Está en la página 1de 6

PLANILLA DE ACERO

ZAPATA Posicin

B1-B4

C1-C4

D1-D4

E1-E4

F1-F4

G1-G4

Diam.
N de
Long.
Long Total
a (cm) b(cm) c (cm)
(mm)
barras Parcial (cm)
(cm)

12

957

60

957

57420

12

208

11

208

2288

28

957

957

5742

14

957

72

957

68904

12

279

56

279

15624

36

957

957

5742

12

989

96

989

94944

12

292

63

292

18396

36

989

989

5934

12

946

71

946

67166

12

202

48

202

9696

28

946

946

5676

12

943

68

943

64124

12

197

48

197

9456

28

943

943

5658

12

944

48

944

45312

12

149

48

149

7152

22

944

944

6608

LANILLA DE ACERO
Peso Unit. Peso Total
(kg/m)
(kg)
0.89

511.04

0.89

20.36

4.83

277.34

1.23

847.52

0.89

139.05

7.99

458.79

0.89

845.00

0.89

163.72

7.99

474.13

0.89

597.78

0.89

86.29

4.83

274.15

0.89

570.70

0.89

84.16

4.83

273.28

0.89

403.28

0.89

63.65

0.89

58.81

TOTAL (Kg)

6149.06

RESUMEN DE VOLUMENES DE LAS FUNDACIONES

VIGA DE
FUNDACION
C 1-3-5
D 1-3-5
E 5-4-3-1
F 5-3-2
I1 G5
G1-G4

b
m
1.80
1.70
1.40
0.90
2.07
1.59

B
m
0.45
0.45
0.45
0.45
0.35
0.35

LARGO
m
15.18
15.20
15.60
14.90
9.53
9.54

h
m

H
m

ALTO
m

BASE
m

0.45
0.45
0.45
0.45
55.00
55.00

VOLUMEN
m3
7.17
6.88
6.12
4.36
593.24
420.24

ZAPATA CONECTADA
A1-A3

BASE
m
1.50

ZAPATA 1
LARGO
m
3.00

ZAPATA 2
LARGO
m
3
2.8

ALTO
m
0.35

ZAPATA
TIPO
B5
A4
B1

BASE
m
3.00
3.20
3.40

ZAPATAS DE MEDIANERIA NO CONECTADAS


LARGO
ALTO
Rebaj
a
m
m
m
m
0.44
0.13
0.35
1.50
0.45
0.14
0.35
1.60
0.45
0.14
0.35
1.70

0.20
0.20
0.20
0.20
25.00
20.00

0.35

b
m

VOLUMEN TOTAL =

CEMENTO (Kg)
AGUA (Lts.)
ARENA (Kg)
GRAVA (Kg)

VOLUMEN HoAo
m3

DATOS DE DOSIFICACION EN PESO POR METRO CBICO


380
170
662
1177

VOLUMENES REQUERIDOS
CEMENTO
AGUA
ARENA
Kg.
Lts.
Kg.

GRAVA
Kg.

0.35
0.35
0.35

ZAPATA
COMBINADA
I5-G5

BASE
m
1.10

LARGO
m
5.20

VIGA
LARGO
m

BASE
m
0.3

7.5

VOLUMEN
m3
1.63
1.87
2.11

1050.88

ALTO
m
0.35

1050.88

399334.11

178649.47

695682.06

1236884.87

ALTO
m
0.45

VOLUMEN
m3
4.69

VOLUMEN
m3
2.57

También podría gustarte