Documentos de Académico
Documentos de Profesional
Documentos de Cultura
Tarea Restrictiva
Tarea Restrictiva
S10
Presupuesto
Presupues 9999010
to
Subpresu 001
TRAMO AV. CANTA CALLAO - AV. UNIVERSITARIA
puesto
Cliente
MUNICIPALIDAD DE LIMA
Lugar
LIMA - LIMA - SAN MARTIN DE PORRES
Costo al
02/08/2013
DATO
Item
Descripcin
01
01.01
Und. Metrado
Precio S/.
Parcial S/.
DATO
cuadrilla
DE CUADRILLA
prod./dia
can per
9,416,609.81
OBRAS PRELIMINARES
259,860.98
01.01.01
INSTALACIONES PROVISIONALES
und
5.00
1,000.00
01.01.02
GLB
1.00
6,480.00
6,480.00
01.01.03
LIMPIEZA DE TERRENO
m2
141,932.85
0.45
63,869.78
430
34,946.02 0.1cp+pe
1.1
1000
5.1
0.5
1.6
136,427.98 0.01cp+1op+1of+1pe
80
3.01
123,534.52 1of+4pe
01.01.04
01.01.05
01.01.06
01.02
GLB
1.00
34,946.02
m2
141,932.85
1.01
und
4.00
1,553.25
DEMOLICIONES
5,000.00
143,352.18 0.1cp+1top+4pe
6,213.00 0.1cp+0.5op+1pe
409,087.08
01.02.01
m2
10,120.77
13.48
01.02.02
m2
26,623.82
4.64
300
m2
5,205.81
4.20
21,864.40 0.1cp+1op+2pe
500
3.1
1,371.26
8.08
11,079.78 0.2cp+2of+4pe
180
6.2
12
120
4.1
01.02.03
01.02.04
01.02.05
pza
35.00
81.94
01.02.06
m2
44.38
9.94
441.14 0.1cp+4pe
01.02.07
m2
1,091.15
11.40
12,439.11 0.1cp+5pe
50
5.1
01.02.08
und
25.00
15.98
399.50 0.1cp+5pe
35
5.1
01.02.09
m3
3,857.80
25.93
100,032.75 0.5cp+1pe
140
5.1
m3
44,022.76
6.00
264,136.56 0.5cp+3pe
500
3.5
m3
52,827.31
25.93
1,369,812.15 0.5cp+1pe
140
1.5
280,523.24 1cp+1op+2of+3pe
1250
01.03
01.03.01
01.03.02
01.04
01.04.01
01.04.01.01
1,633,948.71
6,740,729.09
CARPETA DE RODADURA
CONFORMACION, PERFILADO Y COMPACTADO DE LA SUB RASANTE
C/EQUIPO
2,867.90 4pe
6,528,979.44
m2
76,436.85
3.67
01.04.01.02
m2
76,436.85
12.07
922,592.78 0.1cp+1of+2pe
750
3.1
01.04.01.03
m2
76,436.85
10.65
814,052.45 0.1cp+1of+2pe
700
3.1
01.04.01.04
m2
76,435.85
4.23
323,323.65 1cp+2op+4pe
1500
01.04.01.05
RIEGO DE LIGA
m2
34,345.94
3.73
128,110.36 0.1cp+1op+2pe
1200
3.1
01.04.01.06
m2
34,345.94
62.95
2,162,076.92 1cp+2op+8pe
900
11
m2
42,090.91
45.10
1,898,300.04 1cp+2op+8pe
2000
11
22,649.99 1cp+1op+2of+3pe
1250
01.04.01.07
01.04.02
01.04.02.01
BERMAS
CONFORMACION, PERFILADO Y COMPACTADO DE LA SUB RASANTE
C/EQUIPO
211,749.65
m2
6,171.66
3.67
01.04.02.02
m2
6,171.66
10.65
65,728.18 0.1cp+1of+2pe
700
3.1
01.04.02.03
m2
6,171.66
4.23
26,106.12 1cp+2op+4pe
1500
m2
6,171.66
15.76
97,265.36 1cp+2op+8pe
3100
11
4.15
01.04.02.04
01.05
01.05.01
01.05.01.01
01.05.02
01.05.02.01
01.05.02.02
01.05.03
01.05.03.01
01.05.04
01.05.04.01
VARIOS
372,983.95
MISCELANEOS
NIVELACION DE BUZONES EN GENERAL
29,111.04
und
126.00
231.04
und
670.00
48.59
32,555.30 0.15cp+1op+1of+1pe
12
3.15
und
670.00
48.59
32,555.30 0.15cp+1op+1of+1pe
12
3.15
MANEJO AMBIENTAL
MEDIDAS DE MITIGACIN
49,519.27
GLB
1.00
49,519.27
MOBILIARIO URBANO
m2
60.00
1.01
m3
13.50
35.56
01.05.04.01
und
20.00
4,846.95
m3
17.55
25.93
TACHOS DE BASURA
97,934.73
01.05.04.01
01.05.04.02
49,519.27
229,243.04
CONSTRUCCION DE PARADEROS
01.05.04.01
01.05.04.01
29,111.04 0.15cp+1op+1of+2pe
65,110.60
60.60 0.1cp+1tp+4pe
480.06 0.1cp+1pe
96,939.00 1cp+1op+1of+pe
455.07 0.5cp+1pe
17,279.16
1000
5.1
3.5
1.1
0.5
140
1.5
01.05.04.02
m2
20.88
1.01
01.05.04.02
m3
4.18
35.56
01.05.04.02
m3
4.18
01.05.04.02
und
m3
01.05.04.02
01.05.04.03
01.05.04.03
02
02.01
02.01.01
02.01.01.01
1000
5.1
148.64 0.1cp+pe
3.5
1.1
228.29
954.25 0.1cp+op+pe
25
2.1
58.00
276.11
16,014.38 0.15cp+op+of
5.43
25.93
549.75
207.42
2.1
140.80 0.5cp+pe
114,029.15
140
1.5
114,029.15 0.1cp+op+of+pe
3.1
1250
157,183.06 0.1cp+of+2pe
120
3.1
657,122.14 0.1cp+2op+of+3pe
80
6.1
1,955,226.59
1,955,226.59
VEREDAS Y RAMPAS
CONFORMACION, PERFILADO Y COMPACTADO DE LA SUB RASANTE
C/EQUIPO
21.09 1tp+0.1cp+4pe
1,016,278.88
m2
17,310.91
3.67
63,531.04 cp+op+2of+3pe
02.01.01.02
m2
17,310.91
9.08
02.01.01.03
m2
17,310.91
37.96
m2
178.50
54.70
9,763.95 .1cp+op+0.5of+0.5pe
12
2.1
02.01.01.04
02.01.01.05
m2
1,850.89
48.47
89,712.64 0.1cp+op+0.5of+0.5pe
15
2.1
02.01.01.06
m2
776.99
50.15
38,966.05 0.1cp+op+0.5of+0.5pe
18
2.1
02.01.02
SARDINELES
938,947.71
02.01.02.01
14,795.62
43.06
637,099.40 0.1cp+op+of+3pe
300
4.1
02.01.02.02
6,123.02
30.08
184,180.44 0.1cp+1op+1of+3pe
350
5.1
02.01.02.03
129.04
15.66
2,020.77 0.1cp+op+of+3pe
02.01.02.04
EXCAVACION DE SARDINELES
m3
1,653.07
36.25
m3
2,148.99
25.93
02.01.02.05
03
03.01
03.01.01
350
5.1
59,923.79 0.1cp+pe
3.5
1.1
55,723.31 0.5cp+pe
140
1.5
440,946.96
SEALIZACIN
440,946.96
SEALIZACIN HORIZONTAL
344,289.56
03.01.01.01
5,990.80
13.51
80,935.71 0.1cp+of+pe
100
2.1
03.01.01.02
3,828.00
12.48
47,773.44 0.1cp+1of+2pe
150
3.1
03.01.01.03
m2
1,659.32
39.06
64,813.04 0.1cp+6of+8pe
55
14.1
03.01.01.04
14,795.62
10.19
120
3.1
03.01.02
SEALIZACIN VERTICAL
150,767.37 0.1cp+of+2pe
96,657.40
03.01.02.01
SEALES PREVENTIVAS
und
69.00
521.79
36,003.51 0.1cp+2op+3pe
5.1
03.01.02.02
SEALES REGULADORAS
und
76.00
548.13
41,657.88 0.1cp+op+3pe
4.1
03.01.02.03
und
9.00
468.94
4,220.46 0.1cp+2op+2pe
4.1
03.01.02.04
und
5.00
2,955.11
14,775.55 0.1cp+2of+2pe
4.1
1,963.98 0.1cp+1pe
3.5
1.1
1,861.77 0.5cp+pe
140
1.5
04
04.01
04.01.01
04.01.01.01
04.01.01.02
04.01.02
IMPLEMENTACIN DE SEMFOROS
1,276,380.98
SEMAFORIZACIN
1,276,380.98
MOVIMIENTO DE TIERRAS
3,825.75
m3
55.23
35.56
m3
71.80
25.93
39,522.42
04.01.02.01
und
21.00
669.00
14,049.00 0.1cp+op+2pe
3.1
04.01.02.02
und
37.00
280.42
10,375.54 0.1cp+op+2pe
10
3.1
m3
11.80
242.30
2,859.14 0.1cp+op+3pe
10
4.1
m3
30.87
259.38
8,007.06 0.1cp+1op+3pe
25
4.1
04.01.02.05
und
58.00
72.96
4,231.68 0.1cp+op+of
25
2.1
04.01.02.03
04.01.03
ENCOFRADO DE ZAPATAS
ESTRUCTURAS DE FIERRO
202,368.74
04.01.03.01
SEMIPRTICO
und
15.00
6,412.12
96,181.80 0.5cp+op+2of+pe
0.4
4.5
04.01.03.02
und
3.00
6,628.52
19,885.56 0.5cp+op+2of+pe
0.4
4.5
04.01.03.03
und
1.00
6,259.80
6,259.80 0.5cp+op+2of+pe
0.4
4.5
04.01.03.04
und
2.00
6,472.29
12,944.58 0.5cp+op+2of+pe
0.4
4.5
04.01.03.05
und
1.00
6,490.65
6,490.65 0.5cp+op+2of+pe
0.4
4.5
04.01.03.06
und
10.00
1,487.32
14,873.20 1.25cp+5op+5of
11.25
04.01.03.07
und
5.00
1,704.97
8,524.85 1.25cp+5op+5of
11.25
04.01.03.08
und
14.00
1,470.47
20,586.58 1.25cp+5op+5of
11.25
04.01.03.09
und
7.00
1,685.11
11,795.77 1.25cp+5op+5of
11.25
04.01.03.10
und
3.00
1,608.65
4,825.95 1.25cp+5op+5of
11.25
04.01.04
04.01.04.01
04.01.04.02
14,328.74
und
21.00
400.24
8,405.04 0.1cp+1op+4pe
5.1
und
37.00
160.10
5,923.70 0.1cp+1op+4pe
10
5.1
04.01.05
SEMFOROS A LED'S
110,847.68
04.01.05.01
und
38.00
1,215.27
46,180.26 0.2cp+2op+2of+2pe
10
6.2
04.01.05.02
und
16.00
1,215.27
19,444.32 0.2cp+2op+2of+2pe
10
6.2
04.01.05.03
und
2.00
1,215.27
2,430.54 0.2cp+2op+2of+2pe
10
6.2
04.01.05.04
und
20.00
1,126.12
22,522.40 0.2cp+2op+2of+2pe
20
6.2
und
18.00
1,126.12
20,270.16 0.2cp+2op+2of+2pe
20
6.2
04.01.05.05
04.01.06
493,486.10
04.01.06.01
7,235.00
10.73
77,631.55 0.1cp+op+of
300
2.1
04.01.06.02
4,525.00
10.33
46,743.25 0.1cp+op+of
300
2.1
04.01.06.03
430.00
8.19
3,521.70 0.2cp+op+of
300
2.1
04.01.06.04
8,510.00
13.13
111,736.30 0.1cp+op+of
300
2.1
8,510.00
29.83
253,853.30 0.2cp+2op+2of+pe
100
5.2
04.01.06.05
04.01.07
CANALIZACIN
252,435.81
04.01.07.01
161.00
119.61
19,257.21
300
04.01.07.02
270.00
125.48
33,879.60
200
04.01.07.03
2,190.00
52.86
115,763.40
20
04.01.07.04
350.00
61.07
21,374.50
20
04.01.07.05
360.00
120.09
43,232.40
20
04.01.07.06
180.00
72.45
13,041.00
40
65.00
90.58
5,887.70
20
04.01.07.07
04.01.08
CAJAS DE PASO
49,261.62
04.01.08.01
TIPO CE-1
und
27.00
532.14
14,367.78
04.01.08.02
TIPO CE-2
und
40.00
620.31
24,812.40
04.01.08.03
TIPO CE-3
und
12.00
840.12
10,081.44
und
3.00
35,259.30
04.01.09
04.01.09.01
04.01.10
04.01.10.01
04.01.11
04.01.11.01
05
05.01
105,777.90
2
3.2
30
2.1
3.1
2,893.11
und
3.00
964.37
105,777.90 0.2cp+2op+of
2,893.11 0.1cp+op+of
1,633.11
und
3.00
544.37
1,633.11 0.1cp+op+of+pe
1,302,697.24
PAISAJISMO
1,302,697.24
05.01.01
m3
9,937.34
3.40
33,786.96 0.1cp+pe
400
1.1
05.01.02
m2
49,686.70
9.12
453,142.70 1cp+2pe
100
05.01.03
SEMBRADO DE GRAS
m2
49,686.70
9.68
480,967.26 0.1cp+1op+5pe
250
6.1
05.01.04
und
500.00
51.18
25,590.00 1op+2pe
12
05.01.05
m3
11,924.81
25.93
309,210.32 0.5cp+pe
140
1.5
06
06.01
06.01.01
1,243,813.19
TUBERIAS DE ALIMENTACION
83,329.08
MOVIMIENTO DE TIERRAS
20,703.46
06.01.01.01
m3
06.01.01.02
06.01.01.03
06.01.01.04
06.01.01.05
06.01.02
214.84
35.56
7,639.71 0.1cp+pe
3.5
1.1
1,790.32
1.46
2,613.87 0.1cp+2pe
160
2.1
ML
1,790.32
3.11
5,567.90 4pe
200
m3
107.42
11.74
1,261.11 0.1cp+2pe
30
2.1
m3
139.64
25.93
3,620.87 0.5cp+pe
140
1.5
282.95 0.1cp+op+2pe
350
3.1
TUBERIAS
61,555.83
06.01.02.01
06.01.02.02
06.01.02.03
06.01.03
23.06
12.27
575.28
19.61
11,281.24 0.1cp+op+2pe
300
3.1
1,191.98
41.94
49,991.64 0.1cp+op+2pe
250
3.1
ACCESORIOS
1,069.79
06.01.03.01
und
1.00
34.26
34.26 0.1cp+op+pe
30
2.1
06.01.03.02
und
2.00
83.36
166.72 0.1cp+op+pe
25
2.1
06.01.03.03
und
1.00
49.66
49.66 0.1cp+op+pe
30
2.1
06.01.03.04
und
4.00
136.84
547.36 0.1cp+op+pe
25
2.1
06.01.03.05
06.01.03.06
und
und
2.00
4.00
27.26
40.52
54.52 0.1cp+op+pe
162.08 0.1cp+op+pe
30
25
2.1
2.1
06.01.03.07
und
1.00
55.19
55.19 0.1cp+op+pe
25
2.1
3.5
1.1
06.02
06.02.01
06.02.01.01
TUBERIAS DE DISTRIBUCION
468,312.26
MOVIMIENTO DE TIERRAS
EXCAVACIN DE ZANJA MANUAL
169,944.44
m3
1,763.50
35.56
62,710.06 0.1cp+pe
06.02.01.02
14,695.81
1.46
21,455.88 0.1cp+2pe
160
2.1
06.02.01.03
ML
14,695.81
3.11
45,703.97 4pe
200
06.02.01.04
ML
881.75
11.74
10,351.75 0.1cp+2pe
30
2.1
m3
1,146.27
25.93
29,722.78 0.5cp+pe
140
1.5
06.02.01.05
06.02.02
TUBERIAS
222,008.52
06.02.02.01
487.76
15.62
7,618.81 0.1cp+op+pe
20
2.1
06.02.02.02
7,996.08
16.68
133,374.61 0.1cp+op+pe
20
2.1
06.02.02.03
825.20
18.69
15,422.99 0.1cp+op+pe
20
2.1
5,345.73
12.27
65,592.11 0.1cp+op+2pe
350
3.1
06.02.02.04
06.02.03
ACCESORIOS
76,359.30
06.02.03.01
jgo
76.00
42.56
3,234.56 0.1cp+op
12
1.1
06.02.03.02
jgo
1,379.00
48.16
66,412.64 0.1cp+op
12
1.1
06.02.03.03
und
1.00
25.56
25.56 0.1cp+op+pe
15
2.1
06.02.03.04
und
40.00
26.34
1,053.60 0.1cp+op+pe
15
2.1
06.02.03.05
und
6.00
27.66
165.96 0.1cp+op+pe
15
2.1
06.02.03.06
und
1.00
22.20
22.20 0.1cp+op+pe
15
2.1
06.02.03.07
und
8.00
23.04
184.32 0.1cp+op+pe
15
2.1
06.02.03.08
und
13.00
20.52
266.76 0.1cp+op+pe
15
2.1
06.02.03.09
und
22.00
22.20
488.40 0.1cp+op+pe
15
2.1
06.02.03.10
und
6.00
24.86
149.16 0.1cp+op+pe
15
2.1
06.02.03.11
und
47.00
44.60
2,096.20 0.1cp+op+pe
15
2.1
06.02.03.12
und
13.00
20.10
261.30 0.1cp+op+pe
15
2.1
06.02.03.13
und
19.00
22.20
421.80 0.1cp+op+pe
15
2.1
06.02.03.14
und
6.00
24.44
146.64 0.1cp+op+pe
15
2.1
06.02.03.15
und
42.00
29.17
1,225.14 0.1cp+op+pe
15
2.1
06.02.03.16
und
3.00
20.80
62.40 0.1cp+op+pe
15
2.1
06.02.03.17
und
7.00
20.38
142.66 0.1cp+op+pe
15
2.1
06.03
CISTERNA V=145.73 M3
550,851.86
06.03.01
m3
1,947.22
16.13
31,408.66 0.1cp+op+2pe
100
3.1
06.03.02
m3
2,531.38
25.93
65,638.68 0.5cp+pe
140
1.5
06.03.03
ENCOFRADO Y DESENCOFRADO
m2
1,421.28
53.06
75,413.12 0.1cp+op+of
06.03.04
m3
556.00
266.23
06.03.05
kg
40,111.44
m2
1,278.72
06.03.06
06.04
2.1
148,023.88 0.1cp+op+of+pe
20
3.1
4.60
184,512.62 0.1cp+op+of
250
2.1
35.86
45,854.90 0.1cp+op+pe
12
2.1
INSTALACIONES SANITARIAS
26,641.50
06.04.01
SISTEMA DE SUCCION
GLB
6.00
1,110.43
6,662.58 0.1cp+op+pe
2.1
06.04.02
SISTEMA DE IMPULSION
GLB
6.00
1,030.39
6,182.34 0.1cp+op+pe
2.1
06.04.03
SISTEMA DE REBOSE
und
6.00
405.62
2,433.72 0.1cp+pe
1.1
06.04.04
CAJUELA
und
6.00
298.89
1,793.34 0.1cp+pe
1.1
06.04.05
109.42
10.75
1,176.27 0.1cp+op
150
1.1
06.04.06
109.42
1.46
159.75 0.1cp+2pe
160
2.1
06.04.07
ML
109.42
5.52
604.00 0.1cp+pe
70
1.1
06.04.08
ML
109.42
11.74
1,284.59 0.1cp+2pe
30
2.1
06.04.09
ML
109.42
55.29
6,049.83 0.2cp+op+of+3pe
20
4.2
06.04.10
m3
11.38
25.93
140
1.5
06.05
06.05.01
06.05.02
06.05.03
06.05.04
06.05.05
06.05.06
INSTALACIONES ELECTRICAS
CAJA DE PASO
295.08 0.5cp+pe
112,651.63
12.00
466.44
5,597.28
125.78
119.61
15,044.55
471.68
9.19
und
6.00
544.37
6.00
6.00
859.93
6,365.70
5,159.58 0.1cp+pe
38,194.20 0.5cp+op+pe
und
2
300
4,334.74 0.1cp+op+of
300
2.1
3,266.22 0.1cp+op+of+pe
3.1
0.5
0.5
1.1
2.5
06.05.07
und
6.00
2,780.83
16,684.98 0.5cp+op+of
2.5
06.05.08
und
6.00
4,061.68
24,370.08 0.1cp+op+of
0.5
2.1
33.00
61.42
2.1
06.06
06.06.01
07
VARIOS
ESCALERA DE GATO
2,026.86
SEGURIDAD Y SALUD
2,026.86 0.1cp+op+pe
36,670.00
07.01
und
90.00
253.00
22,770.00
07.02
GLB
1.00
1,600.00
1,600.00
07.03
SEALIZACION DE SEGURIDAD
GLB
1.00
2,700.00
2,700.00
07.04
GLB
1.00
6,000.00
6,000.00
07.05
08
OBRAS DE SANEAMIENTO
08.01
08.01.01
08.01.01.01
08.01.02
GLB
1.00
3,600.00
3,600.00
177,336.44
41,419.08
TRABAJOS PRELIMINARES
383.56
284.12
1.35
MOVIMIENTO DE TIERRAS
383.56 1tp+3pe
500
150
3.1
160
2.1
15,051.22
08.01.02.01
284.12
10.75
08.01.02.02
284.12
1.46
08.01.02.03
ML
1,233.70
5.52
6,810.02 0.1cp+pe
70
1.1
08.01.02.04
ML
284.12
11.74
3,335.57 0.1cp+2pe
30
2.1
08.01.02.05
m3
55.40
25.93
1,436.52 0.5cp+1pe
140
1.5
ML
284.12
84.02
200
4.1
08.01.03
08.01.03.01
08.01.04
08.01.04.01
08.01.04.02
414.82 0.1cp+2pe
23,871.76
3,054.29 0.1cp+1of+2pe
23,871.76 0.1cp+1op+1of+2pe
2,112.54
15.00
8.28
124.20 0.1cp+2pe
180
2.1
15.00
1.46
21.90 0.1cp+2pe
160
2.1
5.52
82.80 0.1cp+1pe
70
1.1
08.01.04.03
ML
15.00
08.01.04.04
ML
15.00
11.74
176.10 0.1cp+2pe
30
2.1
08.01.04.05
m3
4.68
25.93
121.35 0.1cp+1pe
140
1.1
08.01.04.06
und
3.00
512.53
12
3.1
08.01.04.07
ML
15.00
3.24
150
3.1
500
60
3.1
70
70
1.1
12
4.1
140
1.5
20
5.2
200
2.1
150
3.1
08.02
08.02.01
08.02.01.01
08.02.02
08.02.02.01
SISTEMA DE ALCANTARILLADO
418.53
310.02
1.35
MOVIMIENTO DE TIERRAS
ML
310.02
26.88
1.56
ML
310.02
08.02.02.03
ML
310.02
5.52
08.02.02.04
ML
310.02
49.31
m3
145.09
25.93
08.02.02.06
8,333.34 0.1cp+1of+2pe
483.63 1pe
1,711.31 0.1cp+1pe
15,287.09 0.1cp+1op+3pe
3,762.18 0.5cp+1pe
19,838.18
08.02.02.06
ML
310.02
61.71
08.02.02.06
ML
310.02
2.28
08.02.02.07
418.53 1tp+3pe
59,991.66
08.02.02.02
08.02.02.05
48.60 0.1cp+1op+2of
60,410.19
TRABAJOS PRELIMINARES
1,537.59 0.1cp+1op+1of+1pe
19,131.33 0.2cp+1op+1of+3pe
706.85 0.1cp+1op+1of
3,617.11
08.02.02.07
36.00
10.75
08.02.02.07
36.00
1.46
52.56 0.1cp+2pe
160
2.1
08.02.02.07
ML
36.00
5.52
198.72 0.1cp+1pe
70
1.1
08.02.02.07
ML
36.00
11.74
422.64 0.1cp+2pe
30
2.1
08.02.02.07
m3
7.02
25.93
182.03 0.5cp+1pe
140
1.5
08.02.02.07
und
4.00
297.07
1,188.28 0.1cp+1op+1of+2pe
12
4.1
08.02.02.07
und
1,069.24 0.1cp+1op+1of+1pe
3.1
116.64 0.1cp+1op+2pe
6,958.82
150
3.1
08.02.02.07
08.02.02.08
08.02.02.08
08.02.02.08
08.02.02.08
08.03
387.00 0.1cp+1op+2pe
4.00
267.31
36.00
3.24
m3
21.74
36.23
787.64 1pe
m3
28.26
25.93
732.78 0.5cp+1pe
140
1.5
und
3.00
1,812.80
60
3.1
70
70
1.1
5,438.40 2op+1of+3pe
75,507.17
08.03.01
474.06
26.88
08.03.02
ML
474.06
1.56
08.03.03
ML
474.06
5.52
12,742.73 0.1cp+1of+2pe
739.53 1pe
2,616.81 0.1cp+1pe
08.03.04
ML
373.62
61.71
23,056.09 0.2cp+1op+1of+3pe
20
5.2
08.03.05
ML
100.44
65.58
6,586.86 0.2cp+1op+1of+3pe
20
5.2
08.03.06
ML
474.06
49.31
23,375.90 0.1cp+1op+3pe
12
4.1
08.03.07
ML
474.06
2.28
1,080.86 0.1cp+1op+1of
200
2.1
08.03.08
m3
204.72
25.93
5,308.39 0.5cp+1pe
15,849,681.21
1,185,556.15
1,584,968.12
=======================
TOTAL REFERENCIAL sin IGV
IGV 18%
3,351,636.99
18,620,205.48
21,971,842.47
VEINTIUN MILLONES NOVECIENTOS SETENTIUN MIL OCHOCIENTOS CUARENTIDOS Y 47/100 NUEVOS SOLES
140
1.5
M/(PROD/DIA)
TU (dias)
canper*8/prod
tu/tp
Tp
1.0000
1.000
0.0030
0.003
TRABAJO=R*M
1.0000
8.80
1.000
8.80
0.0070
0.04
0.007
5790.86
0.1250
25.60
0.125
102.40
0.0079
0.30
0.008
3046.35
0.0113
0.13
0.011
3549.84
0.0960
0.05
0.096
258.21
0.1313
0.28
0.131
377.86
0.3429
2.67
0.343
93.33
2.7039
0.27
2.704
12.13
0.0458
0.82
0.046
890.38
1.4000
1.17
1.400
29.14
0.0363
0.29
0.036
1124.27
0.0114
0.06
0.011
2465.27
0.0027
0.09
0.003
4528.06
0.0164
0.04
0.016
3424.37
0.0098
0.03
0.010
2527.51
0.0092
0.04
0.009
2708.05
0.0196
0.04
0.020
2853.61
0.0349
0.02
0.035
709.82
0.0262
0.10
0.026
3358.27
0.0475
0.04
0.048
1852.00
0.2025
0.04
0.203
276.49
0.1134
0.04
0.113
218.65
0.2430
0.04
0.243
230.41
0.5023
0.03
0.502
175.20
0.0238
11.07
0.024
1394.40
0.0179
2.10
0.018
1407.00
0.0179
2.10
0.018
1407.00
1.0000
0.00
1.000
0.00
16.6667
0.04 2.083333333
8.000
2.45
0.2593
2.51
0.259
33.94
0.0250
48.00
0.025
960.00
7.9772
0.09
7.977
1.50
47.8927
0.04 5.986590038
8.000
0.85
0.8373
2.51
0.837
10.51
5.9809
0.67
5.981
2.81
0.1379
2.10
0.138
121.80
25.7827
0.09 3.222836096
8.000
0.47
0.0127
3.54
0.013
1947.69
0.0722
0.04
0.072
775.53
0.0069
0.21
0.007
3577.59
0.0046
0.61
0.005
10559.66
0.0672
1.40
0.067
249.90
0.0081
1.12
0.008
2073.00
0.0232
0.93
0.023
725.19
0.0203
0.11
0.020
1617.65
0.0572
0.12
0.057
713.77
2.7123
0.12
2.712
15.04
0.0021
2.51
0.002
4156.29
0.0651
0.09
0.065
184.20
0.0167
0.17
0.017
1006.45
0.0392
0.17
0.039
632.90
0.0331
2.05
0.033
3403.11
0.0081
0.21
0.008
3057.76
0.0580
10.20
0.058
703.80
0.0526
8.20
0.053
623.20
0.2222
16.40
0.222
147.60
0.4000
16.40
0.400
82.00
0.0634
2.51
0.063
138.86
1.9499
0.09
1.950
6.15
0.3810
3.10
0.381
65.10
0.2703
2.48
0.270
91.76
0.8475
3.28
0.847
38.70
0.8098
1.31
0.810
40.50
0.4310
0.67
0.431
38.98
0.0267
90.00
0.027
1350.00
0.1333
90.00
0.133
270.00
0.4000
90.00
0.400
90.00
0.2000
90.00
0.200
180.00
0.4000
90.00
0.400
90.00
0.3000
30.00
0.300
300.00
0.6000
30.00
0.600
150.00
0.2143
30.00
0.214
420.00
0.4286
30.00
0.429
210.00
1.0000
30.00
1.000
90.00
0.1905
10.20
0.190
214.20
0.2703
4.08
0.270
150.96
0.2632
4.96
0.263
188.48
0.6250
4.96
0.625
79.36
5.0000
4.96
5.000
9.92
1.0000
2.48
1.000
49.60
1.1111
2.48
1.111
44.64
0.0415
0.06
0.041
405.16
0.0663
0.06
0.066
253.40
0.6977
0.06
0.698
24.08
0.0353
0.06
0.035
476.56
0.0118
0.42
0.012
3540.16
1.8634
0.00
1.863
0.00
0.7407
0.00
0.741
0.00
0.0091
0.00
0.009
0.00
0.0571
0.00
0.057
0.00
0.0556
0.00
0.056
0.00
0.2222
0.00
0.222
0.00
0.3077
0.00
0.308
0.00
0.0741
0.00
0.074
0.00
0.0500
0.00
0.050
0.00
0.1667
0.00
0.167
0.00
0.6667
12.80
0.667
38.40
10.0000
0.56
1.25
8.000
1.68
2.0000
4.13
2.000
12.40
0.0403
0.02
0.040
218.62
0.0020
0.24
0.002
11924.81
0.0050
0.20
0.005
9698.84
0.0240
2.00
0.024
1000.00
0.0117
0.09
0.012
1022.13
0.0163
2.51
0.016
540.17
0.0894
0.11
0.089
187.98
0.1117
0.16
0.112
286.45
0.2793
0.56
0.279
60.16
1.0026
0.09
1.003
11.97
15.1778
0.07 1.897224631
8.000
1.63
0.5215
0.08
0.521
47.56
0.2097
0.10
0.210
118.24
30.0000
0.56
3.75
8.000
0.56
12.5000
0.67
1.5625
8.000
1.34
30.0000
0.56
3.75
8.000
0.56
6.2500
0.67
6.250
2.69
15.0000
6.2500
0.56
0.67
1.875
1
8.000
6.250
1.12
2.69
25.0000
0.67
3.125
8.000
0.67
0.0020
2.51
0.002
4433.94
0.0109
0.11
0.011
1543.06
0.0136
0.16
0.014
2351.33
0.0340
0.56
0.034
493.78
0.1221
0.09
0.122
98.25
0.0410
0.84
0.041
409.72
0.0025
0.84
0.003
6716.71
0.0242
0.84
0.024
693.17
0.0655
0.07
0.065
378.78
0.1579
0.73
0.158
55.73
0.0087
0.73
0.009
1011.27
15.0000
1.12
1.875
8.000
1.12
0.3750
1.12
0.375
44.80
2.5000
1.12
2.500
6.72
15.0000
1.12
1.875
8.000
1.12
1.8750
1.12
1.875
8.96
1.1538
1.12
1.154
14.56
0.6818
1.12
0.682
24.64
2.5000
1.12
2.500
6.72
0.3191
1.12
0.319
52.64
1.1538
1.12
1.154
14.56
0.7895
1.12
0.789
21.28
2.5000
1.12
2.500
6.72
0.3571
1.12
0.357
47.04
5.0000
1.12
5.000
3.36
2.1429
1.12
2.143
7.84
0.0514
0.25
0.051
482.91
0.0553
0.09
0.055
216.98
0.0063
1.87
0.006
2653.06
0.0360
1.24
0.036
689.44
0.0062
0.07
0.006
2695.49
0.0094
1.40
0.009
1790.21
0.1667
16.80
0.167
100.80
0.1667
16.80
0.167
100.80
0.1667
8.80
0.167
52.80
0.3333
4.40
0.333
26.40
1.3709
0.06
1.371
6.42
1.4623
0.11
1.462
11.49
0.6397
0.13
0.640
13.76
0.2742
0.56
0.274
61.28
0.1828
1.68
0.183
183.83
12.3023
0.09 1.537785589
8.000
0.98
0.1667
0.00
0.167
0.00
2.3851
0.00
2.385
0.00
0.6360
0.06
0.636
26.41
1.0000
4.13
1.000
24.80
0.0833
0.0833
17.60
40.00
1
1
0.083
0.083
105.60
240.00
0.1667
20.00
0.167
120.00
0.0833
33.60
0.083
201.60
0.2424
2.10
0.242
69.30
0.0111
0.00
0.011
0.00
1.0000
0.00
1.000
0.00
1.0000
0.00
1.000
0.00
0.0000
0.0000
1.7598
0.06
1.760
18.18
0.5279
0.17
0.528
46.97
0.5631
0.11
0.563
29.83
0.0567
0.13
0.057
155.09
0.1056
0.56
0.106
159.11
2.5271
0.09
2.527
4.75
0.7039
0.16
0.704
46.60
12.0000
0.09
1.5
8.000
1.40
10.6667
0.11 1.333333333
8.000
1.58
4.6667
0.13
4.667
1.89
2.0000
0.56
2.000
8.40
29.9145
0.06 3.739316239
8.000
0.29
4.0000
2.07
4.000
6.20
10.0000
0.17
1.25
8.000
2.48
1.6128
0.06
1.613
19.84
0.1935
0.41
0.194
128.14
0.2258
0.11
0.226
35.43
0.2258
0.13
0.226
38.97
0.0387
2.73
0.039
847.39
0.9649
0.09
0.965
12.44
0.0645
2.08
0.065
644.84
0.6451
0.08
0.645
26.04
4.1667
0.17
4.167
5.95
4.4444
0.11
4.444
3.78
1.9444
0.13
1.944
4.53
0.8333
0.56
0.833
20.16
19.9430
0.09 2.492877493
8.000
0.60
3.0000
2.73
3.000
10.93
1.0000
6.20
1.000
24.80
4.1667
0.17
4.167
5.95
0.1380
2.67
0.138
57.97
4.9540
0.09
4.954
2.42
0.6667
24.00
0.667
72.00
0.1266
0.41
0.127
195.94
0.1477
0.11
0.148
54.18
0.1477
0.13
0.148
59.60
0.0535
2.08
0.054
777.13
0.1991
2.08
0.199
208.92
0.0253
2.73
0.025
1295.76
0.4219
0.08
0.422
39.82
0.6839
0.09
0.684
17.55
S10
CONSORCIO ESTUDIO
SAN MARTIN DE
MEJORAMIENTO
DE
PORRES
LA AV. CARLOS
IZAGUIRRE, TRAMO
AV. UNIVERSITARIA AV. CANTA CALLAO,
DISTRITO DE SAN
MARTN DE PORRES,
PROVINCIA DE LIMA,
LIMA
Presupuesto
Presupuesto
9999010
TRAMO AV. CANTA CALLAO - AV. UNIVERSITARIA
Subpresupuesto
001
Cliente
MUNICIPALIDAD DE LIMA
Lugar
Item
Descripcin
01
01.01
OBRAS GENERALES
01.01.01
OBRAS PROVISIONALES
01.01.01.01
ALMACEN
01.01.01.02
01.01.01.03
01.01.01.04
CASETAS DE VIGILANCIA
01.01.01.05
01.01.02
OBRAS PRELIMINARES
Costo al
Und.
Metrado
Precio S/.
Parcial S/.
9,416,609.81
und
4.00
1,553.25
6,213.00
259,860.98
01.01.02.01
INSTALACIONES PROVISIONALES
und
5.00
1,000.00
01.01.02.02
GLB
1.00
6,480.00
6,480.00
01.01.02.03
LIMPIEZA DE TERRENO
m2
141,932.85
0.45
63,869.78
01.01.02.04
GLB
1.00
34,946.02
34,946.02
01.01.02.05
m2
141,932.85
1.01
143,352.18
01.01.02.06
01.02
01.02.01
01.02.02
01.03
01.03..01
DEMOLICIONES
5,000.00
409,087.08
MOVIMIENTO DE TIERRAS
1,633,948.71
m3
44,022.76
m3
52,827.31
6.00
264,136.56
25.93 1,369,812.15
PAVIMENTOS FLEXIBLES
6,740,729.09
CARPETA DE RODADURA
6,528,979.44
01.03.01.01
m2
76,436.85
3.67
280,523.24
01.03.01.02
m2
76,436.85
12.07
922,592.78
01.03.01.03
m2
76,436.85
10.65
814,052.45
01.03.01.04
m2
76,435.85
4.23
323,323.65
01.03.01.05
RIEGO DE LIGA
m2
34,345.94
3.73
128,110.36
01.03.01.06
m2
34,345.94
62.95 2,162,076.92
m2
42,090.91
45.10 1,898,300.04
01.03.01.07
01.03..02
BERMAS
211,749.65
01.03.02.01
m2
6,171.66
3.67
22,649.99
01.03.02.02
m2
6,171.66
10.65
65,728.18
01.03.02.03
m2
6,171.66
4.23
26,106.12
01.03.02.04
m2
6,171.66
15.76
01.04
01.04.01
01.04.01.01
01.04.02
01.04.02.01
VARIOS
MISCELANEOS
NIVELACION DE BUZONES EN GENERAL
29,111.04
und
126.00
231.04
97,265.36
372,983.95
29,111.04
65,110.60
und
670.00
48.59
32,555.30
01.04.02.02
01.04.03
01.04.03.01
01.04.04
CONSTRUCCION DE PARADEROS
01.04.04.02
TACHOS DE BASURA
01.04.04.03
BARANDA
02.01
02.01.01
670.00
48.59
GLB
1.00
49,519.27
32,555.30
49,519.27
MOBILIARIO URBANO
01.04.04.01
02
und
MANEJO AMBIENTAL
49,519.27
229,243.04
97,934.73
17,279.16
114,029.15
1,955,226.59
1,955,226.59
VEREDAS Y RAMPAS
1,016,278.88
02.01.01.01
m2
17,310.91
3.67
63,531.04
02.01.01.02
m2
17,310.91
9.08
157,183.06
02.01.01.03
m2
17,310.91
37.96
657,122.14
02.01.01.04
RAMPA DE CONCRETO PARA MINUSVALIDOS, FC=175 KG/CM2 E=0.10M, ACABADO C:A 1:2
m2
178.50
54.70
9,763.95
02.01.01.05
m2
1,850.89
48.47
89,712.64
02.01.01.06
m2
776.99
50.15
38,966.05
02.01.02
SARDINELES
938,947.71
02.01.02.01
14,795.62
43.06
637,099.40
02.01.02.02
6,123.02
30.08
184,180.44
02.01.02.03
129.04
15.66
2,020.77
02.01.02.04
EXCAVACION DE SARDINELES
m3
1,653.07
36.25
59,923.79
m3
2,148.99
25.93
02.01.02.05
03
03.01
03.01.01
55,723.31
440,946.96
SEALIZACIN
440,946.96
SEALIZACIN HORIZONTAL
344,289.56
03.01.01.01
5,990.80
13.51
80,935.71
03.01.01.02
3,828.00
12.48
47,773.44
03.01.01.03
m2
1,659.32
39.06
64,813.04
03.01.01.04
14,795.62
10.19
150,767.37
03.01.02
SEALIZACIN VERTICAL
96,657.40
03.01.02.01
SEALES PREVENTIVAS
und
69.00
521.79
36,003.51
03.01.02.02
SEALES REGULADORAS
und
76.00
548.13
41,657.88
03.01.02.03
und
9.00
468.94
4,220.46
03.01.02.04
und
5.00
2,955.11
14,775.55
04
04.01
04.01.01
04.01.01.01
04.01.01.02
04.01.02
IMPLEMENTACIN DE SEMFOROS
1,276,380.98
SEMAFORIZACIN
1,276,380.98
MOVIMIENTO DE TIERRAS
3,825.75
m3
55.23
35.56
m3
71.80
25.93
1,963.98
1,861.77
39,522.42
04.01.02.01
und
21.00
669.00
14,049.00
04.01.02.02
und
37.00
280.42
10,375.54
04.01.02.03
m3
11.80
242.30
2,859.14
04.01.02.04
m3
30.87
259.38
8,007.06
04.01.02.05
ENCOFRADO DE ZAPATAS
und
58.00
72.96
04.01.03
ESTRUCTURAS DE FIERRO
4,231.68
202,368.74
04.01.03.01
SEMIPRTICO
und
15.00
6,412.12
96,181.80
04.01.03.02
und
3.00
6,628.52
19,885.56
04.01.03.03
und
1.00
6,259.80
6,259.80
04.01.03.04
und
2.00
6,472.29
12,944.58
04.01.03.05
und
1.00
6,490.65
6,490.65
04.01.03.06
und
10.00
1,487.32
14,873.20
04.01.03.07
und
5.00
1,704.97
8,524.85
04.01.03.08
und
14.00
1,470.47
20,586.58
04.01.03.09
und
7.00
1,685.11
11,795.77
04.01.03.10
und
3.00
1,608.65
04.01.04
04.01.04.01
und
21.00
400.24
04.01.04.02
und
37.00
160.10
04.01.05
4,825.95
14,328.74
SEMFOROS A LED'S
8,405.04
5,923.70
110,847.68
04.01.05.01
und
38.00
1,215.27
46,180.26
04.01.05.02
und
16.00
1,215.27
19,444.32
04.01.05.03
und
2.00
1,215.27
2,430.54
04.01.05.04
und
20.00
1,126.12
22,522.40
04.01.05.05
04.01.06
und
18.00
1,126.12
20,270.16
493,486.10
04.01.06.01
7,235.00
10.73
77,631.55
04.01.06.02
4,525.00
10.33
46,743.25
04.01.06.03
430.00
8.19
3,521.70
04.01.06.04
8,510.00
13.13
111,736.30
04.01.06.05
8,510.00
29.83
253,853.30
04.01.07
CANALIZACIN
252,435.81
04.01.07.01
161.00
119.61
19,257.21
04.01.07.02
270.00
125.48
33,879.60
04.01.07.03
2,190.00
52.86
115,763.40
04.01.07.04
350.00
61.07
21,374.50
04.01.07.05
360.00
120.09
43,232.40
04.01.07.06
180.00
72.45
13,041.00
04.01.07.07
65.00
90.58
04.01.08
CAJAS DE PASO
5,887.70
49,261.62
04.01.08.01
TIPO CE-1
und
27.00
532.14
14,367.78
04.01.08.02
TIPO CE-2
und
40.00
620.31
24,812.40
04.01.08.03
TIPO CE-3
und
12.00
840.12
04.01.09
04.01.09.01
04.01.10
04.01.10.01
04.01.11
04.01.11.01
05
05.01
und
3.00
35,259.30
und
3.00
964.37
105,777.90
2,893.11
10,081.44
105,777.90
2,893.11
1,633.11
und
3.00
544.37
1,633.11
1,302,697.24
PAISAJISMO
1,302,697.24
05.01.01
m3
9,937.34
3.40
33,786.96
05.01.02
m2
49,686.70
9.12
453,142.70
05.01.03
SEMBRADO DE GRAS
m2
49,686.70
9.68
480,967.26
05.01.04
und
500.00
51.18
25,590.00
05.01.05
m3
11,924.81
25.93
309,210.32
06
06.01
06.01.01
SISTEMA DE RIEGO TECNIFICADO CON PLANTA DE TRATAMIENTO DE DESAGUE Y/O AGUAS PARA RIEGO
1,243,813.19
TUBERIAS DE ALIMENTACION
83,329.08
MOVIMIENTO DE TIERRAS
20,703.46
06.01.01.01
m3
214.84
35.56
06.01.01.02
7,639.71
1,790.32
1.46
06.01.01.03
2,613.87
ML
1,790.32
3.11
5,567.90
06.01.01.04
m3
107.42
11.74
1,261.11
06.01.01.05
m3
139.64
25.93
3,620.87
06.01.02
TUBERIAS
61,555.83
06.01.02.01
23.06
12.27
282.95
06.01.02.02
575.28
19.61
11,281.24
1,191.98
41.94
49,991.64
06.01.02.03
06.01.03
ACCESORIOS
1,069.79
06.01.03.01
und
1.00
34.26
34.26
06.01.03.02
und
2.00
83.36
166.72
06.01.03.03
und
1.00
49.66
49.66
06.01.03.04
und
4.00
136.84
547.36
06.01.03.05
und
2.00
27.26
54.52
06.01.03.06
und
4.00
40.52
162.08
und
1.00
55.19
06.01.03.07
06.02
06.02.01
55.19
TUBERIAS DE DISTRIBUCION
468,312.26
MOVIMIENTO DE TIERRAS
169,944.44
06.02.01.01
m3
1,763.50
35.56
62,710.06
06.02.01.02
14,695.81
1.46
21,455.88
06.02.01.03
ML
14,695.81
3.11
45,703.97
06.02.01.04
ML
881.75
11.74
10,351.75
06.02.01.05
m3
1,146.27
25.93
06.02.02
TUBERIAS
29,722.78
222,008.52
06.02.02.01
487.76
15.62
7,618.81
06.02.02.02
7,996.08
16.68
133,374.61
06.02.02.03
825.20
18.69
15,422.99
06.02.02.04
5,345.73
12.27
65,592.11
06.02.03
ACCESORIOS
76,359.30
06.02.03.01
jgo
76.00
42.56
3,234.56
06.02.03.02
jgo
1,379.00
48.16
66,412.64
06.02.03.03
und
1.00
25.56
25.56
06.02.03.04
und
40.00
26.34
1,053.60
06.02.03.05
und
6.00
27.66
165.96
06.02.03.06
und
1.00
22.20
22.20
06.02.03.07
und
8.00
23.04
184.32
06.02.03.08
und
13.00
20.52
266.76
06.02.03.09
und
22.00
22.20
488.40
06.02.03.10
und
6.00
24.86
149.16
06.02.03.11
und
47.00
44.60
2,096.20
06.02.03.12
und
13.00
20.10
261.30
06.02.03.13
und
19.00
22.20
421.80
06.02.03.14
und
6.00
24.44
146.64
06.02.03.15
und
42.00
29.17
1,225.14
06.02.03.16
und
3.00
20.80
62.40
06.02.03.17
und
7.00
20.38
142.66
06.03
CISTERNA V=145.73 M3
550,851.86
06.03.01
m3
1,947.22
16.13
31,408.66
06.03.02
m3
2,531.38
25.93
65,638.68
06.03.03
ENCOFRADO Y DESENCOFRADO
m2
1,421.28
53.06
75,413.12
06.03.04
m3
556.00
266.23
148,023.88
06.03.05
kg
40,111.44
4.60
184,512.62
06.03.06
m2
1,278.72
35.86
45,854.90
06.04
INSTALACIONES SANITARIAS
26,641.50
06.04.01
SISTEMA DE SUCCION
GLB
6.00
1,110.43
6,662.58
06.04.02
SISTEMA DE IMPULSION
GLB
6.00
1,030.39
6,182.34
06.04.03
SISTEMA DE REBOSE
und
6.00
405.62
2,433.72
06.04.04
CAJUELA
und
6.00
298.89
1,793.34
06.04.05
109.42
10.75
1,176.27
06.04.06
109.42
1.46
159.75
06.04.07
ML
109.42
5.52
604.00
06.04.08
ML
109.42
11.74
1,284.59
06.04.09
ML
109.42
55.29
6,049.83
06.04.10
m3
11.38
25.93
06.05
INSTALACIONES ELECTRICAS
295.08
112,651.63
06.05.01
CAJA DE PASO
und
12.00
466.44
5,597.28
06.05.02
06.05.03
125.78
119.61
15,044.55
471.68
9.19
06.05.04
4,334.74
und
6.00
544.37
06.05.05
3,266.22
und
6.00
859.93
06.05.06
5,159.58
ELECTROBOMBA DE 7.5 HP
und
6.00
6,365.70
38,194.20
06.05.07
und
6.00
2,780.83
16,684.98
06.05.08
und
6.00
4,061.68
24,370.08
33.00
61.42
06.06
06.06.01
07
VARIOS
ESCALERA DE GATO
2,026.86
m
SEGURIDAD Y SALUD
2,026.86
36,670.00
07.01
und
90.00
253.00
22,770.00
07.02
GLB
1.00
1,600.00
1,600.00
07.03
SEALIZACION DE SEGURIDAD
GLB
1.00
2,700.00
2,700.00
07.04
GLB
1.00
6,000.00
6,000.00
07.05
1.00
3,600.00
08
08.01
08.01.01
08.01.01.01
08.01.02
OBRAS DE SANEAMIENTO
SISTEMA DE AGUA POTABLE
41,419.08
TRABAJOS PRELIMINARES
TRAZO NIVELES Y REPLANTEO DE REDES (C/EQUIPO TOPOGRFICO)
3,600.00
177,336.44
383.56
m
284.12
1.35
MOVIMIENTO DE TIERRAS
383.56
15,051.22
08.01.02.01
284.12
10.75
3,054.29
08.01.02.02
284.12
1.46
414.82
08.01.02.03
ML
1,233.70
5.52
6,810.02
08.01.02.04
ML
284.12
11.74
3,335.57
08.01.02.05
m3
55.40
25.93
08.01.03
1,436.52
23,871.76
08.01.03.01
08.01.04
SUMINISTRO E INSTALACION TUBERIA PVC U/F C-7.5,S 13.3 ISO 4422 110 MM
ML
284.12
84.02
23,871.76
2,112.54
08.01.04.01
15.00
8.28
124.20
08.01.04.02
15.00
1.46
21.90
08.01.04.03
ML
15.00
5.52
82.80
08.01.04.04
ML
15.00
11.74
176.10
08.01.04.05
m3
4.68
25.93
121.35
08.01.04.06
und
3.00
512.53
1,537.59
ML
15.00
3.24
08.01.04.07
08.02
08.02.01
08.02.01.01
08.02.02
SISTEMA DE ALCANTARILLADO
TRABAJOS PRELIMINARES
TRAZO NIVELES Y REPLANTEO DE REDES (C/EQUIPO TOPOGRFICO)
48.60
60,410.19
418.53
310.02
1.35
MOVIMIENTO DE TIERRAS
418.53
59,991.66
08.02.02.01
EXCAVACION DE ZANJA CON EQUIPO TN PARA REDES DE H= 2.10 HASTA H=2.50 MT.
ML
310.02
26.88
08.02.02.02
ML
310.02
1.56
483.63
08.02.02.03
ML
310.02
5.52
1,711.31
08.02.02.04
310.02
49.31
15,287.09
08.02.02.05
145.09
25.93
08.02.02.06
m3
8,333.34
3,762.18
19,838.18
08.02.02.06.01
SUMINISTRO E INSTALACION TUBERIA PVC U/F 200 MM NISO 4435 CL-5 (SERIE 20)
ML
310.02
61.71
19,131.33
08.02.02.06.02
310.02
2.28
706.85
08.02.02.07
3,617.11
08.02.02.07.01
36.00
10.75
08.02.02.07.02
36.00
1.46
52.56
08.02.02.07.03
ML
36.00
5.52
198.72
08.02.02.07.04
ML
36.00
11.74
422.64
08.02.02.07.05
m3
7.02
25.93
182.03
08.02.02.07.06
und
4.00
297.07
1,188.28
08.02.02.07.07
und
4.00
267.31
1,069.24
08.02.02.07.08
36.00
3.24
08.02.02.08
BUZONES
387.00
116.64
6,958.82
08.02.02.08.01
m3
21.74
08.02.02.08.02
m3
28.26
25.93
732.78
08.02.02.08.03
und
3.00
1,812.80
5,438.40
08.03
36.23
787.64
75,507.17
08.03.01
474.06
26.88
08.03.02
ML
474.06
1.56
739.53
08.03.03
ML
474.06
5.52
2,616.81
08.03.04
SUMINISTRO E INSTALACION TUBERIA PVC U/F 200 MM NISO 4435 CL-5 (SERIE 20)
ML
373.62
61.71
23,056.09
08.03.05
SUMINISTRO E INSTALACION TUBERIA PVC U/F 300 MM NTP ISO 4435 CL-5 (SERIE 20)
ML
100.44
65.58
6,586.86
08.03.06
474.06
49.31
23,375.90
08.03.07
ML
474.06
2.28
1,080.86
08.03.08
m3
204.72
25.93
5,308.39
COSTO DIRECTO
12,742.73
###
1,185,556.15
UTILIDAD 10%
1,584,968.12
==========================
TOTAL REFERENCIAL sin IGV
###
IGV 18%
3,351,636.99
SON :
1.02
###
VEINTIUN MILLONES NOVECIENTOS SETENTIUN MIL OCHOCIENTOS CUARENTIDOS Y 47/100 NUEVOS SOLES
DEMOLICIONES
409,087.08
01.02.01
m2
10,120.77
13.48
136,427.98
01.02.02
m2
26,623.82
4.64
123,534.52
01.02.03
m2
5,205.81
4.20
21,864.40
01.02.04
1,371.26
8.08
11,079.78
01.02.05
pza
35.00
81.94
2,867.90
01.02.06
m2
44.38
9.94
441.14
01.02.07
m2
1,091.15
11.40
12,439.11
01.02.08
und
25.00
15.98
399.50
01.02.09
m3
3,857.80
25.93
100,032.75
1.01
01.04.04.01
CONSTRUCCION DE PARADEROS
97,934.73
01.04.04.01.01
m2
60.00
01.04.04.01.02
m3
13.50
35.56
480.06
01.04.04.01.03
und
20.00
4,846.95
96,939.00
m3
17.55
25.93
01.04.04.01.04
01.05.04.02
TACHOS DE BASURA
60.60
455.07
17,279.16
01.05.04.02.01
m2
20.88
1.01
21.09
01.05.04.02.02
m3
4.18
35.56
148.64
01.05.04.02.03
m3
4.18
228.29
954.25
01.05.04.02.04
und
58.00
276.11
16,014.38
m3
5.43
25.93
01.05.04.02.05
01.05.04.03
01.05.04.03.01
BARANDA
BARANDA METALICA INC. PINTADO
140.80
114,029.15
549.75
207.42
114,029.15