Está en la página 1de 21

GOBIERNO AUTNOMO MUNICIPAL DE SUCRE

DEPARTAMENTO TCNICO SUB-ALCALDA D-8

COMPUTOS METRICOS
PROYECTO: CONSTRUCCIN CENTRO DE ACOPIO CHUFLE
UBICACIN: COMUNIDAD CHUFLE

DISTRITO:

CANTN: CHAUNACA

FECHA:

PROYECTISTA: ARQ. JANETH S. FALN ROBLEDO

DESCRIPCION DE ACTIVIDAD

Unid.

1 INSTALACION DE FAENAS

Alto

Ancho

Largo

Long.

Veces

(m)

(m)

(m)

(ml)

5.30

7.10

4.60

GLB

2 REPLANTEO (ESTRUCTURAS Y EDIFICACIONES)

M2

3 EXCAVACIN MANUAL TERRENO SEMI DURO

M3

Excavacin para nivelar el terreno


lugar de emplazamiento
Excavacin para cimientos
Eje 1 (A-B) y Eje 3 (A-B)

0.40

0.30

3.05

Eje A (1-2), (2-3) y Eje B (1-2), (2-3)

0.40

0.30

2.40

1.00

0.75

0.75

Excavacin para zapatas


Zapatas tipo

4 RELLENO Y COMPACTADO MANUAL

M3
6

0.70

0.75

0.75

Descuento cimiento

-6

0.40

0.30

0.75

Descuento columna

-6

0.30

0.20

0.20

0.30

0.75

0.75

Columna C-A1, C-A2, C-A3

4.60

0.20

0.20

Columna C-B1, C-B2, C-B3

3.45

0.20

0.20

Eje 1 (A-B) y Eje 3 (A-B)

0.40

0.30

3.05

Eje A (1-2), (2-3) y Eje B (1-2), (2-3)

0.40

0.30

2.40

5 RETIRO DE ESCOMBROS C/CARGUO

M3
Excavacin para nivelar el terreno

Parcial
Excavacin para cimientos
Parcial
Excavacin para zapatas
Parcial
Descuento relleno de tierra
Parcial
% de esponjamiento

30%

6 ZAPATAS DE HA TIPO "A"

M3
Zapata tipo

7 COLUMNAS HA TIPO "A"

M3

8 CIMIENTOS DE HC 60% P.D. TIPO "B"

M3

Alto

Ancho

Largo

Long.

Veces

(m)

(m)

(m)

(ml)

Eje 1 (A-B) y Eje 3 (A-B)

0.40

0.15

3.60

Eje A (1-2), (2-3) y Eje B (1-2)

0.40

0.15

2.95

Eje B (2-3)

0.40

0.15

2.05

DESCRIPCION DE ACTIVIDAD

Unid.

9 SOBRECIMIENTOS DE HC 60% P.D. TIPO "B"

M3

DESCRIPCION DE ACTIVIDAD

Unid.

10 IMPERMEABILIZACIN DE SOBRECIMIENTOS

Alto

Ancho

Largo

Long.

Veces

(m)

(m)

(m)

(ml)

M2
Eje 1 (A-B) y Eje 3 (A-B)

0.15

3.60

Eje A (1-2), (2-3) y Eje B (1-2)

0.15

2.95

Eje B (2-3)

0.15

2.05

11 MURO LADRILLO GAMBOTE (12cm)

M2
Eje 1 (A-B) y Eje 3 (A-B)

2.35

3.60

Eje A (1-2), (2-3) y Eje B (1-2), (2-3)

2.35

2.95

Mojinete Eje 1 y 3

0.63

3.85

Mojinete Eje A

1.06

2.95

Mojinete Eje B

0.22

2.95

Descuento ventanas

-2

1.20

1.50

Descuento Puerta

-1

2.45

0.90

12 BOTAGUAS DE LADRILLO GAMB e=12cm VISTO

ML
Ventana tipo

1.50

3.00

13 VIGA CADENA HA TIPO "A"

M3
Eje 1 y Eje 3

0.30

0.15

6.50

Eje A y Eje B

0.30

0.15

3.60

Fachada posterior

2.98

6.50

Fachadas laterales

3.01

4.00

Mojinetes laterales

0.44

4.00

Fachada frontal

3.01

6.50

Descuento ventana

-2

1.20

1.50

Descuento Puerta

-1

2.45

0.90

Descuento Ladrillo visto

-2

1.05

Jambas ventanas

14 REVOQUE MORTERO DE CEMENTO EXTERIOR

M2

Jambas puerta

1.50
0.07

1.20

0.07

2.45

0.07

0.07

1.50

0.90

15 REVOQUE YESO INTERIOR

M2
Fachada posterior

3.75

6.40

Fachadas laterales

2.94

3.60

Mojinetes laterales

0.41

3.60

Fachada frontal

2.94

6.40

Descuento ventana

-2

1.20

1.50

Descuento Puerta

-1

2.45

Jambas ventanas

Jambas puerta

0.90
0.07

1.20

0.07

2.45

0.07

1.50

0.07

0.90

5.00

7.10

16 CUBIERTA CALAMINA

3.00

M2

DESCRIPCION DE ACTIVIDAD

Unid.

Alto

Ancho

Largo

Long.

Veces

(m)

(m)

(m)

(ml)

17 CIELO RASO CON VIGA VISTA + MADERAMEN

M2
Interior del ambiente

3.79

6.20

Aleros laterales

0.20

4.10

Alero parte posterior

0.20

7.10

Alero parte frontal

0.52

7.10

Alto

Ancho

Largo

Long.

Veces

(m)

(m)

(m)

(ml)

3.70

6.20

0.15

0.90

Acera laterales

0.30

4.00

Acera parte posterior

0.30

7.10

Acera parte frontal

1.00

7.10

5.00

7.10

3.70

6.20

0.15

0.90

DESCRIPCION DE ACTIVIDAD

Unid.

18 PISO DE CEMENTO e=7,5cm + EMPEDRADO

M2
piso de puerta

19 ACERA DE CEMENTO e=5cm + EMPEDRADO

M2

20 PINTURA ANTICORROSIVA P/CUBIERTA DE CALAMINA

M2

21 PISO DE CERMICA NACIONAL

M2
piso de puerta

22 ZCALO DE CERMICA NACIONAL

ML
2

6.40

3.60

7.20

Descuento puerta

-1

0.90

-0.90

Jamba puerta

0.07

12.80

0.14
19.24

23 VENTANA MADERA CEDRO

M2
2

1.20

1.50

1.20

1.50

1.20

1.50

2.45

0.90

24 PROV. Y COLOCADO DE VIDRIO DOBLE (3mm)

M2

25 PROV. Y COLOCADO REJAS METALICAS

M2

26 PUERTA DE MADERA ROBLE TIPO TABLERO + QUINCALLERIA

M2

27 TABLERO DE DISTRIBUCIN ELECTRICO

PZA
1

1.00

28 INSTALACION ELECTRICA ILUMINACION FLUORESCENTE (2X40 W)

PTO
2

2.00

29 INSTALACION ELECTRICA TOMACORRIENTE

PTO
2

2.00

30 PINTURA LATEX EXTERIOR

M2
Fachada posterior

2.98

6.50

Fachadas laterales

3.01

4.00

Mojinetes laterales

0.44

4.00

Fachada frontal

3.01

6.50

Alto

Ancho

Largo

Long.

Veces

(m)

(m)

(m)

(ml)

Descuento ventana

-2

1.20

1.50

Descuento Puerta

-1

2.45

0.90

Descuento Ladrillo visto

-2

1.05

Jambas ventanas

DESCRIPCION DE ACTIVIDAD

Unid.

Jambas purta

1.20

0.07

2.45

0.07

1.50
0.07

0.07

1.50

0.90

Alto

Ancho

Largo

Long.

Veces

(m)

(m)

(m)

(ml)

Fachada posterior

3.75

6.40

Fachadas laterales

2.94

3.60

Mojinetes laterales

0.41

3.60

DESCRIPCION DE ACTIVIDAD

Unid.

31 PINTURA LATEX EXTERIOR

M2

Fachada frontal

2.94

6.40

Descuento ventana

-2

1.20

1.50

Descuento Puerta

-1

2.45

Jambas ventanas

Jambas puerta

0.90
0.07

1.20

0.07

2.45

0.07

0.07

1.50

0.90

32 PINTURA CERMICA PARA MUROS DE LADRILLO

M2
2

1.05

1.50

Puerta (ambas caras)

2.45

0.90

Ventanas (ambas caras)

1.20

1.50

Vigas vistas (ambas caras)

14

0.15

Vigas

33 BARNIZADO EN CARPINTERIA DE MADERA

M2

34 PLACA DE ENTREGA DE OBRAS

PZA
1

35 LIMPIEZA GENERAL

1.00
GLB
1

1.00

4.80
0.05

4.80

GOBIERNO AUTNOMO MUNICIPAL DE SUCRE

ARTAMENTO TCNICO SUB-ALCALDA D-8

COMPUTOS METRICOS
8
MAYO,2014

Sup.

Vol.

(m2)

(m3)

Total
1.00
37.63

37.6
37.63
21.52
3.54

16.27
0.73
1.15
3.38
21.52
1.75
2.36
-0.54
-0.07
1.75
25.71
16.27
1.88
3.38
-1.75
5.93
25.71
1.01
1.01
1.01
0.97
0.55
0.41
0.97
1.88
0.73
1.15
1.88

Sup.

Vol.

(m2)

(m3)

Total
1.09

0.43
0.53
0.12
1.09

Sup.

Vol.

(m2)

(m3)

Total
2.72

1.08
1.33
0.31
2.72
44.65
16.92
27.73
4.81
6.25
1.30
-3.60
-2.21
44.65
3.00

0.91
0.59
0.32
0.91
58.36
19.37
24.08
3.52
19.57
-3.60
-2.21
-3.15
0.21
0.17
0.34
0.06
58.36
61.88
24.00
21.17
2.92
18.82
-3.60
-2.21
0.21
0.17
0.34
0.06
61.88
35.50
35.50

Sup.

Vol.

(m2)

(m3)

Total

35.50
30.24
23.49
1.64
1.42
3.69
30.24

Sup.

Vol.

(m2)

(m3)

Total
23.08

22.94
0.14
23.08
11.63
2.40
2.13
7.10
11.63
35.50
35.50
35.50
23.08
22.94
0.14
23.08
19.24

3.60
3.60
3.60
3.60
3.60
3.60
3.60
3.60
3.60
2.21
2.21
2.21
1.00

2.00

2.00

58.36
19.37
24.08
3.52
19.57

Sup.

Vol.

(m2)

(m3)

-3.60
-2.21
-3.15
0.21
0.17
0.34
0.06
58.36

Total

Sup.

Vol.

(m2)

(m3)

Total
61.88

24.00
21.17
2.92
18.82
-3.60
-2.21
0.21
0.17
0.34
0.06
61.88
3.15
3.15
3.15
23.37
4.41
7.20
10.08
1.68
23.37
1.00

1.00

GOBIERNO AUTNOMO MUNICIPAL DE SUCRE

DEPARTAMENTO TCNICO SUB-ALCALDA D-8

PRESUPUESTO GENERAL
PROYECTO:

CONSTRUCCIN CENTRO DE ACOPIO CHUFLE

UBICACIN:

COMUNIDAD CHUFLE

CANTN:

CHAUNACA

PLAZO
REFERENCIAL

60 DAS

PROYECTISTA: ARQ. JANETH S. FALN ROBLEDO


FECHA:

MAYO,2014

ITEM

DESCRIPCION

UNID

CANTIDAD

PRECIO

COSTO

UNITARIO

TOTAL

INSTALACION DE FAENAS

GLB

1.00

1850.89

REPLANTEO (ESTRUCTURAS Y EDIFICACIONES)

M2

37.63

8.20

308.57

EXCAVACIN MANUAL TERRENO SEMI DURO

M3

21.52

111.05

2389.80

RELLENO Y COMPACTADO MANUAL

M3

1.75

84.00

147.00

RETIRO DE ESCOMBROS C/CARGUO

M3

25.71

174.95

4497.96

ZAPATAS DE HA TIPO "A"

M3

1.01

2503.31

2528.34

COLUMNAS HA TIPO "A"

M3

0.97

4461.21

4327.37

CIMIENTOS DE HC 60% P.D. TIPO "B"

M3

1.88

675.65

1270.22

SOBRECIMIENTOS DE HC 60% P.D. TIPO "B"

M3

1.09

954.49

1040.39

10

IMPERMEABILIZACIN DE SOBRECIMIENTOS

M2

2.72

51.87

141.09

11

MURO LADRILLO GAMBOTE (12cm)

M2

44.65

254.14

11347.35

12

BOTAGUAS DE LADRILLO GAMB e=12cm VISTO

ML

3.00

145.22

435.66

13

VIGA CADENA HA TIPO "A"

M3

0.91

4245.78

3863.66

14

REVOQUE MORTERO DE CEMENTO EXTERIOR

M2

58.36

96.55

5634.66

15

REVOQUE YESO INTERIOR

M2

61.88

93.71

5798.77

16

CUBIERTA CALAMINA

M2

35.50

297.37

10556.64

17

CIELO RASO CON VIGA VISTA + MADERAMEN

M2

30.24

187.63

5673.93

18

PISO DE CEMENTO e=7,5cm + EMPEDRADO

M2

23.08

129.39

2986.32

19

ACERA DE CEMENTO e=5cm + EMPEDRADO

M2

11.63

238.43

2772.94

20

M2

35.50

33.39

1185.35

21

PINTURA ANTICORROSIVA P/CUBIERTA DE CALAMINA


PISO DE CERMICA NACIONAL

M2

23.08

244.17

5635.44

22

ZCALO DE CERMICA NACIONAL

ML

19.24

53.28

1025.11

23

VENTANA MADERA CEDRO

M2

3.60

664.58

2392.49

24

PROV. Y COLOCADO DE VIDRIO DOBLE (3mm)

M2

3.60

92.22

331.99

25

PROV. Y COLOCADO REJAS METALICAS

M2

3.60

398.55

1434.78

26

PUERTA DE MADERA ROBLE TIPO TABLERO + QUINCALLERIA


TABLERO DE DISTRIBUCIN ELECTRICO

M2

2.21

1701.55

3760.43

1.00

5966.41

5966.41

2.00

403.69

807.38

27

1850.89

28

PZA
INSTALACION ELECTRICA ILUMINACION FLUORESCENTE (2X40 W) PTO

29

INSTALACION ELECTRICA TOMACORRIENTE

299.59

599.18

PINTURA LATEX EXTERIOR

PTO
M2

2.00

30

58.36

43.70

2550.33

31

PINTURA LATEX INTERIOR

M2

61.88

34.84

2155.90

32

PINTURA CERMICA PARA MUROS DE LADRILLO

M2

3.15

41.93

132.08

33

BARNIZADO EN CARPINTERIA DE MADERA

M2

23.37

57.40

1341.44

34

PLACA DE ENTREGA DE OBRAS

PZA

1.00

2217.97

2217.97

35

LIMPIEZA GENERAL

GLB

1.00

788.64

788.64

COSTO PARCIAL DEL PROYECTO (Bs.)

99,896.48

CUADRO DE COTIZACION
PROYECTO:

CONSTRUCCIN CENTRO DE ACOPIO CHUFLE

DISTRITO :

UBICACION:

COMUNIDAD CHUFLE

FECHA:

DATOS DEL PROPONENTE

PLAZO

Nombre y Apellidos:
C.I.:

PROPONENTE
NIT.:

ITEM

Telf:

DESCRIPCION

60 DAS

UNID

CANTIDAD

INSTALACION DE FAENAS

GLB

1.00

REPLANTEO (ESTRUCTURAS Y EDIFICACIONES)

M2

37.63

EXCAVACIN MANUAL TERRENO SEMI DURO

M3

21.52

RELLENO Y COMPACTADO MANUAL

M3

1.75

RETIRO DE ESCOMBROS C/CARGUO

M3

25.71

ZAPATAS DE HA TIPO "A"

M3

1.01

COLUMNAS HA TIPO "A"

M3

0.97

CIMIENTOS DE HC 60% P.D. TIPO "B"

M3

1.88

SOBRECIMIENTOS DE HC 60% P.D. TIPO "B"

M3

1.09

10

IMPERMEABILIZACIN DE SOBRECIMIENTOS

M2

2.72

11

MURO LADRILLO GAMBOTE (12cm)

M2

44.65

12

BOTAGUAS DE LADRILLO GAMB e=12cm VISTO

ML

3.00

13

VIGA CADENA HA TIPO "A"

M3

0.91

14

REVOQUE MORTERO DE CEMENTO EXTERIOR

M2

58.36

15

REVOQUE YESO INTERIOR

M2

61.88

16

CUBIERTA CALAMINA

M2

35.50

17

CIELO RASO CON VIGA VISTA + MADERAMEN

M2

30.24

18

PISO DE CEMENTO e=7,5cm + EMPEDRADO

M2

23.08

19

ACERA DE CEMENTO e=5cm + EMPEDRADO

M2

11.63

20

PINTURA ANTICORROSIVA P/CUBIERTA DE CALAMINA

M2

35.50

21

PISO DE CERMICA NACIONAL

M2

23.08

22

ZCALO DE CERMICA NACIONAL

ML

19.24

23

VENTANA MADERA CEDRO

M2

3.60

24

PROV. Y COLOCADO DE VIDRIO DOBLE (3mm)

M2

3.60

25

PROV. Y COLOCADO REJAS METALICAS

M2

3.60

26

PUERTA DE MADERA ROBLE TIPO TABLERO + QUINCALLERIA

M2

2.21

27

TABLERO DE DISTRIBUCIN ELECTRICO

PZA

1.00

28

INSTALACION ELECTRICA ILUMINACION FLUORESCENTE (2X40 W)

PTO

2.00

29

INSTALACION ELECTRICA TOMACORRIENTE

PTO

2.00

30

PINTURA LATEX EXTERIOR

M2

58.36

31

PINTURA LATEX INTERIOR

M2

61.88

32

PINTURA CERMICA PARA MUROS DE LADRILLO

M2

3.15

33

BARNIZADO EN CARPINTERIA DE MADERA

M2

23.37

34

PLACA DE ENTREGA DE OBRAS

PZA

1.00

35

LIMPIEZA GENERAL

GLB

1.00

PRECIO
UNITARIO

COSTO PARCIAL DEL PROYECTO

CUADRO DE COTIZACION
PROYECTO:

CONSTRUCCIN CENTRO DE ACOPIO CHUFLE

DISTRITO :

UBICACION:

COMUNIDAD CHUFLE

FECHA:

DATOS DEL PROPONENTE

PLAZO

Nombre y Apellidos:
C.I.:

PROPONENTE
NIT.:

Telf:

____________________
FIRMA PROPONENTE

60 DAS

8
MAYO,2014
PLAZO
PROPONENTE
60 DAS

COSTO
TOTAL

8
MAYO,2014
PLAZO
PROPONENTE
60 DAS

HONORABLE ALCALDIA DE SUCRE

DEPARTAMENTO DE ESTUDIOS Y PROYECTOS

CUADRO DE COTIZACION
DATOS DEL PROPONENTE

Nombre y Apellidos
NIT.
C.I.
Telfono

___________________
FIRMA PROPONENTE

PLAZO
PROPONENTE

También podría gustarte