Documentos de Académico
Documentos de Profesional
Documentos de Cultura
Document Owner(s)
Organisation Role
Paul Sefton-Rowston
Director
Version Control
Version
Date
Author
Reviewer
Change Description
0.1
05/09/12
Kirsty McInnes
Paul Sefton-Rowston
Draft
1.0
06/09/12
Kirsty McInnes
Paul Sefton-Rowston
Final
Version
Date
To
Company
1.0
06/09/12
Sandy Alp
Sunbuild
SWMS NO:
GAW012 SWMS.doc
ACTIVITY :
Authorised by:
Signature:
REVIEW NO:
DATE:
Page 1 of 11
Date:
ABN:
Address:
Contact Name:
Position:
Phone number:
Paul Sefton-Rowston
Director
0423 254 114
Project details
Project:
Area:
Darwin
Job Address:
Principal Contractor:
Job Description:
Mechanical Services
Activity:
Signature:
Job Title:
Date:
Paul SeftonRowston
Construction Manager
06/08/12
Daniel Banks
Apprentice Refrigeration
Mechanic
Joseph Gallez
Electrician
Luke Comber
Refrigeration Mechanic
M8
Moderate
ALL PERSONS INVOLVED IN TASK MUST HAVE THIS SWMS COMMUNICATED TO THEM PRIOR TO WORK COMMENCING
Regular inspections and observations will be conducted by Paul Sefton-Rowston to ensure SWMS is being complied with.
Daily Tool Box Talks will be undertaken to identify, control and communicate additional site hazards.
Work must cease immediately if incident or near miss occurs. SWMS must be amended in consultation with relevant persons.
Amendments must be approved by Paul Sefton-Rowston and communicated to all affected workers before work resumes.
SWMS NO:
GAW012 SWMS.doc
ACTIVITY :
Authorised by:
Signature:
REVIEW NO:
DATE:
Page 2 of 11
Date:
Green 204
Foot
Protection
Hearing
Protection
High
Visibility
Head
Protection
Hand
Protection
Protective
Clothing
Emergency Procedures
1. Work under Sunbuild emergency procedures
2. Site induction in accordance with Sunbuild
3. First aid kits to be available on site and in vehicles
4. Qualified first aid personnel on site (Sunbuild)
5. Participate in trial evacuation, as required
Purpose of SWMS:
This SWMS covers risks associated with general installation of air conditioning systems.
Ensure the manufacturers installation manual/guide is available for specific information on all installation works.
Main risks:
- Falls from height
- Electrocution/electric shock
- Exposure to hazardous atmosphere
SWMS NO:
GAW012 SWMS.doc
ACTIVITY :
Authorised by:
Signature:
REVIEW NO:
DATE:
Page 3 of 11
Date:
RB
Risk Rating
Consequence
Likelihood
Risk Rating
Consequence
Possible Safety or
Environmental
Hazards
Likelihood
Activities
Responsible
Officer
RA
NOTE: RB = Risk Rating before controls implemented - RA = Risk Rating after controls are implemented.
Hazardous
substances
on site
Hazardous materials
H:18
Refrigerant Gases:
o Ensure restrained adequately on transport
vehicle.
o Avoid storing inside cabin of vehicles
o Keep minimum quantities
o Ensure Material Safety Data Sheet available
(within 5 year issue date)
o Inspect cylinders regularly to ensure no
damage or leaks
Take care not to kink copper pipes.
Expel air from system as required by manufacturer.
Check for refrigerant leakage from pipe connectors. Use
appropriate gas detector, or soapy water in a spray
bottle. If bubbles form, tighten all fittings and recheck.
Ensure adequate ventilation
M: 10
PSR
M:9
PSR
Carrying
materials
onto site
M:13
Slips/ Trips
M:12
L:3
PSR
Traffic management
M:13
M:10
PSR
SWMS NO:
GAW012 SWMS.doc
ACTIVITY :
Authorised by:
Signature:
REVIEW NO:
DATE:
Page 4 of 11
Date:
RB
Risk Rating
Consequence
Likelihood
Risk Rating
Consequence
Likelihood
Activities
Possible Safety or
Environmental
Hazards
Responsible
Officer
RA
NOTE: RB = Risk Rating before controls implemented - RA = Risk Rating after controls are implemented.
Unloading
heavy
materials
M:20
M: 9
PSR
Slips/ Trips
M:12
L:3
PSR
Traffic management
M:13
M:10
PSR
SWMS NO:
GAW012 SWMS.doc
ACTIVITY :
Authorised by:
Signature:
REVIEW NO:
DATE:
Page 5 of 11
Date:
RB
Risk Rating
Consequence
Likelihood
Risk Rating
Consequence
Likelihood
Activities
Possible Safety or
Environmental
Hazards
Responsible
Officer
RA
NOTE: RB = Risk Rating before controls implemented - RA = Risk Rating after controls are implemented.
Working on
roof
Working at heights
E:25
Working in
ceiling
spaces
Working in
ceiling/confined space
H:18
SWMS NO:
GAW012 SWMS.doc
M: 9
PSR
M:10
PSR
ACTIVITY :
Authorised by:
Signature:
REVIEW NO:
DATE:
Page 6 of 11
Date:
RB
Risk Rating
Consequence
Likelihood
Risk Rating
Consequence
Likelihood
Activities
Possible Safety or
Environmental
Hazards
Responsible
Officer
RA
NOTE: RB = Risk Rating before controls implemented - RA = Risk Rating after controls are implemented.
Air
conditioning
cabling
installation
Electric shock
H:18
M:10
PSR
Working
outside
Hazardous
atmosphere.
(e.g. Dust)
M:13
M:6
PSR
Working
inside
M:8
L:3
PSR
Hazardous
atmosphere.
(e.g. Dust)
M:13
M:6
PSR
SWMS NO:
GAW012 SWMS.doc
ACTIVITY :
Authorised by:
Signature:
REVIEW NO:
DATE:
Page 7 of 11
Date:
RB
Risk Rating
Consequence
Likelihood
Risk Rating
Consequence
Likelihood
Activities
Possible Safety or
Environmental
Hazards
Responsible
Officer
RA
NOTE: RB = Risk Rating before controls implemented - RA = Risk Rating after controls are implemented.
Using power
tools
M:8
L:3
PSR
H:18
Guards in place
Electrical leads in good condition and tested/tagged,
RCDs in use
Correct for job/used for purpose
M: 10
PSR
M:9
PSR
M:9
PSR
M: 10
PSR
Laceration
H:21
Manual handling
M:20
Cutting into
structures
Hazardous materials
(e.g. Asbestos)
SWMS NO:
GAW012 SWMS.doc
H:18
ACTIVITY :
Authorised by:
Signature:
REVIEW NO:
DATE:
Page 8 of 11
Date:
Personal Qualifications,
Licenses and Experience
required for the job:
Employee
Electrical, Management
Daniel Banks
Joseph Gallez
Electrical
Luke Comber
NT Electrical licence.
Attain any necessary permits from Sunbuild.
N/A
Legislation
The following legislation is applicable to this project:
st
Work Health and Safety [National Uniform Legislation]Act 2011 (as in force at 1 January 2012)
st
Work Health and Safety [National Uniform Legislation]Regulations 2011 (as in force at 1 January 2012)
Workplace Health and Safety Act 2011
Workplace Health and Safety Regulations 2011
Electricity Reform Act & (Safety & Technical) Regulations
SWMS NO:
GAW012 SWMS.doc
ACTIVITY :
Authorised by:
Signature:
REVIEW NO:
DATE:
Page 9 of 11
Date:
Codes of Practice
The following codes of practice are applicable to this project:
National
National Code of Practice: First Aid in the workplace
National Code of Practice: Construction Work
National Code of Practice: Hazardous manual tasks
National Code of Practice: How to manage work health and safety risks
National Code of Practice: Managing the risk of falls at workplaces
National Code of Practice: Managing the work environment and facilities
National Code of Practice: Managing noise and preventing hearing loss at work
National Code of Practice: Confined spaces
National Code of Practice: Labelling of workplace hazardous chemicals
National Code of Practice for Induction for Construction Work May 2007
Adopted National Exposure Standards for Atmospheric Contaminants in the Occupational Environment [NOHSC:1003(1995)]
Standards Applicable
The following standards are applicable to this project:
National Standard for Licensing Persons Performing High Risk Work 2006
National Standard for Manual Tasks 2007
ISO 31000 Risk Management
AS 3000 2007 Wiring Rules
AS 3001 2008 Electrical installations Relocatable premises
AS 3012 2010 Electrical Installations Construction and demolitions sites
AS3760 2010 In-service safety inspection and testing of electrical equipment
AS3100 Approval & Test Specification General requirements for electrical equipment
AS1269.2 Occupational Noise Management Noise Control Management
AS1336 Recommended Practices for Occupational Eye Protection
AS1800 Occupational Protective Helmets selection, care and use
AS2210 Occupational Protective Footwear Part 1 Guide to selection, care and use
AS2161.1 Occupational Protective Gloves Selection, use & maintenance
AS4602 High Visibility Garments
SWMS NO:
GAW012 SWMS.doc
ACTIVITY :
Authorised by:
Signature:
DATE:
Page 10 of 11
Date:
Step 1 Determine Likelihood What is the possibility that the effect will occur?
Criteria
Description
Almost
certain
Expected in most
circumstances.
Likely
Possible
Insignificant/Acceptable
Minor
Moderate
Unlikely
Major
Rare
Catastrophic
absolute value and should only be used for comparison and to engender discussion.)
Consequence
Score
Extreme: 23-25
A:
B:
C:
D:
E:
Insignificant
Minor
Moderate
Major
Catastrophic
5: Almost
certain
M11
H16
H20
E23
E25
High: 14-22
4: Likely
M7
M12
H17
H21
E24
Moderate: 4-13
3: Possible
M4
M8
M13
H18
H22
Low: 1-3
2: Unlikely
L2
M5
M9
H14
H19
1: Rare
L1
L3
M6
M10
H15
Likelihood
SWMS NO:
GAW012 SWMS.doc
ACTIVITY :
Authorised by:
Signature:
Action
ACT NOW Urgent - do something about the risks
immediately. Requires immediate attention.
Highest management decision is required urgently.
Follow management instructions.
OK for now. Record and review regularly, and if any
equipment/ people/ materials/ work processes or
procedures change.
REVIEW NO: