Solución A Problemas Sugeridos (Exam 3) PDF
Solución A Problemas Sugeridos (Exam 3) PDF
yt
13
= (kL0 )
1 3
k2 3
t
+
13
6 L0
Graficando (t/yt)1/3 vs t
k2 3
B =
1 3 = 0.0198
6L
0
A = (kL0 )
k = 6B/A = 0.592/d
1 3
= 0.2007
4. y5 = 160 mg/L
Primary Treatment (P.69-70)
1. Q = 10.61 ft3/s
2. At effluent: BOD5 = 149.5 mg/L
For Q = 50,000 m3/d:
&
BOD5 removed = 4,025 kg/d
&
SS = 122.5 mg/L
7. Q = 11.3 ft3/s
Activated Sludge Process (P.78-79)
1. V = 5943 m3
c =
X
dX
Q( S0 S )
dX
=Y
kd X
dt
V
dt
Presumiendo un BOD5 a la salida (efluente) = 10 mg/L:
c = 12.26 d
Nota: Ignoren la ltima oracin del problema, ya que es redundante el cmputo que se les pide
hacer.
4. V = 1,857 m3
12. O2 demand = 697 kg/d
13. Xr = 10,000 mg/L
Qr = 2,560 m3/d
Qw = 80 m3/d
Trickling Filters (P.91)
1. Overall efficiency = 80.5%
2. a. BOD load = 463.7 g/d-m3
b. hyd load = 17.8 m3/d-m2
c. using NRC formula, filter efficiency = 82%
4. A = 815 m2
Oxidation Ponds
2. Vtotal = 9,065 m3
Atotal = 6,043 m2
Area 1st pond = 3,022 m2
Area 2nd and 3rd ponds = 1511 m2