Documentos de Académico
Documentos de Profesional
Documentos de Cultura
TOILE
1.
2.
3.
4.
5.
Boning - Tues 23rd August
6. Testing boning on scrap fabric
7. Sewing boning to toile (2 pieces) 15 mins
First test of tulle Tuesday 6th September
8. Measuring length of tulle 15 mins
9. Sewing tulle 5 mins
10. Marking underwear for tulle 5 mins
11. Sewing tulle to undies 30 mins
12. Unpicking gathering stitch 10 mins
Redo of boning Tuesday 6th September
13. Redo of boning, with casing and measurements 1.5 hours
Ruffler foot test Friday 9th September
14. Experiment with ruffler foot on green fabric 30 mins
15. Sew experiment tulle (1m strip) into ruffle 5 mins
16. Sew experimental tulle to toile underwear 5 mins
Bodice modification Friday 9th September
17. Measuring the mannequin for modification 5 mins
18. Modifying the pattern (drawing) 20 mins
19. Cutting new pattern piece - 10 mins
20. Unpicking old pieces and sewing a new piece 30 mins
21. Invisible zip application and testing 1 hour 15 mins
Tulle cutting, gathering and sewing Sunday 11th September
22. Measuring and folding tulle 1 hour
23. Cutting 2nd layer of tulle 30 mins
24. Gathering 2nd layer of tulle 30 mins
25. Cutting extra piece for 2nd layer 20 mins
26. Gathering extra 2nd layer 5 mins
Measuring and cutting layers 1 and 3 30 mins
27. Gathering layers 1 and 3 45 mins
28. Pinning tulle to test fullness 20 mins
29. Sewing 1st layer of tulle to underwear 25 mins
30. Unpicking tulle to underwear 10 mins
Saturday 29th October
92. Painting the pointe shoes with acrylic paint 2 hours
93. Testing the drape of the organza didnt seem to work 3 hours.
94. Finishing off the hook and eye tape of the basque 1 hour, 5mins
95. Sewing the binding tape to the basque 1 hour, 15 mins
96. Hand sewing press studs around the basque waist 2 hours, 30 mins
Sunday 30th October
97. Sewing ribbons onto the pointe shoes 1 hour, 40 mins
98. Gluing the lace to the pointe shoes 30 mins
99. Hot fixing diamontes to the shoes 30 mins
100.
Hot fixing diamontes to the bodice 1 hour
101.
Sewing the Velcro into the basque for the batteries 30 mins
102.
Hand sewing 2 press studs to secure basque opening 15 mins
103.
Adjusting last electronics to ensure LEDs are operating 15 mins