Está en la página 1de 80

FORMATO COMPUTO METRICO

PROYECTO

VIVENDA FAMILIAR

ITEM

COLUMNAS DE HORMIGON ARMADO

DATOS

CALCULO DE MADERA (P2)

20.0

cm

ANCHO =

20.0

cm

ALTURA =

300.0

cm

MENOR LADO

20.0

cm

MAYOR LADO

20.0

cm

CANTIDAD DE COLUMNAS

20

BASE =

cm

Centimetros

Ancho

DATOS

4
Base

RECUBRIMIENTO

2.0

20

cm

cm

LONGITUD TOTAL COL.

4.00 mts

CANTIDAD DE ESTRIBOS

19

MADERA PRIMARIA
ELEMENTOS DE ENCOFRADO

ESPESOR
Pulg

Pies

TABLERO DE FONDO
COSTILLA DE FONDO (C/60)
LATERAL DE COLUMNA
BARROTES (C/50)
RIOSTRAS

1
1
1
2
1

Pulg
Pulg
Pulg
Pulg
Pulg

7.874
2
9.843
2
2

9.843
0.656
9.843
1.476
1.312

CHAFLAN

1 Pulg

9.843

Cantidad
1 Pza
6 Pza
1 Pza
6 Pza
12 Pza
-

Lados
2
2
2
2
2
Sumatoria ()
10 % Perdida

MADERA SECUNDARIA
FLECHAS

1 Pulg

9.843

4 Sumatoria ()
10 % Perdida

VOLUMEN DE COLUMNA

0.120 m3

MADERA TOTAL PRIMARIA

189.949 Pz

VOLUMEN TOTAL DE COLS.

0.480 m3

MADERA TOTAL SECUNDARIA

43.307 Pz

ENTONCES:
PARA

0.480 m3

189.949 Pz

1 m3
(Pz) por (m3)
(X) Pz =

X
USOS

395.727 Pz

PARA

(Pz) por (m3)


3

131.909

0.480 m3

43.307 Pz

1 m3
(Pz) por (m3)
(X) Pz =

90.223 Pz

PRIMARIA

SECUNDARIA

X
USOS

(Pz) por (m3)


10

9.022

TOTAL MADERA A USAR (PIES CUADRADOS POR METRO CUBICO)


T (madera)

140.931 Pz
CALCULO DE HORMIGON ARMADO

DESCRIPCION

DIMENCIONES (Mts)

AREA

M2

0.2

0.2

0.04

B
C

A
PREVISION SIMICA
"SO"=

7.50

cm

"LO"=

45.00

cm

DESCRIPCION

DIMENCIONES (Mts)

ESTRIBOS

LONGITUD TO.

(ML)

0.16

0.16

0.05

0.74

4.00 mts

BARRAS

ENTONCES:
PARA

31.211 kg

0.12m3

x
X (Kg/m3)

1.00m3
260.088

Total pies2
12.917
1.312
16.146
5.906
5.249
1.640
43.170
47.487 Pz

9.843
9.843
10.827 Pz

VOLUMEN

REPETIR

CANTIDAD

M3

NRO

PARCIAL

0.12

24

2.88

m3 de H

PESO
KG/ML

CANTIDAD

2.88

PESO TOTAL
KG

0.22

19

3.0932

1.58

25.28

TOTAL Kg

28.3732

10% PERD.

31.21052

FORMATO COMPUTO METRICO


PROYECTO
ITEM

VIVENDA FAMILIAR
VIGA DE HORMIGON ARMADO

CALCULO DE MADERA (P2


DATOS

BASE =
datos para
ALTURA=
llenar
LONGITUD=
CANTIDAD DE VIGAS
Centimetros

Centimetros
20
45
5.6
6

20
40

MENOR LADO
MAYOR LADO

Base

MADERA PRIMARIA
ELEMENTOS DE ENCOFRADO

ESPESOR

FONDO DE VIGA
BARROTES DE FONDO (C/60)
LATERAL DE VIGA
BARROTES LATERAL (C/60)
PIEZAS DE AGUANTE
COSTILLAS
CHAFLAN
CRUCETA (C/60)

1
1
1
1
2
2
1
1
se puede
cambiar

Pulg
Pulg
Pulg
Pulg
Pulg
Pulg
Pulg
Pulg

Pulg
7.87
2.00
16.73
2.00
2.00
2.00
1.00
2.00

Pies
0.18
0.66
0.18
1.39
0.18
0.18
0.18
0.98

20

MADERA SECUNDARIA
ELEMENTOS DE ENCOFRADO

ESPESOR

CABEZAL
TORNAPUNTAS
BRIDA
CUA Y C/CUA
SOLERA PIE
PUNTAL

2
1
1
2
1
2

Pulg

Pulg
Pulg
Pulg
Pulg
Pulg
Pulg

se puede
cambiar

VOLUMEN DE VIGA
VOLUMEN TOTAL DE VIGAS.

0.504 m3
3.024 m3

Pies
2
1.476
2
1.640
4
0.5
5
0.417
6
0.5
2 8.202099738
Sumatoria ()
10 % Perdida

MADERA TOTAL PR

MADERA TOTAL SEC

ENTONCES:
PARA

3.024 m3
1 m3

(X) Pz =
PARA

(Pz) por (m3)


16.268 Pz

49.2 Pz
X
USOS

3.024 m3
1 m3
(Pz) por (m3)

(Pz) por (m3)


3
5.423
33.30 Pz
X

USOS

(Pz) por (m3)

(X) Pz =

11.011 Pz

10

1.101

TOTAL MADERA A USAR (PIES CUADRADOS POR METRO CUBICO)


T (madera)

6.524 Pz

CALCULO DE
DESCRIPCION

DIMENCIONES (Mts)
A

0.2

0.45

B
C

A
PREVISION SISMICA
"SO"=

9.60

cm

DESCRIPCION

DIMENCIONES (Mts)
A

0.15

0.40

ESTRIBOS

BARRAS DE
REFUERZO

A
A
4.00

BARRAS DE
REFUERZO

A
4.00

BARRAS

A
5.90

ENTONCES:
PARA

43.8 kg
x
X (Kg/m3)

86.826

TIPO II

Altura

45

cm

DE MADERA (P2)

Base

20

cm

Cantidad
1.00
11.00
1.00
11.00
2.00
2.00
11.00

Lados
1.00
1.00
2.00
2.00
2.00
2.00
1.00
Sumatoria ()
10 % Perdida

Total pies2
0.12
1.20
0.51
5.11
0.24
0.24
0.02
1.80
7.454
8.199 Pz

PUNTAL
Cantidad
1 Pza
2 Pza
1 Pza
1 Pza
1 Pza
1 Pza

()
% Perdida

MADERA TOTAL PRIMARIA

ADERA TOTAL SECUNDARIA

PRIMARIA

(m3)

(m3)

SECUNDARIA

Total pies2
0.547
0.608
0.185
0.386
0.278
3.040
5.045
5.549 Pz

49.2 Pz
33.3 Pz

METRO CUBICO)

CALCULO DE HORMIGON ARMADO

(Mts)

AREA

VOLUMEN

REPETIR

CANTIDAD

M2

M3

NRO

PARCIAL

5.6

0.09

0.504

3.024

m3 de H

(Mts)

3.024

LONGITUD TO.

PESO

(ML)

KG/ML

0.05

1.20

0.22

47

12.46

4.00

1.58

1.00

6.32

CANTIDAD

PESO TOTAL
KG

0.504m3
1.00m3

4.00

1.58

1.00

6.32

5.90

0.89

4.00

21.00

TOTAL Kg

39.78

10% PERD.

43.76

CALCULO DE MADERA
DATOS

BASE =
ALTURA=
LONGITUD=
CANTIDAD DE VIGAS
Centimetros

datos para
llenar

Centimetros
20
45
4.6
6

20
40

MENOR LADO
MAYOR LADO

Base

MADERA PRIMARIA
ELEMENTOS DE ENCOFRADO

ESPESOR

FONDO DE VIGA
BARROTES DE FONDO (C/60)
LATERAL DE VIGA
BARROTES LATERAL (C/60)
PIEZAS DE AGUANTE
COSTILLAS
CHAFLAN
CRUCETA (C/60)

1
1
1
1
2
2
1
1
se puede
cambiar

Pulg
Pulg
Pulg
Pulg
Pulg
Pulg
Pulg
Pulg

Pulg
7.87
2.00
16.73
2.00
2.00
2.00
1.00
2.00

Pies
0.15
0.66
0.15
1.39
0.15
0.15
0.15
0.98

MADERA SECUNDARIA
ELEMENTOS DE ENCOFRADO

ESPESOR

CABEZAL
TORNAPUNTAS
BRIDA
CUA Y C/CUA
SOLERA PIE
PUNTAL

2
1
1
2
1
2

Pulg

Pulg
Pulg
Pulg
Pulg
Pulg
Pulg

se puede
cambiar

VOLUMEN DE VIGA
VOLUMEN TOTAL DE VIGAS.

0.414 m3
2.48 m3

Pies
2
1.476
2
1.640
4
0.5
5
0.417
6
0.5
2 8.202099738
Sumatoria ()
10 % Perdida

MADERA TOT

MADERA TOTA

ENTONCES:
PARA

2.484 m3
1 m3

(X) Pz =
PARA

(Pz) por (m3)


19.265 Pz

47.9 Pz
X
USOS

2.484 m3
1 m3
(Pz) por (m3)

(Pz) por (m3)


3
6.422
32.70 Pz
X

USOS

(Pz) por (m3)

(X) Pz =

13.163 Pz

10

1.316

TOTAL MADERA A USAR (PIES CUADRADOS POR METRO CUB


T (madera)

7.738 Pz

CALCUL
DESCRIPCION

DIMENCIONES (Mts)
A

0.2

0.45

B
C

A
PREVISION SISMICA
"SO"=

9.60

cm

DESCRIPCION

DIMENCIONES (Mts)
A

0.15

0.40

ESTRIBOS

BARRAS DE
REFUERZO

A
A
3.29

BARRAS DE
REFUERZO

A
3.29

BARRAS

A
4.90

ENTONCES:
PARA

36.2 kg
x
X (Kg/m3)

87.458

TIPO II

Altura

45

cm

DE MADERA (P2)

Base

20

cm

Cantidad
1.00
11.00
1.00
11.00
2.00
2.00
11.00

Lados
1.00
1.00
2.00
2.00
2.00
2.00
1.00
Sumatoria ()
10 % Perdida

Total pies2
0.10
1.20
0.42
5.11
0.20
0.20
0.01
1.80
7.251
7.976 Pz

PUNTAL
Cantidad
1 Pza
2 Pza
1 Pza
1 Pza
1 Pza
1 Pza

()
% Perdida

MADERA TOTAL PRIMARIA

ADERA TOTAL SECUNDARIA

PRIMARIA

(m3)

(m3)

SECUNDARIA

Total pies2
0.537
0.597
0.182
0.379
0.273
2.986
4.954
5.450 Pz

47.9 Pz
32.7 Pz

METRO CUBICO)

CALCULO DE HORMIGON ARMADO

(Mts)

AREA

VOLUMEN

REPETIR

CANTIDAD

M2

M3

NRO

PARCIAL

4.6

0.09

0.414

2.484

m3 de H

(Mts)

2.484

LONGITUD TO.

PESO

(ML)

KG/ML

0.05

1.20

0.22

39

10.28

3.29

1.58

1.00

5.19

CANTIDAD

PESO TOTAL
KG

0.414m3
1.00m3

3.29

1.58

1.00

5.19

4.90

0.89

4.00

17.44

TOTAL Kg

32.92

10% PERD.

36.21

CALCULO DE MADERA (P2


DATOS

BASE =
ALTURA=
LONGITUD=
CANTIDAD DE VIGAS
Centimetros

datos para
llenar

Centimetros
20
45
3.2
14

20
40

MENOR LADO
MAYOR LADO

Base

MADERA PRIMARIA
ELEMENTOS DE ENCOFRADO

ESPESOR

FONDO DE VIGA
BARROTES DE FONDO (C/60)
LATERAL DE VIGA
BARROTES LATERAL (C/60)
PIEZAS DE AGUANTE
COSTILLAS
CHAFLAN
CRUCETA (C/60)

1
1
1
1
2
2
1
1
se puede
cambiar

Pulg
Pulg
Pulg
Pulg
Pulg
Pulg
Pulg
Pulg

Pulg
7.87
2.00
16.73
2.00
2.00
2.00
1.00
2.00

Pies
0.10
0.66
0.10
1.39
0.10
0.10
0.10
0.98

20

MADERA SECUNDARIA
ELEMENTOS DE ENCOFRADO

ESPESOR

CABEZAL
TORNAPUNTAS
BRIDA
CUA Y C/CUA
SOLERA PIE
PUNTAL

2
1
1
2
1
2

Pulg

Pulg
Pulg
Pulg
Pulg
Pulg
Pulg

se puede
cambiar

VOLUMEN DE VIGA
VOLUMEN TOTAL DE VIGAS.

0.288 m3
4.032 m3

Pies
2
1.476
2
1.640
4
0.5
5
0.417
6
0.5
2 8.202099738
Sumatoria ()
10 % Perdida

MADERA TOTAL PR

MADERA TOTAL SEC

ENTONCES:
PARA

4.032 m3
1 m3

(X) Pz =
PARA

(Pz) por (m3)


26.606 Pz

107.3 Pz
X
USOS

4.032 m3
1 m3
(Pz) por (m3)

(Pz) por (m3)


3
8.869
74.34 Pz
X

USOS

(Pz) por (m3)

(X) Pz =

18.437 Pz

10

1.844

TOTAL MADERA A USAR (PIES CUADRADOS POR METRO CUBICO)


T (madera)

10.712 Pz

CALCULO DE
DESCRIPCION

DIMENCIONES (Mts)
A

0.2

0.45

B
C

A
PREVISION SISMICA
"SO"=

9.60

cm

DESCRIPCION

DIMENCIONES (Mts)
A

0.15

0.40

ESTRIBOS

BARRAS DE
REFUERZO

A
A
2.29

BARRAS DE
REFUERZO

A
2.29

BARRAS

A
3.50

ENTONCES:
PARA

25.6 kg
x
X (Kg/m3)

89.007

TIPO II

Altura

45

cm

DE MADERA (P2)

Base

20

cm

Cantidad
1.00
11.00
1.00
11.00
2.00
2.00
11.00

Lados
1.00
1.00
2.00
2.00
2.00
2.00
1.00
Sumatoria ()
10 % Perdida

Total pies2
0.07
1.20
0.29
5.11
0.14
0.14
0.01
1.80
6.966
7.663 Pz

PUNTAL
Cantidad
1 Pza
2 Pza
1 Pza
1 Pza
1 Pza
1 Pza

()
% Perdida

MADERA TOTAL PRIMARIA

ADERA TOTAL SECUNDARIA

PRIMARIA

(m3)

(m3)

SECUNDARIA

Total pies2
0.524
0.582
0.177
0.369
0.266
2.909
4.827
5.310 Pz

107.3 Pz
74.3 Pz

METRO CUBICO)

CALCULO DE HORMIGON ARMADO

(Mts)

AREA

VOLUMEN

REPETIR

CANTIDAD

M2

M3

NRO

PARCIAL

3.2

0.09

0.288

14

4.032

m3 de H

(Mts)

4.032

LONGITUD TO.

PESO

(ML)

KG/ML

0.05

1.20

0.22

27

7.23

2.29

1.58

1.00

3.61

CANTIDAD

PESO TOTAL
KG

0.288m3
1.00m3

2.29

1.58

1.00

3.61

3.50

0.89

4.00

12.46

TOTAL Kg

23.30

10% PERD.

25.63

CALCULO DE MADERA (P2


DATOS

BASE =
ALTURA=
LONGITUD=
CANTIDAD DE VIGAS
Centimetros

datos para
llenar

Centimetros
20
45
1.4
12

20
40

MENOR LADO
MAYOR LADO

Base

MADERA PRIMARIA
ELEMENTOS DE ENCOFRADO

ESPESOR

FONDO DE VIGA
BARROTES DE FONDO (C/60)
LATERAL DE VIGA
BARROTES LATERAL (C/60)
PIEZAS DE AGUANTE
COSTILLAS
CHAFLAN
CRUCETA (C/60)

1
1
1
1
2
2
1
1
se puede
cambiar

Pulg
Pulg
Pulg
Pulg
Pulg
Pulg
Pulg
Pulg

Pulg
7.87
2.00
16.73
2.00
2.00
2.00
1.00
2.00

Pies
0.05
0.66
0.05
1.39
0.05
0.05
0.05
0.98

20

MADERA SECUNDARIA
ELEMENTOS DE ENCOFRADO

ESPESOR

CABEZAL
TORNAPUNTAS
BRIDA
CUA Y C/CUA
SOLERA PIE
PUNTAL

2
1
1
2
1
2

Pulg

Pulg
Pulg
Pulg
Pulg
Pulg
Pulg

se puede
cambiar

VOLUMEN DE VIGA
VOLUMEN TOTAL DE VIGAS.

0.126 m3
1.512 m3

Pies
2
1.476
2
1.640
4
0.5
5
0.417
6
0.5
2 8.202099738
Sumatoria ()
10 % Perdida

MADERA TOTAL PR

MADERA TOTAL SEC

ENTONCES:
PARA

1.512 m3
1 m3

(X) Pz =
PARA

(Pz) por (m3)


57.620 Pz

87.1 Pz
X
USOS

1.512 m3
1 m3
(Pz) por (m3)

(Pz) por (m3)


3
19.207
61.56 Pz
X

USOS

(Pz) por (m3)

(X) Pz =

40.716 Pz

10

4.072

TOTAL MADERA A USAR (PIES CUADRADOS POR METRO CUBICO)


T (madera)

23.278 Pz

CALCULO DE
DESCRIPCION

DIMENCIONES (Mts)
A

0.2

0.45

B
C

A
PREVISION SISMICA
"SO"=

9.60

cm

DESCRIPCION

DIMENCIONES (Mts)
A

0.15

0.40

ESTRIBOS

BARRAS DE
REFUERZO

A
A
1.00

BARRAS DE
REFUERZO

A
1.00

BARRAS

A
1.70

ENTONCES:
PARA

12.0 kg
x
X (Kg/m3)

95.548

TIPO II

Altura

45

cm

DE MADERA (P2)

Base

20

cm

Cantidad
1.00
11.00
1.00
11.00
2.00
2.00
11.00

Lados
1.00
1.00
2.00
2.00
2.00
2.00
1.00
Sumatoria ()
10 % Perdida

Total pies2
0.03
1.20
0.13
5.11
0.06
0.06
0.00
1.80
6.600
7.260 Pz

PUNTAL
Cantidad
1 Pza
2 Pza
1 Pza
1 Pza
1 Pza
1 Pza

()
% Perdida

MADERA TOTAL PRIMARIA

ADERA TOTAL SECUNDARIA

PRIMARIA

(m3)

(m3)

SECUNDARIA

Total pies2
0.506
0.562
0.171
0.357
0.257
2.811
4.664
5.130 Pz

87.1 Pz
61.6 Pz

METRO CUBICO)

CALCULO DE HORMIGON ARMADO

(Mts)

AREA

VOLUMEN

REPETIR

CANTIDAD

M2

M3

NRO

PARCIAL

1.4

0.09

0.126

12

1.512

m3 de H

(Mts)

1.512

LONGITUD TO.

PESO

(ML)

KG/ML

0.05

1.20

0.22

13

3.31

1.00

1.58

1.00

1.58

CANTIDAD

PESO TOTAL
KG

0.126m3
1.00m3

1.00

1.58

1.00

1.58

1.70

0.89

4.00

6.05

TOTAL Kg

10.94

10% PERD.

12.04

FORMATO COMPUTO METRICO


PROYECTO

VIVENDA FAMILIAR

ITEM

EXCAVACION
DESCRIPCION

DIMENCIONES (Mts)

EXCAVACION
CIMIENTOS

AREA

M2

0.3

0.4

0.12

1.1

1.6

1.6

EXCAVACION ZAPATAS

A
B

LONGITUD

VOLUMEN

REPETIR NUM.

VOL.TOTAL

KG/ML

M3

M3

M3

58.8

7.06

1.1

12

21.12

m3=

28.176

FORMATO COMPUTO METRICO


PROYECTO
VIVENDA FAMILIAR
ITEM
ZAPATAS DE HA
DESCRIPCION
DIMENCIONES (Mts)
A
B
C

B
1

0.1

0.2

0.2

DIMENCIONES (Mts)
B

0.9

0.1

0.2

0.2

C
A
C

PARRILLA

DESCRIPCION

A
1

Empalme

0.65

BARRAS DE LA
COLUMANA DA
ZAPATAS

ESTRIBOS COLUMNA
ZAPATA

ENTONCES
N ZAPATAS

0.56m3
1.00m3
X (Kg/m3)

C
A

AREA
M2

VOLUMEN
M3

REPETIR
NRO

CANTIDAD
PARCIAL

0.1

0.4

0.04

0.04

0.16

m3 de H

ONES (Mts)

0.56

LONGITUD TO.
(ML)

PESO
KG/ML

CANTIDAD

PESO TOTAL
KG

1.1

0.89

3.916

0.1

0.22

0.88

1.65

1.58

10.428

TOTAL Kg

15.224

10% PERD.

66.986 kg
X
119.617

16.7464

FORMATO COMPUTO METRICO


PROYECTO
VIVENDA FAMILIAR
ITEM
CIMIENTOS HC (PIEDRA 50%)
DESCRIPCION
DIMENCIONES (Mts)
A
B
C

0.3

0.4

58.8

AREA
M2

VOLUMEN
M3

0.12

7.056

REPETIR
NRO

CANTIDAD
PARCIAL

7.056

m3 de H

7.056

FORMATO COMPUTO METRICO


PROYECTO
VIVENDA FAMILIAR
ITEM
SOBRE CIMIENTOS HC (40%)
DESCRIPCION
DIMENCIONES (Mts)
A
B

0.3

0.2

A
ENCOFRADO
MADERA PRIMARIA
ELEMENTOS DE ENCOFRADO
LATERAL DE S/C
BARROTES LATERAL (C/60)
PIEZAS DE AGUANTE
COSTILLAS
CRUCETA (C/60)

ESPESOR
1
1
2
2
1

Pulg
Pulg
Pulg
Pulg
Pulg

Pulg
7.874
2
2
2
2

ENTONCES
3.528 m3
1.000 m3

X (Pz/m3)

246.015

IONES (Mts)
C

AREA
M2

58.8

0.06

VOLUMEN
M3

3.528

REPETIR
NRO

CANTIDAD
PARCIAL

3.528

m3 de H

Pies
192.913
0.656
192.913386
192.913386
0.98425197

Cantidad
1 Pza
98 Pza
2 Pza
2 Pza
98 Pza

867.941 Pz
X
USOS
3

Pz/m3
82.005

Lados
2
2
2
2
1
Sumatoria ()
10 % Perdida

Total pies2
253.167
21.435
257.218
257.218
16.076
789.038
867.941 Pz

3.528

FORMATO COMPUTO METRICO


PROYECTO
VIVENDA FAMILIAR
ITEM
SOLADURA CON HS (20 Cm)
DIMENCIONES (Mts)
A
B
C
C

B
A

1.1

1.1

AREA
M2

1.21

VOLUMEN
M3

REPETIR
NRO

CANTIDAD
PARCIAL

12

14.52

m2 =

14.52

FORMATO COMPUTO METRICO


PROYECTO
VIVENDA FAMILIAR
ITEM
INPERMEABILIZACION DE MUROS
DESCRIPCION
DIMENCIONES (Mts)
A
B
C
A

58.8

AREA
M2

VOLUMEN
M3

REPETIR
NRO

CANTIDAD
PARCIAL

58.8

m2 =

58.8

FORMATO COMPUTO METRICO


PROYECTO
VIVENDA FAMILIAR
ITEM
RELLENO Y CONPACTACION
DESCRIPCION
DIMENCIONES (Mts)
A
B
C

AREA
M2

B
C
A

0.8

1.6

0.8

1.28

VOLUMEN
M3

1.024

REPETIR
NRO

CANTIDAD
PARCIAL

12

12.288

m3 =

12.288

FORMATO COMPUTO METRICO


PROYECTO
VIVENDA FAMILIAR
ITEM
LOSA CON VIGUETA PRETENSADA
DESCRIPCION
DIMENCIONES (Mts)
A
B
B

3.1

11.3

3.2

11.3

1.8

A
B

A
B

MADERA PRIMARIA
ELEMENTOS DE ENCOFRADO
LATERAL DE LOSAS
BARROTES LATERAL (C/60)
PIEZAS DE AGUANTE
COSTILLAS

ENTONCES PARA

ESPESOR
1 Pulg
1 Pulg
2 Pulg
2 Pulg
se puede
cambiar

Pulg
7.87
2.00
2.00
2.00

PARA

95.26m2
1.00m2
Pz
USOS
X Pz= 8.89155679

ONES (Mts)
C

AREA
M2

VOLUMEN
M3

REPETIR
NRO

CANTIDAD
PARCIAL

35.03

70.06

36.16

72.32

12.6

25.2

m2

Pies
192.91
0.66
192.91
192.91

Cantidad
1.00
11.00
2.00
2.00

Lados
2.00
2.00
2.00
2.00
Sumatoria ()
10 % Perdida

Total pies2
253.17
2.41
257.22
257.22
770.009
847.01

95.26

847.01
X
Pz
2.96385226

FORMATO COMPUTO METRICO


PROYECTO
VIVENDA FAMILIAR
ITEM
MUROS
DESCRIPCION
DIMENCIONES (Mts)
A
B

AREA
M2

B
C
A

58.8

2.5

147

AREA
M2

147

VOLUMEN
M3

REPETIR
NRO

CANTIDAD
PARCIAL

294

m3 =

294

Formulario de Presupuestos
N

descripcion
1 INSTALACION DE FAENAS
2 REPLANTEO
3 EXCAVACION DE ZAPATAS Y CIMIENTOS
4 SOLADURA Y H P
5 H A ZAPATAS
6 RELLENO Y COMPACTADO (ZAPATAS)
7 CIMIENTOS DE H'C' P.D 60%
8 SOBRECIMIENTOS DE H'C' P.D 40 %
9 IMPERMEABILIZACION DE SOBRECIMIENTOS
10 H A COLUMNAS
11 H A VIGAS
12 LOSA CON VIGUETAS PRETENSADAS
13 MURO DE LADRILLO 6H

Presupuestos
unidad
GLOBAL
GLOBAL
M3
M2
M3
M3
M3
M3
ML
M3
M3
M2
M2

cantidad

Precio
Unitario

1
1
1
513.69
28.17
14.52
4.63
12.28
7.05
3.52
58.8
5.4
11.052
95.26
294
Total Presupuesto =

Precio Total
0.00
513.69
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
513.69 Bs

También podría gustarte