Piping Engineering

Inspection

PIPING INSPECTOR
1
Email : batamtraining@gmail.com

website : www.batamtraining.com

PIPING INSPECTOR
By : Made Wisnawa Putra

Email : batamtraining@gmail.com

website : www.batamtraining.com

BEFORE FABRICATION
Material receiving inspection
Issuing material process and material
traceability
Transportation material from W/H to Shop,
inspection during material handling, lifting
etc.
Material protection/preservation inspection
prior to deliver to fabrication shop.

Email : batamtraining@gmail.com

website : www.batamtraining.com

Material Inspection Flowchart :

Email : batamtraining@gmail.com

website : www.batamtraining.com

Material Inspection Flowchart ( continue )

Email : batamtraining@gmail.com

website : www.batamtraining.com

Note :

Email : batamtraining@gmail.com

website : www.batamtraining.com

Who responsible during inspection material ?

Email : batamtraining@gmail.com

website : www.batamtraining.com

Who responsible during inspection material ?

Email : batamtraining@gmail.com

website : www.batamtraining.com

Who responsible during inspection material ?

Email : batamtraining@gmail.com

website : www.batamtraining.com

Pipe material traceability :

Email : batamtraining@gmail.com

website : www.batamtraining.com

10

MATERIAL
PRESERVATION

Email : batamtraining@gmail.com

website : www.batamtraining.com

11

CRA Pipe PRESERVATION ( 1 )


STORAGE

Email : batamtraining@gmail.com

website : www.batamtraining.com

12

CRA Pipe PRESERVATION ( 2 )


PROTECTION DURING FIT UP SPOOL

Email : batamtraining@gmail.com

website : www.batamtraining.com

13

CRA Pipe PRESERVATION ( 3 )


Protection after Fabrication/Laydown

Email : batamtraining@gmail.com

website : www.batamtraining.com

14

DURING FABRICATION
Match material with spool/ISO drawing ( size,
rating, THK, material spec etc )
Correct WPS and certified Welder
Spool Dimensional Control ( DC ) check before
spool release from shop is mandatory to
ensure no OOT or re work at erection stage.

Email : batamtraining@gmail.com

website : www.batamtraining.com

15

FABRICATION SEQUENCE
Marking and cutting
Select the pipe as per isometric drawing
Visual checking and check the ovality
Lay the pipe on the proper bed, jack or fixture
Fix the reference point
Select proper tool for more accuracy
Mark on the pipe to the required dimension
Punch mark on the pipe
Cut the pipe trace to the punch mark
Fit and Weld
Email : batamtraining@gmail.com

website : www.batamtraining.com

16

Spool dimensional Check ( DC )

Email : batamtraining@gmail.com

website : www.batamtraining.com

17

MEASURING METHODS

Email : batamtraining@gmail.com

website : www.batamtraining.com

18

Email : batamtraining@gmail.com

website : www.batamtraining.com

19

Email : batamtraining@gmail.com

website : www.batamtraining.com

20

Email : batamtraining@gmail.com

website : www.batamtraining.com

21

Spool dimensional Check ( DC )

Email : batamtraining@gmail.com

website : www.batamtraining.com

22

Spool dimensional Check ( DC )

Email : batamtraining@gmail.com

website : www.batamtraining.com

23

Spool dimensional Check ( DC )

Email : batamtraining@gmail.com

website : www.batamtraining.com

24

Spool dimensional Check ( DC )

Email : batamtraining@gmail.com

website : www.batamtraining.com

25

Spool dimensional Check ( DC )

Email : batamtraining@gmail.com

website : www.batamtraining.com

26

Inspection to check Pipe to Elbows


Alignment

Use a pipe jack or working on a flat


surface

Put the spirit level on top of the pipe and


on the Elbow surface in vertically
position then adjust their position until
the bubble of level in the middle

Piping Dimensional Control Training


CTC - August
Edition
Email2011
: batamtraining@gmail.com

website : www.batamtraining.com

27

Inspection - PipE TO elbow

Make reference line by using chalk line


and make sure it is parallel with the pipe
center line

Make sure the distance between the


reference line and the pipe center line at
both end of pipe location are the same

Then measure the distance between two


sides of the Elbow and reference line and
ensure their alignment
Email : batamtraining@gmail.com

website : www.batamtraining.com

28

Inspection -Flange-PipE-flange

Determine the distance from the end


of the pipe to a specific reference point
by using try square and ruler then
marked the point.
(E.g.: the reference distance is 100mm)

Do the same thing at the other end of


pipe location

Through the two points then


pulled the roll meter to measure
the length of the pipe and plus
two times the reference distance
(E.g.: plus 2x100 mm)

Email : batamtraining@gmail.com

website : www.batamtraining.com

29

PipE-elbow-pipE
Pipe-Elbow-Pipe Alignment Measurment

Use a pipe jack or working on the flat surface

Place the spirit level on the pipe and adjust


their level

Then place the spirit level on the Flange


through the two pins, ensure their level
position

Email : batamtraining@gmail.com

website : www.batamtraining.com

30

Inspection -PipE-elbow-pipE

Determine the distance from the


midpoint of welded joints to a certain
reference point by using roll meter and
marked the point
(E.g. the reference distance of 1 meter
from the midpoint of welded joints)

Do the same thing at the other end of


pipe

Through the two points then pulled the


roll meter to measure the actual length
of the hypotenuse

Compare the actual results with


Pythagoras formula
C
B

C = ( A2 + B2)
Email : batamtraining@gmail.com

website : www.batamtraining.com

31

Inspection - PipE TO flange


Pipe -Flange Alignment Measurement

Use a pipe jack or working on the flat


surface

Place the spirit level on the pipes and adjust


their level

Then place the spirit level on the Flange


through the two pins, ensure their level
position

After their position


are level, determine
the midpoint of the
flange through the
meeting points of
contact line between
two holes flange

Email : batamtraining@gmail.com

website : www.batamtraining.com

32

Inspection-Pipe to flange
Pipe Centre Line in (00) positions

Determine the center line in flat


pipe position (00) by using KURVO-MARK in a level condition, make
the device line position and
marked the points

Then place the device in reverse


position with the same line
location and marked the points

Do the same things at the other


end of pipe connection

Email : batamtraining@gmail.com

website : www.batamtraining.com

33

Inspection-Pipe to flange

Make a straight line that passes


through the midpoint of the two
points marking of Kurv-O-Mark that
indicating the pipe centre line

Email : batamtraining@gmail.com

website : www.batamtraining.com

34

Inspection - Pipe to flange


Pipe-Flange Alignment at (00) position

Put the try square ruler at (00)


position crossed the midpoint of the
flange and make sure the ruler is
parallel to the center line on the pipe

Then measure the distance between


the center line of pipe with a ruler to
ensure their alignment

Perform measurements at two


locations on both ends of the
connection pipe

Email : batamtraining@gmail.com

website : www.batamtraining.com

35

Inspection - Pipe to flange


Pipe-Flange Alignmet at (900) Positions

Put the try square ruler at (900)


position crossed the midpoint of the
flange and make sure the ruler is
parallel to the center line on the pipe

Then measure the distance between


the center line of pipe with a ruler to
ensure their alignment

Perform
measurements at
two locations on
both ends of the
pipe connections

Email : batamtraining@gmail.com

website : www.batamtraining.com

36

FABRICATION TOLERANCE standard

Email : batamtraining@gmail.com

website : www.batamtraining.com

37

PFI-ES-3

Email : batamtraining@gmail.com

website : www.batamtraining.com

38

Email : batamtraining@gmail.com

website : www.batamtraining.com

39

AFTER FABRICATION
Ensure Pipe End Cover/Preservation during
transportation from shop to lay down area or
Module/ platform installation area.
Check latest rev drawing prior to install the spool
to avoid re work post installation.
Internal cleaning inspection ( Boroscope camera
maybe can use )
Line Walk to check actual installation comparing
with latest Rev drawing/design/3 D model.
Email : batamtraining@gmail.com

website : www.batamtraining.com

40

SITE PIPING INSPECTION FINDING

Email : batamtraining@gmail.com

website : www.batamtraining.com

41

Anomaly found during site inspection sample :

Purging connection
for hookup spool
was not considered
during design phase
result in:
New fittings
needs to be
ordered (Tee,
Threadolet,
Cap, Plug,
Flange, Blind
Flange)
Rework on
fabricated spool
Hold up testing
progress
Email : batamtraining@gmail.com

website : www.batamtraining.com

42

Anomaly found during site inspection sample :

The use of non-standard


fitting on purging
connection (nipple
NPTF) during design
stage
Procurement purchased
incorrect material
Nipple NPT (which is a
standard material) and
Plug.
Material received as per
PO Placed
Cap need to be ordered
to replace plug for the
mating of the NPT nipple
All isometric with the
same arrangement
needs to be redlined.
Email : batamtraining@gmail.com

website : www.batamtraining.com

43

Anomaly found during site inspection sample :

As per procedure all


deluge line tapping point
shall be taken from the
top of main header pipe
Some of deluge line
tapping point was taken
from the bottom of
header
pipe;
hence
rework is required to fix
the issue.
Some sample of design
snap shot and redline on
the right side

Email : batamtraining@gmail.com

website : www.batamtraining.com

44

Anomaly found during site inspection sample :

Modification on spray nozzle routing due to spray pattern was obstructed by pipe, cable
tray and pipes
PDMS model

Actual Condition

Redline for re-routing


of the spray nozzle

Email : batamtraining@gmail.com

website : www.batamtraining.com

45

Deluge Line ( Spray nozzle pattern obstruction)


PDMS model

Redline for re-routing


of the spray nozzle

Actual Condition

Email : batamtraining@gmail.com

website : www.batamtraining.com

46

Deluge Line ( Spray nozzle pattern obstruction)


PDMS model

Actual Condition

Redline for re-routing


of the spray nozzle

Email : batamtraining@gmail.com

website : www.batamtraining.com

47

Deluge Line ( Spray nozzle pattern obstruction)


Actual Condition

Redline for re-routing


of the spray nozzle

Email : batamtraining@gmail.com

Field run tubing, cable tray, and


pipe support needs to consider
spray pattern of deluge nozzle
In ESSO project, it was the pipe
that was modified instead of the
field run
Fortunately all deluge piping
modification was not required to
be re-tested; the modification
was considered as closure weld;
specific method statement and
SQ was raised and approved by
Client

website : www.batamtraining.com

48

Anomaly found during site inspection sample :


Small Bore Bracing was
never modeled on the
PDMS; the requirement
of small bore bracing
was only mentioned on
support standard but
none was noted on
isometric; the detail
drawing for the small
bore bracing was
developed later on the
project and not as per
support standard. It was
approved through SQ
and method statement
was generated for the
welding of bracing to
tested lines.

Email : batamtraining@gmail.com

website : www.batamtraining.com

49

Anomaly found during site inspection sample :


Design of pipe support
hanging on stair member
was rejected by EAPL and
site need to propose new
design sketch and get
approval
from
EAPL
through SQ.
This is last
minute
comment and all module
already shipped to the
BARGE.
Design review before
design drawing issued
need to have final review
from Client .
Email : batamtraining@gmail.com

website : www.batamtraining.com

50

Anomaly found during site inspection sample :


Site need to improve on
comprehension of detail
drawing especially on
pipe
support
detail
drawing to minimize
unnecessary punch list
after line walk or during
re instatement. Do it right
at the first beginning is
really important to avoid
re work and spent MH.

Email : batamtraining@gmail.com

website : www.batamtraining.com

51

Gap between Pipe to Close (1 ) Site


installation Gap not follow Design PDMS

Email : batamtraining@gmail.com

website : www.batamtraining.com

52

Gap between Pipe to Close -2 Pipe Gap as per PDMS )

Email : batamtraining@gmail.com

website : www.batamtraining.com

53

Welding Distance to Close

Email : batamtraining@gmail.com

website : www.batamtraining.com

54

CLASH - Pipe penetration with tubing penetration

Email : batamtraining@gmail.com

website : www.batamtraining.com

55

Boroscope
BOROSCOPE Camera :
To check internal pipe cleanliness before or after
spools installation completed.
With this equipment we can found any debris or
not required thing inside the pipe.

Email : batamtraining@gmail.com

website : www.batamtraining.com

56

Boroscope inspection finding - sample


Found foreign material during boroscope cleanliness
inspection, spool KB110233 (drawing; M-PBCDD-AI-3679-01sht1) CS 1 sch XXS

Email : batamtraining@gmail.com

website : www.batamtraining.com

57

Boroscope
Found welding wire during boroscope cleanliness inspection,
spool KA210381

Email : batamtraining@gmail.com

website : www.batamtraining.com

58

Boroscope
Found foreign material during boroscope
cleanliness inspection, M2A Mezanine Deck,
Manifold Line. (foreign material stuck
between flanges)

Email : batamtraining@gmail.com

website : www.batamtraining.com

59

Boroscope
Found baslting sand during boroscope
cleanliness inspection, Location M2B
Mezzanine Deck, Open Drain Carbon Steel

Email : batamtraining@gmail.com

website : www.batamtraining.com

60

Boroscope
Found welding wire during Boroscope
Inspection, and water trap inside because in
the centre of End Cap got hole, so water can
go inside.

Email : batamtraining@gmail.com

website : www.batamtraining.com

61

DESIGN ERROR
Bolt removal space
in some place was
not adequate prior
to remove the
valves we need
to cut

Email : batamtraining@gmail.com

website : www.batamtraining.com

62

DESIGN ERROR

Piping connection as per design


Isometric to LO cooler Nozzle was
error and we need to do total station
DC and fabricate the new spools, drain
LO cooler inside the pipe and
BOROSCOPE cleanliness check ( inside
the pipe ) prior to start installation.

Email : batamtraining@gmail.com

website : www.batamtraining.com

63

CLASH -Site Installation

Email : batamtraining@gmail.com

website : www.batamtraining.com

64

Flange management

Flange face damage due to poor


handling

Email : batamtraining@gmail.com

website : www.batamtraining.com

65

Flange management

Email : batamtraining@gmail.com

Mating flange distorted, for different


flange material the torque value should
be calculated base on the lowest
mechanical properties (yield strength)

website : www.batamtraining.com

66

Piping Inspector Guideline :


API 570 :

Email : batamtraining@gmail.com

website : www.batamtraining.com

67

Email : batamtraining@gmail.com

website : www.batamtraining.com

68

Project Specification/ITP
From NB Project :

Email : batamtraining@gmail.com

website : www.batamtraining.com

69

Project Specification/ITP
From NB Project :

Email : batamtraining@gmail.com

website : www.batamtraining.com

70

Project Specification/ITP
From NB Project :

Email : batamtraining@gmail.com

website : www.batamtraining.com

71

Project Specification/ITP
From NB Project :

Email : batamtraining@gmail.com

website : www.batamtraining.com

72

Project Specification.
From GG Project :

Email : batamtraining@gmail.com

website : www.batamtraining.com

73

Project Specification
From GG Project :

Email : batamtraining@gmail.com

website : www.batamtraining.com

74

Project Specification
From GG Project :

Email : batamtraining@gmail.com

website : www.batamtraining.com

75

CODE & STANDARD

Email : batamtraining@gmail.com

website : www.batamtraining.com

76

CODE & STANDARD

Email : batamtraining@gmail.com

website : www.batamtraining.com

77

CODE & STANDARD

Email : batamtraining@gmail.com

website : www.batamtraining.com

78

Thank You
Q &A?