BILL OF QUANTITIES

B
A

JHR Amendments
Student Version
Quantity
Rate ()

Version D
Item Description

Number

Unit

2/15/2007
10/24/2006
Sept.06
July.06
Amount

Sub
Contractor

Class A: GENERAL ITEMS


Contractual requirements
A110

Performance bond

sum

0.25%

16247477.41

40618.69

Manager

A120

Insurance of the works

sum

1.00%

16247477.41

162474.77

Manager

A130

Third party insurance

sum

0.20%

16247477.41

32494.95

Manager

Specified requirements
A211.1

Establishment and removal of offices for the Engineer's staff - fixed

720.00

Temporary works

A211.2

Maintenance of offices for the Engineer's staff - time related

wk

104

266.00

27664.00

Temporary works

A221.1

Provide and maintain transport vehicle for the Engineer's staff - 2000cc car - time related

wk

104

125.00

13000.00

Plant

A221.2

Provide and maintain transport vehicle for the Engineer's staff - Landrover - time related

wk

104

140.00

14560.00

Plant

A221.2

Petrol for transport vehicles - time related

wk

104

63.60

6614.40

Plant

A222.1

Provide telephones for the Engineer's staff - fixed

400.00

Temporary works

A222.2

Maintain telephones for the Engineer's staff - time related

wk

104

65.00

6760.00

Temporary works

Set of progress photographs comprising twelve prints per week

wk

112

3.00

336.00

Temporary works

500.00

Temporary works

104

136.00

14144.00

Temporary works

500.00

Temporary works

11648.00

Temporary works

500.00

Temporary works

A229

sum

sum

A231.1

Establishment and removal of Office Equipment - fixed

A231.2

Maintenance of office equipment - time related

sum

A232.1

Establishment and removal of Laboratory Equipment - fixed

A232.2

Maintenance of Laboratory equipment - time related

wk

A233.1

Establishment and removal of surveying equipment

sum

A233.2

Maintenance of surveying equipment - time related

wk

A242

Attendance upon the Engineer's staff - Chainmen

A250

Testing of materials - Concrete test cubes samples and methods of testing as Specification clause

wk
sum

104

112.00

104

112.00

11648.00

Labour

wk

65

241.41

15691.65

Labour

nr

339

6.30

2135.70

Concrete

11440.00

Temporary works

104

702.00

73008.00

Temporary works

1520.00

Temporary works

13520.00

Temporary works

2160.00

Temporary works

Method-Related Charges
The Tenderer is to insert fully described items on the following pages to cover any Method Related
Charges he may care to make. The unit of measure shall be the sum and the Tenderer shall
distinguish between those which are FIXED and those which are TIME RELATED. Further
sheets can be inserted if required, although the total sum of all Method Related Charges should
appear at the bottom of this sheet, to be carried forward.
A311.1

Accomodation and buildings, Offices, Establish and remove - Fixed

A311.2

Accomodation and buildings, Offices, Maintain - Time related

A 313.1

Accomodation and buildings, Establish and remove toilet cabins - Fixed

A313.2

Accomodation and buildings, Maintain toilet cabins - Time related

A314.1

Accomodation and buildings, Establish and remove 5 stores and materials compound - Fixed

A314.2

Accomodation and buildings, Maintain 5 stores and materials compound - Time related

A 315.1

Accomodation and buildings, Establish and remove Canteen / messrooms - Fixed

A 315.2

Accomodation and buildings, Maintain Canteen / messrooms - Time related

A321.1

Services, Provide electricity supply and standby generator - Fixed

A321.2

Services, Electricity supply - Time related

A322.1

Services, Provide water supply - Fixed

A322.2

Services, Water supply for the duration of construction - Time related


Services, Site security - Time related

A323

sum
wk
sum
wk

104

130.00

sum
wk

104

64.55

2160.00

Temporary works

4220.00

Temporary works

104

154.00

16016.00

Temporary works

3600.00

Temporary works

6240.00

Labour

sum
wk
sum
wk

104

60.00

2445.00

Labour

wk

104

60.00

6240.00

Labour

wk

104

1130.64

117586.56

Temporary works

25864.64

Temporary works

104

26.92

2799.68

Temporary works

1800.00

Plant
Labour

sum

A324.1

Services, Establish and remove site hoardings - Fixed

A324.2

Services, Maintain site hoardings - Time related

A331.1

Plant, Tower crane, Establish and remove - Fixed

A331.2

Plant, Tower crane, operate - Time related

wk

52

1500.00

78000.00

A331.3

Plant, 35T Mobile Crane - Time related

wk

800.00

800.00

Plant

A332.1

Plant, Wheel wash, Establish - Fixed

360.00

Plant

A332.2

Plant, Operate wheel wash -Time related

2961.20

Plant

A332.3

Plant, Remove wheel wash - Fixed

sum

360.00

Plant

A332.4

Plant, Cherry Pickers -Time related

wk

56

430.00

24080.00

Plant

A332.5

Plant, Forklift - Time related

wk

104

420.00

43680.00

Plant

A333.1

Plant, 5T Bulldozer -Time related

wk

470.00

940.00

Plant

A333.2

Plant, 10T 360 Excavator - Time related

wk

475.00

950.00

Plant

A333.3

Plant, 3T 360 Excavator - Time related

wk

230.00

920.00

Plant

SPAM BoQ Version D

sum
wk
sum

sum
wk

55

53.84

Swimming Pool At Mountbatten

MEng4; 2006

A333.4

Plant, Grader - Time related

wk

370.00

740.00

Plant

A333.5

Plant, 3T Dumper - Time related

wk

A333.6

Plant, Loading Shovel - Time related

wk

130.00

390.00

Plant

1100.00

5500.00

A334.1

Plant, Twin Drum Compactor - Time related

wk

85.00

Plant

170.00

Plant

A334.2

Plant, Plate Compactor - Time related

wk

A335.1

Plant, Petrol Concrete Mixer - Time related

wk

50

40.00

40.00

Plant

25.00

1250.00

A335.2

Plant, Power Float - Time related

wk

Plant

30

48.00

1440.00

Plant

A335.3

Plant, Concrete Vibrator - Time related

wk

50

52.12

2606.00

Plant

A338

Plant, Bring to site 2 Continuous Flight Auger Pile Rigs - Fixed

sum

2400.00

Piling

A353.1

Temporary works, Access road, establish and remove - Fixed

sum

2376.00

Access

A353.2

Temporary works, Access road, maintain - Time related

A361.1

Temporary works, access scaffolding, bring to site - Fixed

Sum

A361.2

Temporary works, access scaffolding, hire - Time related

wk

A361.3

Temporary works, access scaffolding, remove - Fixed

wk

80

5.12

409.60

Labour

1000.00

Access

39

500.00

19500.00

Access

1000.00

Access

sum

A371

Management and supervision for the duration construction - Time related

wk

104

9370.00

974480.00

Labour

A372

Administration for the duration of construction - Time related

wk

104

1757.00

182728.00

Labour

General labour - Time related

wk

104

53.18

5530.72

Labour

Labour for maintenance of plant and site services - Time related

wk

112

240.00

26880.00

Plant

50000.00

Manager

A373.1
A373.2

Provisional Sums
A411

Daywork Labour

A412

Percentage adjustment for daywork Labour

A413

Daywork Materials

A414

Percentage adjustment for daywork Materials

A415

Daywork Plant

A416

Percentage adjustment for daywork Plant

sum
%

50000.00

sum
%

25000.00

10

25000.00

sum
%

2500.00

Labour

25000.00

Manager

1250.00

Labour

25000.00

Manager

2500.00

Labour

Nominated Subcontractors
A510.1

Prime cost item - diversion of telecom cables by BT

sum

8000.00

Manager

A510.2

Prime cost item - diversion of water by PORTSMOUTH WATER

sum

24000.00

Manager

A54.1

Other charges BT

sum

300.00

Manager

A54.2

Other charges PORTSMOUTH WATER

sum

1200.00

Manager

CLASS B: GROUND INVESTIGATION


Trial Pits and Trenches
B112

Material which includes rock, maximum depth: 1-2m

nr

20.00

120.00

Manager

B13

Depth in material other than rock

5.00

45.00

Manager

B15

Depth supported

3.00

27.00

Manager

Light Percussion Boreholes


B210

Number, to 15m depth

nr

35.00

210.00

Manager

B233

Depth 15m

90

16.00

1440.00

Manager

B260

Depth backfilled

90

1.50

135.00

Manager

Samples
B421

From boreholes, open tube

nr

9.00

54.00

Manager

B423

From boreholes, groundwater

nr

1.50

9.00

Manager

Site tests
B511

Permeability

nr

12.00

72.00

Manager

B512

Groundwater level

nr

20.00

120.00

Manager

B513

Standard penetration

nr

12.00

72.00

Manager

Laboratory Tests
B721

Organic matter

nr

12

15.00

180.00

Manager

B722

Sulphate

nr

12

12.00

144.00

Manager

B723

pH value

nr

12

2.00

24.00

Manager

B724

Contaminants

nr

12

12.00

144.00

Manager

Professional Services
B831

Graduate engineer or geologist

31

28.00

868.00

Manager

B832

Chartered engineer or geologist

38.00

152.00

Manager

CLASS D: DEMOLITION AND SITE CLEARANCE

SPAM BoQ Version D

Swimming Pool At Mountbatten


D100

MEng4; 2006

General site clearance of whole site

ha

0.56

597.12

334.39

Piling

D210

Trees, girth 500mm -1m

nr

D310

Stumps, diameter 150-500 mm, backfill with granular material

nr

30

29.11

873.30

Manager

10

37.33

370.30

D414

Buildings, brickwork, volume not exceeding 500 cubic metres (Actual volume 326 m 3)

Manager

407.80

Manager

1113.84

Labour

sum

CLASS E: EARTHWORKS
General excavation
E411.1

Topsoil, depth 150mm, structure, CS 2.30

m3

468

2.38

E411.2

Topsoil, depth 150mm, tunnel, CS 2.30

13.5

2.38

32.13

Labour

E411.3

Topsoil, depth 150mm, car park and road, CS 2.30

m3

342

2.38

813.96

Labour

E421.1

Material other than topsoil, rock etc, structure, max. depth 150mm, CS 2.15

m3

358

2.74

980.92

Labour

E421.2

Material other than topsoil, rock etc, tunnel, max. depth 150mm, CS 2.15

m3

6.1

2.74

16.71

Labour

Material other than topsoil, rock etc, car park and road, max. depth 450mm, CS 2.15

1026

2.74

2811.24

Labour

3.48

2865.78

Concrete

E422

Excavation Ancilliaries
E532.1

Disposal of excavated material, topsoil

m3

823.5

E532.2

Disposal of excavated material, material other than topsoil, rock etc

1390.1

8.69

12079.97

Concrete

Filling to structures - imported rock

m3

1040

12.67

13176.80

Concrete

E617

CLASS F: INSITU CONCRETE


Provision of Concrete
F227

Design mix, concrete grade C10, 20 mm agggregate, sulphate resisting cement to BS4027

m3

175

62.27

10897.25

Concrete

F273

Design mix grade C35A cement to BS 12 - 20 mm aggregate to BS 882

m3

1350

70.40

95,040.00

Concrete

F276

Design mix grade C35A, sulphate resisting cement - 20 mm aggregate to


BS 882, pile caps and ground beams

m3

461

76.40

35220.40

Concrete

Placing of concrete
F511.1

Mass in blinding- thickness 75mm - pile caps and ground beams

m3

57

12.68

722.76

Concrete

F511.2

Mass in blinding- thickness 75mm - Swimming pool

m3

118

12.68

1496.24

Concrete

Mass in tunnel base, 450 - 750 mm deep

m3

57

12.68

722.76

Concrete

F623.1

Reinforced;pile caps and ground beams, thickness 300 - 500mm

60

10.56

633.60

Concrete

F623.2

Reinforced, pool base, thickness 300 - 500mm

m3

421

10.56

4445.76

Concrete

F623.3

Reinforced, base slab, thickness 300 - 500mm

m3

216

10.56

2280.96

Concrete

F624

Reinforced;pile caps , thickness exceeding 500mm

401

10.56

4234.56

Concrete

F633

Reinforced in suspended floor slabs - thickness 300 - 500 mm

m3

208

14.08

2928.64

Concrete

F643

Reinforced in walls - thickness 300 - 500mm - Swimming pool and gallery

m3

448

14.08

6307.84

Concrete

Rough finish plane vertical width 0.4 - 1.22 m to pile caps and ground beams

m2

701.6

28.23

19806.17

Steelfixing & Formwork

G244.1

Fair finish Plane vertical to slab at 2.75 level - width 300 - 500mm

41.0

28.39

1163.99

Steelfixing & Formwork

G244.2

Fair finish Plane vertical to tunnel slab - width 300 - 750mm

m2

39.1

28.39

1110.05

Steelfixing & Formwork

Fair finish, plane vertical, width exceeding 1.22m, pool walls and gallery

m2

1814.6

24.95

45,274.27

Steelfixing & Formwork

F524

CLASS G: CONCRETE ANCILLIARIES


Formwork
G144

G245

Reinforcement
G521

Deformed high yield steel bars, BS 4449, 6mm dia, piles, stairs and seating slabs

1.17

827.30

967.94

Steelfixing & Formwork

G523

Deformed high yield bars to BS4449, 10mm dia, ground beams

0.40

679.69

271.88

Steelfixing & Formwork

G524

Deformed high yield bars to BS4449 12mm dia - Swimming pool wall

19.62

613.11

12029.22

Steelfixing & Formwork

G525.1

Deformed high yield bars to BS4449 16mm dia - Swimming pool slab

78.45

570.65

44767.49

Steelfixing & Formwork

G525.2

Deformed high yield bars to BS4449 16mm dia - Swimming pool wall and gallery

17.24

570.65

9838.01

Steelfixing & Formwork

m2

90.0

6.21

558.90

Steelfixing & Formwork

G566

Steel fabric to BS4483, tunnel


Joints

G631

Formed surface plain, not exceeding 500mm, contraction joints in pool wall

m2

82.0

19.85

1627.70

Steelfixing & Formwork

G641

Formed surface with filler, not exceeding 500 mm, expansion joints in pool base

m2

68.8

27.29

1877.55

Steelfixing & Formwork

G651

Plastics waterstops not exceeding 150mm

172

68.49

11780.28

Steelfixing & Formwork

Concrete Accessories
G811

Wood trowel finish to top of slab, pool base

m2

1312.5

0.74

971.25

Steelfixing & Formwork

G812

Steel trowel finish to slabs at 2.75 level

741.0

0.74

548.34

Steelfixing & Formwork

108

35.00

3780.00

Concrete

CLASS H: PRECAST CONCRETE


Beams
H113

Length not exceeding 5m, mass 0.7t, seating

nr

Slabs

SPAM BoQ Version D

Swimming Pool At Mountbatten

MEng4; 2006

H537

Area 15 m2, mass 15t

nr

625.00

2500.00

Concrete

H548.1

Area 26 m2, mass 64t

nr

2227.45

8909.80

Concrete

H548.2

Area 33 m , mass 78t

nr

26

2341.91

60889.66

Concrete

Segmental Units
H61

Precast concrete stairs at spectator seating

nr

36

26.61

957.96

Concrete

H62

Precast staircase flight, 1.5m x 4.0m, thickness 200mm

nr

131.90

1055.200

Concrete

H63

Stair landings,1.8m x 6.9m, thickness 300mm

nr

472.90

1891.600

Concrete

CLASS I: PIPEWORK - PIPES


I112

Clay pipes, nominal bore 100mm, average depth 1.3m

31

14.53

450.43

Access

I113

Clay pipes, nominal bore 150mm, average depth 1.6m

30

19.86

595.80

Access

I123

Clay pipes, nominal bore 300mm, average depth 1.7m

18

47.15

848.70

Access

I133

Clay pipes, nominal bore 450mm, average depth 1.9m

165

112.83

18616.95

Access

CLASS K: PIPEWORK - MANHOLES AND PIPEWOK ANCILLARIES


K151

Manholes, precast concrete, depth not exceeding 1.5m

nr

625.76

1877.28

Access

K152

Manholes, precast concrete, depth 1.5 - 2m

nr

700.66

700.66

Access

18.19

700.00

12733.00

Structural Metalwork

CLASS M: STRUCTURAL METALWORK


Fabrication of members for frames
M311.1

Columns, staight on plan, UC, up to 300 kg/m - Main Building

M311.2

Columns, staight on plan, UC, up to 300 kg/m - Tunnel

2.19

700.00

1533.00

Structural Metalwork

M311.3

Columns, staight on plan, UC, 300 - 500 kg/m - Main Building

31.60

700.00

22120.00

Structural Metalwork

M311.4

Columns, staight on plan UC, 500 - 700 kg/m - Main Building

234.30

700.00

164010.00

Structural Metalwork

M321.1

Beams, straight on plan, SHS, up to 300 kg/m - Main Building

10.86

900.00

9774.00

Structural Metalwork

M321.2

Beams, straight on plan, UB, up to 300 kg/m - Main Building

21.80

700.00

15260.00

Structural Metalwork

M321.3

Beams, straight on plan, UB Tee, up to 300 kg/m - Entrance Tunnel

0.99

837.86

829.48

Structural Metalwork

M321.4

Beams, straight on plan, UB, up to 300 kg/m - Internal strucure

79.90

700.00

55930.00

Structural Metalwork

M353

Trusses, straight on plan and cambered - Main Building

277.10

1334.78

369867.54

Structural Metalwork

M361

Wind bracing - Main Building

7.67

1877.95

14403.88

Structural Metalwork

M380.1

Holding down bolt assemblies - Main Building

nr

88.00

371.71

32710.48

Structural Metalwork

M380.2

Holding down bolt assemblies - Entrance Tunnel

nr

22.00

98.40

2164.80

Structural Metalwork

M380.3

Holding down assemblies - Internal Structure

nr

12.00

371.71

4460.52

Structural Metalwork

Erection of members for frames


M62.1

Permanent erection - Main Building

628.77

120.00

75452.40

Structural Metalwork

M62.2

Permanent erection - Internal structure

83.62

120.00

10034.40

Structural Metalwork

M62.3

Permanent erection - Entrance Tunnel

4.99

120.00

598.80

Structural Metalwork

M641

HSFG Bolts M12 - Entrance Tunnel

nr

44

0.48

21.12

Structural Metalwork

M643.1

HSFG Bolts M22 - Main Building

nr

1452

0.56

813.12

Structural Metalwork

M643.2

HSFG general grade, M20 bolts - Internal Structure and main building

nr

1016

0.69

701.04

Structural Metalwork

Off site treatment


M81.1

Blast cleaning to steel frame - Main Building

m2

3208

0.50

1604.00

Structural Metalwork

M81.2

Blast cleaning to steel frame - Internal Structure

m2

1945

0.50

972.50

Structural Metalwork

M81.3

Blast cleaning to steel frame - Entrance Tunnel

m2

82

0.50

41.00

Structural Metalwork

M86.1

Galvanising - Main Building

3208

10.00

32080.00

Structural Metalwork

M86.2

Galvanising - Internal Structure

m2

1945

10.00

19450.00

Structural Metalwork

M86.3

Galvanising - Entrance Tunnel

m2

82

10.00

820.00

Structural Metalwork

M87.1

Painting - Main Building

3208

1.50

4812.00

Structural Metalwork

M87.2

Painting - Internal Structure

m2

1945

1.50

2917.50

Structural Metalwork

M87.2

Painting - Entrance Tunnel

m2

82

1.50

123.00

Structural Metalwork

CLASS N - MISCELLANEOUS STRUCTURAL METALWORK


N14.1

Handrails - Stair landings

126

40.00

5040.00

Access

N14.2

Handrails - Spectator gallery

111

40.00

4440.00

Access

CLASS P: PILES
Bored, cast in place concrete piles
P141

Bored, cast in place concrete piles - Diameter 750mm, Number

nr

38

82.50

3135.00

Piling

P142

Bored, cast in place concrete piles - Diameter 750mm, Concreted length

570

44.00

25080.00

Piling

P143

Bored, cast in place concrete piles - Diameter 750mm, Depth bored

520

44.00

22880.00

Piling

SPAM BoQ Version D

Swimming Pool At Mountbatten

MEng4; 2006

P161

Bored, cast in place concrete piles - Diameter 1350mm, Number

nr

18

110.00

1980.00

Piling

P162

Bored, cast in place concrete piles - Diameter 1350mm, Concreted length

366

135.00

49410.00

Piling

P163

Bored, cast in place concrete piles - Diameter 1350mm, Depth bored

360

135.00

48600.00

Piling

P171

Bored, cast in place concrete piles - Diameter 1500mm, Number

nr

44

145.00

6380.00

Piling

P172

Bored, cast in place concrete piles - Diameter 1500mm, Concreted length

881

200.00

176200.00

Piling

P173

Bored, cast in place concrete piles - Diameter 1500mm, Depth bored

880

200.00

176000.00

Piling

CLASS Q: PILING ANCILLARIES


Cast in place concrete piles
Q124

Cast in place concrete piles, Backfilling bore with excavated material - Diameter 750mm

520

2.50

1300.00

Piling

Q126

Cast in place concrete piles, Backfilling bore with excavated material - Diameter 1350mm

360

8.10

2916.00

Piling

Q127

Cast in place concrete piles, Backfilling bore with excavated material - Diameter 1500mm

880

10.00

8800.00

Piling

Q184

Cast in place concrete piles, Preparing heads, diameter 750 mm

nr

38

22.45

853.10

Piling

Q186

Cast in place concrete piles, Preparing heads, diameter 1350 mm

nr

18

33.75

607.50

Piling

Q187

Cast in place concrete piles, Preparing heads, diameter 1500 mm

nr

44

40.90

1799.60

Piling

Q211

Cast in place concrete piles, Reinforcement, straight, deformed high yield bars to BS4449 20mm dia.

48.1

573.00

27561.30

Piling

Q213

Cast in place concrete piles, Reinforcement, helical, deformed high yield bars to BS4449 16mm dia.

11.1

650.00

7215.00

Piling

hr

30

220.00

6600.00

Manager

Obstructions
Q700

Remove obstructions
Pile Tests

Q812

Pile tests, Maintained loading with various reactions, 100-200t

nr

2730.00

2730.00

Manager

Q840

Pile tests, non destructive integrity

nr

102

15.00

1530.00

Manager

CLASS R: ROADS AND PAVING


Sub-bases, flexible road bases and surfacing
R128

Subbase, granular material DTP specified type 2, 450mm thick

m2

2310

9.76

22545.60 Access

R17

Geotextiles

m2

2310

0.54

1247.40 Access

R234

Dense bitumen macadam, 100mm thick

2310

16.60

38346.00

Access

Kerbs, channels and edging


R621

Precast concrete kerbs to BS 7263: Part 1 figure 1(a), straight

398

7.56

R622

Precast concrete kerbs to BS 7263: Part 1 figure 1(a), 5m radius

40

10.77

320

0.96

3008.88 Access
430.80

Access

Ancillaries
R825

Surface markings, intermittent lines

307.20 Labour

CLASS U: BRICKWORK, BLOCK+C546WORK AND MASONARY


U531.1

Dense concrete blockwork, 300mm thick, vertical, stairwells

m2

721

46.70

33670.70

Finishes & Cladding

U531.2

Dense concrete blockwork, 300mm thick, vertical, other areas

m2

846

46.70

39508.20

Finishes & Cladding

CLASS V: PAINTING
U561.1

Emulsion paint to blockwork, stairwells

m2

1442

4.66

6719.72

Finishes & Cladding

U561.2

Emulsion paint to blockwork, other areas

m2

1692

4.66

7884.72

Finishes & Cladding

CLASS W: WATERPROOFING
Tanking
W261.1

Tanking, rendering in waterproof mortar, horizontal, pool base

m2

1336

7.10

9485.60

Finishes & Cladding

W261.2

Tanking, rendering in waterproof mortar, horizontal, first floor

m2

1719

7.10

12204.90

Finishes & Cladding

W263

Tanking, rendering in waterproof mortar, vertical, pool sides

479

12.87

6164.73

Finishes & Cladding

W271.1

Tanking, tiling, horizontal, pool base

m2

1336

40.21

53720.56

Finishes & Cladding

W271.2

Tanking, tiling, horizontal, first floor

m2

1719

40.21

69120.99

Finishes & Cladding

W273

Tanking, tiling, vertical, pool sides

466

48.98

22824.68

Finishes & Cladding

CLASS Z:SIMPLE BUILDING WORKS INCIDENTAL TO CIVIL ENGINEERING WORKS


Windows, doors and glazing
Z313.1

Timber doors, single width

nr

22

28.90

635.80

Access

Z313.2

Timber doors, double width

nr

57.80

115.60

Access

Z341.1

Ironmongery, hinges, single doors

nr

44

2.00

88.00

Access

Z341.2

Ironmongery, hinges, double doors

nr

2.00

16.00

Access

Z342

Ironmomgery, door closers

nr

26

58.00

1508.00

Access

Z343

Ironmongery, door locks

nr

24

99.00

2376.00

Access

m2

1083

16.50

17869.50

Finishes & Cladding

Surface finishes, linings and partions


Z453

Suspended ceilings, 500mm deep

SPAM BoQ Version D

Swimming Pool At Mountbatten

MEng4; 2006

Z48.1

Faramed panel cubicle sets

nr

64

306.69

19628.16

Finishes & Cladding

Z48.2

Faramed panel cubicle sets for disabled

nr

681.42

2725.68

Finishes & Cladding

Cladding and external finishes


Z91

Kingspan Wall Cladding Option D 1000

m2

2624

135.00

354240.00

Finishes & Cladding

Z92.1

Kingspan Roof Cladding -Main Building

m2

3464

152.50

528260.00

Finishes & Cladding

Z92.2

Kingspan Roof Cladding -Entrance Tunnel

92

152.50

14030.00

Finishes & Cladding

Z93.1

Glazing, Pilkington Planar - Main Building

m2

685

208.00

142480.00

Finishes & Cladding

Z93.2

Glazing, Pilkington Planar - Entrance Tunnel

m2

164

208.00

34112.00

Finishes & Cladding

5517133.05
Bill of Quanties Summary For Swimming Pool

Total ()

Class A: GENERAL ITEMS

2,174,271.57

Class B: GROUND INVESTIGATION

3,816.00

Class D: DEMOLITION AND SITE CLEARANCE

1,985.79

Class E: EARTHWORKS

33,891.35

Class F: INSITU CONCRETE

164,930.77

Class G: CONCRETE ANCILLIARIES

152,593.03

Class H: PRECAST CONCRETE

79,984.22

Class I: PIPEWORK - PIPES

20,511.88

CLASS K: PIPEWORK - MANHOLES AND PIPEWOK ANCILLARIES

2,577.94

Class M: STRUCTURAL METALWORK

856,237.58

Class N: MISCELLANEOUS STRUCTURAL METALWORK

9,480.00

Class P: PILES

509,665.00

Class Q: PILING ANCILLARIES

61,912.50

Class R: ROADS AND PAVING

65,885.88

Class U: BRICKWORK, BLOCKWORK AND MASONARY

73,178.90

Class V: PAINTING

14,604.44

Class W: WATERPROOFING

173,521.46

Class Z:SIMPLE BUILDING WORKS

6,635,217.79

Cost of RISK MITIGATION

1,111,250.00

BILL TOTAL

12,145,516.10

Mechanical and Electrical - 30% of total

3,643,654.83

GRAND TOTAL

15,789,170.93

Contingency @ 5%

789,458.55

TOTAL GRAND TOTAL

SPAM BoQ Version D

16,578,629.48

Total excluding A!**

16247477

A353.1
A361.1
A361.2
A361.3
I112
I113
I123
I133
K151
K152
N14.1
N14.2
R128
R17
R234
R621
R622
Z313.1
Z313.2
Z341.1
Z341.2
Z342
Z343
A250
E532.1
E532.2
E617
F227
F273
F276
F511.1
F511.2
F524
F623.1
F623.2
F623.3
F624
F633
F643
H113
H537
H548.1
H548.2
H61
H62
H63
U531.1
U531.2
U561.1
U561.2
W261.1
W261.2
W263
W271.1
W271.2
W273
Z453
Z48.1
Z48.2
Z91
Z92.1
Z92.2
Z93.1
Z93.2
A233.2
A242
A321.2
A322.1
A322.2
A331.2
A353.2
A371
A372
A373.1
A412
A414
A416
E411.1
E411.2
E411.3
E421.1
E421.2
E422
R825
A110
A120
A130
A411
A413
A415
A510.1
A510.2
A54.1
A54.2
B112
B13
B15

Temporary works, Access road, establish and remove - Fixed


Temporary works, access scaffolding, bring to site - Fixed
Temporary works, access scaffolding, hire - Time related
Temporary works, access scaffolding, remove - Fixed
Clay pipes, nominal bore 100mm, average depth 1.3m
Clay pipes, nominal bore 150mm, average depth 1.6m
Clay pipes, nominal bore 300mm, average depth 1.7m
Clay pipes, nominal bore 450mm, average depth 1.9m
Manholes, precast concrete, depth not exceeding 1.5m
Manholes, precast concrete, depth 1.5 - 2m
Handrails - Stair landings
Handrails - Spectator gallery
Subbase, granular material DTP specified type 2, 450mm thick
Geotextiles
Dense bitumen macadam, 100mm thick
Precast concrete kerbs to BS 7263: Part 1 figure 1(a), straight
Precast concrete kerbs to BS 7263: Part 1 figure 1(a), 5m radius
Timber doors, single width
Timber doors, double width
Ironmongery, hinges, single doors
Ironmongery, hinges, double doors
Ironmomgery, door closers
Ironmongery, door locks
Testing of materials - Concrete test cubes samples and methods of testing as Specification clause
Disposal of excavated material, topsoil
Disposal of excavated material, material other than topsoil, rock etc
Filling to structures - imported rock
Design mix, concrete grade C10, 20 mm agggregate, sulphate resisting cement to BS4027
Design mix grade C35A cement to BS 12 - 20 mm aggregate to BS 882
Design mix grade C35A, sulphate resisting cement - 20 mm aggregate to
Mass in blinding- thickness 75mm - pile caps and ground beams
Mass in blinding- thickness 75mm - Swimming pool
Mass in tunnel base, 450 - 750 mm deep
Reinforced;pile caps and ground beams, thickness 300 - 500mm
Reinforced, pool base, thickness 300 - 500mm
Reinforced, base slab, thickness 300 - 500mm
Reinforced;pile caps , thickness exceeding 500mm
Reinforced in suspended floor slabs - thickness 300 - 500 mm
Reinforced in walls - thickness 300 - 500mm - Swimming pool and gallery
Length not exceeding 5m, mass 0.7t, seating
Area 15 m2, mass 15t
Area 26 m2, mass 64t
Area 33 m2, mass 78t
Precast concrete stairs at spectator seating
Precast staircase flight, 1.5m x 4.0m, thickness 200mm
Stair landings,1.8m x 6.9m, thickness 300mm
Dense concrete blockwork, 300mm thick, vertical, stairwells
Dense concrete blockwork, 300mm thick, vertical, other areas
Emulsion paint to blockwork, stairwells
Emulsion paint to blockwork, other areas
Tanking, rendering in waterproof mortar, horizontal, pool base
Tanking, rendering in waterproof mortar, horizontal, first floor
Tanking, rendering in waterproof mortar, vertical, pool sides
Tanking, tiling, horizontal, pool base
Tanking, tiling, horizontal, first floor
Tanking, tiling, vertical, pool sides
Suspended ceilings, 500mm deep
Faramed panel cubicle sets
Faramed panel cubicle sets for disabled
Kingspan Wall Cladding Option D 1000
Kingspan Roof Cladding -Main Building
Kingspan Roof Cladding -Entrance Tunnel
Glazing, Pilkington Planar - Main Building
Glazing, Pilkington Planar - Entrance Tunnel
Maintenance of surveying equipment - time related
Attendance upon the Engineer's staff - Chainmen
Services, Electricity supply - Time related
Services, Provide water supply - Fixed
Services, Water supply for the duration of construction - Time related
Plant, Tower crane, operate - Time related
Temporary works, Access road, maintain - Time related
Management and supervision for the duration construction - Time related
Administration for the duration of construction - Time related
General labour - Time related
Percentage adjustment for daywork Labour
Percentage adjustment for daywork Materials
Percentage adjustment for daywork Plant
Topsoil, depth 150mm, structure, CS 2.30
Topsoil, depth 150mm, tunnel, CS 2.30
Topsoil, depth 150mm, car park and road, CS 2.30
Material other than topsoil, rock etc, structure, max. depth 150mm, CS 2.15
Material other than topsoil, rock etc, tunnel, max. depth 150mm, CS 2.15
Material other than topsoil, rock etc, car park and road, max. depth 450mm, CS 2.15
Surface markings, intermittent lines
Performance bond
Insurance of the works
Third party insurance
Daywork Labour
Daywork Materials
Daywork Plant
Prime cost item - diversion of telecom cables by BT
Prime cost item - diversion of water by PORTSMOUTH WATER
Other charges BT
Other charges PORTSMOUTH WATER
Material which includes rock, maximum depth: 1-2m
Depth in material other than rock
Depth supported

sum
Sum
wk
sum
m
m
m
m
nr
nr
m
m
m2
m2
m2
m
m
nr
nr
nr
nr
nr
nr
nr
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
nr
nr
nr
nr
nr
nr
nr
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
nr
nr
m2
m2
m2
m2
m2
wk
wk
wk
sum
wk
wk
wk
wk
wk
wk
%
%
%
m3
m3
m3
m3
m3
m3
m
sum
sum
sum
sum
sum
sum
sum
sum
sum
sum
nr
m
m

39

500.00

31
30
18
165
3
1
126
111
2310
2310
2310
398
40
22
2
44
8
26
24
339
823.5
1390.1
1040
175
1350
461
57
118
57
60
421
216
401
208
448
32
4
4
26
108
8
4
721
846
1442
1692
1336
1719
479
1336
1719
466
1083
64
4
2624
3464
92
685
164
104
65
104

14.53
19.86
47.15
112.83
625.76
700.66
40.00
40.00
9.76
0.54
16.60
7.56
10.77
28.90
57.80
2.00
2.00
58.00
99.00
6.30
3.48
8.69
12.67
62.27
70.40
76.40
12.68
12.68
12.68
10.56
10.56
10.56
10.56
14.08
14.08
275.00
625.00
2227.45
2341.91
34.67
900.00
2500.00
46.70
46.70
4.66
4.66
7.10
7.10
12.87
40.21
40.21
48.98
16.50
306.69
681.42
135.00
152.50
152.50
208.00
208.00
112.00
241.41
60.00

104
52
80
104
104
104
5
5
10
468
13.5
342
358
6.1
1026
320
0.25%
1.00%
0.20%

60.00
1500.00
5.12
9370.00
1757.00
53.18
50000.00
25000.00
25000.00
2.38
2.38
2.38
2.74
2.74
2.74
0.96
15763765.31
15763765.31
15763765.31

6
9
9

20.00
5.00
3.00

2376.00
1000.00
19500.00
1000.00
450.43
595.80
848.70
18616.95
1877.28
700.66
5040.00
4440.00
22545.60
1247.40
38346.00
3008.88
430.80
635.80
115.60
88.00
16.00
1508.00
2376.00
2135.70
2865.78
12079.97
13176.80
10897.25
95,040.00
35220.40
722.76
1496.24
722.76
633.60
4445.76
2280.96
4234.56
2928.64
6307.84
8800.00
2500.00
8909.80
60889.66
3744.36
7200.000
10000.000
33670.70
39508.20
6719.72
7884.72
9485.60
12204.90
6164.73
53720.56
69120.99
22824.68
17869.50
19628.16
2725.68
354240.00
528260.00
14030.00
142480.00
34112.00
11648.00
15691.65
6240.00
2445.00
6240.00
78000.00
409.60
974480.00
182728.00
5530.72
2500.00
1250.00
2500.00
1113.84
32.13
813.96
980.92
16.71
2811.24
307.20
39409.41
157637.65
31527.53
50000.00
25000.00
25000.00
8000.00
24000.00
300.00
1200.00
120.00
45.00
27.00

Access
Access
Access
Access
Access
Access
Access
Access
Access
Access
Access
Access
Access
Access
Access
Access
Access
Access
Access
Access
Access
Access
Access
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Finishes & Cladding
Finishes & Cladding
Finishes & Cladding
Finishes & Cladding
Finishes & Cladding
Finishes & Cladding
Finishes & Cladding
Finishes & Cladding
Finishes & Cladding
Finishes & Cladding
Finishes & Cladding
Finishes & Cladding
Finishes & Cladding
Finishes & Cladding
Finishes & Cladding
Finishes & Cladding
Finishes & Cladding
Finishes & Cladding
Labour
Labour
Labour
Labour
Labour
Labour
Labour
Labour
Labour
Labour
Labour
Labour
Labour
Labour
Labour
Labour
Labour
Labour
Labour
Labour
Manager
Manager
Manager
Manager
Manager
Manager
Manager
Manager
Manager
Manager
Manager
Manager
Manager

B210
B233
B260
B421
B423
B511
B512
B513
B721
B722
B723
B724
B831
B832
D210
D310
D414
Q700
Q812
Q840
A338
D100
P141
P142
P143
P161
P162
P163
P171
P172
P173
Q124
Q126
Q127
Q184
Q186
Q187
Q211
Q213
A221.1
A221.2
A221.2
A331.1
A331.3
A332.1
A332.2
A332.3
A332.4
A332.5
A333.1
A333.2
A333.3
A333.4
A333.5
A333.6
A334.1
A334.2
A335.1
A335.2
A335.3
A373.2
G144
G244.1
G244.2
G245
G521
G523
G524
G525.1
G525.2
G566
G631
G641
G651
G811
G812
M311.1
M311.2
M311.3
M311.4
M321.1
M321.2
M321.3
M321.4
M353
M361
M380.1
M380.2
M380.3
M62.1
M62.2
M62.3
M641
M643.1
M643.2
M81.1
M81.2
M81.3
M86.1

Number, to 15m depth


Depth 15m
Depth backfilled
From boreholes, open tube
From boreholes, groundwater
Permeability
Groundwater level
Standard penetration
Organic matter
Sulphate
pH value
Contaminants
Graduate engineer or geologist
Chartered engineer or geologist
Trees, girth 500mm -1m
Stumps, diameter 150-500 mm, backfill with granular material
Buildings, brickwork, volume not exceeding 500 cubic metres (Actual volume 326 m 3)
Remove obstructions
Pile tests, Maintained loading with various reactions, 100-200t
Pile tests, non destructive integrity
Plant, Bring to site 2 Continuous Flight Auger Pile Rigs - Fixed
General site clearance of whole site
Bored, cast in place concrete piles - Diameter 750mm, Number
Bored, cast in place concrete piles - Diameter 750mm, Concreted length
Bored, cast in place concrete piles - Diameter 750mm, Depth bored
Bored, cast in place concrete piles - Diameter 1350mm, Number
Bored, cast in place concrete piles - Diameter 1350mm, Concreted length
Bored, cast in place concrete piles - Diameter 1350mm, Depth bored
Bored, cast in place concrete piles - Diameter 1500mm, Number
Bored, cast in place concrete piles - Diameter 1500mm, Concreted length
Bored, cast in place concrete piles - Diameter 1500mm, Depth bored
Cast in place concrete piles, Backfilling bore with excavated material - Diameter 750mm
Cast in place concrete piles, Backfilling bore with excavated material - Diameter 1350mm
Cast in place concrete piles, Backfilling bore with excavated material - Diameter 1500mm
Cast in place concrete piles, Preparing heads, diameter 750 mm
Cast in place concrete piles, Preparing heads, diameter 1350 mm
Cast in place concrete piles, Preparing heads, diameter 1500 mm
Cast in place concrete piles, Reinforcement, straight, deformed high yield bars to BS4449 20mm dia.
Cast in place concrete piles, Reinforcement, helical, deformed high yield bars to BS4449 16mm dia.

Provide and maintain transport vehicle for the Engineer's staff - 2000cc car - time related
Provide and maintain transport vehicle for the Engineer's staff - Landrover - time related
Petrol for transport vehicles - time related
Plant, Tower crane, Establish and remove - Fixed
Plant, 35T Mobile Crane - Time related
Plant, Wheel wash, Establish - Fixed
Plant, Operate wheel wash -Time related
Plant, Remove wheel wash - Fixed
Plant, Cherry Pickers -Time related
Plant, Forklift - Time related
Plant, 5T Bulldozer -Time related
Plant, 10T 360 Excavator - Time related
Plant, 3T 360 Excavator - Time related
Plant, Grader - Time related
Plant, 3T Dumper - Time related
Plant, Loading Shovel - Time related
Plant, Twin Drum Compactor - Time related
Plant, Plate Compactor - Time related
Plant, Petrol Concrete Mixer - Time related
Plant, Power Float - Time related
Plant, Concrete Vibrator - Time related
Labour for maintenance of plant and site services - Time related
Rough finish plane vertical width 0.4 - 1.22 m to pile caps and ground beams
Fair finish Plane vertical to slab at 2.75 level - width 300 - 500mm
Fair finish Plane vertical to tunnel slab - width 300 - 750mm
Fair finish, plane vertical, width exceeding 1.22m, pool walls and gallery
Deformed high yield steel bars, BS 4449, 6mm dia, piles, stairs and seating slabs
Deformed high yield bars to BS4449, 10mm dia, ground beams
Deformed high yield bars to BS4449 12mm dia - Swimming pool wall
Deformed high yield bars to BS4449 16mm dia - Swimming pool slab
Deformed high yield bars to BS4449 16mm dia - Swimming pool wall and gallery
Steel fabric to BS4483, tunnel
Formed surface plain, not exceeding 500mm, contraction joints in pool wall
Formed surface with filler, not exceeding 500 mm, expansion joints in pool base
Plastics waterstops not exceeding 150mm
Wood trowel finish to top of slab, pool base
Steel trowel finish to slabs at 2.75 level
Columns, staight on plan, UC, up to 300 kg/m - Main Building
Columns, staight on plan, UC, up to 300 kg/m - Tunnel
Columns, staight on plan, UC, 300 - 500 kg/m - Main Building
Columns, staight on plan UC, 500 - 700 kg/m - Main Building
Beams, straight on plan, SHS, up to 300 kg/m - Main Building
Beams, straight on plan, UB, up to 300 kg/m - Main Building
Beams, straight on plan, UB Tee, up to 300 kg/m - Entrance Tunnel
Beams, straight on plan, UB, up to 300 kg/m - Internal strucure
Trusses, straight on plan and cambered - Main Building
Wind bracing - Main Building
Holding down bolt assemblies - Main Building
Holding down bolt assemblies - Entrance Tunnel
Holding down assemblies - Internal Structure
Permanent erection - Main Building
Permanent erection - Internal structure
Permanent erection - Entrance Tunnel
HSFG Bolts M12 - Entrance Tunnel
HSFG Bolts M22 - Main Building
HSFG general grade, M20 bolts - Internal Structure and main building
Blast cleaning to steel frame - Main Building
Blast cleaning to steel frame - Internal Structure
Blast cleaning to steel frame - Entrance Tunnel
Galvanising - Main Building

nr
m
m
nr
nr
nr
nr
nr
nr
nr
nr
nr
h
h
nr
nr
sum
hr
nr
nr
sum
ha
nr
m
m
nr
m
m
nr
m
m
m
m
m
nr
nr
nr
t
t
wk
wk
wk
sum
wk
sum
wk
sum
wk
wk
wk
wk
wk
wk
wk
wk
wk
wk
wk
wk
wk
wk
m2
m2
m2
m2
t
t
t
t
t
m2
m2
m2
m
m2
m2
t
t
t
t
t
t
t
t
t
t
nr
nr
nr
t
t
t
nr
nr
nr
m2
m2
m2
m2

6
90
90
6
6
6
6
6
12
12
12
12
31
4
30
10
30
1
102
0.56
38
570
520
18
366
360
44
881
880
520
360
880
38
18
44
48.1
11.1
104
104
104
1
55
56
104
2
2
4
2
3
5
2
1
50
30
50
112
701.6
41.0
39.1
1814.6
1.17
0.40
19.62
78.45
17.24
90.0
82.0
68.8
172
1312.5
741.0
18.19
2.19
31.60
234.30
10.86
21.80
0.99
79.90
277.10
7.67
88.00
22.00
12.00
628.77
83.62
4.99
44
1452
1016
3208
1945
82
3208

35.00
16.00
1.50
9.00
1.50
12.00
20.00
12.00
15.00
12.00
2.00
12.00
28.00
38.00
29.11
37.33

210.00
1440.00
135.00
54.00
9.00
72.00
120.00
72.00
180.00
144.00
24.00
144.00
868.00
152.00
873.30
370.30
407.80
220.00
6600.00
2730.00
2730.00
15.00
1530.00
2400.00
597.12
334.39
82.50
3135.00
44.00
25080.00
44.00
22880.00
110.00
1980.00
135.00
49410.00
135.00
48600.00
145.00
6380.00
200.00
176200.00
200.00
176000.00
2.50
1300.00
8.10
2916.00
10.00
8800.00
22.45
853.10
33.75
607.50
40.90
1799.60
573.00
27561.30
650.00
7215.00
125.00
13000.00
140.00
14560.00
63.60
6614.40
1800.00
800.00
800.00
360.00
53.84
2961.20
360.00
430.00
24080.00
420.00
43680.00
470.00
940.00
475.00
950.00
230.00
920.00
370.00
740.00
130.00
390.00
1100.00
5500.00
85.00
170.00
40.00
40.00
25.00
1250.00
48.00
1440.00
52.12
2606.00
240.00 26880.00
28.23
19806.17
28.39
1163.99
28.39
1110.05
24.95
45,274.27
827.30
967.94
679.69
271.88
613.11
12029.22
570.65
44767.49
570.65
9838.01
6.21
558.90
19.85
1627.70
27.29
1877.55
68.49
11780.28
0.74
971.25
0.74
548.34
700.00
12733.00
700.00
1533.00
700.00
22120.00
700.00
164010.00
900.00
9774.00
700.00
15260.00
837.86
829.48
700.00
55930.00
1334.78
369867.54
1877.95
14403.88
371.71
32710.48
98.40
2164.80
371.71
4460.52
120.00
75452.40
120.00
10034.40
120.00
598.80
0.48
21.12
0.56
813.12
0.69
701.04
0.50
1604.00
0.50
972.50
0.50
41.00
10.00
32080.00

Manager
Manager
Manager
Manager
Manager
Manager
Manager
Manager
Manager
Manager
Manager
Manager
Manager
Manager
Manager
Manager
Manager
Manager
Manager
Manager
Piling
Piling
Piling
Piling
Piling
Piling
Piling
Piling
Piling
Piling
Piling
Piling
Piling
Piling
Piling
Piling
Piling
Piling
Piling
Plant
Plant
Plant
Plant
Plant
Plant
Plant
Plant
Plant
Plant
Plant
Plant
Plant
Plant
Plant
Plant
Plant
Plant
Plant
Plant
Plant
Plant
Steelfixing & Formwork
Steelfixing & Formwork
Steelfixing & Formwork
Steelfixing & Formwork
Steelfixing & Formwork
Steelfixing & Formwork
Steelfixing & Formwork
Steelfixing & Formwork
Steelfixing & Formwork
Steelfixing & Formwork
Steelfixing & Formwork
Steelfixing & Formwork
Steelfixing & Formwork
Steelfixing & Formwork
Steelfixing & Formwork
Structural Metalwork
Structural Metalwork
Structural Metalwork
Structural Metalwork
Structural Metalwork
Structural Metalwork
Structural Metalwork
Structural Metalwork
Structural Metalwork
Structural Metalwork
Structural Metalwork
Structural Metalwork
Structural Metalwork
Structural Metalwork
Structural Metalwork
Structural Metalwork
Structural Metalwork
Structural Metalwork
Structural Metalwork
Structural Metalwork
Structural Metalwork
Structural Metalwork
Structural Metalwork

M86.2
M86.3
M87.1
M87.2
M87.2
A211.1
A211.2
A222.1
A222.2
A229
A231.1
A231.2
A232.1
A232.2
A233.1
A311.1
A311.2
A 313.1
A313.2
A314.1
A314.2
A 315.1
A 315.2
A321.1
A323
A324.1
A324.2

Galvanising - Internal Structure


Galvanising - Entrance Tunnel
Painting - Main Building
Painting - Internal Structure
Painting - Entrance Tunnel
Establishment and removal of offices for the Engineer's staff - fixed
Maintenance of offices for the Engineer's staff - time related
Provide telephones for the Engineer's staff - fixed
Maintain telephones for the Engineer's staff - time related
Set of progress photographs comprising twelve prints per week
Establishment and removal of Office Equipment - fixed
Maintenance of office equipment - time related
Establishment and removal of Laboratory Equipment - fixed
Maintenance of Laboratory equipment - time related
Establishment and removal of surveying equipment
Accomodation and buildings, Offices, Establish and remove - Fixed
Accomodation and buildings, Offices, Maintain - Time related
Accomodation and buildings, Establish and remove toilet cabins - Fixed
Accomodation and buildings, Maintain toilet cabins - Time related
Accomodation and buildings, Establish and remove 5 stores and materials compound - Fixed
Accomodation and buildings, Maintain 5 stores and materials compound - Time related
Accomodation and buildings, Establish and remove Canteen / messrooms - Fixed
Accomodation and buildings, Maintain Canteen / messrooms - Time related
Services, Provide electricity supply and standby generator - Fixed
Services, Site security - Time related
Services, Establish and remove site hoardings - Fixed
Services, Maintain site hoardings - Time related

m2
m2
m2
m2
m2
sum
wk
sum
wk
wk
sum
wk
sum
wk
sum
sum
wk
sum
wk
sum
wk
sum
wk
sum
wk
sum
wk

1945
82
3208
1945
82

10.00
10.00
1.50
1.50
1.50

104

266.00

104
112

65.00
3.00

104

136.00

104

112.00

104

702.00

104

130.00

104

64.55

104

154.00

104

1130.64

104

26.92

19450.00
820.00
4812.00
2917.50
123.00
720.00
27664.00
400.00
6760.00
336.00
500.00
14144.00
500.00
11648.00
500.00
11440.00
73008.00
1520.00
13520.00
2160.00
2160.00
4220.00
16016.00
3600.00
117586.56
25864.64
2799.68

Structural Metalwork
Structural Metalwork
Structural Metalwork
Structural Metalwork
Structural Metalwork
Temporary works
Temporary works
Temporary works
Temporary works
Temporary works
Temporary works
Temporary works
Temporary works
Temporary works
Temporary works
Temporary works
Temporary works
Temporary works
Temporary works
Temporary works
Temporary works
Temporary works
Temporary works
Temporary works
Temporary works
Temporary works
Temporary works

RISK RISK RISK


REF. TYPE DESCRIPTION
0
1 HS
Fire
Chaimen
E
Disposal of rubbish
Disruption of Traffic
Q
Liquidated Damages
Accuracy of Survey Instrument
2 HS
Trespassers
Contamination of water supply
E
Mud on roads
Disposal of waste water
Q
Complaints
Loss of consents
3 HS
Maintainence of plant
Excavation collapse
E
Storage of diesel
Disposal of excavation arisings
Q
Load testing of cranes
Depth of excavation
4 HS
Contaminated land
Noise
E
Unforeseen ground conditions
Dust
Q
Quality assurance of laboratory
Competence of supervision
5 HS
Personnel falling in bore
Existing services
E
Disposal of pilling arisings
Removal of obstructions
Q
Ultra sonic testing
Load testing
6 HS
Personnel falling in excavation
Personnel falling in manholes
E
Disposal of water from excavation
Confined spaces
Q
Width of excavation
Infection through rodents
7 HS
Nails left in timber
High winds
E
Storage of shutter oil
Disposal of waste steel
Q
Accuracy of drawings
Quality assurance of reinforcement
8 HS
Reversing lorries
Dermatitis
E
Disposal of waste concrete
Storage of curing membrane
Q
Quality scheme for ready mixed
Slump of concrete
9 HS
Eye infection
Heavy lifting
E
Wet weather working
Noise of breaking down piles
Q
Temperature days that are too hot or too cold
Competence of workforce

Person Responsible
Site Engineer

Environmental Officer

Plant

Demolition Subcontractor

Pilling Subcontractor

Temporary works

Steelfixing Subcontractor & Formwork

Provision & Placing of concrete

Labour only Subcontractor

10 HS
E
Q
11 HS
E
Q
12 HS
E
Q

Eye damage
Protection of 'live' edges
Flooding of excavation
Disposal of temporary roads
Air testing of clay pipes
Cpompetence of scaffolders
Galvanising
Working at height
Delivery to site
Storage of touch up paint
Quality assurance of fabrication yard
Tolerance of frame
Collision with traffic
Cleaning glass
Night working
Disposal of waste bricks & mortar
Quality control and road materials
Watertightness

Access

Structural metalwork Erector

Finishes & Cladding Subcontractor

RISK START RISK FINISH Probability


L
L
L
L
L
L
VL
VL
VL
VL
VL
VL
VL
L
VL
VL
VL
VL
VL
L
VL
VL
VL
VL
VL
L
L
M
VL
VL
L
L
VL
VL
L
VL
VL
L
L
L
L
L
VL
VL
VL
L
VL
VL
VL
VL
L
L
VL
VL

Impact
Min
Likely
150000
150000
7500
75000
250000
25000
150000
50000
7500
7500
75000
75000
50000
150000
7500
7500
25000
25000
50000
50000
75000
7500
25000
25000
150000
50000
7500
7500
25000
25000
150000
150000
7500
75000
25000
25000
50000
150000
7500
7500
25000
25000
150000
50000
7500
7500
25000
25000
50000
50000
75000
7500
75000
25000

Risk value
Max

300000 600000
300000 600000
15000
30000
150000 300000
500000 1000000
50000 100000
300000 600000
100000 200000
15000
30000
15000
30000
150000 300000
150000 300000
100000 200000
300000 600000
15000
30000
15000
30000
50000 100000
50000 100000
100000 200000
100000 200000
150000 300000
15000
30000
50000 100000
50000 100000
300000 600000
100000 200000
15000
30000
15000
30000
50000 100000
50000 100000
300000 600000
300000 600000
15000
30000
150000 300000
50000 100000
50000 100000
100000 200000
300000 600000
15000
30000
15000
30000
50000 100000
50000 100000
300000 600000
100000 200000
15000
30000
15000
30000
50000 100000
50000 100000
100000 200000
100000 200000
150000 300000
15000
30000
150000 300000
50000 100000

75000
75000
3750
37500
125000
12500
15000
5000
750
750
7500
7500
5000
75000
750
750
2500
2500
5000
25000
7500
750
2500
2500
15000
25000
3750
7500
2500
2500
75000
75000
750
7500
12500
2500
5000
75000
3750
3750
12500
12500
15000
5000
750
3750
2500
2500
5000
5000
37500
3750
7500
2500

VL
VL
VL
VL
VL
VL
VL
VL
L
VL
VL
VL
VL
VL
M
VL
VL
L

50000
150000
75000
7500
25000
25000
50000
150000
7500
7500
25000
25000
150000
150000
75000
7500
25000
25000

100000
300000
150000
15000
50000
50000
100000
300000
15000
15000
50000
50000
300000
300000
150000
15000
50000
50000

200000
600000
300000
30000
100000
100000
200000
600000
30000
30000
100000
100000
600000
600000
300000
30000
100000
100000

5000
15000
7500
750
2500
2500
5000
15000
3750
750
2500
2500
15000
15000
75000
750
2500
12500

1111250