Está en la página 1de 74

IMPORTANT INFORMATION FOR THE INSTALLER

AND THE OWNER


INCLUDED: THERMOMASSEUR INSTALLATION
USING THE MIA SERIES CONTROLS

The quest for your wellness

IMPORTANT: TO BE KEPT FOR THE OWNER

OWNERS MANUAL

YOUR THERAPEUTIC BATH, A KEY COMPONENT


FOR CREATING YOUR INSPERIENCE BATHROOMTM
ESSENCIATM

AMMA
TMU

THALASSA
THERMAL

VEDANA

TEMAZKAL

TEKURA

AYOURA
AZUR

ESPALIER
BALNEO

RELAXATION
CHAIR &
FOOTREST

BASA

ORIGAMI

THERAPEUTIC BATHS

TM All rights reserved.

ELEGANCIA

CARE UNITS

MERIDIAN

UNIVERSAL
LEGREST

UNIVERSAL
MASSAGE
TABLE

COMPLEMENTARY
PRODUCTS

OWN E R S MAN U A L

TABLE OF CONTENTS
SAFETY INSTRUCTIONS
THERMOMASSEUR

PARTS AND TOOLS

SITE PREPARATION

THERMOMASSEUR INSTALLATION

7-9

PLUMBING INSTALLATION
TM

TEKURA

NEW

10 - 12

INSTALLING/CHANGING ACCESSORIES

13 - 16

BALNEO, AYOURA, AMMA AND ORIGAMI FREESTANDING


PARTS AND TOOLS

17

SITE PREPARATION

18 - 19

INSTALLATION

20 - 25

TURBINE
TECHNICAL SPECIFICATIONS

26

ELECTRICAL INSTALLATION

27 - 29

REMOTE MOUNTING

30 - 34

SKIRTS
GENERAL INSTRUCTIONS

35

PARTS AND TOOLS

36

INSTALLATION

37 - 53

THE MIA SERIES CONTROLS


INSTALLATION

54

USER GUIDE

55 - 65

MAINTENANCE

66 - 68

TROUBLESHOOTING

69 - 70

WARRANTY

71 - 72

DRILLING TEMPLATES

73 - 76

956, chemin Olivier


Saint-Nicolas (Qubec)
G7A 2N1
T 418.831.7701

1.800.463.2187

F 418.831.6623

1.800.382.8587

info@bainultra.com

www.bainultra.com
Printed in Canada. Copyright January 2011 BainUltra Inc. All rights reserved. 45220001
Some products, specications, and services mentioned in this manual are described in pending patent applications or are protected by patents.

O W N E RS MAN U AL | SAFET Y I N ST RUCTIONS

INSTRUCTIONS PERTAINING TO A RISK OF FIRE,


ELECTROCUTION, OR PERSONAL INJURY
IMPORTANT SAFETY INSTRUCTIONS
READ AND FOLLOW ALL INSTRUCTIONS
SAVE THESE INSTRUCTIONS
WARNING
s2ISKOFHYPERTHERMIAPEOPLEUSINGMEDICATIONANDORHAVINGANADVERSEMEDICALHISTORYSHOULDCONSULTAPHYSICIANBEFOREUSINGA
Hydro-thermo massageTM bathtub equipped with a heater.
s2ISKOFHYPERTHERMIAANDPOSSIBLEDROWNINGDONOTUSEA(YDRO THERMOMASSAGETMBATHTUBEQUIPPEDWITHHEATERIMMEDIATELYFOLLOWing strenuous exercise.
s2ISKOFFETALINJURYPREGNANTORPOSSIBLYPREGNANTWOMENSHOULDCONSULTAPHYSICIANBEFOREUSINGA(YDRO THERMOMASSAGETM bathtub
equipped with a heater.
s2ISKOFACCIDENTALINJURYORDROWNINGDONOTUSEDRUGSORALCOHOLBEFOREORDURINGTHEUSEOFA(YDRO THERMOMASSAGETM bathtub
equipped with a heater.
s5SETHISUNITONLYFORITSINTENDEDPURPOSESORASDESCRIBEDINTHISMANUAL5SEONLYATTACHMENTSRECOMMENDEDBYTHEMANUFACTURER
s2ISKOFHYPERTHERMIAANDPOSSIBLEDROWNINGWATERTEMPERATUREINEXCESSOF100F (38C) MAYBEINJURIOUSTOYOURHEALTH#HECKAND
ADJUSTTEMPERATUREBEFOREUSE
s4OREDUCETHERISKOFINJURY ASWITHANYOTHERCONVENTIONALBATH DONOTALLOWCHILDRENORPHYSICALLYIMPAIREDPEOPLETOUSETHISUNIT
unless they are closely supervised at all times.
s4OAVOIDINJURY EXERCISECAREWHENENTERINGOREXITINGTHE4HERMOMASSEUR.

RISK OF ELECTRICAL SHOCK


s$ISCONNECTELECTRICPOWERBEFORESERVICING
s$ONOTPERMITELECTRICALAPPLIANCESHAIRDRYER LAMP TELEPHONE RADIO TELEVISION ETC WITHIN5 (1.5 m) OFTHE4HERMOMASSEUR.
s"EFOREUSINGTHE4HERMOMASSEUR ITSEXTERIORCONSTRUCTIONPODIUMORSKIRTING SHOULDBElNISHEDSOTHATABATHERCANNOTACCIDENTALLY
come in contact with electrical components (turbine and power module).
s&ORINDOORUSEONLY

%,%#42)#!,#/..%#4)/.3
s.EVERDROPORINSERTOBJECTSINTOANYOPENINGS
s4HE4HERMOMASSEUR must be connected only to a supply circuit that is protected by A 15 amp class AGROUNDFAULTCIRCUITINTERRUPTER
(GFCI)FORBATHSWITH1HEATEDBACKRESTANDA 20 amp (GFCI)FORBATHSWITH2 heated backrests OFTHE!MMA series. This interrupter
ISSUPPLIEDBYACERTIlEDELECTRICIANANDMUSTBETESTEDONAREGULARBASISINACCORDANCEWITHMANUFAC TURERSINSTRUCTIONS4HE'&#)
GROUNDMUSTBECONNECTED)FDEFECTIVE DONOTUSETHE4HERMOMASSEUR. Disconnect immediately and call a certied electrician.
s5SE12 AWG ORGREATER COPPERCONDUCTORSTHATRESISTTEMPERATURESOFATLEAST194F (90C).
s#ANADAONLYFORPERMANENTLYCONNECTEDUNITS!GREEN COLOREDTERMINALORAWIRECONNECTORMARKEDG GR GROUNDORGROUNDING IS
PROVIDEDWITHINTHETERMINALCOMPARTMENTNOTAPPLICABLEIFUNITSUPPLIEDWITHANELECTRICPLUG 4OREDUCETHERISKOFELECTROCUTION
CONNECTTHISTERMINALORCONNECTORTOTHEGROUNDINGTERMINALOFYOURELECTRICSERVICEORSUPPLYPANELWITHCONDUCTOREQUIVALENTINSIZE
to the circuit conductors supplying the equipment and be 12 AWG or more.
s!LLELECTRICALCONNECTIONSMUSTBECARRIEDOUTBYACERTIlEDELECTRICIANANDMUSTRESPECTFEDERAL PROVINCIALSTATE ANDLOCALBUILDING
codes and regulations.
s)NSTALLINACCORDANCEWITHMANUFACTURERSINSTALLATIONINSTRUCTIONS

1 800 463.2187

From 8 a.m. to 8 p.m. Monday to Thursday (EST) . From 8 a.m. to 5 p.m. on Friday (EST)

Printed in Canada. Copyright January 2011 BainUltra Inc. All rights reserved. 45220001
Some products, specications, and services mentioned in this manual are described in pending patent applications or are protected by patents.

T H E R M O MA SSE U R | O W N E R S M A N U AL
T H E RMOMASS EU R - PA R TS A N D TOOL S

PARTS AND TOOL

A. PARTS AND TOOLS


A-1

24 Level

A-2

24 Square

A-3

#AULKINGGUN

A-4

Pencil

A-5

Hole saw

A-6

1/16 drill bit

A-2

A-1
A-3

TILE FLANGE INSTALLATION


A-7

Miter box (angle cutter)

A-8

Fine tooth saw

A-9

$OUBLE FACETAPE

A-4

MOLDED TILE FLANGE INSTALLATION


A-10

Drill

A-11

11/64 drill bit

A-12

82 routing bit

A-13

Screws

A-14

Appropriate screwdriver

A-5

A-6

A-8

A-7

A-9

SKIRT INSTALLATION
3EESKIRTSECTION

OTHER NECESSARY ITEMS


s7OODSHIMS

A-10

A-11

A-12

A-13

A-14

s3ILICONE

IMPORTANT

s "EFORESTARTINGINSTALLATION ENSURETHATPARTSRECEIVEDMATCHYOURORDER&ORALLQUESTIONS CALL


BainUltra at 1 800 463-2187.

www.bainultra.com
Printed in Canada. Copyright January 2011 BainUltra Inc. All rights reserved. 45220001
Some products, specications, and services mentioned in this manual are described in pending patent applications or are protected by patents.

TH ER MO MASSEUR

THERMOMASSEUR

O W N E RS MAN U AL | T H ERMOMASSEUR

TH ER MO MASSEUR

T H E RMO MA S S E U R - S I T E P RE PA RATIO N

THERMOMASSEUR
SITE PREPARATION

FAUCET INSTALLATION
s3EEFAUCETMANUFACTURERSTECHNICALSPECIlCATIONS
FORZONINGANDPLANWATERSUPPLYACCORDINGLY
s0OSITIONDRAINACCORDINGTOMANUFACTURERS
specications.

BEDDING

There is a technical specication sheet for each


BainUltra ThermoMasseur which includes
information such as necessary dimensions of site
before installation. If you do not already have
the technical specications, download from
the BainUltra site at: www.bainultra.com or
call us at: 1 800 463-2187.

"EFOREINSTALLING ENSURETHATTHEmOORUNDERNEATH
the bath can support 1,500 lbs (680 kg). The bath
MAYSITDIRECTLYONTHEmOOR(OWEVER THEBATHMAY
ALSOBEINSTALLEDONABEDOFCONCRETE&ORTHISTYPE
OFINSTALLATION ITISRECOMMENDEDTHATYOUINSULATE
THECONCRETEBETWEENTWOSHEETSOFPLASTIC ONEON
mOORANDTHEOTHERUNDERNEATHBATH

SERVICE ACCESS AND VENTILATION


s!SERVICEACCESSISNECESSARY-INIMUMDIMENSIONS
AREvXvCMXCM TOPROPERLYREACHALL
ELECTRICALCOMPONENTSOFTHESYSTEM
s!NAIRVENTISALSONECESSARY-INIMUMDIMENSIONS
AREvXvCMXCM TOENSUREPROPER

FUNCTIONINGOFTHETURBINE4HESERVICEACCESSPANEL
ISOFTENTHEBESTPLACETOINSTALLTHEAIRVENT

REMOTE MOUNTING
All ThermoMasseurCOMPONENTSAREFACTORY INSTALLED
)FFORPRACTICALORACCESSIBILITYREASONS THETURBINEAND
the InMix (Chromatherapy) module must be moved,
FOLLOWRECOMMENDATIONSOUTLINEDINTURBINE REMOTE MOUNTINGSECTIONOFTHISMANUAL

WARNING

s4HESPACESURROUNDINGTHETURBINEAIRINTAKEMUSTBELARGEENOUGHANDFREEOFDEBRISFORPROPER
AIRmOWANDBEATATEMPERATUREBETWEEN72F (20C) and 86F (30C)FOROPTIMALPERFORMANCE
1 800 463.2187

From 8 a.m. to 8 p.m. Monday to Thursday (EST) . From 8 a.m. to 5 p.m. on Friday (EST)

Printed in Canada. Copyright January 2011 BainUltra Inc. All rights reserved. 45220001
Some products, specications, and services mentioned in this manual are described in pending patent applications or are protected by patents.

T H E R M O MA SSE U R | O W N E R S M A N U AL
T H E RMOMASS EU R - I N STA L L ATI ON

INSTALLATION

)NSTALLTOPERMITACCESSFORSERVICING
4HEFOLLOWINGINSTRUCTIONSAPPLYTOBOTHRECTANGULAR
and corner baths.

1. ALCOVE INSTALLATION (BETWEEN


2 OR 3 WALLS)
1-1

0LACELEVELLENGTHWISEONDECKINGOFTHE
ThermoMasseurANDADJUSTBYPLACING
shims under ThermoMasseur where
necessary. Repeat exercise width wise on
the bath. Glue shims in place with a drop
OFSILICONE

-ARKPOSITIONOFWOODENSUPPORTSTOBE
attached to the wall by tracing a line
UNDERNEATHTHEDECKOFTHE4HERMO-ASSEUR.

1-3

Pull the ThermoMasseur out.

1-4



Align the wooden supports [at least 1 1/2


CM THICK=WITHMARKINGSANDNAILINTO
PLACEONTHEWALLSTUDS0LANFORNOTCHON
WOODENSUPPORTSFORINSTALLATIONOFASKIRT
IFNECESSARY

1-5

Reposition ThermoMasseur ANDVERIFYTHAT


it is level.

1-2

The BainUltra ThermoMasseur is almost as easy


to install as a conventional bath. The following
instructions outline steps to follow for the main
types of installation.

1-2

1-1

1-4
1 - 11/2"
[2.5 3.8 cm]

1-3
A
1-5

IMPORTANT

s4HE4HERMOMASSEUR must sit entirely on its base with the lip supported by a wooden structure.

s4HE4HERMOMASSEUR must be level.

s4HE4HERMOMASSEURISMOLDEDWITHANINTEGRATEDSLOPETOWARDSTHEDRAIN)FDECKINGAROUND
the Thermomasseur is level, the bath will drain accordingly.

www.bainultra.com
Printed in Canada. Copyright January 2011 BainUltra Inc. All rights reserved. 45220001
Some products, specications, and services mentioned in this manual are described in pending patent applications or are protected by patents.

TH ER MO MASSEUR

THERMOMASSEUR

O W N E RS MAN U AL | T H ERMOMASSEUR

TH ER MO MASSEUR

T H E RMO MA S S E U R - I NS TA L LATIO N

1. ALCOVE INSTALLATION (BETWEEN


2 OR 3 WALLS)(NEXT)
1-6

1-7




Bath Deck

4OlNISHTHEFRONTOFTHEBATHWITHCERAMIC
tile or other materials), a 2 x 3 (5 cm x
7.6 cm) structure is necessary to support
the ThermoMasseur. Place underneath
THEDECK(A)ORTHEEDGEOFTHEBATH(B)
depending on the desired nish.
BainUltraSKIRTINSTALLATIONrequires a single
2 x 3 (5 cm x 7.6 cm) support in the
FRONTOFTHE4HERMO-ASSEUR. Tilt the base
OFTHESUPPORTvCM INWARDSAND
UPWARDS0LACETHETOPOFTHESUPPORT
BEHINDTHETWORETAINERBLOCKS(D)OFTHE
SKIRTPLACEDUNDERNEATHTHELIPOFTHE
ThermoMasseur (C).

Structure
2" x 3"
[5 cm x 7.6 cm]

Bath Lip

1-6

Structure
2" x 3"
[5 cm x 7.6 cm]

)NSTRUCTIONSFORINSTALLINGSKIRTSANDRETAINERBLOCKS
NOTFACTORY INSTALLEDMAYBEFOUNDINTHISMANUAL
in the SKIRT section.

Bath Deck

Structure
2" x 3"
[5 cm x 7.6 cm]

1-7
3 [7.6 cm]

IMPORTANT

s)FTHE4HERMOMASSEURANDTHESKIRTWERENOTORDEREDTOGETHER THERETAINERBLOCKSWILLNOTBE
on the bath. As such, leave a 1/4 (0.6 cm) between the 2 x 3 (5 cm x 7.6 cm) support
STRUCTUREANDTHELIPOFTHEBATHSOTHATTHETOPOFTHESKIRTMAYBEINSERTEDUNDERTHEDECK
1 800 463.2187

From 8 a.m. to 8 p.m. Monday to Thursday (EST) . From 8 a.m. to 5 p.m. on Friday (EST)

Printed in Canada. Copyright January 2011 BainUltra Inc. All rights reserved. 45220001
Some products, specications, and services mentioned in this manual are described in pending patent applications or are protected by patents.

T H E R M O MA SSE U R | O W N E R S M A N U AL
T H E RMOMASS EU R - I N STA L L ATI ON

TH ER MO MASSEUR

TILE FLANGE
!TILEmANGEISRECOMMENDEDFORALCOVEINSTALLATIONS
(between 2 or 3 walls). Some bath models may
INCLUDEAMOLDEDTILEmANGE4ILEmANGESFOROTHER
MODELSARENOTINSTALLEDORMAYBEFACTORY INSTALLED
-OLDEDTILEmANGESECURETHEmANGETOTHEWALL
WHILESUPPORTINGFROMBENEATH 
&ACTORYORCUSTOMER INSTALLEDTILEmANGE
.OTILEmANGE

2. TILE FLANGE INSTALLATION


2-1

Using a miter box (angle cutter) and a


lNE TOOTHSAW CUTPIECESOFTILEmANGE
to desired lengths. Cut 45 angles where
necessary.

2-2

Apply double-sided tape along the entire


LENGTHOFTHEmANGE3TICKTHETILEmANGE
TOTHEDECK

2-3

Apply silicone.

IMPORTANT

s!FACTORY INSTALLEDTILEmANGEDOESNOTREPLACEASILICONEJOINTBETWEENTILINGANDTHE4HERMOMASSEUR.

s4HESURFACESTHATCOMEINTOCONTACTWITHDOUBLE SIDEDTAPEMUSTBECLEAN

www.bainultra.com
Printed in Canada. Copyright January 2011 BainUltra Inc. All rights reserved. 45220001
Some products, specications, and services mentioned in this manual are described in pending patent applications or are protected by patents.

O W N E RS MAN U AL | T H ERMOMASSEUR

TH ER MO MASSEUR

T H E RMO MA S S E U R - P L U MB I NG I NS TA L L ATIO N

THERMOMASSEUR
PLUMBING INSTALLATION

DRAIN, OVERFLOW, AND PLUMBING

All plumbing installations must be carried out by a


certied plumber. Installation of a ThermoMasseur
is the same as for regular acrylic baths. Pay close
attention to the following when installing the
ThermoMasseur:

All BainUltra ThermoMasseurs require a 20 drain


ANDOVERmOWSET EXCEPTFORTHEFOLLOWINGMODELS
s4HE!MMA !MMA/VAL Thermal CN2K,
and Thermal CR2K which require a 27 set.
s4HE!YOURA drop-in model which requires with set
OFADJUSTABLELENGTH
s4HE!YOURAFREESTANDINGMODELWHICHHASA
FACTORYPRE INSTALLEDSET

DRILLING ACRYLIC OR LYPTUS WOOD FOR


FAUCETS

1/4
[0.6 cm]

4HEDRAINANDOVERmOWOPENINGSAREFACTORY DRILLED
(OWEVER DRILLINGMAYBENECESSARYTOINSTALLFAUCETS
4HISDRILLINGOFACRYLICORWOODISAVERYDELICATE
OPERATION ESPECIALLYFOR5#3"AIN5LTRA Coloration
System) ThermoMasseursANDFORTHEACRYLICOR,YPTUS
wood insert on the AyouraFREESTANDINGMODEL

1/16

1-1

1-2

LEAK TEST
Once the plumbing installation is complete and
BEFORETILEORANYOTHERRELATEDWORKBEGINS lLLTHE
BATHTOTHEOVERmOWANDWAITTHIRTYMINUTES#HECK
ALLPLUMBINGHOOK UPSANDBATHFORLEAKS
BainUltra is not responsible for any water damage
caused by leaks due to improper installation (see
WARRANTY section).

1. DRILLING
1-1

$RILLAvGUIDEHOLEBEFOREUSINGTHE
hole saw.

1-2

Use a hole saw in good condition to avoid


accidental scratches. The center guide
BITSHOULDEXTENDvCM FORCORRECT
drill positioning.

IMPORTANT

s$ONOTREMOVETHEPROTECTIVEPLASTIClLMPEELCOAT ONTHEBATHANDPLACEADROP CLOTHINTHE


Thermomasseur during installation to protect acrylic.


s4OAVOIDDRILLINGINANAIRINTAKEZONEOR ANELECTRICCOMPONENT ALWAYSCHECKUNDERDECK


BEFOREDRILLING

s$RILLOPENINGSSLIGHTLYLARGERTHANACTUALFAUCETSIZE4HISISTOAVOIDANYPOSSIBLECRACKINGOR
other damage to the acrylic.

s7HENINSTALLINGFAUCETS DONOTOVER TIGHTENlTTINGS ASTHISMAYDAMAGETHEACRYLIC

s4HISTYPEOFDAMAGEISNOTCOVEREDBYTHEWARRANTY

s$RILLATMEDIUMSPEEDANDDONOTAPPLYPRESSURETODRILLLETTHEDRILLDOTHEWORK

s4HETEMPERATUREOFTHEWATERHEATERSHOULDNOTEXCEEDPRESETANDORRECOMMENDEDLEVELSBYTHE
MANUFACTURER4HISMAYCAUSEATHERMALSHOCKTOTHEACRYLICANDWILLNOTBECOVEREDBYTHEWARRANTY

10

1 800 463.2187

From 8 a.m. to 8 p.m. Monday to Thursday (EST) . From 8 a.m. to 5 p.m. on Friday (EST)

Printed in Canada. Copyright January 2011 BainUltra Inc. All rights reserved. 45220001
Some products, specications, and services mentioned in this manual are described in pending patent applications or are protected by patents.

T H E R M O MA SSE U R | O W N E R S M A N U AL
BAT H ON DE CK - PL U M B I N G I N STA L L ATI ON

PLUMBING INSTALLATION

1. INSTALLATION
1-1

Prepare the site to connect the plumbing


and turbine.

1-2

UILDTHEvXv WOODENSTRUCTURETAKING
"
INTOACCOUNTTHETHICKNESSOFTHECERAMIC
tiles and the plywood as well as the height
OFTHEBATH
NOTE:0LANAIRINTAKEFORTURBINE

1-3

Secure plywood into place with screws


around and above structure.

1-4

#UTINSIDEvOFTHEOUTSIDEDIMENSIONS
OFTHETUB

1-5

Ensure bath is levelled and that it ts properly


in cutout.
NOTE: Protect turbine as you insert bath.

1-6

1-7

1 1/2" [3.8 cm]

Edge of bath

Ceramic, marble,
granit or other

Install desired nishing materials (ceramic


tiles, granit, marble or other) and top
SURFACEANDSIDINGOFTHEDECK

Plywood

3ETBATHBACKINTOPLACEANDconduct
plumbing and turbine connection.

2 x 3
structure

3EESPECIlCATIONSHEETOFBATHFOREXCEPTIONS

IMPORTANT

s"ATHMUSTBECOMPLETELYSUPPORTEDBYTHEmOORMAKINGSURETHEEDGERESTSENTIRELYONTHESTRUCTURE
s"ATHMUSTBELEVELLED
s"ATHISMOLDEDWITHASLOPETOWARDDRAIN)FBATHISLEVELLEDINRESPECTTOTHEDECK THEWATERWILL
drain completely.

www.bainultra.com
Printed in Canada. Copyright January 2011 BainUltra Inc. All rights reserved. 45220001
Some products, specications, and services mentioned in this manual are described in pending patent applications or are protected by patents.

11

TH ER MO MASSEUR

BATH ON DECK

O W N E RS MAN U AL | T H ERMOMASSEUR
U ND E RMO U NT E D B AT H - P L U MB I NG I NS TA L LATIO N

TH ER MO MASSEUR

UNDERMOUNTED BATH
PLUMBING INSTALLATION

1. INSTALLATION
1-1

Prepare the site to connect the plumbing


and turbine.

1-2

Build the (2 x 3) levelled wooden strucTUREWITHPLYWOODASIN$ETAIL! TAKING


INTOACCOUNTTHETHICKNESSOFTHECERAMIC
tiles and the plywood as well as the height
OFTHEBATH
NOTE:0LANAIRINTAKEFORTURBINE

1-3

Ensure bath is levelled.


NOTE: Protect turbine as you insert bath.

1-4

Conduct plumbing and turbine connection.

1-5

%NCLOSECONTOUROFPODIUMUSINGPLYWOOD
NOTE:0LANAIRINTAKEFORTURBINE

Edge of bath

1" [2.5 cm]

1-6

1-7

Ceramic, marble,
granit or other

Install desired nishing materials (ceramic


tiles, granit, marble or other) and top
SURFACEANDSIDINGOFPODIUM

Plywood

PPLYSEALTOJUNCTIONOFCERAMICTILESWITH
!
ceramic grout and/or silicone.

2 x 3
structure

Detail A

IMPORTANT

12

s"ATHMUSTBECOMPLETELYSUPPORTEDBYPODIUMMAKINGSURETHEEDGERESTSENTIRELYONTHESTRUCTURE
s"ATHMUSTBELEVELLED
s"ATHISMOLDEDWITHASLOPETOWARDDRAIN)FBATHISLEVELLEDINRESPECTTOTHEDECK THEWATERWILL
drain completely.
1 800 463.2187

From 8 a.m. to 8 p.m. Monday to Thursday (EST) . From 8 a.m. to 5 p.m. on Friday (EST)

Printed in Canada. Copyright January 2011 BainUltra Inc. All rights reserved. 45220001
Some products, specications, and services mentioned in this manual are described in pending patent applications or are protected by patents.

T H E R M O MA SSE U R | O W N E R S M A N U AL
T E KURA TM - ARM R ESTS

ARMRESTS

1. INSTALLATION
1-1

1-2

To change the armrests, loosen the


2 armrest screws that are in place
WITHAv!LLENKEY
Place new armrest and secure into place
USINGTHEv!LLENKEY

NOTE

s4HE-Y"ODY2ESTTMACCESSORYKITISCOMPRISEDOFARMRESTS HEADRESTSANDLEGRESTS

www.bainultra.com
Printed in Canada. Copyright January 2011 BainUltra Inc. All rights reserved. 45220001
Some products, specications, and services mentioned in this manual are described in pending patent applications or are protected by patents.

13

TH ER MO MASSEUR

TEKURATM

O W N E RS MAN U AL | T H ERMOMASSEUR
T E K U RA TM - H E A DRE S TS

TEKURATM
HEADRESTS

1. INSTALLATION
1-1

NOTE

14

3ETHEADRESTONUPPERPARTOFBACKREST

s)NSTALLATIONOFTHEHEADRESTISPOSSIBLEONANUNDERMOUNTEDBATHTHATWASINSTALLEDACCORDING
TOINSTRUCTIONSSEEPAGEOFTHISMANUAL 
1 800 463.2187

From 8 a.m. to 8 p.m. Monday to Thursday (EST) . From 8 a.m. to 5 p.m. on Friday (EST)

Printed in Canada. Copyright January 2011 BainUltra Inc. All rights reserved. 45220001
Some products, specications, and services mentioned in this manual are described in pending patent applications or are protected by patents.

T H E R M O MA SSE U R | O W N E R S M A N U AL
T E KURA TM - LE GR EST F OR 6 6 3 6 1 - PER SON M O D E L

LEGREST FOR 6636 1-PERSON MODEL

1. INSTALLATION
1-1

Loosen the 2 legrest suction cups by


approximately 0 to 1 (0 to 3.8 cm),
ACCORDINGTODESIREDHEIGHTOFLEGREST
The two suction cups must be at the
same height.

1-2

3ETLEGRESTONBOTTOMOFBATHINORDERFOR
it to rest securely on the specially designed
notches.

1-3

Press down on the uppermost part to


MAKESUCTIONCUPADHERETOSURFACE

0 to 11/2"
[0 to 3.8 cm]

www.bainultra.com
Printed in Canada. Copyright January 2011 BainUltra Inc. All rights reserved. 45220001
Some products, specications, and services mentioned in this manual are described in pending patent applications or are protected by patents.

15

TH ER MO MASSEUR

TEKURATM

O W N E RS MAN U AL | T H ERMOMASSEUR
T E K U RA TM - L E G RE S T S FO R 7242 2-P E RS O N MO DE L

TEKURATM
LEGRESTS FOR 7242 2-PERSON MODEL

1. INSTALLATION
1-1

,OOSENTHESUCTIONCUPSOFEACHLEGREST
by approximately 0 to 1 (0 to 3.8 cm),
ACCORDINGTODESIREDHEIGHTOFLEGRESTS!LL
4 suction cups must be at the same height.

1-2

3ETTHElRSTLEGRESTONBOTTOMOFBATHIN
ORDERFORITTORESTSECURELYONEDGEOFONE
OFTHESEATS

1-3

Press down on the uppermost part to


MAKESUCTIONCUPADHERETOSURFACE

1-4

Set the second legrest opposite the rst so


they rest against one another.

1-5

0RESSDOWNONTOPPARTTOMAKESUCTION
CUPSADHERETOSURFACE
0 to 11/2"
[0 to 3.8 cm]

16

1 800 463.2187

From 8 a.m. to 8 p.m. Monday to Thursday (EST) . From 8 a.m. to 5 p.m. on Friday (EST)

Printed in Canada. Copyright January 2011 BainUltra Inc. All rights reserved. 45220001
Some products, specications, and services mentioned in this manual are described in pending patent applications or are protected by patents.

T H E R M O MA SSE U R | O W N E R S M A N U AL
BALNE O , AYO U R A & A M M A F R EESTA N DI NG - PA R T S A ND T O O L S

TH ER MO MASSEUR

BALNEO, AYOURA, AMMA & ORIGAMI FREESTANDING


PARTS AND TOOLS

A. PARTS INCLUDED
A-1

Pipe concealer (Cella model)

A-2

Screws and washers


(Cella and Amma models)

A-3

Floor anchoring
(Ayoura, Naos and Sanos)

A-4

Template (Ayoura and Amma models)

A-1

A-2

A-3

A-4

x1

x4

x2

x1

B. TOOLS REQUIRED
B-1

24 level

B-2

#AULKINGGUN

B-3

Pencil

B-4

%RASABLEMARKER

B-5

Drill

B-6

3/16 drill bit

B-7

2 hole saw

B-8

7/16 wrench (Cella and Amma models)


7/8 wrench (Ayoura model)

B-9

Phillips #2 screwdriver

B-10

Silicone

B-2

B-1

B-3

B-4

B-5

B-6

B-7

B-8

B-10

B-9

IMPORTANT

s"EFORESTARTINGINSTALLATION ENSURETHATPARTSRECEIVEDMATCHYOURORDER&ORALLQUESTIONS CALL


BainUltra at 1 800 463-2187.

s)NSTRUCTIONSINTHISSECTIONAPPLYTOTHE!YOURA and AmmaFREESTANDINGMODELS2EFERTO


ThermomasseurINSTRUCTIONSFORTHEINSTALLATIONOF!YOURA and Amma drop-in models.

www.bainultra.com
Printed in Canada. Copyright January 2011 BainUltra Inc. All rights reserved. 45220001
Some products, specications, and services mentioned in this manual are described in pending patent applications or are protected by patents.

17

O W N E RS MAN U AL | T H ERMOMASSEUR

TH ER MO MASSEUR

B A L NE O , AY O U RA & A MMA FRE E S TA ND I NG - S I T E P RE PA R ATIO N

BALNEO, AYOURA, AMMA & ORIGAMI FREESTANDING


SITE PREPARATION

If the massage table will be used on the Ayoura


model, BainUltra recommends leaving at least
3 (0.92 m) of free space around the bath to give
the massage therapist enough room to work.

BEDDING
s"EFORElNISHINGYOURBATHROOMmOORCERAMIC
WOODOROTHER ENSURETHATTHEmOORISLEVEL.O
SUBSEQUENTADJUSTMENTSMAYBEMADETOTHESE
BATHSEXCEPTFORTHE!MMA model, where shims
may be installed under the bath.
s4HERMOMASSEURS are molded with an integrated
SLOPETOWARDSTHEDRAIN)FmOORISLEVEL THEBATH
will drain accordingly.
s4HE!YOURA model requires a 12 x 20 (30.5 cm
x 50.8 cm) recess where drain, water and electric
SUPPLIES CONTROLCABLEANDIFNEEDED REMOTEAIR
SUPPLYHAVEBEENINSTALLED3EEBATHSTEMPLATEFOR
correct positions.

If you cannot install the turbine or provide an air


passage under the oor for the Cella, Naos, or
Sanos models, an optional surface installation kit
is available and must be ordered through your
retailer.

s4HE!MMA model requires a 12 x 9 (30.5 cm


XCM RECESSFORTHEDRAIN2EFERTOTHEBATH
TEMPLATEFORTHELOCATIONSOFWATERSUPPLY ELECTRICAL
connection, and control cable and remote air supply,
IFAPPLICABLE

SERVICE ACCESS AND VENTILATION


For models in the Balneo series, the turbine is
not installed on the ThermoMasseur. Determine
a suitable place close to the bath (must be less than
;M=AWAY EITHERUNDERTHEmOOR INACLOSET
or any other location that will conceal the power
module and turbine. Chosen location must be easily
ACCESSIBLEFORSERVICINGWHILEALLOWINGSUFlCIENTAIR
CIRCULATIONFORTHETURBINESEETURBINE - REMOTE
MOUNTING section).
The turbine of the Ayoura and Amma models is
installed beneath the bath. To allow access to
THETURBINEANDOTHERCOMPONENTS FORESEEAv
XvCMXCM SPACEFACINGTHE!YOURA
access panel. For the AmmaMODEL FORESEEANv
(28 cm) space around the bath in order to be able to
TAKEOUTTHEREMOVABLEBASE2EFERTOTHETEMPLATE
4HETURBINEMAYALSOBEINSTALLEDREMOTELY)FNECESSARY
please contact BainUltra at 1 800 463-2187FOR
ADDITIONALINFORMATION

18

1 800 463.2187

From 8 a.m. to 8 p.m. Monday to Thursday (EST) . From 8 a.m. to 5 p.m. on Friday (EST)

Printed in Canada. Copyright January 2011 BainUltra Inc. All rights reserved. 45220001
Some products, specications, and services mentioned in this manual are described in pending patent applications or are protected by patents.

T H E R M O MA SSE U R | O W N E R S M A N U AL
BALNE O , AYO U R A & A M M A F R EESTA N DI NG - S I T E P RE PA RAT I O N

TH ER MO MASSEUR

PLUMBING

32"

s5SEmEXIBLEPIPESFOR!YOURA and Amma water


connections.

[81.3 cm]

s/NTHE!YOURAMODEL THEFAUCETMAYBEINSTALLED
on the acrylic or wood lip. On the Amma model,
THEFAUCETMAYBEINSTALLEDONTHEBATHLEDGE
)NBOTHCASES FOLLOWFAUCETLOCATIONRECOMMENDAtions in drawings.

3 7/8"
[9.8 cm]

NOTE:"EFOREDRILLINGTHEWOODORACRYLIC READTHE
instructions in the THERMOMASSEUR PLUMBING INSTALLATION section.
s/NTHE!YOURA model, BainUltra recommends
INSTALLINGFAUCETSNOHIGHERTHANvCM 
This is the height clearance under the massage
TABLEWHENITISINSTALLED)FTHEFAUCETEXCEEDSTHIS
height, you will not be able to install the massage
table.
NOTE:4HELENGTHOFPIPE! UNDERTHELIPMUST

NOTIMPEDEREINSTALLATIONOFTHEACCESSPANEL

4HISMEASUREVARIESDEPENDINGONFAUCET
models and location on the acrylic or wood lip.

Faucet area Amma

Faucet area Ayoura

MASSAGE table

4 5/8" (11,7cm)
2" (5,1cm)

(A)

Diagonal view Ayoura

WARNING

s BalneoSERIESBATHSCANNOTBEDRILLEDFORFAUCETINSTALLATION&AUCETSMUSTBEFREESTANDINGOR
wall-mounted models.

www.bainultra.com
Printed in Canada. Copyright January 2011 BainUltra Inc. All rights reserved. 45220001
Some products, specications, and services mentioned in this manual are described in pending patent applications or are protected by patents.

19

O W N E RS MAN U AL | T H ERMOMASSEUR

TH ER MO MASSEUR

AY O U RA F RE E S TA ND I NG - I NS TA L L ATIO N

AYOURA FREESTANDING
INSTALLATION

1. BATH SITE
1-1

/NCEmOORISPREPAREDANDLEVELAND
recess is cleared around the drain, place
INSTALLATIONTEMPLATEONmOORINTHE
chosen location.

1-2

!LIGNTEMPLATEOVERmOWDRAINhole with
mOORDRAINANDMAKESURERECESSAROUND
drain matches required measurements.

1-3

-ARKANCHORSCREWENTRYpoints on the
mOOR

1-4

Remove template and screw anchors


where specied.

TEMPLATE:

AYOURA
Dimensions: 1/4" [6mm]

12"

20"

1-1
1-2

2. INSTALLATION
2-1

Unscrew both screws on access panel


under the lip and gently remove panel.

2-2

#OMPLETEINSTALLATIONOFBATHDRAIN-AKE
sure it is watertight.

2-3

Install bath on anchors.

2-4

Connect drain and water supply and


nish wiring.

2-5

Reinstall access panel.

20

1 800 463.2187

2-3

From 8 a.m. to 8 p.m. Monday to Thursday (EST) . From 8 a.m. to 5 p.m. on Friday (EST)

Printed in Canada. Copyright January 2011 BainUltra Inc. All rights reserved. 45220001
Some products, specications, and services mentioned in this manual are described in pending patent applications or are protected by patents.

T H E R M O MA SSE U R | O W N E R S M A N U AL
AMMA FRE E STA N DI N G - I N STA L L ATI ON

INSTALLATION

1. BATH SITE
1-1

NCEmOORISPREPAREDANDLEVELAND
/
recess is cleared around the drain, place
INSTALLATIONTEMPLATEONmOORINTHECHOSEN
location.

1-2

!
LIGNTHETEMPLATEOVERmOWWITHTHEmOOR
drain and ensure that the recess around
the drain is properly measured.

1-3

1-1

1-2

Use a 3/16 bit to drill anchor screw entry


points.

2. INSTALLATION
2-1

Mount drain on bath. Ensure watertightness.

2-2

Position the bath, aligning anchor holes


with anchor screw entry points.

2-3

Connect bath drain and water supply,


and complete electrical wiring.

2-4

Once the bath is in place and all connections


completed, secure bath in place using
washers and screws supplied.

2-5

Install base.
2-3

2-4

www.bainultra.com
Printed in Canada. Copyright January 2011 BainUltra Inc. All rights reserved. 45220001
Some products, specications, and services mentioned in this manual are described in pending patent applications or are protected by patents.

21

TH ER MO MASSEUR

AMMA FREESTANDING

O W N E RS MAN U AL | T H ERMOMASS EUR


B A L NE O - NA O S & S A NO S - I NS TA L LATIO N

TH ER MO MASSEUR

BALNEO - NAOS & SANOS


INSTALLATION

1. BATH SITE
1-1

/NCETHEmOORHASBEENlNISHEDANDIS
PERFECTLYLEVEL PLACE4HERMO-ASSEUR in
the exact chosen location. Trace the outline
OFTHEBATHWITHANERASABLEMARKER
1-1

1-2

Remove the ThermoMasseur ANDCAREFULLY


PLACEITUPSIDEDOWNONABLANKETOR
corrugated cardboard (ex. the box in which
it was delivered).

Vertical
Anchoring
Point

TOP VIEW

1-3


/NTHEmOOR DETERMINEBYREFERRINGTO
MEASUREMENTSTAKENUNDERNEATHTHEBATH
THEEXACTLOCATIONOFTHEDRAIN THEAIRPIPE
and the two anchoring points at each end
OFTHEBATH
Vertical
Air Intake
Pipe

2. INSTALLATION
2-1

)NSTALLTHEDRAINANDOVERmOWSETONTHE
BATHANDTHElRSTSECTIONOFTHEAIRINTAKE
PIPE!"3 UNDERTHEmOOR

2-2

!PPLYASILICONEJOINTTOTHEbase rim.

2-3

Put the ThermoMasseur in place and put


PIPESTHROUGHTHEmOOR ENSURINGBATHIS
aligned with anchoring points.

2-4

7IPEOFFEXCESSSILICONEimmediately.

Horizontal
Anchoring
Point

Vertical
Drain

1- 3

Horizontal Drain

2-2

2-1

LEAK TEST
/NCEPLUMBINGISFULLYINSTALLEDANDBEFOREBEGINNING
ANYOTHERWORK lLLTHE4HERMO-ASSEURTOOVERmOW
ANDWAITMINUTES#HECKALLPLUMBINGHOOK UPS
ANDBATHFORLEAKSBainUltra is not responsible for
any water damage caused by improper installation
(see Warranty section).

ELECTRICITY
Install turbine and InMix power module connections
according to specications outlined in the MIAMULTI
ELECTRICAL INSTALLATION - TURBINE section.
2-3

NOTES

s3INCETHESEMODELSSITDIRECTLYONTHEmOOR THEOVERmOWDRAINPIPEOPENINGISFACTORY DRILLED




s4OINSTALLATIONOFTHE.AOSOR3ANOSONACONCRETESLABWITHNOACCESSBELOWFORAIRENTRYTOTHE
BATHAHOLEOFINCHCM INDIAMETERMUSTBEDRILLEDINTOTHEBATHSKIRTTOALLOWAIR
SUPPLYTOTHEBATH)MPORTANT$ONOTDRILLABOVEHEIGHTOFEXISTINGHOLEINTHESKIRTINTENDEDTO
CONNECTDRAINTOOVERmOW

22

1 800 463.2187

From 8 a.m. to 8 p.m. Monday to Thursday (EST) . From 8 a.m. to 5 p.m. on Friday (EST)

Printed in Canada. Copyright January 2011 BainUltra Inc. All rights reserved. 45220001
Some products, specications, and services mentioned in this manual are described in pending patent applications or are protected by patents.

T H E R M O MA SSE U R | O W N E R S M A N U AL
BALNE O - CE L L A - I N STA L L ATI ON

TH ER MO MASSEUR

BALNEO - CELLA
INSTALLATION

1. BATH SITE
1-1





/NCETHEmOORHASBEENlNISHEDANDIS
PERFECTLYLEVEL DETERMINETHEEXACTLOCATION
OFTHE4HERMO-ASSEUR-ARKTHEFOLLOWING
ONTHEmOOR
A POSITIONOFTHEFOURFEET
B HOLESTOBEDRILLEDFORTHEDRAINANDAIR
INTAKEFORTHETURBINE

1-2

$RILLTHEFOURHOLESFORTHEFEETWITHA
DRILLBITANDTHEDRAINANDAIRINTAKE
openings with a 2 hole saw.

Cella

5 1/2" [14 cm]

2 3/4"

Cella 6036

2. INSTALLATION
2-1

)NSTALLTHEDRAINANDOVERmOWSETONTHE
BATHANDTHElRSTSECTIONOFTHEAIRINTAKE
PIPE!"3 UNDERTHEmOOR#OVER
the ABS pipe with pipe concealer
(included).

2-2

Once the ThermoMasseur is in place


WITHPIPINGINSTALLEDINTHEmOOR SECURE
THEFOURFEETWITHSCREWSANDWASHERS
provided. (A-2)

[7 cm]

Cella

2-1

Cella 6036

2-1

IMPORTANT

s$ONOTREMOVETHEPROTECTIVEPLASTIClLMFROMTHEBATHANDPLACEADROP CLOTHINTHE4HERMOMASSEUR
during installation to protect the acrylic.

s4HE4HERMOMASSEURMUSTBESECUREDTOTHEmOOR

WARNING

s BalneoSERIESBATHSCANNOTBEDRILLEDFORFAUCETINSTALLATION&AUCETSMUSTBEFREESTANDINGOR
wall-mounted models.

www.bainultra.com
Printed in Canada. Copyright January 2011 BainUltra Inc. All rights reserved. 45220001
Some products, specications, and services mentioned in this manual are described in pending patent applications or are protected by patents.

23

O W N E RS MAN U AL | T H ERMOMASSEUR

TH ER MO MASSEUR

OR I GA M I F R EES TA ND I NG D E S I G N S E RI E S - PA R T S A ND T O O L S - S I T E P RE PA RATIO N

ORIGAMI FREESTANDING DESIGN SERIES


PARTS AND TOOLS

A. PARTS INCLUDED
A-1

Anchor points

A-2

Installation template

A-3

&LEXIBLEvPIPEFOROVERmOW

A-4

Access panel

A-5

Access panel hinge

A-1

A-2

A-3

B. TOOLS REQUIRED
B-1

48-inch level

A-4

A-5

B-1

ORIGAMI FREESTANDING DESIGN SERIES


SITE PREPARATION

The Origami Freestanding Design Series requires


a 12 x 10 (30 cm X 25 cm) compartment for the
drain, distance air inlet and, if applicable, space
for control cables and options. Refer to the installation template.

24

1 800 463.2187

ACCESS AND AIR INLET


For this model, the turbine is not installed on the bathtub.
Determine a location near the bathtub at a maximum distance
OFFEETORMETRES UNDERTHEmOOR INACABINETORANYOTHER
location to conceal the turbine and optional accessory casings,
IFAPPLICABLE4HELOCATIONCHOSENMUSTALSOBEACCESSIBLEANDALLOW
SUFlCIENTAIRINTAKEFORTHETURBINE
2EFERTOTHETURBINE DISTANCE INSTALLATION section).

From 8 a.m. to 8 p.m. Monday to Thursday (EST) . From 8 a.m. to 5 p.m. on Friday (EST)

Printed in Canada. Copyright January 2011 BainUltra Inc. All rights reserved. 45220001
Some products, specications, and services mentioned in this manual are described in pending patent applications or are protected by patents.

T H E R M O MA SSE U R | O W N E R S M A N U AL
ORIGAMI FRE ESTA N DI N G DESI GN SER I ES - I N S TA L L AT I O N

INSTALLATION

1. LOCATION
1-1

Once the compartment around the drain is


COMPLETEDINTHEmOOR PLACETHEINSTALLATION
template on the ground at the chosen location.

1-2

LIGNTHEPOSITIONOFTHEOVERmOWDRAINWITH
!
THEmOORDRAINANDENSURETHATTHECOMPARTMENTSIZECORRESPONDSTOREQUIREMENTS

1-3

ARKTHELOCATIONOFTHEANCHORPOINTSCREWS

1-4

Remove the installation template and screw


INTHEANCHORPOINTSINTHEMARKEDLOCATIONS

1-1

2. INSTALLATION
2-1

2-2

Assemble the drain on the bathtub. Use


THEmEXIBLEvPIPEPROVIDEDFORTHE
JUNCTIONBETWEENTHEOVERmOWANDTHE
4 JOINT%NSUREWATERTIGHTNESS4HIS
operation is much easier to complete
when the bathtub rests on its side. Place a
COVERORPROTECTIVECARDBOARDONTHEmOOR
BEFOREPOSITIONINGTHEBATHTUBONITSSIDE
!PPLYAJOINTOFSILICONEUNDERTHEEDGE
OFTHEBASEOFTHEBATHTUB

2-3

Install the bathtub on the anchor points


FASTENEDTOTHEmOORANDIMMEDIATELYWIPE
away any excess silicone. Connect the drain.

2-4

Install the turbine according to the


instructions in the TURBINE DISTANCE
).34!,,!4)/.SECTIONOFTHEMANUAL
4HEAIRINLETISLOCATEDTOTHELEFTOFTHE
BATHTUBDRAINAND IFAPPLICABLE CONTROL
and option connection cables to the right.
Connect control and option cables
IFAPPLICABLE

2-5

SEALEVELORRULERTODRAWALINEONTHEmOOR
5
between contact points between the access
PANELARCHANDTHEBASEOFTHEBATHTUB

2-6

OSITIONTHEMETALACCESSPANELHINGEOF
0
an inch behind the line drawn in Step 2-5.

2-7

3 CREWTHEHINGEINPLACEONTHEmOOR
USINGTHESLOTSPRJOVIDED)NSTALLPANEL

2-2

2-1

2-3

2-6
3/4

NOTES

s4OINSTALLTHE/RIGAMI&REESTANDING$ESIGN3ERIES
ONACONCRETESLABWITHNOPLACEFORTHEPASSAGE
OFTHEAIRINLETPIPETOTHEBATHTUBDRILLAHOLE
INCHESINDIAMETERINTHESKIRT)-0/24!.4
DRILLTHEHOLEINCHESABOVEmOORLEVELAND
PROTECTTHEBATHTUBWITHAPIECEOFWOODPLACED
behind the location to be drilled.

s)FACONTROLOROPTIONSAREINSTALLEDONTHEBATHTUB
a second pipe may be required through which to
FEEDTHECABLES

www.bainultra.com
Printed in Canada. Copyright January 2011 BainUltra Inc. All rights reserved. 45220001
Some products, specications, and services mentioned in this manual are described in pending patent applications or are protected by patents.

25

TH ER MO MASSEUR

ORIGAMI FREESTANDING DESIGN SERIES

O W N E RS MAN U AL | T U RBINE
T U RB I NE - T E CH NI CA L S P E CI F I CATIO N S

TURBINE
TECHNICAL SPECIFICATIONS
10 1/8"
[25.7 cm]

MOTOR

9 3/8"
[23.8 cm]

Weight
5,5 lbs

8 1/4"
[21 cm]

TUR BIN E

Motor power
Panasonic 0,8 HP
120 V
600 W
5A

4 3/8"
[11.1 cm]
AIR INTAKE

Air pressure
2,75 psi

AIR OUTLET

Air ow
CFMATMAXIMUMSPEED
29 1/2"

Motor rotation speed


27 000 rpm at maximum speed

[75 cm]

9 7/8"
[25.1 cm]

Noise level
56 to 60 db at maximum speed
Operating cost
(2FOR+7H

7 3/4"
[19,7 cm]

AIR HEATER
6 3/8"
[16.2 cm]

Power
700 W
5.8 A
Operating cost
(2FOR+7H

6 1/2"
[16.5 cm]

NOTES

s4HESPECIlCATIONSSHOWNINDICATETHEOUTEREDGEDIMENSION

s4HEMANUFACTURERACCEPTSAv;CM=VARIANCE4HEREAREVARIATIONSONEACHPRODUCTAND
SPECIlCATIONSARESUBJECTTOCHANGEASWEIMPROVEUPONOURPRODUCTASREQUIRED4HEDIMENSIONS
NEEDEDFORSITEPREPARATIONANDSTRUCTUREBUILDINGWILLDIFFER"AIN5LTRA assumes no responsibility
FORPREPARATORYWORKDONEPRIORTOTHEPRODUCTBEINGONSITE

WARRANTY

Turbine* | *Some restrictions may apply. (www.bainultra.com/warranty)

26

1 800 463.2187

From 8 a.m. to 8 p.m. Monday to Thursday (EST) . From 8 a.m. to 5 p.m. on Friday (EST)

Printed in Canada. Copyright January 2011 BainUltra Inc. All rights reserved. 45220001
Some products, specications, and services mentioned in this manual are described in pending patent applications or are protected by patents.

T U R B IN E | O W N E R S M A N U A L
T URBINE - E LEC TR I C A L I N STA L L ATI ON

TURBINE
ELECTRICAL INSTALLATION

GROUNDING

MIA, MIAPLUS, MIAMULTI

The turbine is connected to a 120V circuit.


All electrical connections must be carried out by
a certied electrician in accordance with local
electrical requirements and codes. Special attention
must be given to installation of baths power circuit,
and more particularly to the following points:
CONNECTIONS
4HE)N-IXMODULE#HROMATHERAPY OFTHEELECTRONICCONTROLAND
THETURBINEMUSTBEEASILYACCESSIBLEATALLTIMES-AKEALLCONNECtions as indicated on diagram below. Ensure that power circuit
is disabled before proceeding with any electrical connections%LECTRICALCABLEFEEDINGBATHMUSTBEATLEAST.!7'
caliber. Turbine must be connected to its own circuit, which,
in turn must be connected directly in breaker panel without
any interrupters or dimmer switches.#ANADAONLYTHEJUNCTIONBOXMUSTBEATTACHEDTOTHEWALLATTHEHEIGHTOFATLEAST
vCM FROMTHEGROUND

#ONNECTIONSFORCONTROLS

www.bainultra.com
Printed in Canada. Copyright January 2011 BainUltra Inc. All rights reserved. 45220001
Some products, specications, and services mentioned in this manual are described in pending patent applications or are protected by patents.

27

TUR BIN E

The electrical system must be connected to an


independent circuit protected by a 15 AMP Class A
ground fault circuit interrupter (GFCI) that is new
for baths with 1 heated backrest and a 20 amp
(GFCI) for baths with 2 heated backrests of the
Amma series. This electrical circuit must imperatively
be grounded. CANADA ONLY:FORPERMANENTLY
connected units. A green-colored terminal (or a wire
CONNECTORMARKEDG GR GROUNDORGROUNDING ISPROVIDED
WITHINTHETERMINALCOMPARTMENTNOTAPPLICABLEIFUNIT
SUPPLIEDWITHANELECTRICPLUG 4OREDUCETHERISKOF
electrocution, connect this terminal or connector to the
GROUNDINGTERMINALOFYOURELECTRICSERVICEORSUPPLYPANEL
WITHCONDUCTOREQUIVALENTINSIZETOTHECIRCUITCONDUCTORS
supplying the equipment and be 12 AWG or more.
INSTALL THIS UNIT IN ACCORDANCE WITH THE CANADIAN
ELECTRICAL CODE, PART 1.

O W N E RS MAN U AL | T U RBINE
T U RB I NE - E L E CT RI CA L I NS TA L LATIO N

MIAPLUS, MIAMULTI

TUR BIN E

#ONNECTIONSFORDOUBLEHEATEDBACKREST
OFTHE!MMA series

WARNING



28

s%LECTRICALOUTLETMUSTBEINSTALLEDBYACERTIlEDELECTRICIAN)NSTALLATIONMUSTBECONDUCTEDIN
ACCORDANCEWITHALLLOCAL PROVINCIALSTATE ANDFEDERALBUILDINGELECTRICALCODESANDREGULATIONS
#ONNECTELECTRICALPOWERSUPPLYONLYAFTERALLLOWVOLTAGEWIRINGISPROPERLYINSTALLEDONTURBINE
)FYOUDIDNOTFOLLOWTHISLASTSTEP SHUTOFFANDTHENRESTARTYOURHOMESCIRCUITBREAKER4URBINE
ANDAIRPIPESHOULDBECLEAROFBUILDINGMATERIALSANDWIRING
1 800 463.2187

From 8 a.m. to 8 p.m. Monday to Thursday (EST) . From 8 a.m. to 5 p.m. on Friday (EST)

Printed in Canada. Copyright January 2011 BainUltra Inc. All rights reserved. 45220001
Some products, specications, and services mentioned in this manual are described in pending patent applications or are protected by patents.

T U R B IN E | O W N E R S M A N U A L
T URBINE - E LEC TR I C A L I N STA L L ATI ON

ELECTRICAL DIAGRAM
%LECTRICALCONNECTIONSFOR#ANADAONLY

TUR BIN E

www.bainultra.com
Printed in Canada. Copyright January 2011 BainUltra Inc. All rights reserved. 45220001
Some products, specications, and services mentioned in this manual are described in pending patent applications or are protected by patents.

29

O W N E RS MAN U AL | T U RBINE
T U RB I NE - RE MO T E MO U NT I NG I NS TA L L ATIO N

TURBINE
REMOTE MOUNTING INSTALLATION

TUR BIN E

LOCATION

All bath components are factory-installed. If you


wish to relocate the turbine and InMix module
(Chromatherapy) for practical or accessibility reasons, follow these instructions. Failure to follow
these instructions could result in serious personal
injury or and/or property damage. Failure to follow
these instructions will void the warranty for the
ThermoMasseur and BainUltra shall not be responsible
for any damage, loss, cost, expense or liability
relating to failure to follow these instructions.

Choose a location not requiring more than six


elbows (directional changes) and 15 ft. (4.6 m)
of piping to the bath. Choose the shortest possible
distance between bath and turbine to insure the
SYSTEMSPERFORMANCE3UFlCIENTSPACEANDVENTILATIONISNECESSARYFORPROPERAIRCIRCULATION!MBIENT
air temperature should be between 72F (20C) and
86F (30C). Easy access to system must remain
POSSIBLEATALLTIMESFORSERVICING

TURBINE INSTALLATION
Turbine may be relocated in either a vertical or a
HORIZONTALPOSITIONUse only 1 1/2 (3.8 cm) ABS
or PVC non-exible pipes and adaptors to extend
air line; the use of exible pipes is not
recommended (except when factory-installed).
Whenever possible, use two 45 elbows to change
THEDIRECTIONOFYOURPIPING!LLAIRLINEPIPECONNECTIONS
should be glued together except for connections
to the turbine, air-heater of the double heated
backrest of the Amma serie and air entry on the
bath which are secured in place with screws.
The turbine must be mounted at least 4 (10 cm)
from the oor. To reduce heat loss, use insulating
material along the entire air line. Bath is delivered
WITHAFTM CORDTOCONNECTTHEELECTRONIC
CONTROLTOTHETURBINE)FNECESSARY EXTENSIONSARE
AVAILABLETHROUGHARETAILER4ORELOCATETURBINE REFER
TODIRECTIONSANDILLUSTRATIONSONFOLLOWINGPAGES

IMPORTANT

s)FTHE4HERMO-ASSEUR comes with LED Chromatherapy system, InMix module must always be
moved with the turbine.

s"AIN5LTRA Thermomasseurs AREAIRJETBATHSONLY#ONSEQUENTLY NOWATERSUPPLYWHATSOEVER


SHOULDBECONNECTEDTOTHETURBINESINTAKE

WARNING
30

s!WAITINGPERIODOFHOURSISNECESSARYBEFOREUSINGTURBINEIFPIPESHAVEBEENGLUEDTOGETHER
1 800 463.2187

From 8 a.m. to 8 p.m. Monday to Thursday (EST) . From 8 a.m. to 5 p.m. on Friday (EST)

Printed in Canada. Copyright January 2011 BainUltra Inc. All rights reserved. 45220001
Some products, specications, and services mentioned in this manual are described in pending patent applications or are protected by patents.

T U R B IN E | O W N E R S M A N U A L
T URBINE - RE MOTE M OU N TI N G I N STA L L ATI O N

A. TO REMOVE TURBINE FROM ITS


PRESENT SUPPORTS
ORTHEDOUBLEHEATEDBACKRESTOFTHE
&
Amma series, see pages 28 and 29.

A-1

Disconnect wires going to turbine.

A-2

5SINGAmATHEADSCREWDRIVER LOOSEN
tting.

Fitting

A-3

For Ayoura freestanding only:


Disconnect turbine at tting by loosening
LOWERANDUPPERlTTINGWITHmATHEAD
screwdriver.

A-2

Wires
A-1

B. TO REINSTALL TURBINE
B-1

Mount turbine to wall or wall structure


by inserting 1 (2.5 cm) screws in
mounting holes.

B-2

Use as many 1 1/2 (4 cm) ABS or PVC


pipes as necessary to connect turbine to
bath. Follow all relocation instructions
provided in installation manual. To reduce
vibrations, avoid having air line pipes
touch home structure.

B-3

Fitting

3ECUREPIPEATAIROUTPUTOFTURBINEBY
drilling a 1/8 (0.3 cm) hole and by using
1/2 (1.3 cm) screw. (Do not glue).

B-4

Reconnect wires going to turbine.

B-5

Connect turbines power supply.

B-2

Air output B-3


B-4

B-1
B-5

Power cable

A-3

2x

www.bainultra.com
Printed in Canada. Copyright January 2011 BainUltra Inc. All rights reserved. 45220001
Some products, specications, and services mentioned in this manual are described in pending patent applications or are protected by patents.

31

TUR
TUR
BIN
BIN
E E

NOTE

O W N E RS MAN U AL | T U RBINE
A M M A SER I ES W I T H 2 H E AT E D B A CK RE S T S - RE MO T E MO U NT I NG I NS TA L LATIO N

AMMA SERIES WITH 2 HEATED BACKRESTS


TUR BIN E

REMOTE MOUNTING INSTALLATION

TUR BIN E

TUR BIN E

A. TO
RETIRER
REMOVE
LA TURBINE
TURBINEDE
FROM
SES ITS
PRESENT
SUPPORTSSUPPORTS
ACTUELS
A-1

Disconnect wires going to turbine.

A-2

5SINGAmATHEADSCREWDRIVER LOOSENTHE
upper tting on side A and the right
lTTINGOFTHEJOINTUNDERTHETURBINE

A-3

5
SINGAmATHEADSCREWDRIVER DISCONNECT
the turbine by loosening the lower tting
on side B .

A-4

Using a squarehead screwdriver, remove


pipes on side A by unscrewing the
screw securing pipes to turbine.

A-5

Unscrew the screws securing the air-heater


in place under the turbine. Unscrew the
screw on the elbow on side B and
FOLLOWINSTRUCTIONSIN3ECTION"TOREINSTALL
turbine.

A-2

Upper fitting

A-3

Lower fitting
A-1

For double
heated
backrest

A-4

A-5

A-5

Side B

Side A
A-2

32

1 800 463.2187

From 8 a.m. to 8 p.m. Monday to Thursday (EST) . From 8 a.m. to 5 p.m. on Friday (EST)

Printed in Canada. Copyright January 2011 BainUltra Inc. All rights reserved. 45220001
Some products, specications, and services mentioned in this manual are described in pending patent applications or are protected by patents.

T U R B IN E | O W N E R S M A N U A L
AMMA SE RIE S W I TH 2 H EATED B A C K R ESTS - RE MO T E MO U NT I NG I NS TA L L AT I O N

B. TO REINSTALL TURBINE
B-1

Mount the turbine to the wall or wall


structure by inserting 1 (2.5 cm) screws
into mounting holes. Mounting must
FOLLOWTHEDIRECTIONINDICATEDONTHE
air-heater to ensure proper operation.
Moreover, there must be at least 1 1/2
(4 cm) clearance between the air-heater
ANDTHEmOORONCEMOUNTINGISCOMPLETED

B-3

Use as many 1 1/2 (4 cm) ABS or PVC


pipes as necessary to connect the two air
INTAKESTOEACHBACKREST&OLLOWALL
relocation instructions provided in the
installation manual. To reduce vibrations,
avoid having air pipes touch home structure.

B-4

Connect wires going to turbine.

B-5

Connect power to turbine and InMix module.

IMPORTANT

For double
heated backrest

B-4

B-3

B-5

B-2

B-1

Connection

s%NSURETHATBOTHAIRHEATERSARECONNECTEDTOTHETURBINEINTHEDIRECTIONINDICATEDONEACH
air-heater.

www.bainultra.com
Printed in Canada. Copyright January 2011 BainUltra Inc. All rights reserved. 45220001
Some products, specications, and services mentioned in this manual are described in pending patent applications or are protected by patents.

33

TUR BIN E

B-2

Insert the lower air-heater into the end


OFTHE4 SHAPEDPIPE-OUNTPROPERLYTO
ensure air circulation as indicated on the
air-heater. Pre-drill a 1/8 (0.3 cm) hole.
Insert and tighten screw. Do not use glue.
)FNECESSARY UNSCREWTHEAIROUTPUTSCREW
on the turbine to position pipe at desired
angle. Pre-drill a 1/8 (0.3 cm) hole and
insert screw. Do not use glue.

B-3

O W N E RS MAN U AL | T U RBINE
A M M A SER I ES W I T H 2 H E AT E D B A CK RE S T S - RE MO T E MO U NT I NG I NS TA L LATIO N

TUR BIN E

EXAMPLE OF INSTALLATION IN AN
ADJACENT SPACE
1

Turbine must be at least 1 1/2 (3.8 cm)


FROMTHEmOOR

2

$OOROFCLOSETWHERETURBINEISMOUNTED
must provide a minimum 1 (2.5 cm)
GAPBETWEENmOORANDDOORFORSUFlCIENT
VENTILATION#HOSENSPACEFORTURBINE
MUSTBEATLEASTFT3 (1.41m3) or
COMMUNICATEWITHASPACEOFATLEASTSUCH
volume.
%XXvXFT3
MXMXMM3)

TUR BIN E






1.5" [3.8 cm]


1

WARNING

Minimum height
of support

1" [2.5 cm]


2

Space under door

s"EFORESTARTINGTURBINE VERIFYTHATITISINSTALLEDINTHECORRECTPOSITION

s4HEThermomasseur must be connected only to a supply circuit that is protected by a 15 amp


CLASSAGROUNDFAULTCIRCUITINTERRUPTER(GFCI)FORBATHSWITHHEATEDBACKRESTANDA
20 amp GFCIFORBATHSWITHHEATEDBACKRESTSOFTHE!MMA and TMU series.

s&ORDOUBLEHEATEDBACKRESTOFTHE!MMA and TMU series, ensure that both air-heaters are


mounted so that air circulates in the direction indicated on the air-heaters. The air-heater power
module must be mounted in the direction indicated by up on the casing.

s/NCEINSTALLATIONISCOMPLETE ALWAYSSTARTMOTORWITHOUTWATERINBATHTOCHECKIFAIREXITS
FULLYTHROUGHBATHSAIRJETS

s&AILURETOFOLLOWTHESEINSTRUCTIONSCOULDRESULTINSERIOUSPERSONALINJURYORANDORPROPERTY
DAMAGE&AILURETOFOLLOWTHESEINSTRUCTIONSWILLVOIDTHEWARRANTYFORTHE4HERMOMASSEUR and
BainUltraSHALLNOTBERESPONSIBLEFORANYDAMAGE LOSS COST EXPENSEORLIABILITYRELATINGTO
FAILURETOFOLLOWTHESEINSTRUCTIONS

34

1 800 463.2187

From 8 a.m. to 8 p.m. Monday to Thursday (EST) . From 8 a.m. to 5 p.m. on Friday (EST)

Printed in Canada. Copyright January 2011 BainUltra Inc. All rights reserved. 45220001
Some products, specications, and services mentioned in this manual are described in pending patent applications or are protected by patents.

S KIR T S | O W N E R S M A N U A L
SKIR T S - GE NER A L I N STR U C TI ON S

SKIRTS
GENERAL INSTRUCTIONS

SIZING ACRYLIC PARTS


$EPENDINGONWALLlNISH YOUMAYNEEDTOSIZETHE
PANELSANDTOEKICKS7HENINSTALLATIONINSTRUCTIONSOF
SPECIlCSKIRTMODELMENTIONSIZINGOFACRYLICPARTS IF
SUCHSIZINGISNECESSARY FOLLOWTHESESTEPS

PEEL COAT
A plastic lm (peel coat) protects the acrylic parts.
)TISBESTTOLEAVETHISlLMINPLACEWHILEWORKING
/NLYREMOVEITJUSTBEFOREINSTALLINGTHEPARTS)FYOU
REMOVETHEPEELCOATWHENWORKSTARTS YOURISK
SCRATCHINGTHEPARTSDURINGINSTALLATION)FYOUREMOVE
THEPEELCOATONLYAFTERALLPARTSAREINSTALLED SOME
plastic may stay trapped in certain areas.

Instructions specic to each skirt model are


presented on the following pages. These general
instructions apply to all models.
Before starting, make sure all parts match your
order. Contact BainUltra at 1-800-463-2187
if you have any questions.
Ensure that the ThermoMasseur has been
installed in accordance with BainUltra installation
instructions and the bath bottom is ush with
the oor.
1-1

1. SIZING ACRYLIC
Protect the acrylic with tape.

1-2

Trace the cutting line.

1-3

#UTUSINGAJIGSAWWITHAMELAMINEBLADE
or a metal blade (minimum 14 teeth/inch).

SKIRTS

1-1

1-2
1-3

www.bainultra.com
Printed in Canada. Copyright January 2011 BainUltra Inc. All rights reserved. 45220001
Some products, specications, and services mentioned in this manual are described in pending patent applications or are protected by patents.

35

O W N E RS MAN U AL | SK IRTS
S K I R T S - PA R T S A ND TO O LS

SKIRTS
PARTS AND TOOLS

A.NECESSARY
AND
RETIRER LA TOOLS
TURBINE
DE SES
PARTS
REQUIRED
(NOT INCLUDED)
SUPPORTS
ACTUELS
FOR ALL MODELS
A-1

Measuring tape

A-2

Screwdriver
s3ILICONE

You will require the pencil and level used for the
installation of the ThermoMasseur as well as
the following items depending on the skirt you
are installing.

FOR TRIMMING (IF NEEDED)


A-3

Adhesive tape

A-4

Jigsaw and nishing blade

SKIRTS

SKIRTS

AMMA CR 6060 AND LITTORA


A-5

Drill (depending on the installation)

A-6

Eight #8 screws

A-7

vMONKEYWRENCH

A-8

7/16ratchet

A-1

A-2

A-4

A-3

SJ-1 MODEL
A-5

Drill (depending on the installation)


s4WOWOODENBLOCKSXX

S-J 3 CN2K/CR2K MODELS


A-6

Eight screws

A-7

vMONKEYWRENCH

A-8

7/16ratchet

A-9

v!LLENKEY

A-5

A-6

SJ-3 TM/SE MODELS


A-6

Eight screws

A-7

vMONKEYWRENCH

SJ-3 TMU 5454/6060 MODELS


A-6

Ten #8 screws

s#ISSORS

A-7

A-8

A-9

A-10

ELEGANCE
A-10

36

Long-nosed pliers

1 800 463.2187

From 8 a.m. to 8 p.m. Monday to Thursday (EST) . From 8 a.m. to 5 p.m. on Friday (EST)

Printed in Canada. Copyright January 2011 BainUltra Inc. All rights reserved. 45220001
Some products, specications, and services mentioned in this manual are described in pending patent applications or are protected by patents.

S KIR T S | O W N E R S M A N U A L
AMMA CR 6060 - I N STA L L ATI ON

AMMA CR 6060
INSTALLATION

1. PARTS INCLUDED
1-3

1-2

1-1

3KIRT

1-2

,EFTWALLlNISHINGSTRIP

1-3

Right wall nishing strip

1-4

4OEKICK

1-5

Retainer clips

1-6

vCM WOODENBLOCKS

1-7

,OWERANCHORAGEFOR,ITTORA SKIRT

1-8

1/4-20 x 1 hex head bolts

1-9

1/4-20 x 1-3/4 hex head bolts

1-10

#8 x1/2 screws

1-1

1-4

4X

2X

1-5

1-6

4X

4X

4X

1-7

1-8

1-9

1-10

2. INSTALATION
NOTE

)FWOODENBLOCKSAREALREADYINSTALLEDON
bath, see step 2-3.

2-1

Using builders glue or epoxy, glue the


TWOWOODENBLOCKS  ATvCM
FROMTHELEDGEOFTHEBATHANDATv
CM FROMEACHSIDEOFTHECENTER

NOTE

4HEBLOCKSATBOTHENDSAREFACTORY INSTALLED

2-2

Install the retainer clips (1-5) on the


WOODENBLOCKSUSINGTHEXvSCREWS
  4HECENTEROFTHECLIPMUSTBEAT
vCM FROMTHEEXTERIORLEDGEOFTHE
bath.

2-1
12"

12"

[30.5 cm]

[30.5 cm]

1/4"
[0.6 cm]

1-6
1-5
1"

1-10

[2.5 cm]

www.bainultra.com
Printed in Canada. Copyright January 2011 BainUltra Inc. All rights reserved. 45220001
Some products, specications, and services mentioned in this manual are described in pending patent applications or are protected by patents.

2-2

37

SKIRTS

4X

O W N E RS MAN U AL | SK IRTS
A MMA CR 6060 - I NS TA L L ATIO N

SKIRTS

SKIRTS

2. INSTALLATION (NEXT)
2-3

2
ESTINGTHELEVELONTHEOUTERLEDGEOFTHE
BATH TRACEAGUIDELINEONTHELEFTWALL
2EPEATSTEPFOROTHERSIDE

2-4

T vCM FROMTHELINETRACEDIN


!
the preceding step (see gure 2-3), trace
APARALLELLINEUNDERTHEBATH ANDMARK
AHORIZONTALLINEvCM FROMTHE
UPPERLEDGEOFTHEBATH2EPEATSTEPFOR
other side.

2-3

1 3/16"
[3 cm]

17"
[43.2 cm]

2-4

2-5

0OSITIONTOEKICK  BEHINDTHEPARALLEL
traced lines and secure into place using
FOURSCREWS
NOTE:4RIMTOEKICKASNEEDED

2-6

2
ESTTHEBASEOFTHELEFTWALLnishing
STRIP  INFRONTOFTHETOEKICKANDALIGN
to be parallel with the previously traced
LINEANDHORIZONTALLYWITHTHELINE
traced at 17 (43.2 cm).
NOTE:!HORIZONTALSPACEOFAPPROXIMATELY
5/16 (0.8 cm) should remain
BETWEENTHELEDGEOFTHEBATH
ANDTHEFRONTPARTOFTHEWALL
nishing strip.

2-7

2-5

A-6

1-4

Secure into place in the two predrilled


HOLESUSINGTWOSCREWS2EPEATSTEPFOR
other side.

2-7
1-2
5/16"
[0.8 cm]

2-6

38

1 800 463.2187

From 8 a.m. to 8 p.m. Monday to Thursday (EST) . From 8 a.m. to 5 p.m. on Friday (EST)

Printed in Canada. Copyright January 2011 BainUltra Inc. All rights reserved. 45220001
Some products, specications, and services mentioned in this manual are described in pending patent applications or are protected by patents.

S KIR T S | O W N E R S M A N U A L
AMMA CR 6060 - I N STA L L ATI ON

2. INSTALLATION (NEXT)
 

0
OSITIONSKIRT  ONmOORTORESTAGAINST
THETOEKICKANDUSINGSHIMS LIFTSKIRTUNTIL
ITSUPPERLIPISINSERTEDATTHECENTEROFTHE
retainer clips.

 

#
ENTERSKIRTANDWITHAPENCIL MARKTHE
LOCATIONOFTHECENTEROFTHEFACTORY DRILLED
HOLESONTHETOEKICK

 

2EMOVESKIRTANDPOSITIONLOWERANCHORAGE
  ONTHETOEKICKATTHECENTEROFTHE
MARKSMADEINPREVIOUSSTEPANDSECURE
into place by tightening the hex head bolts
(1-8). (Do not over tighten).
2EPOSITIONSKIRTBYREUSINGTHESHIMSAND
secure into place by using the hex head
bolts (1-9).

 

4IGHTENBOLTSUNTILTHEBOTTOMOFTHESKIRT
FORMSASTRAIGHTLINEWITHTHEBOTTOMOF
the side panels.
NOTE:!SILICONESEALATBASEOFTOEKICKIS
recommended to ensure complete
watertightness.

1-1
2-12

SKIRTS

 

2-8

2-9

1-8
1-7
2-10

www.bainultra.com
Printed in Canada. Copyright January 2011 BainUltra Inc. All rights reserved. 45220001
Some products, specications, and services mentioned in this manual are described in pending patent applications or are protected by patents.

1-9

39

2-11

O W N E RS MAN U AL | SK IRTS
E L E G A NCE & L I T T O RA I NS TA L LATIO N

ELEGANCE & LITTORA


INSTALLATION

SKIRTS

1. PARTS INCLUDED
1-2

1-1

3KIRT

1-2

,EFTWALLlNISHINGSTRIP

1-3

Right wall nishing strip

1-4

4OEKICK

1-5

Retainer clips (A or B)

1-6


vCM WOODENBLOCKS
;vCM LEDGEOFBATH=

1-7

vCM WOODENBLOCKS

; vCM LEDGEOFBATH=

1-8

LittoraSKIRTLOWERANCHORAGE

1-9

1/4-20 x 1 hex head bolts

1-10

1/4-20 x 4 hex head bolts

1-11

#8 x 1/2 screws

1-12

#8 x 5/16 screws

1-1

1-3
2X
CLIP A

1-4

2. INSTALLATION

1-5

2X

2X

1-6

1-7

2X

2X

2X

2X

2X

1-8

1-9

1-10

1-11

1-12

2 1/2"
[6.3 cm]

NOTE

)FWOODENBLOCKSAREALREADYINSTALLEDON
the bath, see step 2-3.

2-1

Using builders glue or epoxy, glue the two


WOODENBLOCKS OR  ATvCM
FROMTHELEDGEOFTHEBATHANDAT v
CM FROMEACHSIDEOFTHECENTER

2-2

Install the retainer clips (1-5) on the 1/2


CM THICKWOODENBLOCKSUSINGTHE
#8 x 1/2 screws (1-11) and on the 1/4
CM THICKWOODENBLOCKUSINGTHE
XvSCREWS  4HECENTEROF
THECLIPMUSTBEATvCM FROMTHE
EXTERIORLEDGEOFTHEBATH

NOTE: Wall nishing


strip must be
INSTALLEDBEFORE
THESKIRT

15 1/8"

15 1/8"

[38.4 cm]

[38.4 cm]

2-1
1/4"
[0.6 cm]

2-2

1-5
1"
[2.5 cm]

1-11 OR 1-12
CLIP A

40

1 800 463.2187

From 8 a.m. to 8 p.m. Monday to Thursday (EST) . From 8 a.m. to 5 p.m. on Friday (EST)

Printed in Canada. Copyright January 2011 BainUltra Inc. All rights reserved. 45220001
Some products, specications, and services mentioned in this manual are described in pending patent applications or are protected by patents.

S KIR T S | O W N E R S M A N U A L
E LE GANCE & L I TTOR A I N STA L L ATI ON

2. INSTALLATION (NEXT)
2-3

2-3

ESTINGTHELEVELONTHEOUTERLEDGEOFTHE
2
bath, trace a guide line on both walls.

2-4

RACEPARALLELLINES vCM FORa Littora


4
SKIRTANDv CM FORAN%LEGANCE
SKIRT FROMTHElRSTLINESANDCONNECTTHEM
BYALINEONTHEmOOR

15"
[38.1 cm]

2-4

or
14 5/8"
[37.1 cm]

&
ROMTHETOPOFTHE LEDGEOFTHEBATH
MEASURE v CM FORA,ITTORASKIRT
ANDv CM FORAN%LEGANCE
SKIRT TOWARDSTHEmOORANDTRACEA
HORIZONTALLINE

2-5

2"

2-5

0OSITIONTOEKICK  BEHINDTHELINEON
THEmOOR$RILLANDSECUREINTOPLACEUSING
FOURSCREWS
NOTE:4RIMTOEKICKASNEEDED4HE
MARKINGSUNDERTOEKICKINDICATE
WHICHSIDETOCUTINORDERFORDRAIN
slot to remain centered.

2-6

1 5/8"

[5 cm]

2-5 [4.1 cm]

LITTORA SKIRT

ELEGANCE SKIRT

SKIRTS

2-6
1-4

1 3/8

LITTORA SKIRT

ELEGANCE SKIRT

(3.5 cm)

2 1/4
(5.7 cm)

7 1/2
(19.1 cm)

15 3/4
(40 cm)

12 1/4

(31 cm)

(15.2 cm)

1 1/4

(20.2 cm)

(3.2 cm)

1 1/2
(3.9 cm)

from 60 to 72
(from 152.4 cm to 182.9 cm)

57 1/2
(146 cm)

14 1/2
(36.8 cm)

17

from 18 to 20 1/8

1/4

from 17 1/4 to 20 1/2


(from 43.8 cm to 52.1 cm)

(43.8 cm)

(from 45.7 cm to 51.1 cm)

54 1/2
(138.5 cm)

from 59 3/4 to 72 1/4


(from 151.8 cm to 183.8 cm)

from 59 3/4 to 72 1/4


(from 151.8 cm to 183.5 cm)

www.bainultra.com
Printed in Canada. Copyright January 2011 BainUltra Inc. All rights reserved. 45220001
Some products, specications, and services mentioned in this manual are described in pending patent applications or are protected by patents.

41

O W N E RS MAN U AL | SK IRTS
E L E G A NCE & L I T T O RA I NS TA L LATIO N

2-7

3 ETLEFTPANEL  UNDERTHELEDGEOFTHE
bath and vertically align its inner edge with
the previous line traced vertically under
BATHANDHORIZONTALLYWITHHORIZONTALLINE
NOTE:!HORIZONTALSPACEOFAPPROXIMATELY
5/16 (0.8 cm) or 7/6 (1.1 cm)
SHOULDREMAINBETWEENLEDGEOF
THEBATHANDFRONTPARTOFTHEPANEL

ELEGANCE SKIRT

5/16"

7/16"

[0.8 cm]

[1.1 cm]

1-2
1-9

2-8
2-8

Secure panel into place in the two or three


predrilled holes using two screws. Repeat
STEPFOROTHERPANEL

2-9

Mount lower anchorage (1-8) on center


panel (1-1) as shown. Partially tighten hex
head bolts (1-9 and 1-10).

2-10

Using lower anchorage, secure center


PANELTOTOEKICK

2-11

Center panel and tighten hex head bolts


(1-9) so that anchorage into completely
secured into place (Do not over tighten).

2-12

Slide panel into place under the ledge


OFTHEBATHANDLIFTSOTHATITSUPPERLIPIS
inserted on the retainer clips.

1-8

1-10

SKIRTS

2-7

SKIRTS

2-9

1-1

2-10

2-11

2-12

42

1 800 463.2187

From 8 a.m. to 8 p.m. Monday to Thursday (EST) . From 8 a.m. to 5 p.m. on Friday (EST)

Printed in Canada. Copyright January 2011 BainUltra Inc. All rights reserved. 45220001
Some products, specications, and services mentioned in this manual are described in pending patent applications or are protected by patents.

J UPES

LITTORA SKIRT

2. INSTALLATION (NEXT)

S KIR T S | O W N E R S M A N U A L
E LE GANCE & L I TTOR A I N STA L L ATI ON

2. INSTALLATION (NEXT)
2-13

IGHTENHEXHEADBOLTS  UNTILTOPOF
4
THECENTERPANELFORMSASTRAIGHTLINEWITH
TOPOFSIDEPANELS
NOTE:!SILICONESEALATBASEOFTOEKICKIS
recommended to ensure complete
watertightness.

1-10
2-13

SKIRTS

www.bainultra.com
Printed in Canada. Copyright January 2011 BainUltra Inc. All rights reserved. 45220001
Some products, specications, and services mentioned in this manual are described in pending patent applications or are protected by patents.

43

O W N E RS MAN U AL | SK IRTS
S J -1 - I NS TA L L ATIO N

SJ-1
INSTALLATION

1. PARTS INCLUDED
1-1

Center panel

1-2

Retainer clips

1-3

#8 x 1/2 screws

1-4

7
OODBLOCKSIFNECESSARY
NOTE: Parts may vary depending on
bath model.

1-1

2. INSTALLATION
NOTE

SKIRTS

2-1

)FWOODBLOCKSAREALREADYINSTALLEDONTHE
bath, go to step 2-2.

2X

2X

2X

1-2

1-3

1-4

60 (152.4 cm)

16 (40.6 cm)

66 (167.6 cm)

16 (40.6 cm)

72 (182.9 cm)

20 (50.8 cm)

LUEWOODBLOCKSvCM FROM
'
bath rim with epoxy or construction glue.
0OSITIONBLOCKSACCORDINGTOBATHMODEL

B
A

2-1
1/4"
[0,6 cm]

44

1 800 463.2187

From 8 a.m. to 8 p.m. Monday to Thursday (EST) . From 8 a.m. to 5 p.m. on Friday (EST)

Printed in Canada. Copyright January 2011 BainUltra Inc. All rights reserved. 45220001
Some products, specications, and services mentioned in this manual are described in pending patent applications or are protected by patents.

S KIR T S | O W N E R S M A N U A L
SJ-1 - INSTALL ATI ON

2. INSTALLATION (NEXT)
2-2

2-3

(OLDINGALEVELAGAINSTTHESIDEOFTHE
BATH MARKAGUIDELINEONBOTHWALLS

2-2

4RACEALINEONTHEmOORTOconnect
both lines.
2-3

2-4

)NSTALLTHERETAINERCLIPSONTHEWOODBLOCKS
and secure in place with #8 x 1/2 screws.

2-5

&ASTENTWOWOODBLOCKSTOTHEmOOR
vCM FROMTHECENTEROFTHEBATH
3PACETHEMvCM FROMTHEmOOR
guideline.
)NSERTTOPOFPANELBETWEENTHEBATHRIM
and retainer clips under the bath ledge.

2-7

&ASTENSKIRTTOBLOCKSWITHscrews.
NOTE: It is recommended that
YOUAPPLYASILICONEJOINTTOTHE
bath base to ensure a tight seal.

2-5

SJ-1 : 2 1/2" (6,4 cm)


SJ-2 : 2 1/4"(5,7 cm)

2-4

3/4" [1,9 cm]

SKIRTS

2-6

14"
(35,6 cm)

2-6

2-7

www.bainultra.com
Printed in Canada. Copyright January 2011 BainUltra Inc. All rights reserved. 45220001
Some products, specications, and services mentioned in this manual are described in pending patent applications or are protected by patents.

45

O W N E RS MAN U AL | SK IRTS
S J -3 CN2K & CR2K - I NS TA L L ATIO N

SJ-3 CN2K & CR2K


INSTALLATION

1. PARTS INCLUDED

1-1

1-1

3KIRT

1-2

4OEKICK

1-3

,EFTWALLlNISHINGSTRIP

1-4

Right wall nishing strip

1-5

3KIRTBRACKETS

1-6

1/420 x 1 bolts

1-7

1/420 nuts

1-8

Allen screws

1-9

Retainer clips

1-10

#8 x 1/2 screws

1-4

1-3

SKIRTS

1-2

4X

4X

1-5

1-6

4X

4X

4X

4X

4X

1-7

1-8

1-9

1-10

1-11

THERMAL CR2K

1-11 7
OODBLOCKSIFNECESSARY

8"

8"

[20,3 cm]

[20,3 cm]

32"

32"

[81,3 cm]

[81,3 cm]

2. INSTALLATION
NOTE

)FWOODBLOCKSAREALREADYINSTALLEDONTHE
bath, go to step 2-2.

2-1

LUEWOODBLOCKSvCM FROMBATH
'
rim with epoxy or construction glue.
0OSITIONBLOCKSACCORDINGTOBATHMODEL

2-1
1/4"

2-2

[0,6 cm]

THERMAL CN2K

&OLLOWSTEP INTHE3*nSKIRTSECTION

8"

8"

[20,3 cm]

[20,3 cm]

2-3

Place nishing strip under the bath rim


and align it with the level line on the wall.
,EAVEAROUNDvCM OFSPACE
BETWEENTHEBATHANDTHECURVEDENDOF
the strip.

3"

3"

[7,6 cm]

[7,6 cm]

2-3
2-4

Fasten strip with two screws in the holes


PROVIDED2EPEATFORTHEOTHERSIDE
2x
3/16"

2-4

46

1 800 463.2187

From 8 a.m. to 8 p.m. Monday to Thursday (EST) . From 8 a.m. to 5 p.m. on Friday (EST)

Printed in Canada. Copyright January 2011 BainUltra Inc. All rights reserved. 45220001
Some products, specications, and services mentioned in this manual are described in pending patent applications or are protected by patents.

S KIR T S | O W N E R S M A N U A L
SJ-3 CN2K & C R 2 K - I N STA L L ATI ON

2. INSTALLATION (NEXT)
2-5

)NSTALLTOEKICKBYLEANINGITagainst
THEINNEREDGEOFTHElNISHINGSTRIPSON
each side.

2-6

&ASTENTOEKICKTOmOORWITHFOURSCREWS
in the holes provided.

2-7

)NSTALLTHEFOURRETAINERCLIPSONTHEWOOD
BLOCKSANDSECUREINPLACEWITHXv
screws.

2-5
2-6

)NSERTTOPOFPANELBETWEENTHEBATHRIM
ANDRETAINERCLIPS0OSITIONBASEOFPANEL
AGAINSTTOEKICK

2-9

2AISEPANELANDADJUSTHEIGHTusing wood
BLOCKS4RACEALINEONTHETOEKICKATTHE
FOURSCREWHOLESTOINDICATEPANELHEIGHT
Remove panel.

2-10


0OSITIONSKIRTBRACKETSASHORIZONTALLYAS
POSSIBLEONTOEKICK ALIGNINGTHEBOTTOM
OFTHEBRACKETWITHTHELINETRACEDINSTEP
 &ASTENBRACKETSWITHABOLTANDNUT

2-11

Position panel by supporting it on the


SAMEPIECESOFWOODUSEDINSTEP 
&ASTENPANELTOTOEKICKWITHTHEFOUR
Allen screws.
NOTE: Be sure there is a 1/8 (0.3 cm)
SPACEBETWEENTHESKIRTBASEAND
TOEKICKTOALLOWFORTURBINEAIR
INTAKE

3/4" [1,9 cm]

SKIRTS

2-8

2-7

2-8

2-9

2-10

www.bainultra.com
Printed in Canada. Copyright January 2011 BainUltra Inc. All rights reserved. 45220001
Some products, specications, and services mentioned in this manual are described in pending patent applications or are protected by patents.

2-11

47

O W N E RS MAN U AL | SK IRTS
S J -3 S E - I NS TA L LATIO N

SJ-3 SE
INSTALLATION

1-1

1-1

,EFTPANEL

1-2

Center panel

1-3

Right panel

1-4

,EFTTOEKICK

1-5

#ENTERTOEKICK

1-6

2IGHTTOEKICK

1-7

Retainer clips

1-8

#8 x 1/2 screws

1-9

7OODBLOCKSIFNECESSARY

1-2

1-4

J UPES

1. PARTS INCLUDED

1-3

1-6

1-5

4X

4X

1-7

1-8

4X
1-9

SKIRTS

SKIRTS

SENSATION

9"

9"

[22,8 cm]

[22,8 cm]

27"

27"

[68,6 cm]

[68,6 cm]

2. INSTALLATION
NOTE

)FWOODBLOCKSAREALREADYINSTALLEDONTHE
bath, go to step 2-2.

2-1

LUEWOODBLOCKSvCM FROM
'
bath rim with epoxy or construction glue.
0OSITIONBLOCKSACCORDINGTOBATHMODEL
1/4"
[0,6 cm]

2-1

48

1 800 463.2187

From 8 a.m. to 8 p.m. Monday to Thursday (EST) . From 8 a.m. to 5 p.m. on Friday (EST)

Printed in Canada. Copyright January 2011 BainUltra Inc. All rights reserved. 45220001
Some products, specications, and services mentioned in this manual are described in pending patent applications or are protected by patents.

S KIR T S | O W N E R S M A N U A L
SJ-3 SE - INSTA L L ATI ON

2. INSTALLATION (NEXT)
2-2

(OLDLEVELAGAINSTBATHRIMANDMARK
dashes around the bath every 6 (15.2 cm).

2-3

-ARKASECONDSETOFDASHEScloser to
THEBATH4HISISWHERETHETOEKICKWILLBE

2-4

*OINTHESECONDSETOFDASHEStogether.
This will reproduce the baths curve.

2-2
6"
[15,2 cm]

2"
[5 cm]

2-5

-ARKTHECENTEROFTHISCURVE

2-6

0OSITIONCENTERTOEKICKJUSTbehind the
curved line and center it by aligning the
notch under it with the guideline on
THEmOOR

2-5

3CREWCENTERTOEKICKTOmOOR starting
with the two screws in the middle.

NOTE

9OUMAYHAVETOBENDTHETOEKICKSLIGHTLY
TOMATCHTHECURVEDRAWNONTHEmOOR


2-8

0LACELEFTANDRIGHTTOEKICKSONeither side
ASSHOWNANDSCREWTOmOOR
NOTE:#UTLEFTANDRIGHTTOE
KICKSASNEEDED

2-9

)NSTALLTHEFOURRETAINERCLIPSONTHEWOOD
BLOCKSANDSECUREINPLACEWITHXv
screws.

2"
[5 cm]

2-3
SKIRTS

2-7

2-4

2-6

2-8

2-9

3/4" [1,9 cm]

www.bainultra.com
Printed in Canada. Copyright January 2011 BainUltra Inc. All rights reserved. 45220001
Some products, specications, and services mentioned in this manual are described in pending patent applications or are protected by patents.

49

O W N E RS MAN U AL | SK IRTS
S J -3 S E - I NS TA L LATIO N

J UPES

2. INSTALLATION (NEXT)
2-10

)NSERTTOPOFPANELBETWEENTHEBATHRIM
ANDRETAINERCLIPS0OSITIONBASEOFPANEL
AGAINSTTOEKICK

2-11

3 EATBRACKETSONTOEKICKANDADJUST
SCREWSSOTHATBRACKETSAREVERTICAL

2-12

!DJUSTPANELHEIGHT LEAVINGv(0.6 cm)


BETWEENTHEEDGEOFTHEBATHANDTHE
curved panel top.

2-13

%NSUREBRACKETSAREWELLSEATEDONTOEKICK
and tighten wing nut as much as possible.

2-14

2EMOVEPANELANDFOLLOWSTEPS2-10 to
 FORTHELEFTPANEL

2-15

EMOVELEFTPANELANDREPEATsteps 2-10
2
to 2-13 with the center panel.

2-16

Leave center panel in place and reinstall


THELEFTANDRIGHTPANELS INSERTINGTOPOF
panel rst.
NOTE:#UTLEFTANDRIGHTTOE
KICKSANDPANELSASNEEDED

2-10

SKIRTS

2-11

2-12

50

1 800 463.2187

From 8 a.m. to 8 p.m. Monday to Thursday (EST) . From 8 a.m. to 5 p.m. on Friday (EST)

Printed in Canada. Copyright January 2011 BainUltra Inc. All rights reserved. 45220001
Some products, specications, and services mentioned in this manual are described in pending patent applications or are protected by patents.

S KIR T S | O W N E R S M A N U A L
SJ-3 TMU 5454 /6 0 6 0 - I N STA L L ATI ON

SJ-3 TMU 5454 / 6060


INSTALLATION

1. PARTS INCLUDED
1-1

,EFTPANEL

1-2

Center panel

1-3

Right panel

1-4

,EFTTOEKICK

1-1

1-3

1-2

1-5

1-4

1-6

1-8

1-5

#ENTERTOEKICK

1-6

2IGHTTOEKICK

1-7

!CRYLICFOOTING

1-8

Wood insert*

1-9

5PPERBRACKET

6X

6X

1-10 ,OWERBRACKET

1-9

1-10

1-7

1-12

1-11

1-13

12X

2X

1-14

1-15

1-11 v!LLENKEY
1-12

Cutting template

1-13

Round head Allen screw

1-14

No. 8 x 1/2 screws

1-15

No. 8 x 2 1/2 screws and washers*

2-1

0ARTS  ANDAREONLYINCLUDEDFOR


SKIRTSORDEREDWITHTHESTEP

2. INSTALLATION
2-1

3CREWUPPERBRACKETSINTOFACTORY INSTALLED
WOODBLOCKS"RACKETSMUSTBEmUSHWITH
the bath edge.

2-2

Follow step 2-1 in the SJ-1 SKIRTSECTION

2-3

Cut out cutting template and place it on


mOOR ALIGNINGTHEARROWMARKEDhLEVELv
with the line traced on the wall.

2-3

www.bainultra.com
Printed in Canada. Copyright January 2011 BainUltra Inc. All rights reserved. 45220001
Some products, specications, and services mentioned in this manual are described in pending patent applications or are protected by patents.

51

SKIRTS

6X

O W N E RS MAN U AL | SK IRTS
S J -3 T MU 5454/ 6060 - I NS TA L LATIO N

J UPES

2. INSTALLATION (NEXT)
2-4

SKIRTS

SKIRTS

!LIGNTHECENTER LEFT ANDRIGHTTOEKICKS


with the cutting template. Ensure center
TOEKICKISEXACTLYCENTERED

2-5

3CREWTOEKICKSTOmOORANDremove
template.

2-6

3CREWLOWERBRACKETSINTOTHEpredrilled
holes on the center panel using Allen
screws.
NOTE: Do not tighten. Final tightening is
done in the next step.

2-4

2-5

3/16
[0,5 cm]

2-7

(OOKTHECENTERPANELLOWERBRACKETON
THECENTERTOEKICK0USHPANELAGAINSTTHE
UPPERBRACKETANDSLIDEUNDERBATHRIM

2-8

Tighten Allen screw on each LOWERBRACKET


TOLEAVEv CM OFSPACE AS
shown in the illustration.

2-9

2EPEATSTEPSTOFORTHELEFTAND
right panels.

2-10

,EAVEv CM OFSPACEon each


SIDEOFTHECENTERPANEL

2-11

)FYOUORDEREDTHESTEP place acrylic


FOOTINGALONGTHETOEKICK CENTERAND
SCREWTOTHEmOOR

2-6
2-7
2-8

2-10

2-12 0LACEWOODINSERTONFOOTING

3/16"

2-11

52

1 800 463.2187

From 8 a.m. to 8 p.m. Monday to Thursday (EST) . From 8 a.m. to 5 p.m. on Friday (EST)

Printed in Canada. Copyright January 2011 BainUltra Inc. All rights reserved. 45220001
Some products, specications, and services mentioned in this manual are described in pending patent applications or are protected by patents.

S KIR T S | O W N E R S M A N U A L
BASA DUO - I N STA L L ATI ON

BASA DUO
INSTALLATION

1. INCLUDED PARTS
1-1

Basa Duo bath

1-2

Basa DuoSKIRT

1-1

2. INSTALLATION
2-1

)NSERTUPPERPARTOFSKIRTWITHTOPHOOKS
HOLDINGTHEUPPERPARTOFBATHFRAME

2-2

,OWERSKIRTINORDERFORHOOKSTOrest
AGAINSTLOWERPARTOFBATHFRAME

1-2

!DJUSTTHEHEIGHTOFSKIRTBYraising or
LOWERINGTHELOWERHOOKSANDSECURING
them into place at the desired height by
using the provided wing nuts.

2-1

SKIRTS

2-2

www.bainultra.com
Printed in Canada. Copyright January 2011 BainUltra Inc. All rights reserved. 45220001
Some products, specications, and services mentioned in this manual are described in pending patent applications or are protected by patents.

53

O W N E RS MAN U AL | T H E MI A SERI ES CON TROLS


MI A & MI A P L U S CO NT RO L S - I NS TA L LATIO N

MIA & MIAPLUS CONTROLS


INSTALLATION

REQUIRED TOOLS
1

&INETEETHJIGSAW

Drill

1/4 in. drill bit

LOCATION
Determine the most convenient location, on either
THEWALLORTHEDECK TOINSTALLTHECONTROLMODULEOR
CONSULTTHESPECIlCATIONSSHEETFORTHESUGGESTED
LOCATION4OAVOIDDRILLINGINANAIRINTAKEZONEORAN
ELECTRICCOMPONENT ALWAYSCHECKUNDERTHEDECK
BEFOREDRILLING)FYOUHAVETOINSTALLTHECONTROLTOTHE
WALL REMOVETHEPROTECTIVElLMOFSTICKERBEHINDTHE
control. You can add a silicone bead to secure it.

DRILLING
2EFERTOTHEDRILLINGTEMPLATEon the last pageFORTHE
LOCATIONANDDIAMETEROFTHEHOLES

T H E MIA S ERIES CONTROLS

INSTALLING THE TOUCHPAD


1

Push wiring through drilled holes.

2

2EMOVEPROTECTIVElLMFROMWATERTIGHT
seal.

Secure touchpad into place on either the


podium or the wall by using 2, 8-32 x 1
studs and 2 wing nuts.

4

4IGHTENSUFlCIENTLYTOINSURESEALISAIRTIGHT

WARNING
54

s)FCONTROLWASNOTFACTORY INSTALLED it will be attached to the turbine.


1 800 463.2187

From 8 a.m. to 8 p.m. Monday to Thursday (EST) . From 8 a.m. to 5 p.m. on Friday (EST)

Printed in Canada. Copyright January 2011 BainUltra Inc. All rights reserved. 45220001
Some products, specications, and services mentioned in this manual are described in pending patent applications or are protected by patents.

T H E MIA SE R I E S C ON TR OL S | O W N E RS MAN U AL
MIA - USE R GU I DE

MIA
USER GUIDE

ON/OFF
On
0RESSTHEONOFF KEY to start or to stop the turbine and the Mia control panel.

ADJUST AIR JET PRESSURE


!IRJETPRESSURECANBEADJUSTEDFORMAXIMUM
COMFORTANDAREMARKABLYEFFECTIVEMASSAGE
$EFAULTPRESSUREISSETTO
Increase or decrease the pressureOFTHEAIRJETS
by repeatedly pressing the or KEYSUNTILTHE
desired intensity is reached.

The Mia control panel comes standard with the


following baths:
s!ZUR
s"ASATM
s4HALASSA

TO ACTIVATE THE DRYING CYCLE


4HISFUNCTIONCOMPLETELYDRAINSTHECONDUITSAND
DRIESTHEMFORSECONDS REGARDLESSOFWHETHER
or not the system was activated. By eliminating any
WATERLEFTINTHECONDUITS THEDrying cycle ensures
PERFECTHYGIENE

MAIN FUNCTIONS
s)NCREASEORDECREASEAIRJETPRESSURE
s Activate Drying cycleFUNCTION

s.OSTAGNANTWATER
THE MIA SERIES CO NT RO L S

s.OWATERLEFTOVERFROMTHEPREVIOUSBATH
To activate the Drying cycle, press
.
4HEOPERATIONWILLCEASEAFTERSECONDS)FYOU
DONOTACTIVATETHEFUNCTION THEDRYINGPROCESS
WILLBEGINAUTOMATICALLYAFTERMINUTES)FTHE
BATHISUSEDFORSOAKINGONLY ACTIVATETHEDRYINGCYCLE
manually by pressing
. You can use the Drying
cycleFUNCTIONIMMEDIATELYAFTERA(YDRO THERMO
massageTM session or whenever you wish.

NOTE

s4HEHEATFORTHEHEATEDBACKRESTISCONTROLLEDSIMULTANEOUSLYWITHTHEINTENSITY
OFTHEJETPRESSURE

www.bainultra.com
Printed in Canada. Copyright January 2011 BainUltra Inc. All rights reserved. 45220001
Some products, specications, and services mentioned in this manual are described in pending patent applications or are protected by patents.

55

O W N E RS MAN U AL | T H E MI A SERI ES CON TROLS


MI A P L U S - U S E R GUIDE

MIAPLUS
USER GUIDE

KEYS AND FUNCTIONS

0RESSTHISKEYTOSTARTORTOSTOPTHETURBINEANDTHE
MiaPlus control panel.

0RESSTHISKEYTORETURNTOFUNCTIONADJUSTMENT
The MassageFUNCTIONAPPEARSONTHESCREEN
BYDEFAULT

The Mia control panel comes standard with the


following lines of baths:
sMeridianTM
sOrigami

0RESSEITHEROFTHESEKEYSTONAVIGATETHEMAIN
MENUOFTHE-IA0LUS control panel.
Press the

KEYTOSEETHENEXTFUNCTION

sThermal
sAmma

&UNCTIONSAREDISPLAYEDINTHEFOLLOWINGORDER

sTMU

sMassageAIRJETPRESSURE

sEleganciaTM

T H E MIA S ERIES CONTROLS

sDuration
sChroma (Chromatherapy option)

MAIN FUNCTIONS

sBackrestHEATEDBACKREST

MiaPlusLETSYOUPERSONALIZEYOUR(YDRO THERMOMASSAGETM with


THEFOLLOWINGFUNCTIONSANDOPTIONS
s!DJUSTAIRJETPRESSURE

sCare
sSave

s3ELECTDURATIONOFSESSION

sDrying cycle
sLock

s Select light color (Chromatherapy option)

sContrast (screen contrast)

s!DJUSTBACKRESTTEMPERATURE

sLanguage

s0ERSONALIZESESSIONSETTINGSFORUPTODIFFERENTUSERS

sContact us

s0ERSONALIZEDRYINGCYCLEFORWATERJETCONDUITS
s,OCKCONTROLSWHENBATHISNOTINUSE
s!DJUSTSCREENCONTRAST
s Select display language

0RESSEITHEROFTHESEKEYSTONAVIGATETHEOPTIONS
OFEACHFUNCTION
Press the

KEYTOGOUP

Press the

KEYTOGODOWN

Settings are automatically saved until they are modied.

0RESSTHISKEYTOSAVETHESELECTEDOPTIONSAND
settings.

56

1 800 463.2187

From 8 a.m. to 8 p.m. Monday to Thursday (EST) . From 8 a.m. to 5 p.m. on Friday (EST)

Printed in Canada. Copyright January 2011 BainUltra Inc. All rights reserved. 45220001
Some products, specications, and services mentioned in this manual are described in pending patent applications or are protected by patents.

T H E MIA SE R I E S C ON TR OL S | O W N E RS MAN U AL
MIAPLUS - US ER GU I DE

MASSAGE
4HISFUNCTIONALLOWSTHEUSERTOREGULATEAIRJET
PRESSUREFORPERSONALIZEDCOMFORTANDAREMARKABLY
EFFECTIVE(YDRO THERMOMASSAGETM4HEDEFAULTPRESSUREISTHESAMEFORTHEPREVIOUSBATH
Increase or decrease the pressureOFTHEAIRJETS
by repeatedly pressing the or KEYUNTILTHE
desired pressure is reached. Pressure increases
ININCREMENTS
Pressing

is optional.

DURATION
4HISFUNCTIONLETSYOUPROGRAMTHEDURATIONOFYOUR
BATHFROMTOMINUTES4HESELECTEDDURATION
will remain in the memory until it is modied.
To select the Duration, press the KEYONTHE
menu until the DurationFUNCTIONISDISPLAYED
Select the desired duration using the
Pressing

or

KEYS

is optional.
KEYTORETURNTO

CHROMA (OPTION)
4HISFUNCTIONUSESCOLORTOPROVIDEINCREASED
COMFORTTOBODYANDSOUL

THE CHROMA FUNCTION FEATURES EIGHT OPTIONS


s /FF

$EACTIVATESTHECHROMATHERAPYFUNCTION

To use the ChromaFUNCTION PRESSTHE KEYON


the menu until the ChromaFUNCTIONAPPEARSON
the screen.

s 6IOLET

)MMUNIZINGANDRELAXING"OOSTSTHEIMMUNESYSTEM
detoxies the body, and reduces stress.

s "LUE

3OOTHINGANDRELAXING2EDUCESARTERIALPRESSUREAND
hyperactivity and soothes the soul.

s To turn off the Chroma FUNCTION


select Off. screen.

s 'REEN

0ROVIDESCALMANDBALANCE2ELAXESENTIREBODYAND
STABILIZESEMOTIONS

s 9ELLOW

$IGESTIONANDCREATIVITY(ELPSDIGESTIONANDREGULARITYAND
calms brain activity.

s /RANGE

(EALINGANDPAINRELIEF"OOSTSRESPIRATORYSYSTEMAND
soothes aching muscles.

s 2ED

3TIMULATINGANDEXCITING!CTIVATESCIRCULATIONANDWAKESUP
the senses.

s 3CAN

'OESTHROUGHEACHCOLORINTURN

s The Chroma FUNCTIONWILLTURNOFFBYITSELFAFTER


4 hours.

NOTE

s3HOULDYOUNOTSEETHECOLORSONTHESCREEN PRESSING the rst time will start the color scan.
0RESSINGASECONDTIMEWILLFREEZETHELIGHTSONTHEIRCOLOR ANDTHETHIRDTIMEWILLTURNTHELIGHTSOFF

www.bainultra.com
Printed in Canada. Copyright January 2011 BainUltra Inc. All rights reserved. 45220001
Some products, specications, and services mentioned in this manual are described in pending patent applications or are protected by patents.

57

THE MIA SERIES CO NT RO L S

Use the arrows or or the


the basic Massage screen.

O W N E RS MAN U AL | T H E MI A SERI ES CON TROLS


MI A P L U S - U S E R GUIDE

CHROMA (NEXT)
Choosing a color
Choose the desired color using the
Press

KEYS

and

TOVALIDATEYOURCHOICEOFCOLOR

Selecting Scan
or

Select the Scan option using the


Press

KEYS

to validate your choice.


KEYto return to

Use the arrows or or the


the basic Massage screen.

BACKREST
&ORMAXIMUMRELAXATIONANDEXCEPTIONALCOMFORT
ONEORTWOHEATEDBACKRESTSCANBEINSTALLEDIN
your bath and heated individually.
KEY

Select the BackrestFUNCTIONBYPRESSINGTHE


until the BackrestFUNCTIONISDISPLAYED

T H E MIA S ERIES CONTROLS

&OUROPTIONSAREAVAILABLE
s/FF
s,OW
s-EDIUM
s(IGH
NOTE:-ODELSWITHBACKRESTSWILLSPECIFYBACKREST

ANDBACKREST
Choose the desired option using the
Press

or

KEYS

to validate your choice.

Use the arrows or or the


the basic Massage screen.

KEYTORETURNTO

NOTE: Selecting the Off option WILLTURNOFFTHE


BACKRESTS

58

1 800 463.2187

From 8 a.m. to 8 p.m. Monday to Thursday (EST) . From 8 a.m. to 5 p.m. on Friday (EST)

Printed in Canada. Copyright January 2011 BainUltra Inc. All rights reserved. 45220001
Some products, specications, and services mentioned in this manual are described in pending patent applications or are protected by patents.

T H E MIA SE R I E S C ON TR OL S | O W N E RS MAN U AL
MIAPLUS - US ER GU I DE

CARE
4HISFUNCTIONLETSYOUVARYAIRJETINTENSITYFORADEEPER
or gentler massage.
To select the CareFUNCTION PRESSTHE KEY
on the menu until the CareFUNCTIONAPPEARS
3IXOPTIONSAREAVAILABLE
s Massage Even intensity throughout
the session
s Wave *ETINTENSITYCYCLESFROMTO
maximum desired intensity
s Bather 1, 2, 3, 4 Stores each
bathers selection
KEYSTOSELECTANOPTION

Use the

or

Press

to validate your choice.

Use the arrows or or the


the basic Massage screen.

KEYTORETURNTO

SAVE
THE MIA SERIES CO NT RO L S

The MiaPlusCONTROLSYSTEMLETSYOUSAVEUPTOFOUR
PERSONALIZEDPRESETS4HISSAVEFUNCTIONLETSYOU
conveniently preselect settings adapted to various
USERSORPURPOSES3IMPLYSETTHEFUNCTIONSAND
options according to your tastes and save them
UNDER"ATHER "ATHER ETC4HESEPERSONALIZED
settings will stay saved until modied.
3ELECTABATHERANDSAVEPERSONALIZEDSETTINGS
Press the KEYONTHEMENUUNTILTHESave
FUNCTIONAPPEARS
Use the
Press

or

KEYSto select a user number.

Use the arrows or or the


the basic Massage screen.

KEYTORETURNTO

2EPEATTHESESTEPSFOREACHUSER

www.bainultra.com
Printed in Canada. Copyright January 2011 BainUltra Inc. All rights reserved. 45220001
Some products, specications, and services mentioned in this manual are described in pending patent applications or are protected by patents.

59

O W N E RS MAN U AL | T H E MI A SERI ES CON TROLS


MI A P L U S - U S E R GUIDE

DRYING CYCLE
4HISFUNCTIONCOMPLETELYDRAINSTHECONDUITSAND
DRIESTHEMFORSECONDS"YELIMINATINGANY
WATERLEFTINTHECONDUITS THEDrying cycle
ENSURESPERFECTHYGIENE
s .OSTAGNANTWATER
s .OWATERLEFTOVERFROMTHEPREVIOUSBATH
Drying is mandatory after a Hydro-thermo
massageTM session.
4WOOPTIONSAREAVAILABLE
s$AILY
s!FTER"ATH
Even when the daily drying cycle is programmed,
THEAUTOMATICDRYINGCYCLEWILLACTIVATEAFTER
each use.

Select After Bath

T H E MIA S ERIES CONTROLS

The After Bath option lets you program the


Drying cycleTOSTARTUPTOMINUTESAFTERABATH
To select the After Bath option, press the KEY
on the menu until the Drying cycleFUNCTION
appears.
Use the
option.
Press

and

KEYSTOSELECTthe After Bath

Dry Delay is displayed.


Press the
minutes.
Press

KEYTOSELECTAVALUEFROM5 to 60

to validate.

Use the arrows or or the


the basic Massage screen.

KEYTORETURNTO

)FNOVALUEISSELECTED THEDrying cycle will start


UPAUTOMATICALLYMINUTESAFTERTHEBATH

60

1 800 463.2187

From 8 a.m. to 8 p.m. Monday to Thursday (EST) . From 8 a.m. to 5 p.m. on Friday (EST)

Printed in Canada. Copyright January 2011 BainUltra Inc. All rights reserved. 45220001
Some products, specications, and services mentioned in this manual are described in pending patent applications or are protected by patents.

T H E MIA SE R I E S C ON TR OL S | O W N E RS MAN U AL
MIAPLUS - US ER GU I DE

DRYING CYCLE (NEXT)

Select Daily
The DailyOPTIONLETSYOUDRYANDCLEANTHEAIRJET
SYSTEMCONDUITSATASPECIlCTIMEOFDAYRATHER
THANWITHINANHOUROFA(YDRO THERMOMASSAGETM
session.
To select the Daily option, press the KEYONthe
menu until the Drying cycle option appears.
Use the
Press

and

KEYSTOSELECTthe Daily option.

Start Time is displayed.


Use the or KEYSTOSELECTTHETIMEOFDAYTHE
Drying cycleFUNCTIONSHOULDSTART
Press

Current Time is displayed.


Press and hold the or KEYSORPRESSTHEM
repeatedly to set the preprogrammed current time
in 10 minute slots.
.

THE MIA SERIES CO NT RO L S

Press

Once the Daily option is set, the Drying cycle will


start every day at the same time until the setting is
modied.
Use the arrows or or the
the basic Massage screen.

KEYTORETURNTO

NOTE:4HETIMEFORMATISPRESETASFOLLOWS
French: 24 hour
English: 12 hour (AM and PM)
Spanish: 24 hour

www.bainultra.com
Printed in Canada. Copyright January 2011 BainUltra Inc. All rights reserved. 45220001
Some products, specications, and services mentioned in this manual are described in pending patent applications or are protected by patents.

61

O W N E RS MAN U AL | T H E MI A SERI ES CON TROLS


MI A P L U S - U S E R GUIDE

LOCK
4HISFUNCTIONLETSYOULOCKTHECONTROLSYSTEM
INORDERTOPREVENTTHETURBINEFROMSTARTING
unexpectedly or accidentally.
)TISALSOACHILDSAFETYDEVICE ASITPREVENTS
CHILDRENFROMSTARTINGTHETURBINEBYPRESSING
the
KEY
To activate the LockFUNCTION
Press the KEYONTHEMENUUNTILTHELock
FUNCTIONAPPEARS
KEYSTOSELECTthe Activate option.

Use the

or

Press

to validate your choice.

When you stop the bath, the LockFUNCTIONLOCKSthe


KEY MAKINGITIMPOSSIBLETORESTARTTHETURBINE
To restart the turbine when the Lock function
is activated
KEY

Press the

T H E MIA S ERIES CONTROLS

Lock is displayed. Press

The turbine starts.


To deactivate the LockFUNCTION
Press the KEYONTHEMENUUNTILTHELock
FUNCTIONAPPEARS
Use the
Press

and

KEYSTOSELECTthe Off option.

CONTRAST
4HISFUNCTIONCONTROLSTHEBRIGHTNESSOFTHE-IA0LUS
display screen. No matter which setting you select,
THESCREENISALWAYSCLEARANDEASYTOREADFROM
ANYANGLE REGARDLESSOFTHELIGHTINGCONDITIONSOF
the room where your bath is installed.

62

1 800 463.2187

From 8 a.m. to 8 p.m. Monday to Thursday (EST) . From 8 a.m. to 5 p.m. on Friday (EST)

Printed in Canada. Copyright January 2011 BainUltra Inc. All rights reserved. 45220001
Some products, specications, and services mentioned in this manual are described in pending patent applications or are protected by patents.

T H E MIA SE R I E S C ON TR OL S | O W N E RS MAN U AL
MIAPLUS - US ER GU I DE

CONTRAST (NEXT)
NOTE: The screen automatically dims AFTER
2 minutes.
To set display screen contrast, press the or
KEYONTHEMENUUNTILTHEContrastFUNCTION
appears.
NOTE: Use the KEYTOACCESSTHISFUNCTIONMORE

QUICKLYWHENYOUSTARTTHETURBINE
Press or until the desired PERCENTAGE OF
contrast is displayed.
Press

to validate your choice.

Use the arrows or or the


the basic Massage screen.

KEYto return to

LANGUAGE

THE MIA SERIES CO NT RO L S

The MiaPlusCONTROLSYSTEMLETSYOUSELECTONEOF
THEFOLLOWINGTHREEDISPLAYLANGUAGES
s&RENCH
s%NGLISH
s3PANISH
NOTE:4HEFACTORY SELECTEDLANGUAGEIS%NGLISH
To choose the display language, press the or
KEYONTHEMENUUNTILTHELanguageFUNCTION
appears.
NOTE: Use the KEYTOACCESSTHISFUNCTIONMORE

QUICKLYWHENYOUSTARTTHETURBINE
Press

or

Press

to select your desired language.

Use the arrows or or the


the basic Massage screen.

CONTACT US
KEYTORETURNTO

Feel free to contact Bain Ultra for any information you may
need about your Thermomasseur bath and the MiaPlus
control system.
Simply call the telephone number that appears on this screen
for answers to any question.
1.800.463.2187
BainUltra wishes you complete relaxation!

www.bainultra.com
Printed in Canada. Copyright January 2011 BainUltra Inc. All rights reserved. 45220001
Some products, specications, and services mentioned in this manual are described in pending patent applications or are protected by patents.

63

O W N E RS MAN U AL | T H E MI A SERI ES CON TROLS


MI A MU LT I - U S E R GUIDE

MIAMULTI
USER GUIDE

MIAMULTI
The MiaMultiCONTROLFEATURESTHEsame functions
as the MiaPlus, but also comes with a convenient
ANDEASY TO USEREMOTECONTROL9OUENJOYALLTHEBENElTS
OFAPERSONALIZED(YDRO THERMOMASSAGETM without
HAVINGTOLEAVETHEBATH*USTLIEBACKANDRELAX

REMOTE - HYDRO-THERMO MASSAGETM


1.

Key

T H E MIA S ERIES CONTROLS

Operates the remote

+ key

2.

Backrest 1

)NCREASESTHETEMPERATUREOFBACKREST

3.

Backrest 1

$ECREASESTHETEMPERATUREOFBACKREST

key
+ key

4.

Backrest 2

)NCREASESTHETEMPERATUREOFBACKREST

5.

Backrest 2

$ECREASESTHETEMPERATUREOFBACKREST

6.

Blower

)NCREASESAIRJETPRESSURE

7.

Blower key

$ECREASESAIRJETPRESSURE

8.

Duration key

3ELECTSBATHDURATION0RESSTHEKEYTO
increase bath duration. Each time you
PRESSTHEKEY YOURBATHTIMEINCREASES
5 minutes, to the nearest round number.

BATH
BAIN

key

+ key

9.

Chroma key


3ELECTSTHECHROMATHERAPYFUNCTION
4OCHANGETHECOLOR PRESSTHEKEYUNTIL
the desired color is displayed.

64

1 800 463.2187

NOTE: To work efciently, the


remote must be pointed
toward the MiaMulti
wall-mounted control
in the room where your
bath is.

From 8 a.m. to 8 p.m. Monday to Thursday (EST) . From 8 a.m. to 5 p.m. on Friday (EST)

Printed in Canada. Copyright January 2011 BainUltra Inc. All rights reserved. 45220001
Some products, specications, and services mentioned in this manual are described in pending patent applications or are protected by patents.

T H E MIA SE R I E S C ON TR OL S | O W N E RS MAN U AL
MIAMULTI - U SER GU I DE

PROGRAMMING PROCEDURE
FOR REMOTE CONTROLLER 2011 AND UP
PROGRAMMING MIAMULTI - BATH
0RESSKEYBATH/BAIN

Red light

87J>
76>C

0RESSKEYMINUS
ANDKEEPITPUSHED

BATH
BAIN

0RESSKEY0/7%2
ANDKEEPBOTHKEYS
PUSHEDFORSECONDS
/NCEREDLIGHTISSWITCHEDON RELEASEBOTHKEYS
)MMEDIATELYPRESSKEYSSEQUENCE

2EDLIGHTWILLSWITCHOFFATEVERYKEY
Once sequence is terminated, red light will stay
SWITCHOFF
THE MIA SERIES CO NT RO L S

NOTE: To work efciently, the remote must be pointed toward the


MiaMulti wall-mounted control in the room where your bath is.

www.bainultra.com
Printed in Canada. Copyright January 2011 BainUltra Inc. All rights reserved. 45220001
Some products, specications, and services mentioned in this manual are described in pending patent applications or are protected by patents.

65

O W N E RS MAN U AL | MAI N T EN A NCE

MAINTENANCE
ACRYLIC
Technical information
s!LL"AIN5LTRA ThermoMasseursAREMADEOF
Lucite acrylic.
Maintenance
s#LEANACRYLICWITHAMILDNON ABRASIVEPRODUCT
s!BRASIVEPRODUCTSSUCHASPOWDER PAINTTHINNERS
terpentine and gas can damage the shine and
LUSTREOFTHEACRYLIC
s&ORPARTICULARLYTOUGHSTAINS USEASMALLAMOUNT
OFWOODALCOHOLMETHYLHYDRATE 

The BainUltra ThermoMasseur is as simple to


care for as a conventional acrylic bath. There are
no pumps, valves, pipes, nor accessories to take
apart or clean. Thanks to its design, the system is
perfectly hygienic and completely dry. The automatic
and programmable drying cycles completely empty
the air channel. No standing water. Nothing left
over from the previous bath. The user does not
have to worry about the air channels nor the
turbine. Simply clean the surface of the bath with
a non-abrasive cleanser.

Safety instructions
s7HENAPPLYINGWOODALCOHOLMETHYLHYDRATE
use gloves to protect hands. Rince thoroughly
AFTERUSE
s%NSURETHATESSENTIALOILSOROTHERTHERAPEUTIC
products added to bath water will not damage
the acrylic nish.

Scratch
Paper grade 220
Paper grade 400
Paper grade 600

ACRYLIC (MINOR REPAIRS)


Paper grade 800

Maintenance
s&ORMINORSURFACEDAMAGE USEAPOLISHINGPUTTY
FORACRYLICSURFACESORAUTOMOBILES

Paper grade 1200

Safety instructions

Polish

s&OLLOWPOLISHMANUFACTURERSINSTRUCTIONS

MA I NT ENA NCE

Table - Sandpaper grade

IMPORTANT

66

s!NYPRODUCTADDEDTOYOUR4HERMO-ASSEURMUSTBEDISSOLVEDINTHEWATERORIFNOT BEMIXED
WITHANEMULSIlERSEETHE4HERAPY'UIDEFORMOREDETAILS INORDERTOENSURETHELONGEVITYOF
YOURBATHSACRYLICASWELLASTHEEFlCIENCYOFITSSYSTEM ALONGWITHTHEEXCEPTIONALQUALITYOF
CAREOFFEREDBYYOUR"AIN5LTRA bath.
1 800 463.2187

From 8 a.m. to 8 p.m. Monday to Thursday (EST) . From 8 a.m. to 5 p.m. on Friday (EST)

Printed in Canada. Copyright January 2011 BainUltra Inc. All rights reserved. 45220001
Some products, specications, and services mentioned in this manual are described in pending patent applications or are protected by patents.

M A IN T EN A N C E | O W N E R S M A N U A L

ACRYLIC (DEEPER SCRATCHES)


Maintenance
s&ORSLIGHTLYDEEPERSCRATCHES SANDTHESPOTWITH
AWETSANDPAPERBEFOREPOLISHING
s$EPTHOFABRASIONORSCRATCHWILLDETERMINEGRADE
OFSANDPAPERREQUIRED
- Slight to moderate damage grade 600, 800,
then 1200 sandpaper
- Deeper damage grade 400, 600, 800, then
1200 sandpaper
s7HENSANDING STARTWITHLOWESTGRADESANDPAPER
EG WORKINGYOURWAYUPASYOUSANDA
slightly larger area with each new grade. Finish
with polishing putty.

ACRYSTALTM MYBODYRESTTM
COMPONENTS (FOR TEKURATM)

WOOD MYBODYRESTTM COMPONENTS


(FOR TEKURATM)
Maintenance
s#OMPONENTSSHOULDBECLEANEDWITHADAMP
CLOTHORWITHAVERYMILDSOAP IFREQUIRED!VOID
ANYHARSHCLEANINGPRODUCTS3IMPLYSPONGEOFF
ANYlLMORRESIDUESTHATARELEFTONTHEWOOD
AFTERUSE

CEDAR WOOD (TMU 5454/6060)


Technical information
s4HECEDARWOODCOMPONENTSSTEPANDORSHELF
are protected by a highly durable and resilient
COATOFCATALYZEDPOLYURETHANE
s4HISPROTECTIVECOATINGISDESIGNEDFORAHIGH
humidity environment and ensures a long-lasting,
stain and water resistant nish.

Maintenance
s4HE!CRYSTALTM MyBodyRestTMKITREQUIRESTHESAME
easy maintenance as our other acrylic (standard)
parts (See page 76)
s#LEAN!CRYSTALTM components using a mild, non
ABRASIVECLEANINGPRODUCT SUCHASTHOSEUSEDFOR
GLASSANDMIRRORS ANDASOFTCLOTH

SYSTEM
Technical information
s!NAUTOMATICDRYINGCYCLESTARTSMINUTESAFTER
EACHUSEENSURINGTHEDRYNESSOFTHECHANNEL
s)TISNORMALTOHEARTHETURBINEWORKINGATA
CERTAINTIMEOFDAY4HISMEANSTHATTHEDRYING
cycle has been programmed.
Maintenance

www.bainultra.com
Printed in Canada. Copyright January 2011 BainUltra Inc. All rights reserved. 45220001
Some products, specications, and services mentioned in this manual are described in pending patent applications or are protected by patents.

M A IN TEN A N CE

sBainUltra recommends to start the drying


cycle everytime the bath is used as a shower
or just to soak.

67

O W N E RS MAN U AL | MAI N T EN A NCE

CEDAR WOOD (TMU 5454/6060) NEXT


Maintenance
s4OPROTECTTHEWOODlNISH DONOTLEAVEANY
SOAPSORDETERGENTSONWOODSURFACESFORLONG
PERIODSOFTIME
s#LEANTHEWOODWITHMILDSOAPANDACOTton
cloth. Do not use abrasive or corrosive products.

LYPTUS WOOD (AYOURA)


Technical information
s4HE!YOURAFREESTANDINGMODELHASALIPMADE
OF,YPTUSWOODTREATEDWITHPOLYURETHANEOIL
s,YPTUSWOODISKNOWNFORITSRESISTANCETO
moisture and mildew.
Maintenance
s5SEPOLYURETHANEOILORANOTHERNATURALOIL
(e.g., Watco, Varathane) available in a hardware
store.
s!PPLYWITHARAG

MA I NT ENA NCE

s"UFFTOTIMESPERYEAR

68

1 800 463.2187

From 8 a.m. to 8 p.m. Monday to Thursday (EST) . From 8 a.m. to 5 p.m. on Friday (EST)

Printed in Canada. Copyright January 2011 BainUltra Inc. All rights reserved. 45220001
Some products, specications, and services mentioned in this manual are described in pending patent applications or are protected by patents.

T R O U B LES H OOTI N G | O W N E R S M AN U AL

Your BainUltra ThermoMasseur has been


manufactured and inspected with the greatest
care. In addition, it has been thoroughly tested
on a test bench to offer you a product of superior
quality satisfying your highest expectations. The
following troubleshooting chart will assist you
in correcting a problem. If you continue to have
problems, contact your retailer or the manufacturer.
SITUATION
Your bath will not start.

SOLUTIONS
s-AKESUREBREAKERISh/.v
s3HUTOFFANDRESTARTBREAKER
s#HECKJUNCTIONBOXCONNECTIONSTOBATHFOR#ANADAONLY 

Breaker trips continually.

s-AKESURETHATYOURBATHISTHEONLYAPPLIANCECONNECTED
to circuit.
s#HECKFORASHORTCIRCUITBETWEENBATHANDBREAKERBOX
s"REAKERMAYTOOSENSITIVE DEFECTIVEOROLD4RYANEW
BREAKER4HISCOMPONENTMUSTBENEW

Turbine stops working after only a few minutes.

Turbine and air-heater are equipped with heat sensors


DESIGNEDTOCUTOFFPOWERINCASEOFOVERHEATING)NSUFlCIENT
air circulation may be the cause.
s-AKESURETURBINEHASSUFlCIENTVENTILATION
s-AKESURETURBINEINTAKEISNOTOBSTRUCTED

A few airjets do not work at lowest speeds.

4OMEETEVERYONESNEEDS PARTICULARLYTHOSEOFCHILDREN
YOURBATHISDESIGNEDTOWORKATAVERYLOWSPEED!IRJETSIN
HALF SEATORTHOSECLOSESTTODRAININ4-5MODELS ESPECIALLY
larger models, may remain inactive at lowest speeds. This is
normal and can be easily remedied by slowly raising speed
TOhOPENvINACTIVEAIRJETSANDTHENLOWERINGITTODESIRED
level. Furthermore, your bath is pre-programmed in the
FACTORYATALOW REGULARORHIGHINTENSITYDEPENDINGONTHE
SIZE4OCHANGETHEINTENSITYLEVEL PLEASECONTACT"AIN5LTRA
DIRECTLY#ERTAINCONDITIONSMAYAMPLIFYTHISOCCURRENCE
s#HECKFORTURBINEINTAKEOBSTRUCTION TOOGREATADISTANCE
between turbine and bath, too many directional changes
ELBOWS AND IFADEQUATEPIPINGHASBEENUSED3EE
TURBINE RELOCATION paragraph.

www.bainultra.com
Printed in Canada. Copyright January 2011 BainUltra Inc. All rights reserved. 45220001
Some products, specications, and services mentioned in this manual are described in pending patent applications or are protected by patents.

69

TR O UBLESH O O TIN G

TROUBLESHOOTING

TR O UBLESH O O TIN G

O W N E RS MAN U AL | T ROU B L ESH OO TING

SITUATION

SOLUTIONS
4EMPERATUREOFAIRINJECTEDINTOBATHISDIRECTLYPROPORTIONAL
TOTHESPEEDOFTHETURBINE4HEHIGHERTHESPEED THE
WARMERTHEAIRIS!SIMPLEWAYTOCHECKIFYOURAIR HEATEROR
HEATERSAREWORKINGPROPERLYISTOTURNONTHESYSTEMATTHE
HIGHESTSPEEDIFYOURCONTROLOFFERSARANGEOFINTENSITIES
WITHNOWATERINTHEBATHTHEREISABSOLUTELYNORISKTOTHE
SYSTEM !FTERTOMINUTES THEHEATEDBACKRESTOR
BACKRESTSSHOULDBEWARMTOTHETOUCHANDJETSSHOULDALSO
seem warm when you bring your hands close to them.

Air jets seem cool.

s#HECKTHETURBINEAIRINTAKE)TSHOULDNOTBETOOCOLDNOR
too warm. Ideally, the temperature should be between
72F (20C) and 86F (30C).
s#HECKTHATDISTANCEBETWEENTURBINEANDBATHISNOTTOO
GREAT)FPOSSIBLE INSULATEAIRLINEALONGITSENTIRELENGTH
3EETURBINEINSTALLATIONSECTIONOFTHISMANUAL
!N,%$HASA HOURLIFECYCLE
s6ERIFYWIRINGANDCONNECTIONS

LED does not work.

IMPORTANT: THESE INSTRUCTIONS ONLY APPLY IF


THE LED CAN BE ACCESSED FROM BATH
EXTERIOR.
s5PONVERIlCATION IF,%$STILLDOESNOTWORK DISCONNECT
ANDREPLACETHE,%$BYDOINGTHEFOLLOWING
2EMOVETHE,%$MODULEBYPULLINGONTHEWHITEPARTOF
THEPLUG)FTHEMODULEISDIFlCULTTOREMOVE USEAPAIROF
vice-grips.
$ETACHTHEWIREFROMTHEBATH
5NPLUGTHEWIREFROMTHECHROMATHERAPYCONTROLMODULE
- Plug the wire into the chromatherapy control module.
0LUGTHE,%$MODULEBACKINTOITSSOCKET
NOTE: IT IS NOT NECESSARY TO REATTACH THE WIRE
TO THE BATH.

70

1 800 463.2187

From 8 a.m. to 8 p.m. Monday to Thursday (EST) . From 8 a.m. to 5 p.m. on Friday (EST)

Printed in Canada. Copyright January 2011 BainUltra Inc. All rights reserved. 45220001
Some products, specications, and services mentioned in this manual are described in pending patent applications or are protected by patents.

W A R R A NT Y | O W N E R S M A N U A L

THE BAINULTRA LIMITED WARRANTY


LIMITED WARRANTY
4HISLIMITEDWARRANTYISEXTENDEDONLYTOTHEORIGINALPURCHASEROFTHEUNITUNDERWARRANTYANDISVALIDONLYWHENBOUGHT
THROUGHANDREGISTEREDBYANAUTHORIZED"AIN5LTRA retailer. BainUltraPRODUCTSAREDESIGNEDFORRESIDENTIALUSEONLY"AIN5LTRA
PRODUCTSUSEDFORCOMMERCIALORDISPLAYAPPLICATIONSWILLBELIMITEDTOATWO  YEARWARRANTYAGAINSTDEFAULTSINMATERIALS
ANDWORKMANSHIPREGARDLESSOFTHEVARIOUSDEFECTIVECOMPONENTSOFTHEPRODUCTS"AIN5LTRAPRODUCTSSOLDOUTSIDEOF.ORTH
!MERICAWILLBELIMITEDTOAPARTS ONLYWARRANTYTHROUGHTHEDEALEROFTHESALE/URSERVICEDEPARTMENTWILLHELPDIAGNOSETHE
PROBLEMANDWILLPROVIDEPARTSONLYFORREPAIRSORREPLACEMENTSCOVEREDBYTHEWARRANTY!LLPARTSWILLBESHIPPEDTOTHEDEALER
in North America. BainUltraWILLNOTBERESPONSIBLEFORCOSTOFSHIPPINGORSERVICINGOUTSIDEOF.ORTH!MERICA

&ORWOODENPARTSOFCERTAINMODELSANDFOR-Y"ODY2ESTTMKIT "AIN5LTRA)NCGUARANTEESTHATINTHEIRORIGINALMANUFACTURING
FORM THESEPARTSAREFREEOFANYMANUFACTURING DIMENSIONALORSTRONGLYAPPARENTNATURALDEFECTSFORAONE  YEARPERIOD
FROMTHEORIGINALPURCHASEDATE
EXCLUSIONS
The above-stated limited warranty applies as long as damage ISNOTCAUSEDBYANACCIDENT ABUSE MISUSE lRE INSECTS USEOF
ABRASIVEPRODUCTS FORCEMAJEUREORANACTOF'OD4RANSPORT HANDLINGORINSTALLATIONDAMAGESAREALSOEXCLUDED!NYPARTTHAT
MUSTBECHANGEDDURINGTHEWARRANTYPERIODWILLBECOVEREDBYTHEORIGINALWARRANTYORFORATWO  YEARPERIODFOLLOWING
replacement, according to the rst contingency.
"ECAUSEOFTHEIRORGANICNATURE WOODCOMPONENTSWILLEXPANDANDCONTRACTWITHseasonal changes and normal heating
variations. With time, normal exposure to sunlight will slightly alter the wood tint. These changes are not covered by the warranty.
4HEVINYLSURFACEANDTHESHEETOF!YOURAs optional massage table are not covered by this warranty.
-OREOVER THISWARRANTYISVOIDIFYOUR"AIN5LTRA ThermoMasseur bath, your VedanaORYOUR4EMAZKAL, or any other BainUltra
product is installed by anyone but a licensed contractor.
4HISWARRANTYISALSOVOIDIFYOUR"AIN5LTRA bath, your Vedana YOUR4EMAZKAL, or any other BainUltraPRODUCTORPARTTHEREOF
HASBEENMODIlEDORIFANYREPAIRSHAVEBEENATTEMPTEDBYANYONEOTHERTHAN"AIN5LTRA)NC ANAUTHORIZEDDEALERORREPRESENTATIVE
OF"AIN5LTRA)NC!NYANDALLCOMPONENTSTHATARENOTPROVIDEDBY"AIN5LTRA)NC ASWELLASANYITEMSATTACHEDORINSTALLEDON
your BainUltra ThermoMasseur, your VedanaORYOUR4EMAZKAL, or on any other BainUltraPRODUCTAFTERTHEDATEOF
MANUFACTUREAREEXPRESSLYEXCLUDEDFROMTHISLIMITEDWARRANTY
4HEWARRANTYISVOIDIFTHEUNITISINSTALLEDOUTDOORS ORHASNOTBEENINSTALLEDINACCORDANCEWITHTHEMANUFACTURERSINSTRUCTIONS
and/or in compliance with local codes and ordinances.

www.bainultra.com
Printed in Canada. Copyright January 2011 BainUltra Inc. All rights reserved. 45220001
Some products, specications, and services mentioned in this manual are described in pending patent applications or are protected by patents.

71

W AR R ANTY

Your BainUltra ThermoMasseurORSOAKINGBATHISCOVEREDBYTHEBESTWARRANTYINTHEindustry. BainUltra Inc. guarantees the


ACRYLICANDMOTORTURBINEOFYOURBATHFORATWENTY  YEARPERIODFROMTHEORIGINALPURCHASEDATEAGAINSTDEFECTSINMATERIALS
ANDWORKMANSHIP)NTHECASEOFTHEELECTRONICCOMPONENTSOFTHE4HERMO-ASSEUR, the VedanaORTHE4EMAZKAL and the
MASSAGETABLEFORTHE!YOURA "AIN5LTRA)NCGUARANTEESAGAINSTDEFECTSINMATERIALSANDWORKMANSHIPFORAlVE  YEARPERIOD
FROMTHEORIGINALPURCHASEDATE

O W N E RS MAN U AL | W ARR ANTY

W ARR AN TY

PROCEDURE
!NYDEFECTINVOLVINGTHEMANUFACTURERSLIABILITYSHALLBEREPORTEDTO"AIN5LTRA)NCWITHINTEN DAYSOFITSOCCURRENCE5NITS
CLAIMEDTOBEDEFECTIVESHALLBEHELDUNTILINSPECTEDBYANAUTHORIZEDREPRESENTATIVEOF"AIN5LTRA)NC ANDUPONTHEIRSPECIlC
INSTRUCTIONS UNITSFOUNDTOBEDEFECTIVEWILLBEREPAIREDORREPLACEDAT"AIN5LTRA)NCSCHOICE4HELIABILITYOF"AIN5LTRA)NCWITH
RESPECTTOTHESALEOFTHISUNITSHALLBELIMITEDTOREPAIRORREPLACEMENTBYASIMILARPRODUCTASPROVIDEDABOVEANDDOESNOT
INCLUDEANYCOSTOFREMOVAL REINSTALLATION TRANSPORTOFDEFECTIVEPRODUCT LOSSOFTIME SALARYORANYOTHEREXPENSESASWELLAS
ANYCONSEQUENTIALDAMAGESOFANYKIND"AIN5LTRA)NCANDITSREPRESENTATIVESSHALLNOTBEHELDLIABLEFORANYINJURY LOSS COST
OROTHERDAMAGE WHETHERCONSEQUENTIALORINCIDENTAL THATARISEFROMANYDEFECTCOVEREDUNDERTHISLIMITEDWARRANTY EVENIF
"AIN5LTRA)NCHASBEENADVISEDOFTHEPOSSIBILITYOFSUCHDAMAGE!NADEQUATEACCESSWAYTOMECHANICALANDELECTRICALPARTS
OFYOUR"AIN5LTRA ThermoMasseurBATH YOUR4EMAZKAL, or any other BainUltra product must be anticipated and prepared
BEFOREANAUTHORIZEDREPRESENTATIVEARRIVESONTHEPREMISESTOCARRYOUTAREPAIR4HECOSTSINCURREDTOPROVIDEACCESSTOTHE
motor turbine, the electronic module or the heating system will not be covered by this warranty.
LIMITATIONS
4HISLIMITEDWARRANTYREPLACESALLOTHERWARRANTIES EXPRESSEDORIMPLIED INFACEORATLAW INCLUDINGIMPLIEDWARRANTIESOF
MERCHANTABILITYANDlTNESSFORAPARTICULARPURPOSE4HETERMSOFTHISLIMITEDWARRANTYCANNOTBEMODIlEDOREXTENDEDINANY
way whatsoever by any agent, dealer, distributor, service company or other party other than BainUltra Inc.
LEGAL RIGHTS
4HISLIMITEDWARRANTYGIVESSPECIlCLEGALRIGHTSANDISNOTAPPLICABLEIFITINTERFERESWITHANYLAWORREGULATIONINANYSTATE
province or country.

72

1 800 463.2187

From 8 a.m. to 8 p.m. Monday to Thursday (EST) . From 8 a.m. to 5 p.m. on Friday (EST)

Printed in Canada. Copyright January 2011 BainUltra Inc. All rights reserved. 45220001
Some products, specications, and services mentioned in this manual are described in pending patent applications or are protected by patents.

D R ILLING T E M P L ATE S | O W N E R S MAN U AL


MIA - DRILLIN G TEM PL ATES

MIA
DRILLING TEMPLATES

IMPORTANT
[2.8 cm 0.1 cm]

1.688

[4.3 cm]

1.094" 0.04

Drawing is to scale.

Hole Contour

Control Contour

[
1.1 cm]

0.438

www.bainultra.com
Printed in Canada. Copyright January 2011 BainUltra Inc. All rights reserved. 45220001
Some products, specications, and services mentioned in this manual are described in pending patent applications or are protected by patents.

73

DRILLING TEMPLATES

4.094" 0.04

[10.4 cm 0.1 cm]

[10.0 cm 0.1 cm]

3.938" 0.04

5.125

[13.0 cm]

$RAWINGOF-IA Control hole

D R ILLING T E M P L ATE S | O W N E R S MAN U AL


MIAPLUS & MI A M U LTI - DR I L L I N G TEM PL AT E S

MIAPLUS & MIAMULTI


DRILLING TEMPLATES

[5.5 cm]

IR could be installed at arms reach or maximum


UPTOFEETAWAYFROMTHEBATH

1 .625
(4.1 cm)

1 .375
(3.5 cm)
R 0.125
(R 0.3 cm)

www.bainultra.com
Printed in Canada. Copyright January 2011 BainUltra Inc. All rights reserved. 45220001
Some products, specications, and services mentioned in this manual are described in pending patent applications or are protected by patents.

75

DRILLING TEMPLATES

[13.0 cm 0.1 cm]

5.125 0.04

Hole Contour

Control Contour

0.875
(2.2 cm)

[R 0.6 cm]

1 .125
(2.9 cm)

5.591

[14.2 cm]

$RAWINGOF)2HOLEFOR-IA-ULTI

2.165

$RAWINGOF-IA0LUS and MiaMulti control hole


(same template).

R.250 TYP 4

[4.1 cm 0.1 cm]

Drawing is to scale.

1.625 0.04

IMPORTANT

También podría gustarte