PETA LOKASI QUARRY

7,45 km

7,45 km

Kisaran
Km 158+000

Medan
km 000+000

Kisaran - Sp. Kawat


5,00 km

10,00 km

Tanah Timbun = 10.00 km


Pasir = 30.00 km

Lokasi Quarry Patumbak


- Gravel
- Batu Kali
- Batu Belah

Base Camp

Tanah Jawa / Pematangsiantar

Jarak Rata-rata dari Base Camp ke Lokasi Pekerjaan =


( (5+7,45/2)x7,45 + (7,45+7,45/2)*7,45)
=8,73
km

Jarak Rata-rata dari Base Camp ke Lokasi Pekerjaan =

Jarak Rata-rata dar

( (5+7,45/2)x7,45 + (7,45+7,45/2)*7,45)

( (5+158/2)x158 +

=8,73
km
(7,45+7,45)

km

(1

7,45 km
Sp. Kawat
Km 172+900
Kisaran - Sp. Kawat
5,00 km

ke
Tanjung
Balai

ke Rantau Prapat

Jarak Rata-rata dari Base Camp ke Quarry =


( (5+158/2)x158 + (5+7,45/2)*7,45)
= 80,61
km
(158+7,45)

REKA
N0 KODE

1 PEKERJAAN TANAH
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.9
1.10
1.11
1.12
1.13
1.14
1.15
1.16
1.17
1.17a
1.18
1.19a

2 PEKERJAAN PONDASI
2.1
2.2
2.3
2.4
2.5
2.6
2.7
2.8

2.9
2.1

2.11
2.12
2.13
2.14
2.15
2.16
2.17

3 PEKERJAAN BETON & BAJA


3.1

3.2

3.3

3.4

3.5

3.6

3.7

3.8

3.9

3.10

3.11

3.12

3.13
3.14
3.15
3.16
3.17
3.18
3.19
3.20
3.21
3.22
3.23

3.24
3.25
3.26
3.27
3.28
3.29
3.30
3.31
3.32

4 PEKERJAAN DINDING
4.1

4.2

4.3

4.4

4.5

4.6

4.7

4.8

4.9

4.10

4.11

4.12

4.13

4.14

4.15

4.16

4.17

5. PEKERJAAN PLESTERAN
5.1
5.2
5.3
5.4
5.5
5.6
5.7
5.8

5.9
5.10
5.11
5.12
5.13
5.14
5.15
5.16
5.17
5.18
5.19
5.20
5.21

6. PEKERJAAN KAYU
6.1

6.2

6.3

6.4

6.5

6.6

6.7

6.8

6.9

6.1

6.11

6.12

6.13

6.14
6.15
6.16

6.17
6.18

6.19

6.20
6.21
6.22
6.23
6.24
6.25
6.26
6.27
6.28
6.29
6.30
6.31
6.32
6.33
6.34
6.35

6.36

6.37

6.38
6.39
6.40
6.41
6.42
6.43
6.44
6.45
6.46
6.47

6.48
6.49
6.50
6.50a

7. PEKERJAAN PENUTUP LANTAI DAN DINDING


7.1
7.2
7.3
7.4
7.5
7.6
7.7
7.8

8. PEKERJAAN LANGIT-LANGIT
8.1
8.2
8.3
8.4

9 PEKERJAAN PENGECATAN
9.1
9.2
9.3
9.4

9.5
9.6
9.7
9.8
9.9
9.10
9.11
9.12

9.13

10 PEKERJAAN SANITASI
10.1
10.2
10.3

10.4

10.5

10.6
10.7
10.8
10.9
10.10

REKAP ANALISA SNI


PEKERJAAN

SAT

PEKERJAAN TANAH
Penggalian 1 m3 tanah biasa sedalam 1 meter

m3

Penggalian tanah biasa sedalam 2 meter

m3

Penggalian tanah biasa sedalam 3 meter

m3

Penggalian tanah keras sedalam 1 meter

m3

Penggalian tanah cadas sedalam 1 meter

m3

Penggalian tanah lumpur sedalam 1 meter

m3

Pengerjaan stripping tebing setinggi 1 meter

m2

Membuang tanah sejauh 30 meter

m3

Membuang tanah sejauh 150 meter

m3

Mengurug kembali 1 m3 galian

m3

Memadatkan tanah per 20 cm

m3

Mengurug pasir urug

m3

Urugan tanah

m3

Memasang 1 m2 Lapisan ijuk tebal 10 cm

m2

Mengurug 1 m3 sirtu padat untuk peninggian bangunan

m3

Membuat jalan sementara tebal 25 cm

m3

Bongkaran Beton Bertulang

m3

Bongkaran Beton Bt. Gunung & Batu Bata

m3

Pemadatan Tanah

m3

Sandbag

m3

PEKERJAAN PONDASI
Memasang 1 m3 pondasi batu belah, campuran 1 PC : 1 PP

m3

Memasang 1 m3 pondasi batu belah, campuran 1 PC : 2 PP

m3

Memasang 1 m3 pondasi batu belah, campuran 1 PC : 2,5 PP

m3

Memasang 1 m3 pondasi batu belah, campuran 1 PC : 3 PP

m3

Memasang 1 m3 pondasi batu belah, campuran 1 PC : 4 PP

m3

Memasang 1 m3 pondasi batu belah, campuran 1 PC : 5 PP

m3

Memasang 1 m3 pondasi batu belah, campuran 1 PC : 6 PP

m3

Memasang pondasi batu belah, campuran 1 PC : 8 PP

m3

Memasang batu kosong (aanstamping)

m3

Memasang pondasi siklop, 60% beton camp 1 PC : 2 PB : 3 KR

m3

dan 40% batu belah


Memasang pondasi sumuran, diameter 100 cm

m3

Membuat tiang pancang (40 x 40)cm, beton bertulang

m1

Membuat tiang pancang (35 x 35)cm, beton bertulang

m1

Pancang Ulin 10/10-400

Titik

Pancang Ulin 10/10-200

Titik

Pancang Ulin 12/12-400

Titik

Pancang Ulin 12/12-800

Titik

PEKERJAAN BETON & BAJA


Membuat beton mutu f'c = 7,4 MPa (K 100), slump (12 + 2) cm

m3

w/c = 0,87
Membuat beton mutu f'c = 9,8 MPa (K 125), slump (12 + 2) cm

m3

w/c = 0,78
Membuat beton mutu f'c = 12,2 MPa (K 150), slump (12 + 2) cm

m3

w/c = 0,72
Membuat lantai kerja beton mutu f'c = 7,4 MPa (K 100),

m3

slump (3-6)cm, w/c = 0,87


Membuat beton mutu f'c = 14,5 MPa (K 175), slump (12 + 2) cm

m3

w/c = 0,66
Membuat beton mutu f'c = 16,9 MPa (K 200), slump (12 + 2)cm

m3

w/c = 0,61
Membuat beton mutu f'c = 19,3 MPa (K 225), slump (12 + 2) cm

m3

w/c = 0,58
Membuat beton mutu f'c = 21,7 MPa (K 250), slump (12 + 2) cm

m3

w/c = 0,56
Membuat beton mutu f'c = 24,0MPa (K 275), slump (12 + 2) cm

m3

w/c = 0,53
Membuat beton mutu f'c = 26,4 MPa (K 300), slump (12 + 2) cm

m3

w/c = 0,52
Membuat beton mutu f'c = 28,8 MPa (K 325), slump (12 + 2) cm

m3

w/c = 0,49
Membuat beton mutu f'c =31,2 MPa (K 350), slump (12 + 2) cm

m3

w/c = 0,48
Pembesian 10 kg dengan besi polos

kg

Pembesian 10 kg dengan besi ulir

kg

Memasang 10 kg kabel presstressed polos

kg

Memasang 10 kg kabel presstressed strands

kg

Memasang 10 kg jaring kawat baja/wire mesh dengan besi polos

kg

Memasang 10 kg jaring kawat baja/wire mesh dengan besi ulir

kg

Memasang Wiremesh M6

m2

Memasang Wiremesh M8

m2

Memasang Wiremesh M10

m2

Membuat pondasi beton bertulang (150kg besi + bekisting)

m3

Membuat sloof beton bertulang (200kg besi + bekisting)

m3

Membuat kolom beton bertulang (300kg besi + bekisting)

m3

Membuat balok beton bertulang (200 kg besi + bekisting)

m3

Membuat kolom beton bertulang (150kg besi + bekisting)

m3

Membuat dinding beton bertulang (150kg besi + bekisting)

m3

Membuat dinding beton bertulang (200 kg besi + bekisting)

m3

Membuat kolom praktis beton bertulang (11 x 11) cm

m1

Membuat ring balok beton bertulang (10 x 15) cm

m1

Beton Tumbuk 1Pc : 3Psr : 5Kr

m3

Beton Bertulang 1Pc : 2Psr : 3Kr

m3

PEKERJAAN DINDING
Memasang 1 m2 dinding bata merah uk (8 x 8 x 16) cm

m2

tebal 1 bata, campuran 1 PC : 1 PP


Memasang 1 m2 dinding bata merah uk (8 x 8 x 16) cm

m2

tebal 1 bata, campuran 1 PC : 2 PP


Memasang 1 m2 dinding bata merah uk (8 x 8 x 16) cm

m2

tebal 1 bata, campuran 1 PC : 3 PP


Memasang 1 m2 dinding bata merah uk (8 x 8 x 16) cm

m2

tebal 1 bata, campuran 1 PC : 4 PP


Memasang 1 m2 dinding bata merah uk (8 x 8 x 16) cm

m2

tebal 1 bata, campuran 1 PC : 4 PP


Memasang 1 m2 dinding bata merah uk (8 x 8 x 16) cm

m2

tebal 1 bata, campuran 1 PC : 4 PP


Memasang 1 m2 dinding bata merah uk (8 x 8 x 16) cm

m2

tebal 1 bata, campuran 1 PC : 5 PP


Memasang 1 m2 dinding bata merah uk (8 x 8 x 16) cm

m2

tebal 1/2 bata, campuran 1 PC : 1 PP


Memasang 1 m2 dinding bata merah tebal 1/2 bata,

m2

campuran 1 PC : 2 PP
Memasang 1 m2 dinding bata merah tebal 1/2 bata,

m2

campuran 1 PC : 3 PP
Memasang 1 m2 dinding bata merah tebal 1/2 bata,

m2

campuran 1 PC : 4 PP
Memasang 1 m2 dinding bata merah tebal 1/2 bata,

m2

campuran 1 PC : 5 PP
Memasang 1 m2 dinding bata merah tebal 1/2 bata,

m2

campuran 1 PC : 6 PP
Memasang 1 m2 dinding bata merah tebal 1/2 bata,

m2

campuran 1 PC : 8 PP
Memasang 1 m2 dinding terawang (roster) uk (10 x 20 x 25) cm,

m2

camp spesi 1 PC : 3 PP
Memasang 1 m2 dinding terawang (roster) uk (10 x 20 x 25) cm,

m2

camp spesi 1 PC : 4 PP
Memasang 1 m2 dinding bata berongga ekspose uk (5 x 11 x 24) cm,
camp spesi 1 PC : 3 PP

m2

PEKERJAAN PLESTERAN
Memasang plesteran 1 PC : 1 PP, tebal 15 mm

m2

Memasang plesteran 1 PC : 2 PP, tebal 15 mm

m2

Memasang plesteran 1 PC : 3 PP, tebal 15 mm

m2

Memasang plesteran 1 PC : 4 PP, tebal 15 mm

m2

Memasang plesteran 1 PC : 5 PP, tebal 15 mm

m2

Memasang plesteran 1 PC : 6 PP, tebal 15 mm

m2

Memasang plesteran 1 PC : 7 PP, tebal 15 mm

m2

Memasang plesteran 1 PC : 8 PP, tebal 15 mm

m2

Memasang plesteran 1 PC : 2 PP, tebal 20 mm

m2

Memasang plesteran 1 PC : 3 PP, tebal 20 mm

m2

Memasang plesteran 1 PC : 4 PP, tebal 20 mm

m2

Memasang plesteran 1 PC : 5 PP, tebal 20 mm

m2

Memasang plesteran 1 PC : 6 PP, tebal 20 mm

m2

Memasang plesteran 1 PC : 5 PP, tebal 10 mm

m2

Memasang plesteran skoning 1 PC : 2 PP, tebal 10 mm

m2

Memasang plesteran ciprat 1 PC : 2 PP

m2

Memasang finishing siar pasangan dinding bata merah (=20 m')

m2

Memasang finishing siar pas. dinding conblock ekspose (=8 m')

m2

Memasang finishing siar pasangan batu kali adukan 1 PC : 2 PP

m2

Memasang acian

m2

Memasang plesteran waterproof 3 lapis

m2

PEKERJAAN KAYU
Membuat & memasang 1 m3 kusen pintu & jendela,

m3

kayu kelas I
Membuat dan memasang 1 m3 kusen pintu & jendela,

m3

kayu kelas II atau III


Membuat & memasang 1 m2 pintu klamp standar,

m2

kayu kelas II
Membuat & memasang 1 m2 pintu klamp sederhana,

m2

kayu kelas III


Membuat & memasang 1 m2 daun pintu panel,

m2

kayu kelas I atau II


Membuat & memasang 1 m2 pintu & jendela kaca,

m2

kayu kelas I atau II


Membuat & memasang 1 m2 pintu & jendela jalusi

m2

kayu kelas I atau II


Membuat 1 m2 daun pintu kayu lapis (Teakwood) rangkap,

m2

rangka tertutup kayu kelas II (lebar sampai 90 cm)


Membuat 1 m2 pintu plywood rangkap, rangka ekspose

m2

kayu kelas I atau II


Memasang 1 m2 pintu teakwood rangkap, rangka kayu

m2

kelas I atau II
Memasang 1 m2 pintu plywood & Melamine, rangka kayu

m2

kelas I atau II
Memasang 1 m2 pintu teakwood & formika, rangka kayu

m2

kelas I
Memasang 1 m2 pintu teakwood & formika, rangka kayu

m2

kelas II, divernis


Memasang 1 m2 pintu formika double, rangka kayu kelas I

m2

Memasang 1 m2 pintu formika double, rangka kayu kamper

m2

Memasang jalusi kusen, kayu kelas I atau II

m2

Memasang teakwood rangkap, rangka ekspose kayu kelas I

m2

Memasang teakwood rangkap lapis formika, rangka

m2

ekspose kayu kelas II


Memasang konstruksi kuda-kuda konvensional,

m3

kayu kelas I,II, III bentang 6 meter


Memasang konstruksi kuda-kuda expose, kayu kelas I

m3

Memasang konstruksi gordeng, kayu kelas II

m3

Memasang rangka atap genteng beton, kayu kelas II

m2

Memasang rangka atap genteng beton, kayu kelas II

m2

Memasang rangka atap sirap, kayu kelas II

m2

Memasang rangka langit-langit (50 x 100) cm, kayu kelas II atau III

m2

Memasang rangka langit-langit (60 x 60) cm, kayu kelas II atau III

m2

Memasang rangka langit-langit (100 x 100) cm, kayu kelas III

m2

Memasang rangka langit-langit (30 x 60) cm, kayu kelas III

m2

Memasang rangka langit-langit (30 x 30) cm, kayu kelas III

m2

Memasang lisplank (2 x 20) cm, kayu kelas I atau II

m2

Memasang lisplank (2.5 x 20) cm, kayu kelas II atau III

m2

Memasang lisplank 2 x (2 x 20) cm, kayu bangkirai

m2

Memasang lisplank 2 x (2.5 x 20) cm, kayu meranti

m2

Memasang lisplank 2 x (2 x 20) cm, kayu borneo

m2

Memasang rangka dinding pemisah (60 x 120) cm,

m2

kayu kelas II atau III


Memasang dinding pemisah teakwood rangkap,

m2

rangka kayu kelas III


Memasang dinding pemisah plywood rangkap,

m2

rangka kayu kelas III


Memasang dinding lambriziring dari papan kayu kelas I,

m2

Memasang dinding lambriziring dari plywood uk (120 x 240) cm

m2

Pekerjaan Kayu Kasar Meranti

m3

Pekerjaan Kayu Kasar Ulin

m3

Memasang bekisting untuk pondasi

m2

Memasang bekisting untuk sloof

m2

Memasang bekisting untuk kolom

m2

Memasang bekisting untuk balok

m2

Memasang bekisting untuk lantai

m2

Memasang bekisting untuk dinding

m2

Memasang bekisting untuk tangga

m2

Memasang jembatan untuk pengecoran beton

m2

Pekerjaan Lantai Jembatan Papan Ulin Yang Dipaku diatas gelagar

m2

Pekerjaan Dinding Papan Meranti

m2

PEKERJAAN PENUTUP LANTAI DAN DINDING


Memasang 1 m2 lantai keramik, uk (25 x 25) cm

m2

Memasang 1 m2 lantai keramik, uk (20 x 20) cm

m2

Memasang 1 m2 lantai keramik, uk (20 x 25) cm

m2

Memasang 1 m2 lantai keramik, uk (30 x 30) cm

m2

Pasang Plastik Cor

m2

Pasang Pipa Drain PVC + Ijuk

m1

Pasangan finishing koral sikat variasi keramik

m2

Pasangan finishing koral sikat

m2

PEKERJAAN LANGIT-LANGIT
Memasang 1 m2 langit-langit plywood, uk (60 x 120) cm, tebal 4 mm

m2

Memasang 1 m2 langit-langit plywood, uk (60 x 120) cm, tebal 6 mm

m2

Memasang 1 m2 langit-langit teakwood, uk (30 x 60) cm, tebal 4 mm

m2

Memasang 1 m2 langit-langit teakwood, uk (60 x 120) cm, tebal 4 mm

m2

PEKERJAAN PENGECATAN
Mencuci Bidang Permukaan Tembok yang pernah dicat

M2

Mengerok Karat Cat Lama Permukaan Baja Dengan cara manual

M2

Pengecatan Bidang Kayu Lama

M2

Pengecatan Bidang Kayu Baru (1 Lapis Plamir),

M2

1 Lapis Cat Dasar, 2 Lapis Cat Penutup


Pelaburan Bidang Kayu Dengan Teak Oil

M2

Pengecatan Tembok Baru (1 Lapis Plamir, 1 Lapis Cat dasar, 2 Lapis Cat Penutup

M2

Pengecatan Plafond Baru ( 1 Lapis cat dasar, 2 Lapis Cat Pebutup)

M2

Pengecatan Tembok Lama (1 Lapis Cat Dasar, 2 Lapis Cat Penutup) Vinilex

M2

Pengecatan Tembok Lama (1 Lapis Cat Dasar, 2 Lapis Cat Penutup) Mowilex

M2

Pengecatan Permukaan Baja Dengan Meni Besi

M2

Pengecatan Permukaan Baja Lapis Seng (Galbani)

M2

Pengecatan Permukaan Baja Lapis Seng (Galbani)

M2

Secara Manual Sistem 3 Lapis Cat Konvensional dengan tebal 200 um


Pengecatan Permukaan Baja Lapis Seng (Galbani)
Secara Semprot (Airless Spray) Dengan Sistem
1 Lapis Mutakhir Dengan Tebal 200 um

M2

PEKERJAAN SANITASI
Memasang Bak Mandi Teraso Volume 0,30 m3

Bh

Memasang Bak Mandi Batu Bata Volume 0,30 m3

Bh

Memasang Bak Kontrol Pasangan Batu Bata

Bh

Ukuran (30 x 30) cm Tinggi 35 cm


Memasang Bak Kontrol Pasangan Batu Bata

Bh

Ukuran (45 x 45) cm Tinggi 50 cm


Memasang Bak Kontrol Pasangan Batu Bata

Bh

Ukuran (60 x 60) cm Tinggi 60 cm


Memasang Pipa Galvanis Diameter 1/2"

M'

Memasang Pipa PVC Type AW Diameter 1/2"

M'

Memasang Bak Cuci Piring Stainles Steel

Bh

Pasang Kloset duduk

Bh

Pasang kran air

Bh

ANALISA SNI
RJ YG DIPAKAI

HARGA
SATUAN

70,415.63
86,403.90
102,646.18
93,718.16
142,101.36
113,300.05
5,117.74
30,855.87
52,611.87
23,471.88
#REF!
#REF!
#REF!
30,000.00
#NAME?
#REF!
#REF!
#REF!
#REF!
#REF!

1,716,144.48
1,451,277.99
1,630,412.99
1,410,323.79
1,354,331.27
1,315,474.91
1,288,175.99
1,236,314.31

KET

841,630.07
3,039,254.92

1,212,910.47
1,141,404.66
900,056.28
369,947.23
211,054.87
624,176.88
1,196,191.25

1,273,586.54

1,319,910.51

1,355,484.88

1,206,427.83

1,398,354.17

1,438,128.23

1,469,807.60

1,488,391.77

1,520,624.68

1,530,419.32

1,621,292.39

1,634,281.61

148,948.14
158,671.14
148,948.14
148,948.14
148,948.14
158,671.14
62,358.86
112,285.15
146,387.47
4,914,100.83
5,981,852.19

9,644,934.24
7,556,262.76
6,912,311.99
6,616,372.83
7,013,567.00
120,886.03
139,809.57
1,238,975.66
1,216,134.78

318,575.96

317,545.18

303,011.31

292,325.35

292,325.35

292,325.35

288,118.50

223,779.13

211,896.22

204,476.58

200,525.85

198,059.53

197,218.77

194,352.45

288,585.48

284,401.44

573,314.80

84,804.43
76,928.52
73,735.14
71,378.51
70,283.33
69,305.02
68,843.57
68,382.12

86,823.51
82,565.67
79,290.17
77,963.26
76,525.51
43,476.84
62,123.52
47,516.26
29,351.09
14,825.34
63,597.68
33,595.53
86,720.88

14,189,269.70

14,943,273.28

312,189.70

294,325.98

825,702.87

581,115.85

1,130,535.46

668,238.53

693,397.87

601,095.22

796,646.88

749,044.38

858,664.91

985,417.41
985,417.41
915,762.19

705,094.39
886,663.66

13,395,767.45

15,644,748.90
12,542,199.95
264,155.87
320,330.87
1,670,802.14
213,895.24
226,894.45
99,901.76
141,831.77
167,564.37
146,493.04
74,562.85
201,639.23
59,642.95
68,859.38
174,256.00

497,825.84

280,817.00

361,184.23
52,442.00
5,095,368.15
10,095,262.65
230,842.47
248,055.44
408,790.04
419,117.81
487,706.04
431,306.07

373,599.41
136,083.64
304,966.64
130,183.48

226,766.66
226,797.32
235,408.66
215,077.66
6,930.20
30,235.62
178,076.29
298,240.34

57,107.20
65,051.95
156,853.16
162,496.82

14,515.60
14,515.60
47,244.49
60,728.35

45,106.88
27,420.99
24,441.89
18,941.69
29,652.77
35,894.08
41,586.06
222,392.84

177,779.23

555,388.73
1,729,296.09
708,486.43

656,820.27

1,000,260.67

166,775.20
23,766.87
392,776.09
6,456,166.75
63,048.82

ANALISA SNI
KOTA BALIKPAPAN
No.

Rincian Pekerjaan

Satuan

Harga
Rp.

1 PEKERJAAN TANAH
1.1 Penggalian 1 m3 tanah biasa sedalam 1 meter
0.750
OH Pekerja Tidak terampil
0.025
OH Mandor

m3

1.2

Penggalian tanah biasa sedalam 2 meter


0.900
OH Pekerja Tidak terampil
0.045
OH Mandor

m3

Penggalian tanah biasa sedalam 3 meter


1.050
OH Pekerja Tidak terampil
0.067
OH Mandor

m3

Penggalian tanah keras sedalam 1 meter


1.000
OH Pekerja Tidak terampil
0.032
OH Mandor

m3

Penggalian tanah cadas sedalam 1 meter


1.500
OH Pekerja Tidak terampil
0.060
OH Mandor

m3

Penggalian tanah lumpur sedalam 1 meter


1.200
OH Pekerja Tidak terampil
0.045
OH Mandor

m3

1.3

1.4

1.5

1.6

89,653.85
127,009.61

89,653.85
127,009.61

89,653.85
127,009.61

89,653.85
127,009.61

89,653.85
127,009.61

89,653.85
127,009.61

No.

1.7

1.8

1.9

Rincian Pekerjaan

Satuan

Pengerjaan stripping tebing setinggi 1 meter


0.050
OH Pekerja Tidak terampil
0.005
OH Mandor

m2

Membuang tanah sejauh 30 meter


0.330
OH Pekerja Tidak terampil
0.010
OH Mandor

m3

Membuang tanah sejauh 150 meter


0.516
OH Pekerja Tidak terampil
0.050
OH Mandor

m3

1.10 Mengurug kembali 1 m3 galian

Harga
Rp.

89,653.85
127,009.61

89,653.85
127,009.61

89,653.85
127,009.61

m3

Mengurug kembali 1 m galian dihitung dari 1/3 kali dari indeks pekerjaan galian
3

1.11 Memadatkan tanah per 20 cm


0.500
OH Pekerja Tidak terampil
0.050
OH Mandor

m3

1.12 Mengurug
1.200
0.300
0.010

m3

pasir urug
m3 Pasir urug
OH Pekerja Tidak terampil
OH Mandor

1.13 Urugan tanah


1.200
m3
0.300
OH
0.010
OH

#REF!

#REF!

m3
Tanah Urug
Pekerja Tidak terampil
Mandor

#REF!

No.

Rincian Pekerjaan

1.14 Memasang
6.000
0.150
0.015

1 m2
kg
OH
OH

Lapisan ijuk tebal 10 cm

Satuan
m2

5,000.00

Ijuk

Pekerja Tidak terampil


Mandor

#REF!

1.15 Mengurug
1.200
0.250
0.025

1 m3
m3
OH
OH

m3
sirtu padat untuk peninggian bangunan

1.16 Membuat
0.275
0.030
0.050
1.000
0.100

jalan
m3
m3
m3
Oh
Oh

sementara tebal 25 cm

#NAME?

Sirtu Royalti

Pekerja Tidak terampil


Mandor

#REF!

m3
#REF!

Batu pecah
Kerikil
Pasir ex Palu

Pekerja Tidak terampil


Mandor

1.17 Bongkaran Beton Bertulang


6.667
Oh Pekerja Tidak terampil
0.333
Oh Mandor

1.17 a Bongkaran Beton Bt. Gunung & Batu Bata


1.250
Oh Pekerja Tidak terampil
0.125
Oh Mandor

1.18 Pemadatan Tanah


0.500
Oh Pekerja Tidak terampil
0.050
Oh Mandor

1.19a Sandbag
0.300

Harga
Rp.

m3
#REF!

m3
#REF!

m3
#REF!

m3
Oh

Pekerja Tidak terampil

#REF!

No.

Rincian Pekerjaan
0.010
1.100
218.000
21.000

Oh
M3
Kg
Oh

Satuan

Mandor
Pasir Urug
Semen
Karung

Harga
Rp.

#REF!
2,500.00

2 PEKERJAAN PONDASI
2.1 Memasang
1.100
392.000
0.314
1.500
0.600
0.060
0.750

1 m3
m3
kg
m3
OH
OH
OH
OH

pondasi batu belah, campuran 1 PC : 1m3


PP

2.2 Memasang
1.100
267.000
0.427
1.500
0.600
0.060
0.075

1 m3
m3
kg
m3
OH
OH
OH
OH

pondasi batu belah, campuran 1 PC : 2m3


PP

2.3 Memasang
1.100
392.000
0.314
1.500
0.600
0.060

1 m3
m3
kg
m3
OH
OH
OH

m3 PP
pondasi batu belah, campuran 1 PC : 2,5

Batu belah 15 cm/20 cm


Portland Cement
Pasir pasang

Pekerja Tidak terampil


Tukang batu
Kepala tukang
Mandor

Batu belah 15 cm/20 cm


Portland Cement
Pasir pasang

Pekerja Tidak terampil


Tukang batu
Kepala tukang
Mandor

Batu belah 15 cm/20 cm


Portland Cement
Pasir pasang

Pekerja Tidak terampil


Tukang batu
Kepala tukang

525,000.00
1,794.68
400,000.00
89,653.85
119,538.46
134,480.76
127,009.61

525,000.00
1,794.68
400,000.00
89,653.85
119,538.46
134,480.76
127,009.61

525,000.00
1,794.68
400,000.00
89,653.85
119,538.46
134,480.76

No.

Rincian Pekerjaan
0.075

Satuan

OH

Mandor

2.4 Memasang
1.200
202.000
0.485
1.500
0.600
0.060
0.075

1 m3
m3
kg
m3
OH
OH
OH
OH

pondasi batu belah, campuran 1 PC : 3m3


PP

2.5 Memasang
1.200
163.000
0.520
1.500
0.600
0.060
0.075

1 m3
m3
kg
m3
OH
OH
OH
OH

pondasi batu belah, campuran 1 PC : 4m3


PP

2.6 Memasang
1.200
136.000
0.544
1.500
0.600
0.060
0.075

1 m3
m3
kg
m3
OH
OH
OH
OH

pondasi batu belah, campuran 1 PC : 5m3


PP

Batu belah 15 cm/20 cm


Portland Cement
Pasir pasang

Pekerja Tidak terampil


Tukang batu
Kepala tukang
Mandor

Batu belah 15 cm/20 cm


Portland Cement
Pasir pasang

Pekerja Tidak terampil


Tukang batu
Kepala tukang
Mandor

Batu belah 15 cm/20 cm


Portland Cement
Pasir pasang

Pekerja Tidak terampil


Tukang batu
Kepala tukang
Mandor

2.7 Memasang 1 m3 pondasi batu belah, campuran 1 PC : 6m3


PP
1.200
m3 Batu belah 15 cm/20 cm
117.000
kg Portland Cement

Harga
Rp.
127,009.61

525,000.00
1,794.68
400,000.00
89,653.85
119,538.46
134,480.76
127,009.61

525,000.00
1,794.68
400,000.00
89,653.85
119,538.46
134,480.76
127,009.61

525,000.00
1,794.68
400,000.00
89,653.85
119,538.46
134,480.76
127,009.61

525,000.00
1,794.68

No.

Rincian Pekerjaan
0.561
1.500
0.600
0.060
0.075

2.8

2.9

m3
OH
OH
OH
OH

Satuan

Harga
Rp.
400,000.00

Pasir pasang

Pekerja Tidak terampil


Tukang batu
Kepala tukang
Mandor

89,653.85
119,538.46
134,480.76
127,009.61

Memasang pondasi batu belah, campuran 1 PC : 8


1.200
m3 Batu belah 15 cm/20 cm
91.000
kg Portland Cement
0.548
m3 Pasir pasang
1.500
OH Pekerja Tidak terampil
0.600
OH Tukang batu
0.060
OH Kepala tukang
0.075
OH Mandor

m3

Memasang batu kosong (aanstamping)


1.200
m3 Batu belah 15 cm/20 cm
0.432
m3 Pasir urug
0.780
OH Pekerja Tidak terampil
0.390
OH Tukang batu
0.039
OH Kepala tukang
0.039
OH Mandor

m3

525,000.00
1,794.68
400,000.00
89,653.85
119,538.46
134,480.76
127,009.61

2.10 Memasang pondasi siklop, 60% beton camp 1 PC : 2 m3


dan 40% batu belah
0.480
m3 Batu belah 15 cm/20 cm
194.000
kg Portland Cement
0.312
m3 Pasir ex Palu
0.468
m3 Kerikil
126.000
kg Besi beton polos
1.800
kg Kawat beton
3.000
OH Pekerja Tidak terampil
0.850
OH Tukang batu
0.085
OH Kepala tukang

525,000.00
196,486.00
89,653.85
119,538.46
134,480.76
127,009.61

525,000.00
1,794.68
370,623.00
532,960.00
12,712.00
39,591.00
89,653.85
119,538.46
134,480.76

No.

Rincian Pekerjaan
0.150

OH

Satuan

Mandor

127,009.61

2.11 Memasang pondasi sumuran, diameter 100 cm


0.450
m3 Batu belah 15 cm/20 cm
194.000
kg Portland Cement
0.312
m3 Pasir ex Palu
0.468
m3 Kerikil
2.380
OH Pekerja Tidak terampil
0.300
OH Tukang batu
0.030
OH Kepala tukang
0.080
OH Mandor

m3

2.12 Membuat
0.019
0.094
0.150
60.500
45.000
0.900
0.032
0.120
0.090
0.240
1.000
0.670
0.067
0.050

tiang
m3
m3
m3
kg
kg
kg
m3
kg
lt
kg
OH
OH
OH
OH

pancang (40 x 40)cm, beton bertula

m1

2.13 Membuat
0.016
0.080
0.125
49.000
34.500

tiang
m3
m3
m3
kg
kg

pancang (35 x 35)cm, beton bertula

525,000.00
1,794.68
370,623.00
532,960.00
89,653.85
119,538.46
134,480.76
127,009.61

196,486.00
370,623.00
532,960.00
1,794.68
12,712.00
39,591.00

Pasir urug
Pasir ex Palu
Kerikil
Portland Cement
Besi beton polos
Kawat beton

Kayu kaso (meranti) uk 5/7


Paku
Minyak bekisting (Solar)
Plamir tembok
Pekerja Tidak terampil
Tukang batu
Kepala tukang
Mandor

Pasir urug
Pasir ex Palu
Kerikil
Portland Cement
Besi beton polos

Harga
Rp.

3,442,593.00

23,702.00
15,294.00
29,791.00
89,653.85
119,538.46
134,480.76
127,009.61

m1
196,486.00
370,623.00
532,960.00
1,794.68
12,712.00

No.

Rincian Pekerjaan
0.700
0.027
0.120
0.090
0.200
0.800
0.500
0.050
0.040

kg
m3
kg
lt
kg
OH
OH
OH
OH

Satuan

Harga
Rp.

Kawat beton

39,591.00

Kayu kaso (meranti) uk 5/7


Paku
Minyak bekisting (Solar)
Plamir tembok
Pekerja Tidak terampil
Tukang batu
Kepala tukang
Mandor

3,442,593.00

23,702.00
15,294.00
29,791.00
89,653.85
119,538.46
134,480.76
127,009.61

2.14 Pancang Ulin 10/10-400


0.100
Oh Pekerja Tidak terampil
0.250
Oh Tukang Kayu
0.025
Oh Kepala tukang
0.050
Oh Mandor
0.040
M3 Kayu Ulin 10/10-400
1.000
Ls Peralatan Pancang

Titik

2.15 Pancang Ulin 10/10-200


0.100
Oh Pekerja Tidak terampil
0.250
Oh Tukang Kayu
0.025
Oh Kepala tukang
0.050
Oh Mandor
0.020
M3 Kayu Ulin 10/10-400
1.000
Ls Peralatan Pancang

Titik

2.16 Pancang Ulin 12/12-400


0.100
Oh Pekerja Tidak terampil
0.250
Oh Tukang Kayu
0.025
Oh Kepala tukang
0.050
Oh Mandor
0.058
M3 Kayu Ulin 12/12-400
1.000
Ls Peralatan Pancang

Titik

89,653.85
119,538.46
134,480.76
127,009.61

###
3,600.00

89,653.85
119,538.46
134,480.76
127,009.61

###
3,600.00

89,653.85
119,538.46
134,480.76
127,009.61

###
3,600.00

No.

Rincian Pekerjaan

2.17 Pancang Ulin 12/12-800


0.100
Oh Pekerja Tidak terampil
0.250
Oh Tukang Kayu
0.025
Oh Kepala tukang
0.050
Oh Mandor
0.115
M3 Kayu Ulin 12/12-400
1.000
Ls Peralatan Pancang

Harga
Rp.

Satuan
Titik

89,653.85
119,538.46
134,480.76
127,009.61

###
3,600.00

3 PEKERJAAN BETON & BAJA


3.1 Membuat beton
w/c = 0,87
247.000
kg
0.621
m3
0.740
m3
215.000
ltr
1.650
OH
0.275
OH
0.028
OH
0.083
OH

mutu f'c = 7,4 MPa (K 100), slump (12m3


+ 2) cm

3.2 Membuat beton


w/c = 0,78
276.000
kg
0.591
m3
0.750
m3
215.000
ltr
1.650
OH
0.275
OH
0.028
OH
0.083
OH

mutu f'c = 9,8 MPa (K 125), slump (12m3


+ 2) cm

Portland Cement
Pasir ex Palu
Kerikil (max 30mm)

Air
Pekerja Tidak terampil
Tukang batu
Kepala tukang
Mandor

Portland Cement
Pasir ex Palu
Kerikil (max 30mm)

Air
Pekerja Tidak terampil
Tukang batu
Kepala tukang
Mandor

1,794.68
370,623.00
532,960.00
50.00
89,653.85
119,538.46
134,480.76
127,009.61

1,794.68
370,623.00
532,960.00
50.00
89,653.85
119,538.46
134,480.76
127,009.61

m3
3.3 Membuat beton mutu f'c = 12,2 MPa (K 150), slump (12
+ 2) cm

No.

Rincian Pekerjaan
w/c = 0,72
299.000
0.571
0.753
215.000
1.650
0.275
0.028
0.083

kg
m3
m3
ltr
OH
OH
OH
OH

Harga
Rp.

Satuan

Portland Cement
Pasir ex Palu
Kerikil (max 30mm)

Air
Pekerja Tidak terampil
Tukang batu
Kepala tukang
Mandor

1,794.68
370,623.00
532,960.00
50.00
89,653.85
119,538.46
134,480.76
127,009.61

3.4 Membuat lantai


slump (3-6)cm,
230.000
kg
0.638
m3
0.761
m3
200.000
ltr
1.200
OH
0.200
OH
0.020
OH
0.060
OH

kerja beton mutu f'c = 7,4 MPa (K 100),


m3
w/c = 0,87

3.5 Membuat beton


w/c = 0,66
326.000
kg
0.543
m3
0.762
m3
215.000
ltr
1.650
OH
0.275
OH
0.028
OH
0.083
OH

m3
mutu f'c = 14,5 MPa (K 175), slump (12
+ 2) cm

Portland Cement
Pasir ex Palu
Kerikil (max 30mm)

Air
Pekerja Tidak terampil
Tukang batu
Kepala tukang
Mandor

Portland Cement
Pasir ex Palu
Kerikil (max 30mm)

Air
Pekerja Tidak terampil
Tukang batu
Kepala tukang
Mandor

1,794.68
370,623.00
532,960.00
50.00
89,653.85
119,538.46
134,480.76
127,009.61

1,794.68
370,623.00
532,960.00
50.00

3.6 Membuat beton mutu f'c = 16,9 MPa (K 200), slump (12
m3
+ 2)cm
w/c = 0,61

89,653.85
119,538.46
134,480.76
127,009.61

No.

Rincian Pekerjaan
352.000
0.522
0.764
215.000
1.650
0.275
0.028
0.083

kg
m3
m3
ltr
OH
OH
OH
OH

Portland Cement
Pasir ex Palu
Kerikil (max 30mm)

Air
Pekerja Tidak terampil
Tukang batu
Kepala tukang
Mandor

Satuan

Harga
Rp.
1,794.68
370,623.00
532,960.00
50.00
89,653.85
119,538.46
134,480.76
127,009.61

3.7 Membuat beton


w/c = 0,58
371.000
kg
0.499
m3
0.776
m3
215.000
ltr
1.650
OH
0.275
OH
0.028
OH
0.083
OH

mutu f'c = 19,3 MPa (K 225), slump (12


m3
+ 2) cm

3.8 Membuat beton


w/c = 0,56
384.000
kg
0.494
m3
0.770
m3
215.000
ltr
1.650
OH
0.275
OH
0.028
OH
0.083
OH

m3
mutu f'c = 21,7 MPa (K 250), slump (12
+ 2) cm

Portland Cement
Pasir ex Palu
Kerikil (max 30mm)

Air
Pekerja Tidak terampil
Tukang batu
Kepala tukang
Mandor

Portland Cement
Pasir ex Palu
Kerikil (max 30mm)

Air
Pekerja Tidak terampil
Tukang batu
Kepala tukang
Mandor

1,794.68
370,623.00
532,960.00
50.00
89,653.85
119,538.46
134,480.76
127,009.61

1,794.68
370,623.00
532,960.00
50.00
89,653.85
119,538.46
134,480.76
127,009.61

3.9 Membuat beton mutu f'c = 24,0MPa (K 275), slump (12m3


+ 2) cm
w/c = 0,53
406.000
kg Portland Cement
1,794.68

No.

Rincian Pekerjaan
0.489
0.760
215.000
1.650
0.275
0.028
0.083

m3
m3
ltr
OH
OH
OH
OH

Pasir ex Palu
Kerikil (max 30mm)

Air
Pekerja Tidak terampil
Tukang batu
Kepala tukang
Mandor

Satuan

Harga
Rp.
370,623.00
532,960.00
50.00
89,653.85
119,538.46
134,480.76
127,009.61

3.10 Membuat beton


w/c = 0,52
413.000
kg
0.486
m3
0.756
m3
215.000
ltr
1.650
OH
0.275
OH
0.028
OH
0.083
OH

mutu f'c = 26,4 MPa (K 300), slump (12


m3
+ 2) cm

3.11 Membuat beton


w/c = 0,49
439.000
kg
0.479
m3
0.745
m3
215.000
ltr
2.100
OH
0.350
OH
0.035
OH
0.105
OH

m3
mutu f'c = 28,8 MPa (K 325), slump (12
+ 2) cm

Portland Cement
Pasir ex Palu
Kerikil (max 30mm)

Air
Pekerja Tidak terampil
Tukang batu
Kepala tukang
Mandor

Portland Cement
Pasir ex Palu
Kerikil (max 30mm)

Air
Pekerja Tidak terampil
Tukang batu
Kepala tukang
Mandor

1,794.68
370,623.00
532,960.00
50.00
89,653.85
119,538.46
134,480.76
127,009.61

1,794.68
370,623.00
532,960.00
50.00
89,653.85
119,538.46
134,480.76
127,009.61

3.12 Membuat beton mutu f'c =31,2 MPa (K 350), slump (12m3
+ 2) cm
w/c = 0,48
448.000
kg Portland Cement
1,794.68
0.476
m3 Pasir ex Palu
370,623.00

No.

Rincian Pekerjaan
0.741
215.000
2.100
0.350
0.035
0.105

m3
ltr
OH
OH
OH
OH

Satuan

Harga
Rp.
532,960.00
50.00

Kerikil (max 30mm)

Air
Pekerja Tidak terampil
Tukang batu
Kepala tukang
Mandor

89,653.85
119,538.46
134,480.76
127,009.61

3.13 Pembesian 10 kg dengan besi polos


10.500
kg Besi beton polos
0.100
kg Kawat beton
0.050
OH Pekerja Tidak terampil
0.050
OH Tukang batu
0.005
OH Kepala tukang
0.003
OH Mandor

kg

3.14 Pembesian 10 kg dengan besi ulir


10.500
kg Besi beton ulir
0.100
kg Kawat beton
0.050
OH Pekerja Tidak terampil
0.050
OH Tukang batu
0.005
OH Kepala tukang
0.003
OH Mandor

kg

3.15 Memasang 10 kg kabel presstressed polos


10.500
kg Besi beton polos
0.100
kg Kawat beton
0.050
OH Pekerja Tidak terampil
0.050
OH Tukang batu
0.005
OH Kepala tukang
0.003
OH Mandor

kg

3.16 Memasang 10 kg kabel presstressed strands


10.500
kg Besi beton polos
0.100
kg Kawat beton

kg

12,712.00
39,591.00
89,653.85
119,538.46
134,480.76
127,009.61

13,638.00
39,591.00
89,653.85
119,538.46
134,480.76
127,009.61

12,712.00
39,591.00
89,653.85
119,538.46
134,480.76
127,009.61

12,712.00
39,591.00

No.

Rincian Pekerjaan
0.050
0.050
0.005
0.003

OH
OH
OH
OH

Satuan

Pekerja Tidak terampil


Tukang besi
Kepala tukang
Mandor

Harga
Rp.
89,653.85
119,538.46
134,480.76
127,009.61

3.17 Memasang
10.500
0.100
0.050
0.050
0.005
0.003

kg polos
10 kg jaring kawat baja/wire mesh dengan besi
12,712.00
kg Besi beton polos
39,591.00
kg Kawat beton
OH Pekerja Tidak terampil
89,653.85
OH Tukang besi
119,538.46
OH Kepala tukang
134,480.76
OH Mandor
127,009.61

3.18 Memasang
10.500
0.100
0.050
0.050
0.005
0.003

10 kg jaring kawat baja/wire mesh dengan besi


kg ulir
kg Besi beton ulir
13,638.00
kg Kawat beton
39,591.00
OH Pekerja Tidak terampil
89,653.85
OH Tukang besi
119,538.46
OH Kepala tukang
134,480.76
OH Mandor
127,009.61

3.19 Memasang Wiremesh M6


0.016
Oh Pekerja Tidak terampil
0.016
Oh Tukang besi
0.006
Oh Kepala tukang
1.100
M2 Wire Mesh M6
1.000
Ls Alat Bantu

m2

3.20 Memasang Wiremesh M8


0.016
Oh Pekerja Tidak terampil
0.016
Oh Tukang besi
0.006
Oh Kepala tukang
1.100
M2 Wire Mesh M8

m2

89,653.85
119,538.46
134,480.76

52,041.13
1,000.00

89,653.85
119,538.46
134,480.76

97,428.66

No.

Rincian Pekerjaan
1.000

Ls

Satuan

Alat Bantu

3.21 Memasang Wiremesh M10


0.016
Oh Pekerja Tidak terampil
0.016
Oh Tukang besi
0.006
Oh Kepala tukang
1.100
M2 Wire Mesh M10
1.000
Ls Alat Bantu

1,000.00

m2

3.22 Membuat
0.200
1.500
0.400
157.500
2.250
336.000
0.540
0.810
5.300
0.275
1.300
1.050
0.262
0.265

pondasi beton bertulang (150kg besi + be m3


m3 Kayu kelas III (meranti uk. 5/7)
kg Paku
ltr Minyak bekisting (Solar)
kg Besi beton polos
kg Kawat beton
kg Portland Cement
m3 Pasir ex Palu
m3 Kerikil
OH Pekerja Tidak terampil
OH Tukang batu
OH Tukang kayu
OH Tukang besi
OH Kepala tukang
OH Mandor

3.23 Membuat
0.270
2.000
0.600
210.000
3.000
336.000
0.540
0.810

sloof
m3
kg
ltr
kg
kg
kg
m3
m3

beton bertulang (200kg besi + bekis m3


Kayu kelas III (meranti uk. 5/7)
Paku
Minyak bekisting (Solar)
Besi beton polos
Kawat beton
Portland Cement
Pasir ex Palu
Kerikil

Harga
Rp.

89,653.85
119,538.46
134,480.76

128,430.78
1,000.00

3,442,593.00

23,702.00
15,294.00
12,712.00
39,591.00
1,794.68
370,623.00
532,960.00
89,653.85
119,538.46
119,538.46
119,538.46
134,480.76
127,009.61

3,442,593.00

23,702.00
15,294.00
12,712.00
39,591.00
1,794.68
370,623.00
532,960.00

No.

Rincian Pekerjaan
5.650
0.275
1.560
1.400
0.323
0.283

OH
OH
OH
OH
OH
OH

Satuan

Pekerja Tidak terampil


Tukang batu
Tukang kayu
Tukang besi
Kepala tukang
Mandor

3.24 Membuat
0.400
4.000
2.000
315.000
4.500
336.000
0.540
0.810
0.150
3.500
20.000
7.050
0.275
1.650
2.100
0.403
0.353

kolom beton bertulang (300kg besi + beki m3


m3 Kayu kelas III (meranti uk. 5/7)
kg Paku
ltr Minyak bekisting (Solar)
kg Besi beton polos
kg Kawat beton
kg Portland Cement
m3 Pasir ex Palu
m3 Kerikil
m3 Balok kayu kelas III (meranti)
lbr Plywood tebal 9 mm
btg Dolken kayu galam (8-10)cm, pjg 4 m
OH Pekerja Tidak terampil
OH Tukang batu
OH Tukang kayu
OH Tukang besi
OH Kepala tukang
OH Mandor

3.25 Membuat
0.320
3.200
1.600
210.000
3.000
336.000
0.540
0.810

balok beton bertulang (200 kg besi + beki m3


m3 Kayu kelas III (meranti uk. 5/7)
kg Paku
ltr Minyak bekisting (Solar)
kg Besi beton polos
kg Kawat beton
kg Portland Cement
m3 Pasir ex Palu
m3 Kerikil

Harga
Rp.
89,653.85
119,538.46
119,538.46
119,538.46
134,480.76
127,009.61

3,442,593.00

23,702.00
15,294.00
12,712.00
39,591.00
1,794.68
370,623.00
532,960.00
###
172,004.00
19,729.00
89,653.85
119,538.46
119,538.46
119,538.46
134,480.76
127,009.61

3,442,593.00

23,702.00
15,294.00
12,712.00
39,591.00
1,794.68
370,623.00
532,960.00

No.

Rincian Pekerjaan
0.140
2.800
16.000
6.350
0.275
1.650
1.400
0.333
0.318

3.26 Membuat
0.320
3.200
1.600
157.500
2.250
336.000
0.540
0.810
0.120
2.800
32.000
5.300
0.275
1.300
1.050
0.265
0.265

m3
lbr
btg
OH
OH
OH
OH
OH
OH

Satuan

Balok kayu kelas III (meranti)

Plywood tebal 9 mm
Dolken kayu galam (8-10)cm, pjg 4 m
Pekerja Tidak terampil
Tukang batu
Tukang kayu
Tukang besi
Kepala tukang
Mandor

kolom beton bertulang (150kg besi + beki m3


m3 Kayu kelas III (meranti uk. 5/7)
kg Paku
ltr Minyak bekisting (Solar)
kg Besi beton polos
kg Kawat beton
kg Portland Cement
m3 Pasir ex Palu
m3 Kerikil
m3 Balok kayu kelas III (meranti)
lbr Plywood tebal 9 mm
btg Dolken kayu galam (8-10)cm, pjg 4 m
OH Pekerja Tidak terampil
OH Tukang batu
OH Tukang kayu
OH Tukang besi
OH Kepala tukang
OH Mandor

3.27 Membuat dinding beton bertulang (150kg besi + be m3


0.240
m3 Kayu kelas III (meranti uk. 5/7)
3.200
kg Paku
1.600
ltr Minyak bekisting (Solar)
157.500
kg Besi beton polos
2.250
kg Kawat beton

Harga
Rp.
###
172,004.00
19,729.00
89,653.85
119,538.46
119,538.46
119,538.46
134,480.76
127,009.61

3,442,593.00

23,702.00
15,294.00
12,712.00
39,591.00
1,794.68
370,623.00
532,960.00
###
172,004.00
19,729.00
89,653.85
119,538.46
119,538.46
119,538.46
134,480.76
127,009.61

3,442,593.00

23,702.00
15,294.00
12,712.00
39,591.00

No.

Rincian Pekerjaan
336.000
0.540
0.810

kg
m3
m3

0.16 m3

2.800
24.000
5.300
0.275
1.300
1.050
0.262
0.265

3.28 Membuat
0.250
3.000
1.200
210.000
3.000
336.000
0.540
0.810

lbr
btg
OH
OH
OH
OH
OH
OH

lbr
btg
OH
OH
OH
OH
OH
OH

Harga
Rp.

Portland Cement
Pasir ex Palu
Kerikil
Balok kayu kelas III (meranti)

1,794.68
370,623.00
532,960.00

Plywood tebal 9 mm
Dolken kayu galam (8-10)cm, pjg 4 m
Pekerja Tidak terampil
Tukang batu
Tukang kayu
Tukang besi
Kepala tukang
Mandor

172,004.00
19,729.00

3,442,593.00

89,653.85
119,538.46
119,538.46
119,538.46
134,480.76
127,009.61

dinding beton bertulang (200 kg besi + be m3


m3 Kayu kelas III (meranti uk. 5/7)
kg Paku
ltr Minyak bekisting (Solar)
kg Besi beton polos
kg Kawat beton
kg Portland Cement
m3 Pasir ex Palu
m3 Kerikil

0.105 m3

2.500
14.000
5.650
0.275
1.560
1.400
0.323
0.283

Satuan

Balok kayu kelas III (meranti)

23,702.00
15,294.00
12,712.00
39,591.00
1,794.68
370,623.00
532,960.00
3,442,593.00

172,004.00
19,729.00

Plywood tebal 9 mm
Dolken kayu galam (8-10)cm, pjg 4 m
Pekerja Tidak terampil
Tukang batu
Tukang kayu
Tukang besi
Kepala tukang
Mandor

3.29 Membuat kolom praktis beton bertulang (11 x 11)


0.002
m3 Kayu kelas III (meranti uk. 5/7)
0.010
kg Paku

3,442,593.00

89,653.85
119,538.46
119,538.46
119,538.46
134,480.76
127,009.61

m1
3,442,593.00

23,702.00

No.

Rincian Pekerjaan
1.200
3.000
0.450
4.000
0.006
0.009
0.180
0.020
0.020
0.020
0.006
0.009

3.30 Membuat
0.003
0.020
1.200
3.600
0.050
5.500
0.009
0.015
0.297
0.033
0.033
0.033
0.010
0.015

ltr
kg
kg
kg
m3
m3
OH
OH
OH
OH
OH
OH

Satuan

15,294.00
12,712.00
39,591.00
1,794.68
370,623.00
532,960.00

Minyak bekisting (Solar)


Besi beton polos
Kawat beton
Portland Cement
Pasir ex Palu
Kerikil

Pekerja Tidak terampil


Tukang batu
Tukang kayu
Tukang besi
Kepala tukang
Mandor

ring balok beton bertulang (10 x 15) cm


m3 Kayu kelas III (meranti uk. 5/7)
kg Paku
ltr Minyak bekisting (Solar)
kg Besi beton polos
kg Kawat beton
kg Portland Cement
m3 Pasir ex Palu
m3 Kerikil
OH Pekerja Tidak terampil
OH Tukang batu
OH Tukang kayu
OH Tukang besi
OH Kepala tukang
OH Mandor

3.31 Beton Tumbuk 1Pc : 3Psr : 5Kr


1.650
Oh Pekerja Tidak terampil
0.250
Oh Tukang batu
0.025
Oh Kepala tukang
0.080
Oh Mandor
0.520
M3 Pasir ex Palu

Harga
Rp.

89,653.85
119,538.46
119,538.46
119,538.46
134,480.76
127,009.61

m1
3,442,593.00

23,702.00
15,294.00
12,712.00
39,591.00
1,794.68
370,623.00
532,960.00
89,653.85
119,538.46
119,538.46
119,538.46
134,480.76
127,009.61

m3
89,653.85
119,538.46
134,480.76
127,009.61

370,623.00

No.

Rincian Pekerjaan
0.870
218.000

M3
Kg

Koral Beton/Batu Pecah

Harga
Rp.
532,960.00
1,794.68

Portland Cement

3.32 Beton Bertulang 1Pc : 2Psr : 3Kr


1.650
Oh Pekerja Tidak terampil
0.250
Oh Tukang batu
0.025
Oh Kepala tukang
0.080
Oh Mandor
0.520
M3 Pasir ex Palu
0.780
M3 Koral Beton/Batu Pecah
232.000
Kg Portland Cement

Satuan

m3
89,653.85
119,538.46
134,480.76
127,009.61

370,623.00
532,960.00
1,794.68

PEKERJAAN DINDING

m2
4.1 Memasang 1 m2 dinding bata merah uk (8 x 8 x 16) cm
tebal 1 bata, campuran 1 PC : 1 PP
60.000 buah Bata Merah
64.030
kg Portland Cement
0.059
m3 Pasir pasang
0.650
OH Pekerja Tidak terampil
0.200
OH Tukang batu
0.020
OH Kepala tukang
0.030
OH Mandor

m2
4.2 Memasang 1 m2 dinding bata merah uk (8 x 8 x 16) cm
tebal 1 bata, campuran 1 PC : 2 PP
78.000 buah Bata Merah
43.500
kg Portland Cement
0.080
m3 Pasir pasang
0.650
OH Pekerja Tidak terampil
0.200
OH Tukang batu
0.020
OH Kepala tukang
0.030
OH Mandor

1,523.00
1,794.68
400,000.00
89,653.85
119,538.46
134,480.76
127,009.61

1,523.00
1,794.68
400,000.00
89,653.85
119,538.46
134,480.76
127,009.61

No.

Rincian Pekerjaan

Satuan

m2
4.3 Memasang 1 m2 dinding bata merah uk (8 x 8 x 16) cm
tebal 1 bata, campuran 1 PC : 3 PP
78.000 buah Bata Merah
32.950
kg Portland Cement
0.091
m3 Pasir pasang
0.650
OH Pekerja Tidak terampil
0.200
OH Tukang batu
0.020
OH Kepala tukang
0.030
OH Mandor

m2
4.4 Memasang 1 m2 dinding bata merah uk (8 x 8 x 16) cm
tebal 1 bata, campuran 1 PC : 4 PP
78.000 buah Bata Merah
26.550
kg Portland Cement
0.093
m3 Pasir pasang
0.650
OH Pekerja Tidak terampil
0.200
OH Tukang batu
0.020
OH Kepala tukang
0.030
OH Mandor

m2
4.5 Memasang 1 m2 dinding bata merah uk (8 x 8 x 16) cm
tebal 1 bata, campuran 1 PC : 4 PP
78.000 buah Bata Merah
26.550
kg Portland Cement
0.093
m3 Pasir pasang
0.650
OH Pekerja Tidak terampil
0.200
OH Tukang batu
0.020
OH Kepala tukang
0.030
OH Mandor

m2
4.6 Memasang 1 m2 dinding bata merah uk (8 x 8 x 16) cm
tebal 1 bata, campuran 1 PC : 4 PP
78.000 buah Bata Merah

Harga
Rp.

1,523.00
1,794.68
400,000.00
89,653.85
119,538.46
134,480.76
127,009.61

1,523.00
1,794.68
400,000.00
89,653.85
119,538.46
134,480.76
127,009.61

1,523.00
1,794.68
400,000.00
89,653.85
119,538.46
134,480.76
127,009.61

1,523.00

No.

Rincian Pekerjaan
26.550
0.093
0.650
0.200
0.020
0.030

kg
m3
OH
OH
OH
OH

Satuan

1,794.68
400,000.00

Portland Cement
Pasir pasang

Pekerja Tidak terampil


Tukang batu
Kepala tukang
Mandor

89,653.85
119,538.46
134,480.76
127,009.61

m2
4.7 Memasang 1 m2 dinding bata merah uk (8 x 8 x 16) cm
tebal 1 bata, campuran 1 PC : 5 PP
78.000 buah Bata Merah
22.200
kg Portland Cement
0.102
m3 Pasir pasang
0.650
OH Pekerja Tidak terampil
0.200
OH Tukang batu
0.020
OH Kepala tukang
0.030
OH Mandor

m2
4.8 Memasang 1 m2 dinding bata merah uk (8 x 8 x 16) cm
tebal 1/2 bata, campuran 1 PC : 1 PP
78.000 buah Bata Merah
27.800
kg Portland Cement
0.028
m3 Pasir pasang
0.320
OH Pekerja Tidak terampil
0.100
OH Tukang batu
0.010
OH Kepala tukang
0.015
OH Mandor

4.9 Memasang 1 m2 dinding bata merah tebal 1/2 bata,


campuran 1 PC : 2 PP
78.000 buah Bata Merah
18.950
kg Portland Cement
0.038
m3 Pasir pasang
0.320
OH Pekerja Tidak terampil
0.100
OH Tukang batu
0.010
OH Kepala tukang

Harga
Rp.

1,523.00
1,794.68
400,000.00
89,653.85
119,538.46
134,480.76
127,009.61

1,523.00
1,794.68
400,000.00
89,653.85
119,538.46
134,480.76
127,009.61

m2
1,523.00
1,794.68
400,000.00
89,653.85
119,538.46
134,480.76

No.

Rincian Pekerjaan
0.015

OH

Satuan

Mandor

Harga
Rp.
127,009.61

4.10 Memasang 1 m2 dinding bata merah tebal 1/2 bata,


campuran 1 PC : 3 PP
78.000 buah Bata Merah
14.370
kg Portland Cement
0.040
m3 Pasir pasang
0.320
OH Pekerja Tidak terampil
0.100
OH Tukang batu
0.010
OH Kepala tukang
0.015
OH Mandor

m2

4.11 Memasang 1 m2 dinding bata merah tebal 1/2 bata,


campuran 1 PC : 4 PP
78.000 buah Bata Merah
11.500
kg Portland Cement
0.043
m3 Pasir pasang
0.320
OH Pekerja Tidak terampil
0.100
OH Tukang batu
0.010
OH Kepala tukang
0.015
OH Mandor

m2

4.12 Memasang 1 m2 dinding bata merah tebal 1/2 bata,


campuran 1 PC : 5 PP
78.000 buah Bata Merah
9.680
kg Portland Cement
0.045
m3 Pasir pasang
0.320
OH Pekerja Tidak terampil
0.100
OH Tukang batu
0.010
OH Kepala tukang
0.015
OH Mandor

m2

4.13 Memasang 1 m2 dinding bata merah tebal 1/2 bata,

m2

1,523.00
1,794.68
400,000.00
89,653.85
119,538.46
134,480.76
127,009.61

1,523.00
1,794.68
400,000.00
89,653.85
119,538.46
134,480.76
127,009.61

1,523.00
1,794.68
400,000.00
89,653.85
119,538.46
134,480.76
127,009.61

No.

Rincian Pekerjaan
campuran 1 PC
78.000 buah
8.320
kg
0.049
m3
0.320
OH
0.100
OH
0.010
OH
0.015
OH

Satuan

: 6 PP
Bata Merah

1,523.00
1,794.68
400,000.00

Portland Cement
Pasir pasang

Pekerja Tidak terampil


Tukang batu
Kepala tukang
Mandor

4.14 Memasang 1 m2 dinding bata merah tebal 1/2 bata,


campuran 1 PC : 8 PP
78.000 buah Bata Merah
6.500
kg Portland Cement
0.050
m3 Pasir pasang
0.320
OH Pekerja Tidak terampil
0.100
OH Tukang batu
0.010
OH Kepala tukang
0.015
OH Mandor

Harga
Rp.

89,653.85
119,538.46
134,480.76
127,009.61

m2
1,523.00
1,794.68
400,000.00
89,653.85
119,538.46
134,480.76
127,009.61

4.15 Memasang 1 m2 dinding terawang (roster) uk (10 x 20 m2


x 25) cm,
camp spesi 1 PC : 3 PP
6,952.00
30.000
bh Terawang (roster)
1,794.68
14.000
kg Portland Cement
400,000.00
0.032
m3 Pasir pasang
0.300
OH Pekerja Tidak terampil
89,653.85
0.100
OH Tukang batu
119,538.46
0.010
OH Kepala tukang
134,480.76
0.015
OH Mandor
127,009.61

4.16 Memasang 1 m2 dinding terawang (roster) uk (10 x 20 m2


x 25) cm,
camp spesi 1 PC : 4 PP
6,952.00
30.000
bh Terawang (roster)
11.000
kg Portland Cement
1,794.68
0.035
m3 Pasir pasang
400,000.00
0.300
OH Pekerja Tidak terampil
89,653.85

No.

Rincian Pekerjaan
0.100
0.010
0.015

OH
OH
OH

Satuan

Tukang batu
Kepala tukang
Mandor

Harga
Rp.
119,538.46
134,480.76
127,009.61

4.17 Memasang 1 m2 dinding bata berongga ekspose uk (5 x 11 x 24) cm,


m2
camp spesi 1 PC : 3 PP
6,952.00
70.000
bh Bata berongga ekspose
1,794.68
14.000
kg Portland Cement
400,000.00
0.032
m3 Pasir pasang
0.300
OH Pekerja Tidak terampil
89,653.85
0.150
OH Tukang batu
119,538.46
0.015
OH Kepala tukang
134,480.76
0.015
OH Mandor
127,009.61

5.

PEKERJAAN PLESTERAN

5.1

5.2

5.3

Memasang plesteran 1 PC : 1 PP, tebal 15 mm


15.504
kg Portland Cement
0.016
m3 Pasir pasang
0.200
OH Pekerja Tidak terampil
0.150
OH Tukang batu
0.015
OH Kepala tukang
0.100
OH Mandor

m2

Memasang plesteran 1 PC : 2 PP, tebal 15 mm


10.224
kg Portland Cement
0.020
m3 Pasir pasang
0.200
OH Pekerja Tidak terampil
0.150
OH Tukang batu
0.015
OH Kepala tukang
0.100
OH Mandor

m2

Memasang plesteran 1 PC : 3 PP, tebal 15 mm

m2

1,794.68
400,000.00
89,653.85
119,538.46
134,480.76
127,009.61

1,794.68
400,000.00
89,653.85
119,538.46
134,480.76
127,009.61

No.

Rincian Pekerjaan
7.776
0.023
0.200
0.150
0.015
0.100

5.4

5.5

5.6

5.7

kg
m3
OH
OH
OH
OH

Satuan

Harga
Rp.
1,794.68
400,000.00

Portland Cement
Pasir pasang

Pekerja Tidak terampil


Tukang batu
Kepala tukang
Mandor

89,653.85
119,538.46
134,480.76
127,009.61

Memasang plesteran 1 PC : 4 PP, tebal 15 mm


6.240
kg Portland Cement
0.024
m3 Pasir pasang
0.200
OH Pekerja Tidak terampil
0.150
OH Tukang batu
0.015
OH Kepala tukang
0.100
OH Mandor

m2

Memasang plesteran 1 PC : 5 PP, tebal 15 mm


5.184
kg Portland Cement
0.026
m3 Pasir pasang
0.200
OH Pekerja Tidak terampil
0.150
OH Tukang batu
0.015
OH Kepala tukang
0.100
OH Mandor

m2

Memasang plesteran 1 PC : 6 PP, tebal 15 mm


4.416
kg Portland Cement
0.027
m3 Pasir pasang
0.200
OH Pekerja Tidak terampil
0.150
OH Tukang batu
0.015
OH Kepala tukang
0.100
OH Mandor

m2

Memasang plesteran 1 PC : 7 PP, tebal 15 mm


3.936
kg Portland Cement

m2

1,794.68
400,000.00
89,653.85
119,538.46
134,480.76
127,009.61

1,794.68
400,000.00
89,653.85
119,538.46
134,480.76
127,009.61

1,794.68
400,000.00
89,653.85
119,538.46
134,480.76
127,009.61

1,794.68

No.

Rincian Pekerjaan
0.028
0.200
0.150
0.015
0.100

m3
OH
OH
OH
OH

Satuan

400,000.00

Pasir pasang

Pekerja Tidak terampil


Tukang batu
Kepala tukang
Mandor

89,653.85
119,538.46
134,480.76
127,009.61

Memasang plesteran 1 PC : 8 PP, tebal 15 mm


3.456
kg Portland Cement
0.029
m3 Pasir pasang
0.200
OH Pekerja Tidak terampil
0.150
OH Tukang batu
0.015
OH Kepala tukang
0.100
OH Mandor

m2

Memasang plesteran 1 PC : 2 PP, tebal 20 mm


13.632
kg Portland Cement
0.027
m3 Pasir pasang
0.260
OH Pekerja Tidak terampil
0.200
OH Tukang batu
0.020
OH Kepala tukang
0.013
OH Mandor

m2

5.10 Memasang plesteran 1 PC : 3 PP, tebal 20 mm


10.368
kg Portland Cement
0.031
m3 Pasir pasang
0.260
OH Pekerja Tidak terampil
0.200
OH Tukang batu
0.020
OH Kepala tukang
0.013
OH Mandor

m2

5.11 Memasang plesteran 1 PC : 4 PP, tebal 20 mm


8.320
kg Portland Cement
0.032
m3 Pasir pasang

m2

5.8

5.9

Harga
Rp.

1,794.68
400,000.00
89,653.85
119,538.46
134,480.76
127,009.61

1,794.68
400,000.00
89,653.85
119,538.46
134,480.76
127,009.61

1,794.68
400,000.00
89,653.85
119,538.46
134,480.76
127,009.61

1,794.68
400,000.00

No.

Rincian Pekerjaan
0.260
0.200
0.020
0.013

OH
OH
OH
OH

Satuan

Pekerja Tidak terampil


Tukang batu
Kepala tukang
Mandor

Harga
Rp.
89,653.85
119,538.46
134,480.76
127,009.61

5.12 Memasang plesteran 1 PC : 5 PP, tebal 20 mm


6.912
kg Portland Cement
0.035
m3 Pasir pasang
0.260
OH Pekerja Tidak terampil
0.200
OH Tukang batu
0.020
OH Kepala tukang
0.013
OH Mandor

m2

5.13 Memasang plesteran 1 PC : 6 PP, tebal 20 mm


5.888
kg Portland Cement
0.036
m3 Pasir pasang
0.260
OH Pekerja Tidak terampil
0.200
OH Tukang batu
0.020
OH Kepala tukang
0.013
OH Mandor

m2

5.14 Memasang plesteran 1 PC : 5 PP, tebal 10 mm


5.184
kg Portland Cement
0.026
m3 Pasir pasang
0.150
OH Pekerja Tidak terampil
0.070
OH Tukang batu
0.007
OH Kepala tukang
0.008
OH Mandor

m2

5.15 Memasang plesteran skoning 1 PC : 2 PP, tebal 10


0.500
kg Portland Cement
0.013
m3 Pasir pasang
0.057
OH Pekerja Tidak terampil

m2

1,794.68
400,000.00
89,653.85
119,538.46
134,480.76
127,009.61

1,794.68
400,000.00
89,653.85
119,538.46
134,480.76
127,009.61

1,794.68
400,000.00
89,653.85
119,538.46
134,480.76
127,009.61

1,794.68
400,000.00
89,653.85

No.

Rincian Pekerjaan
0.380
0.038
0.003

OH
OH
OH

Satuan

Tukang batu
Kepala tukang
Mandor

Harga
Rp.
119,538.46
134,480.76
127,009.61

5.16 Memasang plesteran ciprat 1 PC : 2 PP


4.320
kg Portland Cement
0.006
m3 Pasir pasang
0.250
OH Pekerja Tidak terampil
0.100
OH Tukang batu
0.010
OH Kepala tukang
0.013
OH Mandor

m2

5.17 Memasang finishing siar pasangan dinding bata me


3.108
kg Portland Cement
0.150
OH Pekerja Tidak terampil
0.070
OH Tukang batu
0.007
OH Kepala tukang
0.008
OH Mandor

m2

5.18 Memasang finishing siar pas. dinding conblock eks


1.600
kg Portland Cement
0.075
OH Pekerja Tidak terampil
0.035
OH Tukang batu
0.004
OH Kepala tukang
0.004
OH Mandor

m2

1,794.68
400,000.00
89,653.85
119,538.46
134,480.76
127,009.61

1,794.68
89,653.85
119,538.46
134,480.76
127,009.61

5.19 Memasang finishing siar pasangan batu kali adukan m2


6.340
kg Portland Cement
0.012
m3 Pasir pasang
0.300
OH Pekerja Tidak terampil
0.140
OH Tukang batu
0.014
OH Kepala tukang
0.015
OH Mandor

1,794.68
89,653.85
119,538.46
134,480.76
127,009.61

1,794.68
400,000.00
89,653.85
119,538.46
134,480.76
127,009.61

No.

6.

Rincian Pekerjaan

Satuan

5.20 Memasang acian


3.250
kg Portland Cement
0.150
OH Pekerja Tidak terampil
0.100
OH Tukang batu
0.010
OH Kepala tukang
0.008
OH Mandor

m2

5.21 Memasang plesteran waterproof 3 lapis


0.500
kg Portland Cement
2.900
kg AM Tipe ( 100 Weterpoffing )
0.006
m3 Pasir pasang
0.300
OH Pekerja Tidak terampil
0.200
OH Tukang batu
0.020
OH Kepala tukang
0.150
OH Mandor

m2

Harga
Rp.

1,794.68
89,653.85
119,538.46
134,480.76
127,009.61

1,794.68
3,751.25
400,000.00
89,653.85
119,538.46
134,480.76
127,009.61

PEKERJAAN KAYU

6.1 Membuat & memasang 1 m3 kusen pintu & jendela,


kayu kelas I
1.100
m3 Balok kayu
1.250
kg Paku 10 cm
6.000
OH Pekerja Tidak terampil
20.000
OH Tukang kayu
2.000
OH Kepala tukang
0.300
OH Mandor

m3

6.2 Membuat dan memasang 1 m3 kusen pintu & jendela, m3


kayu kelas II atau III
1.200
m3 Balok kayu
1.250
kg Paku 10 cm

###
23,702.00
89,653.85
119,538.46
134,480.76
127,009.61

###
23,702.00

No.

Rincian Pekerjaan
6.000
18.000
2.000
0.300

OH
OH
OH
OH

Satuan

Pekerja Tidak terampil


Tukang kayu
Kepala tukang
Mandor

Harga
Rp.
89,653.85
119,538.46
134,480.76
127,009.61

6.3 Membuat & memasang 1 m2 pintu klamp standar,


kayu kelas II
0.040
m3 Papan kayu (meranti)
0.050
kg Paku 5 - 7 cm
0.350
OH Pekerja Tidak terampil
1.050
OH Tukang kayu
0.105
OH Kepala tukang
0.018
OH Mandor

m2

6.4 Membuat & memasang 1 m2 pintu klamp sederhana,


kayu kelas III
0.040
m3 Papan kayu
0.050
kg Paku 5 - 7 cm
0.350
OH Pekerja Tidak terampil
1.050
OH Tukang kayu
0.105
OH Kepala tukang
0.018
OH Mandor

m2

6.5 Membuat & memasang 1 m2 daun pintu panel,


kayu kelas I atau II
0.040
m3 Papan kayu (Bangkirai)
1.000
OH Pekerja Tidak terampil
2.500
OH Tukang kayu
0.250
OH Kepala tukang
0.050
OH Mandor

m2

6.6 Membuat & memasang 1 m2 pintu & jendela kaca,


kayu kelas I atau II

m2

###
23,702.00
89,653.85
119,538.46
134,480.76
127,009.61

###
23,702.00
89,653.85
119,538.46
134,480.76
127,009.61

###
89,653.85
119,538.46
134,480.76
127,009.61

No.

Rincian Pekerjaan
0.024
0.800
2.000
0.200
0.040

m3
OH
OH
OH
OH

Satuan

###

Papan kayu (Bangkirai)


Pekerja Tidak terampil
Tukang kayu
Kepala tukang
Mandor

6.7 Membuat & memasang 1 m2 pintu & jendela jalusi


kayu kelas I atau II
0.064
m3 Papan kayu (Bangkirai)
1.000
OH Pekerja Tidak terampil
3.000
OH Tukang kayu
0.300
OH Kepala tukang
0.050
OH Mandor

Harga
Rp.
89,653.85
119,538.46
134,480.76
127,009.61

m2

m2
6.8 Membuat 1 m2 daun pintu kayu lapis (Teakwood) rangkap,
rangka tertutup kayu kelas II (lebar sampai 90 cm)
0.025
m3 Papan kayu (Bangkirai)
0.030
kg Paku 1 cm - 2,5 cm
1.000
lbr Plywood tebal 4 mm, ukuran (90 x 220) cm
0.600
OH Pekerja Tidak terampil
2.000
OH Tukang kayu
0.200
OH Kepala tukang
0.030
OH Mandor

m2
6.9 Membuat 1 m2 pintu plywood rangkap, rangka ekspose
kayu kelas I atau II
0.026
m3 Papan kayu (Bangkirai)
0.030
kg Paku 1 cm - 2,5 cm
1.000
lbr Plywood tebal 4 mm, ukuran (90 x 220) cm
0.800
OH Pekerja Tidak terampil
2.000
OH Tukang kayu
0.200
OH Kepala tukang
0.040
OH Mandor

###
89,653.85
119,538.46
134,480.76
127,009.61

###
39,591.00
95,205.00
89,653.85
119,538.46
134,480.76
127,009.61

###
39,591.00
95,205.00
89,653.85
119,538.46
134,480.76
127,009.61

No.

Rincian Pekerjaan

Satuan

6.10 Memasang 1 m2
kelas I atau II
0.020
m3
0.300
kg
1.000
lbr
0.600
OH
2.000
OH
0.020
OH
0.030
OH

pintu teakwood rangkap, rangka kayum2

6.11 Memasang 1 m2
kelas I atau II
0.020
m3
0.300
kg
1.000
lbr
0.500
lbr
0.800
OH
2.500
OH
0.250
OH
0.040
OH

m2
pintu plywood & Melamine, rangka kayu

6.12 Memasang
kelas I
0.020
0.300
0.500
0.500
0.800
2.500
0.250
0.040

Papan kayu (Bangkirai)


Paku 1 cm - 2,5 cm
Plywood tebal 4 mm, ukuran (90 x 220) cm
Pekerja Tidak terampil
Tukang kayu
Kepala tukang
Mandor

Papan kayu (Bangkirai)


Paku 1 cm - 2,5 cm
Plywood tebal 4 mm, ukuran (90 x 220) cm
Melamine
Pekerja Tidak terampil
Tukang kayu
Kepala tukang
Mandor

Harga
Rp.

###
39,591.00
95,205.00
89,653.85
119,538.46
134,480.76
127,009.61

###
39,591.00
95,205.00
171,302.00
89,653.85
119,538.46
134,480.76
127,009.61

m2
1 m2 pintu teakwood & formika, rangka kayu
m3
kg
lbr
lbr
OH
OH
OH
OH

Papan kayu (Bangkirai)


Paku 1 cm - 2,5 cm
Plywood tebal 4 mm, ukuran (90 x 220) cm
Formica 4' x 8' (Melamine)
Pekerja Tidak terampil
Tukang kayu
Kepala tukang
Mandor

###
39,591.00
95,205.00
171,302.00
89,653.85
119,538.46
134,480.76
127,009.61

No.

Rincian Pekerjaan

Satuan

m2
6.13 Memasang 1 m2 pintu teakwood & formika, rangka kayu
kelas II, divernis
0.020
m3 Papan kayu (Bangkirai)
0.300
kg Paku 1 cm - 2,5 cm
0.800
kg Lem kayu
0.500
lbr Plywood tebal 4 mm, ukuran (90 x 220) cm
0.500
lt
Vernis
0.500
lbr Formica 4' x 8' (Melamine)
1.000
OH Pekerja Tidak terampil
2.600
OH Tukang kayu
0.260
OH Kepala tukang
0.050
OH Mandor

6.14 Memasang
0.020
0.300
1.200
1.000
1.000
1.000
2.600
0.260
0.050

1 m2
m3
kg
kg
lbr
lbr
OH
OH
OH
OH

m2 I
pintu formika double, rangka kayu kelas
Papan kayu (Bangkirai)
Paku 1 cm - 2,5 cm
Lem kayu
Plywood tebal 4 mm, ukuran (90 x 220) cm
Formica 4' x 8' (Melamine)
Pekerja Tidak terampil
Tukang kayu
Kepala tukang
Mandor

6.15 Memasang
0.020
0.300
1.200
1.000
1.000
1.000
2.600
0.260
0.050

1 m2
m3
kg
kg
lbr
lbr
OH
OH
OH
OH

m2
pintu formika double, rangka kayu kamper
Papan kayu (kamer)
Paku 1 cm - 2,5 cm
Lem kayu
Plywood tebal 4 mm, ukuran (90 x 220) cm
Formica 4' x 8' (Melamine)
Pekerja Tidak terampil
Tukang kayu
Kepala tukang
Mandor

Harga
Rp.

###
39,591.00
58,850.00
95,205.00
60,082.00
171,302.00
89,653.85
119,538.46
134,480.76
127,009.61

###
39,591.00
58,850.00
95,205.00
171,302.00
89,653.85
119,538.46
134,480.76
127,009.61

###
39,591.00
58,850.00
95,205.00
171,302.00
89,653.85
119,538.46
134,480.76
127,009.61

No.

Rincian Pekerjaan

6.16 Memasang jalusi kusen, kayu kelas I atau II


0.060
m3 Papan kayu (Bangkirai)
0.150
kg Paku 1 cm - 2,5 cm
0.500
OH Pekerja Tidak terampil
2.000
OH Tukang kayu
0.200
OH Kepala tukang
0.025
OH Mandor

Satuan
m2

###
39,591.00
89,653.85
119,538.46
134,480.76
127,009.61

6.17 Memasang teakwood rangkap, rangka ekspose kayu m2


0.025
m3 Papan kayu (Bangkirai)
0.030
kg Paku 1 cm - 2,5 cm
0.300
kg Lem kayu
1.000
lbr Teakwood tebal 4 mm, ukuran (90 x 220) cm
0.800
OH Pekerja Tidak terampil
2.000
OH Tukang kayu
0.200
OH Kepala tukang
0.040
OH Mandor

6.18 Memasang teakwood rangkap lapis formika, rangka m2


ekspose kayu kelas II
0.025
m3 Papan kayu (Bangkirai)
0.030
kg Paku 1 cm - 2,5 cm
0.800
kg Lem kayu
1.000
lbr Teakwood tebal 4 mm, ukuran (90 x 220) cm
0.500
lbr Formica 4' x 8' (Melamine)
0.800
OH Pekerja Tidak terampil
2.500
OH Tukang kayu
0.250
OH Kepala tukang
0.040
OH Mandor

6.19 Memasang konstruksi kuda-kuda konvensional,


kayu kelas I,II, III bentang 6 meter
1.100
m3 Balok kayu

Harga
Rp.

###
39,591.00
58,850.00
95,205.00
89,653.85
119,538.46
134,480.76
127,009.61

###
39,591.00
58,850.00
95,205.00
171,302.00
89,653.85
119,538.46
134,480.76
127,009.61

m3
###

No.

Rincian Pekerjaan
15.000
5.600
4.000
12.000
1.200
0.200

kg
kg
OH
OH
OH
OH

Satuan

23,953.00
23,702.00

Besi strip tebal 5 mm


Paku 12 cm
Pekerja Tidak terampil
Tukang kayu
Kepala tukang
Mandor

89,653.85
119,538.46
134,480.76
127,009.61

6.20 Memasang konstruksi kuda-kuda expose, kayu kelas m3


1.200
m3 Balok kayu
15.000
kg Besi strip tebal 5 mm
5.600
kg Paku 12 cm
6.000
OH Pekerja Tidak terampil
20.000
OH Tukang kayu
2.000
OH Kepala tukang
0.300
OH Mandor

6.21 Memasang konstruksi gordeng, kayu kelas II


1.100
m3 Balok kayu
15.000
kg Besi strip tebal 5 mm
3.000
kg Paku 12 cm
2.400
OH Pekerja Tidak terampil
7.200
OH Tukang kayu
0.720
OH Kepala tukang
0.120
OH Mandor

Harga
Rp.

###
23,953.00
23,702.00
89,653.85
119,538.46
134,480.76
127,009.61

m3

6.22 Memasang rangka atap genteng keramik, kayu kelas m2


0.014
m3 Kaso-kaso (5 x 7) cm
0.036
m3 Reng (2 x 3) cm
0.250
kg Paku 5 cm dan 10 cm
0.100
OH Pekerja Tidak terampil
0.100
OH Tukang kayu
0.010
OH Kepala tukang
0.005
OH Mandor

###
23,953.00
23,702.00
89,653.85
119,538.46
134,480.76
127,009.61

###
###
23,702.00
89,653.85
119,538.46
134,480.76
127,009.61

No.

Rincian Pekerjaan

Satuan

6.23 Memasang rangka atap genteng beton, kayu kelas I m2


0.014
m3 Kaso-kaso (5 x 7) cm
0.057
m3 Reng (2 x 3) cm
0.250
kg Paku 5 cm dan 10 cm
0.100
OH Pekerja Tidak terampil
0.100
OH Tukang kayu
0.010
OH Kepala tukang
0.005
OH Mandor

6.24 Memasang rangka atap sirap, kayu kelas II


0.165
m3 Kayu kelas II
0.200
kg Paku 5 cm dan 10 cm
0.120
OH Pekerja Tidak terampil
0.120
OH Tukang kayu
0.012
OH Kepala tukang
0.006
OH Mandor

Harga
Rp.

###
###
23,702.00
89,653.85
119,538.46
134,480.76
127,009.61

m2

6.25 Memasang rangka langit-langit (50 x 100) cm, kayu k m2


0.015
m3 Kaso-kaso (5 x 7) cm
0.200
kg Paku 7 cm - 10 cm
0.150
OH Pekerja Tidak terampil
0.250
OH Tukang kayu
0.025
OH Kepala tukang
0.075
OH Mandor

6.26 Memasang rangka langit-langit (60 x 60) cm, kayu kelm2


0.016
m3 Kaso-kaso (5 x 7) cm
0.250
kg Paku 7 cm - 10 cm
0.200
OH Pekerja Tidak terampil
0.300
OH Tukang kayu
0.030
OH Kepala tukang
0.010
OH Mandor

###
23,702.00
89,653.85
119,538.46
134,480.76
127,009.61

###
23,702.00
89,653.85
119,538.46
134,480.76
127,009.61

###
23,702.00
89,653.85
119,538.46
134,480.76
127,009.61

No.

Rincian Pekerjaan

Satuan

6.27 Memasang rangka langit-langit (100 x 100) cm, kayu m2


0.012
m3 Balok kayu
0.100
kg Paku 2" - 5"
0.150
OH Pekerja Tidak terampil
0.250
OH Tukang kayu
0.025
OH Kepala tukang
0.075
OH Mandor

6.28 Memasang rangka langit-langit (30 x 60) cm, kayu ke m2


0.023
m3 Balok kayu
0.150
kg Paku 2" - 5"
0.200
OH Pekerja Tidak terampil
0.300
OH Tukang kayu
0.030
OH Kepala tukang
0.010
OH Mandor

6.29 Memasang rangka langit-langit (30 x 30) cm, kayu ke m2


0.027
m3 Balok kayu
0.200
kg Paku 2" - 5"
0.250
OH Pekerja Tidak terampil
0.350
OH Tukang kayu
0.030
OH Kepala tukang
0.013
OH Mandor

6.30 Memasang lisplank (2 x 20) cm, kayu kelas I atau II


0.011
m3 Papan Kayu (Bangkirai)
0.100
kg Paku 2" - 5"
0.100
OH Pekerja Tidak terampil
0.200
OH Tukang kayu
0.025
OH Kepala tukang
0.005
OH Mandor

Harga
Rp.

3,442,593.00

23,702.00
89,653.85
119,538.46
134,480.76
127,009.61

3,442,593.00

23,702.00
89,653.85
119,538.46
134,480.76
127,009.61

3,442,593.00

23,702.00
89,653.85
119,538.46
134,480.76
127,009.61

m2
###
23,702.00
89,653.85
119,538.46
134,480.76
127,009.61

No.

Rincian Pekerjaan

Satuan

6.31 Memasang lisplank (2.5 x 20) cm, kayu kelas II atau


0.011
m3 Papan Kayu (Meranti)
0.050
kg Paku 2" - 5"
0.100
OH Pekerja Tidak terampil
0.200
OH Tukang kayu
0.020
OH Kepala tukang
0.005
OH Mandor

m2

6.32 Memasang lisplank 2 x (2 x 20) cm, kayu bangkirai


0.015
m3 Papan Kayu (Bangkirai)
0.060
kg Paku 2" - 5"
0.150
OH Pekerja Tidak terampil
0.250
OH Tukang kayu
0.025
OH Kepala tukang
0.075
OH Mandor

m2

6.33 Memasang lisplank 2 x (2.5 x 20) cm, kayu meranti


0.009
m3 Papan Kayu (Meranti)
0.060
kg Paku 2" - 5"
0.100
OH Pekerja Tidak terampil
0.100
OH Tukang kayu
0.010
OH Kepala tukang
0.050
OH Mandor

m2

6.34 Memasang lisplank 2 x (2 x 20) cm, kayu borneo


0.004
m3 Papan Kayu
0.060
kg Paku ulin 2" - 5"
0.100
OH Pekerja Tidak terampil
0.100
OH Tukang kayu
0.010
OH Kepala tukang
0.050
OH Mandor

m2

Harga
Rp.

3,442,593.00

23,702.00
89,653.85
119,538.46
134,480.76
127,009.61

###
23,702.00
89,653.85
119,538.46
134,480.76
127,009.61

3,442,593.00

23,702.00
89,653.85
119,538.46
134,480.76
127,009.61

###
39,591.00
89,653.85
119,538.46
134,480.76
127,009.61

No.

Rincian Pekerjaan

6.35 Memasang rangka dinding pemisah (60 x 120) cm,


kayu kelas II atau III
0.028
m3 Balok Kayu
0.150
kg Paku 2" - 5"
0.150
OH Pekerja Tidak terampil
0.450
OH Tukang kayu
0.045
OH Kepala tukang
0.008
OH Mandor

Satuan
m2

3,442,593.00

23,702.00
89,653.85
119,538.46
134,480.76
127,009.61

6.36 Memasang dinding pemisah teakwood rangkap,


m2
rangka kayu kelas III
0.028
m3 Balok Kayu, meranti uk (6 x 12) cm
0.150
kg Paku 2" - 5"
0.860
lbr Teakwood tebal 4 cm, uk (120 x 240) cm
0.150
OH Pekerja Tidak terampil
0.450
OH Tukang kayu
0.045
OH Kepala tukang
0.008
OH Mandor

6.37 Memasang dinding pemisah plywood rangkap,


rangka kayu kelas III
0.028
m3 Balok Kayu, meranti uk (6 x 12) cm
0.150
kg Paku 2" - 5"
0.860
lbr Plywood tebal 4 cm, uk (120 x 240) cm
0.200
OH Pekerja Tidak terampil
0.600
OH Tukang kayu
0.060
OH Kepala tukang
0.010
OH Mandor

Harga
Rp.

###
23,702.00
376,244.00
89,653.85
119,538.46
134,480.76
127,009.61

m2

6.38 Memasang dinding lambriziring dari papan kayu kela m2


0.007
m3 Papan Kayu ulin
0.100
kg Paku ulin 5 cm dan 10 cm
0.600
OH Pekerja Tidak terampil
1.800
OH Tukang kayu

###
23,702.00
95,205.00
89,653.85
119,538.46
134,480.76
127,009.61

###
39,591.00
89,653.85
119,538.46

No.

Rincian Pekerjaan
0.180
0.030

OH
OH

Satuan

Kepala tukang
Mandor

134,480.76
127,009.61

6.39 Memasang dinding lambriziring dari plywood uk (1


0.400
lbr Plywood tebal 4 mm
0.050
kg Paku 1 cm dan 2,5 cm
0.025
OH Pekerja Tidak terampil
0.075
OH Tukang kayu
0.008
OH Kepala tukang
0.001
OH Mandor

m2

6.40 Pekerjaan Kayu Kasar Meranti


2.500 Oh
Pekerja Tidak terampil
7.500 Oh
Tukang kayu
0.750 Oh
Kepala tukang
0.125 Oh
Mandor
1.100 M3
Kayu meranti
3.000 Kg
Paku Biasa

m3

6.41 Pekerjaan
2.500
7.500
0.750
0.125
1.100
3.000

m3

Kayu Kasar Ulin


Oh Pekerja Tidak terampil
Oh Tukang kayu
Oh Kepala tukang
Oh Mandor
M3 Kayu Ulin
Kg Paku Ulin

6.42 Memasang bekisting untuk pondasi


0.040
m3 Kayu kelas III (meranti uk. 5/7)
0.300
kg Paku
0.100
ltr Minyak bekisting (Solar)
0.520
OH Pekerja Tidak terampil
0.260
OH Tukang kayu

Harga
Rp.

95,205.00
39,591.00
89,653.85
119,538.46
134,480.76
127,009.61

89,653.85
119,538.46
134,480.76
127,009.61

###
23,702.00

89,653.85
119,538.46
134,480.76
127,009.61

###
39,591.00

m2
3,442,593.00

23,702.00
15,294.00
89,653.85
119,538.46

No.

Rincian Pekerjaan
0.026
0.026

OH
OH

Satuan

Kepala tukang
Mandor

134,480.76
127,009.61

6.43 Memasang bekisting untuk sloof


0.045
m3 Kayu kelas III (meranti uk. 5/7)
0.300
kg Paku
0.100
ltr Minyak bekisting (Solar)
0.520
OH Pekerja Tidak terampil
0.260
OH Tukang kayu
0.026
OH Kepala tukang
0.026
OH Mandor

m2

6.44 Memasang bekisting untuk kolom


0.040
m3 Kayu kelas III (meranti uk. 5/7)
0.400
kg Paku
0.200
ltr Minyak bekisting (Solar)

m2

0.015 m3

0.350
2.000
0.660
0.330
0.033
0.033

lbr
btg
OH
OH
OH
OH

0.018 m3

0.350
2.000
0.660
0.330
0.033

lbr
btg
OH
OH
OH

3,442,593.00

23,702.00
15,294.00
89,653.85
119,538.46
134,480.76
127,009.61

3,442,593.00

23,702.00
15,294.00

Balok kayu kelas III (meranti)

3,442,593.00

172,004.00
19,729.00

Plywood tebal 9 mm
Dolken kayu galam (8-10)cm, pjg 4 m
Pekerja Tidak terampil
Tukang kayu
Kepala tukang
Mandor

6.45 Memasang bekisting untuk balok


0.040
m3 Kayu kelas III (meranti uk. 5/7)
0.400
kg Paku
0.200
ltr Minyak bekisting (Solar)
Balok kayu kelas III (meranti)

Plywood tebal 9 mm
Dolken kayu galam (8-10)cm, pjg 4 m
Pekerja Tidak terampil
Tukang kayu
Kepala tukang

Harga
Rp.

89,653.85
119,538.46
134,480.76
127,009.61

m2
3,442,593.00

23,702.00
15,294.00
3,442,593.00

172,004.00
19,729.00
89,653.85
119,538.46
134,480.76

No.

Rincian Pekerjaan
0.033

OH

Mandor

6.46 Memasang bekisting untuk lantai


0.040
m3 Kayu kelas III (meranti uk. 5/7)
0.400
kg Paku
0.200
ltr Minyak bekisting (Solar)
0.015 m3

0.350
6.000
0.660
0.330
0.033
0.033

lbr
btg
OH
OH
OH
OH

0.02 m3

lbr
btg
bh
OH
OH
OH
OH

0.015 m3

0.350
2.000

lbr
btg

m2
3,442,593.00

23,702.00
15,294.00
3,442,593.00

172,004.00
19,729.00

Plywood tebal 9 mm
Dolken kayu galam (8-10)cm, pjg 4 m
Pekerja Tidak terampil
Tukang kayu
Kepala tukang
Mandor

89,653.85
119,538.46
134,480.76
127,009.61

m2
3,442,593.00

23,702.00
15,294.00

Balok kayu kelas III (meranti)

3,442,593.00

172,004.00
19,729.00
5,000.00

Plywood tebal 9 mm
Dolken kayu galam (8-10)cm, pjg 4 m
Formite/penjaga jarak bekisting/spacer
Pekerja Tidak terampil
Tukang kayu
Kepala tukang
Mandor

6.48 Memasang bekisting untuk tangga


0.030
m3 Kayu kelas III (meranti uk. 5/7)
0.400
kg Paku
0.150
ltr Minyak bekisting (Solar)
Balok kayu kelas III (meranti)

Plywood tebal 9 mm
Dolken kayu galam (8-10)cm, pjg 4 m

Harga
Rp.
127,009.61

Balok kayu kelas III (meranti)

6.47 Memasang bekisting untuk dinding


0.030
m3 Kayu kelas III (meranti uk. 5/7)
0.400
kg Paku
0.200
ltr Minyak bekisting (Solar)
0.350
3.000
4.000
0.660
0.330
0.033
0.033

Satuan

89,653.85
119,538.46
134,480.76
127,009.61

m2
3,442,593.00

23,702.00
15,294.00
3,442,593.00

172,004.00
19,729.00

No.

Rincian Pekerjaan
0.660
0.330
0.033
0.033

Pekerja Tidak terampil


Tukang kayu
Kepala tukang
Mandor

m2

6.50 Pekerjaan
0.100
0.250
0.025
0.005
0.031
0.400

Lantai Jembatan Papan Ulin Yang Dipaku


Oh Pekerja
Oh Tukang Kayu
Oh Kepala Tukang
Oh Mandor
M3 Papan Ulin
Kg Paku Biasa

m2

Dinding Papan Meranti


Oh Pekerja
Oh Tukang Kayu
Oh Kepala Tukang
Oh Mandor
M3 Papan Meranti
Kg Paku Biasa

m2

3,442,593.00

23,702.00
19,729.00
89,653.85
119,538.46
134,480.76
127,009.61

89,653.85
119,538.46
134,480.76
127,009.61
7,944,618.00
39,591.00

89,653.85
119,538.46
134,480.76
127,009.61
2,600,000.00
39,591.00

PEKERJAAN PENUTUP LANTAI DAN DINDING

7.1 Memasang 1 m2 lantai keramik, uk (25 x 25) cm

Harga
Rp.
89,653.85
119,538.46
134,480.76
127,009.61

6.49 Memasang jembatan untuk pengecoran beton


0.026
m3 Kayu kelas III (meranti uk. 5/7)
0.600
kg Paku
0.500
btg Dolken kayu galam (8-10)cm, pjg 4 m
0.150
OH Pekerja Tidak terampil
0.050
OH Tukang batu
0.005
OH Kepala tukang
0.008
OH Mandor

6.50 a Pekerjaan
0.100
0.250
0.025
0.005
0.028
0.400

7.

OH
OH
OH
OH

Satuan

m2

No.

Rincian Pekerjaan
16.000
11.380
0.042
1.500
0.620
0.350
0.035
0.030

bh
kg
m3
kg
OH
OH
OH
OH

Ubin keramik 25/25

7.2 Memasang
25.000
10.400
0.045
1.620
0.620
0.350
0.035
0.030

1 m2
bh
kg
m3
kg
OH
OH
OH
OH

lantai keramik, uk (20 x 20) cm


Ubin keramik 20/20

7.3 Memasang
20.000
11.380
0.042
1.500
0.620
0.350
0.035
0.030

1 m2
bh
kg
m3
kg
OH
OH
OH
OH

lantai keramik, uk (20 x 25) cm


Ubin keramik 20/25

7.4 Memasang
9.000
11.380
0.042
1.500

1 m2
bh
kg
m3
kg

lantai keramik, uk (30 x 30) cm


Ubin keramik 30/30

Satuan

4,764.63
1,794.68
400,000.00
4,912.15

Portland Cement
Pasir pasang

Semen warna
Pekerja Tidak terampil
Tukang batu
Kepala tukang
Mandor

89,653.85
119,538.46
134,480.76
127,009.61

m2
3,049.36
1,794.68
400,000.00
4,912.15

Portland Cement
Pasir pasang

Semen warna
Pekerja Tidak terampil
Tukang batu
Kepala tukang
Mandor

89,653.85
119,538.46
134,480.76
127,009.61

m2
4,243.80
1,794.68
400,000.00
4,912.15

Portland Cement
Pasir pasang

Semen warna
Pekerja Tidak terampil
Tukang batu
Kepala tukang
Mandor

Portland Cement
Pasir pasang

Semen warna

Harga
Rp.

89,653.85
119,538.46
134,480.76
127,009.61

m2
7,171.67
1,794.68
400,000.00
4,912.15

No.

Rincian Pekerjaan
0.620
0.350
0.035
0.030

7.5

7.6

7.7

7.8

OH
OH
OH
OH

Pasang Plastik
0.015
OH
0.003
OH
1.200 m2
1.000 Ls

Satuan

Pekerja Tidak terampil


Tukang batu
Kepala tukang
Mandor
Cor

Harga
Rp.
89,653.85
119,538.46
134,480.76
127,009.61

m2

Pekerja tidak terampil


Mandor
Plastik Cor
Alat Bantu

89,653.85
127,009.61
4,000.00
500.00

Pasang Pipa Drain PVC + Ijuk


0.036 Oh
Pekerja tidak terampil
0.002 Oh
Tukang batu
0.060 Oh
Kepala tukang
0.006 Oh
Mandor
1.200 Oh
Pipa PVC 2"
1.000 Ls
Alat bantu + Ijuk

bh

Pasangan finishing koral sikat variasi keramik


0.040 Oh
Pekerja
0.200 Oh
Tukang Batu
0.035 Oh
Kepala Tukang
0.030 Oh
Mandor
0.500 kg
Semen Warna
6.000 Bh
Keramik 30 x 30 cm
0.460 Zak
Koral sikat hitam / warna
15.380 Kg
Semen ex Tonasa
0.042 M3
Pasir Pasang

m2

Pasangan finishing koral sikat


0.040 Oh
Pekerja
0.200 Oh
Tukang Batu
0.035 Oh
Kepala Tukang

m2

89,653.85
119,538.46
134,480.76
127,009.61
14,135.00

1,000.00

89,653.85
119,538.46
134,480.76
127,009.61
7,213.73
8,414.18

94,720.00
1,794.68
400,000.00

89,653.85
119,538.46
134,480.76

No.

Rincian Pekerjaan
0.030
1.500
15.380
0.260

8.

Oh
Zak
Kg
kg

Mandor
Koral sikat hitam / warna
Semen ex Tonasa
Coating natural

Satuan

Harga
Rp.
127,009.61

140,000.00
1,794.68
94,720.00

PEKERJAAN LANGIT-LANGIT

8.1 Memasang
0.375
0.030
0.070
0.100
0.010
0.004

1 m2
lbr
kg
OH
OH
OH
OH

m2tebal 4 mm
langit-langit plywood, uk (60 x 120) cm,
Plywood 4' x 8' x 4 mm
95,205.00
Paku
46,212.00
Pekerja Tidak terampil
89,653.85
Tukang kayu
119,538.46
Kepala tukang
134,480.76
Mandor
127,009.61

8.2 Memasang
0.375
0.030
0.070
0.100
0.010
0.004

1 m2
lbr
kg
OH
OH
OH
OH

m2tebal 6 mm
langit-langit plywood, uk (60 x 120) cm,
Plywood 4' x 8' x 6 mm
116,391.00
Paku
46,212.00
Pekerja Tidak terampil
89,653.85
Tukang kayu
119,538.46
Kepala tukang
134,480.76
Mandor
127,009.61

8.3 Memasang
0.360
0.030
0.070
0.100
0.010
0.004

1 m2
lbr
kg
OH
OH
OH
OH

m2tebal 4 mm
langit-langit teakwood, uk (30 x 60) cm,
Teakwood 4' x 8' x 4 mm
376,244.00
Paku
46,212.00
Pekerja Tidak terampil
89,653.85
Tukang kayu
119,538.46
Kepala tukang
134,480.76
Mandor
127,009.61

8.4 Memasang 1 m2 langit-langit teakwood, uk (60 x 120) m2


cm, tebal 4 mm
0.375
lbr Teakwood 4' x 8' x 4 mm
376,244.00

No.

Rincian Pekerjaan
0.030
0.070
0.100
0.010
0.004

kg
OH
OH
OH
OH

Satuan

Harga
Rp.
46,212.00

Paku
Pekerja Tidak terampil
Tukang kayu
Kepala tukang
Mandor

89,653.85
119,538.46
134,480.76
127,009.61

PEKERJAAN PENGECATAN

9.1

9.2

9.3

9.4

Mencuci Bidang Permukaan Tembok yang pernah di


0.150 Oh
Pekerja Tidak terampil
0.003 Oh
Mandor
0.050 Kg
Sabun

M2

Mengerok Karat Cat Lama Permukaan Baja Dengan


0.150 Oh
Pekerja Tidak terampil
0.003 Oh
Mandor
0.050 Kg
Sabun

M2

Pengecatan Bidang Kayu Lama


0.070 Oh
Pekerja Tidak terampil
0.075 Oh
Tukang Cat
0.008 Oh
Kepala tukang
0.003 Oh
Mandor
0.150 Kg
Plamir
0.170 Ltr
Cat Dasar
0.170 Ltr
Cat Penutup

M2

Pengecatan Bidang Kayu Baru (1 Lapis Plamir),


1 Lapis Cat Dasar, 2 Lapis Cat Penutup
0.070 Oh
Pekerja Tidak terampil
0.009 Oh
Tukang Cat
0.006 Oh
Kepala tukang
0.003 Oh
Mandor

M2

89,653.85
127,009.61

15,000.00
Jumlah

89,653.85
127,009.61

15,000.00
Jumlah

89,653.85
119,538.46
134,480.76
127,009.61

29,791.00
70,000.00
84,168.00
Jumlah

89,653.85
119,538.46
134,480.76
127,009.61

No.

Rincian Pekerjaan
0.200
0.150
0.170
0.260

9.5

9.6

9.7

9.8

Ltr
Kg
Ltr
Ltr

Satuan

Cat meni
Plamir
Cat Dasar
Cat Penutup

Pelaburan Bidang Kayu Dengan Teak Oil


0.040 Oh
Pekerja Tidak terampil
0.063 Oh
Tukang Cat
0.063 Oh
Kepala tukang
0.003 Oh
Mandor
0.360 Ltr
Teak oil

70,000.00
29,791.00
70,000.00
84,168.00
Jumlah
M2
89,653.85
119,538.46
134,480.76
127,009.61

70,000.00
Jumlah

Pengecatan Tembok Baru (1 Lapis Plamir, 1 Lapis Ca M2


0.020 Oh
Pekerja Tidak terampil
0.063 Oh
Tukang Cat
0.006 Oh
Kepala tukang
0.003 Oh
Mandor
0.100 Kg
Plamir
0.110 Ltr
Cat Dasar
0.260 Klg
Cat Penutup 2 x
Pengecatan Plafond Baru ( 1 Lapis cat dasar, 2 Lap
0.020 Oh
Pekerja Tidak terampil
0.063 Oh
Tukang Cat
0.006 Oh
Kepala tukang
0.003 Oh
Mandor
0.110 Ltr
Cat Dasar
0.260 Klg
Cat Penutup 2 x

Harga
Rp.

89,653.85
119,538.46
134,480.76
127,009.61

29,791.00
19,809.00
45,285.20
Jumlah

M2

Pengecatan Tembok Lama (1 Lapis Cat Dasar, 2 Lapi M2


0.028 Oh
Pekerja Tidak terampil
0.042 Oh
Tukang Cat
0.004 Oh
Kepala tukang
0.003 Oh
Mandor

89,653.85
119,538.46
134,480.76
127,009.61

19,809.00
45,285.20
Jumlah

89,653.85
119,538.46
134,480.76
127,009.61

No.

Rincian Pekerjaan
0.120 Ltr
0.180 Kg

Cat Dasar
Cat Penutup 2 x

9.9 Pengecatan Tembok Lama (1 Lapis Cat Dasar, 2 Lap

0.028
0.042
0.004
0.003
0.120
0.180

Oh
Oh
Oh
Oh
Ltr
Kg

Satuan

19,809.00
45,285.20
Jumlah
M2

Pekerja Tidak terampil


Tukang Cat
Kepala tukang
Mandor
Cat Dasar
Cat Penutup 2 x

9.10 Pengecatan Permukaan Baja Dengan Meni Besi


0.020 Oh
Pekerja Tidak terampil
0.200 Oh
Tukang Cat
0.020 Oh
Kepala tukang
0.010 Oh
Mandor
0.100 Kg
Meni besi
0.010 Bh
Kuas 4"

Harga
Rp.

89,653.85
119,538.46
134,480.76
127,009.61

19,809.00
104,791.20
Jumlah
M2

9.11 Pengecatan Permukaan Baja Lapis Seng (Galbani)


M2
Secara Manual Sistem 1 Lapis Cat Mutakhir tebal 200 um
0.006 Oh
Pekerja Tidak terampil
0.060 Oh
Tukang Cat
0.012 Oh
Kepala tukang
0.006 Oh
Mandor
0.300 Kg
Cat Penutup

89,653.85
119,538.46
134,480.76
127,009.61

60,649.00
16,869.00
Jumlah

89,653.85
119,538.46
134,480.76
127,009.61

105,000.00
Jumlah

9.12 Pengecatan Permukaan Baja Lapis Seng (Galbani)


M2
Secara Manual Sistem 3 Lapis Cat Konvensional dengan tebal 200 um
0.500 Oh
Pekerja Tidak terampil
89,653.85
0.800 Oh
Tukang Cat
119,538.46
0.300 Oh
Kepala tukang
134,480.76
0.200 Oh
Mandor
127,009.61
0.110 Kg
Cat Dasar
19,809.00
0.170 Kg
Cat Antara
33,000.00

No.

Rincian Pekerjaan
0.080 Kg

Satuan

Cat Penutup

9.13 Pengecatan Permukaan Baja Lapis Seng (Galbani)


Secara Semprot (Airless Spray) Dengan Sistem
1 Lapis Mutakhir Dengan Tebal 200 um
0.400 Oh
Pekerja Tidak terampil
0.700 Oh
Tukang Cat
0.200 Oh
Kepala tukang
0.200 Oh
Mandor
0.300 Kg
Cat Dasar

Harga
Rp.
105,000.00
Jumlah

M2

89,653.85
119,538.46
134,480.76
127,009.61

19,809.00
Jumlah

10 PEKERJAAN SANITASI
10.1 Memasang Bak
2.100 Oh
0.110 Oh
0.750 Oh
0.070 Oh
1.000 Bh
6.000 Kg
0.010 M3

Mandi Teraso Volume 0,30 m3


Pekerja Tidak terampil
Mandor
Tukang batu
Kepala tukang
Bak Teraso

10.2 Memasang Bak


6.000 Oh
0.300 Oh
3.000 Oh
0.300 Oh
200.000 Bh
120.000 Kg
0.300 M3
20.000 Bh
6.000 Kg

Bh
89,653.85
127,009.61
119,538.46
134,480.76

239,309.00
1,794.68
400,000.00
Jumlah

Portland Cement
Pasir pasang

Mandi Batu Bata Volume 0,30 m3


Pekerja Tidak terampil
Mandor
Tukang batu
Kepala tukang
Batu Bata
Portland Cement
Pasir pasang

Keramik (20 x 25) cm


Semen Putih

Bh
89,653.85
127,009.61
119,538.46
134,480.76

1,523.00
1,794.68
400,000.00
4,243.80
4,912.15
Jumlah

No.

Rincian Pekerjaan

Satuan

10.3 Memasang Bak Kontrol Pasangan Batu Bata


Ukuran (30 x 30) cm Tinggi 35 cm
3.200 Oh
Pekerja Tidak terampil
0.016 Oh
Mandor
1.015 Oh
Tukang batu
0.002 Oh
Kepala tukang
73.000 Bh
Batu Bata
44.000 Kg
Portland Cement
0.070 M3
Pasir pasang
0.070 M3
Batu Kerikil
1.600 Kg
Besi Beton polos
0.060 M3
Pasir ex Palu

Bh

10.4 Memasang Bak Kontrol Pasangan Batu Bata


Ukuran (45 x 45) cm Tinggi 50 cm
1.420 Oh
Pekerja Tidak terampil
0.071 Oh
Mandor
0.473 Oh
Tukang batu
0.047 Oh
Kepala tukang
125.000 Bh
Batu Bata
77.000 Kg
Portland Cement
0.130 M3
Pasir pasang
0.020 M3
Batu Kerikil
2.600 Kg
Besi Beton polos
0.090 M3
Pasir ex Palu

Bh

10.5 Memasang Bak Kontrol Pasangan Batu Bata


Ukuran (60 x 60) cm Tinggi 60 cm
2.160 Oh
Pekerja Tidak terampil
0.108 Oh
Mandor
0.720 Oh
Tukang batu
0.100 Oh
Tukang Gali
0.072 Oh
Kepala tukang
186.000 Bh
Batu Bata
114.000 Kg
Portland Cement

Bh

Harga
Rp.

89,653.85
127,009.61
119,538.46
134,480.76

1,523.00
1,794.68
400,000.00
532,960.00
12,712.00
370,623.00
Jumlah

89,653.85
127,009.61
119,538.46
134,480.76

1,523.00
1,794.68
400,000.00
532,960.00
12,712.00
370,623.00
Jumlah

89,653.85
127,009.61
119,538.46
119,538.46
134,480.76

1,523.00
1,794.68

No.

Rincian Pekerjaan
0.184
0.033
4.850
0.120

M3
M3
Kg
M3

Satuan

400,000.00
532,960.00
12,712.00
370,623.00
Jumlah

Pasir pasang

Batu Kerikil
Besi Beton polos
Pasir ex Palu

10.6 Memasang Pipa Galvanis Diameter 1/2"


0.054 Oh
Pekerja Tidak terampil
0.090 Oh
Tukang batu
0.009 Oh
Kepala tukang
0.027 Oh
Mandor
1.200 M'
Pipa Galvanis
1.000 Ls
Perlengkapan (35% Harga Pipa)

M'

10.7 Memasang Pipa PVC Type AW Diameter 1/2"


0.036 Oh
Pekerja Tidak terampil
0.002 Oh
Tukang batu
0.060 Oh
Kepala tukang
0.006 Oh
Mandor
1.200 M'
Pipa PVC
1.000 Ls
Perlengkapan (35% Harga Pipa)

M'

10.8 Memasang Bak


0.030 Oh
0.300 Oh
0.030 Oh
0.002 Oh
1.000 Bh
1.000 Set

Bh

10.9 Pasang Kloset


3.300 Oh
1.100 Oh
0.010 Oh

Cuci Piring Stainles Steel


Pekerja Tidak terampil
Tukang batu
Kepala tukang
Mandor
Bak Cuci Stainles Steel
Water Drain + Assesories

duduk
Pekerja Tidak terampil
Tukang batu
Kepala tukang

Harga
Rp.

89,653.85
119,538.46
134,480.76
127,009.61

94,539.25
33,088.74
Jumlah

89,653.85
119,538.46
134,480.76
127,009.61

7,415.00
2,595.25
Jumlah

89,653.85
119,538.46
134,480.76
127,009.61

300,000.00
50,000.00
Jumlah
Bh
89,653.85
119,538.46
134,480.76

No.

Rincian Pekerjaan
0.160 Oh
1.000 Bh
1.000 Ls

Satuan

Mandor
Kloset Duduk
Perlengkapan 6 % harga kloset

### Pasang kran air


0.010 Oh
Pekerja Tidak terampil
0.100 Oh
Tukang batu
0.010 Oh
Kepala tukang
0.002 Oh
Mandor
1.000 Bh
kran air
0.025 Bh
Seat Tape

Harga
Rp.
127,009.61

###
340,027.38
Jumlah
Bh
89,653.85
119,538.46
134,480.76
127,009.61

48,500.00
5,000.00
Jumlah

NI
PAN
Jumlah Harga (Rp.)
Upah
Bahan
Jumlah

67,240.39
3,175.24
70,415.63

67,240.39
3,175.24
70,415.63

80,688.47
5,715.43
86,403.90

80,688.47
5,715.43
86,403.90

94,136.54
8,509.64
###

94,136.54
8,509.64
###

89,653.85
4,064.31
93,718.16

89,653.85
4,064.31
93,718.16

134,480.78
7,620.58
###

134,480.78
7,620.58
###

107,584.62
5,715.43

107,584.62
5,715.43

Jumlah Harga (Rp.)


Upah
Bahan
Jumlah
###

###

4,482.69
635.05
5,117.74

4,482.69
635.05
5,117.74

29,585.77
1,270.10
30,855.87

29,585.77
1,270.10
30,855.87

46,261.39
6,350.48
52,611.87

46,261.39
6,350.48
52,611.87

23,471.88

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#VALUE!
#VALUE!

#VALUE!
#VALUE!

Jumlah Harga (Rp.)


Upah
Bahan
Jumlah
30,000.00

30,000.00

#REF! 30,000.00

30,000.00

#REF!

#NAME?

#NAME?

#NAME?

#NAME?

#REF!

#REF!

#REF!

#REF!

#REF!
#REF!

#VALUE!
#VALUE!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

Jumlah Harga (Rp.)


Upah
Bahan
Jumlah
#VALUE!
52,500.00

52,500.00
#REF!

577,500.00
703,514.56
125,600.00

577,500.00
703,514.56
125,600.00
134,480.78
71,723.08
8,068.85
95,257.21
###

#REF!

134,480.78
71,723.08
8,068.85
95,257.21
###

###

577,500.00
479,179.56
170,800.00
134,480.78
71,723.08
8,068.85
9,525.72
###

###

577,500.00
703,514.56
125,600.00
134,480.78
71,723.08
8,068.85

577,500.00
479,179.56
170,800.00
134,480.78
71,723.08
8,068.85
9,525.72
###

577,500.00
703,514.56
125,600.00
134,480.78
71,723.08
8,068.85

Jumlah Harga (Rp.)


Upah
Bahan
Jumlah
9,525.72
###

###

630,000.00
362,525.36
194,000.00
134,480.78
71,723.08
8,068.85
9,525.72
###

###

630,000.00
292,532.84
208,000.00
134,480.78
71,723.08
8,068.85
9,525.72
###

###

630,000.00
244,076.48
217,600.00
134,480.78
71,723.08
8,068.85
9,525.72
###

###

630,000.00
209,977.56

9,525.72
###

630,000.00
362,525.36
194,000.00
134,480.78
71,723.08
8,068.85
9,525.72
###

630,000.00
292,532.84
208,000.00
134,480.78
71,723.08
8,068.85
9,525.72
###

630,000.00
244,076.48
217,600.00
134,480.78
71,723.08
8,068.85
9,525.72
###

630,000.00
209,977.56

Jumlah Harga (Rp.)


Upah
Bahan
Jumlah
224,400.00
134,480.78
71,723.08
8,068.85
9,525.72
###

###

630,000.00
163,315.88
219,200.00
134,480.78
71,723.08
8,068.85
9,525.72
###

###

630,000.00
84,881.95
69,930.00
46,620.00
5,244.75
4,953.37
###

###

252,000.00
348,167.92
115,634.38
249,425.28
###
71,263.80
268,961.55
101,607.69
11,430.86

224,400.00
134,480.78
71,723.08
8,068.85
9,525.72
###

630,000.00
163,315.88
219,200.00
134,480.78
71,723.08
8,068.85
9,525.72
###

630,000.00
84,881.95
69,930.00
46,620.00
5,244.75
4,953.37
###

252,000.00
348,167.92
115,634.38
249,425.28
###
71,263.80
268,961.55
101,607.69
11,430.86

Jumlah Harga (Rp.)


Upah
Bahan
Jumlah
19,051.44
###

###

236,250.00
348,167.92
115,634.38
249,425.28
213,376.16
35,861.54
4,034.42
10,160.77
###

###

3,733.23
34,838.56
79,944.00
108,578.14
572,040.00
35,631.90
110,162.98
2,844.24
1,376.46
7,149.84
89,653.85
80,090.77
9,010.21
6,350.48
###

###

3,143.78
29,649.84
66,620.00
87,939.32
438,564.00

19,051.44
###

236,250.00
348,167.92
115,634.38
249,425.28
213,376.16
35,861.54
4,034.42
10,160.77
###

3,733.23
34,838.56
79,944.00
108,578.14
572,040.00
35,631.90
110,162.98
2,844.24
1,376.46
7,149.84
89,653.85
80,090.77
9,010.21
6,350.48
###

3,143.78
29,649.84
66,620.00
87,939.32
438,564.00

Jumlah Harga (Rp.)


Upah
Bahan
Jumlah
27,713.70
92,950.01
2,844.24
1,376.46
5,958.20
71,723.08
59,769.23
6,724.04
5,080.38
###

###

27,713.70
92,950.01
2,844.24
1,376.46
5,958.20
71,723.08
59,769.23
6,724.04
5,080.38
###

317,784.72
3,600.00
###

8,965.39
29,884.62
3,362.02
6,350.48
317,784.72
3,600.00
###

158,892.36
3,600.00
###

8,965.39
29,884.62
3,362.02
6,350.48
158,892.36
3,600.00
###

572,014.37
3,600.00
###

8,965.39
29,884.62
3,362.02
6,350.48
572,014.37
3,600.00
###

8,965.39
29,884.62
3,362.02
6,350.48

48,562.51

8,965.39
29,884.62
3,362.02
6,350.48

48,562.51

8,965.39
29,884.62
3,362.02
6,350.48

48,562.51

Jumlah Harga (Rp.)


Upah
Bahan
Jumlah

8,965.39
29,884.62
3,362.02
6,350.48

48,562.51

###
3,600.00
###

443,285.96
230,050.99
394,390.40
10,750.00
147,928.85
32,873.08
3,765.46
10,541.80
###

###

495,331.68
219,197.03
399,522.61
10,750.00
147,928.85
32,873.08
3,765.46
10,541.80
###

###

8,965.39
29,884.62
3,362.02
6,350.48
###
3,600.00
###

443,285.96
230,050.99
394,390.40
10,750.00
147,928.85
32,873.08
3,765.46
10,541.80
###

495,331.68
219,197.03
399,522.61
10,750.00
147,928.85
32,873.08
3,765.46
10,541.80
###

Jumlah Harga (Rp.)


Upah
Bahan
Jumlah
536,609.32
211,519.84
401,496.53
10,750.00
147,928.85
32,873.08
3,765.46
10,541.80
###

###

412,776.40
236,404.53
405,444.39
10,000.00
107,584.62
23,907.69
2,689.62
7,620.58
###

###

585,065.68
201,195.34
406,233.96
10,750.00
147,928.85
32,873.08
3,765.46
10,541.80
###

###

536,609.32
211,519.84
401,496.53
10,750.00
147,928.85
32,873.08
3,765.46
10,541.80
###

412,776.40
236,404.53
405,444.39
10,000.00
107,584.62
23,907.69
2,689.62
7,620.58
###

585,065.68
201,195.34
406,233.96
10,750.00
147,928.85
32,873.08
3,765.46
10,541.80
###

Jumlah Harga (Rp.)


Upah
Bahan
Jumlah
631,727.36
193,518.15
407,023.53
10,750.00
147,928.85
32,873.08
3,765.46
10,541.80
###

###

665,826.28
184,782.04
413,340.09
10,750.00
147,928.85
32,873.08
3,765.46
10,541.80
###

###

689,157.12
183,193.65
410,181.81
10,750.00
147,928.85
32,873.08
3,765.46
10,541.80
###

###

728,640.08

631,727.36
193,518.15
407,023.53
10,750.00
147,928.85
32,873.08
3,765.46
10,541.80
###

665,826.28
184,782.04
413,340.09
10,750.00
147,928.85
32,873.08
3,765.46
10,541.80
###

689,157.12
183,193.65
410,181.81
10,750.00
147,928.85
32,873.08
3,765.46
10,541.80
###

728,640.08

Jumlah Harga (Rp.)


Upah
Bahan
Jumlah
181,075.81
405,049.60
10,750.00
147,928.85
32,873.08
3,765.46
10,541.80
###

###

741,202.84
180,281.62
403,075.67
10,750.00
147,928.85
32,873.08
3,765.46
10,541.80
###

###

787,864.52
177,369.58
397,153.90
10,750.00
188,273.09
41,838.46
4,706.83
13,336.01
###

###

804,016.64
176,575.39

181,075.81
405,049.60
10,750.00
147,928.85
32,873.08
3,765.46
10,541.80
###

741,202.84
180,281.62
403,075.67
10,750.00
147,928.85
32,873.08
3,765.46
10,541.80
###

787,864.52
177,369.58
397,153.90
10,750.00
188,273.09
41,838.46
4,706.83
13,336.01
###

804,016.64
176,575.39

Jumlah Harga (Rp.)


Upah
Bahan
Jumlah
394,785.19
10,750.00
188,273.09
41,838.46
4,706.83
13,336.01
###

###

133,476.00
3,959.10
4,482.69
5,976.92
672.40
381.03
11,513.04
1,151.30

###
13,743.51
143,199.00
3,959.10

4,482.69
5,976.92
672.40
381.03
11,513.04

###
133,476.00
3,959.10

4,482.69
5,976.92
672.40
381.03
11,513.04

###

133,476.00
3,959.10

394,785.19
10,750.00
188,273.09
41,838.46
4,706.83
13,336.01
###

133,476.00
3,959.10
4,482.69
5,976.92
672.40
381.03
###

143,199.00
3,959.10
4,482.69
5,976.92
672.40
381.03
###
133,476.00
3,959.10
4,482.69
5,976.92
672.40
381.03
###

133,476.00
3,959.10

Jumlah Harga (Rp.)


Upah
Bahan
Jumlah
4,482.69
5,976.92
672.40
381.03
11,513.04

###

133,476.00
3,959.10
4,482.69
5,976.92
672.40
381.03
11,513.04

###

143,199.00
3,959.10
4,482.69
5,976.92
672.40
381.03
11,513.04

###

1,434.46
1,912.62
766.54
57,245.24
1,000.00
58,245.24

4,113.62

1,434.46
1,912.62
766.54
107,171.53

4,482.69
5,976.92
672.40
381.03
###

133,476.00
3,959.10
4,482.69
5,976.92
672.40
381.03
###

143,199.00
3,959.10
4,482.69
5,976.92
672.40
381.03
###

1,434.46
1,912.62
766.54
57,245.24
1,000.00
62,358.86

1,434.46
1,912.62
766.54
107,171.53

Jumlah Harga (Rp.)


Upah
Bahan
Jumlah
1,000.00
###

4,113.62

1,434.46
1,912.62
766.54
141,273.85
1,000.00
###

4,113.62

688,518.60
35,553.00
6,117.60
###
89,079.75
603,012.48
200,136.42
431,697.60
475,165.41
32,873.08
155,400.00
125,515.38
35,233.96
33,657.55
###

1,000.00
###

1,434.46
1,912.62
766.54
141,273.85
1,000.00
###

###

688,518.60
35,553.00
6,117.60
###
89,079.75
603,012.48
200,136.42
431,697.60
475,165.41
32,873.08
155,400.00
125,515.38
35,233.96
33,657.55
###

929,500.11
47,404.00
9,176.40
###
118,773.00
603,012.48
200,136.42
431,697.60

929,500.11
47,404.00
9,176.40
###
118,773.00
603,012.48
200,136.42
431,697.60

Jumlah Harga (Rp.)


Upah
Bahan
Jumlah
506,544.25
32,873.08
186,480.00
167,353.84
43,437.29
35,943.72
###

###

###
94,808.00
30,588.00
###
178,159.50
603,012.48
200,136.42
431,697.60
516,388.95
602,014.00
394,580.00
632,059.64
32,873.08
197,238.46
251,030.77
54,195.75
44,834.39
###

506,544.25
32,873.08
186,480.00
167,353.84
43,437.29
35,943.72
###

###

###
94,808.00
30,588.00
###
178,159.50
603,012.48
200,136.42
431,697.60
516,388.95
602,014.00
394,580.00
632,059.64
32,873.08
197,238.46
251,030.77
54,195.75
44,834.39
###

###
75,846.40
24,470.40
###
118,773.00
603,012.48
200,136.42
431,697.60

###
75,846.40
24,470.40
###
118,773.00
603,012.48
200,136.42
431,697.60

Jumlah Harga (Rp.)


Upah
Bahan
Jumlah
481,963.02
481,611.20
315,664.00
569,301.95
32,873.08
197,238.46
167,353.84
44,782.09
40,389.06
###

###

###
75,846.40
24,470.40
###
89,079.75
603,012.48
200,136.42
431,697.60
413,111.16
481,611.20
631,328.00
475,165.41
32,873.08
155,400.00
125,515.38
35,637.40
33,657.55
###

481,963.02
481,611.20
315,664.00
569,301.95
32,873.08
197,238.46
167,353.84
44,782.09
40,389.06
###

###

###
75,846.40
24,470.40
###
89,079.75
603,012.48
200,136.42
431,697.60
413,111.16
481,611.20
631,328.00
475,165.41
32,873.08
155,400.00
125,515.38
35,637.40
33,657.55
###

826,222.32
75,846.40
24,470.40
###
89,079.75

826,222.32
75,846.40
24,470.40
###
89,079.75

Jumlah Harga (Rp.)


Upah
Bahan
Jumlah
603,012.48
200,136.42
431,697.60
550,814.88
481,611.20
473,496.00
475,165.41
32,873.08
155,400.00
125,515.38
35,233.96
33,657.55
###

###

860,648.25
71,106.00
18,352.80
###
118,773.00
603,012.48
200,136.42
431,697.60
361,472.27
430,010.00
276,206.00
506,544.25
32,873.08
186,480.00
167,353.84
43,437.29
35,943.72
###

###

6,885.19
237.02

603,012.48
200,136.42
431,697.60
550814.88

481,611.20
473,496.00
475,165.41
32,873.08
155,400.00
125,515.38
35,233.96
33,657.55
###

860,648.25
71,106.00
18,352.80
###
118,773.00
603,012.48
200,136.42
431,697.60
361472.27

430,010.00
276,206.00
506,544.25
32,873.08
186,480.00
167,353.84
43,437.29
35,943.72
###

6,885.19
237.02

Jumlah Harga (Rp.)


Upah
Bahan
Jumlah
18,352.80
38,136.00
17,815.95
7,178.72
2,223.74
4,796.64
16,137.69
2,390.77
2,390.77
2,390.77
806.88
1,143.09
25,259.97

95,626.06

10,327.78
474.04
18,352.80
45,763.20
1,979.55
9,870.74
3,335.61
7,994.40
26,627.19
3,944.77
3,944.77
3,944.77
1,344.81
1,905.14
41,711.45

98,098.12

147,928.85
29,884.62
3,362.02
10,160.77
192,723.96

18,352.80
38,136.00
17,815.95
7,178.72
2,223.74
4,796.64
16,137.69
2,390.77
2,390.77
2,390.77
806.88
1,143.09
###

10,327.78
474.04
18,352.80
45,763.20
1,979.55
9,870.74
3,335.61
7,994.40
26,627.19
3,944.77
3,944.77
3,944.77
1,344.81
1,905.14
###

147,928.85
29,884.62
3,362.02
10,160.77
192,723.96

Jumlah Harga (Rp.)


Upah
Bahan
Jumlah
463,675.20
391,240.24
###
###

147,928.85
29,884.62
3,362.02
10,160.77
192,723.96
415,708.80
416,365.76
###
###

91,380.00
114,913.36
23,600.00
58,275.00
23,907.69
2,689.62
3,810.29
88,682.60

###

118,794.00
78,068.58
32,000.00
58,275.00
23,907.69
2,689.62
3,810.29
88,682.60

###

463,675.20
391,240.24
###

147,928.85
29,884.62
3,362.02
10,160.77
192,723.96
415,708.80
416,365.76
###

91,380.00
114,913.36
23,600.00
58,275.00
23,907.69
2,689.62
3,810.29
###

118,794.00
78,068.58
32,000.00
58,275.00
23,907.69
2,689.62
3,810.29
###

Jumlah Harga (Rp.)


Upah
Bahan
Jumlah

118,794.00
59,134.71
36,400.00
58,275.00
23,907.69
2,689.62
3,810.29
88,682.60

###

118,794.00
47,648.75
37,200.00
58,275.00
23,907.69
2,689.62
3,810.29
88,682.60

###

118,794.00
47,648.75
37,200.00
58,275.00
23,907.69
2,689.62
3,810.29
88,682.60

###

118,794.00

118,794.00
59,134.71
36,400.00
58,275.00
23,907.69
2,689.62
3,810.29
###

118,794.00
47,648.75
37,200.00
58,275.00
23,907.69
2,689.62
3,810.29
###

118,794.00
47,648.75
37,200.00
58,275.00
23,907.69
2,689.62
3,810.29
###

118,794.00

Jumlah Harga (Rp.)


Upah
Bahan
Jumlah
47,648.75
37,200.00
58,275.00
23,907.69
2,689.62
3,810.29
88,682.60

###

118,794.00
39,841.90
40,800.00
58,275.00
23,907.69
2,689.62
3,810.29
88,682.60

###

118,794.00
49,892.10
11,200.00
28,689.23
11,953.85
1,344.81
1,905.14
43,893.03

###

118,794.00
34,009.19
15,200.00
28,689.23
11,953.85
1,344.81

47,648.75
37,200.00
58,275.00
23,907.69
2,689.62
3,810.29
###

118,794.00
39,841.90
40,800.00
58,275.00
23,907.69
2,689.62
3,810.29
###

118,794.00
49,892.10
11,200.00
28,689.23
11,953.85
1,344.81
1,905.14
###

118,794.00
34,009.19
15,200.00
28,689.23
11,953.85
1,344.81

Jumlah Harga (Rp.)


Upah
Bahan
Jumlah
1,905.14
43,893.03

###

118,794.00
25,789.55
16,000.00
28,689.23
11,953.85
1,344.81
1,905.14
43,893.03

###

118,794.00
20,638.82
17,200.00
28,689.23
11,953.85
1,344.81
1,905.14
43,893.03

###

118,794.00
17,372.50
18,000.00
28,689.23
11,953.85
1,344.81
1,905.14
43,893.03

###

1,905.14
###

118,794.00
25,789.55
16,000.00
28,689.23
11,953.85
1,344.81
1,905.14
###

118,794.00
20,638.82
17,200.00
28,689.23
11,953.85
1,344.81
1,905.14
###

118,794.00
17,372.50
18,000.00
28,689.23
11,953.85
1,344.81
1,905.14
###

Jumlah Harga (Rp.)


Upah
Bahan
Jumlah
118,794.00
14,931.74
19,600.00
28,689.23
11,953.85
1,344.81
1,905.14
43,893.03

###

118,794.00
11,665.42
20,000.00
28,689.23
11,953.85
1,344.81
1,905.14
43,893.03

###

208,560.00
25,125.52
12,800.00
26,896.16
11,953.85
1,344.81
1,905.14
42,099.96

###

208,560.00
19,741.48
14,000.00
26,896.16

118,794.00
14,931.74
19,600.00
28,689.23
11,953.85
1,344.81
1,905.14
###

118,794.00
11,665.42
20,000.00
28,689.23
11,953.85
1,344.81
1,905.14
###

208,560.00
25,125.52
12,800.00
26,896.16
11,953.85
1,344.81
1,905.14
###

208,560.00
19,741.48
14,000.00
26,896.16

Jumlah Harga (Rp.)


Upah
Bahan
Jumlah
11,953.85
1,344.81
1,905.14
42,099.96

###

486,640.00
25,125.52
12,800.00
26,896.16
17,930.77
2,017.21
1,905.14
48,749.28

###

27,824.72
6,400.00
17,930.77
17,930.77
2,017.21
12,700.96
50,579.71

34,224.72

18,348.81
8,000.00
17,930.77
17,930.77
2,017.21
12,700.96
50,579.71

26,348.81

11,953.85
1,344.81
1,905.14
###

486,640.00
25,125.52
12,800.00
26,896.16
17,930.77
2,017.21
1,905.14
###

27,824.72
6,400.00
17,930.77
17,930.77
2,017.21
12,700.96
84,804.43

18,348.81
8,000.00
17,930.77
17,930.77
2,017.21
12,700.96
76,928.52

Jumlah Harga (Rp.)


Upah
Bahan
Jumlah
13,955.43
9,200.00
17,930.77
17,930.77
2,017.21
12,700.96
50,579.71

23,155.43

11,198.80
9,600.00
17,930.77
17,930.77
2,017.21
12,700.96
50,579.71

20,798.80

9,303.62
10,400.00
17,930.77
17,930.77
2,017.21
12,700.96
50,579.71

19,703.62

7,925.31
10,800.00
17,930.77
17,930.77
2,017.21
12,700.96
50,579.71

13,955.43
9,200.00
17,930.77
17,930.77
2,017.21
12,700.96
73,735.14

11,198.80
9,600.00
17,930.77
17,930.77
2,017.21
12,700.96
71,378.51

9,303.62
10,400.00
17,930.77
17,930.77
2,017.21
12,700.96
70,283.33

18,725.31

7,925.31
10,800.00
17,930.77
17,930.77
2,017.21
12,700.96
69,305.02

7,063.86

7,063.86

Jumlah Harga (Rp.)


Upah
Bahan
Jumlah
11,200.00
17,930.77
17,930.77
2,017.21
12,700.96
50,579.71

18,263.86

6,202.41
11,600.00
17,930.77
17,930.77
2,017.21
12,700.96
50,579.71

17,802.41

24,465.08
10,800.00
23,310.00
23,907.69
2,689.62
1,651.12
51,558.43

35,265.08

18,607.24
12,400.00
23,310.00
23,907.69
2,689.62
1,651.12
51,558.43

11,200.00
17,930.77
17,930.77
2,017.21
12,700.96
68,843.57

6,202.41
11,600.00
17,930.77
17,930.77
2,017.21
12,700.96
68,382.12

24,465.08
10,800.00
23,310.00
23,907.69
2,689.62
1,651.12
86,823.51

31,007.24

18,607.24
12,400.00
23,310.00
23,907.69
2,689.62
1,651.12
82,565.67

14,931.74
12,800.00

14,931.74
12,800.00

Jumlah Harga (Rp.)


Upah
Bahan
Jumlah
23,310.00
23,907.69
2,689.62
1,651.12
51,558.43

27,731.74

12,404.83
14,000.00
23,310.00
23,907.69
2,689.62
1,651.12
51,558.43

26,404.83

10,567.08
14,400.00
23,310.00
23,907.69
2,689.62
1,651.12
51,558.43

24,967.08

9,303.62
10,400.00
13,448.08
8,367.69
941.37
1,016.08
23,773.22

19,703.62

897.34
5,200.00
5,110.27

23,310.00
23,907.69
2,689.62
1,651.12
79,290.17

12,404.83
14,000.00
23,310.00
23,907.69
2,689.62
1,651.12
77,963.26

10,567.08
14,400.00
23,310.00
23,907.69
2,689.62
1,651.12
76,525.51

9,303.62
10,400.00
13,448.08
8,367.69
941.37
1,016.08
43,476.84

897.34
5,200.00
5,110.27

Jumlah Harga (Rp.)


Upah
Bahan
Jumlah
45,424.61
5,110.27
381.03
56,026.18

6,097.34

7,753.02
2,400.00
22,413.46
11,953.85
1,344.81
1,651.12
37,363.24

10,153.02

5,577.87
13,448.08
8,367.69
941.37
1,016.08
23,773.22

5,577.87

2,871.49
6,724.04
4,183.85
537.92
508.04
11,953.85

2,871.49

11,378.27
4,800.00
26,896.16
16,735.38
1,882.73
1,905.14

45,424.61
5,110.27
381.03
62,123.52

7,753.02
2,400.00
22,413.46
11,953.85
1,344.81
1,651.12
47,516.26

5,577.87
13,448.08
8,367.69
941.37
1,016.08
29,351.09

2,871.49
6,724.04
4,183.85
537.92
508.04
14,825.34

11,378.27
4,800.00
26,896.16
16,735.38
1,882.73
1,905.14

Jumlah Harga (Rp.)


Upah
Bahan
Jumlah
47,419.41

13,448.08
11,953.85
1,344.81
1,016.08
27,762.82

16,178.27

63,597.68

5,832.71

5,832.71
13,448.08
11,953.85
1,344.81
1,016.08
33,595.53

5,832.71

897.34
10,878.63
2,400.00
26,896.16
23,907.69
2,689.62
19,051.44
72,544.91

14,175.97

###
29,627.50
537,923.10
###
268,961.52
38,102.88
###

897.34
10,878.63
2,400.00
26,896.16
23,907.69
2,689.62
19,051.44
86,720.88

###

###
29,627.50
537,923.10
###
268,961.52
38,102.88
###

###
29,627.50

###
29,627.50

Jumlah Harga (Rp.)


Upah
Bahan
Jumlah
537,923.10
###
268,961.52
38,102.88
###

###

137,703.72
1,185.10
31,378.85
125,515.38
14,120.48
2,286.17
###

###

119,840.00
1,185.10
31,378.85
125,515.38
14,120.48
2,286.17
###

###

397,232.20
89,653.85
298,846.15
33,620.19
6,350.48
###

###

537,923.10
###
268,961.52
38,102.88
###

137,703.72
1,185.10
31,378.85
125,515.38
14,120.48
2,286.17
###

119,840.00
1,185.10
31,378.85
125,515.38
14,120.48
2,286.17
###

397,232.20
89,653.85
298,846.15
33,620.19
6,350.48
###

Jumlah Harga (Rp.)


Upah
Bahan
Jumlah
238,339.32
71,723.08
239,076.92
26,896.15
5,080.38
###

###

635,571.52
89,653.85
358,615.38
40,344.23
6,350.48
###

###

248,270.13
1,187.73
95,205.00
53,792.31
239,076.92
26,896.15
3,810.29
###

###

254,228.61
1,187.73
95,205.00
71,723.08
239,076.92
26,896.15
5,080.38
###

###

238,339.32
71,723.08
239,076.92
26,896.15
5,080.38
###

635,571.52
89,653.85
358,615.38
40,344.23
6,350.48
###

248,270.13
1,187.73
95,205.00
53,792.31
239,076.92
26,896.15
3,810.29
###

254,228.61
1,187.73
95,205.00
71,723.08
239,076.92
26,896.15
5,080.38
###

Jumlah Harga (Rp.)


Upah
Bahan
Jumlah

194,643.78
11,877.30
95,205.00
53,792.31
239,076.92
2,689.62
3,810.29
###

###

194,643.78
11,877.30
95,205.00
85,651.00
71,723.08
298,846.15
33,620.19
5,080.38
###

###

194,643.78
11,877.30
47,602.50
85,651.00
71,723.08
298,846.15
33,620.19
5,080.38
###

###

194,643.78
11,877.30
95,205.00
53,792.31
239,076.92
2,689.62
3,810.29
###

194,643.78
11,877.30
95,205.00
85,651.00
71,723.08
298,846.15
33,620.19
5,080.38
###

194,643.78
11,877.30
47,602.50
85,651.00
71,723.08
298,846.15
33,620.19
5,080.38
###

Jumlah Harga (Rp.)


Upah
Bahan
Jumlah

194,643.78
11,877.30
47,080.00
47,602.50
30,041.00
85,651.00
89,653.85
310,800.00
34,965.00
6,350.48
###

###

194,643.78
11,877.30
70,620.00
95,205.00
171,302.00
89,653.85
310,800.00
34,965.00
6,350.48
###

###

194,643.78
11,877.30
70,620.00
95,205.00
171,302.00
89,653.85
310,800.00
34,965.00
6,350.48
###

###

194,643.78
11,877.30
47,080.00
47,602.50
30,041.00
85,651.00
89,653.85
310,800.00
34,965.00
6,350.48
###

194,643.78
11,877.30
70,620.00
95,205.00
171,302.00
89,653.85
310,800.00
34,965.00
6,350.48
###

194,643.78
11,877.30
70,620.00
95,205.00
171,302.00
89,653.85
310,800.00
34,965.00
6,350.48
###

Jumlah Harga (Rp.)


Upah
Bahan
Jumlah

595,848.30
5,938.65
44,826.93
239,076.92
26,896.15
3,175.24
###

###

248,270.13
1,187.73
17,655.00
95,205.00
71,723.08
239,076.92
26,896.15
5,080.38
###

###

248,270.13
1,187.73
47,080.00
95,205.00
85,651.00
71,723.08
298,846.15
33,620.19
5,080.38
###

595,848.30
5,938.65
44,826.93
239,076.92
26,896.15
3,175.24
###

248,270.13
1,187.73
17,655.00
95,205.00
71,723.08
239,076.92
26,896.15
5,080.38
###

###

248,270.13
1,187.73
47,080.00
95,205.00
85,651.00
71,723.08
298,846.15
33,620.19
5,080.38
###

###

###

Jumlah Harga (Rp.)


Upah
Bahan
Jumlah
359,295.00
132,731.20
358,615.40
###
161,376.91
25,401.92
###

###

###
359,295.00
132,731.20
537,923.10
###
268,961.52
38,102.88
###

###

###
359,295.00
71,106.00
215,169.24
860,676.91
96,826.15
15,241.15
###

###

139,031.27
96,300.00
5,925.50
8,965.39
11,953.85
1,344.81
635.05

359,295.00
132,731.20
358,615.40
###
161,376.91
25,401.92
###

###
359,295.00
132,731.20
537,923.10
###
268,961.52
38,102.88
###

###
359,295.00
71,106.00
215,169.24
860,676.91
96,826.15
15,241.15
###

139,031.27
96,300.00
5,925.50
8,965.39
11,953.85
1,344.81
635.05

Jumlah Harga (Rp.)


Upah
Bahan
Jumlah
22,899.10

###

139,031.27
152,475.00
5,925.50
8,965.39
11,953.85
1,344.81
635.05
22,899.10

###

###
4,740.40
10,758.46
14,344.62
1,613.77
762.06
27,478.91

###

152,934.40
4,740.40
13,448.08
29,884.62
3,362.02
9,525.72
56,220.44

###

161,872.12
5,925.50
17,930.77
35,861.54
4,034.42
1,270.10

###

139,031.27
152,475.00
5,925.50
8,965.39
11,953.85
1,344.81
635.05
###

###
4,740.40
10,758.46
14,344.62
1,613.77
762.06
###

152,934.40
4,740.40
13,448.08
29,884.62
3,362.02
9,525.72
###

161,872.12
5,925.50
17,930.77
35,861.54
4,034.42
1,270.10

Jumlah Harga (Rp.)


Upah
Bahan
Jumlah
59,096.83

###

41,311.12
2,370.20
13,448.08
29,884.62
3,362.02
9,525.72
56,220.44

43,681.32

79,179.64
3,555.30
17,930.77
35,861.54
4,034.42
1,270.10
59,096.83

82,734.94

92,950.01
4,740.40
22,413.46
41,838.46
4,034.42
1,587.62
69,873.96

97,690.41

107,252.69
2,370.20
8,965.39
23,907.69
3,362.02
635.05
36,870.15

###

###

41,311.12
2,370.20
13,448.08
29,884.62
3,362.02
9,525.72
99,901.76

79,179.64
3,555.30
17,930.77
35,861.54
4,034.42
1,270.10
###

92,950.01
4,740.40
22,413.46
41,838.46
4,034.42
1,587.62
###

107,252.69
2,370.20
8,965.39
23,907.69
3,362.02
635.05
###

Jumlah Harga (Rp.)


Upah
Bahan
Jumlah

37,180.00
1,185.10
8,965.39
23,907.69
2,689.62
635.05
36,197.75

38,365.10

143,996.67
1,422.12
13,448.08
29,884.62
3,362.02
9,525.72
56,220.44

###

29,606.30
1,422.12
8,965.39
11,953.85
1,344.81
6,350.48
28,614.53

31,028.42

37,869.39
2,375.46
8,965.39
11,953.85
1,344.81
6,350.48
28,614.53

40,244.85

37,180.00
1,185.10
8,965.39
23,907.69
2,689.62
635.05
74,562.85

143,996.67
1,422.12
13,448.08
29,884.62
3,362.02
9,525.72
###

29,606.30
1,422.12
8,965.39
11,953.85
1,344.81
6,350.48
59,642.95

37,869.39
2,375.46
8,965.39
11,953.85
1,344.81
6,350.48
68,859.38

Jumlah Harga (Rp.)


Upah
Bahan
Jumlah

96,392.60
3,555.30
13,448.08
53,792.31
6,051.63
1,016.08
74,308.10

99,947.90

96,392.60
3,555.30
323,569.84
13,448.08
53,792.31
6,051.63
1,016.08
74,308.10

###

96,392.60
3,555.30
81,876.30
17,930.77
71,723.08
8,068.85
1,270.10
98,992.80

###

60,246.76
3,959.10
53,792.31
215,169.23

96,392.60
3,555.30
13,448.08
53,792.31
6,051.63
1,016.08
###

96,392.60
3,555.30
323,569.84
13,448.08
53,792.31
6,051.63
1,016.08
###

96,392.60
3,555.30
81,876.30
17,930.77
71,723.08
8,068.85
1,270.10
###

60,246.76
3,959.10
53,792.31
215,169.23

Jumlah Harga (Rp.)


Upah
Bahan
Jumlah
24,206.54
3,810.29
### 64,205.86

38,082.00
1,979.55
2,241.35
8,965.38
1,008.61
165.11
12,380.45

40,061.55

224,134.63
896,538.45
100,860.57
15,876.20

24,206.54
3,810.29
###

38,082.00
1,979.55
2,241.35
8,965.38
1,008.61
165.11
52,442.00

###
71,106.00
###

224,134.63
896,538.45
100,860.57
15,876.20
###
71,106.00
###

###
118,773.00
###
###

224,134.63
896,538.45
100,860.57
15,876.20
###
118,773.00
###

###

224,134.63
896,538.45
100,860.57
15,876.20

137,703.72
7,110.60
1,529.40
46,620.00
31,080.00

137,703.72
7,110.60
1,529.40
46,620.00
31,080.00

Jumlah Harga (Rp.)


Upah
Bahan
Jumlah
3,496.50
3,302.25
84,498.75

###

154,916.69
7,110.60
1,529.40
46,620.00
31,080.00
3,496.50
3,302.25
84,498.75

###

137,703.72
9,480.80
3,058.80
51,638.90
60,201.40
39,458.00
59,171.54
39,447.69
4,437.87
4,191.32
###

###

137,703.72
9,480.80
3,058.80
61,966.67
60,201.40
39,458.00
59,171.54
39,447.69
4,437.87

3,496.50
3,302.25
###

154,916.69
7,110.60
1,529.40
46,620.00
31,080.00
3,496.50
3,302.25
###

137,703.72
9,480.80
3,058.80
51638.9

60,201.40
39,458.00
59,171.54
39,447.69
4,437.87
4,191.32
###

137,703.72
9,480.80
3,058.80
61966.67

60,201.40
39,458.00
59,171.54
39,447.69
4,437.87

Jumlah Harga (Rp.)


Upah
Bahan
Jumlah
4,191.32
###

###

137,703.72
9,480.80
3,058.80
51,638.90
60,201.40
118,374.00
59,171.54
39,447.69
4,437.87
4,191.32
###

###

103,277.79
9,480.80
3,058.80
68,851.86
60,201.40
59,187.00
20,000.00
59,171.54
39,447.69
4,437.87
4,191.32
###

###

103,277.79
9,480.80
2,294.10
51,638.90
60,201.40
39,458.00

4,191.32
###

137,703.72
9,480.80
3,058.80
51638.9

60,201.40
118,374.00
59,171.54
39,447.69
4,437.87
4,191.32
###

103,277.79
9,480.80
3,058.80
68851.86

60,201.40
59,187.00
20,000.00
59,171.54
39,447.69
4,437.87
4,191.32
###

103,277.79
9,480.80
2,294.10
51638.9

60,201.40
39,458.00

Jumlah Harga (Rp.)


Upah
Bahan
Jumlah
59,171.54
39,447.69
4,437.87
4,191.32
###

###

90,884.46
14,221.20
9,864.50
13,448.08
5,976.92
672.40
1,016.08
21,113.48

###

8,965.39
29,884.62
3,362.02
635.05
246,283.16
15,836.40
### 42,212.03

8,965.39
29,884.62
3,362.02
635.05
71,500.00
15,836.40
87,971.45

42,212.03

59,171.54
39,447.69
4,437.87
4,191.32
###

90,884.46
14,221.20
9,864.50
13,448.08
5,976.92
672.40
1,016.08
###

8,965.39
29,884.62
3,362.02
635.05
246,283.16
15,836.40
###

8,965.39
29,884.62
3,362.02
635.05
71,500.00
15,836.40
###

Jumlah Harga (Rp.)


Upah
Bahan
Jumlah
76,234.00
20,423.46
16,800.00
7,368.23
55,585.39
41,838.46
4,706.83
3,810.29
###

###

76,234.00
18,664.67
18,000.00
7,957.68
55,585.39
41,838.46
4,706.83
3,810.29
###

###

84,876.00
20,423.46
16,800.00
7,368.23
55,585.39
41,838.46
4,706.83
3,810.29
###

###

64,545.00
20,423.46
16,800.00
7,368.23

76,234.00
20,423.46
16,800.00
7,368.23
55,585.39
41,838.46
4,706.83
3,810.29
###

76,234.00
18,664.67
18,000.00
7,957.68
55,585.39
41,838.46
4,706.83
3,810.29
###

84,876.00
20,423.46
16,800.00
7,368.23
55,585.39
41,838.46
4,706.83
3,810.29
###

64,545.00
20,423.46
16,800.00
7,368.23

Jumlah Harga (Rp.)


Upah
Bahan
Jumlah
55,585.39
41,838.46
4,706.83
3,810.29
###

###

1,299.98
330.22

1,630.20

4,800.00
500.00
5,300.00

1,299.98
330.22
4,800.00
500.00
6,930.20

16,962.00
1,000.00
17,962.00

3,227.54
215.17
8,068.85
762.06
16,962.00
1,000.00
30,235.62

3,227.54
215.17
8,068.85
762.06

12,273.62

3,586.15
23,907.69
4,706.83
3,810.29
3,606.86

39,617.82

3,586.15
23,907.69
4,706.83

55,585.39
41,838.46
4,706.83
3,810.29
###

50,485.09
43,571.20
27,602.18
16,800.00
###

3,586.15
23,907.69
4,706.83
3,810.29
3,606.86
50,485.09
43,571.20
27,602.18
16,800.00
###

3,586.15
23,907.69
4,706.83

Jumlah Harga (Rp.)


Upah
Bahan
Jumlah
3,810.29

36,010.96

210,000.00
27,602.18
24,627.20
###

35,701.88
1,386.36
6,275.77
11,953.85
1,344.81
444.53
20,018.96

37,088.24

43,646.63
1,386.36
6,275.77
11,953.85
1,344.81
444.53
20,018.96

45,032.99

135,447.84
1,386.36
6,275.77
11,953.85
1,344.81
444.53
20,018.96

###

141,091.50

3,810.29
210,000.00
27,602.18
24,627.20
###

35,701.88
1,386.36
6,275.77
11,953.85
1,344.81
444.53
57,107.20

43,646.63
1,386.36
6,275.77
11,953.85
1,344.81
444.53
65,051.95

135,447.84
1,386.36
6,275.77
11,953.85
1,344.81
444.53
###

141,091.50

Jumlah Harga (Rp.)


Upah
Bahan
Jumlah
1,386.36
6,275.77
11,953.85
1,344.81
444.53
20,018.96

###

13,448.08
317.52
13,765.60

750.00
750.00

13,448.08
317.52
750.00
14,515.60

750.00
750.00

13,448.08
317.52
750.00
14,515.60

4,468.65
11,900.00
14,308.56
30,677.21

6,275.77
8,965.38
1,008.61
317.52
4,468.65
11,900.00
14,308.56
47,244.49

13,448.08
317.52
13,765.60

6,275.77
8,965.38
1,008.61
317.52

16,567.28

6,275.77
1,075.85
806.88
317.52

1,386.36
6,275.77
11,953.85
1,344.81
444.53
###

6,275.77
1,075.85
806.88
317.52

Jumlah Harga (Rp.)


Upah
Bahan
Jumlah

8,476.02

14,000.00
4,468.65
11,900.00
21,883.68
52,252.33

14,000.00
4,468.65
11,900.00
21,883.68
60,728.35

25,200.00
25,200.00

3,586.15
7,530.92
8,472.29
317.52
25,200.00
45,106.88

2,979.10
2,178.99
11,774.15
16,932.24

1,793.08
7,530.92
847.23
317.52
2,979.10
2,178.99
11,774.15
27,420.99

2,178.99
11,774.15
13,953.14

1,793.08
7,530.92
847.23
317.52
2,178.99
11,774.15
24,441.89

3,586.15
7,530.92
8,472.29
317.52
19,906.88

1,793.08
7,530.92
847.23
317.52

10,488.75
1,793.08
7,530.92
847.23
317.52

10,488.75

2,510.31
5,020.62
564.82
317.52

2,510.31
5,020.62
564.82
317.52

Jumlah Harga (Rp.)


Upah
Bahan
Jumlah

8,413.27

2,377.08
8,151.34
10,528.42

2,377.08
8,151.34
18,941.69

2,377.08
18,862.42
21,239.50

2,510.31
5,020.62
564.82
317.52
2,377.08
18,862.42
29,652.77

6,064.90
168.69
6,233.59

1,793.08
23,907.69
2,689.62
1,270.10
6,064.90
168.69
35,894.08

31,500.00
31,500.00

537.92
7,172.31
1,613.77
762.06
31,500.00
41,586.06

2,178.99
5,610.00

44,826.93
95,630.77
40,344.23
25,401.92
2,178.99
5,610.00

2,510.31
5,020.62
564.82
317.52

8,413.27
1,793.08
23,907.69
2,689.62
1,270.10

29,660.49

537.92
7,172.31
1,613.77
762.06
10,086.06

44,826.93
95,630.77
40,344.23
25,401.92

Jumlah Harga (Rp.)


Upah
Bahan
Jumlah
8,400.00
### 16,188.99

35,861.54
83,676.92
26,896.15
25,401.92
###

5,942.70
5,942.70

188,273.09
13,971.06
89,653.85
9,413.65
239,309.00
10,768.08
4,000.00
###
###

537,923.10
38,102.88
358,615.38
40,344.23
304,600.00
215,361.60
120,000.00
84,876.00
29,472.90
###
###

8,400.00
###

35,861.54
83,676.92
26,896.15
25,401.92
5,942.70
###

188,273.09
13,971.06
89,653.85
9,413.65
239,309.00
10,768.08
4,000.00
###

537,923.10
38,102.88
358,615.38
40,344.23
304,600.00
215,361.60
120,000.00
84,876.00
29,472.90
###

Jumlah Harga (Rp.)


Upah
Bahan
Jumlah

286,892.32
2,032.15
121,331.54
201.72
111,179.00
78,965.92
28,000.00
37,307.20
20,339.20
22,237.38
###
###

127,308.47
9,017.68
56,541.69
6,320.60
190,375.00
138,190.36
52,000.00
10,659.20
33,051.20
33,356.07
###
###

193,652.32
13,717.04
86,067.69
11,953.85
9,682.61
283,278.00
204,593.52

286,892.32
2,032.15
121,331.54
201.72
111,179.00
78,965.92
28,000.00
37,307.20
20,339.20
22,237.38
###

127,308.47
9,017.68
56,541.69
6,320.60
190,375.00
138,190.36
52,000.00
10,659.20
33,051.20
33,356.07
###

193,652.32
13,717.04
86,067.69
11,953.85
9,682.61
283,278.00
204,593.52

Jumlah Harga (Rp.)


Upah
Bahan
Jumlah

###

73,600.00
17,587.68
61,653.20
44,474.76
###

73,600.00
17,587.68
61,653.20
44,474.76
###

113,447.10
33,088.74
###

4,841.31
10,758.46
1,210.33
3,429.26
113,447.10
33,088.74
###

8,898.00
2,595.25
11,493.25

3,227.54
215.17
8,068.85
762.06
8,898.00
2,595.25
23,766.87

300,000.00
50,000.00
###

2,689.62
35,861.54
4,034.42
190.51
300,000.00
50,000.00
###

4,841.31
10,758.46
1,210.33
3,429.26

20,239.36

3,227.54
215.17
8,068.85
762.06

12,273.62

2,689.62
35,861.54
4,034.42
190.51

42,776.09

295,857.71
131,492.31
1,344.81

295,857.71
131,492.31
1,344.81

Jumlah Harga (Rp.)


Upah
Bahan
Jumlah
20,321.54
###
340,027.38
###
###
896.54
11,953.85
1,344.81
228.62

14,423.82

48,500.00
125.00
48,625.00

20,321.54
###
340,027.38
###
896.54
11,953.85
1,344.81
228.62
48,500.00
125.00
63,048.82

ITEM PEMBAYARAN
JENIS PEKERJAAN
SATUAN PEMBAYARAN

No.

III.2.

III.3.
3.a.

: AGREGAT KASAR & HALUS


: PENGADAAN AGREGAT KASAR & HALUS
: M3

U RAIAN

HARGA SATUAN AGREGAT PECAH MESIN 5-10 & 10-20 mm


( berlaku juga untuk Aggregat 20-30 mm)
Agregat Kasar Produksi Stone Crusher =
0%
(Tertahan saringan # 4 = 4,75mm)
Harga Satuan Agregat Kasar / M3 =
(K x HSb) / K
HARGA SATUAN AGREGAT PECAH MESIN 0-5 mm
(Agregat Halus)
Agregat Halus Produksi Stone Crusher =
0%
Harga Agregat Halus Prod. Stone Crsh.=
(H x HSb) / H

KODE

K
HSAk

H
Hs1

KOEFISIEN

URAIAN ANALISA HARGA SATUAN


Lanjutan 1

SATUAN

KETERANGAN

%
Rupiah

Di Luar PPN

%
Rupiah

per 1 M3

DAFTAR KUANTITAS DAN HARGA


SPESIFIKASI 2013
Proyek
No. Paket Kontrak
Nama Paket
Prop / Kab / Kodya

No. Mata
Pembayaran
a

1.2
1.8
1.18.(1)
1.18.(2)
1.18.(3)

#REF!

Uraian
b
DIVISI 1. UMUM
Mobilisasi
Manajemen dan Keselamatan Lalu Lintas
Relokasi Utilitas dan Pelayanan Telkom yang Ada
Relokasi Utilitas dan Pelayanan PDAM yang Ada
Relokasi Utilitas dan Pelayanan PLN yang Ada

Jumlah Harga Pekerjaan DIVISI 1 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

2.1
2.2
2.3.1
2.3.2
2.3.3
2.3.4
2.3.5
2.3.6
2.3.7
2.3.8
2.4.1
2.4.2
2.4.3

DIVISI 2. DRAINASE
Galian untuk Selokan Drainase dan Saluran Air
Pasangan Batu dengan Mortar
Gorong-gorong Pipa Beton Bertulang, diameter dalam 50 cm
Gorong-gorong Pipa Beton Bertulang, diameter 50 - 70 cm
Gorong-gorong Pipa Beton Bertulang, diameter dalam 70 - 100 cm
Gorong-gorong Pipa Beton Bertulang, diameter dalam 100 - 130 cm
Gorong2 Pipa Baja Bergelombang
Gorong-gorong Pipa Beton Tanpa Tulangan diameter dalam 20 cm
Gorong-gorong Pipa Beton Tanpa Tulangan diameter dalam 25 cm
Gorong-gorong Pipa Beton Tanpa Tulangan diameter dalam 30 cm
Bahan Porous untuk Bahan Penyaring (Filter)
Anyaman Filter Plastik
Pipa Berlubang Banyak (Perforated Pipe) untuk Pekerjaan Drainase Bawah Permukaan

Jumlah Harga Pekerjaan DIVISI 2 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

3.1.1
3.1.2
3.1.3
3.1.4
3.1.5
3.1.6
3.1.7

DIVISI 3. PEKERJAAN TANAH


Galian Biasa
Galian Batu
Galian Struktur dengan kedalaman 0 - 2 meter
Galian Struktur dengan kedalaman 2 - 4 meter
Galian Struktur dengan kedalaman 4 - 6 meter
Galian Perkerasan Beraspal dengan Cold Milling Machine
Galian Perkerasan Beraspal tanpa Cold Milling Machine

No. Mata
Pembayaran
3.2.1
3.2.2
3.2.3
3.3
3.4
3.4.1
3.4.2
3.4.3
3.4.4
3.4.5

Uraian
Timbunan Biasa
Timbunan Pilihan
Timbunan Pilihan berbutir diatas tanah rawa
Penyiapan Badan Jalan
Pengupasan dan Pencampuran Kembali Perkerasan Lama
Pembersihan dan Pengupasan Lahan
Pemotongan Pohon Pilihan diameter 15 30 cm
Pemotongan Pohon Pilihan diameter 30 50 cm
Pemotongan Pohon Pilihan diameter 50 75 cm
Pemotongan Pohon Pilihan diameter > 75 cm
Jumlah Harga Pekerjaan DIVISI 3 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

4.2.1

DIVISI 4. PELEBARAN PERKERASAN DAN BAHU JALAN


Lapis Pondasi Agregat Kelas A , CBR Min 80%

4.2.2
4.2.3
4.2.4
4.2.5
4.2.6
4.2.7

Lapis Pondasi Agregat Kelas B, CBR Min 60%


Semen untuk Lapis Pondasi Semen Tanah
Lapis Pondasi Semen Tanah
Agregat Penutup BURTU
Bahan Aspal untuk Pekerjaan Pelaburan
Lapis Resap Pengikat

Jumlah Harga Pekerjaan DIVISI 4 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

5.1.1
5.1.2
5.1.3
5.2,1
5.4.1a
5.3.1
5.4.1
5.4.2

DIVISI 5. PERKERASAN BERBUTIR


Lapis Pondasi Agregat Kelas A
Lapis Pondasi Agregat Kelas B
Lapis Pondasi Agregat Kelas S
Lapis Pondasi Agregat Kelas C
Semen Untuk Stabilisasi Perkerasan Lama
Perkerasan Beton Semen
Semen untuk Lapis Pondasi Semen Tanah
Lapis Pondasi Tanah Semen

Uraian

No. Mata
Pembayaran

Jumlah Harga Pekerjaan DIVISI 5 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

6.1 (1)(a)
6.1 (2)(a)
6.2 (1)
6.2 (2)
6.2 (3)(a)
6.3 (1)
6.3 (2)
6.3(3a)
6.3.4
6.3.4a
6.3.4b

DIVISI 6. PERKERASAN ASPAL


Lapis Resap Pengikat - Aspal Cair
Lapis Perekat - Aspal Cair
Agregat Penutup BURTU
Agregat Penutup BURDA
Bahan Aspal untuk Pekerjaan Pelaburan yang diencerkan
Latasir Kelas A (SS-A)
Latasir Kelas B (SS-B)
Lataston Lapis Aus (HRS-WC) 3.0 cm (gradasi senjang/semi senjang)
Asphalt Treated Base (ATB)
Lataston Lapis Pondasi (HRS-Base) (gradasi senjang/semi senjang)
Lataston Lapis Pondasi Perata (HRS-Base(L)) (gradasi senjang/semi senjang)

6.3(5a)
6.3(5b)
6.3(5c)
6.3(5d)
6.3(6a)
6.3(6b)
6.3(6c)
6.3(6d)
6.3.8.a
6.3.8.b1
6.3.9
6.3.10
6.4 (1)
6.4 (2)
6.4 (3)
6.4 (4)
6.4 (5)
6.4 (6)
7.5 ()
6.6.1
6.6.2

Laston Lapis Aus (AC-WC) (gradasi halus/kasar)


Laston Lapis Aus Modifikasi (AC-WC Mod) (gradasi halus/kasar)
Laston Lapis Aus Perata (AC-WC(L)) (gradasi halus/kasar)
Laston Lapis Aus Perata (AC-WC(L)Mod) (gradasi halus/kasar)
Laston Lapis Antara (AC-BC) (gradasi halus/kasar)
Laston Lapis Antara Modifikasi (AC-BC Mod)(gradasi halus/kasar)
Laston Lapis Antara Perata (AC-BC(L)) (gradasi halus/kasar)
Laston Lapis Antara Modifikasi Perata (AC-BC(L)Mod) (gradasi halus/kasar)
Aspal Minyak
Asbuton yang diproses
Aditif anti pengelupasan
Bahan Pengisi (Filler) Tambahan
Lasbutag
Latasbusir Kelas A
Latasbusir Kelas B
Bitumen Asbuton
Bitumen Bahan Peremaja
Bahan Anti Pengelupasan (anti stripping agent)
Campuran Aspal Dingin untuk Pelapisan
Lapis Permukaan Penetrasi Macadam
Lapis Fondasi atau Perata Penetrasi Macadam

Jumlah Harga Pekerjaan DIVISI 6 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

7.1 (2)
7.1 (4)
7.1 (5)

DIVISI 7. STRUKTUR
Beton mutu tinggi dengan fc=45 MPa (K-500)
Beton mutu tinggi dengan fc=35 MPa (K-400)
Beton mutu sedang dengan fc=30 MPa (K-350)

No. Mata
Pembayaran
7.1 (6)
7.1 (7)
7.1 (7)a
7.1 (8)
7.1 (9)
7.1 (10)
7.2 (1)a
7.2 (1)b
7.2 (1)c
7.2 (2)a
7.2 (2)b
7.2 (2)c
7.2.(4)
7.2.(5)
7.2.(6)
7.3 (1)
7.3 (2)
7.3 (3)
7.3 (4)
7.3 (5)
7.3 (6)
7.4 (3)
7.4 (4)
7.4 (5)
7.4 (7)
7.4 (8)
7.6 (1)
7.6 (2)
7.6 (3)
7.6 (4)
7.6 (4)a
7.6 (4)b
7.6 (4)c
7.6 (5)a
7.6 (5)b
7.6 (5)c
7.6 (6)a
7.6 (6)b
7.6 (6)c
7.6 (6)
7.6 (7)

Uraian
Beton mutu sedang dengan fc= 25 MPa (K-300)
Beton mutu sedang dengan fc= 20 MPa (K-250)
Beton mutu sedang dengan fc= 20 MPa (K-225)
Beton mutu rendah dengan fc= 15 MPa (K-175)
Beton Siklop fc=15 MPa (K-175)
Beton mutu rendah dengan fc= 10 MPa (K-125)
Bentang 16 meter
Bentang 25 meter
Bentang 35 meter
Bentang 16 meter
Bentang 25 meter
Bentang 35 meter
Baja Prategang
Pelat Berongga (Hollow Slab) Pracetak bentang 21 meter
Beton Diafragma K350 (fc 30 MPa) termasuk pekerjaan penegangan setelah pengecoran
(post-tension)
Baja Tulangan BJ 24 Polos
Baja Tulangan BJ 32 Polos
Baja Tulangan BJ 32 Ulir
Baja Tulangan BJ 39 Ulir
Baja Tulangan BJ 48 Ulir
Anyaman Kawat Yang Dilas (Welded Wire Mesh)
Baja Struktur BJ 41 (Titik Leleh 250 MPa), penyediaan dan pemasangan.
Baja Struktur BJ 50 (Titik Leleh 290 MPa), penyediaan dan pemasangan.
Baja Struktur BJ 55 (Titik Leleh 410 MPa), penyediaan dan pemasangan.
Pemasangan jembatan baja fabrikasi
Pengangkutan Bahan Jembatan Rangka Baja
Fondasi Cerucuk ulin 10x10, Pengadaan dan Pemancangan
Pengadaan Tiang Pancang Kayu Tanpa Pengawetan.(Kayu Ulin)
Pengadaan Tiang Pancang Kayu Dengan Pengawetan. ukuran ....
Pengadaan Tiang Pancang Baja ukuran: 200 MM
DindingTurap Baja
Pengadaan Tiang Pancang Baja ukuran: Diameter 600 mm tebal 12 mm
Pengadaan Tiang Pancang Baja ukuran: Diameter 1000 mm tebal 16 mm
Pengadaan Tiang Pancang Beton Bertulang Pracetak ukuran/diameter: 350 x 350mm
Pengadaan Tiang Pancang Beton Bertulang Pracetak ukuran/diameter: 400 x 400mm
Pengadaan Tiang Pancang Beton Bertulang Pracetak ukuran/diameter: 450 x 450mm
Pengadaan Tiang Pancang Beton Prategang Pracetak ukuran / diameter 350 mm
Pengadaan Tiang Pancang Beton Prategang Pracetak ukuran / diameter 400 mm
Pengadaan Tiang Pancang Beton Prategang Pracetak ukuran / diameter 450 mm
Penyediaan Tiang Pancang Kayu Tanpa Pengawetan (Kayu Ulin)
Pemancangan Tiang Pancang Kayu. Ukuran Ulin 10 X 10- 4m

No. Mata
Pembayaran
7.6 (8)
7.6 (9)b
7.6 (9)c
7.6 (10)
7.6 (10)a
7.6 (10)b
7.6 (10)c
7.6 (12)

Uraian

7.6 (17)
7.7 (1)
7.7 (2)
7.9
7.10 (1)
7.10 (2)
7.10 (3)

Pemancangan Tiang Pancang Beton bertulang pracetak. Ukuran:


400 mm x 400 mm
500 mm x 500 mm
Pemancangan Tiang Pancang Pipa Baja ukuran 200 MM
Diameter 500 mm
Diameter 600 mm
Diameter 1000 mm tebal 16 mm
Tambahan Biaya untuk no. Mata Pembayaran 7.6.(7) s/d 7.6.(10) bila tiang pancang
dikerjakan di air
Pengujian Keutuhan Tiang dengan Pile Integrated Test
Pengadaan Dinding Sumuran Silinder, diameter ..
Penurunan Dinding Sumuran Silinder, diameter
Pasangan Batu
Pasangan Batu Kosong yang Diisi Adukan
Pasangan Batu Kosong
Bronjong

7.11 (1)
7.11 (2)
7.11 (3)
7.11 (5)
7.11 (6)
7.13.
7.15 (1)
7.15 (2)
7.15 (3)
7.15 (4)
7.15 (5)
7.15 (6)
7.15 (7)
7.15 (8)

Expansion Joint Tipe Asphaltic Plug


Expansion Joint Tipe Rubber 1 (celah 21 mm - 41 mm)
Expansion Joint Tipe Rubber 2 (celah 32 mm - 62 mm)
Join Filler untuk sambungan konstruksi
Expansion Joint Tipe baja bersudut
Sandaran (Railing)
Pembongkaran Pasangan Batu
Pembongkaran Beton
Pembongkaran Beton Pratekan
Pembongkaran Bangunan Gedung
Pembongkaran Rangka Baja
Pembongkaran Balok Baja (Steel Stringers)
Pembongkaran Lantai Jembatan Kayu
Pembongkaran Jembatan Kayu

Jumlah Harga Pekerjaan DIVISI 7 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

8.1 (1)
8.1 (2)
8.1 (3)
8.1 (4)
8.1 (5)
8.1 (7)
8.1 (8)
8.1 (9)
8.2(1)
8.2(2)
8.2(3)
8.2(4)

DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR


Lapis Pondasi Agregat Kelas A utk Pekerjaan Minor
Lapis Pondasi Agregat Kelas B utk Pekerjaan Minor
Agregat untuk Perkerasan Tanpa Penutup Aspal untuk Pekerjaan Minor
Waterbound Macadam untuk Pekerjaan Minor
Campuran Aspal Panas untuk Pekerjaan Minor
Penetrasi Macadam untuk Pekerjaan Minor
Campuran Aspal Dingin untuk Pekerjaan Minor
Residu Bitumen untuk Pekerjaan Minor
Galian untuk Bahu Jalan dan Pekerjaan Minor Lainnya
Pembersihan dan Pembongkaran Tanaman (diamater < 30 cm)
Pemotongan Pohon diameter 30 - 50 cm
Pemotongan Pohon diameter 50 - 75 cm

No. Mata
Pembayaran
8.2(5)
8.3.(1)
8.3.(2)
8.3.(3)
8.4.(1)
8.4.(2)
8.4.(5)
8.4.(6) .(a)
8.4.(7)
8.4.(8)
8.4.(12)
8.5(1)
8.5(2)
8.5(3)
8.6(1)
8.8(2)

Uraian
Pemotongan Pohon diameter > 75 cm
Stabilisasi dengan Tanaman
Semak / Perdu
Pohon
Marka Jalan Termoplastik
Marka Jalan Bukan Termoplastik
Patok Pengarah
Patok Kilometer
Rel Pengaman
Paku Jalan
Perkerasan Blok Beton pada Trotoar dan Median
Pengembalian Kondisi Lantai Jembatan Beton
Pengembalian Kondisi Lantai Jembatan Kayu
Pengembalian Kondisi Pelapisan Permukaan Baja Struktur
Kerb Pracetak Pemisah Jalan (Concrete Barrier)
Memasang Kansteen K-300

Jumlah Harga Pekerjaan DIVISI 8 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

Uraian

No. Mata
Pembayaran

9.1
9.2
9.3
9.4
9.5
9.6
9.7
9.8
9.9
9.10
9.11
9.12
9.13
9.14

DIVISI 9. PEKERJAAN HARIAN


Mandor
Pekerja Biasa
Tukang Kayu, Tukang Batu, dsb
Dump Truck, kapasitas 3-4 m
Truk Bak Datar 3 - 4 ton
Truk Tangki 3000 - 4500 Liter
Bulldozer 100 - 150 PK
Motor Grader min 100 PK
Loader Roda Karet 1.0 - 1.6 M3
Loader Roda Berantai 75 - 100 PK
Alat Penggali (Excavator) 80 - 140 PK
Crane 10 - 15 Ton
Penggilas Roda Besi 6 - 9 Ton
Penggilas Bervibrasi 5 - 8 Ton

9.15
9.16
9.17
9.18
9.19
9.20

Pemadat Bervibrasi 1.5 - 3.0 PK


Penggilas Roda Karet 8 - 10 Ton
Kompresor 4000 - 6500 Ltr/mnt
Beton Pengaduk (Molen) 0.3 - 0.6 M3
Pompa Air 70 - 100 mm
Jack Hammer

Jumlah Harga Pekerjaan DIVISI 9 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

10.1 (1)
10.1 (2)
10.1 (3)
10.1 (4)
10.1 (5)

DIVISI 10. PEKERJAAN PEMELIHARAAN RUTIN


Pemeliharaan Rutin Perkerasan
Pemeliharaan Rutin Bahu Jalan
Pemeliharaan Rutin Selokan, Saluran Air, Galian dan Timbunan
Pemeliharaan Rutin Perlengkapan Jalan
Pemeliharaan Rutin Jembatan

Jumlah Harga Pekerjaan DIVISI 10 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

Satuan
c

Harga satuan
(Rupiah)
e

LS
LS
LS
LS
LS

2,000,000.00
5,500,000.00
35,000,000.00
25,000,000.00
50,000,000.00

M3
M3
M1
M1
M1
M1
Ton
M1
M1
M1
M3
M2
M1

#REF!
#REF!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#REF!
#VALUE!
#VALUE!

M3
M3
M3
M3
M3
M3
M3

#REF!
#VALUE!
#VALUE!
#VALUE!
#REF!
#VALUE!
#VALUE!

Satuan
M3
M3
M3
M2
M3
M2
Pohon
Pohon
Pohon
Pohon

M3

Harga satuan
(Rupiah)
#REF!
#VALUE!
#REF!
#REF!
#VALUE!
#REF!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

#REF!

M3
Ton
M3
M2
Liter
Liter

#VALUE!
#VALUE!
#REF!
#VALUE!
#REF!
#VALUE!

M3
M3
M3
M3
Ton
M3
Ton
M3

#REF!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#REF!
#REF!
#VALUE!

Satuan

Harga satuan
(Rupiah)

Liter
Liter
M2
M2
Liter
M2
M2
Ton
Ton
Ton
Ton

#REF!
#REF!
#REF!
#VALUE!
#VALUE!
#REF!
#REF!
#VALUE!
#VALUE!
#REF!
#REF!

Ton
Ton
Ton
Ton
Ton
Ton
Ton
Ton
Ton
Ton
Kg
Kg
M2
M2
M2
Ton
Ton
Liter
M3
M3
M3

#REF!
#VALUE!
#VALUE!
#VALUE!
#REF!
#VALUE!
#REF!
#VALUE!
#REF!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#REF!
#VALUE!
#VALUE!
#VALUE!
#REF!
#REF!
#VALUE!
#VALUE!

M3
M3
M3

#REF!
#REF!
#VALUE!

Satuan
M3
M3
M3
M3
M3
M3
Buah
Buah
Buah
Buah
Buah
Buah
Kg
Buah
m3
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
m1
m1
M3
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
M3
btg

Harga satuan
(Rupiah)
#VALUE!
#VALUE!
#REF!
#VALUE!
#VALUE!
#REF!
#VALUE!
#VALUE!
#REF!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#REF!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

Satuan

Buah
Meter Panjang
Meter Panjang
M3
M3
M3
M3

Harga satuan
(Rupiah)
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#REF!
#REF!
#NAME?
#REF!
#REF!
#REF!
#VALUE!
#VALUE!
#VALUE!

Buah
m1
m1
Buah
Buah
m1
Buah
M3
Meter Kubik
Meter Persegi
Meter Persegi
Meter Panjang
Meter Persegi
Meter Persegi

#VALUE!
#VALUE!
#VALUE!
#VALUE!
#REF!
#VALUE!
#REF!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

M3
M3
M3 (vol. gembur)
M3
M3
M3
M3
Liter
M3
M2
Buah
Buah

#REF!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

Meter Panjang
Meter Panjang
Meter Panjang
M'
Meter Panjang
Meter Panjang
Meter Panjang
Meter Panjang

Satuan
Buah
M2
M2
Buah
M2
M2
Buah
Buah
M1
Buah
M2
M2
M2
M2
M1
M1

Harga satuan
(Rupiah)
#REF!
#REF!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#REF!
#VALUE!
#VALUE!
#REF!
#REF!
#REF!
#VALUE!
#VALUE!
#REF!
300,244.00

Satuan

Harga satuan
(Rupiah)

Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam

#REF!
#REF!
#REF!
#REF!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
Err:511
#REF!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

Jam
Jam
Jam
Jam
Jam
Jam

#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

LS
LS
LS
LS
LS

#REF!

ITEM PEMBAYARAN NO.


JENIS PEKERJAAN
SATUAN PEMBAYARAN

No.

I.
1
2
3
4
5
6
7
II.
1
2
3

III.
1.

: 7.7 (1)
: Penyediaan Dinding Sumuran Silinder, Diameter 250 cm
: M1
URAIAN ANALISA HARGA SATUAN

U RAIAN

KODE

ASUMSI
Pekerjaan dilakukan secara mekanik/manual
Lokasi pekerjaan : sekitar jembatan
Diameter bagian luar Caison
Jarak rata-rata Base Camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Tebal Caison
Kebutuhan baja tulangan

d
L
Tk
t
Mb

KOEF.

SATUAN

2.50
#REF!
#REF!
0.40
150

M
Km
Jam
M
Kg/M3

URUTAN KERJA
Caison dicetak di Lokasi
Pengecoran dengan Beton K 250 berdasarkan
analisa item pekerjaan ybs
Sekelompok pekerja akan mengerjakan pekerjaan
dengan cara manual dengan menggunakan alat bantu
PEMAKAIAN BAHAN, ALAT DAN TENAGA
BAHAN
Kebutuhan bahan untuk 1 M' Caison
- Beton K-250
= { Phi {(d/2)^2 - {(d-t)/2}^2)}
- Baja Tulangan
= (M37 x Mb)
- Kayu Bekisting = (2 x phi x (d/2) x 1 x 0.025 x 2 x 1.5)
- Paku

2.

ALAT
ALAT BANTU
Diperlukan alat-alat bantu kecil
- Sekop =
2 buah
- Alat-alat kecil lain

3.

TENAGA
Produksi Caison / hari
Kebutuhan tenaga tambahan :
- Pekerja
- Tukang
- Mandor
Koefisien tenaga / M' :
- Pekerja
- Tukang
- Mandor

= (Tk x P) : Qt
= (Tk x T) : Qt
= (Tk x M) : Qt

4.

HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

5.

ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA
SATUAN.

(M37)
(M39)
(M19)
(M18)

1.45
216.77
0.5890
2.00

M3
Kg
M3
Kg

Qt

6.00

M'

P
T
M

9.00
3.00
1.00

orang
orang
orang

(L01)
(L02)
(L03)

#REF!
#REF!
#REF!

jam
jam
jam

Didapat Harga Satuan Pekerjaan :


Rp.

#NAME?

/ M'

6.

WAKTU PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : . . . . . . . . . . . . bulan

7.

VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan :
1.00 M'

ITEM PEMBAYARAN NO.


JENIS PEKERJAAN
SATUAN PEMBAYARAN

No.

I.
1
2
3
4
5
6
7
8
II.
1

: 7.7 (5)
: Penurunan Dinding Sumuran Silinder, Diameter 250 cm
: M1
URAIAN ANALISA HARGA SATUAN

U RAIAN

KODE

SATUAN

ASUMSI
Pekerjaan dilakukan secara mekanik/manual
Lokasi pekerjaan : sekitar jembatan
Diameter bagian luar Caison
Jarak rata-rata Base Camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Tebal Caison
Banyak Galian pada Caison / M'
Faktor pengembangan bahan

d
L
Tk
t
Vt
Fk

2.50
#REF!
#REF!
0.40
4.91
1.20

M
Km
Jam
M
M3
-

URUTAN KERJA
Penggalian dilakukan dengan menggunakan Excavator
dan tenaga manusia. Excavator menuangkan material
hasil galian kedalam Dump Truck
Dump Truck membuang material hasil galian keluar
lokasi jalan sejauh

Lb

2.00

Km

(E10)
V
Fb
Fa

#REF!
0.90
0.83

M3
-

Ts1
T1
T2
Ts1

0.75
0.50
1.25

menit
menit
menit
menit

Q1
Q1

#REF!
#REF!

M3/Jam
M'/Jam

(E10)

#REF!

Jam

#REF!
0.83
20.00
30.00

ton
KM/Jam
KM/Jam
menit
menit
menit
menit
menit
menit

III.
1.

PEMAKAIAN BAHAN, ALAT DAN TENAGA


BAHAN
Tidak ada bahan yang diperlukan

2.
2.a.

ALAT
EXCAVATOR
Kapasitas Bucket
Faktor Bucket
Faktor Efisiensi alat
Waktu siklus
- Menggali / memuat
- Lain-lain

Kap. Prod. / jam =

Koefisien Alat / M'


2.b.

KOEF.

V x Fb x Fa x 60
Ts1 x Fk
= 1 : Q1

DUMP TRUCK
Kapasitas bak
Faktor efisiensi alat
Kecepatan rata-rata bermuatan
Kecepatan rata-rata kosong
Waktu siklus
- Muat
- Waktu tempuh isi
- Waktu tempuh kosong
- lain-lain

= (V : Q1) x 60
= (L : v1) x 60
= (L : v2) x 60

(E08)
V
Fa
v1
v2
Ts2
T1
T2
T3
T4
Ts2

#REF!
6.00
4.00
5.00
#REF!

Kapasitas Produksi / Jam =

Koefisien Alat / M'

2.d.

= 1 : Q2

ALAT BANTU
Diperlukan alat-alat bantu kecil
- Sekop
- Keranjang, dan lain-lain

V x Fa x 60
Fk x Ts2

Q2
Q2
(E08)

#REF! M3/Jam
#REF! M'/Jam
#REF!

Jam

NAMA PAKET
JENIS PEKERJAAN
SATUAN PEMBAYARAN

: 7.7 (5)
: Penurunan Dinding Sumuran Silinder, Diameter 250 cm
: M1
URAIAN ANALISA HARGA SATUAN

No.

3.

U RAIAN

KODE

TENAGA
Produksi menentukan : EXCAVATOR
Produksi Galian / hari = Tk x Q1 x Vt
Kebutuhan tenaga untuk 20% galian :
- Pekerja
- Mandor
Koefisien tenaga / M' :
- Pekerja
- Mandor

= (Tk x P) : (20%Qt)
= (Tk x M) : (20%Qt)

4.

HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

5.

ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :
Rp.

#REF! / M'

6.

WAKTU PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : . . . . . . . . . . . . bulan

7.

VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan :
1.00 M'

KOEF.

SATUAN

Q1
Qt

#REF!
#REF!

M'/Jam
M3

P
M

8.00
1.00

orang
orang

(L01)
(L03)

#REF!
#REF!

Jam
Jam

ITEM PEMBAYARAN NO.


JENIS PEKERJAAN
SATUAN PEMBAYARAN

No.

I.
1
2
3
4
5
6
7
8
9
10

11

II.
1
2
3

: 5.3.1
: Perkerasan Beton Semen
: M3

URAIAN ANALISA HARGA SATUAN

U RAIAN

KODE

ASUMSI
Menggunakan alat (cara mekanik)
Lokasi pekerjaan : sepanjang jalan
Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
Jarak rata-rata Base camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Tebal Lapis perkerasan beton padat
Kadar Semen Minimum (Spesifikasi)
Ukuran Agregat Maksimum
Perbandingan Air/Semen Maksimum (Spesifikasi)
Perbandingan Camp.
: Semen
: Pasir
: Agregat Kasar
Berat Jenis Material :
- Beton
- Semen
- Pasir
- Agregat Kasar

KOEF.

SATUAN

L
Tk
t
Ks
Ag
Wcr
Sm
Ps
Kr

#REF!
0.30
365
19
0.50
400.0
791.0
1,077.0

D1
D2
D3
D4

2.20
1.25
1.30
1.40

KM
jam
m
Kg/M3
mm
%
%
%
T/M3
T/M3
T/M3
T/M3

URUTAN KERJA
Semen, pasir, batu kerikil dan air dicampur dan diaduk
menjadi beton dengan menggunakan Batching Plant
Beton di-cor ke dalam bekisting yang telah disiapkan
Penyelesaian dan perapihan setelah pemasangan

III.

PEMAKAIAN BAHAN, ALAT DAN TENAGA

1.
1.a.
1.b.
1.c.
1.d.
1.e.
1.f.
1.g.
1.h.
1.i.
1.j.
1.k.
1.l.
1.m.

BAHAN
Semen (PC)
= Sm x 1.025
Pasir Beton
= (Ps/1000 : D3) x 1.025
Agregat Kasar
= (Kr/1000 : D4) x 1.025
Baja Tulangan Polos
Joint Sealent
Cat Anti Karat
Expansion Cap
Polytene 125 mikron
Curing Compound

2.
2.a.

ALAT
WHEEL LOADER
Kapasitas bucket
Faktor bucket
Faktor efisiensi alat
Waktu Siklus
- Muat

30

Multiplex 12 mm
Kayu Acuan

Paku
Additive

(M12)
(M01a)
(M03)
(M39a)
(M94)
(M95)
(M96)
(M97)
(M98)
(M63)
(M99)
(M18)
(M67a)

(E15)
V
Fb
Fa
Ts1
T1

410.000
0.6237
0.7885
15.8750
0.9900
0.0200
0.1700
0.4375
0.8700
0.1600
0.096
1.024
0.9139

Kg
M3
M3
Kg
Kg
Kg
M2
Kg
Ltr
Lbr
M3
Kg
Ltr

#REF!
0.85
0.83

M3
-

0.55

menit

- Lain lain

Kap. Prod. / jam =

Koefisien Alat/M2

V x Fb x Fa x 60
Ts1
= 1 : Q1

T2
Ts1

1.00
1.55

menit
menit

Q1

#REF!

M3

#REF!

Jam

ITEM PEMBAYARAN NO.


JENIS PEKERJAAN
SATUAN PEMBAYARAN

No.

2.b.

U RAIAN

BATCHING PLANT (CONCRETE PAN MIXER)


Kapasitas produksi
Faktor Efisiensi alat
Waktu siklus pencampuran : Ts 2
- mengisi
- mengaduk
- menuang
- menunggu dll

Kap.Prod. / jam =
Koefisien Alat/M2
2.c.

2.d.

: 5.3.1
: Perkerasan Beton Semen
: M3

V x Fa x 60
1000 x Ts2
= 1 : Q2

TRUCK MIXER
Kapasitas drum
Faktor Efisiensi alat
Kecepatan rata-rata isi
Kecepatan rata-rata kosong
Waktu Siklus
- mengisi
= (V : Q2) x 60
- mengangkut
= (L : v1) x 60 menit
- Kembali
= (L : v2) x 60 menit
- menumpahkan dll

Kap.Prod. / jam =

V x Fa x 60
Ts3

Koefisien Alat/M2

= 1 : Q3

CONCRETE VIBRATOR
Kebutuhan alat penggetar beton disesuaikan dengan
kapasitas BATCHING PLANT
Kap. Prod. / jam =
Koefisien Alat / M2

2.e.

KODE

liter
-

T1
T2
T3
T4
Ts2

0.50
0.50
0.25
0.25
1.50

menit
menit
menit
menit
menit

Q2

#REF!

M2

#REF!

Jam

(E49)
V
Fa
v1
v2

= 1 : Q5

#REF!
M3
0.83
20.00 KM / Jam
30.00 KM / Jam

T1
T2
T3
T4
Ts3

#REF!
#REF!
#REF!
2.00
#REF!

menit
menit
menit
menit
menit

Q3

#REF!

M3

#REF!

Jam

#REF!

M3

#REF!

jam

(E20)

(E23)
V
Wc
Fa
Pa
pa x Fa x 60
1000 x Wc

SATUAN

#REF!
0.83

= 1 : Q4

Kap. Prod. / jam =

KOEF.

(E43)
V
Fa

Q4

WATER TANK TRUCK


Volume Tanki Air
Kebutuhan air / M3 beton
Faktor Efiesiensi Alat
Kapasitas pompa air

Koefisien Alat / M3

URAIAN ANALISA HARGA SATUAN

4.00
M3
0.21
M3
0.83
100.00 liter/menit

Q5

23.71

M3

(E23)

0.0422

jam

2.f.

CONCRETTE PAVING MACHINE (SLIPFORM PAVER)


Kapasitas (lebar hamparan)
Tebal hamparan
Kecepatan menghampar
faktor effesiensi alat
Kap. Prod. / jam =
Koefisien Alat / M2

b x t Fa x v x 60
= 1 : Q6

(E42)
b
t
v
Fa
Q6

3.00
0.30
3.00
0.83

M
M
M/menit

134.460

M3

0.0074

jam

ITEM PEMBAYARAN NO.


JENIS PEKERJAAN
SATUAN PEMBAYARAN

: 5.3.1
: Perkerasan Beton Semen
: M3

No.

2.h.

3.

U RAIAN

ALAT BANTU
Diperlukan :
- Concrete Cutter
=
- Bar Bending Machine=
- Bar Cutting Machine =
- Sekop
=
- Pacul
=
- Sendok Semen
=
- Ember Cor
=

2
2
2
2
2
3
8

KODE

= Tk x Q2

- Mandor
- Tukang
- Pekerja

Koefisien Tenaga / M3
-

:
Mandor
Tukang
Pekerja

= (Tk x M) : Qt
= (Tk x Tb) : Qt
= (Tk x P) : Qt

4.

HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

5.

ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :
Rp.

KOEF.

SATUAN

buah
buah
buah
buah
buah
buah
buah

TENAGA
Produksi Beton dalam 1 hari
Kebutuhan tenaga :

URAIAN ANALISA HARGA SATUAN

1.00

/ M2

6.

MASA PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan :
0.00
bulan

7.

VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan :
#REF! M2

Qt

#VALUE!

M
Tb
P

3.00
14.00
28.00

(L03)
(L02)
(L01)

#VALUE!
#VALUE!
#VALUE!

M3
orang
orang
orang

jam
jam
jam

Analisa EI-771

ALISA HARGA SATUAN

KETERANGAN

Spec.

Tambahan
Tambahan

Analisa EI-775

ALISA HARGA SATUAN

KETERANGAN

Lump Sump

Berlanjut ke hal. berikut.

Analisa EI-775

ALISA HARGA SATUAN


Lanjutan

KETERANGAN

Analisa EI-531

ALISA HARGA SATUAN

KETERANGAN

Berdasarkan
JMF & sesuai
dgn Spesifikasi

Berlanjut ke hal. berikut.

Analisa EI-531

ALISA HARGA SATUAN


Lanjutan

KETERANGAN

Berlanjut ke hal. berikut.

Analisa EI-531

ALISA HARGA SATUAN


Lanjutan

KETERANGAN

Analisa E
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN

NO.

:
#REF!

PERKIRAAN VOL. PEK.


: Penyediaan Dinding Sumuran Silinder, TOTAL HARGA (Rp.)
: M1
% THD. BIAYA PROYEK

PERKIRAAN
SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1.
2.
3.

Pekerja
Tukang
Mandor

(L01)
(L02)
(L03)

Jam
Jam
Jam

HARGA
SATUAN
(Rp.)

#REF!

#NAME?
#NAME?
#NAME?

JUMLAH HARGA TENAGA


B.

BAHAN

1.
2.
3.
4.

Beton K-250
Baja Tulangan
Kayu Perancah

Paku

(EI-715)
(EI-73)
(M19)
(M18)

M3
Kg
M3
Kg

1.4451
216.7699
0.5890
2.0000

#NAME?
#NAME?
#NAME?
#NAME?

JUMLAH HARGA BAHAN


C.

PERALATAN

1.

Alat Bantu

Ls

1.0000

100.00

JUMLAH HARGA PERALATAN


D.
E.
F.
#REF!
#REF!

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )


OVERHEAD & PROFIT
#REF! % x D
HARGA SATUAN PEKERJAAN ( D + E )
#REF!

:
:
:

JUML
HARG
(Rp

#REF!

Analisa E
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN

NO.

:
#REF!

PERKIRAAN VOL. PEK.


: Penurunan Dinding Sumuran Silinder, TOTAL HARGA (Rp.)
: M1
% THD. BIAYA PROYEK

PERKIRAAN
SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1.
2

Pekerja
Mandor

(L01)
(L03)

Jam
Jam

HARGA
SATUAN
(Rp.)

#REF!

#NAME?
#NAME?

JUMLAH HARGA TENAGA


B.

BAHAN

JUMLAH HARGA BAHAN


C.

PERALATAN

1.
2
3

Excavator
Dump Truck
Alat Bantu

(E10)
(E08)

Jam
Jam
Ls

#REF!
#REF!
1.0000

#NAME?
#NAME?
100.00

JUMLAH HARGA PERALATAN


D.
E.
F.
#REF!
#REF!

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )


OVERHEAD & PROFIT
#REF! % x D
HARGA SATUAN PEKERJAAN ( D + E )
#REF!

:
:
:

JUML
HARG
(Rp

#REF!

Analisa E
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN

NO.

A.
1.
2.
3.

:
#REF!

: M3

PERKIRAAN
SATUAN KUANTITAS

KOMPONEN

TENAGA
Pekerja
Tukang
Mandor

PERKIRAAN VOL. PEK.


TOTAL HARGA (Rp.)
% THD. BIAYA PROYEK

(L01)
(L02)
(L03)

jam
jam
jam

HARGA
SATUAN
(Rp.)

#VALUE!
#VALUE!
#VALUE!

#NAME?
#NAME?
#NAME?

JUMLAH HARGA TENAGA


B.
1.
2
3
4
5
6
7
8
9
10
11
12
13

BAHAN
Semen
Pasir
Agregat Kasar
Baja Tulangan Polos
Joint Sealent
Cat Anti Karat
Expansion Cap
Polytene 125 mikron
Curing Compound

C.
1
2
3
4
5
6
7
8

PERALATAN
Wheel Loader
Batching Plant
Truck Mixer
Con. Vibrator
Water Tank Truck
Conc. Paver
Alat Bantu

D.
E.
F.
G.
#REF!

Multiplex 12 mm
Kayu Acuan

Paku
Additive

(M12)
(M01a)
(M03)
(M39a)
(M94)
(M95)
(M96)
(M97)
(M98)
(M73)
(M99)
(M18)
(M67a)

Kg
M3
M3
Kg
Kg
Kg
M2
Kg
Ltr
Lbr
M3
Kg
Ltr

E15
E43
E49
E20
E23
E42

jam
jam
jam
jam
jam
jam
Ls

410.0000
0.6237
0.7885
15.8750
0.9900
0.0200
0.1700
0.4375
0.8700
0.1600
0.0960
1.0240
0.9139
JUMLAH HARGA BAHAN

#REF!
#REF!
#REF!
#REF!
0.0422
0.0074
1.0000

JUMLAH HARGA PERALATAN


JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )
OVERHEAD & PROFIT
#REF! % x D
HARGA SATUAN PEKERJAAN ( D + E )
HARGA SATUAN PEKERJAAN / M3
#REF!

#REF!
#NAME?
#NAME?
#REF!

#REF!
#NAME?
#NAME?
#REF!

Err:504

100.00

:
:
:

JUML
HARG
(Rp

#REF!

#REF!

945

Analisa EI-771

AN

1.00

JUMLAH
HARGA
(Rp.)

#REF!

#REF!

#NAME?

#NAME?

100.00

100.00
#NAME?
#REF!
#NAME?

Analisa EI-775

AN

1.00

JUMLAH
HARGA
(Rp.)

#REF!

#REF!

0.00

#REF!
100.00

#REF!
#REF!
#REF!
#REF!

Analisa EI-531

AN

1.00

JUMLAH
HARGA
(Rp.)

#VALUE!

#VALUE!

#REF!
#VALUE!
#NAME?
#NAME?
#REF!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#REF!
#NAME?
#NAME?
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#VALUE!
#VALUE!
100.00

#REF!
#REF!
#REF!
#REF!
#REF!

ITEM PEMBAYARAN NO.


JENIS PEKERJAAN
SATUAN PEMBAYARAN

No.

I.
1
2
3
4
5
6
7
8

II.
1
2
3
4

III.
1.

2.
2.a.

: 10.A
: Pondasi Agregat Kls. B Untuk Pek. Rutin
: M3

U RAIAN

ASUMSI
Menggunakan alat berat (cara mekanik)
Lokasi pekerjaan : setempat2 di sepanjang jalan
Kondisi existing jalan : sedang
Jarak rata-rata Base Camp ke lokasi pekerjaan
Tebal lapis agregat padat
Jam kerja efektif per-hari
Berat isi padat
Berat volume agregat (lepas)

KODE

KOEF.

SATUAN

L
t
Tk
Bip
Bil

#REF!
0.15
#REF!
1.81
1.51

KM
M
jam
ton/m3
ton/m3

M27

1.0000

M3

#REF!
0.85
0.83

M3
-

1.00
0.45
1.45

menit
menit
menit

Q1

#REF!

M3

(E15)

#REF!

jam

(E08)
V
Fa
v1
v2
T1
T2
T3

#REF!
0.83
20.00
30.00
#REF!
#REF!
#REF!

ton
KM/jam
KM/jam
menit
menit
menit

URUTAN KERJA
Wheel Loader mencampur & memuat Agregat ke
dalam Dump Truck di Base Camp
Dump Truck mengangkut Agregat ke lokasi
pekerjaan dan dihampar dengan pekerja
Hamparan Agregat dibasahi dengan Water Tank
Truck sebelum dipadatkan dengan Pedestrian Roller
Sekelompok pekerja membuat galian lubang/patching,
merapikan tepi hamparan dan level permukaan
dengan menggunakan Alat Bantu
PEMAKAIAN BAHAN, ALAT DAN TENAGA
BAHAN
Agregat B

ALAT
WHEEL LOADER
Kapasitas bucket
Faktor bucket
Faktor Efisiensi alat
Waktu Siklus :
- Mencampur
- Memuat dan lain-lain

(E15)
V
Fb
Fa
Ts1
T1
T2
Ts1

Kap. Prod. / jam =


Koefisien Alat / M3
2.b.

URAIAN ANALISA HARGA

V x Fb x Fa x 60
(Bip/Bil) x Ts1
= 1 : Q1

DUMP TRUCK
Kapasitas bak
Faktor Efisiensi alat
Kecepatan rata-rata bermuatan
Kecepatan rata-rata kosong
Waktu Siklus : - Waktu memuat = V x (60/Q1) x Bil
- Waktu tempuh isi = (L : v1) x 60 menit
- Waktu tempuh kosong = (L : v2) x 60 menit

- Lain-lain (termasuk dumping setempat-setempat)

T4
Ts2

2.00
#REF!

menit
menit

Berlanjut ke ha

ITEM PEMBAYARAN NO.


JENIS PEKERJAAN
SATUAN PEMBAYARAN

: 10.A
: Pondasi Agregat Kls. B Untuk Pek. Rutin
: M3

No.

U RAIAN

Kap. Prod. / jam =

2.c.

(E09)

#REF!

jam

(E24)
v
b
n
Fa

1.50
0.61
6.00
0.83

KM/jam
M
lintasan
-

Q3

18.99

M3

= 1 : Q3

(E24)

0.0527

jam

WATER TANK TRUCK


Volume tanki air
Kebutuhan air / M3 agregat padat
Kapasitas pompa air
Faktor Efisiensi alat

(E23)
V
Wc
pa
Fa

#REF!
M3
0.07
M3
100.00 liter/menit
0.83
-

= 1 : Q2

PEDESTRIAN ROLLER
Kecepatan rata-rata alat
Lebar efektif pemadatan
Jumlah lintasan
Faktor Efisiensi alat
(v x 1000) x b x t x Fa
n

Kap. Prod. / jam =

3.

SATUAN

M3

Koefisien Alat / M3

2.e.

KOEF.

#REF!

Kap. Prod. / jam =

2.d.

KODE

Q2

Koefisien Alat / M3

V x Fa x 60
(Bip/Bil) x Ts2

URAIAN ANALISA HARGA

pa x Fa x 60
Wc x 1000

Koefisien Alat / M3

= 1 : Q4

ALAT BANTU
Diperlukan :
- Kereta dorong
- Sekop
- Garpu

= 5 buah
= 5 buah
= 5 buah

TENAGA
Produksi menentukan : WHEEL LOADER
Produksi agregat / hari = Tk x Q1
Kebutuhan tenaga :
- Pekerja
- Mandor
Koefisien tenaga / M3 :
- Pekerja
- Mandor

= (Tk x P) : Qt
= (Tk x M) : Qt

Q4

71.14

M3

(E23)

0.0141

jam

Q1
Qt

#REF!
#REF!

M3/jam
M3

P
M

15.00
1.00

orang
orang

(L01)
(L03)

#REF!
#REF!

jam
jam

Berlanjut ke ha

ITEM PEMBAYARAN NO.


JENIS PEKERJAAN
SATUAN PEMBAYARAN

: 10.A
: Pondasi Agregat Kls. B Untuk Pek. Rutin
: M3

No.

U RAIAN

4.

HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

5.

ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :
Rp.

#REF! / M3.

6.

MASA PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : . . . . . . . . . . . bulan

7.

VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan :
0.00 M3

URAIAN ANALISA HARGA

KODE

KOEF.

SATUAN

ITEM PEMBAYARAN NO.


JENIS PEKERJAAN
SATUAN PEMBAYARAN

No.

I.
1
2
3
4
5
6
7
8
9
10

11

11
II.
1
2

: 10.B
: Camp. Aspal Panas Utk.Pek.Rutin
: M3

U RAIAN

ASUMSI
Menggunakan alat berat (cara mekanik)
Lokasi pekerjaan : sepanjang jalan
Kondisi existing jalan : sedang
Jarak rata-rata Base Camp ke lokasi pekerjaan
Tebal Lapis Hotmix padat
Jam kerja efektif per-hari
Faktor kehilanganmaterial :
- Agregat
- Aspal
Berat isi padat
Berat Isi Agregat (lepas)
Komposisi campuran AC-WC :
- Agr Pch Mesin 5 - 10 & 10 - 15 mm
- Agregat Pecah Mesin 0 - 5 mm
- Semen
- Asphalt
Berat Isi bahan :
- AC-WC
- Agr Pch Mesin 5 - 10 & 10 - 15 mm
- Agr Pch Mesin 0 - 5 mm
Jarak Stock pile ke Cold Bin

URAIAN ANALISA HARGA

KODE

KOEF.

SATUAN

L
t
Tk
Fh1
Fh2
Bip
Bil

#REF!
0.04
#REF!
1.05
1.03
1.81
1.51

KM
M
Jam
ton/m3
ton/m3

5-10&10-15

0-5
FF
As

44.70
48.00
1.90
5.40

%
%
%
%

D1
D2
D3
l

2.32
1.42
1.57
50.00

ton / M3
ton / M3
ton / M3
m

(M92)
(M91)
(M05)
(M10)

0.0307
0.0298
1.8514
5.1615

M3
M3
Kg
Kg

(E15)
V
Fb
Fa

#REF!
0.85
0.83

M3
-

URUTAN KERJA
Wheel Loader memuat Agregat dan Aspal ke dalam
Cold Bin AMP
Agregat dan aspal dicampur dan dipanaskan
dengan AMP untuk dimuat langsung kedalam
Dump Truck dan diangkut ke lokasi pekerjaan
Penghamparan dilaksanakan manual oleh pekerja
untuk keperluan penambalan/patching kecil2
dan dipadatkan dengan Pedestrian Roller
Sekelompok pekerja membuat galian lubang/patching,
merapikan tepi hamparaan dengan menggunakan
Alat Bantu

III.

PEMAKAIAN BAHAN, ALAT DAN TENAGA

1.
1.a.
1.b.
1.c.
1.d.

BAHAN
Agr 5-10 & 10-15
Agr 0-5
Semen
Aspal

2.
2.a.

ALAT
WHEEL LOADER
Kapasitas bucket
Faktor bucket
Faktor efisiensi alat

= ("5-10 & 10-15" x (D1 x tM3) x Fh1) : D2


= ("0-5" x (D1 x tM3) x Fh1) : D3
= (FF x (D1 x tM3) x Fh1) x 1000
= (AS x (D1 x tM3) x Fh2) x 1000

Kecepatan maju
Kecepatan kembali
Waktu siklus
((l x 60 : (Vf x 1000)) + (l x 60 : (Vr x 1000))) + 0.75

Vf
Vr

15.00
20.00

km/jam
km/jam

Ts1

1.10

menit

Berlanjut ke ha

ITEM PEMBAYARAN NO.


JENIS PEKERJAAN
SATUAN PEMBAYARAN

: 10.B
: Camp. Aspal Panas Utk.Pek.Rutin
: M3

No.

U RAIAN

Kap. Prod. / jam =

Koefisien Alat/M3
2.b.

V x Fa
D1
= 1 : Q2

SATUAN

Q1

#REF!

M3

(E15)

#REF!

Jam

(E01)
V
Fa

#REF! ton / Jam


0.83
M3

(E01)

#REF!

Jam

GENERATORSET ( GENSET )
Kap.Prod. / Jam = SAMA DENGAN AMP
Koefisien Alat/M3
= 1 : Q3

(E12)
Q3
(E12)

#REF!
#REF!

M3
Jam

DUMP TRUCK (DT)


Kapasitas bak
Faktor Efisiensi alat
Kecepatan rata-rata bermuatan
Kecepatan rata-rata kosong
Kapasitas AMP / batch
Waktu menyiapkan 1 batch AC
Waktu Siklus
- Mengisi Bak
= (V : Q2b) x Tb
- Angkut
= (L : v1) x 60 menit
- Tunggu + dump + Putar
- Kembali
= (L : v2) x 60 menit

(E08)
V
Fa
v1
v2
Q2b
Tb
Ts2
T1
T2
T3
T4
Ts2

#REF!
Ton
0.80
20.00 KM / Jam
30.00 KM / Jam
1.00
Ton
1.00
menit
#REF!
#REF!
30.00
#REF!
#REF!

menit
menit
menit
menit
menit

Q4

#REF!

M3

(E09)

#REF!

Jam

ASPHALT FINISHER ( Tidak dipakai )


Kecepatan menghampar
Faktor efisiensi alat
Lebar hamparan
Kap.Prod. / jam =
V x Fa x b x t x 60

(E02)
V
Fa
b
Q5

0.00
0.00
0.00
0.00

km / jam
M
M3

Koefisien Alat/M3

(E02)

0.0000

(E24)
v
b
n
Fa

1.50
0.61
6.00
0.83

Koefisien Alat/M3

2.f.

KOEF.

#REF!

Kap.Prod. / jam =

2.e.

KODE

Q2

Koefisien Alat/M3

2.d.

= 1 : Q1

ASPHALT MIXING PLANT (AMP)


Kapasitas produksi
Faktor Efisiensi alat
Kap.Prod. / jam =

2.c.

V x Fb x Fa x 60
Fh1 x (Bip/Bil) x Ts1

URAIAN ANALISA HARGA

V x Fa x 60
D1 x Ts2
= 1 : Q4

= 1 : Q5

PEDESTRIAN ROLLER
Kecepatan rata-rata alat
Lebar efektif pemadatan
Jumlah lintasan
Faktor Efisiensi alat

Jam

Km / Jam
M
lintasan
-

Berlanjut ke ha

ITEM PEMBAYARAN NO.


JENIS PEKERJAAN
SATUAN PEMBAYARAN

: 10.B
: Camp. Aspal Panas Utk.Pek.Rutin
: M3

No.

U RAIAN

Kap. Prod. / jam =


Koefisien Alat/M3
2.g.

(v x 1000) x b x t x Fa
n
= 1 : Q6

PNEUMATIC TIRE ROLLER ( tidak dipakai )


Kecepatan rata-rata
Lebar efektif pemadatan
Jumlah lintasan
Faktor Efisiensi alat
Kap.Prod./jam =

(v x 1000) x b x t x Fa
n

Koefisien Alat/M3

= 1 : Q7

2.h.

ALAT BANTU
diperlukan :
- Kereta dorong = 2 buah
- Sekop
= 4 buah
- Garpu
= 4 buah
- Tongkat Kontrol ketebalan hanparan

3.

TENAGA
Produksi menentukan : DUMP TRUCK
Produksi ATB / hari = Tk x Q4
Kebutuhan tenaga :
- Pekerja
- Mandor
Koefisien Tenaga / M3 :
- Pekerja
- Mandor

= (Tk x P) / Qt
= (Tk x M) / Qt

4.

HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

5.

ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKEMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :
Rp.

#REF! / M3.

6.

MASA PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : . . . . . . . . . . . bulan

7.

VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan :
0.00 M3

URAIAN ANALISA HARGA

KODE

Q6

KOEF.

SATUAN

5.06

M3

(E17)

0.1975

Jam

(E18)
v
b
n
Fa

5.00
1.20
8.00
0.83

KM / jam
M
lintasan
-

Q7

24.90

M3

(E18)

0.0000

Jam

Q4
Qt

#REF! M3 / Jam
#REF!
M3

P
M

10.00
2.00

orang
orang

(L01)
(L03)

#REF!
#REF!

Jam
Jam

ITEM PEMBAYARAN NO.


JENIS PEKERJAAN
SATUAN PEMBAYARAN

: 10.C
: Penetrasi Macadam Utk.Pek.Rutin
: M3

No.

U RAIAN

I.
1
2
3
4
5
6
7
8

10
II.
1
2
3

4
5

III.

ASUMSI
Menggunakan alat berat (cara mekanik)
Lokasi pekerjaan : sepanjang jalan
Kondisi existing jalan : sedang
Jarak rata-rata Base Camp ke lokasi pekerjaan
Tebal rata2 Lapen
Jam kerja efektif per-hari
Faktor kehilanganmaterial :
- Agregat
- Aspal
Komposisi campuran Lapen (spesifikasi) :
- Agregat Pokok
- Agregat Pengunci
- Aspal
:
- Paska Agregat Pokok

URAIAN ANALISA HARGA

KODE

KOEF.

L
t
Tk
Fh1
Fh2

#REF!
0.055
#REF!
1.10
1.05

Ak
Ap
As1
As2

133.00
25.00
5.20
94.55

Berat jenis bahan :


- Agregat
- Aspal

D1
D2

1.80
1.01

Faktor kembang Aggregat

Fk

1.20

SATUAN

KM
M
Jam
Kg/M2
Kg/M2
Kg/M2
Kg/M3
ton / M3
ton / M3

URUTAN KERJA
Permukaan dasar dibersihkan dan disemprot aspal cair
bilamana diperlukan
Agregat kasar dimuat ke dalam Dump Truck
menggunakan Wheel Loader (di Base Camp)
Agregat Kasar ditebarkan (manual) sesuai tebal yang
diperlukan dan dipadatkan dengan Three Wheel
Roller (6-8 Ton) minimum 6 lintasan
Aspal disemprotkan di atas agregat kasar yang telah
diratakan menggunakan Aspal Sprayer (merata)
Agregat Pengunci ditebarkan dan dipadatkan dengan
cara yang sama dengan pemadatan agregat kasar
PEMAKAIAN BAHAN, ALAT DAN TENAGA

1.
1.a.
1.b.
1.c.

BAHAN
Agregat Kasar
Agregat Pengunci
Aspal

2.
2.a.

ALAT
WHEEL LOADER
Kapasitas bucket
Faktor bucket
Faktor efisiensi alat
Waktu Siklus
- Memuat, menuang, kembali

= {(Ak/1000 : t M3) x Fh1} : D1


= {(Ap/1000 : t M3) x Fh1} : D1
= {(As : t M3) x Fh2}

(M03)
(M04)
(M10)

(E15)
V
Fb
Fa
Ts1
T1
Ts1

1.4778
0.2778
99.2727

M3
M3
Kg

#REF!
0.85
0.83

M3
-

0.45
0.45

menit
menit

Berlanjut ke ha

ITEM PEMBAYARAN NO.


JENIS PEKERJAAN
SATUAN PEMBAYARAN

: 10.C
: Penetrasi Macadam Utk.Pek.Rutin
: M3

No.

U RAIAN

Kap. Prod. / jam =

2.b.

2.c.

KOEF.

SATUAN

#REF!

M3

= 1 : Q1

(E15)

#REF!

Jam

DUMP TRUCK (DT)


Kapasitas bak
Faktor Efisiensi alat
Kecepatan rata-rata bermuatan
Kecepatan rata-rata kosong

(E08)
V
Fa
v1
v2

#REF!
ton
0.83
20.00 KM / Jam
30.00 KM / Jam

Waktu Siklus
- Mengisi Bak = (V x 60) : (Q1 x D1 X Fk)
- Angkut
= (L : v1) x 60 menit
- Tunggu + dump + Putar
- Kembali
= (L : v2) x 60 menit

Ts2
T1
T2
T3
T4
Ts2

#REF!
#REF!
2.00
#REF!
#REF!

menit
menit
menit
menit
menit

Kap.Prod. / jam =

Q2

#REF!

M3

Koefisien Alat / M3 = = 1 : Q2

(E09)

#REF!

Jam

THREE WHEEL ROLLER


Kecepatan rata-rata alat
Lebar efektif pemadatan
Jumlah lintasan
Faktor Efisiensi alat

(E16)
v
b
n
Fa

2.00
1.70
6.00
0.83

Km / Jam
M
lintasan
-

Q3

25.87

M3

(E16)

0.0387

Jam

V x Fa x 60
Ts2 x D1 x Fk

Kap. Prod. / jam =


Koefisien Alat / M3
2.d.

KODE

Q1

Koefisien Alat/M3

V x Fb x Fa x 60
Ts1 x Fk

URAIAN ANALISA HARGA

(v x 1000) x b x t x Fa
n
= 1 : Q3

ASPHALT SPRAYER
Kapasitas alat
Faktor efisiensi alat
Kapasitas Pompa Aspal
Pemakaian Aspal
= As2 x Fh2 = M10
Kapasitas prod/jam
= (pas x Fa x 60 x D2 x 1000) : (1000 x kas)
Koefesien alat/jam = 1 : Q4

(E03)
V
Fa
pas
kas
Q4

#REF!
liter
0.83
55.00 liter/menit
99.2727
Kg/m3
27.87

M3

0.0359

jam

Berlanjut ke ha

ITEM PEMBAYARAN NO.


JENIS PEKERJAAN
SATUAN PEMBAYARAN

: 10.C
: Penetrasi Macadam Utk.Pek.Rutin
: M3

No.

2.e.

3.

U RAIAN

ALAT BANTU
diperlukan setiap :
- Kereta dorong
- Sekop
- Sapu
- Sikat
- Karung
- Cerek Aspal
- Kaleng Aspal

=
=
=
=
=
=
=

75.00
3 buah
5 buah
5 buah
3 buah
5 buah
3 buah
3 buah

= (Tk x P) / Qt
= (Tk x M) / Qt

4.

HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

5.

ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKEMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :
Rp.

KODE

KOEF.

SATUAN

M3 pekerjaan

TENAGA
Produksi menentukan (Produksi Wheel Loader)
Produksi Lapen / hari = Q1 x Tk
Kebutuhan tenaga :
- Pekerja
- Mandor
Koefisien Tenaga / M3 :
- Pekerja
- Mandor

URAIAN ANALISA HARGA

#REF! / M3.

6.

MASA PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : . . . . . . . . . . . bulan

7.

VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan :
0.00 M3

Q1
Qt

#REF!
#REF!

M3/Jam
M3

P
M

20.00
2.00

orang
orang

(L01)
(L03)

#REF!
#REF!

Jam
Jam

ITEM PEMBAYARAN NO.


JENIS PEKERJAAN
SATUAN PEMBAYARAN

No.

I.
1
2
3
4
5

7
II.

: 10.D
: Camp. Aspal Dingin Utk.Pek.Rutin
: M3

U RAIAN

ASUMSI
Menggunakan buruh dan alat (semi mekanik)
Lokasi pekerjaan : sepanjang jalan
Jarak rata-rata Base camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Batasan Spesifikasi :
- Ukuran Agregat Nominal Maksimum
- Kadar Aspal terhadap berat total campuran
- Tebal nominal padat
Berat Jenis Bahan :
- Campuran Aspal Dingin (diambil)
- Aspal (diambil)
- Agregat (diambil)
Faktor kembang campuran

III.

URUTAN KERJA
Agregat dan Aspal dicampur di dalam Pengaduk
Beton Mekanis (Concrete Mixer)
Campuran dibawa ke lokasi pekerjaan dengan
menggunakan Dump Truck
Pekerja membuat/merapikan lubang patching/galian,
campuran dihampar manual dengan alat bantu
Hamparan dipadatkan dengan Pedestrian Roller
PEMAKAIAN BAHAN, ALAT DAN TENAGA

1.
1.a.
1.b.

BAHAN
Agregat Halus
Aspal Emulsi

2.
2.a.

ALAT
CONCRETE MIXER
Kapasitas Alat
Faktor Efisiensi Alat
Waktu siklus :
(T1 + T2 + T3 + T4)
- Memuat
- Mengaduk
- Menuang
- Tunggu, dll.

1
2
3
4

Kap. Prod. / jam =

= {(100% - As) x 1M3 x D1} : D3


= {As x 1M3 x D1} x 1000

URAIAN ANALISA HARGA

KODE

SATUAN

L
Tk

#REF!

KM
jam

Sa
As
t

19.00
4.50
0.04

MM
%
M

D1
D2
D3
Fk

2.01
1.00
1.60
1.20

Ton/M3
Ton/M3
Ton/M3

(M04)
(M31)

(E06)
V
Fa
Ts1
T1
T2
T3
T4
Ts1
V x Fa x 60
1000 x Ts1

KOEF.

Q1

1.1997
90.4500

M3
Kg

#REF!
0.83

liter
-

5.00
3.50
3.00
2.00
13.50

menit
menit
menit
menit
menit

#REF!

M3

Koefisien Alat / M3

= 1 : Q1

(E06)

#REF!

jam

Berlanjut ke ha

ITEM PEMBAYARAN NO.


JENIS PEKERJAAN
SATUAN PEMBAYARAN

: 10.D
: Camp. Aspal Dingin Utk.Pek.Rutin
: M3

No.

2.b.

U RAIAN

PEDESTRIAN ROLLER
Kecepatan rata-rata alat
Lebar efektif pemadatan
Jumlah lintasan
Faktor Efisiensi alat
Kap. Prod. / jam =
Koefisien Alat / M3

2.c.

(v x 1000) x b x t x Fa
n

Kap.Prod. / jam =

2.d.

3.

ALAT BANTU
Diperlukan :
- Sekop
- Sapu
- Alat Perata
- Gerobak Dorong

KODE

V x Fa x 60
D1 x Ts2
= 1 : Q3

=
=
=
=

3
4
3
2

KOEF.

SATUAN

v
b
n
Fa

2.50
0.65
12.00
0.83

KM/jam
M
lintasan
-

Q2

4.50

M3

0.2224

jam

= 1 : Q2

DUMP TRUCK (DT)


Kapasitas bak
Faktor Efisiensi alat
Kecepatan rata-rata bermuatan
Kecepatan rata-rata kosong
Kapasitas molen
Waktu menyiapkan 1 molen campuran
Waktu Siklus
- Mengisi Bak
= (V : Q1b) x Tb
- Angkut
= (L : v1) x 60 menit
- Tunggu + dump + Putar
- Kembali
= (L : v2) x 60 menit

Koefisien Alat / M3

URAIAN ANALISA HARGA

(E09)
V
Fa
v1
v2
Q1b
Tb
Ts2
T1
T2
T3
T4
Ts2

6.00
M3
0.83
40.00 KM / Jam
50.00 KM / Jam
#REF!
M3
13.50
menit
#REF!
#REF!
10.00
#REF!
#REF!

menit
menit
menit
menit
menit

Q3

#REF!

M3

(E09)

#REF!

Jam

buah
buah
buah
buah

TENAGA
Produksi menentukan (Produksi Concrete Mixer)
Produksi Campuran dalam 1 hari
= Tk x Q1
Kebutuhan tenaga : - Mandor
- Pekerja

Koefisien Tenaga / M3 :
- Mandor
- Pekerja

= (Tk x M) : Qt
= (Tk x P) : Qt

Q1
Qt
M
P

#REF!
#VALUE!
1.00
12.00

M3/Jam
M3
orang
orang

(L03)
(L01)

#VALUE!
#VALUE!

jam
jam

Berlanjut ke ha

ITEM PEMBAYARAN NO.


JENIS PEKERJAAN
SATUAN PEMBAYARAN

: 10.D
: Camp. Aspal Dingin Utk.Pek.Rutin
: 10.D

No.

U RAIAN

4.

HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

5.

ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKEMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :
Rp.

#REF! / M3

6.

MASA PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : . . . . . . . . . . . bulan

7.

VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan :
0.00 M3

URAIAN ANALISA HARGA

KODE

KOEF.

SATUAN

ITEM PEMBAYARAN NO.


JENIS PEKERJAAN
SATUAN PEMBAYARAN

No.

I.
1
2
3
4
5
6

II.
1
2
3
4

: 10.E
: Aspal Pengisian Retak
: LITER

U RAIAN

ASUMSI
Menggunakan alat berat (cara mekanik)
Lokasi pekerjaan : sepanjang jalan
Jarak rata-rata Base Camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Faktor kehilangan bahan
Komposisi campuran :
- Aspal AC - 10 atau AC - 20
- Minyak Fluk / Pencair
Berat jenis bahan :
- Aspal AC - 10 atau AC - 20
- Minyak Fluk / Pencair
Bahan dasar (aspal & minyak pencair) semuanya
diterima dilokasi pekerjaan

PEMAKAIAN BAHAN, ALAT DAN TENAGA

1.

BAHAN
Untuk mendapatkan 1 liter Lapis resap Pengikat
diperlukan :
(1 liter x Fh)
Aspal
Kerosene

= As x Pc x D1 : 100
= K x Pc : 100

ALAT
APHALT SPRAYER
Kapasitas alat
Faktor Efisiensi Alat
Waktu Siklus (termasuk proses pemanasan)
Kap.Prod. / jam =
Koefisien Alat / Ltr

2.b.

KODE

KOEF.

SATUAN

L
Tk
Fh

#REF!
1.10

KM
Jam
-

As
K

87.00
13.00

%
%

D1
D2

1.03
0.80

Kg / Ltr
Kg / Ltr

Pc

1.10

liter

(M10)
(M11)

0.99
0.14

Kg
liter

(E03)
V
Fa
Ts

#REF!
0.83
2.00

liter
Jam

Q1

#REF!

liter

(E03)

#REF!

Jam

(E05)
V
Ap

400.00
0.80

M2 / Jam
liter / M2

Q2

320.00

liter

URUTAN KERJA
Aspal dan minyak tanah dicampur dan dipanaskan
sehingga menjadi campuran aspal cair
Permukaan yang akan dilapis dibersihkan dari debu
dan kotoran dengan Air Compresor
Campuran aspal cair disemprotkan dengan Asphalt
Sprayer ke atas permukaan yang akan dilapis
Angkutan Aspal dan Minyak tanah menggunakan
Dump Truck

III.

2.
2.a.

URAIAN ANALISA HARGA

V x Fa
Ts
= 1 : Q1

AIR COMPRESOR
Kapasitas Alat ------>> diambil
Aplikasi Lapis Resap Pengikat rata-rata (Spesifikasi)
Kap. Prod. / jam =

(V x Ap)

Koefisien Alat / Ltr

= 1 : Q2

(E05)

0.0031

Jam

Berlanjut ke ha

ITEM PEMBAYARAN NO.


JENIS PEKERJAAN
SATUAN PEMBAYARAN

: 10.E
: Aspal Pengisian Retak
: LITER

No.

2.c.

3.

U RAIAN

URAIAN ANALISA HARGA

KODE

KOEF.

SATUAN

DUMP TRUCK (DT)


Sebagai alat pengangkut bahan dilokasi pekerjaan
Dump Truck melayani alat Asphalt Sprayer.
Kap.Prod. / jam = sama dengan Asphalt Sprayer

(E08)

Q3

#REF!

liter

Koefisien Alat / Ltr

(E08)

#REF!

Jam

Q1
Qt

#REF!
#VALUE!

liter
liter

P
M

10.00
1.00

= 1 : Q3

TENAGA
Produksi menentukan : ASPHALT SPRAYER
Produksi / hari = Tk x Q1
Kebutuhan tenaga :
- Pekerja
- Mandor
Koefisien Tenaga / Ltr :
- Pekerja
- Mandor

= (Tk x P) / Qt
= (Tk x M) / Qt

4.

HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

5.

ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKEMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :
Rp.

#REF! / Liter

6.

MASA PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : . . . . . . . . . . . bulan

7.

VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan :
0.00 Liter

(L01)
(L03)

#VALUE!
#VALUE!

orang
orang

Jam
Jam

Analisa EI-10A

IAN ANALISA HARGA SATUAN

KETERANGAN

padat

Berlanjut ke halaman berikut

Analisa EI-10A

IAN ANALISA HARGA SATUAN


Lanjutan

KETERANGAN

Lump Sum

Berlanjut ke halaman berikut

Analisa EI-10A

IAN ANALISA HARGA SATUAN


Lanjutan

KETERANGAN

Analisa EI-10B

IAN ANALISA HARGA SATUAN

KETERANGAN

Gradasi harus memenuhi Spesifikasi

Berlanjut ke halaman berikut

Analisa EI-10B

IAN ANALISA HARGA SATUAN


Lanjutan

KETERANGAN

Berlanjut ke halaman berikut

Analisa EI-10B

IAN ANALISA HARGA SATUAN


Lanjutan

KETERANGAN

Lump Sum

Analisa EI-10C

IAN ANALISA HARGA SATUAN

KETERANGAN

Tabel 6.6.4.
Tabel 6.6.4.
Tabel 6.6.4.
(As1 : t)

Lihat panduan

Berlanjut ke halaman berikut

Analisa EI-10C

IAN ANALISA HARGA SATUAN


Lanjutan

KETERANGAN

Berlanjut ke halaman berikut

Analisa EI-10C

IAN ANALISA HARGA SATUAN


Lanjutan

KETERANGAN

Lump Sum

Analisa EI-10D

IAN ANALISA HARGA SATUAN

KETERANGAN

Spec. 6.5.2 (2)


Tabel 6.5.3 (1)
Tabel 6.5.3 (1)

Berlanjut ke halaman berikut

Analisa EI-10D

IAN ANALISA HARGA SATUAN


Lanjutan

KETERANGAN

Melayani 1 buah
molen

Berlanjut ke halaman berikut

Analisa EI-10D

IAN ANALISA HARGA SATUAN


Lanjutan

KETERANGAN

Analisa EI-10E

IAN ANALISA HARGA SATUAN

KETERANGAN

100 bagian
15 bagian

campuran

Berlanjut ke halaman berikut

Analisa EI-10E

IAN ANALISA HARGA SATUAN


Lanjutan

KETERANGAN