Está en la página 1de 169

MUNICIPALIDAD DISTRITA

HOJA DE METRADOS DE OBRA " PA


Proyecto
Ubicacin
Proyectista

CONSTRUCCION DE PISTAS Y VEREDAS EN 09 CALLES DE LA LOCALIDAD


: Dist: CHIARA; Prov:HUAMANGA; Regin; AYACUCHO
:

PARTIDA

DESCRIPCION

UND.

01.00.00
01.01.00

OBRAS PROVISIONALES
CARTEL DE OBRA

Und

01.02.00

OFICINA Y ALMACENES

Mes

02.00.00
02.01.00

OBRAS PROVISIONALES
MOVILIZACION Y DESMOVILIZACION DE EQUIPO

Glb

02.02.00

FLETE TERRESTRE

Glb

02.03.00

DESVIO DE TRANSITO

Mes

02.06.00

TRAZO NIVELES Y REPLANTEO

m2

AV 1 S/N TRAMO 1
AV 1 S/N TRAMO 2
AV 1 S/N TRAMO 3
AV 1 S/N TRAMO 4
CALLE 2 S/N
CALLE 3 S/N
CALLE 4 S/N TRAMO 1
CALLE 4 S/N TRAMO 2
CALLE 5 S/N
CALLE 6 S/N
CALLE 13 S/N
CALLE 14 S/N
CALLE 16 S/N

03.00.00
03.01.00

MOVIMIENTO DE TIERRAS
CORTE A NIVEL DE SUBRASANTE

m3

03.02.00

RELLENO CON MATERIAL DE PRESTAMO

m3

03.03.00

ELIMINACION DE MATERIAL EXCEDENTE

m3

HOJA DE METRADOS DE OBRA " PA


Proyecto
Ubicacin
Proyectista

CONSTRUCCION DE PISTAS Y VEREDAS EN 09 CALLES DE LA LOCALIDAD


: Dist: CHIARA; Prov:HUAMANGA; Regin; AYACUCHO
:

PARTIDA

04.00.00
04.01.00
04.01.01

DESCRIPCION

UND.

PAVIMENTO Y CALZADAS
PAVIMENTO RIGIDO
PERFILADO Y COMPACTACION DE LA SUBRASANTE DE P. R.
PV-01
PV-02
PV-03
PV-04
PV-05
PV-06
PV-07
PV-08
PV-09
PV-10
PV-11
PV-12
PV-13
PV-14
PV-15
PV-16
PV-17
PV-18
PV-19
PV-20
PV-21
PV-22
PV-23
PV-24
PV-25
PV-26
PV-27
PV-28
PV-29
PV-30
PV-31
PV-32
PV-33

m2

HOJA DE METRADOS DE OBRA " PA


Proyecto
Ubicacin
Proyectista

CONSTRUCCION DE PISTAS Y VEREDAS EN 09 CALLES DE LA LOCALIDAD


: Dist: CHIARA; Prov:HUAMANGA; Regin; AYACUCHO
:

PARTIDA

DESCRIPCION

UND.

BOCACALLES
BC-01
BC-02
BC-03
BC-04
BC-05
BC-06
BADENES
BD-01
BD-02
BD-03
BD-04
BD-05
BD-06
BD-07
BD-08
BD-09
BD-10
BD-11
BD-12
BD-13

04.01.02

CONFORMACION Y COMPACTACION DE BASE GRANULAR E=0.20m


PV-01
PV-02
PV-03
PV-04
PV-05
PV-06
PV-07
PV-08
PV-09
PV-10
PV-11
PV-12
PV-13
PV-14
PV-15
PV-16

m2

HOJA DE METRADOS DE OBRA " PA


Proyecto
Ubicacin
Proyectista

CONSTRUCCION DE PISTAS Y VEREDAS EN 09 CALLES DE LA LOCALIDAD


: Dist: CHIARA; Prov:HUAMANGA; Regin; AYACUCHO
:

PARTIDA

DESCRIPCION
PV-17
PV-18
PV-19
PV-20
PV-21
PV-22
PV-23
PV-24
PV-25
PV-26
PV-27
PV-28
PV-29
PV-30
PV-31
PV-32
PV-33
BOCACALLES
BC-01
BC-02
BC-03
BC-04
BC-05
BC-06
BADENES
BD-01
BD-02
BD-03
BD-04
BD-05
BD-06
BD-07
BD-08
BD-09
BD-10
BD-11
BD-12
BD-13

UND.

HOJA DE METRADOS DE OBRA " PA


Proyecto
Ubicacin
Proyectista

CONSTRUCCION DE PISTAS Y VEREDAS EN 09 CALLES DE LA LOCALIDAD


: Dist: CHIARA; Prov:HUAMANGA; Regin; AYACUCHO
:

PARTIDA

04.01.03

DESCRIPCION

ENCOFRADO Y DESENCOFRADO DE PAVIMENTO RIGIDO


Longitudinal
PV-01
PV-02
PV-03
PV-04
PV-05
PV-06
PV-07
PV-08
PV-09
PV-10
PV-11
PV-12
PV-13
PV-14
PV-15
PV-16
PV-17
PV-18
PV-19
PV-20
PV-21
PV-22
PV-23
PV-24
PV-25
PV-26
PV-27
PV-28
PV-29
PV-30
PV-31
PV-32
PV-33
BOCACALLES
BC-01
BC-02
BC-03

UND.

m2

HOJA DE METRADOS DE OBRA " PA


Proyecto
Ubicacin
Proyectista

CONSTRUCCION DE PISTAS Y VEREDAS EN 09 CALLES DE LA LOCALIDAD


: Dist: CHIARA; Prov:HUAMANGA; Regin; AYACUCHO
:

PARTIDA

DESCRIPCION
BC-04
BC-05
BC-06

Transversal
PV-01
PV-02
PV-03
PV-04
PV-05
PV-06
PV-07
PV-08
PV-09
PV-10
PV-11
PV-12
PV-13
PV-14
PV-15
PV-16
PV-17
PV-18
PV-19
PV-20
PV-21
PV-22
PV-23
PV-24
PV-25
PV-26
PV-27
PV-28
PV-29
PV-30
PV-31
PV-32
PV-33
BOCACALLES
BC-01
BC-02

UND.

HOJA DE METRADOS DE OBRA " PA


Proyecto
Ubicacin
Proyectista

CONSTRUCCION DE PISTAS Y VEREDAS EN 09 CALLES DE LA LOCALIDAD


: Dist: CHIARA; Prov:HUAMANGA; Regin; AYACUCHO
:

PARTIDA

DESCRIPCION

UND.

BC-03
BC-04
BC-05
BC-06

04.01.04

CONCRETO FC=210 KG/CM2 EN P.R. E=0.20m CALZADA


PV-01
PV-02
PV-03
PV-04
PV-05
PV-06
PV-07
PV-08
PV-09
PV-10
PV-11
PV-12
PV-13
PV-14
PV-15
PV-16
PV-17
PV-18
PV-19
PV-20
PV-21
PV-22
PV-23
PV-24
PV-25
PV-26
PV-27
PV-28
PV-29
PV-30
PV-31
PV-32
PV-33

m2

HOJA DE METRADOS DE OBRA " PA


Proyecto
Ubicacin
Proyectista

CONSTRUCCION DE PISTAS Y VEREDAS EN 09 CALLES DE LA LOCALIDAD


: Dist: CHIARA; Prov:HUAMANGA; Regin; AYACUCHO
:

PARTIDA

DESCRIPCION

UND.

BOCACALLES
BC-01
BC-02
BC-03
BC-04
BC-05
BC-06

04.01.05

CURADO DE CONCRETO
PV-01
PV-02
PV-03
PV-04
PV-05
PV-06
PV-07
PV-08
PV-09
PV-10
PV-11
PV-12
PV-13
PV-14
PV-15
PV-16
PV-17
PV-18
PV-19
PV-20
PV-21
PV-22
PV-23
PV-24
PV-25
PV-26
PV-27
PV-28
PV-29
PV-30
PV-31

m2

HOJA DE METRADOS DE OBRA " PA


Proyecto
Ubicacin
Proyectista

CONSTRUCCION DE PISTAS Y VEREDAS EN 09 CALLES DE LA LOCALIDAD


: Dist: CHIARA; Prov:HUAMANGA; Regin; AYACUCHO
:

PARTIDA

DESCRIPCION

UND.

PV-32
PV-33
BOCACALLES
BC-01
BC-02
BC-03
BC-04
BC-05
BC-06

04.01.06

JUNTAS ASFALTICAS DE CONSTRUCCION Y DILATACION (d)


Longitudinal
PV-01
PV-02
PV-03
PV-04
PV-05
PV-06
PV-07
PV-08
PV-09
PV-10
PV-11
PV-12
PV-13
PV-14
PV-15
PV-16
PV-17
PV-18
PV-19
PV-20
PV-21
PV-22
PV-23
PV-24
PV-25
PV-26
PV-27

HOJA DE METRADOS DE OBRA " PA


Proyecto
Ubicacin
Proyectista

CONSTRUCCION DE PISTAS Y VEREDAS EN 09 CALLES DE LA LOCALIDAD


: Dist: CHIARA; Prov:HUAMANGA; Regin; AYACUCHO
:

PARTIDA

DESCRIPCION
PV-28
PV-29
PV-30
PV-31
PV-32
PV-33
BOCACALLES
BC-01
BC-02
BC-03
BC-04
BC-05
BC-06

Transversal
PV-01
PV-02
PV-03
PV-04
PV-05
PV-06
PV-07
PV-08
PV-09
PV-10
PV-11
PV-12
PV-13
PV-14
PV-15
PV-16
PV-17
PV-18
PV-19
PV-20
PV-21
PV-22
PV-23
PV-24
PV-25
PV-26

UND.

HOJA DE METRADOS DE OBRA " PA


Proyecto
Ubicacin
Proyectista

CONSTRUCCION DE PISTAS Y VEREDAS EN 09 CALLES DE LA LOCALIDAD


: Dist: CHIARA; Prov:HUAMANGA; Regin; AYACUCHO
:

PARTIDA

DESCRIPCION

UND.

PV-27
PV-28
PV-29
PV-30
PV-31
PV-32
PV-33
BOCACALLES
BC-01
BC-02
BC-03
BC-04
BC-05
BC-06

04.01.07

JUNTAS ASFALTICAS DE CONTRACCION (d)


Transversal
PV-01
PV-02
PV-03
PV-04
PV-05
PV-06
PV-07
PV-08
PV-09
PV-10
PV-11
PV-12
PV-13
PV-14
PV-15
PV-16
PV-17
PV-18
PV-19
PV-20
PV-21
PV-22

HOJA DE METRADOS DE OBRA " PA


Proyecto
Ubicacin
Proyectista

CONSTRUCCION DE PISTAS Y VEREDAS EN 09 CALLES DE LA LOCALIDAD


: Dist: CHIARA; Prov:HUAMANGA; Regin; AYACUCHO
:

PARTIDA

DESCRIPCION

UND.

PV-23
PV-24
PV-25
PV-26
PV-27
PV-28
PV-29
PV-30
PV-31
PV-32
PV-33
BOCACALLES
BC-01
BC-02
BC-03
BC-04
BC-05
BC-06

04.01.08

ACERO LISO PARA PASADORES LONGITUDINALES Y TRANSVERSALES

Kg
PESO

PV-01
PV-02
PV-03
PV-04
PV-05
PV-06
PV-07
PV-08
PV-09
PV-10
PV-11
PV-12
PV-13
PV-14
PV-15
PV-16
PV-17

1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55

HOJA DE METRADOS DE OBRA " PA


Proyecto
Ubicacin
Proyectista

CONSTRUCCION DE PISTAS Y VEREDAS EN 09 CALLES DE LA LOCALIDAD


: Dist: CHIARA; Prov:HUAMANGA; Regin; AYACUCHO
:

PARTIDA

DESCRIPCION
PV-18
PV-19
PV-20
PV-21
PV-22
PV-23
PV-24
PV-25
PV-26
PV-27
PV-28
PV-29
PV-30
PV-31
PV-32
PV-33

UND.

1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55

BOCACALLES
BC-01
BC-02
BC-03
BC-04
BC-05
BC-06

05.00.00
05.01.00

VEREDAS DE CONCRETO
PERFILADO Y COMPACTADO DE LA SUBRASANTE PARA VEREDAS
V-01
V-02
V-03
V-04
V-05
V-06
V-07
V-08
V-09
V-10
V-11
V-12
V-13
V-14

1.55
1.55
1.55
1.55
1.55
1.55

m2

HOJA DE METRADOS DE OBRA " PA


Proyecto
Ubicacin
Proyectista

CONSTRUCCION DE PISTAS Y VEREDAS EN 09 CALLES DE LA LOCALIDAD


: Dist: CHIARA; Prov:HUAMANGA; Regin; AYACUCHO
:

PARTIDA

DESCRIPCION
V-15
V-16
V-17
V-18
V-19
V-20
V-21
V-22
V-23
V-24
V-25
V-26
V-27
V-28
V-29
V-30
V-31
V-32

MARTILLOS
M-01
M-02
M-03
M-04
M-05
M-06
M-07
M-08
M-09
M-10
M-11
M-12
M-13
M-14
M-15
M-16
M-17
M-18
M-19
M-20
M-21

UND.

HOJA DE METRADOS DE OBRA " PA


Proyecto
Ubicacin
Proyectista

CONSTRUCCION DE PISTAS Y VEREDAS EN 09 CALLES DE LA LOCALIDAD


: Dist: CHIARA; Prov:HUAMANGA; Regin; AYACUCHO
:

PARTIDA

DESCRIPCION

UND.

M-22
M-23
M-24
M-25
M-26
M-27
M-28
M-29
M-30
M-31
M-32
M-33

RAMPAS

05.02.00

CONFORMACION Y COMPACTACION DE BASE GRANULAR EN VEREDAS E=0.10m


V-01
V-02
V-03
V-04
V-05
V-06
V-07
V-08
V-09
V-10
V-11
V-12
V-13
V-14
V-15
V-16
V-17
V-18
V-19
V-20
V-21
V-22
V-23
V-24

m2

HOJA DE METRADOS DE OBRA " PA


Proyecto
Ubicacin
Proyectista

CONSTRUCCION DE PISTAS Y VEREDAS EN 09 CALLES DE LA LOCALIDAD


: Dist: CHIARA; Prov:HUAMANGA; Regin; AYACUCHO
:

PARTIDA

DESCRIPCION
V-25
V-26
V-27
V-28
V-29
V-30
V-31
V-32

MARTILLOS
M-01
M-02
M-03
M-04
M-05
M-06
M-07
M-08
M-09
M-10
M-11
M-12
M-13
M-14
M-15
M-16
M-17
M-18
M-19
M-20
M-21
M-22
M-23
M-24
M-25
M-26
M-27
M-28
M-29
M-30

UND.

HOJA DE METRADOS DE OBRA " PA


Proyecto
Ubicacin
Proyectista

CONSTRUCCION DE PISTAS Y VEREDAS EN 09 CALLES DE LA LOCALIDAD


: Dist: CHIARA; Prov:HUAMANGA; Regin; AYACUCHO
:

PARTIDA

DESCRIPCION

UND.

M-31
M-32
M-33

RAMPAS

05.03.00

ENCOFRADO Y DESENCOFRADO DE VEREDAS


V-01
V-02
V-03
V-04
V-05
V-06
V-07
V-08
V-09
V-10
V-11
V-12
V-13
V-14
V-15
V-16
V-17
V-18
V-19
V-20
V-21
V-22
V-23
V-24
V-25
V-26
V-27
V-28
V-29
V-30
V-31
V-32

m2

HOJA DE METRADOS DE OBRA " PA


Proyecto
Ubicacin
Proyectista

CONSTRUCCION DE PISTAS Y VEREDAS EN 09 CALLES DE LA LOCALIDAD


: Dist: CHIARA; Prov:HUAMANGA; Regin; AYACUCHO
:

PARTIDA

DESCRIPCION

UND.

TRANSVERSAL
V-01
V-02
V-03
V-04
V-05
V-06
V-07
V-08
V-09
V-10
V-11
V-12
V-13
V-14
V-15
V-16
V-17
V-18
V-19
V-20
V-21
V-22
V-23
V-24
V-25
V-26
V-27
V-28
V-29
V-30
V-31
V-32

05.04.00

ENCOFRADO Y DESENCOFRADO DE MARTILLOS


Martillo 01
Martillo 02
Martillo 03
Martillo 04

m2

HOJA DE METRADOS DE OBRA " PA


Proyecto
Ubicacin
Proyectista

CONSTRUCCION DE PISTAS Y VEREDAS EN 09 CALLES DE LA LOCALIDAD


: Dist: CHIARA; Prov:HUAMANGA; Regin; AYACUCHO
:

PARTIDA

DESCRIPCION

UND.

Martillo 05
Martillo 06
Martillo 07
Martillo 08
Martillo 09
Martillo 10
Martillo 11
Martillo 12
Martillo 13
Martillo 14
Martillo 15
Martillo 16
Martillo 17
Martillo 18
Martillo 19
Martillo 20
Martillo 21
Martillo 22
Martillo 23
Martillo 24
Martillo 25
Martillo 26
Martillo 27
Martillo 28
Martillo 29
Martillo 30
Martillo 31
Martillo 32
Martillo 33

05.05.00

ENCOFRADO Y DESENCOFRADO DE RAMPAS

m2

05.06.00

CONCRETO FC=175 KG/CM2 EN VEREDAS, E=0.10m

m2

V-01
V-02
V-03
V-04
V-05
V-06

HOJA DE METRADOS DE OBRA " PA


Proyecto
Ubicacin
Proyectista

CONSTRUCCION DE PISTAS Y VEREDAS EN 09 CALLES DE LA LOCALIDAD


: Dist: CHIARA; Prov:HUAMANGA; Regin; AYACUCHO
:

PARTIDA

DESCRIPCION

UND.

V-07
V-08
V-09
V-10
V-11
V-12
V-13
V-14
V-15
V-16
V-17
V-18
V-19
V-20
V-21
V-22
V-23
V-24
V-25
V-26
V-27
V-28
V-29
V-30
V-31
V-32

05.07.00

CONCRETO FC=175 KG/CM2 EN MARTILLOS, E=0.10m


M-01
M-02
M-03
M-04
M-05
M-06
M-07
M-08
M-09
M-10
M-11
M-12

m2

HOJA DE METRADOS DE OBRA " PA


Proyecto
Ubicacin
Proyectista

CONSTRUCCION DE PISTAS Y VEREDAS EN 09 CALLES DE LA LOCALIDAD


: Dist: CHIARA; Prov:HUAMANGA; Regin; AYACUCHO
:

PARTIDA

DESCRIPCION

UND.

M-13
M-14
M-15
M-16
M-17
M-18
M-19
M-20
M-21
M-22
M-23
M-24
M-25
M-26
M-27
M-28
M-29
M-30
M-31
M-32
M-33

05.08.00

CONCRETO FC=175 KG/CM2 EN RAMPAS

m2

05.09.00

CURADO DEL CONCRETO EN VEREDAS, MARTILLOS Y RAMPAS


VEREDAS

m2

MARTILLO
RAMPAS
05.10.00

BRUADO EN VEREDAS DE CONCRETO


V-01
V-02
V-03
V-04
V-05
V-06
V-07

ml

HOJA DE METRADOS DE OBRA " PA


Proyecto
Ubicacin
Proyectista

CONSTRUCCION DE PISTAS Y VEREDAS EN 09 CALLES DE LA LOCALIDAD


: Dist: CHIARA; Prov:HUAMANGA; Regin; AYACUCHO
:

PARTIDA

DESCRIPCION

UND.

V-08
V-09
V-10
V-11
V-12
V-13
V-14
V-15
V-16
V-17
V-18
V-19
V-20
V-21
V-22
V-23
V-24
V-25
V-26
V-27
V-28
V-29
V-30
V-31
V-32

05.11.00

JUNTAS ASFALTICAS EN VEREDAS E=1"


V-01
V-02
V-03
V-04
V-05
V-06
V-07
V-08
V-09
V-10
V-11
V-12
V-13

ml

HOJA DE METRADOS DE OBRA " PA


Proyecto
Ubicacin
Proyectista

CONSTRUCCION DE PISTAS Y VEREDAS EN 09 CALLES DE LA LOCALIDAD


: Dist: CHIARA; Prov:HUAMANGA; Regin; AYACUCHO
:

PARTIDA

DESCRIPCION

UND.

V-14
V-15
V-16
V-17
V-18
V-19
V-20
V-21
V-22
V-23
V-24
V-25
V-26
V-27
V-28
V-29
V-30
V-31
V-32

06.00.00
06.01.00
06.01.01

SARDINELES DE CONCRETO
SARDINELES PERALTADOS
ENCOFRADO Y DESENCOFRADO PARA SARDINELES PERALTADOS

m2

AVENIDA -1 S/N (Tramo 1)


AVENIDA -1 S/N (Tramo 2)
AVENIDA -1 S/N (Tramo 3)
AVENIDA -1 S/N (Tramo 4)
CALLE -02 S/N (Tramo 1)
CALLE -02 S/N (Tramo 2)
CALLE -03 S/N (Tramo 1)
CALLE -03 S/N (Tramo 2)
CALLE -04 S/N (Tramo 1)
CALLE -04 S/N (Tramo 2)
CALLE -05 S/N
CALLE -06 S/N
CALLE -13 S/N
CALLE -14 S/N
CALLE -16 S/N

06.01.02

CONCRETO FC=175 KG/CM2 EN SARDINEL PERALTADO

m3

HOJA DE METRADOS DE OBRA " PA


Proyecto
Ubicacin
Proyectista

CONSTRUCCION DE PISTAS Y VEREDAS EN 09 CALLES DE LA LOCALIDAD


: Dist: CHIARA; Prov:HUAMANGA; Regin; AYACUCHO
:

PARTIDA

DESCRIPCION

UND.

AVENIDA -1 S/N (Tramo 1)


AVENIDA -1 S/N (Tramo 2)
AVENIDA -1 S/N (Tramo 3)
AVENIDA -1 S/N (Tramo 4)
CALLE -02 S/N (Tramo 1)
CALLE -02 S/N (Tramo 2)
CALLE -03 S/N (Tramo 1)
CALLE -03 S/N (Tramo 2)
CALLE -04 S/N (Tramo 1)
CALLE -04 S/N (Tramo 2)
CALLE -05 S/N
CALLE -06 S/N
CALLE -13 S/N
CALLE -14 S/N
CALLE -16 S/N

06.01.03

CURADO DEL CONCRETO EN SARDINEL PERALTADO

m2

AVENIDA -1 S/N (Tramo 1)


AVENIDA -1 S/N (Tramo 2)
AVENIDA -1 S/N (Tramo 3)
AVENIDA -1 S/N (Tramo 4)
CALLE -02 S/N (Tramo 1)
CALLE -02 S/N (Tramo 2)
CALLE -03 S/N (Tramo 1)
CALLE -03 S/N (Tramo 2)
CALLE -04 S/N (Tramo 1)
CALLE -04 S/N (Tramo 2)
CALLE -05 S/N
CALLE -06 S/N
CALLE -13 S/N
CALLE -14 S/N
CALLE -16 S/N

06.01.04

JUNTAS ASFALTICAS EN SARDINELES PERALTADOS E=1"


AVENIDA -1 S/N (Tramo 1)
AVENIDA -1 S/N (Tramo 2)
AVENIDA -1 S/N (Tramo 3)
AVENIDA -1 S/N (Tramo 4)
CALLE -02 S/N (Tramo 1)
CALLE -02 S/N (Tramo 2)

ml

HOJA DE METRADOS DE OBRA " PA


Proyecto
Ubicacin
Proyectista

CONSTRUCCION DE PISTAS Y VEREDAS EN 09 CALLES DE LA LOCALIDAD


: Dist: CHIARA; Prov:HUAMANGA; Regin; AYACUCHO
:

PARTIDA

DESCRIPCION

UND.

CALLE -03 S/N (Tramo 1)


CALLE -03 S/N (Tramo 2)
CALLE -04 S/N (Tramo 1)
CALLE -04 S/N (Tramo 2)
CALLE -05 S/N
CALLE -06 S/N
CALLE -13 S/N
CALLE -14 S/N
CALLE -16 S/N

06.01.05

ACERO DE REFUERZO FY= 4200 kg/cm2

kg

07.00.00
07.01.00
07.01.01

OBRAS DE ARTE
SISTEMA DE EVACUACION DE AGUAS PLUVIALES
CUNETAS DE CONCRETO
ENCOFRADO Y DESENCOFRADO EN CUNETAS

m2

AVENIDA -1 S/N (Tramo 1, 2, 3 y 4)


CALLE -02 S/N (Tramo 1)
CALLE -02 S/N (Tramo 2)
CALLE -03 S/N (Tramo 1)
CALLE -03 S/N (Tramo 2)
CALLE -04 S/N (Tramo 1)
CALLE -04 S/N (Tramo 2)
CALLE -05 S/N (Tramo 1)
CALLE -05 S/N (Tramo 2)
CALLE -06 S/N
CALLE -13 S/N
CALLE -14 S/N
CALLE -16 S/N

07.01.02

CONCRETO FC=175 KG/CM2 EN CUNETAS


AVENIDA -1 S/N (Tramo 1, 2, 3 y 4)
CALLE -02 S/N (Tramo 1)
CALLE -02 S/N (Tramo 2)
CALLE -03 S/N (Tramo 1)
CALLE -03 S/N (Tramo 2)
CALLE -04 S/N (Tramo 1)
CALLE -04 S/N (Tramo 2)
CALLE -05 S/N (Tramo 1)
CALLE -05 S/N (Tramo 2)

m3

HOJA DE METRADOS DE OBRA " PA


Proyecto
Ubicacin
Proyectista

CONSTRUCCION DE PISTAS Y VEREDAS EN 09 CALLES DE LA LOCALIDAD


: Dist: CHIARA; Prov:HUAMANGA; Regin; AYACUCHO
:

PARTIDA

DESCRIPCION

UND.

CALLE -06 S/N


CALLE -13 S/N
CALLE -14 S/N
CALLE -16 S/N

07.01.03

CURADO DE CONCRETO EN CUNETAS

m2

AVENIDA -1 S/N (Tramo 1)


CALLE -02 S/N (Tramo 1)
CALLE -02 S/N (Tramo 2)
CALLE -03 S/N (Tramo 1)
CALLE -03 S/N (Tramo 2)
CALLE -04 S/N (Tramo 1)
CALLE -04 S/N (Tramo 2)
CALLE -05 S/N (Tramo 1)
CALLE -05 S/N (Tramo 2)
CALLE -06 S/N
CALLE -13 S/N
CALLE -14 S/N
CALLE -16 S/N

07.01.04

JUNTAS ASFALTICAS EN CUNETAS E=1"

ml

AVENIDA -1 S/N (Tramo 1)


CALLE -02 S/N (Tramo 1)
CALLE -02 S/N (Tramo 2)
CALLE -03 S/N (Tramo 1)
CALLE -03 S/N (Tramo 2)
CALLE -04 S/N (Tramo 1)
CALLE -04 S/N (Tramo 2)
CALLE -05 S/N (Tramo 1)
CALLE -05 S/N (Tramo 2)
CALLE -06 S/N
CALLE -13 S/N
CALLE -14 S/N
CALLE -16 S/N

07.02.00
07.02.01

BADENES
CONCRETO FC=210 KG/CM2
Badenes 1
Badenes 2
Badenes 3

m3

HOJA DE METRADOS DE OBRA " PA


Proyecto
Ubicacin
Proyectista

CONSTRUCCION DE PISTAS Y VEREDAS EN 09 CALLES DE LA LOCALIDAD


: Dist: CHIARA; Prov:HUAMANGA; Regin; AYACUCHO
:

PARTIDA

DESCRIPCION

UND.

Badenes 4
Badenes 5
Badenes 6
Badenes 7
Badenes 8
Badenes 9
Badenes 10
Badenes 11
Badenes 12
Badenes 13
07.02.02

ENCOFRADO Y DESENCOFRADO
Badenes 1
Badenes 2
Badenes 3
Badenes 4
Badenes 5
Badenes 6
Badenes 7
Badenes 8
Badenes 9
Badenes 10
Badenes 11
Badenes 12
Badenes 13

8.00.00
8.01.00
8.01.01

SEALIZACION
SEALIZACION HORIZONTAL
PINTURA INTERM. DISCONT. CENTRO DE VIA
AVENIDA -1 S/N (Tramo 1)
AVENIDA -1 S/N (Tramo 2)
AVENIDA -1 S/N (Tramo 3)
AVENIDA -1 S/N (Tramo 4)
CALLE -02 S/N (Tramo 1)
CALLE -02 S/N (Tramo 2)
CALLE -03 S/N (Tramo 1)
CALLE -03 S/N (Tramo 2)
CALLE -04 S/N (Tramo 1)
CALLE -04 S/N (Tramo 2)
CALLE -05 S/N

m2

ml

HOJA DE METRADOS DE OBRA " PA


Proyecto
Ubicacin
Proyectista

CONSTRUCCION DE PISTAS Y VEREDAS EN 09 CALLES DE LA LOCALIDAD


: Dist: CHIARA; Prov:HUAMANGA; Regin; AYACUCHO
:

PARTIDA

DESCRIPCION

UND.

CALLE -06 S/N


CALLE -13 S/N
CALLE -14 S/N
CALLE -16 S/N

8.01.02

PINTURA EN CRUCE PEATONAL

m2

AVENIDA -1 S/N (Tramo 1)


AVENIDA -1 S/N (Tramo 2)
AVENIDA -1 S/N (Tramo 3)
AVENIDA -1 S/N (Tramo 4)
CALLE -02 S/N (Tramo 1)
CALLE -02 S/N (Tramo 2)
CALLE -03 S/N (Tramo 1)
CALLE -03 S/N (Tramo 2)
CALLE -04 S/N (Tramo 1)
CALLE -04 S/N (Tramo 2)
CALLE -05 S/N
CALLE -06 S/N
CALLE -13 S/N
CALLE -14 S/N
CALLE -16 S/N

9.00.00
9.01.00

VARIOS
REPOSICION DE CAJAS DOMICILIARIAS DE AGUA Y DESAGUE

Und

9.02.00

ELEVACION DE TAPA DE BUZONES A NIVEL DE RASANTE

Und

9.03.00

REUBICACION DE POSTES DE MEDIA TENSION

Und

9.04.00

LIMPIEZA FINAL DE OBRA

m2

AV 1 S/N TRAMO 1
AV 1 S/N TRAMO 2
AV 1 S/N TRAMO 3
AV 1 S/N TRAMO 4

HOJA DE METRADOS DE OBRA " PA


Proyecto
Ubicacin
Proyectista

CONSTRUCCION DE PISTAS Y VEREDAS EN 09 CALLES DE LA LOCALIDAD


: Dist: CHIARA; Prov:HUAMANGA; Regin; AYACUCHO
:

PARTIDA

DESCRIPCION

UND.

CALLE 2 S/N
CALLE 3 S/N
CALLE 4 S/N TRAMO 1
CALLE 4 S/N TRAMO 2
CALLE 5 S/N
CALLE 6 S/N
CALLE 13 S/N
CALLE 14 S/N
CALLE 16 S/N

9.05.00

MITIGACION DEL IMPACTO AMBIENTAL

Glb

9.06.00

SEGURIDAD Y SALUD EN EL TRABAJO

Glb

AD DISTRITAL DE CHIARA

OS DE OBRA " PAVIMENTO RIGIDO"

LLES DE LA LOCALIDAD DE ALLPACHACA, DISTRITO DE CHIARA - HUAMANGA - AYACUCHO"

FECHA: FEBRERO-2016
VECES

LARGO

METRADOS
ANCHO

ALTO

PARCIAL

TOTAL

1.00

1.00

1.00

5.00

5.00

5.00

1.00

1.00

1.00

1.00

1.00

1.00

5.00

5.00

5.00
18,526.47

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

63.17
60.93
61.68
57.05
126.91
125.03
163.72
163.72
186.85
64.02
134.54
202.06
205.11

8.60
7.45
7.45
7.45
8.40
10.40
16.10
14.20
14.50
10.50
7.80
11.80
12.20

543.26
453.96
459.51
425.02
1,066.02
1,300.34
2,635.94
2,324.87
2,709.25
672.20
1,049.42
2,384.31
2,502.37

8,694.03
1.00

Segn cuadro de explanaciones

8,694.03
232.05

1.00

Segn cuadro de explanaciones

232.05
11,302.24

OS DE OBRA " PAVIMENTO RIGIDO"

LLES DE LA LOCALIDAD DE ALLPACHACA, DISTRITO DE CHIARA - HUAMANGA - AYACUCHO"

FECHA: FEBRERO-2016
VECES

1.30

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

LARGO

METRADOS
ANCHO

Segn cuadro de explanaciones

AREA
120.94
651.82
178.92
1,057.67
271.90
116.14
435.26
157.12
644.14
185.85
403.05
543.63
402.77
137.83
711.86
194.42
805.60
225.94
153.29
1,140.62
102.41
362.40
301.42
436.05
104.15
430.30
40.66
624.76
308.89
346.24
67.29
324.53
315.20

ALTO

PARCIAL

TOTAL

11,302.24

12,496.61
###
###
178.92
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###

4,199.70

1,057.67

153.29
1,140.62
102.41
362.40
301.42

308.89
346.24

315.20

OS DE OBRA " PAVIMENTO RIGIDO"

LLES DE LA LOCALIDAD DE ALLPACHACA, DISTRITO DE CHIARA - HUAMANGA - AYACUCHO"

FECHA: FEBRERO-2016
VECES

LARGO

METRADOS
ANCHO

ALTO

PARCIAL

TOTAL

1.00
1.00
1.00
1.00
1.00
1.00

21.35
10.78
13.91
18.17
9.71
8.06

###
###
###
###
###
###

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

9.28
10.70
7.64
8.78
9.48
7.44
7.18
6.42
7.24
7.02
7.41
7.50
15.47

###
###
###
###
###
###
###
###
###
###
###
###
###

9.28
10.70
7.64
8.78
9.48
7.44
7.18
6.42
7.24
7.02
7.41
7.50
15.47
12,496.61

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

120.94
651.82
178.92
1,057.67
271.90
116.14
435.26
157.12
644.14
185.85
403.05
543.63
402.77
137.83
711.86
194.42

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###

OS DE OBRA " PAVIMENTO RIGIDO"

LLES DE LA LOCALIDAD DE ALLPACHACA, DISTRITO DE CHIARA - HUAMANGA - AYACUCHO"

FECHA: FEBRERO-2016
VECES

LARGO

METRADOS
ANCHO

ALTO

PARCIAL

TOTAL

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

805.60
225.94
153.29
1,140.62
102.41
362.40
301.42
436.05
104.15
430.30
40.66
624.76
308.89
346.24
67.29
324.53
315.20

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###

1.00
1.00
1.00
1.00
1.00
1.00

21.35
10.78
13.91
18.17
9.71
8.06

###
###
###
###
###
###

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

9.28
10.70
7.64
8.78
9.48
7.44
7.18
6.42
7.24
7.02
7.41
7.50
15.47

9.28
10.70
7.64
8.78
9.48
7.44
7.18
6.42
7.24
7.02
7.41
7.50
15.47

OS DE OBRA " PAVIMENTO RIGIDO"

LLES DE LA LOCALIDAD DE ALLPACHACA, DISTRITO DE CHIARA - HUAMANGA - AYACUCHO"

FECHA: FEBRERO-2016
VECES

METRADOS
ANCHO

LARGO

ALTO

PARCIAL

TOTAL

1,247.74
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00

15.38
52.96
14.77
90.32
23.34
16.10
47.68
16.79
69.68
20.19
42.78
62.31
57.48
13.52
54.46
17.87
71.24
24.69
19.74
134.33
13.12
46.30
58.24
56.00
16.06
56.02
10.59
125.24
59.31
59.91
13.12
56.57
55.92

0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20

9.23
31.78
8.86
54.19
14.00
9.66
28.61
10.07
41.81
12.11
25.67
37.39
34.49
8.11
32.68
10.72
42.74
14.81
11.84
80.60
7.87
27.78
34.94
33.60
9.64
33.61
6.35
75.14
35.59
35.95
7.87
33.94
33.55

3.00
3.00
3.00

2.76
2.06
2.25

0.20
0.20
0.20

1.66
1.24
1.35

54.19
14.00

11.84
80.60
7.87
27.78
34.94

35.59
35.95

33.55
1.66
1.24
1.35

OS DE OBRA " PAVIMENTO RIGIDO"

LLES DE LA LOCALIDAD DE ALLPACHACA, DISTRITO DE CHIARA - HUAMANGA - AYACUCHO"

FECHA: FEBRERO-2016
VECES

METRADOS
ANCHO

LARGO

ALTO

PARCIAL

3.00
3.00
3.00

2.46
1.98
1.92

0.20
0.20
0.20

1.48
1.19
1.15

3.00
7.00
3.00
11.00
4.00
3.00
6.00
3.00
9.00
3.00
6.00
8.00
7.00
3.00
7.00
3.00
9.00
4.00
3.00
16.00
2.00
6.00
7.00
7.00
3.00
7.00
2.00
15.00
8.00
8.00
2.00
7.00
7.00

7.74
11.85
11.85
11.70
12.10
7.09
9.24
9.24
9.24
9.34
9.34
8.70
8.30
10.17
13.11
11.34
11.34
8.80
6.78
8.63
7.77
7.77
4.56
7.80
7.68
7.68
4.97
4.97
4.59
5.80
5.86
5.86
5.00

0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20

4.64
16.59
7.11
25.74
9.68
4.25
11.09
5.54
16.63
5.60
11.21
13.92
11.62
6.10
18.35
6.80
20.41
7.04
4.07
27.62
3.11
9.32
6.38
10.92
4.61
10.75
1.99
14.91
7.34
9.28
2.34
8.20
7.00

2.00
2.00

7.71
5.27

0.20
0.20

3.08
2.11

TOTAL

1.48
1.19
1.15

OS DE OBRA " PAVIMENTO RIGIDO"

LLES DE LA LOCALIDAD DE ALLPACHACA, DISTRITO DE CHIARA - HUAMANGA - AYACUCHO"

FECHA: FEBRERO-2016
VECES

2.00
2.00
2.00
2.00

METRADOS
ANCHO

LARGO

6.14
7.39
4.92
4.25

ALTO

PARCIAL

0.20
0.20
0.20
0.20

TOTAL

2.46
2.96
1.97
1.70
12,385.05

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

120.94
651.82
178.92
1,057.67
271.90
116.14
435.26
157.12
644.14
185.85
403.05
543.63
402.77
137.83
711.86
194.42
805.60
225.94
153.29
1,140.62
102.41
362.40
301.42
436.05
104.15
430.30
40.66
624.76
308.89
346.24
67.29
324.53
315.20

120.94
651.82
178.92
1,057.67
271.90
116.14
435.26
157.12
644.14
185.85
403.05
543.63
402.77
137.83
711.86
194.42
805.60
225.94
153.29
1,140.62
102.41
362.40
301.42
436.05
104.15
430.30
40.66
624.76
308.89
346.24
67.29
324.53
315.20

OS DE OBRA " PAVIMENTO RIGIDO"

LLES DE LA LOCALIDAD DE ALLPACHACA, DISTRITO DE CHIARA - HUAMANGA - AYACUCHO"

FECHA: FEBRERO-2016
VECES

1.00
1.00
1.00
1.00
1.00
1.00

LARGO

21.35
10.78
13.91
18.17
9.71
8.06

METRADOS
ANCHO

ALTO

PARCIAL

TOTAL

21.35
10.78
13.91
18.17
9.71
8.06
12,385.05

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

120.94
651.82
178.92
1,057.67
271.90
116.14
435.26
157.12
644.14
185.85
403.05
543.63
402.77
137.83
711.86
194.42
805.60
225.94
153.29
1,140.62
102.41
362.40
301.42
436.05
104.15
430.30
40.66
624.76
308.89
346.24
67.29

120.94
651.82
178.92
1,057.67
271.90
116.14
435.26
157.12
644.14
185.85
403.05
543.63
402.77
137.83
711.86
194.42
805.60
225.94
153.29
1,140.62
102.41
362.40
301.42
436.05
104.15
430.30
40.66
624.76
308.89
346.24
67.29

OS DE OBRA " PAVIMENTO RIGIDO"

LLES DE LA LOCALIDAD DE ALLPACHACA, DISTRITO DE CHIARA - HUAMANGA - AYACUCHO"

FECHA: FEBRERO-2016
VECES

LARGO

METRADOS
ANCHO

ALTO

PARCIAL

1.00
1.00

324.53
315.20

324.53
315.20

1.00
1.00
1.00
1.00
1.00
1.00

21.35
10.78
13.91
18.17
9.71
8.06

21.35
10.78
13.91
18.17
9.71
8.06

TOTAL

6,203.04
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00

15.38
52.96
14.77
90.32
23.34
16.10
47.68
16.79
69.68
20.19
42.78
62.31
57.48
13.52
54.46
17.87
71.24
24.69
19.74
134.33
13.12
46.30
58.24
56.00
16.06
56.02
10.59

46.14
158.88
44.31
270.96
70.02
48.30
143.04
50.37
209.04
60.57
128.34
186.93
172.44
40.56
163.38
53.61
213.72
74.07
59.22
402.99
39.36
138.90
174.72
168.00
48.18
168.06
31.77

OS DE OBRA " PAVIMENTO RIGIDO"

LLES DE LA LOCALIDAD DE ALLPACHACA, DISTRITO DE CHIARA - HUAMANGA - AYACUCHO"

FECHA: FEBRERO-2016
VECES

METRADOS
ANCHO

LARGO

ALTO

PARCIAL

3.00
3.00
3.00
3.00
3.00
3.00

125.24
59.31
59.91
13.12
56.57
55.92

375.72
177.93
179.73
39.36
169.71
167.76

3.00
3.00
3.00
3.00
3.00
3.00

2.76
2.06
2.25
2.46
1.98
1.92

8.28
6.18
6.75
7.38
5.94
5.76

3.00
7.00
3.00
11.00
4.00
3.00
6.00
3.00
9.00
3.00
6.00
8.00
7.00
3.00
7.00
3.00
9.00
4.00
3.00
16.00
2.00
6.00
7.00
7.00
3.00
7.00

7.74
11.85
11.85
11.70
12.10
7.09
9.24
9.24
9.24
9.34
9.34
8.70
8.30
10.17
13.11
11.34
11.34
8.80
6.78
8.63
7.77
7.77
4.56
7.80
7.68
7.68

23.22
82.95
35.55
128.70
48.40
21.27
55.44
27.72
83.16
28.02
56.04
69.60
58.10
30.51
91.77
34.02
102.06
35.20
20.34
138.08
15.54
46.62
31.92
54.60
23.04
53.76

TOTAL

OS DE OBRA " PAVIMENTO RIGIDO"

LLES DE LA LOCALIDAD DE ALLPACHACA, DISTRITO DE CHIARA - HUAMANGA - AYACUCHO"

FECHA: FEBRERO-2016
VECES

METRADOS
ANCHO

LARGO

ALTO

PARCIAL

2.00
15.00
8.00
8.00
2.00
7.00
7.00

4.97
4.97
4.59
5.80
5.86
5.86
5.00

9.94
74.55
36.72
46.40
11.72
41.02
35.00

1.00
1.00
1.00
1.00
1.00
1.00

7.71
5.27
6.14
7.39
4.92
4.25

7.71
5.27
6.14
7.39
4.92
4.25

TOTAL

3,062.25
4.42
12.77
4.28
21.07
6.19
4.58
11.60
4.73
16.48
5.49
10.51
14.85
13.77
4.00
13.10
4.97
16.83
6.49
5.39
30.85
3.92
11.29

7.74
11.85
11.85
11.70
12.10
7.09
9.24
9.24
9.24
9.34
9.34
8.70
8.30
10.17
13.11
11.34
11.34
8.80
6.78
8.63
7.77
7.77

34.19
151.31
50.74
246.53
74.86
32.46
107.14
43.72
152.32
51.25
98.13
129.17
114.32
40.73
171.77
56.37
190.86
57.08
36.52
266.25
30.42
87.71

OS DE OBRA " PAVIMENTO RIGIDO"

LLES DE LA LOCALIDAD DE ALLPACHACA, DISTRITO DE CHIARA - HUAMANGA - AYACUCHO"

FECHA: FEBRERO-2016
VECES

METRADOS
ANCHO

LARGO

ALTO

PARCIAL

13.94
13.44
4.57
13.45
3.35
28.83
14.18
14.31
3.92
13.57
13.43

4.56
7.80
7.68
7.68
4.97
4.97
4.59
5.80
5.86
5.86
5.00

63.58
104.87
35.09
103.29
16.67
143.29
65.09
83.02
22.95
79.53
67.13

1.61
1.46
1.50
1.55
1.44
1.43

7.71
5.27
6.14
7.39
4.92
4.25

12.44
7.68
9.21
11.43
7.08
6.06

TOTAL

2,738.54

5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"

N ELEM.
IGUALES
3.00
7.00
3.00
11.00
4.00
3.00
6.00
3.00
9.00
3.00
6.00
8.00
7.00
3.00
7.00
3.00
9.00

NPZAS X
ELEM.
20.00
31.00
31.00
30.00
31.00
19.00
24.00
24.00
24.00
24.00
24.00
23.00
22.00
26.00
34.00
29.00
29.00

LONG X
PZA
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40

LONG.
24.00
86.80
37.20
132.00
49.60
22.80
57.60
28.80
86.40
28.80
57.60
73.60
61.60
31.20
95.20
34.80
104.40

KG
37.20
134.54
57.66
204.60
76.88
35.34
89.28
44.64
133.92
44.64
89.28
114.08
95.48
48.36
147.56
53.94
161.82

OS DE OBRA " PAVIMENTO RIGIDO"

LLES DE LA LOCALIDAD DE ALLPACHACA, DISTRITO DE CHIARA - HUAMANGA - AYACUCHO"

FECHA: FEBRERO-2016
VECES

METRADOS
ANCHO

LARGO

ALTO

PARCIAL

TOTAL

5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"

4.00
3.00
16.00
2.00
6.00
7.00
7.00
3.00
7.00
2.00
15.00
8.00
8.00
2.00
7.00
7.00

23.00
18.00
23.00
20.00
20.00
12.00
21.00
20.00
20.00
13.00
13.00
12.00
16.00
16.00
16.00
14.00

0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40

36.80
21.60
147.20
16.00
48.00
33.60
58.80
24.00
56.00
10.40
78.00
38.40
51.20
12.80
44.80
39.20

57.04
33.48
228.16
24.80
74.40
52.08
91.14
37.20
86.80
16.12
120.90
59.52
79.36
19.84
69.44
60.76

5/8"
5/8"
5/8"
5/8"
5/8"
5/8"

1.00
1.00
1.00
1.00
1.00
1.00

20.00
14.00
16.00
19.00
13.00
12.00

0.40
0.40
0.40
0.40
0.40
0.40

8.00
5.60
6.40
7.60
5.20
4.80

12.40
8.68
9.92
11.78
8.06
7.44

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

AREA
191.08
111.50
54.02
160.04
93.16
50.68
56.07
112.85
62.16
63.90
91.17
87.45
162.64
162.65

2,856.95
###
###
###
###
###
###
###
###
###
###
###
###
###
###

OS DE OBRA " PAVIMENTO RIGIDO"

LLES DE LA LOCALIDAD DE ALLPACHACA, DISTRITO DE CHIARA - HUAMANGA - AYACUCHO"

FECHA: FEBRERO-2016
VECES

LARGO

METRADOS
ANCHO

ALTO

PARCIAL

TOTAL

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

55.15
55.20
51.82
51.66
55.20
55.41
55.21
55.24
158.42
148.73
52.62
52.90
58.86
56.40
54.91
54.86
52.38
52.31

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

4.32
7.28
4.32
5.70
5.82
5.88
6.28
5.38
5.10
5.51
6.13
6.77
5.89
7.07
7.30
6.76
3.56
5.97
6.66
5.27
5.13

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###

OS DE OBRA " PAVIMENTO RIGIDO"

LLES DE LA LOCALIDAD DE ALLPACHACA, DISTRITO DE CHIARA - HUAMANGA - AYACUCHO"

FECHA: FEBRERO-2016
VECES

LARGO

METRADOS
ANCHO

ALTO

PARCIAL

TOTAL

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

5.26
5.34
6.17
6.18
6.18
6.20
4.72
5.28
6.24
6.27
5.59
6.17

###
###
###
###
###
###
###
###
###
###
###
###

52.00

0.55

28.60

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

AREA
191.08
111.50
54.02
160.04
93.16
50.68
56.07
112.85
62.16
63.90
91.17
87.45
162.64
162.65
55.15
55.20
51.82
51.66
55.20
55.41
55.21
55.24
158.42
148.73

2,856.95
191.08
111.50
54.02
160.04
93.16
50.68
56.07
112.85
62.16
63.90
91.17
87.45
162.64
162.65
55.15
55.20
51.82
51.66
55.20
55.41
55.21
55.24
158.42
148.73

OS DE OBRA " PAVIMENTO RIGIDO"

LLES DE LA LOCALIDAD DE ALLPACHACA, DISTRITO DE CHIARA - HUAMANGA - AYACUCHO"

FECHA: FEBRERO-2016
VECES

LARGO

METRADOS
ANCHO

ALTO

PARCIAL

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

52.62
52.90
58.86
56.40
54.91
54.86
52.38
52.31

52.62
52.90
58.86
56.40
54.91
54.86
52.38
52.31

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

4.32
7.28
4.32
5.70
5.82
5.88
6.28
5.38
5.10
5.51
6.13
6.77
5.89
7.07
7.30
6.76
3.56
5.97
6.66
5.27
5.13
5.26
5.34
6.17
6.18
6.18
6.20
4.72
5.28
6.24

4.32
7.28
4.32
5.70
5.82
5.88
6.28
5.38
5.10
5.51
6.13
6.77
5.89
7.07
7.30
6.76
3.56
5.97
6.66
5.27
5.13
5.26
5.34
6.17
6.18
6.18
6.20
4.72
5.28
6.24

TOTAL

OS DE OBRA " PAVIMENTO RIGIDO"

LLES DE LA LOCALIDAD DE ALLPACHACA, DISTRITO DE CHIARA - HUAMANGA - AYACUCHO"

FECHA: FEBRERO-2016
VECES

LARGO

METRADOS
ANCHO

ALTO

PARCIAL

1.00
1.00
1.00

6.27
5.59
6.17

6.27
5.59
6.17

52.00

0.55

28.60

TOTAL

340.62
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

156.26
94.20
44.91
134.59
11.64
42.70
47.20
95.12
54.49
53.23
76.36
71.10
135.54
134.86
46.46
46.48
51.82
51.66
55.73
55.98
55.76
56.07
132.83
124.38
52.62
52.79
59.61
56.95
55.25
55.31
52.98
52.89

0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10

15.63
9.42
4.49
13.46
1.16
4.27
4.72
9.51
5.45
5.32
7.64
7.11
13.55
13.49
4.65
4.65
5.18
5.17
5.57
5.60
5.58
5.61
13.28
12.44
5.26
5.28
5.96
5.70
5.53
5.53
5.30
5.29

OS DE OBRA " PAVIMENTO RIGIDO"

LLES DE LA LOCALIDAD DE ALLPACHACA, DISTRITO DE CHIARA - HUAMANGA - AYACUCHO"

FECHA: FEBRERO-2016
VECES

53.00
47.00
23.00
53.00
32.00
16.00
46.00
21.00
15.00
17.00
33.00
19.00
19.00
26.00
25.00
46.00
46.00
16.00
16.00
18.00
18.00
20.00
20.00
20.00
20.00
45.00
42.00
19.00
19.00
21.00
20.00
19.00

METRADOS
ANCHO

LARGO

1.00
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.00
1.00
1.00
1.00
1.00
1.00
1.20
1.20
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

ALTO

PARCIAL

0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10

TOTAL

5.30
5.64
2.76
6.36
3.84
19.20
5.52
2.52
1.80
2.04
3.96
2.28
2.28
3.12
3.00
5.52
4.60
1.60
1.60
1.80
1.80
2.00
2.40
2.40
2.00
4.50
4.20
1.90
1.90
2.10
2.00
1.90
51.15

1.00
1.00
1.00
1.00

14.37
18.05
10.68
13.64

0.10
0.10
0.10
0.10

1.44
1.81
1.07
1.36

OS DE OBRA " PAVIMENTO RIGIDO"

LLES DE LA LOCALIDAD DE ALLPACHACA, DISTRITO DE CHIARA - HUAMANGA - AYACUCHO"

FECHA: FEBRERO-2016
VECES

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

METRADOS
ANCHO

LARGO

14.10
15.70
16.35
14.87
14.38
15.05
16.09
15.42
16.54
18.73
18.03
14.44
8.74
14.04
15.24
14.65
14.41
14.64
14.82
18.30
18.30
18.29
18.32
10.40
12.94
18.36
18.38
17.00
18.18

ALTO

PARCIAL

0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10

TOTAL

1.41
1.57
1.64
1.49
1.44
1.51
1.61
1.54
1.65
1.87
1.80
1.44
0.87
1.40
1.52
1.47
1.44
1.46
1.48
1.83
1.83
1.83
1.83
1.04
1.29
1.84
1.84
1.70
1.82
16.74

52.00

3.22

0.10

16.74

AREA
1.00
1.00
1.00
1.00
1.00
1.00

2,636.65
191.08
111.50
54.02
160.04
93.16
50.68

191.08
111.50
54.02
160.04
93.16
50.68

OS DE OBRA " PAVIMENTO RIGIDO"

LLES DE LA LOCALIDAD DE ALLPACHACA, DISTRITO DE CHIARA - HUAMANGA - AYACUCHO"

FECHA: FEBRERO-2016
VECES

LARGO

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

METRADOS
ANCHO

56.07
112.85
62.16
63.90
91.17
87.45
162.64
162.65
55.15
55.20
51.82
51.66
55.20
55.41
55.21
55.24
158.42
148.73
52.62
52.90
58.86
56.40
54.91
54.86
52.38
52.31

ALTO

PARCIAL

56.07
112.85
62.16
63.90
91.17
87.45
162.64
162.65
55.15
55.20
51.82
51.66
55.20
55.41
55.21
55.24
158.42
148.73
52.62
52.90
58.86
56.40
54.91
54.86
52.38
52.31

AREA
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

TOTAL

511.45
14.37
18.05
10.68
13.64
14.10
15.70
16.35
14.87
14.38
15.05
16.09
15.42

14.37
18.05
10.68
13.64
14.10
15.70
16.35
14.87
14.38
15.05
16.09
15.42

OS DE OBRA " PAVIMENTO RIGIDO"

LLES DE LA LOCALIDAD DE ALLPACHACA, DISTRITO DE CHIARA - HUAMANGA - AYACUCHO"

FECHA: FEBRERO-2016
VECES

LARGO

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

METRADOS
ANCHO

16.54
18.73
18.03
14.44
8.74
14.04
15.24
14.65
14.41
14.64
14.82
18.30
18.30
18.29
18.32
10.40
12.94
18.36
18.38
17.00
18.18

ALTO

PARCIAL

16.54
18.73
18.03
14.44
8.74
14.04
15.24
14.65
14.41
14.64
14.82
18.30
18.30
18.29
18.32
10.40
12.94
18.36
18.38
17.00
18.18

AREA

28.60
0.55

52.00

TOTAL

28.60

1.00

AREA
2,636.65

3,176.70
2,636.65

1.00

511.45

511.45

1.00

28.60

28.60

1.00
1.00
1.00
1.00
1.00
1.00
1.00

15.38
52.96
14.77
90.32
23.34
16.10
47.68

15.38
52.96
14.77
90.32
23.34
16.10
47.68

1,436.11

OS DE OBRA " PAVIMENTO RIGIDO"

LLES DE LA LOCALIDAD DE ALLPACHACA, DISTRITO DE CHIARA - HUAMANGA - AYACUCHO"

FECHA: FEBRERO-2016
VECES

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

METRADOS
ANCHO

LARGO

16.79
69.68
20.19
42.78
62.31
57.48
13.52
54.46
17.87
71.24
24.69
19.74
134.33
13.12
46.30
58.24
56.00
16.06
56.02
10.59
125.24
59.31
59.91
13.12
56.57

ALTO

PARCIAL

TOTAL

16.79
69.68
20.19
42.78
62.31
57.48
13.52
54.46
17.87
71.24
24.69
19.74
134.33
13.12
46.30
58.24
56.00
16.06
56.02
10.59
125.24
59.31
59.91
13.12
56.57
563.20

6.00
19.00
6.00
31.00
9.00
6.00
17.00
7.00
24.00
8.00
15.00
22.00
20.00

1.00
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20

6.00
22.80
7.20
37.20
10.80
7.20
20.40
8.40
28.80
9.60
18.00
26.40
24.00

OS DE OBRA " PAVIMENTO RIGIDO"

LLES DE LA LOCALIDAD DE ALLPACHACA, DISTRITO DE CHIARA - HUAMANGA - AYACUCHO"

FECHA: FEBRERO-2016
VECES

6.00
19.00
7.00
25.00
9.00
8.00
46.00
5.00
16.00
20.00
20.00
6.00
20.00
5.00
43.00
21.00
21.00
5.00
20.00

METRADOS
ANCHO

LARGO

ALTO

PARCIAL

1.20
1.20
1.20
1.00
1.00
1.00
1.00
1.00
1.00
1.20
1.20
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

TOTAL

7.20
22.80
8.40
25.00
9.00
8.00
46.00
5.00
16.00
24.00
24.00
6.00
20.00
5.00
43.00
21.00
21.00
5.00
20.00

1,679.03
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

125.05
123.63
125.29
115.16
122.65
117.38
117.77
117.89
119.09
165.17
320.09
160.82
267.86
401.63
398.91

0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60

75.03
74.18
75.17
69.10
73.59
70.43
70.66
70.73
71.45
99.10
192.05
96.49
160.72
240.98
239.35
251.86

OS DE OBRA " PAVIMENTO RIGIDO"

LLES DE LA LOCALIDAD DE ALLPACHACA, DISTRITO DE CHIARA - HUAMANGA - AYACUCHO"

FECHA: FEBRERO-2016
VECES

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

LARGO

125.05
123.63
125.29
115.16
122.65
117.38
117.77
117.89
119.09
165.17
320.09
160.82
267.86
401.63
398.91

METRADOS
ANCHO

0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15

ALTO

PARCIAL

0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60

TOTAL

11.25
11.13
11.28
10.36
11.04
10.56
10.60
10.61
10.72
14.87
28.81
14.47
24.11
36.15
35.90
1,679.03

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

125.05
123.63
125.29
115.16
122.65
117.38
117.77
117.89
119.09
165.17
320.09
160.82
267.86
401.63
398.91

0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60

75.03
74.18
75.17
69.10
73.59
70.43
70.66
70.73
71.45
99.10
192.05
96.49
160.72
240.98
239.35
568.80

43.00
42.00
43.00
39.00
42.00
40.00

0.60
0.60
0.60
0.60
0.60
0.60

25.80
25.20
25.80
23.40
25.20
24.00

OS DE OBRA " PAVIMENTO RIGIDO"

LLES DE LA LOCALIDAD DE ALLPACHACA, DISTRITO DE CHIARA - HUAMANGA - AYACUCHO"

FECHA: FEBRERO-2016
VECES

LARGO

METRADOS
ANCHO

PARCIAL

0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60

40.00
40.00
41.00
56.00
108.00
55.00
90.00
135.00
134.00
1.00

ALTO

2,149.16

TOTAL

24.00
24.00
24.60
33.60
64.80
33.00
54.00
81.00
80.40
2,149.16

2,149.16

998.44
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

293.61
122.65
117.35
117.77
117.89
117.21
149.50
215.04
91.59
158.73
257.06
374.59
363.10

0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40

117.44
49.06
46.94
47.11
47.16
46.88
59.80
86.02
36.64
63.49
102.82
149.84
145.24

AREA
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

293.61
122.65
117.35
117.77
117.89
117.21
149.50
215.04
91.59

149.77
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06

17.62
7.36
7.04
7.07
7.07
7.03
8.97
12.90
5.50

OS DE OBRA " PAVIMENTO RIGIDO"

LLES DE LA LOCALIDAD DE ALLPACHACA, DISTRITO DE CHIARA - HUAMANGA - AYACUCHO"

FECHA: FEBRERO-2016
VECES

1.00
1.00
1.00
1.00

METRADOS
ANCHO

LARGO

158.73
257.06
374.59
363.10

ALTO

PARCIAL

0.06
0.06
0.06
0.06

TOTAL

9.52
15.42
22.48
21.79
998.44

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

293.61
122.65
117.35
117.77
117.89
117.21
149.50
215.04
91.59
158.73
257.06
374.59
363.10

0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40

117.44
49.06
46.94
47.11
47.16
46.88
59.80
86.02
36.64
63.49
102.82
149.84
145.24
380.70

99.00
42.00
40.00
40.00
40.00
40.00
51.00
73.00
32.00
54.00
87.00
126.00
122.00

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45

44.55
18.90
18.00
18.00
18.00
18.00
22.95
32.85
14.40
24.30
39.15
56.70
54.90

AREA
1.00
1.00
1.00

9.28
10.70
7.64

18.97
0.17
0.17
0.17

1.58
1.82
1.30

OS DE OBRA " PAVIMENTO RIGIDO"

LLES DE LA LOCALIDAD DE ALLPACHACA, DISTRITO DE CHIARA - HUAMANGA - AYACUCHO"

FECHA: FEBRERO-2016
VECES

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

LARGO

8.78
9.48
7.44
7.18
6.42
7.24
7.02
7.41
7.50
15.47

METRADOS
ANCHO

ALTO

PARCIAL

0.17
0.17
0.17
0.17
0.17
0.17
0.17
0.17
0.17
0.17

TOTAL

1.49
1.61
1.26
1.22
1.09
1.23
1.19
1.26
1.28
2.63
35.80

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

18.93
21.86
16.75
18.64
19.01
17.15
15.94
14.69
16.75
16.50
16.59
16.50
29.38

0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15

2.84
3.28
2.51
2.80
2.85
2.57
2.39
2.20
2.51
2.48
2.49
2.48
4.41

8,395.17
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00

125.05
123.63
125.29
115.16
122.65
117.38
117.77
117.89
119.09
165.17
320.09

375.15
370.89
375.87
345.48
367.95
352.14
353.31
353.67
357.27
495.51
960.27

OS DE OBRA " PAVIMENTO RIGIDO"

LLES DE LA LOCALIDAD DE ALLPACHACA, DISTRITO DE CHIARA - HUAMANGA - AYACUCHO"

FECHA: FEBRERO-2016
VECES

3.00
3.00
3.00
3.00

METRADOS
ANCHO

LARGO

160.82
267.86
401.63
398.91

ALTO

PARCIAL

TOTAL

482.46
803.58
1,204.89
1,196.73

600.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00

8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00

2.50
2.50
2.50
2.50
2.50
2.50
2.50
2.50
2.50
2.50
2.50
2.50
2.50
2.50
2.50

40.00
40.00
40.00
40.00
40.00
40.00
40.00
40.00
40.00
40.00
40.00
40.00
40.00
40.00
40.00

60.00

60.00

60.00

10.00

10.00

10.00

5.00

5.00

5.00
18,526.47

1.00
1.00
1.00
1.00

63.17
60.93
61.68
57.05

8.60
7.45
7.45
7.45

543.26
453.96
459.51
425.02

OS DE OBRA " PAVIMENTO RIGIDO"

LLES DE LA LOCALIDAD DE ALLPACHACA, DISTRITO DE CHIARA - HUAMANGA - AYACUCHO"

FECHA: FEBRERO-2016
VECES

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

LARGO

126.91
125.03
163.72
163.72
186.85
64.02
134.54
202.06
205.11

METRADOS
ANCHO

8.40
10.40
16.10
14.20
14.50
10.50
7.80
11.80
12.20

ALTO

PARCIAL

TOTAL

1,066.02
1,300.34
2,635.94
2,324.87
2,709.25
672.20
1,049.42
2,384.31
2,502.37

1.00

1.00

1.00

1.00

1.00

1.00

MUNICIPALIDAD DISTRITA

HOJA DE METRADOS DE OBRA " MEJOR


Proyecto

CONSTRUCCION DE PISTAS Y VEREDAS EN 09 CALLES DE LA LOCALID

Ubicacin : Dist: CHIARA; Prov:HUAMANGA; Regin; AYACUCHO


Proyectista :
PARTIDA
02.06.00

DESCRIPCION
TRAZO NIVELES Y REPLANTEO
PV4

UND.
m2

PV5

PV30
01.00.00 CORTE A NIVEL DE MEJORAMIENTO
01.01.00 CORTE DE LA SUB RASANTE DE LA SUB BASE

01.02.00 ELIMINACION DEL CORTE DE LA SUB RASANTE D

01.02.00 CONFORMACION Y COMPACTACION DEL MEJOR

04.01.00 PAVIMENTO RIGIDO


PERFILADO Y COMPACTACION DE LA
04.01.01
SUBRASANTE DE P. R.
DEDUCTIVOS
PV4

m2

PV5

PV30

04.01.02 CONFORMACION Y COMPACTACION DE BASE GR


PV4
PV5

m2

PV30
04.01.03

ENCOFRADO Y DESENCOFRADO DE PAVIMENTO


RIGIDO
PV4

m2

PV5

PV30

04.01.04

CONCRETO FC=210 KG/CM2 EN P.R. E=0.20m


CALZADA
DEDUCTIVOS
PV4

m2

PV5

PV30

04.01.05 CURADO DE CONCRETO


PV4

m2

PV5

PV30
04.01.06

JUNTAS ASFALTICAS DE CONSTRUCCION Y


DILATACION (d)
Longitudinal
PV4

PV5

PV30
04.01.07 JUNTAS ASFALTICAS DE CONTRACCION (d)
PV4
PV5

PV30

ACERO LISO PARA PASADORES


04.01.08 LONGITUDINALES Y TRANSVERSALES
PV-01
PV-02
PV-03
PV-04
PV-05
PV-06
PV-07
PV-08
PV-09
PV-10
PV-11
PV-12
PV-13
PV-14
PV-15
PV-16
PV-17
PV-18
PV-19
PV-20
PV-21
PV-22
PV-23
PV-24
PV-25
PV-26
PV-27
PV-28
PV-29
PV-30
PV-31
PV-32
PV-33
BOCACALLES
BC-01
BC-02
BC-03
BC-04
BC-05
BC-06
05.00.00 VEREDAS DE CONCRETO
05.01.00 PERFILADO Y COMPACTADO DE LA SUBRASANTE

Kg
PESO
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55

m2

V-08
05.02.00 CONFORMACION Y COMPACTACION DE BASE GRA m2
V-08
05.03.00 ENCOFRADO Y DESENCOFRADO DE VEREDAS
V-08
TRANSVERSAL
V-08

m2

05.06.00 CONCRETO FC=175 KG/CM2 EN VEREDAS, E=0.


V-08

m2

05.09.00 CURADO DEL CONCRETO EN VEREDAS,


V-08

m2

05.10.00 BRUADO EN VEREDAS DE CONCRETO


V-08

ml

05.11.00 JUNTAS ASFALTICAS EN VEREDAS E=1"


V-08

ml

NICIPALIDAD DISTRITAL DE CHIARA

DOS DE OBRA " MEJORAMIENTO PARA SUB BASE"

ALLES DE LA LOCALIDAD DE ALLPACHACA, DISTRITO DE CHIARA - HUAMANGA - AYACUCHO

FECHA: DICIEMBRE-2016
VECES

LARGO

METRADOS
ANCHO
ALTO

92.80
8.50
141.27
6.65
49.18
14.40

2.00
2.00
1.00
1.00
1.00
5.75

PARCIAL
185.60
17.00
141.27
6.65
49.18
82.80

FACTOR
1.00

VER CORTE

V=

96.50

96.50

1.30

VER CORTE

V=

96.50

125.45

1.00

VER CORTE

V=

96.50

96.50

92.80
8.50
141.27
6.65
49.18
14.40

2.00
2.00
1.00
1.00
1.00
5.75

185.60
17.00
141.27
6.65
49.18
82.80

92.80
8.50
141.27
6.65
49.18

2.00
2.00
1.00
1.00
1.00

185.60
17.00
141.27
6.65
49.18

14.40

2.00
2.00
2.00
2.00
2.00
2.00

5.75

2.00
2.00
1.00
1.00
1.00
5.75

82.80

0.20
0.20
0.20
0.20
0.20
0.20

0.80
0.80
0.40
0.40
0.40
2.30

92.80
8.50
141.27
6.65
49.18
14.40

2.00
2.00
1.00
1.00
1.00
5.75

185.60
17.00
141.27
6.65
49.18
82.80

92.80
8.50
141.27
6.65
49.18
14.40

2.00
2.00
1.00
1.00
1.00
5.75

185.60
17.00
141.27
6.65
49.18
82.80

2.00
2.00
2.00
2.00
2.00
2.00

2.00
2.00
1.00
1.00
1.00
5.75

4.00
4.00
2.00
2.00
2.00
11.50

18.00
2.00
32.00
2.00
12.00
4.00

2.00
2.00
1.00
1.00
1.00
5.75

36.00
4.00
32.00
2.00
12.00
23.00


5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"

N ELEM. IGUALES NPZAS X EL LONG X PZA LONG.


3.00
20.00
0.40
24.00
7.00
31.00
0.40
86.80
3.00
31.00
0.40
37.20
11.00
30.00
0.40
132.00
4.00
31.00
0.40
49.60
3.00
19.00
0.40
22.80
6.00
24.00
0.40
57.60
3.00
24.00
0.40
28.80
9.00
24.00
0.40
86.40
3.00
24.00
0.40
28.80
6.00
24.00
0.40
57.60
8.00
23.00
0.40
73.60
7.00
22.00
0.40
61.60
3.00
26.00
0.40
31.20
7.00
34.00
0.40
95.20
3.00
29.00
0.40
34.80
9.00
29.00
0.40
104.40
4.00
23.00
0.40
36.80
3.00
18.00
0.40
21.60
16.00
23.00
0.40
147.20
2.00
20.00
0.40
16.00
6.00
20.00
0.40
48.00
7.00
12.00
0.40
33.60
7.00
21.00
0.40
58.80
3.00
20.00
0.40
24.00
7.00
20.00
0.40
56.00
2.00
13.00
0.40
10.40
15.00
13.00
0.40
78.00
8.00
12.00
0.40
38.40
8.00
16.00
0.40
51.20
2.00
16.00
0.40
12.80
7.00
16.00
0.40
44.80
7.00
14.00
0.40
39.20
1.00
1.00
1.00
1.00
1.00
1.00

20.00
14.00
16.00
19.00
13.00
12.00

AREA

0.40
0.40
0.40
0.40
0.40
0.40

8.00
5.60
6.40
7.60
5.20
4.80

1.00

112.85

112.85

1.00

AREA
112.85

112.85

1.00

95.12

0.10

9.51

7.00

1.20

0.10

0.84

AREA
112.85

1.00

112.85

1.00

AREA
112.85

112.85

1.00

16.79

16.79

7.00

1.20

8.40

AMANGA - AYACUCHO"

RE-2016
TOTAL
482.50

96.50
125.45
96.50

482.50

482.50

5.10

482.50

482.50

25.50

109.00

2,738.54
KG
37.20
134.54
57.66
204.60
76.88
35.34
89.28
44.64
133.92
44.64
89.28
114.08
95.48
48.36
147.56
53.94
161.82
57.04
33.48
228.16
24.80
74.40
52.08
91.14
37.20
86.80
16.12
120.90
59.52
79.36
19.84
69.44
60.76
12.40
8.68
9.92
11.78
8.06
7.44

112.85

112.85

10.35

112.85

112.85

16.79

8.40

MUNICIPALIDAD

HOJA DE METRADOS DE OBRA


Proyecto
Ubicacin
Proyectista
PARTIDA
02.06.00

01.00.00
01.01.00
01.02.00
01.02.00
01.02.00
04.01.00
04.01.01

04.01.02

04.01.03

04.01.04

04.01.05

04.01.06

04.01.07

07.00.00
07.02.00
07.02.01

07.02.02

MUNICIPALIDAD DISTRITAL

HOJA DE METRADOS DE OBRA " MEJORAM

CONSTRUCCION DE PISTAS Y VEREDAS EN 09 CALLES DE LA LOCALIDAD


: Dist: CHIARA; Prov:HUAMANGA; Regin; AYACUCHO
:
DESCRIPCION
TRAZO NIVELES Y REPLANTEO
PV-23
PV-29
PV-33
CORTE A NIVEL DE MEJORAMIENTO
CORTE A NIVEL DE MEJORAMIENTO
CONFORMACION Y COMPACTACION DEL MEJORAMIENTO SUB RA
CONFORMACION Y COMPACTACION DE ENROCADO DE SUB RASAN
ELIMINACION DEL CORTE DE MEJORAMINETO A NIVEL DE SUB RS
PAVIMENTO RIGIDO
PERFILADO Y COMPACTACION DE LA SUBRASANTE DE P. R.
ADICIONALES
PV-23
PV-29
PV-33

CONFORMACION Y COMPACTACION DE BASE GRANULAR E=0.20m


ADICIONALES
PV-23
PV-29
PV-33
ENCOFRADO Y DESENCOFRADO DE PAVIMENTO RIGIDO
PV-23
PV-29
PV-33

CONCRETO FC=210 KG/CM2 EN P.R. E=0.20m CALZADA


DEDUCTIVOS
PV-23
PV-29
PV-33
CURADO DE CONCRETO
PV-23
PV-29
PV-33
JUNTAS ASFALTICAS DE CONSTRUCCION Y DILATACION (d)
PV-23
PV-29
PV-33
JUNTAS ASFALTICAS DE CONTRACCION (d)
PV-23
PV-29
PV-33
OBRAS DE ARTE
SISTEMA DE EVACUACION DE AGUAS PLUVIALES
BADENES
CONCRETO FC=210 KG/CM2
BD-01
BD-02
BD-03
BD-04
BD-05
BD-06
BD-07
BD-08
BD-09
BD-10
BD-11
BD-12
BD-13
ENCOFRADO Y DESENCOFRADO
BD-01
BD-02
BD-03
BD-04

BD-05
BD-06
BD-07
BD-08
BD-09
BD-10
BD-11
BD-12
BD-13

NICIPALIDAD DISTRITAL DE CHIARA

DOS DE OBRA " MEJORAMIENTO PARA SUB BASE"

ALLES DE LA LOCALIDAD DE ALLPACHACA, DISTRITO DE CHIARA - HUAMANGA - AYACUCHO

FECHA: DICIEMBRE-2016
UND.
m2

VECES

LARGO

METRADOS
ANCHO
ALTO

58.65
57.30
59.12

0.45
0.45
0.45

FACTOR
1.00

VER CORTE

V=

4,049.22

1.00

VER CORTE

V=

2,980.95

1.00

VER CORTE

V=

1,068.27

1.30

VER CORTE

V=

4,049.22

m2
58.65
57.30
59.12

0.45
0.45
0.45

58.65
57.30
59.12

0.45
0.45
0.45

m2

m2
2.00
2.00
2.00

0.45
0.45
0.45

0.20
0.20
0.20

m2
58.65
57.30
59.12

0.45
0.45
0.45

58.65
57.30
59.12

0.45
0.45
0.45

m2

m
2.00
2.00
2.00

0.45
0.45
0.45

13.00
12.00
12.00

0.45
0.45
0.45

m3
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA

10.28
1.55
9.25
6.72
0.87
3.96
0.72
1.28
3.45
0.63
1.39
0.33
9.07

0.17
0.17
0.17
0.17
0.17
0.17
0.17
0.17
0.17
0.17
0.17
0.17
0.17

m2
8.71
1.70
15.59
11.26

0.15
0.15
0.15
0.15

3.64
6.08
2.52
3.26
5.03
0.25
2.03
0.55
14.75

0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15

RA - HUAMANGA - AYACUCHO"

ECHA: DICIEMBRE-2016
PARCIAL

TOTAL
78.78

26.39
25.79
26.60

4,049.22

4,049.22

2,980.95

2,980.95

1,068.27

1,068.27

5,263.98

5,263.98

78.78
26.39
25.79
26.60

78.78
26.39
25.79
26.60
0.54
0.18
0.18
0.18

78.78
26.39
25.79
26.60
78.78
26.39
25.79
26.60
2.70
0.90
0.90
0.90
185.50
34.19
151.31

5.22

1.75
0.26
1.57
1.14
0.15
0.67
0.12
0.22
0.59
0.11
0.24
0.06
1.54
6.72
1.31
0.26
2.34
1.69

0.55
0.91
0.38
0.49
0.75
0.04
0.30
0.08
2.21

MUNICIPALIDAD DISTRITA

HOJA DE METRADOS DE OBRA " MEJOR


Proyecto

CONSTRUCCION DE PISTAS Y VEREDAS EN 09 CALLES DE LA LOCALID

Ubicacin : Dist: CHIARA; Prov:HUAMANGA; Regin; AYACUCHO


Proyectista :
PARTIDA
02.06.00

DESCRIPCION
TRAZO NIVELES Y REPLANTEO
DEDUTIVOS
PV4

UND.
m2

PV5

PV30
ADICIONALES
PV-23
PV-29
PV-33
HACIA EL JARDIN
01.00.00 CORTE A NIVEL DE MEJORAMIENTO
01.01.00 CORTE DE LA SUB RASANTE DE LA SUB BASE

01.02.00 ELIMINACION DEL CORTE DE LA SUB RASANTE D

01.02.00 CONFORMACION Y COMPACTACION DEL MEJOR

04.01.00 PAVIMENTO RIGIDO


PERFILADO Y COMPACTACION DE LA
04.01.01
SUBRASANTE DE P. R.
DEDUCTIVOS
PV4
PV5

PV30
ADICIONALES
PV-23

m2

PV-29
PV-33
HACIA EL JARDIN
04.01.02 CONFORMACION Y COMPACTACION DE BASE GR
PV4

m2

PV5

PV30
ADICIONALES
PV-23
PV-29
PV-33
HACIA EL JARDIN
04.01.03

ENCOFRADO Y DESENCOFRADO DE PAVIMENTO


RIGIDO
DEDCUTIVOS
PV4

m2

PV5

PV30
ADICIONALES
PV-23
PV-29
PV-33
HACIA EL JARDIN

04.01.04

CONCRETO FC=210 KG/CM2 EN P.R. E=0.20m


CALZADA
DEDUCTIVOS
PV4
PV5

PV30
DEDUCTIVOS
PV-23
PV-29
PV-33
HACIA EL JARDIN

m2

04.01.05 CURADO DE CONCRETO


DEDUCTIVO
PV4

m2

PV5

PV30
ADICIONALES
PV-23
PV-29
PV-33
HACIA EL JARDIN
04.01.06

JUNTAS ASFALTICAS DE CONSTRUCCION Y


DILATACION (d)
DEDUCTIVO
PV4

PV5

PV30
ADICIONAL
PV-23
PV-29
PV-33
HACIA EL JARDIN
04.01.07 JUNTAS ASFALTICAS DE CONTRACCION (d)
DEDUCTIVO
PV4

PV5

PV30
ADICONALES
PV-23
PV-29
PV-33
HACIA EL JARDIN
ACERO LISO PARA PASADORES
04.01.08 LONGITUDINALES Y TRANSVERSALES

Kg
PESO

PV-01
PV-02
PV-03
PV-04
PV-05
PV-06
PV-07
PV-08
PV-09
PV-10
PV-11
PV-12
PV-13
PV-14
PV-15
PV-16
PV-17
PV-18
PV-19
PV-20
PV-21
PV-22

1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55

PV-23
PV-24
PV-25
PV-26
PV-27
PV-28
PV-29
PV-30
PV-31
PV-32
PV-33
BOCACALLES
BC-01
BC-02
BC-03
BC-04
BC-05
BC-06

05.00.00 VEREDAS DE CONCRETO


05.01.00 PERFILADO Y COMPACTADO DE LA SUBRASANTE
DEDUCTIVO
V-27
V-28
V-08
ADICIONAL
HACIA EL JARDIN

1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55

m2

05.02.00 CONFORMACION Y COMPACTACION DE BASE GRA m2


V-27
V-28
V-08
ADICIONAL
HACIA EL JARDIN
05.03.00 ENCOFRADO Y DESENCOFRADO DE VEREDAS
DEDUCTIVO
V-27
V-28
V-08
TRANSVERSAL
V-08
ADICIONAL
HACIA EL JARDIN
TRANSVERSAL

m2

05.06.00 CONCRETO FC=175 KG/CM2 EN VEREDAS, E=0.


DEDUTIVO
V-27
V-28
V-08
ADICIONAL
HACIA EL JARDIN

m2

05.09.00 CURADO DEL CONCRETO EN VEREDAS,


V-27
V-28
V-08
ADICIONAL
HACIA EL JARDIN

m2

05.10.00 BRUADO EN VEREDAS DE CONCRETO


DEDUCTIVO
V-27
V-28
V-08
ADICIONAL
HACIA EL JARDIN

ml

05.11.00 JUNTAS ASFALTICAS EN VEREDAS E=1"


DEDUCTIVO
V-27
V-28
V-08
ADICIONAL
HACIA EL JARDIN

ml

NICIPALIDAD DISTRITAL DE CHIARA

DOS DE OBRA " MEJORAMIENTO PARA SUB BASE"

ALLES DE LA LOCALIDAD DE ALLPACHACA, DISTRITO DE CHIARA - HUAMANGA - AYACUCHO

FECHA: DICIEMBRE-2016
VECES

LARGO

METRADOS
ANCHO
ALTO

1.00
1.00
1.00
1.00
1.00
1.00

92.80
8.50
141.27
6.65
49.18
14.40

2.00
2.00
1.00
1.00
1.00
5.75

1.00
1.00
1.00
1.00

58.65
57.30
59.12
40.08

0.65
0.65
0.65
9.20

PARCIAL

185.60
17.00
141.27
6.65
49.18
82.80
38.12
37.25
38.43
368.71

FACTOR
1.00

VER CORTE

V=

0.00

0.00

1.30

VER CORTE

V=

0.00

0.00

1.00

VER CORTE

V=

0.00

0.00

1.00
1.00
1.00
1.00
1.00
1.00

92.80
8.50
141.27
6.65
49.18
14.40

2.00
2.00
1.00
1.00
1.00
5.75

1.00

58.65

0.65

185.60
17.00
141.27
6.65
49.18
82.80
38.12

1.00
1.00
1.00

57.30
59.12
40.08

0.65
0.65
9.20

37.25
38.43
368.71

1.00
1.00
1.00
1.00
1.00
1.00

92.80
8.50
141.27
6.65
49.18
14.40

2.00
2.00
1.00
1.00
1.00
5.75

1.00
1.00
1.00
1.00

58.65
57.30
59.12
40.08

0.65
0.65
0.65
9.20

2.00
2.00
2.00
2.00
2.00
2.00

2.00
2.00
1.00
1.00
1.00
5.75

0.20
0.20
0.20
0.20
0.20
0.20

2.00
2.00
2.00
6.00
3.00

0.65
0.65
0.65
9.20
40.08

0.20
0.20
0.20
0.20
0.20

1.00
1.00
1.00
1.00
1.00
1.00

92.80
8.50
141.27
6.65
49.18
14.40

2.00
2.00
1.00
1.00
1.00
5.75

1.00
1.00
1.00
1.00

58.65
57.30
59.12
40.08

0.65
0.65
0.65
9.20

185.60
17.00
141.27
6.65
49.18
82.80
38.12
37.25
38.43
368.71

0.80
0.80
0.40
0.40
0.40
2.30
0.26
0.26
0.26
11.04
24.05

185.60
17.00
141.27
6.65
49.18
82.80
38.12
37.25
38.43
368.71

1.00
1.00
1.00
1.00
1.00
1.00

92.80
8.50
141.27
6.65
49.18
14.40

2.00
2.00
1.00
1.00
1.00
5.75

1.00
1.00
1.00
1.00

58.65
57.30
59.12
40.08

0.65
0.65
0.65
9.20

2.00
2.00
2.00
2.00
2.00
3.00

2.00
2.00
1.00
1.00
1.00
14.40

2.00
2.00
2.00
5.00

0.65
0.65
0.65
9.20

- 18.00
2.00
- 32.00
2.00
- 12.00
4.00

2.00
2.00
1.00
1.00
1.00
5.75

13.00
12.00
12.00
9.00

0.65
0.65
0.65
9.20

185.60
17.00
141.27
6.65
49.18
82.80
38.12
37.25
38.43
368.71

4.00
4.00
2.00
2.00
2.00
43.20

1.30
1.30
1.30
46.00

N ELEM. IGUALES
NPZAS X ELEM.
LONG X PZA

36.00
4.00
32.00
2.00
12.00
23.00
8.45
7.80
7.80
82.80

LONG.

5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"

3.00
7.00
3.00
11.00
4.00
3.00
6.00
3.00
9.00
3.00
6.00
8.00
7.00
3.00
7.00
3.00
9.00
4.00
3.00
16.00
2.00
6.00

20.00
31.00
31.00
30.00
31.00
19.00
24.00
24.00
24.00
24.00
24.00
23.00
22.00
26.00
34.00
29.00
29.00
23.00
18.00
23.00
20.00
20.00

0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40

24.00
86.80
37.20
132.00
49.60
22.80
57.60
28.80
86.40
28.80
57.60
73.60
61.60
31.20
95.20
34.80
104.40
36.80
21.60
147.20
16.00
48.00

5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"

7.00
7.00
3.00
7.00
2.00
15.00
8.00
8.00
2.00
7.00
7.00

12.00
21.00
20.00
20.00
13.00
13.00
12.00
16.00
16.00
16.00
14.00

0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40

33.60
58.80
24.00
56.00
10.40
78.00
38.40
51.20
12.80
44.80
39.20

5/8"
5/8"
5/8"
5/8"
5/8"
5/8"

1.00
1.00
1.00
1.00
1.00
1.00

20.00
14.00
16.00
19.00
13.00
12.00

0.40
0.40
0.40
0.40
0.40
0.40

8.00
5.60
6.40
7.60
5.20
4.80

AREA
-

1.00
1.00
1.00

14.40
14.40
112.85

1.00

39.70

1.00
1.00
1.00

AREA
14.40
14.40
112.85

1.00

39.70

14.40
14.40
112.85
39.70

14.40
14.40
112.85
39.70

1.00
1.00
1.00

14.40
14.40
95.12

0.10 0.10 0.10 -

1.44
1.44
9.51

7.00

1.20

0.10 -

0.84

1.00
5.00

33.08
1.20

0.10
0.10

3.31
0.60

AREA
-

1.00
1.00
1.00

14.40
14.40
112.85

1.00

36.70

1.00
1.00
1.00

AREA
14.40
14.40
112.85

1.00

36.70

1.00
1.00
1.00

28.80
28.80
225.70

1.00

78.15

3.00
3.00
7.00

1.00
1.00
1.20

5.00

1.20

14.40
14.40
112.85
36.70

14.40
14.40
112.85
36.70

28.80
28.80
225.70
78.15

3.00
3.00
8.40
6.00

AMANGA - AYACUCHO"

RE-2016
TOTAL
0.00

0.00
0.00
0.00

0.00

0.00

30.77

0.00

0.00

7.30

2.15

2,738.54
KG

37.20
134.54
57.66
204.60
76.88
35.34
89.28
44.64
133.92
44.64
89.28
114.08
95.48
48.36
147.56
53.94
161.82
57.04
33.48
228.16
24.80
74.40

52.08
91.14
37.20
86.80
16.12
120.90
59.52
79.36
19.84
69.44
60.76
12.40
8.68
9.92
11.78
8.06
7.44

101.95

101.95

9.32

104.95

104.95

205.15

8.40

MUNICIPALIDAD DISTRITAL DE CHIARA

HOJA DE METRADOS DE OBRA "DEDUCTIVO"


Proyecto

CONSTRUCCION DE PISTAS Y VEREDAS EN 09 CALLES DE LA LOCALIDAD DE ALLPACHACA, DISTRITO DE CHIARA - HUAMANGA - AYACUCHO"

Ubicacin : Dist: CHIARA; Prov:HUAMANGA; Regin; AYACUCHO


Proyectista :
PARTIDA

DESCRIPCION

ACERO LISO PARA PASADORES


04.01.08 LONGITUDINALES Y TRANSVERSALES
PV-01
PV-02
PV-03
PV-04
PV-05
PV-06
PV-07
PV-08
PV-09
PV-10
PV-11
PV-12
PV-13
PV-14
PV-15
PV-16
PV-17
PV-18
PV-19
PV-20
PV-21
PV-22
PV-23
PV-24
PV-25
PV-26
PV-27
PV-28
PV-29
PV-30
PV-31
PV-32
PV-33
BOCACALLES
BC-01
BC-02
BC-03
BC-04
BC-05
BC-06

05.00.00 VEREDAS DE CONCRETO


05.01.00 PERFILADO Y COMPACTADO DE LA SUBRASANTE
DEDUCTIVO
V-27
V-28
V-08
ADICIONAL
HACIA EL JARDIN

UND.

LARGO

TOTAL

Kg

2,738.54

PESO
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55

5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"
5/8"

1.55
1.55
1.55
1.55
1.55
1.55

5/8"
5/8"
5/8"
5/8"
5/8"
5/8"

N ELEM. IGUALES
NPZAS X ELEM.
LONG X PZA
3.00
20.00
0.40
7.00
31.00
0.40
3.00
31.00
0.40
11.00
30.00
0.40
4.00
31.00
0.40
3.00
19.00
0.40
6.00
24.00
0.40
3.00
24.00
0.40
9.00
24.00
0.40
3.00
24.00
0.40
6.00
24.00
0.40
8.00
23.00
0.40
7.00
22.00
0.40
3.00
26.00
0.40
7.00
34.00
0.40
3.00
29.00
0.40
9.00
29.00
0.40
4.00
23.00
0.40
3.00
18.00
0.40
16.00
23.00
0.40
2.00
20.00
0.40
6.00
20.00
0.40
7.00
12.00
0.40
7.00
21.00
0.40
3.00
20.00
0.40
7.00
20.00
0.40
2.00
13.00
0.40
15.00
13.00
0.40
8.00
12.00
0.40
8.00
16.00
0.40
2.00
16.00
0.40
7.00
16.00
0.40
7.00
14.00
0.40
1.00
1.00
1.00
1.00
1.00
1.00

m2

20.00
14.00
16.00
19.00
13.00
12.00

LONG.
24.00
86.80
37.20
132.00
49.60
22.80
57.60
28.80
86.40
28.80
57.60
73.60
61.60
31.20
95.20
34.80
104.40
36.80
21.60
147.20
16.00
48.00
33.60
58.80
24.00
56.00
10.40
78.00
38.40
51.20
12.80
44.80
39.20

0.40
0.40
0.40
0.40
0.40
0.40

1.00
1.00
1.00

14.40
14.40
112.85

1.00

39.70

1.00
1.00
1.00

AREA
14.40
14.40
112.85

1.00

39.70

KG
37.20
134.54
57.66
204.60
76.88
35.34
89.28
44.64
133.92
44.64
89.28
114.08
95.48
48.36
147.56
53.94
161.82
57.04
33.48
228.16
24.80
74.40
52.08
91.14
37.20
86.80
16.12
120.90
59.52
79.36
19.84
69.44
60.76
12.40
8.68
9.92
11.78
8.06
7.44

8.00
5.60
6.40
7.60
5.20
4.80

AREA
-

05.02.00 CONFORMACION Y COMPACTACION DE BASE GRA m2


V-27
V-28
V-08
ADICIONAL
HACIA EL JARDIN
05.03.00 ENCOFRADO Y DESENCOFRADO DE VEREDAS
DEDUCTIVO
V-27
V-28
V-08
TRANSVERSAL
V-08
ADICIONAL
HACIA EL JARDIN

VECES

FECHA: DICIEMBRE-2016
METRADOS
ANCHO
ALTO
PARCIAL

101.95

101.95

9.32

14.40
14.40
112.85
39.70

14.40
14.40
112.85
39.70

m2
-

1.00
1.00
1.00

14.40
14.40
95.12

0.10 0.10 0.10 -

1.44
1.44
9.51

7.00

1.20

0.10 -

0.84

1.00

33.08

0.10

3.31

5.00

TRANSVERSAL

05.06.00 CONCRETO FC=175 KG/CM2 EN VEREDAS, E=0.


DEDUTIVO
V-27
V-28
V-08
ADICIONAL
HACIA EL JARDIN

m2

05.09.00 CURADO DEL CONCRETO EN VEREDAS,


V-27
V-28
V-08
ADICIONAL
HACIA EL JARDIN

m2

05.10.00 BRUADO EN VEREDAS DE CONCRETO


DEDUCTIVO
V-27
V-28
V-08
ADICIONAL
HACIA EL JARDIN

ml

05.11.00 JUNTAS ASFALTICAS EN VEREDAS E=1"


DEDUCTIVO
V-27
V-28
V-08
ADICIONAL
HACIA EL JARDIN

ml

1.20

0.10

0.60

AREA
-

1.00
1.00
1.00

14.40
14.40
112.85

1.00

36.70

1.00
1.00
1.00

AREA
14.40
14.40
112.85

1.00

36.70

1.00
1.00
1.00

28.80
28.80
225.70

1.00

78.15

3.00
3.00
7.00

1.00
1.00
1.20

5.00

1.20

104.95

104.95

205.15

8.40

14.40
14.40
112.85
36.70

14.40
14.40
112.85
36.70

28.80
28.80
225.70
78.15

3.00
3.00
8.40
6.00

MUNICIPALIDA

HOJA DE METRADOS DE OBR


Proyecto
Ubicacin
Proyectista
PARTIDA
01.00.00
01.01.00

01.02.00

01.02.00
01.02.00
04.01.07

06.00.00
06.01.00
06.01.01

06.01.02

06.01.03

06.01.04

06.01.05

07.01.00
07.01.01

07.01.02

07.01.03

07.01.04

07.02.00
07.02.01

07.02.02

07.02.02

MUNICIPALIDAD DISTRITA

HOJA DE METRADOS DE OBRA " MEJOR

CONSTRUCCION DE PISTAS Y VEREDAS EN 09 CALLES DE LA LOCALIDA


: Dist: CHIARA; Prov:HUAMANGA; Regin; AYACUCHO
:
DESCRIPCION
CORTE A NIVEL DE MEJORAMIENTO
CORTE A NIVEL DE MEJORAMIENTO
hacia el jardin
CONFORMACION Y COMPACTACION DEL MEJORAMIENTO SUB RASAN
hacia el jardin
CONFORMACION Y COMPACTACION DE ENROCADO DE SUB RASANTE
ELIMINACION DEL CORTE DE MEJORAMINETO A NIVEL DE SUB RSANT
JUNTAS ASFALTICAS DE CONTRACCION (d)
DEDUCTIVO
PV4
PV5

PV30
ADICONALES
calle 5 km 0+000 @0+187
calle 16 0+000 @ 0+213
calle 4 km 0+000 @ 0+164
calle 14 km 0+000 @ 0+205
PV-23
PV-29
PV-33
HACIA EL JARDIN
SARDINELES DE CONCRETO
SARDINELES PERALTADOS
ENCOFRADO Y DESENCOFRADO PARA SARDINELES PERALTADOS
DEDUCTIVO

CALLE 2
ADICIONAL
HACIA EL JARDIN
CONCRETO FC=175 KG/CM2 EN SARDINEL PERALTADO
DEDUCTIVO
AVENIDA -1 S/N (Tramo 1)
ADICIONAL
HACIA EL JARDIN
CURADO DEL CONCRETO EN SARDINEL PERALTADO
DEDUCTIVO
AVENIDA -1 S/N (Tramo 1)
ADICIONAL
HACIA EL JARDIN
JUNTAS ASFALTICAS EN SARDINELES PERALTADOS E=1"
DEDUCTIVO
AVENIDA -1 S/N (Tramo 1)
ADICIONAL
HACIA EL JARDIN
ACERO DE REFUERZO FY= 4200 kg/cm2
DEDUCTIVO
ADICIONAL

CUNETAS DE CONCRETO
ENCOFRADO Y DESENCOFRADO EN CUNETAS
DEDUTIVO
CALLE2
CALLE 5
CALLE -06 S/N
CALLE 4
ADICONALES
AVENIDA -1

HACIA EL JARDIN

CONCRETO FC=175 KG/CM2 EN CUNETAS


DEDUCTIVOS
CALLE2

CALLE 5
CALLE -06 S/N
CALLE 4
ADICONALES
AVENIDA -1

HACIA EL JARDIN

CURADO DE CONCRETO EN CUNETAS


DEDUCTIVOS
CALLE2
CALLE 5
CALLE -06 S/N
CALLE 4
ADICONALES
AVENIDA -1

HACIA EL JARDIN

JUNTAS ASFALTICAS EN CUNETAS E=1"


ADICONALES
DEDUCTIVOS
CALLE2
CALLE 5
CALLE -06 S/N
CALLE 4
ADICONALES
AVENIDA -1

HACIA EL JARDIN

BADENES
CONCRETO FC=210 KG/CM2
ADICIONAL
BD-01
BD-02
BD-03

BD-04
BD-05
BD-06
BD-07
BD-08
BD-09
BD-10
BD-11
BD-12
BD-13
HACIA EL JARDIN
ENCOFRADO Y DESENCOFRADO
ADICIONAL
BD-01
BD-02
BD-03
BD-04
BD-05
BD-06
BD-07
BD-08
BD-09
BD-10
BD-11
BD-12
BD-13
HACIA EL JARDIN
MURO DE CONTENCION
TRAZO, NIVELACION Y REPLANTEO..

EXCAVACION MASIVA PARA MURO DE CONTENCION

CONCRETO SIMPLE
CONCRETO PARA SOLADOS
solado en muro de contecion
CONCRETO ARMADO
CONCRETO f'c=175 kg/cm2 PARA MURO DE CONTENCION

ENCOFRADO Y DESENCOFRADO NORMAL EN MURO DE CONTENCION

ACERO fy=4200 kg/cm2 GRADO 60 en MURO DE CONTENCION


acero vertical
acero longitudinal
ACERO EN BASE
acero longitudinal
acero transversal
CURADO DE MURO DE CONTENCION

CIPALIDAD DISTRITAL DE CHIARA

OS DE OBRA " MEJORAMIENTO PARA SUB BASE"

LLES DE LA LOCALIDAD DE ALLPACHACA, DISTRITO DE CHIARA - HUAMANGA - AYACUCHO"

FECHA: DICIEMBRE-2016
UND.

VECES

FACTOR
1.00

1.00

LARGO

METRADOS
ANCHO
ALTO

VER CORTE
40.08

V=

VER CORTE
40.08

V=

9.2

4,049.22
0.20

9.2

2,980.95
0.20

1.00

VER CORTE

V=

1,068.27

1.30

VER CORTE

V=

4,122.96

m2

- 18.00
2.00
- 32.00
2.00
- 12.00
4.00

2.00
2.00
1.00
1.00
1.00
5.75

2.00
2.00
2.00
2.00
13.00
12.00
12.00
9.00

187.00
213.00
164.00
205.00
0.65
0.65
0.65
9.20

2.00

14.40

0.60

2.00

33.08

0.60

1.00

14.40

0.15

0.60

1.00

33.08

0.15

0.60

1.00

14.40

0.60

1.00

33.08

0.60

m3
-

m2
-

ml
-

4.00

0.60

5.00

0.60

kg
8.00
ESTRIB. - 72.00
8.00
ESTRIB. 165.00

14.40
0.62
33.08
0.62

DE ACERO
0.56
0.56
0.56
0.56

m2
-

2.00
1.00
1.00
1.00

14.40
56.23
61.56
58.67

0.40
0.40
0.40
0.40

1.00
1.00
1.00
1.00
1.00

58.65
57.30
59.12
33.08
40.08

0.40
0.40
0.40
0.40
0.40

m3
-

2.00

14.40

AREA
0.06

1.00
1.00
1.00

56.23
61.56
58.67

0.06
0.06
0.06

1.00
1.00
1.00
1.00
1.00

58.65
57.30
59.12
33.08
40.08

0.06
0.06
0.06
0.06
0.06

2.00
1.00
1.00
1.00

14.40
56.23
61.56
58.67

0.40
0.40
0.40
0.40

1.00
1.00
1.00
1.00
1.00

58.65
57.30
59.12
33.08
40.08

0.40
0.40
0.40
0.40
0.40

m2
-

ml

4.00
- 15.00
- 16.00
- 15.00

0.40
0.40
0.40
0.40

15.00
15.00
15.00
5.00
7.00

0.40
0.40
0.40
0.40
0.40

m3
AREA
AREA
AREA

10.28
1.55
9.25

0.17
0.17
0.17

AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA

6.72
0.87
3.96
0.72
1.28
3.45
0.63
1.39
0.33
9.07
8.40

0.17
0.17
0.17
0.17
0.17
0.17
0.17
0.17
0.17
0.17
0.17

m2

8.71
1.70
15.59
11.26
3.64
6.08
2.52
3.26
5.03
0.25
2.03
0.55
14.75
14.00

0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15

m2
26.90

1.20

26.90
26.90

0.65
0.55

m3
1.98
0.58

m3
26.9

1.2

26.9

area
0.56

m3

0.07

m2
2
2 area

26.9

1.9
0.56

kg

veces

longitud
89
6

DE ACERO
1.9
0.56
26.8
0.56

7
89

26.8
1.23

0.56
0.56

26.9
26.9

1
1.6

m2
2

A - HUAMANGA - AYACUCHO"

ECHA: DICIEMBRE-2016
PARCIAL

TOTAL

4,049.22
73.75

4,122.96

2,980.95
73.75

3,054.69

1,068.27

1,068.27

5,359.85

5,359.85
1,535.85

36.00
4.00
32.00
2.00
12.00
23.00
374.00
426.00
328.00
410.00
8.45
7.80
7.80
82.80

22.42

17.28
39.70
1.68

1.30
2.98
11.21

8.64
19.85
0.60

2.40
3.00
115.98

64.51
25.00
148.20
57.29

17.19
-

11.52
22.49
24.62
23.47

23.46
22.92
23.65
13.23
16.03
2.58
-

1.73

3.37
3.69
3.52
3.52
3.44
3.55
1.98
2.40
17.19

11.52
22.49
24.62
23.47

23.46
22.92
23.65
13.23
16.03

2.80
-

1.60
6.00
6.40
6.00

6.00
6.00
6.00
2.00
2.80

6.65
1.75
0.26
1.57

1.14
0.15
0.67
0.12
0.22
0.59
0.11
0.24
0.06
1.54
1.43
8.82

1.31
0.26
2.34
1.69
0.55
0.91
0.38
0.49
0.75
0.04
0.30
0.08
2.21
2.10

32.28
32.28
43.20
34.62
8.58
2.26
2.26
15.06
15.06
103.34
102.22
1.12

351.10
94.70
90.05
105.06
61.30
69.94
26.90
43.04

MUNICIPALIDAD DISTRITAL DE CHIARA

HOJA DE METRADOS DE OBRA " ADICIONAL"


Proyecto

CONSTRUCCION DE PISTAS Y VEREDAS EN 09 CALLES DE LA LOCALIDAD DE ALLPACHACA, DISTRITO DE CHIARA - HUAMANGA - AYACUCHO"

Ubicacin : Dist: CHIARA; Prov:HUAMANGA; Regin; AYACUCHO


Proyectista :
PARTIDA

DESCRIPCION

UND.

VECES

CORTE A NIVEL DE MEJORAMIENTO


hacia el jardin

FACTOR
1.00

CONFORMACION Y COMPACTACION DEL MEJORAMIENTO SUB RASA


hacia el jardin

1.01.03

CONFORMACION Y COMPACTACION DE ENROCADO DE SUB RASANTE

1.01.04

ELIMINACION DEL CORTE DE MEJORAMINETO A NIVEL DE SUB RSAN

2
2.01

JUNTAS ASFALTICAS
JUNTAS ASFALTICAS DE CONTRACCION (d)
DEDUCTIVO
PV4

1
1.01

MEJORAMIENTO DE BASE
MOVIMIENTO DE TIERRAS

1.01.01

1.01.02

3
3.01

3.02

3.03

3.04

3.05

4
4.01

CURADO DEL CONCRETO EN SARDINEL PERALTADO


DEDUCTIVO
AVENIDA -1 S/N (Tramo 1)
ADICIONAL
HACIA EL JARDIN

m2

JUNTAS ASFALTICAS EN SARDINELES PERALTADOS E=1"


DEDUCTIVO
AVENIDA -1 S/N (Tramo 1)
ADICIONAL
HACIA EL JARDIN

ml

CUNETAS DE CONCRETO
ENCOFRADO Y DESENCOFRADO EN CUNETAS
DEDUTIVO
CALLE2
CALLE 5

4,122.96

2,980.95
0.20

2,980.95
73.75

3,054.69

9.2
V=

1,068.27

1,068.27

1,068.27

V=

4,122.96

5,359.85

5,359.85

VER CORTE
40.08

V=

1.00

VER CORTE

1.30

VER CORTE

1,535.85
- 18.00
2.00
- 32.00
2.00
- 12.00
4.00

2.00
2.00
1.00
1.00
1.00
5.75

2.00
2.00
2.00
2.00
13.00
12.00
12.00
9.00

187.00
213.00
164.00
205.00
0.65
0.65
0.65
9.20

36.00
4.00
32.00
2.00
12.00
23.00
374.00
426.00
328.00
410.00
8.45
7.80
7.80
82.80
22.42

m3

ADICIONAL

4,049.22
73.75

m2

CONCRETO FC=175 KG/CM2 EN SARDINEL PERALTADO


DEDUCTIVO
AVENIDA -1 S/N (Tramo 1)
ADICIONAL
HACIA EL JARDIN

ACERO DE REFUERZO FY= 4200 kg/cm2


DEDUCTIVO

4,049.22
0.20

V=

1.00

TOTAL

9.2

VER CORTE
40.08

PV5

PV30
ADICONALES
calle 5 km 0+000 @0+187
calle 16 0+000 @ 0+213
calle 4 km 0+000 @ 0+164
calle 14 km 0+000 @ 0+205
PV-23
PV-29
PV-33
HACIA EL JARDIN
SARDINELES DE CONCRETO
ENCOFRADO Y DESENCOFRADO PARA SARDINELES PERALTADOS
DEDUCTIVO
CALLE 2
ADICIONAL
HACIA EL JARDIN

LARGO

FECHA: DICIEMBRE-2016
METRADOS
ANCHO
ALTO
PARCIAL

2.00

14.40

0.60

2.00

33.08

0.60

17.28
39.70
1.68

1.00

14.40

0.15

0.60

1.00

33.08

0.15

0.60

1.00

14.40

0.60

1.00

33.08

0.60

1.30
2.98
11.21

8.64
19.85
0.60

4.00

0.60

5.00

0.60

kg
8.00
ESTRIB. - 72.00
8.00
ESTRIB. 165.00

14.40
0.62
33.08
0.62

DE ACERO
0.56
0.56
0.56
0.56

2.40
3.00
115.98

64.51
25.00
148.20
57.29

m2

17.19
-

2.00
1.00

14.40
56.23

0.40
0.40

11.52
22.49

CALLE -06 S/N


CALLE 4

ADICONALES
AVENIDA -1

HACIA EL JARDIN

4.02

CONCRETO FC=175 KG/CM2 EN CUNETAS


DEDUCTIVOS
CALLE2
CALLE 5
CALLE -06 S/N
CALLE 4
ADICONALES
AVENIDA -1

CURADO DE CONCRETO EN CUNETAS


DEDUCTIVOS
CALLE2
CALLE 5
CALLE -06 S/N
CALLE 4

6
6.01
6.01.01

6.01.02

MURO DE CONTENCION
TRABAJOS PRELIMINARES
TRAZO, NIVELACION Y REPLANTEO..

EXCAVACION MASIVA PARA MURO DE CONTENCION

0.40
0.40
0.40
0.40
0.40

24.62
23.47

23.46
22.92
23.65
13.23
16.03

2.00
1.00
1.00
1.00

14.40
56.23
61.56
58.67

AREA
0.06
0.06
0.06
0.06

58.65
57.30
59.12
33.08
40.08

0.06
0.06
0.06
0.06
0.06

1.73
3.37
3.69
3.52
3.52
3.44
3.55
1.98
2.40
17.19

2.00
1.00
1.00
1.00

14.40
56.23
61.56
58.67

0.40
0.40
0.40
0.40

1.00
1.00
1.00
1.00
1.00

58.65
57.30
59.12
33.08
40.08

0.40
0.40
0.40
0.40
0.40

11.52
22.49
24.62
23.47

23.46
22.92
23.65
13.23
16.03

ml
2.80

HACIA EL JARDIN

5.01.01.02ENCOFRADO Y DESENCOFRADO
ADICIONAL
BD-01
BD-02
BD-03
BD-04
BD-05
BD-06
BD-07
BD-08
BD-09
BD-10
BD-11
BD-12
BD-13
HACIA EL JARDIN

58.65
57.30
59.12
33.08
40.08

m2

ADICONALES
AVENIDA -1

5
OBRAS DE ARTE
5.01
SISTEMA DE EVACUACION PLUVIAL
5.01.01
BADENES
5.01.01.01CONCRETO FC=210 KG/CM2
ADICIONAL
BD-01
BD-02
BD-03
BD-04
BD-05
BD-06
BD-07
BD-08
BD-09
BD-10
BD-11
BD-12
BD-13
HACIA EL JARDIN

1.00
1.00
1.00
1.00
1.00

1.00
1.00
1.00
1.00
1.00

HACIA EL JARDIN

JUNTAS ASFALTICAS EN CUNETAS E=1"


ADICONALES
DEDUCTIVOS
CALLE2
CALLE 5
CALLE -06 S/N
CALLE 4

0.40
0.40

2.58
-

ADICONALES
AVENIDA -1

4.04

61.56
58.67

m3

HACIA EL JARDIN

4.03

1.00
1.00

4.00
- 15.00
- 16.00
- 15.00

0.40
0.40
0.40
0.40

15.00
15.00
15.00
5.00
7.00

0.40
0.40
0.40
0.40
0.40

1.60
6.00
6.40
6.00

6.00
6.00
6.00
2.00
2.80

m3

6.65
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA

10.28
1.55
9.25
6.72
0.87
3.96
0.72
1.28
3.45
0.63
1.39
0.33
9.07
8.40

0.17
0.17
0.17
0.17
0.17
0.17
0.17
0.17
0.17
0.17
0.17
0.17 0.17 0.17

1.75
0.26
1.57
1.14
0.15
0.67
0.12
0.22
0.59
0.11
0.24
0.06
1.54
1.43

m2

8.82

8.71
1.70
15.59
11.26
3.64
6.08
2.52
3.26
5.03
0.25
2.03
0.55
14.75
14.00

0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15 0.15 0.15

1.31
0.26
2.34
1.69
0.55
0.91
0.38
0.49
0.75
0.04
0.30
0.08
2.21
2.10

m2

21.52
26.90

0.80

26.90
26.90

0.20
0.60

21.52

m3

12.91
1.50
0.30

8.07
4.84

6.02
6.02.01

CONCRETO EN MURO DE MAMPOSTERIA


CONCRETO EN MURO DE MAMPOSTERIA

m3
26.9

6.02.02

area
0.57

ENCOFRADO Y DESENCOFRADO NORMAL EN MURO DE CONTENCIONm2

32.28
26.9

6.02.03

15.33
15.33

CURADO DE MURO DE CONTENCION

1.2

32.28

m2

32.28
26.9

1.2

32.28

MOVIMIENTO DE TIERRA
HOJA DE METRADOS
PROYECTO
CONSTRUCCION DE PISTAS Y VEREDAS EN 09 CALLES DE LA LOCALIDAD DE ALLPACHACA,
DISTRITO DE CHIARA - HUAMANGA AYACUCHO
ENTIDAD

: MUNICIPALIDAD DISTRITAL DE CHIARA

DISTRITO

: CHIARA

PROVINCIA

: HUAMANGA

DPTO

: AYACUCHO
AREAS (m2)

Estaca

Corte

MEJORAMIENTO

ENROCADO

Distancia (m)

VOLUMEN
CORTE (m3)
Total Corte

CALLE 6 S/N
0+000.00

3.469

3.469

0+060.00

3.469

3.469

60.00

SUB TOTAL

208.14

AREAS (m2)
Estaca

208.14

Corte

MEJORAMIENTO

ENROCADO

Distancia (m)

VOLUMEN
CORTE (m3)
Total Corte

CALLE 5 S/N
0+000.00

7.471

7.471

0+009.00

7.471

7.471

0+009.00

12.462

2.492

0+024.00

12.462

0+068.00

9.00

67.24

9.970

0.00

0.00

2.492

9.970

15.00

186.93

7.477

2.492

4.985

59.00

588.20

0+068.00

7.477

2.492

4.985

44.00

328.99

0+068.00

3.934

2.492

1.442

0.00

0.00

0+085.00

6.378

2.492

3.886

17.00

87.65

SUB TOTAL

1,259.01

AREAS (m2)
Estaca

Corte

MEJORAMIENTO

ENROCADO

Distancia (m)

VOLUMEN
CORTE (m3)
Total Corte

AVENIDA 01
0+000.00

7.943

2.620

5.323

0+040.00

7.943

2.620

5.323

0+040.00

2.620

0+059.00

2.620

40.00

317.72

2.620

0.00

0.00

2.620

19.00

49.78

SUB TOTAL

367.50

AREAS (m2)
Estaca

Distancia (m)

VOLUMEN
CORTE (m3)

VOLUMEN
MEJORAMIEN(m

Estaca

Distancia (m)
Corte

MEJORAMIENTO

VOLUMEN
CORTE (m3)
Total Corte

MEJORAMIEN(m
3
)
Total MEJO

CALLE 04S/N
0+000.00

2.620

2.620

0+030.00

2.620

2.620

0+030.00

7.590

7.590

0.00

0.00

0.00

7.590

7.590

40.00

303.60

303.60

382.20

382.20

0+070.00

30.00

SUB TOTAL

AREAS (m2)
Estaca

Corte

Distancia (m)

MEJORAMIENTO

78.60

VOLUMEN
CORTE (m3)
Total Corte

78.60

VOLUMEN
MEJORAMIEN(m
3
)
Total MEJO

CALLE 03S/N
0+000.00

3.113

3.113

0+125.00

3.113

3.113

125.00

SUB TOTAL
AREAS (m2)
Estaca

Corte

0+000.00

1.116

0+125.00

1.116

Distancia (m)

MEJORAMIENTO

389.13

389.13

VOLUMEN
CORTE (m3)

VOLUMEN
MEJORAMIEN(m
3
)
Total MEJO

CALLE 02S/N
1.116
1.116

125.00

AREAS (m2)
Corte

389.13

Total Corte

SUB TOTAL

Estaca

389.13

Distancia (m)

Relleno

139.50

139.50

139.50

139.50

VOLUMEN
CORTE (m3)

VOLUMEN
RELLENO (m3)

Total Corte

Total Relleno

CALLE 14 S/N
0+000.00

4.610

4.61

0+010.00

4.610

4.61

10.00

46.10

46.10

0+020.00

4.610

4.61

10.00

46.10

46.10

0+030.00

4.610

4.61

10.00

46.10

46.10

0+040.00

4.610

4.61

10.00

46.10

46.10

0+050.00

4.610

4.61

10.00

46.10

46.10

0+060.00

4.610

4.61

10.00

46.10

46.10

0+070.00

4.610

4.61

10.00

46.10

46.10

0+070.00

3.810

3.81

0.00

0.00

0+080.00

3.810

3.81

10.00

38.10

38.10

0+090.00

3.810

3.81

10.00

38.10

38.10

0+100.00

3.810

3.81

10.00

38.10

38.10

0+110.00

3.810

3.81

10.00

38.10

38.10

0+120.00

3.810

3.81

10.00

38.10

38.10

0+120.00

1.150

1.15

0.00

0.00

0+130.00

1.150

1.15

10.00

11.50

11.50

0+140.00

1.150

1.15

10.00

11.50

11.50

0+150.00

1.150

1.15

10.00

11.50

11.50

547.70

547.70

SUB TOTAL
AREAS (m2)
Estaca

Corte

Distancia (m)

Relleno

VOLUMEN
CORTE (m3)

VOLUMEN
RELLENO (m3)

Total Corte

Total Relleno

CALLE 16 S/N
0+000.00

3.686

3.686

0+010.00

3.686

3.686

10.00

36.86

36.86

0+020.00

3.686

3.686

10.00

36.86

36.86

0+030.00

3.686

3.686

10.00

36.86

36.86

0+040.00

3.686

3.686

10.00

36.86

36.86

0+050.00

3.686

3.686

10.00

36.86

36.86

0+060.00

3.686

3.686

10.00

36.86

36.86

0+070.00

3.686

3.686

10.00

36.86

36.86

0+080.00

3.686

3.686

10.00

36.86

36.86

0+090.00

3.686

3.686

10.00

36.86

36.86

0+100.00

3.686

3.686

10.00

36.86

36.86

0+110.00

3.686

3.686

10.00

36.86

36.86

0+120.00

3.686

3.686

10.00

36.86

36.86

0+130.00

3.686

3.686

10.00

36.86

36.86

0+140.00

3.686

3.686

10.00

36.86

36.86

0+150.00

3.686

3.686

10.00

36.86

36.86

0+160.00

3.686

3.686

10.00

36.86

36.86

0+170.00

3.686

3.686

10.00

36.86

36.86

0+180.00

3.686

3.686

10.00

36.86

36.86

0+190.00

3.686

3.686

10.00

36.86

36.86

0+200.00

3.686

3.686

10.00

36.86

36.86

0+205.11

3.686

3.686

5.11

18.84

18.84

756.04

756.04

SUB TOTAL

TOTAL CORTE
TOTAL MEJORAMIENTO
TOTAL ENROCADO

LIDAD DE ALLPACHACA,
HO

VOLUMEN
MEJORAMIENT
O (m3)
Total MEJO.

208.14
208.14

VOLUMEN
VOLUMEN
MEJORAMIENT
ENROCADO (m3)
3
O (m )
Total MEJO.

Total ENROC

67.24

0.00

0.00

0.00

37.38

149.55

147.03

441.17

109.65

219.34

0.00

0.00

42.36

45.29

403.66

855.35

VOLUMEN
VOLUMEN
MEJORAMIENT
ENROCADO (m3)
3
O (m )
Total MEJO.

Total ENROC

104.80

212.92

0.00

0.00

49.78

0.00

154.58

212.92

4,049.22
2,980.95
1,068.27

MUNICIPALIDAD DISTRITAL DE CHIARA

HOJA DE METRADOS DE OBRA "DEDUCTIVO"


Proyecto

CONSTRUCCION DE PISTAS Y VEREDAS EN 09 CALLES DE LA LOCALIDAD DE ALLPACHACA, DISTRITO DE CHIARA - HUAMANGA - AYACUCHO"

Ubicacin : Dist: CHIARA; Prov:HUAMANGA; Regin; AYACUCHO


Proyectista :
PARTIDA

DESCRIPCION
CORTE A NIVEL DE SUB RASANTE
CALLE 16 S/N

UND.

VECES

LARGO

FECHA: DICIEMBRE-2016
METRADOS
ANCHO
ALTO
PARCIAL

TOTAL

M3

3,651.64
1.00
1.00
1.00

40.00
60.00
50.00

9.20
9.20
9.20

0.60
0.40
0.20

220.80
220.80
92.00

533.60

CALLE 14 S/N

1.00

120.00

7.70

0.40

369.60

369.60

CALLE 06 S/N

1.00

60.00

8.70

0.40

208.80

208.80

CALLE 05 S/N

1.00

144.00

12.46

0.70

1,255.97

1,255.97

AVENIDA N 01

1.00

267.27

5.80

0.24

372.04

372.04

CALLE 04 S/N

1.00

137.02

11.20

0.25

383.66

383.66

CALLE 03 S/N

1.00

124.58

7.80

0.40

388.69

388.69

CALLE 02 S/N

1.00

109.16

5.80

0.22

139.29

139.29

1.00

84.89

12.46

0.81

856.76

1,069.04
856.76

AVENIDA N 01

1.00

60.00

5.80

0.61

212.28

212.28

MEJORAMIENTO
CALLE 06 S/N

1.00

60.00

8.70

0.40

208.80

208.80

CALLE 05 S/N

1.00

12.46

0.70

CALLE 14 S/N

1.00

204.45

7.70

0.35

550.99

550.99

CALLE 16 S/N

1.00

245.76

9.20

0.34

757.43

757.43

1.00

12.00

0.40

4.80

7.44

ENROCADO
CALLE 05 S/N

BC-06

05.00.00 VEREDAS DE CONCRETO


05.01.00 PERFILADO Y COMPACTADO DE LA SUBRASANTE
DEDUCTIVO
V-27
V-28
V-08
ADICIONAL
HACIA EL JARDIN

M3

1.55

m2

AREA
-

05.02.00 CONFORMACION Y COMPACTACION DE BASE GRA m2


V-27
V-28
V-08
ADICIONAL
HACIA EL JARDIN
05.03.00 ENCOFRADO Y DESENCOFRADO DE VEREDAS
DEDUCTIVO
V-27
V-28
V-08

5/8"

1.00
1.00
1.00

14.40
14.40
112.85

1.00

39.70

1.00
1.00
1.00

AREA
14.40
14.40
112.85

1.00

39.70

1.00
1.00
1.00

14.40
14.40
95.12

101.95

101.95

9.32

14.40
14.40
112.85
39.70

14.40
14.40
112.85
39.70

m2
-

0.10 0.10 0.10 -

1.44
1.44
9.51

TRANSVERSAL
V-08
ADICIONAL
HACIA EL JARDIN

TRANSVERSAL

05.06.00 CONCRETO FC=175 KG/CM2 EN VEREDAS, E=0.


DEDUTIVO
V-27
V-28
V-08
ADICIONAL
HACIA EL JARDIN

m2

05.09.00 CURADO DEL CONCRETO EN VEREDAS,


V-27
V-28
V-08
ADICIONAL
HACIA EL JARDIN

m2

05.10.00 BRUADO EN VEREDAS DE CONCRETO


DEDUCTIVO
V-27
V-28
V-08
ADICIONAL
HACIA EL JARDIN

ml

05.11.00 JUNTAS ASFALTICAS EN VEREDAS E=1"


DEDUCTIVO
V-27
V-28
V-08
ADICIONAL
HACIA EL JARDIN

ml

7.00

1.20

1.00
5.00

33.08
1.20

0.10 -

0.84

0.10
0.10

3.31
0.60

AREA
-

1.00
1.00
1.00

14.40
14.40
112.85

1.00

36.70

1.00
1.00
1.00

AREA
14.40
14.40
112.85

1.00

36.70

1.00
1.00
1.00

28.80
28.80
225.70

1.00

78.15

3.00
3.00
7.00

1.00
1.00
1.20

5.00

1.20

104.95

104.95

205.15

8.40

14.40
14.40
112.85
36.70

14.40
14.40
112.85
36.70

28.80
28.80
225.70
78.15

3.00
3.00
8.40
6.00

MUNICIPALIDAD DISTRIT

HOJA DE METRADOS DE OBRA " MEJO


Proyecto
Ubicacin
Proyectista
PARTIDA

CONSTRUCCION DE PISTAS Y VEREDAS EN 09 CALLES DE LA LOCALID


: Dist: CHIARA; Prov:HUAMANGA; Regin; AYACUCHO
:
DESCRIPCION

UND.

01.00.00 CORTE A NIVEL DE MEJORAMIENTO


01.01.00 CORTE DE LA SUB RASANTE DE LA SUB BASE

01.02.00 ELIMINACION DEL CORTE DE LA SUB RASANTE D

01.02.00 CONFORMACION Y COMPACTACION DEL MEJOR

04.01.00 PAVIMENTO RIGIDO


PERFILADO Y COMPACTACION DE LA
04.01.01
SUBRASANTE DE P. R.
PV1
PV2
PV3
PV4
PV5
PV6
PV7
PV8
PV9
PV10
PV11
PV12
PV13
PV14
PV15
PV16
PV17
PV18
PV19
PV20
PV21
PV22
PV23
PV24

m2

PV25
PV26
PV27
PV28
PV29
PV30
PV31
PV32
PV33
BOCACALLES
BC-01
BC-02
BC-03
BC-05
BC-06
BADENES
BD-01
BD-02
BD-03
BD-04
BD-05
BD-06
BD-07
BD-08
BD-09
BD-10
BD-11
BD-12
BD-13

04.01.02 CONFORMACION Y COMPACTACION DE BASE GR


PV-01
PV-02
PV-03
PV-04
PV-05
PV-06
PV-07
PV-08
PV-09
PV-10
PV-11
PV-12
PV-13
PV-14

m2

PV-15
PV-16
PV-17
PV-18
PV-19
PV-20
PV-21
PV-22
PV-23
PV-24
PV-25
PV-26
PV-27
PV-28
PV-29
PV-30
PV-31
PV-32
PV-33
BOCACALLES
BC-01
BC-02
BC-03
BC-05
BC-06
BADENES
BD-01
BD-02
BD-03
BD-04
BD-05
BD-06
BD-07
BD-08
BD-09
BD-10
BD-11
BD-12
BD-13

04.01.03

ENCOFRADO Y DESENCOFRADO DE PAVIMENTO


RIGIDO
Longitudinal
PV-01
PV-02
PV-03

m2

PV-04
PV-05
PV-06
PV-07
PV-08
PV-09
PV-10
PV-11
PV-12
PV-13
PV-14
PV-15
PV-16
PV-17
PV-18
PV-19
PV-20
PV-21
PV-22
PV-23
PV-24
PV-25
PV-26
PV-27
PV-28
PV-29
PV-30
PV-31
PV-32
PV-33
BOCACALLES
BC-01
BC-02
BC-03
BC-05
BC-06
BADENES
BD-01
BD-02
BD-03
BD-04
BD-05
BD-06
BD-07
BD-08

BD-09
BD-10
BD-11
BD-12
BD-13

04.01.04

CONCRETO FC=210 KG/CM2 EN P.R. E=0.20m


CALZADA
PV1
PV2
PV3
PV4
PV5
PV6
PV7
PV8
PV9
PV10
PV11
PV12
PV13
PV14
PV15
PV16
PV17
PV18
PV19
PV20
PV21
PV22
PV23
PV24
PV25
PV26
PV27
PV28
PV29
PV30
PV31
PV32
PV33
BOCACALLES
BC-01
BC-02
BC-03
BC-05

m2

BC-06

04.01.05 CURADO DE CONCRETO


PV1
PV2
PV3
PV4
PV5
PV6
PV7
PV8
PV9
PV10
PV11
PV12
PV13
PV14
PV15
PV16
PV17
PV18
PV19
PV20
PV21
PV22
PV23
PV24
PV25
PV26
PV27
PV28
PV29
PV30
PV31
PV32
PV33

m2

BOCACALLES
BC-01
BC-02
BC-03
BC-05
BC-06

04.01.06

JUNTAS ASFALTICAS DE CONSTRUCCION Y


DILATACION (d)
Longitudinal
PV-01

PV-02
PV-03
PV-04
PV-05
PV-06
PV-07
PV-08
PV-09
PV-10
PV-11
PV-12
PV-13
PV-14
PV-15
PV-16
PV-17
PV-18
PV-19
PV-20
PV-21
PV-22
PV-23
PV-24
PV-25
PV-26
PV-27
PV-28
PV-29
PV-30
PV-31
PV-32
PV-33
BOCACALLES
BC-01
BC-02
BC-03
BC-05
BC-06

04.01.07 JUNTAS ASFALTICAS DE CONTRACCION (d)


Transversal
PV-01
PV-02
PV-03
PV-04
PV-05

PV-06
PV-07
PV-08
PV-09
PV-10
PV-11
PV-12
PV-13
PV-14
PV-15
PV-16
PV-17
PV-18
PV-19
PV-20
PV-21
PV-22
PV-23
PV-24
PV-25
PV-26
PV-27
PV-28
PV-29
PV-30
PV-31
PV-32
PV-33
BOCACALLES
BC-01
BC-02
BC-03
BC-04
BC-05
BC-06

05.00.00
05.01.00

VEREDAS DE CONCRETO
PERFILADO Y COMPACTADO DE LA SUBRASANTE PARA VEREDAS
V-01
V-02
V-03
V-04
V-05
V-06
V-07
V-08

m2

V-09
V-10
V-11
V-12
V-13
V-14
V-15
V-16
V-17
V-18
V-19
V-20
V-21
V-22
V-23
V-24
V-25
V-26
V-27
V-28
V-29
V-30
V-31
V-32

MARTILLOS
M-01
M-02
M-03
M-04
M-05
M-06
M-07
M-08
M-09
M-10
M-11
M-12
M-13
M-14
M-15
M-16
M-17
M-18
M-19
M-20
M-21

M-22
M-23
M-24
M-25
M-26
M-27
M-28
M-29
M-30
M-31
M-32
M-33

RAMPAS

CIPALIDAD DISTRITAL DE CHIARA

S DE OBRA " MEJORAMIENTO PARA SUB BASE"

09 CALLES DE LA LOCALIDAD DE ALLPACHACA, DISTRITO DE CHIARA - HUAMANGA - AYACUCHO"

FECHA: FEBRERO-2016
VECES

METRADOS
ANCHO

LARGO

ALTO

PARCIAL

FACTOR
1.00

VER CORTE

V=

#REF!

#REF!

1.30

VER CORTE

V=

#REF!

#REF!

1.00

VER CORTE

V=

#REF!

#REF!

AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA

116.80
687.46
65.05
819.35
357.25
148.97
###
521.80
396.00
134.39
762.38
81.93
808.21
288.41
26.49
33.80
###
327.38
459.15

116.80
687.46
65.05
819.35
357.25
148.97
1,834.15
521.80
396.00
134.39
762.38
81.93
808.21
288.41
26.49
33.80
1,575.60
327.38
459.15

AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA

60.85
450.13
582.35
319.71
261.00
47.31
121.66
330.30

60.85
450.13
582.35
319.71
261.00
47.31
121.66
330.30

AREA
AREA
AREA
AREA
AREA

21.34
10.83
14.00
9.65
8.15

21.34
10.83
14.00
9.65
8.15

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA

19.56
12.25
16.89
15.50
10.35
11.40
7.90
7.70
10.69
7.65
8.80
7.17
6.40

19.56
12.25
16.89
15.50
10.35
11.40
7.90
7.70
10.69
7.65
8.80
7.17
6.40

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA

116.80
687.46
65.05
819.35
357.25
148.97
###
521.80
396.00
134.39

116.80
687.46
65.05
819.35
357.25
148.97
1,834.15
521.80
396.00
134.39

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA

1.00
1.00
1.00
1.00
1.00

AREA
AREA
AREA
AREA
AREA

21.34
10.83
14.00
9.65
8.15

21.34
10.83
14.00
9.65
8.15

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA

19.56
12.25
16.89
15.50
10.35
11.40
7.90
7.70
10.69
7.65
8.80
7.17
6.40

19.56
12.25
16.89
15.50
10.35
11.40
7.90
7.70
10.69
7.65
8.80
7.17
6.40

52.67
254.05
40.25

762.38
81.93
808.21
288.41
26.49
33.80
###
327.38
459.15
60.85
450.13
582.35
319.71
261.00
47.31
121.66
330.30

762.38
81.93
808.21
288.41
26.49
33.80
1,575.60
327.38
459.15
60.85
450.13
582.35
319.71
261.00
47.31
121.66
330.30

0.20
0.20
0.20

10.53
50.81
8.05

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

370.15
134.70
74.78
809.70
249.38
240.43
49.70
277.88
40.03
321.29
105.94
29.55
805.75
30.92
220.05
239.00
33.10
235.60
311.20
216.05
177.20
28.15
205.68
162.85

0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20

21.10
14.72
17.00
13.80
12.40

0.20
0.20
0.20
0.20
0.20

27.64
23.56
32.34
29.90
22.65
23.23
18.46
17.95

0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20

74.03
26.94
14.96
161.94
49.88
48.09
9.94
55.58
8.01
64.26
21.19
5.91
161.15
6.18
44.01
47.80
6.62
47.12
62.24
43.21
35.44
5.63
41.14
32.57
4.22
2.94
3.40
2.76
2.48
5.53
4.71
6.47
5.98
4.53
4.65
3.69
3.59

1.00
1.00
1.00
1.00
1.00

21.78
16.75
18.62
15.95
14.63

AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA

0.20
0.20
0.20
0.20
0.20

116.80
687.46
65.05
819.35
357.25
148.97
###
521.80
396.00
134.39
762.38
81.93
808.21
288.41
26.49
33.80
###
327.38
459.15
60.85
450.13
582.35
319.71
261.00
47.31
121.66
330.30
21.34
10.83
14.00
9.65

4.36
3.35
3.72
3.19
2.93

116.80
687.46
65.05
819.35
357.25
148.97
1,834.15
521.80
396.00
134.39
762.38
81.93
808.21
288.41
26.49
33.80
1,575.60
327.38
459.15
60.85
450.13
582.35
319.71
261.00
47.31
121.66
330.30
21.34
10.83
14.00
9.65

AREA

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA
AREA

1.00
1.00
1.00
1.00
1.00

AREA
AREA
AREA
AREA
AREA

52.67

8.15

116.80
687.46
65.05
819.35
357.25
148.97
###
521.80
396.00
134.39
762.38
81.93
808.21
288.41
26.49
33.80
###
327.38
459.15
60.85
450.13
582.35
319.71
261.00
47.31
121.66
330.30
21.34
10.83
14.00
9.65
8.15

8.15

116.80
687.46
65.05
819.35
357.25
148.97
1,834.15
521.80
396.00
134.39
762.38
81.93
808.21
288.41
26.49
33.80
1,575.60
327.38
459.15
60.85
450.13
582.35
319.71
261.00
47.31
121.66
330.30
21.34
10.83
14.00
9.65
8.15

52.67

254.05
40.25
370.15
134.70
74.78
809.70
249.38
240.43
49.70
277.88
40.03
321.29
105.94
29.55
805.75
30.92
220.05
239.00
33.10
235.60
311.20
216.05
177.20
28.15
205.68
162.85
21.10
14.72
17.00
13.80
12.40

12.70
57.46
9.94
83.26
30.93

#REF!

254.05
40.25
370.15
134.70
74.78
809.70
249.38
240.43
49.70
277.88
40.03
321.29
105.94
29.55
805.75
30.92
220.05
239.00
33.10
235.60
311.20
216.05
177.20
28.15
205.68
162.85
21.10
14.72
17.00
13.80
12.40

34.19
151.31
50.74
246.53
74.86

32.46
107.14
43.72
152.32
51.25
98.13
129.17
114.32
40.73
171.77
56.37
190.86
57.08
36.52
266.25
30.42
87.71
63.58
104.87
35.09
103.29
16.67
143.29
65.09
83.02
22.95
79.53
67.13

17.62
180.93
1.00
1.00
1.00
1.00
56.42
54.43
12.04
62.75
9.90
72.40
24.54
7.57
180.06
7.87
1.00
49.90
54.11
8.36
53.36
1.00
70.16
49.01
40.38
7.26
46.71
37.19
5.69
4.27
4.78
4.07
3.76
#REF!

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

#REF!

12.44
7.68
9.21
11.43
7.08
6.06

AREA
191.08
111.50
54.02
160.04
93.16
50.68
56.07
112.85

191.08
111.50
54.02
160.04
93.16
50.68
56.07
112.85

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

62.16
63.90
91.17
87.45
162.64
162.65
55.15
55.20
51.82
51.66
55.20
55.41
55.21
55.24
158.42
148.73
52.62
52.90
58.86
56.40
54.91
54.86
52.38
52.31

62.16
63.90
91.17
87.45
162.64
162.65
55.15
55.20
51.82
51.66
55.20
55.41
55.21
55.24
158.42
148.73
52.62
52.90
58.86
56.40
54.91
54.86
52.38
52.31

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

4.32
7.28
4.32
5.70
5.82
5.88
6.28
5.38
5.10
5.51
6.13
6.77
5.89
7.07
7.30
6.76
3.56
5.97
6.66
5.27
5.13

4.32
7.28
4.32
5.70
5.82
5.88
6.28
5.38
5.10
5.51
6.13
6.77
5.89
7.07
7.30
6.76
3.56
5.97
6.66
5.27
5.13

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

5.26
5.34
6.17
6.18
6.18
6.20
4.72
5.28
6.24
6.27
5.59
6.17

5.26
5.34
6.17
6.18
6.18
6.20
4.72
5.28
6.24
6.27
5.59
6.17

52.00

0.55

28.60

AYACUCHO"

-2016
TOTAL

#REF!
#REF!
#REF!

###

###

1,159.01

###

###

5,795.07

3,062.25

2,856.95

MUNICIPALIDAD DISTR

HOJA DE METRADOS DE OBRA


Proyecto
Ubicacin
Proyectista
PARTIDA

CONSTRUCCION DE PISTAS Y VEREDAS EN 09 CALLES DE LA LOCAL


: Dist: CHIARA; Prov:HUAMANGA; Regin; AYACUCHO
:
DESCRIPCION

UND.

01.00.00 CORTE A NIVEL DE MEJORAMIENTO


01.01.00 CORTE DE LA SUB RASANTE DE LA SUB BASE

01.02.00 ELIMINACION DEL CORTE DE LA SUB RASANTE DE LA

01.02.00 CONFORMACION Y COMPACTACION DEL MEJORAMIE

04.01.00 PAVIMENTO RIGIDO


PERFILADO Y COMPACTACION DE LA SUBRASANTE
04.01.01
DE P. R.

m2

04.01.02 CONFORMACION Y COMPACTACION DE BASE GRANUL

m2

ENCOFRADO Y DESENCOFRADO DE PAVIMENTO


RIGIDO
CONCRETO FC=210 KG/CM2 EN P.R. E=0.20m
04.01.04
CALZADA
04.01.03

04.01.05 CURADO DE CONCRETO

m2
m2
m2

JUNTAS ASFALTICAS DE CONSTRUCCION Y


DILATACION (d)

04.01.07 JUNTAS ASFALTICAS DE CONTRACCION (d)

04.01.06

04.01.08

ACERO LISO PARA PASADORES LONGITUDINALES Y


TRANSVERSALES

Kg

PALIDAD DISTRITAL DE CHIARA

ADOS DE OBRA " DEDUCTIVO DE OBRA"

CALLES DE LA LOCALIDAD DE ALLPACHACA, DISTRITO DE CHIARA - HUAMANGA - AYACUCHO"

FECHA: DICIEMBRE-2016
VECES

METRADOS
ANCHO

LARGO

ALTO

PARCIAL

FACTOR
1.00

VER CORTE

V=

#REF!

#REF!

1.30

VER CORTE

V=

#REF!

#REF!

1.00

VER CORTE

V=

#REF!

#REF!

YACUCHO"

E-2016
TOTAL

#REF!
#REF!
#REF!

- 3,717.20