 M2 Pembersihan Lahan
Pekerja
Mandor
Jumlah

0.1000
0.0500

org
org

88,000.00
143,000.00
0.00

1 M' Pengukuran dan Pemasangan Bouwplank


kayu meranti bouwplank 5/7
Paku Biasa
Kayu Papan Meranti Bouwplank 3/20
Pekerja
Tukang
Kepala tukang
Mandor
Jumlah

0.0120
0.0200
0.0070
0.100
0.100
0.010
0.0050

1 M2 PEMBUATAN DIREKSI KEET


Kayu Dolken D 8-10 cm - 4 m
Kayu Meranti
Paku
Semen Portland
Pasir Pasang
Koral Beton
Seng Gelombang BJLS 30
Pekerja
tukang kayu
Kepala tukang
Mandor
Jumlah

1.700
0.210
0.300
10.500
0.030
0.050
1.500
1.0000
2.0000
0.2000
0.0500

M
kg
M
org
org
org
org

2,200,000.00
14,850.00
2,200,000.00
88,000.00
104,500.00
121,000.00
143,000.00

26,400.00
297.00
15,400.00

42,097.00

Btg
M3
Kg
Kg
m3
m3
Lbr
org
org
org
org

14,850.00
2,200,000.00
14,850.00
1,650.00
202,631.58
407,000.00
39,996.00
88,000.00
104,500.00
121,000.00
143,000.00

8,800.00
7,150.00
15,950.00

8,800.00
10,450.00
1,210.00
715.00
21,175.00

25,245.00
462,000.00
4,455.00
17,325.00
6,078.95
20,350.00
59,994.00

595,447.95

88,000.00
209,000.00
24,200.00
7,150.00
328,350.00

33

NO

URAIAN

KOEF

SAT

HARGA SAT

HARGA BAHAN

HARGA UPAH

6=(3X5)

7=(3X5)

B. ANALISA PEKERJAAN PONDASI / TANAH


SNI 2835:2008
B1
1 M3 PEK. GALIAN TANAH BIASA MAX KEDALAMAN 1 M'
SNI 2835:2008 Pekerja
0.7500
Mandor
0.0250
Jumlah
B2

B3

B4

B5

B6

B7

org
org

88,000.00
143,000.00
0.00

66,000.00
3,575.00
69,575.00

1 M3 PEK. GALIAN TANAH BIASA MAX KEDALAMAN 2 M'


Pekerja
0.9000
Mandor
0.0450
Jumlah

org
org

88,000.00
143,000.00

79,200.00
6,435.00
85,635.00

1 M3 PEK. URUGAN TANAH KEMBALI


Pekerja
Mandor
Alat bantu
Jumlah

0.1920
0.0190
0.0000

org
org
lot

88,000.00
143,000.00
25,000.00

16,896.00
2,717.00
0.00
19,613.00

1 M3 URUGAN TANAH
Tanah urug
Pekerja / buruh tak terlatih
Mandor
Jumlah

1.2000
0.300
0.010

PEMADATAN TANAH
Pekerja / buruh tak terlatih
Mandor
Jumlah

0.500
0.050

1 M3 URUGAN PASIR
Pasir urug
Pekerja
Mandor
Jumlah

1.2000
0.3000
0.0100

1 Titik Cerucuk Kayu Ulin


Kayu Ulin 10/10 - 2 m'

0.00
m3
org
org

org
org

m3
org
org

47,025.00
88,000.00
143,000.00

56,430.00

56,430.00

26,400.00
1,430.00
27,830.00

0.00

44,000.00
7,150.00
51,150.00

88,000.00
143,000.00

94,050.00
88,000.00
143,000.00

112,860.00

112,860.00

0.0200

m3

4,950,000.00

26,400.00
1,430.00
27,830.00

99,000.00

34

NO

URAIAN

KOEF

SAT

HARGA SAT

4
org

5
88,000.00

Tukang Kayu

0.2700

org

104,500.00

28,215.00

Ka. Tukang Kayu

0.1500

org

121,000.00

18,150.00

Mandor

0.0900

org

143,000.00

12,870.00

Jumlah

6=(3X5)

HARGA UPAH

3
0.2070

Pekerja

B7A

HARGA BAHAN

99,000.00

7=(3X5)
18,216.00

77,451.00

1 M3 PAPAN KALANG ULIN MENERUS DAN SUNDUK ULIN


Balok Ulin Uk. 5/10 + Papan Ulin Uk. 2/20
Paku Ulin
Pekerja
Tukang Kayu
Ka. Tukang Kayu
Mandor
Jumlah

1.0000
1.0000
5.0000
15.0000
1.5000
0.2500

m3
Kg
org
org
org
org

4,950,000.00
14,850.00
88,000.00
104,500.00
121,000.00
143,000.00

4,950,000.00
14,850.00

4,964,850.00

440,000.00
1,567,500.00
181,500.00
35,750.00
2,224,750.00

35

NO

URAIAN

1
B8

2
1 M3 Sloop dan Gelagar Ulin
Balok Ulin Uk. 10/10
Paku Ulin
Pekerja
Tukang Kayu
Ka. Tukang Kayu
Mandor
Jumlah

B8A

Bc

B9
SNI
6.14
03-2836-2002

B10
SNI

1 M3 LANTAI PAPAN ULIN 5/20


Papan Ulin Uk. 5/20
Paku Ulin
Pekerja
Tukang Kayu
Ka. Tukang Kayu
Mandor
Jumlah

KOEF

SAT

HARGA SAT

HARGA BAHAN

HARGA UPAH

6=(3X5)

7=(3X5)

1.1000
1.0000
5.0000
15.0000
1.5000
0.2500

4,950,000.00
22,500.00
88,000.00
104,500.00
121,000.00
143,000.00

5,445,000.00
22,500.00

5,467,500.00

1.1000
2.0000
5.0000
15.0000
1.5000
0.2500

m3
Kg
org
org
org
org

4,950,000.00
22,500.00
88,000.00
104,500.00
121,000.00
143,000.00

0.1200
0.2070
0.2700
0.1500
0.0900

1 M3 PASANGAN ANSTAMPING BATU GUNUNG


Batu gunung
Pasir urug
Pekerja
Tukang batu
Kepala tukang batu
Mandor
Jumlah

1.2000
0.3000
0.7800
0.3900
0.0390
0.0390

m3
org
org
org
org

4,950,000.00
88,000.00
104,500.00
121,000.00
143,000.00

275,000.00
94,050.00
88,000.00
104,500.00
121,000.00
143,000.00

m3

275,000.00

18,216.00
28,215.00
18,150.00
12,870.00
77,451.00

330,000.00
28,215.00

358,215.00

1.1000

440,000.00
1,567,500.00
181,500.00
35,750.00
2,224,750.00

594,000.00

594,000.00

m3
m3
org
org
org
org

440,000.00
1,567,500.00
181,500.00
35,750.00
2,224,750.00

5,445,000.00
45,000.00

5,490,000.00

1 Titik Cerucuk Kayu Ulin


Kayu Ulin 10/10 - 12 m'
Pekerja
Tukang Kayu
Ka. Tukang Kayu
Mandor
Jumlah

1 M3 PASANGAN BATU GUNUNG 1 : 4


Batu gunung

m3
Kg
org
org
org
org

68,640.00
40,755.00
4,719.00
5,577.00
119,691.00

302,500.00

36

NO

URAIAN

1
6.9
03-2836-2002

2
PC ( 50 kg )
Pasir pasang
Pekerja
Tukang batu
Kepala tukang batu
Mandor
Jumlah

KOEF
3
163.0000
0.5200
1.5000
0.6000
0.0600
0.0750

SAT

HARGA SAT

4
kg
m3
org
org
org
org

5
1,650.00
202,631.58
88,000.00
104,500.00
121,000.00
143,000.00

HARGA BAHAN
6=(3X5)
268,950.00
105,368.42

676,818.42

HARGA UPAH
7=(3X5)

132,000.00
62,700.00
7,260.00
10,725.00
212,685.00

37

NO

URAIAN

KOEF

SAT

HARGA SAT

HARGA BAHAN

HARGA UPAH

6=(3X5)

7=(3X5)

C. ANALISA PEKERJAAN BETON


C1
SNI
6.1
03-2837-2002

C6
SNI
7394:2008

C8
SNI
6.20
7394:2008

C9
SNI
6.21
7394:2008

1 M3 LANTAI KERJA/ BETON TUMBUK 1 PC : 3 PS : 5 KRL


PC ( 50 kg )
218.0000
Pasir beton
0.5200
Koral Beton
0.8700
Pekerja
1.6500
Tukang batu
0.2500
Kepala tukang batu
0.0250
Mandor
0.0800
Jumlah

kg
m3
m3
org
org
org
org

0.0450
0.3000
0.1000
0.5200
0.2600
0.0260

359,700.00
126,126.00
354,090.00

839,916.00

1 Kg. Besi beton polos/Ulir


besi beton (polos/ulir)
1.0500
kg
kawat beton
0.0150
kg
Pekerja
0.0070
org
Tukang besi
0.0070
org
Kepala tukang batu
0.0007
org
Mandor
0.0003
org
Jumlah
SNI 7394:2008
1 M2 BEKESTING DENGAN PAPAN UNTUK PONDASI/POOR PLAT
Kayu Kelas III papan meranti begesting
0.0400
M
paku 5 cm-10 cm
0.3000
kg
minyak begesting
0.1000
Ltr
Pekerja
0.5200
org
Tukang kayu
0.2600
org
Kepala tukang kayu
0.0260
org
Mandor
0.0260
org
Jumlah
1 M2 BEKESTING DENGAN PAPAN UNTUK SLOOF
Kayu Kelas III papan meranti begesting
paku 5 cm-10 cm
minyak begesting
Pekerja
Tukang kayu
Kepala tukang kayu

1,650.00
242,550.00
407,000.00
88,000.00
104,500.00
121,000.00
143,000.00

M
kg
Ltr
org
org
org

17,050.00
15,840.00
88,000.00
104,500.00
121,000.00
143,000.00

17,902.50
237.60

18,140.10

1,800,000.00
15,000.00
15,750.00
88,000.00
104,500.00
121,000.00
143,000.00

616.00
731.50
84.70
42.90
1,475.10

72,000.00
4,500.00
1,575.00

78,075.00
BAHAN 2X PAKAI
1,800,000.00
15,000.00
15,750.00
88,000.00
104,500.00
121,000.00

145,200.00
26,125.00
3,025.00
11,440.00
185,790.00

45,760.00
27,170.00
3,146.00
3,718.00
79,794.00

81,000.00
4,500.00
1,575.00
45,760.00
27,170.00
3,146.00

38

NO

URAIAN

2
Mandor
Jumlah

KOEF
3
0.0260

SAT
4
org

HARGA SAT
5
143,000.00

HARGA BAHAN
6=(3X5)
87,075.00
BAHAN 2X PAKAI

HARGA UPAH
7=(3X5)
3,718.00
79,794.00

39

NO
1
C10
SNI
6.22
7394:2008

C11

C12

URAIAN
2
1 M2 BEKESTING UNTUK KOLOM
Kayu Kelas III papan meranti begesting
paku 5 cm-10 cm
minyak begesting
Balok Kayu Meranti kayu kelas II
Plywood tebal 9 mm
Dolken kayu galam d8-10 / 4 m
Pekerja
Tukang kayu
Kepala tukang kayu
Mandor
Jumlah

KOEF

SAT

HARGA SAT

HARGA BAHAN

HARGA UPAH

6=(3X5)

7=(3X5)

0.0400
0.4000
0.2000
0.0150
0.3500
2.0000
0.6600
0.3300
0.0330
0.0330

M
kg
Ltr
M
Lbr
Btg
org
org
org
org

1,800,000.00
15,000.00
15,750.00
88,000.00
150,000.00
17,000.00
88,000.00
104,500.00
121,000.00
143,000.00

72,000.00
6,000.00
3,150.00
1,320.00
52,500.00
34,000.00

168,970.00
BAHAN 2X PAKAI

1 M2 BEKESTING DENGAN PAPAN UNTUK RING BALK


papan begesting
0.0450
paku
0.3000
minyak begesting
0.1000
Pekerja
0.3000
Tukang kayu
0.2600
Kepala tukang kayu
0.0260
Mandor
0.0050
Jumlah

M
kg
Ltr
org
org
org
org

1 M2 BEKESTING UNTUK LANTAI


papan begesting
paku
minyak begesting
Balok Kayu Meranti
Dolken ( kayu perancah )
Plywood Tebal 12 mm
Pekerja
Tukang kayu
Kepala tukang kayu
Mandor
Jumlah

M
kg
Ltr
M
Btg
Lbr
org
org
org
org

0.0400
0.4000
0.2000
0.0140
6.0000
0.3500
0.3200
0.3300
0.0330
0.0060

1,800,000.00
15,000.00
15,750.00
88,000.00
104,500.00
121,000.00
143,000.00

81,000.00
4,500.00
1,575.00

87,075.00
BAHAN 2X PAKAI

15,000.00
15,750.00
2,200,000.00
14,850.00
111,375.00
88,000.00
104,500.00
121,000.00
143,000.00

58,080.00
34,485.00
3,993.00
4,719.00
101,277.00

26,400.00
27,170.00
3,146.00
715.00
57,431.00

0.00
6,000.00
3,150.00
30,800.00
89,100.00
38,981.25

168,031.25
BAHAN 2X PAKAI

28,160.00
34,485.00
3,993.00
858.00
67,496.00

40

NO
1
C12a

C13

URAIAN
2
1 M2 BEKESTING UNTUK LANTAI PLAT DECKER
papan begesting
paku
minyak begesting
Balok Kayu Meranti
Dolken ( kayu perancah )
Plywood Tebal 12 mm
Pekerja
Tukang kayu
Kepala tukang kayu
Mandor
Jumlah
1 M2 BEKESTING UNTUK BALOK
papan begesting
paku
minyak begesting
Balok Kayu Meranti
Dolken ( kayu perancah )
Plywood Tebal 12 mm
Pekerja
Tukang kayu
Kepala tukang kayu
Mandor
Jumlah

C15
1 M3 BETON K-250
SNI 7394:2008 PC ( 50 kg )
Pasir beton
Split pecah mesin 2/3
Pekerja
Tukang batu
Kepala tukang batu
Mandor
Jumlah
SNI 7394:2008
C16
1 M3 BETON BERTULANG PONDASI

KOEF

SAT

HARGA SAT

HARGA BAHAN

HARGA UPAH

6=(3X5)

7=(3X5)

0.0400
0.4000
0.2000
0.0140
0.3500
0.3200
0.3300
0.0330
0.0060

M
kg
Ltr
M
Btg
Lbr
org
org
org
org

15,000.00
15,750.00
2,200,000.00
14,850.00
111,375.00
88,000.00
104,500.00
121,000.00
143,000.00

0.00
6,000.00
3,150.00
30,800.00
0.00
38,981.25

78,931.25
BAHAN 2X PAKAI
0.0400
0.4000
0.2000
0.0180
2.0000
0.3500
0.3200
0.3300
0.0330
0.0060

M
kg
Ltr
M
Btg
Lbr
org
org
org
org

1,800,000.00
15,000.00
15,750.00
1,800,000.00
14,850.00
111,375.00
88,000.00
104,500.00
121,000.00
143,000.00

72,000.00
6,000.00
3,150.00
32,400.00
29,700.00
38,981.25

182,231.25
BAHAN 2X PAKAI
384.000
0.499
0.582
1.650
0.275
0.028
0.083

kg
m3
m3
org
org
org
org

1,650.00
242,550.00
407,000.00
88,000.00
104,500.00
121,000.00
143,000.00

28,160.00
34,485.00
3,993.00
858.00
67,496.00

28,160.00
34,485.00
3,993.00
858.00
67,496.00

633,600.00
120,928.50
236,738.33

991,266.83

145,200.00
28,737.50
3,388.00
11,869.00
189,194.50

41

NO
1

C17

URAIAN
2
Begesting untuk pondasi
Besi beton polos/Ulir
Cor Beton K-250
jumlah

KOEF
3
42.0000
1,911.0000
14.7000

SAT
4
m2
Kg
m3

jadi untuk 1 m3 beton bertulang adalah jumlah total dibagi volume cor beton
1 M3 BETON BERTULANG SLOOP 20/30
Begesting untuk Sloof
114.6000
m2
Besi beton polos/Ulir
1,604.4000
Kg
Cor Beton K-250
11.4600
m3
jumlah
jadi untuk 1 m3 beton bertulang adalah jumlah total dibagi volume cor beton

HARGA SAT

HARGA BAHAN

5
118,831.50
19,615.20
1,180,461.33

6=(3X5)
4,990,923.00
37,484,647.20
17,352,781.60
59,828,351.80

123,331.50
19,615.20
1,180,461.33

14,133,789.90
31,470,626.88
13,528,086.88
59,132,503.66

HARGA UPAH
7=(3X5)

42

NO
1
C18

C19

C19.A

C20

C21

C22

URAIAN
2
1 M3 BETON BERTULANG SLOOP 15/20
Begesting untuk Sloof
Besi beton polos/Ulir
Cor Beton K-250
jumlah

KOEF

SAT

HARGA SAT

HARGA BAHAN

HARGA UPAH

6=(3X5)

7=(3X5)

44.0000
462.0000
3.3000

m2
Kg
m3

jadi untuk 1 m3 beton bertulang adalah jumlah total dibagi volume cor beton
1 M3 BETON BERTULANG BALOK EL. 3.40 25/45
Begesting untuk Balok
305.1625
m2
Besi beton polos/Ulir
4,394.3400
Kg
Cor Beton K-250
27.4646
m3
jumlah
jadi untuk 1 m3 beton bertulang adalah jumlah total dibagi volume cor beton
1 M3 BETON BERTULANG BALOK EL. 3.40 20/30
Begesting untuk Balok
152.4125
m2
Besi beton polos/Ulir
1,170.5280
Kg
Cor Beton K-250
7.3158
m3
jumlah
jadi untuk 1 m3 beton bertulang adalah jumlah total dibagi volume cor beton
1 M3 BETON BERTULANG BALOK EL. 6.00 15/20
Begesting untuk Balok
45.1000
m2
Besi beton polos/Ulir
480.2057
Kg
Cor Beton K-250
2.4600
m3
jumlah
jadi untuk 1 m3 beton bertulang adalah jumlah total dibagi volume cor beton
1 M3 BETON BERTULANG BALOK GEWEL15/20
Begesting untuk Balok
19.3600
m2
Besi beton polos/Ulir
206.1371
Kg
Cor Beton K-250
1.0560
m3
jumlah
jadi untuk 1 m3 beton bertulang adalah jumlah total dibagi volume cor beton
1 M3 BETON BERTULANG KOLOM UTAMA 40/40
Begesting untuk Balok
176.0000
m2
Besi beton polos/Ulir
2,464.0000
Kg

123,331.50
19,615.20
1,180,461.33

5,426,586.00
9,062,222.40
3,895,522.40
18,384,330.80

158,611.63
19,615.20
1,180,461.33

48,402,320.01
86,195,857.97
32,420,927.85
167,019,105.83

28,737.50
19,615.20
1,180,461.33

4,379,954.22
22,960,140.83
8,636,019.02
35,976,114.07

158,611.63
19,615.20
1,180,461.33

7,153,384.29
9,419,330.19
2,903,934.88
19,476,649.36

158,611.63
19,615.20
1,180,461.33

3,070,721.06
4,043,419.79
1,246,567.17
8,360,708.02

185,762.00
19,615.20

32,694,112.00
48,331,852.80

43

NO

URAIAN

C23

C24

KOEF
3
17.6000

SAT
4
m3

Cor Beton K-250


jumlah
jadi untuk 1 m3 beton bertulang adalah jumlah total dibagi volume cor beton
1 M3 BETON BERTULANG KOLOM PRAKTIS 15/15
Begesting untuk Balok
51.0000
m2
Besi beton polos/Ulir
535.5000
Kg
Cor Beton K-250
3.8250
m3
jumlah
jadi untuk 1 m3 beton bertulang adalah jumlah total dibagi volume cor beton
1 M3 BETON BERTULANG PLAT DECK 10CM
Begesting untuk Plat Lantai
123.0000
m2
Besi beton polos/Ulir
1,771.2000
Kg
Cor Beton K-250
14.7600
m3
jumlah
jadi untuk 1 m3 beton bertulang adalah jumlah total dibagi volume cor beton

HARGA SAT

HARGA BAHAN

5
1,180,461.33

6=(3X5)
20,776,119.47
101,802,084.27

185,762.00
19,615.20
1,180,461.33

9,473,862.00
10,503,939.60
4,515,264.60
24,493,066.20

151,511.63
19,615.20
1,180,461.33

18,635,929.88
34,742,442.24
17,423,609.28
70,801,981.40

HARGA UPAH
7=(3X5)

44

NO

URAIAN

KOEF

SAT

HARGA SAT

HARGA BAHAN

HARGA UPAH

6=(3X5)

7=(3X5)

D. ANALISA PEKERJAAN KERAMIK DAN PENUTUP DINDING


D2

D3

D5

1 M2 LANTAI KERAMIK 40/40


Keramik
PC ( 50 kg )
Pasir pasang
Semen warna
Pekerja
Tukang batu
Kepala tukang batu
Mandor
Jumlah

1.0000
11.3800
0.0420
1.5000
0.6200
0.3500
0.0350
0.0300

1 M2 DINDING KERAMIK 20/20


Keramik
PC ( 50 kg )
Pasir pasang
Semen warna
Pekerja
Tukang batu
Kepala tukang batu
Mandor
Jumlah

1.0000
11.3800
0.0180
1.5000
0.6000
0.4500
0.0450
0.0300

1 M2 DINDING BATU ALAM


Keramik
PC ( 50 kg )
Pasir pasang
Semen warna
Pekerja
Tukang batu
Kepala tukang batu
Mandor
Jumlah

m2
kg
m3
kg
org
org
org
org

71,280.00
1,650.00
202,631.58
8,910.00
88,000.00
104,500.00
121,000.00
143,000.00

71,280.00
18,777.00
8,510.53
13,365.00

111,932.53

m2
kg
m3
kg
org
org
org
org

71,280.00
1,650.00
202,631.58
8,910.00
88,000.00
104,500.00
121,000.00
143,000.00

71,280.00
18,777.00
3,647.37
13,365.00

107,069.37

1.0500
11.7500
0.0350
0.6200
0.3500
0.0350
0.0300

m2
kg
m3
kg
org
org
org
org

150,000.00
1,650.00
202,631.58
8,910.00
88,000.00
104,500.00
121,000.00
143,000.00

54,560.00
36,575.00
4,235.00
4,290.00
99,660.00

52,800.00
47,025.00
5,445.00
4,290.00
109,560.00

157,500.00
19,387.50
7,092.11
0.00

183,979.61

54,560.00
36,575.00
4,235.00
4,290.00
99,660.00

45

NO

URAIAN

KOEF

SAT

HARGA SAT

HARGA BAHAN

HARGA UPAH

6=(3X5)

7=(3X5)

E1

1 M2 PASANGAN BATA MERAH 1/2 BATA 1 : 2


Bata merah
PC ( 50 kg )
Pasir pasang
Pekerja
Tukang batu
Kepala tukang batu
Mandor
Jumlah

55.0000
18.9500
0.0380
0.3200
0.1000
0.0100
0.0150

1 M2 PASANGAN BATA MERAH 1/2 BATA 1 : 4


Bata merah
PC ( 50 kg )
Pasir pasang
Pekerja
Tukang batu
Kepala tukang batu
Mandor
Jumlah

55.0000
11.5000
0.0430
0.3200
0.1000
0.0100
0.0150

E. ANALISA PEKERJAAN DINDING

E2

E2.a
SNI
6.4
03-2837-2002

E3

1 M2 PASANGAN BATA MERAH 1 BATA 1 : 4


Bata merah
PC ( 50 kg )
Pasir pasang
Pekerja
Tukang batu
Kepala tukang batu
Mandor
Jumlah

bh
kg
m3
org
org
org
org

1,045.00
1,650.00
202,631.58
88,000.00
104,500.00
121,000.00
143,000.00

57,475.00
31,267.50
7,700.00

96,442.50

bh
kg
m3
org
org
org
org

1,045.00
1,650.00
202,631.58
88,000.00
104,500.00
121,000.00
143,000.00

57,475.00
18,975.00
8,713.16

85,163.16

101.7500
21.2750
0.0796
0.5920
0.1850
0.0185
0.0278

1 M2 PLESTERAN DINDING / SIAR 1 : 2 + ACIAN tebal 20 mm


PC ( 50 kg )
14.2800
Pasir pasang
0.0230
Pekerja
0.2500
Tukang batu
0.2000
Kepala tukang batu
0.0200

bh
kg
m3
org
org
org
org

1,045.00
1,650.00
202,631.58
88,000.00
104,500.00
121,000.00
143,000.00

1,650.00
202,631.58
88,000.00
104,500.00
121,000.00

28,160.00
10,450.00
1,210.00
2,145.00
41,965.00

106,328.75
35,103.75
16,119.34

157,551.84

kg
m3
org
org
org

28,160.00
10,450.00
1,210.00
2,145.00
41,965.00

52,096.00
19,332.50
2,238.50
3,968.25
77,635.25

23,562.00
4,660.53
22,000.00
20,900.00
2,420.00

46

NO

URAIAN

2
Mandor
Jumlah

KOEF
3
0.0125

SAT
4
org

HARGA SAT
5
143,000.00

HARGA BAHAN
6=(3X5)
28,222.53

HARGA UPAH
7=(3X5)
1,787.50
47,107.50

47

NO
1
E4

E5

E6

URAIAN

KOEF

2
3
1 M2 PLESTERAN DINDING / SIAR 1 : 4 + ACIAN tebal 20 cm
PC ( 50 kg )
8.6800
Pasir pasang
0.0280
Pekerja
0.2500
Tukang batu
0.2000
Kepala tukang batu
0.0200
Mandor
0.0125
Jumlah
1 M' Plesteran Sponing 1 : 2
PC ( 50 kg )
Pasir pasang
Pekerja
Tukang batu
Kepala tukang batu
Mandor
Jumlah

0.0250
0.0001
0.0029
0.0019
0.0019
0.0001

1 M2 Plesteran Sponing 1 : 2 Type Kotak


PC ( 50 kg )
Pasir pasang
Pekerja
Tukang batu
Kepala tukang batu
Mandor
Jumlah

4.3200
0.0160
0.2500
0.1000
0.0100
0.0150

SAT

HARGA SAT

HARGA BAHAN

HARGA UPAH

6=(3X5)

7=(3X5)

kg
m3
org
org
org
org

1,650.00
202,631.58
88,000.00
104,500.00
121,000.00
143,000.00

14,322.00
5,673.68

19,995.68

kg
m3
org
org
org
org

1,650.00
202,631.58
88,000.00
104,500.00
121,000.00
143,000.00

41.25
20.26

61.51
kg
m3
org
org
org
org

1,650.00
202,631.58
88,000.00
104,500.00
121,000.00
143,000.00

22,000.00
20,900.00
2,420.00
1,787.50
47,107.50

250.80
198.55
229.90
14.30
693.55

7,128.00
3,242.11

10,370.11

22,000.00
10,450.00
1,210.00
2,145.00
35,805.00

48

NO

URAIAN

KOEF

SAT

HARGA SAT

HARGA BAHAN

HARGA UPAH

6=(3X5)

7=(3X5)

F. ANALISA PEKERJAAN CAT


F1

F2

F3

1 M2 PENGECATAN TEMBOK BARU BAGIAN DALAM ( 1 LAPIS PLAMIR, 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP )
Plamir Tembok
0.1000
kg
47,520.00
4,752.00
Cat Dasar morilex
0.1000
kg
47,520.00
4,752.00
Cat Penutup dalam morilex 2x
0.2600
kg
47,520.00
12,355.20
Pekerja
0.0200
org
88,000.00
Tukang cat
0.0630
org
104,500.00
Kepala tukang cat
0.0063
org
121,000.00
Mandor
0.0025
org
143,000.00
Jumlah
21,859.20

1,760.00
6,583.50
762.30
357.50
9,463.30

1 M2 PENGECATAN TEMBOK BARU BAGIAN LUAR ( 1 LAPIS PLAMIR, 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP )
Alkali
0.1000
kg
47,520.00
4,752.00
Cat Dasar morilex
0.1000
kg
47,520.00
4,752.00
Cat Penutup Luar morilex 2x
0.2600
kg
64,350.00
16,731.00
Pekerja
0.0200
org
88,000.00
Tukang cat
0.0630
org
104,500.00
Kepala tukang cat
0.0063
org
121,000.00
Mandor
0.0025
org
143,000.00
Jumlah
26,235.00

1,760.00
6,583.50
762.30
357.50
9,463.30

1 M2 PENGECATAN KAYU, 1 LAPIS PLAMIR, 1 LAPIS MENI, 2 LAPIS CAT


Meni kayu
0.2000
kg
Plamir kayu
0.1500
kg
Cat kayu dasar morilex
0.1700
kg
Cat kayu penutup morilex
0.2600
kg
Pekerja
0.0700
org
Tukang cat
0.0090
org
Kepala tukang cat
0.0060
org
Mandor
0.0025
org
Jumlah

6,160.00
940.50
726.00
357.50
8,184.00

23,760.00
47,520.00
47,520.00
47,520.00
88,000.00
104,500.00
121,000.00
143,000.00

4,752.00
7,128.00
8,078.40
12,355.20

32,313.60

49

NO
1
F4

F5

URAIAN
2
1 M2 MENDEMPUL DAN MENGGOSOK KAYU
Dempul
Minyak cat
Amplas
Pekerja
Tukang cat
Kepala tukang cat
Mandor
Jumlah
1 M2 MELAMIN / DECO
Clear Doof
Wood Filler
Wood Fstain (Pewarna)
Ampelas
Sanding Sailer
Tinner A
Pekerja
Tukang cat
Kepala tukang cat
Mandor
Jumlah

KOEF

SAT

HARGA SAT

HARGA BAHAN

HARGA UPAH

6=(3X5)

7=(3X5)

0.0800
0.0200
2.0000
0.0400
0.0400
0.0040
0.0025

kg
Ltr
Lbr
org
org
org
org

9,108.00
24,750.00
3,960.00
88,000.00
104,500.00
121,000.00
143,000.00

728.64
495.00
7,920.00

9,143.64

0.6667
0.4000
0.4000
0.8000
0.6667
1.4000
0.1600
0.1600
0.0160
0.0025

Ltr
kg
kg
Lbr
Kg
Ltr
org
org
org
org

99,000.00
34,650.00
37,125.00
3,960.00
34,650.00
24,750.00
88,000.00
104,500.00
121,000.00
143,000.00

3,520.00
4,180.00
484.00
357.50
8,541.50

66,003.30
13,860.00
14,850.00
3,168.00
23,101.16
34,650.00

155,632.46

14,080.00
16,720.00
1,936.00
357.50
33,093.50

50

NO

URAIAN

KOEF

SAT

HARGA SAT

HARGA BAHAN

HARGA UPAH

6=(3X5)

7=(3X5)

G. ANALISA PEKERJAAN PLAFON


E.001

G2

G4

1 M2 PAS. RANGKA PLAFOND HOLLOW ( HANYA RANGKA UKURAN 1 X 1 M' )


Hollow 0,40 mm + Asesoris
4.0000
M1
8,750.00
Sekrup + Asesoris
1.0000
Ls
7,500.00
Pekerja
0.1500
org
88,000.00
Tukang
0.2500
org
104,500.00
Kepala tukang
0.0250
org
121,000.00
Mandor
0.0750
org
143,000.00
Jumlah
1 M2 PAS. BAHAN PLAFOND GYPSUM BOARD TEBAL 9 MM PENUTUP PADA RANGKA
Gypsum Board 9 mm
0.3040
Lbr
99,000.00
Paku Sekrup
0.1100
kg
24,750.00
Pekerja
0.1000
org
88,000.00
Tukang kayu
0.0650
org
104,500.00
Kepala tukang kayu
0.0065
org
121,000.00
Mandor
0.0065
org
143,000.00
Jumlah
1 M' List Plafon gypsum
List gypsum
Paku
Pekerja
Tukang kayu
Kepala tukang kayu
Mandor
Jumlah

1.1000
0.0100
0.0500
0.0500
0.0050
0.0030

Lbr
kg
org
org
org
org

27,500.00
24,750.00
88,000.00
104,500.00
121,000.00
143,000.00

35,000.00
7,500.00

42,500.00

13,200.00
26,125.00
3,025.00
10,725.00
53,075.00

30,096.00
2,722.50

32,818.50

8,800.00
6,792.50
786.50
929.50
17,308.50

30,250.00
247.50

30,497.50

4,400.00
5,225.00
605.00
429.00
10,659.00

51

NO

URAIAN

KOEF

SAT

HARGA SAT

HARGA BAHAN

HARGA UPAH

6=(3X5)

7=(3X5)

F. ANALISA KUSEN & DAUN PINTU


F.001

Membuat dan Memasang 1 m3 kusen pintu dan kusen jendela


Balok Kayu
Paku 10 cm
Lem Kayu
Pekerja
Tukang kayu
Kepala tukang
Mandor

1.1000
1.2500
1.0000
7.0000
21.0000
2.1000
0.3500

M3
Kg
Kg
OH
OH
OH
OH

4,950,000.00
14,850.00
22,770.00
88,000.00
104,500.00
121,000.00
143,000.00

Jumlah

untuk 1 m1 kusen kayu

F.002

0.0400
0.5000
1.0000
3.0000
0.3000
0.0500

M3
kg
OH
OH
OH
OH

4,950,000.00
22,770.00
88,000.00
104,500.00
121,000.00
143,000.00

Jumlah

5,486,332.50

3,114,650.00

102.56

0.01

198,000.00
11,385.00
88,000.00
313,500.00
36,300.00
7,150.00
209,385.00

444,950.00

Membuat dan Memasang 1 m2 pintu dan jendela kaca


Papan Kayu
Lem Kayu
Pekerja
Tukang besi konstruksi
Kepala tukang
Mandor

H5

616,000.00
2,194,500.00
254,100.00
50,050.00

Membuat dan Memasang 1 m2 pintu daun pintu panel


Papan Kayu
Lem Kayu
Pekerja
Tukang besi konstruksi
Kepala tukang
Mandor

F.003

5,445,000.00
18,562.50
22,770.00

Jumlah
1 M2 JALUSI PAPAN BANGKIRAI
Papan Bangkirai
Paku Biasa
Pekerja
Tukang kayu

0.0240
0.3000
0.8000
2.4000
0.2400
0.0400

M3
kg
OH
OH
OH
OH

4,950,000.00
22,770.00
88,000.00
104,500.00
121,000.00
143,000.00

118,800.00
6,831.00
70,400.00
250,800.00
29,040.00
5,720.00
125,631.00

0.0600
0.1500
0.5000
2.0000

m3
Kg
org
org

66,000.00
24,750.00
88,000.00
104,500.00

355,960.00

3,960.00
44,000.00
209,000.00

52

NO

URAIAN

2
Kepala tukang kayu
Mandor
Jumlah

KOEF
3
0.2000
0.0250

SAT
4
org
org

HARGA SAT
5
121,000.00
143,000.00

HARGA BAHAN
6=(3X5)

3,960.00

HARGA UPAH
7=(3X5)
24,200.00
3,575.00
280,775.00

53

NO

URAIAN

KOEF

SAT

HARGA SAT

HARGA BAHAN

HARGA UPAH

6=(3X5)

7=(3X5)

I. ANALISA PEKERJAAN ATAP


I1

I2

I3

I4

1 M2 KUDA-KUDA & RANGKA ATAP BAJA RINGAN


Besi baja Ringan C 75 5 0,5
Reng tipe R-35
Sekrup + Asesoris 30%
Pekerja
Tukang Besi
Kepala tukang
Mandor
Jumlah

6.5000
9.0000
1.0000
0.680
0.680
0.068
0.034

1 M' PEKERJAAN LISTPLANK PAPAN GRC BOARD


Papan GRC
Paku
Pekerja
Tukang kayu
Kepala tukang kayu
Mandor
Jumlah

0.3850
0.0500
0.1000
0.2000
0.0250
0.0050

1 M2 PENUTUP ATAP Genteng Metal


Genteng Metal Multi Roof
Paku Genteng Metal
Pekerja
Tukang kayu
Kepala tukang kayu
Mandor
Jumlah

1.7857
0.0500
0.1315
0.0700
0.0080
0.0080

1 M' PASANG NOK Genteng Metal


Nok Genteng Metal Multi Roof
Paku Genteng
Pekerja
Tukang kayu
Kepala tukang kayu
Mandor

m1
m1
ls
kg
org
org
org

12,500.00
9,500.00
6,600.00
88,000.00
104,500.00
121,000.00
143,000.00

81,250.00
85,500.00
6,600.00
59,840.00

233,190.00

M2
kg
org
org
org
org

66,000.00
14,850.00
88,000.00
104,500.00
121,000.00
143,000.00

25,410.00
742.50

26,152.50

Bh
Kg
org
org
org
org

55,000.00
24,750.00
88,000.00
104,500.00
121,000.00
143,000.00

Bh
kg
org
org
org
org

32,670.00
24,750.00
88,000.00
104,500.00
121,000.00
143,000.00

8,800.00
20,900.00
3,025.00
715.00
33,440.00

98,214.29
1,237.50

99,451.79

3.0000
0.0100
0.4000
0.2000
0.0200
0.0020

71,060.00
8,228.00
4,862.00
84,150.00

11,572.00
7,315.00
968.00
1,144.00
20,999.00

98,010.00
247.50
35,200.00
20,900.00
2,420.00
286.00

54

NO

URAIAN

KOEF

SAT

HARGA SAT

Jumlah

HARGA BAHAN
6=(3X5)
98,257.50

HARGA UPAH
7=(3X5)
58,806.00

55

NO

URAIAN

KOEF

SAT

HARGA SAT

HARGA BAHAN

HARGA UPAH

6=(3X5)

7=(3X5)

K. ANALISA PEKERJAAN KUNCI DAN KACA


K1

K2

K3

K4

K5

1 BH PASANG GERENDEL
Gerendel
Pekerja
Tukang
Kepala tukang
Mandor
Jumlah

1.0000
0.0150
0.1500
0.0150
0.00075

1 BH PASANG KUNCI SILINDER


Kunci silinder
Pekerja
Tukang
Kepala tukang
Mandor
Jumlah

1.0000
0.0050
0.5000
0.0050
0.00025

1 BH PASANG KUNCI TANAM 1 PUTARAN


Kunci Tanam 1 Putaran
Pekerja
Tukang
Kepala tukang
Mandor
Jumlah

1.0000
0.0050
0.5000
0.0050
0.00025

1 BH PASANG KUNCI TANAM 2 PUTARAN


Kunci Tanam 2 Putaran
Pekerja
Tukang
Kepala tukang
Mandor
Jumlah

1.0000
0.0050
0.5000
0.0050
0.00025

bh
org
org
org
org

24,750.00
88,000.00
104,500.00
121,000.00
143,000.00

24,750.00

24,750.00

bh
org
org
org
org

173,250.00
88,000.00
104,500.00
121,000.00
143,000.00

173,250.00

173,250.00

bh
org
org
org
org

168,300.00
88,000.00
104,500.00
121,000.00
143,000.00

1 BH PASANG ENGSEL PINTU KUPU - KUPU BESAR


Engsel pintu
1.0000
Pekerja
0.0150

272,250.00
88,000.00
104,500.00
121,000.00
143,000.00

32,175.00
88,000.00

440.00
52,250.00
605.00
35.75
53,330.75

272,250.00

272,250.00

bh
org

440.00
52,250.00
605.00
35.75
53,330.75

168,300.00

168,300.00

bh
org
org
org
org

1,320.00
15,675.00
1,815.00
107.25
18,917.25

440.00
52,250.00
605.00
35.75
53,330.75

32,175.00
1,320.00

56

NO

URAIAN

2
Tukang
Kepala tukang
Mandor
Jumlah

KOEF
3
0.1500
0.0150
0.00075

SAT
4
org
org
org

HARGA SAT
5
104,500.00
121,000.00
143,000.00

HARGA BAHAN
6=(3X5)

32,175.00

HARGA UPAH
7=(3X5)
15,675.00
1,815.00
107.25
18,917.25

57

NO
1
K6

K7

K8

K9

K10

URAIAN

KOEF

2
3
1 BH PASANG ENGSEL JENDELA KUPU - KUPU KECIL
Engsel jendela
1.0000
Pekerja
0.0100
Tukang
0.1000
Kepala tukang
0.0100
Mandor
0.00050
Jumlah
1 BH PASANG KAIT / HAK ANGIN
kait angin
Pekerja
Tukang
Kepala tukang
Mandor
Jumlah

1.0000
0.0150
0.0150
0.0015
0.00075

SAT

HARGA SAT

HARGA BAHAN

HARGA UPAH

6=(3X5)

7=(3X5)

bh
org
org
org
org

24,750.00

24,750.00

bh
org
org
org
org

16,500.00
88,000.00
104,500.00
121,000.00
143,000.00

bh
org
org
org
org

1 BH PASANG HANDLE JENDELA


Handle Jendela
Pekerja
Tukang
Kepala tukang
Mandor
Jumlah

bh
org
org
org
org

1.0000
0.0150
0.1500
0.0150
0.00075

68,310.00
88,000.00
104,500.00
121,000.00
143,000.00

m2
org
org
org

99,000.00
88,000.00
104,500.00
121,000.00

4,400.00
52,250.00
6,050.00
357.50
63,057.50

24,750.00

24,750.00

1.0000
0.0150
0.1500
0.0150

1,320.00
1,567.50
181.50
107.25
3,176.25

68,310.00

68,310.00

24,750.00
88,000.00
104,500.00
121,000.00
143,000.00

880.00
10,450.00
1,210.00
71.50
12,611.50

16,500.00

16,500.00

1 BH PASANG PEGANGAN PINTU / DOOR HOLDER


Door holder
1.0000
Pekerja
0.0500
Tukang
0.5000
Kepala tukang
0.0500
Mandor
0.00250
Jumlah

1 M2 PASANG KACA BENING , TEBAL 5 MM


Kaca bening 5 mm
Pekerja
Tukang kayu
Kepala tukang kayu

24,750.00
88,000.00
104,500.00
121,000.00
143,000.00

1,320.00
15,675.00
1,815.00
107.25
18,917.25

99,000.00
1,320.00
15,675.00
1,815.00

58

NO

URAIAN

2
Mandor
Jumlah

KOEF
3
0.0008

SAT
4
org

HARGA SAT
5
143,000.00

HARGA BAHAN
6=(3X5)
99,000.00

HARGA UPAH
7=(3X5)
107.25
18,917.25

59

NO

URAIAN

KOEF

SAT

HARGA SAT

HARGA BAHAN

HARGA UPAH

6=(3X5)

7=(3X5)

M. ANALISA PEKERJAAN SANITASI


M1

M4

M5

M7

Memasang 1 bh Kloset Duduk Porselin


closet duduk porselin ex toto
semen PC
pasir pasang
Pekerja
Tukang
Kepala tukang
Mandor
Jumlah

1.0000
6.0000
0.0100
1.0000
1.5000
1.5000
0.1600

Memasang 1 bh kran 1/2"


Kran 1/2"
Seal Tape
Pekerja
Tukang
Kepala tukang
Mandor
Jumlah

1.0000
0.0250
0.0100
0.1000
0.0100
0.0050

Memasang Bak Mandi Teraso


Bak Mandi Teraso
Semen Portland
Pasir Pasang
Pekerja
Tukang
Kepala tukang
Mandor
Jumlah

1.0000
6.0000
0.0100
2.1000
0.7500
0.0700
0.1100

1 M' Memasang Pipa PVC 1/2"


Pipa PVC 1/2" AW
Perlengkapan 35 % x Pipa
Pekerja
Tukang
Kepala tukang
Mandor

bh
kg
m3
org
org
org
org

4,125,000.00
1,650.00
202,631.58
88,000.00
104,500.00
121,000.00
143,000.00

4,125,000.00
9,900.00
2,026.32

4,136,926.32

bh
Bh
org
org
org
org

84,150.00
1,980.00
88,000.00
104,500.00
121,000.00
143,000.00

84,150.00
49.50

84,199.50

bh
Kg
M3
org
org
org
org

247,500.00
1,650.00
202,631.58
88,000.00
104,500.00
121,000.00
143,000.00

m'
Bh
org
org
org
org

3,960.00
1,386.00
88,000.00
104,500.00
121,000.00
143,000.00

880.00
10,450.00
1,210.00
715.00
13,255.00

247,500.00
9,900.00
2,026.32

259,426.32

1.2000
1.0000
0.0360
0.0600
0.0060
0.0018

88,000.00
156,750.00
181,500.00
22,880.00
449,130.00

184,800.00
78,375.00
8,470.00
15,730.00
287,375.00

4,752.00
1,386.00
3,168.00
6,270.00
726.00
257.40

60

NO

URAIAN

KOEF

SAT

HARGA SAT

Jumlah
M8

Memasang Stop Kran 1/2"


Stop Kran
Seal Tape
Pekerja
Tukang
Kepala tukang
Mandor
Jumlah

1.0000
0.0250
0.0100
0.1000
0.0100
0.0050

Bh
Bh
org
org
org
org

84,150.00
1,980.00
88,000.00
104,500.00
121,000.00
143,000.00

HARGA BAHAN
6=(3X5)
6,138.00

HARGA UPAH
7=(3X5)
10,421.40

84,150.00
49.50

84,199.50

880.00
10,450.00
1,210.00
715.00
13,255.00

61

NO

URAIAN

KOEF

SAT

HARGA SAT

HARGA BAHAN

HARGA UPAH

1
M10

6=(3X5)

7=(3X5)

M11

M12

M13

Memasang Floor Drain


Foor Drain
Pekerja
Tukang
Kepala tukang
Mandor
Jumlah

1.0000
0.0100
0.1000
0.0100
0.0050

Memasang 1 bh kran 1/2"


Kran 1/2"
Seal Tape
Pekerja
Tukang
Kepala tukang
Mandor
Jumlah

1.0000
0.0250
0.0100
0.1000
0.0100
0.0050

Mmasang Pipa PVC 3"


Pipa PVC
Perlengkapan 35 % x Pipa
Pekerja
Tukang
Kepala tukang
Mandor
Jumlah

1.2000
1.0000
0.0810
0.1350
0.0135
0.0041

Mmasang Pipa PVC 4"


Pipa PVC
Perlengkapan 35 % x Pipa
Pekerja
Tukang
Kepala tukang
Mandor
Jumlah

1.2000
1.0000
0.0810
0.1350
0.0135
0.0041

Bh
org
org
org
org

103,950.00
88,000.00
104,500.00
121,000.00
143,000.00

103,950.00

103,950.00

bh
Bh
org
org
org
org

84,150.00
1,980.00
88,000.00
104,500.00
121,000.00
143,000.00

84,150.00
49.50

84,199.50

m'
Bh
org
org
org
org

40,342.50
14,119.88
88,000.00
104,500.00
121,000.00
143,000.00

56,925.00
19,923.75
88,000.00
104,500.00
121,000.00
143,000.00

880.00
10,450.00
1,210.00
715.00
13,255.00

48,411.00
14,119.88

62,530.88

m'
Bh
org
org
org
org

880.00
10,450.00
1,210.00
715.00
13,255.00

7,128.00
14,107.50
1,633.50
586.30
23,455.30

68,310.00
19,923.75

88,233.75

7,128.00
14,107.50
1,633.50
586.30
23,455.30

62

ANALISA PEKERJAAN
JUMLAH
8=(6+7)

KERJAAN PERSIAPAN / PENDAHULUAN


8,800.00
7,150.00
15,950.00

26,400.00
297.00
15,400.00
8,800.00
10,450.00
1,210.00
715.00
63,272.00

25,245.00
462,000.00
4,455.00
17,325.00
6,078.95
20,350.00
59,994.00
88,000.00
209,000.00
24,200.00
7,150.00
923,797.95

63

JUMLAH
8=(6+7)

SA PEKERJAAN PONDASI / TANAH


66,000.00
3,575.00
69,575.00
79,200.00
6,435.00
85,635.00
16,896.00
2,717.00
0.00
19,613.00
56,430.00
26,400.00
1,430.00
84,260.00
44,000.00
7,150.00
51,150.00
112,860.00
26,400.00
1,430.00
140,690.00

99,000.00

64

JUMLAH
8=(6+7)
18,216.00
28,215.00
18,150.00
12,870.00
176,451.00

4,950,000.00
14,850.00
440,000.00
1,567,500.00
181,500.00
35,750.00
7,189,600.00

65

JUMLAH
8=(6+7)
5,445,000.00
22,500.00
440,000.00
1,567,500.00
181,500.00
35,750.00
7,692,250.00

5,445,000.00
45,000.00
440,000.00
1,567,500.00
181,500.00
35,750.00
7,714,750.00

594,000.00
18,216.00
28,215.00
18,150.00
12,870.00
671,451.00

330,000.00
28,215.00
68,640.00
40,755.00
4,719.00
5,577.00
477,906.00

302,500.00

66

JUMLAH
8=(6+7)
268,950.00
105,368.42
132,000.00
62,700.00
7,260.00
10,725.00
889,503.42

67

JUMLAH
8=(6+7)

NALISA PEKERJAAN BETON


359,700.00
126,126.00
354,090.00
145,200.00
26,125.00
3,025.00
11,440.00
1,025,706.00

17,902.50
237.60
616.00
731.50
84.70
42.90
19,615.20

72,000.00
4,500.00
1,575.00
45,760.00
27,170.00
3,146.00
3,718.00
157,869.00
118,831.50
81,000.00
4,500.00
1,575.00
45,760.00
27,170.00
3,146.00

68

JUMLAH
8=(6+7)
3,718.00
166,869.00
123,331.50

69

JUMLAH
8=(6+7)
72,000.00
6,000.00
3,150.00
1,320.00
52,500.00
34,000.00
58,080.00
34,485.00
3,993.00
4,719.00
270,247.00
185,762.00
81,000.00
4,500.00
1,575.00
26,400.00
27,170.00
3,146.00
715.00
144,506.00
100,968.50
0.00
6,000.00
3,150.00
30,800.00
89,100.00
38,981.25
28,160.00
34,485.00
3,993.00
858.00
235,527.25
151,511.63

70

JUMLAH
8=(6+7)
0.00
6,000.00
3,150.00
30,800.00
0.00
38,981.25
28,160.00
34,485.00
3,993.00
858.00
146,427.25
106,961.63
72,000.00
6,000.00
3,150.00
32,400.00
29,700.00
38,981.25
28,160.00
34,485.00
3,993.00
858.00
249,727.25
158,611.63
633,600.00
120,928.50
236,738.33
145,200.00
28,737.50
3,388.00
11,869.00
1,180,461.33

71

JUMLAH
8=(6+7)
4,990,923.00
37,484,647.20
17,352,781.60
59,828,351.80
4,069,955.90
14,133,789.90
31,470,626.88
13,528,086.88
59,132,503.66
5,159,904.33

72

JUMLAH
8=(6+7)
5,426,586.00
9,062,222.40
3,895,522.40
18,384,330.80
5,571,009.33
48,402,320.01
86,195,857.97
32,420,927.85
167,019,105.83
6,081,244.72
4,379,954.22
22,960,140.83
8,636,019.02
35,976,114.07
4,917,591.25
7,153,384.29
9,419,330.19
2,903,934.88
19,476,649.36
7,917,337.14
3,070,721.06
4,043,419.79
1,246,567.17
8,360,708.02
7,917,337.14
32,694,112.00
48,331,852.80

73

JUMLAH
8=(6+7)
20,776,119.47
101,802,084.27
5,784,209.33
9,473,862.00
10,503,939.60
4,515,264.60
24,493,066.20
6,403,416.00
18,635,929.88
34,742,442.24
17,423,609.28
70,801,981.40
4,796,882.21

74

JUMLAH
8=(6+7)

RJAAN KERAMIK DAN PENUTUP DINDING


71,280.00
18,777.00
8,510.53
13,365.00
54,560.00
36,575.00
4,235.00
4,290.00
211,592.53

71,280.00
18,777.00
3,647.37
13,365.00
52,800.00
47,025.00
5,445.00
4,290.00
216,629.37

157,500.00
19,387.50
7,092.11
0.00
54,560.00
36,575.00
4,235.00
4,290.00
283,639.61

75

JUMLAH
8=(6+7)

NALISA PEKERJAAN DINDING


57,475.00
31,267.50
7,700.00
28,160.00
10,450.00
1,210.00
2,145.00
138,407.50

57,475.00
18,975.00
8,713.16
28,160.00
10,450.00
1,210.00
2,145.00
127,128.16

106,328.75
35,103.75
16,119.34
52,096.00
19,332.50
2,238.50
3,968.25
235,187.09

23,562.00
4,660.53
22,000.00
20,900.00
2,420.00

76

JUMLAH
8=(6+7)
1,787.50
75,330.03

77

JUMLAH
8=(6+7)
14,322.00
5,673.68
22,000.00
20,900.00
2,420.00
1,787.50
67,103.18

41.25
20.26
250.80
198.55
229.90
14.30
755.06
7,128.00
3,242.11
22,000.00
10,450.00
1,210.00
2,145.00
46,175.11

78

JUMLAH
8=(6+7)

ANALISA PEKERJAAN CAT


4,752.00
4,752.00
12,355.20
1,760.00
6,583.50
762.30
357.50
31,322.50
4,752.00
4,752.00
16,731.00
1,760.00
6,583.50
762.30
357.50
35,698.30
4,752.00
7,128.00
8,078.40
12,355.20
6,160.00
940.50
726.00
357.50
40,497.60

79

JUMLAH
8=(6+7)
728.64
495.00
7,920.00
3,520.00
4,180.00
484.00
357.50
17,685.14

66,003.30
13,860.00
14,850.00
3,168.00
23,101.16
34,650.00
14,080.00
16,720.00
1,936.00
357.50
188,725.96

80

JUMLAH
8=(6+7)

NALISA PEKERJAAN PLAFON


35,000.00
7,500.00
13,200.00
26,125.00
3,025.00
10,725.00
95,575.00
30,096.00
2,722.50
8,800.00
6,792.50
786.50
929.50
50,127.00

30,250.00
247.50
4,400.00
5,225.00
605.00
429.00
41,156.50

81

JUMLAH
8=(6+7)

NALISA KUSEN & DAUN PINTU


5,445,000.00
18,562.50
22,770.00
616,000.00
2,194,500.00
254,100.00
50,050.00
8,600,982.50
83,859.58
198,000.00
11,385.00
88,000.00
313,500.00
36,300.00
7,150.00
654,335.00
118,800.00
6,831.00
70,400.00
250,800.00
29,040.00
5,720.00
481,591.00
3,960.00
44,000.00
209,000.00

82

JUMLAH
8=(6+7)
24,200.00
3,575.00
284,735.00

83

JUMLAH
8=(6+7)

ANALISA PEKERJAAN ATAP


81,250.00
85,500.00
6,600.00
59,840.00
71,060.00
8,228.00
4,862.00
317,340.00

25,410.00
742.50
8,800.00
20,900.00
3,025.00
715.00
59,592.50

98,214.29
1,237.50
11,572.00
7,315.00
968.00
1,144.00
120,450.79

98,010.00
247.50
35,200.00
20,900.00
2,420.00
286.00

84

JUMLAH
8=(6+7)
157,063.50

85

JUMLAH
8=(6+7)

SA PEKERJAAN KUNCI DAN KACA


24,750.00
1,320.00
15,675.00
1,815.00
107.25
43,667.25

173,250.00
440.00
52,250.00
605.00
35.75
226,580.75

168,300.00
440.00
52,250.00
605.00
35.75
221,630.75

272,250.00
440.00
52,250.00
605.00
35.75
325,580.75

32,175.00
1,320.00

86

JUMLAH
8=(6+7)
15,675.00
1,815.00
107.25
51,092.25

87

JUMLAH
8=(6+7)
24,750.00
880.00
10,450.00
1,210.00
71.50
37,361.50

16,500.00
1,320.00
1,567.50
181.50
107.25
19,676.25

68,310.00
4,400.00
52,250.00
6,050.00
357.50
131,367.50

24,750.00
1,320.00
15,675.00
1,815.00
107.25
43,667.25

99,000.00
1,320.00
15,675.00
1,815.00

88

JUMLAH
8=(6+7)
107.25
117,917.25

89

JUMLAH
8=(6+7)

NALISA PEKERJAAN SANITASI


4,125,000.00
9,900.00
2,026.32
88,000.00
156,750.00
181,500.00
22,880.00
4,586,056.32

84,150.00
49.50
880.00
10,450.00
1,210.00
715.00
97,454.50

247,500.00
9,900.00
2,026.32
184,800.00
78,375.00
8,470.00
15,730.00
546,801.32

4,752.00
1,386.00
3,168.00
6,270.00
726.00
257.40

90

JUMLAH
8=(6+7)
16,559.40

84,150.00
49.50
880.00
10,450.00
1,210.00
715.00
97,454.50

91

JUMLAH
8=(6+7)
103,950.00
880.00
10,450.00
1,210.00
715.00
117,205.00

84,150.00
49.50
880.00
10,450.00
1,210.00
715.00
97,454.50

48,411.00
14,119.88
7,128.00
14,107.50
1,633.50
586.30
85,986.18

68,310.00
19,923.75
7,128.00
14,107.50
1,633.50
586.30
111,689.05

92

DAFTAR HARGA SATUAN UPAH TENAGA, SATUAN BAHAN & PERALATAN


LOKASI
TAHUN

: Jl. ......................................, Samarinda


: 2013
MACAM
BAHAN/ALAT
02

NO.
01
A.
1
2
3
4
5
6
7
8
9
10
11
B.
1
2
3
4
5
6
7

MACAM TENAGA
Kepala Tukang Kayu
Kepala Tukang Batu
Kepala Tukang Besi
Mandor
Operator
Pekerja Batu
Pekerja Besi
Pekerja Kayu
Tukang Batu
Tukang Besi
Tukang Kayu
MACAM ALAT
Bar Bender
Bar Cutter
Concrete Mixer
Concrete Pump
Concrete Vibrator
Curing Beton
Alat Pancang Beton

SATUAN
03
Orang
Orang
Orang
Orang
Orang
Orang
Orang
Orang
Orang
Orang
Orang

Per
Per
Per
Per
Per
Per
Per
Per
Per
Per
Per

Jam
Jam
Jam
Jam
Jam
Jam
Jam

Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari

HARGA
SATUAN Rp.
04
121,000.00
121,000.00
121,000.00
143,000.00
132,000.00
88,000.00
88,000.00
88,000.00
104,500.00
104,500.00
104,500.00

12,870.00
12,870.00
74,250.00
247,500.00
50,490.00
39,600.00
148,500.00

93

MACAM
BAHAN/ALAT
02

NO.
01
C.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32

MACAM BAHAN
Alkali
Amplas / ampril / kertas gosok
Baja Profil
Bak Mandi teraso
Bak Cuci Stainliss
Batchup
Batu Bata Merah
Batu gunung ( gebal/besar )
Batu Alam
Batu Apung
Bendrad
Besi beton polos/Ulir
Besi strip
Besi profil
Besi / Kawat Berduri
Box Meteran Listrik
Cincin Pipa Besi 4" Tebal 5mm-20cm
Cat tembok dalam setara mowilex
Cat tembok luar setara mowilex
Cat tembok dasar setara mowilex
Cat kayu besi setara aftelak
Cat kayu besi setara mowilex
Cat M e n y kayu / besi setara nippon
Cat M e n y kayu setara nippon
Cat Clear Doof
Closet jongkok ex toto
Closet duduk ex toto
Urinoir Ex toto
Wastafel komplit kaca & asesories Ex Toto
Dempul
Engsel jendela 3"
Engsel pintu 4"

SATUAN
03
Per Kg
Per Lbr
Per Kg
Per bh
Per bh
Per bh
Per bh
Per m3
Per M2
Per Kg
Per kg
Per kg
Per kg
Per kg
Per kg
Per Bh
Per Bh
Per kg
Per kg
Per kg
Per kg
Per kg
Per kg
Per kg
Per lt
Per bh
Per bh
Per bh
Per bh
Per kg
Per bh
Per bh

HARGA
SATUAN Rp.
04
50,490.00
3,960.00
19,250.00
247,500.00
742,500.00
1,485,000.00
1,045.00
275,000.00
148,500.00
24,750.00
15,840.00
17,050.00
20,592.00
18,304.00
24,750.00
29,700.00
29,700.00
47,520.00
64,350.00
47,520.00
31,680.00
47,520.00
23,760.00
8,538.75
99,000.00
247,500.00
4,125,000.00
2,722,500.00
3,217,500.00
9,108.00
24,750.00
32,175.00

94

MACAM
BAHAN/ALAT
02

NO.
01
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67

Fiber Bergelombang
Floor drain
Genteng Keramik
Genteng Nok Metal
Genteng Metal 2 susun setara sakura elang
Gerendel jendela / bouvenlist
Gypsum Board 9 mm
Gypsum List
GRC BOARD
Kabel NYY 2,5 mm
Kaca bening t = 5 mm
Kaca bening Frameless t = 12 mm
Kaca riben t = 5 mm
Kait Angin / Hak Angin
Kasa
Kayu bangkirai Papan 2/10
Kayu Bangkirai Balok 5/7, 6/12, 8/12
Kayu Bangkirai Listpalnk
Kayu Kapur Papan 2/10
Kayu Kapur Balok 5/7, 6/12, 8/12
Kayu Kapur / Bangkirai Lumber Siring
Kayu meranti Balok 5/7
Kayu Meranti Papan 3/20, 2/20
Kayu Meranti Bouwplank / Begesting
( Kayu perancah / perancah d 8 cm panjang 4 m )
Kayu Ulin Balok 10/10
Kayu Ulin Papan 3/30
Keramik Dinding 20 x 25 cm ex. Roman
Keramik lantai 20 x 20 cm ex. Roman
Keramik lantai 30 x 30 cm ex. Roman
Keramik lantai 40 x 40 cm ex. Roman
Keramik list dinding 10 x 20 cm ex. Roman
Keramik list dinding 10 x 40 cm ex. Roman
Keramik lantai 40 x 40 cm ex. Ezenza
Keramik lantai 30 x 30 cm ex. Ezenza

SATUAN
03
Per Lbr
Per bh
Per Bh
Per Bh
Per Lbr
Per bh
Per Lbr
Per M'
Per Lbr
Per Rol
Per m2
Per m2
Per m2
Per bh
Per M'
Per m3
Per m3
Per m'
Per m3
Per m3
Per Lbr
Per m3
Per m3
Per m3
Per Btg
Per m3
Per m3
Per m2
Per m2
Per m2
Per m2
Per bh
Per bh
Per m2
Per m2

HARGA
SATUAN Rp.
04
74,250.00
103,950.00
16,335.00
32,670.00
55,000.00
24,750.00
99,000.00
27,500.00
66,000.00
196,020.00
99,000.00
198,000.00
123,750.00
16,500.00
3,465.00
5,280,000.00
4,950,000.00
38,500.00
3,300,000.00
3,190,000.00
41,250.00
2,310,000.00
2,420,000.00
2,200,000.00
14,850.00
4,950,000.00
5,500,000.00
71,280.00
71,280.00
71,280.00
71,280.00
11,385.00
22,770.00
193,050.00
193,050.00

95

MACAM
BAHAN/ALAT
02

NO.
01
68
69
70
71

Koral Beton
Kran air / stop k 1/2"
Kuas 2,5"
Kunci Tanam 1 putaran untuk wc/km

SATUAN
03
Per m3
Per bh
Per bh
Per bh

HARGA
SATUAN Rp.
04
407,000.00
84,150.00
4,950.00
168,300.00

96

NO.
01
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106

MACAM
BAHAN/ALAT
02
Kunci Tanam 2 putaran
Kunci Silinder sekualitas ELT
Kusen pintu/jendela aluminium
Lampu TL Philips 2 x 20 Watt
Lampu Gantung TL Philips 2 x 20 Watt
Lampu TL Philips 2 x 40 Watt
Lampu XL Philips 10 Watt
Lampu XL Philips 18 Watt
Lem Kayu (Fox)
Minyak Begesting
Minyak Cat / Tiner A
Nok/kerpus atap multi roof
Nok/kerpus atap Fiberglass
Paku Biasa
Paku Baut
Paku Gypsum ( Paku sekrup )
Paku Genteng Metal
Paku Plywood 1,5 mm
Pasir beton / palu
Pasir pasang Tenggarong
Pasir urug Mahakam
Paving Blok
Pegangan / Handle Jendela
Pegangan / Door Holder
Penyekat Urinoir
Pipa pralon PVC dia. 4" AW
Pipa pralon PVC dia. 3" AW
Pipa pralon PVC dia. 2" AW
Pipa pralon PVC dia. 3/4" AW
Pipa pralon PVC dia. 1/2"
Pipa pralon untuk listrik
Plamir kayu
Plastik cor
Plywood/ tripleks tb. 4 mm
Plywood/ tripleks tb. 9 mm

SATUAN
03
Per bh
Per bh
Per m'
Per bh
Per bh
Per bh
Per bh
Per bh
Per Kg
Per lt
Per lt
Per bh
Per bh
Per kg
Per Bh
Per kg
Per kg
Per kg
Per m3
Per m3
Per m3
Per Bh
Per bh
Per bh
Per bh
Per m'
Per m'
Per m'
Per m'
Per m'
Per m'
Per kg
Per m2
Per lb
Per lb

HARGA
SATUAN Rp.
04
272,250.00
173,250.00
209,880.00
148,500.00
198,000.00
247,500.00
24,750.00
34,650.00
22,770.00
15,592.50
24,750.00
25,740.00
34,650.00
14,850.00
7,425.00
24,750.00
24,750.00
17,325.00
242,550.00
202,631.58
94,050.00
2,970.00
24,750.00
68,310.00
704,880.00
56,925.00
40,342.50
23,760.00
8,910.00
3,960.00
1,980.00
47,520.00
4,950.00
49,500.00
111,375.00

97

NO.
01
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132

MACAM
BAHAN/ALAT
02
Plywood/ tripleks tb. 12 mm
Plywood/ tripleks sungkai
Rangka Atap Baja Ringan
Residu
Saklar Tunggal
Saklar Double
Saklar Triple
Sambungan Tiang Pancang Kayu / Shock 4"
Sambungan Tiang Pancang Beton / Las
Sanding Sailer
Seal Tape
Sekring Lokal
Semen Portland @ 50 Kg
Semen Portland
Semen warna
Seng gelombang 0,8 x 2,10 BJLS 30 ( Zincalume )
Seng gelombang 0,8 x 2,10 BJLS 20
Seng gelombang 0,8 x 2,10 BJLS 18
Stop Kontak
Talang seng t=0.2 mm, L=60 cm
T Dos
T a n a h Urug
Tiang Pancang 20 x 20 K-450
Water Proofing
Wood Filler
Wood Stain (pewarna)

SATUAN
03
Per lb
Per lb
Per M2
Per ltr
Per bh
Per bh
Per bh
Per bh
Per Titik
Per Kg
Per bh
Per bh
Per kg
Per Zak
Per kg
Per lb
Per lb
Per lb
Per bh
Per m'
Per bh
Per m3
Per m'
Per m2
Per kg
Per kg

HARGA
SATUAN Rp.
04
148,500.00
99,000.00
396,000.00
7,920.00
24,750.00
29,700.00
34,650.00
44,550.00
141,570.00
34,650.00
1,980.00
42,075.00
1,650.00
82,500.00
8,910.00
72,270.00
39,996.00
35,640.00
29,700.00
24,750.00
7,425.00
47,025.00
59,400.00
130,680.00
34,650.00
37,125.00

98

BALOK UTAMA 25/45 LT 2


h
15.625
1
15.625
30.625
3
91.875
9.875
0
0
17.4
0
0
17.125
0
0

BALOK ANAK 20/30 LT 2


h
15.625
30.625
9.875
17.4
17.125

v
10
2.5
6.5
18.75
18.5
15
10
18.125

3
0
0
1
1
1
0
3

30
0
0
18.75
18.5
15
0
54.375
244.13

DINDING LT 1
h
14.7
4
1.5
19
4
2.7
3
29
5
2
29

2
1
1
1
1
1
1
1
1
1
1

29.4
4
1.5
19
4
2.7
3
29
5
2
29

10
2.5
6.5
18.75
18.5
15
10
18.125

V
10
3.35
3.075
2.23
6.35
1.425
4.3
2.1
3.3
3.2
6
4
5
12

128.6
DINDING LT 2
h
15.7
12

1
1

15.7
12

V
10

6.5
2.5
4
29
16
8
29

1
3
1
1
1
1
1
1
1

6.5
7.5
4
29
16
8
29
0
0

3.8
6.35
3.925
7
12
7.8
17
2.3
2.2

127.7
DINDING LT 3
h
14
12
6.5
2.5
4
14
8
2.5
16

1
1
1
3
1
1
1
1
1
1
1

14
12
6.5
7.5
4
14
8
2.5
16
0
0

84.5

V
18
3.8
6.35
11
8.5
14

BALOK ANAK 20/30 LT 2


2
0
2
2
1

31.25
0
19.75
34.8
17.125

0
1
1
0
0
0
1
0

0
2.5
6.5
0
0
0
10
0
121.93

1
1
2
1
1
1
2
1
1
1
1
4
1
1

10
3.35
6.15
2.23
6.35
1.425
8.6
2.1
3.3
3.2
6
16
5
12
85.705

10

PINTU
8
15.12
7
11.76
26.88

PINTU FG
22.5
49.38

214.305 M1

16

PINTU
30.24

6
1
4
1
1
1
1
1
1

22.8
6.35
15.7
7
12
7.8
17
2.3
2.2

103.15

1
5
1
1
2
1

18
19
6.35
11
17
14

85.35

8.4
38.64

230.85 M1

11
5

PINTU
20.79
8.4
29.19

169.85 M1