Solucin a Problemas Sugeridos

Wastewater Characteristics (P.61)


1. BODu = 292.7 mg/L
k(30C) = k(20C)1.047(30-20) = 0.36/d
BOD5(30C) = 245.3 mg/L
2.

yt

13

= (kL0 )

1 3

k2 3
t
+
13
6 L0

Graficando (t/yt)1/3 vs t
k2 3

B =
1 3 = 0.0198
6L
0

A = (kL0 )

k = 6B/A = 0.592/d

L0 = 1/(kA3) = 209 mg/L

1 3

= 0.2007

4. y5 = 160 mg/L
Primary Treatment (P.69-70)
1. Q = 10.61 ft3/s
2. At effluent: BOD5 = 149.5 mg/L
For Q = 50,000 m3/d:
&
BOD5 removed = 4,025 kg/d

&

SS = 122.5 mg/L

SS removed = 11,375 kg/d

7. Q = 11.3 ft3/s
Activated Sludge Process (P.78-79)
1. V = 5943 m3

c =

X
dX

Q( S0 S )
dX
=Y
kd X
dt
V

dt
Presumiendo un BOD5 a la salida (efluente) = 10 mg/L:

c = 12.26 d
Nota: Ignoren la ltima oracin del problema, ya que es redundante el cmputo que se les pide
hacer.

2. Assuming 80% of biological solids:


Sludge production = 1,515 kg/d
O2 demand = 5,335 kg/d

Air = 254,564 m3/d

4. V = 1,857 m3
12. O2 demand = 697 kg/d
13. Xr = 10,000 mg/L
Qr = 2,560 m3/d
Qw = 80 m3/d
Trickling Filters (P.91)
1. Overall efficiency = 80.5%
2. a. BOD load = 463.7 g/d-m3
b. hyd load = 17.8 m3/d-m2
c. using NRC formula, filter efficiency = 82%
4. A = 815 m2
Oxidation Ponds
2. Vtotal = 9,065 m3
Atotal = 6,043 m2
Area 1st pond = 3,022 m2
Area 2nd and 3rd ponds = 1511 m2