Está en la página 1de 351

CUADRO N 08 POBLACION DE LA REGION CAJAMARCA

Regin
CAJAMARCA

1993

2007

1,259,808

1,387,809

1993

2007

230,049

316,152

Fuente: INEI

CUADRO N 9: POBLACIN DE REFERENCIA Y DEMANDANTE POTENCIAL

Provincia
CAJAMARCA
Fuente: INEI

Cajamarca: MATRCULA EN EL SISTEMA EDUCATIVO POR TIPO DE GES


Etapa, modalidad y nivel
educativo

Gestin

Total
106,142

Pblica
77,602

95,383

72,784

Inicial

22,166

15,738

Primaria

43,951

35,660

Secundaria

29,266

21,386

4,129

2,287

106

106

Tcnico-Productiva

2,404

1,314

Superior No Universitaria

4,120

1,111

Pedaggica

450

418

Tecnolgica

3,540

563

130

130

Total
Bsica Regular

Bsica Alternativa
Bsica Especial

Artstica
Fuente:MINISTERIODEEDUCACIN-CensoEscolar.

NMERO DE DOCENTES EN EL SISTEMA EDUCATIVO POR TIPO DE GES


EDUCATIVO,
Etapa, modalidad y nivel educativo

Etapa, modalidad y nivel educativo

Gestin
Pblica

Total

Total

6,818

4,168

Bsica Regular

6,035

3,808

Inicial 1/

1,177

634

Primaria

2,733

1,952

Secundaria

2,125

1,222

283

135

36

36

Tcnico-Productiva

136

69

Superior No Universitaria

328

120

Pedaggica

64

55

Tecnolgica

238

39

26

26

Bsica Alternativa
Bsica Especial

Artstica

Nota: Corresponde a la suma del nmero de personas que desempean labor docente, directiva o en el aula, en cada institucin educa
1/ Excluye promotoras educativas comunitarias a cargo de programas no escolarizados.
Fuente: MINISTERIO DE EDUCACIN - Censo Escolar.

PERSONAL NO DOCENTE EN EL SISTEMA EDUCATIVO POR TIPO DE GES


EDUCATIVO,
Etapa, modalidad y nivel educativo
Total

Gestin

Total

Pblica

1,026

622

Bsica Regular

875

560

Inicial 1/

395

269

Primaria

271

153

Secundaria

209

138

Bsica Alternativa

35

15

Bsica Especial

10

10

Tcnico-Productiva

13

Superior No Universitaria

93

31

Pedaggica

17

14

Tecnolgica

68

Artstica

1/ Incluye promotoras educativas comunitarias a cargo de programas no escolarizados.


Fuente: MINISTERIO DE EDUCACIN - Censo Escolar.

Cajamarca: NMERO DE LOCALES ESCOLARES POR TIPO DE GESTIN


SEGN ETAPA, MODALIDAD Y NIVEL EDUCATIVO OFREC
Etapa,modalidadyniveldelasIIEE
quefuncionanenellocal

Gestin

Total

Pblica

Total

884

643

Bsica Regular 1/

847

631

SloInicial

245

175

SloPrimaria

361

339

SloSecundaria

97

48

InicialyPrimaria

69

41

PrimariaySecundaria

39

20

34

Slo Bsica Especial 2/

Slo Tcnico-Productiva

14

Slo Sup. No Universitaria 3/

13

Pedaggica

Tecnolgica

10

InicialySecundaria
Inicial,PrimariaySecundaria
Slo Bsica Alternativa

Artstica

Nota:Excluyelocalesenquefuncionanprogramasnoescolarizadosdeeducacininicial.Lacategoragestinpblicacomprendelocalesescolaresen
1/Incluyelocalesenlosqueseofreceademsotramodalidaddelaeducacinbsicaotcnico-productiva.
2/Incluyelocalesenlosqueseofreceademseducacinbsicaotcnico-productiva.
3/Incluyelocalesenlosqueseofreceademsalgnniveldelaeducacinbsicaotcnico-productiva,uotramodalidaddelaeducacinsuperior
Fuente:MINISTERIODEEDUCACIN-PadrndeInstitucionesEducativas.

CUADRO N 2: POBLACIN DE REFERENCIA


Etapa, modalidad y nivel educativo
1.- POBLACION ESTUDIANTIL SEGN MATRICULA
Bsica Regular
Inicial
Primaria
Secundaria
Bsica Alternativa 1/
Bsica Especial
Tcnico-Productiva
Superior No Universitaria
Pedaggica

Total-2014
106,142
95,383
22,166
43,951
29,266
4,129
106
2,404
4,120
450

Gestin
Pblica
77,602
72,784
15,738
35,660
21,386
2,287
106
1,314
1,111
418

Tecnolgica
Artstica
2.- POBLACION PADRES DE FAMILIA 50% P.E
3.- DOCENTES DE LA JURISDICCION DE CAJAMARCA
Bsica Regular
Inicial 1/
Primaria
Secundaria
Bsica Alternativa 2/
Bsica Especial
Tcnico-Productiva
Superior No Universitaria
Pedaggica
Tecnolgica
Artstica
4.-NO DOCENTES DE LA JURISDICCION DE CAJAMARCA
Bsica Regular
Inicial 1/
Primaria
Secundaria
Bsica Alternativa 2/
Bsica Especial
Tcnico-Productiva 3/
Superior No Universitaria
Pedaggica
Tecnolgica
Artstica

POBLACION TOTAL DE REFERENCIA

3,540
130

563
130

53,071

38,801

6,818
6,035
1,177
2,733
2,125
283
36
136
328
64
238
26

4,168
3,808
634
1,952
1,222
135
36
69
120
55
39
26

1,009

623

875
395
271
209
35
10
13
76
20
48
8

560
269
153
138
15
10
6
32
14
10
8

167,040

CUADRO N 3: POBLACIN DEMANDANTE POTENCIAL


Etapa, modalidad y nivel educativo
1.- POBLACION ESTUDIANTIL SEGN MATRICULA
Bsica Regular
Inicial
Primaria
Secundaria
Bsica Alternativa 1/

Total-2014
105,676
95,383
22,166
43,951
29,266
4,129

Gestin
Pblica
77,368
72,784
15,738
35,660
21,386
2,287

Bsica Especial
Tcnico-Productiva
Superior No Universitaria
Pedaggica
Tecnolgica
Artstica

106
2,404
3,654
417
3,113
124

106
1,314
877
360
393
124

2.- DOCENTES DE LA JURISDICCION DE CAJAMARCA


Bsica Regular
Inicial 1/
Primaria
Secundaria
Bsica Alternativa 2/
Bsica Especial
Tcnico-Productiva
Superior No Universitaria
Pedaggica
Tecnolgica
Artstica
3.-NO DOCENTES DE LA JURISDICCION DE
CAJAMARCA
Bsica Regular
Inicial 1/
Primaria
Secundaria
Bsica Alternativa 2/
Bsica Especial
Tcnico-Productiva 3/
Superior No Universitaria
Pedaggica
Tecnolgica
Artstica
POBLACION DEMANDANTE POTENCIAL

6,374
5,671
1,177
2,733
2,125
283
36
136
248
64
238
26

4,171
3,807
634
1,952
1,222
135
36
69
124
55
39
26

1,009

623

875
395
271
209
35
10
13
76
20
48
8
113,059

560
269
153
138
15
10
6
32
14
10
8

CUADRO N 4: POBLACIN DEMANDANTE EFECTIVA

Etapa, modalidad y nivel educativo


2. Docentes - jurisdiccin-UGEL Cajamarca
Bsica Regular
Bsica Alternativa 2/
Bsica Especial
Tcnico-Productiva
Superior No Universitaria
3. Personal no docente en Inst. Educativas

2015
6,975
6,174
290
37
139
336
1,032

2016
7,135
6,315
296
38
142
343
1,056

Bsica Regular
Bsica Alternativa 2/
Bsica Especial
Tcnico-Productiva
Superior No Universitaria

POBLACIN DEMANDANTE EFECTIVA

895
36
10
13
78

916
37
10
14
80

8,007

8,191

Nota: Corresponde a la suma del nmero de personas que desempean labor docente, directiva o en el aula, en cada institucin educa
1/ Excluye promotoras educativas comunitarias a cargo de programas no escolarizados.
Fuente: MINISTERIO DE EDUCACIN - Censo Escolar.
2/Incluyelocalesenlosqueseofreceademseducacinbsicaotcnico-productiva.
Fuente:MINISTERIODEEDUCACIN-PadrndeInstitucionesEducativas.ElaboracinConsultor

CUADRO N 16: PROYECCIN DE LA POBLACIN DEMANDANTE EFECTIVA DE GESTIN ADMINISTRATIVA

Etapa, modalidad y nivel educativo

2015

2. Docentes - jurisdiccin-UGEL Cajamarca


BsicaRegular
BsicaAlternativa2/
BsicaEspecial
Tcnico-Productiva
SuperiorNoUniversitaria
3. Personal no docente en Inst. Educativas
BsicaRegular
BsicaAlternativa2/
BsicaEspecial
Tcnico-Productiva
SuperiorNoUniversitaria

2016

6,975
6,174
290
37
139
336
1,032
895
36
10
13
78
8,007

POBLACIN DEMANDANTE EFECTIVA PROYECTADA

7,135
6,315
296
38
142
343
1,056
916
37
10
14
80
8,191

1/ Excluye promotoras educativas comunitarias a cargo de programas no escolarizados.


Fuente: MINISTERIO DE EDUCACIN - Censo Escolar.
2/Incluyelocalesenlosqueseofreceademseducacinbsicaotcnico-productiva.
Fuente:MINISTERIODEEDUCACIN-PadrndeInstitucionesEducativas.ElaboracinConsultor

CUADRO N 15:TRAMITE DE DOCUMENTOS

TASA DE CRECIMIENTO

Aos

Expedientes
ingresados

Expedientesresueltos

2012

32307

31660

2013

38515.5

37745.19

19.22%

CUADRO N 19: OFERTA DE INFRAESTRUCTURA SIN PROYECTO

DETALLE

UNIDAD DE MEDIDA

CANTIDAD

Area de Gestion Administrativa

0,00

Area de Gestion Pedagogica

0,00

Area de Gestion Institucional

0,00

Organo de Direccion

0,00

O rgano de Control Interno

0,00

Area de Asesoria Juridica

M
TOTAL

0,00
0,00

FUENTE.- Verificacion I nsitu

CUADRO N 20: OFERTA DE MOBILIARIO UGEL SIN PROYECTO


Detalle del Bien

Unidad

Cantidad

EscritoriodeMelamina

UNID

57

SillonGiratoriodeMetal

UNID

16

ModulodeComputadora

UNID

EstantedeMelamina3divisionesdosgavetas

UNID

61

SofadeMadera

UNID

Sillademetal

UNID

158

MesadeMadera

UNID

10

SillaGiratoriadeMetal

UNID

48

EstantedeMetal

UNID

15

EscaleradeMetal

UNID

Escritoriodemadera

UNID

Sillademadera

UNID

23

PizarraAcrilica

UNID

EstantedeMelamina7cuerpos

UNID

EstantedeMelamina.
EstantesMetalicos(2.30x1.20x0.30)

UNID
UNID

27
23

Bancodemadera

UNID

TOTAL DE MOBILIARIO ACTUAL

1
459

CUADRO N 21: OFERTA DE EQUIPOS UGEL SIN PROYECTO

Detalle del Bien

Unidad

Cantidad

Computadora (Monitor, Teclado, CPU)

UNID

66

Computadora Portatil

UNID

Impresora

UNID

18

Estabilizador

UNID

62

Televisor

UNID

Camara Fotografica

UNID

Proyector

UNID

Servidores

UNID

SWITCH DE 48 PUERTOS PARA RED

UNID

SWITCH DE 16 PUERTOS PARA RED

UNID

UPS 1000W

UNID

CAMIONETAS

UNID

MOTOS LINEALES

UNID

TOTAL DE EQUIPAMIENTO ACTUAL

172

CUADRO N 28: OFERTA - DEMANDA DE INFRAESTRUCTURA CON PROYECTO

UNIDAD DE
MEDIDA

OFERTA
OPTIMIZADA

DIRECCION

0.00

GESTIONINSTITUCIONAL

0.00

ASESORIAJURIDICA

0.00

CONTROLINSTITUCIONAL

0.00

ADMINISTRACION

0.00

GESTIONPEDAGOGICA

0.00

AMBIENTESCOMPLEMENTARIOS

0.00

SERVICIOSHIGIENICOS

0.00

CIRCULACIONES+MUROS

0.00

DETALLE

TOTAL

0.00

CUADRO N 29: OFERTA - DEMANDA DE MOBILIARIO CON PROYECTO

UNIDAD

TOTAL
REQUERIDOS

Sillongiratoriodemetal(SG-01)

UNIDAD

Sillagiratoriademetal(SG-02)

UNIDAD

113

EscritorioGerencialenL(EG-01)

UNIDAD

Muebledeuncuerpo(MB-01)

UNIDAD

26

EscritorioL(EG-02)

UNIDAD

95

Escritoriodemelamina(EM-01)

UNIDAD

13

Escritorio(EM-02)

UNIDAD

Archivadorparadocumentos0.30x1.50(AD-01)

UNIDAD

36

Archivadorparadocumentos0.30x1.20(AD-02)

UNIDAD

97

Camillamdica(CA-01)

UNIDAD

Sillademetal(SM-01)

UNIDAD

206

Mesade0.60x1.00(M-01)

UNIDAD

Mesade0.80x1.50(M-02)

UNIDAD

Mesade0.60x1.00(M-03)

UNIDAD

29

Mesade0.60x1.50(M-04)

UNIDAD

Mesadecentro0.50x0.50(MC-01)

UNIDAD

10

Mesadereunionescon12sillas(MR-01)

UNIDAD

Mesadereunionescon10sillas(MR-02)

UNIDAD

Sillastamden(Modulo03butacas)(ST-01)

UNIDAD

15

ButacadeAuditorium(BA-01)

UNIDAD

177

ArchivadorMetalicoparadocumentos0.30x1.00x2.10(TM-01)

UNIDAD

132

ArchIvadorMetalico0.9X2.10X2.30(TM-02)

UNIDAD

52

EscaleradeMetal

UNIDAD

DESCRIPCION

TOTAL

1027.00

CUADRO N 27: OFERTA - DEMANDA DE EQUIPAMIENTO CON PROYECTO

DESCRIPCION

UNIDAD

CANTIDAD

COMPUTADORAS

UNIDAD

118

IMPRESORASLASERMULTIFUNCIONAL

UNIDAD

44

ANEXOTELEFONICO

UNIDAD

33

PROYECTOR+ECRAN

UNIDAD

04

03GABINETESDEPISOPARAVOZYDATOS

UNIDAD

03

4SWITCHCISCO2960-48PUERTOS100/1000PUERTOSGIGABYTEYFIBRA
OPTICA

UNIDAD

04

SWITCHCONTROLLERSAP

UNIDAD

01

03ACCESPOINTCISCO

UNIDAD

03

SWITCHDEVIDEO,

UNIDAD

01

SWITCHCAP3.

UNIDAD

01

07SERVIDORES(SNP,SIAF,SIGA,DNS,DHP,CORREO,TELEFONIAIPCISCO
ASTERISK)

UNIDAD

07

4PATCHPANELDE48PUERTOS

UNIDAD

04

04DISCOSDUROSDE1TBINTERFAZSASENTERPRISE

UNIDAD

04

(WINDOWSSERVER2012,

UNIDAD

07

ANTIVIRUSCORPORATIVO

UNIDAD

07

WINDOWS7PROFESIONAL

UNIDAD

100

WINDOWS2013PROFESIONAL

UNIDAD

60

UNIDAD

01

LICENCIAS

AIRE ACONDICIONADO
DEPRECISIONTIPOSPLIT
TOTAL

402.00

CUADRO:SERVICIO DE CAPACITACION

DESCRIPCION

UNIDAD

CANTIDAD

MAD(ModulodeAdministracinDocumentaria)

Taller

REGISTRO(AplicativodelaSunat)

Taller

PDTPLANET(AplicativodelaSunat)

Taller

AIRHSP(AplicativoInformticodeRecursosHumanosdelSectorPublico).

Taller

AFPNET(PagosdeAFPdelPersonalactivo).

Taller

SIAF(SistemaIntegradodeAdministracinFinanciera).

Taller

SIGA(SistemaIntegradodeGestinAdministrativa).

Taller

SUP(SistemanicodePlanillas).

Taller

SIRA(SistemadeRacionalizacin).

Taller

NEXUS

Taller

Capacitacinparamejorarlasupervisin,seguimientoymonitoreodelasacciones
quedesarrollanlosdirectoresydocentesdelasI.E.

Taller

TalleresdeInvestigacin,paradirectoresdelaIIEE,docentesdelosCETPROS,ydel
areadeeducacinparaeltrabajo(EBR)

Taller

CapacitacinyelaboracindeinstrumentosdeGestion(SimplificacinAdinistrativa,
Gestinporprocesos,determinacindecostosdeprocedimientosadministrativosy
actualizaciondelTUPA)

Taller

CapacitacinyelaboracindeinstrumentosdeGestion(MANUALORGANIZACINY
FUNCIONES,MANUALDEPROCEDIMIENTOSADMINISTRATIVOS)

Taller

ActualizacinyAdecuacindelTUPA

Taller

ElaboracindelMAPRO

Taller

ActualizacinyAdecuacindelMOF

Taller
TOTAL

DESCRIPCION

1
35

UNIDAD

PERSONAL ACTUAL

DIRECCION

PERSONA

GESTIONINSTITUCIONAL

PERSONA

ASESORIAJURIDICA

PERSONA

CONTROLINSTITUCIONAL

PERSONA

ADMINISTRACION

PERSONA

34

GESTIONPEDAGOGICA

PERSONA

29

TOTAL

81

Tasa Intercensal
0.69%

Tasa Intercensal
2.30%

R TIPO DE GESTIN Y REA GEOGRFICA, SEGN ETAPA, MODALIDAD Y NIVEL ED


Gestin

rea

Sexo

Pblica

Privada
28,540

Urbana
82,767

Rural
Masculino Femenino
23,375
54,570
51,572

Urbana
57,731

22,599

72,159

23,224

49,144

46,239

53,064

6,428

15,991

6,175

11,158

11,008

10,746

8,291

31,558

12,393

22,163

21,788

23,696

7,880

24,610

4,656

15,823

13,443

18,622

1,842

4,129

2,252

1,877

2,287

106

64

42

106

1,090

2,253

151

1,023

1,381

1,163

3,009

4,120

2,087

2,033

1,111

32

450

150

300

418

2,977

3,540

1,838

1,702

563

130

99

31

130

R TIPO DE GESTIN Y REA GEOGRFICA, SEGN ETAPA, MODALIDAD Y NIVEL


EDUCATIVO, 2014
JURISDICCION UGEL CAJAMARCA

Gestin
Privada

rea
Urbana

Pblica
Urbana
Rural

Rural

Privada
Urbana

2,650

5,212

1,606

2,856

1,312

2,356

2,227

4,436

1,599

2,503

1,305

1,933

543

922

255

408

226

514

781

1,860

873

1,112

840

748

903

1,654

471

983

239

671

148

283

135

148

36

36

67

129

62

67

208

328

120

208

64

55

199

238

39

199

26

26

en cada institucin educativa, sin diferenciar si la jornada es de tiempo completo o parcial.

R TIPO DE GESTIN Y REA GEOGRFICA, SEGN ETAPA, MODALIDAD Y NIVEL


EDUCATIVO, 2014
JURISDICCION UGEL CAJAMARCA
rea

Gestin
Privada

Urbana

Rural

Pblica

Urbana

Privada

Rural

Urbana

404

833

193

488

134

345

315

682

193

426

134

256

126

234

161

166

103

68

118

248

23

130

23

118

71

200

130

70

20

35

15

20

10

10

13

62

93

31

62

17

14

59

68

59

PO DE GESTIN Y REA GEOGRFICA,


CATIVO OFRECIDO, 2014
Gestin

rea
Privada

Urbana

Rural

241

344

540

216

308

539

70

114

131

22

55

306

49

34

63

28

39

30

19

33

28

32

2
-

10

13

13

10

8
-

mprendelocalesescolaresenquefuncionaalmenosunainstitucineducativapblica.

elaeducacinsuperior

Gestin
Privada
28,540
22,599
6,428
8,291
7,880
1,842
0
1,090
3,009
32

rea
Urbana
82,767
72,159
15,991
31,558
24,610
4,129
106
2,253
4,120
450

Rural
23,375
23,224
6,175
12,393
4,656
0
0
151
0
0

TOTAL 2015
108,580
97,574
22675.1
44960.5
29938.2
4223.8
108.4
2459.2
4,215
460.3

2,977
0

3,540
130

0
0

3621.3
133.0

14,270

41,384

11,688

54,290

2,650
2,227
543
781
903
148
0
67
208
9
199
0

5,212
4,436
922
1,860
1,654
283
36
129
328
64
238
26

1,606
1,599
255
873
471
0
0
7
0
0
0
0

6,975
6,174
1204.0
2795.8
2173.8
289.5
36.8
139.1
336
65.5
243.5
26.6

386

816

193

315
126
118
71
20
0
7
44
6
38
0

682
234
248
200
35
10
13
76
20
48
8

193
161
23
9
0
0
0
0
0
0
0

1,032
895
404.1
277.2
213.8
35.8
10.2
13.3
78
20.5
49.1
8.2

170,877

Gestin
Privada
28,308
22,599
6,428
8,291
7,880
1,842

rea
Urbana
82,301
72,159
15,991
31,558
24,610
4,129

Rural
23,375
23,224
6,175
12,393
4,656
0

TOTAL 2015
108,103
97,574
22675.1
44960.5
29938.2
4223.8

0
1,090
2,777
57
2,720
0

106
2,253
3,654
417
3,113
124

0
151
0
0
0
0

108.4
2459.2
3,738
426.6
3184.5
126.8

2,203
1,864
543
781
903
148
0
67
124
9
199
0

4,146
3,450
922
1,860
1,654
283
36
129
248
64
238
26

2,228
2,221
255
873
471
0
0
7
0
0
0
0

6,975
6,174
1204.0
2795.8
2173.8
289.5
36.8
139.1
336
65.5
243.5
26.6

386

816

193

1,032

315
126
118
71
20
0
7
44
6
38
0

682
234
248
200
35
10
13
76
20
48
8

193
161
23
9
0
0
0
0
0
0
0

895
404.1
277.2
213.8
35.8
10.2
13.3
78
20.5
49.1
8.2
116,110

2017
7,299
6,460
303
39
146
351
1,080

2018
7,466
6,609
310
39
149
359
1,105

2019
7,638
6,761
317
40
152
367
1,130

2020
7,813
6,916
324
41
156
376
1,156

2021
7,993
7,075
332
42
159
385
1,183

2022
8,176
7,237
339
43
163
393
1,210

937
37
11
14
81

958
38
11
14
83

8,379

8,571

980
39
11
15
85

1,003
40
11
15
87

1,026
41
12
15
89

1,049
42
12
16
91

8,768
8,970
88,872

9,176

9,386

en cada institucin educativa, sin diferenciar si la jornada es de tiempo completo o parcial.

2017
7,299
6,460
303
39
146
351
1,080
937
37
11
14
81
8,379

Expedientes
pendientes

647
770.31

2018
7,466
6,609
310
39
149
359
1,105
958
38
11
14
83
8,571

2019

2020
7,638
6,761
317
40
152
367
1,130
980
39
11
15
85
8,768

7,813
6,916
324
41
156
376
1,156
1,003
40
11
15
87
8,970

2021
7,993
7,075
332
42
159
385
1,183
1,026
41
12
15
89
9,176

2022
8,176
7,237
339
43
163
393
1,210
1,049
42
12
16
91
9,386

Estado (Insitu)
Bueno

Regular

Deteriorado
57
16
4
61
5
158
10
48
15
1
7
23
1
2
27
23

1
0

459

Estado (Insitu)
Bueno

Regular

Desactualizado
66
6
18
62
1
1
1
3
2
1
3
2
6

DEMANDA CON
PROYECTO

BRECHA

246.90

-246.9

146.70

-146.7

62.00

-62

40.55

-40.55

398.75

-398.75

345.45

-345.45

754.15

-754.15

48

-48

612.75

-612.75

2655.25

-2655.25

172

TOTAL
EXISTENTES
(BUEN ESTADO)

BRECHA

CANTIDAD

0.00

-5

5.00

299.90

1,499.50

0.00

-113

113.00

124.87

14,110.32

0.00

-5

5.00

762.71

3,813.55

0.00

-26

26.00

601.07

15,627.92

0.00

-95

95.00

662.35

62,923.41

0.00

-13

13.00

469.37

6,101.76

0.00

-5

5.00

593.24

2,966.20

0.00

-36

36.00

819.20

29,491.26

0.00

-97

97.00

116.20

11,271.56

0.00

-1

1.00

1,186.45

1,186.45

0.00

-206

206.00

87.31

17,985.00

0.00

-2

2.00

610.20

1,220.40

0.00

-3

3.00

282.48

847.45

0.00

-29

29.00

128.58

3,728.78

0.00

-1

1.00

1,071.20

1,071.20

0.00

-10

10.00

91.53

915.30

0.00

-1

1.00

3,813.56

3,813.56

0.00

-2

2.00

3,601.70

7,203.39

0.00

-15

15.00

406.78

6,101.70

0.00

-177

177.00

396.43

70,168.80

0.00

-132

132.00

260.67

34,407.92

0.00

-52

52.00

322.68

16,779.60

0.00

-1

1.00

200.00

200.00

0.00

-1027.00

TOTAL
EXISTENTES
(BUEN ESTADO)

BRECHA

CANTIDAD

0.00

-118

118.00

3,324.41

392,280.00

0.00

-44

44.00

813.96

35,814.32

0.00

-33

33.00

852.30

28,125.80

0.00

-4

4.00

2,224.58

8,898.30

0.00

-3

3.00

18,887.60

56,662.79

0.00

-4

4.00

29,498.77

117,995.06

0.00

-1

1.00

27,701.77

27,701.77

COSTO UNITARIO COSTO DIRECTO


S/.
PARCIAL S/.

313,435.03

COSTO UNITARIO COSTO DIRECTO


S/.
PARCIAL S/.

0.00

-3

3.00

0.00

0.00

0.00

-1

1.00

59,548.39

59,548.39

0.00

-1

1.00

22,352.80

22,352.80

0.00

-7

7.00

15,800.53

110,603.70

0.00

-4

4.00

7,134.20

28,536.80

0.00

-4

4.00

235.00

940.00

0.00

-7

7.00

1,244.57

8,712.00

0.00

-7

7.00

136.43

955.00

0.00

-100

100.00

742.80

74,280.00

0.00

-60

60.00

496.60

29,796.00

0.00

-1

1.00

26,704.89

26,704.89

0.00

-402.00

REALIZADOS A LA
FECHA

BRECHA

-2

-1

-2

-1

-1

-3

-2

-1

-1

-1

-3

-3

-9

-2

-1

-1

1,029,907.64

-1

-35

PERSONAL
REQUERIDO

BRECHA

13

-4

11

-5

-1

-4

43

-9

41

-12

116

-35

ALIDAD Y NIVEL EDUCATIVO, 2014


Pblica

Privada

Rural
19,871

Urbana
25,036

Rural
3,504

19,720

19,095

3,504

4,992

5,245

1,183

11,964

7,862

429

2,764

5,988

1,892

1,842

151

1,090

3,009

32

2,977

LIDAD Y NIVEL

Privada
Rural
294
294
29
33
232
0
0
0
0
0
0
0

LIDAD Y NIVEL

Privada
Rural
59
59
58
0
1
0
0
0
0
0
0
0

2023
8,364
7,404
347
44
167
402
1,238

2024
8,556
7,574
355
45
171
412
1,266

2025
8,753
7,748
363
46
175
421
1,295

1,073
43
12
16
93

1,098
44
13
16
95

1,123
45
13
17
98

9,602

9,822

10,048

2023
8,364
7,404
347
44
167
402
1,238
1,073
43
12
16
93
9,602

2024
8,556
7,574
355
45
171
412
1,266
1,098
44
13
16
95
9,822

2025
8,753
7,748
363
46
175
421
1,295
1,123
45
13
17
98
10,048

Etapa,modalidadynivel
educativo
Total
Bsica Regular
Inicial

Gestin

Total

rea

Pblica
728
710
278

1 004
968
380

Privada
276
258
102

Urbana
365
332
175

UGEL Cajamarca: MATRCULA EN EL SISTEMA EDUCATIVO POR TIPO DE GES


GEOGRFICA, SEGN ETAPA, MODALIDAD Y NIVEL EDUCATIVO, 2013
Etapa, modalidad y
nivel educativo

Gestin

Total

rea

106,775

Pblica
78,255

Privada
28,520

Urbana
71,938

94,627

71,624

23,003

62,206

Inicial

20,389

14,244

6,145

12,775

Primaria

44,870

36,376

8,494

27,318

Secundaria

29,368

21,004

8,364

22,113

6,040

4,183

1,857

3,768

97

97

97

2,357

1,474

883

2,213

3,654

877

2,777

3,654

Pedaggica

417

360

57

417

Tecnolgica

3,113

393

2,720

3,113

124

124

124

Total
Bsica Regular

Bsica Alternativa 1/
Bsica Especial
Tcnico-Productiva
Superior No
Universitaria

Artstica

UGEL Cajamarca: NMERO DE DOCENTES EN EL SISTEMA EDUCATIVO POR


TIPO DE GESTIN Y REA GEOGRFICA, SEGN ETAPA, MODALIDAD Y NIVEL
EDUCATIVO, 2013

Etapa, modalidad y
nivel educativo

Gestin
Pblica
Privada

Total

rea
Urbana

Total

6,393

4,264

2,129

4,065

Bsica Regular

5,671

3,807

1,864

3,450

Inicial 1/

910

516

394

654

Primaria

2,725

2,051

674

1,493

Secundaria

2,036

1,240

796

1,303

322

220

102

222

36

36

36

116

77

39

109

248

124

124

248

Pedaggica

60

45

15

60

Tecnolgica

162

53

109

162

26

26

26

Bsica Alternativa 2/
Bsica Especial
Tcnico-Productiva
Superior No
Universitaria

Artstica

UGEL Cajamarca: PERSONAL NO DOCENTE EN EL SISTEMA EDUCATIVO POR TIPO DE


GESTIN Y REA GEOGRFICA, SEGN ETAPA, MODALIDAD Y NIVEL EDUCATIVO,
2013
Gestin
rea
Etapa, modalidad y
Total
nivel educativo
Pblica
Privada
Urbana
Total

999

649

350

708

Bsica Regular

871

587

284

580

Inicial 1/

402

282

120

189

Primaria

238

167

71

176

Secundaria

231

138

93

215

Bsica Alternativa 2/

22

12

10

22

Bsica Especial

10

10

10

Tcnico-Productiva
3/
Superior No
Universitaria

20

12

20

76

32

44

76

Pedaggica

20

14

20

Tecnolgica

48

10

38

48

Artstica

UGEL Cajamarca: NMERO DE INSTITUCIONES EDUCATIVAS Y


PROGRAMAS DEL SISTEMA EDUCATIVO POR TIPO DE GESTIN Y
REA GEOGRFICA, SEGN ETAPA, MODALIDAD Y NIVEL
EDUCATIVO, 2013
Etapa, modalidad y
nivel
educativo
Total
Bsica Regular
Inicial
Primaria
Secundaria
Bsica Alternativa 1/
Bsica Especial
Tcnico-Productiva
Superior No
Universitaria
Pedaggica
Tecnolgica
Artstica

PERSONAL DE LA UGEL CAJAMARCA

Total
1,278
1,223
559
498
166
24
2
15
14
3
10
1

Gestin
Pblica
Privada
872
406
851
372
376
183
406
92
69
97
10
14
2
0
5
10
4
1
2
1

10
2
8
0

rea
Urbana
455
403
215
115
73
22
2
14
14
3
10
1

AREA

PERSONAL
CAS

DESTACADO

TOTAL

DIRECCION

a
Rural
639
636
205

ATIVO POR TIPO DE GESTIN Y REA


DUCATIVO, 2013
rea

Sexo

Pblica

Rural
Masculino Femenino
34,837
55,656
51,119

Privada

Urbana
47,936

Rural
30,319

Urbana
24,002

32,421

49,697

44,930

43,721

27,903

18,485

7,614

10,282

10,107

8,065

6,179

4,710

17,552

23,336

21,534

19,458

16,918

7,860

7,255

16,079

13,289

16,198

4,806

5,915

2,272

3,182

2,858

1,911

2,272

1,857

58

39

97

144

1,071

1,286

1,330

144

883

1,648

2,006

877

2,777

116

301

360

57

1,436

1,677

393

2,720

96

28

124

EDUCATIVO POR
ODALIDAD Y NIVEL

rea
Rural
2,328
2,221
256
1,232
733
100
0
7
0
0
0
0

ATIVO POR TIPO DE


VEL EDUCATIVO,
rea

Pblica
Rural

Urbana

Privada

Rural

Urbana

Rural

291

431

218

277

73

291

369

218

211

73

213

141

141

48

72

62

106

61

70

16

122

16

93

12

10

10

12

32

44

14

10

38

ATIVAS Y
E GESTIN Y
IVEL
rea
Rural
823
820
344
383
93
2
0
1
0
0
0
0

CUADRO DE AREAS
SOTANO

PRIMER PISO

NOMBRE DE AREA (M2)


RAMPA
48.65
CISTERNA
ALAMACEN GR 27.75
56.20

DEPOSITO

CUADRO DE AREAS

28.90

Privada
Rural
4,518
4,518
1,435
634
2,449
0
0
0
0
0
0
0

1.POBLACIO
Etapa,
N
modalidad
ESTUDIANT Total-2013
y nivel
IL SEGN
educativo
MATRICULA
106,775
Bsica

Gestin
Pblica
Privada
78,255

28,520

94,627

71,624

23,003

Inicial

20,389

14,244

6,145

Primaria
Bsica
Secundaria
Alternativa
1/
Bsica
Superior
Especial
TcnicoNo
Productiva
Universitar
1.ia
DOCENTES
DE
LA
Pedaggica
JURISDICCI
Tecnolgica
ON DE
Artstica
CAJAMARC
A

44,870

36,376

8,494

29,368

21,004

8,364

6,040

4,183

1,857

97

97

2,357

1,474

883

3,654

877

2,777

417

360

57

3,113

393

2,720

124
6,393

124
4,264

0
2,129

36

36

116

77

39

248

124

124

60

45

15

162

53

109

26

26

999

649

350

Regular

871

587

284

Inicial 1/

402

282

120

Primaria
Bsica
Secundaria
Alternativa
2/
Bsica
TcnicoSuperior
Especial
Productiva
No
3/
Universitar
ia
3.Pedaggica
PERSONAL
DE
LA
Tecnolgica
UGEL
Artstica
CAJAMARC
A

238

167

71

231

138

93

22

12

10

10

10

20

12

76

32

44

20

14

48

10

38

Regular

Bsica
Superior
Especial
TcnicoNo
Productiva
Universitar
3.-NO
ia
DOCENTES
Pedaggica
DE LA
JURISDICCI
Tecnolgica
ON DE
Artstica
CAJAMARC
A
Bsica

81

CUADRO DE AREAS

CUADRO DE AREAS

CUADRO DE AREAS

PRIMER PISO

SEGUNDO PISO

TERCER PISO

NOMBRE DE AREA (M2)


CONTABILIDA
18.55
GERENCIA
D
18.80
SALA DE REU
26.60

NOMBRE DE AREA (M2)


ESPECIALI. TE
28.05
SECRETARIA
SEGURIDAD YR 27.00
18.30

HALL DE DIST

RESERVADO

33.75

10.55

rea
Urbana

Rural

TOTAL 2014

71,938

34,837

62,206

32,421

12,775

7,614

27,318

17,552

22,113

7,255

3,768

2,272

97

2,213

144

3,654

417

3,113

124
4,065

0
2,328

36

109

248

60

162

26

708

291

580

291

189

213

176

62

215

16

22

10

20

76

20

48

CUADRO DE AREAS
TERCER PISO
NOMBRE DE AREA (M2)
ARCHIVO
30.45
SECRETARIA
19.75
SALA DE REU
36.10

HALL DE DIST

76.40

Cuadro 45
DETALLE DE GASTOS DE OPERACIN Y MANTENIMIENTO CON PROYECTO

DETALLE DE GASTOS DE OPERACIN Y MANTENIMIENTO CON PROYECTO - ALTERNATIVA 1

OPERACIN

CANTIDAD

COSTO UNIT

REMUNERACIONES*

165,309.45

REMUNERACIONES**

76,900.00

PAPELERIAYOTROSAUXILIARES

27,791.43

AGUA

322.09

LUZ

1,097.14

TELEFONO

534.99

TOTAL
MANTENIMIENTO

CANTIDAD

COSTO UNIT

OFICINASADMINISTRATIVAS(M2)
DIRECCION

247

28.43

GESTIONINSTITUCIONAL

147

28.43

ASESORIAJURIDICA

62

28.43

CONTROLINSTITUCIONAL

41

28.43

ADMINISTRACION

399

28.43

GESTIONPEDAGOGICA

345

28.43

MOBILIARIOP/AMB/ADM

120

5.00

COMPUTADORAS

60

30.00

SISTEMACONTRAINCENDIO

10000.00

ACENSOR

5000.00

SISTEMAPRESIONCONSTANTEAGUA

4000.00

COMUNICACIONES-DATOS

2000.00

UTILERIA

150.00

TOTAL
*Ver:VolumenV-Anexo15.18"ListadetrabajadoresUgelCajamarca"
**Ver:VolumenV-Anexo15.18"Personalnuevoconproyecto"

cuadro 46

DETALLE DE GASTOS DE OPERACIN Y MANTENIMIENTO CON PROYECTO - ALTERNATIVA 2

OPERACIN

CANTIDAD

COSTO UNIT

ALQUILERDELOCAL

122,520.82

REMUNERACIONES*

165,309.45

REMUNERACIONES**

76,900.00

PAPELERIAYOTROSAUXILIARES

27,791.43

AGUA

322.09

LUZ

1,426.28

TELEFONO

534.99

TOTAL
MANTENIMIENTO

CANTIDAD

COSTO UNIT

OFICINASADMINISTRATIVAS
DIRECCION

247

28.43

GESTIONINSTITUCIONAL

147

28.43

ASESORIAJURIDICA

62

28.43

CONTROLINSTITUCIONAL

41

28.43

ADMINISTRACION

399

28.43

GESTIONPEDAGOGICA

345

28.43

MOBILIARIOP/AMB/ADM

120

5.00

COMPUTADORAS

60

30.00

SISTEMACONTRAINCENDIO

10000.00

ACENSOR

5000.00

COMUNICACIONES-DATOS

2000.00

UTILERIA

150.00

SISTEMAPRESIONCONSTANTEAGUA

4000.00

PINTADODEFACHADA

15500.00

TOTAL
*Ver:VolumenV-Anexo15.18"ListadetrabajadoresUgelCajamarca"
**Ver:VolumenV-Anexo15.18"Personalnuevoconproyecto"

TENIMIENTO CON PROYECTO

NTO CON PROYECTO - ALTERNATIVA 1

MES

AO

165,309.45

1,983,713.40

76,900.00

922,800.00

27,791.43

333,497.16

322.09

3,865.10

1,097.14

13,165.68

534.99

6,419.88

S/.271,955.10

S/.3,263,461.22

VEZ/AO

AO
1.00

7,020.48

1.00

4,171.34

1.00

1,762.94

1.00

1,153.02

1.00

11,338.25

1.00

9,822.69

1.00

600.00

2.00

3,600.00

1.00

10,000.00

1.00

10,000.00

2.00

8,000.00

2.00

4,000.00

12.00

1,800.00

S/.73,268.72

NTO CON PROYECTO - ALTERNATIVA 2

MES

AO

122,520.82

1,470,249.86

165,309.45

1,983,713.40

76,900.00

922,800.00

27,791.43

333,497.16

322.09

3,865.10

1,426.28

17,115.38

534.99

6,419.88

S/.394,805.07

S/.4,737,660.78

VEZ/AO

AO
1.00

7,020.48

1.00

4,171.34

1.00

1,762.94

1.00

1,153.02

1.00

11,338.25

1.00

9,822.69

1.00

600.00

2.00

3600.00

1.00

10000.00

1.00

10000.00

2.00

4000.00

12.00

1800.00

S/.18.00

2.00

8000.00

1.00

15500.00

S/.88,768.72

Cuadro 44

DETALLE DE GASTOS DE OPERACIN Y MANTENIMIENTO SIN PROYEC

OPERACIN

CANTIDAD

COSTO UNIT

REMUNERACIONES*

165,309.45

PAPELERIAYOTROSAUXILIARES

27,791.43

ALQUILERLOCAL

16,300.00

AGUA

322.09

LUZ

1,097.14

TELEFONO

534.99

TOTAL
MANTENIMIENTO

CANTIDAD

COSTO UNIT

INSTALACIONESDEAGUA

70.00

INSTALACIONESELECTRICAS

50.00

REPARACIONMOBILIARIO

15.00

DETERGENTE,JABONLIQUIDO

50.00

ESCOBAS

25.00

RECOJEDOR

25.00

CERRAJERIA

15.00

UTILERIA

25.00

TOTAL
*Ver:VolumenV-Anexo15.18"ListadetrabajadoresUgelCajamarca"

MANTENIMIENTO SIN PROYECTO

MES

AO

165,309.45

1,983,713.40

27,791.43

333,497.16

16,300.00

195,600.00

322.09

3,865.10

1,097.14

13,165.68

534.99

6,419.88

S/.211,355.10

S/.2,536,261.22

MES

AO

S/.275.00

70.00

840.00

50.00

600.00

15.00

180.00

50.00

600.00

25.00

300.00

25.00

300.00

15.00

180.00

25.00

300.00

S/.3,300.00

COSTOS
OPERACIN
MANTENIMIENTO
TOTAL

OPERACIN sin proyecto


MANTENIMIENTO sin proyecto

TOTAL

RESUMEN DE COSTOS DE OPERACIN Y MAN


COSTOS

OPERACIN
MANTENIMIENTO
TOTAL
OPERACIN sin proyecto
MANTENIMIENTO sin proye
TOTAL

RESUMEN DE COSTOS DE OPERACIN Y MANTENIMIENTO


O&M S/. PRECIOS PRIVADOS

FACTORES DE
CORRECCIN

ALTERNATIVA N 1

ALTERNATIVA N 2

3,263,461.22

4,737,660.78

0.909

73,268.72

88,768.72

0.847

S/. 3,336,729.94

S/. 4,826,429.50

S/.2,536,261.22

S/.2,536,261.22

0.909

S/.3,300.00

S/.3,300.00

0.847

S/. 2,539,561.22

S/. 2,539,561.22

STOS DE OPERACIN Y MANTENIMIENTO


O&M S/. PRECIOS PRIVADOS
ALTERNATIVA N 1
ALTERNATIVA N 2
2,340,661.22
78,640.59
2,419,301.81
2,464,861.22
1,500.00
2,466,361.22

3,369,335.82
4,200.00
3,373,535.82
2,464,861.22
1,500.00
2,466,361.22

FACTORES DE COR

0.91
0.85
0.91
0.85

ENIMIENTO
O&M S/. PRECIOS SOCIALES
ALTERNATIVA N 1

ALTERNATIVA N 2

2,966,486.25

4,306,533.65

62,058.60

75,187.10

S/. 3,028,544.85

S/. 4,381,720.75

S/.2,305,461.45

S/.2,305,461.45

S/.2,795.10

S/.2,795.10

S/. 2,308,256.55

S/. 2,308,256.55

O&M S/. PRECIOS SOCIALES


ALTERNATIVA N 1
ALTERNATIVA N 2
2,127,661.05
66,608.58
2,194,269.63
2,240,558.85
1,270.50
2,241,829.35

3,062,726.26
3,557.40
3,066,283.66
2,240,558.85
1,270.50
2,241,829.35

COSTOS DE INVERSION A PRECIOS SOCIAL


COSTOS DE INVERSION
COMPONENTE 1: INFRAESTRUCTURA
ESTRUCTURAS

ARQUITECTURA

Err:509

INST. ELECTRICAS

IMPACTO AMBIENTAL

GASTOS GENERALES
UTILIDAD
IGV
EXPEDIENTE TECNICO
COMPONENTE 2: EQUIPAMIENTO Y MOBILIARIO
MOBILIARIO Y EQUIPAMIENTO

IGV
Err:509
Err:509

Err:509

VALOR REFERENCIAL
GESTION DEL PROYECTO
SUPERVISION Y LIQUIDACION DE OBRA

PRESUPUESTO TOTAL

ALTERNATIVA 1
COSTOS DE INVERSION
COMPONENTE 1: INFRAESTRUCTURA
ESTRUCTURAS
ARQUITECTURA
#
INST. ELECTRICAS
IMPACTO AMBIENTAL
GASTOS GENERALES
UTILIDAD
IGV
EXPEDIENTE TECNICO
COMPONENTE 2: EQUIPAMIENTO Y MOBILIARIO
MOBILIARIO Y EQUIPAMIENTO
IGV
Err:509
#
#
VALOR REFERENCIAL
GESTION DEL PROYECTO
SUPERVISION Y LIQUIDACION DE OBRA
PRESUPUESTO TOTAL

CUADRO 42

COSTOS DE INVERSION A PRECIOS SOCIALES - ALTERNATIVA


COSTOS DE INVERSION
COMPONENTE 1: INFRAESTRUCTURA
ESTRUCTURAS
INSUMO DE ORIGEN NACIONAL
INSUMO DE ORIGEN IMPORTADO
MANO DE OBRA CALIFICADA
MANO DE OBRA NO CALIFICADA

ARQUITECTURA
INSUMO DE ORIGEN NACIONAL
INSUMO DE ORIGEN IMPORTADO
MANO DE OBRA CALIFICADA
MANO DE OBRA NO CALIFICADA

Err:509
INSUMO DE ORIGEN NACIONAL
INSUMO DE ORIGEN IMPORTADO
MANO DE OBRA CALIFICADA
MANO DE OBRA NO CALIFICADA

INST. ELECTRICAS
INSUMO DE ORIGEN NACIONAL
INSUMO DE ORIGEN IMPORTADO
MANO DE OBRA CALIFICADA
MANO DE OBRA NO CALIFICADA

IMPACTO AMBIENTAL
INSUMO DE ORIGEN NACIONAL
INSUMO DE ORIGEN IMPORTADO
MANO DE OBRA CALIFICADA
MANO DE OBRA NO CALIFICADA

GASTOS GENERALES
UTILIDAD
IGV
EXPEDIENTE TECNICO
COMPONENTE 2: EQUIPAMIENTO Y MOBILIARIO
MOBILIARIO Y EQUIPAMIENTO
INSUMO DE ORIGEN NACIONAL
INSUMO DE ORIGEN IMPORTADO
MANO DE OBRA CALIFICADA
MANO DE OBRA NO CALIFICADA

IGV
Err:509
Err:509
INSUMO DE ORIGEN NACIONAL
INSUMO DE ORIGEN IMPORTADO
MANO DE OBRA CALIFICADA

MANO DE OBRA NO CALIFICADA

Err:509

VALOR REFERENCIAL
GESTION DEL PROYECTO
SUPERVISION Y LIQUIDACION DE OBRA

PRESUPUESTO TOTAL

ALTERNATIVA 1
COSTOS DE INVERSION
COMPONENTE 1: INFRAESTRUCTURA
ESTRUCTURAS
ARQUITECTURA
INST. ELECTRICAS
IMPACTO AMBIENTAL
GASTOS GENERALES
UTILIDAD
IGV
EXPEDIENTE TECNICO
COMPONENTE 2: EQUIPAMIENTO Y MOBILIARIO
MOBILIARIO Y EQUIPAMIENTO
IGV
Err:509

VALOR REFERENCIAL
GESTION DEL PROYECTO
SUPERVISION Y LIQUIDACION DE OBRA
PRESUPUESTO TOTAL

RECIOS SOCIALES - ALTERNATIVA 1


COSTO A PRECIOS
DE MERCADO

FACTOR DE
CORRECCION

Err:509
321,121.36
192,672.82
0.00
48,168.20
80,280.34

Err:509
239,893.72
0.847
0.867
0.909
0.410

46,545.97
27,927.58
0.00
6,981.90
11,636.49

COSTO A PRECIOS
SOCIALES

163,193.88
43,784.90
32,914.94

36,983.10
0.847
0.867
0.909
0.600

Err:509

23,654.66
6,346.54
6,981.90

Err:509
Err:509
0.00
Err:509
Err:509

0.847
0.867
0.909
0.600

53,624.40
37,537.08
0.00
8,043.66
8,043.66

42,932.22
26,151.61
90,889.92
161,084.17

0.847
0.867
0.909
0.600

3,410.32

0.847
0.867
0.909
0.600
0.909
0.847
0.847
0.909

7,311.69
4,826.20
7,403.67
1,986.40
2,185.26
39,025.39
22,150.41
76,983.76
146,425.51

17,942.26
15,053.72
0.847
0.867
0.909
0.600
0.847

Err:509

9,628.47
2,583.32
2,841.93
2,888.54

Err:509

Err:509
Err:509
0.00
Err:509

31,793.91

11,575.33

22,356.55
18,946.23
11,367.74
0.00
2,841.93
4,736.56

Err:509
Err:509

43,931.80

14,568.41
8,741.05
0.00
2,185.26
3,642.10

Err:509

Err:509
0.847
0.867
0.909

Err:509
Err:509

Err:509

Err:509
Err:509
11,500.00
370,969.35

Err:509

COSTO A PRECIOS
DE MERCADO
Err:509
321,121.36
46,545.97
Err:509
53,624.40
14,568.41
42,932.22
26,151.61
90,889.92
161,084.17
22,356.55
18,946.23
3,410.32
Err:509
Err:509
Err:509
Err:509
11,500.00
370,969.35
Err:509

0.600

Err:509

0.847

Err:509

0.909
0.909

Err:509
10,453.50
337,211.14

Err:509

103,480.50

CUADRO 25

COSTOS DE INVERSION A PRECIOS SOCIALES - ALTERNATIV


COSTOS DE INVERSION
COMPONENTE 1: ADECUACION DE LOCAL ALQUILADO
ADECUACION DE LOCAL ALQUILADO
INSUMO DE ORIGEN NACIONAL
INSUMO DE ORIGEN IMPORTADO
MANO DE OBRA CALIFICADA
MANO DE OBRA NO CALIFICADA
GASTOS GENERALES
UTILIDAD
IGV
EXPEDIENTE TECNICO
COMPONENTE 2: ADQUISICIN DE MOBILIARIO Y EQUIPAMIENTO
MOBILIARIO Y EQUIPAMIENTO
INSUMO DE ORIGEN NACIONAL
INSUMO DE ORIGEN IMPORTADO
MANO DE OBRA CALIFICADA
MANO DE OBRA NO CALIFICADA
IGV
COMPONENTE 3: CAPACITACIN, ADECUACIN DEL TUPA, MOF Y
ELABORACIN DEL MAPRO
Err:509
INSUMO DE ORIGEN NACIONAL
INSUMO DE ORIGEN IMPORTADO
MANO DE OBRA CALIFICADA
MANO DE OBRA NO CALIFICADA
IGV

VALOR REFERENCIAL
GESTION DEL PROYECTO
SUPERVISION Y LIQUIDACION DE OBRA

PRESUPUESTO TOTAL

ALTERNATIVA 2
COSTOS DE INVERSION
COMPONENTE 1: ADECUACION DE LOCAL ALQUILADO
ADECUACION DE LOCAL ALQUILADO
GASTOS GENERALES

UTILIDAD
IGV
EXPEDIENTE TECNICO
COMPONENTE 2: ADQUISICIN DE MOBILIARIO Y EQUIPAMIENTO
MOBILIARIO Y EQUIPAMIENTO
IGV
COMPONENTE 3: CAPACITACIN, ADECUACIN DEL TUPA, MOF Y
ELABORACIN DEL MAPRO
Err:509
IGV
VALOR REFERENCIAL
GESTION DEL PROYECTO
SUPERVISION Y LIQUIDACION DE OBRA
PRESUPUESTO TOTAL

RECIOS SOCIALES - ALTERNATIVA 2


COSTO A PRECIOS FACTOR DE
DE MERCADO
CORRECCION
402,959.30

343,604.53

288,439.98
288,439.98
0.00
0.00
0.00
28,411.34
17,306.40
60,148.39
8,653.20
22,356.55
18,946.23
11,367.74
0.00
2,841.93
4,736.56
3,410.32

COSTO A PRECIOS
SOCIALES
244,308.66

0.847
0.867
0.909
0.600
0.909
0.847
0.847
0.909

244,308.66
0.00
0.00
0.00
25,825.91
14,658.52
50,945.68
7,865.76

0.847
0.867
0.909
0.600
0.847

17,942.26
15,053.72
9,628.47
0.00
2,583.32
2,841.93
2,888.54

Err:509

Err:509

Err:509
Err:509
0.00
Err:509
0.00

0.847
0.867
0.909
0.600

Err:509
Err:509
0.00
Err:509
0.00

Err:509

0.847

Err:509

0.909
0.909

Err:509
7,908.30
2,753.02

Err:509
8,700.00
3,028.62
Err:509

COSTO A PRECIOS
DE MERCADO
402,959.30
288,439.98
28,411.34

Err:509

17,306.40
60,148.39
8,653.20
22,356.55
18,946.23
3,410.32
Err:509
Err:509
Err:509
Err:509
8,700.00
Err:509

Cuadro N 29: costos de Operacin y Mantenimiento a Precios de Mercado - Alternativa 1

COSTOS INCREMENTALES A PRECIO


DESCRIPCIN

AO 0

POBLACIN BENEFICIADA

2015

8,007

BENEFICIOS
BENEFICIOS CON PROYECTO

BENEFICIOS SIN PROYECTO

BENEFICIOS INCREMENTALES

COSTO DE INVERSIN DEL PROYECTO


PRESUPUESTOTOTAL

Err:509

REPOSICIONDEEQUIPOS(CADA5AOS)
COSTO DE INVERSION DEL PROYECTO

Err:509

COSTOS DE OPERACIN Y MANTENIMIENTO


COSTO DE OPERACIN Y MANTENIMIENTO SIN PROYECTO

0.0

COSTOSDEOPERACION
COSTOSMANTENIMIENTO
COSTO DE OPERACIN Y MANTENIMIENTO CON PROYECTO

0.0

COSTOSDEOPERACION
COSTOSMANTENIMIENTO
COSTOS INCREMENTALES

Err:509

BENEFICIOS Y COSTOS INCREMENTALES

Err:509

FLUJO DE COSTOS

Err:509

COEFICIENTE COSTO BENEFICIO


INVERSION
Err:509
TASADCTO=

VAN=
TIR%
RATIO B/C =

Cuadro N 30: costos de Operacin y Mantenimiento a Precios de Mercado - Alternativa 2

COSTOS INCREMENTALES A PRECIO


DESCRIPCIN

AO 0

2015

POBLACIN BENEFICIADA

8007

BENEFICIOS
BENEFICIOS CON PROYECTO

BENEFICIOS SIN PROYECTO

BENEFICIOS INCREMENTALES

COSTO DE INVERSIN DEL PROYECTO


PRESUPUESTOTOTAL

Err:509

REPOSICIONDEEQUIPOS(CADA5AOS)
COSTO DE INVERSION DEL PROYECTO

Err:509

COSTOS DE OPERACIN Y MANTENIMIENTO


COSTO DE OPERACIN Y MANTENIMIENTO SIN PROYECTO

0.0

COSTOSDEOPERACION
COSTOSMANTENIMIENTO
COSTO DE OPERACIN Y MANTENIMIENTO CON PROYECTO

0.0

COSTOSDEOPERACION
COSTOSMANTENIMIENTO
COSTO INCREMENTAL

Err:509

BENEFICIOS Y COSTOS INCREMENTALES

Err:509

FLUJO DE COSTOS

Err:509

COEFICIENTE COSTO BENEFICIO


INVERSION
Err:509
TASADCTO=

VAN=
TIR
RATIO B/C =

COSTOS INCREMENTALES A PRECIOS DE MERCADO DEL PROYECTO - ALTERNATIVA 1


AO 1

2016

AO 2

2017

AO 3

2018

AO 4
2019

AO 5

2020

AO 6
2021

AO 7
2022

8,191

8,379

8,571

8,768

8,970

9,176

9,386

1,190,557

1,390,458

1,625,112

1,900,356

2,223,120

2,601,596

3,045,443

1,190,557

1,390,458

1,625,112

1,900,356

2,223,120

2,601,596

3,045,443

Err:509
0.0

0.0

0.0

0.0

Err:509

0.0

0.0

2,539,561.2

2,539,561.2

2,539,561.2

2,539,561.2

2,539,561.2

2,539,561.2

2,539,561.2

2,536,261.2

2,536,261.2

2,536,261.2

2,536,261.2

2,536,261.2

2,536,261.2

2,536,261.2

3,300.0

3,300.0

3,300.0

3,300.0

3,300.0

3,300.0

3,300.0

3,336,729.9

3,336,729.9

3,336,729.9

3,336,729.9

3,336,729.9

3,336,729.9

3,336,729.9

3,263,461.2

3,263,461.2

3,263,461.2

3,263,461.2

3,263,461.2

3,263,461.2

3,263,461.2

73,268.7

73,268.7

73,268.7

73,268.7

73,268.7

73,268.7

73,268.7

797,168.7

797,168.7

797,168.7

797,168.7

Err:509

797,168.7

797,168.7

393,387.8

593,289.1

827,943.5

1,103,187.0

Err:509

1,804,427.5

2,248,274.6

393,387.8

593,289.1

827,943.5

1,103,187.0

Err:509

1,804,427.5

2,248,274.6

FICIENTE COSTO BENEFICIO - ALTERNATIVA N 1 ( A PRECIOS PRIVADOS)


VACI

VABI

Err:509

S/.15,305,582

9%

Err:509
Err:509
Err:509

COSTOS INCREMENTALES A PRECIOS DE MERCADO DEL PROYECTO - ALTERNATIVA 2


AO 1

2016

AO 2

2017

AO 3

2018

AO 4
2019

AO 5

2020

AO 6
2021

AO 7
2022

8191

8379

8571

8768

8970

9176

9386

1,190,557

1,390,458

1,625,112

1,900,356

2,223,120

2,601,596

3,045,443

1,190,557

1,390,458

1,625,112

1,900,356

2,223,120

2,601,596

3,045,443

Err:509
0.0

0.0

0.0

0.0

Err:509

0.0

0.0

2,539,561.2

2,539,561.2

2,539,561.2

2,539,561.2

2,539,561.2

2,539,561.2

2,539,561.2

2,536,261.2

2,536,261.2

2,536,261.2

2,536,261.2

2,536,261.2

2,536,261.2

2,536,261.2

3,300.0

3,300.0

3,300.0

3,300.0

3,300.0

3,300.0

3,300.0

4,826,429.5

4,826,429.5

4,826,429.5

4,826,429.5

4,826,429.5

4,826,429.5

4,826,429.5

4,737,660.8

4,737,660.8

4,737,660.8

4,737,660.8

4,737,660.8

4,737,660.8

4,737,660.8

88,768.7

88,768.7

88,768.7

88,768.7

88,768.7

88,768.7

88,768.7

2,286,868.3

2,286,868.3

2,286,868.3

2,286,868.3

Err:509

2,286,868.3

2,286,868.3

-1,096,311.7

-896,410.4

-661,756.0

-386,512.6

Err:509

314,727.9

758,575.1

-1,096,311.7

-896,410.4

-661,756.0

-386,512.6

Err:509

314,727.9

758,575.1

FICIENTE COSTO BENEFICIO - ALTERNATIVA N 2 ( A PRECIOS PRIVADOS)


VACI

VABI

Err:509

S/.15,305,582

9%

Err:509
Err:509
Err:509

AO 8
2023

AO 9

2024

AO 10
2025

9,602

9,822

10,048

3,566,035

4,176,758

4,893,367

3,566,035

4,176,758

4,893,367

Err:509
0.0

0.0

Err:509

2,539,561.2

2,539,561.2

2,539,561.2

2,536,261.2

2,536,261.2

2,536,261.2

3,300.0

3,300.0

3,300.0

3,336,729.9

3,336,729.9

3,336,729.9

3,263,461.2

3,263,461.2

3,263,461.2

73,268.7

73,268.7

73,268.7

797,168.7

797,168.7

Err:509

2,768,866.1

3,379,589.0

Err:509

2,768,866.1

3,379,589.0

Err:509

AO 8
2023

AO 9

2024

AO 10
2025

9602

9822

10048

3,566,035

4,176,758

4,893,367

3,566,035

4,176,758

4,893,367

Err:509
0.0

0.0

Err:509

2,539,561.2

2,539,561.2

2,539,561.2

2,536,261.2

2,536,261.2

2,536,261.2

3,300.0

3,300.0

3,300.0

4,826,429.5

4,826,429.5

4,826,429.5

4,737,660.8

4,737,660.8

4,737,660.8

88,768.7

88,768.7

88,768.7

2,286,868.3

2,286,868.3

Err:509

1,279,166.5

1,889,889.5

Err:509

1,279,166.5

1,889,889.5

Err:509

Cuadro N 49: costos de Operacin y Mantenimiento a Precios de Sociales - Alternativa 1

COSTOS INCREMENTALES A PRECIOS


DESCRIPCIN

AO 0

POBLACIN BENEFICIADA

2015 AO 1

8,007

2016

8,191

BENEFICIOS
BENEFICIOS CON PROYECTO

1,390,458

BENEFICIOS SIN PROYECTO

BENEFICIOS INCREMENTALES

1,390,458

COSTO DE INVERSIN DEL PROYECTO


PRESUPUESTOTOTAL

Err:509

REPOSICIONDEEQUIPOS(CADA5AOS)
COSTO DE INVERSION DEL PROYECTO

Err:509

0.0

0.0

2,308,256.5

COSTOS DE OPERACIN Y MANTENIMIENTO


COSTO DE OPERACIN Y MANTENIMIENTO SIN PROYECTO
COSTOSDEOPERACION

2,305,461.4

COSTOSMANTENIMIENTO

2,795.1

COSTO DE OPERACIN Y MANTENIMIENTO CON PROYECTO

0.0

COSTOSDEOPERACION

3,028,544.9
2,966,486.2

COSTOSMANTENIMIENTO

62,058.6

COSTO INCREMENTAL

Err:509

720,288.3

BENEFICIOS Y COSTOS INCREMENTALES

Err:509

670,169.5

FLUJO DE COSTOS

Err:509

670,169.5

VAC
POBLACIN BENEFICIADA
ICE (S/.X POBLACIN BENEFICIADA

Err:509

90,913
Err:509

COEFICIENTE COSTO BENEFICIO


INVERSION

VACI

Err:509

Err:509

TASADCTO= 9%

VAN= Err:509
TIR Err:509
RATIO B/C = Err:509

Cuadro N 50: costos de Operacin y Mantenimiento a Precios de Sociales - Alternativa 2

COSTOS INCREMENTALES A PRECIOS


DESCRIPCIN
POBLACIN BENEFICIADA

AO 0
8007

2015 AO 1
8191

2016

BENEFICIOS
BENEFICIOS CON PROYECTO

1390458

BENEFICIOS SIN PROYECTO

BENEFICIOS INCREMENTALES

1390458

COSTO DE INVERSIN DEL PROYECTO


PRESUPUESTOTOTAL

Err:509

REPOSICIONDEEQUIPOS(CADA5AOS)
COSTO DE INVERSION DEL PROYECTO

Err:509

0.0

0.0

2,308,256.5

COSTOS DE OPERACIN Y MANTENIMIENTO


COSTO DE OPERACIN Y MANTENIMIENTO SIN PROYECTO
COSTOSDEOPERACION

2,305,461.4

COSTOSMANTENIMIENTO

2,795.1

COSTO DE OPERACIN Y MANTENIMIENTO CON PROYECTO

0.0

COSTOSDEOPERACION

4,381,720.8
4,306,533.7

COSTOSMANTENIMIENTO

75,187.1

COSTO INCREMENTAL

Err:509

2,073,464.2

BENEFICIOS Y COSTOS INCREMENTALES

Err:509

-683,006.4

FLUJO DE COSTOS

Err:509

-683,006.4

COEFICIENTE COSTO BENEFICIO


INVERSION

VACI

Err:509

Err:509

TASADCTO= 9%

VAN= Err:509
TIR Err:509
RATIO B/C = Err:509

REMENTALES A PRECIOS SOCIALES DEL PROYECTO - ALTERNATIVA 1


AO 2

2017

AO 3

2018

AO 4
2019

AO 5

2020

AO 6
2021

AO 7
2022

AO 8
2023

8,379

8,571

8,768

8,970

9,176

9,386

9,602

1,625,112

1,900,356

2,223,120

2,601,596

3,045,443

3,566,035

4,176,758

1,625,112

1,900,356

2,223,120

2,601,596

3,045,443

3,566,035

4,176,758

Err:509
0.0

0.0

0.0

Err:509

0.0

0.0

0.0

2,308,256.5

2,308,256.5

2,308,256.5

2,308,256.5

2,308,256.5

2,308,256.5

2,308,256.5

2,305,461.4

2,305,461.4

2,305,461.4

2,305,461.4

2,305,461.4

2,305,461.4

2,305,461.4

2,795.1

2,795.1

2,795.1

2,795.1

2,795.1

2,795.1

2,795.1

3,028,544.9

3,028,544.9

3,028,544.9

3,028,544.9

3,028,544.9

3,028,544.9

3,028,544.9

2,966,486.2

2,966,486.2

2,966,486.2

2,966,486.2

2,966,486.2

2,966,486.2

2,966,486.2

62,058.6

62,058.6

62,058.6

62,058.6

62,058.6

62,058.6

62,058.6

720,288.3

720,288.3

720,288.3

Err:509

720,288.3

720,288.3

720,288.3

904,823.9

1,180,067.4

1,502,831.4

Err:509

2,325,155.0

2,845,746.5

3,456,469.5

904,823.9

1,180,067.4

1,502,831.4

Err:509

2,325,155.0

2,845,746.5

3,456,469.5

FUENTE: Cuadro 40 y 44. Elaboracin Consultor

COSTO BENEFICIO - ALTERNATIVA N 1 ( A PRECIOS SOCIALES)


VABI
S/. 17,914,801

509

REMENTALES A PRECIOS SOCIALES DEL PROYECTO - ALTERNATIVA 2


AO 2
8379

2017

AO 3
8571

2018

AO 4
2019
8768

AO 5
8970

2020

AO 6
2021

AO 7
2022

AO 8
2023

9176

9386

9602

1625112

1900356

2223120

2601596

3045443

3566035

4176758

1625112

1900356

2223120

2601596

3045443

3566035

4176758

Err:509
0.0

0.0

0.0

Err:509

0.0

0.0

0.0

2,308,256.5

2,308,256.5

2,308,256.5

2,308,256.5

2,308,256.5

2,308,256.5

2,308,256.5

2,305,461.4

2,305,461.4

2,305,461.4

2,305,461.4

2,305,461.4

2,305,461.4

2,305,461.4

2,795.1

2,795.1

2,795.1

2,795.1

2,795.1

2,795.1

2,795.1

4,381,720.8

4,381,720.8

4,381,720.8

4,381,720.8

4,381,720.8

4,381,720.8

4,381,720.8

4,306,533.7

4,306,533.7

4,306,533.7

4,306,533.7

4,306,533.7

4,306,533.7

4,306,533.7

75,187.1

75,187.1

75,187.1

75,187.1

75,187.1

75,187.1

75,187.1

2,073,464.2

2,073,464.2

2,073,464.2

Err:509

2,073,464.2

2,073,464.2

2,073,464.2

-448,352.0

-173,108.5

149,655.5

Err:509

971,979.1

1,492,570.6

2,103,293.6

-448,352.0

-173,108.5

149,655.5

Err:509

971,979.1

1,492,570.6

2,103,293.6

COSTO BENEFICIO - ALTERNATIVA N 2 ( A PRECIOS SOCIALES)

509

VABI
S/. 17,914,801

AO 9
2024

AO 10
2025

9,822

10,048

4,893,367

5,734,403

4,893,367

5,734,403

Err:509
0.0

Err:509

2,308,256.5

2,308,256.5

2,305,461.4

2,305,461.4

2,795.1

2,795.1

3,028,544.9

3,028,544.9

2,966,486.2

2,966,486.2

62,058.6

62,058.6

720,288.3

Err:509

4,173,078.4

Err:509

4,173,078.4

Err:509

AO 9
2024

AO 10
2025

9822

10048

4893367

5734403

4893367

5734403

Err:509
0.0

Err:509

2,308,256.5

2,308,256.5

2,305,461.4

2,305,461.4

2,795.1

2,795.1

4,381,720.8

4,381,720.8

4,306,533.7

4,306,533.7

75,187.1

75,187.1

2,073,464.2

Err:509

2,819,902.5

Err:509

2,819,902.5

Err:509

COSTO DE INVERSION

ALTERNATIVA 1

ALTERNATIVA 2

PRECIOS DE MERCADO

Err:509

Err:509

PRECIOS SOCIALES

Err:509

Err:509

INDICADORES DE RENTABILIDAD

ALTERNATIVA 1

VALOR ACTUAL DE COSTOS


VAC (NUEVOS SOLES)
INDICADOR DE EFECTIVIDAD
IE (POBLACION BENEFICIARIA)

ALTERNATIVA 2

Err:509

Err:509

90,912.86

90,912.86

INDICADOR COSTO EFECTIVIDAD-ICE


(POBLACION BENEFICIARIA)

Err:509

Cuadro 46: EVALUACIN DEL PROYECTO


A PRECIOS DE MERCADO
HORIZONTE DE EVALUACIN
ALTERNATIVAS

10 AOS
VAN

TIR

B/C

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Cuadro 47: EVALUACIN DEL PROYECTO


A PRECIOS SOCIALES
HORIZONTE DE EVALUACIN
ALTERNATIVAS

10 AOS
VANS

TIRS

B/C

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

7.10%
0.76%

0.93
0.84

15.49%
13.55%

1.28
1.10

ALTERNATIVA

CASO 1

CASO 2

CASO 3

INVERSION

INVERSION

INVERSION

(+40%)

(+30%)

(+20%)

40.00%

30.00%

20%

ALTERNAT 1
VAN

Err:509

Err:509

Err:509

TIR

Err:509

B/C

Err:509

ALTERNAT 2
VAN

Err:509

Err:509

Err:509

TIR

Err:509

B/C

Err:509
CASO 8
ALTERNATIV

BENEFICIOS
(+20%)
20%

ALTERNAT 1
VAN

Err:509

TIR

Err:509

B/C

Err:509

ALTERNAT 2
VAN

Err:509

TIR

Err:509

B/C

Err:509

ALTERN
EVALUACION

ENMILESDENUEVOSSOL

(+0%DELAI
AOS

INVERSION

Err:509

1
2
3
4
5
6

Err:509

7
8
9

10

Err:509

Tasadedescuento

ALTERN
EVALUACION

ENMILESDENUEVOSSOL

(+0%DELAI
AOS

INVERSION

Err:509

0.00

0.00

0.00

0.00

Err:509

0.00

0.00

0.00

0.00

10

Err:509
Tasadedescuento

ALTERN
EVALUACION

ENMILESDENUEVOSSOL

(-10%DELAI
AOS

INVERSION

Err:509

0.00

0.00

0.00

0.00

Err:509

0.00

0.00

0.00

0.00

10

Err:509

Tasadedescuento

ALTERN
EVALUACION

ENMILESDENUEVOSSOL

(-10%DELAI
AOS

INVERSION

Err:509

0.00

0.00

0.00

0.00

Err:509

0.00

0.00

0.00

0.00

10

Err:509

Tasadedescuento

ALTERN
EVALUACION

ENMILESDENUEVOSSOL

(+20%DELAINVERSIO
AOS

INVERSION

Err:509

0.00

0.00

0.00

0.00

Err:509

0.00

0.00

0.00

0.00

10

Err:509

Tasadedescuento

ALTERN
EVALUACION

ENMILESDENUEVOSSOL

(+20%DELAINVERSIO
AOS

INVERSION

Err:509

0.00

0.00

0.00

0.00

Err:509

0.00

0.00

0.00

0.00

10

Err:509

Tasadedescuento

ALTERN
EVALUACION

ENMILESDENUEVOSSOL

(-10%DELOSB
AOS

INVERSION

Err:509

0.00

0.00

0.00

0.00

Err:509

0.00

0.00

0.00

0.00

10

Err:509

Tasadedescuento

ALTERN
EVALUACION

ENMILESDENUEVOSSOL

(-10%DELOSB
AOS

INVERSION

Err:509

0.00

0.00

0.00

0.00

Err:509

0.00

0.00

0.00

0.00

10

Err:509

Tasadedescuento

ANALISIS DE SENSIBILIDAD PAR LA INERSIN


CASO 4

CASO 5

CASO 6

CASO 7

CASO 8

INVERSION

INVERSION

INVERSION

INVERSION

INVERSION

10%

0%

(-10)

(-20%)

(-30%)

10.00%

0%

-10.00%

-20%

-30%

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509
Err:509
Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

CASO 9

CASO 10

CASO 11

CASO 12

CASO 13

BENEFICIOS

BENEFICIOS

BENEFICIOS

BENEFICIOS

BENEFICIOS

( +10%)

0%

(-10)

(-20%)

(-30%)

10%

0%

-10.00%

-20.00%

-30.00%

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

ALTERNATIVA 1
EVALUACION ECONOMICA
ENMILESDENUEVOSSOLESAPRECIOSSOCIALES
(+0%DELAINVERSION)
COSTOS INCREMENTALES DE OPERACIN Y
MANTENIMIENTO
SIN PROYECTO

Costo Total

BENEFICIOS INCR.

CON PROYECTO

FLUJO
NETO

0.00

0.00

Err:509

0.0

Err:509

2,308,256.55

3,028,544.85

720,288.30

1,390,457.8

670,169.54

2,308,256.55

3,028,544.85

720,288.30

1,625,112.3

904,823.95

2,308,256.55

3,028,544.85

720,288.30

1,900,355.7

1,180,067.42

2,308,256.55

3,028,544.85

720,288.30

2,223,119.7

1,502,831.41

2,308,256.55

3,028,544.85

Err:509

2,601,596.2

Err:509

2,308,256.55

3,028,544.85

720,288.30

3,045,443.3

2,325,155.04

2,308,256.55

3,028,544.85

720,288.30

3,566,034.8

2,845,746.52

2,308,256.55

3,028,544.85

720,288.30

4,176,757.8

3,456,469.46

2,308,256.55

3,028,544.85

720,288.30

4,893,366.7

4,173,078.42

2,308,256.55

3,028,544.85

Err:509

5,734,402.8

Err:509

9%

VAC
VAB

Err:509
17,914,801.3

VAN
TIR
B/C

Err:509
Err:509
Err:509

ALTERNATIVA 2
EVALUACION ECONOMICA
ENMILESDENUEVOSSOLESAPRECIOSSOCIALES
(+0%DELAINVERSION)
COSTOS INCREMENTALES DE OPERACIN Y
MANTENIMIENTO
SIN PROYECTO

FLUJO

Costo Total

CON PROYECTO

BENEFICIOS INCR.

NETO

0.00

0.00

Err:509

0.00

Err:509

2,308,256.55

4,381,720.75

2,073,464.21

1390457.85

-683,006.4

2,308,256.55

4,381,720.75

2,073,464.21

1625112.25

-448,352.0

2,308,256.55

4,381,720.75

2,073,464.21

1900355.73

-173,108.5

2,308,256.55

4,381,720.75

2,073,464.21

2223119.71

149,655.5

2,308,256.55

4,381,720.75

Err:509

2601596.19

Err:509

2,308,256.55

4,381,720.75

2,073,464.21

3045443.34

971,979.1

2,308,256.55

4,381,720.75

2,073,464.21

3566034.83

1,492,570.6

2,308,256.55

4,381,720.75

2,073,464.21

4176757.76

2,103,293.6

2,308,256.55

4,381,720.75

2,073,464.21

4893366.72

2,819,902.5

2,308,256.55

4,381,720.75

Err:509

9%

VAC
VAB

Err:509
17,914,801.3

5734402.83

VAN
TIR
B/C

Err:509

Err:509
Err:509
Err:509

ALTERNATIVA 1
EVALUACION ECONOMICA
ENMILESDENUEVOSSOLESAPRECIOSSOCIALES
(-10%DELAINVERSION)
COSTOS INCREMENTALES
MANTENIM.

FLUJO

Costo Total

OPERACIN

BENEFICIOS INCR.

NETO

0.00

0.00

Err:509

0.0

Err:509

2308256.55

3028544.85

720,288.30

1,390,457.8

670,169.54

2308256.55

3028544.85

720,288.30

1,625,112.3

904,823.95

2308256.55

3028544.85

720,288.30

1,900,355.7

1,180,067.42

2308256.55

3028544.85

720,288.30

2,223,119.7

1,502,831.41

2308256.55

3028544.85

Err:509

2,601,596.2

Err:509

2308256.55

3028544.85

720,288.30

3,045,443.3

2,325,155.04

2308256.55

3028544.85

720,288.30

3,566,034.8

2,845,746.52

2308256.55

3028544.85

720,288.30

4,176,757.8

3,456,469.46

2308256.55

3028544.85

720,288.30

4,893,366.7

4,173,078.42

2308256.55

3028544.85

Err:509

5,734,402.8

Err:509

9%

VAC
VAB

Err:509
17,914,801.3

VAN
TIR
B/C

Err:509
Err:509
Err:509

ALTERNATIVA 2
EVALUACION ECONOMICA
ENMILESDENUEVOSSOLESAPRECIOSSOCIALES
(-10%DELAINVERSION)
COSTOS
MANTENIM.

FLUJO

Costo Total
OPERACIN

BENEFICIOS INCR.

NETO

0.00

0.00

Err:509

0.00

Err:509

2,308,256.55

4,381,720.75

2,073,464.21

1390457.85

-683,006.36

2,308,256.55

4,381,720.75

2,073,464.21

1625112.25

-448,351.96

2,308,256.55

4,381,720.75

2,073,464.21

1900355.73

-173,108.48

2,308,256.55

4,381,720.75

2,073,464.21

2223119.71

149,655.50

2,308,256.55

4,381,720.75

Err:509

2601596.19

Err:509

2,308,256.55

4,381,720.75

2,073,464.21

3045443.34

971,979.14

2,308,256.55

4,381,720.75

2,073,464.21

3566034.83

1,492,570.62

2,308,256.55

4,381,720.75

2,073,464.21

4176757.76

2,103,293.56

2,308,256.55

4,381,720.75

2,073,464.21

4893366.72

2,819,902.52

2,308,256.55

4,381,720.75

Err:509

9%

VAC
VAB

Err:509
17,914,801.3

5734402.83

VAN
TIR
B/C

Err:509

Err:509
Err:509
Err:509

ALTERNATIVA 1
EVALUACION ECONOMICA
ENMILESDENUEVOSSOLESAPRECIOSSOCIALES
(+20%DELAINVERSION-20%BENEFICIOS)
COSTOS INCREMENTALES
MANTENIM.

FLUJO

Costo Total

OPERACIN

BENEFICIOS INCR.

NETO

0.00

0.00

Err:509

0.0

Err:509

2308256.55

3028544.85

720,288.30

1,112,366.3

392,077.97

2308256.55

3028544.85

720,288.30

1,300,089.8

579,801.50

2308256.55

3028544.85

720,288.30

1,520,284.6

799,996.28

2308256.55

3028544.85

720,288.30

1,778,495.8

1,058,207.46

2308256.55

3028544.85

Err:509

2,081,276.9

Err:509

2308256.55

3028544.85

720,288.30

2,436,354.7

1,716,066.37

2308256.55

3028544.85

720,288.30

2,852,827.9

2,132,539.56

2308256.55

3028544.85

720,288.30

3,341,406.2

2,621,117.91

2308256.55

3028544.85

720,288.30

3,914,693.4

3,194,405.08

2308256.55

3028544.85

Err:509

4,587,522.3

Err:509

9%

VAC
VAB

Err:509
14,331,841.1

VAN
TIR
B/C

Err:509
Err:509
Err:509

ALTERNATIVA 2
EVALUACION ECONOMICA
ENMILESDENUEVOSSOLESAPRECIOSSOCIALES
(+20%DELAINVERSION-20%BENEFICIOS)
COSTOS
MANTENIM.

FLUJO

Costo Total
OPERACIN

BENEFICIOS INCR.

NETO

0.00

0.00

Err:509

0.00

Err:509

2,308,256.55

4,381,720.75

2,073,464.21

1112366.28

-961,097.93

2,308,256.55

4,381,720.75

2,073,464.21

1300089.80

-773,374.41

2,308,256.55

4,381,720.75

2,073,464.21

1520284.58

-553,179.63

2,308,256.55

4,381,720.75

2,073,464.21

1778495.77

-294,968.44

2,308,256.55

4,381,720.75

Err:509

2081276.95

Err:509

2,308,256.55

4,381,720.75

2,073,464.21

2436354.67

362,890.47

2,308,256.55

4,381,720.75

2,073,464.21

2852827.86

779,363.66

2,308,256.55

4,381,720.75

2,073,464.21

3341406.21

1,267,942.00

2,308,256.55

4,381,720.75

2,073,464.21

3914693.38

1,841,229.17

2,308,256.55

4,381,720.75

Err:509

9%

VAC
VAB

Err:509
14,331,841.1

4587522.26

VAN
TIR
B/C

Err:509

Err:509
Err:509
Err:509

ALTERNATIVA 1
EVALUACION ECONOMICA
ENMILESDENUEVOSSOLESAPRECIOSSOCIALES
(-10%DELOSBENEFICIOS)
COSTOS INCREMENTALES
MANTENIM.

FLUJO

Costo Total

OPERACIN

BENEFICIOS INCR.

NETO

0.00

0.00

Err:509

0.0

Err:509

2308256.55

3028544.85

720,288.30

1,251,412.1

531,123.76

2308256.55

3028544.85

720,288.30

1,462,601.0

742,312.72

2308256.55

3028544.85

720,288.30

1,710,320.2

990,031.85

2308256.55

3028544.85

720,288.30

2,000,807.7

1,280,519.43

2308256.55

3028544.85

Err:509

2,341,436.6

Err:509

2308256.55

3028544.85

720,288.30

2,740,899.0

2,020,610.70

2308256.55

3028544.85

720,288.30

3,209,431.3

2,489,143.04

2308256.55

3028544.85

720,288.30

3,759,082.0

3,038,793.68

2308256.55

3028544.85

720,288.30

4,404,030.1

3,683,741.75

2308256.55

3028544.85

Err:509

5,160,962.5

Err:509

9%

VAC
VAB

Err:509
16,123,321.2

VAN
TIR
B/C

Err:509
Err:509
Err:509

ALTERNATIVA 2
EVALUACION ECONOMICA
ENMILESDENUEVOSSOLESAPRECIOSSOCIALES
(-10%DELOSBENEFICIOS)
COSTOS
MANTENIM.

FLUJO

Costo Total
OPERACIN

BENEFICIOS INCR.

NETO

0.00

0.00

Err:509

0.00

Err:509

2,308,256.55

4,381,720.75

2,073,464.21

1251412.06

-822,052.14

2,308,256.55

4,381,720.75

2,073,464.21

1462601.03

-610,863.18

2,308,256.55

4,381,720.75

2,073,464.21

1710320.15

-363,144.05

2,308,256.55

4,381,720.75

2,073,464.21

2000807.74

-72,656.47

2,308,256.55

4,381,720.75

Err:509

2341436.57

Err:509

2,308,256.55

4,381,720.75

2,073,464.21

2740899.01

667,434.80

2,308,256.55

4,381,720.75

2,073,464.21

3209431.35

1,135,967.14

2,308,256.55

4,381,720.75

2,073,464.21

3759081.99

1,685,617.78

2,308,256.55

4,381,720.75

2,073,464.21

4404030.05

2,330,565.85

2,308,256.55

4,381,720.75

Err:509

9%

VAC
VAB

Err:509
16,123,321.2

5160962.54

VAN
TIR
B/C

Err:509

Err:509
Err:509
Err:509

CASO 9

CASO 6

CASO 7

INVERSION

INVERSION

BENEFICIOS

INVERSION

BENEFICIOS

(-40%)

(+10)

(+20%)

-40%

10%

(-10%)
-10%

(-20%)
-20%

20%

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

ALTERNATIVA 1
EVALUACION ECONOMICA
ENMILESDENUEVOSSOLESAPRECIOSSOCIALES
(+20%DELAINVERSION)
AOS

INVERSION

COSTOS INCREMENTALES DE
OPERACIN Y MANTENIMIENTO
SIN PROYECTO

Err:509

CON PROYECTO

0.00

0.00

2,308,256.55

3,028,544.85

2,308,256.55

3,028,544.85

2,308,256.55

3,028,544.85

2,308,256.55

3,028,544.85

2,308,256.55

3,028,544.85

2,308,256.55

3,028,544.85

4
5
6

Err:509

2,308,256.55

3,028,544.85

2,308,256.55

3,028,544.85

0.00

2,308,256.55

3,028,544.85

10

Err:509

2,308,256.55

3,028,544.85

9%

VAC
VAB

Tasadedescuento

ALTERNATIVA 2
EVALUACION ECONOMICA
ENMILESDENUEVOSSOLESAPRECIOSSOCIALES
(+20%DELAINVERSION)
AOS

COSTOS INCREMENTALES DE
OPERACIN Y MANTENIMIENTO

INVERSION

SIN PROYECTO

CON PROYECTO

Err:509

0.00

0.00

0.00

2,308,256.55

4,381,720.75

0.00

2,308,256.55

4,381,720.75

0.00

2,308,256.55

4,381,720.75

0.00

2,308,256.55

4,381,720.75

Err:509

2,308,256.55

4,381,720.75

0.00

2,308,256.55

4,381,720.75

0.00

2,308,256.55

4,381,720.75

0.00

2,308,256.55

4,381,720.75

0.00

2,308,256.55

4,381,720.75

10

Err:509

2,308,256.55

4,381,720.75

9%

VAC
VAB

Tasadedescuento

ALTERNATIVA 1
EVALUACION ECONOMICA
ENMILESDENUEVOSSOLESAPRECIOSSOCIALES
(-20%DELAINVERSION)
AOS

INVERSION

COSTOS INCREMENTALES
MANTENIM.

OPERACIN

Err:509

0.00

0.00

0.00

2308256.55

3028544.85

0.00

2308256.55

3028544.85

0.00

2308256.55

3028544.85

0.00

2308256.55

3028544.85

Err:509

2308256.55

3028544.85

0.00

2308256.55

3028544.85

0.00

2308256.55

3028544.85

0.00

2308256.55

3028544.85

0.00

2308256.55

3028544.85

10

Err:509

2308256.55

3028544.85

9%

VAC
VAB

Tasadedescuento

ALTERNATIVA 2
EVALUACION ECONOMICA
ENMILESDENUEVOSSOLESAPRECIOSSOCIALES
(-20%DELAINVERSION)
AOS

INVERSION

COSTOS
MANTENIM.

OPERACIN

Err:509

0.00

0.00

0.00

2,308,256.55

4,381,720.75

0.00

2,308,256.55

4,381,720.75

0.00

2,308,256.55

4,381,720.75

0.00

2,308,256.55

4,381,720.75

Err:509

2,308,256.55

4,381,720.75

0.00

2,308,256.55

4,381,720.75

0.00

2,308,256.55

4,381,720.75

0.00

2,308,256.55

4,381,720.75

0.00

2,308,256.55

4,381,720.75

10

Err:509

2,308,256.55

4,381,720.75

9%

VAC
VAB

Tasadedescuento

ALTERNATIVA 1
EVALUACION ECONOMICA
ENMILESDENUEVOSSOLESAPRECIOSSOCIALES
(+20BENEFICIOS)
AOS

INVERSION

COSTOS INCREMENTALES
MANTENIM.

OPERACIN

Err:509

0.00

0.00

0.00

2308256.55

3028544.85

0.00

2308256.55

3028544.85

0.00

2308256.55

3028544.85

0.00

2308256.55

3028544.85

Err:509

2308256.55

3028544.85

0.00

2308256.55

3028544.85

0.00

2308256.55

3028544.85

0.00

2308256.55

3028544.85

0.00

2308256.55

3028544.85

10

Err:509

2308256.55

3028544.85

9%

VAC
VAB

Tasadedescuento

ALTERNATIVA 2
EVALUACION ECONOMICA
ENMILESDENUEVOSSOLESAPRECIOSSOCIALES
(+20BENEFICIOS)
AOS

INVERSION

COSTOS
MANTENIM.

OPERACIN

Err:509

0.00

0.00

0.00

2,308,256.55

4,381,720.75

0.00

2,308,256.55

4,381,720.75

0.00

2,308,256.55

4,381,720.75

0.00

2,308,256.55

4,381,720.75

Err:509

2,308,256.55

4,381,720.75

0.00

2,308,256.55

4,381,720.75

0.00

2,308,256.55

4,381,720.75

0.00

2,308,256.55

4,381,720.75

0.00

2,308,256.55

4,381,720.75

10

Err:509

2,308,256.55

4,381,720.75

9%

VAC
VAB

Tasadedescuento

ALTERNATIVA 1
EVALUACION ECONOMICA
ENMILESDENUEVOSSOLESAPRECIOSSOCIALES
(-20%DELOSBENEFICIOS)
AOS

INVERSION

COSTOS INCREMENTALES
MANTENIM.

OPERACIN

Err:509

0.00

0.00

0.00

2308256.55

3028544.85

0.00

2308256.55

3028544.85

0.00

2308256.55

3028544.85

0.00

2308256.55

3028544.85

Err:509

2308256.55

3028544.85

0.00

2308256.55

3028544.85

0.00

2308256.55

3028544.85

0.00

2308256.55

3028544.85

0.00

2308256.55

3028544.85

10

Err:509

2308256.55

3028544.85

9%

VAC
VAB

Tasadedescuento

ALTERNATIVA 2
EVALUACION ECONOMICA
ENMILESDENUEVOSSOLESAPRECIOSSOCIALES
(-20%DELOSBENEFICIOS)
AOS

INVERSION

COSTOS
MANTENIM.

OPERACIN

Err:509

0.00

0.00

0.00

2,308,256.55

4,381,720.75

0.00

2,308,256.55

4,381,720.75

0.00

2,308,256.55

4,381,720.75

0.00

2,308,256.55

4,381,720.75

Err:509

2,308,256.55

4,381,720.75

0.00

2,308,256.55

4,381,720.75

0.00

2,308,256.55

4,381,720.75

0.00

2,308,256.55

4,381,720.75

0.00

2,308,256.55

4,381,720.75

10

Err:509

2,308,256.55

4,381,720.75

9%

VAC
VAB

Tasadedescuento

ANLISIS DE SENSIBILIDAD PARA LA INVERSIN (A PRECIOS SOC


12.00
10.00
8.00
6.00
4.00
2.00
0.00

40.00%

30.00%

20.00%

10.00%
ALTERNAT 1

0.00%
-10.00%
ALTERNAT 2

-20.

ANLISIS DE SENSIBILIDAD PARA LOS BENEFICIOS (A PRECIOS SO


12.00
10.00
8.00
6.00
4.00
2.00
0.00

20%

10%

0%
ALTERNAT 1

TERNATIVA 1

-10%
ALTERNAT 2

CION ECONOMICA

SSOLESAPRECIOSSOCIALES

DELAINVERSION)
FLUJO

Costo Total
BENEFICIOS INCR.

AOS

NETO

Err:509

0.0

Err:509

720,288.30

1,390,457.8

670,169.54

720,288.30

1,625,112.3

904,823.95

720,288.30

1,900,355.7

1,180,067.42

720,288.30

2,223,119.7

1,502,831.41

Err:509

2,601,596.2

Err:509

720,288.30

3,045,443.3

2,325,155.04

720,288.30

3,566,034.8

2,845,746.52

720,288.30

4,176,757.8

3,456,469.46

720,288.30

4,893,366.7

4,173,078.42

Err:509

5,734,402.8

Err:509

10

Err:509
17,914,801.3

VAN
TIR
B/C

Err:509
Err:509
Err:509

Tasadedescuento

TERNATIVA 2

CION ECONOMICA

SSOLESAPRECIOSSOCIALES

DELAINVERSION)
FLUJO

Costo Total
BENEFICIOS INCR.

AOS

NETO

Err:509

0.00

Err:509

2,073,464.21

1390457.85

-683,006.36

2,073,464.21

1625112.25

-448,351.96

2,073,464.21

1900355.73

-173,108.48

2,073,464.21

2223119.71

149,655.50

Err:509

2601596.19

Err:509

2,073,464.21

3045443.34

971,979.14

2,073,464.21

3566034.83

1,492,570.62

2,073,464.21

4176757.76

2,103,293.56

2,073,464.21

4893366.72

2,819,902.52

Err:509

10

Err:509

Err:509
17,914,801.3

5734402.83

VAN
TIR
B/C

Err:509
Err:509
Err:509

Tasadedescuento

TERNATIVA 1

CION ECONOMICA

SSOLESAPRECIOSSOCIALES

DELAINVERSION)
FLUJO

Costo Total
BENEFICIOS INCR.

AOS

NETO

Err:509

0.0

Err:509

720,288.30

1,390,457.8

670,169.54

720,288.30

1,625,112.3

904,823.95

720,288.30

1,900,355.7

1,180,067.42

720,288.30

2,223,119.7

1,502,831.41

Err:509

2,601,596.2

Err:509

720,288.30

3,045,443.3

2,325,155.04

720,288.30

3,566,034.8

2,845,746.52

720,288.30

4,176,757.8

3,456,469.46

720,288.30

4,893,366.7

4,173,078.42

Err:509

5,734,402.8

Err:509

10

Err:509
17,914,801.3

VAN
TIR
B/C

Err:509
Err:509
Err:509

Tasadedescuento

TERNATIVA 2

CION ECONOMICA

SSOLESAPRECIOSSOCIALES

DELAINVERSION)
FLUJO

Costo Total
BENEFICIOS INCR.

AOS

NETO

Err:509

0.00

Err:509

2,073,464.21

1390457.85

-683,006.36

2,073,464.21

1625112.25

-448,351.96

2,073,464.21

1900355.73

-173,108.48

2,073,464.21

2223119.71

149,655.50

Err:509

2601596.19

Err:509

2,073,464.21

3045443.34

971,979.14

2,073,464.21

3566034.83

1,492,570.62

2,073,464.21

4176757.76

2,103,293.56

2,073,464.21

4893366.72

2,819,902.52

Err:509

10

Err:509

Err:509
17,914,801.3

5734402.83

VAN
TIR
B/C

Err:509
Err:509
Err:509

Tasadedescuento

TERNATIVA 1

CION ECONOMICA

SSOLESAPRECIOSSOCIALES

0BENEFICIOS)
FLUJO

Costo Total
BENEFICIOS INCR.

AOS

NETO

Err:509

0.0

Err:509

720,288.30

1,668,549.4

948,261.11

720,288.30

1,950,134.7

1,229,846.40

720,288.30

2,280,426.9

1,560,138.57

720,288.30

2,667,743.7

1,947,455.35

Err:509

3,121,915.4

Err:509

720,288.30

3,654,532.0

2,934,243.71

720,288.30

4,279,241.8

3,558,953.49

720,288.30

5,012,109.3

4,291,821.01

720,288.30

5,872,040.1

5,151,751.77

Err:509

6,881,283.4

Err:509

10

Err:509
21,497,761.6

VAN
TIR
B/C

Err:509
Err:509
Err:509

Tasadedescuento

TERNATIVA 2

CION ECONOMICA

SSOLESAPRECIOSSOCIALES

0BENEFICIOS)
FLUJO

Costo Total
BENEFICIOS INCR.

AOS

NETO

Err:509

0.00

Err:509

2,073,464.21

1668549.42

-404,914.79

2,073,464.21

1950134.70

-123,329.51

2,073,464.21

2280426.87

206,962.67

2,073,464.21

2667743.65

594,279.45

Err:509

3121915.42

Err:509

2,073,464.21

3654532.01

1,581,067.81

2,073,464.21

4279241.79

2,205,777.59

2,073,464.21

5012109.32

2,938,645.11

2,073,464.21

5872040.07

3,798,575.86

Err:509

10

Err:509

Err:509
21,497,761.6

6881283.39

VAN
TIR
B/C

Err:509
Err:509
Err:509

Tasadedescuento

TERNATIVA 1

CION ECONOMICA

SSOLESAPRECIOSSOCIALES

ELOSBENEFICIOS)
FLUJO

Costo Total
BENEFICIOS INCR.

AOS

NETO

Err:509

0.0

Err:509

720,288.30

1,112,366.3

392,077.97

720,288.30

1,300,089.8

579,801.50

720,288.30

1,520,284.6

799,996.28

720,288.30

1,778,495.8

1,058,207.46

Err:509

2,081,276.9

Err:509

720,288.30

2,436,354.7

1,716,066.37

720,288.30

2,852,827.9

2,132,539.56

720,288.30

3,341,406.2

2,621,117.91

720,288.30

3,914,693.4

3,194,405.08

Err:509

4,587,522.3

Err:509

10

Err:509
14,331,841.1

VAN
TIR
B/C

Err:509
Err:509
Err:509

Tasadedescuento

TERNATIVA 2

CION ECONOMICA

SSOLESAPRECIOSSOCIALES

ELOSBENEFICIOS)
FLUJO

Costo Total
BENEFICIOS INCR.

AOS

NETO

Err:509

0.00

Err:509

2,073,464.21

1112366.28

-961,097.93

2,073,464.21

1300089.80

-773,374.41

2,073,464.21

1520284.58

-553,179.63

2,073,464.21

1778495.77

-294,968.44

Err:509

2081276.95

Err:509

2,073,464.21

2436354.67

362,890.47

2,073,464.21

2852827.86

779,363.66

2,073,464.21

3341406.21

1,267,942.00

2,073,464.21

3914693.38

1,841,229.17

Err:509

10

Err:509

Err:509
14,331,841.1

4587522.26

VAN
TIR
B/C

Err:509
Err:509
Err:509

Tasadedescuento

VERSIN (A PRECIOS SOCIALES)

ANLISIS DE SENSIBILIDAD PARA LA INVERSIN EN


12.00
10.00
8.00
6.00
4.00

0.00%
-10.00%
ALTERNAT 2

-20.00%

-30.00%

2.00

-40.00%

0.00

40.00%

30.00%

20.00%

ALTERNAT
10.00%

ENEFICIOS (A PRECIOS SOCIALES)

ANLISIS DE SENSIBILIDAD DE LOS BENEFICIOS EN


12.00
10.00
8.00
6.00
4.00

-10%

-20%

-30%

ALTERNAT 2

2.00

ALTERNATIVA 1

0.00

20%

EVALUACION ECONOMICA

10%

ENMILESDENUEVOSSOLESAPRECIOSSOCIALES
(+10%DELAINVERSION)
COSTOS INCREMENTALES DE
OPERACIN Y MANTENIMIENTO

INVERSION

SIN PROYECTO

Costo Total

CON PROYECTO

BENEFICIOS INCR.

Err:509

0.00

0.00

Err:509

0.0

0.00

2,308,256.55

3,028,544.85

720,288.30

1,390,457.8

0.00

2,308,256.55

3,028,544.85

720,288.30

1,625,112.3

0.00

2,308,256.55

3,028,544.85

720,288.30

1,900,355.7

0.00

2,308,256.55

3,028,544.85

720,288.30

2,223,119.7

Err:509

2,308,256.55

3,028,544.85

Err:509

2,601,596.2

0.00

2,308,256.55

3,028,544.85

720,288.30

3,045,443.3

ALTERNAT
0%

0.00

2,308,256.55

3,028,544.85

720,288.30

3,566,034.8

0.00

2,308,256.55

3,028,544.85

720,288.30

4,176,757.8

0.00

2,308,256.55

3,028,544.85

720,288.30

4,893,366.7

Err:509

2,308,256.55

3,028,544.85

Err:509

5,734,402.8

9%

VAC
VAB

Err:509
17,914,801.3

VAN
TIR
B/C

ALTERNATIVA 2
EVALUACION ECONOMICA
ENMILESDENUEVOSSOLESAPRECIOSSOCIALES
(+10%DELAINVERSION)
COSTOS INCREMENTALES DE
OPERACIN Y MANTENIMIENTO

INVERSION

SIN PROYECTO

Costo Total

CON PROYECTO

BENEFICIOS INCR.

Err:509

0.00

0.00

Err:509

0.00

0.00

2,308,256.55

4,381,720.75

2,073,464.21

1390457.85

0.00

2,308,256.55

4,381,720.75

2,073,464.21

1625112.25

0.00

2,308,256.55

4,381,720.75

2,073,464.21

1900355.73

0.00

2,308,256.55

4,381,720.75

2,073,464.21

2223119.71

Err:509

2,308,256.55

4,381,720.75

Err:509

2601596.19

0.00

2,308,256.55

4,381,720.75

2,073,464.21

3045443.34

0.00

2,308,256.55

4,381,720.75

2,073,464.21

3566034.83

0.00

2,308,256.55

4,381,720.75

2,073,464.21

4176757.76

0.00

2,308,256.55

4,381,720.75

2,073,464.21

4893366.72

Err:509

2,308,256.55

4,381,720.75

Err:509

9%

VAC
VAB

Err:509
17,914,801.3

5734402.83

VAN
TIR
B/C

ALTERNATIVA 1
EVALUACION ECONOMICA
ENMILESDENUEVOSSOLESAPRECIOSSOCIALES
(+10%DELAINVERSION-10%BENEFICIOS)
INVERSION

COSTOS INCREMENTALES
MANTENIM.

Costo Total

OPERACIN

BENEFICIOS INCR.

Err:509

0.00

0.00

Err:509

0.0

0.00

2308256.55

3028544.85

720,288.30

1,251,412.1

0.00

2308256.55

3028544.85

720,288.30

1,462,601.0

0.00

2308256.55

3028544.85

720,288.30

1,710,320.2

0.00

2308256.55

3028544.85

720,288.30

2,000,807.7

Err:509

2308256.55

3028544.85

Err:509

2,341,436.6

0.00

2308256.55

3028544.85

720,288.30

2,740,899.0

0.00

2308256.55

3028544.85

720,288.30

3,209,431.3

0.00

2308256.55

3028544.85

720,288.30

3,759,082.0

0.00

2308256.55

3028544.85

720,288.30

4,404,030.1

Err:509

2308256.55

3028544.85

Err:509

5,160,962.5

9%

VAC
VAB

Err:509
16,123,321.2

VAN
TIR
B/C

ALTERNATIVA 2
EVALUACION ECONOMICA
ENMILESDENUEVOSSOLESAPRECIOSSOCIALES
(+10%DELAINVERSION-10%BENEFICIOS)
INVERSION

COSTOS
MANTENIM.

Costo Total

OPERACIN

BENEFICIOS INCR.

Err:509

0.00

0.00

Err:509

0.00

0.00

2,308,256.55

4,381,720.75

2,073,464.21

1251412.06

0.00

2,308,256.55

4,381,720.75

2,073,464.21

1462601.03

0.00

2,308,256.55

4,381,720.75

2,073,464.21

1710320.15

0.00

2,308,256.55

4,381,720.75

2,073,464.21

2000807.74

Err:509

2,308,256.55

4,381,720.75

Err:509

2341436.57

0.00

2,308,256.55

4,381,720.75

2,073,464.21

2740899.01

0.00

2,308,256.55

4,381,720.75

2,073,464.21

3209431.35

0.00

2,308,256.55

4,381,720.75

2,073,464.21

3759081.99

0.00

2,308,256.55

4,381,720.75

2,073,464.21

4404030.05

Err:509

2,308,256.55

4,381,720.75

Err:509

9%

VAC
VAB

Err:509
16,123,321.2

5160962.54

VAN
TIR
B/C

ALTERNATIVA 1
EVALUACION ECONOMICA
ENMILESDENUEVOSSOLESAPRECIOSSOCIALES
(+10%DELOSBENEFICIOS)
INVERSION

COSTOS INCREMENTALES
MANTENIM.

Costo Total

OPERACIN

BENEFICIOS INCR.

Err:509

0.00

0.00

Err:509

0.0

0.00

2308256.55

3028544.85

720,288.30

1,529,503.6

0.00

2308256.55

3028544.85

720,288.30

1,787,623.5

0.00

2308256.55

3028544.85

720,288.30

2,090,391.3

0.00

2308256.55

3028544.85

720,288.30

2,445,431.7

Err:509

2308256.55

3028544.85

Err:509

2,861,755.8

0.00

2308256.55

3028544.85

720,288.30

3,349,987.7

0.00

2308256.55

3028544.85

720,288.30

3,922,638.3

0.00

2308256.55

3028544.85

720,288.30

4,594,433.5

0.00

2308256.55

3028544.85

720,288.30

5,382,703.4

Err:509

2308256.55

3028544.85

Err:509

6,307,843.1

9%

VAC
VAB

Err:509
19,706,281.5

VAN
TIR
B/C

ALTERNATIVA 2
EVALUACION ECONOMICA
ENMILESDENUEVOSSOLESAPRECIOSSOCIALES
(+10%DELOSBENEFICIOS)
INVERSION

COSTOS
MANTENIM.

Costo Total

OPERACIN

BENEFICIOS INCR.

Err:509

0.00

0.00

Err:509

0.00

0.00

2,308,256.55

4,381,720.75

2,073,464.21

1529503.63

0.00

2,308,256.55

4,381,720.75

2,073,464.21

1787623.48

0.00

2,308,256.55

4,381,720.75

2,073,464.21

2090391.30

0.00

2,308,256.55

4,381,720.75

2,073,464.21

2445431.68

Err:509

2,308,256.55

4,381,720.75

Err:509

2861755.80

0.00

2,308,256.55

4,381,720.75

2,073,464.21

3349987.68

0.00

2,308,256.55

4,381,720.75

2,073,464.21

3922638.31

0.00

2,308,256.55

4,381,720.75

2,073,464.21

4594433.54

0.00

2,308,256.55

4,381,720.75

2,073,464.21

5382703.40

Err:509

2,308,256.55

4,381,720.75

Err:509

9%

VAC
VAB

Err:509
19,706,281.5

6307843.11

VAN
TIR
B/C

ALTERNATIVA 1
EVALUACION ECONOMICA
ENMILESDENUEVOSSOLESAPRECIOSSOCIALES
(-30%DELOSBENEFICIOS)
INVERSION

COSTOS INCREMENTALES
MANTENIM.

Costo Total

OPERACIN

BENEFICIOS INCR.

Err:509

0.00

0.00

Err:509

0.0

0.00

2308256.55

3028544.85

720,288.30

973,320.5

0.00

2308256.55

3028544.85

720,288.30

1,137,578.6

0.00

2308256.55

3028544.85

720,288.30

1,330,249.0

0.00

2308256.55

3028544.85

720,288.30

1,556,183.8

Err:509

2308256.55

3028544.85

Err:509

1,821,117.3

0.00

2308256.55

3028544.85

720,288.30

2,131,810.3

0.00

2308256.55

3028544.85

720,288.30

2,496,224.4

0.00

2308256.55

3028544.85

720,288.30

2,923,730.4

0.00

2308256.55

3028544.85

720,288.30

3,425,356.7

Err:509

2308256.55

3028544.85

Err:509

4,014,082.0

9%

VAC
VAB

Err:509
12,540,360.9

edescuento

VAN
TIR
B/C

ALTERNATIVA 2
EVALUACION ECONOMICA
ENMILESDENUEVOSSOLESAPRECIOSSOCIALES
(-20%DELOSBENEFICIOS)
INVERSION

COSTOS
MANTENIM.

Costo Total

OPERACIN

BENEFICIOS INCR.

Err:509

0.00

0.00

Err:509

0.00

0.00

2,308,256.55

4,381,720.75

2,073,464.21

973320.49

0.00

2,308,256.55

4,381,720.75

2,073,464.21

1137578.58

0.00

2,308,256.55

4,381,720.75

2,073,464.21

1330249.01

0.00

2,308,256.55

4,381,720.75

2,073,464.21

1556183.80

Err:509

2,308,256.55

4,381,720.75

Err:509

1821117.33

0.00

2,308,256.55

4,381,720.75

2,073,464.21

2131810.34

0.00

2,308,256.55

4,381,720.75

2,073,464.21

2496224.38

0.00

2,308,256.55

4,381,720.75

2,073,464.21

2923730.43

0.00

2,308,256.55

4,381,720.75

2,073,464.21

3425356.71

Err:509

2,308,256.55

4,381,720.75

Err:509

9%

VAC
VAB

Err:509
12,540,360.9

4014081.98

VAN
TIR
B/C

BILIDAD PARA LA INVERSIN EN FUNCIN DEL BENEFICIO/COSTO (A PRECIOS SOCIALES)

30.00%

ALTERNAT 1
ALTERNAT 2
10.00%
0.00%
-10.00%

20.00%

-20.00%

-30.00%

-40.00%

BILIDAD DE LOS BENEFICIOS EN FUNCION DE BENEFICIO/COSTO (A PRECIOS SOCIALES)

ALTERNAT
1
0%

10%

ALTERNAT
-10% 2

-20%

ALTERNATIVA 1
EVALUACION ECONOM

-30%

ENMILESDENUEVOSSOLESAPRE

(+30%DELAINVERSIO
FLUJO

AOS

COSTOS INCREMENTALES DE OPERACIN Y


MANTENIMIENTO

INVERSION

NETO

SIN PROYECTO
Err:509

Err:509

0.00

670,169.54

0.00

2,308,256.55

904,823.95

0.00

2,308,256.55

1,180,067.42

0.00

2,308,256.55

1,502,831.41

0.00

2,308,256.55

Err:509

Err:509

2,308,256.55

2,325,155.04

0.00

2,308,256.55

2,845,746.52

0.00

2,308,256.55

3,456,469.46

0.00

2,308,256.55

4,173,078.42

0.00

2,308,256.55

Err:509

10

Err:509

2,308,256.55

Err:509
Err:509
Err:509

Tasadedescuento

9%

ALTERNATIVA 2

EVALUACION ECONOM

ENMILESDENUEVOSSOLESAPRE

(+30%DELAINVERSIO
FLUJO

AOS

COSTOS INCREMENTALES DE OPERACIN Y


MANTENIMIENTO

INVERSION

NETO

SIN PROYECTO
Err:509

Err:509

0.00

-683,006.4

0.00

2,308,256.55

-448,352.0

0.00

2,308,256.55

-173,108.5

0.00

2,308,256.55

149,655.5

0.00

2,308,256.55

Err:509

Err:509

2,308,256.55

971,979.1

0.00

2,308,256.55

1,492,570.6

0.00

2,308,256.55

2,103,293.6

0.00

2,308,256.55

2,819,902.5

0.00

2,308,256.55

Err:509

10

Err:509

2,308,256.55

Err:509
Err:509
Err:509

Tasadedescuento

9%

ALTERNATIVA 1
EVALUACION ECONOM

ENMILESDENUEVOSSOLESAPRE

(-30%DELAINVERSIO
FLUJO

AOS

INVERSION

COSTOS INCREMENTALES

NETO

MANTENIM.
Err:509

Err:509

0.00

531,123.76

0.00

2,308,256.55

742,312.72

0.00

2,308,256.55

990,031.85

0.00

2,308,256.55

1,280,519.43

0.00

2,308,256.55

Err:509

Err:509

2,308,256.55

2,020,610.70

0.00

2,308,256.55

2,489,143.04

0.00

2,308,256.55

3,038,793.68

0.00

2,308,256.55

3,683,741.75

0.00

2,308,256.55

Err:509

10

Err:509

2,308,256.55

Err:509
Err:509
Err:509

Tasadedescuento

9%

ALTERNATIVA 2

EVALUACION ECONOM

ENMILESDENUEVOSSOLESAPRE

(-30%DELAINVERSIO
FLUJO

AOS

INVERSION

COSTOS

NETO

MANTENIM.
Err:509

Err:509

0.00

-822,052.14

0.00

2,308,256.55

-610,863.18

0.00

2,308,256.55

-363,144.05

0.00

2,308,256.55

-72,656.47

0.00

2,308,256.55

Err:509

Err:509

2,308,256.55

667,434.80

0.00

2,308,256.55

1,135,967.14

0.00

2,308,256.55

1,685,617.78

0.00

2,308,256.55

2,330,565.85

0.00

2,308,256.55

Err:509

10

Err:509

2,308,256.55

Err:509
Err:509
Err:509

FLUJO
NETO
Err:509
809,215.33
1,067,335.17
1,370,102.99
1,725,143.38
Err:509
2,629,699.37

Tasadedescuento

9%

3,202,350.01
3,874,145.23
4,662,415.09
Err:509

Err:509
Err:509
Err:509

FLUJO
NETO
Err:509
-543,960.58
-285,840.73
16,927.09
371,967.48
Err:509
1,276,523.47
1,849,174.11
2,520,969.33
3,309,239.19
Err:509

Err:509
Err:509
Err:509

FLUJO
NETO
Err:509
253,032.19
417,290.27
609,960.70
835,895.49
Err:509
1,411,522.04

1,775,936.08
2,203,442.13
2,705,068.40
Err:509

Err:509
Err:509
Err:509

FLUJO
NETO
Err:509
-1,100,143.71
-935,885.63
-743,215.20
-517,280.41
Err:509
58,346.13
422,760.17
850,266.23
1,351,892.50
Err:509

Err:509
Err:509
Err:509

ALTERNATIVA 1
EVALUACION ECONOMICA

NMILESDENUEVOSSOLESAPRECIOSSOCIALES
(+30%DELAINVERSION)

NCREMENTALES DE OPERACIN Y
MANTENIMIENTO

FLUJO

Costo Total

CON PROYECTO

BENEFICIOS INCR.

NETO

0.00

Err:509

0.0

Err:509

3,028,544.85

720,288.30

1,390,457.8

670,169.54

3,028,544.85

720,288.30

1,625,112.3

904,823.95

3,028,544.85

720,288.30

1,900,355.7

1,180,067.42

3,028,544.85

720,288.30

2,223,119.7

1,502,831.4

3,028,544.85

Err:509

2,601,596.2

Err:509

3,028,544.85

720,288.30

3,045,443.3

2,325,155.04

3,028,544.85

720,288.30

3,566,034.8

2,845,746.52

3,028,544.85

720,288.30

4,176,757.8

3,456,469.46

3,028,544.85

720,288.30

4,893,366.7

4,173,078.42

3,028,544.85

Err:509

5,734,402.8

Err:509

VAC
VAB

Err:509
17,914,801.3

VAN
TIR
B/C

Err:509
Err:509
Err:509

ALTERNATIVA 2
EVALUACION ECONOMICA

NMILESDENUEVOSSOLESAPRECIOSSOCIALES
(+30%DELAINVERSION)

NCREMENTALES DE OPERACIN Y
MANTENIMIENTO

FLUJO

Costo Total

CON PROYECTO

BENEFICIOS INCR.

NETO

0.00

Err:509

0.00

Err:509

4,381,720.75

2,073,464.21

1390457.85

-683,006.4

4,381,720.75

2,073,464.21

1625112.25

-448,352.0

4,381,720.75

2,073,464.21

1900355.73

-173,108.5

4,381,720.75

2,073,464.21

2223119.71

149,655.5

4,381,720.75

Err:509

2601596.19

Err:509

4,381,720.75

2,073,464.21

3045443.34

971,979.1

4,381,720.75

2,073,464.21

3566034.83

1,492,570.6

4,381,720.75

2,073,464.21

4176757.76

2,103,293.6

4,381,720.75

2,073,464.21

4893366.72

2,819,902.5

4,381,720.75

Err:509

VAC
VAB

Err:509
17,914,801.3

5734402.83

VAN
TIR
B/C

Err:509

Err:509
Err:509
Err:509

ALTERNATIVA 1
EVALUACION ECONOMICA

NMILESDENUEVOSSOLESAPRECIOSSOCIALES
(-30%DELAINVERSION)

COSTOS INCREMENTALES

FLUJO

Costo Total

OPERACIN

BENEFICIOS INCR.

NETO

0.00

Err:509

3,028,544.85

720,288.30

1,390,457.8

670,169.54

Err:509

3,028,544.85

720,288.30

1,625,112.3

904,823.95

3,028,544.85

720,288.30

1,900,355.7

1,180,067.42

3,028,544.85

720,288.30

2,223,119.7

1,502,831.41

3,028,544.85

Err:509

2,601,596.2

Err:509

3,028,544.85

720,288.30

3,045,443.3

2,325,155.04

3,028,544.85

720,288.30

3,566,034.8

2,845,746.52

3,028,544.85

720,288.30

4,176,757.8

3,456,469.46

3,028,544.85

720,288.30

4,893,366.7

4,173,078.42

3,028,544.85

Err:509

5,734,402.8

Err:509

VAC
VAB

Err:509
17,914,801.3

VAN
TIR
B/C

Err:509
Err:509
Err:509

ALTERNATIVA 2
EVALUACION ECONOMICA

NMILESDENUEVOSSOLESAPRECIOSSOCIALES
(-30%DELAINVERSION)
COSTOS

FLUJO

Costo Total
OPERACIN

BENEFICIOS INCR.

NETO

0.00

Err:509

0.00

Err:509

4,381,720.75

2,073,464.21

1390457.85

-683,006.36

4,381,720.75

2,073,464.21

1625112.25

-448,351.96

4,381,720.75

2,073,464.21

1900355.73

-173,108.48

4,381,720.75

2,073,464.21

2223119.71

149,655.50

4,381,720.75

Err:509

2601596.19

Err:509

4,381,720.75

2,073,464.21

3045443.34

971,979.14

4,381,720.75

2,073,464.21

3566034.83

1,492,570.62

4,381,720.75

2,073,464.21

4176757.76

2,103,293.56

4,381,720.75

2,073,464.21

4893366.72

2,819,902.52

4,381,720.75

Err:509

VAC
VAB

Err:509
17,914,801.3

5734402.83

VAN
TIR
B/C

Err:509

Err:509
Err:509
Err:509

ALTERNATIVA 1
EVALUACION ECONOMICA
ENMILESDENUEVOSSOLESAPRECIOSSOCIALES
(+40%DELAINVERSION)
AOS

COSTOS INCREMENTALES DE OPERACIN Y


MANTENIMIENTO

INVERSION

SIN PROYECTO

Costo Total

CON PROYECTO

Err:509

0.00

0.00

Err:509

0.00

2,308,256.55

3,028,544.85

720,288.30

0.00

2,308,256.55

3,028,544.85

720,288.30

0.00

2,308,256.55

3,028,544.85

720,288.30

0.00

2,308,256.55

3,028,544.85

720,288.30

Err:509

2,308,256.55

3,028,544.85

Err:509

0.00

2,308,256.55

3,028,544.85

720,288.30

0.00

2,308,256.55

3,028,544.85

720,288.30

0.00

2,308,256.55

3,028,544.85

720,288.30

0.00

2,308,256.55

3,028,544.85

720,288.30

10

Err:509

2,308,256.55

3,028,544.85

720,288.30

9%

VAC
VAB

Err:509
17,914,801.3

Tasadedescuento

ALTERNATIVA 2
EVALUACION ECONOMICA
ENMILESDENUEVOSSOLESAPRECIOSSOCIALES
(+40%DELAINVERSION)
AOS

COSTOS INCREMENTALES DE OPERACIN Y


MANTENIMIENTO

INVERSION

SIN PROYECTO

Costo Total

CON PROYECTO

Err:509

0.00

0.00

Err:509

0.00

2,308,256.55

4,381,720.75

2,073,464.21

0.00

2,308,256.55

4,381,720.75

2,073,464.21

0.00

2,308,256.55

4,381,720.75

2,073,464.21

0.00

2,308,256.55

4,381,720.75

2,073,464.21

Err:509

2,308,256.55

4,381,720.75

Err:509

0.00

2,308,256.55

4,381,720.75

2,073,464.21

0.00

2,308,256.55

4,381,720.75

2,073,464.21

0.00

2,308,256.55

4,381,720.75

2,073,464.21

0.00

2,308,256.55

4,381,720.75

2,073,464.21

10

Err:509

2,308,256.55

4,381,720.75

Err:509

9%

VAC
VAB

Err:509
17,914,801.3

Tasadedescuento

ALTERNATIVA 1
EVALUACION ECONOMICA
ENMILESDENUEVOSSOLESAPRECIOSSOCIALES
(-40%DELAINVERSION)
AOS

INVERSION

COSTOS INCREMENTALES
MANTENIM.

Costo Total

OPERACIN

Err:509

0.00

0.00

Err:509

0.00

2,308,256.55

3,028,544.85

720,288.30

0.00

2,308,256.55

3,028,544.85

720,288.30

0.00

2,308,256.55

3,028,544.85

720,288.30

0.00

2,308,256.55

3,028,544.85

720,288.30

Err:509

2,308,256.55

3,028,544.85

Err:509

0.00

2,308,256.55

3,028,544.85

720,288.30

0.00

2,308,256.55

3,028,544.85

720,288.30

0.00

2,308,256.55

3,028,544.85

720,288.30

0.00

2,308,256.55

3,028,544.85

720,288.30

10

Err:509

2,308,256.55

3,028,544.85

Err:509

9%

VAC
VAB

Err:509
17,914,801.3

Tasadedescuento

ALTERNATIVA 2
EVALUACION ECONOMICA
ENMILESDENUEVOSSOLESAPRECIOSSOCIALES
(-40%DELAINVERSION)
AOS

INVERSION

COSTOS
MANTENIM.

Costo Total
OPERACIN

Err:509

0.00

0.00

Err:509

0.00

2,308,256.55

4,381,720.75

2,073,464.21

0.00

2,308,256.55

4,381,720.75

2,073,464.21

0.00

2,308,256.55

4,381,720.75

2,073,464.21

0.00

2,308,256.55

4,381,720.75

2,073,464.21

Err:509

2,308,256.55

4,381,720.75

Err:509

0.00

2,308,256.55

4,381,720.75

2,073,464.21

0.00

2,308,256.55

4,381,720.75

2,073,464.21

0.00

2,308,256.55

4,381,720.75

2,073,464.21

0.00

2,308,256.55

4,381,720.75

2,073,464.21

10

Err:509

2,308,256.55

4,381,720.75

Err:509

9%

VAC
VAB

Err:509
17,914,801.3

Tasadedescuento

CIALES

FLUJO
BENEFICIOS INCR.

NETO

0.0

Err:509

1,390,457.8

670,169.54

1,625,112.3

904,823.95

1,900,355.7

1,180,067.42

2,223,119.7

1,502,831.41

2,601,596.2
3,045,443.3

2,325,155.04

3,566,034.8

2,845,746.52

4,176,757.8

3,456,469.46

4,893,366.7

4,173,078.42

5,734,402.8

5,014,114.52

VAN
TIR
B/C

Err:509
Err:509
Err:509

CIALES

FLUJO
BENEFICIOS INCR.

NETO

0.00

Err:509

1390457.85

-683,006.4

1625112.25

-448,352.0

1900355.73

-173,108.5

2223119.71

149,655.5

2601596.19

Err:509

3045443.34

971,979.1

3566034.83

1,492,570.6

4176757.76

2,103,293.6

4893366.72

2,819,902.5

5734402.83

VAN
TIR
B/C

Err:509

Err:509
Err:509
Err:509

CIALES
FLUJO
BENEFICIOS INCR.

NETO

0.0

Err:509

1,390,457.8

670,169.54

1,625,112.3

904,823.95

1,900,355.7

1,180,067.42

2,223,119.7

1,502,831.41

2,601,596.2

Err:509

3,045,443.3

2,325,155.04

3,566,034.8

2,845,746.52

4,176,757.8

3,456,469.46

4,893,366.7

4,173,078.42

5,734,402.8

Err:509

VAN
TIR
B/C

Err:509
Err:509
Err:509

CIALES
FLUJO
BENEFICIOS INCR.

NETO

0.00

Err:509

1390457.85

-683,006.36

1625112.25

-448,351.96

1900355.73

-173,108.48

2223119.71

149,655.50

2601596.19

Err:509

3045443.34

971,979.14

3566034.83

1,492,570.62

4176757.76

2,103,293.56

4893366.72

2,819,902.52

5734402.83

VAN
TIR
B/C

Err:509

Err:509
Err:509
Err:509

COSTO DE INVERSION ALTERNATIVA 1

Err:509

ESCENARIO 1: VARIACION DE LA INVERSION DE LA ALTERNATIVA 1


0.00

(+15% DE LA INVERSIN)
COSTO DE O&M

AO

COSTO DE INVERSION

SIN PROYECTO

CON PROYECTO

COSTO INCREMENTAL

FLUJO DE COSTOS

0.00

0.00

0.00

Err:509

2,308,256.55

3,028,544.85

720,288.30

720,288.30

2,308,256.55

3,028,544.85

720,288.30

720,288.30

2,308,256.55

3,028,544.85

720,288.30

720,288.30

2,308,256.55

3,028,544.85

720,288.30

720,288.30

2,308,256.55

3,028,544.85

720,288.30

720,288.30

2,308,256.55

3,028,544.85

720,288.30

720,288.30

2,308,256.55

3,028,544.85

720,288.30

720,288.30

2,308,256.55

3,028,544.85

720,288.30

720,288.30

2,308,256.55

3,028,544.85

720,288.30

720,288.30

10

2,308,256.55

3,028,544.85

720,288.30

720,288.30

Err:509

VAC (S/.)
IE (BENEF.)
ICE (S/.BENEF)

ESCENARIO 1: VARIACION DE LA INVERSION DE LA ALTERNATIVA 1


0.3

(+30% DE LA INVERSIN)
COSTO DE O&M

AO

COSTO DE INVERSION

SIN PROYECTO

CON PROYECTO

COSTO INCREMENTAL

FLUJO DE COSTOS

0.00

0.00

2,308,256.55

3,028,544.85

720,288.30

720,288.30

2,308,256.55

3,028,544.85

720,288.30

720,288.30

2,308,256.55

3,028,544.85

720,288.30

720,288.30

2,308,256.55

3,028,544.85

720,288.30

720,288.30

2,308,256.55

3,028,544.85

720,288.30

720,288.30

2,308,256.55

3,028,544.85

720,288.30

720,288.30

2,308,256.55

3,028,544.85

720,288.30

720,288.30

2,308,256.55

3,028,544.85

720,288.30

720,288.30

2,308,256.55

3,028,544.85

720,288.30

720,288.30

10

2,308,256.55

3,028,544.85

720,288.30

720,288.30

Err:509

Err:509

VAC (S/.)
IE (BENEF.)
ICE (S/.BENEF)

ESCENARIO 1: VARIACION DE LA INVERSION DE LA ALTERNATIVA 1


0

(+45% DE LA INVERSIN)
COSTO DE O&M

AO

COSTO DE INVERSION

SIN PROYECTO

CON PROYECTO

COSTO INCREMENTAL

FLUJO DE COSTOS

0.00

0.00

2,308,256.55

3,028,544.85

720,288.30

720,288.30

2,308,256.55

3,028,544.85

720,288.30

720,288.30

2,308,256.55

3,028,544.85

720,288.30

720,288.30

2,308,256.55

3,028,544.85

720,288.30

720,288.30

2,308,256.55

3,028,544.85

720,288.30

720,288.30

2,308,256.55

3,028,544.85

720,288.30

720,288.30

2,308,256.55

3,028,544.85

720,288.30

720,288.30

2,308,256.55

3,028,544.85

720,288.30

720,288.30

2,308,256.55

3,028,544.85

720,288.30

720,288.30

10

2,308,256.55

3,028,544.85

720,288.30

720,288.30

Err:509

Err:509

VAC (S/.)
IE (BENEF.)
ICE (S/.BENEF)

ESCENARIO 1: VARIACION DE LA INVERSION DE LA ALTERNATIVA 1


0
POBLACION
BENEFICIARIA

(-15% DE LA INVERSIN)
COSTO DE MANTENIMIENTO

AO

90913

90913

COSTO DE INVERSION

SIN PROYECTO

CON PROYECTO

COSTO INCREMENTAL

0.00

0.00

2,308,256.55

3,028,544.85

720,288.30

90913

2,308,256.55

3,028,544.85

720,288.30

90913

Err:509

2,308,256.55

3,028,544.85

720,288.30

90913

2,308,256.55

3,028,544.85

720,288.30

90913

2,308,256.55

3,028,544.85

720,288.30

90913

2,308,256.55

3,028,544.85

720,288.30

90913

2,308,256.55

3,028,544.85

720,288.30

90913

2,308,256.55

3,028,544.85

720,288.30

90913

2,308,256.55

3,028,544.85

720,288.30

90913

10

2,308,256.55

3,028,544.85

720,288.30

Err:509
90,913
Err:509

ESCENARIO 1: VARIACION DE LA INVERSION DE LA ALTERNATIVA 1


0
POBLACION
BENEFICIARIA

(-30% DE LA INVERSIN)
COSTO DE MANTENIMIENTO

AO

90913

90913

COSTO DE INVERSION

SIN PROYECTO

CON PROYECTO

COSTO INCREMENTAL

0.00

0.00

2,308,256.55

3,028,544.85

720,288.30

90913

2,308,256.55

3,028,544.85

720,288.30

90913

Err:509

2,308,256.55

3,028,544.85

720,288.30

90913

2,308,256.55

3,028,544.85

720,288.30

90913

2,308,256.55

3,028,544.85

720,288.30

90913

2,308,256.55

3,028,544.85

720,288.30

90913

2,308,256.55

3,028,544.85

720,288.30

90913

2,308,256.55

3,028,544.85

720,288.30

90913

2,308,256.55

3,028,544.85

720,288.30

90913

10

2,308,256.55

3,028,544.85

720,288.30

Err:509
90,913
Err:509

ESCENARIO 1: VARIACION DE LA INVERSION DE LA ALTERNATIVA 1


0
POBLACION
BENEFICIARIA

(-45% DE LA INVERSIN)
COSTO DE MANTENIMIENTO

AO

COSTO DE INVERSION

SIN PROYECTO

CON PROYECTO

COSTO INCREMENTAL

90913

0.00

0.00

2,308,256.55

3,028,544.85

720,288.30

90913

2,308,256.55

3,028,544.85

720,288.30

90913

2,308,256.55

3,028,544.85

720,288.30

90913

90913

Err:509

2,308,256.55

3,028,544.85

720,288.30

90913

2,308,256.55

3,028,544.85

720,288.30

90913

2,308,256.55

3,028,544.85

720,288.30

90913

2,308,256.55

3,028,544.85

720,288.30

90913

2,308,256.55

3,028,544.85

720,288.30

90913

2,308,256.55

3,028,544.85

720,288.30

90913

10

2,308,256.55

3,028,544.85

720,288.30

Err:509
90,913
Err:509

LA ALTERNATIVA 1

FLUJO DE COSTOS

POBLACION
BENEFICIARIA

Err:509

90913

720,288.30

90913

720,288.30

90913

720,288.30

90913

720,288.30

90913

720,288.30

90913

720,288.30

90913

720,288.30

90913

720,288.30

90913

720,288.30

90913

720,288.30

90913

VAC (S/.)

Err:509

IE

90,913

ICE

Err:509

LA ALTERNATIVA 1

FLUJO DE COSTOS

POBLACION
BENEFICIARIA

Err:509

90913

720,288.30

90913

720,288.30

90913

720,288.30

90913

720,288.30

90913

720,288.30

90913

720,288.30

90913

720,288.30

90913

720,288.30

90913

720,288.30

90913

720,288.30

90913

VAC (S/.)

Err:509

IE

90,913

ICE

Err:509

LA ALTERNATIVA 1

FLUJO DE COSTOS

POBLACION
BENEFICIARIA

Err:509

90913

720,288.30

90913

720,288.30

90913

720,288.30

90913

720,288.30

90913

720,288.30

90913

720,288.30

90913

720,288.30

90913

720,288.30

90913

720,288.30

90913

720,288.30

90913

VAC (S/.)

Err:509

IE

90,913

ICE

Err:509

COSTO DE INVERSION ALTERNATIVA 2

Err:509

ESCENARIO 2: VARIACION DE LA INVERSION DE LA ALTERNATIVA 2


0

(+15% DE LA INVERSIN)
COSTO DE O&M

AO

COSTO DE INVERSION

SIN PROYECTO

CON PROYECTO

COSTO INCREMENTAL

FLUJO DE COSTOS

0.00

0.00

0.00

Err:509

2,308,256.55

4,381,720.75

2,073,464.21

2,073,464.21

2,308,256.55

4,381,720.75

2,073,464.21

2,073,464.21

2,308,256.55

4,381,720.75

2,073,464.21

2,073,464.21

2,308,256.55

4,381,720.75

2,073,464.21

2,073,464.21

2,308,256.55

4,381,720.75

2,073,464.21

2,073,464.21

2,308,256.55

4,381,720.75

2,073,464.21

2,073,464.21

2,308,256.55

4,381,720.75

2,073,464.21

2,073,464.21

2,308,256.55

4,381,720.75

2,073,464.21

2,073,464.21

2,308,256.55

4,381,720.75

2,073,464.21

2,073,464.21

10

2,308,256.55

4,381,720.75

2,073,464.21

2,073,464.21

Err:509

VAC (S/.)
IE (BENEF.)
ICE (S/.BENEF)

ESCENARIO 2: VARIACION DE LA INVERSION DE LA ALTERNATIVA 2


0

(+30% DE LA INVERSIN)
COSTO DE O&M

AO

COSTO DE INVERSION

SIN PROYECTO

CON PROYECTO

COSTO INCREMENTAL

FLUJO DE COSTOS

0.00

0.00

2,308,256.55

4,381,720.75

2,073,464.21

2,073,464.21

2,308,256.55

4,381,720.75

2,073,464.21

2,073,464.21

2,308,256.55

4,381,720.75

2,073,464.21

2,073,464.21

2,308,256.55

4,381,720.75

2,073,464.21

2,073,464.21

2,308,256.55

4,381,720.75

2,073,464.21

2,073,464.21

2,308,256.55

4,381,720.75

2,073,464.21

2,073,464.21

2,308,256.55

4,381,720.75

2,073,464.21

2,073,464.21

2,308,256.55

4,381,720.75

2,073,464.21

2,073,464.21

2,308,256.55

4,381,720.75

2,073,464.21

2,073,464.21

10

2,308,256.55

4,381,720.75

2,073,464.21

Err:509

Err:509

2,073,464.21
VAC (S/.)
IE (BENEF.)
ICE (S/.BENEF)

ESCENARIO 2: VARIACION DE LA INVERSION DE LA ALTERNATIVA 2


0

(+45% DE LA INVERSIN)
COSTO DE O&M

AO

COSTO DE INVERSION

SIN PROYECTO

CON PROYECTO

COSTO INCREMENTAL

FLUJO DE COSTOS

0.00

0.00

2,308,256.55

4,381,720.75

2,073,464.21

2,073,464.21

2,308,256.55

4,381,720.75

2,073,464.21

2,073,464.21

2,308,256.55

4,381,720.75

2,073,464.21

2,073,464.21

2,308,256.55

4,381,720.75

2,073,464.21

2,073,464.21

2,308,256.55

4,381,720.75

2,073,464.21

2,073,464.21

2,308,256.55

4,381,720.75

2,073,464.21

2,073,464.21

2,308,256.55

4,381,720.75

2,073,464.21

2,073,464.21

2,308,256.55

4,381,720.75

2,073,464.21

2,073,464.21

2,308,256.55

4,381,720.75

2,073,464.21

2,073,464.21

10

2,308,256.55

4,381,720.75

2,073,464.21

2,073,464.21

Err:509

Err:509

VAC (S/.)
IE (BENEF.)
ICE (S/.BENEF)

ESCENARIO 2: VARIACION DE LA INVERSION DE LA ALTERNATIVA 2


0
POBLACION
BENEFICIARIA

(-15% DE LA INVERSIN)
COSTO DE MANTENIMIENTO

AO

90913

90913

COSTO DE INVERSION

SIN PROYECTO

CON PROYECTO

COSTO INCREMENTAL

0.00

0.00

2,308,256.55

4,381,720.75

2,073,464.21

90913

2,308,256.55

4,381,720.75

2,073,464.21

90913

Err:509

2,308,256.55

4,381,720.75

2,073,464.21

90913

2,308,256.55

4,381,720.75

2,073,464.21

90913

2,308,256.55

4,381,720.75

2,073,464.21

90913

2,308,256.55

4,381,720.75

2,073,464.21

90913

2,308,256.55

4,381,720.75

2,073,464.21

90913

2,308,256.55

4,381,720.75

2,073,464.21

90913

2,308,256.55

4,381,720.75

2,073,464.21

90913

10

2,308,256.55

4,381,720.75

2,073,464.21

Err:509
90,913
Err:509

ESCENARIO 2: VARIACION DE LA INVERSION DE LA ALTERNATIVA 2


0
POBLACION
BENEFICIARIA

(-30% DE LA INVERSIN)
COSTO DE MANTENIMIENTO

AO

90913

90913
90913

COSTO DE INVERSION

SIN PROYECTO

CON PROYECTO

COSTO INCREMENTAL

0.00

0.00

2,308,256.55

4,381,720.75

2,073,464.21

Err:509

2,308,256.55

4,381,720.75

2,073,464.21

90913

2,308,256.55

4,381,720.75

2,073,464.21

90913

2,308,256.55

4,381,720.75

2,073,464.21

90913

2,308,256.55

4,381,720.75

2,073,464.21

90913

2,308,256.55

4,381,720.75

2,073,464.21

90913

2,308,256.55

4,381,720.75

2,073,464.21

90913

2,308,256.55

4,381,720.75

2,073,464.21

90913

2,308,256.55

4,381,720.75

2,073,464.21

90913

10

2,308,256.55

4,381,720.75

2,073,464.21

Err:509
90,913
Err:509

ESCENARIO 2: VARIACION DE LA INVERSION DE LA ALTERNATIVA 2


0
POBLACION
BENEFICIARIA

(-45% DE LA INVERSIN)
COSTO DE MANTENIMIENTO

AO

COSTO DE INVERSION

SIN PROYECTO

CON PROYECTO

COSTO INCREMENTAL

90913

0.00

0.00

2,308,256.55

4,381,720.75

2,073,464.21

90913

2,308,256.55

4,381,720.75

2,073,464.21

90913

2,308,256.55

4,381,720.75

2,073,464.21

90913

90913

Err:509

2,308,256.55

4,381,720.75

2,073,464.21

90913

2,308,256.55

4,381,720.75

2,073,464.21

90913

2,308,256.55

4,381,720.75

2,073,464.21

90913

2,308,256.55

4,381,720.75

2,073,464.21

90913

2,308,256.55

4,381,720.75

2,073,464.21

90913

2,308,256.55

4,381,720.75

2,073,464.21

90913

10

2,308,256.55

4,381,720.75

2,073,464.21

Err:509
90,913
Err:509

LA ALTERNATIVA 2

FLUJO DE COSTOS

POBLACION
BENEFICIARIA

Err:509

90913

2,073,464.21

90913

2,073,464.21

90913

2,073,464.21

90913

2,073,464.21

90913

2,073,464.21

90913

2,073,464.21

90913

2,073,464.21

90913

2,073,464.21

90913

2,073,464.21

90913

2,073,464.21

90913

VAC (S/.)

Err:509

IE

90,913

ICE

Err:509

LA ALTERNATIVA 2

FLUJO DE COSTOS

POBLACION
BENEFICIARIA

Err:509

90913

2,073,464.21

90913

2,073,464.21

90913

2,073,464.21

90913

2,073,464.21

90913

2,073,464.21

90913

2,073,464.21

90913

2,073,464.21

90913

2,073,464.21

90913

2,073,464.21

90913

2,073,464.21

90913

VAC (S/.)

Err:509

IE

90,913

ICE

Err:509

LA ALTERNATIVA 2

FLUJO DE COSTOS

POBLACION
BENEFICIARIA

Err:509

90913

2,073,464.21

90913

2,073,464.21

90913

2,073,464.21

90913

2,073,464.21

90913

2,073,464.21

90913

2,073,464.21

90913

2,073,464.21

90913

2,073,464.21

90913

2,073,464.21

90913

2,073,464.21

90913

VAC (S/.)

Err:509

IE

90,913

ICE

Err:509

COMPONENTE N 01: INFRAEST

Item

Descripcin

01

ESTRUCTURAS

Und.

01.01

ESTRUCTURAS

01.01.01

OBRASPROVISIONALES

01.01.01.01

ALMACEN,YCASETADEGUARDIANIA

m2

01.01.01.05

CARTELDEOBRADEMADERA3.60x2.40

und

01.01.03

TRABAJOSPRELIMINARES

01.01.03.01

MOVILIZACIONYDESMOVILIZACIONDEEQUIPOYHERRAMIENTAS

GLB

01.01.03.02

TRAZO,NIVELESYREPLANTEO

m2

01.01.04

MOVIMIENTODETIERRAS

01.01.04.02

RELLENOCOMPACTADOCONAFIRMADO

m3

01.01.04.03

MEJORAMIENTOCONMATERIALDEPRESTAMO(OVER)

m3

01.01.04.04

REFINE,NIVELACIONYAPISONADO

m2

01.01.04.05

ELIMINACIONDEMATERIALEXCEDENTECONVOLQ/CARGUIOCONM m3

01.01.05

OBRASDECONCRETOSIMPLE

01.01.05.01

SOLADOE=10CMMEZCLA1:10PARAPLATEADECIMENTACION

m2

01.01.05.02

FALSOPISO1:8C:He=4"PARAPISOSINTERIORES

m2

01.01.06

OBRASDECONCRETOARMADO

01.01.06.04

COLUMNAS

01.01.06.04.01

COLUMNAS-CONCRETOF'C=210KG/CM2

m3

01.01.06.04.02

COLUMNAS-ENCOFRADOYDESENCOFRADO

m2

01.01.06.04.03

ACEROCORRUGADOFY=4200KG/CM2GRADO60

kg

01.01.06.06

VIGAS

01.01.06.06.01

VIGAS-CONCRETOF'C=210KG/CM2

m3

01.01.06.06.02

VIGAS-ENCOFRADOYDESENCOFRADO

m2

01.01.06.06.03

ACEROCORRUGADOFY=4200KG/CM2GRADO60

kg

01.01.06.07

LOSAALIGERADA

01.01.06.07.01

LOSAALIGERADA-CONCRETOF'C=210KG/CM2

m3

01.01.06.07.02

LOSASALIGERADA-ENCOFRADOYDESENCOFRADO

m2

01.01.06.07.03

ACEROCORRUGADOFY=4200KG/CM2GRADO60

kg

01.01.06.07.04

LADRILLOHUECO20X30X30CMPARATECHOALIGERADO

und

02

ARQUITECTURA

02.01

MUROSYTABIQUESDEALBAILERIA

02.01.01

MURODELADRILLOKKDEARCILLADECABEZAC/M1:5JUNTAAPROX.1. m2

02.01.04

JUNTADEDILATACIONENMUROSe=1"

02.02

REVOQUESENLUCIDOSYMOLDURAS

02.02.02

TARRAJEODEMUROS(INTERIORYEXTERIOR),MEZCLAC:A1:5

m2

02.02.03

TARRAJEODECOLUMNASMEZCLAC:A:1:5

m2

02.02.05

TARRAJEODEVIGASMEZCLAC:A1:5

m2

02.03

CIELORASOS

02.03.01

CIELORRASOSCONMEZCLAC:A1:5

m2

02.06

CUBIERTAS

02.06.01

CUMBRERACONTEJAANDINA

02.06.02

COBERTURACONTEJAANDINA

m2

02.07

CARPINTERIADEMADERA

02.07.01

PUERTASDEMADERACEDROTABLERO

Gbl

02.07.02

PUERTACONTRAPLACADACONMARCOYBAST.DEMAD.DECEDRO

GLB

02.09

CERRAJERIA

02.09.01

CERRADURAPARAPUERTA

pza

02.09.02

CERROJOPUERTASSSHH

und

02.09.04

BISAGRACAPUCHINADE3"X3"

pza

02.10

VIDRIOS,CRISTALESYSIMILARES

02.10.01

CRISTALTEMPLADODE6MM

02.11

PINTURA

02.11.01

PINTURALATEX2MANOSENENCIELORASOYVIGAS

04

INSTALACIONESELECTRICAS

04.01

CONEXIONAREDEXTERNAYMEDIDOR

04.01.01

CONEXIONAREDEXTERNAYMEDIDOR

04.02

SALIDASPARAELECTRICIDAD

04.02.01

SALIDAPARALUMINARIAFLUORESCENTE2X36W.

pto

04.02.04

SALIDADETOMACORRIENTEDOBLECONPUESTAATIERRA

pto

04.02.08

SALIDAPARAINTERRUPTORDOBLE

pto

04.02.09

SALIDAPARAINTERRUPTORSIMPLE

pto

04.02.11

TUBERIAPVCSAP(ELECTRICAS)35MM

04.02.13

CABLEELECTRICONH-802.5MM2.

04.07

POZOATIERRA

04.07.01

POZOATIERRA

04.08

TABLEROS

04.08.01

TABLEROGENERALCAJAMETALICATG-N

und

04.08.02

TABLERODISTRIBUCIONESTABILIZADOTG-EN

und

04.09

ARTEFACTODEALUMBRADO

04.09.01

ARTEFACTOCONFLUORESCENTEDE4x36W

und

04.09.04

ARTEFACTOFLUORESCENTE1x70W(COLGADOALTECHO)

und

04.10

CAJASDEPASO

04.10.01

CAJADEPASECUADRADAF.GALV.100X100X50MM.INC.TAPA

01

IMPACTOAMBIENTAL

01.01

MITIGACIONDEIMPACTOAMBIENTAL

01.01.01

PLANESDEMANEJOAMBIENTAL

GLB

01.01.02

MEDIDASDEPREVENCINYMITIGACIN

GLB

COSTODIRECTO
SUBTOTAL
PRESUPUESTOTOTAL

m2

m2

GLB

und

und

COMPONENTE N 02: EQUIPAMIENTO

Item

Descripcin

Und.

0 01

MOBILIARIO,EQUIPAMIENTO

0 01.01

MOBILIARIOYEQUIPAMIENTO

0 01.01.01

MOBILIARIO,OTROS

GLB

0 01.01.02

COMPUTADORA,OTROS

GLB

COSTODIRECTO
SUBTOTAL
PRESUPUESTOTOTAL

CUADRO 40

RESUMEN DE PRESUPUESTO GLOBAL - ALTERNAT


ITEM

DESCRIPCION POR COMPONENTES

COMPONENTE 1: INFRAESTRUCTURA

ESTRUCTURAS
01.02.00
ARQUITECTURA
01.04.00
INST. ELECTRICAS
01.05.00
IMPACTO AMBIENTAL
COSTO DIRECTO COMPONENTE 1
GASTOS GENERALES
UTILIDAD
IGV
EXPEDIENTE TECNICO
01.01.00

II
02.01.00

COMPONENTE 2: ADQUISICIN DE MOBILIARIO Y EQUIPAMIENTO


MOBILIARIO Y EQUIPAMIENTO
COSTO DIRECTO COMPONENTE 2
IGV

VALOR REFERENCIAL
GESTION DEL PROYECTO
SUPERVISION Y LIQUIDACION DE OBRA

PRESUPUESTO TOTAL

NOTA01:

ELCOSTOTOTALDELASUPERVISIONESTACOMPUESTOPORELDESAGREGADOS

DESAGREGADO DEL COSTO DE S

ITEM
1.00
2.00

DESCRIPCION

UNIDAD
GLB
GLB

EVALUACIONDELEXPEDIENTETECNICODEOBRA
SUPERVISIONDEOBRA

TOTAL
NOTA02:

ELCOSTOTOTALDELAGESTIONDELPROYECTOESTACOMPUESTOPORELDESAG

DESAGREGADO DE COSTO DE GESTION


ITEM
1.00
2.00
3.00

DESCRIPCION

UNIDAD

COORDINADORDEGESTIONDEPROYECTO(GESTIONA04
PROYECTOSENPARALELOCONUNSUELDODE6,000.00SOLES
MENSUALES)

mes
mes
u

IMPRESIONESYUTILESDEESCRITORIO
ADQUISICIONDEEQUIPODECOMPUTO

SUB TOTAL

1: INFRAESTRUCTURA
Metrado

Precio (S/.)

Parcial (S/.)
321,121.36
321,121.36
2,961.31

20.00

68.31

1,366.20

1.00

1,595.11

1,595.11
14,682.87

1.00

13,688.00

343.06

2.90

13,688.00
994.87
167,558.85

299.64

82.03

24,579.47

504.51

43.03

21,709.07

1,009.01

1.79

1,806.13

4,971.46

24.03

119,464.18
72,453.74

1,009.01

35.02

35,335.53

966.62

38.40

37,118.21
63,464.6
20,432.17

12.36

455.82

5,633.94

125.34

52.78

6,615.45

2,125.40

3.85

8,182.79
16,737.96

10.89

344.66

3,753.35

98.60

58.86

5,803.60

1,865.20

3.85

7,181.02
26,294.46

15.60

328.51

5,124.76

189.60

27.54

5,221.58

1,125.70

3.85

4,333.95

3,456.60

3.36

11,614.18
46,545.97
7,248.11

87.25

82.57

7,204.23

15.67

2.80

43.88
2,357.47

87.25

17.43

1,520.77

17.23

26.32

453.49

12.45

30.78

383.21
4,793.40

159.78

30.00

4,793.40

15,128.30
35.58

22.52

801.26

245.20

58.43

14,327.04
788.90

1.00

599.00

599.00

1.00

189.90

189.90
6,578.67

57.00

89.90

5,124.30

4.00

10.05

40.20

171.00

8.27

1,414.17
8,123.63

22.50

361.05

159.78

9.56

8,123.63
1,527.50
1,527.50
53,624.40
2,121.64

1.00

2,121.64

2,121.64
31,524.14

16.00

85.33

1,365.28

248.00

93.42

23,168.16

18.00

41.24

742.32

86.00

35.51

3,053.86

25.00

8.75

218.75

1,234.76

2.41

2,975.77

3.00

1,054.39

3,163.17
3,163.17
9,585.30
1.00

6,561.02

6,561.02

1.00

3,024.28

3,024.28
7,178.51

15.00

466.17

6,992.55

1.00

185.96

185.96

2.00

25.82

51.64
51.64
14,568.41
14,568.41
1.00

10,970.77

10,970.77

1.00

3,597.64

3,597.64

435,860.14
435,860.14

435,860.14

QUIPAMIENTO Y MOBILIARIO
Metrado

Precio (S/.)

Parcial (S/.)
18,946.23
18,946.23

1.00

11,960.23

11,960.23

7.00

998.00

6,986.00

18,946.23
18,946.23

18,946.23

OBAL - ALTERNATIVA 1
COSTO PARCIAL

COSTO TOTAL

595,833.90

0.7367532155
0.1067910672
0.1230312114
0.0334245059

321,121.36
46,545.97
53,624.40
14,568.41

435,860.14
42,932.22
26,151.61
90,889.92
161,084.17

9.85%
6.00%
18.00%

22,356.55
18,946.23
18.00%

18,946.23
3,410.32

618,190.45
11,500.00
370,969.35

1,000,659.80

RELDESAGREGADOSIGUIENTE

O DEL COSTO DE SUPERVISION


CANTIDAD
1
1

COSTO
56,379.46
314,589.89

PARCIAL
56,379.46
314,589.89
370969.35

PUESTOPORELDESAGREGADOSIGUIENTE

COSTO DE GESTION DEL PROYECTO


CANTIDAD

COSTO

PARCIAL

1,500.00

6,000.00

4
1

500.00
3,500.00

2,000.00
3,500.00
11,500.00

175

COMPONENTE N 01: ADECUACION DE LOC

ITEM

DESCRIPCION

01.00.00

ADECUACIONDELOCALALQUILADO

01.01.00

MUROSYTABIQUESDEALBAILERIA

01.01.01

TABIQUEDEDRYWALL2CARASINTERIOR

01.01.02

DIVISIONESENSSHHCONMELAMINE

01.01.03

DERRAMESCONDRYWALLENVANOSDEPUERTASYVENTANAS

01.02.00

CIELORASOS

01.02.01

FALSOCIELOCONBALDOSASTIPOSERENEOSIMILAR

01.03.00

PISOSYPAVIMENTOS

01.03.01

PISODECERMICODE40X40cm

01.03.02

PISODECERAMICOPORCELANATO0.60X0.60M

01.04.00

CARPINTERIADEMADERA

01.04.01

PUERTASDEMADERACEDROTABLERO

01.04.02

PUERTACONTRAPLACADACONMARCOYBAST.DEMAD.DECEDRO

01.05.00

CARPINTERIAMETALICA

01.05.01

VENTANACONPERFILESDEALUMINIOINCLUYEACCESORIOS

01.06.00

CERRAJERIA

01.06.01

CERRADURAPARAPUERTA

01.06.02

CERROJOPUERTASSSHH

01.06.03

MANIJADEBRONCE4"

01.06.04

BISAGRACAPUCHINADE3"X3"

01.06.05

BISAGRACAPUCHINADE4"X4"

01.06.06

JALADORDEACEROINOX.

01.07.00

VIDRIOS,CRISTALESYSIMILARES

01.07.01

CRISTALTEMPLADODE6MM

01.07.02

MUROSDIVISORIOSDEVIDRIO-MAMPARASCRISTALTEMPLADO6MM

01.07.03

ESPEJOBISELADO

01.08.00

PINTURA

01.08.01

PINTURALATEX2MANOSENENCIELORASOYVIGAS

01.08.02

PINTURALATEX2MANOSENMUROSYCOLUMNAS

01.08.03

PINTURALATEX2MANOSENMUROSEXTERIORES

01.09.00

SALIDASPARAELECTRICIDAD

01.09.01

SALIDADETOMACORRIENTEDOBLECONPUESTAATIERRA

01.09.02

SALIDAPARAINTERRUPTORSIMPLE

01.09.03

TUBERIAPVCSAP(ELECTRICAS)20MM

01.09.04

CABLEELECTRICONH-802.5MM2.

01.09.05

CABLEELECTRICONH-804.0MM2.

01.10.00

SALIDASPARACOMUNICACIONESYSEALES

01.10.01

SALIDAPARAREDDATA(SOLOCANALETA)

01.10.02

SALIDAPARAREDDATA2(SOLOCANALETA)

01.10.03

SALIDAPARAVOZYDATA

01.10.04

TUBERIAPVCSAP11/4

01.10.05

CABLECATEGORIA6A

01.10.06

SALIDAPARATV

01.10.07

CABLECOAXIAL

01.10.08

SALIDAPARACAMARADECCTV(SOLOENTUBADO)

01.10.09

CENTRALDECAMARADECCTV(SOLOENTUBADO)

01.11.00

SALIDASESPECIALES

01.11.01

SALIDAPARADETECTORDEHUMO

01.11.02

SALIDAPARACENTRALDEDETECTORDEHUMO

01.11.03

SALIDAPARAPULSADORMANUAL

01.11.04

SALIDAPARASIRENA

01.12.00

BANDEJAS

01.12.01

BANDEJAMETALICAPARACOMUNICACIONES

01.12.02

BANDEJAMETALICAPARAALIMENTADORES

01.13.00

AIREACONDICIONADO

01.13.01

SALIDAPARAAIREACONDICIONADO

01.14.00

ARTEFACTODEALUMBRADO

01.14.01

ARTEFACTOCONFLUORESCENTEDE2x18W

01.14.02

LUMINARIADEEMERGENCIA

01.15.00

SISTEMADECABLEADOESTRUCTURADOCATEGORIA6A

01.15.01

SALIDAPARAENERIAYDATAENPISO

01.15.02

SALIDAPARADATAENPARED

COSTO DIRECTO

COMPONENTE N 02: MOBILIARIO Y EQU

ITEM

DESCRIPCION

01

MOBILIARIO,EQUIPAMIENTO

01.01

MOBILIARIOYEQUIPAMIENTO

01.01.01

MOBILIARIO,OTROS

01.01.02

COMPUTADORA,OTROS

01.01.03

GABINETEDECOMUNICACIONES38RU

01.01.04

GABINETEDECOMUNICACIONESDEPARED15RU

01.01.05

SOFTWAREYLICENCIA

01.01.06

SUMINISTROEINSTALACIONDEAIREACONDICIONADOTIPOSPLITDECORATIVO1200

01.01.07

SUMINISTROEINSTALACIONDEAIREACONDICIONADOTIPOSPLITDEPRECISION120

01.01.08

CENTRALYSALIDAPARATELEFONIA

01.01.09

CENTRALYSALIDADECAMARADECCTV

COSTO DIRECTO

COMPONENTE N 03: CAPACITACION, ADECUACIN D

ITEM

DESCRIPCION

01

CAPACITACION, ADECUACIN DEL TUPA, MOF Y MAPRO

01.01

RECURSOSHUMANOS

01.01.01

CAPACITADORES

01.01.02

ACTUALIZACIONYADECUACINDELTUPA

01.01.03

ELABORACINDEMAPRO

01.01.04

ACTUALIZACIONYADECUACINDELMOF

01.02

RECURSOSMATERIALES

01.03

RECURSOSADMINISTRATIVOSYLOGSTICOS

COSTO DIRECTO

CUADRO 41

RESUMEN DE PRESUPUESTO GLOBAL - ALTER


ITEM

I
01.01.00

DESCRIPCION POR COMPONENTES

COMPONENTE 1: ADECUACION DE LOCAL ALQUILADO


ADECUACION DE LOCAL ALQUILADO
COSTO DIRECTO COMPONENTE 1
GASTOS GENERALES
UTILIDAD
IGV
EXPEDIENTE TECNICO

II
02.01.00

III
03.01.00
03.02.00
03.03.00
03.04.00

COMPONENTE 2: ADQUISICIN DE MOBILIARIO Y EQUIPAMIENTO


MOBILIARIO Y EQUIPAMIENTO
COSTO DIRECTO COMPONENTE 2
IGV
COMPONENTE 3: CAPACITACIN, ADECUACIN DEL TUPA, MOF Y
ELABORACIN DEL MAPRO
CAPACITACIN AL PERSONAL DE LA UGEL CAJAMARCA
Err:509
Err:509
Err:509
COSTO DIRECTO COMPONENTE 3
IGV
VALOR REFERENCIAL
GESTION DEL PROYECTO

SUPERVISION Y LIQUIDACION DE OBRA


PRESUPUESTO TOTAL

NOTA01:

ELCOSTOTOTALDELASUPERVISIONESTACOMPUESTOPORELDESAGREGADOS

DESAGREGADO DEL COSTO DE SUPERVISION

ITEM
1.00
2.00

DESCRIPCION
EVALUACIONDELEXPEDIENTETECNICODEOBRA
SUPERVISIONDEOBRA

TOTAL

NOTA02:

ELCOSTOTOTALDELAGESTIONDELPROYECTOESTACOMPUESTOPORELDESAG

DESAGREGADO DE COSTO DE GESTION DEL PROYECTO


ITEM
1.00

DESCRIPCION
COORDINADORDEGESTIONDEPROYECTO(GESTIONA04PROYECTOSEN
PARALELOCONUNSUELDODE6,000.00SOLESMENSUALES)

2.00
3.00

IMPRESIONESYUTILESDEESCRITORIO

4.00

ALQUILERDECAMIONETA/INCLUYECOMBUSTIBLEYCHOFER(02DIAS/MES)

SUB TOTAL

ADQUISICIONDEEQUIPODECOMPUTO

1: ADECUACION DE LOCAL ALQUILADO

UND

PRECIO
(S/.)

METRADO

PARCIAL (S/.)
288,439.98
10,388.36

m2

105.15

72.96

7,671.38

m2

10.69

182.85

1,953.75

30.83

24.76

763.23
19,633.31

m2

386.10

50.85

19,633.31
62,428.98

m2

38.06

79.93

3,041.74

m2

440.85

134.71

59,387.24
17,801.67

Gbl

1.00

14,082.71

GLB

1.00

3,718.96

14,082.71
3,718.96
15,450.28

m2

32.51

475.32

15,450.28
6,826.76

pza

12.00

173.49

2,081.88

und

10.00

10.05

100.50

und

12.00

13.26

159.12

pza

30.00

8.27

248.10

pza

48.00

11.47

550.56

pza

10.00

368.66

3,686.60
81,065.34

m2

36.84

361.05

13,301.08

m2

102.25

657.75

67,254.94

m2

4.76

107.00

509.32
18,289.97

m2

913.06

9.56

8,728.85

m2

870.97

9.56

8,326.45

m2

124.09

9.95

1,234.67
18,544.46

pto

62.00

93.42

5,792.04

pto

22.00

35.51

781.22

866.06

6.41

5,551.46

1,667.84

2.41

4,019.48

792.17

3.03

2,400.26

pto

20.00

78.67

1,573.40

pto

5.00

78.15

390.75

pto

5.00

86.78

433.90

94.78

20.70

1,961.89

10,941.81

801.28

5.88

4,711.54

pto

6.00

145.13

870.78

120.00

1.07

128.40

pto

5.00

121.83

609.15

pto

3.00

87.33

261.99
8,378.00

pto

20.00

198.61

3,972.20

pto

6.00

372.28

2,233.68

pto

6.00

204.28

1,225.68

pto

6.00

157.74

946.44
4,260.18

23.25

101.76

2,365.92

18.62

101.76

1,894.26
566.60

pto

2.00

283.30

566.60
4,955.90

und

20.00

138.69

2,773.80

und

10.00

218.21

2,182.10
8,908.36

pto

16.00

494.46

7,911.36

pto

25.00

39.88

997.00

288,439.98

02: MOBILIARIO Y EQUIPAMIENTO

UND

PRECIO
(S/.)

METRADO

PARCIAL (S/.)
1,343,342.67
1,343,342.67

GLB

1.00

313,435.03

313,435.03

GLB

1.00

558,110.18

558,110.18

GLB

3.00

50,219.48

150,658.44

GLB

2.00

33,532.96

67,065.92

GLB

1.00

113,743.00

113,743.00

und

1.00

3,529.37

3,529.37

und

1.00

19,298.08

19,298.08

GLB

1.00

79,318.49

79,318.49

pto

1.00

38,184.16

38,184.16

1,343,342.67

TACION, ADECUACIN DEL TUPA, MOF Y MAPRO

UND

METRADO

PRECIO
(S/.)

PARCIAL (S/.)

178,237.17
GLB

1.00

136,000.00

136,000.00

GLB

1.00

99,600.00

99,600.00

GLB

1.00

20,000.00

20,000.00

GLB

1.00

11,400.00

11,400.00

GLB

1.00

5,000.00

5,000.00

GLB

1.00

20,301.00

20,301.00

GLB

1.00

21,936.17

21,936.17

178,237.17

STO GLOBAL - ALTERNATIVA 2


COSTO PARCIAL

(S /.)

COSTO
TOTAL

(S /.)

402,959.30
288,439.98
288,439.98
9.85%

28,411.34

6.00%

17,306.40

18.00%

60,148.39

3.00%

8,653.20

IENTO

22,356.55
18,946.23
18,946.23
3,410.32

18.00%

MOF Y

Err:509
Err:509
Err:509
Err:509
Err:509
18.00%

Err:509
Err:509
Err:509
8,700.00

3,028.62
Err:509

ORELDESAGREGADOSIGUIENTE
UNIDAD

CANTIDAD

GLB
GLB

1
1

COSTO

PARCIAL
3,028.62
Err:509

TOTAL

3,028.62
3028.62

MPUESTOPORELDESAGREGADOSIGUIENTE
UNIDAD

CANTIDAD

COSTO

PARCIAL

mes

1,500.00

3,000.00

mes
u

2
1

500.00
3,500.00

1,000.00
3,500.00

dia

300.00

1,200.00
8,700.00

ALQUILER DE LOCAL EN CONDICIONE


I TEM

DES CRI PCI ON POR COMPONENTES

ALQUILERLOCALAV.EVITAMIENTOSURN553-
OFICINASADMINISTRATIVAS

II

AVREYNAFARGE-ALMACEN

III

ALQUILERAUDITORIUM

TOTAL

NOTA:Ambientesnoadecuados(vivienda),sinlasmedidasdeseguri

ALQUILER DE LOCAL EN CONDIC


I TEM
I

DES CRI PCI ON POR COMPONENTES


ALQUILERLOCAL-OFICINASADMINISTRATIVAS

TOTAL

NOTA:Edificiodeoficinas,necesitarealizartrabajosdeambientacion
Ascensor,ACI,Sistemapresionconstante,otros.

ALQUILER DE LOCAL EN CONDIC

I TEM

DESCRIPCION POR COMPONENTES

ALQUILERLOCALENCONDICIONESDELPROYECTO

ALQUILER DE LOCAL EN CONDIC

I TEM

DESCRIPCION POR COMPONENTES

ALQUILERLOCALENCONDICIONESDELPROYECTO

NOTA:Seconsideraelfactorde1.9porcondicionesdeconfortysegu
Ascensor,ACI,Sistemapresionconstante;asimismolaubicacinye
susnecesidades.

ALQUILER DE LOCAL EN CONDIC

I TEM

DESCRIPCION POR COMPONENTES

ALQUILERLOCALENCONDICIONESDELPROYECTO
INCLUYEGASTOSGENERALES

ALQUILER DE LOCAL EN CONDICIONES ACTUALES SIN PROYECTO

RI PCI ON POR COMPONENTES

ALAV.EVITAMIENTOSURN553-
INISTRATIVAS

ALQUILER MENSUAL (S /.) AREA ACTUAL(M2)

9000.00

658.30

COSTO / (M2)

13.67

GE-ALMACEN

ITORIUM

OTAL

2300.00
5000.00

300.00
400.00

12.50

16300.00

1358.30

11.28

7.67

dos(vivienda),sinlasmedidasdeseguridadyconfortrequeridas

ALQUILER DE LOCAL EN CONDICIONES CON PROYECTO

RI PCI ON POR COMPONENTES

ALQUILER MENSUAL (S /.) AREA ACTUAL(M2)

COSTO / (M2)

AL-OFICINASADMINISTRATIVAS

8500.00

350.00

24.29

OTAL

8500.00

350.00

24.29

cesitarealizartrabajosdeambientaciondeoficinascondrywall,IIEEyData,nocontempla
onconstante,otros.

ALQUILER DE LOCAL EN CONDICIONES CON PROYECTO

RIPCION POR COMPONENTES

ALENCONDICIONESDELPROYECTO

AREA PROYECTO
(M2)

COSTO / (M2)

ALQUILER MENSUAL
(S /.)

2,655.25

24.29

64,484.64

ALQUILER MENSUAL
(S /.)

FACTOR

ALQUILER MENSUAL
(S /.)

64,484.64

1.90

122,520.82

ALQUILER DE LOCAL EN CONDICIONES CON PROYECTO

RIPCION POR COMPONENTES

ALENCONDICIONESDELPROYECTO

de1.9porcondicionesdeconfortyseguridadquelaedficiacioncotizadanocuentacomoson
onconstante;asimismolaubicacinyelcontarconunaedificacionespecificamentediseadapara

ALQUILER DE LOCAL EN CONDICIONES CON PROYECTO

RIPCION POR COMPONENTES

ALENCONDICIONESDELPROYECTO
OSGENERALES

ALQUILER MENSUAL
(S /.)

MESES

ALQUILER ANUAL
(S /.)

122,520.82

12.00

1,470,249.86

Fuente: casas.mitula.pe/casas/alquiler-oficinas-cajamarca

uadro 51

TIEMPOS SIN PROYECTO


PROCEDIMIENTO

GESTION INSTITUCIONAL
OFICINA DE PLANIFICACION
AUTORIZACIONDEAMPLIACIONDENIVELDEUNAII.EE.PRIVADA
AUTORIZACIONDEFUNCIONAMIENTODEUNAII.EE.PRIVADA
CAMBIODEDIRECTORDEUNAII.EE.PRIVADA
OFICINA DE ESTADISTICA
GENERACIONDECODIGOMODULARPARAUNAII.EE.
CONSTACIADEUBICACINGEOGRAFICA
ACTUALIZACIONDEPADRONDEINSTITUCIONESEDUCATIVAS
OFICINA DE RACIONALIZACION
REUBICACIONDEPLAZASEXCEDENTES
RENOVACIONDECUADROSDENECESIDADESDEUNAII.EE.
PRESUPUESTO
ELABORACION,ACTALIZACION,EJECUCIONPRESUPUESTALDEII.EE.
ASESORIA JURIDICA
RECURSOADMINISTRATIVODEAPELACION
ACCIONESDECUMPLIMIENTO
CUMPLIMIENTODESENTENCIAJUDICIAL
OPINIONESLEGALES
AREA DE ADMINISTRACION
PERSONAL
PLANILLAS-RECONOCIMIENTODEPAGOPORCREDITODEVENGADOS
REASIGNACION
PENSIONPORCESANTIA/VIUDEZ/ORFANDAD/ASCENDENCIA
OFICINA DE BIENESTAR DE PERSONAL
ICENCIACONGOCEDEHABERPORENFERMEDAD/MATERNIDAD
ICENCIASINGOCEDEHABER
DESTAQUEPORSALUD
RECORDDELICENCIAS
ESCALAFON
ASIGNACIONPORTIEMPODESERVICIOS
CESEYPENSIONPROVISIONAL
RESOLUCIONDESUBSIDIOPORLUTOYGASTOSDESEPELIO
NFORMEESCALAFONARIO
REMUNERACIONES
ELAB.YEDNTEGADEDUPLICADODEBOLETADEREMUNERAICONES
AREA DE GESTION PEDAGOGICA
EDUCACION INICIAL
VISACIONDEACTASDEEVALUACION
VISACIONDENOMINAS
PRESENTACIONDEDOCUMENTOSDEFINDEAO
UTORIA
EDUCACION PRIMARIA

uadro 51

TIEMPOS SIN PROYECTO


PROCEDIMIENTO

VISACIONDEACTASDEEVALUACION
VISACIONDENOMINAS
PRESENTACIONDEDOCUMENTOSDEFINDEAO
UTORIA
EDUCACION SECUNDARIA
VISACIONDEACTASDEEVALUACION
VISACIONDENOMINAS
PRESENTACIONDEDOCUMENTOSDEFINDEAO
UTORIA
EDUCACION BASICA REGULAR
AUTORIZACIONDECURSODEMODULOS
APROBACIONDEINSTRUMENTOSDEGESTION
AUTORIZACIONDECURSOSDECAPACITACION
AUTORIZACIONDEVIAJESDEPROMOCION-EXCURSION
AUTORIZACIONDECURSOSDECAPACITACIONEXTERNA
DIRECCION
RAMITE DOCUMENTARIO
RECEPCIONYENTREGADEDOCUMENTACION
OFICIOSDELPODERJUDICIAL
ACTAS Y CERTIFICADOS
VISACIONDECERTIFICADOSDEESTUDIOS
RECTIFICACIONDENOMBRESYAPELLIDOS
VISACIONDECERTIFICADOSDEESTUDIOSPARAELMTC
REGISTROYVISACIONDECERTIFICADODECAPACITACION(DOCENTES)
REGISTROYVISACIONDECERTIFICADODECAPACITACION(CETPROS)

PROYECTO
TIEMPO
ACTUAL (DIAS)

EFECTIVO (HR)

EFECTIVO (DIAS)

15
15
5

18.50
18.50
15.50

3
3
2

15
5
32

8.75
8.00
66.50

2
1
9

40
10

163.75
11.00

21
2

10

9.50

90
5
18
5

23.75
13.50
28.50
7.00

3
2
4
1

7
40
15

9.00
76.50
17.50

2
10
3

15
15
40
3

18.50
19.50
67.50
5.75

3
3
9
1

10
12
9
2

18.25
17.00
16.25
8.50

3
3
3
2

5.50

3
3
5
3

7.50
7.50
10.00
6.00

1
1
2
1

PROYECTO
TIEMPO
ACTUAL (DIAS)
3
3
5
3

EFECTIVO (HR)
7.50
7.50
10.00
6.00

EFECTIVO (DIAS)
1
1
2
1

3
3
5
3

7.50
7.50
10.00
6.00

1
1
2
1

10
10
15
11
15

14.25
14.75
26.00
8.50
23.75

2
2
4
2
3

1
1

4.00
4.00

1
1

8
10
4
4
5

10.25
13.00
8.50
8.50
10.50

2
2
2
2
2

Cuadro 52

TIEMPOS CON PROYECTO


PROCEDIMIENTO
GESTION INSTITUCIONAL
OFICINA DE PLANIFICACION
AUTORIZACIONDEAMPLIACIONDENIVELDEUNAII.EE.PRIVADA
AUTORIZACIONDEFUNCIONAMIENTODEUNAII.EE.PRIVADA
CAMBIODEDIRECTORDEUNAII.EE.PRIVADA
OFICINA DE ESTADISTICA
GENERACIONDECODIGOMODULARPARAUNAII.EE.
CONSTACIADEUBICACINGEOGRAFICA
ACTUALIZACIONDEPADRONDEINSTITUCIONESEDUCATIVAS
OFICINA DE RACIONALIZACION
REUBICACIONDEPLAZASEXCEDENTES
RENOVACIONDECUADROSDENECESIDADESDEUNAII.EE.
PRESUPUESTO
ELABORACION,ACTALIZACION,EJECUCIONPRESUPUESTALDEII.EE.
ASESORIA JURIDICA
RECURSOADMINISTRATIVODEAPELACION
ACCIONESDECUMPLIMIENTO
CUMPLIMIENTODESENTENCIAJUDICIAL
OPINIONESLEGALES
AREA DE ADMINISTRACION
PERSONAL
PLANILLAS-RECONOCIMIENTODEPAGOPORCREDITODEVENGADOS
REASIGNACION
PENSIONPORCESANTIA/VIUDEZ/ORFANDAD/ASCENDENCIA
OFICINA DE BIENESTAR DE PERSONAL
LICENCIACONGOCEDEHABERPORENFERMEDAD/MATERNIDAD
LICENCIASINGOCEDEHABER
DESTAQUEPORSALUD
RECORDDELICENCIAS
ESCALAFON
ASIGNACIONPORTIEMPODESERVICIOS
CESEYPENSIONPROVISIONAL
RESOLUCIONDESUBSIDIOPORLUTOYGASTOSDESEPELIO
INFORMEESCALAFONARIO
REMUNERACIONES
ELAB.YEDNTEGADEDUPLICADODEBOLETADEREMUNERAICONES
AREA DE GESTION PEDAGOGICA
EDUCACION INICIAL
VISACIONDEACTASDEEVALUACION
VISACIONDENOMINAS
PRESENTACIONDEDOCUMENTOSDEFINDEAO
TUTORIA
EDUCACION PRIMARIA

Cuadro 52

TIEMPOS CON PROYECTO


PROCEDIMIENTO
VISACIONDEACTASDEEVALUACION
VISACIONDENOMINAS
PRESENTACIONDEDOCUMENTOSDEFINDEAO
TUTORIA
EDUCACION SECUNDARIA
VISACIONDEACTASDEEVALUACION
VISACIONDENOMINAS
PRESENTACIONDEDOCUMENTOSDEFINDEAO
TUTORIA
EDUCACION BASICA REGULAR
AUTORIZACIONDECURSODEMODULOS
APROBACIONDEINSTRUMENTOSDEGESTION
AUTORIZACIONDECURSOSDECAPACITACION
AUTORIZACIONDEVIAJESDEPROMOCION-EXCURSION
AUTORIZACIONDECURSOSDECAPACITACIONEXTERNA
DIRECCION
TRAMITE DOCUMENTARIO
RECEPCIONYENTREGADEDOCUMENTACION
OFICIOSDELPODERJUDICIAL
ACTAS Y CERTIFICADOS
VISACIONDECERTIFICADOSDEESTUDIOS
RECTIFICACIONDENOMBRESYAPELLIDOS
VISACIONDECERTIFICADOSDEESTUDIOSPARAELMTC
REGISTROYVISACIONDECERTIFICADODECAPACITACION(DOCENTES)
REGISTROYVISACIONDECERTIFICADODECAPACITACION(CETPROS)

PROYECTO
TIEMPO
EFECTIVO (HR)

EFECTIVO (DIAS)

12.25
12.25
11.75

2
2
2

4.50
6.50
58.75

1
1
8

137.25
9.00

18
2

6.00

16.75
9.50
24.50
5.00

3
2
4
1

6.50
50.50
15.50

1
7
2

11.25
13.50
47.50
3.25

2
2
6
1

12.75
11.75
10.75
5.50

2
2
2
1

3.00

4.25
4.25
6.25
4.00

1
1
1
1

PROYECTO
TIEMPO
EFECTIVO (HR)
4.25
4.25
6.25
4.00

EFECTIVO (DIAS)
1
1
1
1

4.25
4.25
6.25
4.00

1
1
1
1

8.00
7.75
19.25
5.75
17.25

1
1
3
1
3

2.00
1.00

1
1

7.50
6.50
4.50
4.25
5.75

1
1
1
1
1

uadro 53

AHORRO DE TIEMPO
PROCEDIMIENTO

ESTION INSTITUCIONAL
FICINA DE PLANIFICACION
UTORIZACIONDEAMPLIACIONDENIVELDEUNAII.EE.PRIVADA
UTORIZACIONDEFUNCIONAMIENTODEUNAII.EE.PRIVADA
AMBIODEDIRECTORDEUNAII.EE.PRIVADA
FICINA DE ESTADISTICA
ENERACIONDECODIGOMODULARPARAUNAII.EE.
ONSTACIADEUBICACINGEOGRAFICA
CTUALIZACIONDEPADRONDEINSTITUCIONESEDUCATIVAS
FICINA DE RACIONALIZACION
EUBICACIONDEPLAZASEXCEDENTES
ENOVACIONDECUADROSDENECESIDADESDEUNAII.EE.
RESUPUESTO
LABORACION,ACTALIZACION,EJECUCIONPRESUPUESTALDEII.EE.
SESORIA JURIDICA
ECURSOADMINISTRATIVODEAPELACION
CCIONESDECUMPLIMIENTO
UMPLIMIENTODESENTENCIAJUDICIAL
PINIONESLEGALES
REA DE ADMINISTRACION
ERSONAL
LANILLAS-RECONOCIMIENTODEPAGOPORCREDITODEVENGADOS
EASIGNACION
ENSIONPORCESANTIA/VIUDEZ/ORFANDAD/ASCENDENCIA
FICINA DE BIENESTAR DE PERSONAL
ICENCIACONGOCEDEHABERPORENFERMEDAD/MATERNIDAD
ICENCIASINGOCEDEHABER
ESTAQUEPORSALUD
ECORDDELICENCIAS
SCALAFON
SIGNACIONPORTIEMPODESERVICIOS
ESEYPENSIONPROVISIONAL
ESOLUCIONDESUBSIDIOPORLUTOYGASTOSDESEPELIO
NFORMEESCALAFONARIO
EMUNERACIONES
LAB.YEDNTEGADEDUPLICADODEBOLETADEREMUNERAICONES
REA DE GESTION PEDAGOGICA
DUCACION INICIAL
ISACIONDEACTASDEEVALUACION
ISACIONDENOMINAS
RESENTACIONDEDOCUMENTOSDEFINDEAO
UTORIA
DUCACION PRIMARIA

uadro 53

AHORRO DE TIEMPO
PROCEDIMIENTO

ISACIONDEACTASDEEVALUACION
ISACIONDENOMINAS
RESENTACIONDEDOCUMENTOSDEFINDEAO
UTORIA
DUCACION SECUNDARIA
ISACIONDEACTASDEEVALUACION
ISACIONDENOMINAS
RESENTACIONDEDOCUMENTOSDEFINDEAO
UTORIA
DUCACION BASICA REGULAR
UTORIZACIONDECURSODEMODULOS
PROBACIONDEINSTRUMENTOSDEGESTION
UTORIZACIONDECURSOSDECAPACITACION
UTORIZACIONDEVIAJESDEPROMOCION-EXCURSION
UTORIZACIONDECURSOSDECAPACITACIONEXTERNA
IRECCION
RAMITE DOCUMENTARIO
ECEPCIONYENTREGADEDOCUMENTACION
FICIOSDELPODERJUDICIAL
CTAS Y CERTIFICADOS
ISACIONDECERTIFICADOSDEESTUDIOS
ECTIFICACIONDENOMBRESYAPELLIDOS
ISACIONDECERTIFICADOSDEESTUDIOSPARAELMTC
EGISTROYVISACIONDECERTIFICADODECAPACITACION(DOCENTES)
EGISTROYVISACIONDECERTIFICADODECAPACITACION(CETPROS)

TIEMPO
TIEMPO EN HORAS
SIN PROY.

CON PROY.

AHORRO

18.50
18.50
15.50

12.25
12.25
11.75

6.25
6.25
3.75

8.75
8.00
66.50

4.50
6.50
58.75

4.25
1.50
7.75

163.75
11.00

137.25
9.00

26.50
2.00

9.50

6.00

3.50

23.75
13.50
28.50
7.00

16.75
9.50
24.50
5.00

7.00
4.00
4.00
2.00

9.00
76.50
17.50

6.50
50.50
15.50

2.50
26.00
2.00

18.50
19.50
67.50
5.75

11.25
13.50
47.50
3.25

7.25
6.00
20.00
2.50

18.25
17.00
16.25
8.50

12.75
11.75
10.75
5.50

5.50
5.25
5.50
3.00

5.50

3.00

2.50

7.50
7.50
10.00
6.00

4.25
4.25
6.25
4.00

3.25
3.25
3.75
2.00

TIEMPO
TIEMPO EN HORAS
SIN PROY.
7.50
7.50
10.00
6.00

CON PROY.
4.25
4.25
6.25
4.00

AHORRO
3.25
3.25
3.75
2.00

7.50
7.50
10.00
6.00

4.25
4.25
6.25
4.00

3.25
3.25
3.75
2.00

14.25
14.75
26.00
8.50
23.75

8.00
7.75
19.25
5.75
17.25

6.25
7.00
6.75
2.75
6.50

4.00
4.00

2.00
1.00

2.00
3.00

10.25
13.00
8.50
8.50
10.50

7.50
6.50
4.50
4.25
5.75

2.75
6.50
4.00
4.25
4.75

uadro 54

EXPEDIENTE TRAMITADOS 2012 - 2013


PROCEDIMIENTO

ESTION INSTITUCIONAL
FICINA DE PLANIFICACION
UTORIZACIONDEAMPLIACIONDENIVELDEUNAII.EE.PRIVADA
UTORIZACIONDEFUNCIONAMIENTODEUNAII.EE.PRIVADA
AMBIODEDIRECTORDEUNAII.EE.PRIVADA
FICINA DE ESTADISTICA
ENERACIONDECODIGOMODULARPARAUNAII.EE.
ONSTACIADEUBICACINGEOGRAFICA
CTUALIZACIONDEPADRONDEINSTITUCIONESEDUCATIVAS
FICINA DE RACIONALIZACION
EUBICACIONDEPLAZASEXCEDENTES
ENOVACIONDECUADROSDENECESIDADESDEUNAII.EE.
RESUPUESTO
LABORACION,ACTALIZACION,EJECUCIONPRESUPUESTALDEII.EE.
SESORIA JURIDICA
ECURSOADMINISTRATIVODEAPELACION
CCIONESDECUMPLIMIENTO
UMPLIMIENTODESENTENCIAJUDICIAL
PINIONESLEGALES
REA DE ADMINISTRACION
ERSONAL
LANILLAS-RECONOCIMIENTODEPAGOPORCREDITODEVENGADOS
EASIGNACION
ENSIONPORCESANTIA/VIUDEZ/ORFANDAD/ASCENDENCIA
FICINA DE BIENESTAR DE PERSONAL
ICENCIACONGOCEDEHABERPORENFERMEDAD/MATERNIDAD
ICENCIASINGOCEDEHABER
ESTAQUEPORSALUD
ECORDDELICENCIAS
SCALAFON
SIGNACIONPORTIEMPODESERVICIOS
ESEYPENSIONPROVISIONAL
ESOLUCIONDESUBSIDIOPORLUTOYGASTOSDESEPELIO
NFORMEESCALAFONARIO
EMUNERACIONES
LAB.YEDNTEGADEDUPLICADODEBOLETADEREMUNERAICONES
REA DE GESTION PEDAGOGICA
DUCACION INICIAL
ISACIONDEACTASDEEVALUACION
ISACIONDENOMINAS
RESENTACIONDEDOCUMENTOSDEFINDEAO
UTORIA
DUCACION PRIMARIA

uadro 54

EXPEDIENTE TRAMITADOS 2012 - 2013


PROCEDIMIENTO

ISACIONDEACTASDEEVALUACION
ISACIONDENOMINAS
RESENTACIONDEDOCUMENTOSDEFINDEAO
UTORIA
DUCACION SECUNDARIA
ISACIONDEACTASDEEVALUACION
ISACIONDENOMINAS
RESENTACIONDEDOCUMENTOSDEFINDEAO
UTORIA
DUCACION BASICA REGULAR
UTORIZACIONDECURSODEMODULOS
PROBACIONDEINSTRUMENTOSDEGESTION
UTORIZACIONDECURSOSDECAPACITACION
UTORIZACIONDEVIAJESDEPROMOCION-EXCURSION
UTORIZACIONDECURSOSDECAPACITACIONEXTERNA
IRECCION
RAMITE DOCUMENTARIO
ECEPCIONYENTREGADEDOCUMENTACION
FICIOSDELPODERJUDICIAL
CTAS Y CERTIFICADOS
ISACIONDECERTIFICADOSDEESTUDIOS
ECTIFICACIONDENOMBRESYAPELLIDOS
ISACIONDECERTIFICADOSDEESTUDIOSPARAELMTC
EGISTROYVISACIONDECERTIFICADODECAPACITACION(DOCENTES)
EGISTROYVISACIONDECERTIFICADODECAPACITACION(CETPROS)

2012 - 2013
AO
2012

2013

TASA DE CRECIM.
(%)

205
184
171

238
218
205

16.10%
18.48%
19.88%

80
90
83

91
105
96

13.75%
16.67%
15.66%

16
501

18
596

12.50%
18.96%

302

363

20.20%

1156
160
678
290

1328
186
797
345

14.88%
16.25%
17.55%
18.97%

3688
63
838

4338
75
932

17.62%
19.05%
11.22%

205
89
178
363

246
107
214
426

20.00%
20.22%
20.22%
17.36%

547
329
150
2192

659
382
180
2609

20.48%
16.11%
20.00%
19.02%

670

788

17.61%

691
699
179
367

832
832
208
387

20.41%
19.03%
16.20%
5.45%

2012 - 2013
AO

TASA DE CRECIM.
(%)

2012
839
829
174
472

2013
975
975
199
498

1223
1223
133
268

1438
1438
156
164

17.58%
17.58%
17.29%
-38.81%

69
63
107
131
67

82
74
128
154
77

18.84%
17.46%
19.63%
17.56%
14.93%

1908
159

2218
186

16.25%
16.98%

19470
18
46
2351
1239

22639
21
54
2702
1475

16.28%
16.67%
17.39%
14.93%
19.05%

16.21%
17.61%
14.37%
5.51%

CLUCULO DE LA OFERTA Y LA DEMANDA

PROYECCIN DE LA DEMANDA DE EXPEDIENTES ADMINIS


TIPO DE SERVICIO

GESTION INSTITUCIONAL

RECURSO ADMINISTRATIVO DE APELACION


ACCIONES DE CUMPLIMIENTO
CUMPLIMIENTO DE SENTENCIA JUDICIAL
OPINIONES LEGALES

AREA DE ADMINISTRACION
PERSONAL
PLANILLAS - RECONOCIMIENTO DE PAG
REASIGNACION
PENSION POR CESANTIA / VIUDEZ / OR
OFICINA DE BIENESTAR DE PERSONAL
LICENCIA CON GOCE DE HABER POR EN
LICENCIA SIN GOCE DE HABER
DESTAQUE POR SALUD
RECORD DE LICENCIAS
ESCALAFON
ASIGNACION POR TIEMPO DE SERVICIOS
CESE Y PENSION PROVISIONAL
RESOLUCION DE SUBSIDIO POR LUTO Y
INFORME ESCALAFONARIO
REMUNERACIONES
ELAB. Y EDNTEGA DE DUPLICADO DE B

AREA DE GESTION PEDAGOGICA


EDUCACION INICIAL
VISACION DE ACTAS DE EVALUACION

2020

2066

2114

692

708

724

249
228
215
306
95
110
100
643
19
624
380
380

255
233
219
313
97
112
103
657
19
638
389
389

261
239
224
320
100
115
105
672
20
653
398
398

2779

2843

2909

1390
195
834
361

1422
199
853
369

1454
204
873
378

11465

11728

11998

5593
4540
78
975
1039
257
112
224
446
4008
690
400
188
2730
825
825

5722
4644
80
998
1063
263
115
229
456
4100
705
409
193
2793
844
844

5853
4751
82
1021
1087
269
117
234
467
4194
722
418
197
2857
863
863

9017

9225

9436

2364
871

2418
891

2474
911

OFICINA DE PLANIFICACION
AUTORIZACION DE AMPLIACION DE NIVEL
AUTORIZACION DE FUNCIONAMIENTO DE
CAMBIO DE DIRECTOR DE UNA II. EE. P
OFICINA DE ESTADISTICA
GENERACION DE CODIGO MODULAR PARA
CONSTACIA DE UBICACIN GEOGRAFICA
ACTUALIZACION DE PADRON DE INSTIT
OFICINA DE RACIONALIZACION
REUBICACION DE PLAZAS EXCEDENTES
RENOVACION DE CUADROS DE NECESIDAD
PRESUPUESTO
ELABORACION, ACTALIZACION, EJECUCION

ASESORIA JURIDICA

VISACION DE NOMINAS
PRESENTACION DE DOCUMENTOS DE FI
TUTORIA
EDUCACION PRIMARIA
VISACION DE ACTAS DE EVALUACION
VISACION DE NOMINAS
PRESENTACION DE DOCUMENTOS DE FI
TUTORIA
EDUCACION SECUNDARIA
VISACION DE ACTAS DE EVALUACION
VISACION DE NOMINAS
PRESENTACION DE DOCUMENTOS DE FI
TUTORIA
EDUCACION BASICA REGULAR
AUTORIZACION DE CURSO DE MODULOS
APROBACION DE INSTRUMENTOS DE GE
AUTORIZACION DE CURSOS DE CAPACIT
AUTORIZACION DE VIAJES DE PROMOCIO
AUTORIZACION DE CURSOS DE CAPACIT

DIRECCION

871
218
405
2770
1020
1020
208
521
3345
1505
1505
163
172
539
86
77
134
161
81

891
223
414
2834
1044
1044
213
533
3421
1539
1539
167
176
551
88
79
137
165
82

911
228
424
2899
1068
1068
218
545
3500
1575
1575
171
180
564
90
81
140
169
84

30656

31360

32081

2516
2321
195

2573
2374
199

2633
2429
204

28141

28787

29448

23691
22
57
2828
1544

24235
22
58
2892
1579

24792
23
59
2959
1615

55938

57223

58537

TRAMITE DOCUMENTARIO
RECEPCION Y ENTREGA DE DOCUMENTA
OFICIOS DEL PODER JUDICIAL
ACTAS Y CERTIFICADOS
VISACION DE CERTIFICADOS DE ESTUDI
RECTIFICACION DE NOMBRES Y APELLID
VISACION DE CERTIFICADOS DE ESTUDI
REGISTRO Y VISACION DE CERTIFICADO
REGISTRO Y VISACION DE CERTIFICADO

DEMANDA TOTAL ESTIMADA SIN PROYEC

PROYECCIN DE LA DEMANDA DE EXPEDIENTES ADMINIST


TIPO DE SERVICIO

GESTION INSTITUCIONAL
OFICINA DE PLANIFICACION
AUTORIZACION DE AMPLIACION DE NIVEL
AUTORIZACION DE FUNCIONAMIENTO DE
CAMBIO DE DIRECTOR DE UNA II. EE. P
OFICINA DE ESTADISTICA

2701

3197

3784

921

1088

1285

321
306
295
389

372
363
353
449

432
430
423
519

GENERACION DE CODIGO MODULAR PARA


CONSTACIA DE UBICACIN GEOGRAFICA
ACTUALIZACION DE PADRON DE INSTIT
OFICINA DE RACIONALIZACION
REUBICACION DE PLAZAS EXCEDENTES
RENOVACION DE CUADROS DE NECESIDAD
PRESUPUESTO
ELABORACION, ACTALIZACION, EJECUCION

ASESORIA JURIDICA
RECURSO ADMINISTRATIVO DE APELACION
ACCIONES DE CUMPLIMIENTO
CUMPLIMIENTO DE SENTENCIA JUDICIAL
OPINIONES LEGALES

AREA DE ADMINISTRACION
PERSONAL
PLANILLAS - RECONOCIMIENTO DE PAG
REASIGNACION
PENSION POR CESANTIA / VIUDEZ / OR
OFICINA DE BIENESTAR DE PERSONAL
LICENCIA CON GOCE DE HABER POR EN
LICENCIA SIN GOCE DE HABER
DESTAQUE POR SALUD
RECORD DE LICENCIAS
ESCALAFON
ASIGNACION POR TIEMPO DE SERVICIOS
CESE Y PENSION PROVISIONAL
RESOLUCION DE SUBSIDIO POR LUTO Y
INFORME ESCALAFONARIO
REMUNERACIONES
ELAB. Y EDNTEGA DE DUPLICADO DE B

AREA DE GESTION PEDAGOGICA


EDUCACION INICIAL
VISACION DE ACTAS DE EVALUACION
VISACION DE NOMINAS
PRESENTACION DE DOCUMENTOS DE FI
TUTORIA
EDUCACION PRIMARIA
VISACION DE ACTAS DE EVALUACION
VISACION DE NOMINAS
PRESENTACION DE DOCUMENTOS DE FI
TUTORIA
EDUCACION SECUNDARIA
VISACION DE ACTAS DE EVALUACION
VISACION DE NOMINAS
PRESENTACION DE DOCUMENTOS DE FI

118
143
128
866
23
843
524
524

134
167
149
1029
26
1003
630
630

152
195
172
1222
29
1194
758
758

3594

4181

4865

1753
251
1101
488

2013
292
1295
581

2313
340
1522
691

15183

17882

21069

7261
6002
106
1153
1405
354
155
309
587
5427
956
515
259
3696
1090
1090

8468
7060
127
1282
1671
425
186
372
689
6461
1152
598
311
4399
1282
1282

9881
8304
151
1426
1989
510
224
447
808
7692
1388
694
373
5236
1508
1508

11544

13443

15688

3096
1206
1179
281
430
3480
1317
1349
260
554
4252
1988
1988
215

3635
1452
1403
326
454
3999
1530
1586
298
585
4964
2338
2338
252

4276
1749
1670
379
479
4601
1778
1866
340
617
5815
2748
2748
295

TUTORIA
EDUCACION BASICA REGULAR
AUTORIZACION DE CURSO DE MODULOS
APROBACION DE INSTRUMENTOS DE GE
AUTORIZACION DE CURSOS DE CAPACIT
AUTORIZACION DE VIAJES DE PROMOCIO
AUTORIZACION DE CURSOS DE CAPACIT

DIRECCION

61
716
116
102
183
213
102

38
844
138
120
219
250
117

23
995
164
141
262
294
134

39623

46083

53600

3252
2997
255

3782
3484
298

4399
4050
348

TRAMITE DOCUMENTARIO
RECEPCION Y ENTREGA DE DOCUMENTA
OFICIOS DEL PODER JUDICIAL
ACTAS Y CERTIFICADOS
VISACION DE CERTIFICADOS DE ESTUDI
RECTIFICACION DE NOMBRES Y APELLID
VISACION DE CERTIFICADOS DE ESTUDI
REGISTRO Y VISACION DE CERTIFICADO
REGISTRO Y VISACION DE CERTIFICADO

36371

42301

49201

30608
29
74
3569
2090

35590
33
87
4102
2489

41383
39
103
4714
2963

DEMANDA TOTAL DE EXPEDIENTE

72644

84786

99007

Cuadro 18

RESUMEN DE LA PROYECCIN DE LA DEMANDA DE EXPEDIENTES


SERVICIOS POR REA

GESTION INSTITUCIONAL
ASESORIA JURIDICA
AREA DE ADMINISTRACION
AREA DE GESTION PEDAGOGICA
DIRECCION

DEMANDA TOTAL ESTIMADA SIN


PROYECTO

2020
2779
11465
9017
30656

2066
2843
11728
9225
31360

2114
2909
11998
9436
32081

55938

57223

58537

Cuadro 19

PROYECCIN DE LA DEMANDA DE EXPEDIENTES ADMINIST


SERVICIOS POR REA

GESTION INSTITUCIONAL
ASESORIA JURIDICA
AREA DE ADMINISTRACION
AREA DE GESTION PEDAGOGICA
DIRECCION

2701
3594
15183
11544
39623

3197
4181
17882
13443
46083

3784
4865
21069
15688
53600

DEMANDA TOTAL DE EXPEDIENTES


ADM. CON PROYECTO

72644

84786

99007

DIENTES ADMINISTATIVOS EN LA SITUACIN SIN PROYECTO


3

10

2162

2212

2263

2315

2368

2422

2478

2535

740

757

775

793

811

830

849

868

267
244
230
327
102
118
108
688
20
668
407
407

273
250
235
335
104
120
110
704
21
683
416
416

279
256
240
342
107
123
113
720
21
699
426
426

285
261
246
350
109
126
115
736
22
715
435
435

292
267
251
358
112
129
118
753
22
731
445
445

299
274
257
366
114
132
120
771
23
748
456
456

306
280
263
375
117
135
123
788
23
765
466
466

313
286
269
383
120
138
126
806
24
783
477
477

2975

3044

3114

3185

3258

3333

3410

3488

1488
208
893
386

1522
213
913
395

1557
218
934
404

1593
223
956
414

1629
228
978
423

1667
233
1000
433

1705
239
1023
443

1744
244
1047
453

12273

12555

12844

13139

13440

13749

14065

14388

5988
4860
84
1044
1112
276
120
240
477
4291
738
428
202
2923
883
883

6125
4971
86
1068
1138
282
123
245
488
4389
755
438
206
2990
903
903

6266
5085
88
1093
1164
288
125
251
499
4490
773
448
211
3059
924
924

6410
5202
90
1118
1191
295
128
257
511
4593
790
458
216
3129
945
945

6557
5322
92
1143
1218
302
131
263
523
4699
808
469
221
3201
967
967

6708
5444
94
1170
1246
309
134
269
535
4806
827
479
226
3274
989
989

6862
5569
96
1196
1275
316
137
275
547
4917
846
490
231
3349
1012
1012

7019
5697
98
1224
1304
323
141
281
559
5030
865
502
236
3426
1035
1035

9653

9875

10102

10334

10571

10814

11062

11316

2531
932

2589
953

2648
975

2709
998

2771
1021

2835
1044

2900
1068

2967
1093

932
233
434
2965
1092
1092
223
558
3580
1611
1611
175
184
577
92
83
143
173
86

953
238
443
3033
1117
1117
228
571
3663
1648
1648
179
188
590
94
85
147
176
88

975
244
454
3103
1143
1143
233
584
3747
1686
1686
183
192
604
96
87
150
181
90

998
249
464
3174
1169
1169
239
597
3833
1724
1724
187
197
618
98
89
154
185
92

1021
255
475
3247
1196
1196
244
611
3921
1764
1764
191
201
632
101
91
157
189
94

1044
261
486
3322
1224
1224
250
625
4011
1805
1805
196
206
646
103
93
161
193
97

1068
267
497
3398
1252
1252
255
639
4103
1846
1846
200
211
661
105
95
164
198
99

1093
273
508
3476
1280
1280
261
654
4197
1888
1888
205
215
676
108
97
168
202
101

32818

33571

34342

35131

35938

36764

37608

38472

2693
2485
208

2755
2542
213

2818
2600
218

2883
2660
223

2949
2721
228

3017
2783
233

3086
2847
239

3157
2913
244

30124

30816

31524

32248

32989

33747

34522

35315

25361
24
60
3027
1652

25944
24
62
3096
1690

26540
25
63
3168
1729

27149
25
65
3240
1769

27773
26
66
3315
1809

28411
26
68
3391
1851

29063
27
69
3469
1894

29731
28
71
3548
1937

59882

61257

62664

64103

65576

67082

68623

70199

DIENTES ADMINISTATIVOS EN LA SITUACIN CON PROYECTO


3

4481

5307

6286

7448

8827

10463

12404

14710

10

1519

1794

2121

2507

2963

3504

4144

4901

502
509
508
599

583
603
609
692

677
714
730
799

786
846
875
923

912
1003
1049
1066

1059
1188
1257
1232

1229
1408
1507
1423

1427
1668
1807
1645

173
227
199
1452
32
1420
911
911

197
265
230
1726
36
1689
1095
1095

224
309
266
2051
41
2010
1316
1316

255
360
307
2437
46
2391
1582
1582

290
420
356
2896
52
2844
1901
1901

330
491
411
3442
58
3383
2285
2285

375
572
476
4091
66
4025
2747
2747

427
668
550
4862
74
4788
3301
3301

5663

6592

7676

8939

10412

12129

14133

16470

2657
395
1789
822

3052
459
2103
978

3507
534
2472
1164

4028
620
2906
1384

4628
721
3416
1647

5316
838
4016
1959

6107
975
4720
2331

7016
1133
5549
2773

24831

29275

34524

40725

48054

56717

66959

79071

11533
9767
179
1586
2367
612
269
538
948
9159
1673
806
448
6232
1773
1773

13466
11489
213
1764
2817
735
323
646
1113
10906
2015
936
537
7418
2086
2086

15730
13514
254
1962
3353
881
388
777
1306
12988
2428
1087
645
8829
2453
2453

18380
15896
303
2182
3991
1058
467
934
1533
15469
2925
1262
774
10509
2885
2885

21484
18697
360
2426
4752
1269
561
1123
1799
18425
3523
1465
929
12508
3393
3393

25120
21993
429
2699
5659
1523
675
1350
2111
21948
4245
1701
1115
14887
3991
3991

29380
25869
510
3001
6740
1828
812
1623
2477
26146
5114
1975
1337
17719
4693
4693

34374
30428
608
3338
8027
2193
976
1951
2907
31149
6161
2293
1605
21090
5520
5520

18337

21458

25135

29466

34567

40578

47663

56014

5038
2105
1988
441
505
5301
2066
2194
389
651
6824
3232
3232
346

5945
2535
2366
512
532
6114
2401
2581
445
687
8014
3800
3800
406

7025
3052
2816
595
561
7060
2791
3035
509
725
9417
4468
4468
476

8310
3675
3352
691
592
8160
3243
3569
582
765
11068
5253
5253
559

9842
4425
3990
803
624
9440
3769
4198
666
807
13011
6177
6177
656

11668
5328
4749
934
658
10930
4380
4937
762
851
15295
7262
7262
769

13846
6415
5652
1085
694
12666
5089
5807
871
898
17981
8539
8539
902

16444
7724
6728
1261
732
14689
5914
6830
997
948
21139
10040
10040
1058

14
1174
194
165
314
346
154

9
1384
231
194
375
406
177

5
1633
275
228
449
478
204

3
1927
326
268
537
562
234

2
2274
388
315
642
660
269

1
2685
461
370
768
776
309

1
3169
548
435
919
913
356

0
3742
651
510
1099
1073
409

62345

72521

84361

5116
4708
407

5950
5473
477

6920
6363
558

8049
7397
652

9361
8598
763

10888
9995
893

12663
11619
1044

14729
13507
1222

57229

66571

77440

90089

104809

121940

141878

165084

48119
45
120
5418
3527

55951
53
141
6227
4199

65057
62
166
7157
4998

75646
72
195
8225
5951

87959
84
229
9453
7084

102275
98
268
10865
8433

118922
114
315
12487
10040

138278
134
370
14351
11952

115657

135153

157981

184715

216029

252715

295700

346077

98138 114170 132827 154541 179813

DE EXPEDIENTES ADMINISTATIVOS EN LA SITUACIN SIN PROYECTO


3

10

2162
2975
12273
9653
32818

2212
3044
12555
9875
33571

2263
3114
12844
10102
34342

2315
3185
13139
10334
35131

2368
3258
13440
10571
35938

2422
3333
13749
10814
36764

2478
3410
14065
11062
37608

2535
3488
14388
11316
38472

59882

61257

62664

64103

65576

67082

68623

70199

DIENTES ADMINISTATIVOS EN LA SITUACIN CON PROYECTO


3

4481
5663
24831
18337
62345

5307
6592
29275
21458
72521

6286
7676
34524
25135
84361

7448
8939
40725
29466
98138

8827
10412
48054
34567
114170

10463
12129
56717
40578
132827

12404
14133
66959
47663
154541

10

14710
16470
79071
56014
179813

115657 135153 157981 184715 216029 252715 295700 346077

PROYECCIN DE LA OFERTA DE TRMITES DE EXPEDIENTES ADMIN


TIPO DE SERVICIO

GESTION INSTITUCIONAL

1632

RECURSO ADMINISTRATIVO DE APELACI


ACCIONES DE CUMPLIMIENTO
CUMPLIMIENTO DE SENTENCIA JUDICIAL
OPINIONES LEGALES

AREA DE ADMINISTRACION
PERSONAL
PLANILLAS - RECONOCIMIENTO DE
REASIGNACION
PENSION POR CESANTIA / VIUDEZ /
OFICINA DE BIENESTAR DE PERSONA
LICENCIA CON GOCE DE HABER POR
LICENCIA SIN GOCE DE HABER
DESTAQUE POR SALUD
RECORD DE LICENCIAS
ESCALAFON
ASIGNACION POR TIEMPO DE SERVICI
CESE Y PENSION PROVISIONAL
RESOLUCION DE SUBSIDIO POR LUTO
INFORME ESCALAFONARIO
REMUNERACIONES
ELAB. Y EDNTEGA DE DUPLICADO DE

AREA DE GESTION PEDAGOGICA


EDUCACION INICIAL
VISACION DE ACTAS DE EVALUACION

1632

1632

560

560

560

205
184
171
253
80
90
83
517
16
501
302
302

205
184
171
253
80
90
83
517
16
501
302
302

205
184
171
253
80
90
83
517
16
501
302
302

2284

2284

2284

1156
160
678
290

1156
160
678
290

1156
160
678
290

9312

9312

9312

4589
3688
63
838
835
205
89
178
363
3218
547
329
150
2192
670
670

4589
3688
63
838
835
205
89
178
363
3218
547
329
150
2192
670
670

4589
3688
63
838
835
205
89
178
363
3218
547
329
150
2192
670
670

7534

7534

7534

1936
691

1936
691

1936
691

OFICINA DE PLANIFICACION
AUTORIZACION DE AMPLIACION DE NIV
AUTORIZACION DE FUNCIONAMIENTO D
CAMBIO DE DIRECTOR DE UNA II. EE.
OFICINA DE ESTADISTICA
GENERACION DE CODIGO MODULAR PAR
CONSTACIA DE UBICACIN GEOGRAFI
ACTUALIZACION DE PADRON DE INS
OFICINA DE RACIONALIZACION
REUBICACION DE PLAZAS EXCEDENT
RENOVACION DE CUADROS DE NECESID
PRESUPUESTO
ELABORACION, ACTALIZACION, EJECUC

ASESORIA JURIDICA

VISACION DE NOMINAS
PRESENTACION DE DOCUMENTOS DE
TUTORIA
EDUCACION PRIMARIA
VISACION DE ACTAS DE EVALUACION
VISACION DE NOMINAS
PRESENTACION DE DOCUMENTOS DE
TUTORIA
EDUCACION SECUNDARIA
VISACION DE ACTAS DE EVALUACION
VISACION DE NOMINAS
PRESENTACION DE DOCUMENTOS DE
TUTORIA
EDUCACION BASICA REGULAR
AUTORIZACION DE CURSO DE MODU
APROBACION DE INSTRUMENTOS DE
AUTORIZACION DE CURSOS DE CAPAC
AUTORIZACION DE VIAJES DE PROMO
AUTORIZACION DE CURSOS DE CAPAC

DIRECCION

699
179
367
2314
839
829
174
472
2847
1223
1223
133
268
437
69
63
107
131
67

699
179
367
2314
839
829
174
472
2847
1223
1223
133
268
437
69
63
107
131
67

699
179
367
2314
839
829
174
472
2847
1223
1223
133
268
437
69
63
107
131
67

25191 25191 25191

TRAMITE DOCUMENTARIO
RECEPCION Y ENTREGA DE DOCUMEN
OFICIOS DEL PODER JUDICIAL
ACTAS Y CERTIFICADOS
VISACION DE CERTIFICADOS DE ESTU
RECTIFICACION DE NOMBRES Y APEL
VISACION DE CERTIFICADOS DE ESTU
REGISTRO Y VISACION DE CERTIFICA
REGISTRO Y VISACION DE CERTIFICA

2067
1908
159

2067
1908
159

2067
1908
159

23124

23124

23124

19470
18
46
2351
1239

19470
18
46
2351
1239

19470
18
46
2351
1239

OFERTA TOTAL ESTIMADA SIN PROYEC 45953 45953 45953

PROYECCIN DE LA OFERTA OPTIMIZADA DE TRMITES DE EXPEDIEN


PROYECTO
TIPO DE SERVICIO

GESTION INSTITUCIONAL

1930

OFICINA DE PLANIFICACION
AUTORIZACION DE AMPLIACION DE NIV
AUTORIZACION DE FUNCIONAMIENTO D
CAMBIO DE DIRECTOR DE UNA II. EE.
OFICINA DE ESTADISTICA

1930

1930

661

661

661

238
218
205
292

238
218
205
292

238
218
205
292

GENERACION DE CODIGO MODULAR PAR


CONSTACIA DE UBICACIN GEOGRAFI
ACTUALIZACION DE PADRON DE INS
OFICINA DE RACIONALIZACION
REUBICACION DE PLAZAS EXCEDENT
RENOVACION DE CUADROS DE NECESID
PRESUPUESTO
ELABORACION, ACTALIZACION, EJECUC

ASESORIA JURIDICA
RECURSO ADMINISTRATIVO DE APELACI
ACCIONES DE CUMPLIMIENTO
CUMPLIMIENTO DE SENTENCIA JUDICIAL
OPINIONES LEGALES

AREA DE ADMINISTRACION
PERSONAL
PLANILLAS - RECONOCIMIENTO DE
REASIGNACION
PENSION POR CESANTIA / VIUDEZ /
OFICINA DE BIENESTAR DE PERSONA
LICENCIA CON GOCE DE HABER POR
LICENCIA SIN GOCE DE HABER
DESTAQUE POR SALUD
RECORD DE LICENCIAS
ESCALAFON
ASIGNACION POR TIEMPO DE SERVICI
CESE Y PENSION PROVISIONAL
RESOLUCION DE SUBSIDIO POR LUTO
INFORME ESCALAFONARIO
REMUNERACIONES
ELAB. Y EDNTEGA DE DUPLICADO DE

AREA DE GESTION PEDAGOGICA


EDUCACION INICIAL
VISACION DE ACTAS DE EVALUACION
VISACION DE NOMINAS
PRESENTACION DE DOCUMENTOS DE
TUTORIA
EDUCACION PRIMARIA
VISACION DE ACTAS DE EVALUACION
VISACION DE NOMINAS
PRESENTACION DE DOCUMENTOS DE
TUTORIA
EDUCACION SECUNDARIA
VISACION DE ACTAS DE EVALUACION
VISACION DE NOMINAS
PRESENTACION DE DOCUMENTOS DE

91
105
96
614
18
596
363
363

91
105
96
614
18
596
363
363

91
105
96
614
18
596
363
363

2656

2656

2656

1328
186
797
345

1328
186
797
345

1328
186
797
345

10956 10956 10956


5345
4338
75
932
993
246
107
214
426
3830
659
382
180
2609
788
788

5345
4338
75
932
993
246
107
214
426
3830
659
382
180
2609
788
788

5345
4338
75
932
993
246
107
214
426
3830
659
382
180
2609
788
788

8617

8617

8617

2259
832
832
208
387
2647
975
975
199
498
3196
1438
1438
156

2259
832
832
208
387
2647
975
975
199
498
3196
1438
1438
156

2259
832
832
208
387
2647
975
975
199
498
3196
1438
1438
156

TUTORIA
EDUCACION BASICA REGULAR
AUTORIZACION DE CURSO DE MODU
APROBACION DE INSTRUMENTOS DE
AUTORIZACION DE CURSOS DE CAPAC
AUTORIZACION DE VIAJES DE PROMO
AUTORIZACION DE CURSOS DE CAPAC

DIRECCION

164
515
82
74
128
154
77

164
515
82
74
128
154
77

164
515
82
74
128
154
77

29295 29295 29295

TRAMITE DOCUMENTARIO
RECEPCION Y ENTREGA DE DOCUMEN
OFICIOS DEL PODER JUDICIAL
ACTAS Y CERTIFICADOS
VISACION DE CERTIFICADOS DE ESTU
RECTIFICACION DE NOMBRES Y APEL
VISACION DE CERTIFICADOS DE ESTU
REGISTRO Y VISACION DE CERTIFICA
REGISTRO Y VISACION DE CERTIFICA

2404
2218
186
26891
22639
21
54
2702
1475

2404
2218
186
26891
22639
21
54
2702
1475

2404
2218
186
26891
22639
21
54
2702
1475

OFERTA TOTAL OPTIMIZADA ESTIMADA 53454 53454 53454

Cuadro 27

RESUMEN DE LA PROYECCIN DE LA OFERTA DE TRAMITACIN DE EXPE


PROYECTO
SERVICIOS POR REA

GESTION INSTITUCIONAL
ASESORIA JURIDICA
AREA DE ADMINISTRACION
AREA DE GESTION PEDAGOGICA
DIRECCION
OFERTA TOTAL ESTIMADA SIN PROYECTO

1632
2284
9312
7534
25191

1632
2284
9312
7534
25191

1632
2284
9312
7534
25191

45953 45953 45953

Cuadro 28

PROYECCIN DE LA OFERTA OPTIMIZADA DE TRMITES D


SERVICIOS POR REA

GESTION INSTITUCIONAL
ASESORIA JURIDICA
AREA DE ADMINISTRACION
AREA DE GESTION PEDAGOGICA
DIRECCION

1930
2656
10956
8617
29295

1930
2656
10956
8617
29295

1930
2656
10956
8617
29295

OFERTA TOTAL OPTIMIZADA ESTIMADA

53454 53454 53454

PEDIENTES ADMINISTATIVOS EN LA SITUACIN SIN PROYECTO


3

10

1632

1632

1632

1632

1632

1632

1632

1632

560

560

560

560

560

560

560

560

205
184
171
253
80
90
83
517
16
501
302
302

205
184
171
253
80
90
83
517
16
501
302
302

205
184
171
253
80
90
83
517
16
501
302
302

205
184
171
253
80
90
83
517
16
501
302
302

205
184
171
253
80
90
83
517
16
501
302
302

205
184
171
253
80
90
83
517
16
501
302
302

205
184
171
253
80
90
83
517
16
501
302
302

205
184
171
253
80
90
83
517
16
501
302
302

2284

2284

2284

2284

2284

2284

2284

2284

1156
160
678
290

1156
160
678
290

1156
160
678
290

1156
160
678
290

1156
160
678
290

1156
160
678
290

1156
160
678
290

1156
160
678
290

9312

9312

9312

9312

9312

9312

9312

9312

4589
3688
63
838
835
205
89
178
363
3218
547
329
150
2192
670
670

4589
3688
63
838
835
205
89
178
363
3218
547
329
150
2192
670
670

4589
3688
63
838
835
205
89
178
363
3218
547
329
150
2192
670
670

4589
3688
63
838
835
205
89
178
363
3218
547
329
150
2192
670
670

4589
3688
63
838
835
205
89
178
363
3218
547
329
150
2192
670
670

4589
3688
63
838
835
205
89
178
363
3218
547
329
150
2192
670
670

4589
3688
63
838
835
205
89
178
363
3218
547
329
150
2192
670
670

4589
3688
63
838
835
205
89
178
363
3218
547
329
150
2192
670
670

7534

7534

7534

7534

7534

7534

7534

7534

1936
691

1936
691

1936
691

1936
691

1936
691

1936
691

1936
691

1936
691

699
179
367
2314
839
829
174
472
2847
1223
1223
133
268
437
69
63
107
131
67

699
179
367
2314
839
829
174
472
2847
1223
1223
133
268
437
69
63
107
131
67

699
179
367
2314
839
829
174
472
2847
1223
1223
133
268
437
69
63
107
131
67

699
179
367
2314
839
829
174
472
2847
1223
1223
133
268
437
69
63
107
131
67

699
179
367
2314
839
829
174
472
2847
1223
1223
133
268
437
69
63
107
131
67

699
179
367
2314
839
829
174
472
2847
1223
1223
133
268
437
69
63
107
131
67

699
179
367
2314
839
829
174
472
2847
1223
1223
133
268
437
69
63
107
131
67

699
179
367
2314
839
829
174
472
2847
1223
1223
133
268
437
69
63
107
131
67

25191 25191 25191 25191 25191 25191 25191 25191


2067
1908
159

2067
1908
159

2067
1908
159

2067
1908
159

2067
1908
159

2067
1908
159

2067
1908
159

2067
1908
159

23124

23124

23124

23124

23124

23124

23124

23124

19470
18
46
2351
1239

19470
18
46
2351
1239

19470
18
46
2351
1239

19470
18
46
2351
1239

19470
18
46
2351
1239

19470
18
46
2351
1239

19470
18
46
2351
1239

19470
18
46
2351
1239

45953 45953 45953 45953 45953 45953 45953 45953

MITES DE EXPEDIENTES ADMINISTATIVOS EN LA SITUACIN SIN


PROYECTO
3

10

1930

1930

1930

1930

1930

1930

1930

1930

661

661

661

661

661

661

661

661

238
218
205
292

238
218
205
292

238
218
205
292

238
218
205
292

238
218
205
292

238
218
205
292

238
218
205
292

238
218
205
292

91
105
96
614
18
596
363
363

91
105
96
614
18
596
363
363

91
105
96
614
18
596
363
363

91
105
96
614
18
596
363
363

91
105
96
614
18
596
363
363

91
105
96
614
18
596
363
363

91
105
96
614
18
596
363
363

91
105
96
614
18
596
363
363

2656

2656

2656

2656

2656

2656

2656

2656

1328
186
797
345

1328
186
797
345

1328
186
797
345

1328
186
797
345

1328
186
797
345

1328
186
797
345

1328
186
797
345

1328
186
797
345

10956 10956 10956 10956 10956 10956 10956 10956


5345
4338
75
932
993
246
107
214
426
3830
659
382
180
2609
788
788

5345
4338
75
932
993
246
107
214
426
3830
659
382
180
2609
788
788

5345
4338
75
932
993
246
107
214
426
3830
659
382
180
2609
788
788

5345
4338
75
932
993
246
107
214
426
3830
659
382
180
2609
788
788

5345
4338
75
932
993
246
107
214
426
3830
659
382
180
2609
788
788

5345
4338
75
932
993
246
107
214
426
3830
659
382
180
2609
788
788

5345
4338
75
932
993
246
107
214
426
3830
659
382
180
2609
788
788

5345
4338
75
932
993
246
107
214
426
3830
659
382
180
2609
788
788

8617

8617

8617

8617

8617

8617

8617

8617

2259
832
832
208
387
2647
975
975
199
498
3196
1438
1438
156

2259
832
832
208
387
2647
975
975
199
498
3196
1438
1438
156

2259
832
832
208
387
2647
975
975
199
498
3196
1438
1438
156

2259
832
832
208
387
2647
975
975
199
498
3196
1438
1438
156

2259
832
832
208
387
2647
975
975
199
498
3196
1438
1438
156

2259
832
832
208
387
2647
975
975
199
498
3196
1438
1438
156

2259
832
832
208
387
2647
975
975
199
498
3196
1438
1438
156

2259
832
832
208
387
2647
975
975
199
498
3196
1438
1438
156

164
515
82
74
128
154
77

164
515
82
74
128
154
77

164
515
82
74
128
154
77

164
515
82
74
128
154
77

164
515
82
74
128
154
77

164
515
82
74
128
154
77

164
515
82
74
128
154
77

164
515
82
74
128
154
77

29295 29295 29295 29295 29295 29295 29295 29295


2404
2218
186
26891
22639
21
54
2702
1475

2404
2218
186
26891
22639
21
54
2702
1475

2404
2218
186
26891
22639
21
54
2702
1475

2404
2218
186
26891
22639
21
54
2702
1475

2404
2218
186
26891
22639
21
54
2702
1475

2404
2218
186
26891
22639
21
54
2702
1475

2404
2218
186
26891
22639
21
54
2702
1475

2404
2218
186
26891
22639
21
54
2702
1475

53454 53454 53454 53454 53454 53454 53454 53454

MITACIN DE EXPEDIENTES ADMINISTATIVOS EN LA SITUACIN SIN


PROYECTO
3

1632
2284
9312
7534
25191

1632
2284
9312
7534
25191

1632
2284
9312
7534
25191

1632
2284
9312
7534
25191

1632
2284
9312
7534
25191

1632
2284
9312
7534
25191

1632
2284
9312
7534
25191

10

1632
2284
9312
7534
25191

45953 45953 45953 45953 45953 45953 45953 45953

DA DE TRMITES DE EXPEDIENTES ADMINISTATIVOS


3

1930
2656
10956
8617
29295

1930
2656
10956
8617
29295

1930
2656
10956
8617
29295

1930
2656
10956
8617
29295

1930
2656
10956
8617
29295

1930
2656
10956
8617
29295

1930
2656
10956
8617
29295

10

1930
2656
10956
8617
29295

53454 53454 53454 53454 53454 53454 53454 53454

PROYECCIN DEL BALANCE OFERTA - DEMANDA DE TRMITES DE EXPEDIENTES A


TIPO DE SERVICIO

GESTION INSTITUCIONAL
OFICINA DE PLANIFICACION
AUTORIZACION DE AMPLIACION DE
AUTORIZACION DE FUNCIONAMIENT
CAMBIO DE DIRECTOR DE UNA II.
OFICINA DE ESTADISTICA
GENERACION DE CODIGO MODULAR
CONSTACIA DE UBICACIN GEOG
ACTUALIZACION DE PADRON DE
OFICINA DE RACIONALIZACION
REUBICACION DE PLAZAS EXCED
RENOVACION DE CUADROS DE NEC
PRESUPUESTO
ELABORACION, ACTALIZACION, EJE

ASESORIA JURIDICA
RECURSO ADMINISTRATIVO DE APEL
ACCIONES DE CUMPLIMIENTO
CUMPLIMIENTO DE SENTENCIA JUDIC
OPINIONES LEGALES

AREA DE ADMINISTRACION
PERSONAL
PLANILLAS - RECONOCIMIENTO
REASIGNACION
PENSION POR CESANTIA / VIUDEZ
OFICINA DE BIENESTAR DE PERS
LICENCIA CON GOCE DE HABER
LICENCIA SIN GOCE DE HABER
DESTAQUE POR SALUD
RECORD DE LICENCIAS
ESCALAFON
ASIGNACION POR TIEMPO DE SER
CESE Y PENSION PROVISIONAL
RESOLUCION DE SUBSIDIO POR L
INFORME ESCALAFONARIO
REMUNERACIONES
ELAB. Y EDNTEGA DE DUPLICAD

AREA DE GESTION PEDAGOGICA


EDUCACION INICIAL
VISACION DE ACTAS DE EVALUACI

-1069

-1565

-2152

-2849

-361

-528

-725

-959

-116
-122
-124
-136
-38
-53
-45
-349
-7
-342
-222
-222

-167
-179
-182
-196
-54
-77
-66
-512
-10
-502
-328
-328

-227
-246
-252
-266
-72
-105
-89
-705
-13
-693
-456
-456

-297
-325
-337
-346
-93
-137
-116
-935
-16
-919
-609
-609

-1310

-1897

-2581

-3379

-597
-91
-423
-198

-857
-132
-617
-291

-1157
-180
-844
-401

-1501
-235
-1111
-532

-5871

-8570

-11757

-15519

-2672
-2314
-43
-315
-570
-149
-66
-131
-224
-2209
-409
-186
-109
-1504
-420
-420

-3879
-3372
-64
-444
-836
-220
-97
-194
-326
-3243
-605
-269
-161
-2207
-612
-612

-5292
-4616
-88
-588
-1154
-305
-135
-269
-445
-4474
-841
-365
-223
-3044
-838
-838

-6944
-6079
-116
-748
-1532
-407
-180
-360
-585
-5941
-1126
-477
-298
-4040
-1103
-1103

-4010

-5909

-8154

-10803

-1160
-515

-1699
-761

-2340
-1058

-3102
-1414

VISACION DE NOMINAS
PRESENTACION DE DOCUMENTOS
TUTORIA
EDUCACION PRIMARIA
VISACION DE ACTAS DE EVALUACI
VISACION DE NOMINAS
PRESENTACION DE DOCUMENTOS
TUTORIA
EDUCACION SECUNDARIA
VISACION DE ACTAS DE EVALUACI
VISACION DE NOMINAS
PRESENTACION DE DOCUMENTOS
TUTORIA
EDUCACION BASICA REGULAR
AUTORIZACION DE CURSO DE M
APROBACION DE INSTRUMENTOS
AUTORIZACION DE CURSOS DE CA
AUTORIZACION DE VIAJES DE PR
AUTORIZACION DE CURSOS DE C

DIRECCION

-480
-102
-63
-1166
-478
-520
-86
-82
-1405
-765
-765
-82
207
-279
-47
-39
-76
-82
-35

-704
-147
-87
-1685
-691
-757
-124
-113
-2117
-1115
-1115
-119
230
-407
-69
-57
-112
-119
-50

-971
-200
-112
-2287
-939
-1037
-166
-145
-2968
-1525
-1525
-162
245
-558
-95
-78
-155
-163
-67

-1289
-262
-138
-2987
-1227
-1365
-215
-179
-3977
-2009
-2009
-213
254
-737
-125
-102
-207
-215
-87

-14432

-20892

-28409

-37154

-1185
-1089
-96

-1715
-1576
-139

-2332
-2142
-189

-3049
-2800
-248

TRAMITE DOCUMENTARIO
RECEPCION Y ENTREGA DE DOCU
OFICIOS DEL PODER JUDICIAL
ACTAS Y CERTIFICADOS
VISACION DE CERTIFICADOS DE
RECTIFICACION DE NOMBRES Y A
VISACION DE CERTIFICADOS DE E
REGISTRO Y VISACION DE CERTIF
REGISTRO Y VISACION DE CERTIF

-13247

-19177

-26077

-34105

-11138
-11
-28
-1218
-851

-16120
-15
-41
-1751
-1250

-21913
-21
-57
-2363
-1724

-28649
-27
-74
-3067
-2288

DEMANDA TOTAL ESTIMADA SIN PR

-26691

-38833

-53054

-69704

PROYECCIN DEL BALANCE OFERTA OPTIMIZADA - DEMANDA DE TRMITES DE EXP


PROYECTO
TIPO DE SERVICIO

GESTION INSTITUCIONAL
OFICINA DE PLANIFICACION
AUTORIZACION DE AMPLIACION DE
AUTORIZACION DE FUNCIONAMIENT
CAMBIO DE DIRECTOR DE UNA II.
OFICINA DE ESTADISTICA

-771

-1267

-1854

-2551

-260

-427

-624

-858

-83
-88
-90
-97

-134
-145
-148
-157

-194
-212
-218
-227

-264
-291
-303
-307

GENERACION DE CODIGO MODULAR


CONSTACIA DE UBICACIN GEOG
ACTUALIZACION DE PADRON DE
OFICINA DE RACIONALIZACION
REUBICACION DE PLAZAS EXCED
RENOVACION DE CUADROS DE NEC
PRESUPUESTO
ELABORACION, ACTALIZACION, EJE

ASESORIA JURIDICA
RECURSO ADMINISTRATIVO DE APEL
ACCIONES DE CUMPLIMIENTO
CUMPLIMIENTO DE SENTENCIA JUDIC
OPINIONES LEGALES

AREA DE ADMINISTRACION
PERSONAL
PLANILLAS - RECONOCIMIENTO
REASIGNACION
PENSION POR CESANTIA / VIUDEZ
OFICINA DE BIENESTAR DE PERS
LICENCIA CON GOCE DE HABER
LICENCIA SIN GOCE DE HABER
DESTAQUE POR SALUD
RECORD DE LICENCIAS
ESCALAFON
ASIGNACION POR TIEMPO DE SER
CESE Y PENSION PROVISIONAL
RESOLUCION DE SUBSIDIO POR L
INFORME ESCALAFONARIO
REMUNERACIONES
ELAB. Y EDNTEGA DE DUPLICAD

AREA DE GESTION PEDAGOGICA


EDUCACION INICIAL
VISACION DE ACTAS DE EVALUACI
VISACION DE NOMINAS
PRESENTACION DE DOCUMENTOS
TUTORIA
EDUCACION PRIMARIA
VISACION DE ACTAS DE EVALUACI
VISACION DE NOMINAS
PRESENTACION DE DOCUMENTOS
TUTORIA
EDUCACION SECUNDARIA
VISACION DE ACTAS DE EVALUACI
VISACION DE NOMINAS
PRESENTACION DE DOCUMENTOS

-27
-38
-32
-252
-5
-247
-161
-161

-43
-62
-53
-415
-8
-407
-267
-267

-61
-90
-76
-608
-11
-598
-395
-395

-82
-122
-103
-838
-14
-824
-548
-548

-938

-1525

-2209

-3007

-425
-65
-304
-143

-685
-106
-498
-236

-985
-154
-725
-346

-1329
-209
-992
-477

-4227

-6926

-10113

-13875

-1916
-1664
-31
-221
-412
-108
-48
-95
-161
-1597
-297
-133
-79
-1087
-302
-302

-3123
-2722
-52
-350
-678
-179
-79
-158
-263
-2631
-493
-216
-131
-1790
-494
-494

-4536
-3966
-76
-494
-996
-264
-117
-233
-382
-3862
-729
-312
-193
-2627
-720
-720

-6188
-5429
-104
-654
-1374
-366
-162
-324
-522
-5329
-1014
-424
-268
-3623
-985
-985

-2927

-4826

-7071

-9720

-837
-374
-347
-73
-43
-833
-342
-374
-61
-56
-1056
-550
-550
-59

-1376
-620
-571
-118
-67
-1352
-555
-611
-99
-87
-1768
-900
-900
-96

-2017
-917
-838
-171
-92
-1954
-803
-891
-141
-119
-2619
-1310
-1310
-139

-2779
-1273
-1156
-233
-118
-2654
-1091
-1219
-190
-153
-3628
-1794
-1794
-190

TUTORIA
EDUCACION BASICA REGULAR
AUTORIZACION DE CURSO DE M
APROBACION DE INSTRUMENTOS
AUTORIZACION DE CURSOS DE CA
AUTORIZACION DE VIAJES DE PR
AUTORIZACION DE CURSOS DE C

103
-201
-34
-28
-55
-59
-25

126
-329
-56
-46
-91
-96
-40

141
-480
-82
-67
-134
-140
-57

150
-659
-112
-91
-186
-192
-77

-10328

-16788

-24305

-33050

-848
-779
-69

-1378
-1266
-112

-1995
-1832
-162

-2712
-2490
-221

-9480

-15410

-22310

-30338

-7969
-8
-20
-867
-615

-12951
-12
-33
-1400
-1014

-18744
-18
-49
-2012
-1488

-25480
-24
-66
-2716
-2052

DEMANDA TOTAL DE EXPED -19190

-31332

-45553

-62203

DIRECCION
TRAMITE DOCUMENTARIO
RECEPCION Y ENTREGA DE DOCU
OFICIOS DEL PODER JUDICIAL
ACTAS Y CERTIFICADOS
VISACION DE CERTIFICADOS DE
RECTIFICACION DE NOMBRES Y A
VISACION DE CERTIFICADOS DE E
REGISTRO Y VISACION DE CERTIF
REGISTRO Y VISACION DE CERTIF

cuadro 31

RESUMEN DE LA PROYECCIN DEL BALANCE OFERTA - DEMANDA DE TRMITES DE


SIN PROYECTO
SERVICIOS POR REA

GESTION INSTITUCIONAL
ASESORIA JURIDICA
AREA DE ADMINISTRACION
AREA DE GESTION PEDAGOGICA
DIRECCION
DEMANDA TOTAL ESTIMADA SIN
PROYECTO

-1069
-1310
-5871
-4010
-14432

-1565
-1897
-8570
-5909
-20892

-2152
-2581
-11757
-8154
-28409

-2849
-3379
-15519
-10803
-37154

-26691

-38833

-53054

-69704

Cuadro 32

RESUMEN DE LA PROYECCIN DEL BALANCE OFERTA OPTIMIZADA - DEMANDA DE T


SITUACIN CON PROYECTO
SERVICIOS POR REA

GESTION INSTITUCIONAL
ASESORIA JURIDICA
AREA DE ADMINISTRACION
AREA DE GESTION PEDAGOGICA
DIRECCION

-771
-938
-4227
-2927
-10328

-1267
-1525
-6926
-4826
-16788

-1854
-2209
-10113
-7071
-24305

-2551
-3007
-13875
-9720
-33050

DEMANDA TOTAL DE EXPEDIENTES


ADM. CON PROYECTO

-19190

-31332

-45553

-62203

DE EXPEDIENTES ADMINISTATIVOS EN LA SITUACIN SIN PROYECTO


4

10

-3675

-4654

-5816

-7195

-8831

-10772

-13078

-1234

-1561

-1947

-2403

-2944

-3584

-4341

-378
-419
-438
-439
-117
-175
-147
-1209
-20
-1188
-793
-793

-472
-530
-559
-546
-144
-219
-183
-1534
-25
-1509
-1014
-1014

-581
-662
-704
-670
-175
-270
-224
-1920
-30
-1890
-1280
-1280

-707
-819
-878
-813
-210
-330
-273
-2379
-36
-2343
-1599
-1599

-854
-1004
-1086
-979
-250
-401
-328
-2925
-42
-2882
-1983
-1983

-1024
-1224
-1336
-1170
-295
-482
-393
-3574
-50
-3524
-2445
-2445

-1222
-1484
-1636
-1392
-347
-578
-467
-4345
-58
-4287
-2999
-2999

-4308

-5392

-6655

-8128

-9845

-11849

-14186

-1896
-299
-1425
-688

-2351
-374
-1794
-874

-2872
-460
-2228
-1094

-3472
-561
-2738
-1357

-4160
-678
-3338
-1669

-4951
-815
-4042
-2041

-5860
-973
-4871
-2483

-19963

-25212

-31413

-38742

-47405

-57647

-69759

-8877
-7801
-150
-926
-1982
-530
-234
-468
-750
-7688
-1468
-607
-387
-5226
-1416
-1416

-11141
-9826
-191
-1124
-2518
-676
-299
-599
-943
-9770
-1881
-758
-495
-6637
-1783
-1783

-13791
-12208
-240
-1344
-3156
-853
-378
-756
-1170
-12251
-2378
-933
-624
-8317
-2215
-2215

-16895
-15009
-297
-1588
-3917
-1064
-472
-945
-1436
-15207
-2976
-1136
-779
-10316
-2723
-2723

-20531
-18305
-366
-1861
-4824
-1318
-586
-1172
-1748
-18730
-3698
-1372
-965
-12695
-3321
-3321

-24791
-22181
-447
-2163
-5905
-1623
-723
-1445
-2114
-22928
-4567
-1646
-1187
-15527
-4023
-4023

-29785
-26740
-545
-2500
-7192
-1988
-887
-1773
-2544
-27931
-5614
-1964
-1455
-18898
-4850
-4850

-13924

-17601

-21932

-27033

-33044

-40129

-48480

-4009
-1844

-5089
-2361

-6374
-2984

-7906
-3734

-9732
-4637

-11910
-5724

-14508
-7033

-1667
-333
-165
-3800
-1562
-1752
-271
-215
-5167
-2577
-2577
-273
259
-947
-162
-131
-268
-275
-110

-2117
-416
-194
-4746
-1952
-2206
-335
-253
-6570
-3245
-3245
-343
263
-1196
-206
-165
-342
-347
-137

-2653
-512
-225
-5846
-2404
-2740
-408
-293
-8221
-4030
-4030
-426
265
-1490
-257
-205
-430
-431
-167

-3291
-624
-257
-7126
-2930
-3369
-492
-335
-10164
-4954
-4954
-523
266
-1837
-319
-252
-535
-529
-202

-4050
-755
-291
-8616
-3541
-4108
-588
-379
-12448
-6039
-6039
-636
267
-2248
-392
-307
-661
-645
-242

-4953
-906
-327
-10352
-4250
-4978
-697
-426
-15134
-7316
-7316
-769
267
-2732
-479
-372
-812
-782
-289

-6029
-1082
-365
-12375
-5075
-6001
-823
-476

-47330

-59170

-72947

-3883
-3565
-318

-4853
-4455
-399

-5982
-5489
-493

-7294
-6690
-604

-8821
-8087
-734

-10596

-12662

-9711
-885

-11599
-1063

-43447

-54316

-66965

-81685

-98816

-118754

-141960

-36481
-35
-95
-3876
-2960

-45587
-44
-120
-4806
-3759

-56176
-54
-149
-5874
-4712

-68489
-66
-183
-7102
-5845

-82805
-80
-222
-8514
-7194

-99452
-96
-269
-10136
-8801

-118808

-18292

-8817
-8817
-925
268
-3305
-582
-447
-992
-942
-342

-88979 -107636 -129350 -154622

-116
-324
-12000
-10713

-89200 -112028 -138762 -170076 -206762 -249747 -300124

E TRMITES DE EXPEDIENTES ADMINISTATIVOS EN LA SITUACIN CON


ROYECTO
4

10

-3377

-4356

-5518

-6897

-8533

-10474

-12780

-1133

-1460

-1846

-2302

-2843

-3483

-4240

-345
-385
-404
-400

-439
-496
-525
-507

-548
-628
-670
-631

-674
-785
-844
-774

-821
-970
-1052
-940

-991
-1190
-1302
-1131

-1189
-1450
-1602
-1353

-106
-160
-134
-1112
-18
-1093
-732
-732

-133
-204
-170
-1437
-23
-1414
-953
-953

-164
-255
-211
-1823
-28
-1795
-1219
-1219

-199
-315
-260
-2282
-34
-2248
-1538
-1538

-239
-386
-315
-2828
-40
-2787
-1922
-1922

-284
-467
-380
-3477
-48
-3429
-2384
-2384

-336
-563
-454
-4248
-56
-4192
-2938
-2938

-3936

-5020

-6283

-7756

-9473

-11477

-13814

-1724
-273
-1306
-633

-2179
-348
-1675
-819

-2700
-434
-2109
-1039

-3300
-535
-2619
-1302

-3988
-652
-3219
-1614

-4779
-789
-3923
-1986

-5688
-947
-4752
-2428

-18319

-23568

-29769

-37098

-45761

-56003

-68115

-8121
-7151
-138
-832
-1824
-489
-216
-432
-687
-7076
-1356
-554
-357
-4809
-1298
-1298

-10385
-9176
-179
-1030
-2360
-635
-281
-563
-880
-9158
-1769
-705
-465
-6220
-1665
-1665

-13035
-11558
-228
-1250
-2998
-812
-360
-720
-1107
-11639
-2266
-880
-594
-7900
-2097
-2097

-16139
-14359
-285
-1494
-3759
-1023
-454
-909
-1373
-14595
-2864
-1083
-749
-9899
-2605
-2605

-19775
-17655
-354
-1767
-4666
-1277
-568
-1136
-1685
-18118
-3586
-1319
-935
-12278
-3203
-3203

-24035
-21531
-435
-2069
-5747
-1582
-705
-1409
-2051
-22316
-4455
-1593
-1157
-15110
-3905
-3905

-29029
-26090
-533
-2406
-7034
-1947
-869
-1737
-2481
-27319
-5502
-1911
-1425
-18481
-4732
-4732

-12841

-16518

-20849

-25950

-31961

-39046

-47397

-3686
-1703
-1534
-304
-145
-3467
-1426
-1606
-246
-189
-4818
-2362
-2362
-250

-4766
-2220
-1984
-387
-174
-4413
-1816
-2060
-310
-227
-6221
-3030
-3030
-320

-6051
-2843
-2520
-483
-205
-5513
-2268
-2594
-383
-267
-7872
-3815
-3815
-403

-7583
-3593
-3158
-595
-237
-6793
-2794
-3223
-467
-309
-9815
-4739
-4739
-500

-9409
-4496
-3917
-726
-271
-8283
-3405
-3962
-563
-353

-11587
-5583
-4820
-877
-307
-10019
-4114
-4832
-672
-400
-14785
-7101
-7101
-746

-14185
-6892
-5896
-1053
-345
-12042
-4939
-5855
-798
-450
-17943
-8602
-8602
-902

-12099

-5824
-5824
-613

155
-869
-149
-120
-247
-252
-100

159
-1118
-193
-154
-321
-324
-127

161
-1412
-244
-194
-409
-408
-157

162
-1759
-306
-241
-514
-506
-192

163
-2170
-379
-296
-640
-622
-232

163
-2654
-466
-361
-791
-759
-279

164
-3227
-569
-436
-971
-919
-332

-43226

-55066

-68843

-3546
-3255
-291

-4516
-4145
-372

-5645
-5179
-466

-6957
-6380
-577

-8484
-7777
-707

-10259
-9401
-858

-12325
-11289
-1036

-39680

-50549

-63198

-77918

-95049

-114987

-138193

-33312
-32
-87
-3525
-2724

-42418
-41
-112
-4455
-3523

-53007
-51
-141
-5523
-4476

-65320
-63
-175
-6751
-5609

-79636
-77
-214
-8163
-6958

-96283
-93
-261
-9785
-8565

-115639

-84875 -103532 -125246 -150518

-113
-316
-11649
-10477

-81699 -104527 -131261 -162575 -199261 -242246 -292623

DA DE TRMITES DE EXPEDIENTES ADMINISTATIVOS EN LA SITUACIN


PROYECTO
4

-3675
-4308
-19963
-13924
-47330

-4654
-5392
-25212
-17601
-59170

-5816
-6655
-31413
-21932
-72947

-7195
-8128
-38742
-27033
-88979

-8831
-9845
-47405
-33044
-107636

-10772
-11849
-57647
-40129
-129350

10

-13078
-14186
-69759
-48480
-154622

-89200 -112028 -138762 -170076 -206762 -249747 -300124

DA - DEMANDA DE TRMITES DE EXPEDIENTES ADMINISTATIVOS EN LA


N CON PROYECTO
4

-3377
-3936
-18319
-12841
-43226

-4356
-5020
-23568
-16518
-55066

-5518
-6283
-29769
-20849
-68843

-6897
-7756
-37098
-25950
-84875

-8533
-9473
-45761
-31961
-103532

-10474
-11477
-56003
-39046
-125246

10

-12780
-13814
-68115
-47397
-150518

-81699 -104527 -131261 -162575 -199261 -242246 -292623

Valor Social del tiempo - rea Urbana (segn Anexo SNIP 10)
Cuadro 55

BENEFICIO POR
TIPO DE SERVICIO

GESTION INSTITUCIONAL
OFICINA DE PLANIFICACION
AUTORIZACION DE AMPLIACION DE NIVEL DE UNA II. EE. PRIVADA
AUTORIZACION DE FUNCIONAMIENTO DE UNA II. EE. PRIVADA
CAMBIO DE DIRECTOR DE UNA II. EE. PRIVADA
OFICINA DE ESTADISTICA
GENERACION DE CODIGO MODULAR PARA UNA II. EE.
CONSTACIA DE UBICACIN GEOGRAFICA
ACTUALIZACION DE PADRON DE INSTITUCIONES EDUCATIVAS
OFICINA DE RACIONALIZACION
REUBICACION DE PLAZAS EXCEDENTES
RENOVACION DE CUADROS DE NECESIDADES DE UNA II. EE.
PRESUPUESTO
ELABORACION, ACTALIZACION, EJECUCION PRESUPUESTAL DE II. EE.

ASESORIA JURIDICA
RECURSO ADMINISTRATIVO DE APELACION
ACCIONES DE CUMPLIMIENTO
CUMPLIMIENTO DE SENTENCIA JUDICIAL
OPINIONES LEGALES

AREA DE ADMINISTRACION
PERSONAL
PLANILLAS - RECONOCIMIENTO DE PAGO POR CREDITO DEVENGADOS
REASIGNACION
PENSION POR CESANTIA / VIUDEZ / ORFANDAD / ASCENDENCIA
OFICINA DE BIENESTAR DE PERSONAL
LICENCIA CON GOCE DE HABER POR ENFERMEDAD / MATERNIDAD
LICENCIA SIN GOCE DE HABER
DESTAQUE POR SALUD
RECORD DE LICENCIAS
ESCALAFON
ASIGNACION POR TIEMPO DE SERVICIOS

CESE Y PENSION PROVISIONAL


RESOLUCION DE SUBSIDIO POR LUTO Y GASTOS DE SEPELIO
INFORME ESCALAFONARIO
REMUNERACIONES
ELAB. Y EDNTEGA DE DUPLICADO DE BOLETA DE REMUNERAICONES

AREA DE GESTION PEDAGOGICA


EDUCACION INICIAL
VISACION DE ACTAS DE EVALUACION
VISACION DE NOMINAS
PRESENTACION DE DOCUMENTOS DE FIN DE AO
TUTORIA
EDUCACION PRIMARIA
VISACION DE ACTAS DE EVALUACION
VISACION DE NOMINAS
PRESENTACION DE DOCUMENTOS DE FIN DE AO
TUTORIA
EDUCACION SECUNDARIA
VISACION DE ACTAS DE EVALUACION
VISACION DE NOMINAS
PRESENTACION DE DOCUMENTOS DE FIN DE AO
TUTORIA
EDUCACION BASICA REGULAR
AUTORIZACION DE CURSO DE MODULOS
APROBACION DE INSTRUMENTOS DE GESTION
AUTORIZACION DE CURSOS DE CAPACITACION
AUTORIZACION DE VIAJES DE PROMOCION - EXCURSION
AUTORIZACION DE CURSOS DE CAPACITACION EXTERNA

DIRECCION
TRAMITE DOCUMENTARIO
RECEPCION Y ENTREGA DE DOCUMENTACION
OFICIOS DEL PODER JUDICIAL
ACTAS Y CERTIFICADOS
VISACION DE CERTIFICADOS DE ESTUDIOS
RECTIFICACION DE NOMBRES Y APELLIDOS
VISACION DE CERTIFICADOS DE ESTUDIOS PARA EL MTC
REGISTRO Y VISACION DE CERTIFICADO DE CAPACITACION (DOCENTES)

REGISTRO Y VISACION DE CERTIFICADO DE CAPACITACION (CETPROS)

BENEFICIO TOTAL

Cuadro 56

BENEFICIO POR
TIPO DE SERVICIO

GESTION INSTITUCIONAL
OFICINA DE PLANIFICACION
AUTORIZACION DE AMPLIACION DE NIVEL DE UNA II. EE. PRIVADA
AUTORIZACION DE FUNCIONAMIENTO DE UNA II. EE. PRIVADA
CAMBIO DE DIRECTOR DE UNA II. EE. PRIVADA
OFICINA DE ESTADISTICA
GENERACION DE CODIGO MODULAR PARA UNA II. EE.
CONSTACIA DE UBICACIN GEOGRAFICA
ACTUALIZACION DE PADRON DE INSTITUCIONES EDUCATIVAS
OFICINA DE RACIONALIZACION
REUBICACION DE PLAZAS EXCEDENTES
RENOVACION DE CUADROS DE NECESIDADES DE UNA II. EE.
PRESUPUESTO
ELABORACION, ACTALIZACION, EJECUCION PRESUPUESTAL DE II. EE.

ASESORIA JURIDICA
RECURSO ADMINISTRATIVO DE APELACION
ACCIONES DE CUMPLIMIENTO
CUMPLIMIENTO DE SENTENCIA JUDICIAL
OPINIONES LEGALES

AREA DE ADMINISTRACION
PERSONAL
PLANILLAS - RECONOCIMIENTO DE PAGO POR CREDITO DEVENGADOS
REASIGNACION
PENSION POR CESANTIA / VIUDEZ / ORFANDAD / ASCENDENCIA
OFICINA DE BIENESTAR DE PERSONAL

LICENCIA CON GOCE DE HABER POR ENFERMEDAD / MATERNIDAD


LICENCIA SIN GOCE DE HABER
DESTAQUE POR SALUD
RECORD DE LICENCIAS
ESCALAFON
ASIGNACION POR TIEMPO DE SERVICIOS
CESE Y PENSION PROVISIONAL
RESOLUCION DE SUBSIDIO POR LUTO Y GASTOS DE SEPELIO
INFORME ESCALAFONARIO
REMUNERACIONES
ELAB. Y EDNTEGA DE DUPLICADO DE BOLETA DE REMUNERAICONES

AREA DE GESTION PEDAGOGICA


EDUCACION INICIAL
VISACION DE ACTAS DE EVALUACION
VISACION DE NOMINAS
PRESENTACION DE DOCUMENTOS DE FIN DE AO
TUTORIA
EDUCACION PRIMARIA
VISACION DE ACTAS DE EVALUACION
VISACION DE NOMINAS
PRESENTACION DE DOCUMENTOS DE FIN DE AO
TUTORIA
EDUCACION SECUNDARIA
VISACION DE ACTAS DE EVALUACION
VISACION DE NOMINAS
PRESENTACION DE DOCUMENTOS DE FIN DE AO
TUTORIA
EDUCACION BASICA REGULAR
AUTORIZACION DE CURSO DE MODULOS
APROBACION DE INSTRUMENTOS DE GESTION
AUTORIZACION DE CURSOS DE CAPACITACION
AUTORIZACION DE VIAJES DE PROMOCION - EXCURSION
AUTORIZACION DE CURSOS DE CAPACITACION EXTERNA

DIRECCION
TRAMITE DOCUMENTARIO
RECEPCION Y ENTREGA DE DOCUMENTACION

OFICIOS DEL PODER JUDICIAL


ACTAS Y CERTIFICADOS
VISACION DE CERTIFICADOS DE ESTUDIOS
RECTIFICACION DE NOMBRES Y APELLIDOS
VISACION DE CERTIFICADOS DE ESTUDIOS PARA EL MTC
REGISTRO Y VISACION DE CERTIFICADO DE CAPACITACION (DOCENTES)
REGISTRO Y VISACION DE CERTIFICADO DE CAPACITACION (CETPROS)

BENEFICIO TOTAL

6.81

BENEFICIO POR AHORRO DE TIEMPO SIN PROYECTO


0

BENEFICIO POR AHORRO DE TIEMPO CON PROYECTO


0

10130

11761

13654

15852

18403

21366

24805

9279

10993

13024

15431

18283

21661

25663

5235

6276

7524

9020

10813

12963

15541

2634

2996

3408

3876

4409

5016

5705

1073

1251

1460

1703

1987

2318

2705

5067

5860

6778

7840

9068

10488

12131

3248

3654

4111

4625

5203

5854

6585

8118

9657

11488

13666

16258

19340

23008

8652

10400

12500

15025

18060

21708

26093

63306

72725

83546

95976

110256

126661

145507

5067

5890

6847

7960

9253

10757

12505

21710

25521

30000

35266

41455

48731

57285

4699

5590

6650

7912

9412

11197

13321

73854

86871

102182

120191

141375

166291

195600

13280

15809

18820

22405

26673

31753

37801

12694

14118

15701

17463

19421

21600

24023

12146

14575

17490

20988

25185

30222

36267

4372

5256

6319

7597

9134

10981

13202

29147

35042

42129

50649

60893

73208

88014

7253

8511

9989

11722

13757

16144

18946

24683

29737

35825

43161

51998

62645

75472

13657

15858

18412

21378

24822

28821

33464

6742

8090

9708

11650

13980

16776

20131

53302

63442

75511

89876

106974

127324

151546

13416

15778

18557

21826

25670

30191

35508

18414

22172

26696

32143

38702

46599

56108

18414

21918

26088

31052

36961

43993

52364

5312

6172

7172

8334

9685

11254

13077

5271

5558

5861

6180

6517

6872

7247

21579

25077

29142

33866

39356

45735

53149

21579

25380

29849

35106

41289

48561

57113

5082

5812

6647

7602

8695

9944

11372

6783

7156

7551

7967

8405

8868

9357

31827

37422

44000

51735

60830

71524

84098

31827

37422

44000

51735

60830

71524

84098

3984

4673

5481

6429

7540

8844

10374

2234

1367

836

512

313

192

117

3490

4148

4929

5858

6961

8273

9832

3528

4144

4867

5717

6715

7887

9265

5884

7039

8420

10073

12049

14414

17243

2884

3390

3986

4685

5508

6475

7612

3408

3917

4502

5174

5946

6833

7853

30209

35117

40823

47456

55166

64129

74548

3800

4445

5200

6083

7116

8325

9738

423972

492979

573218

666517

775001

901143

1047815

930

1084

1265

1476

1722

2009

2344

1471

1727

2027

2380

2793

3279

3850

78203

89878

103297

118719

136443

156814

180226

47713

56801

67620

80500

95833

114087

135818

1190557

1390458

1625112

1900356

2223120

2601596

3045443

10

10

28798

33434

38816

45065

30406

36024

42681

50567

18631

22335

26776

32100

6490

7382

8397

9552

3155

3681

4295

5011

14030

16228

18770

21710

7409

8335

9376

10549

27371

32561

38735

46080

31363

37698

45313

54465

167157

192028

220600

253423

14537

16899

19645

22838

67339

79158

93051

109383

15847

18852

22428

26681

230074

270624

318320

374423

45001

53573

63778

75926

26718

29714

33048

36755

43520

52224

62669

75203

15872

19082

22942

27582

105815

127216

152945

183878

22234

26093

30621

35936

90925

109542

131971

158992

38855

45114

52381

60820

24157

28989

34787

41744

180375

214689

255531

304143

41761

49116

57767

67940

67557

81342

97940

117925

62327

74186

88302

105103

15195

17657

20518

23842

7642

8058

8498

8961

61764

71776

83410

96931

67172

79002

92915

109279

13006

14875

17012

19457

9872

10416

10990

11595

98882

116265

136704

160736

98882

116265

136704

160736

12168

14272

16740

19635

72

44

27

16

11684

13885

16502

19610

10882

12782

15014

17636

20627

24676

29519

35312

8948

10520

12366

14538

9025

10372

11921

13700

86660

100740

117108

136135

11392

13326

15589

18236

1218361

1416666

1647247

1915358

2735

3190

3722

4343

4519

5305

6228

7311

207134

238058

273600

314448

161688

192486

229150

272797

3566035

4176758

4893367

5734403

OBJETIVOS

ACTIVIDADES

1.1.Construccinde
infraestructurabsicay
complementaria.

2.1.Adquisicinde
mobiliario.

3.1.Capacitacinal
personaldelaUGEL,
AdecuacindelTUPA
conmetodologiade
costosysimplificacin
administrativa,
actualizacindelMOFy
elaboracindelMAPRO

INDICADORES
ElaboracindelExpedienteTcnico,poruncostodeS/.161,084.17enunplazodetres(03)meses.
Err:509
DESCRIPCION POR COMPONENTES

COMPONENTE 1: INFRAESTRUCTURA
ESTRUCTURAS
ARQUITECTURA
Err:509
INST.ELECTRICAS
IMPACTOAMBIENTAL
GASTOSGENERALES
UTILIDAD
IGV
EXPEDIENTETECNICO
COMPONENTE 2: ADQUISICIN DE MOBILIARIO Y
EQUIPAMIENTO
MOBILIARIOYEQUIPAMIENTO
IGV
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
VALOR REFERENCIAL
GESTIONDELPROYECTO
SUPERVISIONYLIQUIDACIONDEOBRA

PRESUPUESTO TOTAL
AdquisicindemobiliarioyEquipamientoS/.22,356.55enunplazodedosymedio(2.5)meses.

Err:509

Err:509

Err:509

Err:509

INDICADORES

61,084.17enunplazodetres(03)meses.

PRESUPUESTO

Err:509
321,121.36
46,545.97
Err:509
53,624.40
14,568.41
42,932.22
26,151.61
90,889.92
161,084.17
22,356.55
18,946.23
3,410.32
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
11,500.00
370,969.35

unplazodedosymedio(2.5)meses.

Err:509

MEDIOS DE VERIFICACION

SUPUESTOS

Informedeavancefsicoyfinancierodel Asignacinpresupuestariaoportunaporel
proyecto.CuadernodeObra.
GobiernoRegionalCajamarca

Conformidadderecepcindebienes

LaoficinadelogsticadelGobiernoRegional
Cajamarcacuenteconpersonalcapacitado
Informedeliquidacindelproyecto.pararealizarlosprocesosdeadquisiciny
TUPA
contratacindebienesyservicios
actualizadoconestructuradecostos adecuados
MOFactualizadoy
MAPRO

PROGRAMA: FORTALECIMIENTO DE LA GESTIN DEL SISTEMA EDUCATIVO


CAPACITACION PEDAGOGICA

ACTI VI DADES

Fortalecimiento al Liderazgo del Director dentro del


Nuevo Marco Curricular dirigido a Directores de la
EBR

RetroalimentacindelBuenUsoconelnuevodiseo
curricularnacional

Planificacin Curricular con el nuevo diseo


curricularnacionalaDocentesdelaEBR

EjeBuenTrato:Bullying

ConviviendoMejorenmiIE

Fortalecimiento de Habilidades Investigativas en las


II.EE.deEBR
TOTAL

CAPACITAC
C

RECURSO REQUERIDO

a) RECURSOS HUMANOS
Capacitadores

Profesionalespecializadoencapacitacin

ProfesionalespecializadoenCapacitacinen
SimplificacinAdministrativayelaboracinde
instrumentosdegestin

Especialistas

Especialistaenactualizacinyelaboracinde:
TUPA,MAPROyMOF

b) RECURSOS MATERIALES

Materialimpresoparalosasistentes

TallerdeCapacitacin

c) RECURSOS ADMINISTRATIVOS Y LOGSTICOS


-Alimentacinparticipantes
GastosLogsticosparalarealizacindelostalleres

PRO
ACTI VI DADES

AtiendasedemaneraintegralalaUnidaddeGestin
EducativaLocaldeCajamarca

Personal administrativo de la UGEL CAJAMARCA,


cuentan con una infraestructura adecuada que
permita atender de manera descentralizada,
participativa,pertinentealasII.EE.Delmbito
jurisdiccionaldel.
Organizacin de eventos de capacitacin para el
personalauxiliar,tcnicoyprofesionaldela
sededelaUGELCAJAMARCA.

FUENTE: UGEL CAJAMARCA rea de Gestin Institucional,


ao 2013.

ACTI
PROGRAMACIN DE ACTIVID

TEMA EDUCATIVO

OBJETIVOS ESPECIFICOS

REALIZARYANALIZARDIAGNOSTICOINSTITUCIONALPARAELABORARELPLANANUALDE
TRABAJOCONLOSCOMPROMISOSYPROGRAMACIONESCURRICULARESUTILIZANDORUTASD
APRENDIZAJE

SocializaicondelNuevoSistemaCurricular.ProgramacionCurricular,EvaluacinCurricular,Programade
RuatasdeAprendizaje

REALIZARLAPLANIFICACIONANUAL,DEUNIDADYSESIONDEAPRENDIZAJEUTILIZANDOEL
ENFOQUEDECOMPETENCIA

JornadasTecnologicaspararedesII.EE

TalleresdeCapacitaciones:Educacionambiental,rutasdeaprendizaje,elaboraciondedocumentosde
gestion

Directoresydocentes,Instrumentostecnicospedagogicosydegestiondebidamenteactualizados

COSTO TOTAL

CAPACITACIN AL PERSONAL DE LA UGEL CAJAMARCA CAJAM


COSTO DE INVERSIN A PRECIOS DE MERCADO
ALTERNATIVAS 1 Y 2
DESCRIPCIN

Profesionales Especialistas en Capacitacin


Profesionales titulados en ciencias de la educacin o ingeniera; capacitado en manejo de estrategias y
metodologas activas; con experiencia mnima de 02 aos en capacitacin. TEMAS:
Capacitacinenprogramasquehacenusoenelsectoreducacin.
MAD(ModulodeAdministracinDocumentaria)
REGISTRO(AplicativodelaSunat)
PDTPLANET(AplicativodelaSunat)
AIRHSP(AplicativoInformticodeRecursosHumanosdelSectorPublico).
AFPNET(PagosdeAFPdelPersonalactivo).
SIAF(SistemaIntegradodeAdministracinFinanciera).
SIGA(SistemaIntegradodeGestinAdministrativa).
SUP(SistemanicodePlanillas).
SIRA(SistemadeRacionalizacin).
NEXUS
Capacitacinparamejorarlasupervisin,seguimientoymonitoreodelasaccionesque
desarrollanlosdirectoresydocentesdelasI.E.
TalleresdeInvestigacin,paradirectoresdelaIIEE,docentesdelosCETPROS,ydelareade
educacinparaeltrabajo(EBR)

Profesional titulado en ciencias de Sociales, Economa o educacin o ingeniera; capacitado en mane


de estrategias
y metodologas activas; con experiencia mnima de 01 ao y 8 prestaciones
Municipales y/o UGELs:

CapacitacinyelaboracindeinstrumentosdeGestion(SimplificacinAdinistrativa,Gestinporprocesos
determinacindecostosdeprocedimientosadministrativosyactualizaciondelTUPA)

CapacitacinyelaboracindeinstrumentosdeGestion(MANUALORGANIZACINYFUNCIONES,
MANUALDEPROCEDIMIENTOSADMINISTRATIVOS)

Profesionales Especialistas en TUPA, MAPRO y MOF

ActualizacinyAdecuacindelTUPA

ElaboracindelMAPRO
ActualizacinyAdecuacindelMOF

04Manualdeldocente,03separatas,blockdenotasylapicero.
Manualdeldocente
Separatas
Blockdenotas
Lapicero
Certificado
Juegosdeplumonesnormalesyparapizarrablanca,ppelografos,cintamaskingtape.
Plumonesparapapel
Plumonesparapizarrablanca
Papelgrafos
Cintamaskingtape

Y LOGSTICOS
Alimentacin(S/.10.00pordaporparticipante,para81participantesdauntotalS/.810,00,solose
consideralamitadsoloparatalleresde8horas).
Trasladodemateriales,equiposeinstalacin

TOTAL COSTO DIRECTO

PROGRAMA: FORTALECIMIENTO DE LA GESTIN


RES ULTADO

LasII.EE.Delmbitototaldelajuridiccindel,recibenatencinintegral,conenfsisen

gestineducativa.

Ntrabajadores(auxiliares,tcnicosyprofesionales)querecibencapacitacin.

Trabajadorescapacitados,atravsdediversos
eventos.

ACTIVIDADES DE CAPACITACIN
CTIVIDADES EN EL PROGRAMA ESTRATGICO - AO 2014

PERIODICIDAD

N MXIMO DE
PARTICIPANTES POR
CAPACITACIN

TOTAL
PARTICIPANTES

META

REGULAR

120

275.00

791

PERMANENTE

120

3867.00

4352

PERMANENTE

50

1588.00

1910

REGULAR

120

400.00

400

REGULAR

120

300.00

300

PERMANENTE

120

43.00

50

6473.00

7803.00

CAJAMARCA
O

UNIDAD

CANTIDAD

COSTO/H
REF. S/.

TOTAL

136,000.00
Profesional

99,600.00
73,200.00

CAPACITACION

1Taller-8horaspara2
grupos

200.00

3,200.00

CAPACITACION

1TALLERDE8horas

200.00

1,600.00

CAPACITACION

2TALLERDE6horas

200.00

1,200.00

CAPACITACION

1TALLERDE8horas

200.00

1,600.00

CAPACITACION

1Tallerde2horas

600.00

1,200.00

CAPACITACION

3Talleres-8horaspara8
personas

300.00

7,200.00

CAPACITACION

2Talleres-8horaspara
dosgrupos

300.00

9,600.00

CAPACITACION

1Tallerde4horaspara4
personas

200.00

800.00

CAPACITACION

1Taller-8horaspara6
personas

200.00

1,600.00

CAPACITACION

1Taller-8horaspara4
Personas

250.00

2,000.00

CAPACITACION

3Talleresde8horaspara
tresgrupos

300.00

21,600.00

CAPACITACION

3Talleresde8horaspara
tresgrupos

300.00

21,600.00

26,400.00

PROFESIONAL/TALLER-
3Talleresde8horaspara
CONFERENCIAStresgrupos
CAPACITACION/HORA

300.00

21,600.00

PROFESIONAL/TALLER-
CONFERENCIASCAPACITACION/HORA

300.00

4,800.00

1Tallerde8horaspara
dosgrupos

Profesional
ESPECILISTAEN
SIMPLIFICACIN
ADMINISTRATIVA
PROFESIONAL
ESPECIALISTA
PROFESIONAL
ESPECIALISTA

36,400.00

20,000.00

20,000.00

11,400.00

11,400.00

5,000.00

5,000.00

20,301.00
17,901.00
CARPETA/PART

81

125.00

10,125.00

CARPETA/PART

81

80.00

6,480.00

CARPETA/PART

81

5.00

405.00

CARPETA/PART

81

1.00

81.00

CARPETA/PART

81

10.00

810.00

KITDEMATERIALDE
APOYOPEDAGGICO

1KITX8TALLERES

Caja

20

22.00

440.00

Caja

20

28.00

560.00

Ciento

30

40.00

1,200.00

Unid

40

5.00

200.00

2,400.00

21,936.17
Alimentacin/participante

27

405.00

10,935.00

GastosLogsticos/Taller

30

366.71

11,001.17

178,237.17

STIN DEL SISTEMA EDUCATIVO


I NDI CADOR/UNI DAD
DE MEDI DA

% de II.EE. Que reciben


atencin en las diferentes
reas de la UGEL
CAJAMARCA.

META

1ER

2do

PROGRAMADA

TRI MES TRE

TRI MES TRE

100.00%

81

Nequiposeducativos
organizadosycapacitados
anualmente.

DURACION DIAS

Material para
capacitacin S/.

Refrigerios S/.

Viticos S/.
Especialistas y
equipo soporte

Alquiler de
local

9.00

6833.50

7443.00

7500.00

4500.00

13.00

510.00

15000.00

1500.00

6500.00

3.00

6833.50

7443.00

1500.00

1500.00

3.00

1813.00

1400.00

450.00

1500.00

1.00

100.00

600.00

150.00

500.00

2.00

434.00

300.00

150.00

1000.00

31.00

16524.00

32186.00

11250.00

15500.00

75,460.00

2
1
2
1
1
3
4
1
1
1

3er
RO
TRI MES TRE

X
25,500

ITEM
A
1
2
3
4
5
6
B
1
2
3
4
5
ITEM
A
1
2
3
4
B
1
2
3
4
TOTAL

PLANES DE MANEJO AMBIENTAL


EN LA ETAPA DE CONSTRUCCIN
PLANDECOORDINACINCIUDADANA
PLANDESEALIZACINYCONTROLDETRFICO
PLANDESEGURIDADEHIGIENEOCUPACIONAL
PLANDEMONITOREOYPROTECCINAMBIENTAL
PLANDEMANEJODERESIDUOS
PLANDEMITIGACINSOCIOAMBIENTALDECOMUNICACINPORAFECTACINENREASDEINFLUENCIA
EN LA ETAPA DE OPERACIN
PLANDEARBORIZACIN
PLANDEMANEJODERESIDUOSSOLIDOS
PLANDESEALIZACINPARALAACCESIBILIDADVEHICULAR
PLANDESEGURIDAD
PLANDEMONITOREOYPROTECCINAMBIENTAL
MEDIDAS DE PREVENCIN Y MITIGACIN
EN LA ETAPA DE CONSTRUCCIN
CONTAMINACINAUDITIVA
IMPACTOSOBREELMEDIOBIOLGICO
ALTERACINDELTRNSITOVEHICULARENELREADEINFLUENCIA
AFECTACINDESUELOSYPAVIMENTOS
EN LA ETAPA DE OPERACIN
DETERIORODELACALIDADDEAIRE
CONTAMINACINAUDITIVA
PERTURBACINARESIDENTESENELREADEINFLUENCIA
IMPACTOSPORGENERACINDERESIDUOSSOLIDOS
TOTAL

COSTO

6,000.00
4,000.00
4,000.00
8,500.00
42,477.19
6,000.00
VARIABLE
VARIABLE
VARIABLE
VARIABLE
VARIABLE
COSTO

13,000.00
5,500.00
6,500.00
15,000.00
VARIABLE
VARIABLE
VARIABLE
VARIABLE
S/. 110,977.19

CRONOGRAMA DE INVERSION DE METAS FISICAS - UGEL CAJAMARCA


N

DESCRIPCION

UNIDAD

METRADO

PRESUP.

GBL

1.00

Err:509

AO 2016 - 2017
Mes 1

Mes 2

Mes 3

Mes 4

Mes 5

Mes 6

Mes 7

Mes 8

Mes 9

Mes 10

Mes 11

Mes 12

Mes 13

Mes 14

Mes 15

14,433.64

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

14,433.64

43,300.92

43,300.92

28,867.28

28,867.28

28,867.28

28,867.28

28,867.28

28,867.28

14,433.64

Mes 16

TANGIBLES

I.1

COMPONENTE 1: INFRAESTRUCTURA

ESTRUCTURAS

GBL

1.00

288,672.81
5.00%

I.5

II

II.1

III

Err:509

GBL

INST.ELECTRICAS

GBL

IMPACTOAMBIENTAL

GBL

COMPONENTE 2: ADQUISICIN DE MOBILIARIO Y EQUIPAMIENTO

MOBILIARIOYEQUIPAMIENTO

GBL

GBL

COMPONENTE 3: CAPACITACIN, ADECUACIN DEL TUPA, MOF Y


ELABORACIN DEL MAPRO

III.1 Err:509

GBL

GLB

III.2 Err:509

GLB

III.3 Err:509

GLB

III.4 Err:509

GLB

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

2.00

15.00%

10.00%

10.00%

10.00%

10.00%

10.00%

10.00%

5.00%

6276.39

6276.39

4184.26

4184.26

4184.26

4184.26

4184.26

6276.39
15.00%

41,842.61
5.00%

15.00%

15.00%

10.00%

10.00%

10.00%

10.00%

10.00%

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

15.00%

15.00%

10.00%

10.00%

10.00%

10.00%

10.00%

10.00%

10.00%

7,230.87

7,230.87

7,230.87

4,820.58

4,820.58

4,820.58

4,820.58

7,230.87

15.00%

15.00%

15.00%

10.00%

10.00%

10.00%

10.00%

Err:509

48,205.78

13,096.31

22,356.55

22,356.55

15.00%
13096.31

LICITACIN OBRA

I.4

GBL

EXPEDIENTE TECNICO

I.3

ARQUITECTURA

LICITACIN ESTUDIOS

I.2

15.00%
2,092.13

100.00%
11,178.28

11,178.28

50.00%

50.00%

11,178.28

11,178.28

50.00%

50.00%

Err:509

Err:509

Err:509

Err:509

Err:509
Err:509

Err:509

50.00%

50.00%

LIQ U IDAC IO N D E O B RA

Err:509
Err:509

Err:509

50.00%

50.00%

Err:509
Err:509

Err:509

50.00%

50.00%

Err:509
Err:509

Err:509

50.00%

50.00%

Err:509

INTANGIBLES
1.00 GASTOSGENERALES

GBL

1.00

32,216.83
2.00 EXPEDIENTETECNICO

GBL

3.00 SUPERVISION,LIQUIDACIONYGESTIONDELPROYECTO

AVANCE MENSUAL
AVANCE ACUMULADO

GBL

1.00

1.00

4,293.22

4,293.22

4,293.22

4,293.22

4,293.22

4,293.22

4,293.22

4,293.22

4,293.22

4,293.22

10.00%

10.00%

10.00%

10.00%

10.00%

10.00%

10.00%

10.00%

10.00%

10.00%

7,737.88

26,772.85

30,597.55

30,597.55

30,597.55

30,597.55

30,597.55

30,597.55

30,597.55

26,772.85

42,932.22
64,433.67

64,433.67

161,084.17
20.00%

40.00%

40.00%

34,333.75

26,772.85

26,772.85

19,123.47

382,469.35

Err:509

8.98%

7.00%

7.00%

2.02%

7.00%

8.00%

8.00%

8.00%

8.00%

8.00%

8.00%

8.00%

7.00%

5.00%

66,550.59

91,206.52

91,206.52

26,464.74

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

19,123.47

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

66,550.59

157,757.11

248,963.63

275,428.37

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

AO 1
1

1.- LICITACIN
EXPEDIENTE
2.- EXPEDIENTE
TCNICO

AO 2

10

11

12

1.- LICITACIN DE OBRA


2.- CONSTRUCCIN INFRAESTRUCTURA
3.- SUPERVISIN DE OBRA
4.- LIQUIDACIN DE OBRA

12

1.- VIDA
2.-OPERACI

AO 3

1.- VIDA TIL DEL PROYECTO


2.-OPERACIN Y MANTENIMIENTO

AO 12

También podría gustarte