Está en la página 1de 347

Reliance

Project:J3
ISO No.

Line No.

Test Pack No.

Spool No./
Matcode

SA 106

Lin

Plant:
STS/RIL/FLR/A1/1404/03-14

Unit:
Rev.

COIL A (N1H-N2H)

Pipe Class

Report No:
1

:
:

EC 12 EMFR HC 50

% NDT ( RT / UT) :
Type of Fit up Date
Weld

Weld
Visual
Date

Fit up & Welder No.


Weld Visual
Rep.No

WPS
No.

NDT
Control,
XR. No.

RT / UT
Report No.

RT / UT
Report
Date

5%RT
PWHT
Chart
No.

PWHT Hardness Test


Date
Report No.

Joint No.

Size

Thick

N1H1

2"

5.54MM BW

17/07/2015

15380

14118

NA

NA

NA

N1H2

2"

5.54MM BW

17/07/2015

15380

14118

NA

NA

NA

N1H3

2"

5.54MM BW

17/07/2015

15380

14118

NA

NA

NA

N1H4

2"

5.54MM BW

17/07/2015

15378

14118

NA

NA

NA

N1H5

2"

5.54MM BW

17/07/2015

15378

14118

NA

NA

NA

N1H6

2"

5.54MM BW

17/07/2015

15378

14118

NA

NA

NA

N1H7

2"

5.54MM BW

17/07/2015

15378

14118

NA

NA

NA

N1H8

2"

5.54MM BW

17/07/2015

15378

14118

NA

NA

NA

Note-01: Pipe support Welding: Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-025.

330

STS/RIL/RT/ 8/14/2015
83

Note-02: Confirm Connecting Joint Clearance (in case of two isometrics): YES/No. if not cleared, details transferred to Form: EPCMD 2QM00FMTPP003: YES / NO
Note-03: Steam Tracing (as applicable): Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-031.
Note-04: PMI: PMI shall be checked on LAS / SS / Non-ferrous materials and Fit-up & Weld Visual Report no. to be menioned.
Note-05: NDT lot no.: Only accepted lot no. shall be recorded. In case of 100% lines & FPJ, record as "100%".
Legend : PWHT - Post Weld Heat Treatment,

XR - Radiography Control Number,


Contractor QA/QC

Signatures
Name
Date
Format No.: EPCMD-2QM00FMTPP002, Rev.-03, Date: 26.03.2015

Rep. No - Report Number


Reliance QMD

Line History Sheet


Date:

C 50
MPT/LPT
Report No.

PMI NDT Lot Branch RF


(Note- No. (Note- Pad Test
04) 05)
Report No.

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

Remarks

FPJ: First Production Joint


Reliance O&M / TPI

Page 1 of 1

Reliance
Project:J3
ISO No.

Line No.

Test Pack No.

Spool No./
Matcode

SA 106

Line History S

Plant:
STS/RIL/FLR/A1/1404/03-14

Unit:
Rev.

COIL A (N1H-N2H)

Pipe Class

Report No:
1

:
:

EC 12 EMFR HC 50

% NDT ( RT / UT) :
Type of Fit up Date
Weld

Weld
Visual
Date

Fit up & Welder No.


Weld Visual
Rep.No

WPS
No.

NDT
Control,
XR. No.

RT / UT
Report No.

RT / UT
Report
Date

5%RT
PWHT
Chart
No.

PWHT Hardness Test


Date
Report No.

Joint No.

Size

Thick

N1H9

2"

5.54MM BW

17/07/2015

15378

14118

NA

NA

NA

N1H10

2"

5.54MM BW

17/07/2015

13579

14118

NA

NA

NA

N1H11

2"

5.54MM BW

17/07/2015

15379

14118

NA

NA

NA

N1H12

2"

5.54MM BW

17/07/2015

15380

14118

NA

NA

NA

N1H13

2"

5.54MM BW

17/07/2015

15380

14118

NA

NA

NA

N1H14

2"

5.54MM BW

17/07/2015

15379

14118

NA

NA

NA

N1H15

2"

5.54MM BW

17/07/2015

15379

14118

NA

NA

NA

N1H16

2"

5.54MM BW

17/07/2015

15378

14118

NA

NA

NA

Note-01: Pipe support Welding: Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-025.


Note-02: Confirm Connecting Joint Clearance (in case of two isometrics): YES/No. if not cleared, details transferred to Form: EPCMD 2QM00FMTPP003: YES / NO
Note-03: Steam Tracing (as applicable): Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-031.
Note-04: PMI: PMI shall be checked on LAS / SS / Non-ferrous materials and Fit-up & Weld Visual Report no. to be menioned.
Note-05: NDT lot no.: Only accepted lot no. shall be recorded. In case of 100% lines & FPJ, record as "100%".

Legend : PWHT - Post Weld Heat Treatment,

XR - Radiography Control Number,


Contractor QA/QC

Signatures
Name
Date
Format No.: EPCMD-2QM00FMTPP002, Rev.-03, Date: 26.03.2015

Rep. No - Report Number


Reliance QMD

ory Sheet
Date:

MPT/LPT
Report No.

PMI NDT Lot Branch RF


(Note- No. (Note- Pad Test
04) 05)
Report No.

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

Remarks

FPJ: First Production Joint


Reliance O&M / TPI

Page 1 of 1

Reliance
Project:J3
ISO No.

Line No.

Test Pack No.

Spool No./
Matcode

SA 106

Line His

Plant:
STS/RIL/FLR/A1/1404/03-14

Unit:
Rev.

COILA N1H-N2H

Pipe Class

Report No:
1

:
:

EC 12 EMFR HC

% NDT ( RT / UT) :
Type of Fit up Date
Weld

Weld
Visual
Date

Fit up & Weld Welder No.


Visual Rep.No

WPS
No.

Joint No.

Size

Thick

N1H17

2"

5.54MM BW

17/07/2015

15379

14118

N1H18

2"

5.54MM BW

17/07/2015

15379

N1H19

2"

5.54MM BW

17/07/2015

N1H20

2"

5.54MM BW

17/07/2015

N1H21

2"

5.54MM BW

N1H22

2"

N1H23

N1H24

NDT
Control, XR.
No.
X 331

RT / UT
Report No.

RT / UT
Report
Date

STS/RIL/RT83 8/14/2015

5%RT
PWHT
Chart
No.

PWHT
Date

NA

NA

14118

NA

NA

15379

14118

NA

NA

15380

14118

NA

NA

17/07/2015

15378

14118

NA

NA

5.54MM BW

17/07/2015

15379

14118

NA

NA

2"

5.54MM BW

17/07/2015

15380

14118

NA

NA

2"

5.54MM BW

17/07/2015

15380

14118

NA

NA

Note-01: Pipe support Welding: Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-025.


Note-02: Confirm Connecting Joint Clearance (in case of two isometrics): YES/No. if not cleared, details transferred to Form: EPCMD 2QM00FMTPP003: YES / NO
Note-03: Steam Tracing (as applicable): Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-031.
Note-04: PMI: PMI shall be checked on LAS / SS / Non-ferrous materials and Fit-up & Weld Visual Report no. to be menioned.
Note-05: NDT lot no.: Only accepted lot no. shall be recorded. In case of 100% lines & FPJ, record as "100%".
Legend : PWHT - Post Weld Heat Treatment,

XR - Radiography Control Number,


Contractor QA/QC

Signatures
Name
Date
Format No.: EPCMD-2QM00FMTPP002, Rev.-03, Date: 26.03.2015

Rep. No - Report Number


Reliance QMD

e History Sheet
Date:

MFR HC 50
Hardness Test MPT/LPT
Report No. Report No.

PMI NDT Lot


Branch RF
(Note- No. (Note- Pad Test
04) 05)
Report No.

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

Remarks

FPJ: First Production Joint


Reliance O&M / TPI

Page 1 of 1

Reliance
Project:J3
ISO No.

Line No.

Test Pack No.

Spool No./
Matcode

Line Histor

Plant:
STS/RIL/FLR/A1/1404/03-14

Unit:
Rev.

COILA N1H-N2H

Pipe Class

Report No:
1

:
:

EC 12 EMFR HC 50

% NDT ( RT / UT) :
Type of Fit up Date
Weld

Weld
Visual
Date

Fit up & Welder No.


Weld Visual
Rep.No

WPS
No.

NDT
Control,
XR. No.

RT / UT
Report No.

RT / UT
Report
Date

5%RT
PWHT
Chart
No.

PWHT Hardness Test


Date
Report No.

Joint No.

Size

Thick

N1H25

2"

5.54MM BW

17/07/2015

15380

14118

NA

NA

NA

N1H26

2"

5.54MM BW

17/07/2015

13579

14118

NA

NA

NA

N1H27

2"

5.54MM BW

17/07/2015

15379

14118

NA

NA

NA

N1H28

2"

5.54MM BW

17/07/2015

15378

14118

NA

NA

NA

N1H29

2"

5.54MM BW

17/07/2015

15379

14118

NA

NA

NA

N1H30

2"

5.54MM BW

17/07/2015

15380

14118

NA

NA

NA

Note-01: Pipe support Welding: Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-025.


Note-02: Confirm Connecting Joint Clearance (in case of two isometrics): YES/No. if not cleared, details transferred to Form: EPCMD 2QM00FMTPP003: YES / NO
Note-03: Steam Tracing (as applicable): Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-031.
Note-04: PMI: PMI shall be checked on LAS / SS / Non-ferrous materials and Fit-up & Weld Visual Report no. to be menioned.

Note-05: NDT lot no.: Only accepted lot no. shall be recorded. In case of 100% lines & FPJ, record as "100%".
Legend : PWHT - Post Weld Heat Treatment,

XR - Radiography Control Number,


Contractor QA/QC

Signatures
Name
Date
Format No.: EPCMD-2QM00FMTPP002, Rev.-03, Date: 26.03.2015

Rep. No - Report Number


Reliance QMD

istory Sheet
Date:

MPT/LPT
Report No.

PMI
NDT Lot
(Note-04) No. (Note05)

Branch RF
Pad Test
Report No.

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

Remarks

FPJ: First Production Joint


Reliance O&M / TPI

Page 1 of 1

Reliance

Project:J3

Plant:

ISO No.
: No.
Line
Test: Pack
No. :

Unit:

STS/RIL/FLR/A1/1404/03-14

Type of
Weld

Fit up Date

Weld Visual
Date

Fit up & Welder No.


Weld Visual
Rep.No

WPS
No.

Joint No.

Size

Thick

N1J1

2"

5.54MM BW

14-07-2015

13-08-2015

15379

14118

N1J2

2"

5.54MM BW

14-07-2016

13-08-2016

15379

14118

N1J3

2"

5.54MM BW

14-07-2017

13-08-2017

15379

14118

N1J4

2"

5.54MM BW

14-07-2018

13-08-2018

15378/1537 14118
9

N1J5

2"

5.54MM BW

14-07-2019

13-08-2019

15378

14118

N1J6

2"

5.54MM BW

14-07-2020

13-08-2020

15378

14118

N1J7

2"

5.54MM BW

14-07-2021

13-08-2021

15378

14118

N1J8

2"

5.54MM BW

14-07-2022

13-08-2022

15378

14118

Rev.
Pipe Class
% NDT ( RT /
NDT UT)
RT /: UT
Control, Report No.
XR. No.

X332

8/14/2015

Reliance

Project:J3

Plant:

ISO No.
: No.
Line
Test: Pack
No. :

Unit:

STS/RIL/FLR/A1/1404/03-14

Type of
Weld

Fit up Date

Weld Visual
Date

Fit up & Welder No.


Weld Visual
Rep.No

WPS
No.

Joint No.

Size

Thick

N1J8

2"

5.54MM BW

14-07-2022

13-08-2022

15378

14118

N1J9

2"

5.54MM BW

14-07-2023

13-08-2023

15378

14118

N1J10

2"

5.54MM BW

14-07-2024

13-08-2024

13579

14118

N1J11

2"

5.54MM BW

14-07-2025

13-08-2025

13579

14118

N1J12

2"

5.54MM BW

14-07-2026

13-08-2026

13579

14118

N1J13

2"

5.54MM BW

14-07-2027

13-08-2027

13579

14118

N1J14

2"

5.54MM BW

14-07-2028

13-08-2028

13579

14118

N1J15

2"

5.54MM BW

14-07-2029

13-08-2029

13579

14118

N1J16

2"

5.54MM BW

14-07-2030

13-08-2030

15378

14118

Rev.
Pipe Class
% NDT ( RT /
NDT UT)
RT /: UT
Control, Report No.
XR. No.

Reliance

Project:J3

Plant:

ISO No.
: No.
Line
Test: Pack
No. :

Unit:

STS/RIL/FLR/A1/1404/03-14

Type of
Weld

Fit up Date

Weld Visual
Date

Fit up & Welder No.


Weld Visual
Rep.No

WPS
No.

Joint No.

Size

Thick

N1J17

2"

5.54MM BW

14-07-2031

13-08-2031

15378

14118

N1J18

2"

5.54MM BW

14-07-2032

13-08-2032

15380

14118

N1J19

2"

5.54MM BW

14-07-2033

13-08-2033

15380

14118

N1J20

2"

5.54MM BW

14-07-2034

13-08-2034

15378

14118

N1J21

2"

5.54MM BW

14-07-2035

13-08-2035

15378

14118

N1J22

2"

5.54MM BW

14-07-2036

13-08-2036

15379

14118

N1J23

2"

5.54MM BW

14-07-2037

13-08-2037

15379

14118

N1J24

2"

5.54MM BW

14-07-2038

13-08-2038

15380

14118

N1J25

2"

5.54MM BW

14-07-2039

13-08-2039

15380

14118

N1J26

2"

5.54MM BW

14-07-2040

13-08-2040

15379

14118

Rev.
Pipe Class
% NDT ( RT /
NDT UT)
RT /: UT
Control, Report No.
XR. No.

Reliance

Project:J3

Plant:

ISO No.
: No.
Line
Test: Pack
No. :

Unit:

STS/RIL/FLR/A1/1404/03-14

Type of
Weld

Fit up Date

Weld Visual
Date

Fit up & Welder No.


Weld Visual
Rep.No

WPS
No.

Joint No.

Size

Thick

N1J26

2"

5.54MM BW

14-07-2040

13-08-2040

15379

14118

N1J27

2"

5.54MM BW

14-07-2041

13-08-2041

15379

14118

N1J28

2"

5.54MM BW

14-07-2042

13-08-2042

15378

14118

N1J29

2"

5.54MM BW

14-07-2043

13-08-2043

15378

14118

N1J30

2"

5.54MM BW

14-07-2044

13-08-2044

15378

14118

N1J31

2"

5.54MM BW

14-07-2045

13-08-2045

15379

14118

N1J32

2"

5.54MM BW

14-07-2046

13-08-2046

15379

14118

Rev.
Pipe Class
% NDT ( RT /
NDT UT)
RT /: UT
Control, Report No.
XR. No.

Note-01: Pipe support Welding: Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-025.


Note-02: Confirm Connecting Joint Clearance (in case of two isometrics): YES/No. if not cleared, details transferred to Form: EPCMD 2QM00FMTPP003: YES / NO
Note-03: Steam Tracing (as applicable): Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-031.
Note-04: PMI: PMI shall be checked on LAS / SS / Non-ferrous materials and Fit-up & Weld Visual Report no. to be menioned.

Reliance

Project:J3

Plant:

ISO No.
: No.
Line
Test: Pack
No. :
Joint No.

Unit:

STS/RIL/FLR/A1/1404/03-14

Type of
Weld
Size

Fit up Date

Weld Visual
Date

Thick

Fit up & Welder No.


Weld Visual
Rep.No

WPS
No.

Rev.
Pipe Class
% NDT ( RT /
NDT UT)
RT /: UT
Control, Report No.
XR. No.

Note-05: NDT lot no.: Only accepted lot no. shall be recorded. In case of 100% lines & FPJ, record as "100%".
Legend : PWHT - Post Weld Heat Treatment,

XR - Radiography Control Number,

Contractor QA/QC
Signatures
Name
Date

Relian

ass
( RT /

Line History Sheet

Report No:
:

Date:

1
:

EC 12 EMFR HC 50
5%RT
RT / PWH PW Hardness MPT/LPT
UT
T
HT
Test Report No.
Repor Chart Date Report
t Date No.
No.

PMI
(Note-04)

NDT Lot Branch


No. (Note- RF Pad
05)
Test
Report
No.
NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

Remarks

ass
( RT /

Line History Sheet

Report No:
:

Date:

1
:

EC 12 EMFR HC 50
5%RT
RT / PWH PW Hardness MPT/LPT
UT
T
HT
Test Report No.
Repor Chart Date Report
t Date No.
No.
NA NA
NA
NA

PMI
(Note-04)
NA

NDT Lot Branch


No. (Note- RF Pad
05)
Test
Report
NA
No.

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

Remarks

ass
( RT /

Line History Sheet

Report No:
:

Date:

1
:

EC 12 EMFR HC 50
5%RT
RT / PWH PW Hardness MPT/LPT
UT
T
HT
Test Report No.
Repor Chart Date Report
t Date No.
No.

PMI
(Note-04)

NDT Lot Branch


No. (Note- RF Pad
05)
Test
Report
No.
NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

Remarks

ass
( RT /

Line History Sheet

Report No:
:

Date:

1
:

EC 12 EMFR HC 50
5%RT
RT / PWH PW Hardness MPT/LPT
UT
T
HT
Test Report No.
Repor Chart Date Report
t Date No.
No.
NA NA
NA
NA

PMI
(Note-04)
NA

NDT Lot Branch


No. (Note- RF Pad
05)
Test
Report
No.
NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

Remarks

Line History Sheet

Report No:
:

ass
( RT /

Date:

1
:

EC 12 EMFR HC 50
5%RT
RT / PWH PW Hardness MPT/LPT
UT
T
HT
Test Report No.
Repor Chart Date Report
t Date No.
No.

Rep. No - Report Number

Reliance QMD

PMI
(Note-04)

NDT Lot Branch


No. (Note- RF Pad
05)
Test
Report
No.

FPJ: First Production Joint

Reliance O&M / TPI

Remarks

Reliance
Project:J3
ISO No.

Line No.

Pipe Class

Test Pack No.

% NDT ( RT / UT) :

Spool No./
Matcode

Plant:
STS/RIL/FLR/A1/1404/03-14

Type of Fit up Date


Weld

Weld Visual Date

Unit:
Rev.

Fit up & Welder No.


Weld Visual
Rep.No

WPS
No.

NDT
Control,
XR. No.

RT / UT
Report No.

Report No:
1

:
:
RT / UT
Report Date

PWHT
Chart No.

Joint No.

Size

Thick

N1G1

2"

5.54M
M

BW

16-07-2015 12/8/2015

15378

14118

NA

N1G2

2"

5.54M
M

BW

16-07-2015 12/8/2015

15378

14118

NA

N1G3

2"

5.54M
M

BW

16-07-2015 12/8/2015

15378

14118

328

STS/RIL/RT/8 8/14/2015
2

NA

N1G4

2"

5.54M
M

BW

16-07-2015 12/8/2015

15378

14118

339

STS/RIL/RT/8 8/14/2015
5

NA

N1G5

2"

5.54M
M

BW

16-07-2015 12/8/2015

15379

14118

NA

N1G6

2"

5.54M
M

BW

16-07-2015 12/8/2015

15378

14118

NA

N1G7

2"

5.54M
M

BW

16-07-2015 12/8/2015

15380

14118

NA

Note-01: Pipe support Welding: Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-025.

Note-02: Confirm Connecting Joint Clearance (in case of two isometrics): YES/No. if not cleared, details transferred to Form: EPCMD 2QM00

Note-03: Steam Tracing (as applicable): Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-031.
Note-04: PMI: PMI shall be checked on LAS / SS / Non-ferrous materials and Fit-up & Weld Visual Report no. to be menioned.
Note-05: NDT lot no.: Only accepted lot no. shall be recorded. In case of 100% lines & FPJ, record as "100%".
Legend : PWHT - Post Weld Heat Treatment,

XR - Radiography Control Number,

Contractor QA/QC

Rep. No - Report Number

Reliance QMD

Signatures
Name
Date
N1G8

2"

5.54M
M

BW

16-07-2015 12/8/2015

15380

14118

NA

N1G9

2"

5.54M
M

BW

16-07-2015 12/8/2015

15378

14118

NA

N1G10

2"

5.54M
M

BW

16-07-2015 12/8/2015

15379

14118

NA

N1G11

2"

5.54M
M

BW

16-07-2015 12/8/2015

15379

14118

NA

N1G12

2"

5.54M
M

BW

16-07-2015 12/8/2015

15378

14118

NA

N1G13

2"

5.54M
M

BW

16-07-2015 12/8/2015

15380

14118

NA

N1G14

2"

5.54M
M

BW

16-07-2015 12/8/2015

15380

14118

NA

N1G15

2"

5.54M
M

BW

16-07-2015 12/8/2015

15380

14118

NA

N1G15

2"

5.54M
M

BW

16-07-2015 12/8/2015

15380

14118

NA

N1G16

2"

5.54M
M

BW

16-07-2015 12/8/2015

15380

14118

NA

N1G17

2"

5.54M
M

BW

16-07-2015 12/8/2015

15378

14118

NA

N1G18

2"

5.54M
M

BW

16-07-2015 12/8/2015

15379

14118

NA

N1G19

2"

5.54M
M

BW

16-07-2015 12/8/2015

15379

14118

NA

N1G20

2"

5.54M
M

BW

16-07-2015 12/8/2015

15378

14118

NA

N1G21

2"

5.54M
M

BW

16-07-2015 12/8/2015

15378

14118

NA

N1G22

2"

5.54M
M

BW

16-07-2015 12/8/2015

15379

14118

N1G23

2"

5.54M
M

BW

16-07-2015 12/8/2015

15378

14118

NA

N1G24

2"

5.54M
M

BW

16-07-2015 12/8/2015

15379

14118

NA

N1G25

2"

5.54M
M

BW

16-07-2015 12/8/2015

15379

14118

NA

N1G26

2"

5.54M
M

BW

16-07-2015 12/8/2015

15378

14118

NA

N1G27

2"

5.54M
M

BW

16-07-2015 12/8/2015

15379

14118

N1G28

2"

5.54M
M

BW

16-07-2015 12/8/2015

15379

14118

X 340

X 329

STS/RIL/RT/8 8/14/2015
5

STS/RIL/RT/8 8/14/2015
2

NA

NA
NA

N1G28

2"

5.54M
M

BW

16-07-2015 12/8/2015

15379

14118

NA

N1G29

2"

5.54M
M

BW

16-07-2015 12/8/2015

15379

14118

NA

N1G30

2"

5.54M
M

BW

16-07-2015 12/8/2015

15379

14118

NA

N1G31

2"

5.54M
M

BW

16-07-2015 12/8/2015

15378

14118

NA

N1G32

2"

5.54M
M

BW

16-07-2015 12/8/2015

15379

14118

NA

N1G33

2"

5.54M
M

BW

16-07-2015 12/8/2015

15379

NA

N1G34

2"

5.54M
M

BW

16-07-2015 12/8/2015

15379

NA

N2G2

2"

5.54M
M

BW

16-07-2015 12/8/2015

15379

NA

Format No.: EPCMD-2QM00FMTPP002, Rev.-03, Date: 26.03.2015

Line History Sheet

t No:

Date:
EC 12 EMFR HC 50

5%RT
PWHT
Date

Hardness Test
Report No.

MPT/LPT
Report No.

PMI
(Note-04)

NDT Lot
Branch RF
No. (Note- Pad Test
05)
Report No.

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

2QM00FMTPP003: YES / NO

Remarks

FPJ: First Production Joint

Reliance O&M / TPI

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA
Page 1 of 1

Reliance
Project:J3

Plant:

ISO No.

Line No.

Test Pack No.

Spool No./
Matcode

STS/RIL/FLR/A1/1404/03-14
COILB (N1K-N2K)
Type of Weld Fit up Date

Weld Visual
Date

Fit up & Welder No.


Weld Visual
Rep.No

WPS
No.

Joint No.

Size

Thick

N1K1

2"

5.54MM

BW

19-07-2015

13-8-2015

15379

14118

N1K2

2"

5.54MM

BW

19-07-2015

13-8-2015

15379

14118

N1K3

2"

5.54MM

BW

19-07-2015

13-8-2015

15379

14118

N1K4

2"

5.54MM

BW

19-07-2015

13-8-2015

15380

14118

N1K5

2"

5.54MM

BW

19-07-2015

13-8-2015

15380

14118

N1K6

2"

5.54MM

BW

19-07-2015

13-8-2015

15380

14118

N1K7

2"

5.54MM

BW

19-07-2015

13-8-2015

15380

14118

N1K8

2"

5.54MM

BW

19-07-2015

13-8-2015

15380

14118

N1K9

2"

5.54MM

BW

19-07-2015

13-8-2015

15380

14118

N1K10

2"

5.54MM

BW

19-07-2015

13-8-2015

15380

14118

NDT
Control,
XR. No.

333

Reliance
Project:J3

Plant:

ISO No.

Line No.

Test Pack No.

Spool No./
Matcode

STS/RIL/FLR/A1/1404/03-14
COILB (N1K-N2K)
Type of Weld Fit up Date

Weld Visual
Date

Fit up & Welder No.


Weld Visual
Rep.No

WPS
No.

Joint No.

Size

Thick

N1K11

2"

5.54MM

BW

19-07-2015

13-8-2015

15380

14118

N1K12

2"

5.54MM

BW

19-07-2015

13-8-2015

15380

14118

N1K13

2"

5.54MM

BW

19-07-2015

13-8-2015

15379

14118

N1K14

2"

5.54MM

BW

19-07-2015

13-8-2015

15380

14118

N1K15

2"

5.54MM

BW

19-07-2015

13-8-2015

15380

14118

NDT
Control,
XR. No.

Note-01: Pipe support Welding: Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-025.

Note-02: Confirm Connecting Joint Clearance (in case of two isometrics): YES/No. if not cleared, details transferred to Form: EPCMD 2
Note-03: Steam Tracing (as applicable): Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-031.
Note-04: PMI: PMI shall be checked on LAS / SS / Non-ferrous materials and Fit-up & Weld Visual Report no. to be menioned.
Note-05: NDT lot no.: Only accepted lot no. shall be recorded. In case of 100% lines & FPJ, record as "100%".
Legend : PWHT - Post Weld Heat Treatment,
XR - Radiography Control Number,
Contractor QA/QC
Signatures

Reliance
Project:J3

Plant:

ISO No.

Line No.

Test Pack No.

Spool No./
Matcode

STS/RIL/FLR/A1/1404/03-14
COILB (N1K-N2K)
Type of Weld Fit up Date
Joint No.

Size

Thick

Name
Date
Format No.: EPCMD-2QM00FMTPP002, Rev.-03, Date: 26.03.2015

Weld Visual
Date

Fit up & Welder No.


Weld Visual
Rep.No

WPS
No.

NDT
Control,
XR. No.

Reliance
Project:J3

Plant:

ISO No.

Line No.

Test Pack No.

Spool No./
Matcode

STS/RIL/FLR/A1/1404/03-14
COILB (N1K-N2K)
Type of Weld Fit up Date

Weld Visual
Date

Fit up & Welder No.


Weld Visual
Rep.No

WPS
No.

Joint No.

Size

Thick

N1K16

2"

5.54MM

BW

19-07-2015

13-8-2015

15379

14118

N1K17

2"

5.54MM

BW

19-07-2015

13-8-2015

15380

14118

N1K18

2"

5.54MM

BW

19-07-2015

13-8-2015

15380

14118

N1K19

2"

5.54MM

BW

19-07-2015

13-8-2015

15380

14118

N1K20

2"

5.54MM

BW

19-07-2015

13-8-2015

15380

14118

N1K21

2"

5.54MM

BW

19-07-2015

13-8-2015

15380

14118

N1K22

2"

5.54MM

BW

19-07-2015

13-8-2015

15380

14118

N1K23

2"

5.54MM

BW

19-07-2015

13-8-2015

15380

14118

N1K24

2"

5.54MM

BW

19-07-2015

13-8-2015

15380

14118

NDT
Control,
XR. No.

Reliance
Project:J3

Plant:

ISO No.

Line No.

Test Pack No.

Spool No./
Matcode

STS/RIL/FLR/A1/1404/03-14
COILB (N1K-N2K)
Type of Weld Fit up Date

Weld Visual
Date

Fit up & Welder No.


Weld Visual
Rep.No

WPS
No.

Joint No.

Size

Thick

N1K25

2"

5.54MM

BW

19-07-2015

13-8-2015

15380

14118

N1K26

2"

5.54MM

BW

19-07-2015

13-8-2015

15380

14118

N1K27

2"

5.54MM

BW

19-07-2015

13-8-2015

15379

14118

NDT
Control,
XR. No.

Note-01: Pipe support Welding: Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-025.


Note-02: Confirm Connecting Joint Clearance (in case of two isometrics): YES/No. if not cleared, details transferred to Form: EPCMD 2QM00FMTPP003: YES / NO
Note-03: Steam Tracing (as applicable): Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-031.
Note-04: PMI: PMI shall be checked on LAS / SS / Non-ferrous materials and Fit-up & Weld Visual Report no. to be menioned.
Note-05: NDT lot no.: Only accepted lot no. shall be recorded. In case of 100% lines & FPJ, record as "100%".
Legend : PWHT - Post Weld Heat Treatment,

XR - Radiography Control Number,

Contractor QA/QC
Signatures
Name
Date
Format No.: EPCMD-2QM00FMTPP002, Rev.-03, Date: 26.03.2015

Reliance
Project:J3

Plant:

ISO No.

Line No.

Test Pack No.

Spool No./
Matcode

STS/RIL/FLR/A1/1404/03-14
COILB (N1K-N2K)
Type of Weld Fit up Date

Weld Visual
Date

Fit up & Welder No.


Weld Visual
Rep.No

WPS
No.

Joint No.

Size

Thick

N1K28

2"

5.54MM

BW

19-07-2015

13-8-2015

15380

14118

N1K29

2"

5.54MM

BW

19-07-2015

13-8-2015

15380

14118

N1K30

2"

5.54MM

BW

19-07-2015

13-8-2015

15379

14118

N1K31

2"

5.54MM

BW

19-07-2015

13-8-2015

15380

14118

N1K32

2"

5.54MM

BW

19-07-2015

13-8-2015

15380

14118

N1K33

2"

5.54MM

BW

19-07-2015

13-8-2015

15378

14118

N1K34

2"

5.54MM

BW

19-07-2015

13-8-2015

15378

14118

N2K

2"

5.54MM

BW

19-07-2015

13-8-2015

15380

14118

Note-01: Pipe support Welding: Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-025.

NDT
Control,
XR. No.

Reliance
Project:J3

Plant:

ISO No.

Line No.

Test Pack No.

Spool No./
Matcode

STS/RIL/FLR/A1/1404/03-14
COILB (N1K-N2K)
Type of Weld Fit up Date
Joint No.

Size

Thick

Weld Visual
Date

Fit up & Welder No.


Weld Visual
Rep.No

WPS
No.

NDT
Control,
XR. No.

Note-02: Confirm Connecting Joint Clearance (in case of two isometrics): YES/No. if not cleared, details transferred to Form: EPCMD 2QM00FMTPP003: YES / NO
Note-03: Steam Tracing (as applicable): Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-031.
Note-04: PMI: PMI shall be checked on LAS / SS / Non-ferrous materials and Fit-up & Weld Visual Report no. to be menioned.
Note-05: NDT lot no.: Only accepted lot no. shall be recorded. In case of 100% lines & FPJ, record as "100%".
Legend : PWHT - Post Weld Heat Treatment,

XR - Radiography Control Number,

Contractor QA/QC
Signatures
Name
Date
Format No.: EPCMD-2QM00FMTPP002, Rev.-03, Date: 26.03.2015

Line History Sheet


Unit:
Rev.
Pipe Class

Report No:
:

1
:

EC 12 EMFR HC 50

% NDT ( RT / UT) :
RT / UT
Report No.

Date:

RT / UT
Report Date

STS/RIL/RT/ 8/14/2015
83

5%RT
PWHT
Chart
No.

PWH
T
Date

Hardness MPT/LPT
PMI NDT Lot No.
Test Report Report No. (Note- (Note-05)
No.
04)

Branch RF Pad
Test Report
No.

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

Rema
rks

Line History Sheet


Unit:
Rev.
Pipe Class

Report No:
:

1
:

EC 12 EMFR HC 50

% NDT ( RT / UT) :
RT / UT
Report No.

Date:

RT / UT
Report Date

5%RT
PWHT
Chart
No.

PWH
T
Date

Hardness MPT/LPT
PMI NDT Lot No.
Test Report Report No. (Note- (Note-05)
No.
04)

Branch RF Pad
Test Report
No.

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

nsferred to Form: EPCMD 2QM00FMTPP003: YES / NO

no. to be menioned.
%".
Rep. No - Report Number
Reliance QMD

FPJ: First Production


Joint
Reliance O&M / TPI

Rema
rks

Line History Sheet


Unit:
Rev.
Pipe Class

Report No:
:

1
:

EC 12 EMFR HC 50

% NDT ( RT / UT) :
RT / UT
Report No.

Date:

RT / UT
Report Date

5%RT
PWHT
Chart
No.

PWH
T
Date

Hardness MPT/LPT
PMI NDT Lot No.
Test Report Report No. (Note- (Note-05)
No.
04)

Branch RF Pad
Test Report
No.

Page 1 of 1

Rema
rks

Line History Sheet


Unit:
Rev.
Pipe Class

Report No:
:

1
:

EC 12 EMFR HC 50

% NDT ( RT / UT) :
RT / UT
Report No.

Date:

RT / UT
Report Date

5%RT
PWHT
Chart
No.

PWH
T
Date

Hardness MPT/LPT
PMI NDT Lot No.
Test Report Report No. (Note- (Note-05)
No.
04)

Branch RF Pad
Test Report
No.

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

Rema
rks

Line History Sheet


Unit:
Rev.
Pipe Class

Report No:
:

1
:

EC 12 EMFR HC 50

% NDT ( RT / UT) :
RT / UT
Report No.

Date:

RT / UT
Report Date

5%RT
PWHT
Chart
No.

PWH
T
Date

Hardness MPT/LPT
PMI NDT Lot No.
Test Report Report No. (Note- (Note-05)
No.
04)

Branch RF Pad
Test Report
No.

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

Rema
rks

QM00FMTPP003: YES / NO

Rep. No - Report Number

Reliance QMD

FPJ: First Production Joint

Reliance O&M / TPI

Page 1 of 1

Line History Sheet


Unit:
Rev.
Pipe Class

Report No:
:

1
:

EC 12 EMFR HC 50

% NDT ( RT / UT) :
RT / UT
Report No.

Date:

RT / UT
Report Date

5%RT
PWHT
Chart
No.

PWH
T
Date

Hardness MPT/LPT
PMI NDT Lot No.
Test Report Report No. (Note- (Note-05)
No.
04)

Branch RF Pad
Test Report
No.

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

Rema
rks

Line History Sheet


Unit:
Rev.
Pipe Class

Report No:
:

1
:

EC 12 EMFR HC 50

% NDT ( RT / UT) :
RT / UT
Report No.

Date:

RT / UT
Report Date

5%RT
PWHT
Chart
No.

PWH
T
Date

Hardness MPT/LPT
PMI NDT Lot No.
Test Report Report No. (Note- (Note-05)
No.
04)

Branch RF Pad
Test Report
No.

Rema
rks

QM00FMTPP003: YES / NO

Rep. No - Report Number

Reliance QMD

FPJ: First Production Joint

Reliance O&M / TPI

Page 1 of 1

Reliance
Project:J3

Plant:

ISO No.
Line No.

:
:

Test Pack No.

Unit:

STS/RIL/FLR/A1/1404/03-14
COILA N1J-N2J

Rev.
Pipe Class

:
:

% NDT ( RT / UT) :

Spool No./
Matcode

Type of
Weld

Fit up Date

Weld Visual
Date

Fit up & Welder No.


Weld Visual
Rep.No

WPS
No.

Joint No.

Size

Thick

N1J1

2"

5.54MM BW

14-072015

13-08-2015

15379

14118

N1J2

2"

5.54MM BW

14-072015

13-08-2015

15379

14118

N1J3

2"

5.54MM BW

14-072015

13-08-2015

15379

14118

N1J4

2"

5.54MM BW

14-072015

13-08-2015

15378/15 14118
379

N1J5

2"

5.54MM BW

14-072015

13-08-2015

15378

14118

N1J6

2"

5.54MM BW

14-072015

13-08-2015

15378

14118

N1J7

2"

5.54MM BW

14-072015

13-08-2015

15378

14118

NDT
Control,
XR. No.

X332

RT / UT
Report No.

8/14/2015

Reliance
Project:J3

Plant:

ISO No.
Line No.

:
:

Test Pack No.

Unit:

STS/RIL/FLR/A1/1404/03-14
COILA N1J-N2J

Rev.
Pipe Class

:
:

% NDT ( RT / UT) :

Spool No./
Matcode

Type of
Weld

Fit up Date

Weld Visual
Date

Fit up & Welder No.


Weld Visual
Rep.No

WPS
No.

Joint No.

Size

Thick

N1J8

2"

5.54MM BW

14-072015

13-08-2015

15378

14118

N1J9

2"

5.54MM BW

14-072015

13-08-2015

15378

14118

N1J10

2"

5.54MM BW

14-072015

13-08-2015

13579

14118

NDT
Control,
XR. No.

RT / UT
Report No.

Note-01: Pipe support Welding: Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-025.


Note-02: Confirm Connecting Joint Clearance (in case of two isometrics): YES/No. if not cleared, details transferred to Form: EPCMD 2QM00FMTPP003: YES / NO
Note-03: Steam Tracing (as applicable): Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-031.
Note-04: PMI: PMI shall be checked on LAS / SS / Non-ferrous materials and Fit-up & Weld Visual Report no. to be menioned.
Note-05: NDT lot no.: Only accepted lot no. shall be recorded. In case of 100% lines & FPJ, record as "100%".
Legend : PWHT - Post Weld Heat Treatment,

XR - Radiography Control Number,


Contractor QA/QC

Signatures
Name
Date

Reliance

Reliance
Project:J3

Plant:

ISO No.
Line No.

:
:

Test Pack No.

STS/RIL/FLR/A1/1404/03-14
COILA N1J-N2J

Rev.
Pipe Class

:
:

% NDT ( RT / UT) :

Spool No./
Matcode

Type of
Weld
Joint No.

Unit:

Size

Thick

Format No.: EPCMD-2QM00FMTPP002, Rev.-03, Date: 26.03.2015

Fit up Date

Weld Visual
Date

Fit up & Welder No.


Weld Visual
Rep.No

WPS
No.

NDT
Control,
XR. No.

RT / UT
Report No.

Reliance
Project:J3

Plant:

ISO No.
Line No.

:
:

Test Pack No.

Unit:

STS/RIL/FLR/A1/1404/03-14
COILA N1J-N2J

Rev.
Pipe Class

:
:

% NDT ( RT / UT) :

Spool No./
Matcode

Type of
Weld

Fit up Date

Weld Visual
Date

Fit up & Welder No.


Weld Visual
Rep.No

WPS
No.

Joint No.

Size

Thick

N1J11

2"

5.54MM BW

14-072015

13-08-2015

13579

14118

N1J12

2"

5.54MM BW

14-072015

13-08-2015

13579

14118

N1J13

2"

5.54MM BW

14-072015

13-08-2015

13579

14118

N1J14

2"

5.54MM BW

14-072015

13-08-2015

13579

14118

N1J15

2"

5.54MM BW

14-072015

13-08-2015

13579

14118

N1J16

2"

5.54MM BW

14-072015

13-08-2015

15378

14118

N1J17

2"

5.54MM BW

14-072015

13-08-2015

15378

14118

N1J18

2"

5.54MM BW

14-072015

13-08-2015

15380

14118

NDT
Control,
XR. No.

RT / UT
Report No.

Reliance
Project:J3

Plant:

ISO No.
Line No.

:
:

Test Pack No.

Unit:

STS/RIL/FLR/A1/1404/03-14
COILA N1J-N2J

Rev.
Pipe Class

:
:

% NDT ( RT / UT) :

Spool No./
Matcode

Type of
Weld

Fit up Date

Weld Visual
Date

Fit up & Welder No.


Weld Visual
Rep.No

WPS
No.

Joint No.

Size

Thick

N1J19

2"

5.54MM BW

14-072015

13-08-2015

15380

14118

N1J20

2"

5.54MM BW

14-072015

13-08-2015

15378

14118

N1G20

2"

5.54MM

14-072015

13-08-2015

15378

14118

BW

NDT
Control,
XR. No.

RT / UT
Report No.

Note-03: Steam Tracing (as applicable): Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-031.
Note-04: PMI: PMI shall be checked on LAS / SS / Non-ferrous materials and Fit-up & Weld Visual Report no. to be menioned.
Note-05: NDT lot no.: Only accepted lot no. shall be recorded. In case of 100% lines & FPJ, record as "100%".
Legend : PWHT - Post Weld Heat Treatment,

XR - Radiography Control Number,

Contractor QA/QC
Signatures
Name
Date
Format No.: EPCMD-2QM00FMTPP002, Rev.-03, Date: 26.03.2015

Reliance

Reliance
Project:J3

Plant:

ISO No.
Line No.

:
:

Test Pack No.

Unit:

STS/RIL/FLR/A1/1404/03-14
COILA N1J-N2J

Rev.
Pipe Class

:
:

% NDT ( RT / UT) :

Spool No./
Matcode

Type of
Weld

Fit up Date

Weld Visual
Date

Fit up & Welder No.


Weld Visual
Rep.No

WPS
No.

Joint No.

Size

Thick

N1J21

2"

5.54MM BW

14-072015

13-08-2015

15378

14118

N1J22

2"

5.54MM BW

14-072015

13-08-2015

15379

14118

N1J23

2"

5.54MM BW

14-072015

13-08-2015

15379

14118

N1J24

2"

5.54MM BW

14-072015

13-08-2015

15380

14118

N1J25

2"

5.54MM BW

14-072015

13-08-2015

15380

14118

N1J26

2"

5.54MM BW

14-072015

13-08-2015

15379

14118

N1J27

2"

5.54MM BW

14-072015

13-08-2015

15379

14118

N1J28

2"

5.54MM BW

14-072015

13-08-2015

15378

14118

NDT
Control,
XR. No.

RT / UT
Report No.

Reliance
Project:J3

Plant:

ISO No.
Line No.

:
:

Test Pack No.

Unit:

STS/RIL/FLR/A1/1404/03-14
COILA N1J-N2J

Rev.
Pipe Class

:
:

% NDT ( RT / UT) :

Spool No./
Matcode

Type of
Weld

Fit up Date

Weld Visual
Date

Fit up & Welder No.


Weld Visual
Rep.No

WPS
No.

Joint No.

Size

Thick

N1J29

2"

5.54MM BW

14-072015

13-08-2015

15378

14118

N1J30

2"

5.54MM BW

14-072015

13-08-2015

15378

14118

Contractor QA/QC
Signatures
Name
Date
Format No.: EPCMD-2QM00FMTPP002, Rev.-03, Date: 26.03.2015

NDT
Control,
XR. No.

RT / UT
Report No.

Reliance

Line History Sheet


Report No:

Date:

1
:

EC 12 EMFR HC 50

UT) :
RT / UT
Report
Date

5%RT
PWHT
Chart No.

PWHT
Date

Hardness MPT/LPT
Test Report Report No.
No.

PMI
NDT Lot
(Note-04) No. (Note05)

Branch RF
Pad Test
Report No.
Remarks

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

Line History Sheet


Report No:

Date:

1
:

EC 12 EMFR HC 50

UT) :
RT / UT
Report
Date

5%RT
PWHT
Chart No.

PWHT
Date

Hardness MPT/LPT
Test Report Report No.
No.

PMI
NDT Lot
(Note-04) No. (Note05)

Branch RF
Pad Test
Report No.
Remarks

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

Rep. No - Report Number


Reliance QMD

FPJ: First Production Joint


Reliance O&M / TPI

Line History Sheet


Report No:

Date:

1
:

EC 12 EMFR HC 50

UT) :
RT / UT
Report
Date

5%RT
PWHT
Chart No.

PWHT
Date

Hardness MPT/LPT
Test Report Report No.
No.

PMI
NDT Lot
(Note-04) No. (Note05)

Branch RF
Pad Test
Report No.
Remarks

Page 1 of 1

Line History Sheet


Report No:

Date:

1
:

EC 12 EMFR HC 50

UT) :
RT / UT
Report
Date

5%RT
PWHT
Chart No.

PWHT
Date

Hardness MPT/LPT
Test Report Report No.
No.

PMI
NDT Lot
(Note-04) No. (Note05)

Branch RF
Pad Test
Report No.
Remarks

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

Line History Sheet


Report No:

Date:

1
:

EC 12 EMFR HC 50

UT) :
RT / UT
Report
Date

5%RT
PWHT
Chart No.

PWHT
Date

Hardness MPT/LPT
Test Report Report No.
No.

PMI
NDT Lot
(Note-04) No. (Note05)

Branch RF
Pad Test
Report No.
Remarks

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

Rep. No - Report Number

Reliance QMD

FPJ: First Production Joint

Reliance O&M / TPI

Page 1 of 1

Line History Sheet


Report No:

Date:

1
:

EC 12 EMFR HC 50

UT) :
RT / UT
Report
Date

5%RT
PWHT
Chart No.

PWHT
Date

Hardness MPT/LPT
Test Report Report No.
No.

PMI
NDT Lot
(Note-04) No. (Note05)

Branch RF
Pad Test
Report No.
Remarks

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

Line History Sheet


Report No:

Date:

1
:

EC 12 EMFR HC 50

UT) :
RT / UT
Report
Date

5%RT
PWHT
Chart No.

PWHT
Date

Hardness MPT/LPT
Test Report Report No.
No.

PMI
NDT Lot
(Note-04) No. (Note05)

Branch RF
Pad Test
Report No.
Remarks

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

Reliance QMD

Reliance O&M / TPI

Page 1 of 1

Reliance
Project:J3
ISO No.
Line No.
Test Pack No.

Plant:
STS/RIL/FLR/A1/1404/03-14

:
:

COIL C N1F-N2F

Spool No./
Matcode

Type of Weld Fit up Date

Weld Visual Fit up & Weld Welder No.


Date
Visual Rep.No

Joint No.

Size

Thick

N1F1

2"

5.54MM

BW

20-07-2015

12/8/2015

15378

N1F2

2"

5.54MM

BW

20-07-2016

12/9/2015

15378

N1F3

2"

5.54MM

BW

20-07-2017

12/10/2015

15378

N1F4

2"

5.54MM

BW

20-07-2018

12/11/2015

15379

N1F5

2"

5.54MM

BW

20-07-2019

12/12/2015

15379

N1F6

2"

5.54MM

BW

20-07-2020

12/13/2015

15379

N1F7

2"

5.54MM

BW

20-07-2021

12/14/2015

15380

Reliance
Project:J3
ISO No.
Line No.
Test Pack No.

Plant:
STS/RIL/FLR/A1/1404/03-14

:
:

COIL C N1F-N2F

Spool No./
Matcode

Type of Weld Fit up Date

Weld Visual Fit up & Weld Welder No.


Date
Visual Rep.No

Joint No.

Size

Thick

N1F8

2"

5.54MM

BW

20-07-2022

12/15/2015

15380

N1F9

2"

5.54MM

BW

20-07-2023

12/16/2015

15378

N1F10

2"

5.54MM

BW

20-07-2024

12/17/2015

15379

N1F11

2"

5.54MM

BW

20-07-2025

12/18/2015

15379

N1F12

2"

5.54MM

BW

20-07-2026

12/19/2015

15378

Note-01: Pipe support Welding: Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-025.


Note-02: Confirm Connecting Joint Clearance (in case of two isometrics): YES/No. if not cleared, details transferred to Form: EPCMD 2Q
Note-03: Steam Tracing (as applicable): Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-031.
Note-04: PMI: PMI shall be checked on LAS / SS / Non-ferrous materials and Fit-up & Weld Visual Report no. to be menioned.

Reliance
Project:J3
ISO No.
Line No.
Test Pack No.

:
:

Plant:
STS/RIL/FLR/A1/1404/03-14
COIL C N1F-N2F

Spool No./
Matcode

Type of Weld Fit up Date


Joint No.

Size

Weld Visual Fit up & Weld Welder No.


Date
Visual Rep.No

Thick

Note-05: NDT lot no.: Only accepted lot no. shall be recorded. In case of 100% lines & FPJ, record as "100%".
Legend : PWHT - Post Weld Heat Treatment,

XR - Radiography Control Numb


Contractor QA/QC

Signatures
Name
Date
Format No.: EPCMD-2QM00FMTPP002, Rev.-03, Date: 26.03.2015

Reliance
Project:J3
ISO No.
Line No.
Test Pack No.

Plant:
STS/RIL/FLR/A1/1404/03-14

:
:

COIL C N1F-N2F

Spool No./
Matcode

Type of Weld Fit up Date

Weld Visual Fit up & Weld Welder No.


Date
Visual Rep.No

Joint No.

Size

Thick

N1F13

2"

5.54MM

BW

20-07-2027

12/20/2015

15378

N1F14

2"

5.54MM

BW

20-07-2028

12/21/2015

15380

N1F15

2"

5.54MM

BW

20-07-2029

12/22/2015

15380

N1F16

2"

5.54MM

BW

20-07-2030

12/23/2015

15378

N1F17

2"

5.54MM

BW

20-07-2031

12/24/2015

15378

N1F18

2"

5.54MM

BW

20-07-2032

12/25/2015

15379

N1F19

2"

5.54MM

BW

20-07-2033

12/26/2015

15379

Reliance
Project:J3
ISO No.
Line No.
Test Pack No.

Plant:
STS/RIL/FLR/A1/1404/03-14

:
:

COIL C N1F-N2F

Spool No./
Matcode

Type of Weld Fit up Date

Weld Visual Fit up & Weld Welder No.


Date
Visual Rep.No

Joint No.

Size

Thick

N1F20

2"

5.54MM

BW

20-07-2034

12/27/2015

15378

N1F21

2"

5.54MM

BW

20-07-2035

12/28/2015

15378

N1F22

2"

5.54MM

BW

20-07-2036

12/29/2015

15378

N1F23

2"

5.54MM

BW

20-07-2037

12/30/2015

15378

N1F24

2"

5.54MM

BW

20-07-2038

12/31/2015

15379

Note-01: Pipe support Welding: Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-025.

Note-02: Confirm Connecting Joint Clearance (in case of two isometrics): YES/No. if not cleared, details transferred to Form: EPCMD 2Q
Note-03: Steam Tracing (as applicable): Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-031.
Note-04: PMI: PMI shall be checked on LAS / SS / Non-ferrous materials and Fit-up & Weld Visual Report no. to be menioned.
Note-05: NDT lot no.: Only accepted lot no. shall be recorded. In case of 100% lines & FPJ, record as "100%".

Reliance
Project:J3
ISO No.
Line No.
Test Pack No.

:
:

Plant:
STS/RIL/FLR/A1/1404/03-14
COIL C N1F-N2F

Spool No./
Matcode

Type of Weld Fit up Date


Joint No.

Size

Weld Visual Fit up & Weld Welder No.


Date
Visual Rep.No

Thick

Legend : PWHT - Post Weld Heat Treatment,

XR - Radiography Control Numb

Contractor QA/QC
Signatures
Name
Date
Format No.: EPCMD-2QM00FMTPP002, Rev.-03, Date: 26.03.2015

Reliance
Project:J3
ISO No.
Line No.
Test Pack No.

Plant:
STS/RIL/FLR/A1/1404/03-14

:
:

COIL C N1F-N2F

Spool No./
Matcode

Type of Weld Fit up Date

Weld Visual Fit up & Weld Welder No.


Date
Visual Rep.No

Joint No.

Size

Thick

N1F25

2"

5.54MM

BW

20-07-2039

1/1/2016

15379

N1F26

2"

5.54MM

BW

20-07-2040

1/2/2016

15378

N1F27

2"

5.54MM

BW

20-07-2041

1/3/2016

15378

N1F28

2"

5.54MM

BW

20-07-2042

1/4/2016

15380

N1F29

2"

5.54MM

BW

20-07-2043

1/5/2016

15380

N1F30

2"

5.54MM

BW

20-07-2044

1/6/2016

15378

N1F31

2"

5.54MM

BW

20-07-2045

1/7/2016

15379

Reliance
Project:J3
ISO No.
Line No.
Test Pack No.

Plant:
STS/RIL/FLR/A1/1404/03-14

:
:

COIL C N1F-N2F

Spool No./
Matcode

Type of Weld Fit up Date

Weld Visual Fit up & Weld Welder No.


Date
Visual Rep.No

Joint No.
N1F31

Size
2"

Thick
5.54MM

BW

20-07-2045

1/7/2016

15379

N1F32

2"

5.54MM

BW

20-07-2046

1/8/2016

15379

N1F33

2"

5.54MM

BW

20-07-2047

1/9/2016

15378

N1F34

2"

5.54MM

BW

20-07-2048

1/10/2016

15378

N2F

2"

5.54MM

BW

20-07-2049

1/11/2016

15379

Note-01: Pipe support Welding: Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-025.

Note-02: Confirm Connecting Joint Clearance (in case of two isometrics): YES/No. if not cleared, details transferred to Form: EPCMD 2Q
Note-03: Steam Tracing (as applicable): Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-031.
Note-04: PMI: PMI shall be checked on LAS / SS / Non-ferrous materials and Fit-up & Weld Visual Report no. to be menioned.

Reliance
Project:J3
ISO No.
Line No.
Test Pack No.

:
:

Plant:
STS/RIL/FLR/A1/1404/03-14
COIL C N1F-N2F

Spool No./
Matcode

Type of Weld Fit up Date


Joint No.

Size

Weld Visual Fit up & Weld Welder No.


Date
Visual Rep.No

Thick

Note-05: NDT lot no.: Only accepted lot no. shall be recorded. In case of 100% lines & FPJ, record as "100%".
Legend : PWHT - Post Weld Heat Treatment,
XR - Radiography Control Numb
Contractor QA/QC
Signatures
Name
Date
Format No.: EPCMD-2QM00FMTPP002, Rev.-03, Date: 26.03.2015

Line History Sheet


Unit:
Rev.
Pipe Class

Report No:
1

:
:

EC 12 EMFR HC 50

% NDT ( RT / UT) :
WPS
No.

NDT
Control,
XR. No.

RT / UT
Report No.

Date:

5%RT

RT / UT
PWHT
Report Date Chart No.

PWHT
Date

Hardness MPT/LPT
Test Report No.
Report
No.

PMI
(Note-04)

14118

NA

NA

NA

NA

NA

14118

NA

NA

NA

NA

NA

14118

NA

NA

NA

NA

NA

14118

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

14118

NA

NA

NA

NA

NA

14118

NA

NA

NA

NA

NA

14118

327

STS/RIL/RT/ 8/14/2015
82

NDT Lot No.


(Note-05)

Line History Sheet


Unit:
Rev.
Pipe Class

Report No:
1

:
:

EC 12 EMFR HC 50

% NDT ( RT / UT) :
WPS
No.

NDT
Control,
XR. No.

RT / UT
Report No.

Date:

5%RT

RT / UT
PWHT
Report Date Chart No.

PWHT
Date

Hardness MPT/LPT
Test Report No.
Report
No.

PMI
(Note-04)

14118

NA

NA

NA

NA

NA

14118

NA

NA

NA

NA

NA

14118

NA

NA

NA

NA

NA

14118

NA

NA

NA

NA

NA

14118

NA

NA

NA

NA

NA

CMD 2QM00FMTPP003: YES / NO

NDT Lot No.


(Note-05)

Line History Sheet


Unit:
Rev.
Pipe Class

Report No:
1

:
:

EC 12 EMFR HC 50

% NDT ( RT / UT) :
WPS
No.

l Number,

NDT
Control,
XR. No.

RT / UT
Report No.

Date:

RT / UT
PWHT
Report Date Chart No.

Rep. No - Report Number


Reliance QMD

5%RT
PWHT
Date

Hardness MPT/LPT
Test Report No.
Report
No.

PMI
(Note-04)

NDT Lot No.


(Note-05)

FPJ: First Production Joint


Reliance O&M / TPI

Line History Sheet


Unit:
Rev.
Pipe Class

Report No:
1

:
:

EC 12 EMFR HC 50

% NDT ( RT / UT) :
WPS
No.

NDT
Control,
XR. No.

RT / UT
Report No.

Date:

5%RT

RT / UT
PWHT
Report Date Chart No.

PWHT
Date

Hardness MPT/LPT
Test Report No.
Report
No.

PMI
(Note-04)

14118

NA

NA

NA

NA

NA

14118

NA

NA

NA

NA

NA

14118

NA

NA

NA

NA

NA

14118

NA

NA

NA

NA

NA

14118

NA

NA

NA

NA

NA

14118

NA

NA

NA

NA

NA

14118

NA

NA

NA

NA

NA

NDT Lot No.


(Note-05)

Line History Sheet


Unit:
Rev.
Pipe Class

Report No:
1

:
:

EC 12 EMFR HC 50

% NDT ( RT / UT) :
WPS
No.

NDT
Control,
XR. No.

RT / UT
Report No.

Date:

5%RT

RT / UT
PWHT
Report Date Chart No.

PWHT
Date

Hardness MPT/LPT
Test Report No.
Report
No.

PMI
(Note-04)

14118

NA

NA

NA

NA

NA

14118

NA

NA

NA

NA

NA

14118

NA

NA

NA

NA

NA

14118

NA

NA

NA

NA

NA

14118

NA

NA

NA

NA

NA

CMD 2QM00FMTPP003: YES / NO

NDT Lot No.


(Note-05)

Line History Sheet


Unit:
Rev.
Pipe Class

Report No:
1

:
:

% NDT ( RT / UT) :
WPS
No.

l Number,

NDT
Control,
XR. No.

RT / UT
Report No.

RT / UT
PWHT
Report Date Chart No.

Rep. No - Report Number

Reliance QMD

Date:
EC 12 EMFR HC 50
5%RT
PWHT
Date

Hardness MPT/LPT
Test Report No.
Report
No.

PMI
(Note-04)

NDT Lot No.


(Note-05)

FPJ: First Production Joint

Reliance O&M / TPI

Line History Sheet


Unit:
Rev.
Pipe Class

Report No:
1

:
:

EC 12 EMFR HC 50

% NDT ( RT / UT) :
WPS
No.

NDT
Control,
XR. No.

RT / UT
Report No.

Date:

5%RT

RT / UT
PWHT
Report Date Chart No.

PWHT
Date

Hardness MPT/LPT
Test Report No.
Report
No.

PMI
(Note-04)

14118

NA

NA

NA

NA

NA

14118

NA

NA

NA

NA

NA

14118

NA

NA

NA

NA

NA

14118

NA

NA

NA

NA

NA

14118

NA

NA

NA

NA

NA

14118

NA

NA

NA

NA

NA

14118

NA

NA

NA

NA

NA

NDT Lot No.


(Note-05)

Line History Sheet


Unit:
Rev.
Pipe Class

Report No:
1

:
:

EC 12 EMFR HC 50

% NDT ( RT / UT) :
WPS
No.

NDT
Control,
XR. No.

RT / UT
Report No.

Date:

5%RT

14118

NA

NA

Hardness MPT/LPT
PMI
Test Report No.
(Note-04)
Report
NANo.
NA
NA

14118

NA

NA

NA

NA

NA

14118

NA

NA

NA

NA

NA

14118

NA

NA

NA

NA

NA

14118

NA

NA

NA

NA

NA

CMD 2QM00FMTPP003: YES / NO

RT / UT
PWHT
Report Date Chart No.

PWHT
Date

NDT Lot No.


(Note-05)

Line History Sheet


Unit:
Rev.
Pipe Class

Report No:
1

:
:

EC 12 EMFR HC 50

% NDT ( RT / UT) :
WPS
No.

l Number,

NDT
Control,
XR. No.

RT / UT
Report No.

Date:

RT / UT
PWHT
Report Date Chart No.

Rep. No - Report Number


Reliance QMD

5%RT
PWHT
Date

Hardness MPT/LPT
Test Report No.
Report
No.

PMI
(Note-04)

NDT Lot No.


(Note-05)

FPJ: First Production Joint


Reliance O&M / TPI

Line History Sheet


Date:

Branch RF
Pad Test
Report No.

NA
NA
NA
NA
NA
NA
NA

Remarks

Line History Sheet


Date:

Branch RF
Pad Test
Report No.

NA
NA
NA
NA
NA

Remarks

Line History Sheet


Date:

Branch RF
Pad Test
Report No.

Remarks

Reliance O&M / TPI

Page 1 of 1

Line History Sheet


Date:

Branch RF
Pad Test
Report No.

NA
NA
NA
NA
NA
NA
NA

Remarks

Line History Sheet


Date:

Branch RF
Pad Test
Report No.

NA
NA
NA
NA
NA

Remarks

Line History Sheet


Date:

Branch RF
Pad Test
Report No.

Remarks

Reliance O&M / TPI

Page 1 of 1

Line History Sheet


Date:

Branch RF
Pad Test
Report No.

NA
NA
NA
NA
NA
NA

NA

Remarks

Line History Sheet


Date:

Branch RF
Pad Test
Report No.
NA

NA

NA

NA

NA

Remarks

Line History Sheet


Date:

Branch RF
Pad Test
Report No.

Remarks

Reliance O&M / TPI

Page 1 of 1

Reliance
Project:J3

Plant:

ISO No.

STS/RIL/FLR/A1/1404/03-14

Line No.

COIL C( N1L-N2L)

Test Pack No.

Spool No./
Matcode

Type of Fit up Date


Weld
Joint No.

Size

Thick

Weld
Fit up & Welder
Visual Date
Weld No.
Visual
Rep.No

WPS
No.

N1L1

2"

5.54MM

BW

20-07-2015

13-08-2015

15378

14118

N1L2

2"

5.54MM

BW

20-07-2015

13-08-2015

15378

14118

N1L3

2"

5.54MM

BW

20-07-2015

13-08-2015

15379

14118

N1L4

2"

5.54MM

BW

20-07-2015

13-08-2015

15380

14118

Reliance
Project:J3

Plant:

ISO No.

STS/RIL/FLR/A1/1404/03-14

Line No.

COIL C( N1L-N2L)

Test Pack No.

Spool No./
Matcode

Type of Fit up Date


Weld
Joint No.

Size

Thick

Weld
Fit up & Welder
Visual Date
Weld No.
Visual
Rep.No

WPS
No.

N1L5

2"

5.54MM

BW

20-07-2015

13-08-2015

15379

14118

N1L6

2"

5.54MM

BW

20-07-2015

13-08-2015

15378

14118

N1L7

2"

5.54MM

BW

20-07-2015

13-08-2015

15379

14118

N1L8

2"

5.54MM

BW

20-07-2015

13-08-2015

15379

14118

Reliance
Project:J3

Plant:

ISO No.

STS/RIL/FLR/A1/1404/03-14

Line No.

COIL C( N1L-N2L)

Test Pack No.

Spool No./
Matcode

Type of Fit up Date


Weld
Joint No.

Size

Thick

Weld
Fit up & Welder
Visual Date
Weld No.
Visual
Rep.No

WPS
No.

Note-01: Pipe support Welding: Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-025.

Note-02: Confirm Connecting Joint Clearance (in case of two isometrics): YES/No. if not cleared, details transferred to Form: E
Note-03: Steam Tracing (as applicable): Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-031.
Note-04: PMI: PMI shall be checked on LAS / SS / Non-ferrous materials and Fit-up & Weld Visual Report no. to be menioned.
Note-05: NDT lot no.: Only accepted lot no. shall be recorded. In case of 100% lines & FPJ, record as "100%".
Legend : PWHT - Post Weld Heat Treatment,

XR - Radiography Control Number,


Contractor QA/QC

Signatures
Name

Reliance
Project:J3

Plant:

ISO No.

STS/RIL/FLR/A1/1404/03-14

Line No.

COIL C( N1L-N2L)

Test Pack No.

Spool No./
Matcode

Type of Fit up Date


Weld
Joint No.

Size

Thick

Date
Format No.: EPCMD-2QM00FMTPP002, Rev.-03, Date: 26.03.2015

Weld
Fit up & Welder
Visual Date
Weld No.
Visual
Rep.No

WPS
No.

Reliance
Project:J3

Plant:

ISO No.

STS/RIL/FLR/A1/1404/03-14

Line No.

COIL C( N1L-N2L)

Test Pack No.

Spool No./
Matcode

Type of Fit up Date


Weld
Joint No.

Size

Thick

Weld
Fit up & Welder
Visual Date
Weld No.
Visual
Rep.No

WPS
No.

N1L9

2"

5.54MM

BW

20-07-2015

13-08-2015

15378

14118

N1L10

2"

5.54MM

BW

20-07-2015

13-08-2015

15380

14118

N1L11

2"

5.54MM

BW

20-07-2015

13-08-2015

15380

14118

N1L12

2"

5.54MM

BW

20-07-2015

13-08-2015

15380

14118

Reliance
Project:J3

Plant:

ISO No.

STS/RIL/FLR/A1/1404/03-14

Line No.

COIL C( N1L-N2L)

Test Pack No.

Spool No./
Matcode

Type of Fit up Date


Weld
Joint No.

Size

Thick

Weld
Fit up & Welder
Visual Date
Weld No.
Visual
Rep.No

WPS
No.

N1L13

2"

5.54MM

BW

20-07-2015

13-08-2015

15379

14118

N1L14

2"

5.54MM

BW

20-07-2015

13-08-2015

15380

14118

N1L15

2"

5.54MM

BW

20-07-2015

13-08-2015

15380

14118

N1L16

2"

5.54MM

BW

20-07-2015

13-08-2015

15379

14118

Reliance
Project:J3

Plant:

ISO No.

STS/RIL/FLR/A1/1404/03-14

Line No.

COIL C( N1L-N2L)

Test Pack No.

Spool No./
Matcode

Type of Fit up Date


Weld
Joint No.

Size

Thick

Weld
Fit up & Welder
Visual Date
Weld No.
Visual
Rep.No

WPS
No.

Note-01: Pipe support Welding: Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-025.


Note-02: Confirm Connecting Joint Clearance (in case of two isometrics): YES/No. if not cleared, details transferred to Form: EPCMD 2QM00FMTPP003: YES / NO
Note-03: Steam Tracing (as applicable): Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-031.
Note-04: PMI: PMI shall be checked on LAS / SS / Non-ferrous materials and Fit-up & Weld Visual Report no. to be menioned.
Note-05: NDT lot no.: Only accepted lot no. shall be recorded. In case of 100% lines & FPJ, record as "100%".
Legend : PWHT - Post Weld Heat Treatment,

XR - Radiography Control Number,

Contractor QA/QC

Reliance
Project:J3

Plant:

ISO No.

STS/RIL/FLR/A1/1404/03-14

Line No.

COIL C( N1L-N2L)

Test Pack No.

Spool No./
Matcode

Type of Fit up Date


Weld
Joint No.

Signatures
Name
Date

Size

Thick

Weld
Fit up & Welder
Visual Date
Weld No.
Visual
Rep.No

WPS
No.

Reliance
Project:J3

Plant:

ISO No.

STS/RIL/FLR/A1/1404/03-14

Line No.

COIL C( N1L-N2L)

Test Pack No.

Spool No./
Matcode

Type of Fit up Date


Weld

Weld
Fit up & Welder
Visual Date
Weld No.
Visual
Rep.No

WPS
No.

Joint No.

Size

Thick

N1L22

2"

5.54MM

BW

20-07-2015

13-08-2015

15378

14118

N1L23

2"

5.54MM

BW

20-07-2015

13-08-2015

15378

14118

N1L24

2"

5.54MM

BW

20-07-2015

13-08-2015

15380

14118

N1L25

2"

5.54MM

BW

20-07-2015

13-08-2015

15380

14118

Reliance
Project:J3

Plant:

ISO No.

STS/RIL/FLR/A1/1404/03-14

Line No.

COIL C( N1L-N2L)

Test Pack No.

Spool No./
Matcode

Type of Fit up Date


Weld

Weld
Fit up & Welder
Visual Date
Weld No.
Visual
Rep.No

WPS
No.

Joint No.

Size

Thick

N1L26

2"

5.54MM

BW

20-07-2015

13-08-2015

15380

14118

N1L27

2"

5.54MM

BW

20-07-2015

13-08-2015

15379

14118

N1L28

2"

5.54MM

BW

20-07-2015

13-08-2015

15380

14118

N1L29

2"

5.54MM

BW

20-07-2015

13-08-2015

15380

14118

Reliance
Project:J3

Plant:

ISO No.

STS/RIL/FLR/A1/1404/03-14

Line No.

COIL C( N1L-N2L)

Test Pack No.

Spool No./
Matcode

Type of Fit up Date


Weld
Joint No.

Size

Thick

N2L

2"

5.54MM

BW

20-07-2015

Weld
Fit up & Welder
Visual Date
Weld No.
Visual
Rep.No

13-08-2015

15380

WPS
No.

14118

Note-01: Pipe support Welding: Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-025.

Note-02: Confirm Connecting Joint Clearance (in case of two isometrics): YES/No. if not cleared, details transferred to Form: E
Note-03: Steam Tracing (as applicable): Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-031.
Note-04: PMI: PMI shall be checked on LAS / SS / Non-ferrous materials and Fit-up & Weld Visual Report no. to be menioned.
Note-05: NDT lot no.: Only accepted lot no. shall be recorded. In case of 100% lines & FPJ, record as "100%".
Legend : PWHT - Post Weld Heat Treatment,

XR - Radiography Control Number,


Contractor QA/QC

Reliance
Project:J3

Plant:

ISO No.

STS/RIL/FLR/A1/1404/03-14

Line No.

COIL C( N1L-N2L)

Test Pack No.

Spool No./
Matcode

Type of Fit up Date


Weld
Joint No.

Signatures
Name
Date

Size

Thick

Weld
Fit up & Welder
Visual Date
Weld No.
Visual
Rep.No

WPS
No.

Line History Sheet


Unit:

Rev.
Pipe Class

Report No:

1
:

EC 12 EMFR HC 50

% NDT ( RT / UT) :

NDT
Control,
XR. No.

RT / UT
Report No.

Date:

RT / UT
Report Date

5%RT

PWHT
Chart
No.

PWHT
Date

Hardness MPT/LPT
Test
Report No.
Report No.

PMI
(Note-04)

NDT Lot No.


(Note-05)

Branch
RF Pad
Test
Report
No.

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

Line History Sheet


Unit:

Rev.
Pipe Class

Report No:

1
:

EC 12 EMFR HC 50

% NDT ( RT / UT) :

NDT
Control,
XR. No.

RT / UT
Report No.

Date:

RT / UT
Report Date

5%RT

PWHT
Chart
No.

PWHT
Date

Hardness MPT/LPT
Test
Report No.
Report No.

PMI
(Note-04)

NDT Lot No.


(Note-05)

Branch
RF Pad
Test
Report
No.

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

Line History Sheet


Unit:

Rev.
Pipe Class

Report No:

1
:

EC 12 EMFR HC 50

% NDT ( RT / UT) :

NDT
Control,
XR. No.

RT / UT
Report No.

Date:

5%RT

RT / UT
Report Date

PWHT
Chart
No.

PWHT
Date

Hardness MPT/LPT
Test
Report No.
Report No.

PMI
(Note-04)

NDT Lot No.


(Note-05)

o Form: EPCMD 2QM00FMTPP003: YES / NO

nioned.

Number,

Rep. No - Report Number


Reliance QMD

FPJ: First Production Joint


Reliance O&M / TPI

Branch
RF Pad
Test
Report
No.

Line History Sheet


Unit:

Rev.
Pipe Class

Report No:

1
:

EC 12 EMFR HC 50

% NDT ( RT / UT) :

NDT
Control,
XR. No.

RT / UT
Report No.

Date:

RT / UT
Report Date

5%RT

PWHT
Chart
No.

PWHT
Date

Hardness MPT/LPT
Test
Report No.
Report No.

PMI
(Note-04)

NDT Lot No.


(Note-05)

Branch
RF Pad
Test
Report
No.
Page 1 of 1

Line History Sheet


Unit:

Rev.
Pipe Class

Report No:

1
:

EC 12 EMFR HC 50

% NDT ( RT / UT) :

NDT
Control,
XR. No.

RT / UT
Report No.

Date:

RT / UT
Report Date

5%RT

PWHT
Chart
No.

PWHT
Date

Hardness MPT/LPT
Test
Report No.
Report No.

PMI
(Note-04)

NDT Lot No.


(Note-05)

Branch
RF Pad
Test
Report
No.

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

Line History Sheet


Unit:

Rev.
Pipe Class

Report No:

Date:

1
:

EC 12 EMFR HC 50

% NDT ( RT / UT) :

5%RT

NDT
Control,
XR. No.

RT / UT
Report No.

RT / UT
Report Date

PWHT
Chart
No.

PWHT
Date

Hardness MPT/LPT
Test
Report No.
Report No.

PMI
(Note-04)

NDT Lot No.


(Note-05)

Branch
RF Pad
Test
Report
No.

334

STS/RIL/RT/84

8/14/2015

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

Line History Sheet


Unit:

Rev.
Pipe Class

Report No:

1
:

EC 12 EMFR HC 50

% NDT ( RT / UT) :

NDT
Control,
XR. No.

RT / UT
Report No.

Date:

5%RT

RT / UT
Report Date

PWHT
Chart
No.

PWHT
Date

Hardness MPT/LPT
Test
Report No.
Report No.

PMI
(Note-04)

NDT Lot No.


(Note-05)

ES / NO

Rep. No - Report Number

Reliance QMD

FPJ: First Production Joint

Reliance O&M / TPI

Branch
RF Pad
Test
Report
No.

Line History Sheet


Unit:

Rev.
Pipe Class

Report No:

1
:

EC 12 EMFR HC 50

% NDT ( RT / UT) :

NDT
Control,
XR. No.

RT / UT
Report No.

Date:

RT / UT
Report Date

5%RT

PWHT
Chart
No.

PWHT
Date

Hardness MPT/LPT
Test
Report No.
Report No.

PMI
(Note-04)

NDT Lot No.


(Note-05)

Branch
RF Pad
Test
Report
No.

Line History Sheet


Unit:

Rev.
Pipe Class

Report No:

1
:

EC 12 EMFR HC 50

% NDT ( RT / UT) :

NDT
Control,
XR. No.

RT / UT
Report No.

Date:

RT / UT
Report Date

5%RT

PWHT
Chart
No.

PWHT
Date

Hardness MPT/LPT
Test
Report No.
Report No.

PMI
(Note-04)

NDT Lot No.


(Note-05)

Branch
RF Pad
Test
Report
No.

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

Line History Sheet


Unit:

Rev.
Pipe Class

Report No:

1
:

EC 12 EMFR HC 50

% NDT ( RT / UT) :

NDT
Control,
XR. No.

RT / UT
Report No.

Date:

RT / UT
Report Date

5%RT

PWHT
Chart
No.

PWHT
Date

Hardness MPT/LPT
Test
Report No.
Report No.

PMI
(Note-04)

NDT Lot No.


(Note-05)

Branch
RF Pad
Test
Report
No.

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

Line History Sheet


Unit:

Rev.
Pipe Class

Report No:

1
:

EC 12 EMFR HC 50

% NDT ( RT / UT) :

NDT
Control,
XR. No.

RT / UT
Report No.

Date:

5%RT

RT / UT
Report Date

PWHT
Chart
No.

NA

PWHT
Date

NA

Hardness MPT/LPT
Test
Report No.
Report No.

NA

NA

PMI
(Note-04)

NDT Lot No.


(Note-05)

NA

Branch
RF Pad
Test
Report
No.
NA

o Form: EPCMD 2QM00FMTPP003: YES / NO

nioned.

Number,

Rep. No - Report Number


Reliance QMD

FPJ: First Production Joint


Reliance O&M / TPI

Line History Sheet


Unit:

Rev.
Pipe Class

Report No:

1
:

EC 12 EMFR HC 50

% NDT ( RT / UT) :

NDT
Control,
XR. No.

RT / UT
Report No.

Date:

RT / UT
Report Date

5%RT

PWHT
Chart
No.

PWHT
Date

Hardness MPT/LPT
Test
Report No.
Report No.

PMI
(Note-04)

NDT Lot No.


(Note-05)

Branch
RF Pad
Test
Report
No.

Remarks

Remarks

Remarks

Remarks

1 of 1

Remarks

Remarks

Remarks

Remarks

Remarks

Remarks

Remarks

Remarks

Reliance

Line History

Project:J3
ISO No.

Line No.

Pipe Class

Test Pack No.

% NDT ( RT / UT) :

Spool No./
Matcode

Plant:
STS/RIL/FLR/A1/1404/03-14

Type of Fit up Date


Weld

Weld
Visual
Date

Unit:
Rev.

Fit up & Welder No.


Weld Visual
Rep.No

WPS
No.

NDT
Control,
XR. No.

RT / UT
Report No.

Report No:
1

:
:
RT / UT
Report
Date

EC
5%RT
PWHT
Chart
No.

PWHT Hardness Test


Date
Report No.

Joint No.

Size

Thick

N1M1

2"

5.54MM BW

22-07-2015

13/08/2015

15378

14118

NA

NA

NA

N1M2

2"

5.54MM BW

22-07-2015

13/08/2015

15379

14118

NA

NA

NA

N1M3

2"

5.54MM BW

22-07-2015

13/08/2015

15379

14118

NA

NA

NA

N1M4

2"

5.54MM BW

22-07-2015

13/08/2015

15379

14118

NA

NA

NA

N1M5

2"

5.54MM BW

22-07-2015

13/08/2015

15379

14118

NA

NA

NA

N1M6

2"

5.54MM BW

22-07-2015

13/08/2015

15379

14118

NA

NA

NA

N1M7

2"

5.54MM BW

22-07-2015

13/08/2015

15380

14118

NA

NA

NA

N1M8

2"

5.54MM BW

22-07-2015

13/08/2015

15380

14118

NA

NA

NA

N1M9

2"

5.54MM BW

22-07-2015

13/08/2015

15380

14118

NA

NA

NA

N1M10

2"

5.54MM BW

22-07-2015

13/08/2015

15380

14118

NA

NA

NA

Note-01: Pipe support Welding: Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-025.

335

STS/RIL/RT 8/14/2015
84

Note-02: Confirm Connecting Joint Clearance (in case of two isometrics): YES/No. if not cleared, details transferred to Form: EPCMD 2QM00FMTPP003: YES / NO
Note-03: Steam Tracing (as applicable): Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-031.
Note-04: PMI: PMI shall be checked on LAS / SS / Non-ferrous materials and Fit-up & Weld Visual Report no. to be menioned.
Note-05: NDT lot no.: Only accepted lot no. shall be recorded. In case of 100% lines & FPJ, record as "100%".
Legend : PWHT - Post Weld Heat Treatment,

XR - Radiography Control Number,


Contractor QA/QC

Signatures
Name
Date

Rep. No - Report Number


Reliance QMD

Format No.: EPCMD-2QM00FMTPP002, Rev.-03, Date: 26.03.2015

N1M11

2"

5.54MM BW

22-07-2015

13/08/2015

15379

14118

NA

NA

NA

N1M12

2"

5.54MM BW

22-07-2015

13/08/2015

15379

14118

NA

NA

NA

N1M13

2"

5.54MM BW

22-07-2015

13/08/2015

15379

14118

NA

NA

NA

N1M14

2"

5.54MM BW

22-07-2015

13/08/2015

15380

14118

NA

NA

NA

N1M15

2"

5.54MM BW

22-07-2015

13/08/2015

15380

14118

NA

NA

NA

N1M16

2"

5.54MM BW

22-07-2015

13/08/2015

15379

14118

NA

NA

NA

N1M17

2"

5.54MM BW

22-07-2015

13/08/2015

15379

14118

NA

NA

NA

N1M18

2"

5.54MM BW

22-07-2015

13/08/2015

15380

14118

NA

NA

NA

N1M19

2"

5.54MM BW

22-07-2015

13/08/2015

15380

14118

NA

NA

NA

N1M20

2"

5.54MM BW

22-07-2015

13/08/2015

15378

14118

NA

NA

NA

Note-01: Pipe support Welding: Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-025.


Note-02: Confirm Connecting Joint Clearance (in case of two isometrics): YES/No. if not cleared, details transferred to Form: EPCMD 2QM00FMTPP003: YES / NO
Note-03: Steam Tracing (as applicable): Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-031.
Note-04: PMI: PMI shall be checked on LAS / SS / Non-ferrous materials and Fit-up & Weld Visual Report no. to be menioned.
Note-05: NDT lot no.: Only accepted lot no. shall be recorded. In case of 100% lines & FPJ, record as "100%".
Legend : PWHT - Post Weld Heat Treatment,

XR - Radiography Control Number,


Contractor QA/QC

Signatures
Name

Rep. No - Report Number


Reliance QMD

Date

N1M26

2"

5.54MM BW

22-07-2015

13/08/2015

15380

14118

NA

NA

NA

N1M27

2"

5.54MM BW

22-07-2015

13/08/2015

15379

14118

NA

NA

NA

N1M28

2"

5.54MM BW

22-07-2015

13/08/2015

15378

14118

NA

NA

NA

N1M29

2"

5.54MM BW

22-07-2015

13/08/2015

15379

14118

NA

NA

NA

N1M30

2"

5.54MM BW

22-07-2015

13/08/2015

15379

14118

NA

NA

NA

N1M31

2"

5.54MM BW

22-07-2015

13/08/2015

15380

14118

NA

NA

NA

N1M32

2"

5.54MM BW

22-07-2015

13/08/2015

15380

14118

NA

NA

NA

N1M33

2"

5.54MM BW

22-07-2015

13/08/2015

15378

14118

NA

NA

NA

N1M34

2"

5.54MM BW

22-07-2015

13/08/2015

15378

14118

NA

NA

NA

N2M

2"

5.54MM BW

22-07-2015

13/08/2015

15378

14118

NA

NA

NA

Note-01: Pipe support Welding: Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-025.

336

STS/RIL/RT 1/5/2016
142

Note-02: Confirm Connecting Joint Clearance (in case of two isometrics): YES/No. if not cleared, details transferred to Form: EPCMD 2QM00FMTPP003: YES / NO
Note-03: Steam Tracing (as applicable): Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-031.
Note-04: PMI: PMI shall be checked on LAS / SS / Non-ferrous materials and Fit-up & Weld Visual Report no. to be menioned.
Note-05: NDT lot no.: Only accepted lot no. shall be recorded. In case of 100% lines & FPJ, record as "100%".
Legend : PWHT - Post Weld Heat Treatment,

XR - Radiography Control Number,


Contractor QA/QC

Signatures
Name
Date
Format No.: EPCMD-2QM00FMTPP002, Rev.-03, Date: 26.03.2015

Rep. No - Report Number


Reliance QMD

Line History Sheet


Report No:

Date:
EC 12 EMFR HC 50

5%RT
MPT/LPT
Report No.

PMI NDT Lot Branch RF


(Note- No. (Note- Pad Test
04) 05)
Report No.

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

Remarks

ferred to Form: EPCMD 2QM00FMTPP003: YES / NO


be menioned.
FPJ: First Production Joint
Reliance O&M / TPI

Page 1 of 1

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

ferred to Form: EPCMD 2QM00FMTPP003: YES / NO


be menioned.
FPJ: First Production Joint
Reliance O&M / TPI

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

ferred to Form: EPCMD 2QM00FMTPP003: YES / NO


be menioned.
FPJ: First Production Joint
Reliance O&M / TPI

Page 1 of 1

Reliance
Project:J3

Plant:

ISO No.

Line No.

Test Pack No.

Spool No./
Matcode

STS/RIL/FLR/A1/1404/03-14

COIL D N1E-N2E

Type of Weld

Fit up Date

Weld Visual
Date

Fit up & Weld Welder No.


Visual Rep.No

WPS
No.

Joint No.

Size

Thick

N1E1

2"

5.54MM

BW

24-07-2015

12/8/2015

15378

14118

N1E2

2"

5.54MM

BW

23-07-2015

12/8/2015

15378

14118

N1E3

2"

5.54MM

BW

23-07-2015

12/8/2015

15378

14118

N1E4

2"

5.54MM

BW

23-07-2015

12/8/2015

15380

14118

N1E5

2"

5.54MM

BW

23-07-2015

12/8/2015

15379

14118

N1E6

2"

5.54MM

BW

23-07-2015

12/8/2015

15378

14118

N1E7

2"

5.54MM

BW

23-07-2015

12/8/2015

15378

14118

N1E8

2"

5.54MM

BW

23-07-2015

12/8/2015

15378

14118

NDT
Control, XR. No.

X 326

Reliance
Project:J3

Plant:

ISO No.

Line No.

Test Pack No.

Spool No./
Matcode

STS/RIL/FLR/A1/1404/03-14

COIL D N1E-N2E

N1E8
Joint No.

2"
Size

5.54MM
Thick

BW
Type of Weld

Fit up Date
23-07-2015

12/8/2015
Weld Visual
Date

8 Fit up & Weld 15378


Welder No.
Visual Rep.No

14118
WPS
No.

N1E9

2"

5.54MM

BW

23-07-2015

12/8/2015

15378

14118

N1E10

2"

5.54MM

BW

23-07-2015

12/8/2015

15379

14118

N1E11

2"

5.54MM

BW

23-07-2015

12/8/2015

15379

14118

NDT
Control, XR. No.

Note-01: Pipe support Welding: Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-025.


Note-02: Confirm Connecting Joint Clearance (in case of two isometrics): YES/No. if not cleared, details transferred to Form: EPCMD 2QM00FMTPP003: YES / NO
Note-03: Steam Tracing (as applicable): Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-031.
Note-04: PMI: PMI shall be checked on LAS / SS / Non-ferrous materials and Fit-up & Weld Visual Report no. to be menioned.
Note-05: NDT lot no.: Only accepted lot no. shall be recorded. In case of 100% lines & FPJ, record as "100%".
Legend : PWHT - Post Weld Heat Treatment,

XR - Radiography Control Number,


Contractor QA/QC

Signatures

Reliance
Project:J3

Plant:

ISO No.

Line No.

Test Pack No.

Spool No./
Matcode

STS/RIL/FLR/A1/1404/03-14

Joint No.

COIL D N1E-N2E

Size

Name
Date
Format No.: EPCMD-2QM00FMTPP002, Rev.-03, Date: 26.03.2015

Thick

Type of Weld

Fit up Date

Weld Visual
Date

Fit up & Weld Welder No.


Visual Rep.No

WPS
No.

NDT
Control, XR. No.

Reliance
Project:J3

Plant:

ISO No.

Line No.

Test Pack No.

Spool No./
Matcode

STS/RIL/FLR/A1/1404/03-14

COIL D N1E-N2E

Type of Weld

Fit up Date

Weld Visual
Date

Fit up & Weld Welder No.


Visual Rep.No

WPS
No.

Joint No.

Size

Thick

N1E12

2"

5.54MM

BW

23-07-2015

12/8/2015

15378

14118

N1E13

2"

5.54MM

BW

23-07-2015

12/8/2015

15378

14118

N1E14

2"

5.54MM

BW

23-07-2015

12/8/2015

15379

14118

N1E15

2"

5.54MM

BW

23-07-2015

12/8/2015

15379

14118

N1E16

2"

5.54MM

BW

23-07-2015

12/8/2015

15378

14118

N1E17

2"

5.54MM

BW

23-07-2015

12/8/2015

15378

14118

N1E18

2"

5.54MM

BW

23-07-2015

12/8/2015

15379

14118

N1E19

2"

5.54MM

BW

23-07-2015

12/8/2015

15378

14118

NDT
Control, XR. No.

Reliance
Project:J3

Plant:

ISO No.

Line No.

Test Pack No.

Spool No./
Matcode

STS/RIL/FLR/A1/1404/03-14

COIL D N1E-N2E

N1E19
Joint No.

2"
Size

5.54MM
Thick

BW
Type of Weld

Fit up Date
23-07-2015

12/8/2015
Weld Visual
Date

8 Fit up & Weld 15378


Welder No.
Visual Rep.No

14118
WPS
No.

N1E20

2"

5.54MM

BW

23-07-2015

12/8/2015

15380

14118

N1E21

2"

5.54MM

BW

23-07-2015

12/8/2015

15380

14118

N1E22

2"

5.54MM

BW

23-07-2015

12/8/2015

15380

14118

N1E23

2"

5.54MM

BW

23-07-2015

12/8/2015

15379

14118

NDT
Control, XR. No.

Note-01: Pipe support Welding: Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-025.


Note-02: Confirm Connecting Joint Clearance (in case of two isometrics): YES/No. if not cleared, details transferred to Form: EPCMD 2QM00FMTPP003: YES / NO
Note-03: Steam Tracing (as applicable): Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-031.
Note-04: PMI: PMI shall be checked on LAS / SS / Non-ferrous materials and Fit-up & Weld Visual Report no. to be menioned.
Note-05: NDT lot no.: Only accepted lot no. shall be recorded. In case of 100% lines & FPJ, record as "100%".
Legend : PWHT - Post Weld Heat Treatment,

XR - Radiography Control Number,

Reliance
Project:J3

Plant:

ISO No.

Line No.

Test Pack No.

Spool No./
Matcode

STS/RIL/FLR/A1/1404/03-14

Joint No.

COIL D N1E-N2E

Size

Thick

Type of Weld

Fit up Date

Weld Visual
Date

Contractor QA/QC

Signatures
Name
Date

Fit up & Weld Welder No.


Visual Rep.No

WPS
No.

NDT
Control, XR. No.

Reliance
Project:J3

Plant:

ISO No.

Line No.

Test Pack No.

Spool No./
Matcode

STS/RIL/FLR/A1/1404/03-14

COIL D N1E-N2E

Type of Weld

Fit up Date

Weld Visual
Date

Fit up & Weld Welder No.


Visual Rep.No

WPS
No.

Joint No.

Size

Thick

N1E29

2"

5.54MM

BW

23-07-2015

12/8/2015

15378

14118

N1E30

2"

5.54MM

BW

23-07-2015

12/8/2015

15378

14118

N1E31

2"

5.54MM

BW

23-07-2015

12/8/2015

15378

14118

N1E32

2"

5.54MM

BW

23-07-2015

12/8/2015

15378

14118

N1E33

2"

5.54MM

BW

23-07-2015

12/8/2015

15378

14118

N1E34

2"

5.54MM

BW

23-07-2015

12/8/2015

15378

14118

N2E

2"

5.54MM

BW

23-07-2015

12/8/2015

15378

14118

NDT
Control, XR. No.

Reliance
Project:J3

Plant:

ISO No.

Line No.

Test Pack No.

Spool No./
Matcode

STS/RIL/FLR/A1/1404/03-14

Joint No.

COIL D N1E-N2E

Size

Thick

Type of Weld

Fit up Date

Weld Visual
Date

Fit up & Weld Welder No.


Visual Rep.No

WPS
No.

NDT
Control, XR. No.

Note-01: Pipe support Welding: Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-025.


Note-02: Confirm Connecting Joint Clearance (in case of two isometrics): YES/No. if not cleared, details transferred to Form: EPCMD 2QM00FMTPP003: YES / NO
Note-03: Steam Tracing (as applicable): Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-031.
Note-04: PMI: PMI shall be checked on LAS / SS / Non-ferrous materials and Fit-up & Weld Visual Report no. to be menioned.
Note-05: NDT lot no.: Only accepted lot no. shall be recorded. In case of 100% lines & FPJ, record as "100%".
Legend : PWHT - Post Weld Heat Treatment,

XR - Radiography Control Number,


Contractor QA/QC

Signatures
Name
Date

Reliance
Project:J3

Plant:

ISO No.

Line No.

Test Pack No.

Spool No./
Matcode

STS/RIL/FLR/A1/1404/03-14

Joint No.

COIL D N1E-N2E

Size

Format No.: EPCMD-2QM00FMTPP002, Rev.-03, Date: 26.03.2015

Thick

Type of Weld

Fit up Date

Weld Visual
Date

Fit up & Weld Welder No.


Visual Rep.No

WPS
No.

NDT
Control, XR. No.

Line History Sheet


Unit:
Rev.
Pipe Class

Report No:
:

1
:

EC 12 EMFR HC 50

% NDT ( RT / UT) :
RT / UT
Report No.

STS/RIL/RT-82

Date:

5%RT

RT / UT
Report Date

8/14/2015

PWHT
Chart No.

PWHT
Date

Hardness Test
Report No.

MPT/LPT
Report No.

PMI
(Note-04)

NDT Lot No.


(Note-05)

Branch RF Pad
Test Report No.

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

Remarks

Line History Sheet


Unit:
Rev.
Pipe Class

Report No:
:

1
:

EC 12 EMFR HC 50

% NDT ( RT / UT) :
RT / UT
Report No.

Date:

5%RT

RT / UT
Report Date

NA PWHT
Chart No.

NAPWHT
Date

NA
Hardness Test
Report No.

NA
MPT/LPT
Report No.

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

Rep. No - Report Number


Reliance QMD

PMI
(Note-04)

NDT Lot No.


(Note-05)

FPJ: First Production Joint


Reliance O&M / TPI

NA
Branch RF Pad
Test Report No.

Remarks

Line History Sheet


Unit:
Rev.
Pipe Class

Report No:
:

1
:

EC 12 EMFR HC 50

% NDT ( RT / UT) :
RT / UT
Report No.

Date:

RT / UT
Report Date

5%RT
PWHT
Chart No.

PWHT
Date

Hardness Test
Report No.

MPT/LPT
Report No.

PMI
(Note-04)

NDT Lot No.


(Note-05)

Branch RF Pad
Test Report No.

Page 1 of 1

Remarks

Line History Sheet


Unit:
Rev.
Pipe Class

Report No:
:

1
:

EC 12 EMFR HC 50

% NDT ( RT / UT) :
RT / UT
Report No.

Date:

5%RT

RT / UT
Report Date

PWHT
Chart No.

PWHT
Date

Hardness Test
Report No.

MPT/LPT
Report No.

PMI
(Note-04)

NDT Lot No.


(Note-05)

Branch RF Pad
Test Report No.

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

Remarks

Line History Sheet


Unit:
Rev.
Pipe Class

Report No:
:

1
:

EC 12 EMFR HC 50

% NDT ( RT / UT) :
RT / UT
Report No.

Date:

RT / UT
Report Date

5%RT
NA PWHT
Chart No.

NAPWHT
Date

NA
Hardness Test
Report No.

NA
MPT/LPT
Report No.

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

Rep. No - Report Number

PMI
(Note-04)

FPJ: First Production Joint

NDT Lot No.


(Note-05)

NA
Branch RF Pad
Test Report No.

Remarks

Line History Sheet


Unit:
Rev.
Pipe Class

Report No:
:

1
:

EC 12 EMFR HC 50

% NDT ( RT / UT) :
RT / UT
Report No.

Date:

5%RT

RT / UT
Report Date

PWHT
Chart No.

Reliance QMD

PWHT
Date

Hardness Test
Report No.

MPT/LPT
Report No.

PMI
(Note-04)

NDT Lot No.


(Note-05)

Reliance O&M / TPI

Branch RF Pad
Test Report No.

Remarks

Line History Sheet


Unit:
Rev.
Pipe Class

Report No:
:

1
:

EC 12 EMFR HC 50

% NDT ( RT / UT) :
RT / UT
Report No.

Date:

5%RT

RT / UT
Report Date

PWHT
Chart No.

PWHT
Date

Hardness Test
Report No.

MPT/LPT
Report No.

PMI
(Note-04)

NDT Lot No.


(Note-05)

Branch RF Pad
Test Report No.

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

Remarks

Line History Sheet


Unit:
Rev.
Pipe Class

Report No:
:

1
:

EC 12 EMFR HC 50

% NDT ( RT / UT) :
RT / UT
Report No.

Date:

5%RT

RT / UT
Report Date

PWHT
Chart No.

Rep. No - Report Number


Reliance QMD

PWHT
Date

Hardness Test
Report No.

MPT/LPT
Report No.

PMI
(Note-04)

NDT Lot No.


(Note-05)

FPJ: First Production Joint


Reliance O&M / TPI

Branch RF Pad
Test Report No.

Remarks

Line History Sheet


Unit:
Rev.
Pipe Class

Report No:
:

1
:

EC 12 EMFR HC 50

% NDT ( RT / UT) :
RT / UT
Report No.

Date:

RT / UT
Report Date

5%RT
PWHT
Chart No.

PWHT
Date

Hardness Test
Report No.

MPT/LPT
Report No.

PMI
(Note-04)

NDT Lot No.


(Note-05)

Branch RF Pad
Test Report No.
Page 1 of 1

Remarks

Reliance
Project:J3

Plant:

ISO No.
:
Line No.
:
Test Pack No. :

Unit:

STS/RIL/FLR/A1/1404/03-15

Rev.
Pipe Class
% NDT ( RT

COIL E (N1N-N2N)

Spool No./
Matcode

Type of Fit up Date


Weld

Weld Visual
Date

Fit up & Welder


Weld No.
Visual
Rep.No

WPS
No.

Joint No.

Size

Thick

N1N1

2"

5.54MM

BW

7/24/2015

8/12/2015

15378

14118

N1N2

2"

5.54MM

BW

7/24/2015

8/12/2015

15378

14118

N1N3

2"

5.54MM

BW

7/24/2015

8/12/2015

15379

14118

N1N4

2"

5.54MM

BW

7/24/2015

8/12/2015

15379

14118

N1N5

2"

5.54MM

BW

7/24/2015

8/12/2015

15379

14118

N1N6

2"

5.54MM

BW

7/24/2015

8/12/2015

15378

14118

NDT
RT / UT
Control, Report No.
XR. No.

337

STS/RIL/RT
/142

Reliance
Project:J3

Plant:

ISO No.
:
Line No.
:
Test Pack No. :

Unit:

STS/RIL/FLR/A1/1404/03-15

Rev.
Pipe Class
% NDT ( RT

COIL E (N1N-N2N)

Spool No./
Matcode

Type of Fit up Date


Weld

Weld Visual
Date

Fit up & Welder


Weld No.
Visual
Rep.No

WPS
No.

Joint No.

Size

Thick

N1N7

2"

5.54MM

BW

7/24/2015

8/12/2015

15378

14118

N1N8

2"

5.54MM

BW

7/24/2015

8/12/2015

15378

14118

N1N9

2"

5.54MM

BW

7/24/2015

8/12/2015

15379

14118

N1N10

2"

5.54MM

BW

7/24/2015

8/12/2015

15379

14118

NDT
RT / UT
Control, Report No.
XR. No.

Note-01: Pipe support Welding: Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-025.


Note-02: Confirm Connecting Joint Clearance (in case of two isometrics): YES/No. if not cleared, details transferred to Form: EPCMD 2QM00FMTPP003: YES / NO
Note-03: Steam Tracing (as applicable): Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-031.
Note-04: PMI: PMI shall be checked on LAS / SS / Non-ferrous materials and Fit-up & Weld Visual Report no. to be menioned.
Note-05: NDT lot no.: Only accepted lot no. shall be recorded. In case of 100% lines & FPJ, record as "100%".
Legend : PWHT - Post Weld Heat Treatment,

XR - Radiography Control Number,


Contractor QA/QC

Reliance
Project:J3

Plant:

ISO No.
:
Line No.
:
Test Pack No. :

STS/RIL/FLR/A1/1404/03-15

Rev.
Pipe Class
% NDT ( RT

COIL E (N1N-N2N)

Spool No./
Matcode

Type of Fit up Date


Weld
Joint No.

Unit:

Size

Thick

Signatures
Name
Date
Format No.: EPCMD-2QM00FMTPP002, Rev.-03, Date: 26.03.2015

Weld Visual
Date

Fit up & Welder


Weld No.
Visual
Rep.No

WPS
No.

NDT
RT / UT
Control, Report No.
XR. No.

Reliance
Project:J3

Plant:

ISO No.
:
Line No.
:
Test Pack No. :

Unit:

STS/RIL/FLR/A1/1404/03-15

Rev.
Pipe Class
% NDT ( RT

COIL E (N1N-N2N)

Spool No./
Matcode

Type of Fit up Date


Weld

Weld Visual
Date

Fit up & Welder


Weld No.
Visual
Rep.No

WPS
No.

Joint No.

Size

Thick

N1N11

2"

5.54MM

BW

7/24/2015

8/12/2015

15378

14118

N1N12

2"

5.54MM

BW

7/24/2015

8/12/2015

15378

14118

N1N13

2"

5.54MM

BW

7/24/2015

8/12/2015

15378

14118

N1N14

2"

5.54MM

BW

7/24/2015

8/12/2015

15379

14118

N1N15

2"

5.54MM

BW

7/24/2015

8/12/2015

15379

14118

N1N16

2"

5.54MM

BW

7/24/2015

8/12/2015

15379

14118

NDT
RT / UT
Control, Report No.
XR. No.

Reliance
Project:J3

Plant:

ISO No.
:
Line No.
:
Test Pack No. :

Unit:

STS/RIL/FLR/A1/1404/03-15

Rev.
Pipe Class
% NDT ( RT

COIL E (N1N-N2N)

Spool No./
Matcode

Type of Fit up Date


Weld

Weld Visual
Date

Fit up & Welder


Weld No.
Visual
Rep.No

WPS
No.

Joint No.

Size

Thick

N1N17

2"

5.54MM

BW

7/24/2015

8/12/2015

15380

14118

N1N18

2"

5.54MM

BW

7/24/2015

8/12/2015

15380

14118

N1N19

2"

5.54MM

BW

7/24/2015

8/12/2015

15380

14118

N1N20

2"

5.54MM

BW

7/24/2015

8/12/2015

15380

14118

NDT
RT / UT
Control, Report No.
XR. No.

Note-01: Pipe support Welding: Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-025.


Note-02: Confirm Connecting Joint Clearance (in case of two isometrics): YES/No. if not cleared, details transferred to Form: EPCMD 2QM00FMTPP003: YES / NO
Note-03: Steam Tracing (as applicable): Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-031.
Note-04: PMI: PMI shall be checked on LAS / SS / Non-ferrous materials and Fit-up & Weld Visual Report no. to be menioned.
Note-05: NDT lot no.: Only accepted lot no. shall be recorded. In case of 100% lines & FPJ, record as "100%".
Legend : PWHT - Post Weld Heat Treatment,

XR - Radiography Control Number,


Contractor QA/QC

Reliance
Project:J3

Plant:

ISO No.
:
Line No.
:
Test Pack No. :

STS/RIL/FLR/A1/1404/03-15

Signatures
Name
Date

Rev.
Pipe Class
% NDT ( RT

COIL E (N1N-N2N)

Spool No./
Matcode

Type of Fit up Date


Weld
Joint No.

Unit:

Size

Thick

Weld Visual
Date

Fit up & Welder


Weld No.
Visual
Rep.No

WPS
No.

NDT
RT / UT
Control, Report No.
XR. No.

Reliance
Project:J3

Plant:

ISO No.
:
Line No.
:
Test Pack No. :

Unit:

STS/RIL/FLR/A1/1404/03-15

Rev.
Pipe Class
% NDT ( RT

COIL E (N1N-N2N)

Spool No./
Matcode

Type of Fit up Date


Weld

Weld Visual
Date

Fit up & Welder


Weld No.
Visual
Rep.No

WPS
No.

Joint No.

Size

Thick

N1N26

2"

5.54MM

BW

7/24/2015

8/12/2015

15380

14118

N1N27

2"

5.54MM

BW

7/24/2015

8/12/2015

15380

14118

N1N28

2"

5.54MM

BW

7/24/2015

8/12/2015

15380

14118

N1N29

2"

5.54MM

BW

7/24/2015

8/12/2015

15379

14118

N1N30

2"

5.54MM

BW

7/24/2015

8/12/2015

15379

14118

N1N31

2"

5.54MM

BW

7/24/2015

8/12/2015

15379

14118

NDT
RT / UT
Control, Report No.
XR. No.

338

STS/RIL/RT
/85

Reliance
Project:J3

Plant:

ISO No.
:
Line No.
:
Test Pack No. :

Unit:

STS/RIL/FLR/A1/1404/03-15

Rev.
Pipe Class
% NDT ( RT

COIL E (N1N-N2N)

Spool No./
Matcode

Type of Fit up Date


Weld

Weld Visual
Date

Fit up & Welder


Weld No.
Visual
Rep.No

WPS
No.

Joint No.

Size

Thick

N1N31

2"

5.54MM

BW

7/24/2015

8/12/2015

15379

14118

N2N

2"

5.54MM

BW

7/24/2015

8/12/2015

15379

14118

NDT
RT / UT
Control, Report No.
XR. No.

Note-01: Pipe support Welding: Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-025.


Note-02: Confirm Connecting Joint Clearance (in case of two isometrics): YES/No. if not cleared, details transferred to Form: EPCMD 2QM00FMTPP003: YES / NO
Note-03: Steam Tracing (as applicable): Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-031.
Note-04: PMI: PMI shall be checked on LAS / SS / Non-ferrous materials and Fit-up & Weld Visual Report no. to be menioned.
Note-05: NDT lot no.: Only accepted lot no. shall be recorded. In case of 100% lines & FPJ, record as "100%".
Legend : PWHT - Post Weld Heat Treatment,

XR - Radiography Control Number,


Contractor QA/QC

Signatures
Name
Date
Format No.: EPCMD-2QM00FMTPP002, Rev.-03, Date: 26.03.2015

Line History Sheet


Report No:
:

:
T / UT) :
RT / UT
Report Date

1/5/2015

Date:

EC 12 EMFR HC 50
5%RT
PWHT
Chart
No.

PWHT
Date

Hardnes MPT/LPT
PMI
NDT Lot Branch
s Test Report No. (Note-04) No.
RF Pad
Report
(Note-05)
Test
No.
Report
No.

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

Re
ma
rks

Line History Sheet


Report No:
:

:
T / UT) :
RT / UT
Report Date

Date:

EC 12 EMFR HC 50
5%RT
PWHT
Chart
No.

PWHT
Date

Hardnes MPT/LPT
PMI
NDT Lot Branch
s Test Report No. (Note-04) No.
RF Pad
Report
(Note-05)
Test
No.
Report
No.

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

Rep. No - Report Number


Reliance QMD

FPJ: First Production Joint


Reliance O&M / TPI

Re
ma
rks

Line History Sheet


Report No:
:

:
T / UT) :
RT / UT
Report Date

Date:

EC 12 EMFR HC 50
5%RT
PWHT
Chart
No.

PWHT
Date

Hardnes MPT/LPT
PMI
NDT Lot Branch
s Test Report No. (Note-04) No.
RF Pad
Report
(Note-05)
Test
No.
Report
No.

Page 1 of 1

Re
ma
rks

Line History Sheet


Report No:
:

:
T / UT) :
RT / UT
Report Date

Date:

EC 12 EMFR HC 50
5%RT
PWHT
Chart
No.

PWHT
Date

Hardnes MPT/LPT
PMI
NDT Lot Branch
s Test Report No. (Note-04) No.
RF Pad
Report
(Note-05)
Test
No.
Report
No.

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

Re
ma
rks

Line History Sheet


Report No:
:

:
T / UT) :
RT / UT
Report Date

Date:

EC 12 EMFR HC 50
5%RT
PWHT
Chart
No.

PWHT
Date

Hardnes MPT/LPT
PMI
NDT Lot Branch
s Test Report No. (Note-04) No.
RF Pad
Report
(Note-05)
Test
No.
Report
No.

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

Rep. No - Report Number


Reliance QMD

FPJ: First Production Joint


Reliance O&M / TPI

Re
ma
rks

Line History Sheet


Report No:
:

:
T / UT) :
RT / UT
Report Date

Date:

EC 12 EMFR HC 50
5%RT
PWHT
Chart
No.

PWHT
Date

Hardnes MPT/LPT
PMI
NDT Lot Branch
s Test Report No. (Note-04) No.
RF Pad
Report
(Note-05)
Test
No.
Report
No.

Re
ma
rks

Line History Sheet


Report No:
:

:
T / UT) :
RT / UT
Report Date

8/14/2015

Date:

EC 12 EMFR HC 50
5%RT
PWHT
Chart
No.

PWHT
Date

Hardnes MPT/LPT
PMI
NDT Lot Branch
s Test Report No. (Note-04) No.
RF Pad
Report
(Note-05)
Test
No.
Report
No.

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

Re
ma
rks

Line History Sheet


Report No:
:

:
T / UT) :
RT / UT
Report Date

Date:

EC 12 EMFR HC 50
5%RT
PWHT
Chart
No.
NA

NA

Hardnes MPT/LPT
PMI
NDT Lot Branch
s Test Report No. (Note-04) No.
RF Pad
Report
(Note-05)
Test
No.
Report
NA
NA
NA
NANo.

NA

NA

NA

Rep. No - Report Number


Reliance QMD

PWHT
Date

NA

NA

NA

FPJ: First Production Joint


Reliance O&M / TPI

Page 1 of 1

Re
ma
rks

Reliance
Project:J3

Plant:

ISO No.

Line No.

Test Pack No.

STS/RIL/FLR/A1/1404/03-14
COIL N1D-N2D

Spool No./
Matcode

Type of Weld Fit up Date

Weld Visual
Fit up & Welder No.
Date
Weld Visual
Rep.No

WPS
No.

Joint No.

Size

Thick

N1D1

2"

5.54MM

BW

26-07-2015

13/08/2015

10

15378

14118

N1D2

2"

5.54MM

BW

26-07-2015

13/08/2015

10

15378

14118

N1D3

2"

5.54MM

BW

26-07-2015

13/08/2015

10

15378

14118

N1D4

2"

5.54MM

BW

26-07-2015

13/08/2015

10

15379

14118

Reliance
Project:J3

Plant:

ISO No.

Line No.

Test Pack No.

STS/RIL/FLR/A1/1404/03-14
COIL N1D-N2D

N1D5

2"

5.54MM

BW

26-07-2015

13/08/2015

10

15378

14118

N1D6

2"

5.54MM

BW

26-07-2015

13/08/2015

10

15378

14118

N1D7

2"

5.54MM

BW

26-07-2015

13/08/2015

10

15378

14118

N1D8

2"

5.54MM

BW

26-07-2015

13/08/2015

10

15378

14118

N1D9

2"

5.54MM

BW

26-07-2015

13/08/2015

10

15379

14118

N1D10

2"

5.54MM

BW

26-07-2015

13/08/2015

10

15378

14118

Reliance
Project:J3

Plant:

ISO No.

Line No.

Test Pack No. :


N1D10

STS/RIL/FLR/A1/1404/03-14
COIL N1D-N2D
2"

5.54MM

BW

26-07-2015

13/08/2015

10

15378

14118

Note-01: Pipe support Welding: Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-025.


Note-02: Confirm Connecting Joint Clearance (in case of two isometrics): YES/No. if not cleared, details transferred to Form: EPCMD 2QM00FMTPP003: YES / NO
Note-03: Steam Tracing (as applicable): Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-031.
Note-04: PMI: PMI shall be checked on LAS / SS / Non-ferrous materials and Fit-up & Weld Visual Report no. to be menioned.
Note-05: NDT lot no.: Only accepted lot no. shall be recorded. In case of 100% lines & FPJ, record as "100%".
Legend : PWHT - Post Weld Heat Treatment,

XR - Radiography Control Number,

Contractor QA/QC

Signatures
Name
Date
Format No.: EPCMD-2QM00FMTPP002, Rev.-03, Date: 26.03.2015

Reliance
Project:J3

Plant:

ISO No.

Line No.

Test Pack No.

STS/RIL/FLR/A1/1404/03-14
COIL N1D-N2D

N1D11

2"

5.54MM

BW

26-07-2015

13/08/2015

10

15380

14118

N1D12

2"

5.54MM

BW

26-07-2015

13/08/2015

10

15380

14118

N1D13

2"

5.54MM

BW

26-07-2015

13/08/2015

10

15380

14118

N1D14

2"

5.54MM

BW

26-07-2015

13/08/2015

10

15380

14118

N1D15

2"

5.54MM

BW

26-07-2015

13/08/2015

10

15378

14118

N1D16

2"

5.54MM

BW

26-07-2015

13/08/2015

10

15378

14118

Reliance
Project:J3

Plant:

ISO No.

Line No.

STS/RIL/FLR/A1/1404/03-14
COIL N1D-N2D

Test Pack No.N1D16


:

2"

5.54MM

BW

26-07-2015

13/08/2015

10

15378

14118

N1D17

2"

5.54MM

BW

26-07-2015

13/08/2015

10

15379

14118

N1D18

2"

5.54MM

BW

26-07-2015

13/08/2015

10

15378

14118

N1D19

2"

5.54MM

BW

26-07-2015

13/08/2015

10

15378

14118

N1D20

2"

5.54MM

BW

26-07-2015

13/08/2015

10

15378

14118

Note-01: Pipe support Welding: Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-025.


Note-02: Confirm Connecting Joint Clearance (in case of two isometrics): YES/No. if not cleared, details transferred to Form: EPCMD 2QM00FMTPP003: YES / NO
Note-03: Steam Tracing (as applicable): Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-031.
Note-04: PMI: PMI shall be checked on LAS / SS / Non-ferrous materials and Fit-up & Weld Visual Report no. to be menioned.

Reliance
Project:J3

Plant:

ISO No.

Line No.

Test Pack No.

STS/RIL/FLR/A1/1404/03-14
COIL N1D-N2D

Note-05: NDT lot no.: Only accepted lot no. shall be recorded. In case of 100% lines & FPJ, record as "100%".
Legend : PWHT - Post Weld Heat Treatment,

XR - Radiography Control Number,

Reliance
Project:J3

Plant:

ISO No.

Line No.

Test Pack No.

STS/RIL/FLR/A1/1404/03-14
COIL N1D-N2D

Contractor QA/QC

Signatures
Name
Date
N1D26

2"

5.54MM

BW

26-07-2015

13/08/2015

10

15380

14118

N1D27

2"

5.54MM

BW

26-07-2015

13/08/2015

10

15380

14118

N1D28

2"

5.54MM

BW

26-07-2015

13/08/2015

10

15380

14118

N1D29

2"

5.54MM

BW

26-07-2015

13/08/2015

10

15378

14118

Reliance
Project:J3

Plant:

ISO No.

Line No.

Test Pack No.

STS/RIL/FLR/A1/1404/03-14
COIL N1D-N2D

N1D30

2"

5.54MM

BW

26-07-2015

13/08/2015

10

15379

14118

N1D31

2"

5.54MM

BW

26-07-2015

13/08/2015

10

15379

14118

N1D2

2"

5.54MM

BW

26-07-2015

13/08/2015

10

15379

14118

Reliance
Project:J3

Plant:

ISO No.

Line No.

Test Pack No.

STS/RIL/FLR/A1/1404/03-14
COIL N1D-N2D

Note-01: Pipe support Welding: Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-025.


Note-02: Confirm Connecting Joint Clearance (in case of two isometrics): YES/No. if not cleared, details transferred to Form: EPCMD 2QM00FMTPP003: YES / NO
Note-03: Steam Tracing (as applicable): Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-031.
Note-04: PMI: PMI shall be checked on LAS / SS / Non-ferrous materials and Fit-up & Weld Visual Report no. to be menioned.
Note-05: NDT lot no.: Only accepted lot no. shall be recorded. In case of 100% lines & FPJ, record as "100%".
Legend : PWHT - Post Weld Heat Treatment,

XR - Radiography Control Number,

Contractor QA/QC

Signatures
Name
Date
Format No.: EPCMD-2QM00FMTPP002, Rev.-03, Date: 26.03.2015

Line History Sheet


Unit:
Rev.
Pipe Class

Report No:
:

Date:

1
:

EC 12 EMFR HC 50

% NDT ( RT / UT) :
NDT
RT / UT
Control, XR. Report No.
No.

RT / UT
Report Date

5%RT
PWHT
Chart No.

PWHT
Date

Hardness MPT/LPT
Test Report Report No.
No.

PMI
NDT Lot No. Branch RF
(Note-04) (Note-05)
Pad Test
Report No.

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

Line History Sheet


Unit:
Rev.
Pipe Class

Report No:
:

Date:

1
:

EC 12 EMFR HC 50

% NDT ( RT / UT) :

5%RT
NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

Line History Sheet


Unit:
Rev.
Pipe Class

Report No:
:

Date:

1
:

% NDT ( RT / UT) :

EC 12 EMFR HC 50
NA

Rep. No - Report Number

Reliance QMD

NA

5%RT
NA

NA

NA

NA

FPJ: First Production Joint

Reliance O&M / TPI

Page 1 of 1

Line History Sheet


Unit:
Rev.
Pipe Class

Report No:
:

Date:

1
:

EC 12 EMFR HC 50

% NDT ( RT / UT) :

X 325

STS/RIL/RT/81 8/14/2015

5%RT
NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

Line History Sheet


Unit:
Rev.
Pipe Class

Report No:
:

Date:

1
:

% NDT ( RT / UT) :

EC 12 EMFR HC 50
NA

NA

5%RT
NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

Line History Sheet


Unit:
Rev.
Pipe Class

Report No:
:

Date:

1
:

% NDT ( RT / UT) :

Rep. No - Report Number

EC 12 EMFR HC 50
5%RT

FPJ: First Production Joint

Line History Sheet


Unit:
Rev.
Pipe Class

Report No:
:

Date:

1
:

EC 12 EMFR HC 50

% NDT ( RT / UT) :

5%RT
Reliance QMD

Reliance O&M / TPI

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

Line History Sheet


Unit:
Rev.
Pipe Class

Report No:
:

Date:

1
:

EC 12 EMFR HC 50

% NDT ( RT / UT) :

5%RT
NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

Line History Sheet


Unit:
Rev.
Pipe Class

Report No:
:

Date:

1
:

EC 12 EMFR HC 50

% NDT ( RT / UT) :

5%RT

Rep. No - Report Number

Reliance QMD

FPJ: First Production Joint

Reliance O&M / TPI

Page 1 of 1

History Sheet
Date:

Remarks

History Sheet
Date:

History Sheet
Date:

Reliance O&M / TPI

Page 1 of 1

History Sheet
Date:

History Sheet
Date:

History Sheet
Date:

History Sheet
Date:

Reliance O&M / TPI

History Sheet
Date:

History Sheet
Date:

Reliance O&M / TPI

Page 1 of 1

Reliance
Project:J3

Plant:

ISO No.

STS/RIL/FLR/A1/1404/03-14

Line No.

COIL F N1C-N2C

Test Pack No.

Spool No./
Matcode

Type of Weld Fit up Date

Weld Visual
Date

Fit up & Weld Welder No.


Visual Rep.No

WPS
No.

Joint No.

Size

Thick

N1C1

2"

5.54MM

BW

4/8/2015

4/8/2015

13

15379

14118

N1C2

2"

5.54MM

BW

28/07/2015

12/8/2015

13

15378

14118

N1C3

2"

5.54MM

BW

28/07/2015

12/8/2015

13

15378

14118

N1C4

2"

5.54MM

BW

28/07/2015

12/8/2015

13

15378

14118

N1C5

2"

5.54MM

BW

28/07/2015

12/8/2015

13

15380

14118

N1C6

2"

5.54MM

BW

28/07/2015

12/8/2015

13

15380

14118

NDT
Control,
XR. No.

Reliance
Project:J3

Plant:

ISO No.

STS/RIL/FLR/A1/1404/03-14

Line No.

COIL F N1C-N2C

Test Pack No.


N1C6:

2"

5.54MM

BW

28/07/2015

12/8/2015

13

15380

14118

N1C7

2"

5.54MM

BW

28/07/2015

12/8/2015

13

15380

14118

N1C8

2"

5.54MM

BW

28/07/2015

12/8/2015

13

15380

14118

Note-01: Pipe support Welding: Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-025.

Note-02: Confirm Connecting Joint Clearance (in case of two isometrics): YES/No. if not cleared, details transferred to Form: E
Note-03: Steam Tracing (as applicable): Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-031.
Note-04: PMI: PMI shall be checked on LAS / SS / Non-ferrous materials and Fit-up & Weld Visual Report no. to be menioned.
Note-05: NDT lot no.: Only accepted lot no. shall be recorded. In case of 100% lines & FPJ, record as "100%".
Legend : PWHT - Post Weld Heat Treatment,
XR - Radiography Control Number,
Contractor QA/QC
Signatures
Name
Date
Format No.: EPCMD-2QM00FMTPP002, Rev.-03, Date: 26.03.2015

Reliance
Project:J3

Plant:

ISO No.

STS/RIL/FLR/A1/1404/03-14

Line No.

COIL F N1C-N2C

Test Pack No.

N1C9

2"

5.54MM

BW

28/07/2015

12/8/2015

13

15379

14118

N1C10

2"

5.54MM

BW

28/07/2015

12/8/2015

13

15378

14118

N1C11

2"

5.54MM

BW

28/07/2015

12/8/2015

13

15378

14118

N1C12

2"

5.54MM

BW

28/07/2015

12/8/2015

13

15380

14118

N1C13

2"

5.54MM

BW

28/07/2015

12/8/2015

13

15380

14118

N1C14

2"

5.54MM

BW

28/07/2015

12/8/2015

13

15378

14118

X 324

Reliance
Project:J3

Plant:

ISO No.

STS/RIL/FLR/A1/1404/03-14

Line No.

COIL F N1C-N2C

Test Pack No.


:
N1C14

2"

5.54MM

BW

28/07/2015

12/8/2015

13

15378

14118

N1C15

2"

5.54MM

BW

28/07/2015

12/8/2015

13

15378

14118

N1C16

2"

5.54MM

BW

28/07/2015

12/8/2015

13

15379

14118

Note-01: Pipe support Welding: Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-025.

Note-02: Confirm Connecting Joint Clearance (in case of two isometrics): YES/No. if not cleared, details transferred to Form: EPCMD 2QM00FM
Note-03: Steam Tracing (as applicable): Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-031.
Note-04: PMI: PMI shall be checked on LAS / SS / Non-ferrous materials and Fit-up & Weld Visual Report no. to be menioned.
Note-05: NDT lot no.: Only accepted lot no. shall be recorded. In case of 100% lines & FPJ, record as "100%".
Legend : PWHT - Post Weld Heat Treatment,
XR - Radiography Control Number,
Contractor QA/QC
Signatures

Name

Reliance
Project:J3

Plant:

ISO No.

STS/RIL/FLR/A1/1404/03-14

Line No.

COIL F N1C-N2C

Test Pack No.

Date
Format No.: EPCMD-2QM00FMTPP002, Rev.-03, Date: 26.03.2015

Reliance
Project:J3

Plant:

ISO No.

STS/RIL/FLR/A1/1404/03-14

Line No.

COIL F N1C-N2C

Test Pack No.

N1C17

2"

5.54MM

BW

28/07/2015

12/8/2015

13

15378

14118

N1C18

2"

5.54MM

BW

28/07/2015

12/8/2015

13

15378

14118

N1C19

2"

5.54MM

BW

28/07/2015

12/8/2015

13

15378

14118

N1C20

2"

5.54MM

BW

28/07/2015

12/8/2015

13

15378

14118

N1C21

2"

5.54MM

BW

28/07/2015

12/8/2015

13

15379

14118

N1C22

2"

5.54MM

BW

28/07/2015

12/8/2015

13

15378

14118

Reliance
Project:J3

Plant:

ISO No.

STS/RIL/FLR/A1/1404/03-14

Line No.

COIL F N1C-N2C

Test Pack No.


:
N1C22

2"

5.54MM

BW

28/07/2015

12/8/2015

13

15378

14118

N1C23

2"

5.54MM

BW

28/07/2015

12/8/2015

13

15378

14118

N1C24

2"

5.54MM

BW

28/07/2015

12/8/2015

13

15378

14118

Note-01: Pipe support Welding: Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-025.

Note-02: Confirm Connecting Joint Clearance (in case of two isometrics): YES/No. if not cleared, details transferred to Form: E
Note-03: Steam Tracing (as applicable): Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-031.
Note-04: PMI: PMI shall be checked on LAS / SS / Non-ferrous materials and Fit-up & Weld Visual Report no. to be menioned.
Note-05: NDT lot no.: Only accepted lot no. shall be recorded. In case of 100% lines & FPJ, record as "100%".
Legend : PWHT - Post Weld Heat Treatment,

XR - Radiography Control Number,


Contractor QA/QC

Reliance
Project:J3

Plant:

ISO No.

STS/RIL/FLR/A1/1404/03-14

Line No.

COIL F N1C-N2C

Test Pack No.

Signatures
Name
Date
Format No.: EPCMD-2QM00FMTPP002, Rev.-03, Date: 26.03.2015

Reliance
Project:J3

Plant:

ISO No.

STS/RIL/FLR/A1/1404/03-14

Line No.

COIL F N1C-N2C

Test Pack No.

N1C25

2"

5.54MM

BW

28/07/2015

12/8/2015

13

15378

14118

N1C26

2"

5.54MM

BW

28/07/2015

12/8/2015

13

15378

14118

N1C27

2"

5.54MM

BW

28/07/2015

12/8/2015

13

15378

14118

N1C28

2"

5.54MM

BW

28/07/2015

12/8/2015

13

15378

14118

N1C29

2"

5.54MM

BW

28/07/2015

12/8/2015

13

15378

14118

N2C

2"

5.54MM

BW

28/07/2015

12/8/2015

13

15378

14118

Reliance
Project:J3

Plant:

ISO No.

STS/RIL/FLR/A1/1404/03-14

Line No.

COIL F N1C-N2C

Test Pack No.


N2C :

2"

5.54MM

BW

28/07/2015

12/8/2015

13

15378

14118

Note-01: Pipe support Welding: Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-025.


Note-02: Confirm Connecting Joint Clearance (in case of two isometrics): YES/No. if not cleared, details transferred to Form: E
Note-03: Steam Tracing (as applicable): Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-031.
Note-04: PMI: PMI shall be checked on LAS / SS / Non-ferrous materials and Fit-up & Weld Visual Report no. to be menioned.
Note-05: NDT lot no.: Only accepted lot no. shall be recorded. In case of 100% lines & FPJ, record as "100%".
Legend : PWHT - Post Weld Heat Treatment,

XR - Radiography Control Number,


Contractor QA/QC

Signatures
Name

Reliance
Project:J3

Plant:

ISO No.

STS/RIL/FLR/A1/1404/03-14

Line No.

COIL F N1C-N2C

Test Pack No.

Date
Format No.: EPCMD-2QM00FMTPP002, Rev.-03, Date: 26.03.2015

Line History Sheet


Unit:
Rev.
Pipe Class

Report No:
:

1
:

% NDT ( RT / UT) :
RT / UT
Report No.

Date:

RT / UT
Report Date

EC 12 EMFR HC 50
5%RT
PWHT
Chart No.

PWHT
Date

Hardness MPT/LPT
Test Report Report No.
No.

PMI
(Note-04)

NDT Lot No.


(Note-05)

Branch RF Pad
Test Report No.
Remarks

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

Line History Sheet


Unit:
Rev.
Pipe Class

Report No:
:

Date:

1
:

% NDT ( RT / UT) :

EC 12 EMFR HC 50
5%RT
NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

Form: EPCMD 2QM00FMTPP003: YES / NO

ioned.
Rep. No - Report Number
Reliance QMD

FPJ: First Production Joint


Reliance O&M / TPI

Page 1 of 1

Line History Sheet


Unit:
Rev.
Pipe Class

Report No:
:

Date:

1
:

EC 12 EMFR HC 50

% NDT ( RT / UT) :

5%RT

STS/RIL/R 8/14/2015
T/81

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

Line History Sheet


Unit:
Rev.
Pipe Class

Report No:
:

Date:

1
:

% NDT ( RT / UT) :

EC 12 EMFR HC 50
5%RT
NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

2QM00FMTPP003: YES / NO

Rep. No - Report Number


Reliance QMD

FPJ: First Production Joint


Reliance O&M / TPI

Line History Sheet


Unit:
Rev.
Pipe Class

Report No:
:

Date:

1
:

% NDT ( RT / UT) :

EC 12 EMFR HC 50
5%RT

Page 1 of 1

Line History Sheet


Unit:
Rev.
Pipe Class

Report No:
:

Date:

1
:

% NDT ( RT / UT) :

EC 12 EMFR HC 50
5%RT
NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

Line History Sheet


Unit:
Rev.
Pipe Class

Report No:
:

Date:

1
:

% NDT ( RT / UT) :

EC 12 EMFR HC 50
5%RT
NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

Form: EPCMD 2QM00FMTPP003: YES / NO

ioned.

Rep. No - Report Number


Reliance QMD

FPJ: First Production Joint


Reliance O&M / TPI

Line History Sheet


Unit:
Rev.
Pipe Class

Report No:
:

Date:

1
:

% NDT ( RT / UT) :

EC 12 EMFR HC 50
5%RT

Page 1 of 1

Line History Sheet


Unit:
Rev.
Pipe Class

Report No:
:

Date:

1
:

% NDT ( RT / UT) :

EC 12 EMFR HC 50
5%RT
NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

Line History Sheet


Unit:
Rev.
Pipe Class

Report No:
:

Date:

1
:

% NDT ( RT / UT) :

EC 12 EMFR HC 50
5%RT
NA

NA

NA

NA

NA

NA

Form: EPCMD 2QM00FMTPP003: YES / NO

ioned.
Rep. No - Report Number
Reliance QMD

FPJ: First Production Joint


Reliance O&M / TPI

Line History Sheet


Unit:
Rev.
Pipe Class

Report No:
:

Date:

1
:

% NDT ( RT / UT) :

EC 12 EMFR HC 50
5%RT

Page 1 of 1

Reliance
Project:J3

Plant:

ISO No.
Line No.

:
:

Test Pack No.

Spool No./
Matcode

Line History
Unit:

STS/RIL/FLR/A1/1404/03-14

Rev.
Pipe Class

COIL F N1P 2P

Report No:

1
:

EC 12 EMFR HC 50

% NDT ( RT / UT) :
Type of Fit up Date
Weld

Weld Visual Fit up & Welder No.


Date
Weld
Visual
Rep.No

WPS
No.

NDT
RT / UT
Control, Report No.
XR. No.

5%RT

RT / UT PWHT
Report Chart
Date
No.

PWHT Hardness
Date
Test Report
No.

Joint No.

Size

Thick

N1P1

2"

5.54MM BW

30-7-2015

13/08/2015

12

15378

14118

NA

NA

NA

N1P2

2"

5.54MM BW

30-7-2015

13/08/2015

12

15378

14118

NA

NA

NA

N1P3

2"

5.54MM BW

30-7-2015

13/08/2015

12

15378

14118

NA

NA

NA

N1P4

2"

5.54MM BW

30-7-2015

13/08/2015

12

15378

14118

NA

NA

NA

N1P5

2"

5.54MM BW

30-7-2015

13/08/2015

12

15380

14118

NA

NA

NA

N1P6

2"

5.54MM BW

30-7-2015

13/08/2015

12

15380

14118

NA

NA

NA

N1P7

2"

5.54MM BW

30-7-2015

13/08/2015

12

15378

14118

NA

NA

NA

N1P8

2"

5.54MM BW

30-7-2015

13/08/2015

12

15378

14118

NA

NA

NA

N1P9

2"

5.54MM BW

30-7-2015

13/08/2015

12

15378

14118

NA

NA

NA

N1P10

2"

5.54MM BW

30-7-2015

13/08/2015

12

15378

14118

NA

NA

NA

341

STS/RIL/
RT-85

Reliance
Project:J3

Plant:

ISO No.
Line No.

:
:

Test Pack No.

Spool No./
Matcode

Line History

Joint No.

Unit:

STS/RIL/FLR/A1/1404/03-14

Rev.
Pipe Class

COIL F N1P 2P

Report No:

1
:

% NDT ( RT / UT) :

Size

Thick

Type of Fit up Date


Weld

Weld Visual Fit up & Welder No.


Date
Weld
Visual
Rep.No

WPS
No.

NDT
RT / UT
Control, Report No.
XR. No.

RT / UT PWHT
Report Chart
Date
No.

EC 12 EMFR HC 50
5%RT
PWHT Hardness
Date
Test Report
No.

Note-01: Pipe support Welding: Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-025.


Note-02: Confirm Connecting Joint Clearance (in case of two isometrics): YES/No. if not cleared, details transferred to Form: EPCMD 2QM00FMTPP003: YES / NO
Note-03: Steam Tracing (as applicable): Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-031.
Note-04: PMI: PMI shall be checked on LAS / SS / Non-ferrous materials and Fit-up & Weld Visual Report no. to be menioned.
Note-05: NDT lot no.: Only accepted lot no. shall be recorded. In case of 100% lines & FPJ, record as "100%".
Legend : PWHT - Post Weld Heat Treatment,

XR - Radiography Control Number,

Contractor QA/QC
Signatures
Name
Date
Format No.: EPCMD-2QM00FMTPP002, Rev.-03, Date: 26.03.2015

Rep. No - Report Number

Reliance QMD

Reliance
Project:J3

Plant:

ISO No.
Line No.

:
:

Test Pack No.

Spool No./
Matcode

Line History
Unit:

STS/RIL/FLR/A1/1404/03-14

Rev.
Pipe Class

COIL F N1P 2P

Report No:

1
:

EC 12 EMFR HC 50

% NDT ( RT / UT) :
Type of Fit up Date
Weld

Weld Visual Fit up & Welder No.


Date
Weld
Visual
Rep.No

WPS
No.

NDT
RT / UT
Control, Report No.
XR. No.

5%RT

RT / UT PWHT
Report Chart
Date
No.

PWHT Hardness
Date
Test Report
No.

Joint No.

Size

Thick

N1P11

2"

5.54MM BW

30-7-2015

13/08/2015

12

15378

14118

NA

NA

NA

N1P12

2"

5.54MM BW

30-7-2015

13/08/2015

12

15378

14118

NA

NA

NA

N1P13

2"

5.54MM BW

30-7-2015

13/08/2015

12

15378

14118

NA

NA

NA

N1P14

2"

5.54MM BW

30-7-2015

13/08/2015

12

15378

14118

NA

NA

NA

N1P15

2"

5.54MM BW

30-7-2015

13/08/2015

12

15378

14118

NA

NA

NA

N1P16

2"

5.54MM BW

30-7-2015

13/08/2015

12

15378

14118

NA

NA

NA

N1P17

2"

5.54MM BW

30-7-2015

13/08/2015

12

15378

14118

NA

NA

NA

N1P18

2"

5.54MM BW

30-7-2015

13/08/2015

12

15378

14118

NA

NA

NA

N1P19

2"

5.54MM BW

30-7-2015

13/08/2015

12

15378

14118

NA

NA

NA

N1P20

2"

5.54MM BW

30-7-2015

13/08/2015

12

15378

14118

NA

NA

NA

342

STS/RIL/
RT-86

Reliance
Project:J3

Plant:

ISO No.
Line No.

:
:

Test Pack No.

Spool No./
Matcode

Line History

Joint No.

Unit:

STS/RIL/FLR/A1/1404/03-14

Rev.
Pipe Class

COIL F N1P 2P

Report No:

1
:

% NDT ( RT / UT) :

Size

Thick

Type of Fit up Date


Weld

Weld Visual Fit up & Welder No.


Date
Weld
Visual
Rep.No

WPS
No.

NDT
RT / UT
Control, Report No.
XR. No.

RT / UT PWHT
Report Chart
Date
No.

EC 12 EMFR HC 50
5%RT
PWHT Hardness
Date
Test Report
No.

Note-01: Pipe support Welding: Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-025.


Note-02: Confirm Connecting Joint Clearance (in case of two isometrics): YES/No. if not cleared, details transferred to Form: EPCMD 2QM00FMTPP003: YES / NO
Note-03: Steam Tracing (as applicable): Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-031.
Note-04: PMI: PMI shall be checked on LAS / SS / Non-ferrous materials and Fit-up & Weld Visual Report no. to be menioned.
Note-05: NDT lot no.: Only accepted lot no. shall be recorded. In case of 100% lines & FPJ, record as "100%".
Legend : PWHT - Post Weld Heat Treatment,

XR - Radiography Control Number,


Contractor QA/QC

Signatures
Name
Date
Format No.: EPCMD-2QM00FMTPP002, Rev.-03, Date: 26.03.2015

Rep. No - Report Number


Reliance QMD

Reliance
Project:J3

Plant:

ISO No.
Line No.

:
:

Test Pack No.

Spool No./
Matcode

Line History
Unit:

STS/RIL/FLR/A1/1404/03-14

Rev.
Pipe Class

COIL F N1P 2P

Report No:

1
:

EC 12 EMFR HC 50

% NDT ( RT / UT) :
Type of Fit up Date
Weld

Weld Visual Fit up & Welder No.


Date
Weld
Visual
Rep.No

WPS
No.

NDT
RT / UT
Control, Report No.
XR. No.

5%RT

RT / UT PWHT
Report Chart
Date
No.

PWHT Hardness
Date
Test Report
No.

Joint No.

Size

Thick

N1P21

2"

5.54MM BW

30-7-2015

13/08/2015

12

15380

14118

NA

NA

NA

N1P22

2"

5.54MM BW

30-7-2015

13/08/2015

12

15378

14118

NA

NA

NA

N1P23

2"

5.54MM BW

30-7-2015

13/08/2015

12

15379

14118

NA

NA

NA

N1P24

2"

5.54MM BW

30-7-2015

13/08/2015

12

15378

14118

NA

NA

NA

N1P25

2"

5.54MM BW

30-7-2015

13/08/2015

12

15378

14118

NA

NA

NA

N1P26

2"

5.54MM BW

30-7-2015

13/08/2015

12

15379

14118

NA

NA

NA

N1P27

2"

5.54MM BW

30-7-2015

13/08/2015

12

15379

14118

NA

NA

NA

N1P28

2"

5.54MM BW

30-7-2015

13/08/2015

12

15379

14118

NA

NA

NA

N1P29

2"

5.54MM BW

30-7-2015

13/08/2015

12

15379

14118

NA

NA

NA

N2P

2"

5.54MM BW

30-7-2015

13/08/2015

12

15379

14118

NA

NA

NA

Reliance
Project:J3

Plant:

ISO No.
Line No.

:
:

Test Pack No.

Spool No./
Matcode

Line History

Joint No.

Unit:

STS/RIL/FLR/A1/1404/03-14

Rev.
Pipe Class

COIL F N1P 2P

Report No:

1
:

% NDT ( RT / UT) :

Size

Thick

Type of Fit up Date


Weld

Weld Visual Fit up & Welder No.


Date
Weld
Visual
Rep.No

WPS
No.

NDT
RT / UT
Control, Report No.
XR. No.

RT / UT PWHT
Report Chart
Date
No.

EC 12 EMFR HC 50
5%RT
PWHT Hardness
Date
Test Report
No.

Note-01: Pipe support Welding: Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-025.


Note-02: Confirm Connecting Joint Clearance (in case of two isometrics): YES/No. if not cleared, details transferred to Form: EPCMD 2QM00FMTPP003: YES / NO
Note-03: Steam Tracing (as applicable): Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-031.
Note-04: PMI: PMI shall be checked on LAS / SS / Non-ferrous materials and Fit-up & Weld Visual Report no. to be menioned.
Note-05: NDT lot no.: Only accepted lot no. shall be recorded. In case of 100% lines & FPJ, record as "100%".
Legend : PWHT - Post Weld Heat Treatment,

XR - Radiography Control Number,

Contractor QA/QC
Signatures
Name
Date
Format No.: EPCMD-2QM00FMTPP002, Rev.-03, Date: 26.03.2015

Rep. No - Report Number

Reliance QMD

ory Sheet
Date:

0
MPT/LPT PMI NDT Lot
Report
(Note- No.
No.
04) (Note-05)

Branch
RF Pad
Test
Report
No.

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

Remark
s

ory Sheet
Date:

0
MPT/LPT PMI NDT Lot
Report
(Note- No.
No.
04) (Note-05)

Branch
RF Pad
Test
Report
No.

Remark
s

FPJ: First Production Joint

Reliance O&M / TPI

Page 1 of 1

ory Sheet
Date:

0
MPT/LPT PMI NDT Lot
Report
(Note- No.
No.
04) (Note-05)

Branch
RF Pad
Test
Report
No.

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

Remark
s

ory Sheet
Date:

0
MPT/LPT PMI NDT Lot
Report
(Note- No.
No.
04) (Note-05)

Branch
RF Pad
Test
Report
No.

Remark
s

FPJ: First Production Joint


Reliance O&M / TPI

Page 1 of 1

ory Sheet
Date:

0
MPT/LPT PMI NDT Lot
Report
(Note- No.
No.
04) (Note-05)

Branch
RF Pad
Test
Report
No.

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

Remark
s

ory Sheet
Date:

0
MPT/LPT PMI NDT Lot
Report
(Note- No.
No.
04) (Note-05)

Branch
RF Pad
Test
Report
No.

Remark
s

FPJ: First Production Joint

Reliance O&M / TPI

Page 1 of 1

Reliance
Project:J3

ISO No.
Line No.

Line His
Plant:

:
:

Unit:

STS/RIL/FLR/A1/1404/03-14

Rev.
Pipe Class

COILG N1R-N2R

Test Pack No. :


Spool
No./
Matcode
Joint No. Size

Type of Fit up Date


Weld
Thick

Weld
Visual
Date

Fit up & Welder No.


Weld
Visual
Rep.No

WPS
No.

Report No:

1
:

EC 12 EMFR HC

% NDT ( RT / UT) :
5%RT
NDT
RT / UT
RT / UT PWHT
PWH
Control, Report No.
Report
Chart
T
XR. No.
Date
No.
Date

N1R1

2"

5.54MM BW

4/8/2015

13/08/2015

13

15379

14118

NA

NA

N1R2

2"

5.54MM BW

4/8/2015

13/08/2015

13

15379

14118

NA

NA

N1R3

2"

5.54MM BW

4/8/2015

13/08/2015

13

15379

14118

NA

NA

N1R4

2"

5.54MM BW

4/8/2015

13/08/2015

13

15378

14118

NA

NA

N1R5

2"

5.54MM BW

4/8/2015

13/08/2015

13

15378

14118

NA

NA

N1R6

2"

5.54MM BW

4/8/2015

13/08/2015

13

15378

14118

NA

NA

N1R7

2"

5.54MM BW

4/8/2015

13/08/2015

13

15378

14118

NA

NA

N1R8

2"

5.54MM BW

4/8/2015

13/08/2015

13

15378

14118

NA

NA

N1R9

2"

5.54MM BW

4/8/2015

13/08/2015

13

15380

14118

NA

NA

N1R10

2"

5.54MM BW

4/8/2015

13/08/2015

13

15380

14118

NA

NA

343

Reliance
Project:J3

ISO No.
Line No.

Line His
Plant:

:
:

Test Pack No. :


Spool
No./
Matcode
Joint No. Size

Unit:

STS/RIL/FLR/A1/1404/03-14

Rev.
Pipe Class

COILG N1R-N2R
Type of Fit up Date
Weld
Thick

Weld
Visual
Date

Fit up & Welder No.


Weld
Visual
Rep.No

WPS
No.

Report No:

1
:

EC 12 EMFR HC

% NDT ( RT / UT) :
5%RT
NDT
RT / UT
RT / UT PWHT
PWH
Control, Report No.
Report
Chart
T
XR. No.
Date
No.
Date

Note-01: Pipe support Welding: Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-025.


Note-02: Confirm Connecting Joint Clearance (in case of two isometrics): YES/No. if not cleared, details transferred to Form: EPCMD 2QM00FMTPP003: YES / NO
Note-03: Steam Tracing (as applicable): Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-031.
Note-04: PMI: PMI shall be checked on LAS / SS / Non-ferrous materials and Fit-up & Weld Visual Report no. to be menioned.
Note-05: NDT lot no.: Only accepted lot no. shall be recorded. In case of 100% lines & FPJ, record as "100%".
Legend : PWHT - Post Weld Heat Treatment,

XR - Radiography Control Number,


Contractor QA/QC

Signatures
Name
Date
Format No.: EPCMD-2QM00FMTPP002, Rev.-03, Date: 26.03.2015

Rep. No - Report Number


Reliance QMD

Reliance
Project:J3

ISO No.
Line No.

Line His
Plant:

:
:

Unit:

STS/RIL/FLR/A1/1404/03-14

Rev.
Pipe Class

COILG N1R-N2R

Test Pack No. :


Spool
No./
Matcode
Joint No. Size

Type of Fit up Date


Weld
Thick

Weld
Visual
Date

Fit up & Welder No.


Weld
Visual
Rep.No

WPS
No.

Report No:

1
:

EC 12 EMFR HC

% NDT ( RT / UT) :
5%RT
NDT
RT / UT
RT / UT PWHT
PWH
Control, Report No.
Report
Chart
T
XR. No.
Date
No.
Date

N1R11

2"

5.54MM BW

4/8/2015

13/08/2015

13

15378

14118

NA

NA

N1R12

2"

5.54MM BW

4/8/2015

13/08/2015

13

15378

14118

NA

NA

N1R13

2"

5.54MM BW

4/8/2015

13/08/2015

13

15378

14118

NA

NA

N1R14

2"

5.54MM BW

4/8/2015

13/08/2015

13

15378

14118

NA

NA

N1R15

2"

5.54MM BW

4/8/2015

13/08/2015

13

15380

14118

NA

NA

N1R16

2"

5.54MM BW

4/8/2015

13/08/2015

13

15380

14118

NA

NA

N1R17

2"

5.54MM BW

4/8/2015

13/08/2015

13

15380

14118

NA

NA

N1R18

2"

5.54MM BW

4/8/2015

13/08/2015

13

15380

14118

NA

NA

N1R19

2"

5.54MM BW

4/8/2015

13/08/2015

13

15380

14118

NA

NA

N1R20

2"

5.54MM BW

4/8/2015

13/08/2015

13

15378

14118

NA

NA

Reliance
Project:J3

ISO No.
Line No.

Line His
Plant:

:
:

Test Pack No. :


Spool
No./
Matcode
Joint No. Size

Unit:

STS/RIL/FLR/A1/1404/03-14

Rev.
Pipe Class

COILG N1R-N2R
Type of Fit up Date
Weld
Thick

Weld
Visual
Date

Fit up & Welder No.


Weld
Visual
Rep.No

WPS
No.

Report No:

1
:

EC 12 EMFR HC

% NDT ( RT / UT) :
5%RT
NDT
RT / UT
RT / UT PWHT
PWH
Control, Report No.
Report
Chart
T
XR. No.
Date
No.
Date

Note-01: Pipe support Welding: Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-025.


Note-02: Confirm Connecting Joint Clearance (in case of two isometrics): YES/No. if not cleared, details transferred to Form: EPCMD 2QM00FMTPP003: YES / NO
Note-03: Steam Tracing (as applicable): Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-031.
Note-04: PMI: PMI shall be checked on LAS / SS / Non-ferrous materials and Fit-up & Weld Visual Report no. to be menioned.
Note-05: NDT lot no.: Only accepted lot no. shall be recorded. In case of 100% lines & FPJ, record as "100%".
Legend : PWHT - Post Weld Heat Treatment,

XR - Radiography Control Number,

Contractor QA/QC
Signatures
Name
Date
Format No.: EPCMD-2QM00FMTPP002, Rev.-03, Date: 26.03.2015

Rep. No - Report Number

Reliance QMD

Reliance
Project:J3

Line His
Plant:

ISO No.
Line No.

:
:

Unit:

STS/RIL/FLR/A1/1404/03-14

Rev.
Pipe Class

COILG N1R-N2R

Test Pack No. :


Spool
No./
Matcode
Joint No. Size

Type of Fit up Date


Weld
Thick

Weld
Visual
Date

Fit up & Welder No.


Weld
Visual
Rep.No

WPS
No.

Report No:

1
:

EC 12 EMFR HC

% NDT ( RT / UT) :
5%RT
NDT
RT / UT
RT / UT PWHT
PWH
Control, Report No.
Report
Chart
T
XR. No.
Date
No.
Date

N1R21

2"

5.54M
M

BW

4/8/2015

13/08/2015 13

15378

14118

NA

NA

N1R22

2"

5.54M
M

BW

4/8/2015

13/08/2015 13

15378

14118

NA

NA

N1R23

2"

5.54M
M

BW

4/8/2015

13/08/2015 13

15378

14118

NA

NA

N1R24

2"

5.54M
M

BW

4/8/2015

13/08/2015 13

15378

14118

NA

NA

N1R25

2"

5.54M
M

BW

4/8/2015

13/08/2015 13

15378

14118

NA

NA

N1R26

2"

5.54M
M

BW

4/8/2015

13/08/2015 13

15379

14118

NA

NA

N2R

2"

5.54M
M

BW

4/8/2015

13/08/2015 13

15379

14118

NA

NA

Note-01: Pipe support Welding: Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-025.


Note-02: Confirm Connecting Joint Clearance (in case of two isometrics): YES/No. if not cleared, details transferred to Form: EPCMD 2QM00FMTPP003: YES / NO
Note-03: Steam Tracing (as applicable): Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-031.
Note-04: PMI: PMI shall be checked on LAS / SS / Non-ferrous materials and Fit-up & Weld Visual Report no. to be menioned.
Note-05: NDT lot no.: Only accepted lot no. shall be recorded. In case of 100% lines & FPJ, record as "100%".
Legend : PWHT - Post Weld Heat Treatment,

XR - Radiography Control Number,

Rep. No - Report Number

Reliance
Project:J3

ISO No.
Line No.

Line His
Plant:

:
:

Test Pack No. :


Spool
No./
Matcode
Joint No. Size

Unit:

STS/RIL/FLR/A1/1404/03-14

Rev.
Pipe Class

COILG N1R-N2R
Type of Fit up Date
Weld
Thick

Weld
Visual
Date

Contractor QA/QC
Signatures
Name
Date
Format No.: EPCMD-2QM00FMTPP002, Rev.-03, Date: 26.03.2015

Fit up & Welder No.


Weld
Visual
Rep.No

WPS
No.

Report No:

1
:

EC 12 EMFR HC

% NDT ( RT / UT) :
5%RT
NDT
RT / UT
RT / UT PWHT
PWH
Control, Report No.
Report
Chart
T
XR. No.
Date
No.
Date

Reliance QMD

e History Sheet
Date:

EMFR HC 50
Hardness MPT/LP
Test Report T
No.
Report
No.

PMI NDT Lot Branch RF


(Note- No.
Pad Test
04) (Note- Report No.
05)

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

Remark
s

e History Sheet
Date:

EMFR HC 50
Hardness MPT/LP
Test Report T
No.
Report
No.

PMI NDT Lot Branch RF


(Note- No.
Pad Test
04) (Note- Report No.
05)

FPJ: First Production Joint


Reliance O&M / TPI

Page 1 of 1

Remark
s

e History Sheet
Date:

EMFR HC 50
Hardness MPT/LP
Test Report T
No.
Report
No.

PMI NDT Lot Branch RF


(Note- No.
Pad Test
04) (Note- Report No.
05)

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

Remark
s

e History Sheet
Date:

EMFR HC 50
Hardness MPT/LP
Test Report T
No.
Report
No.

PMI NDT Lot Branch RF


(Note- No.
Pad Test
04) (Note- Report No.
05)

Remark
s

FPJ: First Production Joint

Reliance O&M / TPI

Page 1 of 1

e History Sheet
Date:

EMFR HC 50
Hardness MPT/LP
Test Report T
No.
Report
No.

PMI NDT Lot Branch RF


(Note- No.
Pad Test
04) (Note- Report No.
05)

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

FPJ: First Production Joint

Remark
s

e History Sheet
Date:

EMFR HC 50
Hardness MPT/LP
Test Report T
No.
Report
No.

PMI NDT Lot Branch RF


(Note- No.
Pad Test
04) (Note- Report No.
05)

Remark
s

Reliance O&M / TPI

Page 1 of 1

Reliance
Project:J3

ISO No.
Line No.

Line His
Plant:

:
:

Unit:

STS/RIL/FLR/A1/1404/03-14

Rev.
Pipe Class

COILH N1A-N2A

Test Pack No. :


Spool
No./
Matcode
Joint No. Size

Type of Fit up Date


Weld
Thick

Weld
Visual
Date

Fit up & Welder No.


Weld
Visual
Rep.No

WPS
No.

Report No:

1
:

EC 12 EMFR HC

% NDT ( RT / UT) :
5%RT
NDT
RT / UT
RT / UT PWHT
PWH
Control, Report No.
Report
Chart
T
XR. No.
Date
No.
Date

N1G1

2"

5.54M
M

BW

16-07-2015

12/8/2015

15378

14118

NA

NA

N1G2

2"

5.54M
M

BW

16-07-2015

12/8/2015

15378

14118

NA

NA

N1G3

2"

5.54M
M

BW

16-07-2015

12/8/2015

15378

14118

328

STS/RIL/RT 8/14/2015 NA
/82

NA

N1G4

2"

5.54M
M

BW

16-07-2015

12/8/2015

15378

14118

339

STS/RIL/RT 8/14/2015 NA
/85

NA

N1G5

2"

5.54M
M

BW

16-07-2015

12/8/2015

15379

14118

NA

NA

N1G6

2"

5.54M
M

BW

16-07-2015

12/8/2015

15378

14118

NA

NA

N1G7

2"

5.54M
M

BW

16-07-2015

12/8/2015

15380

14118

NA

NA

Reliance
Project:J3

ISO No.
Line No.

Line His
Plant:

:
:

Test Pack No. :


Spool
No./
Matcode
Joint No. Size

Unit:

STS/RIL/FLR/A1/1404/03-14

Rev.
Pipe Class

COILH N1A-N2A
Type of Fit up Date
Weld
Thick

Weld
Visual
Date

Fit up & Welder No.


Weld
Visual
Rep.No

WPS
No.

Report No:

1
:

EC 12 EMFR HC

% NDT ( RT / UT) :
5%RT
NDT
RT / UT
RT / UT PWHT
PWH
Control, Report No.
Report
Chart
T
XR. No.
Date
No.
Date

Note-01: Pipe support Welding: Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-025.


Note-02: Confirm Connecting Joint Clearance (in case of two isometrics): YES/No. if not cleared, details transferred to Form: EPCMD 2QM00FMTPP003: YES / NO
Note-03: Steam Tracing (as applicable): Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-031.
Note-04: PMI: PMI shall be checked on LAS / SS / Non-ferrous materials and Fit-up & Weld Visual Report no. to be menioned.
Note-05: NDT lot no.: Only accepted lot no. shall be recorded. In case of 100% lines & FPJ, record as "100%".
Legend : PWHT - Post Weld Heat Treatment,

XR - Radiography Control Number,


Contractor QA/QC

Signatures
Name
Date
Format No.: EPCMD-2QM00FMTPP002, Rev.-03, Date: 26.03.2015

Rep. No - Report Number


Reliance QMD

Reliance
Project:J3

ISO No.
Line No.

Line His
Plant:

:
:

Test Pack No. :


Spool
No./
Matcode
Joint No. Size

Unit:

STS/RIL/FLR/A1/1404/03-14

Rev.
Pipe Class

COILH N1A-N2A
Type of Fit up Date
Weld
Thick

Weld
Visual
Date

Fit up & Welder No.


Weld
Visual
Rep.No

WPS
No.

Report No:

1
:

EC 12 EMFR HC

% NDT ( RT / UT) :
5%RT
NDT
RT / UT
RT / UT PWHT
PWH
Control, Report No.
Report
Chart
T
XR. No.
Date
No.
Date

Reliance
Project:J3

ISO No.
Line No.

Line His
Plant:

:
:

Test Pack No. :


Spool
No./
Matcode
Joint No. Size

Unit:

STS/RIL/FLR/A1/1404/03-14

Rev.
Pipe Class

COILH N1A-N2A
Type of Fit up Date
Weld
Thick

Weld
Visual
Date

Fit up & Welder No.


Weld
Visual
Rep.No

WPS
No.

Report No:

1
:

EC 12 EMFR HC

% NDT ( RT / UT) :
5%RT
NDT
RT / UT
RT / UT PWHT
PWH
Control, Report No.
Report
Chart
T
XR. No.
Date
No.
Date

Note-01: Pipe support Welding: Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-025.


Note-02: Confirm Connecting Joint Clearance (in case of two isometrics): YES/No. if not cleared, details transferred to Form: EPCMD 2QM00FMTPP003: YES / NO
Note-03: Steam Tracing (as applicable): Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-031.
Note-04: PMI: PMI shall be checked on LAS / SS / Non-ferrous materials and Fit-up & Weld Visual Report no. to be menioned.
Note-05: NDT lot no.: Only accepted lot no. shall be recorded. In case of 100% lines & FPJ, record as "100%".
Legend : PWHT - Post Weld Heat Treatment,

XR - Radiography Control Number,

Contractor QA/QC
Signatures
Name
Date
Format No.: EPCMD-2QM00FMTPP002, Rev.-03, Date: 26.03.2015

Rep. No - Report Number

Reliance QMD

Reliance
Project:J3

ISO No.
Line No.

Line His
Plant:

:
:

Test Pack No. :


Spool
No./
Matcode
Joint No. Size

Unit:

STS/RIL/FLR/A1/1404/03-14

Rev.
Pipe Class

COILH N1A-N2A
Type of Fit up Date
Weld
Thick

Weld
Visual
Date

Fit up & Welder No.


Weld
Visual
Rep.No

WPS
No.

Report No:

1
:

EC 12 EMFR HC

% NDT ( RT / UT) :
5%RT
NDT
RT / UT
RT / UT PWHT
PWH
Control, Report No.
Report
Chart
T
XR. No.
Date
No.
Date

Note-01: Pipe support Welding: Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-025.


Note-02: Confirm Connecting Joint Clearance (in case of two isometrics): YES/No. if not cleared, details transferred to Form: EPCMD 2QM00FMTPP003: YES / NO
Note-03: Steam Tracing (as applicable): Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-031.
Note-04: PMI: PMI shall be checked on LAS / SS / Non-ferrous materials and Fit-up & Weld Visual Report no. to be menioned.
Note-05: NDT lot no.: Only accepted lot no. shall be recorded. In case of 100% lines & FPJ, record as "100%".
Legend : PWHT - Post Weld Heat Treatment,

XR - Radiography Control Number,

Rep. No - Report Number

Reliance
Project:J3

ISO No.
Line No.

Line His
Plant:

:
:

Test Pack No. :


Spool
No./
Matcode
Joint No. Size

Unit:

STS/RIL/FLR/A1/1404/03-14

Rev.
Pipe Class

COILH N1A-N2A
Type of Fit up Date
Weld
Thick

Weld
Visual
Date

Contractor QA/QC
Signatures
Name
Date
Format No.: EPCMD-2QM00FMTPP002, Rev.-03, Date: 26.03.2015

Fit up & Welder No.


Weld
Visual
Rep.No

WPS
No.

Report No:

1
:

EC 12 EMFR HC

% NDT ( RT / UT) :
5%RT
NDT
RT / UT
RT / UT PWHT
PWH
Control, Report No.
Report
Chart
T
XR. No.
Date
No.
Date

Reliance QMD

e History Sheet
Date:

EMFR HC 50
Hardness MPT/LP
Test Report T
No.
Report
No.

PMI NDT Lot Branch RF


(Note- No.
Pad Test
04) (Note- Report No.
05)

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

Remark
s

e History Sheet
Date:

EMFR HC 50
Hardness MPT/LP
Test Report T
No.
Report
No.

PMI NDT Lot Branch RF


(Note- No.
Pad Test
04) (Note- Report No.
05)

FPJ: First Production Joint


Reliance O&M / TPI

Page 1 of 1

Remark
s

e History Sheet
Date:

EMFR HC 50
Hardness MPT/LP
Test Report T
No.
Report
No.

PMI NDT Lot Branch RF


(Note- No.
Pad Test
04) (Note- Report No.
05)

Remark
s

e History Sheet
Date:

EMFR HC 50
Hardness MPT/LP
Test Report T
No.
Report
No.

PMI NDT Lot Branch RF


(Note- No.
Pad Test
04) (Note- Report No.
05)

Remark
s

FPJ: First Production Joint

Reliance O&M / TPI

Page 1 of 1

e History Sheet
Date:

EMFR HC 50
Hardness MPT/LP
Test Report T
No.
Report
No.

PMI NDT Lot Branch RF


(Note- No.
Pad Test
04) (Note- Report No.
05)

FPJ: First Production Joint

Remark
s

e History Sheet
Date:

EMFR HC 50
Hardness MPT/LP
Test Report T
No.
Report
No.

PMI NDT Lot Branch RF


(Note- No.
Pad Test
04) (Note- Report No.
05)

Remark
s

Reliance O&M / TPI

Page 1 of 1

Reliance

Line His

Project:J3
ISO No.

Line No.

Pipe Class

Test Pack No.

% NDT ( RT / UT) :

Spool No./
Matcode

RT

Plant:
STS/RIL/FLR/A1/1404/03-14

Type of Fit up Date


Weld

Weld
Visual
Date

Unit:
Rev.

Fit up & Welder No.


Weld Visual
Rep.No

WPS
No.

NDT
Control,
XR. No.

RT / UT
Report No.

Report No:
1

:
:
RT / UT
Report
Date

EC 12 EMFR HC
PWHT
Chart
No.

Joint No.

Size

Thick

N1B1

2"

5.54MM BW

8/9/2015

13/08/2015

14

15378

14118

NA

N1B2

2"

5.54MM BW

8/9/2015

13/08/2015

14

15378

14118

NA

N1B3

2"

5.54MM BW

8/9/2015

13/08/2015

14

15378

14118

N1B4

2"

5.54MM BW

8/9/2015

13/08/2015

14

15379

14118

NA

N1B5

2"

5.54MM BW

8/9/2015

13/08/2015

14

15379

14118

NA

N1B6

2"

5.54MM BW

8/9/2015

13/08/2015

14

15379

14118

NA

N1B7

2"

5.54MM BW

8/9/2015

13/08/2015

14

15379

14118

NA

N1B8

2"

5.54MM BW

8/9/2015

13/08/2015

14

15378

14118

NA

X 323

STS/RIL/RT/ 8/14/2015
81

NA

N1B9

2"

5.54MM BW

8/9/2015

13/08/2015

14

15378

14118

NA

N1B10

2"

5.54MM BW

8/9/2015

13/08/2015

14

15380

14118

NA

N1B11

2"

5.54MM BW

8/9/2015

13/08/2015

14

15380

14118

NA

N1B12

2"

5.54MM BW

8/9/2015

13/08/2015

14

15380

14118

NA

N1B13

2"

5.54MM BW

8/9/2015

13/08/2015

14

15378

14118

NA

N1B14

2"

5.54MM BW

8/9/2015

13/08/2015

14

15378

14118

NA

N1B15

2"

5.54MM BW

8/9/2015

13/08/2015

14

15380

14118

NA

N1B16

2"

5.54MM BW

8/9/2015

13/08/2015

14

15380

14118

NA

N1B17

2"

5.54MM BW

8/9/2015

13/08/2015

14

15380

14118

NA

N1B18

2"

5.54MM BW

8/9/2015

13/08/2015

14

15378

14118

NA

N1B19

2"

5.54MM BW

8/9/2015

13/08/2015

14

15378

14118

NA

N1B20

2"

5.54MM BW

8/9/2015

13/08/2015

14

15378

14118

NA

N1B21

2"

5.54MM BW

8/9/2015

13/08/2015

14

15378

14118

NA

N1B21

2"

5.54MM BW

8/9/2015

13/08/2015

14

15378

14118

NA

N1B22

2"

5.54MM BW

8/9/2015

13/08/2015

14

15379

14118

NA

N1B23

2"

5.54MM BW

8/9/2015

13/08/2015

14

15379

14118

NA

N2B

2"

5.54MM BW

8/9/2015

13/08/2015

14

15379

14118

NA

Note-01: Pipe support Welding: Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-025.


Note-02: Confirm Connecting Joint Clearance (in case of two isometrics): YES/No. if not cleared, details transferred to Form: EPCMD 2QM00FMTPP003: YES / NO
Note-03: Steam Tracing (as applicable): Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-031.
Note-04: PMI: PMI shall be checked on LAS / SS / Non-ferrous materials and Fit-up & Weld Visual Report no. to be menioned.
Note-05: NDT lot no.: Only accepted lot no. shall be recorded. In case of 100% lines & FPJ, record as "100%".
Legend : PWHT - Post Weld Heat Treatment,

XR - Radiography Control Number,


Contractor QA/QC

Signatures
Name
Date

Rep. No - Report Number


Reliance QMD

Format No.: EPCMD-2QM00FMTPP002, Rev.-03, Date: 26.03.2015

Line History Sheet


Report No:

Date:

EC 12 EMFR HC 50
5%RT
PWHT Hardness Test MPT/LPT
Date
Report No. Report No.

PMI NDT Lot Branch RF


(Note- No. (Note- Pad Test
04) 05)
Report No.

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

Remarks

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

FMTPP003: YES / NO

- Report Number

nce QMD

FPJ: First Production Joint


Reliance O&M / TPI

Page 1 of 1

Reliance

Line His

Project:J3
ISO No.

Line No.

Pipe Class

Test Pack No.

% NDT ( RT / UT) :

Spool No./
Matcode

Plant:
STS/RIL/FLR/A1/1404/03-14

Type of Fit up Date


Weld

Weld
Visual
Date

Unit:
Rev.

Fit up & Welder No.


Weld Visual
Rep.No

WPS
No.

NDT
Control,
XR. No.

RT / UT
Report No.

Report No:
1

:
:
RT / UT
Report
Date

EC 12 EMFR H
PWHT
Chart
No.

Joint No.

Size

Thick

N1A1

2"

5.54MM BW

8/10/2015

8/13/2015

15

15378

14118

NA

N1A2

2"

5.54MM BW

8/10/2015

8/13/2015

15

15378

14118

NA

N1A3

2"

5.54MM BW

8/10/2015

8/13/2015

15

15380

14118

N1A4

2"

5.54MM BW

8/10/2015

8/13/2015

15

15380

14118

NA

N1A5

2"

5.54MM BW

8/10/2015

8/13/2015

15

15380

14118

NA

N1A6

2"

5.54MM BW

8/10/2015

8/13/2015

15

15378

14118

NA

N1A7

2"

5.54MM BW

8/10/2015

8/13/2015

15

15378

14118

NA

N1A8

2"

5.54MM BW

8/10/2015

8/13/2015

15

15378

14118

NA

X 322

STS/RIL/RT/8 8/14/2015
1

NA

Reliance

Line His

Project:J3
ISO No.

Line No.

Pipe Class

Test Pack No.

% NDT ( RT / UT) :

Spool No./
Matcode

Plant:
STS/RIL/FLR/A1/1404/03-14

Type of Fit up Date


Weld

Weld
Visual
Date

Unit:
Rev.

Fit up & Welder No.


Weld Visual
Rep.No

WPS
No.

NDT
Control,
XR. No.

RT / UT
Report No.

Report No:
1

:
:
RT / UT
Report
Date

EC 12 EMFR H
PWHT
Chart
No.

Joint No.

Size

Thick

N1A9

2"

5.54MM BW

8/10/2015

8/13/2015

15

15379

14118

NA

N1A10

2"

5.54MM BW

8/10/2015

8/13/2015

15

15379

14118

NA

N1A11

2"

5.54MM BW

8/10/2015

8/13/2015

15

15378

14118

NA

N1A12

2"

5.54MM BW

8/10/2015

8/13/2015

15

15378

14118

NA

N1A13

2"

5.54MM BW

8/10/2015

8/13/2015

15

15378

14118

NA

N2A

2"

5.54MM BW

8/10/2015

8/13/2015

15

15378

14118

NA

Reliance

Line His

Project:J3
ISO No.

Line No.

Pipe Class

Test Pack No.

% NDT ( RT / UT) :

Spool No./
Matcode

Joint No.

Plant:
STS/RIL/FLR/A1/1404/03-14

Size

Thick

Type of Fit up Date


Weld

Weld
Visual
Date

Fit up & Welder No.


Weld Visual
Rep.No

Unit:
Rev.

WPS
No.

NDT
Control,
XR. No.

RT / UT
Report No.

Report No:
1

:
:
RT / UT
Report
Date

EC 12 EMFR H
PWHT
Chart
No.

Reliance

Line His

Project:J3
ISO No.

Line No.

Pipe Class

Test Pack No.

% NDT ( RT / UT) :

Spool No./
Matcode

Joint No.

Plant:
STS/RIL/FLR/A1/1404/03-14

Size

Thick

Type of Fit up Date


Weld

Weld
Visual
Date

Fit up & Welder No.


Weld Visual
Rep.No

Unit:
Rev.

WPS
No.

NDT
Control,
XR. No.

RT / UT
Report No.

Report No:
1

:
:
RT / UT
Report
Date

EC 12 EMFR H
PWHT
Chart
No.

Reliance

Line His

Project:J3
ISO No.

Line No.

Pipe Class

Test Pack No.

% NDT ( RT / UT) :

Spool No./
Matcode

Joint No.

Plant:
STS/RIL/FLR/A1/1404/03-14

Size

Thick

Type of Fit up Date


Weld

Weld
Visual
Date

Fit up & Welder No.


Weld Visual
Rep.No

Unit:
Rev.

WPS
No.

NDT
Control,
XR. No.

RT / UT
Report No.

Report No:
1

:
:
RT / UT
Report
Date

EC 12 EMFR H
PWHT
Chart
No.

Reliance

Line His

Project:J3
ISO No.

Line No.

Pipe Class

Test Pack No.

% NDT ( RT / UT) :

Spool No./
Matcode

Joint No.

Plant:
STS/RIL/FLR/A1/1404/03-14

Size

Thick

Type of Fit up Date


Weld

Weld
Visual
Date

Fit up & Welder No.


Weld Visual
Rep.No

Unit:
Rev.

WPS
No.

NDT
Control,
XR. No.

RT / UT
Report No.

Report No:
1

:
:
RT / UT
Report
Date

EC 12 EMFR H
PWHT
Chart
No.

Note-01: Pipe support Welding: Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-025.


Note-02: Confirm Connecting Joint Clearance (in case of two isometrics): YES/No. if not cleared, details transferred to Form: EPCMD 2QM00FMTPP003: YES / NO
Note-03: Steam Tracing (as applicable): Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-031.
Note-04: PMI: PMI shall be checked on LAS / SS / Non-ferrous materials and Fit-up & Weld Visual Report no. to be menioned.
Note-05: NDT lot no.: Only accepted lot no. shall be recorded. In case of 100% lines & FPJ, record as "100%".
Legend : PWHT - Post Weld Heat Treatment,

XR - Radiography Control Number,


Contractor QA/QC

Signatures
Name
Date
Format No.: EPCMD-2QM00FMTPP002, Rev.-03, Date: 26.03.2015

Rep. No - Report Number


Reliance QMD

Line History Sheet


Report No:

Date:

EC 12 EMFR HC 50
5%RT
PWHT Hardness Test MPT/LPT
Date
Report No. Report No.

PMI NDT Lot Branch RF


(Note- No. (Note- Pad Test
04) 05)
Report No.

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

Remarks

Line History Sheet


Report No:

Date:

EC 12 EMFR HC 50
5%RT
PWHT Hardness Test MPT/LPT
Date
Report No. Report No.

PMI NDT Lot Branch RF


(Note- No. (Note- Pad Test
04) 05)
Report No.

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

Remarks

Line History Sheet


Report No:

Date:

EC 12 EMFR HC 50
5%RT
PWHT Hardness Test MPT/LPT
Date
Report No. Report No.

PMI NDT Lot Branch RF


(Note- No. (Note- Pad Test
04) 05)
Report No.

Remarks

Line History Sheet


Report No:

Date:

EC 12 EMFR HC 50
5%RT
PWHT Hardness Test MPT/LPT
Date
Report No. Report No.

PMI NDT Lot Branch RF


(Note- No. (Note- Pad Test
04) 05)
Report No.

Remarks

Line History Sheet


Report No:

Date:

EC 12 EMFR HC 50
5%RT
PWHT Hardness Test MPT/LPT
Date
Report No. Report No.

PMI NDT Lot Branch RF


(Note- No. (Note- Pad Test
04) 05)
Report No.

Remarks

Line History Sheet


Report No:

Date:

EC 12 EMFR HC 50
5%RT
PWHT Hardness Test MPT/LPT
Date
Report No. Report No.

PMI NDT Lot Branch RF


(Note- No. (Note- Pad Test
04) 05)
Report No.

Remarks

FMTPP003: YES / NO

- Report Number

nce QMD

FPJ: First Production Joint


Reliance O&M / TPI

Page 1 of 1

Reliance

Line His

Project:J3
ISO No.

Line No.

Pipe Class

Test Pack No.

% NDT ( RT / UT) :

Spool No./
Matcode

Plant:
STS/RIL/FLR/A1/1404/03-14

Type of Fit up Date


Weld

Weld
Visual
Date

Unit:
Rev.

Fit up & Welder No.


Weld Visual
Rep.No

WPS
No.

NDT
Control,
XR. No.

RT / UT
Report No.

Report No:
1

:
:
RT / UT
Report
Date

EC 12 EMFR HC
PWHT
Chart
No.

Joint No.

Size

Thick

N1S1

2"

5.54MM BW

8/10/2015

8/13/2015

16

15378

14118

NA

N1S2

2"

5.54MM BW

8/10/2015

8/13/2015

16

15378

14118

NA

N1S3

2"

5.54MM BW

8/10/2015

8/13/2015

16

15378

14118

NA

N1S4

2"

5.54MM BW

8/10/2015

8/13/2015

16

15378

14118

NA

N1S5

2"

5.54MM BW

8/10/2015

8/13/2015

16

15378

14118

NA

N1S6

2"

5.54MM BW

8/10/2015

8/13/2015

16

15378

14118

NA

N1S7

2"

5.54MM BW

8/10/2015

8/13/2015

16

15379

14118

NA

N1S8

2"

5.54MM BW

8/10/2015

8/13/2015

16

15379

14118

NA

N1S9

2"

5.54MM BW

8/10/2015

8/13/2015

16

15380

14118

NA

N1S10

2"

5.54MM BW

8/10/2015

8/13/2015

16

15380

14118

NA

N1S11

2"

5.54MM BW

8/10/2015

8/13/2015

16

15378

14118

NA

N1S12

2"

5.54MM BW

8/10/2015

8/13/2015

16

15378

14118

NA

N1S13

2"

5.54MM BW

8/10/2015

8/13/2015

16

15380

14118

NA

N2S

2"

5.54MM BW

8/10/2015

8/13/2015

16

15380

14118

NA

Note-01: Pipe support Welding: Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-025.


Note-02: Confirm Connecting Joint Clearance (in case of two isometrics): YES/No. if not cleared, details transferred to Form: EPCMD 2QM00FMTPP003: YES / NO
Note-03: Steam Tracing (as applicable): Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-031.
Note-04: PMI: PMI shall be checked on LAS / SS / Non-ferrous materials and Fit-up & Weld Visual Report no. to be menioned.
Note-05: NDT lot no.: Only accepted lot no. shall be recorded. In case of 100% lines & FPJ, record as "100%".
Legend : PWHT - Post Weld Heat Treatment,

XR - Radiography Control Number,


Contractor QA/QC

Signatures
Name
Date

Rep. No - Report Number


Reliance QMD

Format No.: EPCMD-2QM00FMTPP002, Rev.-03, Date: 26.03.2015

Line History Sheet


Report No:

Date:

EC 12 EMFR HC 50
5%RT
PWHT Hardness Test MPT/LPT
Date
Report No. Report No.

PMI NDT Lot Branch RF


(Note- No. (Note- Pad Test
04) 05)
Report No.

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

Remarks

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

FMTPP003: YES / NO

- Report Number

nce QMD

FPJ: First Production Joint


Reliance O&M / TPI

Page 1 of 1

Spool
No./
Matcode

Type of Fit up Date


Weld

Weld Visual Date

Joint No. Size

Thick

N1H5

2"

5.54MM BW

17/07/2015

12/8/2015

N1J4

2"

5.54MM BW

14-07-2018

8/13/2015

N1G3

2"

5.54MM BW

16-07-2015

12/8/2015

N1G4

2"

5.54MM BW

16-07-2015

12/8/2015

N1G22

2"

5.54MM BW

16-07-2015

12/8/2015

N1G27

2"

5.54MM BW

16-07-2015

12/8/2015

N1K5

2"

5.54MM BW

19-07-2015

13-8-2015

N1F5

2"

5.54MM BW

20-07-2019

12/12/2015

N1L13

2"

5.54MM BW

20-07-2015

13-08-2015

10

N1M28

2"

5.54MM BW

22-07-2015

13/08/2015

11

N1E6

2"

5.54MM BW

23-07-2015

12/8/2015

12

N1N26

2"

5.54MM BW

24-07-02040

1/2/2016

13

N1D12

2"

5.54MM BW

26-07-2015

13/08/2015

14

N1C9

2"

5.54MM BW

28/07/2015

12/8/2015

14

N1C9

2"

5.54MM BW

28/07/2015

12/8/2015

15

N1P18

2"

5.54MM BW

30-7-2015

13/08/2015

16

N1R3

2"

5.54MM BW

4/8/2015

13/08/2015

17

N1B3

2"

5.54MM BW

8/9/2015

13/08/2015

18

N1A3

2"

5.54MM BW

8/10/2015

8/13/2015

Fit up & Welder


Weld No.
Visual
Rep.No
3
15378

WPS
No.
14118

NDT
Control,
XR. No.

RT / UT
Report No.

330

STS/RIL/RT/83

RT / UT
Report Date
8/14/2015

15378/15 14118
379

X332

8/14/2015

15378

14118

328

STS/RIL/RT/82

8/14/2015

15378

14118

339

STS/RIL/RT/85

8/14/2015

15379

14118

X 340

STS/RIL/RT/85

8/14/2015

15379

14118

X 329

STS/RIL/RT/82

8/14/2015

15380

14118

333

STS/RIL/RT/83

8/14/2015

15379

14118

327

STS/RIL/RT/82

8/14/2015

15379

14118

334

STS/RIL/RT/84

8/14/2015

15378

14118

336

STS/RIL/RT142

1/5/2016

15378

14118

X 326

STS/RIL/RT-82

8/14/2015

15380

14118

338

STS/RIL/RT/85

8/14/2015

10

15380

14118

X 325

STS/RIL/RT/81

8/14/2015

13

15379

14118

X 324

STS/RIL/RT/81

8/14/2015

13

15379

14118

12

15378

14118

X 324

STS/RIL/RT/81

8/14/2015

STS/RIL/RT-86
342

13

15379

14118

343

14

15378

14118

X 323

STS/RIL/RT/81

8/14/2015

15

15380

14118

X 322

STS/RIL/RT/81

8/14/2015

Spool
No./
Matco Joint Size
de No.
N1H5 2"

5.54 BW
MM

17/07/2015

Weld Visual Fit up


Date
&
Weld
Visual
Rep.N
12/8/2015
3 o

N1J4 2"

5.54 BW
MM

14-07-2018

8/13/2015

N1G3 2"

5.54 BW
MM

16-07-2015

12/8/2015

N1G4 2"

5.54 BW
MM

16-07-2015

12/8/2015

N1G2 2"
2

5.54 BW
MM

16-07-2015

12/8/2015

N1G2 2"
7

5.54 BW
MM

16-07-2015

12/8/2015

N1K5 2"

5.54 BW
MM

19-07-2015

13-8-2015

N1F5 2"

5.54 BW
MM

20-07-2019

12/12/2015

N1L1 2"
3

5.54 BW
MM

20-07-2015

13-08-2015

N1M2 2"
10 8

5.54 BW
MM

22-07-2015

13/08/2015

N1E6 2"

5.54 BW
MM

23-07-2015

12/8/2015

N1N2 2"
12 6

5.54 BW
MM

24-07-02040 1/2/2016

N1D1 2"
13 2

5.54 BW
MM

26-07-2015

10

1
2
3
4

7
8
9

Type Fit up Date


of
Thick Weld

13/08/2015

N1D1 2"
13 2

5.54 BW
MM

26-07-2015

13/08/2015

10

N1C9 2"

5.54 BW
MM

28/07/2015

12/8/2015

13

N1P1 2"
15 8

5.54 BW
MM

30-7-2015

13/08/2015

12

N1R3 2"

5.54 BW
MM

4/8/2015

13/08/2015

13

N1B3 2"

5.54 BW
MM

8/9/2015

13/08/2015

14

N1A3 2"

5.54 BW
MM

8/10/2015

8/13/2015

15

N1H1 2"
19 7

5.54 BW
MM

17/07/2015

43442

N1M8 2"

5.54 BW
MM

22-07-2015

13/08/2015

N1N3 2"

5.54 BW
MM

24-07-02017 12/10/2015

N1P6 2"

5.54 BW
MM

30-7-2015

12

14

16
17
18

20
21
22

13/08/2015

Welder No.

15378

WPS
No.

NDT
Control,
XR. No.

RT / UT
Report No.

RT / UT
Report Date

14118

330

STS/RIL/RT/ 8/14/2015
83

15378/15379 14118

332

STS/RIL/RT/ 8/14/2015
83

15378

14118

328

STS/RIL/RT/ 8/14/2015
82

15378

14118

339

STS/RIL/RT/ 8/14/2015
85

15379

14118

340

STS/RIL/RT/ 8/14/2015
85

15379

14118

329

STS/RIL/RT/ 8/14/2015
82

15380

14118

333

STS/RIL/RT/ 8/14/2015
83

15379

14118

327

STS/RIL/RT/ 8/14/2015
82

15379

14118

334

STS/RIL/RT/ 8/14/2015
84

15378

14118

336

STS/RIL/RT1 1/5/2016
42

15378

14118

326

STS/RIL/RT- 8/14/2015
82

15380

14118

338

STS/RIL/RT/ 8/14/2015
85

15380

14118

325

STS/RIL/RT/ 8/14/2015
81

15380

14118

325

STS/RIL/RT/ 8/14/2015
81

15379

14118

324

STS/RIL/RT/ 8/14/2015
81

15378

14118

15379

14118

343

STS/RIL/RT- 8/14/2015
86

15378

14118

323

STS/RIL/RT/ 8/14/2015
81

15380

14118

322

STS/RIL/RT/ 8/14/2015
81

15378

14118

331

STS/RIL/RT8 8/14/2015
3

15380

14118

335

STS/RIL/RT8 8/14/2015
4

15379

14118

337

STS/RIL/RT/ 1/5/2015
142

15380

14118

342

341

STS/RIL/RT- 8/14/2015
86

STS/RIL/RT85

GOUTAM MOITRA
FARUKHUSSAIN SHIKH

Reliance
Project:J3

Plant:DTA-PCG

ISO No.

Line No.

Test Pack No.

Spool No./
Matcode

STS/RIL/FLR/A1/1404/03-15
COIL- 1/44

MT-GOG-370-T001B

Type of Fit up Date


Weld

Weld Visual Fit up & Weld Welder


Date
Visual
No.
Rep.No

WPS
No.

NDT
Control,
XR. No.

Joint No.

Size

Thick

RC1

1/2

3.73 MM

BW

7/27/2015

10/27/2015

17199

14118

NA

RC2

1/2

3.73 MM

BW

7/27/2015

10/27/2015

17199

14118

NA

RC3

1/2

3.73 MM

BW

7/27/2015

10/27/2015

17199

14118

NA

RC4

1/2

3.73 MM

BW

7/27/2015

10/27/2015

17199

14118

NA

RC5

1/2

3.73 MM

BW

7/27/2015

10/27/2015

17199

14118

NA

RC6

1/2

3.73 MM

BW

7/27/2015

10/27/2015

17199

14118

NA

Reliance
Project:J3

Plant:DTA-PCG

ISO No.

Line No.

Test Pack No.

Spool No./
Matcode

STS/RIL/FLR/A1/1404/03-15
COIL- 1/44

MT-GOG-370-T001B

Type of Fit up Date


Weld

Weld Visual Fit up & Weld Welder


Date
Visual
No.
Rep.No

WPS
No.

NDT
Control,
XR. No.

Joint No.

Size

Thick

RC7

1/2

3.73 MM

BW

7/27/2015

10/27/2015

17199

14118

NA

RC8

1/2

3.73 MM

BW

7/27/2015

10/27/2015

17199

14118

NA

RC9

1/2

3.73 MM

BW

7/27/2015

10/27/2015

17199

14118

NA

RC10

1/2

3.73 MM

FW

7/27/2015

10/27/2015

17199

14118

NA

Note-01: Pipe support Welding: Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-025.


Note-02: Confirm Connecting Joint Clearance (in case of two isometrics): YES/No. if not cleared, details transferred to Form: EPCMD 2QM00FMTPP003: YES / NO
Note-03: Steam Tracing (as applicable): Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-031.
Note-04: PMI: PMI shall be checked on LAS / SS / Non-ferrous materials and Fit-up & Weld Visual Report no. to be menioned.
Note-05: NDT lot no.: Only accepted lot no. shall be recorded. In case of 100% lines & FPJ, record as "100%".
Legend : PWHT - Post Weld Heat Treatment,

XR - Radiography Control Number,


Contractor QA/QC

Reliance
Project:J3

Plant:DTA-PCG

ISO No.

Line No.

Test Pack No.

Spool No./
Matcode

Joint No.

STS/RIL/FLR/A1/1404/03-15
COIL- 1/44

Size

Thick

Signatures
Name
Date
Format No.: EPCMD-2QM00FMTPP002, Rev.-03, Date: 26.03.2015

MT-GOG-370-T001B

Type of Fit up Date


Weld

Weld Visual Fit up & Weld Welder


Date
Visual
No.
Rep.No

WPS
No.

NDT
Control,
XR. No.

Reliance
Project:J3

Plant:DTA-PCG

ISO No.

Line No.

Test Pack No.

Spool No./
Matcode

STS/RIL/FLR/A1/1404/03-15
COIL- 1/44

MT-GOG-370-T001B

Type of Fit up Date


Weld

Weld Visual Fit up & Weld Welder


Date
Visual
No.
Rep.No

WPS
No.

NDT
Control,
XR. No.

Joint No.

Size

Thick

RC11

1/2

3.73MM

FW

7/27/2015

10/27/2015

17199

14118

NA

RC12

1/2

3.73MM

BW

7/27/2015

10/27/2015

17199

14118

NA

RC13

1/2

3.73MM

BW

7/27/2015

10/27/2015

17199

14118

NA

RC14

1/2

3.73MM

BW

7/27/2015

10/27/2015

17199

14118

NA

RC15

1/2

3.73MM

BW

7/27/2015

10/27/2015

17199

14118

NA

RC16

1/2

3.73MM

FW

7/27/2015

10/27/2015

17199

14118

NA

Reliance
Project:J3

Plant:DTA-PCG

ISO No.

Line No.

Test Pack No.

Spool No./
Matcode

STS/RIL/FLR/A1/1404/03-15
COIL- 1/44

MT-GOG-370-T001B

Type of Fit up Date


Weld

Weld Visual Fit up & Weld Welder


Date
Visual
No.
Rep.No

WPS
No.

NDT
Control,
XR. No.

Joint No.

Size

Thick

RC17

1/2

3.73MM

FW

7/27/2015

10/27/2015

17199

14118

NA

RC18

1/2

3.73MM

FW

7/27/2015

10/27/2015

17199

14118

NA

RC19

1/2

3.73MM

BW

7/27/2015

10/27/2015

17199

14118

NA

RC20

1/2

3.73MM

BW

7/27/2015

10/27/2015

17199

14118

NA

RC21

1/2

3.73MM

BW

7/27/2015

10/27/2015

17199

14118

NA

Note-01: Pipe support Welding: Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-025.


Note-02: Confirm Connecting Joint Clearance (in case of two isometrics): YES/No. if not cleared, details transferred to Form: EPCMD 2QM00FMTPP003: YES / NO
Note-03: Steam Tracing (as applicable): Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-031.
Note-04: PMI: PMI shall be checked on LAS / SS / Non-ferrous materials and Fit-up & Weld Visual Report no. to be menioned.

Reliance
Project:J3

Plant:DTA-PCG

ISO No.

Line No.

Test Pack No.

Spool No./
Matcode

Joint No.

STS/RIL/FLR/A1/1404/03-15
COIL- 1/44

Size

Thick

MT-GOG-370-T001B

Type of Fit up Date


Weld

Weld Visual Fit up & Weld Welder


Date
Visual
No.
Rep.No

Note-05: NDT lot no.: Only accepted lot no. shall be recorded. In case of 100% lines & FPJ, record as "100%".
Legend : PWHT - Post Weld Heat Treatment,

XR - Radiography Control Number,


Contractor QA/QC

Signatures
Name
Date

WPS
No.

NDT
Control,
XR. No.

Reliance
Project:J3

Plant:DTA-PCG

ISO No.

Line No.

Test Pack No.

Spool No./
Matcode

STS/RIL/FLR/A1/1404/03-15
COIL- 1/44

MT-GOG-370-T001B

Type of Fit up Date


Weld

Weld Visual Fit up & Weld Welder


Date
Visual
No.
Rep.No

WPS
No.

NDT
Control,
XR. No.

Joint No.

Size

Thick

RC22

1/2

3.73MM

BW

7/27/2015

10/27/2015

17199

14118

NA

RC23

1/2

3.73MM

BW

7/27/2015

10/27/2015

17199

14118

NA

RC24

1/2

3.73MM

BW

7/27/2015

10/27/2015

17199

14118

NA

RC25

1/2

3.73MM

BW

7/27/2015

10/27/2015

17199

14118

NA

RC26

1/2

3.73MM

FW

7/27/2015

10/27/2015

17199

14118

NA

RC27

1/2

3.73MM

FW

7/27/2015

10/27/2015

17199

14118

NA

Reliance
Project:J3

Plant:DTA-PCG

ISO No.

Line No.

Test Pack No.

Spool No./
Matcode

STS/RIL/FLR/A1/1404/03-15
COIL- 1/44

MT-GOG-370-T001B

Type of Fit up Date


Weld

Weld Visual Fit up & Weld Welder


Date
Visual
No.
Rep.No

WPS
No.

NDT
Control,
XR. No.

Joint No.

Size

Thick

RC28

1/2

3.73MM

BW

7/27/2015

10/27/2015

17199

14118

NA

RC29

1/2

3.73MM

BW

7/27/2015

10/27/2015

17199

14118

NA

RC30

1/2

3.73MM

BW

7/27/2015

10/27/2015

17199

14118

NA

RC31

1/2

3.73MM

BW

7/27/2015

10/27/2015

17199

14118

NA

Note-01: Pipe support Welding: Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-025.


Note-02: Confirm Connecting Joint Clearance (in case of two isometrics): YES/No. if not cleared, details transferred to Form: EPCMD 2QM00FMTPP003: YES / NO
Note-03: Steam Tracing (as applicable): Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-031.
Note-04: PMI: PMI shall be checked on LAS / SS / Non-ferrous materials and Fit-up & Weld Visual Report no. to be menioned.
Note-05: NDT lot no.: Only accepted lot no. shall be recorded. In case of 100% lines & FPJ, record as "100%".
Legend : PWHT - Post Weld Heat Treatment,

XR - Radiography Control Number,

Reliance
Project:J3

Plant:DTA-PCG

ISO No.

Line No.

Test Pack No.

Spool No./
Matcode

Joint No.

STS/RIL/FLR/A1/1404/03-15
COIL- 1/44

Size

Thick

MT-GOG-370-T001B

Type of Fit up Date


Weld

Weld Visual Fit up & Weld Welder


Date
Visual
No.
Rep.No

Contractor QA/QC
Signatures
Name
Date

WPS
No.

NDT
Control,
XR. No.

Reliance
Project:J3

Plant:DTA-PCG

ISO No.

Line No.

Test Pack No.

Spool No./
Matcode

STS/RIL/FLR/A1/1404/03-15
COIL- 1/44

MT-GOG-370-T001B

Type of Fit up Date


Weld

Weld Visual Fit up & Weld Welder


Date
Visual
No.
Rep.No

WPS
No.

NDT
Control,
XR. No.

Joint No.

Size

Thick

RC32

1/2

3.73MM

BW

7/27/2015

10/27/2015

17199

NA

RC33

1/2

3.73MM

BW

7/27/2015

10/27/2015

17199

NA

RC34

1/2

3.73MM

BW

7/27/2015

10/27/2015

17199

NA

RC35

1/2

3.73MM

BW

7/27/2015

10/27/2015

17199

NA

RC36

1/2

3.73MM

BW

7/27/2015

10/27/2015

17199

NA

Reliance
Project:J3

Plant:DTA-PCG

ISO No.

Line No.

Test Pack No.

Spool No./
Matcode

Joint No.

STS/RIL/FLR/A1/1404/03-15
COIL- 1/44

Size

Thick

MT-GOG-370-T001B

Type of Fit up Date


Weld

Weld Visual Fit up & Weld Welder


Date
Visual
No.
Rep.No

WPS
No.

NDT
Control,
XR. No.

Note-01: Pipe support Welding: Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-025.


Note-02: Confirm Connecting Joint Clearance (in case of two isometrics): YES/No. if not cleared, details transferred to Form: EPCMD 2QM00FMTPP003: YES / NO
Note-03: Steam Tracing (as applicable): Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-031.
Note-04: PMI: PMI shall be checked on LAS / SS / Non-ferrous materials and Fit-up & Weld Visual Report no. to be menioned.
Note-05: NDT lot no.: Only accepted lot no. shall be recorded. In case of 100% lines & FPJ, record as "100%".
Legend : PWHT - Post Weld Heat Treatment,

XR - Radiography Control Number,

Reliance
Project:J3

Plant:DTA-PCG

ISO No.

Line No.

Test Pack No.

Spool No./
Matcode

Joint No.

STS/RIL/FLR/A1/1404/03-15
COIL- 1/44

Size

Thick

MT-GOG-370-T001B

Type of Fit up Date


Weld

Weld Visual Fit up & Weld Welder


Date
Visual
No.
Rep.No

Contractor QA/QC
Signatures
Name
Date

WPS
No.

NDT
Control,
XR. No.

Line History Sheet


Unit:370

Report No:1

Rev.

Pipe Class

1
:

EC 12 EMFR HC 40

% NDT ( RT / UT) :
RT / UT
Report No.

Date:8/2/2016

RT / UT
Report Date

5%DP
PWHT
Chart
No.

PWHT
Date

Hardnes MPT/LPT
PMI
NDT Lot Branch
s Test Report No. (Note-04) No.
RF Pad
Report
(Note-05)
Test
No.
Report
No.

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

Re
ma
rks

Line History Sheet


Unit:370

Report No:1

Rev.

Pipe Class

1
:

EC 12 EMFR HC 40

% NDT ( RT / UT) :
RT / UT
Report No.

Date:8/2/2016

RT / UT
Report Date

5%DP
PWHT
Chart
No.

PWHT
Date

Hardnes MPT/LPT
PMI
NDT Lot Branch
s Test Report No. (Note-04) No.
RF Pad
Report
(Note-05)
Test
No.
Report
No.

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

Rep. No - Report Number


Reliance QMD

FPJ: First Production Joint


Reliance O&M / TPI

Re
ma
rks

Line History Sheet


Unit:370
Rev.
Pipe Class

Report No:1
:

1
:

EC 12 EMFR HC 40

% NDT ( RT / UT) :
RT / UT
Report No.

Date:8/2/2016

RT / UT
Report Date

5%DP
PWHT
Chart
No.

PWHT
Date

Hardnes MPT/LPT
PMI
NDT Lot Branch
s Test Report No. (Note-04) No.
RF Pad
Report
(Note-05)
Test
No.
Report
No.

Page 1 of 1

Re
ma
rks

Line History Sheet


Unit:370

Report No:1

Rev.

Pipe Class

1
:

EC 12 EMFR HC 40

% NDT ( RT / UT) :
RT / UT
Report No.

Date:8/2/2016

RT / UT
Report Date

5%DP
PWHT
Chart
No.

PWHT
Date

Hardnes MPT/LPT
PMI
NDT Lot Branch
s Test Report No. (Note-04) No.
RF Pad
Report
(Note-05)
Test
No.
Report
No.

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

Re
ma
rks

Line History Sheet


Unit:370

Report No:1

Rev.

Pipe Class

1
:

EC 12 EMFR HC 40

% NDT ( RT / UT) :
RT / UT
Report No.

Date:8/2/2016

RT / UT
Report Date

5%DP
PWHT
Chart
No.

PWHT
Date

Hardnes MPT/LPT
PMI
NDT Lot Branch
s Test Report No. (Note-04) No.
RF Pad
Report
(Note-05)
Test
No.
Report
No.

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

Re
ma
rks

Line History Sheet


Unit:370
Rev.
Pipe Class

Report No:1
:

1
:

EC 12 EMFR HC 40

% NDT ( RT / UT) :
RT / UT
Report No.

Date:8/2/2016

RT / UT
Report Date

5%DP
PWHT
Chart
No.

Rep. No - Report Number


Reliance QMD

PWHT
Date

Hardnes MPT/LPT
PMI
NDT Lot Branch
s Test Report No. (Note-04) No.
RF Pad
Report
(Note-05)
Test
No.
Report
No.
FPJ: First Production Joint
Reliance O&M / TPI

Re
ma
rks

Line History Sheet


Unit:370

Report No:1

Rev.

Pipe Class

1
:

EC 12 EMFR HC 40

% NDT ( RT / UT) :
RT / UT
Report No.

Date:8/2/2016

RT / UT
Report Date

5%DP
PWHT
Chart
No.

PWHT
Date

Hardnes MPT/LPT
PMI
NDT Lot Branch
s Test Report No. (Note-04) No.
RF Pad
Report
(Note-05)
Test
No.
Report
No.

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

Re
ma
rks

Line History Sheet


Unit:370

Report No:1

Rev.

Pipe Class

1
:

EC 12 EMFR HC 40

% NDT ( RT / UT) :
RT / UT
Report No.

Date:8/2/2016

RT / UT
Report Date

5%DP
PWHT
Chart
No.

PWHT
Date

Hardnes MPT/LPT
PMI
NDT Lot Branch
s Test Report No. (Note-04) No.
RF Pad
Report
(Note-05)
Test
No.
Report
No.

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

Rep. No - Report Number

FPJ: First Production Joint

Re
ma
rks

Line History Sheet


Unit:370
Rev.
Pipe Class

Report No:1
:

1
:

EC 12 EMFR HC 40

% NDT ( RT / UT) :
RT / UT
Report No.

Date:8/2/2016

RT / UT
Report Date

5%DP
PWHT
Chart
No.

Reliance QMD

PWHT
Date

Hardnes MPT/LPT
PMI
NDT Lot Branch
s Test Report No. (Note-04) No.
RF Pad
Report
(Note-05)
Test
No.
Report
No.
Reliance O&M / TPI

Re
ma
rks

Line History Sheet


Unit:370

Report No:1

Rev.

Pipe Class

1
:

EC 12 EMFR HC 40

% NDT ( RT / UT) :
RT / UT
Report No.

Date:8/2/2016

RT / UT
Report Date

5%DP
PWHT
Chart
No.

PWHT
Date

Hardnes MPT/LPT
PMI
NDT Lot Branch
s Test Report No. (Note-04) No.
RF Pad
Report
(Note-05)
Test
No.
Report
No.

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

Re
ma
rks

Line History Sheet


Unit:370
Rev.
Pipe Class

Report No:1
:

1
:

EC 12 EMFR HC 40

% NDT ( RT / UT) :
RT / UT
Report No.

Date:8/2/2016

RT / UT
Report Date

5%DP
PWHT
Chart
No.

Rep. No - Report Number

PWHT
Date

Hardnes MPT/LPT
PMI
NDT Lot Branch
s Test Report No. (Note-04) No.
RF Pad
Report
(Note-05)
Test
No.
Report
No.

FPJ: First Production Joint

Re
ma
rks

Line History Sheet


Unit:370
Rev.
Pipe Class

Report No:1
:

1
:

EC 12 EMFR HC 40

% NDT ( RT / UT) :
RT / UT
Report No.

Date:8/2/2016

RT / UT
Report Date

5%DP
PWHT
Chart
No.

Reliance QMD

PWHT
Date

Hardnes MPT/LPT
PMI
NDT Lot Branch
s Test Report No. (Note-04) No.
RF Pad
Report
(Note-05)
Test
No.
Report
No.
Reliance O&M / TPI

Re
ma
rks

Reliance
Project:J3

Plant:DTA-PCG

ISO No.

Line No.

Test Pack No.

Spool No./
Matcode

STS/RIL/FLR/A1/1404/03-15
COIL- 2/44

MT-GOG-370-T001B

Type of Fit up Date


Weld

Weld Visual Fit up & Weld Welder


Date
Visual
No.
Rep.No

WPS
No.

NDT
Control,
XR. No.

Joint No.

Size

Thick

RC1

1/2

3.73 MM

BW

7/28/2015

10/27/2015

15380

14118

NA

RC2

1/2

3.73 MM

BW

7/28/2015

10/27/2015

15380

14118

NA

RC3

1/2

3.73 MM

BW

7/28/2015

10/27/2015

15380

14118

NA

RC4

1/2

3.73 MM

BW

7/28/2015

10/27/2015

15380

14118

NA

RC5

1/2

3.73 MM

BW

7/28/2015

10/27/2015

15380

14118

NA

RC6

1/2

3.73 MM

BW

7/28/2015

10/27/2015

15380

14118

NA

Reliance
Project:J3

Plant:DTA-PCG

ISO No.

Line No.

Test Pack No.

Spool No./
Matcode

STS/RIL/FLR/A1/1404/03-15
COIL- 2/44

MT-GOG-370-T001B

Type of Fit up Date


Weld

Weld Visual Fit up & Weld Welder


Date
Visual
No.
Rep.No

WPS
No.

NDT
Control,
XR. No.

Joint No.

Size

Thick

RC7

1/2

3.73 MM

BW

7/28/2015

10/27/2015

15380

14118

NA

RC8

1/2

3.73 MM

BW

7/28/2015

10/27/2015

15380

14118

NA

RC9

1/2

3.73 MM

BW

7/28/2015

10/27/2015

15380

14118

NA

RC10

1/2

3.73 MM

FW

7/28/2015

10/27/2015

15380

14118

NA

Note-01: Pipe support Welding: Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-025.


Note-02: Confirm Connecting Joint Clearance (in case of two isometrics): YES/No. if not cleared, details transferred to Form: EPCMD 2QM00FMTPP003: YES / NO
Note-03: Steam Tracing (as applicable): Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-031.
Note-04: PMI: PMI shall be checked on LAS / SS / Non-ferrous materials and Fit-up & Weld Visual Report no. to be menioned.
Note-05: NDT lot no.: Only accepted lot no. shall be recorded. In case of 100% lines & FPJ, record as "100%".
Legend : PWHT - Post Weld Heat Treatment,

XR - Radiography Control Number,


Contractor QA/QC

Reliance
Project:J3

Plant:DTA-PCG

ISO No.

Line No.

Test Pack No.

Spool No./
Matcode

Joint No.

STS/RIL/FLR/A1/1404/03-15
COIL- 2/44

Size

Thick

Signatures
Name
Date
Format No.: EPCMD-2QM00FMTPP002, Rev.-03, Date: 26.03.2015

MT-GOG-370-T001B

Type of Fit up Date


Weld

Weld Visual Fit up & Weld Welder


Date
Visual
No.
Rep.No

WPS
No.

NDT
Control,
XR. No.

Reliance
Project:J3

Plant:DTA-PCG

ISO No.

Line No.

Test Pack No.

Spool No./
Matcode

STS/RIL/FLR/A1/1404/03-15
COIL- 2/44

MT-GOG-370-T001B

Type of Fit up Date


Weld

Weld Visual Fit up & Weld Welder


Date
Visual
No.
Rep.No

WPS
No.

NDT
Control,
XR. No.

Joint No.

Size

Thick

RC11

1/2

3.73MM

FW

7/28/2015

10/27/2015

15380

14118

NA

RC12

1/2

3.73MM

BW

7/28/2015

10/27/2015

15380

14118

NA

RC13

1/2

3.73MM

BW

7/28/2015

10/27/2015

15380

14118

NA

RC14

1/2

3.73MM

BW

7/28/2015

10/27/2015

15380

14118

NA

RC15

1/2

3.73MM

BW

7/28/2015

10/27/2015

15380

14118

NA

RC16

1/2

3.73MM

FW

7/28/2015

10/27/2015

15380

14118

NA

Reliance
Project:J3

Plant:DTA-PCG

ISO No.

Line No.

Test Pack No.

Spool No./
Matcode

STS/RIL/FLR/A1/1404/03-15
COIL- 2/44

MT-GOG-370-T001B

Type of Fit up Date


Weld

Weld Visual Fit up & Weld Welder


Date
Visual
No.
Rep.No

WPS
No.

NDT
Control,
XR. No.

Joint No.

Size

Thick

RC17

1/2

3.73MM

FW

7/28/2015

10/27/2015

15380

14118

NA

RC18

1/2

3.73MM

FW

7/28/2015

10/27/2015

15380

14118

NA

RC19

1/2

3.73MM

BW

7/28/2015

10/27/2015

15380

14118

NA

RC20

1/2

3.73MM

BW

7/28/2015

10/27/2015

15380

14118

NA

RC21

1/2

3.73MM

BW

7/28/2015

10/27/2015

15380

14118

NA

Note-01: Pipe support Welding: Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-025.


Note-02: Confirm Connecting Joint Clearance (in case of two isometrics): YES/No. if not cleared, details transferred to Form: EPCMD 2QM00FMTPP003: YES / NO
Note-03: Steam Tracing (as applicable): Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-031.
Note-04: PMI: PMI shall be checked on LAS / SS / Non-ferrous materials and Fit-up & Weld Visual Report no. to be menioned.
Note-05: NDT lot no.: Only accepted lot no. shall be recorded. In case of 100% lines & FPJ, record as "100%".
Legend : PWHT - Post Weld Heat Treatment,

XR - Radiography Control Number,

Reliance
Project:J3

Plant:DTA-PCG

ISO No.

Line No.

Test Pack No.

Spool No./
Matcode

Joint No.

STS/RIL/FLR/A1/1404/03-15
COIL- 2/44

Size

Thick

MT-GOG-370-T001B

Type of Fit up Date


Weld

Weld Visual Fit up & Weld Welder


Date
Visual
No.
Rep.No

Contractor QA/QC
Signatures
Name
Date

WPS
No.

NDT
Control,
XR. No.

Reliance
Project:J3

Plant:DTA-PCG

ISO No.

Line No.

Test Pack No.

Spool No./
Matcode

STS/RIL/FLR/A1/1404/03-15
COIL- 2/44

MT-GOG-370-T001B

Type of Fit up Date


Weld

Weld Visual Fit up & Weld Welder


Date
Visual
No.
Rep.No

WPS
No.

NDT
Control,
XR. No.

Joint No.

Size

Thick

RC22

1/2

3.73MM

BW

7/28/2015

10/27/2015

15380

14118

NA

RC23

1/2

3.73MM

BW

7/28/2015

10/27/2015

15380

14118

NA

RC24

1/2

3.73MM

BW

7/28/2015

10/27/2015

15380

14118

NA

RC25

1/2

3.73MM

BW

7/28/2015

10/27/2015

15380

14118

NA

RC26

1/2

3.73MM

FW

7/28/2015

10/27/2015

15380

14118

NA

RC27

1/2

3.73MM

FW

7/28/2015

10/27/2015

15380

14118

NA

Reliance
Project:J3

Plant:DTA-PCG

ISO No.

Line No.

Test Pack No.

Spool No./
Matcode

STS/RIL/FLR/A1/1404/03-15
COIL- 2/44

MT-GOG-370-T001B

Type of Fit up Date


Weld

Weld Visual Fit up & Weld Welder


Date
Visual
No.
Rep.No

WPS
No.

NDT
Control,
XR. No.

Joint No.

Size

Thick

RC28

1/2

3.73MM

BW

7/28/2015

10/27/2015

15380

14118

NA

RC29

1/2

3.73MM

BW

7/28/2015

10/27/2015

15380

14118

NA

RC30

1/2

3.73MM

BW

7/28/2015

10/27/2015

15380

14118

NA

RC31

1/2

3.73MM

BW

7/28/2015

10/27/2015

15380

14118

NA

Note-01: Pipe support Welding: Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-025.


Note-02: Confirm Connecting Joint Clearance (in case of two isometrics): YES/No. if not cleared, details transferred to Form: EPCMD 2QM00FMTPP003: YES / NO
Note-03: Steam Tracing (as applicable): Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-031.
Note-04: PMI: PMI shall be checked on LAS / SS / Non-ferrous materials and Fit-up & Weld Visual Report no. to be menioned.
Note-05: NDT lot no.: Only accepted lot no. shall be recorded. In case of 100% lines & FPJ, record as "100%".
Legend : PWHT - Post Weld Heat Treatment,

XR - Radiography Control Number,

Reliance
Project:J3

Plant:DTA-PCG

ISO No.

Line No.

Test Pack No.

Spool No./
Matcode

Joint No.

STS/RIL/FLR/A1/1404/03-15
COIL- 2/44

Size

Thick

MT-GOG-370-T001B

Type of Fit up Date


Weld

Weld Visual Fit up & Weld Welder


Date
Visual
No.
Rep.No

Contractor QA/QC
Signatures
Name
Date

WPS
No.

NDT
Control,
XR. No.

Reliance
Project:J3

Plant:DTA-PCG

ISO No.

Line No.

Test Pack No.

Spool No./
Matcode

STS/RIL/FLR/A1/1404/03-15
COIL- 2/44

MT-GOG-370-T001B

Type of Fit up Date


Weld

Weld Visual Fit up & Weld Welder


Date
Visual
No.
Rep.No

WPS
No.

NDT
Control,
XR. No.

Joint No.

Size

Thick

RC32

1/2

3.73MM

BW

7/28/2015

10/27/2015

15380

NA

RC33

1/2

3.73MM

BW

7/28/2015

10/27/2015

15380

NA

RC34

1/2

3.73MM

BW

7/28/2015

10/27/2015

15380

NA

RC35

1/2

3.73MM

BW

7/28/2015

10/27/2015

15380

NA

RC36

1/2

3.73MM

BW

7/28/2015

10/27/2015

15380

NA

Reliance
Project:J3

Plant:DTA-PCG

ISO No.

Line No.

Test Pack No.

Spool No./
Matcode

Joint No.

STS/RIL/FLR/A1/1404/03-15
COIL- 2/44

Size

Thick

MT-GOG-370-T001B

Type of Fit up Date


Weld

Weld Visual Fit up & Weld Welder


Date
Visual
No.
Rep.No

WPS
No.

NDT
Control,
XR. No.

Note-01: Pipe support Welding: Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-025.


Note-02: Confirm Connecting Joint Clearance (in case of two isometrics): YES/No. if not cleared, details transferred to Form: EPCMD 2QM00FMTPP003: YES / NO
Note-03: Steam Tracing (as applicable): Ensure availability of Format no: EPCMD-2-QM00-FMT-PP-031.
Note-04: PMI: PMI shall be checked on LAS / SS / Non-ferrous materials and Fit-up & Weld Visual Report no. to be menioned.
Note-05: NDT lot no.: Only accepted lot no. shall be recorded. In case of 100% lines & FPJ, record as "100%".
Legend : PWHT - Post Weld Heat Treatment,

XR - Radiography Control Number,

Reliance
Project:J3

Plant:DTA-PCG

ISO No.

Line No.

Test Pack No.

Spool No./
Matcode

Joint No.

STS/RIL/FLR/A1/1404/03-15
COIL- 2/44

Size

Thick

MT-GOG-370-T001B

Type of Fit up Date


Weld

Weld Visual Fit up & Weld Welder


Date
Visual
No.
Rep.No

Contractor QA/QC
Signatures
Name
Date

WPS
No.

NDT
Control,
XR. No.

Line History Sheet


Unit:370

Report No:2

Rev.

Pipe Class

1
:

EC 12 EMFR HC 40

% NDT ( RT / UT) :
RT / UT
Report No.

Date:8/2/2016

RT / UT
Report Date

5%DP
PWHT
Chart
No.

PWHT
Date

Hardnes MPT/LPT
PMI
NDT Lot Branch
s Test Report No. (Note-04) No.
RF Pad
Report
(Note-05)
Test
No.
Report
No.

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

Re
ma
rks

Line History Sheet


Unit:370

Report No:2

Rev.

Pipe Class

1
:

EC 12 EMFR HC 40

% NDT ( RT / UT) :
RT / UT
Report No.

Date:8/2/2016

RT / UT
Report Date

5%DP
PWHT
Chart
No.

PWHT
Date

Hardnes MPT/LPT
PMI
NDT Lot Branch
s Test Report No. (Note-04) No.
RF Pad
Report
(Note-05)
Test
No.
Report
No.

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

Rep. No - Report Number


Reliance QMD

FPJ: First Production Joint


Reliance O&M / TPI

Re
ma
rks

Line History Sheet


Unit:370
Rev.
Pipe Class

Report No:2
:

1
:

EC 12 EMFR HC 40

% NDT ( RT / UT) :
RT / UT
Report No.

Date:8/2/2016

RT / UT
Report Date

5%DP
PWHT
Chart
No.

PWHT
Date

Hardnes MPT/LPT
PMI
NDT Lot Branch
s Test Report No. (Note-04) No.
RF Pad
Report
(Note-05)
Test
No.
Report
No.

Page 1 of 1

Re
ma
rks

Line History Sheet


Unit:370

Report No:2

Rev.

Pipe Class

1
:

EC 12 EMFR HC 40

% NDT ( RT / UT) :
RT / UT
Report No.

Date:8/2/2016

RT / UT
Report Date

5%DP
PWHT
Chart
No.

PWHT
Date

Hardnes MPT/LPT
PMI
NDT Lot Branch
s Test Report No. (Note-04) No.
RF Pad
Report
(Note-05)
Test
No.
Report
No.

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

Re
ma
rks

Line History Sheet


Unit:370

Report No:2

Rev.

Pipe Class

1
:

EC 12 EMFR HC 40

% NDT ( RT / UT) :
RT / UT
Report No.

Date:8/2/2016

RT / UT
Report Date

5%DP
PWHT
Chart
No.

PWHT
Date

Hardnes MPT/LPT
PMI
NDT Lot Branch
s Test Report No. (Note-04) No.
RF Pad
Report
(Note-05)
Test
No.
Report
No.

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

Rep. No - Report Number

FPJ: First Production Joint

Re
ma
rks

Line History Sheet


Unit:370
Rev.
Pipe Class

Report No:2
:

1
:

EC 12 EMFR HC 40

% NDT ( RT / UT) :
RT / UT
Report No.

Date:8/2/2016

RT / UT
Report Date

5%DP
PWHT
Chart
No.

Reliance QMD

PWHT
Date

Hardnes MPT/LPT
PMI
NDT Lot Branch
s Test Report No. (Note-04) No.
RF Pad
Report
(Note-05)
Test
No.
Report
No.
Reliance O&M / TPI

Re
ma
rks

Line History Sheet


Unit:370

Report No:2

Rev.

Pipe Class

1
:

EC 12 EMFR HC 40

% NDT ( RT / UT) :
RT / UT
Report No.

Date:8/2/2016

RT / UT
Report Date

5%DP
PWHT
Chart
No.

PWHT
Date

Hardnes MPT/LPT
PMI
NDT Lot Branch
s Test Report No. (Note-04) No.
RF Pad
Report
(Note-05)
Test
No.
Report
No.

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

Re
ma
rks

Line History Sheet


Unit:370

Report No:2

Rev.

Pipe Class

1
:

EC 12 EMFR HC 40

% NDT ( RT / UT) :
RT / UT
Report No.

Date:8/2/2016

RT / UT
Report Date

5%DP
PWHT
Chart
No.

PWHT
Date

Hardnes MPT/LPT
PMI
NDT Lot Branch
s Test Report No. (Note-04) No.
RF Pad
Report
(Note-05)
Test
No.
Report
No.

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

Rep. No - Report Number

FPJ: First Production Joint

Re
ma
rks

Line History Sheet


Unit:370
Rev.
Pipe Class

Report No:2
:

1
:

EC 12 EMFR HC 40

% NDT ( RT / UT) :
RT / UT
Report No.

Date:8/2/2016

RT / UT
Report Date

5%DP
PWHT
Chart
No.

Reliance QMD

PWHT
Date

Hardnes MPT/LPT
PMI
NDT Lot Branch
s Test Report No. (Note-04) No.
RF Pad
Report
(Note-05)
Test
No.
Report
No.
Reliance O&M / TPI

Re
ma
rks

Line History Sheet


Unit:370

Report No:2

Rev.

Pipe Class

1
:

EC 12 EMFR HC 40

% NDT ( RT / UT) :
RT / UT
Report No.

Date:8/2/2016

RT / UT
Report Date

5%DP
PWHT
Chart
No.

PWHT
Date

Hardnes MPT/LPT
PMI
NDT Lot Branch
s Test Report No. (Note-04) No.
RF Pad
Report
(Note-05)
Test
No.
Report
No.

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

Re
ma
rks

Line History Sheet


Unit:370
Rev.
Pipe Class

Report No:2
:

1
:

EC 12 EMFR HC 40

% NDT ( RT / UT) :
RT / UT
Report No.

Date:8/2/2016

RT / UT
Report Date

5%DP
PWHT
Chart
No.

Rep. No - Report Number

PWHT
Date

Hardnes MPT/LPT
PMI
NDT Lot Branch
s Test Report No. (Note-04) No.
RF Pad
Report
(Note-05)
Test
No.
Report
No.

FPJ: First Production Joint

Re
ma
rks

Line History Sheet


Unit:370
Rev.
Pipe Class

Report No:2
:

1
:

EC 12 EMFR HC 40

% NDT ( RT / UT) :
RT / UT
Report No.

Date:8/2/2016

RT / UT
Report Date

5%DP
PWHT
Chart
No.

Reliance QMD

PWHT
Date

Hardnes MPT/LPT
PMI
NDT Lot Branch
s Test Report No. (Note-04) No.
RF Pad
Report
(Note-05)
Test
No.
Report
No.
Reliance O&M / TPI

Re
ma
rks