CRONOGRAMA VALORIZADO

MUNICIPALIDAD DISTRITAL DE TUMAN

ENTIDAD
OBRA
Item

Descripcin

Und

Metrado

P. Unit.
S/.

MES 1
Parcial

Parcial
S/.

1 OBRAS PROVISIONALES

MES3
%

1,880.00

14.64%

1,880.00

14.64%

7,080.00

7,079.99

1,180.00

16.67%

1,219.33

17.22%

1,101.33

15.56%

1,219.33

17.22%

1,180.00

16.67%

1,180.00

16.67%

723.33

17.22%

653.33

15.56%

723.33

17.22%

700.00

16.67%

700.00

16.67%

343,185.56

35.56%

568,520.96

58.91%

567,450.80

67.70%

6.00

700.00

4,199.99

700.00

16.67%

und

1.00

1,561.49

1,561.49

1,561.49

100.00%

150.00

150.00

100.00%

GLB

1.00

150.00

150.00

150.00

100.00%

3,623.77

3,623.77

100.00%

10.20

2,747.93

2,747.93

100.00%

2 SEGURIDAD Y SALUD

3 TRABAJOS PRELIMINARES
3.01

DEMOLICION DE VEREDAS EXISTENTES E=0.10M

m2

269.50

3.02

ACARREO DE MATERIAL PROV. DE DEMOLICIONES- CARRETILLAS(50m)

m3

40.43

9.34

377.43

377.43

100.00%

3.03

ELIMINACION DE MATERIAL PROV. DE DEMOLICIONES CON VOLQUETE

m3

40.43

12.33

498.41

498.41

100.00%

965,055.32

6,143.27

0.64%

47,205.53

4.89%

16,382.05

6,143.27

37.50%

10,238.78

62.50%

16,382.05

6,143.27

37.50%

10,238.78

62.50%

4 PAVIMENTO FLEXIBLE

04.02.02
4.03

TRAZO Y REPLANTEO
1.40

MOVIMIENTO DE TIERRAS
CORTE CON MAQUINARIA CON PAVIMENTO FLEXIBLE

m3

4,105.72

11.25

ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA

m3

5,132.15

12.33

109,475.91

36,966.75

33.77%

72,509.16

66.23%

46,208.44

36,966.75

80.00%

9,241.69

20.00%
100.00%

63,267.47

63,267.47

838,127.20

270,676.40

32.30%

3.15

36,992.29

36,992.29

100.00%

CARPETA ASFALTICA

04.03.01

PERFILADO, NIVELACION Y COMPACTACION DE LA SUBRAZANTE EN ZONAS DE CORTE

m2

11,730.63

04.03.02

SUB-BASE GRANULAR E=0.15 M FACT. COMPACT.=1.20

m2

11,730.63

9.62

112,796.70

112,796.70

100.00%

04.03.03

BASE GRANULAR E=0.15 M FACT. COMPACT.=1.20

m2

11,730.63

11.45

134,319.36

120,887.42

90.00%

13,431.94

10.00%

04.03.04

IMPRIMACION ASFALTICA

m2

11,730.63

5.71

66,952.78

66,952.78

100.00%

CARPETA ASFALTICA EN CALIENTE DE 2"

m2

11,730.63

41.52

487,066.08

487,066.08

100.00%

1,070.18

1,070.18

100.00%

1,070.18

1,070.18

100.00%

04.03.05
4.04
04.04.01

SEALIZACION
SEALIZACION EN PAVIMENTOS

m2

53.58

15.13%

mes

04.02.01

Parcial

1,942.66

CARTEL DE IDENTIFICACION DE LA OBRA DE 8.50M X 3.60M.

11,730.63

MES6
%

13.66%

ALQUILER DE LOCAL PARA ALMACEN

m2

Parcial

1,754.66

1.03

TRAZO Y REPLANTEO EN PISTAS

MES5
%

15.13%

1.02

4.02

Parcial

1,942.66

1.00

04.01.01

MES4
%

26.80%

GLB

4.01

Parcial

3,441.49

MOVILIZACION Y DESMOVILIZACION DE EQUIPO

EQUIPOS DE PROTECCION INDIVIDUAL

MES2
Parcial

12,841.47

1.01

2.01

FECHA: noviembre
2016

MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DE SECTORES VULNERABLES DE LA CIUDAD DE TUMAN-CHICLAYO-LAMBAYEQUE

19.97

299,104.51

15,305.15

5.12%

10,822.02

3.62%

36,859.97

12.32%

42,161.55

14.10%

84,025.74

28.09%

109,930.08

36.75%

5.01

5 OBRAS DE CONCRETO
VEREDA DE CONCRETO

299,104.51

15,305.15

5.12%

10,822.02

3.62%

36,859.97

12.32%

42,161.55

14.10%

84,025.74

28.09%

109,930.08

36.75%

05.01.01

TRAZO Y REPLANTEO

5,155.46

5,155.46

100.00%
100.00%
29,881.71

29.53%

27,739.80

27.41%

6,039.61

5.97%

16,554.98

16.36%

6,039.61

50.00%

05.01.01.01
05.01.02

TRAZO Y REPLANTEO EN VEREDAS

m2

1.33

5,155.46

5,155.46

101,187.81

10,149.69

10.03%

10,822.02

10.69%

257.26

28.01

7,204.85

3,740.98

51.92%

3,463.87

48.08%

m3

777.88

27.46

21,362.37

6,408.71

30.00%

7,358.15

34.44%

6,646.07

31.11%

949.44

4.44%

m2

3,889.38

2.42

9,400.63

7,896.53

84.00%

1,504.10

16.00%

RELLENO CON AFIRMADO H=10CM

m2

3,889.38

9.05

35,189.73

15,339.11

43.59%

19,850.62

56.41%

ACARREO DE MATERIAL EXCEDENTE EN CARRETILLA (50m)

m3

1,293.92

9.34

12,079.21

5,435.64

45.00%

ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA

m3

1,293.92

12.33

15,951.02

05.01.02.01

EXCAVACION PARA UAS DE VEREDAS

m3

05.01.02.02

CORTE SUPERFICIAL MANUAL HASTA 0.20 MT, PARA VEREDAS

05.01.02.03

NIVELACION Y APISONADO MANUAL DE TERRENO

05.01.02.04
05.01.02.05
05.01.02.06
05.01.03

3,889.38

MOVIMIENTO DE TIERRAS

CONCRETO PREMEZCLADO

174,098.64

05.01.03.01

CONCRETO PREMEZCLADO EN UAS PARA VEREDA F'C=175 KG/CM2

m3

257.26

411.22

105,791.62

05.01.03.02

CONCRETO PREMEZCLADO PARA VEREDAS F'C=175 KG/CM2, E=0.10M

m3

777.88

52.53

40,859.18

05.01.03.03

ENCOFRADO Y DESENCOFRADO EN VEREDAS

m2

704.15

38.98

27,447.84

1,063.38

5.95

2,274.32

5.43

05.01.04
05.01.04.01
05.01.05
05.01.05.01

JUNTA ASFALTICA EN VEREDAS


JUNTAS ASFALTICAS EN VEREDAS
SEALIZACION
SEALIZACION EN VEREDAS

6 RAMPAS
6.01
06.01.01
6.02

TRAZO Y REPLANTEO
TRAZO Y REPLANTEO EN RAMPAS

m2

53.40

0.47

MOVIMIENTO DE TIERRAS

6,978.26

6,978.26

100.00%

12,340.16

100.00%

16.67%

106,450.11

9,968.15

9.36%

25.02

25.02

100.00%
100.00%

25.02

25.02

2,407.12

2,407.12

100.00%

BASE COMPACTACION MANUAL PARA RAMPAS-RELLENO AFIRMADO E=10CM

m2

267.00

6.07

1,619.41

1,619.41

100.00%

06.02.03

ACARREO DE MATERIAL EXCEDENTE EN CARRETILLA (50m)

m3

13.35

9.34

124.63

124.63

100.00%

06.02.04

ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA

m3

13.35

12.33

164.57

164.57

100.00%

100,723.81

4,241.85

4.21%

640.94

640.94

100.00%
100.00%

06.03.02.01

EXCAVACION PARA SARDINELES e=0.15cm

m3

06.03.02.02

RELLENO CON MATERIAL PROPIO

06.03.02.03

ACARREO DE MATERIAL EXCEDENTE EN CARRETILLA (50m)

06.03.02.04

ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA

06.03.03

483.54

1.33

2,688.58

25.48%

34,315.27

41.97%

34,315.27

100.00%

40.38%
40.91%

m3

69.08

6.29

434.56

434.56

100.00%

m3

185.65

9.34

1,733.11

1,333.16

76.92%

m3

185.65

12.33

2,288.63

96.71

235.52

22,777.11

81,764.32

413.99

34,315.27

29.76

24,671.94

51.81

5.26

1,381.55

5.43

06.04.02

41.78%

2,492.94

82.89

SEALIZACION

SARDINEL SUMERGIDO DE CONCRETO E= 0.15CM


TRAZO Y REPLANTEO
TRAZO Y REPLANTEO EN SARDINELES

42,083.67

4,260.66

828.93

06.04.01.01

40.41%

34.13%

m2

6.04

40,704.24

59.09%

m3

06.04.01

13.60%

3,600.91

ENCOFRADO Y DESENCOFRADO EN SARDINELES

SEALIZACION EN SARDINELES

13,694.05

6,093.85

CONCRETO PREMEZCLADO EN SARDINEL F'C=175KG/CM2

06.03.05

39.53%

28.01

06.03.03.03

06.03.05.01

42,083.67

640.94

06.03.03.02

JUNTAS ASFALTICAS EN SARDINELES

38.24%

3,600.91

m3

JUNTAS ASFALTICAS EN SARDINELES

40,704.24

640.94

CONCRETO 1:8+25% P.M. EN CIMIENTO DE SARDINELES

06.03.04

12.86%

10,550.15

06.03.03.01

06.03.04.01

13,694.05

217.59

CONCRETO F'c=175kg/cm2

m2

23.63

1.33

28.01

MOVIMIENTO DE TIERRAS

100.00%

22.03%

12,340.16

06.02.02

m2

40,859.18
6,047.83

12,340.16

100.00%

TRAZO Y REPLANTEO EN SARDINELES

32.00%

12,340.16

498.51

MOVIMIENTO DE TIERRAS

42.91%

33,853.32

100.00%

498.51

06.03.02

74,712.50

68.00%

100.00%

46.68

06.03.01.01

44.79%

71,938.30

6,322.44

10.68

TRAZO Y REPLANTEO

52.54%

77,986.13

6,322.44

m3

06.03.01

14,421.75

8.28%

6,322.44

EXCAVACION DE ZANJAS PARA RAMPAS

SARDINEL DE CONCRETO E=0.15CM

25.42%

14,421.75

5.00%
100.00%

6,322.44

06.02.01

6.03

4.01%

603.96
15,951.02

9,433.39

9,433.39

11.54%

38.24%

399.95

23.08%

2,288.63

100.00%

38,015.66

46.49%

22,777.11

100.00%

15,238.55

61.76%

272.29

272.29

100.00%

272.29

272.29

100.00%

7,496.11

7,496.11

100.00%

7,496.11

7,496.11

100.00%

3,294.16

3,294.16

31.32

31.32

100.00%
100.00%

31.32

31.32

100.00%

390.49

390.49

100.00%

198.56

198.56

100.00%

06.04.02.01

EXCAVACION PARA SARDINELES SUMERGIDO A=0.15M

m3

7.09

06.04.02.02

ACARREO DE MATERIAL EXCEDENTE EN CARRETILLA (50m)

m3

8.86

9.34

82.71

82.71

100.00%

06.04.02.03

ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA

m3

8.86

12.33

109.22

109.22

100.00%

2,872.35

2,872.35

100.00%

2,872.35

2,872.35

100.00%

1,000.01

166.67

16.67%

172.22

17.22%

155.56

15.56%

172.22

17.22%

166.67

16.67%

166.67

1,000.01

166.67

16.67%

172.22

17.22%

155.56

15.56%

172.22

17.22%

166.67

16.67%

166.67

16.67%

1,000.01

166.67

16.67%

172.22

17.22%

155.56

15.56%

172.22

17.22%

166.67

16.67%

166.67

16.67%

4,239.71

31.84%

3,836.72

28.81%

4,239.71

100.00%
3,836.72

100.00%

06.04.03
06.04.03.01

CONCRETO F'c=175kg/cm2
CONCRETO EN SARDINEL F'C=175 KG/CM2 EN SARDINEL SUMERGIDO

m3

7.09

405.13

7 MITIGACION AMBIENTAL
7.01
07.01.01

PROGRAMA DE PREVENCION, CONTROL Y MITIGACION


PLAN DE MEDIDAS DE CONTROL AMBIENTAL O CONTINGENCIAS

GLB

1.00

1,000.00

13,317.63

5,241.20

39.36%

31.00

169.07

5,241.20

5,241.20

100.00%

8 OTROS
8.01

NIVELACION DE BUZONES EN GENERAL

und

8.02

NIVELACION DE CAJAS DE CONEXIONES DOMICILIARIAS

und

43.00

98.60

4,239.71

8.03

LIMPIEZA DE OBRA-MANUAL

m2

16,127.18

0.24

3,836.72

COSTO DIRECTO
GASTOS GENERALES
SUB-TOTAL
TOTAL- PRESUPUESTO

3.00%

S/.
S/.
S/.
S/.

1,401,542.82

38,798.50

73,836.48

427,901.19

659,120.77

86,072.41

115,813.47

1,401,542.82
42,046.28
1,443,589.10
1,443,589.10

38,798.50
1,163.96
39,962.46
39,962.46

73,836.48
2,215.09
76,051.57
76,051.57

427,901.19
12,837.04
440,738.23
440,738.23

659,120.77
19,773.62
678,894.39
678,894.39

86,072.41
2,582.17
88,654.58
88,654.58

115,813.47
3,474.40
119,287.87
119,287.87

2.8%

5.3%

30.5%

47.0%

6.1%

8.3%