Está en la página 1de 18

CALCULO HIDRAULICO DE CAPTACION DE RIO

PROYECTO
UBICACIN : LOCALIDAD / DISTRITO / PROVINCIA
ENTIDAD PROMOTOR EJECUTOR
PROGRESIVA
Q (caudal mx de descarga)

0.30 m3/s

Q (caudal de diseo)

0.022 m3/s

L (Ancho de ro)

1.20 m

n (coef. rugosidad captacin del ro)

0.016

n (coef. de rugosidad canal conducc.)

0.016

S (pendiente del ro m/m)

0.01

S (pendiente canal conduccin m/m)

0.005

C (coefic.descarga)

2.00
Por Ing. Belisario Soria Urbano Huaraz - Ancash

1.- AZUD - VENTANA CAPTACION


Carga total Hidrulica sobre el azud
Ho = H + Hv
Ho = (Q/C.L)

H = Ho - Hv
0.25 m

2/3

Caudal especfico
q = C.Ho3/2

0.25 m3/s/m

Diseo ventana de captacin


Q = C.b.h3/2 ;

b = Q/(1.84h3/2)

h (m)

0.11 m

h (m)

Usar

b (m)

0.15 m
0.21 m

b' = b + N.t

Usar

P = ho + h + h'

0.25 m
0.85 m

Prdida de carga en la rejilla


Hv = q2/[2g(P + Ho + Hv)2]

0.003 m OK

Carga sobre el azud


H = Ho - Hv

0.25 m

Veloc.acercam. al azud
Va = Vo = q/(P + H)

0.23 m/s

2.- COLCHON DISIPADOR


Zo = Co - C1 = e = Desnivel topogfico

0.30 m

To = Zo + P + H + Vo /2g

1.40 m

Y1 =

0.05 m

Y1 = q/K((To - Y1)*2g)1/2 ; K = 0.90

0.05 m OK

V =q/Y1
F = V1/(gY1)1/2
Y2 = Y1 /2*(1+8F2)1/2-1

5.00 m/s
7.14
0.51 m

Longitud del colchon disipador


Lc = 5(Y2 - Y1)

2.30 m

RAULICO DE CAPTACION DE RIO


MEJORAMIENTO DEL CANAL LLACLLIN
LLACLLIN - LLACLLIN - RECUAY
FONCODES - ZONAL HUARAZ
KM : 00 + 000
(coefic.de forma de soleras)

2.42

t (espesor de las soleras )

0.01 m

s (separacin entre soleras)

0.08 m

V (veloc.agua frente a rejilla )


(.inclinac.ventana vs hz )
g (aceleracin de la grav.)

1.00 m/s
55.00
9.81 m/s2

Hv (prdida de carga en la rejilla)

0.003

Soria Urbano Huaraz - Ancash

Profundidad del colchon disipador


e = Zo = Co - C1

0.30 m

3.- ALIVIADERO DE DEMASIAS


Prd. carga en la rejilla
hr = b (t/s) 4/3*(V2/2g)*(Sen a)

0.0069 m

Carga sobre la ventana


Hc = (h/2 + h' + H) - hr

0.52 m

Caudal de ingreso x la ventana ( orificio )


Q1 = C.A.(2gHc)1/2

Captado

0.06 m3/s

Q2 =

Diseo

0.02 m3/s

Q' = Q1 - Q2

Exceso

0.04 m3/s

Tirante del canal antes del aliviadero


Ya = (Q.n/(S1/221/3))3/8

0.22 m

b = 2Y

0.43 m

Tirante del canal despus del aliviadero


Yd = (Q.n/(S1/221/3))3/8

0.15 m

Alto total del aliviadero


Ha = (Ya - Yd) + BL

0.10 m

CORTE

Ancho del aliviadero


L =3Q/(2*C.K*(2g)1/2*Ha3/2)

LINEA DE ENERG

0.85 m

4.- CANAL DE LIMPIA


Vc = 1.5*C.d1/2
q = Vc3/g

1.51 m/s
0.35 m3/s/m

B = Q/q

0.90 m

h = B/2

0.45 m

S = n.g10/9/q2/9

Le = 0.67*C*(Dn.q) - Lc

Ho
H
h'

0.26

5.- ENROCADO DE PROTECCION


q =Q/B

Hv

0.25 m3/s/m
0.30 m

h
ho

b
Co

GRAFICO DE VISUALIZACIN DEL DISEO

CORTE A - A
LINEA DE ENERGIA

CORTE B - B

Hv

Ho

Ya

h'
P

Yd

h
ho

b
Co

Yn

Y2
Y1

C1

DEL DISEO

GRAFICO DE VISUALIZACIN DEL D

CORTE A - A
LINEA DE ENERGIA

RTE B - B

Hv
Ho
H
Yd

P
Yn

Ya

h'
h
ho

b
Co
Y1

C1

AFICO DE VISUALIZACIN DEL DISEO

CORTE B - B
H
Ya

Yd

Yn

Y2
Y1

C1

Y2
Y1

C1

Y1

C1

Y1

C1

FRMULAS LGICAS BSICAS


=SI(O(C50=0,K50=0),"",+K50-C50)

=SI(Y(B5>2,B5<=4),"4",SI(Y(B5>4,B5<=6),"6",SI(Y(B5>6,B5<=8),"8",SI(Y(B5>8,B5<=10),"10",SI(Y(B5>10,B

=+SI(Y(A8>2.5,A8<4.5),"TIPO I",(+SI(Y(A8>4.5,A6<17.24),"TIPO II",(+SI(Y(A8>4.5,A6>17.24),"TIPO III","N


=SI(O(O(E48=0,D48=0),H48=0),"",(1.72*10^6*D48*E48^1.85/140^1.85/H48^4.87))
=SI(O(E49=0,F49=0),"",(E49/(0.0597*(F49^0.54)))^(1/2.63))
=+SI(D32<H39,F39,SI(D32<H40,F40,SI(D32<H41,F41,SI(D32<H42,F42,SI(D32<H43,F43)))))
=SI(E91>2,"Ok","No pasa")
=+SI(H13="","",PARTIDAS!$D$5/CONTARA($F$13:$AK$13))

Reparte en forma proporcional l

=SI(PARTIDAS!$C$8="","",PARTIDAS!$C$8)

=+E199*(1-0.0444444*(F199*PI()/180)^2+0.0007054*(F199*PI()/180)^4-0.0000025*(F199*PI()/180)^6)*CO
=SI(F199>18,ENTERO(F199/3-(0.00958*F199)^3),ENTERO(F199/3))

Conviete un valor a grados

=SI(F199>18,3600*((F199/3-(0.00958*F199)^3)-I199-J199/60),3600*(F199/3-I199-J199/60))
=SI(F199>18,3600*((F199/3-(0.00958*F199)^3)-I199-J199/60),3600*(F199/3-I199-J199/60))
=CONCATENAR(": ",DAT!$D$5)

soria U

=SUMAR.SI(B10:B59,">0:",K10:K59)
=BUSCARV(C21,INS!$C$6:INS!$D$49,2)
'=": "&DESREF(ESP!$D$9,I1,1)
=": "&DESREF(ESP!F9,I1,1)&" "&DESREF(ESP!G9,I1,1)&DESREF(ESP!H9,I1,1)
=SI(B201>B200,100*1.27/B201,100*2/B200)
Para multiplicar varias columnas y devolver nada si no hay nada

=SI(Y(E16<>0,F16<>0,G16<>0),E16*F16*G16*H16,SI(Y(E16<>0,F16<>0,G1

10

20

30

40

B5<=10),"10",SI(Y(B5>10,B5<=12),"12",SI(Y(B5>12,B5<=14),"14",SI(Y(B5>14,B5<=16),"16")))))))

.5,A6>17.24),"TIPO III","No Necesita")))))

<H43,F43)))))

te en forma proporcional los valores de hoja partida en otra celda

25*(F199*PI()/180)^6)*COS((I199+J199/60+K199/3600)*PI()/180)

iete un valor a grados


Convierte un valor a minutos
Convierte un valor a segundos

:soria U

EF(ESP!H9,I1,1)

16<>0,F16<>0,G16=0),E16*F16*H16,SI(Y(E16<>0,F16=0,G16<>0),E16*G16*H16,SI(Y(E16=0,F16<>

6,SI(Y(E16=0,F16<>0,G16<>0),F16*G16*H16,SI(Y(E16<>0,F16=0,G16=0),E16*H16,H16)))))

6,H16)))))

También podría gustarte