2010 CODE COMPLIANCE REVIEW CHECKLIST

OGS Project No.

Project Description: (Project Title, Facility Name and Address)

Building Name(s)/No.(s):

Client Agency:

Date:

Estimated Project Cost:

Architect/Engineer:

Project Type: (Check all that apply.)


New Building

Repair

Historic Building

Alteration LVL1

Alteration LVL2

Alteration LVL3

Change of Occupancy

Addition

Existing Building Code Chapter 12 Compliance Alternatives (Provide evaluation with this review.)

Work Involved: (Check all that apply.)


General Construction
Plumbing

Roofing

Electrical

Site Work

Asbestos Abatement/Environmental
Sprinkler

Code Enforcement Jurisdiction:


OGS

Other

Elevators

Fire Alarm
Other

YES

Mechanical

Occupancy Classification(s) Chapter 3:

Variance Requested:

Structural

NO

Construction Classification(s) Chapter 6:

LEGEND: NA: Not Applicable; NR: Not Required, NP: Not Permitted
FC: Fire Code; PC: Plumbing Code; MC: Mechanical Code; FGC: Fuel Gas Code, ECCC: Energy Conservation Construction Code;
BC: Building Code; EBC: Existing Building Code
No.

Topic

Building Code Section


(unless otherwise noted)

Required/
Allowed

Actual

Comment

Fire Apparatus Access Road

FC503.1

Incidental Use Areas

BC508.2

Mixed Occupancies:

BC508.1

Attach analysis.

BC508.3.2

BC508.3.2.3

BC403

Non-separated Occupancies
Separated Occupancies (Ratio < 1)
4

High Rise Buildings

BC403.2

BC403.5- 403.8

Standby Power

BC403.10

Emergency Power

BC403.11

BC404

Sprinkler Protection

BC404.3

Smoke Control

BC404.4

Enclosures

BC404.5

Standby Power

BC404.6

Travel Distance

BC404.8

Control Areas

BC414.2

Provide additional information indicating


number, size, materials stored, and quantity of
each material.

Building Areas and Heights

Sprinkler Protection
Fire Alarm

Atriums

Exterior Wall Fire-Resistance Rating


Exterior Fire Separation Distance

BC501, Table 503


BC602.1
Table 602
BC602.1
Table 602

Fire Resistive Construction

BC701.1

Exterior Wall:
Allowable Area of Openings

BC704.8

Provide additional information below.

Attach analysis.

Unprotected

BC704.8

Protected

BC704.8

BDC 402.10 (12/10)

Page 1 of 8
E-File: V:\DesignAndConstr\Project Folder\RecordCorrespondence

LEGEND: NA: Not Applicable; NR: Not Required, NP: Not Permitted
FC: Fire Code; PC: Plumbing Code; MC: Mechanical Code; FGC: Fuel Gas Code, ECCC: Energy Conservation Construction Code;
BC: Building Code; EBC: Existing Building Code
No.

Topic

Exterior Wall:
Vertical Separation of Openings
Parapets

10

Actual

Comment

BC704.11

Fire Walls

BC705

Fire Barriers

BC706

Shaft Enclosures

BC707

Fire Partitions

BC708

Smoke Barriers

BC709

Fire Stopping

BC712

Joint Systems

BC713

Opening Protectives

BC715

Concealed Spaces

BC717

Interior Finishes

BC801.1

Wall and Ceiling: Exits

BC803.5

Wall and Ceiling: Exit Access

BC803.5

Wall and Ceiling: Rooms

BC803.5

BC804

Fire Protection: General

BC901.1

Sprinkler System

BC903

Alt. Fire Extinguishing System

BC904

Standpipe System

BC905

Portable Fire Extinguishers

BC906

Fire Alarm System

BC907

Smoke Detection System

BC907

Emergency Voice

BC907

Smoke Control

BC909

BC909.20

BC911

Smokeproof Enclosure /
Stair Pressurization
Fire Command Center
12

Required/
Allowed

BC704.9

Floors
11

Building Code Section


(unless otherwise noted)

Exits

BC1001.1

Also provide additional information below.

Exit Signs

BC1011

Emergency Lighting

BC1006

Accessible Means of Egress


Area of Refuge

BC1007

BC1007.6

BC1008.1.3.4

Interior Stairs

BC1009.3

Handrails

BC1009.10

Panic Hardware

Access-Controlled Egress Doors

BC1008.1.9

Ramps

BC1010.1

Exit Doorway Arrangement

BC1014.2

Common Path of Travel

BC1014.3

Corridor Fire Rating

BC1017.1

Corridor Width

BC1017.2

Dead End Corridor

BC1017.3

Building with One Exit

BC1019.2

Exit Fire Rating

BC1020.1

BC1020.1.7

BC1022

Smoke-proof Enclosure
Horizontal Exit
BDC 402.10 (12/10)

Page 2 of 8
E-File: V:\DesignAndConstr\Project Folder\RecordCorrespondence

LEGEND: NA: Not Applicable; NR: Not Required, NP: Not Permitted
FC: Fire Code; PC: Plumbing Code; MC: Mechanical Code; FGC: Fuel Gas Code, ECCC: Energy Conservation Construction Code;
BC: Building Code; EBC: Existing Building Code
No.

13

Topic

Actual

Comment

BC1023

Assembly

BC1025

Accessibility

BC1101
ICC/A117.1(2003)
BC1104

Accessible Entrance

BC1105

Parking

BC1106

BC1107.6.2

BC1109.2

BC1110

Group R-2
Toilet Rooms
Signage
14

Ceiling Heights

15

Light: Natural / Artificial


Ventilation

16

Energy Conservation

17

Roof Assembly Fire Classification


Roof Covering

18

Structural Requirements

19

Foundation

20

Safety Glazing

21

Electrical

BC1208.2

BC1205.2 / 1205.3

BC1203

BC1301/ECCC

Provide additional information below.

BC1505

BC1507

BC1601.1

Provide additional information below.

BC1801

Provide additional information below.

BC2406.1

BC2701
BC2702

Smoke Control Systems

BC2702.2.2

Exit Signs

BC2702.2.3

Means of Egress

BC2702.2.4

And Chapter 30

Emergency and Standby Power

Elevator
High Rise Building
Smokeproof Enclosures
Mechanical Systems

BC2702.2.5/2702.2.1
8
BC2702.2.15
BC2702.2.20
BC2801.1
BC716

Refer to BC716.5 for specific requirements.

Fan Shutdown

MC606.4

Combustion Air

MC701.1 & FGC304.1

Chimneys, Flues and Gasvents

MC801.1 & BC2113.1

PC604.4

Fixture Units

PC709.1

House Traps

PC1002.6

Labor Law Art. 10-A

See Labor Law Art. 10-A for piping materials.

BC3003.2

Elevator Hoistway Venting

BC3004

Identification of truss type construction

FC505.3

See Title 19 NYCRR, Part 1264 at


http://www.dos.state.ny.us/code/trussID.htm

Fire and Smoke Dampers

23

Required/
Allowed

Exterior Stairs

Accessible Route

22

Building Code Section


(unless otherwise noted)

Plumbing
Fixture Count
Maximum Consumption

Provide additional information below.


Provide diameter of chimney/gasvents.

BC2901.1
BC2902.1, PC403

Provide additional information below.

Available Street Water Pressure

Water Supply Materials


24

25

Elevator Emergency Operation

Additional Information:
BDC 402.10 (12/10)

Page 3 of 8
E-File: V:\DesignAndConstr\Project Folder\RecordCorrespondence

ALLOWABLE FLOOR AREA (BC503, BC506)


STORY NO.

BLDG. AREA
PER STORY
(ACTUAL)

TABLE 503
AREA

AREA FOR OPEN


1
SPACE INCREASE

AREA FOR
SPRINKLER
2
INCREASE

ALLOWABLE
AREA

Open space area increases from BC Section 506.2 are computed thus:
a. Perimeter which fronts a public way or open space having 20 feet minimum width = (F)
b. Total Building Perimeter = (P)
c. Ratio (F/P) = (F/P)
d. W = Minimum width of public way = (W)
e. Percent of frontage increase If = 100 [ F/P - 0.25] x W/30= (%)

The sprinkler increase per BC Section 506.3 is as follows:


a. Multi-story building Is = 200 percent
b. Single story building Is = 300 percent

MAXIMUM BUILDING AREA (BC503, BC506)


Maximum Building Area = number of stories in the building times max allowable floor area (A) but not greater than 3 x A.

ACTUAL:

ALLOWABLE:

ALLOWABLE HEIGHT (BC503, BC504)


ALLOWABLE

ACTUAL

(TABLE 503)

INCREASE FOR SPRINKLERS

Building Height in Feet

Feet:

Feet = H + 20' =

Building Height in Stories

Stories:

Stories + 1 =

NUMBER AND ARRANGEMENT OF EXITS (CHAPTER 10)


FLOOR, ROOM OR SPACE
DESIGNATION

MINIMUM
NUMBER OF EXITS

TRAVEL DISTANCE
(1016)

ARRANGEMENT MEANS OF EGRESS


(1015.2)

REQUIRED

ACTUAL

ALLOWABLE

ACTUAL

REQUIRED
DISTANCE BETWEEN
EXIT DOORS

ACTUAL DISTANCE
SHOWN ON PLANS

BDC 402.10 (12/10)

Page 4 of 8
E-File: V:\DesignAndConstr\Project Folder\RecordCorrespondence

OCCUPANT LOAD AND EXIT WIDTH (BC1003 AND BC1004)


(A)
USE GROUP
OR SPACE
DESCRIPTION

(B)
AREA PER
OCCUPANT

AREA
SQ. FT.

(TABLE
1004.1.1)

(C)

(D)

EXIT WIDTH (IN)


REQUIRED
WIDTH

EGRESS WIDTH
PER OCCUPANT
(TABLE 1005.1)

OCCUPANT
LOAD
(AB)

ACTUAL WIDTH
SHOWN ON
PLANS

(SECTION 1005.1)

STAIR

LEVEL

STAIR

LEVEL

STAIR

LEVEL

PLUMBING FIXTURE REQUIREMENTS (BC2902.1), PC403


WATERCLOSETS
MALE
FEMALE

OCCUPANCY

URINALS

LAVATORIES
MALE
FEMALE

SHOWERS/ TUBS
& EYEWASH

DRINKING FOUNTAINS
REGULAR ACCESSIBLE

SERVICE SINK

ENERGY CODE COMPLIANCE (Note: All code citations refer to the Energy Conservation Construction Code (ECCC).)
Compliance Method
Residential (101.5)

Yes (If yes, indicate compliance method below).

No

Energy Conservation Construction Code of New York State, Chapter 4


Residential, one and two family dwelling with glazing area * 15%
Commercial (101.5)

15%

Yes (If yes, indicate compliance method below.)

No

Energy Conservation Construction Code of New York State, Chapter 5

Exempt Building? (101.5.2)

Yes (If yes, describe exemption type below).

No

Historic Building? (101.4.2)

Yes

No

Alteration, Renovation, or Repairs to Existing Building? (101.4.3)


below.)

Yes (If yes, list bldg. system(s) undergoing substantial renovation

No

Project Location: (301.1)

County:

Zone:

Thermal Values of Building Components (402, 502)


Energy Conservation Construction Code (ECCC) of New York State and Chapter 11of Residential Code of New York State
Fill in values below as applicable:
Foundation wall construction U-value

Foundation wall insulation R-value


Insulation Depth
BDC 402.10 (12/10)

Page 5 of 8
E-File: V:\DesignAndConstr\Project Folder\RecordCorrespondence

Below grade wall insulation R-value

Basement walls U-value

Basement wall insulation R-value

Insulation Depth

Crawl Space Walls U-value

Crawl Space Insulation R-value

Heated Slab on grade insulation R-value

Unheated slab on grade insulation R-value

Slab edge insulation R-value

Insulation Depth

Floors over unheated spaces U-value

Floors over unheated spaces insulation R-value

Interior walls separating conditioned and


unconditioned spaces insulation R-value
Exterior wall construction U-value

Exterior wall insulation R-value

Roof/ceiling construction U-value

Roof/ceiling insulation R-value

Skylights U-value

Windows U-value

Air infiltration rate

% window area

projection factor

Exterior Doors U-value

Air infiltration rate

% door area

Fenestration solar heat gain coefficient:

Duct insulation R-value

Pipe insulation R-value

Mechanical and Electrical Systems (ECCC 403, 404, 405, 503, 504, 505, 506)
Energy Conservation Construction Code (ECCC) of New York State and Chapter 11 of Residential Code of New York State
Electric resistance heat? (ECCC402, 502)

Yes

No

Renewable energy sources used? (ECCC806.2.4, 506.3)


Type:
HVAC system(s) type:

Yes (If yes, describe type.)

No

Design Values:
Indoor temperature:
Outdoor temperature:

Heating

Cooling

Heating and cooling load calculations:


Attach calculations for all systems.
Equipment: (Fill in values below as applicable.)
Equipment Type

Fuel

Rating/Size

Efficiency

Water Heaters

Storage Tanks

Boilers

Furnaces

Chillers

Condensers

Cooling Towers

Air Conditioners

Heat Pumps

BDC 402.10 (12/10)

Type

Steam

Hot Water

Electric
Air Cooled

Centrifugal
Water Cooled

Air Cooled

Water Cooled

Air Cooled

Water Cooled

Page 6 of 8
E-File: V:\DesignAndConstr\Project Folder\RecordCorrespondence

Ground Water
Package units

Unit heaters

Transformers

Ground Source

Heating

Cooling

Liquid

Dry

Phase:

Voltage:

Lighting W/ft :
Building:

Tenant Areas:(List all that apply.)

STRUCTURAL DESIGN
Design Loads
Importance Factors (BC1604.5):

Live Loads (BC1607):

Roof

psf

Floor

psf

Ce:

Snow Load (BC1608)


Wind Load (BC1609)

Wind (IW):

Snow (IS)

Seismic (IE)

Dead Loads (1606):

Ct

Pg

Basic Wind Speed (3 sec. gust)

Exposure Category

Exterior Components and Cladding:

psf

Ps

Roof

psf

Floor

psf

Psf

mph (ASCE-7-02)

Interior Zones

psf

End Zones

psf

Corner Zones

psf

Seismic Requirements (BC1613 -1623)


Seismic Use Group

Site Class

Spectral Response Acceleration


Spectral Response Coefficients
Seismic Design Category

SS

%g

S1

%g

SMS

%g

SM1

%g

SDs

%g

SD1

%g

SEISMIC DESIGN CATEGORY A

Compliance with Section BC1616.4 only:

Yes

No

SEISMIC DESIGN CATEGORY B, C, AND D (Provide the following Seismic Design parameters.)
Basic Structural System:(Check one.)

Analysis Procedure

Simplified

Bearing Wall

Dual w/ Special Moment Frame

Building Frame

Dual w/ Intermediate R/C or Special Steel

Moment Frame

Inverted Pendulum

Equivalent Lateral Force

Architectural, Mechanical, Components anchored?

Yes

LATERAL DESIGN CONTROL

Modal

No

Earthquake

Wind

Foundations (BC1801, 1805)


SOIL BEARING CAPACITIES (BC1804)
Field Test (Provide copy of test report.)

Pile size, type and capacity

psf

Presumptive Bearing capacity

psf

COMBUSTION AIR (MC701.1 and FGC 304.1)


SQ IN FREE AREA
GROSS

SQ IN FREE AREA
NET

BTUH
INPUT

NO. OF
OPENINGS

HEATING APPLIANCE

BDC 402.10 (12/10)

1000

BTUH/SQ. IN.
2000
GROSS

4000

Page 7 of 8
E-File: V:\DesignAndConstr\Project Folder\RecordCorrespondence

Total (Sq. In.):

ADDITIONAL COMMENTS:

BDC 402.10 (12/10)

Page 8 of 8
E-File: V:\DesignAndConstr\Project Folder\RecordCorrespondence

También podría gustarte