Está en la página 1de 7

calle 72 carerra 9

ABSCISA
k0+000
k0+010
k0+020
k0+030
k0+040
k0+050
k0+060

DIST
0
10
20
30
40
50
60

TERRENO NATURAL
IZQ
EJE
DER
49.508
49.494
49.499
49.772
49.737
50.107
49.577
49.569
50.410
49.312
49.307
49.947
48.987
48.981
49.072
48.487
48.522
48.867
48.137
48.007
48.301

COTAS DE DISEO
IZQ
EJE
DER
49.500
49.500
49.500
49.353
49.393
49.353
49.246
49.286
49.246
49.139
49.179
49.139
49.032
49.072
49.032
48.496
48.536
48.496
47.960
48.000
47.960

IZQ
0.088
0.499
0.411
0.253
0.035
0.071
0.257

CORTES
EJE
0.794
1.144
1.083
0.928
0.709
0.786
0.807

DER
0.946
1.661
2.071
1.715
1.376
1.707
49.101

TOTAL M3

terrazas
ABSCISA
K0+000
K0+05
K0+010
K0+015
K0+025

IZQ
49.667
49.867
49.847
49.652
49.467

DER

AREA

VOLUMEN

2.437
4.405
4.753
3.861
2.827
3.419
66.887

34.213
45.793
43.073
33.440
31.227
351.527

TOTAL M3

539.273

ABSCISA
k0+000
k0+010
k0+020
k0+030
k0+040
k0+050
k0+060

TN
49.494
49.737
49.569
49.307
48.981
48.522
48.000

DISEO
49.500
49.393
49.286
49.179
49.072
48.536
48.000

CALLE 72 CON CARRERA 9


TN

DISEO

RERA 9

SUB-BASE
ABSCISA PROMEDIO
k0+000
k0+010
k0+020
k0+030
k0+040
k0+050
k0+060

0.45
0.45
0.45
0.45
0.45
0.45

ABSCISA
k0+000
k0+010
k0+020
k0+030
k0+040
k0+050
k0+060

SUB-BASE
M3
ACUMULADO
0
23.4
23.4
23.4
23.4
23.4
23.4

23.4
46.8
70.2
93.6
117

140.4

SUELO CEMENTO
ABSCISA PROMEDIO
k0+000
k0+010
k0+020
k0+030
k0+040
k0+050
k0+060

0.15
0.15
0.15
0.15
0.15
0.15

SUELO CEMENTO
ABSCISA
M3
ACUMULADO
k0+000
k0+010
k0+020
k0+030
k0+040
k0+050
k0+060

0
7.8
7.8
7.8
7.8
7.8
7.8

7.8
15.6
23.4
31.2
39.0

46.8

También podría gustarte