Documentos de Académico
Documentos de Profesional
Documentos de Cultura
Client
: Belani Projects Ltd.
Contractor : ADS Designs Pvt. Ltd.
Site
: 5A, Woodburn Park, Kolkata - 700 020
Subject
: LOI for Interior Work at Belani Office
SL. NO.
ITEM DESCRIPTION
UNIT
QTY
1.00
CIVIL WORK
1.01
125 mm. thk. Brick Wall (AAC BLOCK) fixing (Material lifting
included)
SQM
287.62
1.02
250 mm. thk. Brick Wall (AAC BLOCK) fixing (Material lifting
included)
SQM
2.94
1.03
NOS
13.00
SQM
429.18
SQM
156.21
Providing, compacting and laying in position RCC lintels 5" x 6" x 4'0"
cast in situation in 1:2:4 cement concrete with 4 Nos of 8mm TOR
steel reinforcement with stirrups of 8mm dia TOR steel at 200mm c/c,
including 12mm cover, necessary shuttering, curing, compacting,
bending of steel reinforcement etc. complete. (Material lifting
included)
1.04
1.05
IPS FLOORING
IPS flooring layer below the carpet / wooden flooring and making the
level clear as per instructions given by the architect. (Material lifting
included)
1.06
PCC FLOORING
ANNEXTURE 01
Client
: Belani Projects Ltd.
Contractor : ADS Designs Pvt. Ltd.
Site
: 5A, Woodburn Park, Kolkata - 700 020
Subject
: LOI for Interior Work at Belani Office
SL. NO.
ITEM DESCRIPTION
UNIT
QTY
1.06.A
Providing & making upto 50 mm thk PCC flooring using sand /cement
complete as instructed. (Material lifting included)
SQM
608.13
1.06.B
SQM
11.14
1.08
SQM
135.87
SQM
53.00
1.09
2.01
Vitrified Flooring
ANNEXTURE 01
Client
: Belani Projects Ltd.
Contractor : ADS Designs Pvt. Ltd.
Site
: 5A, Woodburn Park, Kolkata - 700 020
Subject
: LOI for Interior Work at Belani Office
SL. NO.
2.02
ITEM DESCRIPTION
UNIT
QTY
SQM
385.97
SQM
23.92
ANNEXTURE 01
Client
: Belani Projects Ltd.
Contractor : ADS Designs Pvt. Ltd.
Site
: 5A, Woodburn Park, Kolkata - 700 020
Subject
: LOI for Interior Work at Belani Office
SL. NO.
2.03
2.04
ITEM DESCRIPTION
UNIT
QTY
RMT
192.62
SQM
17.96
RMT
5.04
SQM
26.62
SQM
8.59
SQM
36.22
VITRIFIED SKIRTING
2.05
2.06
2.07
2.08
ANNEXTURE 01
Client
: Belani Projects Ltd.
Contractor : ADS Designs Pvt. Ltd.
Site
: 5A, Woodburn Park, Kolkata - 700 020
Subject
: LOI for Interior Work at Belani Office
SL. NO.
2.09
ITEM DESCRIPTION
UNIT
QTY
SQM
30.00
SQM
482.52
SQM
996.11
SQM
212.20
GRANITE FLOORING
WALL FINISHES
3.01
POP PUNNING
Providing and applying Plaster of pata Paris punning (1st quality ISI
approved POP) with minimum thickness of 8mm to wall surfaces in
true level and plumb complete as directed.
3.02
3.03
ANNEXTURE 01
Client
: Belani Projects Ltd.
Contractor : ADS Designs Pvt. Ltd.
Site
: 5A, Woodburn Park, Kolkata - 700 020
Subject
: LOI for Interior Work at Belani Office
SL. NO.
3.04
3.05
ITEM DESCRIPTION
QTY
SQM
10.85
SQM
10.00
SQM
55.00
SQM
587.27
WALL PAPER
Providing and fixing as per the Architects choice and paste on to the
existing wall surfaces as per the location showed in the drawings.
(Basic Rate Rs. 170/ Per Sqft)
3.06
UNIT
FALSE CEILING
4.01
GYPSUM CEILING
4.02
ANNEXTURE 01
Client
: Belani Projects Ltd.
Contractor : ADS Designs Pvt. Ltd.
Site
: 5A, Woodburn Park, Kolkata - 700 020
Subject
: LOI for Interior Work at Belani Office
SL. NO.
4.03
ITEM DESCRIPTION
UNIT
QTY
SQM
10.00
SQM
11.50
4.04
ANNEXTURE 01
Client
: Belani Projects Ltd.
Contractor : ADS Designs Pvt. Ltd.
Site
: 5A, Woodburn Park, Kolkata - 700 020
Subject
: LOI for Interior Work at Belani Office
SL. NO.
ITEM DESCRIPTION
UNIT
QTY
SQM
22.00
SQM
7.50
SQM
634.00
5.02
RMT
106.00
5.03
BLINDS
4.05
MISCLLENIOUS
5.01
PEST CONTROL
ANNEXTURE 01
Client
: Belani Projects Ltd.
Contractor : ADS Designs Pvt. Ltd.
Site
: 5A, Woodburn Park, Kolkata - 700 020
Subject
: LOI for Interior Work at Belani Office
SL. NO.
ITEM DESCRIPTION
UNIT
QTY
5.03.A
SQM
113.50
5.03.B
SQM
40.00
SQM
12.00
LS
1.00
SQM
25.00
LS
1.00
NOS
6.00
5.04
5.05
FALSE FLOORING
Providing and fixing false flooring tiles 600x600x35 mm. with under
structure, height upto 330 mm. ffl.
SS STRIP INLAY
Providing and fixng of ss inlay strip as per site requirement &
complete for all locations as directed and instructed by Architect.
5.06
5.07
5.08
FROSTED FILM
Providing and fixing Frosted film (3M)
SIGNAGES as per architect's design.
Internal signages, Pull /push signages
FIRE SAFTY SIGNAGES
LED self
illuminated Acrylic Bothside Fire exit with hanging
attachment of size 16" x 8"
5.09
SQM
35.00
5.10
SQM
35.00
5.11
1.00
5.12
PLANTER BOX
ANNEXTURE 01
Client
: Belani Projects Ltd.
Contractor : ADS Designs Pvt. Ltd.
Site
: 5A, Woodburn Park, Kolkata - 700 020
Subject
: LOI for Interior Work at Belani Office
SL. NO.
5.13
ITEM DESCRIPTION
UNIT
QTY
NOS
1.00
NOS
1.00
SQM
17.00
SQM
23.00
NOS
7.00
DESIGNER MIRROR
Providing and fixing 900 mm. dia mirror with wooden frame polish
finish as per architect's instruction & design complete in all respect.
5.14
CARPET FLOORING
Providing and inatallation of carpet tile including adhesive, stair
profile, nessecery hardware & fittings complete in all respect as per
architect's instruction & design. (carpet basic rate: 170/ )
CARPENTARY
6.01
6.02
6.03
ANNEXTURE 01
Client
: Belani Projects Ltd.
Contractor : ADS Designs Pvt. Ltd.
Site
: 5A, Woodburn Park, Kolkata - 700 020
Subject
: LOI for Interior Work at Belani Office
SL. NO.
6.04
ITEM DESCRIPTION
UNIT
QTY
SQM
14.00
SQM
17.71
ANNEXTURE 01
Client
: Belani Projects Ltd.
Contractor : ADS Designs Pvt. Ltd.
Site
: 5A, Woodburn Park, Kolkata - 700 020
Subject
: LOI for Interior Work at Belani Office
SL. NO.
6.05
ITEM DESCRIPTION
UNIT
QTY
SQM
7.76
Providing and fixing of full height partition made of one side VENEER
over 12 mm. plywood & one side cement fibre board skinning over
solid joint wood frame inside treated with anti termite chemical & 50
mm thk. 28 density Glass wool insulation inside. All the joints would
be properly filled with proprietor y jointing compound, gauze tape etc.
with the surface rubbed with emery paper & finished in perfect line &
SQ.M.
level to receive paint finish.The rate shall include providing carpentary,
neccesery hardware, additional supports, bracing wherever needed
as per the design & making of sleeves/ cutouts wherever required and
including of all necessary hardware, scaffolding etc. complete in all
respect as per architect's instruction & design. (Veneer basic rate:
120/ sq.ft.)
1.46
Providing and fixing of full height partition made of one side gypsum
board & one side cement fibre board skinning over solid joint wood
frame inside treated with anti termite chemical & 50 mm thk. 28
density Glass wool insulation inside. All the joints would be properly
filled with proprietor y jointing compound, gauze tape etc. with the
surface rubbed with emery paper & finished in perfect line & level to
receive paint finish.The rate
shall include providing additional
supports, bracing wherever needed as per the design & making of
sleeves/ cutouts wherever required and including of all necessary
hardware, scaffolding etc. complete in all respect as per architect's
instruction & design.
6.06
6.07
ANNEXTURE 01
Client
: Belani Projects Ltd.
Contractor : ADS Designs Pvt. Ltd.
Site
: 5A, Woodburn Park, Kolkata - 700 020
Subject
: LOI for Interior Work at Belani Office
SL. NO.
ITEM DESCRIPTION
UNIT
QTY
Providing and fixing of full height partition made of one side VENEER
over 12 mm. plywood & one side gypsum board skinning over solid
joint wood frame inside treated with anti termite chemical & 50 mm
thk. 28 density Glass wool insulation inside. All the joints would be
properly filled with proprietory jointing compound, gauze tape etc. with
the surface rubbed with emery paper & finished in perfect line & level
to receive paint finish.The rate shall include providing carpentary,
neccesery hardware, additional supports, bracing wherever needed
as per the design & making of sleeves/ cutouts wherever required and
including of all necessary hardware, scaffolding etc. complete in all
respect as per architect's instruction & design. (Veneer basic rate:
120/ sq.ft.)
SQM
1.00
6.08
SQM
3.50
6.09
SQM
27.00
NOS
1.00
6.10
6.11
ANNEXTURE 01
Client
: Belani Projects Ltd.
Contractor : ADS Designs Pvt. Ltd.
Site
: 5A, Woodburn Park, Kolkata - 700 020
Subject
: LOI for Interior Work at Belani Office
SL. NO.
6.12
ITEM DESCRIPTION
UNIT
QTY
Full ht. fully glazed partition with 10mm. Thk glass of modiguard
complete as per drawing & Intructions of the Architect.The rate shall
include providing & fixing transparent acoustic sealent as per
approval infill for the joints between glass panes, with all necessary
hardware etc.
SQM
6.50
SQM
92.94
SQM
29.00
SQM
18.80
VENEER PANELING
Providing and fixing veneer finished wall paneling with wooden section
& ply backing to level the back surface. The vertical support sections
would be erected @ max. 2'0" c/c.The skinning shall be of 12.5 mm
thk PLY WOOD of on either side screwed to the erected framework
complete WITH POLISHED VENEER as per instructions of the
architect. The rate shall include providing additional supports, bracing
wherever needed as per the design & making of sleeves/ cutouts
wherever required and including of all necessary hardware,
scaffolding etc. complete as per instruction & design of the architect.
6.13
6.14
ANNEXTURE 01
Client
: Belani Projects Ltd.
Contractor : ADS Designs Pvt. Ltd.
Site
: 5A, Woodburn Park, Kolkata - 700 020
Subject
: LOI for Interior Work at Belani Office
SL. NO.
6.15
ITEM DESCRIPTION
RMT
58.95
SQM
3.50
SQM
2.00
6.19
6.36
6.18
SQM
6.17
QTY
6.16
UNIT
ANNEXTURE 01
Client
: Belani Projects Ltd.
Contractor : ADS Designs Pvt. Ltd.
Site
: 5A, Woodburn Park, Kolkata - 700 020
Subject
: LOI for Interior Work at Belani Office
SL. NO.
6.20
ITEM DESCRIPTION
UNIT
QTY
Providing & fixing counter out with Cuddapa frame finished with Jet
black granite as per detailed drawing with cutout for wash basin
complete with half round moulding etc complete as per architects
instructions Basic Cost of polished granite Rs.140/ per Sq. Ft
RMT
1.80
RMT
2.90
SQM
3.25
RMT
17.50
RMT
11.50
RMT
35.25
NOS
1.00
NOS
2.00
NOS
1.00
6.21
MIRROR PANELING
Providing and fixing 6mm thick float mirror of approved make edge
polished and without any defects, waves etc., shall be fixed to 12mm
ply backing with 3M tape and stainless steel beading all round as per
details, above wash basins. Modiguard float mirror.
6.22
6.22.A
6.22.B
6.22.C
Providing and fixing 200 mm x 50 mm. SAL WOOD door frame with
PU paint finish
6.23
6.23.A
ANNEXTURE 01
Client
: Belani Projects Ltd.
Contractor : ADS Designs Pvt. Ltd.
Site
: 5A, Woodburn Park, Kolkata - 700 020
Subject
: LOI for Interior Work at Belani Office
SL. NO.
ITEM DESCRIPTION
UNIT
QTY
NOS
1.00
NOS
NOS
1.00
1.00
NOS
4.00
NOS
1.00
6.23.C
6.23.D
6.23.E
CONFERENCE DOOR
ANNEXTURE 01
Client
: Belani Projects Ltd.
Contractor : ADS Designs Pvt. Ltd.
Site
: 5A, Woodburn Park, Kolkata - 700 020
Subject
: LOI for Interior Work at Belani Office
SL. NO.
ITEM DESCRIPTION
UNIT
QTY
NOS
1.00
NOS
1.00
NOS
NOS
NOS
NOS
1.00
1.00
1.00
1.00
6.24
TRAP DOOR
SQM
15.00
6.25
CABINETS
6.25.A
Wall cabinet made of ply along with venner pasting & paint finish on
top of it, complete in all respect as per design for HOD cabins.
NOS
7.00
6.25.B
Low Height cabinet made of ply along with venner pasting & paint
finish on top of it, complete in all respect as per design for director's
cabin 01.
NOS
1.00
6.25.C
6.25.D
6.25.E
6.25.F
NOS
NOS
SQM
SQM
1.00
1.00
5.40
4.75
6.23.G
ANNEXTURE 01
Client
: Belani Projects Ltd.
Contractor : ADS Designs Pvt. Ltd.
Site
: 5A, Woodburn Park, Kolkata - 700 020
Subject
: LOI for Interior Work at Belani Office
SL. NO.
ITEM DESCRIPTION
6.26
6.26.A
6.26.B
6.26.C
6.27
6.27.A
6.27.B
6.27.C
6.28
1.00
1.00
SQM
75.00
RMT
5.00
NOS
1.00
NOS
1.00
SQM
7.56
NOS
1.00
SQM
34.84
SQM
4.00
6.31
LS
LS
6.30
QTY
DB BOXING
Providing and fixing DB boxing made of plywood with laminate finish
including 100 mm. wide grill on botton portion, necessary hardware
etc. complete in all respect as per design & architect's instruction.
6.29
UNIT
BRANDING PANEL
Providing & fixing BRANDING panel made of digital printed sav sheet
pasted over 12 mm. ply structure & backing, including nessecery
hardware, labour etc. complete in all respect as per design &
architect's instruction.
ANNEXTURE 01
Client
: Belani Projects Ltd.
Contractor : ADS Designs Pvt. Ltd.
Site
: 5A, Woodburn Park, Kolkata - 700 020
Subject
: LOI for Interior Work at Belani Office
SL. NO.
6.32
ITEM DESCRIPTION
UNIT
QTY
SQM
0.53
SQM
19.00
SQM
634.00
RMT
RMT
120.00
30.00
SQM
595.00
PU FINISHED SHELVES
Providing & fixing 50 mm. thick wooden shelves made of pu paint
finish over ply structure including nessecery hardware, labour etc.
complete in all respect as per design & architect's instruction.
Supply and fixing all internal pipelines, traps, stopcocks and other
nessecery fitting complete in all respect as per instruction of architect.
SUB TOTAL OF 7.00
8.00
ELECTRICAL WORKS
8.01
Supply and fixing all electrical work along with normal LIGHT
FIXTURE & regular switch socket, DB box, MCB, ETC complete in all
respect as per instruction of architect.
8.02
CABLE TRAY
Supply and nstalltion of GI perforated cable tray hang with GI tie rod &
neccesery MS support, complete in all respect as per instruction of
architect.
8.02.A
8.02.B
9.00
PA SYSTEM
Quotation supply & laying for internal Music Syestem Wiring
PVC conduit, Speaker Installation as per drawing etc.
with
Raw Power circuit wiring with 3 run 2.5.sq.mm. Cu wires from DBs to
Service power Socket per electrical layout.
ANNEXTURE 01
Client
: Belani Projects Ltd.
Contractor : ADS Designs Pvt. Ltd.
Site
: 5A, Woodburn Park, Kolkata - 700 020
Subject
: LOI for Interior Work at Belani Office
SL. NO.
ITEM DESCRIPTION
UNIT
QTY
SQM
595.00
SQM
595.00
SQM
595.00
SQM
634.00
11.00
12.00
13.00
ANNEXTURE 01
Client
: Belani Projects Ltd.
Contractor : ADS Designs Pvt. Ltd.
Site
: 5A, Woodburn Park, Kolkata - 700 020
Subject
: LOI for Interior Work at Belani Office
SL. NO.
ITEM DESCRIPTION
UNIT
QTY
SQM
595
SQM
595.00
with TCP/IP
RATE
% of work
completed
Certified
Qty
AMOUNT
1,560.00
266.15
100%
266.15
415,194
2,748.00
2.88
100%
2.88
7,914
1,040.00
13.00
100%
13.00
13,520
292.00
378.71
100%
378.71
110,583
470.50
154.50
100%
154.50
72,692
RATE
% of work
completed
Certified
Qty
AMOUNT
743.00
532.08
100%
532.08
395,335
545.00
128.31
100%
128.31
69,929
2,691.00
48.91
100%
48.91
131,617
3,120.00
1,216,785
RATE
% of work
completed
Certified
Qty
AMOUNT
1,251.00
349.55
90%
314.60
393,558
1,646.00
25.88
85%
22.00
36,209
RATE
% of work
completed
Certified
Qty
AMOUNT
170.00
162.97
90%
146.67
24,934
2,090.50
17.96
30%
5.39
11,263.61
5,445.00
26.21
100%
26.21
142,713
1,850.00
7.12
90%
6.41
11,855
2,110.00
34.01
90%
30.61
64,585
1,362.00
RATE
% of work
completed
Certified
Qty
AMOUNT
1,250.00
685,118
446.00
399.67
90%
359.70
160,428
238.00
134.00
75%
100.50
23,919
282.00
223.90
66%
147.77
41,672
RATE
% of work
completed
Certified
Qty
AMOUNT
505.00
2,822.00
2,860.00
226,019
1,175.00
55%
323.00
379,523
RATE
1,203.00
2,675.00
% of work
completed
Certified
Qty
AMOUNT
RATE
% of work
completed
Certified
Qty
AMOUNT
5,700.00
19.00
35%
6.65
37,905
5,987.00
417,428
110.00
745.00
100%
634.00
69,740
RATE
% of work
completed
Certified
Qty
AMOUNT
2,950.00
4,500.00
7,975.00
84,000.00
50,400
1,040.00
40,000.00
5,000.00
2,050.00
22,500.00
6,500.00
19.39
75%
14.54
327,206
RATE
% of work
completed
Certified
Qty
AMOUNT
13,200.00
7,500.00
2,830.00
447,346
8,700.00
26.89
40%
10.76
93,577
45,500.00
6.00
45%
2.70
122,850
RATE
14,200.00
2,300.00
% of work
completed
Certified
Qty
0%
17.63
90%
AMOUNT
15.87
36,494
RATE
% of work
completed
Certified
Qty
AMOUNT
6,100.00
7.76
90%
6.98
42,602
6,700.00
1.15
90%
1.04
6,935
RATE
% of work
completed
Certified
Qty
AMOUNT
4,499.00
0.96
40%
0.38
1,728
26.77
70%
18.74
95,569
11,840.00
5,100.00
14,550.00
RATE
% of work
completed
Certified
Qty
AMOUNT
44.82
80%
35.86
163,324
17.70
70%
12.39
51,728
5,695.00
4,555.00
2,390.00
4,175.00
RATE
% of work
completed
Certified
Qty
AMOUNT
4,220.00
1.60
50%
0.80
3,376
1,385.00
57.43
85%
48.82
67,609
17,575.00
3.50
40%
1.40
24,605
13,810.00
2.00
25%
0.50
6,905
RATE
% of work
completed
Certified
Qty
AMOUNT
29.55
70%
20.69
72,160
9,655.00
17,325.00
4,165.00
4,065.00
2,600.50
3,488.50
28,250.00
30,200.00
31,680.00
RATE
30,200.00
30,500.00
28,000.00
43,500.00
40,985.00
% of work
completed
Certified
Qty
AMOUNT
RATE
57,389.00
48,500.00
29,455.00
28,250.00
54,400.00
32,555.00
5,150.00
20,850.00
34,650.00
0.00
0.00
0.00
0.00
% of work
completed
Certified
Qty
AMOUNT
RATE
% of work
completed
Certified
Qty
AMOUNT
250,000.00
200,000.00
50%
50%
125,000.00
100,000.00
6,995.00
15%
11.25
1,049.25
52%
10.44
22,960
5,500.00
22,000.00
15,000.00
7,814.00
30,000.00
2,200.00
8,252.00
20.07
RATE
% of work
completed
Certified
Qty
AMOUNT
8,500.00
0.53
50%
0.27
2,253
1,040,724
4,800.00
50%
2,400
2,400
5,875.00
375.00
500.00
35.74
14.65
70%
443.80
2607325
95%
100%
33.95
14.65
12,732.38
7,325.00
2,627,382
416.00
50%
298
123,760
RATE
416.00
% of work
completed
Certified
Qty
AMOUNT
50%
298
123,760
123,760
745.00
30%
178.50
132,983
132,983
415.00
20%
119.00
49,385
505.00
60%
380.40
192,102
192,102
RATE
1,299
% of work
completed
Certified
Qty
AMOUNT
40%
238
309,269
309,269
960.00
40%
238
228,480
228,480
intly measurement taken for the the activities, completed more than 90%.
REMARKS
Claimed
%
Certified
%
Differ %
Complted
100%
100%
0%
Complted
100%
100%
0%
Complted
100%
100%
0%
100%
100%
0%
100%
100%
0%
Claimed
%
Certified
%
Differ %
100%
100%
0%
100%
0%
100%
Complted
100%
100%
0%
100%
100%
0%
REMARKS
Claimed
%
Certified
%
Differ %
95%
90%
5%
90%
85%
5%
REMARKS
Claimed
%
Certified
%
Differ %
95%
90%
5%
30%
30%
0%
0%
0%
0%
Complted
100%
100%
0%
95%
90%
5%
95%
90%
5%
REMARKS
Claimed
%
Certified
%
Differ %
0%
0%
0%
95%
90%
5%
60%
10%
50%
70%
70%
0%
REMARKS
REMARKS
Claimed
%
Certified
%
Differ %
0%
0%
0%
0%
0%
0%
0%
0%
0%
80%
55%
25%
REMARKS
Claimed
%
Certified
%
Differ %
0%
0%
0%
0%
0%
0%
REMARKS
On overall area
Claimed
%
Certified
%
Differ %
65%
30%
35%
0%
0%
0%
100%
100%
0%
0%
0%
0%
REMARKS
Claimed
%
Certified
%
Differ %
0%
0%
0%
0%
0%
0%
0%
0%
0%
80%
60%
20%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
80%
42%
38%
0%
0%
0%
Claimed
%
Certified
%
Differ %
0%
0%
0%
0%
0%
0%
0%
0%
0%
45%
40%
5%
45%
45%
0%
REMARKS
REMARKS
Gypsum fixed
finishing work is
going on
Claimed
%
Certified
%
Differ %
0%
0%
0%
90%
90%
0%
REMARKS
Claimed
%
Certified
%
Differ %
90%
90%
0%
90%
71%
19%
REMARKS
Claimed
%
Certified
%
Differ %
90%
38%
52%
0%
0%
0%
80%
69%
11%
0%
0%
0%
REMARKS
Claimed
%
Certified
%
Differ %
0%
0%
0%
70%
39%
31%
0%
0%
0%
90%
66%
24%
REMARKS
Claimed
%
Certified
%
Differ %
70%
13%
57%
90%
83%
7%
60%
40%
20%
50%
25%
25%
REMARKS
Claimed
%
Certified
%
Differ %
0%
0%
0%
50%
0%
50%
0%
0%
0%
0%
0%
0%
0%
0%
0%
70%
59%
11%
0%
0%
0%
0%
0%
0%
0%
0%
0%
REMARKS
Claimed
%
Certified
%
Differ %
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
REMARKS
Claimed
%
Certified
%
Differ %
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
REMARKS
Claimed
%
Certified
%
Differ %
50%
50%
50%
50%
0%
0%
30%
15%
15%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
Work in progress
60%
30%
30%
0%
0%
0%
REMARKS
Claimed
%
Certified
%
Differ %
50%
25%
25%
Internal plumbing
work done
100%
50%
50%
75%
70%
5%
95%
100%
28%
49%
67%
51%
55%
55%
0%
REMARKS
Claimed
%
Certified
%
Differ %
55%
55%
0%
40%
30%
10%
40%
20%
20%
75%
60%
15%
90%.
REMARKS
Claimed
%
Certified
%
Differ %
70%
40%
30%
70%
40%
30%