Documentos de Académico
Documentos de Profesional
Documentos de Cultura
July 2014
Approved
IGS
Fax:(9821)-8131-5679
--./ 0123.4 56-73895:;3 <=5;7- >8?.@:A4 0BC9 D=.EF 0G HIJ 56-73895:;3K3 >-5L:;3 M3.G
http://igs.nigc.ir
igs@nigc.ir
N.I.G.C.
July 2014
IGS-M-IN-104(1)
FOREWORD
This standard is intended to be mainly used by NIGC and contractors,
and has been prepared based on interpretation of recognized standards,
technical documents, knowledge, backgrounds and experiences in
natural gas industry at national and international levels.
Iranian Gas Standards (IGS) are prepared, reviewed and amended by
technical standard committees within NIGC Standardization division and
submitted to the NIGC's "STANDARDS COUNCIL" for approval.
IGS Standards are subject to revision, amendment or withdrawal, if
required, thus the latest edition of IGS shall be checked/inquired by
NIGC employees and contractors.
This standard must not be modified or altered by NIGC employees or its
contractors. Any deviation from normative references and / or wellknown manufacturers specifications must be reported to Standardization
division.
The technical standard committee welcomes comments and feedbacks
about this standard, and may revise this document accordingly based on
the received feedbacks.
GENERAL DEFINITIONS:
Throughout this standard the following definitions, where
applicable, should be followed:
1- "STANDARDIZATION DIV." is organized to deal with all aspects
of industry standards in NIGC. Therefore, all enquiries for
clarification or amendments are requested to be directed to
mentioned division.
2- "COMPANY": refers to National Iranian Gas Company (NIGC).
3- "SUPPLIER": refers to a firm who will supply the service,
equipment or material to NIGC whether as the prime producer or
manufacturer or a trading firm.
4- "SHALL ": is used where a provision is mandatory.
5- "SHOULD": is used where a provision is advised only.
6- "MAY": is used where a provision is completely discretionary.
------------------------------------Website: http://igs.nigc.ir
E-mail: igs@nigc.ir
July 2014
)IGS-M-IN-104(1
N.I.G.C.
-1 / .
-2 ) (IPS
) (IGS .
-3 ) (IGS
) (
.
-4 ) (IGS
.
.
*
-5 ) (CD
.
-6 5 .
.
-7
.
) (IGS .
" -1" ) : (COMPANY " " .
" -2 " ) : (PUPPLIER / VENDOR
.
" -3" ) : (PURCHASER " "
.
: "SHALL" -4 .
: "SHOULD" -5 .
: "MAY" -6 .
) (nigcigs@nigc.ir ) *(http://igs.nigc.ir
II
N.I.G.C.
July 2014
CONTENTS
IGS-M-IN-104(1)
PAGE
1. SCOPE
2. REFERENCES
3. DEFINITIONS
4. REQUIREMENTS
4.2 Materials
6. PAINTING
7. MARKING
9. DOCUMENTATION
N.I.G.C.
July 2014
IGS-M-IN-104(1)
1. SCOPE
This specification together with the Appendix A there to covers the minimum
requirements for design, material, fabrication, testing, inspection, painting, marking,
packing and packaging of "Multi path ultrasonic transit-time flow meter (UM) according
to AGA report No.9 but with following requirements which have been mentioned at this
specification.
This specification is only used for UM with ANSI Class rating 600 and not applicable to
clamp-on externally mounted meters.
2. REFERENCES
Throughout this standard specification the following standards, codes and reports are
referred to. The editions of these standards and codes that are in effect at the time of
publication of this standard specification (2014) shall, to the extent specified herein,
form a part of this standard specification. The applicability of changes in standards and
codes that occur after the date of this standard specification shall be mutually agreed
upon by the purchaser and supplier and/or manufacturer.
AGA REPORT No.9 Measurement of Gas by Multipath Ultrasonic Meter
IGS-CH-033 (1) Specification for Iranian Natural Gas Quality
ISO 17089-1 Measurement of Fluid in Closed Conduits-ultrasonic for gas Part 1:
Meters for Custody Transfer and Allocation Measurement
3. DEFINITIONS
For the purposes of this standard, the terminology, definitions, and units apply
according to AGA Report No.9: 2007 (Item2).
4. REQUIREMENTS
4.1 Design and Service Conditions
4.1.1 Multi path ultrasonic meters shall have at least four independent pairs of
measuring transducers (acoustic path).
4.1.2 For specific requirements see data sheet (normative Appendix). In case of any
exception to the specification, it shall be clearly stated on the technical quotation
submitted by suppliers.
4.1.3 The UM shall be constructed of quality materials in a workmanlike manner in
order to attain gas tightness, stability of performance and sustained accurate metering
over a period of time and over the range of operating conditions with minimum of
maintenance, when metering natural gas.
4.1.4 The UM shall be tamper proof, gas tight and capable to sustain accuracy under
the whole range of service conditions.
2
N.I.G.C.
July 2014
IGS-M-IN-104(1)
4.1.5 The natural gas which is used for the measurement by the UM, shall be according
to IGS-CH-033(1). The UM shall, as a minimum requirement, operate with any of the
"normal range" natural gas composition mixtures specified in that standard. This
includes relative densities between 0.554 (pure methane) and 0.87.
4.1.6 Standard volume measured at 1.01325 bara (14.696 psia) and 15.56 C (60 F).
4.1.7 For each meter design and size, the minimum, transition and maximum gas flow
rate ( q min , qt and q max ) passing through the UM should be specified by the manufacturer.
4.1.8 As some pressure-reducing control valves, designed to reduce audible noise, may
produce very high levels of ultrasonic noise under certain flowing conditions and the
ultrasonic noise from these "quiet" control valves can interfere with the operation of a
nearby ultrasonic meter, so the UM shall be installed at the upstream of the regulator
and the control valve according to the manufacturer instructions.
4.1.9 Filtration of the flowing gas is necessary for UM Application for avoiding the
accumulation of deposits to a mixture of dirt, mill scale, condensates, lubricating oil and
construction debris (for new installations).
4.1.10 When the UM is installed according to the operator's piping system, it will
perform with in the specified flow-rate measurement accuracy limits from qmin to qmax.
4.1.11 The UM's output is typically an uncorrected volume, either per unit of time or
accumulated. Therefore, an associated flow computer must be installed by the designer
to correct for pressure, temperature, compressibility, and accumulated uncorrected and
corrected volumes, and to provide the necessary date retention and audit trail.
Optionally, the flow computer functions could be integrated into the UM's SPU by the
manufacturer.
For bi-directional applications, the UM should be treated as two separate meters,
associated with two "meter runs" in a single flow computer or with two separate flow
computers.
For other applicable flow computer requirements, the designer should reference API
MPMS Chapter 21.1. Flow measurement using electronic metering systems. A UM
would be considered a "Linear Meter" in that document.
4.1.12 UM flange shall be according to ANSI B16.5 up to 24 inches and ANSI B16.47
for above 24 inches.
4.2 Materials
4.2.1 Cable jackets, rubber, plastics and other exposed parts shall be resistant to
ultraviolet light, water, oil and grease.
4.2.2 UM flange material shall be carbon steel according to ASTM A 105.
4.2.3 UM body material shall be carbon steel according to API 5L or cast carbon steel
according to ASTM A 216 Gr. WCB/WCC.
N.I.G.C.
July 2014
IGS-M-IN-104(1)
N.I.G.C.
July 2014
IGS-M-IN-104(1)
6. PAINTING
The external surface of the UM shall be thoroughly cleaned by removing all rust and
mill scale. Surfaces to be painted, shall be completely free from grease, grit and other
foreign materials.
UM shall be painted with organic zinc rich system according to BS 5493 reference No.
SD3 with total thickness of 100 microns.
Paint specification shall be in accordance with reference No. DF of BS-5493.
N.I.G.C.
July 2014
IGS-M-IN-104(1)
7. MARKING
The marking of each UM shall be according to AGA report No. 9 (Item 4.3.7).
9. DOCUMENTATION
The Documentation with technical quotation, after receipt of order and before shipment
shall be according to AGA report No.9 (item 4.7).
N.I.G.C.
July 2014
IGS-M-IN-104(1)
APPENDIX A
Data Sheet
(Normative)
To be Filled by NIGC
To be Filled by Manufacturer/Supplier
Inquiry No.:
Inquiry Date:
NIGC Standard : IGS-M-IN-104(1):2014
Quotation No.:
Quotation Date:
Catalogue No.:
Standard:
Inquiry Data
Item
Offered Data
Indent
Size
Class
Quantity
Item No.
(in)
Rating
Required
Item
Offered
Size
Class
Item No.
(in)
Rating
Quantity Offered
This data sheet is an integrated part of IGS-M-IN-104(1):2014 and should not be used separately.
N.I.G.C.
July 2014
To be Filled by NIGC
To be Filled by
Manufacturer/Supplier
-----------
-----------
Custody transfer
Non custody transfer
-----------
Flow Direction
Uni - direction
Bi - direction
Uni - direction
Bi - direction
----------
-----------
Manufacturer
-----------
-----------
Model No.
-----------
-----------
-----------
-----------
Please specify
Natural gas
-----------
min.:----------max.:----------
min.:----------max.:----------
-----------
-----------
min.:----------max.:----------:
min.:----------max.:----------
min.:----------max.:----------
-----------
-----------
Item
Subject
Tag No.
General
Application
Hazardous Area
Classification
Manufacturer
Recommendation for
Installing UM Near a
Pressure Reducing Control
Valve
Process Fluid
Flow Rate (scm/h)
Operating Design Pressure
(barg)
Process Data
IGS-M-IN-104(1)
Operating Design
Temperature (C)
Ambient Temperature
Range (C)
min.: -29
Specific Gravity
Standard Conditions
max.: +60
min.:----------max.:-------------------Yes
No
N.I.G.C.
Item
July 2014
Subject
To be Filled by NIGC
To be Filled by
Manufacturer/Supplier
Transit time
-----------
-----------
-----------
Type
UM Size (in)
Yes
No
Yes
No
Flangeless
Yes
No
-----------
Yes
No
UM Flange Material
Yes
No
UM Class Rating
Meter Data
UM Connection Type
UM Body Material
-----------
-----------
-----------
-----------
-----------
-----------
Pipe Material
-----------
-----------
Inlet/Outlet Upstream/Downstream
Piping Configuration Requirements
Yes
No
Horizontal
Yes
No
Yes
No
Yes
No
UM Mounting
Flow Conditioner
UM Equipped With
IGS-M-IN-104(1)
Yes
No
Indoor
Yes
No
Number of Paths/Channels
At least 4 pairs
Yes
No
-----------
Transducer Replaceable in
Operation
-----------
Process Connection
-----------
-----------
Transducer Mounting
-----------
-----------
Transducer Type/Model
-----------
-----------
Transducer Material
Titanium
-----------
-----------
-----------
-----------
Weatherproof to IP 65
-----------
Titanium
No
Others
N.I.G.C.
Transducer (or)Sensor
Item
July 2014
IGS-M-IN-104(1)
To be Filled by NIGC
To be Filled by
Manufacturer/Supplier
Transducer Manufacturer
-----------
-----------
-----------
-----------
Transducer Enclosure
Certification
-----------
-----------
-----------
-----------
-----------
-----------
-----------
-----------
-----------
-----------
-----------
-----------
-----------
-----------
Transducer Operating
Temperature Range
-----------
-----------
-----------
-----------
Transmitter Manufacturer
-----------
---------------------
-----------
---------------------
-----------
---------------------
-----------
-----------
-----------
Transmitter Enclosure
Certification
-----------
-----------
Transmitter Range
-----------
Overall Accuracy/Repeatability
-----------
-----------
Subject
10
-----------------------------------------------------------------------------------------------------------------------------------------------------------------
N.I.G.C.
Item
Subject
SPU Data
Power Supply
July 2014
IGS-M-IN-104(1)
To be Filled by NIGC
To be Filled by
Manufacturer/Supplier
12 VDC
1) 12 VDC
24 VDC
2) 24 VDC
110 VAC , 50 Hz
3) 110 VAC , 50 Hz
220 VAC , 50 Hz
4) 220 VAC , 50 Hz
Others
5) Others*
2 RS- 232
and
2 RS- 485
No
Yes
No
Yes
No
Leakage Test
Yes
No
Dimensional Measurements
Yes
No
Yes
No
Yes
No
Procedure is required
Yes
No
Yes
No
Visual Inspection
Yes
No
Paint Test
Yes
No
Guarantee
Yes
No
Hydrostatic
Test
Tests
1. Individual Test
2. Type Test
No
or Equivalent-----------
Yes
Yes
Please specify.
Note: Certification: In all cases for certifications, they shall be issued by an impartial laboratory or
authority.
11