Documentos de Académico
Documentos de Profesional
Documentos de Cultura
Planenergi
2016128
Tetsunari IIDA /
Institute for Sustainable Energy Policies
tetsu@isep.or.jp
EUEU
EU2016216COM(2016) 51 final
EU205080%
EU4(2012)
1.
2.
3.
4.
5.
3050%
20501050%
()
4
100
The purpose of this paper has been to dene the concept of 4th
Generation District Heating (4GDH) including the concept of smart
thermal grids. The paper has described the historical development
of district heating systems in terms of three generations and
4
()
>200
>100
<100
<50~60(70)
4
1.
2.
3.
45 %
/
95 / 36 C
: 15 C
:
118 %
District
Heating
Flow,
95
C
95
Absorption
Heat
Pump
7 C
105
C
80
C
12
C
60
C
Flue
gas
Fuel
15
C
Bio
Boiler
Combustion
air
Pre
heating
Condensor
District Heating
40-50
Return
40-50
C
VS
(% Hn*)
45%,
20%,
> 60%
10
JP ('08)
15 1 15
GE ('07)
43
US ('05)
40
0
20
Space
Heat
Hot
water
Cooling
EL
Cooking
etc.
7 10 2
20
40
8
60
30
80
GJ/household*y
100
120
10
1.0
Japan
0.8
W/m
K
U value
(W/m22K)
Korea
0.6
USCalifornia
Prescriptive
0.4
Germany
UK
0.2
0.0
0
500
1,000
1,500
2,000
2,500
3,000
3,500
4,000
4,500
5,000
11
5,500
25
(50%)
89 (05-10)
45(90%)
12
13
renewable heat energy in Japan
PJ
14
106ha
96
22ha
10
EC
82GJ/h
59GJ/h
E C
614GJ/h
614GJ/h
(180)
(80)
(6)
E C
170GJ/h
170GJ/h
154GJ/h
154GJ/h
9,630kW
9,630kW
E C
38GJ/h
38GJ/h
21GJ/h
21GJ/h
1,270kW
1,270kW
24
E C
29GJ/h
29GJ/h
24GJ/h
24GJ/h
700kW
700kW
15
(SoG)
SoG
ISEP
16
ISEP/
,
C
17
18
2008
State-of-green.jp
2015
180 :
(40%)
(15%)
(35%)
(10%)
30
19
20
Projectbalance1Project schedule
Set project schedule separately in Step1 and Step2.
Conduit improvement takes about three years in Step1, and the supply will start accordingly.
In Step 2, it will take 10years to improve the conduits, and supply will be expanded to the whole area once Step 1 has finished.
H 27
H 28
H 29
H 31
H 32
H 33
S tep1
1
S tep2/1
H 34
H 35
H 36
H 37
H 38
H 39
H 40
H 41
H 42
H 30
S tep2
S tep2/2
S tep2/3
Planning
Local
Biomass
and
District
HeaPng
Ogata Mura
Area 1:
Hotel, Polder Spa, Welfare
and Nursing Home
Area 2:
Villagerun Housing
Area 3: Public facilities
Village Office, Village Center,
Clinic, Health Center,
Schools, Public Hall
Area 4:
Individual Housing 731 units.
Danish-Japan
Technology
Transfer
Program
22
Jens Birch Jensen