VALORIZACION N 03

OBRA: "MEJORAMIENTO DE LA CARRETERA BARRANCA -ARAYA GRANDE DEL DISTRITO DE BARRANCA- PROVINCIA DE BAR
GRAFICO AVANCE FISICO PROGRAMADO VS AVANCE FISICO EJECUTADO
100%

AVANCE MENSUAL ACUMULADO

90%

80%

70%

60%

55.77%

50%

44.74%

40%

30.79%

30%

20.02%
20%

15.26%

10% 4.41%
0%
Nov-11

8.95%

0.97%

dic.-2011

Jan-12

Feb-12
PLAZO DE EJECUCION (meses)

Mar-12

VALORIZACION N 01

OBRA: "CONSTRUCCION DE LA CASA DE LA CULTURA DEL DISTRITO DE BARRANCA, PROVINCIA DE BARRANC


GRAFICO AVANCE FISICO PROGRAMADO VS AVANCE FISICO EJECUTADO
100.00%

100%

AVANCE MENSUAL ACUMULADO

90%

80%

70%

60%

50%

46.94%
40%

30%

20%
10%
0%
dic.-2011

9.96%

Jan-12

2.67%

Feb-12

Mar-12

PLAZO DE EJECUCION (meses)

03

O DE BARRANCA- PROVINCIA DE BARRANCA -LIMA"

E FISICO EJECUTADO
100.00%

81.46%

Programado
Ejecutado
Apr-12

May-12

MONTO VALORIZADO EJECUTADO

MONTOS (sin IGV)

MES

PARCIAL

ACUMUL.

S/.

S/.

92,498.63

92,498.63

dic.-2011

227,514.18

320,012.81

Jan-12

618,334.57

938,347.38

Nov-11

Feb-12
Mar-12
Apr-12
May-12

TOTAL

938,347.38

01

RRANCA, PROVINCIA DE BARRANCA - LIMA"

FISICO EJECUTADO

Programado
Ejecutado

)
MONTO VALORIZADO EJECUTADO
MONTOS (sin IGV)

MES

PARCIAL

ACUMUL.

Jan-12

S/.

S/.

17,898.15

17,898.15

Feb-12
Mar-12

TOTAL

17,898.15

RIZADO EJECUTADO

MONTO VALORIZADO PROGRAMADO

PORCENTAJES
PARCIAL

MONTOS (sin IGV)

ACUMUL.

PARCIAL

ACUMUL.

PORCENTAJES
PARCIAL

ACUMUL.

S/.

S/.

Nov-11

31,240.12

31,240.12

15.26%

dic.-2011

257,515.21

288,755.33

7.98%

8.95%

44.74%

Jan-12

357,109.06

645,864.39

11.07%

20.02%

4.41%

4.41%

10.85%
29.48%

44.74%

MES

TOTAL

0.97%

0.97%

Feb-12

347,591.11

993,455.50

10.77%

30.79%

Mar-12

806,139.51

1,799,595.01

24.98%

55.77%

Apr-12

828,848.68

2,628,443.69

25.69%

81.46%

May-12

598,387.47

3,226,831.16

18.54%

100.00%

3,226,831.16

100.00%

RIZADO EJECUTADO

MONTO VALORIZADO PROGRAMADO

PORCENTAJES
PARCIAL

ACUMUL.

MONTOS (sin IGV)

MES

PARCIAL

ACUMUL.

PORCENTAJES
PARCIAL

ACUMUL.

S/.
9.96%

9.96%

9.96%

TOTAL

S/.

Jan-12

4,637.46

4,637.46

2.67%

2.67%

Feb-12

76,830.79

81,468.25

44.26%

46.93%

Mar-12

92,107.32

173,575.57

53.06%

100.00%

173,575.57

100.00%