Está en la página 1de 1

S10

Pgina :

Presupuesto descompuesto
Presupuesto
Fecha

0301035 "MEJORAMIENTO DEL SERVICIO DE EDUCACION SECUNDARIA EN LA I.E. PEDRO RUIZ GALLO, DISTRITO DE
ETEN - CHICLAYO - LAMBAYEQUE".
03/01/2014

Moneda principal

S/. NUEVOS SOLES

Subpresupuesto

004 INSTALACIONES SANITARIAS

Item

Subpartida

Descripcin

26
26.01
26.02
26.03
26.04
26.05
26.06
26.07
26.08
27
27.01
27.02
27.03
27.04
27.05
27.06
27.07
27.08
27.09
27.10
27.11
28
28.01
28.02
28.03
28.04
28.05
28.06
28.07
28.08
28.09
28.10
28.11
29
29.01

051
051.01
051.02
051.03
051.04
051.05
051.06
051.07
051.08
053
053.01
053.02
053.03
053.04
053.05
053.06
053.07
053.08
053.09
053.10
053.11
055
055.01
055.02
055.03
055.04
055.05
055.06
055.07
055.08
055.09
055.10
055.11
057
057.01

APARATOS Y ACCESORIOS SANITARIOS


INODORO TANQUE BAJO ADULTO DE COLOR TIPO SIFON JET
LAVATORIOS DE PEDESTAL
LAVADERO DE ACERO INOXIDABLE, 1 POZA C/ESCURRIDERRO, EN COCINA
DUCHA CROMADA 1 LLAVE INCLUYE ACCESORIOS
PAPELERA DE LOSA DE COLOR
JABONERA DE LOSA COLOR BLANCO
TOALLERA DE LOSA DE COLOR TIPO BARRA
BARRA DE APOYO PARA MINUSVALIDOS EN SS.HH.
SISTEMA DE DESAGUE
SALIDAS DE PVC SAL PARA DESAGUE
SALIDAS DE PVC SAL PARA VENTILACION DE 2"
TUBERIA DE PVC SAP 2"
TUBERIA DE PVC SAP 4"
SUMIDERO DE BRONCE 2"
SUMIDERO DE BRONCE 3"
REGISTROS DE BRONCE DE 4"
REGISTRO DE BRONCE ROSCADO 2"
CAJA DE REGISTRO DE DESAGUE 10" X 20"
CAJA DE REGISTRO DE DESAGUE 12" X 20"
CAJA DE REGISTRO DE DESAGUE 18" X 25"
SISTEMA DE AGUA FRIA
SALIDA DE AGUA FRIA
TUBERIA DE 1/2" PVC CLASE 10
TUBERIA DE 3/4" PVC CLASE 10
TUBERIA DE 1" PVC CLASE 10
TUBERIA DE 1 1/2" PVC CLASE 10
VALVULA COMPUERTA DE BRONCE DE 1/2"
VALVULA COMPUERTA DE BRONCE DE 3/4"
VALVULA COMPUERTA DE BRONCE DE 1 1/2"
VALVULA DE RETENCION 1 1/4"
LLAVE DE RIEGO CON GRIFO DE 1/2"
EQUIPO DE BOMBEO, ELECTROBOMBA DE 1.00 HP
PISCINA
INSTALACION DE ACCESORIOS PARA PISCINA

Unidad

Metrado

Precio (S/.)

37.00
5.00
1.00
8.00
9.00
9.00
9.00
9.00

349.86
326.16
452.86
124.66
27.01
27.01
23.83
40.08

pto
pto
m
m
u
u
pza
pza
pza
pza
pza

108.00
5.00
325.60
485.90
11.00
2.00
37.00
4.00
17.00
1.00
1.00

110.30
75.17
24.19
24.50
117.49
129.41
125.34
96.45
134.36
193.38
193.38

pto
m
m
m
m
u
u
u
u
pza
u

51.00
335.40
187.50
45.20
35.15
20.00
25.00
1.00
2.00
2.00
1.00

49.68
14.23
14.79
17.46
18.50
101.77
113.60
186.37
175.07
64.08
1,699.05

1.00

86,124.50

u
u
u
u
u
u
u
u

Parcial (S/.)
17,087.13
12,944.82
1,630.80
452.86
997.28
243.09
243.09
214.47
360.72
41,314.53
11,912.40
375.85
7,876.26
11,904.55
1,292.39
258.82
4,637.58
385.80
2,284.12
193.38
193.38
18,758.13
2,533.68
4,772.74
2,773.13
789.19
650.27
2,035.40
2,840.00
186.37
350.14
128.16
1,699.05
86,124.50
86,124.50

Horas
Hombre
293.3571
207.2037
28.0005
5.6001
14.9328
9.9000
9.9000
7.9200
9.9000
2,161.3959
604.8108
21.0000
538.3145
803.3385
17.6000
4.8000
78.9321
12.8000
64.6000
7.6000
7.6000
868.0900
130.5600
281.7360
157.5000
37.9680
29.5260
84.0000
105.0000
4.2000
8.4000
4.4000
24.8000
24.0000
24.0000

Parcial HH

Horas
Maquina

4,224.68
2,965.99
400.81
80.16
228.79
138.96
138.96
111.17
159.84
30,196.03
8,657.44
300.60
7,355.73
10,977.11
259.90
70.88
1,179.53
191.28
974.32
114.62
114.62
12,500.22
1,951.06
4,032.85
2,254.50
543.48
422.65
1,202.40
1,503.00
60.12
120.24
71.04
338.88
335.84
335.84

Parcial HM
126.73
88.98
12.02
2.40
6.86
4.17
4.17
3.33
4.80
899.24
259.72
9.02
220.66
329.29
2.60
0.71
35.39
5.74
29.23
3.44
3.44
1,724.95
58.54
120.95
67.61
16.30
12.68
36.07
45.09
1.80
3.61
2.13
1,360.17
3.36
3.36

Fecha :

Parcial MT
12,736.23
9,890.10
1,218.00
370.30
761.60
100.04
100.04
100.04
196.11
10,218.14
2,996.93
66.25
297.93
597.66
1,029.80
187.24
3,422.50
188.80
1,280.39
75.32
75.32
4,536.46
523.77
622.04
451.05
229.71
215.02
797.03
1,292.10
124.45
226.31
54.98
85,785.30
85,785.30

10/04/2014 11:56:39a.m.