Está en la página 1de 20

# de Barra

No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.

2
3
4
5
6
7
8
9
10
11
14
18

Diametro
en Pulgadas
1/4"
3/8"
1/2"
5/8"
3/4"
7/8"
1"
1-1/8"
1 - 1/4"
1 - 3/8"
1 - 3/4"
2 - 1/4"

Diametro
mm

Diametro
Cms
6.4
0.64
9.5
0.95
12.07
1.207
15.9
1.59
19.1
1.91
22.2
2.22
25.4
2.54
28.7
2.87
32.3
3.23
35.8
3.58
43
4.3
57.3
5.73

Dimensiones columna(cms)
h=
41
b=
35
f'y =
2820
Altura libre =
4.35

Espaciamiento So
8dlb =
24Db est =
1/2 dm col =
300 mm =

12.72 cms
22.8
20.5
30 cms

Area
mm2
32
71
129
199
284
387
510
645
819
1006
1452
2581

As refuerzo Columna
Esquinas =
4
Intermedia =
4

13

Area
Cms2
0.32
0.71
1.29
1.99
2.84
3.87
5.1
6.45
8.19
10.06
14.52
25.81

# de Barra Cant De Bar


a colocar
0
No. 2
0
No. 3
4
No. 4
4
No. 5
No. 6
No. 7
No. 8
No. 9
No. 10
No. 11
No. 14
No. 18

Columna
Fe. No. # 5
Fe. No.# 4

Longitud Lo
1/6lLh =
max dim =
450 mm =

0.73 m
0.8 m
0.45 m

0.80

Area de
Barra
0.32
0.71
1.29
1.99
2.84
3.87
5.1
6.45
8.19
10.06
14.52
25.81

Area total
0
0
5.16
7.96
0
0
0
0
0
0
0
0

h1
h2
h3
h4
h5

=
=
=
=
=

Alturas entre pisos


3
0
0
0
0

# de Barra
No. 2
No. 3
No. 4
No. 5
No. 6
No. 7
No. 8
No. 9
No. 10
No. 11
No. 14
No. 18

Diametro
en Pulgadas
1/4"
3/8"
1/2"
5/8"
3/4"
7/8"
1"
1-1/8"
1 - 1/4"
1 - 3/8"
1 - 3/4"
2 - 1/4"

Diametro
mm
6.4
9.5
12.07
15.9
19.1
22.2
25.4
28.7
32.3
35.8
43
57.3

Diametro
Cms
0.64
0.95
1.207
1.59
1.91
2.22
2.54
2.87
3.23
3.58
4.3
5.73

As = 14.10db/f'y

DIMENSIONES VIGA B (Cm


h=
Rec =
d=
b=

PREDIMENSIONAMIENTO VIGA B
Cama Sup =
Cama Inf =
As Torsion =
1er. Estribo =
Conf. Extremos =
Long. Conf. =
Conf. Intermedio =
Diametro Var. Long =
Diametro Var. Est =

5 Cms
#REF! Cms
0 Cms
0 Cms
#REF!

#REF! Vrebar+Ttrnbar
#REF!

#REF!

Separacion
Etabs
#REF!
#VALUE!
#VALUE!

#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

Area
mm2
32
71
129
199
284
387
510
645
819
1006
1452
2581

Area
Cms2
0.32
0.71
1.29
1.99
2.84
3.87
5.1
6.45
8.19
10.06
14.52
25.81

DIMENSIONES VIGA B (Cms)


56 cms
3 cms
51.4465 cms
28 cms

# de Barra
No. 2
No. 3
No. 4
No. 5
No. 6
No. 7
No. 8
No. 9
No. 10
No. 11
No. 14
No. 18

As min

4.94

DIMENSIONES VIGA B (Cms)


h=
Rec =
d=
b=

CONFORME CODI

Chequeo Estribos
d/4 =
0
8*Dlb =
#REF!
24*D est =
#VALUE!
300 mm =
30

Estacion ACI Separacion


Separacion a colocar
ACI
5
5
3
15
9.656
3
30
9.656
3

PREDIMENSIONAMIENTO VIGA B
Cama Sup =
Cama Inf =
As Torsion =
1er. Estribo =
Conf. Extremos =
Long. Conf. =
Conf. Intermedio =
Diametro Var. Long =
Diametro Var. Est =

45
60
75
90
0

9.656
9.656
9.656
9.656
9.656
27.72325
27.72325
27.72325
27.72325
27.72325
27.72325
27.72325
9.656
9.656
9.656
9.656
9.656
9.656
9.656
9.656
5

4
5
5
7
7
7
19
20
20
19
19
18
7.5
7.5
7.5
5
5
5
3
3
3

Cant De Bar
a colocar

0
0
0
2
4
0
0
0
0
0

Area de
Barra
0.32
0.71
1.29
1.99
2.84
3.87
5.1
6.45
8.19
10.06
14.52
25.81

MENSIONES VIGA B (Cms)


60 cms

Area total
0
0
0
3.98
11.36
0
0
0
0
0
0
0

As min

5.71

3 cms
55.4465 cms
30 cms

CONFORME CODIGO ACI 318-08

SIONAMIENTO VIGA B

5 Cms
9.656 Cms
120 Cms
27.72325 Cms
1.207
0.95

Chequeo Estribos
d/4 =
13.861625
8*Dlb =
9.656
24*D est =
22.8
300 mm =
30

DATOS TECNICOS
Resist. Conc. (F'c) =
Grado Acero (G) =

DIMENSIONES VIGA SECUNDARIA


h=
Rec =
d=
b=

0.34
DATOS TECNICOS
PSI
KG/CM2
3000
60000

IMENSIONES VIGA SECUNDARIA (Cms)


70 cms

211.36
4227.28

As min

7.64

3 cms
65.4465 cms
35 cms

ESTO SEGN ACI 318-08

PREDIMENSIONAMIENTO VIGA SEC


Cama Sup =
Cama Inf =
As Torsion =
1er. Estribo =
5 Cms
Conf. Extremos =
12.72 Cms
Long. Conf. =
140 Cms
Conf. Intermedio =
32.72325 Cms
Diametro Var. Lon
1.59
Diametro Var. Estr
0.95

Chequeo Estribos
d/4 =
16.361625
8*Dlb =
12.72
24*D est =
22.8
300 mm =
30

A(col) =
L(col) =
B = 1.3
L = 1.2
Vuelo (lv) =
Vuelo (lv)2 =
Ao =
Lo =
bo =
Ao =

0.41 m
0.35 m
m
m
0.445 m

Area (A)= 1.56

0.728965 m
0.668965 m
2.80 m
0.49 m

CORTANTE ULTIMO ZAPATA


Vu = (A - Ao)
u =
Vu =

30,071.00 Kg
32,246.57 kg

Vu Vc
32,246.57

= 0.75
32,513.48

OK

Cortante Ultimo

Carga Ultima
Wu = u*L

Vu =Wu*X

Wu = 39,092.30

Vu =

4,927.00

MOMENTO ULTIMO
Mu =

=
=

Wu*lv
2

Mu =

CUANTIA DE ACERO
[1-(1-(2.62*Mu/b*d*f'c))]*f'c/1.18fy
0.00116

USAR =

0.0018

3,870.63 Kg - m

min

ACI 318-08
=
0.0018

M2

Peralte (d) H - Rec - /2


d = 0.318965

H=
Rec =
/2 =

0.4
0.075
0.006035

Vc =
Vc =

0.17(1+2/)**(f'c)bo*d
60,461.14 Kg

Vc =
Vc =

0.083((*d)/bo + 2)**(f'c)*bo*d
71,564.00 Kg

Vc =

0.33*(f'c)*bo*d
43,351.31 Kg

f'c
bo
d
f'y

=
=
=
=
=
=
=

CORTE FLEXIONANTE
Cortante Ultimo

I 318-08

X = 0.1260

CHEQUEAR =Vu Vc

Kg

Calculos
1
0.0353
0.98217409
0.01782591

Asmin = *b*d
Asmin =
7.463781

(cms)=

1.17
1.00
40.00
217.00
279.59
31.90
2820.00

1.207

kg/cm2
cms
cms
cms

Vc = 0.75(f'c)*L*d
Vc =
45,811.82 Kg
4,927.00

45,811.82

Ok

n =
n =

Az =
Az =
B=
L=

t -t*Df-hc*t-s/c
2.3038 Kg/cm2

P/n
18,253.28 Cm2
135.10 cms
135.10 cms

Vuelo lv1 =
Vuelo lv2 =

1.83
135
135

47.05 Cms
50.05 Cms

bo1 =
bo2 =
Perimetro (bo) = 289.59
Area (Ao) =
5,232.25

75.3965
69.3965
Cms
cms2

2.90
0.52

Cms
Cms
Cms
Cms

d=
d=

Datos Armado Zapata:


H
rec

/2

= 42.5
= 7.5
= 1.207
= 0.6035

CORTANTE ULTIMO ZAPATA

Vu = (A - Ao)
Vu =

36,126.47 kg/cm2

Vu Vc
=

0.75

36,126.47

36,315.91

OK

Datos:

cms
cms

18,225.00
1.8225

t
t
Df
hc
s/c
Cm
Cv
P
Acol

=
=
=
=
=
=
=
=
=

Bcol =
Pu =
Pu =
m
m2

H-rec-/2
34.3965

2.5 Kg/cm2
0.00133 kg/cm3
130 Cms
10 Cms
0.01 Kg/cm2
26,229.00 Kg
12,000.00 Kg
42,051.90 Kg
41 cms
35 cms

1.2Cm + 1.6Cv
50,674.80
Kg
u =
Pu/Az
u =
375.08 Kg/cm2
27,805.10 Kg/m2

Cms

ULTIMO ZAPATA

Vc =
Vc =

0.17(1+2/)**(f'c)bo*d
67,532.02 Kg

Vc =
Vc =

0.083((*d)/bo + 2)**(f'c)*bo*d
82,219.74 Kg

Vc =

0.33*(f'c)*bo*d
48,421.21 Kg

f'c
bo
d
f'y

= 1.17
= 1.00
= 40.00
= 217.00
= 289.59
= 34.40
= 2820.00

Tierra Mojada
Tierra Seca =

kg/cm2
cms
cms
cms

1800 Kg/cm3
1330 Kg/cm3
1500 Kg/cm3

TIPO

CONCRETOS (Para 1 M3 de Concreto


PROPORCION VOLUMETRICA
RESISTENCIA (PSI) CEMENTO
ARENA
PIEDRIN
1 3850 PSI - 4300 PSI
1
1.5
1.5
2 3500 PSI - 3835 PSI
1
1.5
2.0
3 3280 PSI - 3480 PSI
1
1.5
2.5
4 3100 PSI - 3275 PSI
1
1.5
3.0
5 2775 PSI-3080 PSI
1
2.0
2.0
6 2355 PSI - 2770 PSI
1
2.0
2.5
7 2350 PSI
1
2.0
3.0
8
1
2.0
3.5
9
1
2.0
4.0
10
1
2.5
2.5
11
1
2.5
3.0
12
1
2.5
3.5
13
1
2.5
4.0
14
1
3.0
4.0
15
1
3.0
5.0

* Saco de 42.5 Kg. Cementos Progreso


* 1 Bote plastico equivale a una capacidad de 19 Lts

Rendimiento
Crestuco
Cemento (Saco)
Arena (Bote)

CERNIDO
Arquitecto
6 M2
6 M2

CERNIDO
Albail 1
12 M2

1 1 Saco cem
6 3 Botes arena
Cernido Gris (alisado)

REPELLO
Albail
7 M2
1 Saco cem
4 Botes arena

Si la pared a repellar no esta a plomo aumentar en30% el consumo de cemento en

ara 1 M3 de Concreto)
BOLSAS
CEMENTO
12.6
11.3
10.1
9.3
9.8
9.1
8.4
7.8
7.3
8.3
7.6
7.2
6.7
6.3
5.6
3.35
2.8

ARENA
M3
0.53
0.48
0.43
0.37
0.55
0.51
0.47
0.44
0.41
0.58
0.54
0.51
0.48
0.53
0.47
0.24
0.24

apacidad de 19 Lts

Volumen Bote
19 Lts = 0.0258 M3

onsumo de cemento en sacos

PIEDRIN
M3
0.55
0.64
0.71
0.79
0.55
0.64
0.71
0.76
0.82
0.58
0.65
0.71
0.77
0.71
0.79
0.385
0.4

AGUA
LITROS
226
221
216
207
227
226
216
212
211
232
222
220
218
224
215
200
200

RESISTENCIA
Kg/cm2
303
270
245
230
217
195
165
164
140
156
147
132
118
94
80
59
40

Resistencia del elemento (PSI) =

Un. a Fundir
h
B
L
Volumen

=
=
=
=

DATOS :
1
3.2
0.35
0.41
0.43

Bolsas Cemento
Arena M3
Piedrin M3
Agua

=
=
=
=

4.21
0.24
0.24
97.61

Un. a Fundir
h=
B=
L=
Volumen =
Bolsas Cemento =
Arena M3 =
Piedrin M3 =
Agua =

DATOS :
1

2350

165.57 KG/Cm2

unidades
m
m
m
m3
bolsas
M3
M3
Lts

4.21 bolsas
11.83 Botes
11.83 Botes
5.14 Botes

unidades
3.2 m
0.35 m
0.41 m
2.5 m3
8.375 bolsas
0.6 M3
0.96 M3
500 Lts

8.375 bolsas
30 Botes
48.13 Botes
26.32 Botes