PREGUNTA N O1.
CALCULAR EL COSTO PARA ELIMINAR UN HUAYCO DE LODO Y PIEDRAS
EN EL KM : 178 CFB (LA CHANCADORA), EMPUJANDO EL MATERIAL A LA ZONA MAS BAJA:
DIST
20
178+060
20
178+080
20
178+100
20
178+120
20
178+140
20
178+160
20
178+180
TOTAL
AREAS (M2)
VOLUMEN TOTAL
RELL
CORT . M3
RELL
CORTE M3
10.40
258.00
15.40
316.30
16.23
416.30
25.40
538.00
28.40
530.00
24.60
410.00
16.40
250.00
8.60
0.00
0.00
2718.60
C.T.H
CTH
C.P
C. O
:
:
:
= C.P + C. O
920,000.00
12000
202,400.00
460
95
165
Soles
Horas
Va
HP
M3/Hr
M3/Hr
n
HORAS
ANUALES
=
D=( )/( )
D
Va
Vr
VEU hrs
59.8
Soles/hora
VALOR DE ADQUISICION
VALOR DE RESCATE O SALVATAJE
# DE AOS DE LA VIDA ECONOMICA UTIL
16.1
=
INTERES (I)=( %)/( )
IMPUESTOS =( ( )
IMA
2.5
2
1
%
%
%
17.08
=
( ))/(
)
TOTAL DE COSTO HORARIO POSESION (C.H.P)
DEPRECIACION (D)
INTERESES (I)
SEGUROS, IMPUESTOS Y ALMACENAJE
C.H.P
S.I.A
59.8
49.99
17.08
Soles/hora
Soles/hora
Soles/hora
126.87
Soles/hora
MOTOR GRADO 40
DE CAJA DE CAMBIO GRADO 140
TOMA FUERZA, REDUCTOR, DIRECCION GRADO 140
DIRECCION
NEUMATICOS:
NEUMATICOS
VIDA UTIL DE CADA UNIDAD
OPERADOR:
OPERADOR DE EQUIPOS PESADOS
COSTO DE MANTENIMIENTO
90
828000 Soles
C..=(% (.))/( )
17.25
Soles/hora
51.75
Soles/hora
69
Soles/hora
VEU hrs
C.M
=(% (.))/( )
C.M.R =
C.M.R
C.M.O + C.R
=
COTIZACIONES
GALON DE PETROLEO (galon)
GALON DE ACEITE MOTOR GRADO 40
ACEITE CAJA DE CAMBIO GRADO 140
ACEITE TOMA DE FUERZA, REDUCTOR, DIRECCION GRADO 140
ACEITE DIRECCION
GRASA (libras)
REFRIGERANTE (galon)
NEUMATICOS (unidad)
OPERARIO DE CONTRUCCION CIVIL
7.6
31.09
33.96
33.96
38.55
4.67
35.01
1215
12.42
=
CANTIDAD DE GALON * PRECIO DE COMBUSTIBLE
COMBUSTIBLE
26.6
Soles/hora
1.09
Soles/hora
0.15
Soles/hora
0.09
0.04
ACEITE DIRECCION
REFRIGERANTE (galon)
Soles/hora
REFRIGERANTE (galon)
TOTAL DE LUBRICANTES
0.07
Soles/hora
1.44
Soles/hora
GRASA TOTAL
1.03
Soles/hora
FILTROS TOTAL =
20%*(COMBUSTIBLE + LUBRICANTE)
5.61
Soles/hora
no tiene
no tiene
CALCULO
COSTO DE LOS NEUMATICOS
2.8.
DEL
)/(
OPERADOR ESPECIALIZADO
18.63
OPERADOR ESPECIALIZADO
Soles/hora
69
26.6
1.44
5.61
1.03
0
0
15.19
18.63
Soles/hora
Soles/hora
Soles/hora
Soles/hora
Soles/hora
Soles/hora
Soles/hora
Soles/hora
Soles/hora
137.5
Soles/hora
(CHT)
Soles/hora
UTILIDAD : 10 % CHT
:
IMPUESTOS IGV : 18% CHT :
264.37
26.437
47.59
338.39
Soles/hora
6 PTOS
DO Y PIEDRAS
A ZONA MAS BAJA:
NTO DE HUAYCO
6 PTOS
6
2000
aos
Horas/ao
(C.O)
(C.P)
) 621000 Soles/ao
49.99
Soles/hora
JE (S.I.A)
))/( )
Soles/hora
3.5
gal/hora
0.035
0.00435
0.0026
0.001
0.22
0.002
gal/hora
gal/hora
gal/hora
gal/hora
lib/hora
gal/hora
10
800
unidades
horas
(condiciones severas)
C.M.R)
ACION
EL VALOR DE ADQUISICION
Soles
sin
Soles
sin
Soles
sin
Soles
sin
Soles
sin
Soles
sin
Soles
sin
Soles c/u sin
Soles H-H
I.G.V.
I.G.V.
I.G.V.
I.G.V.
I.G.V.
I.G.V.
I.G.V.
I.G.V.
15.19
Soles/hora
4 PTOS
AREAS (M2)
VOLUMEN TOTAL
RELL
CORT . M2
RELL
20.40
DIST
10
192+050
35.40
10
192+070
26.23
10
192+90
35.40
10
192+100
48.40
10
192+110
34.60
10
192+120
26.40
10
192+130
18.60
TOTAL
920,000.00
12000
202,400.00
460
95
165
Soles
Horas
Va
HP
M3/Hr
M3/Hr
C.T.H
= C.H.P + C. O
CTH
C.H.P
C. H.O
D=( )/( )
=
D
Va
Vr
VEU hrs
59.8
Soles/hora
1.2. COSTO HORARIO DEL INTERES DE CAPITAL INVERTIDO (I) = 80% Depreciacio
VALOR DE ADQUISICION
VALOR DE RESCATE O SALVATAJE
INTERES (I)=(
%)/( )
1.3. COSTO HORARIO DE LO SEGUROS, IMPUESTOS Y ALMACENAJE (S.I.A)
UROS, IMPUESTOS =( (
IMA
2.5
2
1
%
%
%
.=( ( ))/(= )
TOTAL DE COSTO HORARIO POSESION (C.H.P)
DEPRECIACION (D)
INTERESES (I)
SEGUROS, IMPUESTOS Y ALMACENAJE
C.H.P
S.I.A
59.8
49.99
17.08
=
Soles/hora
Soles/hora
Soles/hora
126.87
90
COSTO DE MANTENIMIENTO
828000
C..=(% (.))/( )
=
VEU hrs
C.M
17.25
C. =(% (.))/( )
=
C.M.R =
C.M.R
51.75
C.M.O + C.R
=
69
Soles/hora
COTIZACIONES
GALON DE PETROLEO (galon)
GALON DE ACEITE MOTOR GRADO 40
ACEITE CAJA DE CAMBIO GRADO 140
ACEITE TOMA DE FUERZA, REDUCTOR, DIRECCION GRADO 140
ACEITE DIRECCION
GRASA (libras)
REFRIGERANTE (galon)
NEUMATICOS (unidad)
OPERARIO DE CONTRUCCION CIVIL
COMBUSTIBLE
45.6
Soles/hora
2.18
0.3
ACEITE DIRECCION
0.08
REFRIGERANTE (galon)
REFRIGERANTE (galon)
TOTAL DE LUBRICANTES
0.14
2.88
GRASA TOTAL
2.05
Soles/hora
FILTROS TOTAL =
20%*(COMBUSTIBLE + LUBRICANTE)
9.7
Soles/hora
no tiene
no tiene
OS=( )/(
2.9. CALCULO DEL COSTO DEL OPERADOR ESPECIALIZADO
OPERADOR ESPECIALIZADO
OPERADOR ESPECIALIZADO
18.63
Soles/hora
69
45.6
2.88
9.7
2.05
0
0
28
18.63
COSTO HORARIO
175.86
302.73
UTILIDAD : 10 % CHT
:
IMPUESTOS IGV : 18% CHT :
30.273
54.49
Soles/hora
Soles/hora
Soles/hora
Soles/hora
Soles/hora
Soles/hora
Soles/hora
Soles/hora
Soles/hora
387.49
4.-
6 PTOS
O DE LODO Y PIEDRAS
ERIAL A LA ZONA MAS BAJA:
LUMEN TOTAL
CORTE M3
279.00
308.15
308.15
419.00
415.00
305.00
225.00
2259.30
CURRIMIENTO DE HUAYCO
6 PTOS
n
HORAS
ANUALES
6
2000
aos
Horas/ao
ESION (C.P)
621000
Soles/ao
CA UTIL
16.1
=
49.99
Soles/hora
MACENAJE (S.I.A)
))/( )
DE SEGUROS, TASAS
JE
QUINA EXPRESADA EN
)17.08
Soles/hora
Soles/hora
N (CO)
N GRADO 140
gal/hora
0.07
0.0087
0.0052
gal/hora
gal/hora
gal/hora
0.002
0.44
0.004
gal/hora
lib/hora
gal/hora
4
800
unidades
horas
ACION (C.M.R)
REPARACION
Soles/hora
Soles/hora
7.6
31.09
33.96
33.96
38.55
4.67
Soles
Soles
Soles
Soles
Soles
Soles
sin
sin
sin
sin
sin
sin
I.G.V.
I.G.V.
I.G.V.
I.G.V.
I.G.V.
I.G.V.
(condiciones severas)
35.01
5600
12.42
Soles
sin I.G.V.
Soles c/u sin I.G.V.
Soles H-H
O DE COMBUSTIBLE
0.18
Soles/hora
LUBRICANTE)
ORTE
)
28
=
Soles/hora
DO
Soles/hora
(CH)
Soles/hora
Soles/hora
UNA MAQUINARIA.
OS INDIRECTOS.
AREAS (M2)
VOLUMEN TOTAL
RELL
CORT . M2
RELL
20.40
DIST
10
192+050
35.40
10
192+070
26.23
10
192+90
35.40
10
192+100
48.40
10
192+110
34.60
10
192+120
26.40
10
192+130
18.60
TOTAL
NOTA : CONSIDERAR UN 25 % DE VOLUMEN ADICIONAL X ESCURRIMIENTO DE HUAYCO
920,000.00
12000
202,400.00
460
Soles
Horas
Va
HP
95
165
M3/Hr
M3/Hr
FORMULAS A UTILIZAR:
C.T.H
= C.H.P + C. O
CTH
C.H.P
C. H.O
D=( )/( )
=
D
Va
Vr
VEU hrs
59.8
Soles/hora
1.2. COSTO HORARIO DEL INTERES DE CAPITAL INVERTIDO (I) = 80% Depreciacion
1.3. COSTO HORARIO DE SEGUROS Y OTROS (S) = 12% Depreciacion
6 PTOS
B.- QUE MAQUINARIA PESADA ELIGERIA UD PARA LA APERTURA DE UNA TROCHA CARROZABLE
A NIVEL DE AFIRMADO EN ZONA DE SELVA BAJA - ENUMERE Y DESCRIBA A GROSO MODO SU TRABAJO
C.- QUE CRITERIOS SE ADOPTA PARA ESTIMAR EL VALOR DE RESCATE DE UN EQUIPO
D.- DESCRIBA O GRAFIQUE COMO SE CALCULA EL RENDIMIENTO DE UN VOLQUETE
CO DE LODO Y PIEDRAS
ERIAL A LA ZONA MAS BAJA:
LUMEN TOTAL
CORTE M3
279.00
308.15
308.15
419.00
415.00
305.00
225.00
2259.30
CURRIMIENTO DE HUAYCO
6 PTOS
n
HORAS
ANUALES
6
2000
aos
Horas/ao
ESION (C.P)
preciacion
ROCHA CARROZABLE
GROSO MODO SU TRABAJO.
UN EQUIPO
OLQUETE
NDIRECTOS.
SE DESEA COLOCAR UNA CAPA DE AFIRMADO (HORMIGON 80% + TIERRA ROJA 20%) EN LA CARRETERA CAMPO VER
TOURNAVISTA DE 38.42 KM. DE LONGITUD, 7.20 MTS DE ANCHO , 20 CM DE ESPESOR Y TALUD DE AFIRMADO 1:1
SE PIDE CALCULAR LO SIGUIENTE :
A.- PRESUPUESTO PARA LA COMPRA DE MATERIAL DE AFIRMADO TENIENDO EN CUENTA QUE EL FACTOR DE
COMPACTADO Y/O ESPONJAMIENTO ES 25% Y EL COSTO DEL AFIRMADO PUESTO EN OBRA ES S/. 85.00 M3
B.- PRESUPUESTO PARA EL ALQUILER DE EQUIPO PESADO PARA LA COLOCACION Y COMPACTADO DEL AFIRMADO
CONSIDERANDO LOS SIGUIENTES DATOS:
750,000.00
12000
21% (Va)
135
310
Soles
Horas
Soles
HP
m2/Hr
C.T.H
= C.H.P + C. O
CTH
C.H.P
C. H.O
C.H.P =
D=( )/( )
D=( )/( )
=
D
Va
Vr
VEU hrs
Soles/hora
1.2. COSTO HORARIO DEL INTERES DE CAPITAL INVERTIDO (I) = 80% (D)
1.3. COSTO HORARIO DE SEGUROS Y OTROS (S) = 12% ( D)
8 puntos
RESPUESTA PREGUNTA 1:
a = 7.20 mts
talud 1:1
RESPUESTA A :
area:
A = hx ( b1 +b2 )/2
Vol neto
costo
56861.6
5,686,160.00
RESPUESTA B :
RODILLO LISO
VIBRATORIO
500,000.00
12000
22% (Va)
14
160
Soles
Horas
Soles
TN
m3/hr
CTH
TOTAL COSTO H-M
(C.P)
Soles/hora
2.-COSTO DE OPERACIN (120% CHP)
COSTO TOTAL HORARIO DE EQUIPO
UTILIDAD 10%
IGV 18% CTH
CTH
TOTAL COSTO H-M
=120% CHP
8 puntos
A TROCHA CARROZABLE
A A GROSO MODO SU TRABAJO.
DE UN EQUIPO
N VOLQUETE
RESPUESTA PREGUNTA 2:
DATOS
ancho de via
f esponj.=
Costo afirm :
L ongitud =
espesor =
e
x ( b1 +b2 )/2
m3
soles
1.48 m2
vol. Total =
VELADORA:
S DE CAPITAL : 80%D
OS Y OTROS : 12%D
20% CHP)
S DE CAPITAL : 80%D
OS Y OTROS : 12%D
94.80
49.38
39.50
5.93
113.76
208.56
20.86
37.54
266.96
62.40
32.50
26.00
3.90
71077 m3
7.2 mts
0.25
80 S/.m3
38420 mts
0.2 mts
20% CHP)
74.88
137.28
13.73
24.71
175.72
RENDIM.X
HORAS
COSTO
COSTO
HORA
X EQUIPO
H-M
PARCIAL
310.00
892.34
266.96 238215.03
160.00
444.23
175.72
78059.60
TOTAL S/.
316274.63
PREGUNTA N1.-
12 PTOS
SE DESEA COLOCAR UNA CAPA DE AFIRMADO (HORMIGON 80% + TIERRA ROJA 20%) EN LA CARRETERA NESHU
CURIMANA SEGN DATOS SIGUIENTES:
7.2 MTS
38.42 KMS
12 CM
TALUD 1:1
A.-
B.-
PRESUPUESTO PARA EL ALQUILER DE EQUIPO PESADO PARA LA COLOCACION Y COMPACTADO DEL AFIRMADO
CONSIDERANDO LOS SIGUIENTES DATOS:
8 PTOS
MOTONIVELADORA
RODILLO LISO
CATARPILLAR
VIBRATORIO
###
12000
21% (Va)
135
310
C.T.H
CTH
C.H.P
C. H.O
= C.H.P + C. O
Soles
Horas
Soles
HP
m2/Hr
###
12000
22% (Va)
14
160
C.H.P =
D=( )/( )
=
D
Va
Vr
VEU hrs
Soles/hora
1.2. COSTO HORARIO DEL INTERES DE CAPITAL INVERTIDO (I) = 80% (D)
1.3. COSTO HORARIO DE SEGUROS Y OTROS (S) = 12% ( D)
2.-
D
RESPUESTA PREGUNTA 1:
DATOS
EN LA CARRETERA NESHUYA -
a = 7.20 mts
talud 1:1
RESPUESTA A :
area:
Vol neto =
costo
A = hx ( b1 +b2 )/2
33748.128 m3
3,585,738.60 soles
0.8784
vol. Total =
QUE EL FACTOR DE
RESPUESTA B :
COSTO HORARIO MOTONIVELADORA:
1.- COSTO DE POSESION (CHP)
Soles
Horas
Soles
TN
m3/hr
89.74
46.74
37.39
CTH
5.61
107.69
197.44
19.74
35.54
252.72
70.51
36.73
29.38
4.41
84.61
155.13
15.51
27.92
198.56
RESPUESTA PREGUNTA 2:
0% (D)
HP
2B.- EQUIPO MINIMO:
TRACTOR NEUMATICO : PARA REALIZAR CORTES MENORES
ancho de via
f esponj.=
Costo afirm :
L ongitud =
espesor =
e
7.2 mts
0.25
85 S/.m3
38420 mts
0.12 mts
m2
42185.16 m3
2 PTOS
2 PTOS
COSTO
COSTO
H-M
PARCIAL
252.72 225510.22
198.56
52352.26
TOTAL S/.
277862.48
S EN MATERIAL SUELTO
O DE TALUDES Y CARGIO DE MATERIAL
Y RAZANTES
RAZANTES Y TERRAPLENES
A DE RODADURA