Cronograma Magic Inspection
Cronograma Magic Inspection
SEMANA N 33
DIA
AREA
CENTRAL
GRUPO
SISTEMA
SUBSISTEMA
EQUIPO
6-Sep-16
7-Sep-16
8-Sep-16
MEC
MEC
MEC
SISTEMA DE ENFRIAMIENTO
SISTEMA DE ENFRIAMIENTO
SISTEMA DE ENFRIAMIENTO
SISTEMA DE ENFRIAMIENTO
SISTEMA DE ENFRIAMIENTO
SISTEMA DE ENFRIAMIENTO
FILTROS
VENTILADORES
MOTORES
7-Sep-16
MEC
SISTEMA DE ENFRIAMIENTO
SISTEMA DE ENFRIAMIENTO
RADIADORES
9-Sep-16
11-Sep-16
MEC
MEC
LUBE OIL
LIQUID FUEL
LUBE OIL
LIQUID FUEL
KKS
AN001-M01/2/3/4/5/6
88FC-1/2/3/4/5/6
88FC-1/2/3/4/5/6
MBE30 AC001
MBE30AC002
ORDEN DE TRABAJO
[SAP]
COD MP / AVISO
SAP
MOTIVO
TIPO OT
TIPO MANT
CONDICION
RESPONSABLE
EJECUCION
PERSONAL
APOYO
HORA INICIO
HORA FIN
HH-PROG
FECHA
PR
PR
PR
PREV
PREV
PREV
F/S
F/S
F/S
VICTOR INOAN
VICTOR INOAN
VICTOR INOAN
17:00
17:00
17:00
4
4
4
6-Sep-16
7-Sep-16
8-Sep-16
PR
PREV
F/S
VICTOR INOAN
17:00
7-Sep-16
BOMBAS
88QA-1/23QA-2
88QA-2/23QA-1
88ES-1/23QS-1
88QS-1/23QS-1
PR
PREV
F/S
VICTOR INOAN
17:00
9-Sep-16
BOMBAS
88FP-1
88FP-2
88FP-3
PR
PREV
F/S
VICTOR INOAN
17:00
11-Sep-16
96AK-01
96AK-02
PR
PREV
F/S
VICTOR INOAN
17:00
12-Sep-16
PR
PREV
F/S
VICTOR INOAN
17:00
13-Sep-16
PR
PREV
F/S
VICTOR INOAN
17:00
14-Sep-16
PR
PREV
F/S
VICTOR INOAN
17:00
15-Sep-16
12-Sep-16
MEC
AIRE DE ATOMIZACION
AIRE DE ATOMIZACION
COMPRESORES
13-Sep-16
MEC
PLANTA
PLANTA
VALVULAS
14-Sep-16
MEC
GENERADOR
GENERADOR
TUBERIAS
15-Sep-16
MEC
VENTILADORES
88TK-1
88TK-2
88BN-1
88BN-2