Small Scale Metallic Mining Survey Questionnaire for LGUs
EITI-Philippines Scoping Study
Name of LGU: _______________________________________ Category: [ ] Province [ ] City (please check one) Respondent: _______________________________________ Designation: ______________________ Office Number: _________________ Mobile Number: _________________ Email: __________________ INSTRUCTIONS to the LGU: It is very important that this questionnaire be filled in as completely as possible, to enable the National Government, through the Philippine-EITI, to capture the needed information on small-scale metallic in preparation for global reporting to EITI. A. Profile of Small-Scale Metallic Mining Operations in the Province/City, as of June 30, 2015 1. Number of Existing Small-Scale Metallic Mining (SSMM) Operations _________________ 2. Number of Existing Registered (with permits/contracts) SSMM Operations ____________ 3. Type of Metallic Minerals Extracted: ___________________________________________ 4. Usual Equipment and Chemicals used for SSMM, if any: ____________________________________ __________________________________________________________________________________ 5. Estimated Existing Number of Unregistered SSMM Operations (Best Estimate): _________ 6. Type of Metallic Minerals Extracted: _____________________________________________________ 7. Total Estimated Area Size of Operations of Unregistered SSMM (Best Estimate): ___________________ 8. Barangay & City/Municipality where Unregistered SSMM Operate: ___________________________ ___________________________________________________________________________________ 9. Year when unregistered SSMM started operating (if known): ________________ 10. Do you have an organized association of small-scale metallic mining operators? [ ] Yes [ ] No If Yes, please indicate name: _____________________________________________________ contact person: ______________________ contact number: ____________ and email ____________________. 11. Please list down all small-scale metallic mining activities in your Province/City:
B. Revenues (Taxes, Fees, Charges) from Small-Scale Metallic Mining
Operations 1. Which office in the Province/City collects the fees? ________________________________ 2. Is there a 100% collection of these fees? [ ] Yes [ ] No If not, what percentage is collected: ______ 3. On an annual average basis, what is the range of total income of the Province/City from SSMM? ________________________________ 4. Please provide a summary of fees, taxes and charges collected from SSMM contract and permit holders and the relevant ordinances. Taxes/Fees/Charges Effectivity Date
Rate
Legal Basis/ Ordinance No. and Title
of Ordinance
(Please use separate sheet if needed.)
C. Small-Scale Metallic Mining Permitting, Regulatory and Monitoring Arrangements
3. If No, please provide information below:
3.1 Who accepts and reviews the SSMM application? ________________________________________ 3.2 Who endorses the SSMM application? _________________________________________________ 3.3 Who approves the SSMM application? _________________________________________________ 3.4 Is MGB part of the permitting process? Yes ___ No ___ 3.5 If yes, what is the role or participation of the MGB?? ____________________________________ ________________________________________________________________________________ C.2 MRFC 3. Have you formally created and convened your MRFC?
[ ] Yes [ ] No
If Yes, date created: ___________________________________________________
4. How often does the MRFC meet to discuss and monitor small-scale metallic mining activities? Monthly [ ] Quarterly [ ] Annually [ ] Others: [ ______________________________________ 5. Please provide any significant resolutions or accomplishments of MRFC on SSMM. ___________________________________________________________________________________ ___________________________________________________________________________________ C.3 Monitoring Team 6. Do you have an existing monitoring team dedicated to SSMM? [ ] Yes [ ] No 7. If Yes, is this the Multipartite Monitoring Team (MMT) organized by the DENR under the EIA laws? [ ] Yes [ ] No
If Yes, year created: _____________________
8. How often does the MMT conduct monitoring inspection?
Monthly [ ] Quarterly [ ] Annually [ ] Others: [ ] ________________________________________ 9. Please provide any significant resolutions or accomplishments of the MMT on SSMM. ___________________________________________________________________________________ ___________________________________________________________________________________ 10. Apart from this MMT, are there other monitoring teams dedicated to SSMM? [ ] Yes [ ] No 10.1 Ordinance/Order Creating the monitoring team _______________________________________ 10.2 Name of monitoring team: _____________________________ Year created: _________________ 10.3 How often does the monitoring committee/team conduct monitoring inspection? Monthly [ ] Quarterly [ ] Annually [ ] Others: [ ] ______________________________________ D. Copy of Permits, Contracts and Ordinances on Small-Scale Metallic Mining.
Kindly attach. Thank you.//
PLEASE RETURN, TOGETHER WITH A SAMPLE SIGNED SMALL-SCALE
METALLIC MINING CONTRACT or PERMIT, RELEVANT EXCERPTS OF YOUR LOCAL TAX CODE and OTHER INDICATED ORDINANCES/EXECUTIVE ORDERS to EITI-PHILIPPINES BY OCTOBER 2, 2015 VIA FAX 02-523-5678, EMAIL eitiphilippines@gmail.com or COURIER to EITIPhilippines, Department of Finance, Roxas Boulevard, Manila. 3