CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 02
"TERRACERAS"
UNIDAD
M3
ESTACIN KM.
REA
L1+L2
D/2
13+000.000
8.25
8.25
13+001.680
0.00
71+840.000
REA ACUMULADA
PARCIAL
ACUMULADO
0.00
0.00
0.00
8.25
0.84
6.93
6.93
0.00
0.00
29,419.16
0.00
6.93
71+860.000
0.00
0.00
10.00
0.00
6.93
71+880.000
0.00
0.00
10.00
0.00
6.93
71+900.000
0.00
0.00
10.00
0.00
6.93
71+920.000
0.00
0.00
10.00
0.00
6.93
71+940.000
0.00
0.00
10.00
0.00
6.93
71+960.000
0.00
0.00
10.00
0.00
6.93
71+980.000
0.00
0.00
10.00
0.00
6.93
72+000.000
0.00
0.00
10.00
0.00
6.93
72+020.000
0.00
0.00
10.00
0.00
6.93
72+040.000
0.00
0.00
10.00
0.00
6.93
72+060.000
0.00
0.00
10.00
0.00
6.93
72+080.000
0.00
0.00
10.00
0.00
6.93
72+100.000
0.00
0.00
10.00
0.00
6.93
72+120.000
0.00
0.00
10.00
0.00
6.93
72+140.000
0.00
0.00
10.00
0.00
6.93
72+160.000
0.00
0.00
10.00
0.00
6.93
72+180.000
0.00
0.00
10.00
0.00
6.93
72+200.000
0.00
0.00
10.00
0.00
6.93
72+220.000
1.75
1.75
10.00
17.50
24.43
72+240.000
1.71
3.46
10.00
34.60
59.03
72+260.000
0.00
1.71
10.00
17.10
76.13
72+280.000
0.00
0.00
10.00
0.00
76.13
72+300.000
0.00
0.00
10.00
0.00
76.13
72+320.000
0.00
0.00
10.00
0.00
76.13
72+340.000
0.00
0.00
10.00
0.00
76.13
72+360.000
0.00
0.00
10.00
0.00
76.13
72+380.000
0.00
0.00
10.00
0.00
76.13
72+400.000
0.00
0.00
10.00
0.00
76.13
72+420.000
0.00
0.00
10.00
0.00
76.13
72+440.000
0.00
0.00
10.00
0.00
76.13
72+460.000
0.00
0.00
10.00
0.00
76.13
72+480.000
0.00
0.00
10.00
0.00
76.13
72+500.000
0.00
0.00
10.00
0.00
76.13
72+520.000
0.00
0.00
10.00
0.00
76.13
72+540.000
0.00
0.00
10.00
0.00
76.13
72+560.000
0.00
0.00
10.00
0.00
76.13
72+580.000
0.00
0.00
10.00
0.00
76.13
72+600.000
0.00
0.00
10.00
0.00
76.13
72+620.000
0.00
0.00
10.00
0.00
76.13
72+640.000
0.00
0.00
10.00
0.00
76.13
72+654.982
0.00
0.00
7.49
0.00
76.13
72+660.000
0.00
0.00
2.51
0.00
76.13
72+678.443
0.00
0.00
9.22
0.00
76.13
72+680.000
0.00
0.00
0.78
0.00
76.13
72+700.000
0.00
0.00
10.00
0.00
76.13
72+701.905
0.00
0.00
0.95
0.00
76.13
72+720.000
0.00
0.00
9.05
0.00
76.13
72+739.443
0.00
0.00
9.72
0.00
76.13
72+740.000
0.00
0.00
0.28
0.00
76.13
REVISO:
RALIZO:
Pgina 1 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 02
"TERRACERAS"
UNIDAD
M3
ESTACIN KM.
REA
L1+L2
D/2
72+760.000
2.99
2.99
72+780.000
3.08
72+800.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
29.90
106.03
6.07
10.00
60.70
166.73
3.10
6.18
10.00
61.80
228.53
72+820.000
3.55
6.65
10.00
66.50
295.03
72+840.000
0.00
3.55
10.00
35.50
330.53
72+860.000
0.00
0.00
10.00
0.00
330.53
72+880.000
0.00
0.00
10.00
0.00
330.53
72+900.000
0.00
0.00
10.00
0.00
330.53
72+920.000
0.00
0.00
10.00
0.00
330.53
72+940.000
0.00
0.00
10.00
0.00
330.53
72+960.000
0.00
0.00
10.00
0.00
330.53
72+971.651
0.00
0.00
5.83
0.00
330.53
72+980.000
0.00
0.00
4.17
0.00
330.53
73+000.000
0.00
0.00
10.00
0.00
330.53
73+009.189
0.00
0.00
4.59
0.00
330.53
73+020.000
0.00
0.00
5.41
0.00
330.53
73+032.651
0.00
0.00
6.33
0.00
330.53
73+040.000
0.00
0.00
3.67
0.00
330.53
73+056.112
0.00
0.00
8.06
0.00
330.53
73+060.000
0.00
0.00
1.94
0.00
330.53
73+080.000
0.00
0.00
10.00
0.00
330.53
73+100.000
0.00
0.00
10.00
0.00
330.53
73+120.000
0.00
0.00
10.00
0.00
330.53
73+140.000
0.00
0.00
10.00
0.00
330.53
73+160.000
0.00
0.00
10.00
0.00
330.53
73+180.000
0.00
0.00
10.00
0.00
330.53
73+200.000
0.00
0.00
10.00
0.00
330.53
73+220.000
0.00
0.00
10.00
0.00
330.53
73+240.000
0.00
0.00
10.00
0.00
330.53
73+260.000
0.00
0.00
10.00
0.00
330.53
73+280.000
0.00
0.00
10.00
0.00
330.53
73+300.000
0.00
0.00
10.00
0.00
330.53
73+320.000
0.00
0.00
10.00
0.00
330.53
73+340.000
0.00
0.00
10.00
0.00
330.53
73+360.000
0.00
0.00
10.00
0.00
330.53
73+380.000
0.00
0.00
10.00
0.00
330.53
73+400.000
0.00
0.00
10.00
0.00
330.53
73+420.000
0.00
0.00
10.00
0.00
330.53
73+440.000
0.00
0.00
10.00
0.00
330.53
73+460.000
0.00
0.00
10.00
0.00
330.53
73+480.000
0.00
0.00
10.00
0.00
330.53
73+500.000
0.00
0.00
10.00
0.00
330.53
73+520.000
0.00
0.00
10.00
0.00
330.53
73+540.000
0.00
0.00
10.00
0.00
330.53
73+560.000
0.00
0.00
10.00
0.00
330.53
73+580.000
0.00
0.00
10.00
0.00
330.53
73+600.000
0.00
0.00
10.00
0.00
330.53
73+620.000
0.00
0.00
10.00
0.00
330.53
73+640.000
0.00
0.00
10.00
0.00
330.53
73+660.000
0.00
0.00
10.00
0.00
330.53
73+680.000
0.00
0.00
10.00
0.00
330.53
73+700.000
0.00
0.00
10.00
0.00
330.53
73+720.000
0.00
0.00
10.00
0.00
330.53
73+740.000
0.00
0.00
10.00
0.00
330.53
REVISO:
RALIZO:
Pgina 2 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 02
"TERRACERAS"
UNIDAD
M3
ESTACIN KM.
REA
L1+L2
D/2
73+760.000
0.00
0.00
73+780.000
0.00
73+800.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
0.00
330.53
0.00
10.00
0.00
330.53
0.00
0.00
10.00
0.00
330.53
73+807.617
0.00
0.00
3.81
0.00
330.53
73+820.000
0.00
0.00
6.19
0.00
330.53
73+840.000
0.00
0.00
10.00
0.00
330.53
73+848.283
0.00
0.00
4.14
0.00
330.53
73+860.000
0.00
0.00
5.86
0.00
330.53
73+880.000
0.00
0.00
10.00
0.00
330.53
73+888.950
0.00
0.00
4.47
0.00
330.53
73+900.000
0.00
0.00
5.53
0.00
330.53
73+909.283
0.00
0.00
4.64
0.00
330.53
73+920.000
0.00
0.00
5.36
0.00
330.53
73+940.000
0.00
0.00
10.00
0.00
330.53
73+960.000
0.00
0.00
10.00
0.00
330.53
73+980.000
0.00
0.00
10.00
0.00
330.53
74+000.000
0.00
0.00
10.00
0.00
330.53
74+020.000
0.00
0.00
10.00
0.00
330.53
74+040.000
0.00
0.00
10.00
0.00
330.53
74+060.000
0.00
0.00
10.00
0.00
330.53
74+080.000
0.00
0.00
10.00
0.00
330.53
74+089.272
0.00
0.00
4.64
0.00
330.53
74+100.000
0.00
0.00
5.36
0.00
330.53
74+109.605
0.00
0.00
4.80
0.00
330.53
74+120.000
0.00
0.00
5.20
0.00
330.53
74+140.000
0.00
0.00
10.00
0.00
330.53
74+150.272
0.00
0.00
5.14
0.00
330.53
74+160.000
0.00
0.00
4.86
0.00
330.53
74+180.000
0.00
0.00
10.00
0.00
330.53
74+190.939
0.00
0.00
5.47
0.00
330.53
74+200.000
0.00
0.00
4.53
0.00
330.53
74+220.000
0.00
0.00
10.00
0.00
330.53
74+240.000
0.00
0.00
10.00
0.00
330.53
74+260.000
0.00
0.00
10.00
0.00
330.53
74+280.000
0.00
0.00
10.00
0.00
330.53
74+300.000
0.00
0.00
10.00
0.00
330.53
74+320.000
0.00
0.00
10.00
0.00
330.53
74+340.000
0.00
0.00
10.00
0.00
330.53
74+360.000
0.00
0.00
10.00
0.00
330.53
74+380.000
0.00
0.00
10.00
0.00
330.53
74+400.000
0.46
0.46
10.00
4.60
335.13
74+420.000
0.55
1.01
10.00
10.10
345.23
74+440.000
0.43
0.98
10.00
9.80
355.03
74+457.851
0.23
0.66
8.93
5.89
360.92
74+460.000
0.26
0.49
1.07
0.53
361.45
74+480.000
0.18
0.44
10.00
4.40
365.85
74+498.518
0.00
0.18
9.26
1.67
367.51
74+500.000
0.00
0.00
0.74
0.00
367.51
74+520.000
0.00
0.00
10.00
0.00
367.51
74+539.184
0.00
0.00
9.59
0.00
367.51
74+540.000
0.00
0.00
0.41
0.00
367.51
74+559.518
0.00
0.00
9.76
0.00
367.51
74+560.000
0.00
0.00
0.24
0.00
367.51
74+580.000
0.00
0.00
10.00
0.00
367.51
REVISO:
RALIZO:
Pgina 3 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 02
"TERRACERAS"
UNIDAD
M3
ESTACIN KM.
REA
L1+L2
D/2
74+600.000
0.00
0.00
74+620.000
0.00
74+640.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
0.00
367.51
0.00
10.00
0.00
367.51
0.00
0.00
10.00
0.00
367.51
74+660.000
0.00
0.00
10.00
0.00
367.51
74+680.000
0.00
0.00
10.00
0.00
367.51
74+700.000
0.00
0.00
10.00
0.00
367.51
74+720.000
0.00
0.00
10.00
0.00
367.51
74+740.000
0.00
0.00
10.00
0.00
367.51
74+760.000
0.00
0.00
10.00
0.00
367.51
74+779.360
0.00
0.00
9.68
0.00
367.51
74+780.000
0.00
0.00
0.32
0.00
367.51
74+799.693
1.41
1.41
9.85
13.88
381.40
74+800.000
1.51
2.92
0.15
0.45
381.85
74+820.000
4.46
5.97
10.00
59.70
441.55
74+840.000
5.42
9.88
10.00
98.80
540.35
74+840.360
5.43
10.85
0.18
1.95
542.30
74+860.000
4.92
10.35
9.82
101.64
643.94
74+880.000
3.60
8.52
10.00
85.20
729.14
74+881.027
3.51
7.11
0.51
3.65
732.78
74+900.000
0.81
4.32
9.49
40.98
773.77
74+920.000
0.00
0.81
10.00
8.10
781.87
74+940.000
0.00
0.00
10.00
0.00
781.87
74+960.000
0.00
0.00
10.00
0.00
781.87
74+980.000
5.74
5.74
10.00
57.40
839.27
75+000.000
5.55
11.29
10.00
112.90
952.17
75+020.000
5.06
10.61
10.00
106.10
1,058.27
75+040.000
5.46
10.52
10.00
105.20
1,163.47
75+060.000
6.07
11.53
10.00
115.30
1,278.77
75+080.000
7.31
13.38
10.00
133.80
1,412.57
75+100.000
7.58
14.89
10.00
148.90
1,561.47
75+120.000
8.69
16.27
10.00
162.70
1,724.17
75+140.000
9.22
17.91
10.00
179.10
1,903.27
75+160.000
9.29
18.51
10.00
185.10
2,088.37
75+180.000
14.60
23.89
10.00
238.90
2,327.27
75+200.000
16.94
31.54
10.00
315.40
2,642.67
75+220.000
17.26
34.20
10.00
342.00
2,984.67
75+240.000
16.50
33.76
10.00
337.60
3,322.27
75+260.000
15.28
31.78
10.00
317.80
3,640.07
75+280.000
13.54
28.82
10.00
288.20
3,928.27
75+300.000
12.38
25.92
10.00
259.20
4,187.47
75+320.000
10.80
23.18
10.00
231.80
4,419.27
75+340.000
10.39
21.19
10.00
211.90
4,631.17
75+360.000
10.00
20.39
10.00
203.90
4,835.07
75+380.000
8.78
18.78
10.00
187.80
5,022.87
75+400.000
8.59
17.37
10.00
173.70
5,196.57
75+420.000
7.61
16.20
10.00
162.00
5,358.57
75+440.000
7.70
15.31
10.00
153.10
5,511.67
75+460.000
8.38
16.08
10.00
160.80
5,672.47
75+480.000
8.30
16.68
10.00
166.80
5,839.27
75+500.000
8.09
16.39
10.00
163.90
6,003.17
75+520.000
7.73
15.82
10.00
158.20
6,161.37
75+540.000
7.07
14.80
10.00
148.00
6,309.37
75+560.000
6.36
13.43
10.00
134.30
6,443.67
75+580.000
6.01
12.37
10.00
123.70
6,567.37
REVISO:
RALIZO:
Pgina 4 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 02
"TERRACERAS"
UNIDAD
M3
ESTACIN KM.
REA
L1+L2
D/2
75+600.000
5.94
11.95
75+611.738
5.96
75+620.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
119.50
6,686.87
11.90
5.87
69.84
6,756.71
5.95
11.91
4.13
49.20
6,805.91
75+635.122
5.83
11.78
7.56
89.07
6,894.98
75+640.000
5.77
11.60
2.44
28.29
6,923.27
75+658.507
5.41
11.18
9.25
103.45
7,026.72
75+660.000
5.40
10.81
0.75
8.07
7,034.79
75+680.000
4.07
9.47
10.00
94.70
7,129.49
75+700.000
0.00
4.07
10.00
40.70
7,170.19
75+711.122
0.00
0.00
5.56
0.00
7,170.19
75+720.000
0.00
0.00
4.44
0.00
7,170.19
75+740.000
0.00
0.00
10.00
0.00
7,170.19
75+760.000
0.00
0.00
10.00
0.00
7,170.19
75+780.000
0.00
0.00
10.00
0.00
7,170.19
75+800.000
0.00
0.00
10.00
0.00
7,170.19
75+820.000
0.00
0.00
10.00
0.00
7,170.19
75+840.000
0.00
0.00
10.00
0.00
7,170.19
75+860.000
0.00
0.00
10.00
0.00
7,170.19
75+880.000
0.00
0.00
10.00
0.00
7,170.19
75+900.000
0.00
0.00
10.00
0.00
7,170.19
75+920.000
0.00
0.00
10.00
0.00
7,170.19
75+940.000
0.00
0.00
10.00
0.00
7,170.19
75+960.000
0.00
0.00
10.00
0.00
7,170.19
75+980.000
0.00
0.00
10.00
0.00
7,170.19
76+000.000
0.00
0.00
10.00
0.00
7,170.19
76+020.000
0.00
0.00
10.00
0.00
7,170.19
76+040.000
0.00
0.00
10.00
0.00
7,170.19
76+060.000
0.00
0.00
10.00
0.00
7,170.19
76+080.000
0.00
0.00
10.00
0.00
7,170.19
76+100.000
0.00
0.00
10.00
0.00
7,170.19
76+120.000
0.00
0.00
10.00
0.00
7,170.19
76+140.000
0.00
0.00
10.00
0.00
7,170.19
76+160.000
0.00
0.00
10.00
0.00
7,170.19
76+180.000
0.00
0.00
10.00
0.00
7,170.19
76+200.000
0.00
0.00
10.00
0.00
7,170.19
76+220.000
0.00
0.00
10.00
0.00
7,170.19
76+240.000
0.63
0.63
10.00
6.30
7,176.49
76+255.500
1.09
1.72
7.75
13.33
7,189.82
76+260.000
1.08
2.17
2.25
4.88
7,194.71
76+280.000
2.47
3.55
10.00
35.50
7,230.21
76+300.000
2.74
5.21
10.00
52.10
7,282.31
76+320.000
2.41
5.15
10.00
51.50
7,333.81
76+321.961
2.32
4.73
0.98
4.64
7,338.44
76+340.000
1.15
3.47
9.02
31.30
7,369.74
76+351.500
0.46
1.61
5.75
9.26
7,379.00
76+360.000
0.00
0.46
4.25
1.96
7,380.95
76+380.000
0.00
0.00
10.00
0.00
7,380.95
76+381.038
0.00
0.00
0.52
0.00
7,380.95
76+400.000
0.00
0.00
9.48
0.00
7,380.95
76+420.000
0.00
0.00
10.00
0.00
7,380.95
76+440.000
0.58
0.58
10.00
5.80
7,386.75
76+460.000
0.68
1.26
10.00
12.60
7,399.35
76+480.000
1.13
1.81
10.00
18.10
7,417.45
76+500.000
1.39
2.52
10.00
25.20
7,442.65
REVISO:
RALIZO:
Pgina 5 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 02
"TERRACERAS"
UNIDAD
M3
ESTACIN KM.
REA
L1+L2
D/2
76+520.000
1.07
2.46
76+540.000
0.00
76+560.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
24.60
7,467.25
1.07
10.00
10.70
7,477.95
0.00
0.00
10.00
0.00
7,477.95
76+580.000
0.34
0.34
10.00
3.40
7,481.35
76+600.000
1.39
1.73
10.00
17.30
7,498.65
76+620.000
2.03
3.42
10.00
34.20
7,532.85
76+640.000
2.02
4.05
10.00
40.50
7,573.35
76+660.000
1.70
3.72
10.00
37.20
7,610.55
76+680.000
1.22
2.92
10.00
29.20
7,639.75
76+700.000
0.00
1.22
10.00
12.20
7,651.95
76+720.000
0.00
0.00
10.00
0.00
7,651.95
76+740.000
0.00
0.00
10.00
0.00
7,651.95
76+760.000
0.00
0.00
10.00
0.00
7,651.95
76+780.000
0.00
0.00
10.00
0.00
7,651.95
76+800.000
0.00
0.00
10.00
0.00
7,651.95
76+820.000
0.00
0.00
10.00
0.00
7,651.95
76+840.000
0.00
0.00
10.00
0.00
7,651.95
76+860.000
0.00
0.00
10.00
0.00
7,651.95
76+880.000
0.00
0.00
10.00
0.00
7,651.95
76+900.000
0.00
0.00
10.00
0.00
7,651.95
76+920.000
0.00
0.00
10.00
0.00
7,651.95
76+940.000
0.00
0.00
10.00
0.00
7,651.95
76+960.000
1.12
1.12
10.00
11.20
7,663.15
76+980.000
1.61
2.73
10.00
27.30
7,690.45
76+985.245
1.72
3.33
2.62
8.73
7,699.19
76+993.182
1.87
3.59
3.97
14.25
7,713.43
77+000.000
2.05
3.92
3.41
13.36
7,726.80
77+001.118
2.08
4.13
0.56
2.31
7,729.11
77+018.182
2.33
4.41
8.53
37.62
7,766.73
77+020.000
2.32
4.65
0.91
4.23
7,770.96
77+040.000
2.32
4.64
10.00
46.40
7,817.36
77+060.000
1.37
3.69
10.00
36.90
7,854.26
77+080.000
0.00
1.37
10.00
13.70
7,867.96
77+100.000
0.00
0.00
10.00
0.00
7,867.96
77+120.000
0.28
0.28
10.00
2.80
7,870.76
77+140.000
1.48
1.76
10.00
17.60
7,888.36
77+160.000
1.49
2.97
10.00
29.70
7,918.06
77+180.000
1.86
3.35
10.00
33.50
7,951.56
77+200.000
0.00
1.86
10.00
18.60
7,970.16
77+220.000
0.00
0.00
10.00
0.00
7,970.16
77+240.000
1.94
1.94
10.00
19.40
7,989.56
77+260.000
5.27
7.21
10.00
72.10
8,061.66
77+280.000
6.54
11.81
10.00
118.10
8,179.76
77+300.000
6.76
13.30
10.00
133.00
8,312.76
77+320.000
6.37
13.13
10.00
131.30
8,444.06
77+340.000
5.91
12.28
10.00
122.80
8,566.86
77+360.000
4.04
9.95
10.00
99.50
8,666.36
77+380.000
1.56
5.60
10.00
56.00
8,722.36
77+400.000
0.38
1.94
10.00
19.40
8,741.76
77+420.000
5.02
5.40
10.00
54.00
8,795.76
77+440.000
6.16
11.18
10.00
111.80
8,907.56
77+460.000
6.45
12.61
10.00
126.10
9,033.66
77+480.000
6.67
13.12
10.00
131.20
9,164.86
77+500.000
6.50
13.17
10.00
131.70
9,296.56
REVISO:
RALIZO:
Pgina 6 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 02
"TERRACERAS"
UNIDAD
M3
ESTACIN KM.
REA
L1+L2
D/2
77+520.000
6.20
12.70
77+525.218
6.12
77+540.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
127.00
9,423.56
12.32
2.61
32.14
9,455.70
6.11
12.23
7.39
90.39
9,546.09
77+540.234
6.10
12.21
0.12
1.43
9,547.52
77+547.218
5.98
12.08
3.49
42.18
9,589.70
77+554.202
5.87
11.85
3.49
41.38
9,631.08
77+560.000
5.65
11.52
2.90
33.40
9,664.48
77+580.000
3.11
8.76
10.00
87.60
9,752.08
77+600.000
1.63
4.74
10.00
47.40
9,799.48
77+620.000
0.00
1.63
10.00
16.30
9,815.78
77+640.000
0.00
0.00
10.00
0.00
9,815.78
77+647.342
0.00
0.00
3.67
0.00
9,815.78
77+660.000
0.00
0.00
6.33
0.00
9,815.78
77+663.215
0.00
0.00
1.61
0.00
9,815.78
77+679.088
0.00
0.00
7.94
0.00
9,815.78
77+680.000
0.00
0.00
0.46
0.00
9,815.78
77+700.000
0.00
0.00
10.00
0.00
9,815.78
77+713.215
4.94
4.94
6.61
32.64
9,848.42
77+720.000
4.83
9.77
3.39
33.15
9,881.57
77+740.000
0.00
4.83
10.00
48.30
9,929.87
77+760.000
0.36
0.36
10.00
3.60
9,933.47
77+780.000
1.97
2.33
10.00
23.30
9,956.77
77+800.000
5.01
6.98
10.00
69.80
10,026.57
77+820.000
5.22
10.23
10.00
102.30
10,128.87
77+840.000
5.44
10.66
10.00
106.60
10,235.47
77+860.000
5.59
11.03
10.00
110.30
10,345.77
77+880.000
5.58
11.17
10.00
111.70
10,457.47
77+900.000
5.34
10.92
10.00
109.20
10,566.67
77+920.000
5.13
10.47
10.00
104.70
10,671.37
77+940.000
4.76
9.89
10.00
98.90
10,770.27
77+960.000
4.83
9.59
10.00
95.90
10,866.17
77+980.000
4.52
9.35
10.00
93.50
10,959.67
78+000.000
4.74
9.26
10.00
92.60
11,052.27
78+020.000
4.74
9.48
10.00
94.80
11,147.07
78+040.000
0.00
4.74
10.00
47.40
11,194.47
78+060.000
1.47
1.47
10.00
14.70
11,209.17
78+080.000
0.91
2.38
10.00
23.80
11,232.97
78+094.334
1.11
2.02
7.17
14.48
11,247.45
78+100.000
1.56
2.67
2.83
7.56
11,255.01
78+116.175
1.00
2.56
8.09
20.70
11,275.71
78+120.000
1.63
2.63
1.91
5.03
11,280.74
78+126.334
1.70
3.33
3.17
10.55
11,291.29
78+136.493
1.74
3.44
5.08
17.47
11,308.76
78+140.000
1.54
3.28
1.75
5.75
11,314.52
78+160.000
2.07
3.61
10.00
36.10
11,350.62
78+180.000
2.18
4.25
10.00
42.50
11,393.12
78+200.000
2.22
4.40
10.00
44.00
11,437.12
78+220.000
2.39
4.61
10.00
46.10
11,483.22
78+240.000
2.39
4.78
10.00
47.80
11,531.02
78+260.000
2.52
4.91
10.00
49.10
11,580.12
78+280.000
0.00
2.52
10.00
25.20
11,605.32
78+300.000
0.00
0.00
10.00
0.00
11,605.32
78+320.000
0.00
0.00
10.00
0.00
11,605.32
78+340.000
0.00
0.00
10.00
0.00
11,605.32
REVISO:
RALIZO:
Pgina 7 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 02
"TERRACERAS"
UNIDAD
M3
ESTACIN KM.
REA
L1+L2
D/2
78+360.000
0.00
0.00
78+380.000
0.00
78+400.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
0.00
11,605.32
0.00
10.00
0.00
11,605.32
0.00
0.00
10.00
0.00
11,605.32
78+420.000
0.00
0.00
10.00
0.00
11,605.32
78+440.000
0.00
0.00
10.00
0.00
11,605.32
78+460.000
0.00
0.00
10.00
0.00
11,605.32
78+480.000
0.00
0.00
10.00
0.00
11,605.32
78+500.000
0.00
0.00
10.00
0.00
11,605.32
78+520.000
0.00
0.00
10.00
0.00
11,605.32
78+540.000
0.00
0.00
10.00
0.00
11,605.32
78+560.000
0.00
0.00
10.00
0.00
11,605.32
78+580.000
0.00
0.00
10.00
0.00
11,605.32
78+600.000
0.00
0.00
10.00
0.00
11,605.32
78+620.000
0.00
0.00
10.00
0.00
11,605.32
78+640.000
0.00
0.00
10.00
0.00
11,605.32
78+660.000
2.74
2.74
10.00
27.40
11,632.72
78+680.000
2.96
5.70
10.00
57.00
11,689.72
78+700.000
4.14
7.10
10.00
71.00
11,760.72
78+720.000
4.49
8.63
10.00
86.30
11,847.02
78+740.000
4.82
9.31
10.00
93.10
11,940.12
78+760.000
4.81
9.63
10.00
96.30
12,036.42
78+780.000
4.80
9.61
10.00
96.10
12,132.52
78+790.492
4.80
9.60
5.25
50.36
12,182.88
78+796.615
4.77
9.57
3.06
29.30
12,212.17
78+800.000
4.77
9.54
1.69
16.15
12,228.32
78+802.737
4.77
9.54
1.37
13.06
12,241.38
78+811.615
4.95
9.72
4.44
43.14
12,284.52
78+820.000
3.08
8.03
4.19
33.67
12,318.19
78+840.000
3.37
6.45
10.00
64.50
12,382.69
78+860.000
3.84
7.21
10.00
72.10
12,454.79
78+880.000
4.82
8.66
10.00
86.60
12,541.39
78+900.000
4.83
9.65
10.00
96.50
12,637.89
78+920.000
4.86
9.69
10.00
96.90
12,734.79
78+940.000
4.88
9.74
10.00
97.40
12,832.19
78+960.000
4.87
9.75
10.00
97.50
12,929.69
78+980.000
4.82
9.69
10.00
96.90
13,026.59
79+000.000
4.39
9.21
10.00
92.10
13,118.69
79+020.000
3.89
8.28
10.00
82.80
13,201.49
79+040.000
0.00
3.89
10.00
38.90
13,240.39
79+060.000
0.00
0.00
10.00
0.00
13,240.39
79+080.000
0.00
0.00
10.00
0.00
13,240.39
79+097.907
0.00
0.00
8.95
0.00
13,240.39
79+100.000
0.00
0.00
1.05
0.00
13,240.39
79+120.000
0.00
0.00
10.00
0.00
13,240.39
79+133.417
0.00
0.00
6.71
0.00
13,240.39
79+140.000
0.00
0.00
3.29
0.00
13,240.39
79+157.907
0.00
0.00
8.95
0.00
13,240.39
79+160.000
0.00
0.00
1.05
0.00
13,240.39
79+180.000
0.00
0.00
10.00
0.00
13,240.39
79+182.397
0.00
0.00
1.20
0.00
13,240.39
79+200.000
0.00
0.00
8.80
0.00
13,240.39
79+220.000
0.00
0.00
10.00
0.00
13,240.39
79+240.000
1.78
1.78
10.00
17.80
13,258.19
79+260.000
2.99
4.77
10.00
47.70
13,305.89
79+280.000
2.94
5.93
10.00
59.30
13,365.19
79+300.000
2.94
5.88
10.00
58.80
13,423.99
79+320.000
3.37
6.31
10.00
63.10
13,487.09
REVISO:
RALIZO:
Pgina 8 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 02
"TERRACERAS"
UNIDAD
M3
ESTACIN KM.
REA
L1+L2
D/2
79+340.000
4.65
8.02
79+360.000
3.94
79+380.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
80.20
13,567.29
8.59
10.00
85.90
13,653.19
4.72
8.66
10.00
86.60
13,739.79
79+400.000
4.74
9.46
10.00
94.60
13,834.39
79+420.000
4.79
9.53
10.00
95.30
13,929.69
79+440.000
4.76
9.55
10.00
95.50
14,025.19
79+460.000
4.77
9.53
10.00
95.30
14,120.49
79+480.000
4.75
9.52
10.00
95.20
14,215.69
79+500.000
3.71
8.46
10.00
84.60
14,300.29
79+520.000
3.48
7.19
10.00
71.90
14,372.19
79+540.000
3.48
6.96
10.00
69.60
14,441.79
79+560.000
3.45
6.93
10.00
69.30
14,511.09
79+580.000
3.41
6.86
10.00
68.60
14,579.69
79+600.000
3.44
6.85
10.00
68.50
14,648.19
79+620.000
3.87
7.31
10.00
73.10
14,721.29
79+640.000
4.03
7.90
10.00
79.00
14,800.29
79+660.000
4.76
8.79
10.00
87.90
14,888.19
79+680.000
4.78
9.54
10.00
95.40
14,983.59
79+700.000
4.79
9.57
10.00
95.70
15,079.29
79+720.000
4.83
9.62
10.00
96.20
15,175.49
79+740.000
4.90
9.73
10.00
97.30
15,272.79
79+760.000
4.96
9.86
10.00
98.60
15,371.39
79+780.000
5.00
9.96
10.00
99.60
15,470.99
79+800.000
5.04
10.04
10.00
100.40
15,571.39
79+820.000
5.09
10.13
10.00
101.30
15,672.69
79+840.000
5.15
10.24
10.00
102.40
15,775.09
79+860.000
5.15
10.30
10.00
103.00
15,878.09
79+880.000
5.13
10.28
10.00
102.80
15,980.89
79+900.000
5.05
10.18
10.00
101.80
16,082.69
79+920.000
4.42
9.47
10.00
94.70
16,177.39
79+940.000
3.65
8.07
10.00
80.70
16,258.09
79+960.000
0.44
4.09
10.00
40.90
16,298.99
79+980.000
0.00
0.44
10.00
4.40
16,303.39
80+000.000
0.00
0.00
10.00
0.00
16,303.39
80+020.000
0.00
0.00
10.00
0.00
16,303.39
80+040.000
0.00
0.00
10.00
0.00
16,303.39
80+060.000
0.00
0.00
10.00
0.00
16,303.39
80+080.000
0.00
0.00
10.00
0.00
16,303.39
80+100.000
0.38
0.38
10.00
3.80
16,307.19
80+120.000
3.87
4.25
10.00
42.50
16,349.69
80+140.000
4.60
8.47
10.00
84.70
16,434.39
80+160.000
4.80
9.40
10.00
94.00
16,528.39
80+180.000
4.86
9.66
10.00
96.60
16,624.99
80+200.000
4.83
9.69
10.00
96.90
16,721.89
80+220.000
4.45
9.28
10.00
92.80
16,814.69
80+240.000
0.00
4.45
10.00
44.50
16,859.19
80+260.000
0.00
0.00
10.00
0.00
16,859.19
80+280.000
0.00
0.00
10.00
0.00
16,859.19
80+300.000
0.00
0.00
10.00
0.00
16,859.19
80+320.000
0.00
0.00
10.00
0.00
16,859.19
80+340.000
0.00
0.00
10.00
0.00
16,859.19
80+360.000
0.00
0.00
10.00
0.00
16,859.19
80+380.000
0.00
0.00
10.00
0.00
16,859.19
80+400.000
0.00
0.00
10.00
0.00
16,859.19
80+420.000
0.00
0.00
10.00
0.00
16,859.19
80+440.000
0.00
0.00
10.00
0.00
16,859.19
80+460.000
0.00
0.00
10.00
0.00
16,859.19
REVISO:
RALIZO:
Pgina 9 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 02
"TERRACERAS"
UNIDAD
M3
ESTACIN KM.
REA
L1+L2
D/2
80+480.000
0.00
0.00
80+500.000
0.00
80+520.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
0.00
16,859.19
0.00
10.00
0.00
16,859.19
0.00
0.00
10.00
0.00
16,859.19
80+540.000
0.00
0.00
10.00
0.00
16,859.19
80+560.000
0.00
0.00
10.00
0.00
16,859.19
80+580.000
0.00
0.00
10.00
0.00
16,859.19
80+600.000
0.00
0.00
10.00
0.00
16,859.19
80+620.000
0.00
0.00
10.00
0.00
16,859.19
80+640.000
0.22
0.22
10.00
2.20
16,861.39
80+660.000
1.14
1.36
10.00
13.60
16,874.99
80+680.000
1.33
2.47
10.00
24.70
16,899.69
80+700.000
2.42
3.75
10.00
37.50
16,937.19
80+720.000
2.34
4.76
10.00
47.60
16,984.79
80+740.000
2.07
4.41
10.00
44.10
17,028.89
80+760.000
1.49
3.56
10.00
35.60
17,064.49
80+780.000
0.00
1.49
10.00
14.90
17,079.39
80+800.000
0.00
0.00
10.00
0.00
17,079.39
80+820.000
1.54
1.54
10.00
15.40
17,094.79
80+840.000
1.54
3.08
10.00
30.80
17,125.59
80+860.000
0.00
1.54
10.00
15.40
17,140.99
80+880.000
0.26
0.26
10.00
2.60
17,143.59
80+900.000
0.33
0.59
10.00
5.90
17,149.49
80+920.000
1.80
2.13
10.00
21.30
17,170.79
80+940.000
1.97
3.77
10.00
37.70
17,208.49
80+960.000
0.00
1.97
10.00
19.70
17,228.19
80+980.000
0.00
0.00
10.00
0.00
17,228.19
81+000.000
3.17
3.17
10.00
31.70
17,259.89
81+020.000
0.00
3.17
10.00
31.70
17,291.59
81+040.000
0.00
0.00
10.00
0.00
17,291.59
81+060.000
0.00
0.00
10.00
0.00
17,291.59
81+080.000
0.00
0.00
10.00
0.00
17,291.59
81+100.000
0.00
0.00
10.00
0.00
17,291.59
81+120.000
0.00
0.00
10.00
0.00
17,291.59
81+140.000
81+160.000
81+180.000
81+200.000
81+220.000
81+240.000
81+260.000
81+280.000
81+300.000
81+320.000
81+340.000
81+360.000
81+380.000
81+400.000
81+420.000
81+440.000
81+460.000
81+480.000
81+500.000
81+520.000
81+540.000
81+560.000
81+580.000
81+600.000
81+620.000
81+640.000
81+660.000
81+680.000
81+700.000
81+720.000
1.46
2.89
4.88
3.81
2.73
4.84
5.17
5.48
5.55
5.40
5.22
5.06
5.25
5.16
3.00
0.56
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.46
4.35
7.77
8.69
6.54
7.57
10.01
10.65
11.03
10.95
10.62
10.28
10.31
10.41
8.16
3.56
0.56
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
14.60
43.50
77.70
86.90
65.40
75.70
100.10
106.50
110.30
109.50
106.20
102.80
103.10
104.10
81.60
35.60
5.60
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
17,306.19
17,349.69
17,427.39
17,514.29
17,579.69
17,655.39
17,755.49
17,861.99
17,972.29
18,081.79
18,187.99
18,290.79
18,393.89
18,497.99
18,579.59
18,615.19
18,620.79
18,620.79
18,620.79
18,620.79
18,620.79
18,620.79
18,620.79
18,620.79
18,620.79
18,620.79
18,620.79
18,620.79
18,620.79
18,620.79
REVISO:
RALIZO:
Pgina 10 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 02
"TERRACERAS"
UNIDAD
M3
ESTACIN KM.
REA
L1+L2
D/2
81+740.000
81+760.000
81+780.000
81+800.000
81+820.000
81+840.000
81+860.000
81+880.000
81+900.000
81+920.000
81+940.000
81+960.000
81+980.000
82+000.000
82+020.000
82+040.000
82+060.000
82+080.000
82+100.000
82+120.000
82+140.000
82+160.000
82+180.000
82+200.000
82+220.000
82+240.000
82+260.000
82+280.000
82+300.000
82+320.000
82+340.000
82+360.000
82+380.000
82+400.000
82+420.000
82+440.000
82+460.000
82+480.000
82+500.000
82+520.000
82+540.000
82+560.000
82+580.000
82+600.000
82+620.000
82+640.000
82+660.000
82+680.000
82+700.000
82+720.000
82+740.000
82+760.000
82+780.000
82+800.000
82+820.000
82+840.000
82+860.000
82+880.000
82+900.000
82+920.000
82+940.000
82+960.000
82+980.000
83+000.000
83+020.000
83+040.000
83+060.000
83+080.000
83+100.000
83+120.000
83+140.000
83+160.000
83+170.200
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.51
2.77
0.00
0.00
0.00
3.44
4.85
4.98
5.02
5.02
5.04
5.02
4.91
4.81
4.61
4.66
4.83
4.94
4.98
4.94
4.92
4.90
4.87
4.92
4.91
4.91
4.86
4.79
3.33
3.78
3.05
0.24
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.51
5.28
2.77
0.00
0.00
3.44
8.29
9.83
10.00
10.04
10.06
10.06
9.93
9.72
9.42
9.27
9.49
9.77
9.92
9.92
9.86
9.82
9.77
9.79
9.83
9.82
9.77
9.65
8.12
7.11
6.83
3.29
0.24
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
5.10
REVISO:
REA ACUMULADA
PARCIAL
ACUMULADO
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
25.10
52.80
27.70
0.00
0.00
34.40
82.90
98.30
100.00
100.40
100.60
100.60
99.30
97.20
94.20
92.70
94.90
97.70
99.20
99.20
98.60
98.20
97.70
97.90
98.30
98.20
97.70
96.50
81.20
71.10
68.30
32.90
2.40
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
18,620.79
18,620.79
18,620.79
18,620.79
18,620.79
18,620.79
18,620.79
18,620.79
18,620.79
18,620.79
18,620.79
18,620.79
18,620.79
18,645.89
18,698.69
18,726.39
18,726.39
18,726.39
18,760.79
18,843.69
18,941.99
19,041.99
19,142.39
19,242.99
19,343.59
19,442.89
19,540.09
19,634.29
19,726.99
19,821.89
19,919.59
20,018.79
20,117.99
20,216.59
20,314.79
20,412.49
20,510.39
20,608.69
20,706.89
20,804.59
20,901.09
20,982.29
21,053.39
21,121.69
21,154.59
21,156.99
21,156.99
21,156.99
21,156.99
21,156.99
21,156.99
21,156.99
21,156.99
21,156.99
21,156.99
21,156.99
21,156.99
21,156.99
21,156.99
21,156.99
21,156.99
21,156.99
21,156.99
21,156.99
21,156.99
21,156.99
21,156.99
21,156.99
21,156.99
21,156.99
21,156.99
21,156.99
21,156.99
RALIZO:
Pgina 11 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 02
"TERRACERAS"
UNIDAD
M3
ESTACIN KM.
REA
L1+L2
D/2
83+180.000
83+200.000
83+220.000
83+240.000
83+260.000
83+280.000
83+300.000
83+320.000
83+340.000
83+360.000
83+380.000
83+400.000
83+420.000
83+440.000
83+460.000
83+480.000
83+500.000
83+520.000
83+540.000
83+560.000
83+570.105
83+580.000
83+593.182
83+600.000
83+616.259
83+620.000
83+640.000
83+653.182
83+660.000
83+680.000
83+700.000
83+720.000
83+740.000
83+760.000
83+780.000
83+785.000
0.36
1.09
3.01
5.19
5.20
5.12
4.82
4.71
3.86
2.47
2.29
2.40
3.19
4.83
4.94
4.96
4.96
4.89
4.85
4.91
4.93
4.94
4.98
5.01
5.04
5.05
5.06
5.05
5.06
5.04
5.04
5.04
5.01
5.00
5.00
4.53
0.36
1.45
4.10
8.20
10.39
10.32
9.94
9.53
8.57
6.33
4.76
4.69
5.59
8.02
9.77
9.90
9.92
9.85
9.74
9.76
9.84
9.87
9.92
9.99
10.05
10.09
10.11
10.11
10.11
10.10
10.08
10.08
10.05
10.01
10.00
9.53
4.90
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
5.05
4.95
6.59
3.41
8.13
1.87
10.00
6.59
3.41
10.00
10.00
10.00
10.00
10.00
10.00
2.50
REVISO:
REA ACUMULADA
PARCIAL
ACUMULADO
1.76
14.50
41.00
82.00
103.90
103.20
99.40
95.30
85.70
63.30
47.60
46.90
55.90
80.20
97.70
99.00
99.20
98.50
97.40
97.60
49.72
48.83
65.38
34.06
81.70
18.88
101.10
66.63
34.47
101.00
100.80
100.80
100.50
100.10
100.00
23.83
21,158.75
21,173.25
21,214.25
21,296.25
21,400.15
21,503.35
21,602.75
21,698.05
21,783.75
21,847.05
21,894.65
21,941.55
21,997.45
22,077.65
22,175.35
22,274.35
22,373.55
22,472.05
22,569.45
22,667.05
22,716.77
22,765.60
22,830.98
22,865.04
22,946.74
22,965.62
23,066.72
23,133.35
23,167.82
23,268.82
23,369.62
23,470.42
23,570.92
23,671.02
23,771.02
23,794.84
RALIZO:
Pgina 12 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 03
"TERRACERAS"
UNIDAD
M3
REA ACUMULADA
ESTACIN KM.
REA
L1+L2
D/2
71+800.000
5.46
0.00
0.00
0.00
0.00
71+820.000
5.47
10.93
10.00
109.30
109.30
71+840.000
5.53
11.00
10.00
110.00
219.30
71+860.000
5.44
10.97
10.00
109.70
329.00
71+880.000
5.35
10.79
10.00
107.90
436.90
71+900.000
5.36
10.71
10.00
107.10
544.00
71+920.000
5.31
10.67
10.00
106.70
650.70
71+940.000
5.47
10.78
10.00
107.80
758.50
71+960.000
5.56
11.03
10.00
110.30
868.80
71+980.000
5.40
10.96
10.00
109.60
978.40
72+000.000
5.37
10.77
10.00
107.70
1,086.10
72+020.000
5.32
10.69
10.00
106.90
1,193.00
72+040.000
5.22
10.54
10.00
105.40
1,298.40
72+060.000
5.22
10.44
10.00
104.40
1,402.80
72+080.000
5.23
10.45
10.00
104.50
1,507.30
72+100.000
5.12
10.35
10.00
103.50
1,610.80
72+120.000
5.02
10.14
10.00
101.40
1,712.20
72+140.000
5.25
10.27
10.00
102.70
1,814.90
72+160.000
5.33
10.58
10.00
105.80
1,920.70
72+180.000
5.30
10.63
10.00
106.30
2,027.00
72+200.000
5.23
10.53
10.00
105.30
2,132.30
72+220.000
3.39
8.62
10.00
86.20
2,218.50
72+240.000
3.56
6.95
10.00
69.50
2,288.00
72+260.000
5.35
8.91
10.00
89.10
2,377.10
72+280.000
5.40
10.75
10.00
107.50
2,484.60
72+300.000
5.48
10.88
10.00
108.80
2,593.40
72+320.000
5.41
10.89
10.00
108.90
2,702.30
72+340.000
5.47
10.88
10.00
108.80
2,811.10
72+360.000
5.44
10.91
10.00
109.10
2,920.20
72+380.000
5.60
11.04
10.00
110.40
3,030.60
72+400.000
5.64
11.24
10.00
112.40
3,143.00
72+420.000
5.54
11.18
10.00
111.80
3,254.80
72+440.000
5.57
11.11
10.00
111.10
3,365.90
72+460.000
5.39
10.96
10.00
109.60
3,475.50
72+480.000
5.32
10.71
10.00
107.10
3,582.60
72+500.000
5.42
10.74
10.00
107.40
3,690.00
72+520.000
5.55
10.97
10.00
109.70
3,799.70
72+540.000
5.71
11.26
10.00
112.60
3,912.30
72+560.000
5.50
11.21
10.00
112.10
4,024.40
72+580.000
5.50
11.00
10.00
110.00
4,134.40
72+600.000
5.62
11.12
10.00
111.20
4,245.60
72+620.000
5.62
11.24
10.00
112.40
4,358.00
72+640.000
5.54
11.16
10.00
111.60
4,469.60
72+654.982
5.50
11.04
7.49
82.70
4,552.30
72+660.000
5.51
11.01
2.51
27.63
4,579.92
72+678.443
5.50
11.01
9.22
101.53
4,681.45
72+680.000
5.43
10.93
0.78
8.51
4,689.96
72+700.000
5.55
10.98
10.00
109.80
4,799.76
72+701.905
5.52
11.07
0.95
10.54
4,810.30
72+720.000
5.44
10.96
9.05
99.16
4,909.47
72+739.443
5.41
10.85
9.72
105.48
5,014.95
72+740.000
5.37
10.78
0.28
3.00
5,017.95
REVISO:
PARCIAL
ACUMULADO
REALIZO:
Pgina 13 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 03
"TERRACERAS"
UNIDAD
M3
ESTACIN KM.
REA
L1+L2
D/2
72+760.000
2.24
7.61
72+780.000
2.16
72+800.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
76.10
5,094.05
4.40
10.00
44.00
5,138.05
2.11
4.27
10.00
42.70
5,180.75
72+820.000
1.34
3.45
10.00
34.50
5,215.25
72+840.000
5.12
6.46
10.00
64.60
5,279.85
72+860.000
5.29
10.41
10.00
104.10
5,383.95
72+880.000
5.26
10.55
10.00
105.50
5,489.45
72+900.000
4.38
9.64
10.00
96.40
5,585.85
72+920.000
4.96
9.34
10.00
93.40
5,679.25
72+940.000
0.00
4.96
10.00
49.60
5,728.85
72+960.000
0.00
0.00
10.00
0.00
5,728.85
72+971.651
0.00
0.00
5.83
0.00
5,728.85
72+980.000
0.00
0.00
4.17
0.00
5,728.85
73+000.000
0.00
0.00
10.00
0.00
5,728.85
73+009.189
0.00
0.00
4.59
0.00
5,728.85
73+020.000
0.00
0.00
5.41
0.00
5,728.85
73+032.651
0.00
0.00
6.33
0.00
5,728.85
73+040.000
0.00
0.00
3.67
0.00
5,728.85
73+056.112
0.00
0.00
8.06
0.00
5,728.85
73+060.000
0.00
0.00
1.94
0.00
5,728.85
73+080.000
0.00
0.00
10.00
0.00
5,728.85
73+100.000
0.00
0.00
10.00
0.00
5,728.85
73+120.000
0.00
0.00
10.00
0.00
5,728.85
73+140.000
0.00
0.00
10.00
0.00
5,728.85
73+160.000
0.00
0.00
10.00
0.00
5,728.85
73+180.000
0.00
0.00
10.00
0.00
5,728.85
73+200.000
0.00
0.00
10.00
0.00
5,728.85
73+220.000
0.00
0.00
10.00
0.00
5,728.85
73+240.000
0.00
0.00
10.00
0.00
5,728.85
73+260.000
6.84
6.84
10.00
68.40
5,797.25
73+280.000
6.96
13.80
10.00
138.00
5,935.25
73+300.000
7.13
14.09
10.00
140.90
6,076.15
73+320.000
7.16
14.29
10.00
142.90
6,219.05
73+340.000
7.16
14.32
10.00
143.20
6,362.25
73+360.000
7.31
14.47
10.00
144.70
6,506.95
73+380.000
7.23
14.54
10.00
145.40
6,652.35
73+400.000
7.08
14.31
10.00
143.10
6,795.45
73+420.000
7.21
14.29
10.00
142.90
6,938.35
73+440.000
7.21
14.42
10.00
144.20
7,082.55
73+460.000
7.03
14.24
10.00
142.40
7,224.95
73+480.000
6.87
13.90
10.00
139.00
7,363.95
73+500.000
6.90
13.77
10.00
137.70
7,501.65
73+520.000
6.92
13.82
10.00
138.20
7,639.85
73+540.000
6.97
13.89
10.00
138.90
7,778.75
73+560.000
7.02
13.99
10.00
139.90
7,918.65
73+580.000
6.99
14.01
10.00
140.10
8,058.75
73+600.000
7.19
14.18
10.00
141.80
8,200.55
73+620.000
7.05
14.24
10.00
142.40
8,342.95
73+640.000
7.05
14.10
10.00
141.00
8,483.95
73+660.000
7.04
14.09
10.00
140.90
8,624.85
73+680.000
7.03
14.07
10.00
140.70
8,765.55
73+700.000
6.74
13.77
10.00
137.70
8,903.25
73+720.000
6.92
13.66
10.00
136.60
9,039.85
73+740.000
7.09
14.01
10.00
140.10
9,179.95
REVISO:
REALIZO:
Pgina 14 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 03
"TERRACERAS"
UNIDAD
M3
ESTACIN KM.
REA
L1+L2
D/2
73+760.000
7.06
14.15
73+780.000
6.94
73+800.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
141.50
9,321.45
14.00
10.00
140.00
9,461.45
6.97
13.91
10.00
139.10
9,600.55
73+807.617
6.93
13.90
3.81
52.93
9,653.48
73+820.000
6.92
13.85
6.19
85.76
9,739.24
73+840.000
0.00
6.92
10.00
69.20
9,808.44
73+848.283
0.00
0.00
4.14
0.00
9,808.44
73+860.000
0.00
0.00
5.86
0.00
9,808.44
73+880.000
0.00
0.00
10.00
0.00
9,808.44
73+888.950
0.00
0.00
4.47
0.00
9,808.44
73+900.000
0.00
0.00
5.53
0.00
9,808.44
73+909.283
0.00
0.00
4.64
0.00
9,808.44
73+920.000
0.00
0.00
5.36
0.00
9,808.44
73+940.000
0.00
0.00
10.00
0.00
9,808.44
73+960.000
6.86
6.86
10.00
68.60
9,877.04
73+980.000
7.18
14.04
10.00
140.40
10,017.44
74+000.000
7.76
14.94
10.00
149.40
10,166.84
74+020.000
8.06
15.82
10.00
158.20
10,325.04
74+040.000
8.39
16.45
10.00
164.50
10,489.54
74+060.000
8.18
16.57
10.00
165.70
10,655.24
74+080.000
7.62
15.80
10.00
158.00
10,813.24
74+089.272
7.01
14.63
4.64
67.83
10,881.06
74+100.000
6.58
13.59
5.36
72.90
10,953.96
74+109.605
6.39
12.97
4.80
62.29
11,016.25
74+120.000
6.22
12.61
5.20
65.54
11,081.79
74+140.000
6.17
12.39
10.00
123.90
11,205.69
74+150.272
6.48
12.65
5.14
64.97
11,270.66
74+160.000
6.63
13.11
4.86
63.77
11,334.43
74+180.000
6.53
13.16
10.00
131.60
11,466.03
74+190.939
6.58
13.11
5.47
71.70
11,537.73
74+200.000
6.72
13.30
4.53
60.26
11,597.99
74+220.000
7.10
13.82
10.00
138.20
11,736.19
74+240.000
7.02
14.12
10.00
141.20
11,877.39
74+260.000
6.85
13.87
10.00
138.70
12,016.09
74+280.000
6.74
13.59
10.00
135.90
12,151.99
74+300.000
6.72
13.46
10.00
134.60
12,286.59
74+320.000
6.64
13.36
10.00
133.60
12,420.19
74+340.000
6.67
13.31
10.00
133.10
12,553.29
74+360.000
6.41
13.08
10.00
130.80
12,684.09
74+380.000
6.27
12.68
10.00
126.80
12,810.89
74+400.000
5.97
12.24
10.00
122.40
12,933.29
74+420.000
5.89
11.86
10.00
118.60
13,051.89
74+440.000
6.10
11.99
10.00
119.90
13,171.79
74+457.851
6.51
12.61
8.93
112.55
13,284.34
74+460.000
6.52
13.03
1.07
14.00
13,298.34
74+480.000
6.58
13.10
10.00
131.00
13,429.34
74+498.518
6.93
13.51
9.26
125.09
13,554.42
74+500.000
6.94
13.87
0.74
10.28
13,564.70
74+520.000
7.30
14.24
10.00
142.40
13,707.10
74+539.184
7.76
15.06
9.59
144.46
13,851.56
74+540.000
7.79
15.55
0.41
6.34
13,857.90
74+559.518
8.23
16.02
9.76
156.34
14,014.24
74+560.000
8.28
16.51
0.24
3.98
14,018.22
74+580.000
8.49
16.77
10.00
167.70
14,185.92
REVISO:
REALIZO:
Pgina 15 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 03
"TERRACERAS"
UNIDAD
M3
ESTACIN KM.
REA
L1+L2
D/2
74+600.000
8.70
17.19
74+620.000
8.58
74+640.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
171.90
14,357.82
17.28
10.00
172.80
14,530.62
8.19
16.77
10.00
167.70
14,698.32
74+660.000
7.81
16.00
10.00
160.00
14,858.32
74+680.000
7.53
15.34
10.00
153.40
15,011.72
74+700.000
7.36
14.89
10.00
148.90
15,160.62
74+720.000
7.83
15.19
10.00
151.90
15,312.52
74+740.000
8.32
16.15
10.00
161.50
15,474.02
74+760.000
7.68
16.00
10.00
160.00
15,634.02
74+779.360
6.87
14.55
9.68
140.84
15,774.87
74+780.000
6.84
13.71
0.32
4.39
15,779.25
74+799.693
4.08
10.92
9.85
107.53
15,886.78
74+800.000
3.94
8.02
0.15
1.23
15,888.01
74+820.000
0.84
4.78
10.00
47.80
15,935.81
74+840.000
0.00
0.84
10.00
8.40
15,944.21
74+840.360
0.00
0.00
0.18
0.00
15,944.21
74+860.000
0.55
0.55
9.82
5.40
15,949.61
74+880.000
2.40
2.95
10.00
29.50
15,979.11
74+881.027
2.52
4.92
0.51
2.53
15,981.64
74+900.000
5.95
8.47
9.49
80.35
16,061.99
74+920.000
8.64
14.59
10.00
145.90
16,207.89
74+940.000
8.18
16.82
10.00
168.20
16,376.09
74+960.000
5.72
13.90
10.00
139.00
16,515.09
74+980.000
0.00
5.72
10.00
57.20
16,572.29
75+000.000
0.00
0.00
10.00
0.00
16,572.29
75+020.000
0.00
0.00
10.00
0.00
16,572.29
75+040.000
0.00
0.00
10.00
0.00
16,572.29
75+060.000
0.00
0.00
10.00
0.00
16,572.29
75+080.000
0.00
0.00
10.00
0.00
16,572.29
75+100.000
0.00
0.00
10.00
0.00
16,572.29
75+120.000
0.00
0.00
10.00
0.00
16,572.29
75+140.000
0.00
0.00
10.00
0.00
16,572.29
75+160.000
0.00
0.00
10.00
0.00
16,572.29
75+180.000
0.00
0.00
10.00
0.00
16,572.29
75+200.000
0.00
0.00
10.00
0.00
16,572.29
75+220.000
0.00
0.00
10.00
0.00
16,572.29
75+240.000
0.00
0.00
10.00
0.00
16,572.29
75+260.000
0.00
0.00
10.00
0.00
16,572.29
75+280.000
0.00
0.00
10.00
0.00
16,572.29
75+300.000
0.00
0.00
10.00
0.00
16,572.29
75+320.000
0.00
0.00
10.00
0.00
16,572.29
75+340.000
0.00
0.00
10.00
0.00
16,572.29
75+360.000
0.00
0.00
10.00
0.00
16,572.29
75+380.000
0.00
0.00
10.00
0.00
16,572.29
75+400.000
0.00
0.00
10.00
0.00
16,572.29
75+420.000
0.00
0.00
10.00
0.00
16,572.29
75+440.000
0.00
0.00
10.00
0.00
16,572.29
75+460.000
0.00
0.00
10.00
0.00
16,572.29
75+480.000
0.00
0.00
10.00
0.00
16,572.29
75+500.000
0.00
0.00
10.00
0.00
16,572.29
75+520.000
0.00
0.00
10.00
0.00
16,572.29
75+540.000
0.00
0.00
10.00
0.00
16,572.29
75+560.000
0.00
0.00
10.00
0.00
16,572.29
75+580.000
0.00
0.00
10.00
0.00
16,572.29
REVISO:
REALIZO:
Pgina 16 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 03
"TERRACERAS"
UNIDAD
M3
ESTACIN KM.
REA
L1+L2
D/2
75+600.000
0.00
0.00
75+611.738
0.00
75+620.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
0.00
16,572.29
0.00
5.87
0.00
16,572.29
0.00
0.00
4.13
0.00
16,572.29
75+635.122
0.00
0.00
7.56
0.00
16,572.29
75+640.000
0.00
0.00
2.44
0.00
16,572.29
75+658.507
0.00
0.00
9.25
0.00
16,572.29
75+660.000
0.00
0.00
0.75
0.00
16,572.29
75+680.000
1.08
1.08
10.00
10.80
16,583.09
75+700.000
6.04
7.12
10.00
71.20
16,654.29
75+711.122
6.93
12.97
5.56
72.13
16,726.42
75+720.000
7.62
14.55
4.44
64.58
16,791.00
75+740.000
9.25
16.87
10.00
168.70
16,959.70
75+760.000
8.86
18.11
10.00
181.10
17,140.80
75+780.000
10.09
18.95
10.00
189.50
17,330.30
75+800.000
10.06
20.15
10.00
201.50
17,531.80
75+820.000
10.03
20.09
10.00
200.90
17,732.70
75+840.000
10.23
20.26
10.00
202.60
17,935.30
75+860.000
10.90
21.13
10.00
211.30
18,146.60
75+880.000
11.57
22.47
10.00
224.70
18,371.30
75+900.000
11.18
22.75
10.00
227.50
18,598.80
75+920.000
11.70
22.88
10.00
228.80
18,827.60
75+940.000
10.99
22.69
10.00
226.90
19,054.50
75+960.000
10.51
21.50
10.00
215.00
19,269.50
75+980.000
10.03
20.54
10.00
205.40
19,474.90
76+000.000
9.46
19.49
10.00
194.90
19,669.80
76+020.000
9.06
18.52
10.00
185.20
19,855.00
76+040.000
8.85
17.91
10.00
179.10
20,034.10
76+060.000
8.62
17.47
10.00
174.70
20,208.80
76+080.000
8.58
17.20
10.00
172.00
20,380.80
76+100.000
8.50
17.08
10.00
170.80
20,551.60
76+120.000
8.32
16.82
10.00
168.20
20,719.80
76+140.000
8.14
16.46
10.00
164.60
20,884.40
76+160.000
7.78
15.92
10.00
159.20
21,043.60
76+180.000
7.53
15.31
10.00
153.10
21,196.70
76+200.000
7.13
14.66
10.00
146.60
21,343.30
76+220.000
6.66
13.79
10.00
137.90
21,481.20
76+240.000
6.06
12.72
10.00
127.20
21,608.40
76+255.500
5.63
11.69
7.75
90.60
21,699.00
76+260.000
5.57
11.20
2.25
25.20
21,724.20
76+280.000
4.30
9.87
10.00
98.70
21,822.90
76+300.000
3.79
8.09
10.00
80.90
21,903.80
76+320.000
3.74
7.53
10.00
75.30
21,979.10
76+321.961
3.78
7.52
0.98
7.37
21,986.47
76+340.000
4.57
8.35
9.02
75.31
22,061.79
76+351.500
5.07
9.64
5.75
55.43
22,117.21
76+360.000
5.54
10.61
4.25
45.09
22,162.31
76+380.000
5.56
11.10
10.00
111.00
22,273.31
76+381.038
5.54
11.10
0.52
5.76
22,279.07
76+400.000
5.21
10.75
9.48
101.92
22,380.99
76+420.000
4.95
10.16
10.00
101.60
22,482.59
76+440.000
4.35
9.30
10.00
93.00
22,575.59
76+460.000
4.27
8.62
10.00
86.20
22,661.79
76+480.000
3.76
8.03
10.00
80.30
22,742.09
76+500.000
3.51
7.27
10.00
72.70
22,814.79
REVISO:
REALIZO:
Pgina 17 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 03
"TERRACERAS"
UNIDAD
M3
ESTACIN KM.
REA
L1+L2
D/2
76+520.000
4.00
7.51
76+540.000
5.22
76+560.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
75.10
22,889.89
9.22
10.00
92.20
22,982.09
5.55
10.77
10.00
107.70
23,089.79
76+580.000
5.27
10.82
10.00
108.20
23,197.99
76+600.000
4.66
9.93
10.00
99.30
23,297.29
76+620.000
4.47
9.13
10.00
91.30
23,388.59
76+640.000
4.48
8.95
10.00
89.50
23,478.09
76+660.000
4.77
9.25
10.00
92.50
23,570.59
76+680.000
4.98
9.75
10.00
97.50
23,668.09
76+700.000
5.85
10.83
10.00
108.30
23,776.39
76+720.000
5.97
11.82
10.00
118.20
23,894.59
76+740.000
5.81
11.78
10.00
117.80
24,012.39
76+760.000
5.91
11.72
10.00
117.20
24,129.59
76+780.000
5.89
11.80
10.00
118.00
24,247.59
76+800.000
5.83
11.72
10.00
117.20
24,364.79
76+820.000
5.78
11.61
10.00
116.10
24,480.89
76+840.000
5.84
11.62
10.00
116.20
24,597.09
76+860.000
5.90
11.74
10.00
117.40
24,714.49
76+880.000
5.95
11.85
10.00
118.50
24,832.99
76+900.000
5.99
11.94
10.00
119.40
24,952.39
76+920.000
6.09
12.08
10.00
120.80
25,073.19
76+940.000
5.82
11.91
10.00
119.10
25,192.29
76+960.000
4.86
10.68
10.00
106.80
25,299.09
76+980.000
4.83
9.69
10.00
96.90
25,395.99
76+985.245
4.81
9.64
2.62
25.28
25,421.27
76+993.182
4.82
9.63
3.97
38.21
25,459.49
77+000.000
4.86
9.68
3.41
33.00
25,492.49
77+001.118
4.86
9.72
0.56
5.44
25,497.92
77+018.182
5.07
9.93
8.53
84.72
25,582.64
77+020.000
5.11
10.18
0.91
9.25
25,591.90
77+040.000
5.04
10.15
10.00
101.50
25,693.40
77+060.000
5.73
10.77
10.00
107.70
25,801.10
77+080.000
6.79
12.52
10.00
125.20
25,926.30
77+100.000
6.85
13.64
10.00
136.40
26,062.70
77+120.000
6.60
13.45
10.00
134.50
26,197.20
77+140.000
5.50
12.10
10.00
121.00
26,318.20
77+160.000
5.17
10.67
10.00
106.70
26,424.90
77+180.000
4.33
9.50
10.00
95.00
26,519.90
77+200.000
6.27
10.60
10.00
106.00
26,625.90
77+220.000
6.35
12.62
10.00
126.20
26,752.10
77+240.000
4.44
10.79
10.00
107.90
26,860.00
77+260.000
1.00
5.44
10.00
54.40
26,914.40
77+280.000
0.00
1.00
10.00
10.00
26,924.40
77+300.000
0.00
0.00
10.00
0.00
26,924.40
77+320.000
0.00
0.00
10.00
0.00
26,924.40
77+340.000
0.00
0.00
10.00
0.00
26,924.40
77+360.000
2.62
2.62
10.00
26.20
26,950.60
77+380.000
4.64
7.26
10.00
72.60
27,023.20
77+400.000
5.48
10.12
10.00
101.20
27,124.40
77+420.000
0.52
6.00
10.00
60.00
27,184.40
77+440.000
0.00
0.52
10.00
5.20
27,189.60
77+460.000
0.00
0.00
10.00
0.00
27,189.60
77+480.000
0.00
0.00
10.00
0.00
27,189.60
77+500.000
0.00
0.00
10.00
0.00
27,189.60
REVISO:
REALIZO:
Pgina 18 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 03
"TERRACERAS"
UNIDAD
M3
ESTACIN KM.
REA
L1+L2
D/2
77+520.000
0.00
0.00
77+525.218
0.00
77+540.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
0.00
27,189.60
0.00
2.61
0.00
27,189.60
0.00
0.00
7.39
0.00
27,189.60
77+540.234
0.00
0.00
0.12
0.00
27,189.60
77+547.218
0.00
0.00
3.49
0.00
27,189.60
77+554.202
0.00
0.00
3.49
0.00
27,189.60
77+560.000
0.00
0.00
2.90
0.00
27,189.60
77+580.000
2.31
2.31
10.00
23.10
27,212.70
77+600.000
3.97
6.28
10.00
62.80
27,275.50
77+620.000
5.69
9.66
10.00
96.60
27,372.10
77+640.000
6.21
11.90
10.00
119.00
27,491.10
77+647.342
6.27
12.48
3.67
45.81
27,536.91
77+660.000
6.25
12.52
6.33
79.24
27,616.15
77+663.215
6.23
12.48
1.61
20.06
27,636.21
77+679.088
6.32
12.55
7.94
99.60
27,735.81
77+680.000
6.33
12.65
0.46
5.77
27,741.58
77+700.000
5.50
11.83
10.00
118.30
27,859.88
77+713.215
0.00
5.50
6.61
36.34
27,896.22
77+720.000
0.21
0.21
3.39
0.71
27,896.93
77+740.000
5.81
6.02
10.00
60.20
27,957.13
77+760.000
5.42
11.23
10.00
112.30
28,069.43
77+780.000
3.24
8.66
10.00
86.60
28,156.03
77+800.000
0.00
3.24
10.00
32.40
28,188.43
77+820.000
0.00
0.00
10.00
0.00
28,188.43
77+840.000
0.00
0.00
10.00
0.00
28,188.43
77+860.000
0.00
0.00
10.00
0.00
28,188.43
77+880.000
0.00
0.00
10.00
0.00
28,188.43
77+900.000
0.00
0.00
10.00
0.00
28,188.43
77+920.000
0.00
0.00
10.00
0.00
28,188.43
77+940.000
0.00
0.00
10.00
0.00
28,188.43
77+960.000
0.00
0.00
10.00
0.00
28,188.43
77+980.000
0.60
0.60
10.00
6.00
28,194.43
78+000.000
0.40
1.00
10.00
10.00
28,204.43
78+020.000
0.31
0.71
10.00
7.10
28,211.53
78+040.000
6.42
6.73
10.00
67.30
28,278.83
78+060.000
5.41
11.83
10.00
118.30
28,397.13
78+080.000
6.31
11.72
10.00
117.20
28,514.33
78+094.334
5.94
12.25
7.17
87.80
28,602.13
78+100.000
5.38
11.32
2.83
32.07
28,634.20
78+116.175
5.64
11.02
8.09
89.13
28,723.33
78+120.000
4.96
10.60
1.91
20.27
28,743.60
78+126.334
4.84
9.80
3.17
31.04
28,774.63
78+136.493
4.79
9.63
5.08
48.91
28,823.55
78+140.000
5.01
9.80
1.75
17.19
28,840.73
78+160.000
4.42
9.43
10.00
94.30
28,935.03
78+180.000
4.30
8.72
10.00
87.20
29,022.23
78+200.000
4.19
8.49
10.00
84.90
29,107.13
78+220.000
4.30
8.49
10.00
84.90
29,192.03
78+240.000
4.16
8.46
10.00
84.60
29,276.63
78+260.000
4.34
8.50
10.00
85.00
29,361.63
78+280.000
0.00
4.34
10.00
43.40
29,405.03
78+300.000
0.00
0.00
10.00
0.00
29,405.03
78+320.000
0.00
0.00
10.00
0.00
29,405.03
78+340.000
0.00
0.00
10.00
0.00
29,405.03
REVISO:
REALIZO:
Pgina 19 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 03
"TERRACERAS"
UNIDAD
M3
ESTACIN KM.
REA
L1+L2
D/2
78+360.000
0.00
0.00
78+380.000
0.00
78+400.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
0.00
29,405.03
0.00
10.00
0.00
29,405.03
0.00
0.00
10.00
0.00
29,405.03
78+420.000
0.00
0.00
10.00
0.00
29,405.03
78+440.000
0.00
0.00
10.00
0.00
29,405.03
78+460.000
0.00
0.00
10.00
0.00
29,405.03
78+480.000
0.00
0.00
10.00
0.00
29,405.03
78+500.000
0.00
0.00
10.00
0.00
29,405.03
78+520.000
0.00
0.00
10.00
0.00
29,405.03
78+540.000
7.31
7.31
10.00
73.10
29,478.13
78+560.000
7.25
14.56
10.00
145.60
29,623.73
78+580.000
7.05
14.30
10.00
143.00
29,766.73
78+600.000
6.80
13.85
10.00
138.50
29,905.23
78+620.000
6.28
13.08
10.00
130.80
30,036.03
78+640.000
5.95
12.23
10.00
122.30
30,158.33
78+660.000
2.92
8.87
10.00
88.70
30,247.03
78+680.000
2.54
5.46
10.00
54.60
30,301.63
78+700.000
1.17
3.71
10.00
37.10
30,338.73
78+720.000
0.52
1.69
10.00
16.90
30,355.63
78+740.000
0.00
0.52
10.00
5.20
30,360.83
78+760.000
0.00
0.00
10.00
0.00
30,360.83
78+780.000
0.00
0.00
10.00
0.00
30,360.83
78+790.492
0.00
0.00
5.25
0.00
30,360.83
78+796.615
0.00
0.00
3.06
0.00
30,360.83
78+800.000
0.00
0.00
1.69
0.00
30,360.83
78+802.737
0.00
0.00
1.37
0.00
30,360.83
78+811.615
0.70
0.70
4.44
3.11
30,363.94
78+820.000
1.78
2.48
4.19
10.40
30,374.34
78+840.000
1.46
3.24
10.00
32.40
30,406.74
78+860.000
0.95
2.41
10.00
24.10
30,430.84
78+880.000
0.00
0.95
10.00
9.50
30,440.34
78+900.000
0.00
0.00
10.00
0.00
30,440.34
78+920.000
0.00
0.00
10.00
0.00
30,440.34
78+940.000
0.00
0.00
10.00
0.00
30,440.34
78+960.000
0.00
0.00
10.00
0.00
30,440.34
78+980.000
0.00
0.00
10.00
0.00
30,440.34
79+000.000
0.49
0.49
10.00
4.90
30,445.24
79+020.000
1.08
1.57
10.00
15.70
30,460.94
79+040.000
5.13
6.21
10.00
62.10
30,523.04
79+060.000
5.33
10.46
10.00
104.60
30,627.64
79+080.000
5.49
10.82
10.00
108.20
30,735.84
79+097.907
5.64
11.13
8.95
99.65
30,835.49
79+100.000
5.64
11.28
1.05
11.80
30,847.30
79+120.000
5.80
11.44
10.00
114.40
30,961.70
79+133.417
5.85
11.65
6.71
78.16
31,039.85
79+140.000
5.90
11.75
3.29
38.67
31,078.52
79+157.907
5.89
11.79
8.95
105.56
31,184.09
79+160.000
5.88
11.77
1.05
12.32
31,196.40
79+180.000
5.73
11.61
10.00
116.10
31,312.50
79+182.397
5.71
11.44
1.20
13.71
31,326.21
79+200.000
5.52
11.23
8.80
98.84
31,425.05
79+220.000
5.26
10.78
10.00
107.80
31,532.85
79+240.000
3.21
8.47
10.00
84.70
31,617.55
79+260.000
1.89
5.10
10.00
51.00
31,668.55
79+280.000
1.95
3.84
10.00
38.40
31,706.95
79+300.000
1.94
3.89
10.00
38.90
31,745.85
REVISO:
REALIZO:
Pgina 20 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 03
"TERRACERAS"
UNIDAD
M3
ESTACIN KM.
REA
L1+L2
D/2
79+320.000
1.52
3.46
79+340.000
0.15
79+360.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
34.60
31,780.45
1.67
10.00
16.70
31,797.15
0.83
0.98
10.00
9.80
31,806.95
79+380.000
0.00
0.83
10.00
8.30
31,815.25
79+400.000
0.00
0.00
10.00
0.00
31,815.25
79+420.000
0.00
0.00
10.00
0.00
31,815.25
79+440.000
0.00
0.00
10.00
0.00
31,815.25
79+460.000
0.00
0.00
10.00
0.00
31,815.25
79+480.000
0.00
0.00
10.00
0.00
31,815.25
79+500.000
1.09
1.09
10.00
10.90
31,826.15
79+520.000
1.33
2.42
10.00
24.20
31,850.35
79+540.000
1.33
2.66
10.00
26.60
31,876.95
79+560.000
1.31
2.64
10.00
26.40
31,903.35
79+580.000
1.38
2.69
10.00
26.90
31,930.25
79+600.000
1.36
2.74
10.00
27.40
31,957.65
79+620.000
0.90
2.26
10.00
22.60
31,980.25
79+640.000
0.73
1.63
10.00
16.30
31,996.55
79+660.000
0.00
0.73
10.00
7.30
32,003.85
79+680.000
0.00
0.00
10.00
0.00
32,003.85
79+700.000
0.00
0.00
10.00
0.00
32,003.85
79+720.000
0.00
0.00
10.00
0.00
32,003.85
79+740.000
0.00
0.00
10.00
0.00
32,003.85
79+760.000
0.00
0.00
10.00
0.00
32,003.85
79+780.000
0.00
0.00
10.00
0.00
32,003.85
79+800.000
0.00
0.00
10.00
0.00
32,003.85
79+820.000
0.00
0.00
10.00
0.00
32,003.85
79+840.000
0.00
0.00
10.00
0.00
32,003.85
79+860.000
0.00
0.00
10.00
0.00
32,003.85
79+880.000
0.00
0.00
10.00
0.00
32,003.85
79+900.000
0.00
0.00
10.00
0.00
32,003.85
79+920.000
0.44
0.44
10.00
4.40
32,008.25
79+940.000
1.22
1.66
10.00
16.60
32,024.85
79+960.000
4.51
5.73
10.00
57.30
32,082.15
79+980.000
5.19
9.70
10.00
97.00
32,179.15
80+000.000
5.30
10.49
10.00
104.90
32,284.05
80+020.000
5.40
10.70
10.00
107.00
32,391.05
80+040.000
5.41
10.81
10.00
108.10
32,499.15
80+060.000
5.28
10.69
10.00
106.90
32,606.05
80+080.000
5.07
10.35
10.00
103.50
32,709.55
80+100.000
4.58
9.65
10.00
96.50
32,806.05
80+120.000
1.01
5.59
10.00
55.90
32,861.95
80+140.000
0.23
1.24
10.00
12.40
32,874.35
80+160.000
0.00
0.23
10.00
2.30
32,876.65
80+180.000
0.00
0.00
10.00
0.00
32,876.65
80+200.000
0.00
0.00
10.00
0.00
32,876.65
80+220.000
0.35
0.35
10.00
3.50
32,880.15
80+240.000
5.22
5.57
10.00
55.70
32,935.85
80+260.000
5.92
11.14
10.00
111.40
33,047.25
80+280.000
6.64
12.56
10.00
125.60
33,172.85
80+300.000
6.46
13.10
10.00
131.00
33,303.85
80+320.000
6.94
13.40
10.00
134.00
33,437.85
80+340.000
6.94
13.88
10.00
138.80
33,576.65
80+360.000
7.12
14.06
10.00
140.60
33,717.25
80+380.000
6.89
14.01
10.00
140.10
33,857.35
80+400.000
6.91
13.80
10.00
138.00
33,995.35
80+420.000
7.21
14.12
10.00
141.20
34,136.55
REVISO:
REALIZO:
Pgina 21 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 03
"TERRACERAS"
UNIDAD
M3
ESTACIN KM.
REA
L1+L2
D/2
80+440.000
0.00
7.21
80+460.000
0.00
80+480.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
72.10
34,208.65
0.00
10.00
0.00
34,208.65
0.00
0.00
10.00
0.00
34,208.65
80+500.000
0.00
0.00
10.00
0.00
34,208.65
80+520.000
0.00
0.00
10.00
0.00
34,208.65
80+540.000
0.00
0.00
10.00
0.00
34,208.65
80+560.000
0.00
0.00
10.00
0.00
34,208.65
80+580.000
0.00
0.00
10.00
0.00
34,208.65
80+600.000
6.80
6.80
10.00
68.00
34,276.65
80+620.000
6.52
10.00
0.00
34,276.65
80+640.000
5.82
12.34
10.00
123.40
34,400.05
80+660.000
4.28
10.10
10.00
101.00
34,501.05
80+680.000
3.88
8.16
10.00
81.60
34,582.65
80+700.000
2.72
6.60
10.00
66.00
34,648.65
80+720.000
2.85
5.57
10.00
55.70
34,704.35
80+740.000
3.04
5.89
10.00
58.90
34,763.25
80+760.000
3.47
6.51
10.00
65.10
34,828.35
80+780.000
4.79
8.26
10.00
82.60
34,910.95
80+800.000
5.05
9.84
10.00
98.40
35,009.35
80+820.000
3.80
8.85
10.00
88.50
35,097.85
80+840.000
3.78
7.58
10.00
75.80
35,173.65
80+860.000
5.48
9.26
10.00
92.60
35,266.25
80+880.000
5.18
10.66
10.00
106.60
35,372.85
80+900.000
5.15
10.33
10.00
103.30
35,476.15
80+920.000
3.64
8.79
10.00
87.90
35,564.05
80+940.000
3.36
7.00
10.00
70.00
35,634.05
80+960.000
5.27
8.63
10.00
86.30
35,720.35
80+980.000
5.18
10.45
10.00
104.50
35,824.85
81+000.000
1.64
6.82
10.00
68.20
35,893.05
81+020.000
5.04
6.68
10.00
66.80
35,959.85
81+040.000
5.66
10.70
10.00
107.00
36,066.85
81+060.000
6.21
11.87
10.00
118.70
36,185.55
81+080.000
6.43
12.64
10.00
126.40
36,311.95
81+100.000
6.27
12.70
10.00
127.00
36,438.95
81+120.000
5.85
12.12
10.00
121.20
36,560.15
81+140.000
81+160.000
81+180.000
81+200.000
81+220.000
81+240.000
81+260.000
81+280.000
81+300.000
81+320.000
81+340.000
81+360.000
81+380.000
81+400.000
81+420.000
81+440.000
81+460.000
81+480.000
81+500.000
81+520.000
81+540.000
81+560.000
81+580.000
81+600.000
81+620.000
81+640.000
81+660.000
3.44
2.02
0.03
1.01
2.38
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.96
5.15
6.89
7.69
7.63
7.10
6.92
6.90
6.75
6.71
6.68
6.88
0.00
9.29
5.46
2.05
1.04
3.39
2.38
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.96
7.11
12.04
14.58
15.32
14.73
14.02
13.82
13.65
13.46
13.39
13.56
6.88
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
92.90
54.60
20.50
10.40
33.90
23.80
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
19.60
71.10
120.40
145.80
153.20
147.30
140.20
138.20
136.50
134.60
133.90
135.60
68.80
36,653.05
36,707.65
36,728.15
36,738.55
36,772.45
36,796.25
36,796.25
36,796.25
36,796.25
36,796.25
36,796.25
36,796.25
36,796.25
36,796.25
36,815.85
36,886.95
37,007.35
37,153.15
37,306.35
37,453.65
37,593.85
37,732.05
37,868.55
38,003.15
38,137.05
38,272.65
38,341.45
REVISO:
REALIZO:
Pgina 22 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 03
"TERRACERAS"
UNIDAD
M3
ESTACIN KM.
REA
L1+L2
D/2
81+680.000
81+700.000
81+720.000
81+740.000
81+760.000
81+780.000
81+800.000
81+820.000
81+840.000
81+860.000
81+880.000
81+900.000
81+920.000
81+940.000
81+960.000
81+980.000
82+000.000
82+020.000
82+040.000
82+060.000
82+080.000
82+100.000
82+120.000
82+140.000
82+160.000
82+180.000
82+200.000
82+220.000
82+240.000
82+260.000
82+280.000
82+300.000
82+320.000
82+340.000
82+360.000
82+380.000
82+400.000
82+420.000
82+440.000
82+460.000
82+480.000
82+500.000
82+520.000
82+540.000
82+560.000
82+580.000
82+600.000
82+620.000
82+640.000
82+660.000
82+680.000
82+700.000
82+720.000
82+740.000
82+760.000
82+780.000
82+800.000
82+820.000
82+840.000
82+860.000
82+880.000
82+900.000
82+920.000
82+940.000
82+960.000
82+980.000
83+000.000
83+020.000
83+040.000
83+060.000
83+080.000
83+100.000
0.00
0.00
0.00
0.00
0.00
0.00
4.23
5.12
5.88
6.48
7.35
7.62
7.57
7.54
6.82
5.62
2.28
2.03
5.75
6.57
5.82
1.84
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.33
0.29
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.61
1.29
2.22
5.25
5.45
5.35
5.22
5.18
5.39
5.67
5.76
6.00
5.66
6.24
7.61
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.23
9.35
11.00
12.36
13.83
14.97
15.19
15.11
14.36
12.44
7.90
4.31
7.78
12.32
12.39
7.66
1.84
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.33
0.62
0.29
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.61
2.90
3.51
7.47
10.70
10.80
10.57
10.40
10.57
11.06
11.43
11.76
11.66
11.90
13.85
7.61
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
REVISO:
REA ACUMULADA
PARCIAL
ACUMULADO
0.00
0.00
0.00
0.00
0.00
0.00
42.30
93.50
110.00
123.60
138.30
149.70
151.90
151.10
143.60
124.40
79.00
43.10
77.80
123.20
123.90
76.60
18.40
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.30
6.20
2.90
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
16.10
29.00
35.10
74.70
107.00
108.00
105.70
104.00
105.70
110.60
114.30
117.60
116.60
119.00
138.50
76.10
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
38,341.45
38,341.45
38,341.45
38,341.45
38,341.45
38,341.45
38,383.75
38,477.25
38,587.25
38,710.85
38,849.15
38,998.85
39,150.75
39,301.85
39,445.45
39,569.85
39,648.85
39,691.95
39,769.75
39,892.95
40,016.85
40,093.45
40,111.85
40,111.85
40,111.85
40,111.85
40,111.85
40,111.85
40,111.85
40,111.85
40,115.15
40,121.35
40,124.25
40,124.25
40,124.25
40,124.25
40,124.25
40,124.25
40,124.25
40,124.25
40,124.25
40,124.25
40,124.25
40,124.25
40,140.35
40,169.35
40,204.45
40,279.15
40,386.15
40,494.15
40,599.85
40,703.85
40,809.55
40,920.15
41,034.45
41,152.05
41,268.65
41,387.65
41,526.15
41,602.25
41,602.25
41,602.25
41,602.25
41,602.25
41,602.25
41,602.25
41,602.25
41,602.25
41,602.25
41,602.25
41,602.25
41,602.25
REALIZO:
Pgina 23 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 03
"TERRACERAS"
UNIDAD
M3
ESTACIN KM.
REA
L1+L2
D/2
83+120.000
83+140.000
83+160.000
83+170.200
83+180.000
83+200.000
83+220.000
83+240.000
83+260.000
83+280.000
83+300.000
83+320.000
83+340.000
83+360.000
83+380.000
83+400.000
83+420.000
83+440.000
83+460.000
83+480.000
83+500.000
83+520.000
83+540.000
83+560.000
83+570.105
83+580.000
83+593.182
83+600.000
83+616.259
83+620.000
83+640.000
83+653.182
83+660.000
83+680.000
83+700.000
83+720.000
83+740.000
83+760.000
83+780.000
83+785.000
0.00
0.00
0.00
6.70
5.29
4.34
2.01
0.00
0.00
0.00
0.00
0.08
1.06
2.80
3.12
2.81
1.91
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.54
0.00
0.00
0.00
6.70
11.99
9.63
6.35
2.01
0.00
0.00
0.00
0.08
1.14
3.86
5.92
5.93
4.72
1.91
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.54
10.00
10.00
10.00
5.10
4.90
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
5.05
4.95
6.59
3.41
8.13
1.87
10.00
6.59
3.41
10.00
10.00
10.00
10.00
10.00
10.00
2.50
REVISO:
REA ACUMULADA
PARCIAL
ACUMULADO
0.00
0.00
0.00
34.17
58.75
96.30
63.50
20.10
0.00
0.00
0.00
0.80
11.40
38.60
59.20
59.30
47.20
19.10
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.35
41,602.25
41,602.25
41,602.25
41,636.42
41,695.18
41,791.48
41,854.98
41,875.08
41,875.08
41,875.08
41,875.08
41,875.88
41,887.28
41,925.88
41,985.08
42,044.38
42,091.58
42,110.68
42,110.68
42,110.68
42,110.68
42,110.68
42,110.68
42,110.68
42,110.68
42,110.68
42,110.68
42,110.68
42,110.68
42,110.68
42,110.68
42,110.68
42,110.68
42,110.68
42,110.68
42,110.68
42,110.68
42,110.68
42,110.68
42,112.03
REALIZO:
Pgina 24 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS DIVERSOS Y
SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS - CABO SAN LUCAS
GENERADOR DE FINIQUITO
CONCEPTO No. 04
"TERRACERAS"
UNIDAD
M3
ESTACIN KM.
REA
L1+L2
D/2
71+800.000
0.00
0.00
71+820.000
0.00
71+840.000
REA ACUMULADA
PARCIAL
ACUMULADO
0.00
0.00
0.00
0.00
10.00
0.00
0.00
0.00
0.00
10.00
0.00
0.00
71+860.000
0.00
0.00
10.00
0.00
0.00
71+880.000
0.00
0.00
10.00
0.00
0.00
71+900.000
0.00
0.00
10.00
0.00
0.00
71+920.000
0.00
0.00
10.00
0.00
0.00
71+940.000
0.00
0.00
10.00
0.00
0.00
71+960.000
0.00
0.00
10.00
0.00
0.00
71+980.000
0.00
0.00
10.00
0.00
0.00
72+000.000
0.00
0.00
10.00
0.00
0.00
72+020.000
0.00
0.00
10.00
0.00
0.00
72+040.000
0.00
0.00
10.00
0.00
0.00
72+060.000
0.00
0.00
10.00
0.00
0.00
72+080.000
0.00
0.00
10.00
0.00
0.00
72+100.000
0.00
0.00
10.00
0.00
0.00
72+120.000
0.00
0.00
10.00
0.00
0.00
72+140.000
0.00
0.00
10.00
0.00
0.00
72+160.000
0.00
0.00
10.00
0.00
0.00
72+180.000
0.00
0.00
10.00
0.00
0.00
72+200.000
0.00
0.00
10.00
0.00
0.00
72+220.000
1.27
1.27
10.00
12.70
12.70
72+240.000
1.63
2.90
10.00
29.00
41.70
72+260.000
0.00
1.63
10.00
16.30
58.00
72+280.000
0.00
0.00
10.00
0.00
58.00
72+300.000
0.00
0.00
10.00
0.00
58.00
72+320.000
0.00
0.00
10.00
0.00
58.00
72+340.000
0.00
0.00
10.00
0.00
58.00
72+360.000
0.00
0.00
10.00
0.00
58.00
72+380.000
0.00
0.00
10.00
0.00
58.00
72+400.000
0.00
0.00
10.00
0.00
58.00
72+420.000
0.00
0.00
10.00
0.00
58.00
72+440.000
0.00
0.00
10.00
0.00
58.00
72+460.000
0.00
0.00
10.00
0.00
58.00
72+480.000
0.00
0.00
10.00
0.00
58.00
72+500.000
0.00
0.00
10.00
0.00
58.00
72+520.000
0.00
0.00
10.00
0.00
58.00
72+540.000
0.00
0.00
10.00
0.00
58.00
72+560.000
0.00
0.00
10.00
0.00
58.00
72+580.000
0.00
0.00
10.00
0.00
58.00
72+600.000
0.00
0.00
10.00
0.00
58.00
72+620.000
0.00
0.00
10.00
0.00
58.00
72+640.000
0.00
0.00
10.00
0.00
58.00
72+654.982
0.00
0.00
7.49
0.00
58.00
72+660.000
0.00
0.00
2.51
0.00
58.00
72+678.443
0.00
0.00
9.22
0.00
58.00
72+680.000
0.00
0.00
0.78
0.00
58.00
72+700.000
0.00
0.00
10.00
0.00
58.00
72+701.905
0.00
0.00
0.95
0.00
58.00
72+720.000
0.00
0.00
9.05
0.00
58.00
72+739.443
0.00
0.00
9.72
0.00
58.00
72+740.000
0.00
0.00
0.28
0.00
58.00
REVISO:
REALIZO:
Pgina 25 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS DIVERSOS Y
SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS - CABO SAN LUCAS
GENERADOR DE FINIQUITO
CONCEPTO No. 04
"TERRACERAS"
UNIDAD
M3
REA ACUMULADA
ESTACIN KM.
REA
L1+L2
D/2
72+760.000
2.95
2.95
10.00
29.50
87.50
72+780.000
3.86
6.81
10.00
68.10
155.60
72+800.000
4.08
7.94
10.00
79.40
235.00
72+820.000
4.19
8.27
10.00
82.70
317.70
72+840.000
0.00
4.19
10.00
41.90
359.60
72+860.000
0.00
0.00
10.00
0.00
359.60
72+880.000
0.00
0.00
10.00
0.00
359.60
72+900.000
0.00
0.00
10.00
0.00
359.60
72+920.000
0.00
0.00
10.00
0.00
359.60
72+940.000
0.00
0.00
10.00
0.00
359.60
72+960.000
0.00
0.00
10.00
0.00
359.60
72+971.651
0.00
0.00
5.83
0.00
359.60
72+980.000
0.00
0.00
4.17
0.00
359.60
73+000.000
0.00
0.00
10.00
0.00
359.60
73+009.189
0.00
0.00
4.59
0.00
359.60
73+020.000
0.00
0.00
5.41
0.00
359.60
73+032.651
0.00
0.00
6.33
0.00
359.60
73+040.000
0.00
0.00
3.67
0.00
359.60
73+056.112
0.00
0.00
8.06
0.00
359.60
73+060.000
0.00
0.00
1.94
0.00
359.60
73+080.000
0.00
0.00
10.00
0.00
359.60
73+100.000
0.00
0.00
10.00
0.00
359.60
73+120.000
0.00
0.00
10.00
0.00
359.60
73+140.000
0.00
0.00
10.00
0.00
359.60
73+160.000
0.00
0.00
10.00
0.00
359.60
73+180.000
0.00
0.00
10.00
0.00
359.60
73+200.000
0.00
0.00
10.00
0.00
359.60
73+220.000
0.00
0.00
10.00
0.00
359.60
73+240.000
0.00
0.00
10.00
0.00
359.60
73+260.000
0.00
0.00
10.00
0.00
359.60
73+280.000
0.00
0.00
10.00
0.00
359.60
73+300.000
0.00
0.00
10.00
0.00
359.60
73+320.000
0.00
0.00
10.00
0.00
359.60
73+340.000
0.00
0.00
10.00
0.00
359.60
73+360.000
0.00
0.00
10.00
0.00
359.60
73+380.000
0.00
0.00
10.00
0.00
359.60
73+400.000
0.00
0.00
10.00
0.00
359.60
73+420.000
0.00
0.00
10.00
0.00
359.60
73+440.000
0.00
0.00
10.00
0.00
359.60
73+460.000
0.00
0.00
10.00
0.00
359.60
73+480.000
0.00
0.00
10.00
0.00
359.60
73+500.000
0.00
0.00
10.00
0.00
359.60
73+520.000
0.00
0.00
10.00
0.00
359.60
73+540.000
0.00
0.00
10.00
0.00
359.60
73+560.000
0.00
0.00
10.00
0.00
359.60
73+580.000
0.00
0.00
10.00
0.00
359.60
73+600.000
0.00
0.00
10.00
0.00
359.60
73+620.000
0.00
0.00
10.00
0.00
359.60
73+640.000
0.00
0.00
10.00
0.00
359.60
73+660.000
0.00
0.00
10.00
0.00
359.60
73+680.000
0.00
0.00
10.00
0.00
359.60
73+700.000
0.00
0.00
10.00
0.00
359.60
73+720.000
0.00
0.00
10.00
0.00
359.60
73+740.000
0.00
0.00
10.00
0.00
359.60
REVISO:
PARCIAL
ACUMULADO
REALIZO:
Pgina 26 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS DIVERSOS Y
SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS - CABO SAN LUCAS
GENERADOR DE FINIQUITO
CONCEPTO No. 04
"TERRACERAS"
UNIDAD
M3
ESTACIN KM.
REA
L1+L2
D/2
73+760.000
0.00
0.00
73+780.000
0.00
73+800.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
0.00
359.60
0.00
10.00
0.00
359.60
0.00
0.00
10.00
0.00
359.60
73+807.617
0.00
0.00
3.81
0.00
359.60
73+820.000
0.00
0.00
6.19
0.00
359.60
73+840.000
0.00
0.00
10.00
0.00
359.60
73+848.283
0.00
0.00
4.14
0.00
359.60
73+860.000
0.00
0.00
5.86
0.00
359.60
73+880.000
0.00
0.00
10.00
0.00
359.60
73+888.950
0.00
0.00
4.47
0.00
359.60
73+900.000
0.00
0.00
5.53
0.00
359.60
73+909.283
0.00
0.00
4.64
0.00
359.60
73+920.000
0.00
0.00
5.36
0.00
359.60
73+940.000
0.00
0.00
10.00
0.00
359.60
73+960.000
0.00
0.00
10.00
0.00
359.60
73+980.000
0.00
0.00
10.00
0.00
359.60
74+000.000
0.00
0.00
10.00
0.00
359.60
74+020.000
0.00
0.00
10.00
0.00
359.60
74+040.000
0.00
0.00
10.00
0.00
359.60
74+060.000
0.00
0.00
10.00
0.00
359.60
74+080.000
0.00
0.00
10.00
0.00
359.60
74+089.272
0.00
0.00
4.64
0.00
359.60
74+100.000
0.00
0.00
5.36
0.00
359.60
74+109.605
0.00
0.00
4.80
0.00
359.60
74+120.000
0.00
0.00
5.20
0.00
359.60
74+140.000
0.00
0.00
10.00
0.00
359.60
74+150.272
0.00
0.00
5.14
0.00
359.60
74+160.000
0.00
0.00
4.86
0.00
359.60
74+180.000
0.00
0.00
10.00
0.00
359.60
74+190.939
0.00
0.00
5.47
0.00
359.60
74+200.000
0.00
0.00
4.53
0.00
359.60
74+220.000
0.00
0.00
10.00
0.00
359.60
74+240.000
0.00
0.00
10.00
0.00
359.60
74+260.000
0.00
0.00
10.00
0.00
359.60
74+280.000
0.00
0.00
10.00
0.00
359.60
74+300.000
0.00
0.00
10.00
0.00
359.60
74+320.000
0.00
0.00
10.00
0.00
359.60
74+340.000
0.00
0.00
10.00
0.00
359.60
74+360.000
0.00
0.00
10.00
0.00
359.60
74+380.000
0.00
0.00
10.00
0.00
359.60
74+400.000
0.29
0.29
10.00
2.90
362.50
74+420.000
0.41
0.70
10.00
7.00
369.50
74+440.000
0.21
0.62
10.00
6.20
375.70
74+457.851
0.25
0.46
8.93
4.11
379.81
74+460.000
0.32
0.57
1.07
0.61
380.42
74+480.000
0.15
0.47
10.00
4.70
385.12
74+498.518
0.00
0.15
9.26
1.39
386.51
74+500.000
0.00
0.00
0.74
0.00
386.51
74+520.000
0.00
0.00
10.00
0.00
386.51
74+539.184
0.00
0.00
9.59
0.00
386.51
74+540.000
0.00
0.00
0.41
0.00
386.51
74+559.518
0.00
0.00
9.76
0.00
386.51
74+560.000
0.00
0.00
0.24
0.00
386.51
74+580.000
0.00
0.00
10.00
0.00
386.51
REVISO:
REALIZO:
Pgina 27 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS DIVERSOS Y
SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS - CABO SAN LUCAS
GENERADOR DE FINIQUITO
CONCEPTO No. 04
"TERRACERAS"
UNIDAD
M3
ESTACIN KM.
REA
L1+L2
D/2
74+600.000
0.00
0.00
74+620.000
0.00
74+640.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
0.00
386.51
0.00
10.00
0.00
386.51
0.00
0.00
10.00
0.00
386.51
74+660.000
0.00
0.00
10.00
0.00
386.51
74+680.000
0.00
0.00
10.00
0.00
386.51
74+700.000
0.00
0.00
10.00
0.00
386.51
74+720.000
0.00
0.00
10.00
0.00
386.51
74+740.000
0.00
0.00
10.00
0.00
386.51
74+760.000
0.00
0.00
10.00
0.00
386.51
74+779.360
0.00
0.00
9.68
0.00
386.51
74+780.000
0.00
0.00
0.32
0.00
386.51
74+799.693
4.74
4.74
9.85
46.67
433.18
74+800.000
5.13
9.87
0.15
1.51
434.69
74+820.000
40.84
45.97
10.00
459.70
894.39
74+840.000
89.21
130.05
10.00
1300.50
2,194.89
74+840.360
83.47
172.68
0.18
31.08
2,225.97
74+860.000
55.08
138.55
9.82
1360.57
3,586.54
74+880.000
39.16
94.24
10.00
942.40
4,528.94
74+881.027
32.50
71.66
0.51
36.78
4,565.72
74+900.000
1.32
33.82
9.49
320.84
4,886.56
74+920.000
0.00
1.32
10.00
13.20
4,899.76
74+940.000
0.00
0.00
10.00
0.00
4,899.76
74+960.000
0.00
0.00
10.00
0.00
4,899.76
74+980.000
127.39
127.39
10.00
1273.90
6,173.66
75+000.000
92.16
219.55
10.00
2195.50
8,369.16
75+020.000
27.08
119.24
10.00
1192.40
9,561.56
75+040.000
93.12
120.20
10.00
1202.00
10,763.56
75+060.000
182.35
275.47
10.00
2754.70
13,518.26
75+080.000
249.87
432.22
10.00
4322.20
17,840.46
75+100.000
332.12
581.99
10.00
5819.90
23,660.36
75+120.000
395.83
727.95
10.00
7279.50
30,939.86
75+140.000
331.56
727.39
10.00
7273.90
38,213.76
75+160.000
694.72
1026.28
10.00
10262.80
48,476.56
75+180.000
1,228.68
1923.40
10.00
19234.00
67,710.56
75+200.000
1,814.63
3043.31
10.00
30433.10
98,143.66
75+220.000
2,131.26
3945.89
10.00
39458.90
137,602.56
75+240.000
2,106.50
4237.76
10.00
42377.60
179,980.16
75+260.000
1,741.21
3847.71
10.00
38477.10
218,457.26
75+280.000
1,425.97
3167.18
10.00
31671.80
250,129.06
75+300.000
1,124.49
2550.46
10.00
25504.60
275,633.66
75+320.000
882.12
2006.61
10.00
20066.10
295,699.76
75+340.000
802.02
1684.14
10.00
16841.40
312,541.16
75+360.000
700.24
1502.26
10.00
15022.60
327,563.76
75+380.000
531.23
1231.47
10.00
12314.70
339,878.46
75+400.000
478.76
1009.99
10.00
10099.90
349,978.36
75+420.000
434.46
913.22
10.00
9132.20
359,110.56
75+440.000
435.41
869.87
10.00
8698.70
367,809.26
75+460.000
566.66
1002.07
10.00
10020.70
377,829.96
75+480.000
602.08
1168.74
10.00
11687.40
389,517.36
75+500.000
551.95
1154.03
10.00
11540.30
401,057.66
75+520.000
449.95
1001.90
10.00
10019.00
411,076.66
75+540.000
336.42
786.37
10.00
7863.70
418,940.36
75+560.000
232.79
569.21
10.00
5692.10
424,632.46
75+580.000
154.94
387.73
10.00
3877.30
428,509.76
REVISO:
REALIZO:
Pgina 28 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS DIVERSOS Y
SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS - CABO SAN LUCAS
GENERADOR DE FINIQUITO
CONCEPTO No. 04
"TERRACERAS"
UNIDAD
M3
ESTACIN KM.
REA
L1+L2
D/2
75+600.000
172.04
326.98
75+611.738
171.70
75+620.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
3269.80
431,779.56
343.74
5.87
2017.37
433,796.93
171.97
343.67
4.13
1419.74
435,216.67
75+635.122
164.07
336.04
7.56
2540.87
437,757.54
75+640.000
157.58
321.65
2.44
784.44
438,541.98
75+658.507
103.30
260.88
9.25
2414.06
440,956.03
75+660.000
98.57
201.87
0.75
150.69
441,106.72
75+680.000
18.58
117.15
10.00
1171.50
442,278.22
75+700.000
0.00
18.58
10.00
185.80
442,464.02
75+711.122
0.00
0.00
5.56
0.00
442,464.02
75+720.000
0.00
0.00
4.44
0.00
442,464.02
75+740.000
0.00
0.00
10.00
0.00
442,464.02
75+760.000
0.00
0.00
10.00
0.00
442,464.02
75+780.000
0.00
0.00
10.00
0.00
442,464.02
75+800.000
0.00
0.00
10.00
0.00
442,464.02
75+820.000
0.00
0.00
10.00
0.00
442,464.02
75+840.000
0.00
0.00
10.00
0.00
442,464.02
75+860.000
0.00
0.00
10.00
0.00
442,464.02
75+880.000
0.00
0.00
10.00
0.00
442,464.02
75+900.000
0.00
0.00
10.00
0.00
442,464.02
75+920.000
0.00
0.00
10.00
0.00
442,464.02
75+940.000
0.00
0.00
10.00
0.00
442,464.02
75+960.000
0.00
0.00
10.00
0.00
442,464.02
75+980.000
0.00
0.00
10.00
0.00
442,464.02
76+000.000
0.00
0.00
10.00
0.00
442,464.02
76+020.000
0.00
0.00
10.00
0.00
442,464.02
76+040.000
0.00
0.00
10.00
0.00
442,464.02
76+060.000
0.00
0.00
10.00
0.00
442,464.02
76+080.000
0.00
0.00
10.00
0.00
442,464.02
76+100.000
0.00
0.00
10.00
0.00
442,464.02
76+120.000
0.00
0.00
10.00
0.00
442,464.02
76+140.000
0.00
0.00
10.00
0.00
442,464.02
76+160.000
0.00
0.00
10.00
0.00
442,464.02
76+180.000
0.00
0.00
10.00
0.00
442,464.02
76+200.000
0.00
0.00
10.00
0.00
442,464.02
76+220.000
0.00
0.00
10.00
0.00
442,464.02
76+240.000
1.65
1.65
10.00
16.50
442,480.52
76+255.500
4.79
6.44
7.75
49.91
442,530.43
76+260.000
5.59
10.38
2.25
23.36
442,553.79
76+280.000
24.69
30.28
10.00
302.80
442,856.59
76+300.000
26.84
51.53
10.00
515.30
443,371.89
76+320.000
15.51
42.35
10.00
423.50
443,795.39
76+321.961
12.53
28.04
0.98
27.50
443,822.89
76+340.000
3.06
15.59
9.02
140.61
443,963.50
76+351.500
0.42
3.48
5.75
20.01
443,983.51
76+360.000
0.00
0.42
4.25
1.79
443,985.29
76+380.000
0.00
0.00
10.00
0.00
443,985.29
76+381.038
0.00
0.00
0.52
0.00
443,985.29
76+400.000
0.00
0.00
9.48
0.00
443,985.29
76+420.000
0.00
0.00
10.00
0.00
443,985.29
76+440.000
0.53
0.53
10.00
5.30
443,990.59
76+460.000
0.90
1.43
10.00
14.30
444,004.89
76+480.000
1.71
2.61
10.00
26.10
444,030.99
76+500.000
3.23
4.94
10.00
49.40
444,080.39
REVISO:
REALIZO:
Pgina 29 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS DIVERSOS Y
SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS - CABO SAN LUCAS
GENERADOR DE FINIQUITO
CONCEPTO No. 04
"TERRACERAS"
UNIDAD
M3
ESTACIN KM.
REA
L1+L2
D/2
76+520.000
1.66
4.89
76+540.000
0.00
76+560.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
48.90
444,129.29
1.66
10.00
16.60
444,145.89
0.00
0.00
10.00
0.00
444,145.89
76+580.000
0.30
0.30
10.00
3.00
444,148.89
76+600.000
11.06
11.36
10.00
113.60
444,262.49
76+620.000
25.91
36.97
10.00
369.70
444,632.19
76+640.000
25.65
51.56
10.00
515.60
445,147.79
76+660.000
20.28
45.93
10.00
459.30
445,607.09
76+680.000
9.30
29.58
10.00
295.80
445,902.89
76+700.000
0.00
9.30
10.00
93.00
445,995.89
76+720.000
0.00
0.00
10.00
0.00
445,995.89
76+740.000
0.00
0.00
10.00
0.00
445,995.89
76+760.000
0.00
0.00
10.00
0.00
445,995.89
76+780.000
0.00
0.00
10.00
0.00
445,995.89
76+800.000
0.00
0.00
10.00
0.00
445,995.89
76+820.000
0.00
0.00
10.00
0.00
445,995.89
76+840.000
0.00
0.00
10.00
0.00
445,995.89
76+860.000
0.00
0.00
10.00
0.00
445,995.89
76+880.000
0.00
0.00
10.00
0.00
445,995.89
76+900.000
0.00
0.00
10.00
0.00
445,995.89
76+920.000
0.00
0.00
10.00
0.00
445,995.89
76+940.000
0.00
0.00
10.00
0.00
445,995.89
76+960.000
4.13
4.13
10.00
41.30
446,037.19
76+980.000
17.46
21.59
10.00
215.90
446,253.09
76+985.245
21.13
38.59
2.62
101.21
446,354.30
76+993.182
26.95
48.08
3.97
190.79
446,545.10
77+000.000
32.98
59.93
3.41
204.30
446,749.40
77+001.118
33.99
66.97
0.56
37.45
446,786.85
77+018.182
40.84
74.83
8.53
638.43
447,425.28
77+020.000
40.91
81.75
0.91
74.32
447,499.60
77+040.000
37.18
78.09
10.00
780.90
448,280.50
77+060.000
9.44
46.62
10.00
466.20
448,746.70
77+080.000
0.00
9.44
10.00
94.40
448,841.10
77+100.000
0.00
0.00
10.00
0.00
448,841.10
77+120.000
0.39
0.39
10.00
3.90
448,845.00
77+140.000
11.38
11.77
10.00
117.70
448,962.70
77+160.000
8.95
20.33
10.00
203.30
449,166.00
77+180.000
12.29
21.24
10.00
212.40
449,378.40
77+200.000
0.00
12.29
10.00
122.90
449,501.30
77+220.000
0.00
0.00
10.00
0.00
449,501.30
77+240.000
9.84
9.84
10.00
98.40
449,599.70
77+260.000
100.58
110.42
10.00
1104.20
450,703.90
77+280.000
241.86
342.44
10.00
3424.40
454,128.30
77+300.000
310.95
552.81
10.00
5528.10
459,656.40
77+320.000
254.51
565.46
10.00
5654.60
465,311.00
77+340.000
146.59
401.10
10.00
4011.00
469,322.00
77+360.000
56.38
202.97
10.00
2029.70
471,351.70
77+380.000
7.89
64.27
10.00
642.70
471,994.40
77+400.000
0.38
8.27
10.00
82.70
472,077.10
77+420.000
76.66
77.04
10.00
770.40
472,847.50
77+440.000
211.21
287.87
10.00
2878.70
475,726.20
77+460.000
286.08
497.29
10.00
4972.90
480,699.10
77+480.000
302.95
589.03
10.00
5890.30
486,589.40
77+500.000
262.84
565.79
10.00
5657.90
492,247.30
REVISO:
REALIZO:
Pgina 30 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS DIVERSOS Y
SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS - CABO SAN LUCAS
GENERADOR DE FINIQUITO
CONCEPTO No. 04
"TERRACERAS"
UNIDAD
M3
ESTACIN KM.
REA
L1+L2
D/2
77+520.000
216.57
479.41
77+525.218
206.43
77+540.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
4794.10
497,041.40
423.00
2.61
1103.55
498,144.94
186.26
392.69
7.39
2902.43
501,047.37
77+540.234
185.54
371.80
0.12
43.42
501,090.80
77+547.218
164.60
350.14
3.49
1222.71
502,313.51
77+554.202
142.00
306.60
3.49
1070.67
503,384.17
77+560.000
120.31
262.31
2.90
760.46
504,144.63
77+580.000
38.94
159.25
10.00
1592.50
505,737.13
77+600.000
10.14
49.08
10.00
490.80
506,227.93
77+620.000
0.00
10.14
10.00
101.40
506,329.33
77+640.000
0.00
0.00
10.00
0.00
506,329.33
77+647.342
0.00
0.00
3.67
0.00
506,329.33
77+660.000
0.00
0.00
6.33
0.00
506,329.33
77+663.215
0.00
0.00
1.61
0.00
506,329.33
77+679.088
0.00
0.00
7.94
0.00
506,329.33
77+680.000
0.00
0.00
0.46
0.00
506,329.33
77+700.000
0.00
0.00
10.00
0.00
506,329.33
77+713.215
29.75
29.75
6.61
196.57
506,525.90
77+720.000
17.83
47.58
3.39
161.43
506,687.32
77+740.000
0.00
17.83
10.00
178.30
506,865.62
77+760.000
0.43
0.43
10.00
4.30
506,869.92
77+780.000
11.65
12.08
10.00
120.80
506,990.72
77+800.000
43.92
55.57
10.00
555.70
507,546.42
77+820.000
73.74
117.66
10.00
1176.60
508,723.02
77+840.000
58.90
132.64
10.00
1326.40
510,049.42
77+860.000
106.06
164.96
10.00
1649.60
511,699.02
77+880.000
151.01
257.07
10.00
2570.70
514,269.72
77+900.000
79.99
231.00
10.00
2310.00
516,579.72
77+920.000
42.81
122.80
10.00
1228.00
517,807.72
77+940.000
25.92
68.73
10.00
687.30
518,495.02
77+960.000
12.46
38.38
10.00
383.80
518,878.82
77+980.000
21.14
33.60
10.00
336.00
519,214.82
78+000.000
30.28
51.42
10.00
514.20
519,729.02
78+020.000
14.30
44.58
10.00
445.80
520,174.82
78+040.000
0.00
14.30
10.00
143.00
520,317.82
78+060.000
1.98
1.98
10.00
19.80
520,337.62
78+080.000
1.19
3.17
10.00
31.70
520,369.32
78+094.334
1.72
2.91
7.17
20.86
520,390.18
78+100.000
2.61
4.33
2.83
12.27
520,402.45
78+116.175
0.80
3.41
8.09
27.58
520,430.03
78+120.000
1.74
2.54
1.91
4.86
520,434.88
78+126.334
2.04
3.78
3.17
11.97
520,446.85
78+136.493
2.79
4.83
5.08
24.53
520,471.39
78+140.000
2.63
5.42
1.75
9.50
520,480.89
78+160.000
5.06
7.69
10.00
76.90
520,557.79
78+180.000
5.80
10.86
10.00
108.60
520,666.39
78+200.000
5.68
11.48
10.00
114.80
520,781.19
78+220.000
5.76
11.44
10.00
114.40
520,895.59
78+240.000
5.49
11.25
10.00
112.50
521,008.09
78+260.000
3.96
9.45
10.00
94.50
521,102.59
78+280.000
0.00
3.96
10.00
39.60
521,142.19
78+300.000
0.00
0.00
10.00
0.00
521,142.19
78+320.000
0.00
0.00
10.00
0.00
521,142.19
78+340.000
0.00
0.00
10.00
0.00
521,142.19
REVISO:
REALIZO:
Pgina 31 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS DIVERSOS Y
SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS - CABO SAN LUCAS
GENERADOR DE FINIQUITO
CONCEPTO No. 04
"TERRACERAS"
UNIDAD
M3
ESTACIN KM.
REA
L1+L2
D/2
78+360.000
0.00
0.00
78+380.000
0.00
78+400.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
0.00
521,142.19
0.00
10.00
0.00
521,142.19
0.00
0.00
10.00
0.00
521,142.19
78+420.000
0.00
0.00
10.00
0.00
521,142.19
78+440.000
0.00
0.00
10.00
0.00
521,142.19
78+460.000
0.00
0.00
10.00
0.00
521,142.19
78+480.000
0.00
0.00
10.00
0.00
521,142.19
78+500.000
0.00
0.00
10.00
0.00
521,142.19
78+520.000
0.00
0.00
10.00
0.00
521,142.19
78+540.000
0.00
0.00
10.00
0.00
521,142.19
78+560.000
0.00
0.00
10.00
0.00
521,142.19
78+580.000
0.00
0.00
10.00
0.00
521,142.19
78+600.000
0.00
0.00
10.00
0.00
521,142.19
78+620.000
0.00
0.00
10.00
0.00
521,142.19
78+640.000
0.00
0.00
10.00
0.00
521,142.19
78+660.000
3.95
3.95
10.00
39.50
521,181.69
78+680.000
7.78
11.73
10.00
117.30
521,298.99
78+700.000
12.94
20.72
10.00
207.20
521,506.19
78+720.000
16.30
29.24
10.00
292.40
521,798.59
78+740.000
15.86
32.16
10.00
321.60
522,120.19
78+760.000
16.19
32.05
10.00
320.50
522,440.69
78+780.000
12.36
28.55
10.00
285.50
522,726.19
78+790.492
10.46
22.82
5.25
119.72
522,845.91
78+796.615
8.19
18.65
3.06
57.09
522,903.00
78+800.000
6.56
14.75
1.69
24.97
522,927.97
78+802.737
5.60
12.16
1.37
16.64
522,944.61
78+811.615
4.91
10.51
4.44
46.65
522,991.26
78+820.000
5.21
10.12
4.19
42.43
523,033.69
78+840.000
5.60
10.81
10.00
108.10
523,141.79
78+860.000
5.71
11.31
10.00
113.10
523,254.89
78+880.000
7.33
13.04
10.00
130.40
523,385.29
78+900.000
10.06
17.39
10.00
173.90
523,559.19
78+920.000
10.86
20.92
10.00
209.20
523,768.39
78+940.000
15.45
26.31
10.00
263.10
524,031.49
78+960.000
17.26
32.71
10.00
327.10
524,358.59
78+980.000
13.65
30.91
10.00
309.10
524,667.69
79+000.000
8.20
21.85
10.00
218.50
524,886.19
79+020.000
4.27
12.47
10.00
124.70
525,010.89
79+040.000
0.00
4.27
10.00
42.70
525,053.59
79+060.000
0.00
0.00
10.00
0.00
525,053.59
79+080.000
0.00
0.00
10.00
0.00
525,053.59
79+097.907
0.00
0.00
8.95
0.00
525,053.59
79+100.000
0.00
0.00
1.05
0.00
525,053.59
79+120.000
0.00
0.00
10.00
0.00
525,053.59
79+133.417
0.00
0.00
6.71
0.00
525,053.59
79+140.000
0.00
0.00
3.29
0.00
525,053.59
79+157.907
0.00
0.00
8.95
0.00
525,053.59
79+160.000
0.00
0.00
1.05
0.00
525,053.59
79+180.000
0.00
0.00
10.00
0.00
525,053.59
79+182.397
0.00
0.00
1.20
0.00
525,053.59
79+200.000
0.00
0.00
8.80
0.00
525,053.59
79+220.000
0.00
0.00
10.00
0.00
525,053.59
79+240.000
1.45
1.45
10.00
14.50
525,068.09
79+260.000
4.56
6.01
10.00
60.10
525,128.19
79+280.000
7.03
11.59
10.00
115.90
525,244.09
79+300.000
7.06
14.09
10.00
140.90
525,384.99
79+320.000
7.27
14.33
10.00
143.30
525,528.29
REVISO:
REALIZO:
Pgina 32 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS DIVERSOS Y
SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS - CABO SAN LUCAS
GENERADOR DE FINIQUITO
CONCEPTO No. 04
"TERRACERAS"
UNIDAD
M3
ESTACIN KM.
REA
L1+L2
D/2
79+340.000
10.74
18.01
79+360.000
10.70
79+380.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
180.10
525,708.39
21.44
10.00
214.40
525,922.79
12.34
23.04
10.00
230.40
526,153.19
79+400.000
13.42
25.76
10.00
257.60
526,410.79
79+420.000
14.25
27.67
10.00
276.70
526,687.49
79+440.000
13.91
28.16
10.00
281.60
526,969.09
79+460.000
11.89
25.80
10.00
258.00
527,227.09
79+480.000
10.68
22.57
10.00
225.70
527,452.79
79+500.000
9.44
20.12
10.00
201.20
527,653.99
79+520.000
9.33
18.77
10.00
187.70
527,841.69
79+540.000
9.08
18.41
10.00
184.10
528,025.79
79+560.000
8.78
17.86
10.00
178.60
528,204.39
79+580.000
8.61
17.39
10.00
173.90
528,378.29
79+600.000
8.96
17.57
10.00
175.70
528,553.99
79+620.000
8.98
17.94
10.00
179.40
528,733.39
79+640.000
9.62
18.60
10.00
186.00
528,919.39
79+660.000
11.93
21.55
10.00
215.50
529,134.89
79+680.000
13.89
25.82
10.00
258.20
529,393.09
79+700.000
14.72
28.61
10.00
286.10
529,679.19
79+720.000
17.78
32.50
10.00
325.00
530,004.19
79+740.000
22.60
40.38
10.00
403.80
530,407.99
79+760.000
28.16
50.76
10.00
507.60
530,915.59
79+780.000
33.06
61.22
10.00
612.20
531,527.79
79+800.000
35.88
68.94
10.00
689.40
532,217.19
79+820.000
38.28
74.16
10.00
741.60
532,958.79
79+840.000
41.18
79.46
10.00
794.60
533,753.39
79+860.000
42.29
83.47
10.00
834.70
534,588.09
79+880.000
41.49
83.78
10.00
837.80
535,425.89
79+900.000
33.35
74.84
10.00
748.44
536,174.33
79+920.000
17.08
50.43
10.00
504.34
536,678.67
79+940.000
7.02
24.10
10.00
241.00
536,919.67
79+960.000
0.18
7.20
10.00
72.00
536,991.67
79+980.000
0.00
0.18
10.00
1.80
536,993.47
80+000.000
0.00
0.00
10.00
0.00
536,993.47
80+020.000
0.00
0.00
10.00
0.00
536,993.47
80+040.000
0.00
0.00
10.00
0.00
536,993.47
80+060.000
0.00
0.00
10.00
0.00
536,993.47
80+080.000
0.00
0.00
10.00
0.00
536,993.47
80+100.000
0.35
0.35
10.00
3.50
536,996.97
80+120.000
5.51
5.86
10.00
58.60
537,055.57
80+140.000
8.93
14.44
10.00
144.40
537,199.97
80+160.000
15.15
24.08
10.00
240.80
537,440.77
80+180.000
18.82
33.97
10.00
339.70
537,780.47
80+200.000
14.70
33.52
10.00
335.20
538,115.67
80+220.000
6.07
20.77
10.00
207.70
538,323.37
80+240.000
0.00
6.07
10.00
60.70
538,384.07
80+260.000
0.00
0.00
10.00
0.00
538,384.07
80+280.000
0.00
0.00
10.00
0.00
538,384.07
80+300.000
0.00
0.00
10.00
0.00
538,384.07
80+320.000
0.00
0.00
10.00
0.00
538,384.07
80+340.000
0.00
0.00
10.00
0.00
538,384.07
80+360.000
0.00
0.00
10.00
0.00
538,384.07
80+380.000
0.00
0.00
10.00
0.00
538,384.07
80+400.000
0.00
0.00
10.00
0.00
538,384.07
80+420.000
0.00
0.00
10.00
0.00
538,384.07
80+440.000
0.00
0.00
10.00
0.00
538,384.07
80+460.000
0.00
0.00
10.00
0.00
538,384.07
REVISO:
REALIZO:
Pgina 33 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS DIVERSOS Y
SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS - CABO SAN LUCAS
GENERADOR DE FINIQUITO
CONCEPTO No. 04
"TERRACERAS"
UNIDAD
M3
ESTACIN KM.
REA
L1+L2
D/2
80+480.000
0.00
0.00
80+500.000
0.00
80+520.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
0.00
538,384.07
0.00
10.00
0.00
538,384.07
0.00
0.00
10.00
0.00
538,384.07
80+540.000
0.00
0.00
10.00
0.00
538,384.07
80+560.000
0.00
0.00
10.00
0.00
538,384.07
80+580.000
0.00
0.00
10.00
0.00
538,384.07
80+600.000
0.00
0.00
10.00
0.00
538,384.07
80+620.000
0.00
0.00
10.00
0.00
538,384.07
80+640.000
0.02
0.02
10.00
0.20
538,384.27
80+660.000
2.86
2.88
10.00
28.80
538,413.07
80+680.000
5.03
7.89
10.00
78.90
538,491.97
80+700.000
8.36
13.39
10.00
133.90
538,625.87
80+720.000
5.96
14.32
10.00
143.20
538,769.07
80+740.000
24.29
30.25
10.00
302.50
539,071.57
80+760.000
0.24
24.53
10.00
245.30
539,316.87
80+780.000
0.00
0.24
10.00
2.40
539,319.27
80+800.000
0.00
0.00
10.00
0.00
539,319.27
80+820.000
3.19
3.19
10.00
31.90
539,351.17
80+840.000
3.25
6.44
10.00
64.40
539,415.57
80+860.000
0.00
3.25
10.00
32.50
539,448.07
80+880.000
0.02
0.02
10.00
0.20
539,448.27
80+900.000
0.04
0.06
10.00
0.60
539,448.87
80+920.000
2.04
2.08
10.00
20.80
539,469.67
80+940.000
4.95
6.99
10.00
69.90
539,539.57
80+960.000
0.00
4.95
10.00
49.50
539,589.07
80+980.000
0.00
0.00
10.00
0.00
539,589.07
81+000.000
1.20
1.20
10.00
12.00
539,601.07
81+020.000
0.00
1.20
10.00
12.00
539,613.07
81+040.000
0.00
0.00
10.00
0.00
539,613.07
81+060.000
0.00
0.00
10.00
0.00
539,613.07
81+080.000
0.00
0.00
10.00
0.00
539,613.07
81+100.000
0.00
0.00
10.00
0.00
539,613.07
81+120.000
0.00
0.00
10.00
0.00
539,613.07
81+140.000
81+160.000
81+180.000
81+200.000
81+220.000
81+240.000
81+260.000
81+280.000
81+300.000
81+320.000
81+340.000
81+360.000
81+380.000
81+400.000
81+420.000
81+440.000
81+460.000
81+480.000
81+500.000
81+520.000
81+540.000
81+560.000
81+580.000
81+600.000
81+620.000
81+640.000
81+660.000
81+680.000
81+700.000
81+720.000
2.35
10.58
16.23
7.36
9.96
26.95
52.16
76.91
78.03
71.94
58.57
35.37
49.09
36.75
17.31
0.55
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.35
12.93
26.81
23.59
17.32
36.91
79.11
129.07
154.94
149.97
130.51
93.94
84.46
85.84
54.06
17.86
0.55
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
23.50
129.30
268.10
235.90
173.20
369.10
791.10
1290.70
1549.40
1499.70
1305.10
939.40
844.60
858.40
540.60
178.60
5.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
539,636.57
539,765.87
540,033.97
540,269.87
540,443.07
540,812.17
541,603.27
542,893.97
544,443.37
545,943.07
547,248.17
548,187.57
549,032.17
549,890.57
550,431.17
550,609.77
550,615.27
550,615.27
550,615.27
550,615.27
550,615.27
550,615.27
550,615.27
550,615.27
550,615.27
550,615.27
550,615.27
550,615.27
550,615.27
550,615.27
REVISO:
REALIZO:
Pgina 34 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS DIVERSOS Y
SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS - CABO SAN LUCAS
GENERADOR DE FINIQUITO
CONCEPTO No. 04
"TERRACERAS"
UNIDAD
M3
ESTACIN KM.
REA
L1+L2
D/2
81+740.000
81+760.000
81+780.000
81+800.000
81+820.000
81+840.000
81+860.000
81+880.000
81+900.000
81+920.000
81+940.000
81+960.000
81+980.000
82+000.000
82+020.000
82+040.000
82+060.000
82+080.000
82+100.000
82+120.000
82+140.000
82+160.000
82+180.000
82+200.000
82+220.000
82+240.000
82+260.000
82+280.000
82+300.000
82+320.000
82+340.000
82+360.000
82+380.000
82+400.000
82+420.000
82+440.000
82+460.000
82+480.000
82+500.000
82+520.000
82+540.000
82+560.000
82+580.000
82+600.000
82+620.000
82+640.000
82+660.000
82+680.000
82+700.000
82+720.000
82+740.000
82+760.000
82+780.000
82+800.000
82+820.000
82+840.000
82+860.000
82+880.000
82+900.000
82+920.000
82+940.000
82+960.000
82+980.000
83+000.000
83+020.000
83+040.000
83+060.000
83+080.000
83+100.000
83+120.000
83+140.000
83+160.000
83+170.200
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5.81
8.06
0.00
0.00
0.00
7.16
24.62
44.31
54.17
58.21
55.53
49.95
39.99
32.26
27.38
28.47
30.83
36.25
40.34
39.26
39.00
46.80
36.26
39.26
37.86
41.71
28.51
18.15
10.59
9.19
4.37
0.02
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5.81
13.87
8.06
0.00
0.00
7.16
31.78
68.93
98.48
112.38
113.74
105.48
89.94
72.25
59.64
55.85
59.30
67.08
76.59
79.60
78.26
85.80
83.06
75.52
77.12
79.57
70.22
46.66
28.74
19.78
13.56
4.39
0.02
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
0.00
REVISO:
REA ACUMULADA
PARCIAL
ACUMULADO
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
58.10
138.70
80.60
0.00
0.00
71.60
317.80
689.30
984.80
1123.80
1137.40
1054.80
899.40
722.50
596.40
558.50
593.00
670.80
765.90
796.00
782.60
858.00
830.60
755.20
771.20
795.70
702.20
466.60
287.40
197.80
135.60
43.90
0.20
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
550,615.27
550,615.27
550,615.27
550,615.27
550,615.27
550,615.27
550,615.27
550,615.27
550,615.27
550,615.27
550,615.27
550,615.27
550,615.27
550,673.37
550,812.07
550,892.67
550,892.67
550,892.67
550,964.27
551,282.07
551,971.37
552,956.17
554,079.97
555,217.37
556,272.17
557,171.57
557,894.07
558,490.47
559,048.97
559,641.97
560,312.77
561,078.67
561,874.67
562,657.27
563,515.27
564,345.87
565,101.07
565,872.27
566,667.97
567,370.17
567,836.77
568,124.17
568,321.97
568,457.57
568,501.47
568,501.67
568,501.67
568,501.67
568,501.67
568,501.67
568,501.67
568,501.67
568,501.67
568,501.67
568,501.67
568,501.67
568,501.67
568,501.67
568,501.67
568,501.67
568,501.67
568,501.67
568,501.67
568,501.67
568,501.67
568,501.67
568,501.67
568,501.67
568,501.67
568,501.67
568,501.67
568,501.67
568,501.67
REALIZO:
Pgina 35 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS DIVERSOS Y
SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS - CABO SAN LUCAS
GENERADOR DE FINIQUITO
CONCEPTO No. 04
"TERRACERAS"
UNIDAD
M3
ESTACIN KM.
REA
L1+L2
D/2
83+180.000
83+200.000
83+220.000
83+240.000
83+260.000
83+280.000
83+300.000
83+320.000
83+340.000
83+360.000
83+380.000
83+400.000
83+420.000
83+440.000
83+460.000
83+480.000
83+500.000
83+520.000
83+540.000
83+560.000
83+570.105
83+580.000
83+593.182
83+600.000
83+616.259
83+620.000
83+640.000
83+653.182
83+660.000
83+680.000
83+700.000
83+720.000
83+740.000
83+760.000
83+780.000
83+785.000
0.00
4.85
14.01
38.13
45.49
40.75
21.42
11.88
9.41
4.84
5.33
7.39
11.39
22.03
31.59
34.03
37.09
32.70
35.56
41.85
44.64
47.86
51.24
52.70
52.98
53.20
53.20
48.68
51.58
47.31
47.31
47.31
43.34
41.00
39.67
34.74
0.00
4.85
18.86
52.14
83.62
86.24
62.17
33.30
21.29
14.25
10.17
12.72
18.78
33.42
53.62
65.62
71.12
69.79
68.26
77.41
86.49
92.50
99.10
103.94
105.68
106.18
106.40
101.88
100.26
98.89
94.62
94.62
90.65
84.34
80.67
74.41
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
5.05
4.95
6.59
3.41
8.13
1.87
10.00
6.59
3.41
10.00
10.00
10.00
10.00
10.00
10.00
2.50
REA ACUMULADA
PARCIAL
ACUMULADO
0.00
48.50
188.60
521.40
836.20
862.40
621.70
333.00
212.90
142.50
101.70
127.20
187.80
334.20
536.20
656.20
711.20
697.90
682.60
774.10
436.98
457.66
653.15
354.35
859.10
198.63
1064.00
671.47
341.80
988.90
946.20
946.20
906.50
843.40
806.70
186.03
568,501.67
568,550.17
568,738.77
569,260.17
570,096.37
570,958.77
571,580.47
571,913.47
572,126.37
572,268.87
572,370.57
572,497.77
572,685.57
573,019.77
573,555.97
574,212.17
574,923.37
575,621.27
576,303.87
577,077.97
577,514.95
577,972.61
578,625.76
578,980.11
579,839.21
580,037.84
581,101.84
581,773.32
582,115.12
583,104.02
584,050.22
584,996.42
585,902.92
586,746.32
587,553.02
587,739.04
587,739.04
158,327.00
429,412.04
REVISO:
REALIZO:
Pgina 36 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS EN EL ESTADO DE BAJA CALIFORNIA SUR"
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 06
"TERRACERAS"
UNIDAD
Compactacin:
a) Del terreno natural en el area de desplante de los terraplenes
M3
REA ACUMULADA
ESTACIN KM.
REA
L1+L2
D/2
71+800.000
5.46
0.00
0.00
0.00
0.00
71+820.000
5.46
10.92
10.00
109.20
109.20
71+840.000
6.32
11.78
10.00
117.80
227.00
71+860.000
5.44
11.76
10.00
117.60
344.60
71+880.000
5.35
10.79
10.00
107.90
452.50
71+900.000
5.36
10.71
10.00
107.10
559.60
71+920.000
5.31
10.67
10.00
106.70
666.30
71+940.000
5.47
10.78
10.00
107.80
774.10
71+960.000
5.56
11.03
10.00
110.30
884.40
71+980.000
5.40
10.96
10.00
109.60
994.00
72+000.000
5.41
10.81
10.00
108.10
1,102.10
72+020.000
5.33
10.74
10.00
107.40
1,209.50
72+040.000
5.23
10.56
10.00
105.60
1,315.10
72+060.000
5.24
10.47
10.00
104.70
1,419.80
72+080.000
5.26
10.50
10.00
105.00
1,524.80
72+100.000
5.14
10.40
10.00
104.00
1,628.80
72+120.000
5.05
10.19
10.00
101.90
1,730.70
72+140.000
5.29
10.34
10.00
103.40
1,834.10
72+160.000
5.36
10.65
10.00
106.50
1,940.60
72+180.000
5.34
10.70
10.00
107.00
2,047.60
72+200.000
5.37
10.71
10.00
107.10
2,154.70
72+220.000
3.40
8.77
10.00
87.70
2,242.40
72+240.000
3.60
7.00
10.00
70.00
2,312.40
72+260.000
5.42
9.02
10.00
90.20
2,402.60
72+280.000
5.45
10.87
10.00
108.70
2,511.30
72+300.000
5.55
11.00
10.00
110.00
2,621.30
72+320.000
5.47
11.02
10.00
110.20
2,731.50
72+340.000
5.52
10.99
10.00
109.90
2,841.40
72+360.000
5.49
11.01
10.00
110.10
2,951.50
72+380.000
5.66
11.15
10.00
111.50
3,063.00
72+400.000
5.72
11.38
10.00
113.80
3,176.80
72+420.000
5.65
11.37
10.00
113.70
3,290.50
72+440.000
5.60
11.25
10.00
112.50
3,403.00
72+460.000
5.40
11.00
10.00
110.00
3,513.00
72+480.000
5.36
10.76
10.00
107.60
3,620.60
72+500.000
5.45
10.81
10.00
108.10
3,728.70
72+520.000
5.59
11.04
10.00
110.40
3,839.10
72+540.000
7.78
13.37
10.00
133.70
3,972.80
72+560.000
5.58
13.36
10.00
133.60
4,106.40
72+580.000
5.56
11.14
10.00
111.40
4,217.80
72+600.000
5.64
11.20
10.00
112.00
4,329.80
72+620.000
5.64
11.28
10.00
112.80
4,442.60
72+640.000
5.56
11.20
10.00
112.00
4,554.60
72+654.982
5.52
11.08
7.49
83.00
4,637.60
72+660.000
5.53
11.05
2.51
27.73
4,665.32
72+678.443
5.52
11.05
9.22
101.90
4,767.22
72+680.000
5.45
10.97
0.78
8.54
4,775.76
72+700.000
5.56
11.01
10.00
110.10
4,885.86
72+701.905
5.54
11.10
0.95
10.57
4,896.43
72+720.000
5.45
10.99
9.05
99.43
4,995.87
72+739.443
5.43
10.88
9.72
105.77
5,101.64
72+740.000
5.39
10.82
0.28
3.01
5,104.65
REVISO:
PARCIAL
ACUMULADO
REALIZO:
Pgina 37 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS EN EL ESTADO DE BAJA CALIFORNIA SUR"
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 06
"TERRACERAS"
UNIDAD
Compactacin:
a) Del terreno natural en el area de desplante de los terraplenes
M3
ESTACIN KM.
REA
L1+L2
D/2
72+760.000
2.27
7.66
72+780.000
2.18
72+800.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
76.60
5,181.25
4.45
10.00
44.50
5,225.75
2.12
4.30
10.00
43.00
5,268.75
72+820.000
1.35
3.47
10.00
34.70
5,303.45
72+840.000
5.13
6.48
10.00
64.80
5,368.25
72+860.000
5.29
10.42
10.00
104.20
5,472.45
72+880.000
5.29
10.58
10.00
105.80
5,578.25
72+900.000
5.19
10.48
10.00
104.80
5,683.05
72+920.000
6.11
11.30
10.00
113.00
5,796.05
72+940.000
0.00
6.11
10.00
61.10
5,857.15
72+960.000
0.00
0.00
10.00
0.00
5,857.15
72+971.651
0.00
0.00
5.83
0.00
5,857.15
72+980.000
0.00
0.00
4.17
0.00
5,857.15
73+000.000
0.00
0.00
10.00
0.00
5,857.15
73+009.189
0.00
0.00
4.59
0.00
5,857.15
73+020.000
0.00
0.00
5.41
0.00
5,857.15
73+032.651
0.00
0.00
6.33
0.00
5,857.15
73+040.000
0.00
0.00
3.67
0.00
5,857.15
73+056.112
0.00
0.00
8.06
0.00
5,857.15
73+060.000
0.00
0.00
1.94
0.00
5,857.15
73+080.000
0.00
0.00
10.00
0.00
5,857.15
73+100.000
0.00
0.00
10.00
0.00
5,857.15
73+120.000
0.00
0.00
10.00
0.00
5,857.15
73+140.000
0.00
0.00
10.00
0.00
5,857.15
73+160.000
0.00
0.00
10.00
0.00
5,857.15
73+180.000
0.00
0.00
10.00
0.00
5,857.15
73+200.000
0.00
0.00
10.00
0.00
5,857.15
73+220.000
0.00
0.00
10.00
0.00
5,857.15
73+240.000
0.00
0.00
10.00
0.00
5,857.15
73+260.000
6.86
6.86
10.00
68.60
5,925.75
73+280.000
6.98
13.84
10.00
138.40
6,064.15
73+300.000
7.16
14.14
10.00
141.40
6,205.55
73+320.000
7.22
14.38
10.00
143.80
6,349.35
73+340.000
7.21
14.43
10.00
144.30
6,493.65
73+360.000
7.39
14.60
10.00
146.00
6,639.65
73+380.000
7.28
14.67
10.00
146.70
6,786.35
73+400.000
7.13
14.41
10.00
144.10
6,930.45
73+420.000
7.25
14.38
10.00
143.80
7,074.25
73+440.000
7.25
14.50
10.00
145.00
7,219.25
73+460.000
7.07
14.32
10.00
143.20
7,362.45
73+480.000
6.92
13.99
10.00
139.90
7,502.35
73+500.000
6.94
13.86
10.00
138.60
7,640.95
73+520.000
6.96
13.90
10.00
139.00
7,779.95
73+540.000
7.01
13.97
10.00
139.70
7,919.65
73+560.000
7.06
14.07
10.00
140.70
8,060.35
73+580.000
7.02
14.08
10.00
140.80
8,201.15
73+600.000
0.21
7.23
10.00
72.30
8,273.45
73+620.000
7.10
7.31
10.00
73.10
8,346.55
73+640.000
7.10
14.20
10.00
142.00
8,488.55
73+660.000
7.08
14.18
10.00
141.80
8,630.35
73+680.000
7.12
14.20
10.00
142.00
8,772.35
73+700.000
6.79
13.91
10.00
139.10
8,911.45
73+720.000
6.99
13.78
10.00
137.80
9,049.25
73+740.000
7.17
14.16
10.00
141.60
9,190.85
REVISO:
REALIZO:
Pgina 38 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS EN EL ESTADO DE BAJA CALIFORNIA SUR"
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 06
"TERRACERAS"
UNIDAD
Compactacin:
a) Del terreno natural en el area de desplante de los terraplenes
M3
ESTACIN KM.
REA
L1+L2
D/2
73+760.000
7.11
14.28
73+780.000
6.98
73+800.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
142.80
9,333.65
14.09
10.00
140.90
9,474.55
6.99
13.97
10.00
139.70
9,614.25
73+807.617
6.94
13.93
3.81
53.05
9,667.30
73+820.000
6.93
13.87
6.19
85.88
9,753.18
73+840.000
0.00
6.93
10.00
69.30
9,822.48
73+848.283
0.00
0.00
4.14
0.00
9,822.48
73+860.000
0.00
0.00
5.86
0.00
9,822.48
73+880.000
0.00
0.00
10.00
0.00
9,822.48
73+888.950
0.00
0.00
4.47
0.00
9,822.48
73+900.000
0.00
0.00
5.53
0.00
9,822.48
73+909.283
0.00
0.00
4.64
0.00
9,822.48
73+920.000
0.00
0.00
5.36
0.00
9,822.48
73+940.000
0.00
0.00
10.00
0.00
9,822.48
73+960.000
6.89
6.89
10.00
68.90
9,891.38
73+980.000
7.26
14.15
10.00
141.50
10,032.88
74+000.000
7.81
15.07
10.00
150.70
10,183.58
74+020.000
8.17
15.98
10.00
159.80
10,343.38
74+040.000
8.47
16.64
10.00
166.40
10,509.78
74+060.000
8.34
16.81
10.00
168.10
10,677.88
74+080.000
7.71
16.05
10.00
160.50
10,838.38
74+089.272
7.05
14.76
4.64
68.43
10,906.81
74+100.000
6.59
13.64
5.36
73.16
10,979.97
74+109.605
6.41
13.00
4.80
62.44
11,042.41
74+120.000
6.24
12.65
5.20
65.75
11,108.15
74+140.000
6.18
12.42
10.00
124.20
11,232.35
74+150.272
6.53
12.71
5.14
65.28
11,297.63
74+160.000
6.71
13.24
4.86
64.40
11,362.03
74+180.000
6.58
13.29
10.00
132.90
11,494.93
74+190.939
6.64
13.22
5.47
72.31
11,567.24
74+200.000
6.78
13.42
4.53
60.80
11,628.04
74+220.000
7.23
14.01
10.00
140.10
11,768.14
74+240.000
7.09
14.32
10.00
143.20
11,911.34
74+260.000
6.98
14.07
10.00
140.70
12,052.04
74+280.000
6.85
13.83
10.00
138.30
12,190.34
74+300.000
6.76
13.61
10.00
136.10
12,326.44
74+320.000
6.69
13.45
10.00
134.50
12,460.94
74+340.000
6.74
13.43
10.00
134.30
12,595.24
74+360.000
6.55
13.29
10.00
132.90
12,728.14
74+380.000
6.41
12.96
10.00
129.60
12,857.74
74+400.000
6.12
12.53
10.00
125.30
12,983.04
74+420.000
6.04
12.16
10.00
121.60
13,104.64
74+440.000
6.26
12.30
10.00
123.00
13,227.64
74+457.851
6.72
12.98
8.93
115.85
13,343.49
74+460.000
6.69
13.41
1.07
14.41
13,357.90
74+480.000
6.77
13.46
10.00
134.60
13,492.50
74+498.518
7.12
13.89
9.26
128.60
13,621.10
74+500.000
7.14
14.26
0.74
10.57
13,631.67
74+520.000
7.46
14.60
10.00
146.00
13,777.67
74+539.184
7.87
15.33
9.59
147.05
13,924.72
74+540.000
7.92
15.79
0.41
6.44
13,931.16
74+559.518
8.36
16.28
9.76
158.87
14,090.03
74+560.000
8.40
16.76
0.24
4.04
14,094.08
74+580.000
8.62
17.02
10.00
170.20
14,264.28
REVISO:
REALIZO:
Pgina 39 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS EN EL ESTADO DE BAJA CALIFORNIA SUR"
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 06
"TERRACERAS"
UNIDAD
Compactacin:
a) Del terreno natural en el area de desplante de los terraplenes
M3
ESTACIN KM.
REA
L1+L2
D/2
74+600.000
8.87
17.49
74+620.000
8.83
74+640.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
174.90
14,439.18
17.70
10.00
177.00
14,616.18
8.58
17.41
10.00
174.10
14,790.28
74+660.000
7.94
16.52
10.00
165.20
14,955.48
74+680.000
7.68
15.62
10.00
156.20
15,111.68
74+700.000
7.44
15.12
10.00
151.20
15,262.88
74+720.000
7.88
15.32
10.00
153.20
15,416.08
74+740.000
8.41
16.29
10.00
162.90
15,578.98
74+760.000
7.79
16.20
10.00
162.00
15,740.98
74+779.360
4.11
11.90
9.68
115.19
15,856.17
74+780.000
7.01
11.12
0.32
3.56
15,859.73
74+799.693
4.11
11.12
9.85
109.49
15,969.22
74+800.000
3.97
8.08
0.15
1.24
15,970.46
74+820.000
0.85
4.82
10.00
48.20
16,018.66
74+840.000
0.00
0.85
10.00
8.50
16,027.16
74+840.360
0.00
0.00
0.18
0.00
16,027.16
74+860.000
0.56
0.56
9.82
5.50
16,032.66
74+880.000
2.46
3.02
10.00
30.20
16,062.86
74+881.027
2.59
5.05
0.51
2.59
16,065.45
74+900.000
6.07
8.66
9.49
82.15
16,147.61
74+920.000
8.85
14.92
10.00
149.20
16,296.81
74+940.000
8.22
17.07
10.00
170.70
16,467.51
74+960.000
5.73
13.95
10.00
139.50
16,607.01
74+980.000
0.00
5.73
10.00
57.30
16,664.31
75+000.000
0.00
0.00
10.00
0.00
16,664.31
75+020.000
0.00
0.00
10.00
0.00
16,664.31
75+040.000
0.00
0.00
10.00
0.00
16,664.31
75+060.000
0.00
0.00
10.00
0.00
16,664.31
75+080.000
0.00
0.00
10.00
0.00
16,664.31
75+100.000
0.00
0.00
10.00
0.00
16,664.31
75+120.000
0.00
0.00
10.00
0.00
16,664.31
75+140.000
0.00
0.00
10.00
0.00
16,664.31
75+160.000
0.00
0.00
10.00
0.00
16,664.31
75+180.000
0.00
0.00
10.00
0.00
16,664.31
75+200.000
0.00
0.00
10.00
0.00
16,664.31
75+220.000
0.00
0.00
10.00
0.00
16,664.31
75+240.000
0.00
0.00
10.00
0.00
16,664.31
75+260.000
0.00
0.00
10.00
0.00
16,664.31
75+280.000
0.00
0.00
10.00
0.00
16,664.31
75+300.000
0.00
0.00
10.00
0.00
16,664.31
75+320.000
0.00
0.00
10.00
0.00
16,664.31
75+340.000
0.00
0.00
10.00
0.00
16,664.31
75+360.000
0.00
0.00
10.00
0.00
16,664.31
75+380.000
0.00
0.00
10.00
0.00
16,664.31
75+400.000
0.00
0.00
10.00
0.00
16,664.31
75+420.000
0.00
0.00
10.00
0.00
16,664.31
75+440.000
0.00
0.00
10.00
0.00
16,664.31
75+460.000
0.00
0.00
10.00
0.00
16,664.31
75+480.000
0.00
0.00
10.00
0.00
16,664.31
75+500.000
0.00
0.00
10.00
0.00
16,664.31
75+520.000
0.00
0.00
10.00
0.00
16,664.31
75+540.000
0.00
0.00
10.00
0.00
16,664.31
75+560.000
0.00
0.00
10.00
0.00
16,664.31
75+580.000
0.00
0.00
10.00
0.00
16,664.31
REVISO:
REALIZO:
Pgina 40 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS EN EL ESTADO DE BAJA CALIFORNIA SUR"
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 06
"TERRACERAS"
UNIDAD
Compactacin:
a) Del terreno natural en el area de desplante de los terraplenes
M3
ESTACIN KM.
REA
L1+L2
D/2
75+600.000
0.00
0.00
75+611.738
0.00
75+620.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
0.00
16,664.31
0.00
5.87
0.00
16,664.31
0.00
0.00
4.13
0.00
16,664.31
75+635.122
0.00
0.00
7.56
0.00
16,664.31
75+640.000
0.00
0.00
2.44
0.00
16,664.31
75+658.507
0.00
0.00
9.25
0.00
16,664.31
75+660.000
0.00
0.00
0.75
0.00
16,664.31
75+680.000
1.09
1.09
10.00
10.90
16,675.21
75+700.000
6.12
7.21
10.00
72.10
16,747.31
75+711.122
7.01
13.13
5.56
73.02
16,820.33
75+720.000
7.71
14.72
4.44
65.34
16,885.66
75+740.000
9.35
17.06
10.00
170.60
17,056.26
75+760.000
9.44
18.79
10.00
187.90
17,244.16
75+780.000
10.45
19.89
10.00
198.90
17,443.06
75+800.000
10.37
20.82
10.00
208.20
17,651.26
75+820.000
10.35
20.72
10.00
207.20
17,858.46
75+840.000
10.54
20.89
10.00
208.90
18,067.36
75+860.000
11.02
21.56
10.00
215.60
18,282.96
75+880.000
11.74
22.76
10.00
227.60
18,510.56
75+900.000
11.36
23.10
10.00
231.00
18,741.56
75+920.000
11.92
23.28
10.00
232.80
18,974.36
75+940.000
11.17
23.09
10.00
230.90
19,205.26
75+960.000
10.65
21.82
10.00
218.20
19,423.46
75+980.000
10.17
20.82
10.00
208.20
19,631.66
76+000.000
9.56
19.73
10.00
197.30
19,828.96
76+020.000
9.17
18.73
10.00
187.30
20,016.26
76+040.000
9.01
18.18
10.00
181.80
20,198.06
76+060.000
8.69
17.70
10.00
177.00
20,375.06
76+080.000
8.64
17.33
10.00
173.30
20,548.36
76+100.000
8.59
17.23
10.00
172.30
20,720.66
76+120.000
8.39
16.98
10.00
169.80
20,890.46
76+140.000
8.23
16.62
10.00
166.20
21,056.66
76+160.000
7.87
16.10
10.00
161.00
21,217.66
76+180.000
7.63
15.50
10.00
155.00
21,372.66
76+200.000
7.22
14.85
10.00
148.50
21,521.16
76+220.000
6.80
14.02
10.00
140.20
21,661.36
76+240.000
6.18
12.98
10.00
129.80
21,791.16
76+255.500
5.75
11.93
7.75
92.46
21,883.62
76+260.000
5.68
11.43
2.25
25.72
21,909.34
76+280.000
4.42
10.10
10.00
101.00
22,010.34
76+300.000
3.92
8.34
10.00
83.40
22,093.74
76+320.000
3.83
7.75
10.00
77.50
22,171.24
76+321.961
3.86
7.69
0.98
7.54
22,178.78
76+340.000
4.61
8.47
9.02
76.39
22,255.17
76+351.500
5.12
9.73
5.75
55.95
22,311.12
76+360.000
5.57
10.69
4.25
45.43
22,356.55
76+380.000
5.58
11.15
10.00
111.50
22,468.05
76+381.038
5.56
11.14
0.52
5.78
22,473.84
76+400.000
5.21
10.77
9.48
102.11
22,575.95
76+420.000
4.95
10.16
10.00
101.60
22,677.55
76+440.000
4.37
9.32
10.00
93.20
22,770.75
76+460.000
4.29
8.66
10.00
86.60
22,857.35
76+480.000
3.76
8.05
10.00
80.50
22,937.85
76+500.000
3.51
7.27
10.00
72.70
23,010.55
REVISO:
REALIZO:
Pgina 41 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS EN EL ESTADO DE BAJA CALIFORNIA SUR"
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 06
"TERRACERAS"
UNIDAD
Compactacin:
a) Del terreno natural en el area de desplante de los terraplenes
M3
ESTACIN KM.
REA
L1+L2
D/2
76+520.000
4.00
7.51
76+540.000
5.23
76+560.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
75.10
23,085.65
9.23
10.00
92.30
23,177.95
5.59
10.82
10.00
108.20
23,286.15
76+580.000
5.36
10.95
10.00
109.50
23,395.65
76+600.000
4.78
10.14
10.00
101.40
23,497.05
76+620.000
4.66
9.44
10.00
94.40
23,591.45
76+640.000
4.59
9.25
10.00
92.50
23,683.95
76+660.000
4.87
9.46
10.00
94.60
23,778.55
76+680.000
5.12
9.99
10.00
99.90
23,878.45
76+700.000
5.94
11.06
10.00
110.60
23,989.05
76+720.000
6.05
11.99
10.00
119.90
24,108.95
76+740.000
5.87
11.92
10.00
119.20
24,228.15
76+760.000
5.97
11.84
10.00
118.40
24,346.55
76+780.000
5.95
11.92
10.00
119.20
24,465.75
76+800.000
5.86
11.81
10.00
118.10
24,583.85
76+820.000
5.81
11.67
10.00
116.70
24,700.55
76+840.000
5.86
11.67
10.00
116.70
24,817.25
76+860.000
5.93
11.79
10.00
117.90
24,935.15
76+880.000
5.98
11.91
10.00
119.10
25,054.25
76+900.000
6.03
12.01
10.00
120.10
25,174.35
76+920.000
6.14
12.17
10.00
121.70
25,296.05
76+940.000
5.90
12.04
10.00
120.40
25,416.45
76+960.000
5.00
10.90
10.00
109.00
25,525.45
76+980.000
5.00
10.00
10.00
100.00
25,625.45
76+985.245
4.97
9.97
2.62
26.15
25,651.59
76+993.182
4.99
9.96
3.97
39.52
25,691.12
77+000.000
5.04
10.03
3.41
34.19
25,725.31
77+001.118
5.04
10.08
0.56
5.64
25,730.95
77+018.182
5.22
10.26
8.53
87.54
25,818.48
77+020.000
5.25
10.47
0.91
9.52
25,828.00
77+040.000
5.26
10.51
10.00
105.10
25,933.10
77+060.000
5.89
11.15
10.00
111.50
26,044.60
77+080.000
6.92
12.81
10.00
128.10
26,172.70
77+100.000
7.05
13.97
10.00
139.70
26,312.40
77+120.000
6.77
13.82
10.00
138.20
26,450.60
77+140.000
5.72
12.49
10.00
124.90
26,575.50
77+160.000
5.29
11.01
10.00
110.10
26,685.60
77+180.000
4.47
9.76
10.00
97.60
26,783.20
77+200.000
6.31
10.78
10.00
107.80
26,891.00
77+220.000
6.41
12.72
10.00
127.20
27,018.20
77+240.000
4.53
10.94
10.00
109.40
27,127.60
77+260.000
1.06
5.59
10.00
55.90
27,183.50
77+280.000
0.00
1.06
10.00
10.60
27,194.10
77+300.000
0.00
0.00
10.00
0.00
27,194.10
77+320.000
0.00
0.00
10.00
0.00
27,194.10
77+340.000
0.00
0.00
10.00
0.00
27,194.10
77+360.000
2.71
2.71
10.00
27.10
27,221.20
77+380.000
4.69
7.40
10.00
74.00
27,295.20
77+400.000
5.51
10.20
10.00
102.00
27,397.20
77+420.000
0.52
6.03
10.00
60.30
27,457.50
77+440.000
0.00
0.52
10.00
5.20
27,462.70
77+460.000
0.00
0.00
10.00
0.00
27,462.70
77+480.000
0.00
0.00
10.00
0.00
27,462.70
77+500.000
0.00
0.00
10.00
0.00
27,462.70
REVISO:
REALIZO:
Pgina 42 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS EN EL ESTADO DE BAJA CALIFORNIA SUR"
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 06
"TERRACERAS"
UNIDAD
Compactacin:
a) Del terreno natural en el area de desplante de los terraplenes
M3
ESTACIN KM.
REA
L1+L2
D/2
77+520.000
0.00
0.00
77+525.218
0.00
77+540.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
0.00
27,462.70
0.00
2.61
0.00
27,462.70
0.00
0.00
7.39
0.00
27,462.70
77+540.234
0.00
0.00
0.12
0.00
27,462.70
77+547.218
0.00
0.00
3.49
0.00
27,462.70
77+554.202
0.00
0.00
3.49
0.00
27,462.70
77+560.000
0.00
0.00
2.90
0.00
27,462.70
77+580.000
2.34
2.34
10.00
23.40
27,486.10
77+600.000
4.07
6.41
10.00
64.10
27,550.20
77+620.000
5.73
9.80
10.00
98.00
27,648.20
77+640.000
6.23
11.96
10.00
119.60
27,767.80
77+647.342
6.30
12.53
3.67
45.99
27,813.80
77+660.000
6.28
12.58
6.33
79.62
27,893.42
77+663.215
6.27
12.55
1.61
20.17
27,913.59
77+679.088
6.37
12.64
7.94
100.32
28,013.91
77+680.000
6.38
12.75
0.46
5.82
28,019.72
77+700.000
5.52
11.90
10.00
119.00
28,138.72
77+713.215
0.00
5.52
6.61
36.47
28,175.20
77+720.000
0.22
0.22
3.39
0.75
28,175.94
77+740.000
5.82
6.04
10.00
60.40
28,236.34
77+760.000
5.47
11.29
10.00
112.90
28,349.24
77+780.000
3.31
8.78
10.00
87.80
28,437.04
77+800.000
0.00
3.31
10.00
33.10
28,470.14
77+820.000
0.00
0.00
10.00
0.00
28,470.14
77+840.000
0.00
0.00
10.00
0.00
28,470.14
77+860.000
0.00
0.00
10.00
0.00
28,470.14
77+880.000
0.00
0.00
10.00
0.00
28,470.14
77+900.000
0.00
0.00
10.00
0.00
28,470.14
77+920.000
0.00
0.00
10.00
0.00
28,470.14
77+940.000
0.00
0.00
10.00
0.00
28,470.14
77+960.000
0.00
0.00
10.00
0.00
28,470.14
77+980.000
0.61
0.61
10.00
6.10
28,476.24
78+000.000
0.41
1.02
10.00
10.20
28,486.44
78+020.000
0.32
0.73
10.00
7.30
28,493.74
78+040.000
6.48
6.80
10.00
68.00
28,561.74
78+060.000
5.56
12.04
10.00
120.40
28,682.14
78+080.000
6.54
12.10
10.00
121.00
28,803.14
78+094.334
6.12
12.66
7.17
90.73
28,893.88
78+100.000
5.55
11.67
2.83
33.06
28,926.94
78+116.175
5.79
11.34
8.09
91.71
29,018.65
78+120.000
5.13
10.92
1.91
20.88
29,039.53
78+126.334
5.01
10.14
3.17
32.11
29,071.65
78+136.493
4.95
9.96
5.08
50.59
29,122.24
78+140.000
5.17
10.12
1.75
17.75
29,139.98
78+160.000
4.61
9.78
10.00
97.80
29,237.78
78+180.000
4.51
9.12
10.00
91.20
29,328.98
78+200.000
4.45
8.96
10.00
89.60
29,418.58
78+220.000
4.69
9.14
10.00
91.40
29,509.98
78+240.000
4.54
9.23
10.00
92.30
29,602.28
78+260.000
4.32
8.86
10.00
88.60
29,690.88
78+280.000
0.00
4.32
10.00
43.20
29,734.08
78+300.000
0.00
0.00
10.00
0.00
29,734.08
78+320.000
0.00
0.00
10.00
0.00
29,734.08
78+340.000
0.00
0.00
10.00
0.00
29,734.08
REVISO:
REALIZO:
Pgina 43 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS EN EL ESTADO DE BAJA CALIFORNIA SUR"
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 06
"TERRACERAS"
UNIDAD
Compactacin:
a) Del terreno natural en el area de desplante de los terraplenes
M3
ESTACIN KM.
REA
L1+L2
D/2
78+360.000
0.00
0.00
78+380.000
0.00
78+400.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
0.00
29,734.08
0.00
10.00
0.00
29,734.08
0.00
0.00
10.00
0.00
29,734.08
78+420.000
0.00
0.00
10.00
0.00
29,734.08
78+440.000
0.00
0.00
10.00
0.00
29,734.08
78+460.000
0.00
0.00
10.00
0.00
29,734.08
78+480.000
0.00
0.00
10.00
0.00
29,734.08
78+500.000
0.00
0.00
10.00
0.00
29,734.08
78+520.000
0.00
0.00
10.00
0.00
29,734.08
78+540.000
7.77
7.77
10.00
77.70
29,811.78
78+560.000
7.50
15.27
10.00
152.70
29,964.48
78+580.000
7.20
14.70
10.00
147.00
30,111.48
78+600.000
6.98
14.18
10.00
141.80
30,253.28
78+620.000
6.38
13.36
10.00
133.60
30,386.88
78+640.000
5.95
12.33
10.00
123.30
30,510.18
78+660.000
2.95
8.90
10.00
89.00
30,599.18
78+680.000
2.59
5.54
10.00
55.40
30,654.58
78+700.000
1.21
3.80
10.00
38.00
30,692.58
78+720.000
0.52
1.73
10.00
17.30
30,709.88
78+740.000
0.00
0.52
10.00
5.20
30,715.08
78+760.000
0.00
0.00
10.00
0.00
30,715.08
78+780.000
0.00
0.00
10.00
0.00
30,715.08
78+790.492
0.00
0.00
5.25
0.00
30,715.08
78+796.615
0.00
0.00
3.06
0.00
30,715.08
78+800.000
0.00
0.00
1.69
0.00
30,715.08
78+802.737
0.00
0.00
1.37
0.00
30,715.08
78+811.615
0.70
0.70
4.44
3.11
30,718.19
78+820.000
1.78
2.48
4.19
10.40
30,728.59
78+840.000
1.46
3.24
10.00
32.40
30,760.99
78+860.000
0.96
2.42
10.00
24.20
30,785.19
78+880.000
0.00
0.96
10.00
9.60
30,794.79
78+900.000
0.00
0.00
10.00
0.00
30,794.79
78+920.000
0.00
0.00
10.00
0.00
30,794.79
78+940.000
0.00
0.00
10.00
0.00
30,794.79
78+960.000
0.00
0.00
10.00
0.00
30,794.79
78+980.000
0.00
0.00
10.00
0.00
30,794.79
79+000.000
0.49
0.49
10.00
4.90
30,799.69
79+020.000
1.09
1.58
10.00
15.80
30,815.49
79+040.000
5.16
6.25
10.00
62.50
30,877.99
79+060.000
5.37
10.53
10.00
105.30
30,983.29
79+080.000
5.52
10.89
10.00
108.90
31,092.19
79+097.907
5.68
11.20
8.95
100.28
31,192.47
79+100.000
5.67
11.35
1.05
11.88
31,204.35
79+120.000
5.83
11.50
10.00
115.00
31,319.35
79+133.417
5.92
11.75
6.71
78.83
31,398.17
79+140.000
5.95
11.87
3.29
39.07
31,437.24
79+157.907
5.94
11.89
8.95
106.46
31,543.70
79+160.000
5.93
11.87
1.05
12.42
31,556.12
79+180.000
5.77
11.70
10.00
117.00
31,673.12
79+182.397
5.75
11.52
1.20
13.81
31,686.93
79+200.000
5.55
11.30
8.80
99.46
31,786.38
79+220.000
5.29
10.84
10.00
108.40
31,894.78
79+240.000
3.22
8.51
10.00
85.10
31,979.88
79+260.000
1.90
5.12
10.00
51.20
32,031.08
79+280.000
1.94
3.84
10.00
38.40
32,069.48
79+300.000
1.94
3.88
10.00
38.80
32,108.28
79+320.000
1.53
3.47
10.00
34.70
32,142.98
REVISO:
REALIZO:
Pgina 44 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS EN EL ESTADO DE BAJA CALIFORNIA SUR"
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 06
"TERRACERAS"
UNIDAD
Compactacin:
a) Del terreno natural en el area de desplante de los terraplenes
M3
ESTACIN KM.
REA
L1+L2
D/2
79+340.000
0.15
1.68
79+360.000
0.83
79+380.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
16.80
32,159.78
0.98
10.00
9.80
32,169.58
0.00
0.83
10.00
8.30
32,177.88
79+400.000
0.00
0.00
10.00
0.00
32,177.88
79+420.000
0.00
0.00
10.00
0.00
32,177.88
79+440.000
0.00
0.00
10.00
0.00
32,177.88
79+460.000
0.00
0.00
10.00
0.00
32,177.88
79+480.000
0.00
0.00
10.00
0.00
32,177.88
79+500.000
1.09
1.09
10.00
10.90
32,188.78
79+520.000
1.33
2.42
10.00
24.20
32,212.98
79+540.000
1.33
2.66
10.00
26.60
32,239.58
79+560.000
1.32
2.65
10.00
26.50
32,266.08
79+580.000
1.39
2.71
10.00
27.10
32,293.18
79+600.000
1.36
2.75
10.00
27.50
32,320.68
79+620.000
0.90
2.26
10.00
22.60
32,343.28
79+640.000
0.73
1.63
10.00
16.30
32,359.58
79+660.000
0.00
0.73
10.00
7.30
32,366.88
79+680.000
0.00
0.00
10.00
0.00
32,366.88
79+700.000
0.00
0.00
10.00
0.00
32,366.88
79+720.000
0.00
0.00
10.00
0.00
32,366.88
79+740.000
0.00
0.00
10.00
0.00
32,366.88
79+760.000
0.00
0.00
10.00
0.00
32,366.88
79+780.000
0.00
0.00
10.00
0.00
32,366.88
79+800.000
0.00
0.00
10.00
0.00
32,366.88
79+820.000
0.00
0.00
10.00
0.00
32,366.88
79+840.000
0.00
0.00
10.00
0.00
32,366.88
79+860.000
0.00
0.00
10.00
0.00
32,366.88
79+880.000
0.00
0.00
10.00
0.00
32,366.88
79+900.000
0.00
0.00
10.00
0.00
32,366.88
79+920.000
0.44
0.44
10.00
4.40
32,371.28
79+940.000
1.22
1.66
10.00
16.60
32,387.88
79+960.000
4.52
5.74
10.00
57.40
32,445.28
79+980.000
5.20
9.72
10.00
97.20
32,542.48
80+000.000
5.33
10.53
10.00
105.30
32,647.78
80+020.000
5.45
10.78
10.00
107.80
32,755.58
80+040.000
5.41
10.86
10.00
108.60
32,864.18
80+060.000
5.29
10.70
10.00
107.00
32,971.18
80+080.000
5.09
10.38
10.00
103.80
33,074.98
80+100.000
4.59
9.68
10.00
96.80
33,171.78
80+120.000
1.01
5.60
10.00
56.00
33,227.78
80+140.000
0.23
1.24
10.00
12.40
33,240.18
80+160.000
0.00
0.23
10.00
2.30
33,242.48
80+180.000
0.00
0.00
10.00
0.00
33,242.48
80+200.000
0.00
0.00
10.00
0.00
33,242.48
80+220.000
0.35
0.35
10.00
3.50
33,245.98
80+240.000
5.29
5.64
10.00
56.40
33,302.38
80+260.000
6.17
11.46
10.00
114.60
33,416.98
80+280.000
6.81
12.98
10.00
129.80
33,546.78
80+300.000
6.55
13.36
10.00
133.60
33,680.38
80+320.000
7.12
13.67
10.00
136.70
33,817.08
80+340.000
6.94
14.06
10.00
140.60
33,957.68
80+360.000
7.14
14.08
10.00
140.80
34,098.48
80+380.000
6.93
14.07
10.00
140.70
34,239.18
80+400.000
6.93
13.86
10.00
138.60
34,377.78
80+420.000
7.22
14.15
10.00
141.50
34,519.28
80+440.000
0.00
7.22
10.00
72.20
34,591.48
80+460.000
0.00
0.00
10.00
0.00
34,591.48
REVISO:
REALIZO:
Pgina 45 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS EN EL ESTADO DE BAJA CALIFORNIA SUR"
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 06
"TERRACERAS"
UNIDAD
Compactacin:
a) Del terreno natural en el area de desplante de los terraplenes
M3
ESTACIN KM.
REA
L1+L2
D/2
80+480.000
0.00
0.00
80+500.000
0.00
80+520.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
0.00
34,591.48
0.00
10.00
0.00
34,591.48
0.00
0.00
10.00
0.00
34,591.48
80+540.000
0.00
0.00
10.00
0.00
34,591.48
80+560.000
0.00
0.00
10.00
0.00
34,591.48
80+580.000
0.00
0.00
10.00
0.00
34,591.48
80+600.000
6.81
6.81
10.00
68.10
34,659.58
80+620.000
6.67
13.48
10.00
134.80
34,794.38
80+640.000
6.33
13.00
10.00
130.00
34,924.38
80+660.000
4.50
10.83
10.00
108.30
35,032.68
80+680.000
4.08
8.58
10.00
85.80
35,118.48
80+700.000
3.07
7.15
10.00
71.50
35,189.98
80+720.000
3.08
6.15
10.00
61.50
35,251.48
80+740.000
3.16
6.24
10.00
62.40
35,313.88
80+760.000
3.53
6.69
10.00
66.90
35,380.78
80+780.000
4.80
8.33
10.00
83.30
35,464.08
80+800.000
5.09
9.89
10.00
98.90
35,562.98
80+820.000
3.90
8.99
10.00
89.90
35,652.88
80+840.000
3.91
7.81
10.00
78.10
35,730.98
80+860.000
5.48
9.39
10.00
93.90
35,824.88
80+880.000
5.25
10.73
10.00
107.30
35,932.18
80+900.000
5.57
10.82
10.00
108.20
36,040.38
80+920.000
3.70
9.27
10.00
92.70
36,133.08
80+940.000
3.39
7.09
10.00
70.90
36,203.98
80+960.000
5.30
8.69
10.00
86.90
36,290.88
80+980.000
5.20
10.50
10.00
105.00
36,395.88
81+000.000
1.65
6.85
10.00
68.50
36,464.38
81+020.000
5.02
6.67
10.00
66.70
36,531.08
81+040.000
5.73
10.75
10.00
107.50
36,638.58
81+060.000
6.33
12.06
10.00
120.60
36,759.18
81+080.000
7.08
13.41
10.00
134.10
36,893.28
81+100.000
6.38
13.46
10.00
134.60
37,027.88
81+120.000
5.89
12.27
10.00
122.70
37,150.58
81+140.000
81+160.000
81+180.000
81+200.000
81+220.000
81+240.000
81+260.000
81+280.000
81+300.000
81+320.000
81+340.000
81+360.000
81+380.000
81+400.000
81+420.000
81+440.000
81+460.000
81+480.000
81+500.000
81+520.000
81+540.000
81+560.000
81+580.000
81+600.000
81+620.000
81+640.000
81+660.000
81+680.000
81+700.000
81+720.000
3.48
2.04
0.02
1.02
1.07
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.98
5.24
7.07
7.87
7.74
12.15
6.89
6.89
6.76
6.75
6.69
6.89
0.00
0.00
0.00
0.00
9.37
5.52
2.06
1.04
2.09
1.07
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.98
7.22
12.31
14.94
15.61
19.89
19.04
13.78
13.65
13.51
13.44
13.58
6.89
0.00
0.00
0.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
93.70
55.20
20.60
10.40
20.90
10.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
19.80
72.20
123.10
149.40
156.10
198.90
190.40
137.80
136.50
135.10
134.40
135.80
68.90
0.00
0.00
0.00
37,244.28
37,299.48
37,320.08
37,330.48
37,351.38
37,362.08
37,362.08
37,362.08
37,362.08
37,362.08
37,362.08
37,362.08
37,362.08
37,362.08
37,381.88
37,454.08
37,577.18
37,726.58
37,882.68
38,081.58
38,271.98
38,409.78
38,546.28
38,681.38
38,815.78
38,951.58
39,020.48
39,020.48
39,020.48
39,020.48
REVISO:
REALIZO:
Pgina 46 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS EN EL ESTADO DE BAJA CALIFORNIA SUR"
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 06
"TERRACERAS"
UNIDAD
Compactacin:
a) Del terreno natural en el area de desplante de los terraplenes
M3
ESTACIN KM.
REA
L1+L2
D/2
81+740.000
81+760.000
81+780.000
81+800.000
81+820.000
81+840.000
81+860.000
81+880.000
81+900.000
81+920.000
81+940.000
81+960.000
81+980.000
82+000.000
82+020.000
82+040.000
82+060.000
82+080.000
82+100.000
82+120.000
82+140.000
82+160.000
82+180.000
82+200.000
82+220.000
82+240.000
82+260.000
82+280.000
82+300.000
82+320.000
82+340.000
82+360.000
82+380.000
82+400.000
82+420.000
82+440.000
82+460.000
82+480.000
82+500.000
82+520.000
82+540.000
82+560.000
82+580.000
82+600.000
82+620.000
82+640.000
82+660.000
82+680.000
82+700.000
82+720.000
82+740.000
82+760.000
82+780.000
82+800.000
82+820.000
82+840.000
82+860.000
82+880.000
82+900.000
82+920.000
82+940.000
82+960.000
82+980.000
83+000.000
83+020.000
83+040.000
83+060.000
83+080.000
83+100.000
83+120.000
83+140.000
83+160.000
83+170.200
0.00
0.00
0.00
5.48
5.51
6.01
6.53
7.44
8.07
7.87
7.67
6.86
5.76
2.58
2.27
5.77
6.83
5.92
1.90
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.34
0.29
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.38
1.31
2.26
5.29
5.48
5.36
5.23
5.24
5.41
5.66
5.77
6.12
5.81
6.25
7.64
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6.85
0.00
0.00
0.00
5.48
10.99
11.52
12.54
13.97
15.51
15.94
15.54
14.53
12.62
8.34
4.85
8.04
12.60
12.75
7.82
1.90
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.34
0.63
0.29
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.38
2.69
3.57
7.55
10.77
10.84
10.59
10.47
10.65
11.07
11.43
11.89
11.93
12.06
13.89
7.64
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6.85
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
5.10
REVISO:
REA ACUMULADA
PARCIAL
ACUMULADO
0.00
0.00
0.00
54.80
109.90
115.20
125.40
139.70
155.10
159.40
155.40
145.30
126.20
83.40
48.50
80.40
126.00
127.50
78.20
19.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.40
6.30
2.90
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
13.80
26.90
35.70
75.50
107.70
108.40
105.90
104.70
106.50
110.70
114.30
118.90
119.30
120.60
138.90
76.40
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
34.93
39,020.48
39,020.48
39,020.48
39,075.28
39,185.18
39,300.38
39,425.78
39,565.48
39,720.58
39,879.98
40,035.38
40,180.68
40,306.88
40,390.28
40,438.78
40,519.18
40,645.18
40,772.68
40,850.88
40,869.88
40,869.88
40,869.88
40,869.88
40,869.88
40,869.88
40,869.88
40,869.88
40,873.28
40,879.58
40,882.48
40,882.48
40,882.48
40,882.48
40,882.48
40,882.48
40,882.48
40,882.48
40,882.48
40,882.48
40,882.48
40,882.48
40,896.28
40,923.18
40,958.88
41,034.38
41,142.08
41,250.48
41,356.38
41,461.08
41,567.58
41,678.28
41,792.58
41,911.48
42,030.78
42,151.38
42,290.28
42,366.68
42,366.68
42,366.68
42,366.68
42,366.68
42,366.68
42,366.68
42,366.68
42,366.68
42,366.68
42,366.68
42,366.68
42,366.68
42,366.68
42,366.68
42,366.68
42,401.62
REALIZO:
Pgina 47 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS EN EL ESTADO DE BAJA CALIFORNIA SUR"
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 06
"TERRACERAS"
UNIDAD
Compactacin:
a) Del terreno natural en el area de desplante de los terraplenes
M3
ESTACIN KM.
REA
L1+L2
D/2
83+180.000
83+200.000
83+220.000
83+240.000
83+260.000
83+280.000
83+300.000
83+320.000
83+340.000
83+360.000
83+380.000
83+400.000
83+420.000
83+440.000
83+460.000
83+480.000
83+500.000
83+520.000
83+540.000
83+560.000
83+570.105
83+580.000
83+593.182
83+600.000
83+616.259
83+620.000
83+640.000
83+653.182
83+660.000
83+680.000
83+700.000
83+720.000
83+740.000
83+760.000
83+780.000
83+785.000
5.61
4.49
2.06
0.00
0.00
0.00
0.00
0.08
1.07
2.82
3.17
2.84
1.93
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
12.46
10.10
6.55
2.06
0.00
0.00
0.00
0.08
1.15
3.89
5.99
6.01
4.77
1.93
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.90
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
5.05
4.95
6.59
3.41
8.13
1.87
10.00
6.59
3.41
10.00
10.00
10.00
10.00
10.00
10.00
2.50
REVISO:
REA ACUMULADA
PARCIAL
ACUMULADO
61.05
101.00
65.50
20.60
0.00
0.00
0.00
0.80
11.50
38.90
59.90
60.10
47.70
19.30
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
42,462.67
42,563.67
42,629.17
42,649.77
42,649.77
42,649.77
42,649.77
42,650.57
42,662.07
42,700.97
42,760.87
42,820.97
42,868.67
42,887.97
42,887.97
42,887.97
42,887.97
42,887.97
42,887.97
42,887.97
42,887.97
42,887.97
42,887.97
42,887.97
42,887.97
42,887.97
42,887.97
42,887.97
42,887.97
42,887.97
42,887.97
42,887.97
42,887.97
42,887.97
42,887.97
42,887.97
REALIZO:
Pgina 48 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 07
"TERRACERAS"
UNIDAD
Compactacin:
b) De la cama de los cortes en que no se halla ordenado excavacin adicional
M3
ESTACIN KM.
REA
L1+L2
D/2
71+800.000
0.00
0.00
71+820.000
0.00
71+840.000
REA ACUMULADA
PARCIAL
ACUMULADO
0.00
0.00
0.00
0.00
10.00
0.00
0.00
0.00
0.00
10.00
0.00
0.00
71+860.000
0.00
0.00
10.00
0.00
0.00
71+880.000
0.00
0.00
10.00
0.00
0.00
71+900.000
0.00
0.00
10.00
0.00
0.00
71+920.000
0.00
0.00
10.00
0.00
0.00
71+940.000
0.00
0.00
10.00
0.00
0.00
71+960.000
0.00
0.00
10.00
0.00
0.00
71+980.000
0.00
0.00
10.00
0.00
0.00
72+000.000
0.00
0.00
10.00
0.00
0.00
72+020.000
0.00
0.00
10.00
0.00
0.00
72+040.000
0.00
0.00
10.00
0.00
0.00
72+060.000
0.00
0.00
10.00
0.00
0.00
72+080.000
0.00
0.00
10.00
0.00
0.00
72+100.000
0.00
0.00
10.00
0.00
0.00
72+120.000
0.00
0.00
10.00
0.00
0.00
72+140.000
0.00
0.00
10.00
0.00
0.00
72+160.000
0.00
0.00
10.00
0.00
0.00
72+180.000
0.00
0.00
10.00
0.00
0.00
72+200.000
0.00
0.00
10.00
0.00
0.00
72+220.000
1.75
1.75
10.00
17.50
17.50
72+240.000
1.69
3.44
10.00
34.40
51.90
72+260.000
0.00
1.69
10.00
16.90
68.80
72+280.000
0.00
0.00
10.00
0.00
68.80
72+300.000
0.00
0.00
10.00
0.00
68.80
72+320.000
0.00
0.00
10.00
0.00
68.80
72+340.000
0.00
0.00
10.00
0.00
68.80
72+360.000
0.00
0.00
10.00
0.00
68.80
72+380.000
0.00
0.00
10.00
0.00
68.80
72+400.000
0.00
0.00
10.00
0.00
68.80
72+420.000
0.00
0.00
10.00
0.00
68.80
72+440.000
0.00
0.00
10.00
0.00
68.80
72+460.000
0.00
0.00
10.00
0.00
68.80
72+480.000
0.00
0.00
10.00
0.00
68.80
72+500.000
0.00
0.00
10.00
0.00
68.80
72+520.000
0.00
0.00
10.00
0.00
68.80
72+540.000
0.00
0.00
10.00
0.00
68.80
72+560.000
0.00
0.00
10.00
0.00
68.80
72+580.000
0.00
0.00
10.00
0.00
68.80
72+600.000
0.00
0.00
10.00
0.00
68.80
72+620.000
0.00
0.00
10.00
0.00
68.80
72+640.000
0.00
0.00
10.00
0.00
68.80
72+654.982
0.00
0.00
7.49
0.00
68.80
72+660.000
0.00
0.00
2.51
0.00
68.80
72+678.443
0.00
0.00
9.22
0.00
68.80
72+680.000
0.00
0.00
0.78
0.00
68.80
72+700.000
0.00
0.00
10.00
0.00
68.80
72+701.905
0.00
0.00
0.95
0.00
68.80
72+720.000
0.00
0.00
9.05
0.00
68.80
72+739.443
0.00
0.00
9.72
0.00
68.80
72+740.000
0.00
0.00
0.28
0.00
68.80
REVISO:
REALIZO:
Pgina 49 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 07
"TERRACERAS"
UNIDAD
Compactacin:
b) De la cama de los cortes en que no se halla ordenado excavacin adicional
M3
ESTACIN KM.
REA
L1+L2
D/2
72+760.000
3.75
3.75
72+780.000
3.08
72+800.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
37.50
106.30
6.83
10.00
68.30
174.60
3.09
6.17
10.00
61.70
236.30
72+820.000
3.49
6.58
10.00
65.80
302.10
72+840.000
0.00
3.49
10.00
34.90
337.00
72+860.000
0.00
0.00
10.00
0.00
337.00
72+880.000
0.00
0.00
10.00
0.00
337.00
72+900.000
0.83
0.83
10.00
8.30
345.30
72+920.000
0.93
1.76
10.00
17.60
362.90
72+940.000
0.00
0.93
10.00
9.30
372.20
72+960.000
0.00
0.00
10.00
0.00
372.20
72+971.651
0.00
0.00
5.83
0.00
372.20
72+980.000
0.00
0.00
4.17
0.00
372.20
73+000.000
0.00
0.00
10.00
0.00
372.20
73+009.189
0.00
0.00
4.59
0.00
372.20
73+020.000
0.00
0.00
5.41
0.00
372.20
73+032.651
0.00
0.00
6.33
0.00
372.20
73+040.000
0.00
0.00
3.67
0.00
372.20
73+056.112
0.00
0.00
8.06
0.00
372.20
73+060.000
0.00
0.00
1.94
0.00
372.20
73+080.000
0.00
0.00
10.00
0.00
372.20
73+100.000
0.00
0.00
10.00
0.00
372.20
73+120.000
0.00
0.00
10.00
0.00
372.20
73+140.000
0.00
0.00
10.00
0.00
372.20
73+160.000
0.00
0.00
10.00
0.00
372.20
73+180.000
0.00
0.00
10.00
0.00
372.20
73+200.000
0.00
0.00
10.00
0.00
372.20
73+220.000
0.00
0.00
10.00
0.00
372.20
73+240.000
0.00
0.00
10.00
0.00
372.20
73+260.000
0.00
0.00
10.00
0.00
372.20
73+280.000
0.00
0.00
10.00
0.00
372.20
73+300.000
0.00
0.00
10.00
0.00
372.20
73+320.000
0.00
0.00
10.00
0.00
372.20
73+340.000
0.00
0.00
10.00
0.00
372.20
73+360.000
0.00
0.00
10.00
0.00
372.20
73+380.000
0.00
0.00
10.00
0.00
372.20
73+400.000
0.00
0.00
10.00
0.00
372.20
73+420.000
0.00
0.00
10.00
0.00
372.20
73+440.000
0.00
0.00
10.00
0.00
372.20
73+460.000
0.00
0.00
10.00
0.00
372.20
73+480.000
0.00
0.00
10.00
0.00
372.20
73+500.000
0.00
0.00
10.00
0.00
372.20
73+520.000
0.00
0.00
10.00
0.00
372.20
73+540.000
0.00
0.00
10.00
0.00
372.20
73+560.000
0.00
0.00
10.00
0.00
372.20
73+580.000
0.00
0.00
10.00
0.00
372.20
73+600.000
0.00
0.00
10.00
0.00
372.20
73+620.000
0.00
0.00
10.00
0.00
372.20
73+640.000
0.00
0.00
10.00
0.00
372.20
73+660.000
0.00
0.00
10.00
0.00
372.20
73+680.000
0.00
0.00
10.00
0.00
372.20
73+700.000
0.00
0.00
10.00
0.00
372.20
73+720.000
0.00
0.00
10.00
0.00
372.20
73+740.000
0.00
0.00
10.00
0.00
372.20
REVISO:
REALIZO:
Pgina 50 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 07
"TERRACERAS"
UNIDAD
Compactacin:
b) De la cama de los cortes en que no se halla ordenado excavacin adicional
M3
ESTACIN KM.
REA
L1+L2
D/2
73+760.000
0.00
0.00
73+780.000
0.00
73+800.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
0.00
372.20
0.00
10.00
0.00
372.20
0.00
0.00
10.00
0.00
372.20
73+807.617
0.00
0.00
3.81
0.00
372.20
73+820.000
0.00
0.00
6.19
0.00
372.20
73+840.000
0.00
0.00
10.00
0.00
372.20
73+848.283
0.00
0.00
4.14
0.00
372.20
73+860.000
0.00
0.00
5.86
0.00
372.20
73+880.000
0.00
0.00
10.00
0.00
372.20
73+888.950
0.00
0.00
4.47
0.00
372.20
73+900.000
0.00
0.00
5.53
0.00
372.20
73+909.283
0.00
0.00
4.64
0.00
372.20
73+920.000
0.00
0.00
5.36
0.00
372.20
73+940.000
0.00
0.00
10.00
0.00
372.20
73+960.000
0.00
0.00
10.00
0.00
372.20
73+980.000
0.00
0.00
10.00
0.00
372.20
74+000.000
0.00
0.00
10.00
0.00
372.20
74+020.000
0.00
0.00
10.00
0.00
372.20
74+040.000
0.00
0.00
10.00
0.00
372.20
74+060.000
0.00
0.00
10.00
0.00
372.20
74+080.000
0.00
0.00
10.00
0.00
372.20
74+089.272
0.00
0.00
4.64
0.00
372.20
74+100.000
0.00
0.00
5.36
0.00
372.20
74+109.605
0.00
0.00
4.80
0.00
372.20
74+120.000
0.00
0.00
5.20
0.00
372.20
74+140.000
0.00
0.00
10.00
0.00
372.20
74+150.272
0.00
0.00
5.14
0.00
372.20
74+160.000
0.00
0.00
4.86
0.00
372.20
74+180.000
0.00
0.00
10.00
0.00
372.20
74+190.939
0.00
0.00
5.47
0.00
372.20
74+200.000
0.00
0.00
4.53
0.00
372.20
74+220.000
0.00
0.00
10.00
0.00
372.20
74+240.000
0.00
0.00
10.00
0.00
372.20
74+260.000
0.00
0.00
10.00
0.00
372.20
74+280.000
0.00
0.00
10.00
0.00
372.20
74+300.000
0.00
0.00
10.00
0.00
372.20
74+320.000
0.00
0.00
10.00
0.00
372.20
74+340.000
0.00
0.00
10.00
0.00
372.20
74+360.000
0.00
0.00
10.00
0.00
372.20
74+380.000
0.00
0.00
10.00
0.00
372.20
74+400.000
0.44
0.44
10.00
4.40
376.60
74+420.000
0.52
0.96
10.00
9.60
386.20
74+440.000
0.42
0.94
10.00
9.40
395.60
74+457.851
0.13
0.55
8.93
4.91
400.51
74+460.000
0.14
0.27
1.07
0.29
400.80
74+480.000
0.13
0.27
10.00
2.70
403.50
74+498.518
0.00
0.13
9.26
1.20
404.70
74+500.000
0.00
0.00
0.74
0.00
404.70
74+520.000
0.00
0.00
10.00
0.00
404.70
74+539.184
0.00
0.00
9.59
0.00
404.70
74+540.000
0.00
0.00
0.41
0.00
404.70
74+559.518
0.00
0.00
9.76
0.00
404.70
74+560.000
0.00
0.00
0.24
0.00
404.70
74+580.000
0.00
0.00
10.00
0.00
404.70
REVISO:
REALIZO:
Pgina 51 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 07
"TERRACERAS"
UNIDAD
Compactacin:
b) De la cama de los cortes en que no se halla ordenado excavacin adicional
M3
ESTACIN KM.
REA
L1+L2
D/2
74+600.000
0.00
0.00
74+620.000
0.00
74+640.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
0.00
404.70
0.00
10.00
0.00
404.70
0.00
0.00
10.00
0.00
404.70
74+660.000
0.00
0.00
10.00
0.00
404.70
74+680.000
0.00
0.00
10.00
0.00
404.70
74+700.000
0.00
0.00
10.00
0.00
404.70
74+720.000
0.00
0.00
10.00
0.00
404.70
74+740.000
0.00
0.00
10.00
0.00
404.70
74+760.000
0.00
0.00
10.00
0.00
404.70
74+779.360
0.00
0.00
9.68
0.00
404.70
74+780.000
0.00
0.00
0.32
0.00
404.70
74+799.693
1.28
1.28
9.85
12.60
417.31
74+800.000
1.38
2.66
0.15
0.41
417.71
74+820.000
4.11
5.49
10.00
54.90
472.61
74+840.000
4.70
8.81
10.00
88.10
560.71
74+840.360
4.70
9.40
0.18
1.69
562.41
74+860.000
4.38
9.08
9.82
89.17
651.57
74+880.000
3.20
7.58
10.00
75.80
727.37
74+881.027
3.12
6.32
0.51
3.24
730.62
74+900.000
0.75
3.87
9.49
36.71
767.33
74+920.000
0.00
0.75
10.00
7.50
774.83
74+940.000
0.00
0.00
10.00
0.00
774.83
74+960.000
0.00
0.00
10.00
0.00
774.83
74+980.000
4.78
4.78
10.00
47.80
822.63
75+000.000
4.82
9.60
10.00
96.00
918.63
75+020.000
4.88
9.70
10.00
97.00
1,015.63
75+040.000
4.86
9.74
10.00
97.40
1,113.03
75+060.000
4.86
9.72
10.00
97.20
1,210.23
75+080.000
4.78
9.64
10.00
96.40
1,306.63
75+100.000
4.86
9.64
10.00
96.40
1,403.03
75+120.000
4.86
9.72
10.00
97.20
1,500.23
75+140.000
4.86
9.72
10.00
97.20
1,597.43
75+160.000
4.86
9.72
10.00
97.20
1,694.63
75+180.000
4.86
9.72
10.00
97.20
1,791.83
75+200.000
4.85
9.71
10.00
97.10
1,888.93
75+220.000
4.86
9.71
10.00
97.10
1,986.03
75+240.000
4.86
9.72
10.00
97.20
2,083.23
75+260.000
4.86
9.72
10.00
97.20
2,180.43
75+280.000
4.86
9.72
10.00
97.20
2,277.63
75+300.000
4.86
9.72
10.00
97.20
2,374.83
75+320.000
4.86
9.72
10.00
97.20
2,472.03
75+340.000
4.85
9.71
10.00
97.10
2,569.13
75+360.000
4.86
9.71
10.00
97.10
2,666.23
75+380.000
4.85
9.71
10.00
97.10
2,763.33
75+400.000
4.86
9.71
10.00
97.10
2,860.43
75+420.000
4.77
9.63
10.00
96.30
2,956.73
75+440.000
4.86
9.63
10.00
96.30
3,053.03
75+460.000
4.86
9.72
10.00
97.20
3,150.23
75+480.000
4.86
9.72
10.00
97.20
3,247.43
75+500.000
4.87
9.73
10.00
97.30
3,344.73
75+520.000
4.79
9.66
10.00
96.60
3,441.33
75+540.000
4.73
9.52
10.00
95.20
3,536.53
75+560.000
4.70
9.43
10.00
94.30
3,630.83
75+580.000
4.75
9.45
10.00
94.50
3,725.33
REVISO:
REALIZO:
Pgina 52 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 07
"TERRACERAS"
UNIDAD
Compactacin:
b) De la cama de los cortes en que no se halla ordenado excavacin adicional
M3
ESTACIN KM.
REA
L1+L2
D/2
75+600.000
4.70
9.45
75+611.738
4.70
75+620.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
94.50
3,819.83
9.40
5.87
55.17
3,875.00
4.70
9.40
4.13
38.83
3,913.83
75+635.122
4.72
9.42
7.56
71.23
3,985.06
75+640.000
4.73
9.45
2.44
23.05
4,008.10
75+658.507
4.75
9.48
9.25
87.72
4,095.83
75+660.000
4.79
9.54
0.75
7.12
4,102.95
75+680.000
3.89
8.68
10.00
86.80
4,189.75
75+700.000
0.00
3.89
10.00
38.90
4,228.65
75+711.122
0.00
0.00
5.56
0.00
4,228.65
75+720.000
0.00
0.00
4.44
0.00
4,228.65
75+740.000
0.00
0.00
10.00
0.00
4,228.65
75+760.000
0.00
0.00
10.00
0.00
4,228.65
75+780.000
0.00
0.00
10.00
0.00
4,228.65
75+800.000
0.00
0.00
10.00
0.00
4,228.65
75+820.000
0.00
0.00
10.00
0.00
4,228.65
75+840.000
0.00
0.00
10.00
0.00
4,228.65
75+860.000
0.00
0.00
10.00
0.00
4,228.65
75+880.000
0.00
0.00
10.00
0.00
4,228.65
75+900.000
0.00
0.00
10.00
0.00
4,228.65
75+920.000
0.00
0.00
10.00
0.00
4,228.65
75+940.000
0.00
0.00
10.00
0.00
4,228.65
75+960.000
0.00
0.00
10.00
0.00
4,228.65
75+980.000
0.00
0.00
10.00
0.00
4,228.65
76+000.000
0.00
0.00
10.00
0.00
4,228.65
76+020.000
0.00
0.00
10.00
0.00
4,228.65
76+040.000
0.00
0.00
10.00
0.00
4,228.65
76+060.000
0.00
0.00
10.00
0.00
4,228.65
76+080.000
0.00
0.00
10.00
0.00
4,228.65
76+100.000
0.00
0.00
10.00
0.00
4,228.65
76+120.000
0.00
0.00
10.00
0.00
4,228.65
76+140.000
0.00
0.00
10.00
0.00
4,228.65
76+160.000
0.00
0.00
10.00
0.00
4,228.65
76+180.000
0.00
0.00
10.00
0.00
4,228.65
76+200.000
0.00
0.00
10.00
0.00
4,228.65
76+220.000
0.00
0.00
10.00
0.00
4,228.65
76+240.000
0.47
0.47
10.00
4.70
4,233.35
76+255.500
0.87
1.34
7.75
10.38
4,243.73
76+260.000
0.81
1.68
2.25
3.78
4,247.51
76+280.000
2.00
2.81
10.00
28.10
4,275.61
76+300.000
2.27
4.27
10.00
42.70
4,318.31
76+320.000
2.14
4.41
10.00
44.10
4,362.41
76+321.961
2.07
4.21
0.98
4.13
4,366.54
76+340.000
1.06
3.13
9.02
28.23
4,394.77
76+351.500
0.45
1.51
5.75
8.68
4,403.45
76+360.000
0.00
0.45
4.25
1.91
4,405.37
76+380.000
0.00
0.00
10.00
0.00
4,405.37
76+381.038
0.00
0.00
0.52
0.00
4,405.37
76+400.000
0.00
0.00
9.48
0.00
4,405.37
76+420.000
0.00
0.00
10.00
0.00
4,405.37
76+440.000
0.55
0.55
10.00
5.50
4,410.87
76+460.000
0.65
1.20
10.00
12.00
4,422.87
76+480.000
1.09
1.74
10.00
17.40
4,440.27
76+500.000
1.33
2.42
10.00
24.20
4,464.47
REVISO:
REALIZO:
Pgina 53 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 07
"TERRACERAS"
UNIDAD
Compactacin:
b) De la cama de los cortes en que no se halla ordenado excavacin adicional
M3
ESTACIN KM.
REA
L1+L2
D/2
76+520.000
1.01
2.34
76+540.000
0.00
76+560.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
23.40
4,487.87
1.01
10.00
10.10
4,497.97
0.00
0.00
10.00
0.00
4,497.97
76+580.000
0.30
0.30
10.00
3.00
4,500.97
76+600.000
1.01
1.31
10.00
13.10
4,514.07
76+620.000
1.37
2.38
10.00
23.80
4,537.87
76+640.000
1.43
2.80
10.00
28.00
4,565.87
76+660.000
1.13
2.56
10.00
25.60
4,591.47
76+680.000
0.85
1.98
10.00
19.80
4,611.27
76+700.000
0.00
0.85
10.00
8.50
4,619.77
76+720.000
0.00
0.00
10.00
0.00
4,619.77
76+740.000
0.00
0.00
10.00
0.00
4,619.77
76+760.000
0.00
0.00
10.00
0.00
4,619.77
76+780.000
0.00
0.00
10.00
0.00
4,619.77
76+800.000
0.00
0.00
10.00
0.00
4,619.77
76+820.000
0.00
0.00
10.00
0.00
4,619.77
76+840.000
0.00
0.00
10.00
0.00
4,619.77
76+860.000
0.00
0.00
10.00
0.00
4,619.77
76+880.000
0.00
0.00
10.00
0.00
4,619.77
76+900.000
0.00
0.00
10.00
0.00
4,619.77
76+920.000
0.00
0.00
10.00
0.00
4,619.77
76+940.000
0.00
0.00
10.00
0.00
4,619.77
76+960.000
0.90
0.90
10.00
9.00
4,628.77
76+980.000
1.06
1.96
10.00
19.60
4,648.37
76+985.245
1.09
2.15
2.62
5.64
4,654.01
76+993.182
1.13
2.22
3.97
8.81
4,662.81
77+000.000
1.20
2.33
3.41
7.94
4,670.76
77+001.118
1.22
2.42
0.56
1.35
4,672.11
77+018.182
1.35
2.57
8.53
21.93
4,694.04
77+020.000
1.34
2.69
0.91
2.45
4,696.48
77+040.000
1.49
2.83
10.00
28.30
4,724.78
77+060.000
0.99
2.48
10.00
24.80
4,749.58
77+080.000
0.00
0.99
10.00
9.90
4,759.48
77+100.000
0.00
0.00
10.00
0.00
4,759.48
77+120.000
0.20
0.20
10.00
2.00
4,761.48
77+140.000
1.15
1.35
10.00
13.50
4,774.98
77+160.000
1.21
2.36
10.00
23.60
4,798.58
77+180.000
1.63
2.84
10.00
28.40
4,826.98
77+200.000
0.00
1.63
10.00
16.30
4,843.28
77+220.000
0.00
0.00
10.00
0.00
4,843.28
77+240.000
1.70
1.70
10.00
17.00
4,860.28
77+260.000
4.44
6.14
10.00
61.40
4,921.68
77+280.000
4.79
9.23
10.00
92.30
5,013.98
77+300.000
4.78
9.57
10.00
95.70
5,109.68
77+320.000
4.79
9.57
10.00
95.70
5,205.38
77+340.000
4.70
9.49
10.00
94.90
5,300.28
77+360.000
3.43
8.13
10.00
81.30
5,381.58
77+380.000
1.39
4.82
10.00
48.20
5,429.78
77+400.000
0.34
1.73
10.00
17.30
5,447.08
77+420.000
4.37
4.71
10.00
47.10
5,494.18
77+440.000
4.78
9.15
10.00
91.50
5,585.68
77+460.000
4.79
9.57
10.00
95.70
5,681.38
77+480.000
4.78
9.57
10.00
95.70
5,777.08
77+500.000
4.78
9.56
10.00
95.60
5,872.68
REVISO:
REALIZO:
Pgina 54 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 07
"TERRACERAS"
UNIDAD
Compactacin:
b) De la cama de los cortes en que no se halla ordenado excavacin adicional
M3
ESTACIN KM.
REA
L1+L2
D/2
77+520.000
4.78
9.56
77+525.218
4.78
77+540.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
95.60
5,968.28
9.56
2.61
24.94
5,993.22
4.73
9.51
7.39
70.29
6,063.51
77+540.234
4.72
9.45
0.12
1.10
6,064.62
77+547.218
4.70
9.42
3.49
32.90
6,097.51
77+554.202
4.70
9.40
3.49
32.83
6,130.34
77+560.000
4.70
9.40
2.90
27.25
6,157.59
77+580.000
2.59
7.29
10.00
72.90
6,230.49
77+600.000
1.45
4.04
10.00
40.40
6,270.89
77+620.000
0.00
1.45
10.00
14.50
6,285.39
77+640.000
0.00
0.00
10.00
0.00
6,285.39
77+647.342
0.00
0.00
3.67
0.00
6,285.39
77+660.000
0.00
0.00
6.33
0.00
6,285.39
77+663.215
0.00
0.00
1.61
0.00
6,285.39
77+679.088
0.00
0.00
7.94
0.00
6,285.39
77+680.000
0.00
0.00
0.46
0.00
6,285.39
77+700.000
0.00
0.00
10.00
0.00
6,285.39
77+713.215
4.77
4.77
6.61
31.52
6,316.91
77+720.000
4.70
9.47
3.39
32.13
6,349.04
77+740.000
0.00
4.70
10.00
47.00
6,396.04
77+760.000
0.31
0.31
10.00
3.10
6,399.14
77+780.000
1.86
2.17
10.00
21.70
6,420.84
77+800.000
4.79
6.65
10.00
66.50
6,487.34
77+820.000
4.79
9.58
10.00
95.80
6,583.14
77+840.000
4.78
9.57
10.00
95.70
6,678.84
77+860.000
4.78
9.56
10.00
95.60
6,774.44
77+880.000
4.78
9.56
10.00
95.60
6,870.04
77+900.000
4.78
9.56
10.00
95.60
6,965.64
77+920.000
4.78
9.56
10.00
95.60
7,061.24
77+940.000
4.72
9.50
10.00
95.00
7,156.24
77+960.000
4.78
9.50
10.00
95.00
7,251.24
77+980.000
4.43
9.21
10.00
92.10
7,343.34
78+000.000
4.56
8.99
10.00
89.90
7,433.24
78+020.000
4.65
9.21
10.00
92.10
7,525.34
78+040.000
0.00
4.65
10.00
46.50
7,571.84
78+060.000
1.45
1.45
10.00
14.50
7,586.34
78+080.000
0.88
2.33
10.00
23.30
7,609.64
78+094.334
1.07
1.95
7.17
13.98
7,623.61
78+100.000
1.53
2.60
2.83
7.37
7,630.98
78+116.175
0.99
2.52
8.09
20.38
7,651.36
78+120.000
1.62
2.61
1.91
4.99
7,656.35
78+126.334
1.68
3.30
3.17
10.45
7,666.80
78+136.493
1.72
3.40
5.08
17.27
7,684.07
78+140.000
1.51
3.23
1.75
5.66
7,689.73
78+160.000
2.04
3.55
10.00
35.50
7,725.23
78+180.000
2.16
4.20
10.00
42.00
7,767.23
78+200.000
2.22
4.38
10.00
43.80
7,811.03
78+220.000
2.24
4.46
10.00
44.60
7,855.63
78+240.000
2.25
4.49
10.00
44.90
7,900.53
78+260.000
2.47
4.72
10.00
47.20
7,947.73
78+280.000
0.00
2.47
10.00
24.70
7,972.43
78+300.000
0.00
0.00
10.00
0.00
7,972.43
78+320.000
0.00
0.00
10.00
0.00
7,972.43
78+340.000
0.00
0.00
10.00
0.00
7,972.43
REVISO:
REALIZO:
Pgina 55 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 07
"TERRACERAS"
UNIDAD
Compactacin:
b) De la cama de los cortes en que no se halla ordenado excavacin adicional
M3
ESTACIN KM.
REA
L1+L2
D/2
78+360.000
0.00
0.00
78+380.000
0.00
78+400.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
0.00
7,972.43
0.00
10.00
0.00
7,972.43
0.00
0.00
10.00
0.00
7,972.43
78+420.000
0.00
0.00
10.00
0.00
7,972.43
78+440.000
0.00
0.00
10.00
0.00
7,972.43
78+460.000
0.00
0.00
10.00
0.00
7,972.43
78+480.000
0.00
0.00
10.00
0.00
7,972.43
78+500.000
0.00
0.00
10.00
0.00
7,972.43
78+520.000
0.00
0.00
10.00
0.00
7,972.43
78+540.000
0.00
0.00
10.00
0.00
7,972.43
78+560.000
0.00
0.00
10.00
0.00
7,972.43
78+580.000
0.00
0.00
10.00
0.00
7,972.43
78+600.000
0.00
0.00
10.00
0.00
7,972.43
78+620.000
0.00
0.00
10.00
0.00
7,972.43
78+640.000
0.00
0.00
10.00
0.00
7,972.43
78+660.000
2.74
2.74
10.00
27.40
7,999.83
78+680.000
2.91
5.65
10.00
56.50
8,056.33
78+700.000
4.05
6.96
10.00
69.60
8,125.93
78+720.000
4.37
8.42
10.00
84.20
8,210.13
78+740.000
4.70
9.07
10.00
90.70
8,300.83
78+760.000
4.70
9.40
10.00
94.00
8,394.83
78+780.000
4.70
9.40
10.00
94.00
8,488.83
78+790.492
4.70
9.40
5.25
49.31
8,538.15
78+796.615
4.70
9.40
3.06
28.78
8,566.92
78+800.000
4.71
9.41
1.69
15.93
8,582.85
78+802.737
4.72
9.43
1.37
12.91
8,595.76
78+811.615
4.18
8.90
4.44
39.51
8,635.26
78+820.000
3.04
7.22
4.19
30.27
8,665.53
78+840.000
3.34
6.38
10.00
63.80
8,729.33
78+860.000
3.81
7.15
10.00
71.50
8,800.83
78+880.000
4.77
8.58
10.00
85.80
8,886.63
78+900.000
4.77
9.54
10.00
95.40
8,982.03
78+920.000
4.77
9.54
10.00
95.40
9,077.43
78+940.000
4.77
9.54
10.00
95.40
9,172.83
78+960.000
4.77
9.54
10.00
95.40
9,268.23
78+980.000
4.76
9.53
10.00
95.30
9,363.53
79+000.000
4.36
9.12
10.00
91.20
9,454.73
79+020.000
3.89
8.25
10.00
82.50
9,537.23
79+040.000
0.00
3.89
10.00
38.90
9,576.13
79+060.000
0.00
0.00
10.00
0.00
9,576.13
79+080.000
0.00
0.00
10.00
0.00
9,576.13
79+097.907
0.00
0.00
8.95
0.00
9,576.13
79+100.000
0.00
0.00
1.05
0.00
9,576.13
79+120.000
0.00
0.00
10.00
0.00
9,576.13
79+133.417
0.00
0.00
6.71
0.00
9,576.13
79+140.000
0.00
0.00
3.29
0.00
9,576.13
79+157.907
0.00
0.00
8.95
0.00
9,576.13
79+160.000
0.00
0.00
1.05
0.00
9,576.13
79+180.000
0.00
0.00
10.00
0.00
9,576.13
79+182.397
0.00
0.00
1.20
0.00
9,576.13
79+200.000
0.00
0.00
8.80
0.00
9,576.13
79+220.000
0.00
0.00
10.00
0.00
9,576.13
79+240.000
1.79
1.79
10.00
17.90
9,594.03
79+260.000
2.99
4.78
10.00
47.80
9,641.83
79+280.000
2.94
5.93
10.00
59.30
9,701.13
79+300.000
2.94
5.88
10.00
58.80
9,759.93
79+320.000
3.37
6.31
10.00
63.10
9,823.03
REVISO:
REALIZO:
Pgina 56 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 07
"TERRACERAS"
UNIDAD
Compactacin:
b) De la cama de los cortes en que no se halla ordenado excavacin adicional
M3
ESTACIN KM.
REA
L1+L2
D/2
79+340.000
4.65
8.02
79+360.000
3.93
79+380.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
80.20
9,903.23
8.58
10.00
85.80
9,989.03
4.70
8.63
10.00
86.30
10,075.33
79+400.000
4.70
9.40
10.00
94.00
10,169.33
79+420.000
4.70
9.40
10.00
94.00
10,263.33
79+440.000
4.70
9.40
10.00
94.00
10,357.33
79+460.000
4.71
9.41
10.00
94.10
10,451.43
79+480.000
4.71
9.42
10.00
94.20
10,545.63
79+500.000
3.67
8.38
10.00
83.80
10,629.43
79+520.000
3.44
7.11
10.00
71.10
10,700.53
79+540.000
3.44
6.88
10.00
68.80
10,769.33
79+560.000
3.42
6.86
10.00
68.60
10,837.93
79+580.000
3.38
6.80
10.00
68.00
10,905.93
79+600.000
3.40
6.78
10.00
67.80
10,973.73
79+620.000
3.86
7.26
10.00
72.60
11,046.33
79+640.000
3.99
7.85
10.00
78.50
11,124.83
79+660.000
4.70
8.69
10.00
86.90
11,211.73
79+680.000
4.36
9.06
10.00
90.60
11,302.33
79+700.000
4.70
9.06
10.00
90.60
11,392.93
79+720.000
4.70
9.40
10.00
94.00
11,486.93
79+740.000
4.70
9.40
10.00
94.00
11,580.93
79+760.000
4.70
9.40
10.00
94.00
11,674.93
79+780.000
4.70
9.40
10.00
94.00
11,768.93
79+800.000
4.70
9.40
10.00
94.00
11,862.93
79+820.000
4.70
9.40
10.00
94.00
11,956.93
79+840.000
4.70
9.40
10.00
94.00
12,050.93
79+860.000
4.70
9.40
10.00
94.00
12,144.93
79+880.000
4.70
9.40
10.00
94.00
12,238.93
79+900.000
4.70
9.40
10.00
94.00
12,332.93
79+920.000
4.27
8.97
10.00
89.70
12,422.63
79+940.000
3.58
7.85
10.00
78.50
12,501.13
79+960.000
0.44
4.02
10.00
40.20
12,541.33
79+980.000
0.00
0.44
10.00
4.40
12,545.73
80+000.000
0.00
0.00
10.00
0.00
12,545.73
80+020.000
0.00
0.00
10.00
0.00
12,545.73
80+040.000
0.00
0.00
10.00
0.00
12,545.73
80+060.000
0.00
0.00
10.00
0.00
12,545.73
80+080.000
0.00
0.00
10.00
0.00
12,545.73
80+100.000
0.36
0.36
10.00
3.60
12,549.33
80+120.000
3.81
4.17
10.00
41.70
12,591.03
80+140.000
4.53
8.34
10.00
83.40
12,674.43
80+160.000
4.70
9.23
10.00
92.30
12,766.73
80+180.000
4.70
9.40
10.00
94.00
12,860.73
80+200.000
4.70
9.40
10.00
94.00
12,954.73
80+220.000
4.37
9.07
10.00
90.70
13,045.43
80+240.000
0.00
4.37
10.00
43.70
13,089.13
80+260.000
0.00
0.00
10.00
0.00
13,089.13
80+280.000
0.00
0.00
10.00
0.00
13,089.13
80+300.000
0.00
0.00
10.00
0.00
13,089.13
80+320.000
0.00
0.00
10.00
0.00
13,089.13
80+340.000
0.00
0.00
10.00
0.00
13,089.13
80+360.000
0.00
0.00
10.00
0.00
13,089.13
80+380.000
0.00
0.00
10.00
0.00
13,089.13
80+400.000
0.00
0.00
10.00
0.00
13,089.13
80+420.000
0.00
0.00
10.00
0.00
13,089.13
80+440.000
0.00
0.00
10.00
0.00
13,089.13
80+460.000
0.00
0.00
10.00
0.00
13,089.13
REVISO:
REALIZO:
Pgina 57 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 07
"TERRACERAS"
UNIDAD
Compactacin:
b) De la cama de los cortes en que no se halla ordenado excavacin adicional
M3
ESTACIN KM.
REA
L1+L2
D/2
80+480.000
0.00
0.00
80+500.000
0.00
80+520.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
0.00
13,089.13
0.00
10.00
0.00
13,089.13
0.00
0.00
10.00
0.00
13,089.13
80+540.000
0.00
0.00
10.00
0.00
13,089.13
80+560.000
0.00
0.00
10.00
0.00
13,089.13
80+580.000
0.00
0.00
10.00
0.00
13,089.13
80+600.000
0.00
0.00
10.00
0.00
13,089.13
80+620.000
0.00
0.00
10.00
0.00
13,089.13
80+640.000
0.22
0.22
10.00
2.20
13,091.33
80+660.000
1.14
1.36
10.00
13.60
13,104.93
80+680.000
1.30
2.44
10.00
24.40
13,129.33
80+700.000
2.35
3.65
10.00
36.50
13,165.83
80+720.000
2.27
4.62
10.00
46.20
13,212.03
80+740.000
2.02
4.29
10.00
42.90
13,254.93
80+760.000
1.48
3.50
10.00
35.00
13,289.93
80+780.000
0.00
1.48
10.00
14.80
13,304.73
80+800.000
0.00
0.00
10.00
0.00
13,304.73
80+820.000
1.54
1.54
10.00
15.40
13,320.13
80+840.000
1.54
3.08
10.00
30.80
13,350.93
80+860.000
0.00
1.54
10.00
15.40
13,366.33
80+880.000
0.26
0.26
10.00
2.60
13,368.93
80+900.000
0.26
0.52
10.00
5.20
13,374.13
80+920.000
1.80
2.06
10.00
20.60
13,394.73
80+940.000
1.97
3.77
10.00
37.70
13,432.43
80+960.000
0.00
1.97
10.00
19.70
13,452.13
80+980.000
0.00
0.00
10.00
0.00
13,452.13
81+000.000
3.18
3.18
10.00
31.80
13,483.93
81+020.000
0.00
3.18
10.00
31.80
13,515.73
81+040.000
0.00
0.00
10.00
0.00
13,515.73
81+060.000
0.00
0.00
10.00
0.00
13,515.73
81+080.000
0.00
0.00
10.00
0.00
13,515.73
81+100.000
0.00
0.00
10.00
0.00
13,515.73
81+120.000
0.00
0.00
10.00
0.00
13,515.73
81+140.000
81+160.000
81+180.000
81+200.000
81+220.000
81+240.000
81+260.000
81+280.000
81+300.000
81+320.000
81+340.000
81+360.000
81+380.000
81+400.000
81+420.000
81+440.000
81+460.000
81+480.000
81+500.000
81+520.000
81+540.000
81+560.000
81+580.000
81+600.000
81+620.000
81+640.000
81+660.000
81+680.000
81+700.000
81+720.000
1.45
2.71
4.71
3.76
2.74
4.74
4.74
4.74
4.78
4.74
4.74
4.74
4.74
4.74
2.84
0.53
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.45
4.16
7.42
8.47
6.50
7.48
9.48
9.48
9.52
9.52
9.48
9.48
9.48
9.48
7.58
3.37
0.53
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
14.50
41.60
74.20
84.70
65.00
74.80
94.80
94.80
95.20
95.20
94.80
94.80
94.80
94.80
75.80
33.70
5.30
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
13,530.23
13,571.83
13,646.03
13,730.73
13,795.73
13,870.53
13,965.33
14,060.13
14,155.33
14,250.53
14,345.33
14,440.13
14,534.93
14,629.73
14,705.53
14,739.23
14,744.53
14,744.53
14,744.53
14,744.53
14,744.53
14,744.53
14,744.53
14,744.53
14,744.53
14,744.53
14,744.53
14,744.53
14,744.53
14,744.53
REVISO:
REALIZO:
Pgina 58 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 07
"TERRACERAS"
UNIDAD
Compactacin:
b) De la cama de los cortes en que no se halla ordenado excavacin adicional
M3
ESTACIN KM.
REA
L1+L2
D/2
81+740.000
81+760.000
81+780.000
81+800.000
81+820.000
81+840.000
81+860.000
81+880.000
81+900.000
81+920.000
81+940.000
81+960.000
81+980.000
82+000.000
82+020.000
82+040.000
82+060.000
82+080.000
82+100.000
82+120.000
82+140.000
82+160.000
82+180.000
82+200.000
82+220.000
82+240.000
82+260.000
82+280.000
82+300.000
82+320.000
82+340.000
82+360.000
82+380.000
82+400.000
82+420.000
82+440.000
82+460.000
82+480.000
82+500.000
82+520.000
82+540.000
82+560.000
82+580.000
82+600.000
82+620.000
82+640.000
82+660.000
82+680.000
82+700.000
82+720.000
82+740.000
82+760.000
82+780.000
82+800.000
82+820.000
82+840.000
82+860.000
82+880.000
82+900.000
82+920.000
82+940.000
82+960.000
82+980.000
83+000.000
83+020.000
83+040.000
83+060.000
83+080.000
83+100.000
83+120.000
83+140.000
83+160.000
83+170.200
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.42
2.67
0.00
0.00
0.00
3.42
4.70
4.70
4.70
4.70
4.70
4.70
4.70
4.70
4.51
4.55
4.70
4.70
4.70
4.70
4.70
4.70
4.70
4.70
4.70
4.70
4.70
4.71
3.33
3.77
3.04
0.24
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.42
5.09
2.67
0.00
0.00
3.42
8.12
9.40
9.40
9.40
9.40
9.40
9.40
9.40
9.21
9.06
9.25
9.40
9.40
9.40
9.40
9.40
9.40
9.40
9.40
9.40
9.40
9.41
8.04
7.10
6.81
3.28
0.24
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
5.10
REVISO:
REA ACUMULADA
PARCIAL
ACUMULADO
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
24.20
50.90
26.70
0.00
0.00
34.20
81.20
94.00
94.00
94.00
94.00
94.00
94.00
94.00
92.10
90.60
92.50
94.00
94.00
94.00
94.00
94.00
94.00
94.00
94.00
94.00
94.00
94.10
80.40
71.00
68.10
32.80
2.40
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
14,744.53
14,744.53
14,744.53
14,744.53
14,744.53
14,744.53
14,744.53
14,744.53
14,744.53
14,744.53
14,744.53
14,744.53
14,744.53
14,768.73
14,819.63
14,846.33
14,846.33
14,846.33
14,880.53
14,961.73
15,055.73
15,149.73
15,243.73
15,337.73
15,431.73
15,525.73
15,619.73
15,711.83
15,802.43
15,894.93
15,988.93
16,082.93
16,176.93
16,270.93
16,364.93
16,458.93
16,552.93
16,646.93
16,740.93
16,834.93
16,929.03
17,009.43
17,080.43
17,148.53
17,181.33
17,183.73
17,183.73
17,183.73
17,183.73
17,183.73
17,183.73
17,183.73
17,183.73
17,183.73
17,183.73
17,183.73
17,183.73
17,183.73
17,183.73
17,183.73
17,183.73
17,183.73
17,183.73
17,183.73
17,183.73
17,183.73
17,183.73
17,183.73
17,183.73
17,183.73
17,183.73
17,183.73
17,183.73
REALIZO:
Pgina 59 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 07
"TERRACERAS"
UNIDAD
Compactacin:
b) De la cama de los cortes en que no se halla ordenado excavacin adicional
M3
ESTACIN KM.
REA
L1+L2
D/2
83+180.000
83+200.000
83+220.000
83+240.000
83+260.000
83+280.000
83+300.000
83+320.000
83+340.000
83+360.000
83+380.000
83+400.000
83+420.000
83+440.000
83+460.000
83+480.000
83+500.000
83+520.000
83+540.000
83+560.000
83+570.105
83+580.000
83+593.182
83+600.000
83+616.259
83+620.000
83+640.000
83+653.182
83+660.000
83+680.000
83+700.000
83+720.000
83+740.000
83+760.000
83+780.000
83+785.000
0.79
0.77
1.45
4.70
4.70
4.70
4.70
4.74
3.84
2.47
2.29
2.40
3.17
4.70
4.70
4.70
4.70
4.70
4.70
4.70
4.70
4.70
4.70
4.71
4.72
4.73
4.73
4.77
4.75
4.77
4.77
4.77
4.77
4.77
4.77
4.34
0.79
1.56
2.22
6.15
9.40
9.40
9.40
9.44
8.58
6.31
4.76
4.69
5.57
7.87
9.40
9.40
9.40
9.40
9.40
9.40
9.40
9.40
9.40
9.41
9.43
9.45
9.46
9.50
9.52
9.52
9.54
9.54
9.54
9.54
9.54
9.11
4.90
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
5.05
4.95
6.59
3.41
8.13
1.87
10.00
6.59
3.41
10.00
10.00
10.00
10.00
10.00
10.00
2.50
REVISO:
REA ACUMULADA
PARCIAL
ACUMULADO
3.87
15.60
22.20
61.50
94.00
94.00
94.00
94.40
85.80
63.10
47.60
46.90
55.70
78.70
94.00
94.00
94.00
94.00
94.00
94.00
47.49
46.51
61.95
32.08
76.66
17.68
94.60
62.61
32.46
95.20
95.40
95.40
95.40
95.40
95.40
22.78
17,187.60
17,203.20
17,225.40
17,286.90
17,380.90
17,474.90
17,568.90
17,663.30
17,749.10
17,812.20
17,859.80
17,906.70
17,962.40
18,041.10
18,135.10
18,229.10
18,323.10
18,417.10
18,511.10
18,605.10
18,652.60
18,699.10
18,761.06
18,793.14
18,869.80
18,887.48
18,982.08
19,044.69
19,077.14
19,172.34
19,267.74
19,363.14
19,458.54
19,553.94
19,649.34
19,672.12
REALIZO:
Pgina 60 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 09
"TERRACERAS"
UNIDAD
TERRAPLENES
2) Para noventa por ciento (a 90 % T)
M3
REA ACUMULADA
ESTACIN KM.
REA
L1+L2
D/2
71+800.000
3.79
0.00
0.00
0.00
0.00
71+820.000
3.20
6.99
10.00
69.90
69.90
71+840.000
6.39
9.59
10.00
95.90
165.80
71+860.000
7.08
13.47
10.00
134.70
300.50
71+880.000
7.36
14.44
10.00
144.40
444.90
71+900.000
9.27
16.63
10.00
166.30
611.20
71+920.000
11.59
20.86
10.00
208.60
819.80
71+940.000
10.88
22.47
10.00
224.70
1,044.50
71+960.000
15.62
26.50
10.00
265.00
1,309.50
71+980.000
8.46
24.08
10.00
240.80
1,550.30
72+000.000
9.77
18.23
10.00
182.30
1,732.60
72+020.000
5.97
15.74
10.00
157.40
1,890.00
72+040.000
4.00
9.97
10.00
99.70
1,989.70
72+060.000
3.18
7.18
10.00
71.80
2,061.50
72+080.000
5.34
8.52
10.00
85.20
2,146.70
72+100.000
3.71
9.05
10.00
90.50
2,237.20
72+120.000
5.05
8.76
10.00
87.60
2,324.80
72+140.000
5.77
10.82
10.00
108.20
2,433.00
72+160.000
7.92
13.69
10.00
136.90
2,569.90
72+180.000
6.20
14.12
10.00
141.20
2,711.10
72+200.000
4.47
10.67
10.00
106.70
2,817.80
72+220.000
1.03
5.50
10.00
55.00
2,872.80
72+240.000
3.13
4.16
10.00
41.60
2,914.40
72+260.000
7.98
11.11
10.00
111.10
3,025.50
72+280.000
7.52
15.50
10.00
155.00
3,180.50
72+300.000
8.05
15.57
10.00
155.70
3,336.20
72+320.000
10.85
18.90
10.00
189.00
3,525.20
72+340.000
9.49
20.34
10.00
203.40
3,728.60
72+360.000
6.19
15.68
10.00
156.80
3,885.40
72+380.000
10.68
16.87
10.00
168.70
4,054.10
72+400.000
17.00
27.68
10.00
276.80
4,330.90
72+420.000
13.43
30.43
10.00
304.30
4,635.20
72+440.000
10.89
24.32
10.00
243.20
4,878.40
72+460.000
5.91
16.80
10.00
168.00
5,046.40
72+480.000
6.08
11.99
10.00
119.90
5,166.30
72+500.000
9.69
15.77
10.00
157.70
5,324.00
72+520.000
13.74
23.43
10.00
234.30
5,558.30
72+540.000
20.14
33.88
10.00
338.80
5,897.10
72+560.000
10.93
31.07
10.00
310.70
6,207.80
72+580.000
10.84
21.77
10.00
217.70
6,425.50
72+600.000
14.00
24.84
10.00
248.40
6,673.90
72+620.000
14.25
28.25
10.00
282.50
6,956.40
72+640.000
13.13
27.38
10.00
273.80
7,230.20
72+654.982
10.83
23.96
7.49
179.48
7,409.68
72+660.000
10.45
21.28
2.51
53.40
7,463.08
72+678.443
10.33
20.78
9.22
191.62
7,654.70
72+680.000
6.18
16.51
0.78
12.85
7,667.55
72+700.000
7.78
13.96
10.00
139.60
7,807.15
72+701.905
7.53
15.31
0.95
14.58
7,821.73
72+720.000
4.49
12.02
9.05
108.75
7,930.48
72+739.443
6.23
10.72
9.72
104.21
8,034.70
72+740.000
6.17
12.40
0.28
3.45
8,038.15
REVISO:
PARCIAL
ACUMULADO
REALIZO:
Pgina 61 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 09
"TERRACERAS"
UNIDAD
TERRAPLENES
2) Para noventa por ciento (a 90 % T)
M3
ESTACIN KM.
REA
L1+L2
D/2
72+760.000
5.06
11.23
72+780.000
5.25
72+800.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
112.30
8,150.45
10.31
10.00
103.10
8,253.55
3.26
8.51
10.00
85.10
8,338.65
72+820.000
0.00
3.26
10.00
32.60
8,371.25
72+840.000
2.66
2.66
10.00
26.60
8,397.85
72+860.000
8.95
11.61
10.00
116.10
8,513.95
72+880.000
17.46
26.41
10.00
264.10
8,778.05
72+900.000
17.69
35.15
10.00
351.50
9,129.55
72+920.000
25.99
43.68
10.00
436.80
9,566.35
72+940.000
0.00
25.99
10.00
259.90
9,826.25
72+960.000
0.00
0.00
10.00
0.00
9,826.25
72+971.651
0.00
0.00
5.83
0.00
9,826.25
72+980.000
0.00
0.00
4.17
0.00
9,826.25
73+000.000
0.00
0.00
10.00
0.00
9,826.25
73+009.189
0.00
0.00
4.59
0.00
9,826.25
73+020.000
0.00
0.00
5.41
0.00
9,826.25
73+032.651
0.00
0.00
6.33
0.00
9,826.25
73+040.000
0.00
0.00
3.67
0.00
9,826.25
73+056.112
0.00
0.00
8.06
0.00
9,826.25
73+060.000
0.00
0.00
1.94
0.00
9,826.25
73+080.000
0.00
0.00
10.00
0.00
9,826.25
73+100.000
0.00
0.00
10.00
0.00
9,826.25
73+120.000
0.00
0.00
10.00
0.00
9,826.25
73+140.000
0.00
0.00
10.00
0.00
9,826.25
73+160.000
0.00
0.00
10.00
0.00
9,826.25
73+180.000
0.00
0.00
10.00
0.00
9,826.25
73+200.000
0.00
0.00
10.00
0.00
9,826.25
73+220.000
0.00
0.00
10.00
0.00
9,826.25
73+240.000
0.00
0.00
10.00
0.00
9,826.25
73+260.000
82.03
82.03
10.00
820.30
10,646.55
73+280.000
81.87
163.90
10.00
1639.00
12,285.55
73+300.000
88.25
170.12
10.00
1701.20
13,986.75
73+320.000
88.95
177.20
10.00
1772.00
15,758.75
73+340.000
94.13
183.08
10.00
1830.80
17,589.55
73+360.000
105.77
199.90
10.00
1999.00
19,588.55
73+380.000
98.12
203.89
10.00
2038.90
21,627.45
73+400.000
87.70
185.82
10.00
1858.20
23,485.65
73+420.000
79.90
167.60
10.00
1676.00
25,161.65
73+440.000
79.90
159.80
10.00
1598.00
26,759.65
73+460.000
76.04
155.94
10.00
1559.40
28,319.05
73+480.000
71.83
147.87
10.00
1478.70
29,797.75
73+500.000
71.83
143.66
10.00
1436.60
31,234.35
73+520.000
80.93
152.76
10.00
1527.60
32,761.95
73+540.000
80.49
161.42
10.00
1614.20
34,376.15
73+560.000
90.07
170.56
10.00
1705.60
36,081.75
73+580.000
98.34
188.41
10.00
1884.10
37,965.85
73+600.000
104.93
203.27
10.00
2032.70
39,998.55
73+620.000
92.16
197.09
10.00
1970.90
41,969.45
73+640.000
92.16
184.32
10.00
1843.20
43,812.65
73+660.000
87.39
179.55
10.00
1795.50
45,608.15
73+680.000
83.56
170.95
10.00
1709.50
47,317.65
73+700.000
78.04
161.60
10.00
1616.00
48,933.65
73+720.000
83.04
161.08
10.00
1610.80
50,544.45
73+740.000
82.23
165.27
10.00
1652.70
52,197.15
REVISO:
REALIZO:
Pgina 62 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 09
"TERRACERAS"
UNIDAD
TERRAPLENES
2) Para noventa por ciento (a 90 % T)
M3
ESTACIN KM.
REA
L1+L2
D/2
73+760.000
78.36
160.59
73+780.000
83.02
73+800.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
1605.90
53,803.05
161.38
10.00
1613.80
55,416.85
82.13
165.15
10.00
1651.50
57,068.35
73+807.617
78.69
160.82
3.81
612.44
57,680.80
73+820.000
87.83
166.52
6.19
1031.05
58,711.85
73+840.000
0.00
87.83
10.00
878.30
59,590.15
73+848.283
0.00
0.00
4.14
0.00
59,590.15
73+860.000
0.00
0.00
5.86
0.00
59,590.15
73+880.000
0.00
0.00
10.00
0.00
59,590.15
73+888.950
0.00
0.00
4.47
0.00
59,590.15
73+900.000
0.00
0.00
5.53
0.00
59,590.15
73+909.283
0.00
0.00
4.64
0.00
59,590.15
73+920.000
0.00
0.00
5.36
0.00
59,590.15
73+940.000
0.00
0.00
10.00
0.00
59,590.15
73+960.000
86.88
86.88
10.00
868.80
60,458.95
73+980.000
91.98
178.86
10.00
1788.60
62,247.55
74+000.000
112.58
204.56
10.00
2045.60
64,293.15
74+020.000
127.97
240.55
10.00
2405.50
66,698.65
74+040.000
143.90
271.87
10.00
2718.70
69,417.35
74+060.000
145.14
289.04
10.00
2890.40
72,307.75
74+080.000
103.24
248.38
10.00
2483.80
74,791.55
74+089.272
81.94
185.18
4.64
858.50
75,650.05
74+100.000
56.51
138.45
5.36
742.64
76,392.69
74+109.605
49.75
106.26
4.80
510.34
76,903.02
74+120.000
41.88
91.63
5.20
476.23
77,379.25
74+140.000
40.99
82.87
10.00
828.70
78,207.95
74+150.272
70.64
111.63
5.14
573.34
78,781.29
74+160.000
80.85
151.49
4.86
736.84
79,518.13
74+180.000
72.30
153.15
10.00
1531.50
81,049.63
74+190.939
80.29
152.59
5.47
834.57
81,884.20
74+200.000
87.38
167.67
4.53
759.65
82,643.85
74+220.000
104.31
191.69
10.00
1916.90
84,560.75
74+240.000
99.32
203.63
10.00
2036.30
86,597.05
74+260.000
107.73
207.05
10.00
2070.50
88,667.55
74+280.000
95.89
203.62
10.00
2036.20
90,703.75
74+300.000
67.36
163.25
10.00
1632.50
92,336.25
74+320.000
58.82
126.18
10.00
1261.80
93,598.05
74+340.000
66.15
124.97
10.00
1249.70
94,847.75
74+360.000
61.20
127.35
10.00
1273.50
96,121.25
74+380.000
66.29
127.49
10.00
1274.90
97,396.15
74+400.000
63.59
129.88
10.00
1298.80
98,694.95
74+420.000
70.66
134.25
10.00
1342.50
100,037.45
74+440.000
68.61
139.27
10.00
1392.70
101,430.15
74+457.851
74.82
143.43
8.93
1280.17
102,710.32
74+460.000
72.46
147.28
1.07
158.26
102,868.59
74+480.000
81.19
153.65
10.00
1536.50
104,405.09
74+498.518
94.01
175.20
9.26
1622.13
106,027.22
74+500.000
94.79
188.80
0.74
139.95
106,167.17
74+520.000
107.39
202.18
10.00
2021.80
108,188.97
74+539.184
125.65
233.04
9.59
2235.34
110,424.31
74+540.000
127.37
253.02
0.41
103.21
110,527.52
74+559.518
151.32
278.69
9.76
2719.67
113,247.18
74+560.000
149.86
301.18
0.24
72.66
113,319.84
74+580.000
178.38
328.24
10.00
3282.40
116,602.24
REVISO:
REALIZO:
Pgina 63 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 09
"TERRACERAS"
UNIDAD
TERRAPLENES
2) Para noventa por ciento (a 90 % T)
M3
ESTACIN KM.
REA
L1+L2
D/2
74+600.000
193.25
371.63
74+620.000
198.48
74+640.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
3716.30
120,318.54
391.73
10.00
3917.30
124,235.84
176.06
374.54
10.00
3745.40
127,981.24
74+660.000
170.86
346.92
10.00
3469.20
131,450.44
74+680.000
135.41
306.27
10.00
3062.70
134,513.14
74+700.000
122.64
258.05
10.00
2580.50
137,093.64
74+720.000
134.26
256.90
10.00
2569.00
139,662.64
74+740.000
194.07
328.33
10.00
3283.30
142,945.94
74+760.000
136.13
330.20
10.00
3302.00
146,247.94
74+779.360
77.16
213.29
9.68
2064.64
148,312.58
74+780.000
78.27
155.43
0.32
49.74
148,362.33
74+799.693
14.33
92.60
9.85
911.80
149,274.12
74+800.000
12.82
27.15
0.15
4.16
149,278.29
74+820.000
0.03
12.85
10.00
128.50
149,406.79
74+840.000
0.00
0.03
10.00
0.30
149,407.09
74+840.360
0.00
0.00
0.18
0.00
149,407.09
74+860.000
0.01
0.01
9.82
0.10
149,407.19
74+880.000
7.68
7.69
10.00
76.90
149,484.09
74+881.027
9.34
17.02
0.51
8.74
149,492.82
74+900.000
57.47
66.81
9.49
633.81
150,126.63
74+920.000
215.12
272.59
10.00
2725.90
152,852.53
74+940.000
160.20
375.32
10.00
3753.20
156,605.73
74+960.000
22.81
183.01
10.00
1830.10
158,435.83
74+980.000
0.00
22.81
10.00
228.10
158,663.93
75+000.000
0.00
0.00
10.00
0.00
158,663.93
75+020.000
0.00
0.00
10.00
0.00
158,663.93
75+040.000
0.00
0.00
10.00
0.00
158,663.93
75+060.000
0.00
0.00
10.00
0.00
158,663.93
75+080.000
0.00
0.00
10.00
0.00
158,663.93
75+100.000
0.00
0.00
10.00
0.00
158,663.93
75+120.000
0.00
0.00
10.00
0.00
158,663.93
75+140.000
0.00
0.00
10.00
0.00
158,663.93
75+160.000
0.00
0.00
10.00
0.00
158,663.93
75+180.000
0.00
0.00
10.00
0.00
158,663.93
75+200.000
0.00
0.00
10.00
0.00
158,663.93
75+220.000
0.00
0.00
10.00
0.00
158,663.93
75+240.000
0.00
0.00
10.00
0.00
158,663.93
75+260.000
0.00
0.00
10.00
0.00
158,663.93
75+280.000
0.00
0.00
10.00
0.00
158,663.93
75+300.000
0.00
0.00
10.00
0.00
158,663.93
75+320.000
0.00
0.00
10.00
0.00
158,663.93
75+340.000
0.00
0.00
10.00
0.00
158,663.93
75+360.000
0.00
0.00
10.00
0.00
158,663.93
75+380.000
0.00
0.00
10.00
0.00
158,663.93
75+400.000
0.00
0.00
10.00
0.00
158,663.93
75+420.000
0.00
0.00
10.00
0.00
158,663.93
75+440.000
0.00
0.00
10.00
0.00
158,663.93
75+460.000
0.00
0.00
10.00
0.00
158,663.93
75+480.000
0.00
0.00
10.00
0.00
158,663.93
75+500.000
0.00
0.00
10.00
0.00
158,663.93
75+520.000
0.00
0.00
10.00
0.00
158,663.93
75+540.000
0.00
0.00
10.00
0.00
158,663.93
75+560.000
0.00
0.00
10.00
0.00
158,663.93
75+580.000
0.00
0.00
10.00
0.00
158,663.93
REVISO:
REALIZO:
Pgina 64 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 09
"TERRACERAS"
UNIDAD
TERRAPLENES
2) Para noventa por ciento (a 90 % T)
M3
ESTACIN KM.
REA
L1+L2
D/2
75+600.000
0.00
0.00
75+611.738
0.00
75+620.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
0.00
158,663.93
0.00
5.87
0.00
158,663.93
0.00
0.00
4.13
0.00
158,663.93
75+635.122
0.00
0.00
7.56
0.00
158,663.93
75+640.000
0.00
0.00
2.44
0.00
158,663.93
75+658.507
0.00
0.00
9.25
0.00
158,663.93
75+660.000
0.00
0.00
0.75
0.00
158,663.93
75+680.000
0.00
0.00
10.00
0.00
158,663.93
75+700.000
43.58
43.58
10.00
435.80
159,099.73
75+711.122
92.07
135.65
5.56
754.38
159,854.11
75+720.000
133.93
226.00
4.44
1003.17
160,857.27
75+740.000
247.85
381.78
10.00
3817.80
164,675.07
75+760.000
292.12
539.97
10.00
5399.70
170,074.77
75+780.000
392.63
684.75
10.00
6847.50
176,922.27
75+800.000
376.72
769.35
10.00
7693.50
184,615.77
75+820.000
364.15
740.87
10.00
7408.70
192,024.47
75+840.000
386.03
750.18
10.00
7501.80
199,526.27
75+860.000
339.87
725.90
10.00
7259.00
206,785.27
75+880.000
348.92
688.79
10.00
6887.90
213,673.17
75+900.000
336.87
685.79
10.00
6857.90
220,531.07
75+920.000
328.89
665.76
10.00
6657.60
227,188.67
75+940.000
317.98
646.87
10.00
6468.70
233,657.37
75+960.000
294.80
612.78
10.00
6127.80
239,785.17
75+980.000
270.47
565.27
10.00
5652.70
245,437.87
76+000.000
237.77
508.24
10.00
5082.40
250,520.27
76+020.000
209.34
447.11
10.00
4471.10
254,991.37
76+040.000
196.29
405.63
10.00
4056.30
259,047.67
76+060.000
177.80
374.09
10.00
3740.90
262,788.57
76+080.000
162.01
339.81
10.00
3398.10
266,186.67
76+100.000
158.62
320.63
10.00
3206.30
269,392.97
76+120.000
146.58
305.20
10.00
3052.00
272,444.97
76+140.000
145.44
292.02
10.00
2920.20
275,365.17
76+160.000
133.02
278.46
10.00
2784.60
278,149.77
76+180.000
123.79
256.81
10.00
2568.10
280,717.87
76+200.000
106.99
230.78
10.00
2307.80
283,025.67
76+220.000
94.36
201.35
10.00
2013.50
285,039.17
76+240.000
77.90
172.26
10.00
1722.60
286,761.77
76+255.500
68.79
146.69
7.75
1136.83
287,898.60
76+260.000
61.67
130.46
2.25
293.55
288,192.16
76+280.000
48.49
110.16
10.00
1101.60
289,293.76
76+300.000
37.19
85.68
10.00
856.80
290,150.56
76+320.000
31.59
68.78
10.00
687.80
290,838.36
76+321.961
30.78
62.37
0.98
61.16
290,899.52
76+340.000
27.87
58.65
9.02
528.99
291,428.50
76+351.500
28.92
56.79
5.75
326.53
291,755.04
76+360.000
24.76
53.68
4.25
228.15
291,983.19
76+380.000
21.91
46.67
10.00
466.70
292,449.89
76+381.038
21.40
43.31
0.52
22.48
292,472.37
76+400.000
9.92
31.32
9.48
296.94
292,769.31
76+420.000
3.34
13.26
10.00
132.60
292,901.91
76+440.000
7.38
10.72
10.00
107.20
293,009.11
76+460.000
7.50
14.88
10.00
148.80
293,157.91
76+480.000
0.00
7.50
10.00
75.00
293,232.91
76+500.000
0.00
0.00
10.00
0.00
293,232.91
REVISO:
REALIZO:
Pgina 65 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 09
"TERRACERAS"
UNIDAD
TERRAPLENES
2) Para noventa por ciento (a 90 % T)
M3
ESTACIN KM.
REA
L1+L2
D/2
76+520.000
3.36
3.36
76+540.000
10.06
76+560.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
33.60
293,266.51
13.42
10.00
134.20
293,400.71
21.51
31.57
10.00
315.70
293,716.41
76+580.000
29.22
50.73
10.00
507.30
294,223.71
76+600.000
29.73
58.95
10.00
589.50
294,813.21
76+620.000
33.68
63.41
10.00
634.10
295,447.31
76+640.000
25.35
59.03
10.00
590.30
296,037.61
76+660.000
25.21
50.56
10.00
505.60
296,543.21
76+680.000
35.84
61.05
10.00
610.50
297,153.71
76+700.000
38.36
74.20
10.00
742.00
297,895.71
76+720.000
42.61
80.97
10.00
809.70
298,705.41
76+740.000
35.30
77.91
10.00
779.10
299,484.51
76+760.000
32.52
67.82
10.00
678.20
300,162.71
76+780.000
32.35
64.87
10.00
648.70
300,811.41
76+800.000
29.54
61.89
10.00
618.90
301,430.31
76+820.000
23.60
53.14
10.00
531.40
301,961.71
76+840.000
24.74
48.34
10.00
483.40
302,445.11
76+860.000
27.58
52.32
10.00
523.20
302,968.31
76+880.000
30.89
58.47
10.00
584.70
303,553.01
76+900.000
35.38
66.27
10.00
662.70
304,215.71
76+920.000
46.04
81.42
10.00
814.20
305,029.91
76+940.000
42.23
88.27
10.00
882.70
305,912.61
76+960.000
37.01
79.24
10.00
792.40
306,705.01
76+980.000
39.88
76.89
10.00
768.90
307,473.91
76+985.245
40.10
79.98
2.62
209.76
307,683.67
76+993.182
42.53
82.63
3.97
327.90
308,011.57
77+000.000
45.57
88.10
3.41
300.34
308,311.91
77+001.118
46.10
91.67
0.56
51.26
308,363.17
77+018.182
54.00
100.10
8.53
854.03
309,217.20
77+020.000
54.63
108.63
0.91
98.75
309,315.95
77+040.000
55.19
109.82
10.00
1098.20
310,414.15
77+060.000
69.64
124.83
10.00
1248.30
311,662.45
77+080.000
78.22
147.86
10.00
1478.60
313,141.05
77+100.000
91.51
169.73
10.00
1697.30
314,838.35
77+120.000
88.01
179.52
10.00
1795.20
316,633.55
77+140.000
76.88
164.89
10.00
1648.90
318,282.45
77+160.000
57.19
134.07
10.00
1340.70
319,623.15
77+180.000
49.27
106.46
10.00
1064.60
320,687.75
77+200.000
68.13
117.40
10.00
1174.00
321,861.75
77+220.000
77.99
146.12
10.00
1461.20
323,322.95
77+240.000
39.55
117.54
10.00
1175.40
324,498.35
77+260.000
1.17
40.72
10.00
407.20
324,905.55
77+280.000
0.00
1.17
10.00
11.70
324,917.25
77+300.000
0.00
0.00
10.00
0.00
324,917.25
77+320.000
0.00
0.00
10.00
0.00
324,917.25
77+340.000
0.00
0.00
10.00
0.00
324,917.25
77+360.000
15.57
15.57
10.00
155.70
325,072.95
77+380.000
35.41
50.98
10.00
509.80
325,582.75
77+400.000
40.21
75.62
10.00
756.20
326,338.95
77+420.000
0.00
40.21
10.00
402.10
326,741.05
77+440.000
0.00
0.00
10.00
0.00
326,741.05
77+460.000
0.00
0.00
10.00
0.00
326,741.05
77+480.000
0.00
0.00
10.00
0.00
326,741.05
77+500.000
0.00
0.00
10.00
0.00
326,741.05
REVISO:
REALIZO:
Pgina 66 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 09
"TERRACERAS"
UNIDAD
TERRAPLENES
2) Para noventa por ciento (a 90 % T)
M3
ESTACIN KM.
REA
L1+L2
D/2
77+520.000
0.00
0.00
77+525.218
0.00
77+540.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
0.00
326,741.05
0.00
2.61
0.00
326,741.05
0.00
0.00
7.39
0.00
326,741.05
77+540.234
0.00
0.00
0.12
0.00
326,741.05
77+547.218
0.00
0.00
3.49
0.00
326,741.05
77+554.202
0.00
0.00
3.49
0.00
326,741.05
77+560.000
0.00
0.00
2.90
0.00
326,741.05
77+580.000
0.08
0.08
10.00
0.80
326,741.85
77+600.000
13.97
14.05
10.00
140.50
326,882.35
77+620.000
32.55
46.52
10.00
465.20
327,347.55
77+640.000
43.80
76.35
10.00
763.50
328,111.05
77+647.342
46.60
90.40
3.67
331.84
328,442.88
77+660.000
56.36
102.96
6.33
651.66
329,094.54
77+663.215
58.76
115.12
1.61
185.03
329,279.57
77+679.088
68.59
127.35
7.94
1010.71
330,290.29
77+680.000
68.55
137.14
0.46
62.57
330,352.85
77+700.000
16.23
84.78
10.00
847.80
331,200.65
77+713.215
0.00
16.23
6.61
107.24
331,307.89
77+720.000
0.00
0.00
3.39
0.00
331,307.89
77+740.000
36.66
36.66
10.00
366.60
331,674.49
77+760.000
43.23
79.89
10.00
798.90
332,473.39
77+780.000
13.89
57.12
10.00
571.20
333,044.59
77+800.000
0.00
13.89
10.00
138.90
333,183.49
77+820.000
0.00
0.00
10.00
0.00
333,183.49
77+840.000
0.00
0.00
10.00
0.00
333,183.49
77+860.000
0.00
0.00
10.00
0.00
333,183.49
77+880.000
0.00
0.00
10.00
0.00
333,183.49
77+900.000
0.00
0.00
10.00
0.00
333,183.49
77+920.000
0.00
0.00
10.00
0.00
333,183.49
77+940.000
0.00
0.00
10.00
0.00
333,183.49
77+960.000
0.00
0.00
10.00
0.00
333,183.49
77+980.000
0.00
0.00
10.00
0.00
333,183.49
78+000.000
0.00
0.00
10.00
0.00
333,183.49
78+020.000
0.00
0.00
10.00
0.00
333,183.49
78+040.000
33.41
33.41
10.00
334.10
333,517.59
78+060.000
77.09
110.50
10.00
1105.00
334,622.59
78+080.000
99.40
176.49
10.00
1764.90
336,387.49
78+094.334
87.07
186.47
7.17
1336.43
337,723.92
78+100.000
77.20
164.27
2.83
465.37
338,189.30
78+116.175
62.20
139.40
8.09
1127.42
339,316.72
78+120.000
58.54
120.74
1.91
230.90
339,547.61
78+126.334
56.00
114.54
3.17
362.75
339,910.36
78+136.493
53.24
109.24
5.08
554.87
340,465.23
78+140.000
51.46
104.70
1.75
183.60
340,648.83
78+160.000
51.37
102.83
10.00
1028.30
341,677.13
78+180.000
50.59
101.96
10.00
1019.60
342,696.73
78+200.000
53.05
103.64
10.00
1036.40
343,733.13
78+220.000
51.69
104.74
10.00
1047.40
344,780.53
78+240.000
48.95
100.64
10.00
1006.40
345,786.93
78+260.000
47.46
96.41
10.00
964.10
346,751.03
78+280.000
0.00
47.46
10.00
474.60
347,225.63
78+300.000
0.00
0.00
10.00
0.00
347,225.63
78+320.000
0.00
0.00
10.00
0.00
347,225.63
78+340.000
0.00
0.00
10.00
0.00
347,225.63
REVISO:
REALIZO:
Pgina 67 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 09
"TERRACERAS"
UNIDAD
TERRAPLENES
2) Para noventa por ciento (a 90 % T)
M3
ESTACIN KM.
REA
L1+L2
D/2
78+360.000
0.00
0.00
78+380.000
0.00
78+400.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
0.00
347,225.63
0.00
10.00
0.00
347,225.63
0.00
0.00
10.00
0.00
347,225.63
78+420.000
0.00
0.00
10.00
0.00
347,225.63
78+440.000
0.00
0.00
10.00
0.00
347,225.63
78+460.000
0.00
0.00
10.00
0.00
347,225.63
78+480.000
0.00
0.00
10.00
0.00
347,225.63
78+500.000
0.00
0.00
10.00
0.00
347,225.63
78+520.000
0.00
0.00
10.00
0.00
347,225.63
78+540.000
41.71
41.71
10.00
417.10
347,642.73
78+560.000
37.87
79.58
10.00
795.80
348,438.53
78+580.000
32.61
70.48
10.00
704.80
349,143.33
78+600.000
41.61
74.22
10.00
742.20
349,885.53
78+620.000
27.39
69.00
10.00
690.00
350,575.53
78+640.000
10.53
37.92
10.00
379.20
350,954.73
78+660.000
5.77
16.30
10.00
163.00
351,117.73
78+680.000
2.13
7.90
10.00
79.00
351,196.73
78+700.000
0.67
2.80
10.00
28.00
351,224.73
78+720.000
0.00
0.67
10.00
6.70
351,231.43
78+740.000
0.00
0.00
10.00
0.00
351,231.43
78+760.000
0.00
0.00
10.00
0.00
351,231.43
78+780.000
0.00
0.00
10.00
0.00
351,231.43
78+790.492
0.00
0.00
5.25
0.00
351,231.43
78+796.615
0.00
0.00
3.06
0.00
351,231.43
78+800.000
0.00
0.00
1.69
0.00
351,231.43
78+802.737
0.00
0.00
1.37
0.00
351,231.43
78+811.615
0.00
0.00
4.44
0.00
351,231.43
78+820.000
0.00
0.00
4.19
0.00
351,231.43
78+840.000
0.00
0.00
10.00
0.00
351,231.43
78+860.000
0.00
0.00
10.00
0.00
351,231.43
78+880.000
0.00
0.00
10.00
0.00
351,231.43
78+900.000
0.00
0.00
10.00
0.00
351,231.43
78+920.000
0.00
0.00
10.00
0.00
351,231.43
78+940.000
0.00
0.00
10.00
0.00
351,231.43
78+960.000
0.00
0.00
10.00
0.00
351,231.43
78+980.000
0.00
0.00
10.00
0.00
351,231.43
79+000.000
0.00
0.00
10.00
0.00
351,231.43
79+020.000
0.04
0.04
10.00
0.40
351,231.83
79+040.000
3.95
3.99
10.00
39.90
351,271.73
79+060.000
8.69
12.64
10.00
126.40
351,398.13
79+080.000
20.32
29.01
10.00
290.10
351,688.23
79+097.907
27.53
47.85
8.95
428.43
352,116.66
79+100.000
18.17
45.70
1.05
47.82
352,164.49
79+120.000
25.30
43.47
10.00
434.70
352,599.19
79+133.417
38.03
63.33
6.71
424.86
353,024.05
79+140.000
37.72
75.75
3.29
249.32
353,273.36
79+157.907
37.09
74.81
8.95
669.82
353,943.18
79+160.000
36.89
73.98
1.05
77.41
354,020.59
79+180.000
30.09
66.98
10.00
669.80
354,690.39
79+182.397
29.16
59.25
1.20
71.01
354,761.41
79+200.000
19.41
48.57
8.80
427.49
355,188.89
79+220.000
11.00
30.41
10.00
304.10
355,492.99
79+240.000
0.13
11.13
10.00
111.30
355,604.29
79+260.000
0.00
0.13
10.00
1.30
355,605.59
79+280.000
0.00
0.00
10.00
0.00
355,605.59
79+300.000
0.00
0.00
10.00
0.00
355,605.59
79+320.000
0.00
0.00
10.00
0.00
355,605.59
REVISO:
REALIZO:
Pgina 68 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 09
"TERRACERAS"
UNIDAD
TERRAPLENES
2) Para noventa por ciento (a 90 % T)
M3
ESTACIN KM.
REA
L1+L2
D/2
79+340.000
0.00
0.00
79+360.000
0.00
79+380.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
0.00
355,605.59
0.00
10.00
0.00
355,605.59
0.00
0.00
10.00
0.00
355,605.59
79+400.000
0.00
0.00
10.00
0.00
355,605.59
79+420.000
0.00
0.00
10.00
0.00
355,605.59
79+440.000
0.00
0.00
10.00
0.00
355,605.59
79+460.000
0.00
0.00
10.00
0.00
355,605.59
79+480.000
0.00
0.00
10.00
0.00
355,605.59
79+500.000
0.00
0.00
10.00
0.00
355,605.59
79+520.000
0.00
0.00
10.00
0.00
355,605.59
79+540.000
0.00
0.00
10.00
0.00
355,605.59
79+560.000
0.00
0.00
10.00
0.00
355,605.59
79+580.000
0.00
0.00
10.00
0.00
355,605.59
79+600.000
0.00
0.00
10.00
0.00
355,605.59
79+620.000
0.00
0.00
10.00
0.00
355,605.59
79+640.000
0.00
0.00
10.00
0.00
355,605.59
79+660.000
0.00
0.00
10.00
0.00
355,605.59
79+680.000
0.00
0.00
10.00
0.00
355,605.59
79+700.000
0.00
0.00
10.00
0.00
355,605.59
79+720.000
0.00
0.00
10.00
0.00
355,605.59
79+740.000
0.00
0.00
10.00
0.00
355,605.59
79+760.000
0.00
0.00
10.00
0.00
355,605.59
79+780.000
0.00
0.00
10.00
0.00
355,605.59
79+800.000
0.00
0.00
10.00
0.00
355,605.59
79+820.000
0.00
0.00
10.00
0.00
355,605.59
79+840.000
0.00
0.00
10.00
0.00
355,605.59
79+860.000
0.00
0.00
10.00
0.00
355,605.59
79+880.000
0.00
0.00
10.00
0.00
355,605.59
79+900.000
0.00
0.00
10.00
0.00
355,605.59
79+920.000
0.00
0.00
10.00
0.00
355,605.59
79+940.000
0.00
0.00
10.00
0.00
355,605.59
79+960.000
2.55
2.55
10.00
25.50
355,631.09
79+980.000
9.56
12.11
10.00
121.10
355,752.19
80+000.000
19.88
29.44
10.00
294.40
356,046.59
80+020.000
25.19
45.07
10.00
450.70
356,497.29
80+040.000
20.82
46.01
10.00
460.10
356,957.39
80+060.000
15.93
36.75
10.00
367.50
357,324.89
80+080.000
10.93
26.86
10.00
268.60
357,593.49
80+100.000
3.68
14.61
10.00
146.10
357,739.59
80+120.000
0.00
3.68
10.00
36.80
357,776.39
80+140.000
0.00
0.00
10.00
0.00
357,776.39
80+160.000
0.00
0.00
10.00
0.00
357,776.39
80+180.000
0.00
0.00
10.00
0.00
357,776.39
80+200.000
0.00
0.00
10.00
0.00
357,776.39
80+220.000
0.00
0.00
10.00
0.00
357,776.39
80+240.000
5.94
5.94
10.00
59.40
357,835.79
80+260.000
31.36
37.30
10.00
373.00
358,208.79
80+280.000
66.98
98.34
10.00
983.40
359,192.19
80+300.000
50.55
117.53
10.00
1175.30
360,367.49
80+320.000
77.53
128.08
10.00
1280.80
361,648.29
80+340.000
82.47
160.00
10.00
1600.00
363,248.29
80+360.000
90.59
173.06
10.00
1730.60
364,978.89
80+380.000
95.79
186.38
10.00
1863.80
366,842.69
80+400.000
97.36
193.15
10.00
1931.50
368,774.19
80+420.000
102.43
199.79
10.00
1997.90
370,772.09
80+440.000
110.18
212.61
10.00
2126.10
372,898.19
80+460.000
0.00
110.18
10.00
1101.80
373,999.99
REVISO:
REALIZO:
Pgina 69 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 09
"TERRACERAS"
UNIDAD
TERRAPLENES
2) Para noventa por ciento (a 90 % T)
M3
ESTACIN KM.
REA
L1+L2
D/2
80+480.000
0.00
0.00
80+500.000
0.00
80+520.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
0.00
373,999.99
0.00
10.00
0.00
373,999.99
0.00
0.00
10.00
0.00
373,999.99
80+540.000
0.00
0.00
10.00
0.00
373,999.99
80+560.000
0.00
0.00
10.00
0.00
373,999.99
80+580.000
0.00
0.00
10.00
0.00
373,999.99
80+600.000
76.34
76.34
10.00
763.40
374,763.39
80+620.000
57.16
133.50
10.00
1335.00
376,098.39
80+640.000
50.37
107.53
10.00
1075.30
377,173.69
80+660.000
34.99
85.36
10.00
853.60
378,027.29
80+680.000
19.25
54.24
10.00
542.40
378,569.69
80+700.000
9.44
28.69
10.00
286.90
378,856.59
80+720.000
5.77
15.21
10.00
152.10
379,008.69
80+740.000
1.22
6.99
10.00
69.90
379,078.59
80+760.000
0.20
1.42
10.00
14.20
379,092.79
80+780.000
0.00
0.20
10.00
2.00
379,094.79
80+800.000
3.12
3.12
10.00
31.20
379,125.99
80+820.000
1.54
4.66
10.00
46.60
379,172.59
80+840.000
8.95
10.49
10.00
104.90
379,277.49
80+860.000
10.48
19.43
10.00
194.30
379,471.79
80+880.000
8.02
18.50
10.00
185.00
379,656.79
80+900.000
9.99
18.01
10.00
180.10
379,836.89
80+920.000
4.37
14.36
10.00
143.60
379,980.49
80+940.000
2.09
6.46
10.00
64.60
380,045.09
80+960.000
2.54
4.63
10.00
46.30
380,091.39
80+980.000
8.09
10.63
10.00
106.30
380,197.69
81+000.000
0.00
8.09
10.00
80.90
380,278.59
81+020.000
2.26
2.26
10.00
22.60
380,301.19
81+040.000
13.68
15.94
10.00
159.40
380,460.59
81+060.000
34.48
48.16
10.00
481.60
380,942.19
81+080.000
56.46
90.94
10.00
909.40
381,851.59
81+100.000
43.18
99.64
10.00
996.40
382,847.99
81+120.000
25.19
68.37
10.00
683.70
383,531.69
81+140.000
81+160.000
81+180.000
81+200.000
81+220.000
81+240.000
81+260.000
81+280.000
81+300.000
81+320.000
81+340.000
81+360.000
81+380.000
81+400.000
81+420.000
81+440.000
81+460.000
81+480.000
81+500.000
81+520.000
81+540.000
81+560.000
81+580.000
81+600.000
81+620.000
81+640.000
81+660.000
81+680.000
81+700.000
81+720.000
0.05
0.00
0.00
0.00
0.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
24.23
63.23
91.33
95.07
79.37
78.72
77.46
76.29
6.75
77.69
87.99
0.00
0.00
0.00
0.00
25.24
0.05
0.00
0.00
0.50
0.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
24.23
87.46
154.56
186.40
174.44
158.09
156.18
153.75
83.04
84.44
165.68
87.99
0.00
0.00
0.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
252.40
0.50
0.00
0.00
5.00
5.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
242.30
874.60
1545.60
1864.00
1744.40
1580.90
1561.80
1537.50
830.40
844.40
1656.80
879.90
0.00
0.00
0.00
383,784.09
383,784.59
383,784.59
383,784.59
383,789.59
383,794.59
383,794.59
383,794.59
383,794.59
383,794.59
383,794.59
383,794.59
383,794.59
383,794.59
383,794.59
384,036.89
384,911.49
386,457.09
388,321.09
390,065.49
391,646.39
393,208.19
394,745.69
395,576.09
396,420.49
398,077.29
398,957.19
398,957.19
398,957.19
398,957.19
REVISO:
REALIZO:
Pgina 70 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 09
"TERRACERAS"
UNIDAD
TERRAPLENES
2) Para noventa por ciento (a 90 % T)
M3
ESTACIN KM.
REA
L1+L2
D/2
81+740.000
81+760.000
81+780.000
81+800.000
81+820.000
81+840.000
81+860.000
81+880.000
81+900.000
81+920.000
81+940.000
81+960.000
81+980.000
82+000.000
82+020.000
82+040.000
82+060.000
82+080.000
82+100.000
82+120.000
82+140.000
82+160.000
82+180.000
82+200.000
82+220.000
82+240.000
82+260.000
82+280.000
82+300.000
82+320.000
82+340.000
82+360.000
82+380.000
82+400.000
82+420.000
82+440.000
82+460.000
82+480.000
82+500.000
82+520.000
82+540.000
82+560.000
82+580.000
82+600.000
82+620.000
82+640.000
82+660.000
82+680.000
82+700.000
82+720.000
82+740.000
82+760.000
82+780.000
82+800.000
82+820.000
82+840.000
82+860.000
82+880.000
82+900.000
82+920.000
82+940.000
82+960.000
82+980.000
83+000.000
83+020.000
83+040.000
83+060.000
83+080.000
83+100.000
83+120.000
83+140.000
83+160.000
83+172.200
0.00
0.00
0.00
36.98
26.68
41.50
63.49
88.04
119.23
112.56
105.82
69.26
32.86
10.67
7.47
28.95
62.68
23.07
6.21
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.23
4.36
5.52
7.86
8.45
8.71
9.88
16.11
24.38
35.19
59.70
67.51
78.00
141.48
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
97.86
0.00
0.00
0.00
36.98
63.66
68.18
104.99
151.53
207.27
231.79
218.38
175.08
102.12
43.53
18.14
36.42
91.63
85.75
29.28
6.21
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.23
5.59
9.88
13.38
16.31
17.16
18.59
25.99
40.49
59.57
94.89
127.21
145.51
219.48
141.48
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
97.86
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
6.10
REVISO:
REA ACUMULADA
PARCIAL
ACUMULADO
0.00
0.00
0.00
369.80
636.60
681.80
1049.90
1515.30
2072.70
2317.90
2183.80
1750.80
1021.20
435.30
181.40
364.20
916.30
857.50
292.80
62.10
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
12.30
55.90
98.80
133.80
163.10
171.60
185.90
259.90
404.90
595.70
948.90
1272.10
1455.10
2194.80
1414.80
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
596.95
398,957.19
398,957.19
398,957.19
399,326.99
399,963.59
400,645.39
401,695.29
403,210.59
405,283.29
407,601.19
409,784.99
411,535.79
412,556.99
412,992.29
413,173.69
413,537.89
414,454.19
415,311.69
415,604.49
415,666.59
415,666.59
415,666.59
415,666.59
415,666.59
415,666.59
415,666.59
415,666.59
415,666.59
415,666.59
415,666.59
415,666.59
415,666.59
415,666.59
415,666.59
415,666.59
415,666.59
415,666.59
415,666.59
415,666.59
415,666.59
415,666.59
415,666.59
415,678.89
415,734.79
415,833.59
415,967.39
416,130.49
416,302.09
416,487.99
416,747.89
417,152.79
417,748.49
418,697.39
419,969.49
421,424.59
423,619.39
425,034.19
425,034.19
425,034.19
425,034.19
425,034.19
425,034.19
425,034.19
425,034.19
425,034.19
425,034.19
425,034.19
425,034.19
425,034.19
425,034.19
425,034.19
425,034.19
425,631.14
REALIZO:
Pgina 71 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 09
"TERRACERAS"
UNIDAD
TERRAPLENES
2) Para noventa por ciento (a 90 % T)
M3
ESTACIN KM.
REA
L1+L2
D/2
83+180.000
83+200.000
83+220.000
83+240.000
83+260.000
83+280.000
83+300.000
83+320.000
83+340.000
83+360.000
83+380.000
83+400.000
83+420.000
83+440.000
83+460.000
83+480.000
83+500.000
83+520.000
83+540.000
83+560.000
83+570.105
83+580.000
83+593.182
83+600.000
83+616.259
83+620.000
83+640.000
83+653.182
83+660.000
83+680.000
83+700.000
83+720.000
83+740.000
83+760.000
83+780.000
83+785.000
57.68
24.76
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.23
5.76
4.04
1.98
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
155.54
82.44
24.76
0.00
0.00
0.00
0.00
0.00
0.00
3.23
8.99
9.80
6.02
1.98
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
3.90
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
5.05
4.95
6.59
3.41
8.13
1.87
10.00
6.59
3.41
10.00
10.00
10.00
10.00
10.00
10.00
2.50
REA ACUMULADA
PARCIAL
ACUMULADO
606.61
824.40
247.60
0.00
0.00
0.00
0.00
0.00
0.00
32.30
89.90
98.00
60.20
19.80
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.50
426,237.75
427,062.15
427,309.75
427,309.75
427,309.75
427,309.75
427,309.75
427,309.75
427,309.75
427,342.05
427,431.95
427,529.95
427,590.15
427,609.95
427,609.95
427,609.95
427,609.95
427,609.95
427,609.95
427,609.95
427,609.95
427,609.95
427,609.95
427,609.95
427,609.95
427,609.95
427,609.95
427,609.95
427,609.95
427,609.95
427,609.95
427,609.95
427,609.95
427,609.95
427,609.95
427,612.45
REVISO:
183,721.07
10,818.75
233,073.23
REALIZO:
Pgina 72 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 11
"TERRACERAS"
UNIDAD
TERRAPLENES
3) Para noventa por ciento (a 95 % ) con material de banco
M3
REA ACUMULADA
ESTACIN KM.
REA
L1+L2
D/2
71+800.000
11.95
0.00
0.00
0.00
0.00
71+820.000
9.58
21.53
10.00
215.30
215.30
71+840.000
9.86
19.44
10.00
194.40
409.70
71+860.000
8.94
18.80
10.00
188.00
597.70
71+880.000
8.73
17.67
10.00
176.70
774.40
71+900.000
10.47
19.20
10.00
192.00
966.40
71+920.000
11.69
22.16
10.00
221.60
1,188.00
71+940.000
12.64
24.33
10.00
243.30
1,431.30
71+960.000
12.72
25.36
10.00
253.60
1,684.90
71+980.000
11.85
24.57
10.00
245.70
1,930.60
72+000.000
12.70
24.55
10.00
245.50
2,176.10
72+020.000
12.10
24.80
10.00
248.00
2,424.10
72+040.000
11.61
23.71
10.00
237.10
2,661.20
72+060.000
10.36
21.97
10.00
219.70
2,880.90
72+080.000
11.59
21.95
10.00
219.50
3,100.40
72+100.000
10.68
22.27
10.00
222.70
3,323.10
72+120.000
9.56
20.24
10.00
202.40
3,525.50
72+140.000
10.75
20.31
10.00
203.10
3,728.60
72+160.000
11.37
22.12
10.00
221.20
3,949.80
72+180.000
10.51
21.88
10.00
218.80
4,168.60
72+200.000
8.37
18.88
10.00
188.80
4,357.40
72+220.000
1.90
10.27
10.00
102.70
4,460.10
72+240.000
6.99
8.89
10.00
88.90
4,549.00
72+260.000
9.20
16.19
10.00
161.90
4,710.90
72+280.000
9.78
18.98
10.00
189.80
4,900.70
72+300.000
10.96
20.74
10.00
207.40
5,108.10
72+320.000
11.13
22.09
10.00
220.90
5,329.00
72+340.000
10.11
21.24
10.00
212.40
5,541.40
72+360.000
8.06
18.17
10.00
181.70
5,723.10
72+380.000
9.21
17.27
10.00
172.70
5,895.80
72+400.000
12.69
21.90
10.00
219.00
6,114.80
72+420.000
12.56
25.25
10.00
252.50
6,367.30
72+440.000
12.72
25.28
10.00
252.80
6,620.10
72+460.000
12.71
25.43
10.00
254.30
6,874.40
72+480.000
11.69
24.40
10.00
244.00
7,118.40
72+500.000
12.70
24.39
10.00
243.90
7,362.30
72+520.000
12.72
25.42
10.00
254.20
7,616.50
72+540.000
12.72
25.44
10.00
254.40
7,870.90
72+560.000
12.72
25.44
10.00
254.40
8,125.30
72+580.000
12.72
25.44
10.00
254.40
8,379.70
72+600.000
12.72
25.44
10.00
254.40
8,634.10
72+620.000
12.72
25.44
10.00
254.40
8,888.50
72+640.000
12.72
25.44
10.00
254.40
9,142.90
72+654.982
12.72
25.44
7.49
190.56
9,333.46
72+660.000
12.71
25.43
2.51
63.81
9,397.27
72+678.443
12.70
25.41
9.22
234.32
9,631.59
72+680.000
14.75
27.45
0.78
21.37
9,652.96
72+700.000
11.93
26.68
10.00
266.80
9,919.76
72+701.905
12.21
24.14
0.95
22.99
9,942.75
72+720.000
10.19
22.40
9.05
202.67
10,145.42
72+739.443
9.33
19.52
9.72
189.76
10,335.18
72+740.000
9.03
18.36
0.28
5.11
10,340.30
REVISO:
PARCIAL
ACUMULADO
REALIZO:
Pgina 73 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 11
"TERRACERAS"
UNIDAD
TERRAPLENES
3) Para noventa por ciento (a 95 % ) con material de banco
M3
ESTACIN KM.
REA
L1+L2
D/2
72+760.000
4.57
13.60
72+780.000
4.30
72+800.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
136.00
10,476.30
8.87
10.00
88.70
10,565.00
4.21
8.51
10.00
85.10
10,650.10
72+820.000
1.38
5.59
10.00
55.90
10,706.00
72+840.000
8.12
9.50
10.00
95.00
10,801.00
72+860.000
11.69
19.81
10.00
198.10
10,999.10
72+880.000
10.75
22.44
10.00
224.40
11,223.50
72+900.000
10.61
21.36
10.00
213.60
11,437.10
72+920.000
11.76
22.37
10.00
223.70
11,660.80
72+940.000
0.00
11.76
10.00
117.60
11,778.40
72+960.000
0.00
0.00
10.00
0.00
11,778.40
72+971.651
0.00
0.00
5.83
0.00
11,778.40
72+980.000
0.00
0.00
4.17
0.00
11,778.40
73+000.000
0.00
0.00
10.00
0.00
11,778.40
73+009.189
0.00
0.00
4.59
0.00
11,778.40
73+020.000
0.00
0.00
5.41
0.00
11,778.40
73+032.651
0.00
0.00
6.33
0.00
11,778.40
73+040.000
0.00
0.00
3.67
0.00
11,778.40
73+056.112
0.00
0.00
8.06
0.00
11,778.40
73+060.000
0.00
0.00
1.94
0.00
11,778.40
73+080.000
0.00
0.00
10.00
0.00
11,778.40
73+100.000
0.00
0.00
10.00
0.00
11,778.40
73+120.000
0.00
0.00
10.00
0.00
11,778.40
73+140.000
0.00
0.00
10.00
0.00
11,778.40
73+160.000
0.00
0.00
10.00
0.00
11,778.40
73+180.000
0.00
0.00
10.00
0.00
11,778.40
73+200.000
0.00
0.00
10.00
0.00
11,778.40
73+220.000
0.00
0.00
10.00
0.00
11,778.40
73+240.000
0.00
0.00
10.00
0.00
11,778.40
73+260.000
12.72
12.72
10.00
127.20
11,905.60
73+280.000
12.72
25.44
10.00
254.40
12,160.00
73+300.000
12.72
25.44
10.00
254.40
12,414.40
73+320.000
12.72
25.44
10.00
254.40
12,668.80
73+340.000
12.72
25.44
10.00
254.40
12,923.20
73+360.000
12.72
25.44
10.00
254.40
13,177.60
73+380.000
12.72
25.44
10.00
254.40
13,432.00
73+400.000
12.72
25.44
10.00
254.40
13,686.40
73+420.000
12.72
25.44
10.00
254.40
13,940.80
73+440.000
12.72
25.44
10.00
254.40
14,195.20
73+460.000
12.72
25.44
10.00
254.40
14,449.60
73+480.000
12.72
25.44
10.00
254.40
14,704.00
73+500.000
12.72
25.44
10.00
254.40
14,958.40
73+520.000
12.72
25.44
10.00
254.40
15,212.80
73+540.000
12.72
25.44
10.00
254.40
15,467.20
73+560.000
12.72
25.44
10.00
254.40
15,721.60
73+580.000
12.72
25.44
10.00
254.40
15,976.00
73+600.000
12.72
25.44
10.00
254.40
16,230.40
73+620.000
12.72
25.44
10.00
254.40
16,484.80
73+640.000
12.72
25.44
10.00
254.40
16,739.20
73+660.000
12.72
25.44
10.00
254.40
16,993.60
73+680.000
12.72
25.44
10.00
254.40
17,248.00
73+700.000
12.72
25.44
10.00
254.40
17,502.40
73+720.000
12.72
25.44
10.00
254.40
17,756.80
73+740.000
12.72
25.44
10.00
254.40
18,011.20
REVISO:
REALIZO:
Pgina 74 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 11
"TERRACERAS"
UNIDAD
TERRAPLENES
3) Para noventa por ciento (a 95 % ) con material de banco
M3
ESTACIN KM.
REA
L1+L2
D/2
73+760.000
12.72
25.44
73+780.000
12.72
73+800.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
254.40
18,265.60
25.44
10.00
254.40
18,520.00
12.72
25.44
10.00
254.40
18,774.40
73+807.617
12.72
25.44
3.81
96.88
18,871.28
73+820.000
12.72
25.44
6.19
157.52
19,028.80
73+840.000
0.00
12.72
10.00
127.20
19,156.00
73+848.283
0.00
0.00
4.14
0.00
19,156.00
73+860.000
0.00
0.00
5.86
0.00
19,156.00
73+880.000
0.00
0.00
10.00
0.00
19,156.00
73+888.950
0.00
0.00
4.47
0.00
19,156.00
73+900.000
0.00
0.00
5.53
0.00
19,156.00
73+909.283
0.00
0.00
4.64
0.00
19,156.00
73+920.000
0.00
0.00
5.36
0.00
19,156.00
73+940.000
0.00
0.00
10.00
0.00
19,156.00
73+960.000
12.84
12.84
10.00
128.40
19,284.40
73+980.000
12.84
25.68
10.00
256.80
19,541.20
74+000.000
12.84
25.68
10.00
256.80
19,798.00
74+020.000
12.84
25.68
10.00
256.80
20,054.80
74+040.000
12.84
25.68
10.00
256.80
20,311.60
74+060.000
12.84
25.68
10.00
256.80
20,568.40
74+080.000
12.84
25.68
10.00
256.80
20,825.20
74+089.272
12.84
25.68
4.64
119.05
20,944.25
74+100.000
12.81
25.65
5.36
137.59
21,081.84
74+109.605
12.79
25.60
4.80
122.95
21,204.79
74+120.000
12.76
25.55
5.20
132.79
21,337.58
74+140.000
12.72
25.48
10.00
254.80
21,592.38
74+150.272
12.70
25.42
5.14
130.56
21,722.93
74+160.000
12.71
25.41
4.86
123.59
21,846.53
74+180.000
12.71
25.42
10.00
254.20
22,100.73
74+190.939
12.72
25.43
5.47
139.09
22,239.81
74+200.000
12.72
25.44
4.53
115.26
22,355.07
74+220.000
12.72
25.44
10.00
254.40
22,609.47
74+240.000
12.72
25.44
10.00
254.40
22,863.87
74+260.000
12.72
25.44
10.00
254.40
23,118.27
74+280.000
12.72
25.44
10.00
254.40
23,372.67
74+300.000
12.72
25.44
10.00
254.40
23,627.07
74+320.000
12.72
25.44
10.00
254.40
23,881.47
74+340.000
12.72
25.44
10.00
254.40
24,135.87
74+360.000
12.56
25.28
10.00
252.80
24,388.67
74+380.000
10.73
23.29
10.00
232.90
24,621.57
74+400.000
10.17
20.90
10.00
209.00
24,830.57
74+420.000
9.97
20.14
10.00
201.40
25,031.97
74+440.000
9.91
19.88
10.00
198.80
25,230.77
74+457.851
11.73
21.64
8.93
193.15
25,423.92
74+460.000
11.43
23.16
1.07
24.89
25,448.81
74+480.000
11.71
23.14
10.00
231.40
25,680.21
74+498.518
12.50
24.21
9.26
224.15
25,904.36
74+500.000
12.52
25.02
0.74
18.55
25,922.91
74+520.000
12.75
25.27
10.00
252.70
26,175.61
74+539.184
12.79
25.54
9.59
244.98
26,420.59
74+540.000
12.79
25.58
0.41
10.43
26,431.02
74+559.518
12.84
25.63
9.76
250.12
26,681.14
74+560.000
12.84
25.68
0.24
6.20
26,687.33
74+580.000
12.84
25.68
10.00
256.80
26,944.13
REVISO:
REALIZO:
Pgina 75 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 11
"TERRACERAS"
UNIDAD
TERRAPLENES
3) Para noventa por ciento (a 95 % ) con material de banco
M3
ESTACIN KM.
REA
L1+L2
D/2
74+600.000
12.84
25.68
74+620.000
12.84
74+640.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
256.80
27,200.93
25.68
10.00
256.80
27,457.73
12.84
25.68
10.00
256.80
27,714.53
74+660.000
12.84
25.68
10.00
256.80
27,971.33
74+680.000
12.84
25.68
10.00
256.80
28,228.13
74+700.000
12.84
25.68
10.00
256.80
28,484.93
74+720.000
12.84
25.68
10.00
256.80
28,741.73
74+740.000
12.84
25.68
10.00
256.80
28,998.53
74+760.000
12.84
25.68
10.00
256.80
29,255.33
74+779.360
12.83
25.67
9.68
248.48
29,503.82
74+780.000
12.82
25.65
0.32
8.21
29,512.03
74+799.693
8.52
21.34
9.85
210.13
29,722.16
74+800.000
8.27
16.79
0.15
2.58
29,724.73
74+820.000
1.12
9.39
10.00
93.90
29,818.63
74+840.000
0.00
1.12
10.00
11.20
29,829.83
74+840.360
0.00
0.00
0.18
0.00
29,829.83
74+860.000
0.65
0.65
9.82
6.38
29,836.21
74+880.000
3.71
4.36
10.00
43.60
29,879.81
74+881.027
3.96
7.67
0.51
3.94
29,883.75
74+900.000
9.65
13.61
9.49
129.11
30,012.86
74+920.000
12.71
22.36
10.00
223.60
30,236.46
74+940.000
12.79
25.50
10.00
255.00
30,491.46
74+960.000
12.82
25.61
10.00
256.10
30,747.56
74+980.000
0.00
12.82
10.00
128.20
30,875.76
75+000.000
0.00
0.00
10.00
0.00
30,875.76
75+020.000
0.00
0.00
10.00
0.00
30,875.76
75+040.000
0.00
0.00
10.00
0.00
30,875.76
75+060.000
0.00
0.00
10.00
0.00
30,875.76
75+080.000
0.00
0.00
10.00
0.00
30,875.76
75+100.000
0.00
0.00
10.00
0.00
30,875.76
75+120.000
0.00
0.00
10.00
0.00
30,875.76
75+140.000
0.00
0.00
10.00
0.00
30,875.76
75+160.000
0.00
0.00
10.00
0.00
30,875.76
75+180.000
0.00
0.00
10.00
0.00
30,875.76
75+200.000
0.00
0.00
10.00
0.00
30,875.76
75+220.000
0.00
0.00
10.00
0.00
30,875.76
75+240.000
0.00
0.00
10.00
0.00
30,875.76
75+260.000
0.00
0.00
10.00
0.00
30,875.76
75+280.000
0.00
0.00
10.00
0.00
30,875.76
75+300.000
0.00
0.00
10.00
0.00
30,875.76
75+320.000
0.00
0.00
10.00
0.00
30,875.76
75+340.000
0.00
0.00
10.00
0.00
30,875.76
75+360.000
0.00
0.00
10.00
0.00
30,875.76
75+380.000
0.00
0.00
10.00
0.00
30,875.76
75+400.000
0.00
0.00
10.00
0.00
30,875.76
75+420.000
0.00
0.00
10.00
0.00
30,875.76
75+440.000
0.00
0.00
10.00
0.00
30,875.76
75+460.000
0.00
0.00
10.00
0.00
30,875.76
75+480.000
0.00
0.00
10.00
0.00
30,875.76
75+500.000
0.00
0.00
10.00
0.00
30,875.76
75+520.000
0.00
0.00
10.00
0.00
30,875.76
75+540.000
0.00
0.00
10.00
0.00
30,875.76
75+560.000
0.00
0.00
10.00
0.00
30,875.76
75+580.000
0.00
0.00
10.00
0.00
30,875.76
REVISO:
REALIZO:
Pgina 76 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 11
"TERRACERAS"
UNIDAD
TERRAPLENES
3) Para noventa por ciento (a 95 % ) con material de banco
M3
ESTACIN KM.
REA
L1+L2
D/2
75+600.000
0.00
0.00
75+611.738
0.00
75+620.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
0.00
30,875.76
0.00
5.87
0.00
30,875.76
0.00
0.00
4.13
0.00
30,875.76
75+635.122
0.00
0.00
7.56
0.00
30,875.76
75+640.000
0.00
0.00
2.44
0.00
30,875.76
75+658.507
0.00
0.00
9.25
0.00
30,875.76
75+660.000
0.00
0.00
0.75
0.00
30,875.76
75+680.000
1.58
1.58
10.00
15.80
30,891.56
75+700.000
12.94
14.52
10.00
145.20
31,036.76
75+711.122
13.13
26.07
5.56
144.98
31,181.75
75+720.000
13.10
26.23
4.44
116.43
31,298.18
75+740.000
13.10
26.20
10.00
262.00
31,560.18
75+760.000
13.10
26.20
10.00
262.00
31,822.18
75+780.000
13.10
26.20
10.00
262.00
32,084.18
75+800.000
13.10
26.20
10.00
262.00
32,346.18
75+820.000
13.10
26.20
10.00
262.00
32,608.18
75+840.000
13.10
26.20
10.00
262.00
32,870.18
75+860.000
13.10
26.20
10.00
262.00
33,132.18
75+880.000
13.10
26.20
10.00
262.00
33,394.18
75+900.000
13.10
26.20
10.00
262.00
33,656.18
75+920.000
13.10
26.20
10.00
262.00
33,918.18
75+940.000
13.10
26.20
10.00
262.00
34,180.18
75+960.000
13.10
26.20
10.00
262.00
34,442.18
75+980.000
13.10
26.20
10.00
262.00
34,704.18
76+000.000
13.10
26.20
10.00
262.00
34,966.18
76+020.000
13.10
26.20
10.00
262.00
35,228.18
76+040.000
13.10
26.20
10.00
262.00
35,490.18
76+060.000
13.10
26.20
10.00
262.00
35,752.18
76+080.000
13.10
26.20
10.00
262.00
36,014.18
76+100.000
13.10
26.20
10.00
262.00
36,276.18
76+120.000
13.10
26.20
10.00
262.00
36,538.18
76+140.000
13.10
26.20
10.00
262.00
36,800.18
76+160.000
13.10
26.20
10.00
262.00
37,062.18
76+180.000
13.10
26.20
10.00
262.00
37,324.18
76+200.000
13.10
26.20
10.00
262.00
37,586.18
76+220.000
12.56
25.66
10.00
256.60
37,842.78
76+240.000
11.14
23.70
10.00
237.00
38,079.78
76+255.500
10.11
21.25
7.75
164.68
38,244.46
76+260.000
10.19
20.30
2.25
45.68
38,290.14
76+280.000
7.18
17.37
10.00
173.70
38,463.84
76+300.000
6.42
13.60
10.00
136.00
38,599.84
76+320.000
6.69
13.11
10.00
131.10
38,730.94
76+321.961
6.82
13.51
0.98
13.25
38,744.19
76+340.000
9.05
15.87
9.02
143.14
38,887.32
76+351.500
10.59
19.64
5.75
112.93
39,000.25
76+360.000
12.33
22.92
4.25
97.41
39,097.66
76+380.000
12.71
25.04
10.00
250.40
39,348.06
76+381.038
12.71
25.42
0.52
13.20
39,361.26
76+400.000
12.56
25.27
9.48
239.58
39,600.84
76+420.000
11.10
23.66
10.00
236.60
39,837.44
76+440.000
10.22
21.32
10.00
213.20
40,050.64
76+460.000
10.02
20.24
10.00
202.40
40,253.04
76+480.000
6.62
16.64
10.00
166.40
40,419.44
76+500.000
5.78
12.40
10.00
124.00
40,543.44
REVISO:
REALIZO:
Pgina 77 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 11
"TERRACERAS"
UNIDAD
TERRAPLENES
3) Para noventa por ciento (a 95 % ) con material de banco
M3
ESTACIN KM.
REA
L1+L2
D/2
76+520.000
8.46
14.24
76+540.000
9.87
76+560.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
142.40
40,685.84
18.33
10.00
183.30
40,869.14
11.79
21.66
10.00
216.60
41,085.74
76+580.000
10.98
22.77
10.00
227.70
41,313.44
76+600.000
9.54
20.52
10.00
205.20
41,518.64
76+620.000
8.73
18.27
10.00
182.70
41,701.34
76+640.000
8.51
17.24
10.00
172.40
41,873.74
76+660.000
9.30
17.81
10.00
178.10
42,051.84
76+680.000
9.97
19.27
10.00
192.70
42,244.54
76+700.000
12.01
21.98
10.00
219.80
42,464.34
76+720.000
12.72
24.73
10.00
247.30
42,711.64
76+740.000
12.71
25.43
10.00
254.30
42,965.94
76+760.000
12.72
25.43
10.00
254.30
43,220.24
76+780.000
12.72
25.44
10.00
254.40
43,474.64
76+800.000
12.72
25.44
10.00
254.40
43,729.04
76+820.000
12.72
25.44
10.00
254.40
43,983.44
76+840.000
12.72
25.44
10.00
254.40
44,237.84
76+860.000
12.72
25.44
10.00
254.40
44,492.24
76+880.000
12.72
25.44
10.00
254.40
44,746.64
76+900.000
12.72
25.44
10.00
254.40
45,001.04
76+920.000
12.72
25.44
10.00
254.40
45,255.44
76+940.000
12.24
24.96
10.00
249.60
45,505.04
76+960.000
9.65
21.89
10.00
218.90
45,723.94
76+980.000
9.48
19.13
10.00
191.30
45,915.24
76+985.245
9.39
18.87
2.62
49.49
45,964.73
76+993.182
9.31
18.70
3.97
74.21
46,038.94
77+000.000
9.16
18.47
3.41
62.97
46,101.90
77+001.118
9.14
18.30
0.56
10.23
46,112.14
77+018.182
8.89
18.03
8.53
153.83
46,265.96
77+020.000
8.92
17.81
0.91
16.19
46,282.15
77+040.000
8.56
17.48
10.00
174.80
46,456.95
77+060.000
9.68
18.24
10.00
182.40
46,639.35
77+080.000
11.82
21.50
10.00
215.00
46,854.35
77+100.000
12.39
24.21
10.00
242.10
47,096.45
77+120.000
11.69
24.08
10.00
240.80
47,337.25
77+140.000
9.35
21.04
10.00
210.40
47,547.65
77+160.000
8.96
18.31
10.00
183.10
47,730.75
77+180.000
8.01
16.97
10.00
169.70
47,900.45
77+200.000
12.57
20.58
10.00
205.80
48,106.25
77+220.000
12.90
25.47
10.00
254.70
48,360.95
77+240.000
7.61
20.51
10.00
205.10
48,566.05
77+260.000
0.95
8.56
10.00
85.60
48,651.65
77+280.000
0.00
0.95
10.00
9.50
48,661.15
77+300.000
0.00
0.00
10.00
0.00
48,661.15
77+320.000
0.00
0.00
10.00
0.00
48,661.15
77+340.000
0.00
0.00
10.00
0.00
48,661.15
77+360.000
3.49
3.49
10.00
34.90
48,696.05
77+380.000
8.52
12.01
10.00
120.10
48,816.15
77+400.000
11.04
19.56
10.00
195.60
49,011.75
77+420.000
0.31
11.35
10.00
113.50
49,125.25
77+440.000
0.00
0.31
10.00
3.10
49,128.35
77+460.000
0.00
0.00
10.00
0.00
49,128.35
77+480.000
0.00
0.00
10.00
0.00
49,128.35
77+500.000
0.00
0.00
10.00
0.00
49,128.35
REVISO:
REALIZO:
Pgina 78 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 11
"TERRACERAS"
UNIDAD
TERRAPLENES
3) Para noventa por ciento (a 95 % ) con material de banco
M3
ESTACIN KM.
REA
L1+L2
D/2
77+520.000
0.00
0.00
77+525.218
0.00
77+540.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
0.00
49,128.35
0.00
2.61
0.00
49,128.35
0.00
0.00
7.39
0.00
49,128.35
77+540.234
0.00
0.00
0.12
0.00
49,128.35
77+547.218
0.00
0.00
3.49
0.00
49,128.35
77+554.202
0.00
0.00
3.49
0.00
49,128.35
77+560.000
0.00
0.00
2.90
0.00
49,128.35
77+580.000
5.44
5.44
10.00
54.40
49,182.75
77+600.000
8.46
13.90
10.00
139.00
49,321.75
77+620.000
12.55
21.01
10.00
210.10
49,531.85
77+640.000
12.72
25.27
10.00
252.70
49,784.55
77+647.342
12.72
25.44
3.67
93.38
49,877.94
77+660.000
12.70
25.42
6.33
160.89
50,038.83
77+663.215
12.70
25.40
1.61
40.82
50,079.65
77+679.088
12.75
25.45
7.94
201.98
50,281.64
77+680.000
12.73
25.48
0.46
11.62
50,293.26
77+700.000
12.03
24.76
10.00
247.60
50,540.86
77+713.215
0.00
12.03
6.61
79.49
50,620.35
77+720.000
0.17
0.17
3.39
0.58
50,620.92
77+740.000
12.90
13.07
10.00
130.70
50,751.62
77+760.000
11.25
24.15
10.00
241.50
50,993.12
77+780.000
7.29
18.54
10.00
185.40
51,178.52
77+800.000
0.00
7.29
10.00
72.90
51,251.42
77+820.000
0.00
0.00
10.00
0.00
51,251.42
77+840.000
0.00
0.00
10.00
0.00
51,251.42
77+860.000
0.00
0.00
10.00
0.00
51,251.42
77+880.000
0.00
0.00
10.00
0.00
51,251.42
77+900.000
0.00
0.00
10.00
0.00
51,251.42
77+920.000
0.00
0.00
10.00
0.00
51,251.42
77+940.000
0.00
0.00
10.00
0.00
51,251.42
77+960.000
0.00
0.00
10.00
0.00
51,251.42
77+980.000
0.67
0.67
10.00
6.70
51,258.12
78+000.000
0.33
1.00
10.00
10.00
51,268.12
78+020.000
0.24
0.57
10.00
5.70
51,273.82
78+040.000
12.90
13.14
10.00
131.40
51,405.22
78+060.000
8.43
21.33
10.00
213.30
51,618.52
78+080.000
9.22
17.65
10.00
176.50
51,795.02
78+094.334
8.72
17.94
7.17
128.58
51,923.60
78+100.000
8.18
16.90
2.83
47.88
51,971.48
78+116.175
8.49
16.67
8.09
134.82
52,106.30
78+120.000
7.59
16.08
1.91
30.75
52,137.05
78+126.334
7.52
15.11
3.17
47.85
52,184.90
78+136.493
7.48
15.00
5.08
76.19
52,261.09
78+140.000
7.67
15.15
1.75
26.57
52,287.66
78+160.000
6.86
14.53
10.00
145.30
52,432.96
78+180.000
6.55
13.41
10.00
134.10
52,567.06
78+200.000
6.41
12.96
10.00
129.60
52,696.66
78+220.000
6.29
12.70
10.00
127.00
52,823.66
78+240.000
6.23
12.52
10.00
125.20
52,948.86
78+260.000
5.99
12.22
10.00
122.20
53,071.06
78+280.000
0.00
5.99
10.00
59.90
53,130.96
78+300.000
0.00
0.00
10.00
0.00
53,130.96
78+320.000
0.00
0.00
10.00
0.00
53,130.96
78+340.000
0.00
0.00
10.00
0.00
53,130.96
REVISO:
REALIZO:
Pgina 79 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 11
"TERRACERAS"
UNIDAD
TERRAPLENES
3) Para noventa por ciento (a 95 % ) con material de banco
M3
ESTACIN KM.
REA
L1+L2
D/2
78+360.000
0.00
0.00
78+380.000
0.00
78+400.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
0.00
53,130.96
0.00
10.00
0.00
53,130.96
0.00
0.00
10.00
0.00
53,130.96
78+420.000
0.00
0.00
10.00
0.00
53,130.96
78+440.000
0.00
0.00
10.00
0.00
53,130.96
78+460.000
0.00
0.00
10.00
0.00
53,130.96
78+480.000
0.00
0.00
10.00
0.00
53,130.96
78+500.000
0.00
0.00
10.00
0.00
53,130.96
78+520.000
0.00
0.00
10.00
0.00
53,130.96
78+540.000
12.90
12.90
10.00
129.00
53,259.96
78+560.000
12.89
25.79
10.00
257.90
53,517.86
78+580.000
12.83
25.72
10.00
257.20
53,775.06
78+600.000
12.69
25.52
10.00
255.20
54,030.26
78+620.000
12.90
25.59
10.00
255.90
54,286.16
78+640.000
8.09
20.99
10.00
209.90
54,496.06
78+660.000
4.80
12.89
10.00
128.90
54,624.96
78+680.000
3.33
8.13
10.00
81.30
54,706.26
78+700.000
0.87
4.20
10.00
42.00
54,748.26
78+720.000
0.30
1.17
10.00
11.70
54,759.96
78+740.000
0.00
0.30
10.00
3.00
54,762.96
78+760.000
0.00
0.00
10.00
0.00
54,762.96
78+780.000
0.00
0.00
10.00
0.00
54,762.96
78+790.492
0.00
0.00
5.25
0.00
54,762.96
78+796.615
0.00
0.00
3.06
0.00
54,762.96
78+800.000
0.00
0.00
1.69
0.00
54,762.96
78+802.737
0.00
0.00
1.37
0.00
54,762.96
78+811.615
0.22
0.22
4.44
0.98
54,763.94
78+820.000
0.87
1.09
4.19
4.57
54,768.51
78+840.000
0.09
0.96
10.00
9.60
54,778.11
78+860.000
0.30
0.39
10.00
3.90
54,782.01
78+880.000
0.00
0.30
10.00
3.00
54,785.01
78+900.000
0.00
0.00
10.00
0.00
54,785.01
78+920.000
0.00
0.00
10.00
0.00
54,785.01
78+940.000
0.00
0.00
10.00
0.00
54,785.01
78+960.000
0.00
0.00
10.00
0.00
54,785.01
78+980.000
0.00
0.00
10.00
0.00
54,785.01
79+000.000
0.24
0.24
10.00
2.40
54,787.41
79+020.000
1.75
1.99
10.00
19.90
54,807.31
79+040.000
10.27
12.02
10.00
120.20
54,927.51
79+060.000
12.19
22.46
10.00
224.60
55,152.11
79+080.000
12.82
25.01
10.00
250.10
55,402.21
79+097.907
12.84
25.66
8.95
229.75
55,631.96
79+100.000
12.84
25.68
1.05
26.87
55,658.83
79+120.000
12.78
25.62
10.00
256.20
55,915.03
79+133.417
12.75
25.53
6.71
171.27
56,086.30
79+140.000
12.73
25.48
3.29
83.86
56,170.16
79+157.907
12.70
25.43
8.95
227.69
56,397.85
79+160.000
12.70
25.40
1.05
26.58
56,424.43
79+180.000
12.72
25.42
10.00
254.20
56,678.63
79+182.397
12.72
25.44
1.20
30.49
56,709.12
79+200.000
12.72
25.44
8.80
223.91
56,933.03
79+220.000
12.68
25.40
10.00
254.00
57,187.03
79+240.000
5.19
17.87
10.00
178.70
57,365.73
79+260.000
2.59
7.78
10.00
77.80
57,443.53
79+280.000
2.11
4.70
10.00
47.00
57,490.53
79+300.000
1.99
4.10
10.00
41.00
57,531.53
79+320.000
2.21
4.20
10.00
42.00
57,573.53
REVISO:
REALIZO:
Pgina 80 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 11
"TERRACERAS"
UNIDAD
TERRAPLENES
3) Para noventa por ciento (a 95 % ) con material de banco
M3
ESTACIN KM.
REA
L1+L2
D/2
79+340.000
0.03
2.24
79+360.000
0.29
79+380.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
22.40
57,595.93
0.32
10.00
3.20
57,599.13
0.00
0.29
10.00
2.90
57,602.03
79+400.000
0.00
0.00
10.00
0.00
57,602.03
79+420.000
0.00
0.00
10.00
0.00
57,602.03
79+440.000
0.00
0.00
10.00
0.00
57,602.03
79+460.000
0.00
0.00
10.00
0.00
57,602.03
79+480.000
0.00
0.00
10.00
0.00
57,602.03
79+500.000
0.19
0.19
10.00
1.90
57,603.93
79+520.000
0.44
0.63
10.00
6.30
57,610.23
79+540.000
0.39
0.83
10.00
8.30
57,618.53
79+560.000
0.42
0.81
10.00
8.10
57,626.63
79+580.000
0.51
0.93
10.00
9.30
57,635.93
79+600.000
0.47
0.98
10.00
9.80
57,645.73
79+620.000
0.33
0.80
10.00
8.00
57,653.73
79+640.000
0.08
0.41
10.00
4.10
57,657.83
79+660.000
0.00
0.08
10.00
0.80
57,658.63
79+680.000
0.00
0.00
10.00
0.00
57,658.63
79+700.000
0.00
0.00
10.00
0.00
57,658.63
79+720.000
0.00
0.00
10.00
0.00
57,658.63
79+740.000
0.00
0.00
10.00
0.00
57,658.63
79+760.000
0.00
0.00
10.00
0.00
57,658.63
79+780.000
0.00
0.00
10.00
0.00
57,658.63
79+800.000
0.00
0.00
10.00
0.00
57,658.63
79+820.000
0.00
0.00
10.00
0.00
57,658.63
79+840.000
0.00
0.00
10.00
0.00
57,658.63
79+860.000
0.00
0.00
10.00
0.00
57,658.63
79+880.000
0.00
0.00
10.00
0.00
57,658.63
79+900.000
0.00
0.00
10.00
0.00
57,658.63
79+920.000
0.11
0.11
10.00
1.10
57,659.73
79+940.000
1.01
1.12
10.00
11.20
57,670.93
79+960.000
9.26
10.27
10.00
102.70
57,773.63
79+980.000
12.65
21.91
10.00
219.10
57,992.73
80+000.000
12.72
25.37
10.00
253.70
58,246.43
80+020.000
12.72
25.44
10.00
254.40
58,500.83
80+040.000
12.72
25.44
10.00
254.40
58,755.23
80+060.000
12.69
25.41
10.00
254.10
59,009.33
80+080.000
11.68
24.37
10.00
243.70
59,253.03
80+100.000
10.63
22.31
10.00
223.10
59,476.13
80+120.000
0.64
11.27
10.00
112.70
59,588.83
80+140.000
0.03
0.67
10.00
6.70
59,595.53
80+160.000
0.00
0.03
10.00
0.30
59,595.83
80+180.000
0.00
0.00
10.00
0.00
59,595.83
80+200.000
0.00
0.00
10.00
0.00
59,595.83
80+220.000
0.00
0.00
10.00
0.00
59,595.83
80+240.000
11.54
11.54
10.00
115.40
59,711.23
80+260.000
12.72
24.26
10.00
242.60
59,953.83
80+280.000
12.72
25.44
10.00
254.40
60,208.23
80+300.000
12.72
25.44
10.00
254.40
60,462.63
80+320.000
12.72
25.44
10.00
254.40
60,717.03
80+340.000
7.21
19.93
10.00
199.30
60,916.33
80+360.000
12.72
19.93
10.00
199.30
61,115.63
80+380.000
12.72
25.44
10.00
254.40
61,370.03
80+400.000
12.72
25.44
10.00
254.40
61,624.43
80+420.000
12.72
25.44
10.00
254.40
61,878.83
80+440.000
12.72
25.44
10.00
254.40
62,133.23
80+460.000
0.00
12.72
10.00
127.20
62,260.43
REVISO:
REALIZO:
Pgina 81 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 11
"TERRACERAS"
UNIDAD
TERRAPLENES
3) Para noventa por ciento (a 95 % ) con material de banco
M3
ESTACIN KM.
REA
L1+L2
D/2
80+480.000
0.00
0.00
80+500.000
0.00
80+520.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
0.00
62,260.43
0.00
10.00
0.00
62,260.43
0.00
0.00
10.00
0.00
62,260.43
80+540.000
0.00
0.00
10.00
0.00
62,260.43
80+560.000
0.00
0.00
10.00
0.00
62,260.43
80+580.000
0.00
0.00
10.00
0.00
62,260.43
80+600.000
12.72
12.72
10.00
127.20
62,387.63
80+620.000
12.72
25.44
10.00
254.40
62,642.03
80+640.000
11.21
23.93
10.00
239.30
62,881.33
80+660.000
14.81
26.02
10.00
260.20
63,141.53
80+680.000
8.88
23.69
10.00
236.90
63,378.43
80+700.000
5.94
14.82
10.00
148.20
63,526.63
80+720.000
6.02
11.96
10.00
119.60
63,646.23
80+740.000
7.13
13.15
10.00
131.50
63,777.73
80+760.000
6.57
13.70
10.00
137.00
63,914.73
80+780.000
0.00
6.57
10.00
65.70
63,980.43
80+800.000
10.03
10.03
10.00
100.30
64,080.73
80+820.000
7.95
17.98
10.00
179.80
64,260.53
80+840.000
7.81
15.76
10.00
157.60
64,418.13
80+860.000
9.55
17.36
10.00
173.60
64,591.73
80+880.000
9.55
19.10
10.00
191.00
64,782.73
80+900.000
8.80
18.35
10.00
183.50
64,966.23
80+920.000
7.31
16.11
10.00
161.10
65,127.33
80+940.000
6.32
13.63
10.00
136.30
65,263.63
80+960.000
8.76
15.08
10.00
150.80
65,414.43
80+980.000
8.09
16.85
10.00
168.50
65,582.93
81+000.000
2.13
10.22
10.00
102.20
65,685.13
81+020.000
8.89
11.02
10.00
110.20
65,795.33
81+040.000
11.64
20.53
10.00
205.30
66,000.63
81+060.000
12.71
24.35
10.00
243.50
66,244.13
81+080.000
12.70
25.41
10.00
254.10
66,498.23
81+100.000
12.72
25.42
10.00
254.20
66,752.43
81+120.000
25.19
37.91
10.00
379.10
67,131.53
81+140.000
81+160.000
81+180.000
81+200.000
81+220.000
81+240.000
81+260.000
81+280.000
81+300.000
81+320.000
81+340.000
81+360.000
81+380.000
81+400.000
81+420.000
81+440.000
81+460.000
81+480.000
81+500.000
81+520.000
81+540.000
81+560.000
81+580.000
81+600.000
81+620.000
81+640.000
81+660.000
81+680.000
81+700.000
81+720.000
5.08
0.21
0.00
0.66
4.22
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.15
10.16
12.79
12.79
12.79
12.79
12.79
12.79
12.79
12.79
12.79
12.79
0.00
0.00
0.00
0.00
30.27
5.29
0.21
0.66
4.88
4.22
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.15
10.31
22.95
25.58
25.58
25.58
25.58
25.58
25.58
25.58
25.58
25.58
12.79
0.00
0.00
0.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
302.70
52.90
2.10
6.60
48.80
42.20
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.50
103.10
229.50
255.80
255.80
255.80
255.80
255.80
255.80
255.80
255.80
255.80
127.90
0.00
0.00
0.00
67,434.23
67,487.13
67,489.23
67,495.83
67,544.63
67,586.83
67,586.83
67,586.83
67,586.83
67,586.83
67,586.83
67,586.83
67,586.83
67,586.83
67,588.33
67,691.43
67,920.93
68,176.73
68,432.53
68,688.33
68,944.13
69,199.93
69,455.73
69,711.53
69,967.33
70,223.13
70,351.03
70,351.03
70,351.03
70,351.03
REVISO:
REALIZO:
Pgina 82 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 11
"TERRACERAS"
UNIDAD
TERRAPLENES
3) Para noventa por ciento (a 95 % ) con material de banco
M3
ESTACIN KM.
REA
L1+L2
D/2
81+740.000
81+760.000
81+780.000
81+800.000
81+820.000
81+840.000
81+860.000
81+880.000
81+900.000
81+920.000
81+940.000
81+960.000
81+980.000
82+000.000
82+020.000
82+040.000
82+060.000
82+080.000
82+100.000
82+120.000
82+140.000
82+160.000
82+180.000
82+200.000
82+220.000
82+240.000
82+260.000
82+280.000
82+300.000
82+320.000
82+340.000
82+360.000
82+380.000
82+400.000
82+420.000
82+440.000
82+460.000
82+480.000
82+500.000
82+520.000
82+540.000
82+560.000
82+580.000
82+600.000
82+620.000
82+640.000
82+660.000
82+680.000
82+700.000
82+720.000
82+740.000
82+760.000
82+780.000
82+800.000
82+820.000
82+840.000
82+860.000
82+880.000
82+900.000
82+920.000
82+940.000
82+960.000
82+980.000
83+000.000
83+020.000
83+040.000
83+060.000
83+080.000
83+100.000
83+120.000
83+140.000
83+160.000
83+170.200
0.00
0.00
0.00
8.98
12.39
12.72
12.72
12.72
12.72
12.72
12.72
12.72
12.72
5.49
4.83
12.69
12.72
12.72
3.39
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.25
0.22
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.08
2.33
3.74
4.42
12.28
12.71
12.55
12.28
12.61
12.72
12.72
12.72
12.72
12.72
12.72
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
12.72
0.00
0.00
0.00
8.98
21.37
25.11
25.44
25.44
25.44
25.44
25.44
25.44
25.44
18.21
10.32
17.52
25.41
25.44
16.11
3.39
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.25
0.47
0.22
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.08
2.41
6.07
8.16
16.70
24.99
25.26
24.83
24.89
25.33
25.44
25.44
25.44
25.44
25.44
12.72
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
12.72
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
5.10
REVISO:
REA ACUMULADA
PARCIAL
ACUMULADO
0.00
0.00
0.00
89.80
213.70
251.10
254.40
254.40
254.40
254.40
254.40
254.40
254.40
182.10
103.20
175.20
254.10
254.40
161.10
33.90
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.50
4.70
2.20
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.80
24.10
60.70
81.60
167.00
249.90
252.60
248.30
248.90
253.30
254.40
254.40
254.40
254.40
254.40
127.20
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
64.87
70,351.03
70,351.03
70,351.03
70,440.83
70,654.53
70,905.63
71,160.03
71,414.43
71,668.83
71,923.23
72,177.63
72,432.03
72,686.43
72,868.53
72,971.73
73,146.93
73,401.03
73,655.43
73,816.53
73,850.43
73,850.43
73,850.43
73,850.43
73,850.43
73,850.43
73,850.43
73,850.43
73,852.93
73,857.63
73,859.83
73,859.83
73,859.83
73,859.83
73,859.83
73,859.83
73,859.83
73,859.83
73,859.83
73,859.83
73,859.83
73,859.83
73,860.63
73,884.73
73,945.43
74,027.03
74,194.03
74,443.93
74,696.53
74,944.83
75,193.73
75,447.03
75,701.43
75,955.83
76,210.23
76,464.63
76,719.03
76,846.23
76,846.23
76,846.23
76,846.23
76,846.23
76,846.23
76,846.23
76,846.23
76,846.23
76,846.23
76,846.23
76,846.23
76,846.23
76,846.23
76,846.23
76,846.23
76,911.10
REALIZO:
Pgina 83 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 11
"TERRACERAS"
UNIDAD
TERRAPLENES
3) Para noventa por ciento (a 95 % ) con material de banco
M3
ESTACIN KM.
REA
L1+L2
D/2
83+180.000
83+200.000
83+220.000
83+240.000
83+260.000
83+280.000
83+300.000
83+320.000
83+340.000
83+360.000
83+380.000
83+400.000
83+420.000
83+440.000
83+460.000
83+480.000
83+500.000
83+520.000
83+540.000
83+560.000
83+570.105
83+580.000
83+593.182
83+600.000
83+616.259
83+620.000
83+640.000
83+653.182
83+660.000
83+680.000
83+700.000
83+720.000
83+740.000
83+760.000
83+780.000
83+785.000
11.45
10.18
1.58
0.00
0.00
0.00
0.00
0.00
1.19
4.52
5.40
4.34
3.71
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
24.17
21.63
11.76
1.58
0.00
0.00
0.00
0.00
1.19
5.71
9.92
9.74
8.05
3.71
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.90
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
5.05
4.95
6.59
3.41
8.13
1.87
10.00
6.59
3.41
10.00
10.00
10.00
10.00
10.00
10.00
2.50
REVISO:
REA ACUMULADA
PARCIAL
ACUMULADO
118.43
216.30
117.60
15.80
0.00
0.00
0.00
0.00
11.90
57.10
99.20
97.40
80.50
37.10
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
77,029.54
77,245.84
77,363.44
77,379.24
77,379.24
77,379.24
77,379.24
77,379.24
77,391.14
77,448.24
77,547.44
77,644.84
77,725.34
77,762.44
77,762.44
77,762.44
77,762.44
77,762.44
77,762.44
77,762.44
77,762.44
77,762.44
77,762.44
77,762.44
77,762.44
77,762.44
77,762.44
77,762.44
77,762.44
77,762.44
77,762.44
77,762.44
77,762.44
77,762.44
77,762.44
77,762.44
REALIZO:
Pgina 84 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 12
"TERRACERAS"
UNIDAD
TERRACERAS
4) Para cien por ciento (a 100 % SR) con material de banco
M3
REA ACUMULADA
ESTACIN KM.
REA
L1+L2
D/2
71+800.000
7.21
0.00
0.00
0.00
0.00
71+820.000
7.21
14.42
10.00
144.20
144.20
71+840.000
7.21
14.42
10.00
144.20
288.40
71+860.000
7.21
14.42
10.00
144.20
432.60
71+880.000
7.21
14.42
10.00
144.20
576.80
71+900.000
7.21
14.42
10.00
144.20
721.00
71+920.000
7.21
14.42
10.00
144.20
865.20
71+940.000
7.21
14.42
10.00
144.20
1,009.40
71+960.000
7.21
14.42
10.00
144.20
1,153.60
71+980.000
7.21
14.42
10.00
144.20
1,297.80
72+000.000
7.21
14.42
10.00
144.20
1,442.00
72+020.000
7.21
14.42
10.00
144.20
1,586.20
72+040.000
7.21
14.42
10.00
144.20
1,730.40
72+060.000
7.21
14.42
10.00
144.20
1,874.60
72+080.000
7.21
14.42
10.00
144.20
2,018.80
72+100.000
7.21
14.42
10.00
144.20
2,163.00
72+120.000
5.02
12.23
10.00
122.30
2,285.30
72+140.000
7.21
12.23
10.00
122.30
2,407.60
72+160.000
7.21
14.42
10.00
144.20
2,551.80
72+180.000
7.21
14.42
10.00
144.20
2,696.00
72+200.000
7.21
14.42
10.00
144.20
2,840.20
72+220.000
7.21
14.42
10.00
144.20
2,984.40
72+240.000
7.47
14.68
10.00
146.80
3,131.20
72+260.000
7.21
14.68
10.00
146.80
3,278.00
72+280.000
7.21
14.42
10.00
144.20
3,422.20
72+300.000
7.21
14.42
10.00
144.20
3,566.40
72+320.000
7.21
14.42
10.00
144.20
3,710.60
72+340.000
7.21
14.42
10.00
144.20
3,854.80
72+360.000
7.21
14.42
10.00
144.20
3,999.00
72+380.000
7.21
14.42
10.00
144.20
4,143.20
72+400.000
7.21
14.42
10.00
144.20
4,287.40
72+420.000
7.21
14.42
10.00
144.20
4,431.60
72+440.000
7.21
14.42
10.00
144.20
4,575.80
72+460.000
7.21
14.42
10.00
144.20
4,720.00
72+480.000
7.21
14.42
10.00
144.20
4,864.20
72+500.000
7.21
14.42
10.00
144.20
5,008.40
72+520.000
7.21
14.42
10.00
144.20
5,152.60
72+540.000
7.21
14.42
10.00
144.20
5,296.80
72+560.000
7.21
14.42
10.00
144.20
5,441.00
72+580.000
7.21
14.42
10.00
144.20
5,585.20
72+600.000
7.21
14.42
10.00
144.20
5,729.40
72+620.000
7.21
14.42
10.00
144.20
5,873.60
72+640.000
7.21
14.42
10.00
144.20
6,017.80
72+654.982
7.21
14.42
7.49
108.02
6,125.82
72+660.000
7.21
14.42
2.51
36.18
6,162.00
72+678.443
7.21
14.42
9.22
132.97
6,294.97
72+680.000
7.21
14.42
0.78
11.23
6,306.20
72+700.000
7.27
14.48
10.00
144.80
6,451.00
72+701.905
7.27
14.54
0.95
13.85
6,464.85
72+720.000
7.33
14.60
9.05
132.10
6,596.94
72+739.443
7.30
14.63
9.72
142.23
6,739.17
72+740.000
7.33
14.63
0.28
4.07
6,743.24
REVISO:
PARCIAL
ACUMULADO
REALIZO:
Pgina 85 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 12
"TERRACERAS"
UNIDAD
TERRACERAS
4) Para cien por ciento (a 100 % SR) con material de banco
M3
ESTACIN KM.
REA
L1+L2
D/2
72+760.000
7.32
14.65
72+780.000
7.30
72+800.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
146.50
6,889.74
14.62
10.00
146.20
7,035.94
7.30
14.60
10.00
146.00
7,181.94
72+820.000
7.56
14.86
10.00
148.60
7,330.54
72+840.000
7.30
14.86
10.00
148.60
7,479.14
72+860.000
7.26
14.56
10.00
145.60
7,624.74
72+880.000
7.30
14.56
10.00
145.60
7,770.34
72+900.000
6.78
14.08
10.00
140.80
7,911.14
72+920.000
7.38
14.16
10.00
141.60
8,052.74
72+940.000
0.00
7.38
10.00
73.80
8,126.54
72+960.000
0.00
0.00
10.00
0.00
8,126.54
72+971.651
0.00
0.00
5.83
0.00
8,126.54
72+980.000
0.00
0.00
4.17
0.00
8,126.54
73+000.000
0.00
0.00
10.00
0.00
8,126.54
73+009.189
0.00
0.00
4.59
0.00
8,126.54
73+020.000
0.00
0.00
5.41
0.00
8,126.54
73+032.651
0.00
0.00
6.33
0.00
8,126.54
73+040.000
0.00
0.00
3.67
0.00
8,126.54
73+056.112
0.00
0.00
8.06
0.00
8,126.54
73+060.000
0.00
0.00
1.94
0.00
8,126.54
73+080.000
0.00
0.00
10.00
0.00
8,126.54
73+100.000
0.00
0.00
10.00
0.00
8,126.54
73+120.000
0.00
0.00
10.00
0.00
8,126.54
73+140.000
0.00
0.00
10.00
0.00
8,126.54
73+160.000
0.00
0.00
10.00
0.00
8,126.54
73+180.000
0.00
0.00
10.00
0.00
8,126.54
73+200.000
0.00
0.00
10.00
0.00
8,126.54
73+220.000
0.00
0.00
10.00
0.00
8,126.54
73+240.000
0.00
0.00
10.00
0.00
8,126.54
73+260.000
7.21
7.21
10.00
72.10
8,198.64
73+280.000
7.21
14.42
10.00
144.20
8,342.84
73+300.000
7.21
14.42
10.00
144.20
8,487.04
73+320.000
7.21
14.42
10.00
144.20
8,631.24
73+340.000
7.21
14.42
10.00
144.20
8,775.44
73+360.000
7.21
14.42
10.00
144.20
8,919.64
73+380.000
7.21
14.42
10.00
144.20
9,063.84
73+400.000
7.21
14.42
10.00
144.20
9,208.04
73+420.000
7.21
14.42
10.00
144.20
9,352.24
73+440.000
7.21
14.42
10.00
144.20
9,496.44
73+460.000
7.21
14.42
10.00
144.20
9,640.64
73+480.000
7.21
14.42
10.00
144.20
9,784.84
73+500.000
7.21
14.42
10.00
144.20
9,929.04
73+520.000
7.21
14.42
10.00
144.20
10,073.24
73+540.000
7.21
14.42
10.00
144.20
10,217.44
73+560.000
7.21
14.42
10.00
144.20
10,361.64
73+580.000
7.21
14.42
10.00
144.20
10,505.84
73+600.000
7.21
14.42
10.00
144.20
10,650.04
73+620.000
7.21
14.42
10.00
144.20
10,794.24
73+640.000
7.21
14.42
10.00
144.20
10,938.44
73+660.000
7.21
14.42
10.00
144.20
11,082.64
73+680.000
7.21
14.42
10.00
144.20
11,226.84
73+700.000
7.21
14.42
10.00
144.20
11,371.04
73+720.000
7.21
14.42
10.00
144.20
11,515.24
73+740.000
7.21
14.42
10.00
144.20
11,659.44
REVISO:
REALIZO:
Pgina 86 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 12
"TERRACERAS"
UNIDAD
TERRACERAS
4) Para cien por ciento (a 100 % SR) con material de banco
M3
ESTACIN KM.
REA
L1+L2
D/2
73+760.000
7.21
14.42
73+780.000
7.21
73+800.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
144.20
11,803.64
14.42
10.00
144.20
11,947.84
7.21
14.42
10.00
144.20
12,092.04
73+807.617
7.21
14.42
3.81
54.91
12,146.96
73+820.000
7.21
14.42
6.19
89.29
12,236.24
73+840.000
0.00
7.21
10.00
72.10
12,308.34
73+848.283
0.00
0.00
4.14
0.00
12,308.34
73+860.000
0.00
0.00
5.86
0.00
12,308.34
73+880.000
0.00
0.00
10.00
0.00
12,308.34
73+888.950
0.00
0.00
4.47
0.00
12,308.34
73+900.000
0.00
0.00
5.53
0.00
12,308.34
73+909.283
0.00
0.00
4.64
0.00
12,308.34
73+920.000
0.00
0.00
5.36
0.00
12,308.34
73+940.000
0.00
0.00
10.00
0.00
12,308.34
73+960.000
7.29
7.29
10.00
72.90
12,381.24
73+980.000
7.29
14.58
10.00
145.80
12,527.04
74+000.000
7.29
14.58
10.00
145.80
12,672.84
74+020.000
7.29
14.58
10.00
145.80
12,818.64
74+040.000
7.29
14.58
10.00
145.80
12,964.44
74+060.000
7.29
14.58
10.00
145.80
13,110.24
74+080.000
7.29
14.58
10.00
145.80
13,256.04
74+089.272
7.29
14.58
4.64
67.59
13,323.64
74+100.000
7.28
14.57
5.36
78.15
13,401.79
74+109.605
7.26
14.54
4.80
69.83
13,471.62
74+120.000
7.25
14.51
5.20
75.41
13,547.03
74+140.000
7.22
14.47
10.00
144.70
13,691.73
74+150.272
7.21
14.43
5.14
74.11
13,765.85
74+160.000
7.21
14.42
4.86
70.14
13,835.98
74+180.000
7.21
14.42
10.00
144.20
13,980.18
74+190.939
7.21
14.42
5.47
78.87
14,059.05
74+200.000
7.21
14.42
4.53
65.33
14,124.38
74+220.000
7.21
14.42
10.00
144.20
14,268.58
74+240.000
7.21
14.42
10.00
144.20
14,412.78
74+260.000
7.21
14.42
10.00
144.20
14,556.98
74+280.000
7.21
14.42
10.00
144.20
14,701.18
74+300.000
7.21
14.42
10.00
144.20
14,845.38
74+320.000
7.21
14.42
10.00
144.20
14,989.58
74+340.000
7.21
14.42
10.00
144.20
15,133.78
74+360.000
7.21
14.42
10.00
144.20
15,277.98
74+380.000
7.14
14.35
10.00
143.50
15,421.48
74+400.000
7.13
14.27
10.00
142.70
15,564.18
74+420.000
7.13
14.26
10.00
142.60
15,706.78
74+440.000
7.13
14.26
10.00
142.60
15,849.38
74+457.851
7.13
14.26
8.93
127.28
15,976.66
74+460.000
7.13
14.26
1.07
15.32
15,991.98
74+480.000
7.13
14.26
10.00
142.60
16,134.58
74+498.518
7.21
14.34
9.26
132.77
16,267.36
74+500.000
7.21
14.42
0.74
10.69
16,278.04
74+520.000
7.24
14.45
10.00
144.50
16,422.54
74+539.184
7.26
14.50
9.59
139.09
16,561.63
74+540.000
7.26
14.52
0.41
5.92
16,567.55
74+559.518
7.29
14.55
9.76
141.99
16,709.54
74+560.000
7.29
14.58
0.24
3.52
16,713.06
74+580.000
7.29
14.58
10.00
145.80
16,858.86
REVISO:
REALIZO:
Pgina 87 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 12
"TERRACERAS"
UNIDAD
TERRACERAS
4) Para cien por ciento (a 100 % SR) con material de banco
M3
ESTACIN KM.
REA
L1+L2
D/2
74+600.000
7.29
14.58
74+620.000
7.29
74+640.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
145.80
17,004.66
14.58
10.00
145.80
17,150.46
7.29
14.58
10.00
145.80
17,296.26
74+660.000
7.29
14.58
10.00
145.80
17,442.06
74+680.000
7.29
14.58
10.00
145.80
17,587.86
74+700.000
7.29
14.58
10.00
145.80
17,733.66
74+720.000
7.29
14.58
10.00
145.80
17,879.46
74+740.000
7.29
14.58
10.00
145.80
18,025.26
74+760.000
7.29
14.58
10.00
145.80
18,171.06
74+779.360
7.29
14.58
9.68
141.13
18,312.19
74+780.000
7.29
14.58
0.32
4.67
18,316.86
74+799.693
7.18
14.47
9.85
142.48
18,459.34
74+800.000
7.18
14.36
0.15
2.20
18,461.54
74+820.000
7.16
14.34
10.00
143.40
18,604.94
74+840.000
7.05
14.21
10.00
142.10
18,747.04
74+840.360
7.05
14.10
0.18
2.54
18,749.58
74+860.000
7.13
14.18
9.82
139.25
18,888.83
74+880.000
7.13
14.26
10.00
142.60
19,031.43
74+881.027
7.13
14.26
0.51
7.32
19,038.75
74+900.000
7.13
14.26
9.49
135.28
19,174.03
74+920.000
7.21
14.34
10.00
143.40
19,317.43
74+940.000
7.26
14.47
10.00
144.70
19,462.13
74+960.000
7.28
14.54
10.00
145.40
19,607.53
74+980.000
7.18
14.46
10.00
144.60
19,752.13
75+000.000
7.24
14.42
10.00
144.20
19,896.33
75+020.000
7.32
14.56
10.00
145.60
20,041.93
75+040.000
7.30
14.62
10.00
146.20
20,188.13
75+060.000
7.30
14.60
10.00
146.00
20,334.13
75+080.000
7.30
14.60
10.00
146.00
20,480.13
75+100.000
7.30
14.60
10.00
146.00
20,626.13
75+120.000
7.30
14.60
10.00
146.00
20,772.13
75+140.000
7.30
14.60
10.00
146.00
20,918.13
75+160.000
7.30
14.60
10.00
146.00
21,064.13
75+180.000
7.30
14.60
10.00
146.00
21,210.13
75+200.000
7.31
14.61
10.00
146.10
21,356.23
75+220.000
7.30
14.61
10.00
146.10
21,502.33
75+240.000
7.30
14.60
10.00
146.00
21,648.33
75+260.000
7.30
14.60
10.00
146.00
21,794.33
75+280.000
7.30
14.60
10.00
146.00
21,940.33
75+300.000
7.30
14.60
10.00
146.00
22,086.33
75+320.000
7.30
14.60
10.00
146.00
22,232.33
75+340.000
7.31
14.61
10.00
146.10
22,378.43
75+360.000
7.30
14.61
10.00
146.10
22,524.53
75+380.000
7.30
14.60
10.00
146.00
22,670.53
75+400.000
7.30
14.60
10.00
146.00
22,816.53
75+420.000
7.31
14.61
10.00
146.10
22,962.63
75+440.000
7.30
14.61
10.00
146.10
23,108.73
75+460.000
7.30
14.60
10.00
146.00
23,254.73
75+480.000
7.30
14.60
10.00
146.00
23,400.73
75+500.000
7.28
14.58
10.00
145.80
23,546.53
75+520.000
7.19
14.47
10.00
144.70
23,691.23
75+540.000
7.09
14.28
10.00
142.80
23,834.03
75+560.000
9.51
16.60
10.00
166.00
24,000.03
75+580.000
7.05
16.56
10.00
165.60
24,165.63
REVISO:
REALIZO:
Pgina 88 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 12
"TERRACERAS"
UNIDAD
TERRACERAS
4) Para cien por ciento (a 100 % SR) con material de banco
M3
ESTACIN KM.
REA
L1+L2
D/2
75+600.000
7.05
14.10
75+611.738
7.05
75+620.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
141.00
24,306.63
14.10
5.87
82.75
24,389.38
7.05
14.10
4.13
58.25
24,447.63
75+635.122
7.05
14.10
7.56
106.61
24,554.24
75+640.000
7.07
14.12
2.44
34.44
24,588.68
75+658.507
7.12
14.19
9.25
131.31
24,719.98
75+660.000
7.15
14.27
0.75
10.65
24,730.64
75+680.000
7.29
14.44
10.00
144.40
24,875.04
75+700.000
7.43
14.72
10.00
147.20
25,022.24
75+711.122
7.46
14.89
5.56
82.81
25,105.04
75+720.000
7.44
14.90
4.44
66.14
25,171.18
75+740.000
7.44
14.88
10.00
148.80
25,319.98
75+760.000
7.44
14.88
10.00
148.80
25,468.78
75+780.000
7.44
14.88
10.00
148.80
25,617.58
75+800.000
7.44
14.88
10.00
148.80
25,766.38
75+820.000
7.44
14.88
10.00
148.80
25,915.18
75+840.000
7.44
14.88
10.00
148.80
26,063.98
75+860.000
7.44
14.88
10.00
148.80
26,212.78
75+880.000
7.44
14.88
10.00
148.80
26,361.58
75+900.000
7.44
14.88
10.00
148.80
26,510.38
75+920.000
7.44
14.88
10.00
148.80
26,659.18
75+940.000
7.44
14.88
10.00
148.80
26,807.98
75+960.000
7.44
14.88
10.00
148.80
26,956.78
75+980.000
7.44
14.88
10.00
148.80
27,105.58
76+000.000
7.44
14.88
10.00
148.80
27,254.38
76+020.000
7.44
14.88
10.00
148.80
27,403.18
76+040.000
7.44
14.88
10.00
148.80
27,551.98
76+060.000
7.44
14.88
10.00
148.80
27,700.78
76+080.000
7.44
14.88
10.00
148.80
27,849.58
76+100.000
7.44
14.88
10.00
148.80
27,998.38
76+120.000
7.44
14.88
10.00
148.80
28,147.18
76+140.000
7.44
14.88
10.00
148.80
28,295.98
76+160.000
7.44
14.88
10.00
148.80
28,444.78
76+180.000
7.44
14.88
10.00
148.80
28,593.58
76+200.000
7.44
14.88
10.00
148.80
28,742.38
76+220.000
7.41
14.85
10.00
148.50
28,890.88
76+240.000
7.36
14.77
10.00
147.70
29,038.58
76+255.500
7.36
14.72
7.75
114.08
29,152.66
76+260.000
7.35
14.71
2.25
33.10
29,185.76
76+280.000
7.30
14.65
10.00
146.50
29,332.26
76+300.000
7.25
14.55
10.00
145.50
29,477.76
76+320.000
7.20
14.45
10.00
144.50
29,622.26
76+321.961
7.20
14.40
0.98
14.12
29,636.38
76+340.000
7.15
14.35
9.02
129.43
29,765.81
76+351.500
7.13
14.28
5.75
82.11
29,847.92
76+360.000
7.21
14.34
4.25
60.95
29,908.86
76+380.000
7.21
14.42
10.00
144.20
30,053.06
76+381.038
7.21
14.42
0.52
7.49
30,060.55
76+400.000
7.21
14.42
9.48
136.71
30,197.26
76+420.000
7.16
14.37
10.00
143.70
30,340.96
76+440.000
7.13
14.29
10.00
142.90
30,483.86
76+460.000
7.13
14.26
10.00
142.60
30,626.46
76+480.000
7.13
14.26
10.00
142.60
30,769.06
76+500.000
7.13
14.26
10.00
142.60
30,911.66
REVISO:
REALIZO:
Pgina 89 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 12
"TERRACERAS"
UNIDAD
TERRACERAS
4) Para cien por ciento (a 100 % SR) con material de banco
M3
ESTACIN KM.
REA
L1+L2
D/2
76+520.000
7.13
14.26
76+540.000
7.14
76+560.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
142.60
31,054.26
14.27
10.00
142.70
31,196.96
7.20
14.34
10.00
143.40
31,340.36
76+580.000
7.13
14.33
10.00
143.30
31,483.66
76+600.000
7.13
14.26
10.00
142.60
31,626.26
76+620.000
7.13
14.26
10.00
142.60
31,768.86
76+640.000
7.13
14.26
10.00
142.60
31,911.46
76+660.000
7.13
14.26
10.00
142.60
32,054.06
76+680.000
7.13
14.26
10.00
142.60
32,196.66
76+700.000
7.16
14.29
10.00
142.90
32,339.56
76+720.000
7.21
14.37
10.00
143.70
32,483.26
76+740.000
7.21
14.42
10.00
144.20
32,627.46
76+760.000
7.21
14.42
10.00
144.20
32,771.66
76+780.000
7.21
14.42
10.00
144.20
32,915.86
76+800.000
7.21
14.42
10.00
144.20
33,060.06
76+820.000
7.21
14.42
10.00
144.20
33,204.26
76+840.000
7.21
14.42
10.00
144.20
33,348.46
76+860.000
7.21
14.42
10.00
144.20
33,492.66
76+880.000
7.21
14.42
10.00
144.20
33,636.86
76+900.000
7.21
14.42
10.00
144.20
33,781.06
76+920.000
7.21
14.42
10.00
144.20
33,925.26
76+940.000
7.21
14.42
10.00
144.20
34,069.46
76+960.000
7.13
14.34
10.00
143.40
34,212.86
76+980.000
7.13
14.26
10.00
142.60
34,355.46
76+985.245
7.13
14.26
2.62
37.40
34,392.86
76+993.182
7.13
14.26
3.97
56.59
34,449.45
77+000.000
7.16
14.29
3.41
48.72
34,498.16
77+001.118
7.16
14.32
0.56
8.01
34,506.17
77+018.182
7.23
14.39
8.53
122.77
34,628.94
77+020.000
7.24
14.47
0.91
13.15
34,642.10
77+040.000
7.24
14.48
10.00
144.80
34,786.90
77+060.000
7.24
14.48
10.00
144.80
34,931.70
77+080.000
7.17
14.41
10.00
144.10
35,075.80
77+100.000
7.30
14.47
10.00
144.70
35,220.50
77+120.000
7.24
14.54
10.00
145.40
35,365.90
77+140.000
7.24
14.48
10.00
144.80
35,510.70
77+160.000
7.24
14.48
10.00
144.80
35,655.50
77+180.000
7.24
14.48
10.00
144.80
35,800.30
77+200.000
7.32
14.56
10.00
145.60
35,945.90
77+220.000
7.32
14.64
10.00
146.40
36,092.30
77+240.000
7.24
14.56
10.00
145.60
36,237.90
77+260.000
7.24
14.48
10.00
144.80
36,382.70
77+280.000
7.18
14.42
10.00
144.20
36,526.90
77+300.000
7.18
14.36
10.00
143.60
36,670.50
77+320.000
7.18
14.36
10.00
143.60
36,814.10
77+340.000
7.18
14.36
10.00
143.60
36,957.70
77+360.000
7.24
14.42
10.00
144.20
37,101.90
77+380.000
7.24
14.48
10.00
144.80
37,246.70
77+400.000
7.24
14.48
10.00
144.80
37,391.50
77+420.000
7.24
14.48
10.00
144.80
37,536.30
77+440.000
7.18
14.42
10.00
144.20
37,680.50
77+460.000
7.18
14.36
10.00
143.60
37,824.10
77+480.000
7.18
14.36
10.00
143.60
37,967.70
77+500.000
7.18
14.36
10.00
143.60
38,111.30
REVISO:
REALIZO:
Pgina 90 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 12
"TERRACERAS"
UNIDAD
TERRACERAS
4) Para cien por ciento (a 100 % SR) con material de banco
M3
ESTACIN KM.
REA
L1+L2
D/2
77+520.000
7.18
14.36
77+525.218
7.18
77+540.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
143.60
38,254.90
14.36
2.61
37.46
38,292.36
7.09
14.27
7.39
105.47
38,397.83
77+540.234
7.09
14.18
0.12
1.66
38,399.49
77+547.218
7.05
14.14
3.49
49.38
38,448.87
77+554.202
7.05
14.10
3.49
49.24
38,498.11
77+560.000
7.05
14.10
2.90
40.88
38,538.98
77+580.000
7.13
14.18
10.00
141.80
38,680.78
77+600.000
7.13
14.26
10.00
142.60
38,823.38
77+620.000
7.21
14.34
10.00
143.40
38,966.78
77+640.000
7.21
14.42
10.00
144.20
39,110.98
77+647.342
7.21
14.42
3.67
52.93
39,163.91
77+660.000
7.21
14.42
6.33
91.27
39,255.18
77+663.215
7.21
14.42
1.61
23.18
39,278.36
77+679.088
7.24
14.45
7.94
114.68
39,393.04
77+680.000
7.23
14.47
0.46
6.60
39,399.64
77+700.000
7.28
14.51
10.00
145.10
39,544.74
77+713.215
7.17
14.45
6.61
95.48
39,640.22
77+720.000
7.25
14.42
3.39
48.92
39,689.14
77+740.000
7.32
14.57
10.00
145.70
39,834.84
77+760.000
7.24
14.56
10.00
145.60
39,980.44
77+780.000
7.24
14.48
10.00
144.80
40,125.24
77+800.000
7.18
14.42
10.00
144.20
40,269.44
77+820.000
7.18
14.36
10.00
143.60
40,413.04
77+840.000
7.18
14.36
10.00
143.60
40,556.64
77+860.000
7.18
14.36
10.00
143.60
40,700.24
77+880.000
7.18
14.36
10.00
143.60
40,843.84
77+900.000
7.18
14.36
10.00
143.60
40,987.44
77+920.000
7.18
14.36
10.00
143.60
41,131.04
77+940.000
7.09
14.27
10.00
142.70
41,273.74
77+960.000
7.18
14.27
10.00
142.70
41,416.44
77+980.000
7.26
14.44
10.00
144.40
41,560.84
78+000.000
7.27
14.53
10.00
145.30
41,706.14
78+020.000
7.26
14.53
10.00
145.30
41,851.44
78+040.000
7.32
14.58
10.00
145.80
41,997.24
78+060.000
7.24
14.56
10.00
145.60
42,142.84
78+080.000
7.24
14.48
10.00
144.80
42,287.64
78+094.334
7.24
14.48
7.17
103.78
42,391.42
78+100.000
7.22
14.46
2.83
40.96
42,432.38
78+116.175
7.16
14.38
8.09
116.30
42,548.69
78+120.000
7.15
14.31
1.91
27.37
42,576.05
78+126.334
7.13
14.28
3.17
45.23
42,621.28
78+136.493
7.13
14.26
5.08
72.43
42,693.71
78+140.000
7.13
14.26
1.75
25.01
42,718.71
78+160.000
7.13
14.26
10.00
142.60
42,861.31
78+180.000
7.13
14.26
10.00
142.60
43,003.91
78+200.000
7.13
14.26
10.00
142.60
43,146.51
78+220.000
7.21
14.34
10.00
143.40
43,289.91
78+240.000
7.21
14.42
10.00
144.20
43,434.11
78+260.000
7.21
14.42
10.00
144.20
43,578.31
78+280.000
0.00
7.21
10.00
72.10
43,650.41
78+300.000
0.00
0.00
10.00
0.00
43,650.41
78+320.000
0.00
0.00
10.00
0.00
43,650.41
78+340.000
0.00
0.00
10.00
0.00
43,650.41
REVISO:
REALIZO:
Pgina 91 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 12
"TERRACERAS"
UNIDAD
TERRACERAS
4) Para cien por ciento (a 100 % SR) con material de banco
M3
ESTACIN KM.
REA
L1+L2
D/2
78+360.000
0.00
0.00
78+380.000
0.00
78+400.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
0.00
43,650.41
0.00
10.00
0.00
43,650.41
0.00
0.00
10.00
0.00
43,650.41
78+420.000
0.00
0.00
10.00
0.00
43,650.41
78+440.000
0.00
0.00
10.00
0.00
43,650.41
78+460.000
0.00
0.00
10.00
0.00
43,650.41
78+480.000
0.00
0.00
10.00
0.00
43,650.41
78+500.000
0.00
0.00
10.00
0.00
43,650.41
78+520.000
0.00
0.00
10.00
0.00
43,650.41
78+540.000
7.32
7.32
10.00
73.20
43,723.61
78+560.000
7.32
14.64
10.00
146.40
43,870.01
78+580.000
7.32
14.64
10.00
146.40
44,016.41
78+600.000
7.32
14.64
10.00
146.40
44,162.81
78+620.000
7.32
14.64
10.00
146.40
44,309.21
78+640.000
7.32
14.64
10.00
146.40
44,455.61
78+660.000
7.24
14.56
10.00
145.60
44,601.21
78+680.000
7.24
14.48
10.00
144.80
44,746.01
78+700.000
7.24
14.48
10.00
144.80
44,890.81
78+720.000
7.22
14.46
10.00
144.60
45,035.41
78+740.000
7.05
14.27
10.00
142.70
45,178.11
78+760.000
7.05
14.10
10.00
141.00
45,319.11
78+780.000
7.05
14.10
10.00
141.00
45,460.11
78+790.492
7.05
14.10
5.25
73.97
45,534.09
78+796.615
7.05
14.10
3.06
43.16
45,577.25
78+800.000
7.07
14.12
1.69
23.90
45,601.15
78+802.737
7.09
14.16
1.37
19.38
45,620.53
78+811.615
7.30
14.39
4.44
63.87
45,684.40
78+820.000
7.21
14.51
4.19
60.83
45,745.24
78+840.000
7.19
14.40
10.00
144.00
45,889.24
78+860.000
7.15
14.34
10.00
143.40
46,032.64
78+880.000
7.15
14.30
10.00
143.00
46,175.64
78+900.000
7.15
14.30
10.00
143.00
46,318.64
78+920.000
7.15
14.30
10.00
143.00
46,461.64
78+940.000
7.15
14.30
10.00
143.00
46,604.64
78+960.000
7.15
14.30
10.00
143.00
46,747.64
78+980.000
7.15
14.30
10.00
143.00
46,890.64
79+000.000
7.22
14.37
10.00
143.70
47,034.34
79+020.000
7.22
14.44
10.00
144.40
47,178.74
79+040.000
7.29
14.51
10.00
145.10
47,323.84
79+060.000
7.29
14.58
10.00
145.80
47,469.64
79+080.000
7.29
14.58
10.00
145.80
47,615.44
79+097.907
7.29
14.58
8.95
130.54
47,745.98
79+100.000
7.29
14.58
1.05
15.26
47,761.24
79+120.000
7.26
14.55
10.00
145.50
47,906.74
79+133.417
7.24
14.50
6.71
97.28
48,004.01
79+140.000
7.23
14.47
3.29
47.63
48,051.64
79+157.907
7.21
14.44
8.95
129.29
48,180.93
79+160.000
7.21
14.42
1.05
15.09
48,196.02
79+180.000
7.21
14.42
10.00
144.20
48,340.22
79+182.397
7.21
14.42
1.20
17.28
48,357.50
79+200.000
7.21
14.42
8.80
126.92
48,484.42
79+220.000
7.21
14.42
10.00
144.20
48,628.62
79+240.000
7.20
14.41
10.00
144.10
48,772.72
79+260.000
7.13
14.33
10.00
143.30
48,916.02
79+280.000
7.13
14.26
10.00
142.60
49,058.62
79+300.000
7.14
14.27
10.00
142.70
49,201.32
79+320.000
7.17
14.31
10.00
143.10
49,344.42
REVISO:
REALIZO:
Pgina 92 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 12
"TERRACERAS"
UNIDAD
TERRACERAS
4) Para cien por ciento (a 100 % SR) con material de banco
M3
ESTACIN KM.
REA
L1+L2
D/2
79+340.000
7.16
14.33
79+360.000
7.11
79+380.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
143.30
49,487.72
14.27
10.00
142.70
49,630.42
7.06
14.17
10.00
141.70
49,772.12
79+400.000
7.05
14.11
10.00
141.10
49,913.22
79+420.000
7.05
14.10
10.00
141.00
50,054.22
79+440.000
7.05
14.10
10.00
141.00
50,195.22
79+460.000
7.07
14.12
10.00
141.20
50,336.42
79+480.000
7.06
14.13
10.00
141.30
50,477.72
79+500.000
7.11
14.17
10.00
141.70
50,619.42
79+520.000
7.12
14.23
10.00
142.30
50,761.72
79+540.000
7.12
14.24
10.00
142.40
50,904.12
79+560.000
7.09
14.21
10.00
142.10
51,046.22
79+580.000
7.12
14.21
10.00
142.10
51,188.32
79+600.000
7.12
14.24
10.00
142.40
51,330.72
79+620.000
7.11
14.23
10.00
142.30
51,473.02
79+640.000
7.08
14.19
10.00
141.90
51,614.92
79+660.000
7.05
14.13
10.00
141.30
51,756.22
79+680.000
7.05
14.10
10.00
141.00
51,897.22
79+700.000
7.05
14.10
10.00
141.00
52,038.22
79+720.000
7.05
14.10
10.00
141.00
52,179.22
79+740.000
7.05
14.10
10.00
141.00
52,320.22
79+760.000
7.05
14.10
10.00
141.00
52,461.22
79+780.000
7.05
14.10
10.00
141.00
52,602.22
79+800.000
7.05
14.10
10.00
141.00
52,743.22
79+820.000
7.05
14.10
10.00
141.00
52,884.22
79+840.000
7.05
14.10
10.00
141.00
53,025.22
79+860.000
7.05
14.10
10.00
141.00
53,166.22
79+880.000
7.05
14.10
10.00
141.00
53,307.22
79+900.000
7.05
14.10
10.00
141.00
53,448.22
79+920.000
7.05
14.10
10.00
141.00
53,589.22
79+940.000
7.13
14.18
10.00
141.80
53,731.02
79+960.000
7.13
14.26
10.00
142.60
53,873.62
79+980.000
7.21
14.34
10.00
143.40
54,017.02
80+000.000
7.21
14.42
10.00
144.20
54,161.22
80+020.000
7.21
14.42
10.00
144.20
54,305.42
80+040.000
7.21
14.42
10.00
144.20
54,449.62
80+060.000
7.21
14.42
10.00
144.20
54,593.82
80+080.000
7.20
14.41
10.00
144.10
54,737.92
80+100.000
7.12
14.32
10.00
143.20
54,881.12
80+120.000
7.10
14.22
10.00
142.20
55,023.32
80+140.000
7.07
14.17
10.00
141.70
55,165.02
80+160.000
6.99
14.06
10.00
140.60
55,305.62
80+180.000
6.96
13.95
10.00
139.50
55,445.12
80+200.000
6.98
13.94
10.00
139.40
55,584.52
80+220.000
7.02
14.00
10.00
140.00
55,724.52
80+240.000
7.21
14.23
10.00
142.30
55,866.82
80+260.000
7.21
14.42
10.00
144.20
56,011.02
80+280.000
7.21
14.42
10.00
144.20
56,155.22
80+300.000
7.21
14.42
10.00
144.20
56,299.42
80+320.000
7.21
14.42
10.00
144.20
56,443.62
80+340.000
12.72
19.93
10.00
199.30
56,642.92
80+360.000
7.21
19.93
10.00
199.30
56,842.22
80+380.000
7.21
14.42
10.00
144.20
56,986.42
80+400.000
7.21
14.42
10.00
144.20
57,130.62
80+420.000
7.21
14.42
10.00
144.20
57,274.82
80+440.000
7.21
14.42
10.00
144.20
57,419.02
80+460.000
0.00
7.21
10.00
72.10
57,491.12
REVISO:
REALIZO:
Pgina 93 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 12
"TERRACERAS"
UNIDAD
TERRACERAS
4) Para cien por ciento (a 100 % SR) con material de banco
M3
ESTACIN KM.
REA
L1+L2
D/2
80+480.000
0.00
0.00
80+500.000
0.00
80+520.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
0.00
57,491.12
0.00
10.00
0.00
57,491.12
0.00
0.00
10.00
0.00
57,491.12
80+540.000
0.00
0.00
10.00
0.00
57,491.12
80+560.000
0.00
0.00
10.00
0.00
57,491.12
80+580.000
0.00
0.00
10.00
0.00
57,491.12
80+600.000
7.21
7.21
10.00
72.10
57,563.22
80+620.000
7.21
14.42
10.00
144.20
57,707.42
80+640.000
7.21
14.42
10.00
144.20
57,851.62
80+660.000
8.44
15.65
10.00
156.50
58,008.12
80+680.000
7.11
15.55
10.00
155.50
58,163.62
80+700.000
7.13
14.24
10.00
142.40
58,306.02
80+720.000
6.02
13.15
10.00
131.50
58,437.52
80+740.000
5.40
11.42
10.00
114.20
58,551.72
80+760.000
7.06
12.46
10.00
124.60
58,676.32
80+780.000
7.13
14.19
10.00
141.90
58,818.22
80+800.000
7.20
14.33
10.00
143.30
58,961.52
80+820.000
7.21
14.41
10.00
144.10
59,105.62
80+840.000
7.21
14.42
10.00
144.20
59,249.82
80+860.000
7.21
14.42
10.00
144.20
59,394.02
80+880.000
7.21
14.42
10.00
144.20
59,538.22
80+900.000
7.21
14.42
10.00
144.20
59,682.42
80+920.000
7.21
14.42
10.00
144.20
59,826.62
80+940.000
7.21
14.42
10.00
144.20
59,970.82
80+960.000
7.21
14.42
10.00
144.20
60,115.02
80+980.000
7.21
14.42
10.00
144.20
60,259.22
81+000.000
7.10
14.31
10.00
143.10
60,402.32
81+020.000
7.19
14.29
10.00
142.90
60,545.22
81+040.000
7.21
14.40
10.00
144.00
60,689.22
81+060.000
7.21
14.42
10.00
144.20
60,833.42
81+080.000
7.21
14.42
10.00
144.20
60,977.62
81+100.000
7.22
14.43
10.00
144.30
61,121.92
81+120.000
12.75
19.97
10.00
199.70
61,321.62
81+140.000
81+160.000
81+180.000
81+200.000
81+220.000
81+240.000
81+260.000
81+280.000
81+300.000
81+320.000
81+340.000
81+360.000
81+380.000
81+400.000
81+420.000
81+440.000
81+460.000
81+480.000
81+500.000
81+520.000
81+540.000
81+560.000
81+580.000
81+600.000
81+620.000
81+640.000
81+660.000
81+680.000
81+700.000
81+720.000
7.16
7.11
7.11
7.19
7.26
7.11
7.11
7.11
7.11
7.11
7.11
7.11
7.11
7.11
7.18
7.18
7.26
7.26
7.26
7.26
7.26
7.26
7.26
7.26
7.26
7.26
0.00
0.00
0.00
0.00
19.91
14.27
14.22
14.30
14.45
14.37
14.22
14.22
14.22
14.22
14.22
14.22
14.22
14.22
14.29
14.36
14.44
14.52
14.52
14.52
14.52
14.52
14.52
14.52
14.52
14.52
7.26
0.00
0.00
0.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
199.10
142.70
142.20
143.00
144.50
143.70
142.20
142.20
142.20
142.20
142.20
142.20
142.20
142.20
142.90
143.60
144.40
145.20
145.20
145.20
145.20
145.20
145.20
145.20
145.20
145.20
72.60
0.00
0.00
0.00
61,520.72
61,663.42
61,805.62
61,948.62
62,093.12
62,236.82
62,379.02
62,521.22
62,663.42
62,805.62
62,947.82
63,090.02
63,232.22
63,374.42
63,517.32
63,660.92
63,805.32
63,950.52
64,095.72
64,240.92
64,386.12
64,531.32
64,676.52
64,821.72
64,966.92
65,112.12
65,184.72
65,184.72
65,184.72
65,184.72
REVISO:
REALIZO:
Pgina 94 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 12
"TERRACERAS"
UNIDAD
TERRACERAS
4) Para cien por ciento (a 100 % SR) con material de banco
M3
ESTACIN KM.
REA
L1+L2
D/2
81+740.000
81+760.000
81+780.000
81+800.000
81+820.000
81+840.000
81+860.000
81+880.000
81+900.000
81+920.000
81+940.000
81+960.000
81+980.000
82+000.000
82+020.000
82+040.000
82+060.000
82+080.000
82+100.000
82+120.000
82+140.000
82+160.000
82+180.000
82+200.000
82+220.000
82+240.000
82+260.000
82+280.000
82+300.000
82+320.000
82+340.000
82+360.000
82+380.000
82+400.000
82+420.000
82+440.000
82+460.000
82+480.000
82+500.000
82+520.000
82+540.000
82+560.000
82+580.000
82+600.000
82+620.000
82+640.000
82+660.000
82+680.000
82+700.000
82+720.000
82+740.000
82+760.000
82+780.000
82+800.000
82+820.000
82+840.000
82+860.000
82+880.000
82+900.000
82+920.000
82+940.000
82+960.000
82+980.000
83+000.000
83+020.000
83+040.000
83+060.000
83+080.000
83+100.000
83+120.000
83+140.000
83+160.000
83+170.200
0.00
0.00
0.00
7.13
7.21
5.88
7.21
7.21
7.21
7.21
7.21
7.21
7.21
7.21
7.05
7.21
7.21
7.21
7.13
7.08
7.05
7.05
7.05
7.05
7.05
7.05
7.02
7.13
7.13
7.05
7.05
7.05
7.05
7.05
7.05
7.05
7.05
7.05
7.05
7.05
7.06
7.21
7.13
7.13
7.21
7.21
7.21
7.21
7.21
7.21
7.21
7.21
7.21
7.21
7.21
7.21
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
7.21
0.00
0.00
0.00
7.13
14.34
13.09
13.09
14.42
14.42
14.42
14.42
14.42
14.42
14.42
14.26
14.26
14.42
14.42
14.34
14.21
14.13
14.10
14.10
14.10
14.10
14.10
14.07
14.15
14.26
14.18
14.10
14.10
14.10
14.10
14.10
14.10
14.10
14.10
14.10
14.10
14.11
14.27
14.34
14.26
14.34
14.42
14.42
14.42
14.42
14.42
14.42
14.42
14.42
14.42
14.42
14.42
7.21
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
7.21
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
5.10
REVISO:
REA ACUMULADA
PARCIAL
ACUMULADO
0.00
0.00
0.00
71.30
143.40
130.90
130.90
144.20
144.20
144.20
144.20
144.20
144.20
144.20
142.60
142.60
144.20
144.20
143.40
142.10
141.30
141.00
141.00
141.00
141.00
141.00
140.70
141.50
142.60
141.80
141.00
141.00
141.00
141.00
141.00
141.00
141.00
141.00
141.00
141.00
141.10
142.70
143.40
142.60
143.40
144.20
144.20
144.20
144.20
144.20
144.20
144.20
144.20
144.20
144.20
144.20
72.10
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
36.77
65,184.72
65,184.72
65,184.72
65,256.02
65,399.42
65,530.32
65,661.22
65,805.42
65,949.62
66,093.82
66,238.02
66,382.22
66,526.42
66,670.62
66,813.22
66,955.82
67,100.02
67,244.22
67,387.62
67,529.72
67,671.02
67,812.02
67,953.02
68,094.02
68,235.02
68,376.02
68,516.72
68,658.22
68,800.82
68,942.62
69,083.62
69,224.62
69,365.62
69,506.62
69,647.62
69,788.62
69,929.62
70,070.62
70,211.62
70,352.62
70,493.72
70,636.42
70,779.82
70,922.42
71,065.82
71,210.02
71,354.22
71,498.42
71,642.62
71,786.82
71,931.02
72,075.22
72,219.42
72,363.62
72,507.82
72,652.02
72,724.12
72,724.12
72,724.12
72,724.12
72,724.12
72,724.12
72,724.12
72,724.12
72,724.12
72,724.12
72,724.12
72,724.12
72,724.12
72,724.12
72,724.12
72,724.12
72,760.89
REALIZO:
Pgina 95 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 12
"TERRACERAS"
UNIDAD
TERRACERAS
4) Para cien por ciento (a 100 % SR) con material de banco
M3
ESTACIN KM.
REA
L1+L2
D/2
83+180.000
83+200.000
83+220.000
83+240.000
83+260.000
83+280.000
83+300.000
83+320.000
83+340.000
83+360.000
83+380.000
83+400.000
83+420.000
83+440.000
83+460.000
83+480.000
83+500.000
83+520.000
83+540.000
83+560.000
83+570.105
83+580.000
83+593.182
83+600.000
83+616.259
83+620.000
83+640.000
83+653.182
83+660.000
83+680.000
83+700.000
83+720.000
83+740.000
83+760.000
83+780.000
83+785.000
7.13
7.13
7.05
7.05
7.05
7.05
7.05
7.10
7.13
7.21
7.21
7.14
7.13
7.05
7.05
7.05
7.05
7.05
7.05
7.05
7.05
7.05
7.05
7.06
7.09
7.09
7.09
7.15
7.13
7.15
7.15
7.15
7.15
7.15
7.16
7.22
14.34
14.26
14.18
14.10
14.10
14.10
14.10
14.15
14.23
14.34
14.42
14.35
14.27
14.18
14.10
14.10
14.10
14.10
14.10
14.10
14.10
14.10
14.10
14.11
14.15
14.18
14.18
14.24
14.28
14.28
14.30
14.30
14.30
14.30
14.31
14.38
4.90
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
5.05
4.95
6.59
3.41
8.13
1.87
10.00
6.59
3.41
10.00
10.00
10.00
10.00
10.00
10.00
2.50
REVISO:
REA ACUMULADA
PARCIAL
ACUMULADO
70.27
142.60
141.80
141.00
141.00
141.00
141.00
141.50
142.30
143.40
144.20
143.50
142.70
141.80
141.00
141.00
141.00
141.00
141.00
141.00
71.24
69.76
92.93
48.10
115.03
26.53
141.80
93.85
48.68
142.80
143.00
143.00
143.00
143.00
143.10
35.95
72,831.15
72,973.75
73,115.55
73,256.55
73,397.55
73,538.55
73,679.55
73,821.05
73,963.35
74,106.75
74,250.95
74,394.45
74,537.15
74,678.95
74,819.95
74,960.95
75,101.95
75,242.95
75,383.95
75,524.95
75,596.19
75,665.95
75,758.88
75,806.99
75,922.02
75,948.54
76,090.34
76,184.20
76,232.88
76,375.68
76,518.68
76,661.68
76,804.68
76,947.68
77,090.78
77,126.73
REALIZO:
Pgina 96 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 26
"PAVIMENTOS"
UNIDAD
M3
b) Compactadas al 100%
REA ACUMULADA
ESTACIN KM.
REA
L1+L2
D/2
71+800.000
5.43
5.43
0.00
0.00
0.00
71+820.000
5.43
10.86
10.00
108.60
108.60
71+840.000
5.43
10.86
10.00
108.60
217.20
71+860.000
5.43
10.86
10.00
108.60
325.80
71+880.000
5.43
10.86
10.00
108.60
434.40
71+900.000
5.43
10.86
10.00
108.60
543.00
71+920.000
5.43
10.86
10.00
108.60
651.60
71+940.000
5.43
10.86
10.00
108.60
760.20
71+960.000
5.43
10.86
10.00
108.60
868.80
71+980.000
5.43
10.86
10.00
108.60
977.40
72+000.000
5.43
10.86
10.00
108.60
1,086.00
72+020.000
5.43
10.86
10.00
108.60
1,194.60
72+040.000
5.43
10.86
10.00
108.60
1,303.20
72+060.000
5.43
10.86
10.00
108.60
1,411.80
72+080.000
5.43
10.86
10.00
108.60
1,520.40
72+100.000
5.43
10.86
10.00
108.60
1,629.00
72+120.000
5.43
10.86
10.00
108.60
1,737.60
72+140.000
5.43
10.86
10.00
108.60
1,846.20
72+160.000
5.43
10.86
10.00
108.60
1,954.80
72+180.000
5.43
10.86
10.00
108.60
2,063.40
72+200.000
5.43
10.86
10.00
108.60
2,172.00
72+220.000
5.43
10.86
10.00
108.60
2,280.60
72+240.000
5.43
10.86
10.00
108.60
2,389.20
72+260.000
5.43
10.86
10.00
108.60
2,497.80
72+280.000
5.43
10.86
10.00
108.60
2,606.40
72+300.000
5.43
10.86
10.00
108.60
2,715.00
72+320.000
5.43
10.86
10.00
108.60
2,823.60
72+340.000
5.43
10.86
10.00
108.60
2,932.20
72+360.000
5.43
10.86
10.00
108.60
3,040.80
72+380.000
5.43
10.86
10.00
108.60
3,149.40
72+400.000
5.43
10.86
10.00
108.60
3,258.00
72+420.000
5.43
10.86
10.00
108.60
3,366.60
72+440.000
5.43
10.86
10.00
108.60
3,475.20
72+460.000
5.43
10.86
10.00
108.60
3,583.80
72+480.000
5.43
10.86
10.00
108.60
3,692.40
72+500.000
5.43
10.86
10.00
108.60
3,801.00
72+520.000
5.43
10.86
10.00
108.60
3,909.60
72+540.000
5.43
10.86
10.00
108.60
4,018.20
72+560.000
5.43
10.86
10.00
108.60
4,126.80
72+580.000
5.43
10.86
10.00
108.60
4,235.40
72+600.000
5.43
10.86
10.00
108.60
4,344.00
72+620.000
5.43
10.86
10.00
108.60
4,452.60
72+640.000
5.43
10.86
10.00
108.60
4,561.20
72+654.982
5.43
10.86
7.49
81.35
4,642.55
72+660.000
5.43
10.86
2.51
27.25
4,669.80
72+678.443
5.43
10.86
9.22
100.15
4,769.95
72+680.000
5.43
10.86
0.78
8.45
4,778.40
72+700.000
5.48
10.91
10.00
109.10
4,887.50
72+701.905
5.49
10.97
0.95
10.45
4,897.95
72+720.000
5.53
11.02
9.05
99.71
4,997.65
72+739.443
5.58
11.11
9.72
108.01
5,105.66
72+740.000
5.58
11.16
0.28
3.11
5,108.77
REVISO:
PARCIAL
ACUMULADO
REALIZO:
Pgina 97 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 26
"PAVIMENTOS"
UNIDAD
M3
b) Compactadas al 100%
ESTACIN KM.
REA
L1+L2
D/2
72+760.000
5.58
11.16
72+780.000
5.58
72+800.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
111.60
5,220.37
11.16
10.00
111.60
5,331.97
5.58
11.16
10.00
111.60
5,443.57
72+820.000
5.58
11.16
10.00
111.60
5,555.17
72+840.000
5.58
11.16
10.00
111.60
5,666.77
72+860.000
5.58
11.16
10.00
111.60
5,778.37
72+880.000
5.58
11.16
10.00
111.60
5,889.97
72+900.000
5.58
11.16
10.00
111.60
6,001.57
72+920.000
5.58
11.16
10.00
111.60
6,113.17
72+940.000
0.00
5.58
10.00
55.80
6,168.97
72+960.000
0.00
0.00
10.00
0.00
6,168.97
72+971.651
0.00
0.00
5.83
0.00
6,168.97
72+980.000
0.00
0.00
4.17
0.00
6,168.97
73+000.000
0.00
0.00
10.00
0.00
6,168.97
73+009.189
0.00
0.00
4.59
0.00
6,168.97
73+020.000
0.00
0.00
5.41
0.00
6,168.97
73+032.651
0.00
0.00
6.33
0.00
6,168.97
73+040.000
0.00
0.00
3.67
0.00
6,168.97
73+056.112
0.00
0.00
8.06
0.00
6,168.97
73+060.000
0.00
0.00
1.94
0.00
6,168.97
73+080.000
0.00
0.00
10.00
0.00
6,168.97
73+100.000
0.00
0.00
10.00
0.00
6,168.97
73+120.000
0.00
0.00
10.00
0.00
6,168.97
73+140.000
0.00
0.00
10.00
0.00
6,168.97
73+160.000
0.00
0.00
10.00
0.00
6,168.97
73+180.000
0.00
0.00
10.00
0.00
6,168.97
73+200.000
0.00
0.00
10.00
0.00
6,168.97
73+220.000
0.00
0.00
10.00
0.00
6,168.97
73+240.000
0.00
0.00
10.00
0.00
6,168.97
73+260.000
5.43
5.43
10.00
54.30
6,223.27
73+280.000
5.43
10.86
10.00
108.60
6,331.87
73+300.000
5.43
10.86
10.00
108.60
6,440.47
73+320.000
5.43
10.86
10.00
108.60
6,549.07
73+340.000
5.43
10.86
10.00
108.60
6,657.67
73+360.000
5.43
10.86
10.00
108.60
6,766.27
73+380.000
5.43
10.86
10.00
108.60
6,874.87
73+400.000
5.43
10.86
10.00
108.60
6,983.47
73+420.000
5.43
10.86
10.00
108.60
7,092.07
73+440.000
5.43
10.86
10.00
108.60
7,200.67
73+460.000
5.43
10.86
10.00
108.60
7,309.27
73+480.000
5.43
10.86
10.00
108.60
7,417.87
73+500.000
5.43
10.86
10.00
108.60
7,526.47
73+520.000
5.43
10.86
10.00
108.60
7,635.07
73+540.000
5.43
10.86
10.00
108.60
7,743.67
73+560.000
5.43
10.86
10.00
108.60
7,852.27
73+580.000
5.43
10.86
10.00
108.60
7,960.87
73+600.000
5.43
10.86
10.00
108.60
8,069.47
73+620.000
5.43
10.86
10.00
108.60
8,178.07
73+640.000
5.43
10.86
10.00
108.60
8,286.67
73+660.000
5.43
10.86
10.00
108.60
8,395.27
73+680.000
5.43
10.86
10.00
108.60
8,503.87
73+700.000
5.43
10.86
10.00
108.60
8,612.47
73+720.000
5.43
10.86
10.00
108.60
8,721.07
73+740.000
5.43
10.86
10.00
108.60
8,829.67
REVISO:
REALIZO:
Pgina 98 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 26
"PAVIMENTOS"
UNIDAD
M3
b) Compactadas al 100%
ESTACIN KM.
REA
L1+L2
D/2
73+760.000
5.43
10.86
73+780.000
5.43
73+800.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
108.60
8,938.27
10.86
10.00
108.60
9,046.87
5.43
10.86
10.00
108.60
9,155.47
73+807.617
5.43
10.86
3.81
41.36
9,196.82
73+820.000
5.43
10.86
6.19
67.24
9,264.07
73+840.000
0.00
5.43
10.00
54.30
9,318.37
73+848.283
0.00
0.00
4.14
0.00
9,318.37
73+860.000
0.00
0.00
5.86
0.00
9,318.37
73+880.000
0.00
0.00
10.00
0.00
9,318.37
73+888.950
0.00
0.00
4.47
0.00
9,318.37
73+900.000
0.00
0.00
5.53
0.00
9,318.37
73+909.283
0.00
0.00
4.64
0.00
9,318.37
73+920.000
0.00
0.00
5.36
0.00
9,318.37
73+940.000
0.00
0.00
10.00
0.00
9,318.37
73+960.000
5.50
5.50
10.00
55.00
9,373.37
73+980.000
5.50
11.00
10.00
110.00
9,483.37
74+000.000
5.50
11.00
10.00
110.00
9,593.37
74+020.000
5.50
11.00
10.00
110.00
9,703.37
74+040.000
5.50
11.00
10.00
110.00
9,813.37
74+060.000
5.50
11.00
10.00
110.00
9,923.37
74+080.000
5.50
11.00
10.00
110.00
10,033.37
74+089.272
5.50
11.00
4.64
51.00
10,084.36
74+100.000
5.49
10.99
5.36
58.95
10,143.31
74+109.605
5.48
10.97
4.80
52.69
10,196.00
74+120.000
5.47
10.95
5.20
56.91
10,252.91
74+140.000
5.44
10.91
10.00
109.10
10,362.01
74+150.272
5.43
10.87
5.14
55.83
10,417.84
74+160.000
5.43
10.86
4.86
52.82
10,470.66
74+180.000
5.43
10.86
10.00
108.60
10,579.26
74+190.939
5.43
10.86
5.47
59.40
10,638.66
74+200.000
5.43
10.86
4.53
49.20
10,687.86
74+220.000
5.43
10.86
10.00
108.60
10,796.46
74+240.000
5.43
10.86
10.00
108.60
10,905.06
74+260.000
5.43
10.86
10.00
108.60
11,013.66
74+280.000
5.43
10.86
10.00
108.60
11,122.26
74+300.000
5.43
10.86
10.00
108.60
11,230.86
74+320.000
5.43
10.86
10.00
108.60
11,339.46
74+340.000
5.43
10.86
10.00
108.60
11,448.06
74+360.000
5.43
10.86
10.00
108.60
11,556.66
74+380.000
5.43
10.86
10.00
108.60
11,665.26
74+400.000
5.43
10.86
10.00
108.60
11,773.86
74+420.000
5.43
10.86
10.00
108.60
11,882.46
74+440.000
5.43
10.86
10.00
108.60
11,991.06
74+457.851
5.43
10.86
8.93
96.93
12,087.99
74+460.000
5.43
10.86
1.07
11.67
12,099.66
74+480.000
5.43
10.86
10.00
108.60
12,208.26
74+498.518
5.43
10.86
9.26
100.55
12,308.81
74+500.000
5.43
10.86
0.74
8.05
12,316.86
74+520.000
5.45
10.88
10.00
108.80
12,425.66
74+539.184
5.50
10.95
9.59
105.03
12,530.69
74+540.000
5.48
10.98
0.41
4.48
12,535.17
74+559.518
5.50
10.98
9.76
107.15
12,642.32
74+560.000
5.50
11.00
0.24
2.65
12,644.98
74+580.000
5.50
11.00
10.00
110.00
12,754.98
REVISO:
REALIZO:
Pgina 99 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 26
"PAVIMENTOS"
UNIDAD
M3
b) Compactadas al 100%
ESTACIN KM.
REA
L1+L2
D/2
74+600.000
5.50
11.00
74+620.000
5.50
74+640.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
110.00
12,864.98
11.00
10.00
110.00
12,974.98
5.50
11.00
10.00
110.00
13,084.98
74+660.000
5.50
11.00
10.00
110.00
13,194.98
74+680.000
5.50
11.00
10.00
110.00
13,304.98
74+700.000
5.50
11.00
10.00
110.00
13,414.98
74+720.000
5.50
11.00
10.00
110.00
13,524.98
74+740.000
5.50
11.00
10.00
110.00
13,634.98
74+760.000
5.50
11.00
10.00
110.00
13,744.98
74+779.360
5.48
10.98
9.68
106.29
13,851.26
74+780.000
5.50
10.98
0.32
3.51
13,854.78
74+799.693
5.48
10.98
9.85
108.12
13,962.89
74+800.000
5.48
10.96
0.15
1.68
13,964.57
74+820.000
5.45
10.93
10.00
109.30
14,073.87
74+840.000
5.43
10.88
10.00
108.80
14,182.67
74+840.360
5.43
10.86
0.18
1.95
14,184.63
74+860.000
5.43
10.86
9.82
106.65
14,291.27
74+880.000
5.43
10.86
10.00
108.60
14,399.87
74+881.027
5.43
10.86
0.51
5.57
14,405.45
74+900.000
5.43
10.86
9.49
103.03
14,508.47
74+920.000
5.44
10.87
10.00
108.70
14,617.17
74+940.000
5.48
10.92
10.00
109.20
14,726.37
74+960.000
5.49
10.97
10.00
109.70
14,836.07
74+980.000
5.53
11.02
10.00
110.20
14,946.27
75+000.000
5.58
11.11
10.00
111.10
15,057.37
75+020.000
5.63
11.21
10.00
112.10
15,169.47
75+040.000
5.63
11.26
10.00
112.60
15,282.07
75+060.000
6.63
12.26
10.00
122.60
15,404.67
75+080.000
5.63
12.26
10.00
122.60
15,527.27
75+100.000
5.63
11.26
10.00
112.60
15,639.87
75+120.000
5.63
11.26
10.00
112.60
15,752.47
75+140.000
5.63
11.26
10.00
112.60
15,865.07
75+160.000
5.63
11.26
10.00
112.60
15,977.67
75+180.000
5.63
11.26
10.00
112.60
16,090.27
75+200.000
5.63
11.26
10.00
112.60
16,202.87
75+220.000
5.63
11.26
10.00
112.60
16,315.47
75+240.000
5.63
11.26
10.00
112.60
16,428.07
75+260.000
5.63
11.26
10.00
112.60
16,540.67
75+280.000
5.63
11.26
10.00
112.60
16,653.27
75+300.000
5.63
11.26
10.00
112.60
16,765.87
75+320.000
5.63
11.26
10.00
112.60
16,878.47
75+340.000
5.63
11.26
10.00
112.60
16,991.07
75+360.000
5.63
11.26
10.00
112.60
17,103.67
75+380.000
5.63
11.26
10.00
112.60
17,216.27
75+400.000
5.63
11.26
10.00
112.60
17,328.87
75+420.000
5.63
11.26
10.00
112.60
17,441.47
75+440.000
5.63
11.26
10.00
112.60
17,554.07
75+460.000
5.63
11.26
10.00
112.60
17,666.67
75+480.000
5.63
11.26
10.00
112.60
17,779.27
75+500.000
5.63
11.26
10.00
112.60
17,891.87
75+520.000
5.54
11.17
10.00
111.70
18,003.57
75+540.000
5.46
11.00
10.00
110.00
18,113.57
75+560.000
5.43
10.89
10.00
108.90
18,222.47
75+580.000
5.43
10.86
10.00
108.60
18,331.07
REVISO:
REALIZO:
Pgina 100 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 26
"PAVIMENTOS"
UNIDAD
M3
b) Compactadas al 100%
ESTACIN KM.
REA
L1+L2
D/2
75+600.000
5.43
10.86
75+611.738
5.43
75+620.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
108.60
18,439.67
10.86
5.87
63.74
18,503.41
5.43
10.86
4.13
44.86
18,548.27
75+635.122
5.43
10.86
7.56
82.11
18,630.39
75+640.000
5.44
10.87
2.44
26.51
18,656.90
75+658.507
5.49
10.93
9.25
101.14
18,758.04
75+660.000
5.51
11.00
0.75
8.21
18,766.25
75+680.000
5.56
11.07
10.00
110.70
18,876.95
75+700.000
5.62
11.18
10.00
111.80
18,988.75
75+711.122
5.64
11.26
5.56
62.62
19,051.37
75+720.000
5.63
11.27
4.44
50.03
19,101.40
75+740.000
5.63
11.26
10.00
112.60
19,214.00
75+760.000
5.63
11.26
10.00
112.60
19,326.60
75+780.000
5.63
11.26
10.00
112.60
19,439.20
75+800.000
5.63
11.26
10.00
112.60
19,551.80
75+820.000
5.63
11.26
10.00
112.60
19,664.40
75+840.000
5.63
11.26
10.00
112.60
19,777.00
75+860.000
5.63
11.26
10.00
112.60
19,889.60
75+880.000
5.63
11.26
10.00
112.60
20,002.20
75+900.000
5.63
11.26
10.00
112.60
20,114.80
75+920.000
5.63
11.26
10.00
112.60
20,227.40
75+940.000
5.63
11.26
10.00
112.60
20,340.00
75+960.000
5.63
11.26
10.00
112.60
20,452.60
75+980.000
5.63
11.26
10.00
112.60
20,565.20
76+000.000
5.63
11.26
10.00
112.60
20,677.80
76+020.000
5.63
11.26
10.00
112.60
20,790.40
76+040.000
5.63
11.26
10.00
112.60
20,903.00
76+060.000
5.63
11.26
10.00
112.60
21,015.60
76+080.000
5.63
11.26
10.00
112.60
21,128.20
76+100.000
5.63
11.26
10.00
112.60
21,240.80
76+120.000
5.63
11.26
10.00
112.60
21,353.40
76+140.000
5.63
11.26
10.00
112.60
21,466.00
76+160.000
5.63
11.26
10.00
112.60
21,578.60
76+180.000
5.63
11.26
10.00
112.60
21,691.20
76+200.000
5.63
11.26
10.00
112.60
21,803.80
76+220.000
5.63
11.26
10.00
112.60
21,916.40
76+240.000
5.63
11.26
10.00
112.60
22,029.00
76+255.500
5.63
11.26
7.75
87.26
22,116.26
76+260.000
5.62
11.25
2.25
25.31
22,141.57
76+280.000
5.58
11.20
10.00
112.00
22,253.57
76+300.000
5.54
11.12
10.00
111.20
22,364.77
76+320.000
5.49
11.03
10.00
110.30
22,475.07
76+321.961
5.49
10.98
0.98
10.77
22,485.84
76+340.000
5.45
10.94
9.02
98.67
22,584.51
76+351.500
5.43
10.88
5.75
62.56
22,647.07
76+360.000
5.43
10.86
4.25
46.16
22,693.23
76+380.000
5.43
10.86
10.00
108.60
22,801.83
76+381.038
5.43
10.86
0.52
5.64
22,807.46
76+400.000
5.43
10.86
9.48
102.96
22,910.43
76+420.000
5.43
10.86
10.00
108.60
23,019.03
76+440.000
5.43
10.86
10.00
108.60
23,127.63
76+460.000
5.43
10.86
10.00
108.60
23,236.23
76+480.000
5.43
10.86
10.00
108.60
23,344.83
76+500.000
5.43
10.86
10.00
108.60
23,453.43
REVISO:
REALIZO:
Pgina 101 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 26
"PAVIMENTOS"
UNIDAD
M3
b) Compactadas al 100%
ESTACIN KM.
REA
L1+L2
D/2
76+520.000
5.43
10.86
76+540.000
5.43
76+560.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
108.60
23,562.03
10.86
10.00
108.60
23,670.63
5.43
10.86
10.00
108.60
23,779.23
76+580.000
5.43
10.86
10.00
108.60
23,887.83
76+600.000
5.43
10.86
10.00
108.60
23,996.43
76+620.000
5.43
10.86
10.00
108.60
24,105.03
76+640.000
5.43
10.86
10.00
108.60
24,213.63
76+660.000
5.43
10.86
10.00
108.60
24,322.23
76+680.000
5.43
10.86
10.00
108.60
24,430.83
76+700.000
5.43
10.86
10.00
108.60
24,539.43
76+720.000
5.43
10.86
10.00
108.60
24,648.03
76+740.000
5.43
10.86
10.00
108.60
24,756.63
76+760.000
5.43
10.86
10.00
108.60
24,865.23
76+780.000
5.43
10.86
10.00
108.60
24,973.83
76+800.000
5.43
10.86
10.00
108.60
25,082.43
76+820.000
5.43
10.86
10.00
108.60
25,191.03
76+840.000
5.43
10.86
10.00
108.60
25,299.63
76+860.000
5.43
10.86
10.00
108.60
25,408.23
76+880.000
5.43
10.86
10.00
108.60
25,516.83
76+900.000
5.43
10.86
10.00
108.60
25,625.43
76+920.000
5.43
10.86
10.00
108.60
25,734.03
76+940.000
5.43
10.86
10.00
108.60
25,842.63
76+960.000
5.43
10.86
10.00
108.60
25,951.23
76+980.000
5.43
10.86
10.00
108.60
26,059.83
76+985.245
5.43
10.86
2.62
28.48
26,088.31
76+993.182
5.43
10.86
3.97
43.10
26,131.40
77+000.000
5.46
10.89
3.41
37.12
26,168.53
77+001.118
5.46
10.92
0.56
6.11
26,174.64
77+018.182
5.52
10.98
8.53
93.68
26,268.31
77+020.000
5.53
11.05
0.91
10.05
26,278.36
77+040.000
5.53
11.06
10.00
110.60
26,388.96
77+060.000
5.53
11.06
10.00
110.60
26,499.56
77+080.000
5.53
11.06
10.00
110.60
26,610.16
77+100.000
5.53
11.06
10.00
110.60
26,720.76
77+120.000
5.53
11.06
10.00
110.60
26,831.36
77+140.000
5.53
11.06
10.00
110.60
26,941.96
77+160.000
5.53
11.06
10.00
110.60
27,052.56
77+180.000
5.53
11.06
10.00
110.60
27,163.16
77+200.000
5.53
11.06
10.00
110.60
27,273.76
77+220.000
5.53
11.06
10.00
110.60
27,384.36
77+240.000
5.53
11.06
10.00
110.60
27,494.96
77+260.000
5.53
11.06
10.00
110.60
27,605.56
77+280.000
5.53
11.06
10.00
110.60
27,716.16
77+300.000
5.53
11.06
10.00
110.60
27,826.76
77+320.000
5.53
11.06
10.00
110.60
27,937.36
77+340.000
5.53
11.06
10.00
110.60
28,047.96
77+360.000
5.53
11.06
10.00
110.60
28,158.56
77+380.000
5.53
11.06
10.00
110.60
28,269.16
77+400.000
5.53
11.06
10.00
110.60
28,379.76
77+420.000
5.53
11.06
10.00
110.60
28,490.36
77+440.000
5.53
11.06
10.00
110.60
28,600.96
77+460.000
5.53
11.06
10.00
110.60
28,711.56
77+480.000
5.53
11.06
10.00
110.60
28,822.16
77+500.000
5.53
11.06
10.00
110.60
28,932.76
REVISO:
REALIZO:
Pgina 102 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 26
"PAVIMENTOS"
UNIDAD
M3
b) Compactadas al 100%
ESTACIN KM.
REA
L1+L2
D/2
77+520.000
5.53
11.06
77+525.218
5.53
77+540.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
110.60
29,043.36
11.06
2.61
28.85
29,072.21
5.53
11.06
7.39
81.75
29,153.96
77+540.234
5.46
10.99
0.12
1.28
29,155.24
77+547.218
5.43
10.89
3.49
38.03
29,193.27
77+554.202
5.43
10.86
3.49
37.92
29,231.20
77+560.000
5.43
10.86
2.90
31.48
29,262.68
77+580.000
5.43
10.86
10.00
108.60
29,371.28
77+600.000
5.43
10.86
10.00
108.60
29,479.88
77+620.000
5.43
10.86
10.00
108.60
29,588.48
77+640.000
5.43
10.86
10.00
108.60
29,697.08
77+647.342
5.43
10.86
3.67
39.86
29,736.94
77+660.000
5.43
10.86
6.33
68.74
29,805.68
77+663.215
5.43
10.86
1.61
17.46
29,823.13
77+679.088
5.46
10.89
7.94
86.43
29,909.56
77+680.000
5.45
10.91
0.46
4.98
29,914.54
77+700.000
5.49
10.94
10.00
109.40
30,023.94
77+713.215
5.52
11.01
6.61
72.75
30,096.69
77+720.000
5.53
11.05
3.39
37.49
30,134.18
77+740.000
5.53
11.06
10.00
110.60
30,244.78
77+760.000
5.53
11.06
10.00
110.60
30,355.38
77+780.000
5.53
11.06
10.00
110.60
30,465.98
77+800.000
5.53
11.06
10.00
110.60
30,576.58
77+820.000
5.53
11.06
10.00
110.60
30,687.18
77+840.000
5.53
11.06
10.00
110.60
30,797.78
77+860.000
5.53
11.06
10.00
110.60
30,908.38
77+880.000
5.53
11.06
10.00
110.60
31,018.98
77+900.000
5.53
11.06
10.00
110.60
31,129.58
77+920.000
5.53
11.06
10.00
110.60
31,240.18
77+940.000
5.53
11.06
10.00
110.60
31,350.78
77+960.000
5.53
11.06
10.00
110.60
31,461.38
77+980.000
5.53
11.06
10.00
110.60
31,571.98
78+000.000
5.53
11.06
10.00
110.60
31,682.58
78+020.000
5.53
11.06
10.00
110.60
31,793.18
78+040.000
5.53
11.06
10.00
110.60
31,903.78
78+060.000
5.53
11.06
10.00
110.60
32,014.38
78+080.000
5.53
11.06
10.00
110.60
32,124.98
78+094.334
5.53
11.06
7.17
79.27
32,204.24
78+100.000
5.51
11.04
2.83
31.28
32,235.52
78+116.175
5.46
10.97
8.09
88.72
32,324.24
78+120.000
5.45
10.91
1.91
20.86
32,345.10
78+126.334
5.43
10.88
3.17
34.46
32,379.56
78+136.493
5.43
10.86
5.08
55.16
32,434.72
78+140.000
5.43
10.86
1.75
19.04
32,453.77
78+160.000
5.43
10.86
10.00
108.60
32,562.37
78+180.000
5.43
10.86
10.00
108.60
32,670.97
78+200.000
5.43
10.86
10.00
108.60
32,779.57
78+220.000
5.43
10.86
10.00
108.60
32,888.17
78+240.000
5.43
10.86
10.00
108.60
32,996.77
78+260.000
5.43
10.86
10.00
108.60
33,105.37
78+280.000
0.00
5.43
10.00
54.30
33,159.67
78+300.000
0.00
0.00
10.00
0.00
33,159.67
78+320.000
0.00
0.00
10.00
0.00
33,159.67
78+340.000
0.00
0.00
10.00
0.00
33,159.67
REVISO:
REALIZO:
Pgina 103 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 26
"PAVIMENTOS"
UNIDAD
M3
b) Compactadas al 100%
ESTACIN KM.
REA
L1+L2
D/2
78+360.000
0.00
0.00
78+380.000
0.00
78+400.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
0.00
33,159.67
0.00
10.00
0.00
33,159.67
0.00
0.00
10.00
0.00
33,159.67
78+420.000
0.00
0.00
10.00
0.00
33,159.67
78+440.000
0.00
0.00
10.00
0.00
33,159.67
78+460.000
0.00
0.00
10.00
0.00
33,159.67
78+480.000
0.00
0.00
10.00
0.00
33,159.67
78+500.000
0.00
0.00
10.00
0.00
33,159.67
78+520.000
0.00
0.00
10.00
0.00
33,159.67
78+540.000
5.53
5.53
10.00
55.30
33,214.97
78+560.000
5.53
11.06
10.00
110.60
33,325.57
78+580.000
5.53
11.06
10.00
110.60
33,436.17
78+600.000
5.53
11.06
10.00
110.60
33,546.77
78+620.000
5.53
11.06
10.00
110.60
33,657.37
78+640.000
5.53
11.06
10.00
110.60
33,767.97
78+660.000
5.53
11.06
10.00
110.60
33,878.57
78+680.000
5.53
11.06
10.00
110.60
33,989.17
78+700.000
5.53
11.06
10.00
110.60
34,099.77
78+720.000
5.51
11.04
10.00
110.40
34,210.17
78+740.000
5.43
10.94
10.00
109.40
34,319.57
78+760.000
5.43
10.86
10.00
108.60
34,428.17
78+780.000
5.43
10.86
10.00
108.60
34,536.77
78+790.492
5.43
10.86
5.25
56.97
34,593.74
78+796.615
5.43
10.86
3.06
33.24
34,626.99
78+800.000
5.45
10.88
1.69
18.42
34,645.40
78+802.737
5.46
10.91
1.37
14.93
34,660.33
78+811.615
5.60
11.06
4.44
49.09
34,709.43
78+820.000
5.50
11.10
4.19
46.54
34,755.96
78+840.000
5.50
11.00
10.00
110.00
34,865.96
78+860.000
5.50
11.00
10.00
110.00
34,975.96
78+880.000
5.50
11.00
10.00
110.00
35,085.96
78+900.000
5.50
11.00
10.00
110.00
35,195.96
78+920.000
5.50
11.00
10.00
110.00
35,305.96
78+940.000
5.50
11.00
10.00
110.00
35,415.96
78+960.000
5.50
11.00
10.00
110.00
35,525.96
78+980.000
5.50
11.00
10.00
110.00
35,635.96
79+000.000
5.50
11.00
10.00
110.00
35,745.96
79+020.000
5.50
11.00
10.00
110.00
35,855.96
79+040.000
5.50
11.00
10.00
110.00
35,965.96
79+060.000
5.50
11.00
10.00
110.00
36,075.96
79+080.000
5.50
11.00
10.00
110.00
36,185.96
79+097.907
5.50
11.00
8.95
98.49
36,284.45
79+100.000
5.50
11.00
1.05
11.51
36,295.96
79+120.000
5.48
10.98
10.00
109.80
36,405.76
79+133.417
5.46
10.94
6.71
73.39
36,479.16
79+140.000
5.45
10.91
3.29
35.91
36,515.07
79+157.907
5.43
10.88
8.95
97.42
36,612.48
79+160.000
5.43
10.86
1.05
11.36
36,623.84
79+180.000
5.43
10.86
10.00
108.60
36,732.44
79+182.397
5.43
10.86
1.20
13.02
36,745.46
79+200.000
5.43
10.86
8.80
95.58
36,841.04
79+220.000
5.43
10.86
10.00
108.60
36,949.64
79+240.000
5.43
10.86
10.00
108.60
37,058.24
79+260.000
5.43
10.86
10.00
108.60
37,166.84
79+280.000
5.43
10.86
10.00
108.60
37,275.44
79+300.000
5.43
10.86
10.00
108.60
37,384.04
79+320.000
5.43
10.86
10.00
108.60
37,492.64
REVISO:
REALIZO:
Pgina 104 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 26
"PAVIMENTOS"
UNIDAD
M3
b) Compactadas al 100%
ESTACIN KM.
REA
L1+L2
D/2
79+340.000
5.43
10.86
79+360.000
5.43
79+380.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
108.60
37,601.24
10.86
10.00
108.60
37,709.84
5.43
10.86
10.00
108.60
37,818.44
79+400.000
5.43
10.86
10.00
108.60
37,927.04
79+420.000
5.43
10.86
10.00
108.60
38,035.64
79+440.000
5.43
10.86
10.00
108.60
38,144.24
79+460.000
5.43
10.86
10.00
108.60
38,252.84
79+480.000
5.43
10.86
10.00
108.60
38,361.44
79+500.000
5.43
10.86
10.00
108.60
38,470.04
79+520.000
5.43
10.86
10.00
108.60
38,578.64
79+540.000
5.43
10.86
10.00
108.60
38,687.24
79+560.000
5.43
10.86
10.00
108.60
38,795.84
79+580.000
5.43
10.86
10.00
108.60
38,904.44
79+600.000
5.43
10.86
10.00
108.60
39,013.04
79+620.000
5.43
10.86
10.00
108.60
39,121.64
79+640.000
5.43
10.86
10.00
108.60
39,230.24
79+660.000
5.43
10.86
10.00
108.60
39,338.84
79+680.000
5.43
10.86
10.00
108.60
39,447.44
79+700.000
5.43
10.86
10.00
108.60
39,556.04
79+720.000
5.43
10.86
10.00
108.60
39,664.64
79+740.000
5.43
10.86
10.00
108.60
39,773.24
79+760.000
5.43
10.86
10.00
108.60
39,881.84
79+780.000
5.43
10.86
10.00
108.60
39,990.44
79+800.000
5.43
10.86
10.00
108.60
40,099.04
79+820.000
5.43
10.86
10.00
108.60
40,207.64
79+840.000
5.43
10.86
10.00
108.60
40,316.24
79+860.000
5.43
10.86
10.00
108.60
40,424.84
79+880.000
5.43
10.86
10.00
108.60
40,533.44
79+900.000
5.43
10.86
10.00
108.60
40,642.04
79+920.000
5.43
10.86
10.00
108.60
40,750.64
79+940.000
5.43
10.86
10.00
108.60
40,859.24
79+960.000
5.43
10.86
10.00
108.60
40,967.84
79+980.000
5.43
10.86
10.00
108.60
41,076.44
80+000.000
5.43
10.86
10.00
108.60
41,185.04
80+020.000
5.43
10.86
10.00
108.60
41,293.64
80+040.000
5.43
10.86
10.00
108.60
41,402.24
80+060.000
5.43
10.86
10.00
108.60
41,510.84
80+080.000
5.43
10.86
10.00
108.60
41,619.44
80+100.000
5.44
10.87
10.00
108.70
41,728.14
80+120.000
5.46
10.90
10.00
109.00
41,837.14
80+140.000
5.47
10.93
10.00
109.30
41,946.44
80+160.000
5.48
10.95
10.00
109.50
42,055.94
80+180.000
5.48
10.96
10.00
109.60
42,165.54
80+200.000
5.48
10.96
10.00
109.60
42,275.14
80+220.000
5.48
10.96
10.00
109.60
42,384.74
80+240.000
5.48
10.96
10.00
109.60
42,494.34
80+260.000
5.48
10.96
10.00
109.60
42,603.94
80+280.000
5.48
10.96
10.00
109.60
42,713.54
80+300.000
5.48
10.96
10.00
109.60
42,823.14
80+320.000
5.48
10.96
10.00
109.60
42,932.74
80+340.000
5.48
10.96
10.00
109.60
43,042.34
80+360.000
5.48
10.96
10.00
109.60
43,151.94
80+380.000
5.48
10.96
10.00
109.60
43,261.54
80+400.000
5.48
10.96
10.00
109.60
43,371.14
80+420.000
5.48
10.96
10.00
109.60
43,480.74
80+440.000
0.00
5.48
10.00
54.80
43,535.54
80+460.000
0.00
0.00
10.00
0.00
43,535.54
REVISO:
REALIZO:
Pgina 105 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 26
"PAVIMENTOS"
UNIDAD
M3
b) Compactadas al 100%
ESTACIN KM.
REA
L1+L2
D/2
80+480.000
0.00
0.00
80+500.000
0.00
80+520.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
0.00
43,535.54
0.00
10.00
0.00
43,535.54
0.00
0.00
10.00
0.00
43,535.54
80+540.000
0.00
0.00
10.00
0.00
43,535.54
80+560.000
0.00
0.00
10.00
0.00
43,535.54
80+580.000
0.00
0.00
10.00
0.00
43,535.54
80+600.000
5.48
5.48
10.00
54.80
43,590.34
80+620.000
5.48
10.96
10.00
109.60
43,699.94
80+640.000
5.46
10.94
10.00
109.40
43,809.34
80+660.000
5.45
10.91
10.00
109.10
43,918.44
80+680.000
5.43
10.88
10.00
108.80
44,027.24
80+700.000
5.43
10.86
10.00
108.60
44,135.84
80+720.000
5.43
10.86
10.00
108.60
44,244.44
80+740.000
5.43
10.86
10.00
108.60
44,353.04
80+760.000
5.43
10.86
10.00
108.60
44,461.64
80+780.000
5.43
10.86
10.00
108.60
44,570.24
80+800.000
5.43
10.86
10.00
108.60
44,678.84
80+820.000
5.43
10.86
10.00
108.60
44,787.44
80+840.000
5.43
10.86
10.00
108.60
44,896.04
80+860.000
5.43
10.86
10.00
108.60
45,004.64
80+880.000
5.43
10.86
10.00
108.60
45,113.24
80+900.000
5.43
10.86
10.00
108.60
45,221.84
80+920.000
5.43
10.86
10.00
108.60
45,330.44
80+940.000
5.43
10.86
10.00
108.60
45,439.04
80+960.000
5.43
10.86
10.00
108.60
45,547.64
80+980.000
5.43
10.86
10.00
108.60
45,656.24
81+000.000
5.43
10.86
10.00
108.60
45,764.84
81+020.000
5.43
10.86
10.00
108.60
45,873.44
81+040.000
5.43
10.86
10.00
108.60
45,982.04
81+060.000
5.43
10.86
10.00
108.60
46,090.64
81+080.000
5.43
10.86
10.00
108.60
46,199.24
81+100.000
5.43
10.86
10.00
108.60
46,307.84
81+120.000
5.43
10.86
10.00
108.60
46,416.44
81+140.000
81+160.000
81+180.000
81+200.000
81+220.000
81+240.000
81+260.000
81+280.000
81+300.000
81+320.000
81+340.000
81+360.000
81+380.000
81+400.000
81+420.000
81+440.000
81+460.000
81+480.000
81+500.000
81+520.000
81+540.000
81+560.000
81+580.000
81+600.000
81+620.000
81+640.000
81+660.000
81+680.000
81+700.000
81+720.000
5.43
5.43
5.43
5.43
5.43
5.43
5.43
5.43
5.43
5.43
5.43
5.43
5.43
5.43
5.43
5.43
5.43
5.43
5.43
5.43
5.43
5.43
5.43
5.43
5.43
5.43
0.00
0.00
0.00
0.00
10.86
10.86
10.86
10.86
10.86
10.86
10.86
10.86
10.86
10.86
10.86
10.86
10.86
10.86
10.86
10.86
10.86
10.86
10.86
10.86
10.86
10.86
10.86
10.86
10.86
10.86
5.43
0.00
0.00
0.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
108.60
108.60
108.60
108.60
108.60
108.60
108.60
108.60
108.60
108.60
108.60
108.60
108.60
108.60
108.60
108.60
108.60
108.60
108.60
108.60
108.60
108.60
108.60
108.60
108.60
108.60
54.30
0.00
0.00
0.00
46,525.04
46,633.64
46,742.24
46,850.84
46,959.44
47,068.04
47,176.64
47,285.24
47,393.84
47,502.44
47,611.04
47,719.64
47,828.24
47,936.84
48,045.44
48,154.04
48,262.64
48,371.24
48,479.84
48,588.44
48,697.04
48,805.64
48,914.24
49,022.84
49,131.44
49,240.04
49,294.34
49,294.34
49,294.34
49,294.34
REVISO:
REALIZO:
Pgina 106 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 26
"PAVIMENTOS"
UNIDAD
M3
b) Compactadas al 100%
ESTACIN KM.
REA
L1+L2
D/2
81+740.000
81+760.000
81+780.000
81+800.000
81+820.000
81+840.000
81+860.000
81+880.000
81+900.000
81+920.000
81+940.000
81+960.000
81+980.000
82+000.000
82+020.000
82+040.000
82+060.000
82+080.000
82+100.000
82+120.000
82+140.000
82+160.000
82+180.000
82+200.000
82+220.000
82+240.000
82+260.000
82+280.000
82+300.000
82+320.000
82+340.000
82+360.000
82+380.000
82+400.000
82+420.000
82+440.000
82+460.000
82+480.000
82+500.000
82+520.000
82+540.000
82+560.000
82+580.000
82+600.000
82+620.000
82+640.000
82+660.000
82+680.000
82+700.000
82+720.000
82+740.000
82+760.000
82+780.000
82+800.000
82+820.000
82+840.000
82+860.000
82+880.000
82+900.000
82+920.000
82+940.000
82+960.000
82+980.000
83+000.000
83+020.000
83+040.000
83+060.000
83+080.000
83+100.000
83+120.000
83+140.000
83+160.000
83+170.200
0.00
0.00
0.00
5.43
5.43
5.43
5.43
5.43
5.43
5.43
5.43
5.43
5.43
5.43
5.43
5.43
5.43
5.43
5.43
5.43
5.43
5.43
5.43
5.43
5.43
5.43
5.43
5.43
5.43
5.43
5.43
5.43
5.43
5.43
5.43
5.43
5.43
5.43
5.43
5.43
5.43
5.43
5.43
5.43
5.43
5.43
5.43
5.43
5.43
5.43
5.43
5.43
5.43
5.43
5.43
5.43
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5.43
0.00
0.00
0.00
5.43
10.86
10.86
10.86
10.86
10.86
10.86
10.86
10.86
10.86
10.86
10.86
10.86
10.86
10.86
10.86
10.86
10.86
10.86
10.86
10.86
10.86
10.86
10.86
10.86
10.86
10.86
10.86
10.86
10.86
10.86
10.86
10.86
10.86
10.86
10.86
10.86
10.86
10.86
10.86
10.86
10.86
10.86
10.86
10.86
10.86
10.86
10.86
10.86
10.86
10.86
10.86
10.86
5.43
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5.43
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
5.10
REVISO:
REA ACUMULADA
PARCIAL
ACUMULADO
0.00
0.00
0.00
54.30
108.60
108.60
108.60
108.60
108.60
108.60
108.60
108.60
108.60
108.60
108.60
108.60
108.60
108.60
108.60
108.60
108.60
108.60
108.60
108.60
108.60
108.60
108.60
108.60
108.60
108.60
108.60
108.60
108.60
108.60
108.60
108.60
108.60
108.60
108.60
108.60
108.60
108.60
108.60
108.60
108.60
108.60
108.60
108.60
108.60
108.60
108.60
108.60
108.60
108.60
108.60
108.60
54.30
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
27.69
49,294.34
49,294.34
49,294.34
49,348.64
49,457.24
49,565.84
49,674.44
49,783.04
49,891.64
50,000.24
50,108.84
50,217.44
50,326.04
50,434.64
50,543.24
50,651.84
50,760.44
50,869.04
50,977.64
51,086.24
51,194.84
51,303.44
51,412.04
51,520.64
51,629.24
51,737.84
51,846.44
51,955.04
52,063.64
52,172.24
52,280.84
52,389.44
52,498.04
52,606.64
52,715.24
52,823.84
52,932.44
53,041.04
53,149.64
53,258.24
53,366.84
53,475.44
53,584.04
53,692.64
53,801.24
53,909.84
54,018.44
54,127.04
54,235.64
54,344.24
54,452.84
54,561.44
54,670.04
54,778.64
54,887.24
54,995.84
55,050.14
55,050.14
55,050.14
55,050.14
55,050.14
55,050.14
55,050.14
55,050.14
55,050.14
55,050.14
55,050.14
55,050.14
55,050.14
55,050.14
55,050.14
55,050.14
55,077.84
REALIZO:
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 26
"PAVIMENTOS"
UNIDAD
M3
b) Compactadas al 100%
ESTACIN KM.
REA
L1+L2
D/2
83+180.000
83+200.000
83+220.000
83+240.000
83+260.000
83+280.000
83+300.000
83+320.000
83+340.000
83+360.000
83+380.000
83+400.000
83+420.000
83+440.000
83+460.000
83+480.000
83+500.000
83+520.000
83+540.000
83+560.000
83+570.105
83+580.000
83+593.182
83+600.000
83+616.259
83+620.000
83+640.000
83+653.182
83+660.000
83+680.000
83+700.000
83+720.000
83+740.000
83+760.000
83+780.000
83+785.000
5.43
5.43
5.43
5.43
5.43
5.43
5.43
5.43
5.43
5.43
5.43
5.43
5.43
5.43
5.43
5.43
5.43
5.43
5.43
5.43
5.43
5.43
5.43
5.44
5.49
5.46
5.49
5.50
5.50
5.50
5.50
5.50
5.50
5.50
5.50
5.50
10.86
10.86
10.86
10.86
10.86
10.86
10.86
10.86
10.86
10.86
10.86
10.86
10.86
10.86
10.86
10.86
10.86
10.86
10.86
10.86
10.86
10.86
10.86
10.87
10.93
10.95
10.95
10.99
11.00
11.00
11.00
11.00
11.00
11.00
11.00
11.00
4.90
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
5.05
4.95
6.59
3.41
8.13
1.87
10.00
6.59
3.41
10.00
10.00
10.00
10.00
10.00
10.00
2.50
REVISO:
REA ACUMULADA
PARCIAL
ACUMULADO
53.21
108.60
108.60
108.60
108.60
108.60
108.60
108.60
108.60
108.60
108.60
108.60
108.60
108.60
108.60
108.60
108.60
108.60
108.60
108.60
54.87
53.73
71.58
37.06
88.85
20.48
109.50
72.43
37.50
110.00
110.00
110.00
110.00
110.00
110.00
27.50
55,131.05
55,239.65
55,348.25
55,456.85
55,565.45
55,674.05
55,782.65
55,891.25
55,999.85
56,108.45
56,217.05
56,325.65
56,434.25
56,542.85
56,651.45
56,760.05
56,868.65
56,977.25
57,085.85
57,194.45
57,249.32
57,303.05
57,374.63
57,411.69
57,500.54
57,521.02
57,630.52
57,702.96
57,740.46
57,850.46
57,960.46
58,070.46
58,180.46
58,290.46
58,400.46
58,427.96
REALIZO:
Pgina 108 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 29
"PAVIMENTOS"
UNIDAD
M3
REA ACUMULADA
ESTACIN KM.
REA
L1+L2
D/2
71+800.000
2.33
0.00
0.00
0.00
0.00
71+820.000
2.33
4.66
10.00
46.60
46.60
71+840.000
2.33
4.66
10.00
46.60
93.20
71+860.000
2.33
4.66
10.00
46.60
139.80
71+880.000
2.33
4.66
10.00
46.60
186.40
71+900.000
2.33
4.66
10.00
46.60
233.00
71+920.000
2.33
4.66
10.00
46.60
279.60
71+940.000
2.33
4.66
10.00
46.60
326.20
71+960.000
2.33
4.66
10.00
46.60
372.80
71+980.000
2.33
4.66
10.00
46.60
419.40
72+000.000
2.33
4.66
10.00
46.60
466.00
72+020.000
2.33
4.66
10.00
46.60
512.60
72+040.000
2.33
4.66
10.00
46.60
559.20
72+060.000
2.33
4.66
10.00
46.60
605.80
72+080.000
2.33
4.66
10.00
46.60
652.40
72+100.000
2.33
4.66
10.00
46.60
699.00
72+120.000
2.33
4.66
10.00
46.60
745.60
72+140.000
2.33
4.66
10.00
46.60
792.20
72+160.000
2.33
4.66
10.00
46.60
838.80
72+180.000
2.33
4.66
10.00
46.60
885.40
72+200.000
2.33
4.66
10.00
46.60
932.00
72+220.000
2.33
4.66
10.00
46.60
978.60
72+240.000
2.33
4.66
10.00
46.60
1,025.20
72+260.000
2.33
4.66
10.00
46.60
1,071.80
72+280.000
2.33
4.66
10.00
46.60
1,118.40
72+300.000
2.33
4.66
10.00
46.60
1,165.00
72+320.000
2.33
4.66
10.00
46.60
1,211.60
72+340.000
2.33
4.66
10.00
46.60
1,258.20
72+360.000
2.33
4.66
10.00
46.60
1,304.80
72+380.000
2.33
4.66
10.00
46.60
1,351.40
72+400.000
2.33
4.66
10.00
46.60
1,398.00
72+420.000
2.33
4.66
10.00
46.60
1,444.60
72+440.000
2.33
4.66
10.00
46.60
1,491.20
72+460.000
2.33
4.66
10.00
46.60
1,537.80
72+480.000
2.33
4.66
10.00
46.60
1,584.40
72+500.000
2.33
4.66
10.00
46.60
1,631.00
72+520.000
2.33
4.66
10.00
46.60
1,677.60
72+540.000
2.33
4.66
10.00
46.60
1,724.20
72+560.000
2.33
4.66
10.00
46.60
1,770.80
72+580.000
2.33
4.66
10.00
46.60
1,817.40
72+600.000
2.33
4.66
10.00
46.60
1,864.00
72+620.000
2.33
4.66
10.00
46.60
1,910.60
72+640.000
2.33
4.66
10.00
46.60
1,957.20
72+654.982
2.33
4.66
7.49
34.91
1,992.11
72+660.000
2.33
4.66
2.51
11.69
2,003.80
72+678.443
2.33
4.66
9.22
42.97
2,046.77
72+680.000
2.33
4.66
0.78
3.63
2,050.40
72+700.000
2.36
4.69
10.00
46.90
2,097.30
72+701.905
2.36
4.72
0.95
4.49
2,101.79
72+720.000
2.38
4.74
9.05
42.89
2,144.68
72+739.443
2.40
4.78
9.72
46.47
2,191.15
72+740.000
2.40
4.80
0.28
1.34
2,192.49
REVISO:
PARCIAL
ACUMULADO
REALIZO:
Pgina 109 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 29
"PAVIMENTOS"
UNIDAD
M3
ESTACIN KM.
REA
L1+L2
D/2
72+760.000
2.40
4.80
72+780.000
2.40
72+800.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
48.00
2,240.49
4.80
10.00
48.00
2,288.49
2.40
4.80
10.00
48.00
2,336.49
72+820.000
2.40
4.80
10.00
48.00
2,384.49
72+840.000
2.40
4.80
10.00
48.00
2,432.49
72+860.000
2.40
4.80
10.00
48.00
2,480.49
72+880.000
2.40
4.80
10.00
48.00
2,528.49
72+900.000
2.40
4.80
10.00
48.00
2,576.49
72+920.000
2.40
4.80
10.00
48.00
2,624.49
72+940.000
0.00
2.40
10.00
24.00
2,648.49
72+960.000
0.00
0.00
10.00
0.00
2,648.49
72+971.651
0.00
0.00
5.83
0.00
2,648.49
72+980.000
0.00
0.00
4.17
0.00
2,648.49
73+000.000
0.00
0.00
10.00
0.00
2,648.49
73+009.189
0.00
0.00
4.59
0.00
2,648.49
73+020.000
0.00
0.00
5.41
0.00
2,648.49
73+032.651
0.00
0.00
6.33
0.00
2,648.49
73+040.000
0.00
0.00
3.67
0.00
2,648.49
73+056.112
0.00
0.00
8.06
0.00
2,648.49
73+060.000
0.00
0.00
1.94
0.00
2,648.49
73+080.000
0.00
0.00
10.00
0.00
2,648.49
73+100.000
0.00
0.00
10.00
0.00
2,648.49
73+120.000
0.00
0.00
10.00
0.00
2,648.49
73+140.000
0.00
0.00
10.00
0.00
2,648.49
73+160.000
0.00
0.00
10.00
0.00
2,648.49
73+180.000
0.00
0.00
10.00
0.00
2,648.49
73+200.000
0.00
0.00
10.00
0.00
2,648.49
73+220.000
0.00
0.00
10.00
0.00
2,648.49
73+240.000
0.00
0.00
10.00
0.00
2,648.49
73+260.000
2.33
2.33
10.00
23.30
2,671.79
73+280.000
2.33
4.66
10.00
46.60
2,718.39
73+300.000
2.33
4.66
10.00
46.60
2,764.99
73+320.000
2.33
4.66
10.00
46.60
2,811.59
73+340.000
2.33
4.66
10.00
46.60
2,858.19
73+360.000
2.33
4.66
10.00
46.60
2,904.79
73+380.000
2.33
4.66
10.00
46.60
2,951.39
73+400.000
2.33
4.66
10.00
46.60
2,997.99
73+420.000
2.33
4.66
10.00
46.60
3,044.59
73+440.000
2.33
4.66
10.00
46.60
3,091.19
73+460.000
2.33
4.66
10.00
46.60
3,137.79
73+480.000
2.33
4.66
10.00
46.60
3,184.39
73+500.000
2.33
4.66
10.00
46.60
3,230.99
73+520.000
2.33
4.66
10.00
46.60
3,277.59
73+540.000
2.33
4.66
10.00
46.60
3,324.19
73+560.000
2.33
4.66
10.00
46.60
3,370.79
73+580.000
2.33
4.66
10.00
46.60
3,417.39
73+600.000
2.33
4.66
10.00
46.60
3,463.99
73+620.000
2.33
4.66
10.00
46.60
3,510.59
73+640.000
2.33
4.66
10.00
46.60
3,557.19
73+660.000
2.33
4.66
10.00
46.60
3,603.79
73+680.000
2.33
4.66
10.00
46.60
3,650.39
73+700.000
2.33
4.66
10.00
46.60
3,696.99
73+720.000
2.33
4.66
10.00
46.60
3,743.59
73+740.000
2.33
4.66
10.00
46.60
3,790.19
REVISO:
REALIZO:
Pgina 110 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 29
"PAVIMENTOS"
UNIDAD
M3
ESTACIN KM.
REA
L1+L2
D/2
73+760.000
2.33
4.66
73+780.000
2.33
73+800.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
46.60
3,836.79
4.66
10.00
46.60
3,883.39
2.33
4.66
10.00
46.60
3,929.99
73+807.617
2.33
4.66
3.81
17.75
3,947.73
73+820.000
2.33
4.66
6.19
28.85
3,976.59
73+840.000
0.00
2.33
10.00
23.30
3,999.89
73+848.283
0.00
0.00
4.14
0.00
3,999.89
73+860.000
0.00
0.00
5.86
0.00
3,999.89
73+880.000
0.00
0.00
10.00
0.00
3,999.89
73+888.950
0.00
0.00
4.47
0.00
3,999.89
73+900.000
0.00
0.00
5.53
0.00
3,999.89
73+909.283
0.00
0.00
4.64
0.00
3,999.89
73+920.000
0.00
0.00
5.36
0.00
3,999.89
73+940.000
0.00
0.00
10.00
0.00
3,999.89
73+960.000
2.37
2.37
10.00
23.70
4,023.59
73+980.000
2.37
4.74
10.00
47.40
4,070.99
74+000.000
2.37
4.74
10.00
47.40
4,118.39
74+020.000
2.37
4.74
10.00
47.40
4,165.79
74+040.000
2.37
4.74
10.00
47.40
4,213.19
74+060.000
2.37
4.74
10.00
47.40
4,260.59
74+080.000
2.37
4.74
10.00
47.40
4,307.99
74+089.272
2.37
4.74
4.64
21.97
4,329.96
74+100.000
2.36
4.73
5.36
25.37
4,355.33
74+109.605
2.36
4.72
4.80
22.67
4,378.00
74+120.000
2.35
4.71
5.20
24.48
4,402.48
74+140.000
2.34
4.69
10.00
46.90
4,449.38
74+150.272
2.33
4.67
5.14
23.99
4,473.37
74+160.000
2.33
4.66
4.86
22.67
4,496.03
74+180.000
2.33
4.66
10.00
46.60
4,542.63
74+190.939
2.33
4.66
5.47
25.49
4,568.12
74+200.000
2.33
4.66
4.53
21.11
4,589.23
74+220.000
2.33
4.66
10.00
46.60
4,635.83
74+240.000
2.33
4.66
10.00
46.60
4,682.43
74+260.000
2.33
4.66
10.00
46.60
4,729.03
74+280.000
2.33
4.66
10.00
46.60
4,775.63
74+300.000
2.33
4.66
10.00
46.60
4,822.23
74+320.000
2.33
4.66
10.00
46.60
4,868.83
74+340.000
2.33
4.66
10.00
46.60
4,915.43
74+360.000
2.33
4.66
10.00
46.60
4,962.03
74+380.000
2.33
4.66
10.00
46.60
5,008.63
74+400.000
2.33
4.66
10.00
46.60
5,055.23
74+420.000
2.33
4.66
10.00
46.60
5,101.83
74+440.000
2.33
4.66
10.00
46.60
5,148.43
74+457.851
2.33
4.66
8.93
41.59
5,190.02
74+460.000
2.33
4.66
1.07
5.01
5,195.03
74+480.000
2.33
4.66
10.00
46.60
5,241.63
74+498.518
2.33
4.66
9.26
43.15
5,284.78
74+500.000
2.33
4.66
0.74
3.45
5,288.23
74+520.000
2.35
4.68
10.00
46.80
5,335.03
74+539.184
2.36
4.71
9.59
45.18
5,380.21
74+540.000
2.36
4.72
0.41
1.93
5,382.14
74+559.518
2.37
4.73
9.76
46.16
5,428.30
74+560.000
2.37
4.74
0.24
1.14
5,429.44
74+580.000
2.37
4.74
10.00
47.40
5,476.84
REVISO:
REALIZO:
Pgina 111 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 29
"PAVIMENTOS"
UNIDAD
M3
ESTACIN KM.
REA
L1+L2
D/2
74+600.000
2.37
4.74
74+620.000
2.37
74+640.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
47.40
5,524.24
4.74
10.00
47.40
5,571.64
2.37
4.74
10.00
47.40
5,619.04
74+660.000
2.37
4.74
10.00
47.40
5,666.44
74+680.000
2.37
4.74
10.00
47.40
5,713.84
74+700.000
2.37
4.74
10.00
47.40
5,761.24
74+720.000
2.37
4.74
10.00
47.40
5,808.64
74+740.000
2.37
4.74
10.00
47.40
5,856.04
74+760.000
2.37
4.74
10.00
47.40
5,903.44
74+779.360
2.36
4.73
9.68
45.79
5,949.22
74+780.000
2.37
4.73
0.32
1.51
5,950.74
74+799.693
2.36
4.73
9.85
46.57
5,997.31
74+800.000
2.36
4.72
0.15
0.72
5,998.04
74+820.000
2.34
4.70
10.00
47.00
6,045.04
74+840.000
2.33
4.67
10.00
46.70
6,091.74
74+840.360
2.33
4.66
0.18
0.84
6,092.58
74+860.000
2.33
4.66
9.82
45.76
6,138.34
74+880.000
2.33
4.66
10.00
46.60
6,184.94
74+881.027
2.33
4.66
0.51
2.39
6,187.33
74+900.000
2.33
4.66
9.49
44.21
6,231.54
74+920.000
2.34
4.67
10.00
46.70
6,278.24
74+940.000
2.36
4.70
10.00
47.00
6,325.24
74+960.000
2.36
4.72
10.00
47.20
6,372.44
74+980.000
2.38
4.74
10.00
47.40
6,419.84
75+000.000
2.40
4.78
10.00
47.80
6,467.64
75+020.000
2.42
4.82
10.00
48.20
6,515.84
75+040.000
2.42
4.84
10.00
48.40
6,564.24
75+060.000
2.42
4.84
10.00
48.40
6,612.64
75+080.000
2.42
4.84
10.00
48.40
6,661.04
75+100.000
2.42
4.84
10.00
48.40
6,709.44
75+120.000
2.42
4.84
10.00
48.40
6,757.84
75+140.000
2.42
4.84
10.00
48.40
6,806.24
75+160.000
2.42
4.84
10.00
48.40
6,854.64
75+180.000
2.42
4.84
10.00
48.40
6,903.04
75+200.000
2.42
4.84
10.00
48.40
6,951.44
75+220.000
2.42
4.84
10.00
48.40
6,999.84
75+240.000
2.42
4.84
10.00
48.40
7,048.24
75+260.000
2.42
4.84
10.00
48.40
7,096.64
75+280.000
2.42
4.84
10.00
48.40
7,145.04
75+300.000
2.42
4.84
10.00
48.40
7,193.44
75+320.000
2.42
4.84
10.00
48.40
7,241.84
75+340.000
2.42
4.84
10.00
48.40
7,290.24
75+360.000
2.42
4.84
10.00
48.40
7,338.64
75+380.000
2.42
4.84
10.00
48.40
7,387.04
75+400.000
2.42
4.84
10.00
48.40
7,435.44
75+420.000
2.42
4.84
10.00
48.40
7,483.84
75+440.000
2.42
4.84
10.00
48.40
7,532.24
75+460.000
2.42
4.84
10.00
48.40
7,580.64
75+480.000
2.42
4.84
10.00
48.40
7,629.04
75+500.000
2.42
4.84
10.00
48.40
7,677.44
75+520.000
2.38
4.80
10.00
48.00
7,725.44
75+540.000
2.35
4.73
10.00
47.30
7,772.74
75+560.000
2.33
4.68
10.00
46.80
7,819.54
75+580.000
2.33
4.66
10.00
46.60
7,866.14
REVISO:
REALIZO:
Pgina 112 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 29
"PAVIMENTOS"
UNIDAD
M3
ESTACIN KM.
REA
L1+L2
D/2
75+600.000
2.33
4.66
75+611.738
2.33
75+620.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
46.60
7,912.74
4.66
5.87
27.35
7,940.09
2.33
4.66
4.13
19.25
7,959.34
75+635.122
2.33
4.66
7.56
35.24
7,994.57
75+640.000
2.34
4.67
2.44
11.39
8,005.96
75+658.507
2.36
4.70
9.25
43.49
8,049.45
75+660.000
2.37
4.73
0.75
3.53
8,052.98
75+680.000
2.39
4.76
10.00
47.60
8,100.58
75+700.000
2.42
4.81
10.00
48.10
8,148.68
75+711.122
2.43
4.85
5.56
26.97
8,175.66
75+720.000
2.42
4.85
4.44
21.53
8,197.18
75+740.000
2.42
4.84
10.00
48.40
8,245.58
75+760.000
2.42
4.84
10.00
48.40
8,293.98
75+780.000
2.42
4.84
10.00
48.40
8,342.38
75+800.000
2.42
4.84
10.00
48.40
8,390.78
75+820.000
2.42
4.84
10.00
48.40
8,439.18
75+840.000
2.42
4.84
10.00
48.40
8,487.58
75+860.000
2.42
4.84
10.00
48.40
8,535.98
75+880.000
2.42
4.84
10.00
48.40
8,584.38
75+900.000
2.42
4.84
10.00
48.40
8,632.78
75+920.000
2.42
4.84
10.00
48.40
8,681.18
75+940.000
2.42
4.84
10.00
48.40
8,729.58
75+960.000
2.42
4.84
10.00
48.40
8,777.98
75+980.000
2.42
4.84
10.00
48.40
8,826.38
76+000.000
2.42
4.84
10.00
48.40
8,874.78
76+020.000
2.42
4.84
10.00
48.40
8,923.18
76+040.000
2.42
4.84
10.00
48.40
8,971.58
76+060.000
2.42
4.84
10.00
48.40
9,019.98
76+080.000
2.42
4.84
10.00
48.40
9,068.38
76+100.000
2.42
4.84
10.00
48.40
9,116.78
76+120.000
2.42
4.84
10.00
48.40
9,165.18
76+140.000
2.42
4.84
10.00
48.40
9,213.58
76+160.000
2.42
4.84
10.00
48.40
9,261.98
76+180.000
2.42
4.84
10.00
48.40
9,310.38
76+200.000
2.42
4.84
10.00
48.40
9,358.78
76+220.000
2.42
4.84
10.00
48.40
9,407.18
76+240.000
2.42
4.84
10.00
48.40
9,455.58
76+255.500
2.42
4.84
7.75
37.51
9,493.09
76+260.000
2.42
4.84
2.25
10.89
9,503.98
76+280.000
2.40
4.82
10.00
48.20
9,552.18
76+300.000
2.38
4.78
10.00
47.80
9,599.98
76+320.000
2.36
4.74
10.00
47.40
9,647.38
76+321.961
2.36
4.72
0.98
4.63
9,652.01
76+340.000
2.34
4.70
9.02
42.39
9,694.40
76+351.500
2.33
4.67
5.75
26.85
9,721.26
76+360.000
2.33
4.66
4.25
19.81
9,741.06
76+380.000
2.33
4.66
10.00
46.60
9,787.66
76+381.038
2.33
4.66
0.52
2.42
9,790.08
76+400.000
2.33
4.66
9.48
44.18
9,834.26
76+420.000
2.33
4.66
10.00
46.60
9,880.86
76+440.000
2.33
4.66
10.00
46.60
9,927.46
76+460.000
2.33
4.66
10.00
46.60
9,974.06
76+480.000
2.33
4.66
10.00
46.60
10,020.66
76+500.000
2.33
4.66
10.00
46.60
10,067.26
REVISO:
REALIZO:
Pgina 113 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 29
"PAVIMENTOS"
UNIDAD
M3
REA ACUMULADA
ESTACIN KM.
REA
L1+L2
D/2
76+520.000
2.33
4.66
10.00
46.60
10,113.86
76+540.000
2.33
4.66
10.00
46.60
10,160.46
76+560.000
2.33
4.66
10.00
46.60
10,207.06
76+580.000
2.33
4.66
10.00
46.60
10,253.66
76+600.000
2.33
4.66
10.00
46.60
10,300.26
76+620.000
2.33
4.66
10.00
46.60
10,346.86
76+640.000
2.33
4.66
10.00
46.60
10,393.46
76+660.000
2.33
4.66
10.00
46.60
10,440.06
76+680.000
2.33
4.66
10.00
46.60
10,486.66
76+700.000
2.33
4.66
10.00
46.60
10,533.26
76+720.000
2.33
4.66
10.00
46.60
10,579.86
76+740.000
2.33
4.66
10.00
46.60
10,626.46
76+760.000
2.33
4.66
10.00
46.60
10,673.06
76+780.000
2.33
4.66
10.00
46.60
10,719.66
76+800.000
2.33
4.66
10.00
46.60
10,766.26
76+820.000
2.33
4.66
10.00
46.60
10,812.86
76+840.000
2.33
4.66
10.00
46.60
10,859.46
76+860.000
2.33
4.66
10.00
46.60
10,906.06
76+880.000
2.33
4.66
10.00
46.60
10,952.66
76+900.000
2.33
4.66
10.00
46.60
10,999.26
76+920.000
2.33
4.66
10.00
46.60
11,045.86
76+940.000
2.33
4.66
10.00
46.60
11,092.46
76+960.000
2.33
4.66
10.00
46.60
11,139.06
76+980.000
2.33
4.66
10.00
46.60
11,185.66
76+985.245
2.33
4.66
2.62
12.22
11,197.88
76+993.182
2.33
4.66
3.97
18.49
11,216.37
77+000.000
2.35
4.68
3.41
15.95
11,232.33
77+001.118
2.35
4.70
0.56
2.63
11,234.96
77+018.182
2.38
4.73
8.53
40.36
11,275.31
77+020.000
2.38
4.76
0.91
4.33
11,279.64
77+040.000
2.38
4.76
10.00
47.60
11,327.24
77+060.000
2.38
4.76
10.00
47.60
11,374.84
77+080.000
2.38
4.76
10.00
47.60
11,422.44
77+100.000
2.38
4.76
10.00
47.60
11,470.04
77+120.000
2.38
4.76
10.00
47.60
11,517.64
77+140.000
2.38
4.76
10.00
47.60
11,565.24
77+160.000
2.38
4.76
10.00
47.60
11,612.84
77+180.000
2.38
4.76
10.00
47.60
11,660.44
77+200.000
2.38
4.76
10.00
47.60
11,708.04
77+220.000
2.38
4.76
10.00
47.60
11,755.64
77+240.000
2.38
4.76
10.00
47.60
11,803.24
77+260.000
2.38
4.76
10.00
47.60
11,850.84
77+280.000
2.38
4.76
10.00
47.60
11,898.44
77+300.000
2.38
4.76
10.00
47.60
11,946.04
77+320.000
2.38
4.76
10.00
47.60
11,993.64
77+340.000
2.38
4.76
10.00
47.60
12,041.24
77+360.000
2.38
4.76
10.00
47.60
12,088.84
77+380.000
2.38
4.76
10.00
47.60
12,136.44
77+400.000
2.38
4.76
10.00
47.60
12,184.04
77+420.000
2.38
4.76
10.00
47.60
12,231.64
77+440.000
2.38
4.76
10.00
47.60
12,279.24
77+460.000
2.38
4.76
10.00
47.60
12,326.84
77+480.000
2.38
4.76
10.00
47.60
12,374.44
77+500.000
2.38
4.76
10.00
47.60
12,422.04
REVISO:
PARCIAL
ACUMULADO
REALIZO:
Pgina 114 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 29
"PAVIMENTOS"
UNIDAD
M3
ESTACIN KM.
REA
L1+L2
D/2
77+520.000
2.38
4.76
77+525.218
2.38
77+540.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
47.60
12,469.64
4.76
2.61
12.42
12,482.06
2.35
4.73
7.39
34.96
12,517.02
77+540.234
2.23
4.58
0.12
0.53
12,517.55
77+547.218
2.33
4.56
3.49
15.92
12,533.48
77+554.202
2.33
4.66
3.49
16.27
12,549.75
77+560.000
2.33
4.66
2.90
13.51
12,563.26
77+580.000
2.33
4.66
10.00
46.60
12,609.86
77+600.000
2.33
4.66
10.00
46.60
12,656.46
77+620.000
2.33
4.66
10.00
46.60
12,703.06
77+640.000
2.33
4.66
10.00
46.60
12,749.66
77+647.342
2.33
4.66
3.67
17.11
12,766.77
77+660.000
2.33
4.66
6.33
29.49
12,796.26
77+663.215
2.33
4.66
1.61
7.49
12,803.75
77+679.088
2.35
4.68
7.94
37.14
12,840.89
77+680.000
2.34
4.69
0.46
2.14
12,843.03
77+700.000
2.36
4.70
10.00
47.00
12,890.03
77+713.215
2.37
4.73
6.61
31.25
12,921.28
77+720.000
2.38
4.75
3.39
16.12
12,937.40
77+740.000
2.38
4.76
10.00
47.60
12,985.00
77+760.000
2.38
4.76
10.00
47.60
13,032.60
77+780.000
2.38
4.76
10.00
47.60
13,080.20
77+800.000
2.38
4.76
10.00
47.60
13,127.80
77+820.000
2.38
4.76
10.00
47.60
13,175.40
77+840.000
2.38
4.76
10.00
47.60
13,223.00
77+860.000
2.38
4.76
10.00
47.60
13,270.60
77+880.000
2.38
4.76
10.00
47.60
13,318.20
77+900.000
2.38
4.76
10.00
47.60
13,365.80
77+920.000
2.38
4.76
10.00
47.60
13,413.40
77+940.000
2.38
4.76
10.00
47.60
13,461.00
77+960.000
2.38
4.76
10.00
47.60
13,508.60
77+980.000
2.38
4.76
10.00
47.60
13,556.20
78+000.000
2.38
4.76
10.00
47.60
13,603.80
78+020.000
2.38
4.76
10.00
47.60
13,651.40
78+040.000
2.38
4.76
10.00
47.60
13,699.00
78+060.000
2.38
4.76
10.00
47.60
13,746.60
78+080.000
2.38
4.76
10.00
47.60
13,794.20
78+094.334
2.38
4.76
7.17
34.12
13,828.31
78+100.000
2.37
4.75
2.83
13.46
13,841.77
78+116.175
2.35
4.72
8.09
38.17
13,879.95
78+120.000
2.34
4.69
1.91
8.97
13,888.91
78+126.334
2.33
4.67
3.17
14.79
13,903.70
78+136.493
2.33
4.66
5.08
23.67
13,927.37
78+140.000
2.33
4.66
1.75
8.17
13,935.55
78+160.000
2.33
4.66
10.00
46.60
13,982.15
78+180.000
2.33
4.66
10.00
46.60
14,028.75
78+200.000
2.33
4.66
10.00
46.60
14,075.35
78+220.000
2.33
4.66
10.00
46.60
14,121.95
78+240.000
2.33
4.66
10.00
46.60
14,168.55
78+260.000
2.33
4.66
10.00
46.60
14,215.15
78+280.000
0.00
2.33
10.00
23.30
14,238.45
78+300.000
0.00
0.00
10.00
0.00
14,238.45
78+320.000
0.00
0.00
10.00
0.00
14,238.45
78+340.000
0.00
0.00
10.00
0.00
14,238.45
REVISO:
REALIZO:
Pgina 115 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 29
"PAVIMENTOS"
UNIDAD
M3
ESTACIN KM.
REA
L1+L2
D/2
78+360.000
0.00
0.00
78+380.000
0.00
78+400.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
0.00
14,238.45
0.00
10.00
0.00
14,238.45
0.00
0.00
10.00
0.00
14,238.45
78+420.000
0.00
0.00
10.00
0.00
14,238.45
78+440.000
0.00
0.00
10.00
0.00
14,238.45
78+460.000
0.00
0.00
10.00
0.00
14,238.45
78+480.000
0.00
0.00
10.00
0.00
14,238.45
78+500.000
0.00
0.00
10.00
0.00
14,238.45
78+520.000
0.00
0.00
10.00
0.00
14,238.45
78+540.000
2.38
2.38
10.00
23.80
14,262.25
78+560.000
2.38
4.76
10.00
47.60
14,309.85
78+580.000
2.38
4.76
10.00
47.60
14,357.45
78+600.000
2.38
4.76
10.00
47.60
14,405.05
78+620.000
2.38
4.76
10.00
47.60
14,452.65
78+640.000
2.38
4.76
10.00
47.60
14,500.25
78+660.000
2.38
4.76
10.00
47.60
14,547.85
78+680.000
2.38
4.76
10.00
47.60
14,595.45
78+700.000
2.38
4.76
10.00
47.60
14,643.05
78+720.000
2.37
4.75
10.00
47.50
14,690.55
78+740.000
2.33
4.70
10.00
47.00
14,737.55
78+760.000
2.33
4.66
10.00
46.60
14,784.15
78+780.000
2.33
4.66
10.00
46.60
14,830.75
78+790.492
2.33
4.66
5.25
24.45
14,855.19
78+796.615
2.33
4.66
3.06
14.27
14,869.46
78+800.000
2.34
4.67
1.69
7.90
14,877.36
78+802.737
2.35
4.69
1.37
6.42
14,883.78
78+811.615
2.41
4.76
4.44
21.13
14,904.91
78+820.000
2.37
4.78
4.19
20.04
14,924.95
78+840.000
2.37
4.74
10.00
47.40
14,972.35
78+860.000
2.37
4.74
10.00
47.40
15,019.75
78+880.000
2.37
4.74
10.00
47.40
15,067.15
78+900.000
2.37
4.74
10.00
47.40
15,114.55
78+920.000
2.37
4.74
10.00
47.40
15,161.95
78+940.000
2.37
4.74
10.00
47.40
15,209.35
78+960.000
2.37
4.74
10.00
47.40
15,256.75
78+980.000
2.37
4.74
10.00
47.40
15,304.15
79+000.000
2.37
4.74
10.00
47.40
15,351.55
79+020.000
2.37
4.74
10.00
47.40
15,398.95
79+040.000
2.37
4.74
10.00
47.40
15,446.35
79+060.000
2.37
4.74
10.00
47.40
15,493.75
79+080.000
2.37
4.74
10.00
47.40
15,541.15
79+097.907
2.37
4.74
8.95
42.44
15,583.59
79+100.000
2.37
4.74
1.05
4.96
15,588.55
79+120.000
2.35
4.72
10.00
47.20
15,635.75
79+133.417
2.35
4.70
6.71
31.53
15,667.28
79+140.000
2.34
4.69
3.29
15.44
15,682.72
79+157.907
2.33
4.67
8.95
41.81
15,724.53
79+160.000
2.33
4.66
1.05
4.88
15,729.41
79+180.000
2.33
4.66
10.00
46.60
15,776.01
79+182.397
2.33
4.66
1.20
5.59
15,781.59
79+200.000
2.33
4.66
8.80
41.01
15,822.61
79+220.000
2.33
4.66
10.00
46.60
15,869.21
79+240.000
2.33
4.66
10.00
46.60
15,915.81
79+260.000
2.33
4.66
10.00
46.60
15,962.41
79+280.000
2.33
4.66
10.00
46.60
16,009.01
79+300.000
2.33
4.66
10.00
46.60
16,055.61
79+320.000
2.33
4.66
10.00
46.60
16,102.21
REVISO:
REALIZO:
Pgina 116 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 29
"PAVIMENTOS"
UNIDAD
M3
1.165
ESTACIN KM.
REA
L1+L2
D/2
79+340.000
2.33
4.66
79+360.000
2.33
79+380.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
46.60
16,148.81
4.66
10.00
46.60
16,195.41
2.33
4.66
10.00
46.60
16,242.01
79+400.000
2.33
4.66
10.00
46.60
16,288.61
79+420.000
2.33
4.66
10.00
46.60
16,335.21
79+440.000
2.33
4.66
10.00
46.60
16,381.81
79+460.000
2.33
4.66
10.00
46.60
16,428.41
79+480.000
2.33
4.66
10.00
46.60
16,475.01
79+500.000
2.33
4.66
10.00
46.60
16,521.61
79+520.000
2.33
4.66
10.00
46.60
16,568.21
79+540.000
2.33
4.66
10.00
46.60
16,614.81
79+560.000
2.33
4.66
10.00
46.60
16,661.41
79+580.000
2.33
4.66
10.00
46.60
16,708.01
79+600.000
2.33
4.66
10.00
46.60
16,754.61
79+620.000
2.33
4.66
10.00
46.60
16,801.21
79+640.000
2.33
4.66
10.00
46.60
16,847.81
79+660.000
2.33
4.66
10.00
46.60
16,894.41
79+680.000
2.33
4.66
10.00
46.60
16,941.01
79+700.000
2.33
4.66
10.00
46.60
16,987.61
79+720.000
2.33
4.66
10.00
46.60
17,034.21
79+740.000
2.33
4.66
10.00
46.60
17,080.81
79+760.000
2.33
4.66
10.00
46.60
17,127.41
79+780.000
2.33
4.66
10.00
46.60
17,174.01
79+800.000
2.33
4.66
10.00
46.60
17,220.61
79+820.000
2.33
4.66
10.00
46.60
17,267.21
79+840.000
2.33
4.66
10.00
46.60
17,313.81
79+860.000
2.33
4.66
10.00
46.60
17,360.41
79+880.000
2.33
4.66
10.00
46.60
17,407.01
79+900.000
2.33
4.66
10.00
46.60
17,453.61
79+920.000
2.33
4.66
10.00
46.60
17,500.21
79+940.000
2.33
4.66
10.00
46.60
17,546.81
79+960.000
2.33
4.66
10.00
46.60
17,593.41
79+980.000
2.33
4.66
10.00
46.60
17,640.01
80+000.000
2.33
4.66
10.00
46.60
17,686.61
80+020.000
2.33
4.66
10.00
46.60
17,733.21
80+040.000
2.33
4.66
10.00
46.60
17,779.81
80+060.000
2.33
4.66
10.00
46.60
17,826.41
80+080.000
2.33
4.66
10.00
46.60
17,873.01
80+100.000
2.34
4.67
10.00
46.70
17,919.71
80+120.000
2.35
4.69
10.00
46.90
17,966.61
80+140.000
2.35
4.70
10.00
47.00
18,013.61
80+160.000
2.36
4.71
10.00
47.10
18,060.71
80+180.000
2.36
4.72
10.00
47.20
18,107.91
80+200.000
2.36
4.72
10.00
47.20
18,155.11
80+220.000
2.36
4.72
10.00
47.20
18,202.31
80+240.000
2.36
4.72
10.00
47.20
18,249.51
80+260.000
2.36
4.72
10.00
47.20
18,296.71
80+280.000
2.36
4.72
10.00
47.20
18,343.91
80+300.000
2.36
4.72
10.00
47.20
18,391.11
80+320.000
2.36
4.72
10.00
47.20
18,438.31
80+340.000
2.36
4.72
10.00
47.20
18,485.51
80+360.000
2.36
4.72
10.00
47.20
18,532.71
80+380.000
2.36
4.72
10.00
47.20
18,579.91
80+400.000
2.36
4.72
10.00
47.20
18,627.11
80+420.000
2.36
4.72
10.00
47.20
18,674.31
80+440.000
2.36
4.72
10.00
47.20
18,721.51
80+460.000
0.00
2.36
10.00
23.60
18,745.11
REVISO:
REALIZO:
Pgina 117 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 29
"PAVIMENTOS"
UNIDAD
M3
ESTACIN KM.
REA
L1+L2
D/2
80+480.000
0.00
0.00
80+500.000
0.00
80+520.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
0.00
18,745.11
0.00
10.00
0.00
18,745.11
0.00
0.00
10.00
0.00
18,745.11
80+540.000
0.00
0.00
10.00
0.00
18,745.11
80+560.000
0.00
0.00
10.00
0.00
18,745.11
80+580.000
0.00
0.00
10.00
0.00
18,745.11
80+600.000
2.36
2.36
10.00
23.60
18,768.71
80+620.000
2.36
4.72
10.00
47.20
18,815.91
80+640.000
2.35
4.71
10.00
47.10
18,863.01
80+660.000
2.34
4.69
10.00
46.90
18,909.91
80+680.000
2.33
4.67
10.00
46.70
18,956.61
80+700.000
2.33
4.66
10.00
46.60
19,003.21
80+720.000
2.33
4.66
10.00
46.60
19,049.81
80+740.000
2.33
4.66
10.00
46.60
19,096.41
80+760.000
2.33
4.66
10.00
46.60
19,143.01
80+780.000
2.33
4.66
10.00
46.60
19,189.61
80+800.000
2.33
4.66
10.00
46.60
19,236.21
80+820.000
2.33
4.66
10.00
46.60
19,282.81
80+840.000
2.33
4.66
10.00
46.60
19,329.41
80+860.000
2.33
4.66
10.00
46.60
19,376.01
80+880.000
2.33
4.66
10.00
46.60
19,422.61
80+900.000
2.33
4.66
10.00
46.60
19,469.21
80+920.000
2.33
4.66
10.00
46.60
19,515.81
80+940.000
2.33
4.66
10.00
46.60
19,562.41
80+960.000
2.33
4.66
10.00
46.60
19,609.01
80+980.000
2.33
4.66
10.00
46.60
19,655.61
81+000.000
2.33
4.66
10.00
46.60
19,702.21
81+020.000
2.33
4.66
10.00
46.60
19,748.81
81+040.000
2.33
4.66
10.00
46.60
19,795.41
81+060.000
2.33
4.66
10.00
46.60
19,842.01
81+080.000
2.33
4.66
10.00
46.60
19,888.61
81+100.000
2.33
4.66
10.00
46.60
19,935.21
81+120.000
2.33
4.66
10.00
46.60
19,981.81
81+140.000
81+160.000
81+180.000
81+200.000
81+220.000
81+240.000
81+260.000
81+280.000
81+300.000
81+320.000
81+340.000
81+360.000
81+380.000
81+400.000
81+420.000
81+440.000
81+460.000
81+480.000
81+500.000
81+520.000
81+540.000
81+560.000
81+580.000
81+600.000
81+620.000
81+640.000
81+660.000
81+680.000
81+700.000
81+720.000
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
0.00
0.00
0.00
0.00
4.66
4.66
4.66
4.66
4.66
4.66
4.66
4.66
4.66
4.66
4.66
4.66
4.66
4.66
4.66
4.66
4.66
4.66
4.66
4.66
4.66
4.66
4.66
4.66
4.66
4.66
2.33
0.00
0.00
0.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
46.60
46.60
46.60
46.60
46.60
46.60
46.60
46.60
46.60
46.60
46.60
46.60
46.60
46.60
46.60
46.60
46.60
46.60
46.60
46.60
46.60
46.60
46.60
46.60
46.60
46.60
23.30
0.00
0.00
0.00
20,028.41
20,075.01
20,121.61
20,168.21
20,214.81
20,261.41
20,308.01
20,354.61
20,401.21
20,447.81
20,494.41
20,541.01
20,587.61
20,634.21
20,680.81
20,727.41
20,774.01
20,820.61
20,867.21
20,913.81
20,960.41
21,007.01
21,053.61
21,100.21
21,146.81
21,193.41
21,216.71
21,216.71
21,216.71
21,216.71
REVISO:
REALIZO:
Pgina 118 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 29
"PAVIMENTOS"
UNIDAD
M3
ESTACIN KM.
REA
L1+L2
D/2
81+740.000
81+760.000
81+780.000
81+800.000
81+820.000
81+840.000
81+860.000
81+880.000
81+900.000
81+920.000
81+940.000
81+960.000
81+980.000
82+000.000
82+020.000
82+040.000
82+060.000
82+080.000
82+100.000
82+120.000
82+140.000
82+160.000
82+180.000
82+200.000
82+220.000
82+240.000
82+260.000
82+280.000
82+300.000
82+320.000
82+340.000
82+360.000
82+380.000
82+400.000
82+420.000
82+440.000
82+460.000
82+480.000
82+500.000
82+520.000
82+540.000
82+560.000
82+580.000
82+600.000
82+620.000
82+640.000
82+660.000
82+680.000
82+700.000
82+720.000
82+740.000
82+760.000
82+780.000
82+800.000
82+820.000
82+840.000
82+860.000
82+880.000
82+900.000
82+920.000
82+940.000
82+960.000
82+980.000
83+000.000
83+020.000
83+040.000
83+060.000
83+080.000
83+100.000
83+120.000
83+140.000
83+160.000
83+170.200
0.00
0.00
0.00
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.33
0.00
0.00
0.00
2.33
4.66
4.66
4.66
4.66
4.66
4.66
4.66
4.66
4.66
4.66
4.66
4.66
4.66
4.66
4.66
4.66
4.66
4.66
4.66
4.66
4.66
4.66
4.66
4.66
4.66
4.66
4.66
4.66
4.66
4.66
4.66
4.66
4.66
4.66
4.66
4.66
4.66
4.66
4.66
4.66
4.66
4.66
4.66
4.66
4.66
4.66
4.66
4.66
4.66
4.66
4.66
4.66
2.33
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.33
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
5.10
REVISO:
REA ACUMULADA
PARCIAL
ACUMULADO
0.00
0.00
0.00
23.30
46.60
46.60
46.60
46.60
46.60
46.60
46.60
46.60
46.60
46.60
46.60
46.60
46.60
46.60
46.60
46.60
46.60
46.60
46.60
46.60
46.60
46.60
46.60
46.60
46.60
46.60
46.60
46.60
46.60
46.60
46.60
46.60
46.60
46.60
46.60
46.60
46.60
46.60
46.60
46.60
46.60
46.60
46.60
46.60
46.60
46.60
46.60
46.60
46.60
46.60
46.60
46.60
23.30
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
11.88
21,216.71
21,216.71
21,216.71
21,240.01
21,286.61
21,333.21
21,379.81
21,426.41
21,473.01
21,519.61
21,566.21
21,612.81
21,659.41
21,706.01
21,752.61
21,799.21
21,845.81
21,892.41
21,939.01
21,985.61
22,032.21
22,078.81
22,125.41
22,172.01
22,218.61
22,265.21
22,311.81
22,358.41
22,405.01
22,451.61
22,498.21
22,544.81
22,591.41
22,638.01
22,684.61
22,731.21
22,777.81
22,824.41
22,871.01
22,917.61
22,964.21
23,010.81
23,057.41
23,104.01
23,150.61
23,197.21
23,243.81
23,290.41
23,337.01
23,383.61
23,430.21
23,476.81
23,523.41
23,570.01
23,616.61
23,663.21
23,686.51
23,686.51
23,686.51
23,686.51
23,686.51
23,686.51
23,686.51
23,686.51
23,686.51
23,686.51
23,686.51
23,686.51
23,686.51
23,686.51
23,686.51
23,686.51
23,698.39
REALIZO:
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 29
"PAVIMENTOS"
UNIDAD
M3
ESTACIN KM.
REA
L1+L2
D/2
83+180.000
83+200.000
83+220.000
83+240.000
83+260.000
83+280.000
83+300.000
83+320.000
83+340.000
83+360.000
83+380.000
83+400.000
83+420.000
83+440.000
83+460.000
83+480.000
83+500.000
83+520.000
83+540.000
83+560.000
83+570.105
83+580.000
83+593.182
83+600.000
83+616.259
83+620.000
83+640.000
83+653.182
83+660.000
83+680.000
83+700.000
83+720.000
83+740.000
83+760.000
83+780.000
83+785.000
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.34
2.35
2.35
2.36
2.37
2.36
2.37
2.37
2.37
2.37
2.37
2.37
2.37
4.66
4.66
4.66
4.66
4.66
4.66
4.66
4.66
4.66
4.66
4.66
4.66
4.66
4.66
4.66
4.66
4.66
4.66
4.66
4.66
4.66
4.66
4.66
4.67
4.69
4.70
4.71
4.73
4.73
4.73
4.74
4.74
4.74
4.74
4.74
4.74
4.90
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
5.05
4.95
6.59
3.41
8.13
1.87
10.00
6.59
3.41
10.00
10.00
10.00
10.00
10.00
10.00
2.50
REVISO:
REA ACUMULADA
PARCIAL
ACUMULADO
22.83
46.60
46.60
46.60
46.60
46.60
46.60
46.60
46.60
46.60
46.60
46.60
46.60
46.60
46.60
46.60
46.60
46.60
46.60
46.60
23.54
23.06
30.71
15.92
38.13
8.79
47.10
31.17
16.13
47.30
47.40
47.40
47.40
47.40
47.40
11.85
23,721.22
23,767.82
23,814.42
23,861.02
23,907.62
23,954.22
24,000.82
24,047.42
24,094.02
24,140.62
24,187.22
24,233.82
24,280.42
24,327.02
24,373.62
24,420.22
24,466.82
24,513.42
24,560.02
24,606.62
24,630.17
24,653.22
24,683.94
24,699.86
24,737.98
24,746.78
24,793.88
24,825.05
24,841.18
24,888.48
24,935.88
24,983.28
25,030.68
25,078.08
25,125.48
25,137.33
REALIZO:
Pgina 120 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 31
"PAVIMENTOS"
UNIDAD
M3
REA ACUMULADA
ESTACIN KM.
REA
L1+L2
D/2
71+800.000
1.05
0.00
0.00
0.00
0.00
71+820.000
1.05
2.10
10.00
21.00
21.00
71+840.000
1.05
2.10
10.00
21.00
42.00
71+860.000
1.05
2.10
10.00
21.00
63.00
71+880.000
1.05
2.10
10.00
21.00
84.00
71+900.000
1.05
2.10
10.00
21.00
105.00
71+920.000
1.05
2.10
10.00
21.00
126.00
71+940.000
1.05
2.10
10.00
21.00
147.00
71+960.000
1.05
2.10
10.00
21.00
168.00
71+980.000
1.05
2.10
10.00
21.00
189.00
72+000.000
1.05
2.10
10.00
21.00
210.00
72+020.000
1.05
2.10
10.00
21.00
231.00
72+040.000
1.05
2.10
10.00
21.00
252.00
72+060.000
1.05
2.10
10.00
21.00
273.00
72+080.000
1.05
2.10
10.00
21.00
294.00
72+100.000
1.05
2.10
10.00
21.00
315.00
72+120.000
1.05
2.10
10.00
21.00
336.00
72+140.000
1.05
2.10
10.00
21.00
357.00
72+160.000
1.05
2.10
10.00
21.00
378.00
72+180.000
1.05
2.10
10.00
21.00
399.00
72+200.000
1.05
2.10
10.00
21.00
420.00
72+220.000
1.05
2.10
10.00
21.00
441.00
72+240.000
1.05
2.10
10.00
21.00
462.00
72+260.000
1.05
2.10
10.00
21.00
483.00
72+280.000
1.05
2.10
10.00
21.00
504.00
72+300.000
1.05
2.10
10.00
21.00
525.00
72+320.000
1.05
2.10
10.00
21.00
546.00
72+340.000
1.05
2.10
10.00
21.00
567.00
72+360.000
1.05
2.10
10.00
21.00
588.00
72+380.000
1.05
2.10
10.00
21.00
609.00
72+400.000
1.05
2.10
10.00
21.00
630.00
72+420.000
1.05
2.10
10.00
21.00
651.00
72+440.000
1.05
2.10
10.00
21.00
672.00
72+460.000
1.05
2.10
10.00
21.00
693.00
72+480.000
1.05
2.10
10.00
21.00
714.00
72+500.000
1.05
2.10
10.00
21.00
735.00
72+520.000
1.05
2.10
10.00
21.00
756.00
72+540.000
1.05
2.10
10.00
21.00
777.00
72+560.000
1.05
2.10
10.00
21.00
798.00
72+580.000
1.05
2.10
10.00
21.00
819.00
72+600.000
1.05
2.10
10.00
21.00
840.00
72+620.000
1.05
2.10
10.00
21.00
861.00
72+640.000
1.05
2.10
10.00
21.00
882.00
72+654.982
1.05
2.10
7.49
15.73
897.73
72+660.000
1.05
2.10
2.51
5.27
903.00
72+678.443
1.05
2.10
9.22
19.37
922.37
72+680.000
1.05
2.10
0.78
1.63
924.00
72+700.000
1.06
2.11
10.00
21.10
945.10
72+701.905
1.06
2.12
0.95
2.02
947.12
72+720.000
1.07
2.13
9.05
19.27
966.39
72+739.443
1.08
2.15
9.72
20.90
987.29
72+740.000
1.08
2.16
0.28
0.60
987.89
REVISO:
PARCIAL
ACUMULADO
REALIZO:
Pgina 121 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 31
"PAVIMENTOS"
UNIDAD
M3
ESTACIN KM.
REA
L1+L2
D/2
72+760.000
1.08
2.16
72+780.000
1.08
72+800.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
21.60
1,009.49
2.16
10.00
21.60
1,031.09
1.08
2.16
10.00
21.60
1,052.69
72+820.000
1.08
2.16
10.00
21.60
1,074.29
72+840.000
1.08
2.16
10.00
21.60
1,095.89
72+860.000
1.08
2.16
10.00
21.60
1,117.49
72+880.000
1.08
2.16
10.00
21.60
1,139.09
72+900.000
1.08
2.16
10.00
21.60
1,160.69
72+920.000
1.08
2.16
10.00
21.60
1,182.29
72+940.000
0.00
1.08
10.00
10.80
1,193.09
72+960.000
0.00
0.00
10.00
0.00
1,193.09
72+971.651
0.00
0.00
5.83
0.00
1,193.09
72+980.000
0.00
0.00
4.17
0.00
1,193.09
73+000.000
0.00
0.00
10.00
0.00
1,193.09
73+009.189
0.00
0.00
4.59
0.00
1,193.09
73+020.000
0.00
0.00
5.41
0.00
1,193.09
73+032.651
0.00
0.00
6.33
0.00
1,193.09
73+040.000
0.00
0.00
3.67
0.00
1,193.09
73+056.112
0.00
0.00
8.06
0.00
1,193.09
73+060.000
0.00
0.00
1.94
0.00
1,193.09
73+080.000
0.00
0.00
10.00
0.00
1,193.09
73+100.000
0.00
0.00
10.00
0.00
1,193.09
73+120.000
0.00
0.00
10.00
0.00
1,193.09
73+140.000
0.00
0.00
10.00
0.00
1,193.09
73+160.000
0.00
0.00
10.00
0.00
1,193.09
73+180.000
0.00
0.00
10.00
0.00
1,193.09
73+200.000
0.00
0.00
10.00
0.00
1,193.09
73+220.000
0.00
0.00
10.00
0.00
1,193.09
73+240.000
0.00
0.00
10.00
0.00
1,193.09
73+260.000
1.05
1.05
10.00
10.50
1,203.59
73+280.000
1.05
2.10
10.00
21.00
1,224.59
73+300.000
1.05
2.10
10.00
21.00
1,245.59
73+320.000
1.05
2.10
10.00
21.00
1,266.59
73+340.000
1.05
2.10
10.00
21.00
1,287.59
73+360.000
1.05
2.10
10.00
21.00
1,308.59
73+380.000
1.05
2.10
10.00
21.00
1,329.59
73+400.000
1.05
2.10
10.00
21.00
1,350.59
73+420.000
1.05
2.10
10.00
21.00
1,371.59
73+440.000
1.05
2.10
10.00
21.00
1,392.59
73+460.000
1.05
2.10
10.00
21.00
1,413.59
73+480.000
1.05
2.10
10.00
21.00
1,434.59
73+500.000
1.05
2.10
10.00
21.00
1,455.59
73+520.000
1.05
2.10
10.00
21.00
1,476.59
73+540.000
1.05
2.10
10.00
21.00
1,497.59
73+560.000
1.05
2.10
10.00
21.00
1,518.59
73+580.000
1.05
2.10
10.00
21.00
1,539.59
73+600.000
1.05
2.10
10.00
21.00
1,560.59
73+620.000
1.05
2.10
10.00
21.00
1,581.59
73+640.000
1.05
2.10
10.00
21.00
1,602.59
73+660.000
1.05
2.10
10.00
21.00
1,623.59
73+680.000
1.05
2.10
10.00
21.00
1,644.59
73+700.000
1.05
2.10
10.00
21.00
1,665.59
73+720.000
1.05
2.10
10.00
21.00
1,686.59
73+740.000
1.05
2.10
10.00
21.00
1,707.59
REVISO:
REALIZO:
Pgina 122 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 31
"PAVIMENTOS"
UNIDAD
M3
ESTACIN KM.
REA
L1+L2
D/2
73+760.000
1.05
2.10
73+780.000
1.05
73+800.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
21.00
1,728.59
2.10
10.00
21.00
1,749.59
1.05
2.10
10.00
21.00
1,770.59
73+807.617
1.05
2.10
3.81
8.00
1,778.59
73+820.000
1.05
2.10
6.19
13.00
1,791.59
73+840.000
0.00
1.05
10.00
10.50
1,802.09
73+848.283
0.00
0.00
4.14
0.00
1,802.09
73+860.000
0.00
0.00
5.86
0.00
1,802.09
73+880.000
0.00
0.00
10.00
0.00
1,802.09
73+888.950
0.00
0.00
4.47
0.00
1,802.09
73+900.000
0.00
0.00
5.53
0.00
1,802.09
73+909.283
0.00
0.00
4.64
0.00
1,802.09
73+920.000
0.00
0.00
5.36
0.00
1,802.09
73+940.000
0.00
0.00
10.00
0.00
1,802.09
73+960.000
1.07
1.07
10.00
10.70
1,812.79
73+980.000
1.07
2.14
10.00
21.40
1,834.19
74+000.000
1.07
2.14
10.00
21.40
1,855.59
74+020.000
1.07
2.14
10.00
21.40
1,876.99
74+040.000
1.07
2.14
10.00
21.40
1,898.39
74+060.000
1.07
2.14
10.00
21.40
1,919.79
74+080.000
1.07
2.14
10.00
21.40
1,941.19
74+089.272
1.07
2.14
4.64
9.92
1,951.11
74+100.000
1.06
2.13
5.36
11.43
1,962.54
74+109.605
1.06
2.12
4.80
10.18
1,972.72
74+120.000
1.06
2.12
5.20
11.02
1,983.74
74+140.000
1.05
2.11
10.00
21.10
2,004.84
74+150.272
1.05
2.10
5.14
10.79
2,015.63
74+160.000
1.05
2.10
4.86
10.21
2,025.84
74+180.000
1.05
2.10
10.00
21.00
2,046.84
74+190.939
1.05
2.10
5.47
11.49
2,058.33
74+200.000
1.05
2.10
4.53
9.51
2,067.84
74+220.000
1.05
2.10
10.00
21.00
2,088.84
74+240.000
1.05
2.10
10.00
21.00
2,109.84
74+260.000
1.05
2.10
10.00
21.00
2,130.84
74+280.000
1.05
2.10
10.00
21.00
2,151.84
74+300.000
1.05
2.10
10.00
21.00
2,172.84
74+320.000
1.05
2.10
10.00
21.00
2,193.84
74+340.000
1.05
2.10
10.00
21.00
2,214.84
74+360.000
1.05
2.10
10.00
21.00
2,235.84
74+380.000
1.05
2.10
10.00
21.00
2,256.84
74+400.000
1.05
2.10
10.00
21.00
2,277.84
74+420.000
1.05
2.10
10.00
21.00
2,298.84
74+440.000
1.05
2.10
10.00
21.00
2,319.84
74+457.851
1.05
2.10
8.93
18.74
2,338.58
74+460.000
1.05
2.10
1.07
2.26
2,340.84
74+480.000
1.05
2.10
10.00
21.00
2,361.84
74+498.518
1.05
2.10
9.26
19.44
2,381.28
74+500.000
1.05
2.10
0.74
1.56
2,382.84
74+520.000
1.06
2.11
10.00
21.10
2,403.94
74+539.184
1.06
2.12
9.59
20.34
2,424.27
74+540.000
1.06
2.12
0.41
0.86
2,425.14
74+559.518
1.07
2.13
9.76
20.79
2,445.93
74+560.000
1.07
2.14
0.24
0.52
2,446.44
74+580.000
1.07
2.14
10.00
21.40
2,467.84
REVISO:
REALIZO:
Pgina 123 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 31
"PAVIMENTOS"
UNIDAD
M3
ESTACIN KM.
REA
L1+L2
D/2
74+600.000
1.07
2.14
74+620.000
1.07
74+640.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
21.40
2,489.24
2.14
10.00
21.40
2,510.64
1.07
2.14
10.00
21.40
2,532.04
74+660.000
1.07
2.14
10.00
21.40
2,553.44
74+680.000
1.07
2.14
10.00
21.40
2,574.84
74+700.000
1.07
2.14
10.00
21.40
2,596.24
74+720.000
1.07
2.14
10.00
21.40
2,617.64
74+740.000
1.07
2.14
10.00
21.40
2,639.04
74+760.000
1.07
2.14
10.00
21.40
2,660.44
74+779.360
1.07
2.14
9.68
20.72
2,681.16
74+780.000
1.07
2.14
0.32
0.68
2,681.84
74+799.693
1.06
2.13
9.85
20.97
2,702.82
74+800.000
1.06
2.12
0.15
0.33
2,703.14
74+820.000
1.06
2.12
10.00
21.20
2,724.34
74+840.000
1.05
2.11
10.00
21.10
2,745.44
74+840.360
1.05
2.10
0.18
0.38
2,745.82
74+860.000
1.05
2.10
9.82
20.62
2,766.44
74+880.000
1.05
2.10
10.00
21.00
2,787.44
74+881.027
1.05
2.10
0.51
1.08
2,788.52
74+900.000
1.05
2.10
9.49
19.92
2,808.44
74+920.000
1.05
2.10
10.00
21.00
2,829.44
74+940.000
1.06
2.11
10.00
21.10
2,850.54
74+960.000
1.07
2.13
10.00
21.30
2,871.84
74+980.000
1.07
2.14
10.00
21.40
2,893.24
75+000.000
1.08
2.15
10.00
21.50
2,914.74
75+020.000
1.09
2.17
10.00
21.70
2,936.44
75+040.000
1.09
2.18
10.00
21.80
2,958.24
75+060.000
1.09
2.18
10.00
21.80
2,980.04
75+080.000
1.09
2.18
10.00
21.80
3,001.84
75+100.000
1.09
2.18
10.00
21.80
3,023.64
75+120.000
1.09
2.18
10.00
21.80
3,045.44
75+140.000
1.09
2.18
10.00
21.80
3,067.24
75+160.000
1.09
2.18
10.00
21.80
3,089.04
75+180.000
1.09
2.18
10.00
21.80
3,110.84
75+200.000
1.09
2.18
10.00
21.80
3,132.64
75+220.000
1.09
2.18
10.00
21.80
3,154.44
75+240.000
1.09
2.18
10.00
21.80
3,176.24
75+260.000
1.09
2.18
10.00
21.80
3,198.04
75+280.000
1.09
2.18
10.00
21.80
3,219.84
75+300.000
1.09
2.18
10.00
21.80
3,241.64
75+320.000
1.09
2.18
10.00
21.80
3,263.44
75+340.000
1.09
2.18
10.00
21.80
3,285.24
75+360.000
1.09
2.18
10.00
21.80
3,307.04
75+380.000
1.09
2.18
10.00
21.80
3,328.84
75+400.000
1.09
2.18
10.00
21.80
3,350.64
75+420.000
1.09
2.18
10.00
21.80
3,372.44
75+440.000
1.09
2.18
10.00
21.80
3,394.24
75+460.000
1.09
2.18
10.00
21.80
3,416.04
75+480.000
1.09
2.18
10.00
21.80
3,437.84
75+500.000
1.09
2.18
10.00
21.80
3,459.64
75+520.000
1.08
2.17
10.00
21.70
3,481.34
75+540.000
1.06
2.14
10.00
21.40
3,502.74
75+560.000
1.05
2.11
10.00
21.10
3,523.84
75+580.000
1.05
2.10
10.00
21.00
3,544.84
REVISO:
REALIZO:
Pgina 124 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 31
"PAVIMENTOS"
UNIDAD
M3
ESTACIN KM.
REA
L1+L2
D/2
75+600.000
1.05
2.10
75+611.738
1.05
75+620.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
21.00
3,565.84
2.10
5.87
12.32
3,578.17
1.05
2.10
4.13
8.68
3,586.84
75+635.122
1.05
2.10
7.56
15.88
3,602.72
75+640.000
1.06
2.11
2.44
5.15
3,607.86
75+658.507
1.06
2.12
9.25
19.62
3,627.48
75+660.000
1.07
2.13
0.75
1.59
3,629.07
75+680.000
1.08
2.15
10.00
21.50
3,650.57
75+700.000
1.09
2.17
10.00
21.70
3,672.27
75+711.122
1.10
2.19
5.56
12.18
3,684.45
75+720.000
1.09
2.19
4.44
9.72
3,694.17
75+740.000
1.09
2.18
10.00
21.80
3,715.97
75+760.000
1.09
2.18
10.00
21.80
3,737.77
75+780.000
1.09
2.18
10.00
21.80
3,759.57
75+800.000
1.09
2.18
10.00
21.80
3,781.37
75+820.000
1.09
2.18
10.00
21.80
3,803.17
75+840.000
1.09
2.18
10.00
21.80
3,824.97
75+860.000
1.09
2.18
10.00
21.80
3,846.77
75+880.000
1.09
2.18
10.00
21.80
3,868.57
75+900.000
1.09
2.18
10.00
21.80
3,890.37
75+920.000
1.09
2.18
10.00
21.80
3,912.17
75+940.000
1.09
2.18
10.00
21.80
3,933.97
75+960.000
1.09
2.18
10.00
21.80
3,955.77
75+980.000
1.09
2.18
10.00
21.80
3,977.57
76+000.000
1.09
2.18
10.00
21.80
3,999.37
76+020.000
1.09
2.18
10.00
21.80
4,021.17
76+040.000
1.09
2.18
10.00
21.80
4,042.97
76+060.000
1.09
2.18
10.00
21.80
4,064.77
76+080.000
1.09
2.18
10.00
21.80
4,086.57
76+100.000
1.09
2.18
10.00
21.80
4,108.37
76+120.000
1.09
2.18
10.00
21.80
4,130.17
76+140.000
1.09
2.18
10.00
21.80
4,151.97
76+160.000
1.09
2.18
10.00
21.80
4,173.77
76+180.000
1.09
2.18
10.00
21.80
4,195.57
76+200.000
1.09
2.18
10.00
21.80
4,217.37
76+220.000
1.09
2.18
10.00
21.80
4,239.17
76+240.000
1.09
2.18
10.00
21.80
4,260.97
76+255.500
1.09
2.18
7.75
16.89
4,277.87
76+260.000
1.09
2.18
2.25
4.91
4,282.77
76+280.000
1.08
2.17
10.00
21.70
4,304.47
76+300.000
1.07
2.15
10.00
21.50
4,325.97
76+320.000
1.07
2.14
10.00
21.40
4,347.37
76+321.961
1.06
2.13
0.98
2.09
4,349.46
76+340.000
1.06
2.12
9.02
19.12
4,368.58
76+351.500
1.05
2.11
5.75
12.13
4,380.71
76+360.000
1.05
2.10
4.25
8.93
4,389.64
76+380.000
1.05
2.10
10.00
21.00
4,410.64
76+381.038
1.05
2.10
0.52
1.09
4,411.73
76+400.000
1.05
2.10
9.48
19.91
4,431.64
76+420.000
1.05
2.10
10.00
21.00
4,452.64
76+440.000
1.05
2.10
10.00
21.00
4,473.64
76+460.000
1.05
2.10
10.00
21.00
4,494.64
76+480.000
1.05
2.10
10.00
21.00
4,515.64
76+500.000
1.05
2.10
10.00
21.00
4,536.64
REVISO:
REALIZO:
Pgina 125 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 31
"PAVIMENTOS"
UNIDAD
M3
ESTACIN KM.
REA
L1+L2
D/2
76+520.000
1.05
2.10
76+540.000
1.05
76+560.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
21.00
4,557.64
2.10
10.00
21.00
4,578.64
1.05
2.10
10.00
21.00
4,599.64
76+580.000
1.05
2.10
10.00
21.00
4,620.64
76+600.000
1.05
2.10
10.00
21.00
4,641.64
76+620.000
1.05
2.10
10.00
21.00
4,662.64
76+640.000
1.05
2.10
10.00
21.00
4,683.64
76+660.000
1.05
2.10
10.00
21.00
4,704.64
76+680.000
1.05
2.10
10.00
21.00
4,725.64
76+700.000
1.05
2.10
10.00
21.00
4,746.64
76+720.000
1.05
2.10
10.00
21.00
4,767.64
76+740.000
1.05
2.10
10.00
21.00
4,788.64
76+760.000
1.05
2.10
10.00
21.00
4,809.64
76+780.000
1.05
2.10
10.00
21.00
4,830.64
76+800.000
1.05
2.10
10.00
21.00
4,851.64
76+820.000
1.05
2.10
10.00
21.00
4,872.64
76+840.000
1.05
2.10
10.00
21.00
4,893.64
76+860.000
1.05
2.10
10.00
21.00
4,914.64
76+880.000
1.05
2.10
10.00
21.00
4,935.64
76+900.000
1.05
2.10
10.00
21.00
4,956.64
76+920.000
1.05
2.10
10.00
21.00
4,977.64
76+940.000
1.05
2.10
10.00
21.00
4,998.64
76+960.000
1.05
2.10
10.00
21.00
5,019.64
76+980.000
1.05
2.10
10.00
21.00
5,040.64
76+985.245
1.05
2.10
2.62
5.51
5,046.15
76+993.182
1.05
2.10
3.97
8.33
5,054.48
77+000.000
1.06
2.11
3.41
7.19
5,061.67
77+001.118
1.06
2.12
0.56
1.19
5,062.86
77+018.182
1.07
2.13
8.53
18.17
5,081.03
77+020.000
1.07
2.14
0.91
1.95
5,082.98
77+040.000
1.07
2.14
10.00
21.40
5,104.38
77+060.000
1.07
2.14
10.00
21.40
5,125.78
77+080.000
1.07
2.14
10.00
21.40
5,147.18
77+100.000
1.07
2.14
10.00
21.40
5,168.58
77+120.000
1.07
2.14
10.00
21.40
5,189.98
77+140.000
1.07
2.14
10.00
21.40
5,211.38
77+160.000
1.07
2.14
10.00
21.40
5,232.78
77+180.000
1.07
2.14
10.00
21.40
5,254.18
77+200.000
1.07
2.14
10.00
21.40
5,275.58
77+220.000
1.07
2.14
10.00
21.40
5,296.98
77+240.000
1.07
2.14
10.00
21.40
5,318.38
77+260.000
1.07
2.14
10.00
21.40
5,339.78
77+280.000
1.07
2.14
10.00
21.40
5,361.18
77+300.000
1.07
2.14
10.00
21.40
5,382.58
77+320.000
1.07
2.14
10.00
21.40
5,403.98
77+340.000
1.07
2.14
10.00
21.40
5,425.38
77+360.000
1.07
2.14
10.00
21.40
5,446.78
77+380.000
1.07
2.14
10.00
21.40
5,468.18
77+400.000
1.07
2.14
10.00
21.40
5,489.58
77+420.000
1.07
2.14
10.00
21.40
5,510.98
77+440.000
1.07
2.14
10.00
21.40
5,532.38
77+460.000
1.07
2.14
10.00
21.40
5,553.78
77+480.000
1.07
2.14
10.00
21.40
5,575.18
77+500.000
1.07
2.14
10.00
21.40
5,596.58
REVISO:
REALIZO:
Pgina 126 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 31
"PAVIMENTOS"
UNIDAD
M3
ESTACIN KM.
REA
L1+L2
D/2
77+520.000
1.07
2.14
77+525.218
1.07
77+540.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
21.40
5,617.98
2.14
2.61
5.58
5,623.56
1.06
2.13
7.39
15.74
5,639.30
77+540.234
1.06
2.12
0.12
0.25
5,639.55
77+547.218
1.05
2.11
3.49
7.37
5,646.92
77+554.202
1.05
2.10
3.49
7.33
5,654.25
77+560.000
1.05
2.10
2.90
6.09
5,660.34
77+580.000
1.05
2.10
10.00
21.00
5,681.34
77+600.000
1.05
2.10
10.00
21.00
5,702.34
77+620.000
1.05
2.10
10.00
21.00
5,723.34
77+640.000
1.05
2.10
10.00
21.00
5,744.34
77+647.342
1.05
2.10
3.67
7.71
5,752.05
77+660.000
1.05
2.10
6.33
13.29
5,765.34
77+663.215
1.05
2.10
1.61
3.38
5,768.72
77+679.088
1.06
2.11
7.94
16.75
5,785.46
77+680.000
1.06
2.12
0.46
0.97
5,786.43
77+700.000
1.06
2.12
10.00
21.20
5,807.63
77+713.215
1.07
2.13
6.61
14.07
5,821.70
77+720.000
1.07
2.14
3.39
7.26
5,828.96
77+740.000
1.07
2.14
10.00
21.40
5,850.36
77+760.000
1.07
2.14
10.00
21.40
5,871.76
77+780.000
1.07
2.14
10.00
21.40
5,893.16
77+800.000
1.07
2.14
10.00
21.40
5,914.56
77+820.000
1.07
2.14
10.00
21.40
5,935.96
77+840.000
1.07
2.14
10.00
21.40
5,957.36
77+860.000
1.07
2.14
10.00
21.40
5,978.76
77+880.000
1.07
2.14
10.00
21.40
6,000.16
77+900.000
1.07
2.14
10.00
21.40
6,021.56
77+920.000
1.07
2.14
10.00
21.40
6,042.96
77+940.000
1.07
2.14
10.00
21.40
6,064.36
77+960.000
1.07
2.14
10.00
21.40
6,085.76
77+980.000
1.07
2.14
10.00
21.40
6,107.16
78+000.000
1.07
2.14
10.00
21.40
6,128.56
78+020.000
1.07
2.14
10.00
21.40
6,149.96
78+040.000
1.07
2.14
10.00
21.40
6,171.36
78+060.000
1.07
2.14
10.00
21.40
6,192.76
78+080.000
1.07
2.14
10.00
21.40
6,214.16
78+094.334
1.07
2.14
7.17
15.34
6,229.50
78+100.000
1.07
2.14
2.83
6.06
6,235.56
78+116.175
1.06
2.13
8.09
17.23
6,252.79
78+120.000
1.06
2.12
1.91
4.05
6,256.84
78+126.334
1.05
2.11
3.17
6.68
6,263.53
78+136.493
1.05
2.10
5.08
10.67
6,274.19
78+140.000
1.05
2.10
1.75
3.68
6,277.88
78+160.000
1.05
2.10
10.00
21.00
6,298.88
78+180.000
1.05
2.10
10.00
21.00
6,319.88
78+200.000
1.05
2.10
10.00
21.00
6,340.88
78+220.000
1.05
2.10
10.00
21.00
6,361.88
78+240.000
1.05
2.10
10.00
21.00
6,382.88
78+260.000
1.05
2.10
10.00
21.00
6,403.88
78+280.000
0.00
1.05
10.00
10.50
6,414.38
78+300.000
0.00
0.00
10.00
0.00
6,414.38
78+320.000
0.00
0.00
10.00
0.00
6,414.38
78+340.000
0.00
0.00
10.00
0.00
6,414.38
REVISO:
REALIZO:
Pgina 127 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 31
"PAVIMENTOS"
UNIDAD
M3
ESTACIN KM.
REA
L1+L2
D/2
78+360.000
0.00
0.00
78+380.000
0.00
78+400.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
0.00
6,414.38
0.00
10.00
0.00
6,414.38
0.00
0.00
10.00
0.00
6,414.38
78+420.000
0.00
0.00
10.00
0.00
6,414.38
78+440.000
0.00
0.00
10.00
0.00
6,414.38
78+460.000
0.00
0.00
10.00
0.00
6,414.38
78+480.000
0.00
0.00
10.00
0.00
6,414.38
78+500.000
0.00
0.00
10.00
0.00
6,414.38
78+520.000
0.00
0.00
10.00
0.00
6,414.38
78+540.000
1.07
1.07
10.00
10.70
6,425.08
78+560.000
1.07
2.14
10.00
21.40
6,446.48
78+580.000
1.07
2.14
10.00
21.40
6,467.88
78+600.000
1.07
2.14
10.00
21.40
6,489.28
78+620.000
1.07
2.14
10.00
21.40
6,510.68
78+640.000
1.07
2.14
10.00
21.40
6,532.08
78+660.000
1.07
2.14
10.00
21.40
6,553.48
78+680.000
1.07
2.14
10.00
21.40
6,574.88
78+700.000
1.07
2.14
10.00
21.40
6,596.28
78+720.000
1.07
2.14
10.00
21.40
6,617.68
78+740.000
1.05
2.12
10.00
21.20
6,638.88
78+760.000
1.05
2.10
10.00
21.00
6,659.88
78+780.000
1.05
2.10
10.00
21.00
6,680.88
78+790.492
1.05
2.10
5.25
11.02
6,691.89
78+796.615
1.05
2.10
3.06
6.43
6,698.32
78+800.000
1.06
2.11
1.69
3.57
6,701.89
78+802.737
1.06
2.12
1.37
2.90
6,704.79
78+811.615
1.09
2.15
4.44
9.54
6,714.34
78+820.000
1.07
2.16
4.19
9.06
6,723.39
78+840.000
1.07
2.14
10.00
21.40
6,744.79
78+860.000
1.07
2.14
10.00
21.40
6,766.19
78+880.000
1.07
2.14
10.00
21.40
6,787.59
78+900.000
1.07
2.14
10.00
21.40
6,808.99
78+920.000
1.07
2.14
10.00
21.40
6,830.39
78+940.000
1.07
2.14
10.00
21.40
6,851.79
78+960.000
1.07
2.14
10.00
21.40
6,873.19
78+980.000
1.07
2.14
10.00
21.40
6,894.59
79+000.000
1.07
2.14
10.00
21.40
6,915.99
79+020.000
1.07
2.14
10.00
21.40
6,937.39
79+040.000
1.07
2.14
10.00
21.40
6,958.79
79+060.000
1.07
2.14
10.00
21.40
6,980.19
79+080.000
1.07
2.14
10.00
21.40
7,001.59
79+097.907
1.07
2.14
8.95
19.16
7,020.75
79+100.000
1.07
2.14
1.05
2.24
7,022.99
79+120.000
1.06
2.13
10.00
21.30
7,044.29
79+133.417
1.06
2.12
6.71
14.22
7,058.52
79+140.000
1.06
2.12
3.29
6.98
7,065.49
79+157.907
1.05
2.11
8.95
18.89
7,084.39
79+160.000
1.05
2.10
1.05
2.20
7,086.58
79+180.000
1.05
2.10
10.00
21.00
7,107.58
79+182.397
1.05
2.10
1.20
2.52
7,110.10
79+200.000
1.05
2.10
8.80
18.48
7,128.58
79+220.000
1.05
2.10
10.00
21.00
7,149.58
79+240.000
1.05
2.10
10.00
21.00
7,170.58
79+260.000
1.05
2.10
10.00
21.00
7,191.58
79+280.000
1.05
2.10
10.00
21.00
7,212.58
79+300.000
1.05
2.10
10.00
21.00
7,233.58
79+320.000
1.05
2.10
10.00
21.00
7,254.58
REVISO:
REALIZO:
Pgina 128 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 31
"PAVIMENTOS"
UNIDAD
M3
ESTACIN KM.
REA
L1+L2
D/2
79+340.000
1.05
2.10
79+360.000
1.05
79+380.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
21.00
7,275.58
2.10
10.00
21.00
7,296.58
1.05
2.10
10.00
21.00
7,317.58
79+400.000
1.05
2.10
10.00
21.00
7,338.58
79+420.000
1.05
2.10
10.00
21.00
7,359.58
79+440.000
1.05
2.10
10.00
21.00
7,380.58
79+460.000
1.05
2.10
10.00
21.00
7,401.58
79+480.000
1.05
2.10
10.00
21.00
7,422.58
79+500.000
1.05
2.10
10.00
21.00
7,443.58
79+520.000
1.05
2.10
10.00
21.00
7,464.58
79+540.000
1.05
2.10
10.00
21.00
7,485.58
79+560.000
1.05
2.10
10.00
21.00
7,506.58
79+580.000
1.05
2.10
10.00
21.00
7,527.58
79+600.000
1.05
2.10
10.00
21.00
7,548.58
79+620.000
1.05
2.10
10.00
21.00
7,569.58
79+640.000
1.05
2.10
10.00
21.00
7,590.58
79+660.000
1.05
2.10
10.00
21.00
7,611.58
79+680.000
1.05
2.10
10.00
21.00
7,632.58
79+700.000
1.05
2.10
10.00
21.00
7,653.58
79+720.000
1.05
2.10
10.00
21.00
7,674.58
79+740.000
1.05
2.10
10.00
21.00
7,695.58
79+760.000
1.05
2.10
10.00
21.00
7,716.58
79+780.000
1.05
2.10
10.00
21.00
7,737.58
79+800.000
1.05
2.10
10.00
21.00
7,758.58
79+820.000
1.05
2.10
10.00
21.00
7,779.58
79+840.000
1.05
2.10
10.00
21.00
7,800.58
79+860.000
1.05
2.10
10.00
21.00
7,821.58
79+880.000
1.05
2.10
10.00
21.00
7,842.58
79+900.000
1.05
2.10
10.00
21.00
7,863.58
79+920.000
1.05
2.10
10.00
21.00
7,884.58
79+940.000
1.05
2.10
10.00
21.00
7,905.58
79+960.000
1.05
2.10
10.00
21.00
7,926.58
79+980.000
1.05
2.10
10.00
21.00
7,947.58
80+000.000
1.05
2.10
10.00
21.00
7,968.58
80+020.000
1.05
2.10
10.00
21.00
7,989.58
80+040.000
1.05
2.10
10.00
21.00
8,010.58
80+060.000
1.05
2.10
10.00
21.00
8,031.58
80+080.000
1.05
2.10
10.00
21.00
8,052.58
80+100.000
1.05
2.10
10.00
21.00
8,073.58
80+120.000
1.06
2.11
10.00
21.10
8,094.68
80+140.000
1.06
2.12
10.00
21.20
8,115.88
80+160.000
1.06
2.12
10.00
21.20
8,137.08
80+180.000
1.06
2.12
10.00
21.20
8,158.28
80+200.000
1.06
2.12
10.00
21.20
8,179.48
80+220.000
1.06
2.12
10.00
21.20
8,200.68
80+240.000
1.06
2.12
10.00
21.20
8,221.88
80+260.000
1.06
2.12
10.00
21.20
8,243.08
80+280.000
1.06
2.12
10.00
21.20
8,264.28
80+300.000
1.06
2.12
10.00
21.20
8,285.48
80+320.000
1.06
2.12
10.00
21.20
8,306.68
80+340.000
1.06
2.12
10.00
21.20
8,327.88
80+360.000
1.06
2.12
10.00
21.20
8,349.08
80+380.000
1.06
2.12
10.00
21.20
8,370.28
80+400.000
1.06
2.12
10.00
21.20
8,391.48
80+420.000
1.06
2.12
10.00
21.20
8,412.68
80+440.000
1.06
2.12
10.00
21.20
8,433.88
80+460.000
0.00
1.06
10.00
10.60
8,444.48
REVISO:
REALIZO:
Pgina 129 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 31
"PAVIMENTOS"
UNIDAD
M3
ESTACIN KM.
REA
L1+L2
D/2
80+480.000
0.00
0.00
80+500.000
0.00
80+520.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
0.00
8,444.48
0.00
10.00
0.00
8,444.48
0.00
0.00
10.00
0.00
8,444.48
80+540.000
0.00
0.00
10.00
0.00
8,444.48
80+560.000
0.00
0.00
10.00
0.00
8,444.48
80+580.000
0.00
0.00
10.00
0.00
8,444.48
80+600.000
1.06
1.06
10.00
10.60
8,455.08
80+620.000
1.06
2.12
10.00
21.20
8,476.28
80+640.000
1.06
2.12
10.00
21.20
8,497.48
80+660.000
1.06
2.12
10.00
21.20
8,518.68
80+680.000
1.05
2.11
10.00
21.10
8,539.78
80+700.000
1.05
2.10
10.00
21.00
8,560.78
80+720.000
1.05
2.10
10.00
21.00
8,581.78
80+740.000
1.05
2.10
10.00
21.00
8,602.78
80+760.000
1.05
2.10
10.00
21.00
8,623.78
80+780.000
1.05
2.10
10.00
21.00
8,644.78
80+800.000
1.05
2.10
10.00
21.00
8,665.78
80+820.000
1.05
2.10
10.00
21.00
8,686.78
80+840.000
1.05
2.10
10.00
21.00
8,707.78
80+860.000
1.05
2.10
10.00
21.00
8,728.78
80+880.000
1.05
2.10
10.00
21.00
8,749.78
80+900.000
1.05
2.10
10.00
21.00
8,770.78
80+920.000
1.05
2.10
10.00
21.00
8,791.78
80+940.000
1.05
2.10
10.00
21.00
8,812.78
80+960.000
1.05
2.10
10.00
21.00
8,833.78
80+980.000
1.05
2.10
10.00
21.00
8,854.78
81+000.000
1.05
2.10
10.00
21.00
8,875.78
81+020.000
1.05
2.10
10.00
21.00
8,896.78
81+040.000
1.05
2.10
10.00
21.00
8,917.78
81+060.000
1.05
2.10
10.00
21.00
8,938.78
81+080.000
1.05
2.10
10.00
21.00
8,959.78
81+100.000
1.05
2.10
10.00
21.00
8,980.78
81+120.000
1.05
2.10
10.00
21.00
9,001.78
81+140.000
81+160.000
81+180.000
81+200.000
81+220.000
81+240.000
81+260.000
81+280.000
81+300.000
81+320.000
81+340.000
81+360.000
81+380.000
81+400.000
81+420.000
81+440.000
81+460.000
81+480.000
81+500.000
81+520.000
81+540.000
81+560.000
81+580.000
81+600.000
81+620.000
81+640.000
81+660.000
81+680.000
81+700.000
81+720.000
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
0.00
0.00
0.00
0.00
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
1.05
0.00
0.00
0.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
21.00
21.00
21.00
21.00
21.00
21.00
21.00
21.00
21.00
21.00
21.00
21.00
21.00
21.00
21.00
21.00
21.00
21.00
21.00
21.00
21.00
21.00
21.00
21.00
21.00
21.00
10.50
0.00
0.00
0.00
9,022.78
9,043.78
9,064.78
9,085.78
9,106.78
9,127.78
9,148.78
9,169.78
9,190.78
9,211.78
9,232.78
9,253.78
9,274.78
9,295.78
9,316.78
9,337.78
9,358.78
9,379.78
9,400.78
9,421.78
9,442.78
9,463.78
9,484.78
9,505.78
9,526.78
9,547.78
9,558.28
9,558.28
9,558.28
9,558.28
REVISO:
REALIZO:
Pgina 130 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 31
"PAVIMENTOS"
UNIDAD
M3
ESTACIN KM.
REA
L1+L2
D/2
81+740.000
81+760.000
81+780.000
81+800.000
81+820.000
81+840.000
81+860.000
81+880.000
81+900.000
81+920.000
81+940.000
81+960.000
81+980.000
82+000.000
82+020.000
82+040.000
82+060.000
82+080.000
82+100.000
82+120.000
82+140.000
82+160.000
82+180.000
82+200.000
82+220.000
82+240.000
82+260.000
82+280.000
82+300.000
82+320.000
82+340.000
82+360.000
82+380.000
82+400.000
82+420.000
82+440.000
82+460.000
82+480.000
82+500.000
82+520.000
82+540.000
82+560.000
82+580.000
82+600.000
82+620.000
82+640.000
82+660.000
82+680.000
82+700.000
82+720.000
82+740.000
82+760.000
82+780.000
82+800.000
82+820.000
82+840.000
82+860.000
82+880.000
82+900.000
82+920.000
82+940.000
82+960.000
82+980.000
83+000.000
83+020.000
83+040.000
83+060.000
83+080.000
83+100.000
83+120.000
83+140.000
83+160.000
83+170.200
0.00
0.00
0.00
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.05
0.00
0.00
0.00
1.05
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
1.05
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.05
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
5.10
REVISO:
REA ACUMULADA
PARCIAL
ACUMULADO
0.00
0.00
0.00
10.50
21.00
21.00
21.00
21.00
21.00
21.00
21.00
21.00
21.00
21.00
21.00
21.00
21.00
21.00
21.00
21.00
21.00
21.00
21.00
21.00
21.00
21.00
21.00
21.00
21.00
21.00
21.00
21.00
21.00
21.00
21.00
21.00
21.00
21.00
21.00
21.00
21.00
21.00
21.00
21.00
21.00
21.00
21.00
21.00
21.00
21.00
21.00
21.00
21.00
21.00
21.00
21.00
10.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5.35
9,558.28
9,558.28
9,558.28
9,568.78
9,589.78
9,610.78
9,631.78
9,652.78
9,673.78
9,694.78
9,715.78
9,736.78
9,757.78
9,778.78
9,799.78
9,820.78
9,841.78
9,862.78
9,883.78
9,904.78
9,925.78
9,946.78
9,967.78
9,988.78
10,009.78
10,030.78
10,051.78
10,072.78
10,093.78
10,114.78
10,135.78
10,156.78
10,177.78
10,198.78
10,219.78
10,240.78
10,261.78
10,282.78
10,303.78
10,324.78
10,345.78
10,366.78
10,387.78
10,408.78
10,429.78
10,450.78
10,471.78
10,492.78
10,513.78
10,534.78
10,555.78
10,576.78
10,597.78
10,618.78
10,639.78
10,660.78
10,671.28
10,671.28
10,671.28
10,671.28
10,671.28
10,671.28
10,671.28
10,671.28
10,671.28
10,671.28
10,671.28
10,671.28
10,671.28
10,671.28
10,671.28
10,671.28
10,676.64
REALIZO:
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 31
"PAVIMENTOS"
UNIDAD
M3
ESTACIN KM.
REA
L1+L2
D/2
83+180.000
83+200.000
83+220.000
83+240.000
83+260.000
83+280.000
83+300.000
83+320.000
83+340.000
83+360.000
83+380.000
83+400.000
83+420.000
83+440.000
83+460.000
83+480.000
83+500.000
83+520.000
83+540.000
83+560.000
83+570.105
83+580.000
83+593.182
83+600.000
83+616.259
83+620.000
83+640.000
83+653.182
83+660.000
83+680.000
83+700.000
83+720.000
83+740.000
83+760.000
83+780.000
83+785.000
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.06
1.06
1.06
1.07
1.07
1.07
1.07
1.07
1.07
1.07
1.07
1.07
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.11
2.12
2.12
2.13
2.14
2.14
2.14
2.14
2.14
2.14
2.14
2.14
4.90
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
5.05
4.95
6.59
3.41
8.13
1.87
10.00
6.59
3.41
10.00
10.00
10.00
10.00
10.00
10.00
2.50
REVISO:
REA ACUMULADA
PARCIAL
ACUMULADO
10.29
21.00
21.00
21.00
21.00
21.00
21.00
21.00
21.00
21.00
21.00
21.00
21.00
21.00
21.00
21.00
21.00
21.00
21.00
21.00
10.61
10.39
13.84
7.16
17.15
3.97
21.20
14.04
7.30
21.40
21.40
21.40
21.40
21.40
21.40
5.35
10,686.93
10,707.93
10,728.93
10,749.93
10,770.93
10,791.93
10,812.93
10,833.93
10,854.93
10,875.93
10,896.93
10,917.93
10,938.93
10,959.93
10,980.93
11,001.93
11,022.93
11,043.93
11,064.93
11,085.93
11,096.54
11,106.93
11,120.77
11,127.93
11,145.08
11,149.05
11,170.25
11,184.29
11,191.58
11,212.98
11,234.38
11,255.78
11,277.18
11,298.58
11,319.98
11,325.33
REALIZO:
Pgina 132 de 157
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 93
"TERRACERAS"
UNIDAD
TERRACERAS
Excavacin en Cortes debajo de la subrasante cuando el material se desperdicie
M3
ESTACIN KM.
REA
L1+L2
D/2
71+800.000
0.00
0.00
71+820.000
0.00
71+840.000
REA ACUMULADA
PARCIAL
ACUMULADO
0.00
0.00
0.00
0.00
10.00
0.00
0.00
0.00
0.00
10.00
0.00
0.00
71+860.000
0.00
0.00
10.00
0.00
0.00
71+880.000
0.00
0.00
10.00
0.00
0.00
71+900.000
0.00
0.00
10.00
0.00
0.00
71+920.000
0.00
0.00
10.00
0.00
0.00
71+940.000
0.00
0.00
10.00
0.00
0.00
71+960.000
0.00
0.00
10.00
0.00
0.00
71+980.000
0.00
0.00
10.00
0.00
0.00
72+000.000
0.00
0.00
10.00
0.00
0.00
72+020.000
0.00
0.00
10.00
0.00
0.00
72+040.000
0.00
0.00
10.00
0.00
0.00
72+060.000
0.00
0.00
10.00
0.00
0.00
72+080.000
0.00
0.00
10.00
0.00
0.00
72+100.000
0.00
0.00
10.00
0.00
0.00
72+120.000
0.00
0.00
10.00
0.00
0.00
72+140.000
0.00
0.00
10.00
0.00
0.00
72+160.000
0.00
0.00
10.00
0.00
0.00
72+180.000
0.00
0.00
10.00
0.00
0.00
72+200.000
0.00
0.00
10.00
0.00
0.00
72+220.000
0.00
0.00
10.00
0.00
0.00
72+240.000
0.00
0.00
10.00
0.00
0.00
72+260.000
0.00
0.00
10.00
0.00
0.00
72+280.000
0.00
0.00
10.00
0.00
0.00
72+300.000
0.00
0.00
10.00
0.00
0.00
72+320.000
0.00
0.00
10.00
0.00
0.00
72+340.000
0.00
0.00
10.00
0.00
0.00
72+360.000
0.00
0.00
10.00
0.00
0.00
72+380.000
0.00
0.00
10.00
0.00
0.00
72+400.000
0.00
0.00
10.00
0.00
0.00
72+420.000
0.00
0.00
10.00
0.00
0.00
72+440.000
0.00
0.00
10.00
0.00
0.00
72+460.000
0.00
0.00
10.00
0.00
0.00
72+480.000
0.00
0.00
10.00
0.00
0.00
72+500.000
0.00
0.00
10.00
0.00
0.00
72+520.000
0.00
0.00
10.00
0.00
0.00
72+540.000
0.00
0.00
10.00
0.00
0.00
72+560.000
0.00
0.00
10.00
0.00
0.00
72+580.000
0.00
0.00
10.00
0.00
0.00
72+600.000
0.00
0.00
10.00
0.00
0.00
72+620.000
0.00
0.00
10.00
0.00
0.00
72+640.000
0.00
0.00
10.00
0.00
0.00
72+654.982
0.00
0.00
7.49
0.00
0.00
72+660.000
0.00
0.00
2.51
0.00
0.00
72+678.443
0.00
0.00
9.22
0.00
0.00
72+680.000
0.00
0.00
0.78
0.00
0.00
72+700.000
0.00
0.00
10.00
0.00
0.00
72+701.905
0.00
0.00
0.95
0.00
0.00
72+720.000
0.00
0.00
9.05
0.00
0.00
72+739.443
0.00
0.00
9.72
0.00
0.00
72+740.000
0.00
0.00
0.28
0.00
0.00
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 93
"TERRACERAS"
UNIDAD
TERRACERAS
Excavacin en Cortes debajo de la subrasante cuando el material se desperdicie
M3
ESTACIN KM.
REA
L1+L2
D/2
72+760.000
0.00
0.00
72+780.000
0.00
72+800.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
0.00
0.00
0.00
10.00
0.00
0.00
0.00
0.00
10.00
0.00
0.00
72+820.000
0.00
0.00
10.00
0.00
0.00
72+840.000
0.00
0.00
10.00
0.00
0.00
72+860.000
0.00
0.00
10.00
0.00
0.00
72+880.000
0.00
0.00
10.00
0.00
0.00
72+900.000
0.00
0.00
10.00
0.00
0.00
72+920.000
0.00
0.00
10.00
0.00
0.00
72+940.000
0.00
0.00
10.00
0.00
0.00
72+960.000
0.00
0.00
10.00
0.00
0.00
72+971.651
0.00
0.00
5.83
0.00
0.00
72+980.000
0.00
0.00
4.17
0.00
0.00
73+000.000
0.00
0.00
10.00
0.00
0.00
73+009.189
0.00
0.00
4.59
0.00
0.00
73+020.000
0.00
0.00
5.41
0.00
0.00
73+032.651
0.00
0.00
6.33
0.00
0.00
73+040.000
0.00
0.00
3.67
0.00
0.00
73+056.112
0.00
0.00
8.06
0.00
0.00
73+060.000
0.00
0.00
1.94
0.00
0.00
73+080.000
0.00
0.00
10.00
0.00
0.00
73+100.000
0.00
0.00
10.00
0.00
0.00
73+120.000
0.00
0.00
10.00
0.00
0.00
73+140.000
0.00
0.00
10.00
0.00
0.00
73+160.000
0.00
0.00
10.00
0.00
0.00
73+180.000
0.00
0.00
10.00
0.00
0.00
73+200.000
0.00
0.00
10.00
0.00
0.00
73+220.000
0.00
0.00
10.00
0.00
0.00
73+240.000
0.00
0.00
10.00
0.00
0.00
73+260.000
0.00
0.00
10.00
0.00
0.00
73+280.000
0.00
0.00
10.00
0.00
0.00
73+300.000
0.00
0.00
10.00
0.00
0.00
73+320.000
0.00
0.00
10.00
0.00
0.00
73+340.000
0.00
0.00
10.00
0.00
0.00
73+360.000
0.00
0.00
10.00
0.00
0.00
73+380.000
0.00
0.00
10.00
0.00
0.00
73+400.000
0.00
0.00
10.00
0.00
0.00
73+420.000
0.00
0.00
10.00
0.00
0.00
73+440.000
0.00
0.00
10.00
0.00
0.00
73+460.000
0.00
0.00
10.00
0.00
0.00
73+480.000
0.00
0.00
10.00
0.00
0.00
73+500.000
0.00
0.00
10.00
0.00
0.00
73+520.000
0.00
0.00
10.00
0.00
0.00
73+540.000
0.00
0.00
10.00
0.00
0.00
73+560.000
0.00
0.00
10.00
0.00
0.00
73+580.000
0.00
0.00
10.00
0.00
0.00
73+600.000
0.00
0.00
10.00
0.00
0.00
73+620.000
0.00
0.00
10.00
0.00
0.00
73+640.000
0.00
0.00
10.00
0.00
0.00
73+660.000
0.00
0.00
10.00
0.00
0.00
73+680.000
0.00
0.00
10.00
0.00
0.00
73+700.000
0.00
0.00
10.00
0.00
0.00
73+720.000
0.00
0.00
10.00
0.00
0.00
73+740.000
0.00
0.00
10.00
0.00
0.00
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 93
"TERRACERAS"
UNIDAD
TERRACERAS
Excavacin en Cortes debajo de la subrasante cuando el material se desperdicie
M3
ESTACIN KM.
REA
L1+L2
D/2
73+760.000
0.00
0.00
73+780.000
0.00
73+800.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
0.00
0.00
0.00
10.00
0.00
0.00
0.00
0.00
10.00
0.00
0.00
73+807.617
0.00
0.00
3.81
0.00
0.00
73+820.000
0.00
0.00
6.19
0.00
0.00
73+840.000
0.00
0.00
10.00
0.00
0.00
73+848.283
0.00
0.00
4.14
0.00
0.00
73+860.000
0.00
0.00
5.86
0.00
0.00
73+880.000
0.00
0.00
10.00
0.00
0.00
73+888.950
0.00
0.00
4.47
0.00
0.00
73+900.000
0.00
0.00
5.53
0.00
0.00
73+909.283
0.00
0.00
4.64
0.00
0.00
73+920.000
0.00
0.00
5.36
0.00
0.00
73+940.000
0.00
0.00
10.00
0.00
0.00
73+960.000
0.00
0.00
10.00
0.00
0.00
73+980.000
0.00
0.00
10.00
0.00
0.00
74+000.000
0.00
0.00
10.00
0.00
0.00
74+020.000
0.00
0.00
10.00
0.00
0.00
74+040.000
0.00
0.00
10.00
0.00
0.00
74+060.000
0.00
0.00
10.00
0.00
0.00
74+080.000
0.00
0.00
10.00
0.00
0.00
74+089.272
0.00
0.00
4.64
0.00
0.00
74+100.000
0.00
0.00
5.36
0.00
0.00
74+109.605
0.00
0.00
4.80
0.00
0.00
74+120.000
0.00
0.00
5.20
0.00
0.00
74+140.000
0.00
0.00
10.00
0.00
0.00
74+150.272
0.00
0.00
5.14
0.00
0.00
74+160.000
0.00
0.00
4.86
0.00
0.00
74+180.000
0.00
0.00
10.00
0.00
0.00
74+190.939
0.00
0.00
5.47
0.00
0.00
74+200.000
0.00
0.00
4.53
0.00
0.00
74+220.000
0.00
0.00
10.00
0.00
0.00
74+240.000
0.00
0.00
10.00
0.00
0.00
74+260.000
0.00
0.00
10.00
0.00
0.00
74+280.000
0.00
0.00
10.00
0.00
0.00
74+300.000
0.00
0.00
10.00
0.00
0.00
74+320.000
0.00
0.00
10.00
0.00
0.00
74+340.000
0.00
0.00
10.00
0.00
0.00
74+360.000
0.00
0.00
10.00
0.00
0.00
74+380.000
0.00
0.00
10.00
0.00
0.00
74+400.000
0.00
0.00
10.00
0.00
0.00
74+420.000
0.00
0.00
10.00
0.00
0.00
74+440.000
0.00
0.00
10.00
0.00
0.00
74+457.851
0.00
0.00
8.93
0.00
0.00
74+460.000
0.00
0.00
1.07
0.00
0.00
74+480.000
0.00
0.00
10.00
0.00
0.00
74+498.518
0.00
0.00
9.26
0.00
0.00
74+500.000
0.00
0.00
0.74
0.00
0.00
74+520.000
0.00
0.00
10.00
0.00
0.00
74+539.184
0.00
0.00
9.59
0.00
0.00
74+540.000
0.00
0.00
0.41
0.00
0.00
74+559.518
0.00
0.00
9.76
0.00
0.00
74+560.000
0.00
0.00
0.24
0.00
0.00
74+580.000
0.00
0.00
10.00
0.00
0.00
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 93
"TERRACERAS"
UNIDAD
TERRACERAS
Excavacin en Cortes debajo de la subrasante cuando el material se desperdicie
M3
ESTACIN KM.
REA
L1+L2
D/2
74+600.000
0.00
0.00
74+620.000
0.00
74+640.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
0.00
0.00
0.00
10.00
0.00
0.00
0.00
0.00
10.00
0.00
0.00
74+660.000
0.00
0.00
10.00
0.00
0.00
74+680.000
0.00
0.00
10.00
0.00
0.00
74+700.000
0.00
0.00
10.00
0.00
0.00
74+720.000
0.00
0.00
10.00
0.00
0.00
74+740.000
0.00
0.00
10.00
0.00
0.00
74+760.000
0.00
0.00
10.00
0.00
0.00
74+779.360
0.00
0.00
9.68
0.00
0.00
74+780.000
0.00
0.00
0.32
0.00
0.00
74+799.693
0.00
0.00
9.85
0.00
0.00
74+800.000
0.00
0.00
0.15
0.00
0.00
74+820.000
0.00
0.00
10.00
0.00
0.00
74+840.000
0.00
0.00
10.00
0.00
0.00
74+840.360
0.00
0.00
0.18
0.00
0.00
74+860.000
0.00
0.00
9.82
0.00
0.00
74+880.000
0.00
0.00
10.00
0.00
0.00
74+881.027
0.00
0.00
0.51
0.00
0.00
74+900.000
0.00
0.00
9.49
0.00
0.00
74+920.000
0.00
0.00
10.00
0.00
0.00
74+940.000
0.00
0.00
10.00
0.00
0.00
74+960.000
0.00
0.00
10.00
0.00
0.00
74+980.000
0.00
0.00
10.00
0.00
0.00
75+000.000
0.00
0.00
10.00
0.00
0.00
75+020.000
0.00
0.00
10.00
0.00
0.00
75+040.000
0.00
0.00
10.00
0.00
0.00
75+060.000
0.00
0.00
10.00
0.00
0.00
75+080.000
0.00
0.00
10.00
0.00
0.00
75+100.000
0.00
0.00
10.00
0.00
0.00
75+120.000
0.00
0.00
10.00
0.00
0.00
75+140.000
0.00
0.00
10.00
0.00
0.00
75+160.000
0.00
0.00
10.00
0.00
0.00
75+180.000
582.27
582.27
10.00
5822.71
5,822.71
75+200.000
859.95
1442.22
10.00
14422.25
20,244.96
75+220.000
1,010.00
1869.96
10.00
18699.57
38,944.53
75+240.000
998.27
2008.27
10.00
20082.74
59,027.28
75+260.000
825.16
1823.43
10.00
18234.30
77,261.58
75+280.000
675.77
1500.93
10.00
15009.27
92,270.84
75+300.000
532.90
1208.66
10.00
12086.63
104,357.47
75+320.000
418.04
950.93
10.00
9509.32
113,866.80
75+340.000
380.08
798.11
10.00
7981.14
121,847.94
75+360.000
331.84
711.92
10.00
7119.21
128,967.15
75+380.000
251.75
583.59
10.00
5835.94
134,803.08
75+400.000
226.88
478.63
10.00
4786.34
139,589.42
75+420.000
205.89
432.77
10.00
4327.75
143,917.17
75+440.000
206.34
412.23
10.00
4122.31
148,039.49
75+460.000
268.54
474.88
10.00
4748.81
152,788.30
75+480.000
285.33
553.87
10.00
5538.66
158,326.96
75+500.000
0.00
0.00
10.00
0.00
158,327.0
75+520.000
0.00
0.00
10.00
0.00
158,327.0
75+540.000
0.00
0.00
10.00
0.00
158,327.0
75+560.000
0.00
0.00
10.00
0.00
158,327.0
75+580.000
0.00
0.00
10.00
0.00
158,327.0
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 93
"TERRACERAS"
UNIDAD
TERRACERAS
Excavacin en Cortes debajo de la subrasante cuando el material se desperdicie
M3
ESTACIN KM.
REA
L1+L2
D/2
75+600.000
0.00
0.00
75+611.738
0.00
75+620.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
0.00
158,327.0
0.00
5.87
0.00
158,327.0
0.00
0.00
4.13
0.00
158,327.0
75+635.122
0.00
0.00
7.56
0.00
158,327.0
75+640.000
0.00
0.00
2.44
0.00
158,327.0
75+658.507
0.00
0.00
9.25
0.00
158,327.0
75+660.000
0.00
0.00
0.75
0.00
158,327.0
75+680.000
0.00
0.00
10.00
0.00
158,327.0
75+700.000
0.00
0.00
10.00
0.00
158,327.0
75+711.122
0.00
0.00
5.56
0.00
158,327.0
75+720.000
0.00
0.00
4.44
0.00
158,327.0
75+740.000
0.00
0.00
10.00
0.00
158,327.0
75+760.000
0.00
0.00
10.00
0.00
158,327.0
75+780.000
0.00
0.00
10.00
0.00
158,327.0
75+800.000
0.00
0.00
10.00
0.00
158,327.0
75+820.000
0.00
0.00
10.00
0.00
158,327.0
75+840.000
0.00
0.00
10.00
0.00
158,327.0
75+860.000
0.00
0.00
10.00
0.00
158,327.0
75+880.000
0.00
0.00
10.00
0.00
158,327.0
75+900.000
0.00
0.00
10.00
0.00
158,327.0
75+920.000
0.00
0.00
10.00
0.00
158,327.0
75+940.000
0.00
0.00
10.00
0.00
158,327.0
75+960.000
0.00
0.00
10.00
0.00
158,327.0
75+980.000
0.00
0.00
10.00
0.00
158,327.0
76+000.000
0.00
0.00
10.00
0.00
158,327.0
76+020.000
0.00
0.00
10.00
0.00
158,327.0
76+040.000
0.00
0.00
10.00
0.00
158,327.0
76+060.000
0.00
0.00
10.00
0.00
158,327.0
76+080.000
0.00
0.00
10.00
0.00
158,327.0
76+100.000
0.00
0.00
10.00
0.00
158,327.0
76+120.000
0.00
0.00
10.00
0.00
158,327.0
76+140.000
0.00
0.00
10.00
0.00
158,327.0
76+160.000
0.00
0.00
10.00
0.00
158,327.0
76+180.000
0.00
0.00
10.00
0.00
158,327.0
76+200.000
0.00
0.00
10.00
0.00
158,327.0
76+220.000
0.00
0.00
10.00
0.00
158,327.0
76+240.000
0.00
0.00
10.00
0.00
158,327.0
76+255.500
0.00
0.00
7.75
0.00
158,327.0
76+260.000
0.00
0.00
2.25
0.00
158,327.0
76+280.000
0.00
0.00
10.00
0.00
158,327.0
76+300.000
0.00
0.00
10.00
0.00
158,327.0
76+320.000
0.00
0.00
10.00
0.00
158,327.0
76+321.961
0.00
0.00
0.98
0.00
158,327.0
76+340.000
0.00
0.00
9.02
0.00
158,327.0
76+351.500
0.00
0.00
5.75
0.00
158,327.0
76+360.000
0.00
0.00
4.25
0.00
158,327.0
76+380.000
0.00
0.00
10.00
0.00
158,327.0
76+381.038
0.00
0.00
0.52
0.00
158,327.0
76+400.000
0.00
0.00
9.48
0.00
158,327.0
76+420.000
0.00
0.00
10.00
0.00
158,327.0
76+440.000
0.00
0.00
10.00
0.00
158,327.0
76+460.000
0.00
0.00
10.00
0.00
158,327.0
76+480.000
0.00
0.00
10.00
0.00
158,327.0
76+500.000
0.00
0.00
10.00
0.00
158,327.0
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 93
"TERRACERAS"
UNIDAD
TERRACERAS
Excavacin en Cortes debajo de la subrasante cuando el material se desperdicie
M3
ESTACIN KM.
REA
L1+L2
D/2
76+520.000
0.00
0.00
76+540.000
0.00
76+560.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
0.00
158,327.0
0.00
10.00
0.00
158,327.0
0.00
0.00
10.00
0.00
158,327.0
76+580.000
0.00
0.00
10.00
0.00
158,327.0
76+600.000
0.00
0.00
10.00
0.00
158,327.0
76+620.000
0.00
0.00
10.00
0.00
158,327.0
76+640.000
0.00
0.00
10.00
0.00
158,327.0
76+660.000
0.00
0.00
10.00
0.00
158,327.0
76+680.000
0.00
0.00
10.00
0.00
158,327.0
76+700.000
0.00
0.00
10.00
0.00
158,327.0
76+720.000
0.00
0.00
10.00
0.00
158,327.0
76+740.000
0.00
0.00
10.00
0.00
158,327.0
76+760.000
0.00
0.00
10.00
0.00
158,327.0
76+780.000
0.00
0.00
10.00
0.00
158,327.0
76+800.000
0.00
0.00
10.00
0.00
158,327.0
76+820.000
0.00
0.00
10.00
0.00
158,327.0
76+840.000
0.00
0.00
10.00
0.00
158,327.0
76+860.000
0.00
0.00
10.00
0.00
158,327.0
76+880.000
0.00
0.00
10.00
0.00
158,327.0
76+900.000
0.00
0.00
10.00
0.00
158,327.0
76+920.000
0.00
0.00
10.00
0.00
158,327.0
76+940.000
0.00
0.00
10.00
0.00
158,327.0
76+960.000
0.00
0.00
10.00
0.00
158,327.0
76+980.000
0.00
0.00
10.00
0.00
158,327.0
76+985.245
0.00
0.00
2.62
0.00
158,327.0
76+993.182
0.00
0.00
3.97
0.00
158,327.0
77+000.000
0.00
0.00
3.41
0.00
158,327.0
77+001.118
0.00
0.00
0.56
0.00
158,327.0
77+018.182
0.00
0.00
8.53
0.00
158,327.0
77+020.000
0.00
0.00
0.91
0.00
158,327.0
77+040.000
0.00
0.00
10.00
0.00
158,327.0
77+060.000
0.00
0.00
10.00
0.00
158,327.0
77+080.000
0.00
0.00
10.00
0.00
158,327.0
77+100.000
0.00
0.00
10.00
0.00
158,327.0
77+120.000
0.00
0.00
10.00
0.00
158,327.0
77+140.000
0.00
0.00
10.00
0.00
158,327.0
77+160.000
0.00
0.00
10.00
0.00
158,327.0
77+180.000
0.00
0.00
10.00
0.00
158,327.0
77+200.000
0.00
0.00
10.00
0.00
158,327.0
77+220.000
0.00
0.00
10.00
0.00
158,327.0
77+240.000
0.00
0.00
10.00
0.00
158,327.0
77+260.000
0.00
0.00
10.00
0.00
158,327.0
77+280.000
0.00
0.00
10.00
0.00
158,327.0
77+300.000
0.00
0.00
10.00
0.00
158,327.0
77+320.000
0.00
0.00
10.00
0.00
158,327.0
77+340.000
0.00
0.00
10.00
0.00
158,327.0
77+360.000
0.00
0.00
10.00
0.00
158,327.0
77+380.000
0.00
0.00
10.00
0.00
158,327.0
77+400.000
0.00
0.00
10.00
0.00
158,327.0
77+420.000
0.00
0.00
10.00
0.00
158,327.0
77+440.000
0.00
0.00
10.00
0.00
158,327.0
77+460.000
0.00
0.00
10.00
0.00
158,327.0
77+480.000
0.00
0.00
10.00
0.00
158,327.0
77+500.000
0.00
0.00
10.00
0.00
158,327.0
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 93
"TERRACERAS"
UNIDAD
TERRACERAS
Excavacin en Cortes debajo de la subrasante cuando el material se desperdicie
M3
ESTACIN KM.
REA
L1+L2
D/2
77+520.000
0.00
0.00
77+525.218
0.00
77+540.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
0.00
158,327.0
0.00
2.61
0.00
158,327.0
0.00
0.00
7.39
0.00
158,327.0
77+540.234
0.00
0.00
0.12
0.00
158,327.0
77+547.218
0.00
0.00
3.49
0.00
158,327.0
77+554.202
0.00
0.00
3.49
0.00
158,327.0
77+560.000
0.00
0.00
2.90
0.00
158,327.0
77+580.000
0.00
0.00
10.00
0.00
158,327.0
77+600.000
0.00
0.00
10.00
0.00
158,327.0
77+620.000
0.00
0.00
10.00
0.00
158,327.0
77+640.000
0.00
0.00
10.00
0.00
158,327.0
77+647.342
0.00
0.00
3.67
0.00
158,327.0
77+660.000
0.00
0.00
6.33
0.00
158,327.0
77+663.215
0.00
0.00
1.61
0.00
158,327.0
77+679.088
0.00
0.00
7.94
0.00
158,327.0
77+680.000
0.00
0.00
0.46
0.00
158,327.0
77+700.000
0.00
0.00
10.00
0.00
158,327.0
77+713.215
0.00
0.00
6.61
0.00
158,327.0
77+720.000
0.00
0.00
3.39
0.00
158,327.0
77+740.000
0.00
0.00
10.00
0.00
158,327.0
77+760.000
0.00
0.00
10.00
0.00
158,327.0
77+780.000
0.00
0.00
10.00
0.00
158,327.0
77+800.000
0.00
0.00
10.00
0.00
158,327.0
77+820.000
0.00
0.00
10.00
0.00
158,327.0
77+840.000
0.00
0.00
10.00
0.00
158,327.0
77+860.000
0.00
0.00
10.00
0.00
158,327.0
77+880.000
0.00
0.00
10.00
0.00
158,327.0
77+900.000
0.00
0.00
10.00
0.00
158,327.0
77+920.000
0.00
0.00
10.00
0.00
158,327.0
77+940.000
0.00
0.00
10.00
0.00
158,327.0
77+960.000
0.00
0.00
10.00
0.00
158,327.0
77+980.000
0.00
0.00
10.00
0.00
158,327.0
78+000.000
0.00
0.00
10.00
0.00
158,327.0
78+020.000
0.00
0.00
10.00
0.00
158,327.0
78+040.000
0.00
0.00
10.00
0.00
158,327.0
78+060.000
0.00
0.00
10.00
0.00
158,327.0
78+080.000
0.00
0.00
10.00
0.00
158,327.0
78+094.334
0.00
0.00
7.17
0.00
158,327.0
78+100.000
0.00
0.00
2.83
0.00
158,327.0
78+116.175
0.00
0.00
8.09
0.00
158,327.0
78+120.000
0.00
0.00
1.91
0.00
158,327.0
78+126.334
0.00
0.00
3.17
0.00
158,327.0
78+136.493
0.00
0.00
5.08
0.00
158,327.0
78+140.000
0.00
0.00
1.75
0.00
158,327.0
78+160.000
0.00
0.00
10.00
0.00
158,327.0
78+180.000
0.00
0.00
10.00
0.00
158,327.0
78+200.000
0.00
0.00
10.00
0.00
158,327.0
78+220.000
0.00
0.00
10.00
0.00
158,327.0
78+240.000
0.00
0.00
10.00
0.00
158,327.0
78+260.000
0.00
0.00
10.00
0.00
158,327.0
78+280.000
0.00
0.00
10.00
0.00
158,327.0
78+300.000
0.00
0.00
10.00
0.00
158,327.0
78+320.000
0.00
0.00
10.00
0.00
158,327.0
78+340.000
0.00
0.00
10.00
0.00
158,327.0
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 93
"TERRACERAS"
UNIDAD
TERRACERAS
Excavacin en Cortes debajo de la subrasante cuando el material se desperdicie
M3
ESTACIN KM.
REA
L1+L2
D/2
78+360.000
0.00
0.00
78+380.000
0.00
78+400.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
0.00
158,327.0
0.00
10.00
0.00
158,327.0
0.00
0.00
10.00
0.00
158,327.0
78+420.000
0.00
0.00
10.00
0.00
158,327.0
78+440.000
0.00
0.00
10.00
0.00
158,327.0
78+460.000
0.00
0.00
10.00
0.00
158,327.0
78+480.000
0.00
0.00
10.00
0.00
158,327.0
78+500.000
0.00
0.00
10.00
0.00
158,327.0
78+520.000
0.00
0.00
10.00
0.00
158,327.0
78+540.000
0.00
0.00
10.00
0.00
158,327.0
78+560.000
0.00
0.00
10.00
0.00
158,327.0
78+580.000
0.00
0.00
10.00
0.00
158,327.0
78+600.000
0.00
0.00
10.00
0.00
158,327.0
78+620.000
0.00
0.00
10.00
0.00
158,327.0
78+640.000
0.00
0.00
10.00
0.00
158,327.0
78+660.000
0.00
0.00
10.00
0.00
158,327.0
78+680.000
0.00
0.00
10.00
0.00
158,327.0
78+700.000
0.00
0.00
10.00
0.00
158,327.0
78+720.000
0.00
0.00
10.00
0.00
158,327.0
78+740.000
0.00
0.00
10.00
0.00
158,327.0
78+760.000
0.00
0.00
10.00
0.00
158,327.0
78+780.000
0.00
0.00
10.00
0.00
158,327.0
78+790.492
0.00
0.00
5.25
0.00
158,327.0
78+796.615
0.00
0.00
3.06
0.00
158,327.0
78+800.000
0.00
0.00
1.69
0.00
158,327.0
78+802.737
0.00
0.00
1.37
0.00
158,327.0
78+811.615
0.00
0.00
4.44
0.00
158,327.0
78+820.000
0.00
0.00
4.19
0.00
158,327.0
78+840.000
0.00
0.00
10.00
0.00
158,327.0
78+860.000
0.00
0.00
10.00
0.00
158,327.0
78+880.000
0.00
0.00
10.00
0.00
158,327.0
78+900.000
0.00
0.00
10.00
0.00
158,327.0
78+920.000
0.00
0.00
10.00
0.00
158,327.0
78+940.000
0.00
0.00
10.00
0.00
158,327.0
78+960.000
0.00
0.00
10.00
0.00
158,327.0
78+980.000
0.00
0.00
10.00
0.00
158,327.0
79+000.000
0.00
0.00
10.00
0.00
158,327.0
79+020.000
0.00
0.00
10.00
0.00
158,327.0
79+040.000
0.00
0.00
10.00
0.00
158,327.0
79+060.000
0.00
0.00
10.00
0.00
158,327.0
79+080.000
0.00
0.00
10.00
0.00
158,327.0
79+097.907
0.00
0.00
8.95
0.00
158,327.0
79+100.000
0.00
0.00
1.05
0.00
158,327.0
79+120.000
0.00
0.00
10.00
0.00
158,327.0
79+133.417
0.00
0.00
6.71
0.00
158,327.0
79+140.000
0.00
0.00
3.29
0.00
158,327.0
79+157.907
0.00
0.00
8.95
0.00
158,327.0
79+160.000
0.00
0.00
1.05
0.00
158,327.0
79+180.000
0.00
0.00
10.00
0.00
158,327.0
79+182.397
0.00
0.00
1.20
0.00
158,327.0
79+200.000
0.00
0.00
8.80
0.00
158,327.0
79+220.000
0.00
0.00
10.00
0.00
158,327.0
79+240.000
0.00
0.00
10.00
0.00
158,327.0
79+260.000
0.00
0.00
10.00
0.00
158,327.0
79+280.000
0.00
0.00
10.00
0.00
158,327.0
79+300.000
0.00
0.00
10.00
0.00
158,327.0
79+320.000
0.00
0.00
10.00
0.00
158,327.0
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 93
"TERRACERAS"
UNIDAD
TERRACERAS
Excavacin en Cortes debajo de la subrasante cuando el material se desperdicie
M3
ESTACIN KM.
REA
L1+L2
D/2
79+340.000
0.00
0.00
79+360.000
0.00
79+380.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
0.00
158,327.0
0.00
10.00
0.00
158,327.0
0.00
0.00
10.00
0.00
158,327.0
79+400.000
0.00
0.00
10.00
0.00
158,327.0
79+420.000
0.00
0.00
10.00
0.00
158,327.0
79+440.000
0.00
0.00
10.00
0.00
158,327.0
79+460.000
0.00
0.00
10.00
0.00
158,327.0
79+480.000
0.00
0.00
10.00
0.00
158,327.0
79+500.000
0.00
0.00
10.00
0.00
158,327.0
79+520.000
0.00
0.00
10.00
0.00
158,327.0
79+540.000
0.00
0.00
10.00
0.00
158,327.0
79+560.000
0.00
0.00
10.00
0.00
158,327.0
79+580.000
0.00
0.00
10.00
0.00
158,327.0
79+600.000
0.00
0.00
10.00
0.00
158,327.0
79+620.000
0.00
0.00
10.00
0.00
158,327.0
79+640.000
0.00
0.00
10.00
0.00
158,327.0
79+660.000
0.00
0.00
10.00
0.00
158,327.0
79+680.000
0.00
0.00
10.00
0.00
158,327.0
79+700.000
0.00
0.00
10.00
0.00
158,327.0
79+720.000
0.00
0.00
10.00
0.00
158,327.0
79+740.000
0.00
0.00
10.00
0.00
158,327.0
79+760.000
0.00
0.00
10.00
0.00
158,327.0
79+780.000
0.00
0.00
10.00
0.00
158,327.0
79+800.000
0.00
0.00
10.00
0.00
158,327.0
79+820.000
0.00
0.00
10.00
0.00
158,327.0
79+840.000
0.00
0.00
10.00
0.00
158,327.0
79+860.000
0.00
0.00
10.00
0.00
158,327.0
79+880.000
0.00
0.00
10.00
0.00
158,327.0
79+900.000
0.00
0.00
10.00
0.00
158,327.0
79+920.000
0.00
0.00
10.00
0.00
158,327.0
79+940.000
0.00
0.00
10.00
0.00
158,327.0
79+960.000
0.00
0.00
10.00
0.00
158,327.0
79+980.000
0.00
0.00
10.00
0.00
158,327.0
80+000.000
0.00
0.00
10.00
0.00
158,327.0
80+020.000
0.00
0.00
10.00
0.00
158,327.0
80+040.000
0.00
0.00
10.00
0.00
158,327.0
80+060.000
0.00
0.00
10.00
0.00
158,327.0
80+080.000
0.00
0.00
10.00
0.00
158,327.0
80+100.000
0.00
0.00
10.00
0.00
158,327.0
80+120.000
0.00
0.00
10.00
0.00
158,327.0
80+140.000
0.00
0.00
10.00
0.00
158,327.0
80+160.000
0.00
0.00
10.00
0.00
158,327.0
80+180.000
0.00
0.00
10.00
0.00
158,327.0
80+200.000
0.00
0.00
10.00
0.00
158,327.0
80+220.000
0.00
0.00
10.00
0.00
158,327.0
80+240.000
0.00
0.00
10.00
0.00
158,327.0
80+260.000
0.00
0.00
10.00
0.00
158,327.0
80+280.000
0.00
0.00
10.00
0.00
158,327.0
80+300.000
0.00
0.00
10.00
0.00
158,327.0
80+320.000
0.00
0.00
10.00
0.00
158,327.0
80+340.000
0.00
0.00
10.00
0.00
158,327.0
80+360.000
0.00
0.00
10.00
0.00
158,327.0
80+380.000
0.00
0.00
10.00
0.00
158,327.0
80+400.000
0.00
0.00
10.00
0.00
158,327.0
80+420.000
0.00
0.00
10.00
0.00
158,327.0
80+440.000
0.00
0.00
10.00
0.00
158,327.0
80+460.000
0.00
0.00
10.00
0.00
158,327.0
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 93
"TERRACERAS"
UNIDAD
TERRACERAS
Excavacin en Cortes debajo de la subrasante cuando el material se desperdicie
M3
ESTACIN KM.
REA
L1+L2
D/2
80+480.000
0.00
0.00
80+500.000
0.00
80+520.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
0.00
158,327.0
0.00
10.00
0.00
158,327.0
0.00
0.00
10.00
0.00
158,327.0
80+540.000
0.00
0.00
10.00
0.00
158,327.0
80+560.000
0.00
0.00
10.00
0.00
158,327.0
80+580.000
0.00
0.00
10.00
0.00
158,327.0
80+600.000
0.00
0.00
10.00
0.00
158,327.0
80+620.000
0.00
0.00
10.00
0.00
158,327.0
80+640.000
0.00
0.00
10.00
0.00
158,327.0
80+660.000
0.00
0.00
10.00
0.00
158,327.0
80+680.000
0.00
0.00
10.00
0.00
158,327.0
80+700.000
0.00
0.00
10.00
0.00
158,327.0
80+720.000
0.00
0.00
10.00
0.00
158,327.0
80+740.000
0.00
0.00
10.00
0.00
158,327.0
80+760.000
0.00
0.00
10.00
0.00
158,327.0
80+780.000
0.00
0.00
10.00
0.00
158,327.0
80+800.000
0.00
0.00
10.00
0.00
158,327.0
80+820.000
0.00
0.00
10.00
0.00
158,327.0
80+840.000
0.00
0.00
10.00
0.00
158,327.0
80+860.000
0.00
0.00
10.00
0.00
158,327.0
80+880.000
0.00
0.00
10.00
0.00
158,327.0
80+900.000
0.00
0.00
10.00
0.00
158,327.0
80+920.000
0.00
0.00
10.00
0.00
158,327.0
80+940.000
0.00
0.00
10.00
0.00
158,327.0
80+960.000
0.00
0.00
10.00
0.00
158,327.0
80+980.000
0.00
0.00
10.00
0.00
158,327.0
81+000.000
0.00
0.00
10.00
0.00
158,327.0
81+020.000
0.00
0.00
10.00
0.00
158,327.0
81+040.000
0.00
0.00
10.00
0.00
158,327.0
81+060.000
0.00
0.00
10.00
0.00
158,327.0
81+080.000
0.00
0.00
10.00
0.00
158,327.0
81+100.000
0.00
0.00
10.00
0.00
158,327.0
81+120.000
0.00
0.00
10.00
0.00
158,327.0
81+140.000
81+160.000
81+180.000
81+200.000
81+220.000
81+240.000
81+260.000
81+280.000
81+300.000
81+320.000
81+340.000
81+360.000
81+380.000
81+400.000
81+420.000
81+440.000
81+460.000
81+480.000
81+500.000
81+520.000
81+540.000
81+560.000
81+580.000
81+600.000
81+620.000
81+640.000
81+660.000
81+680.000
81+700.000
81+720.000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 93
"TERRACERAS"
UNIDAD
TERRACERAS
Excavacin en Cortes debajo de la subrasante cuando el material se desperdicie
M3
REA ACUMULADA
ESTACIN KM.
REA
L1+L2
D/2
81+740.000
81+760.000
81+780.000
81+800.000
81+820.000
81+840.000
81+860.000
81+880.000
81+900.000
81+920.000
81+940.000
81+960.000
81+980.000
82+000.000
82+020.000
82+040.000
82+060.000
82+080.000
82+100.000
82+120.000
82+140.000
82+160.000
82+180.000
82+200.000
82+220.000
82+240.000
82+260.000
82+280.000
82+300.000
82+320.000
82+340.000
82+360.000
82+380.000
82+400.000
82+420.000
82+440.000
82+460.000
82+480.000
82+500.000
82+520.000
82+540.000
82+560.000
82+580.000
82+600.000
82+620.000
82+640.000
82+660.000
82+680.000
82+700.000
82+720.000
82+740.000
82+760.000
82+780.000
82+800.000
82+820.000
82+840.000
82+860.000
82+880.000
82+900.000
82+920.000
82+940.000
82+960.000
82+980.000
83+000.000
83+020.000
83+040.000
83+060.000
83+080.000
83+100.000
83+120.000
83+140.000
83+160.000
83+180.000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
PARCIAL
ACUMULADO
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 93
"TERRACERAS"
UNIDAD
TERRACERAS
Excavacin en Cortes debajo de la subrasante cuando el material se desperdicie
M3
REA ACUMULADA
ESTACIN KM.
REA
L1+L2
D/2
83+200.000
83+220.000
83+240.000
83+260.000
83+280.000
83+300.000
83+320.000
83+340.000
83+360.000
83+380.000
83+400.000
83+420.000
83+440.000
83+460.000
83+480.000
83+500.000
83+520.000
83+540.000
83+560.000
83+570.105
83+580.000
83+593.182
83+600.000
83+616.259
83+620.000
83+640.000
83+653.182
83+660.000
83+680.000
83+700.000
83+720.000
83+740.000
83+760.000
83+780.000
83+785.000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
5.05
4.95
6.59
3.41
8.13
1.87
10.00
6.59
3.41
10.00
10.00
10.00
10.00
0.00
0.00
0.00
PARCIAL
ACUMULADO
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
158,327.0
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 94
"TERRACERAS"
UNIDAD
TERRACERAS
Corte para la formacin de Bermas.
M3
ESTACIN KM.
REA
L1+L2
D/2
71+800.000
0.00
0.00
71+820.000
0.00
71+840.000
REA ACUMULADA
PARCIAL
ACUMULADO
0.00
0.00
0.00
0.00
10.00
0.00
0.00
0.00
0.00
10.00
0.00
0.00
71+860.000
0.00
0.00
10.00
0.00
0.00
71+880.000
0.00
0.00
10.00
0.00
0.00
71+900.000
0.00
0.00
10.00
0.00
0.00
71+920.000
0.00
0.00
10.00
0.00
0.00
71+940.000
0.00
0.00
10.00
0.00
0.00
71+960.000
0.00
0.00
10.00
0.00
0.00
71+980.000
0.00
0.00
10.00
0.00
0.00
72+000.000
0.00
0.00
10.00
0.00
0.00
72+020.000
0.00
0.00
10.00
0.00
0.00
72+040.000
0.00
0.00
10.00
0.00
0.00
72+060.000
0.00
0.00
10.00
0.00
0.00
72+080.000
0.00
0.00
10.00
0.00
0.00
72+100.000
0.00
0.00
10.00
0.00
0.00
72+120.000
0.00
0.00
10.00
0.00
0.00
72+140.000
0.00
0.00
10.00
0.00
0.00
72+160.000
0.00
0.00
10.00
0.00
0.00
72+180.000
0.00
0.00
10.00
0.00
0.00
72+200.000
0.00
0.00
10.00
0.00
0.00
72+220.000
0.00
0.00
10.00
0.00
0.00
72+240.000
0.00
0.00
10.00
0.00
0.00
72+260.000
0.00
0.00
10.00
0.00
0.00
72+280.000
0.00
0.00
10.00
0.00
0.00
72+300.000
0.00
0.00
10.00
0.00
0.00
72+320.000
0.00
0.00
10.00
0.00
0.00
72+340.000
0.00
0.00
10.00
0.00
0.00
72+360.000
0.00
0.00
10.00
0.00
0.00
72+380.000
0.00
0.00
10.00
0.00
0.00
72+400.000
0.00
0.00
10.00
0.00
0.00
72+420.000
0.00
0.00
10.00
0.00
0.00
72+440.000
0.00
0.00
10.00
0.00
0.00
72+460.000
0.00
0.00
10.00
0.00
0.00
72+480.000
0.00
0.00
10.00
0.00
0.00
72+500.000
0.00
0.00
10.00
0.00
0.00
72+520.000
0.00
0.00
10.00
0.00
0.00
72+540.000
0.00
0.00
10.00
0.00
0.00
72+560.000
0.00
0.00
10.00
0.00
0.00
72+580.000
0.00
0.00
10.00
0.00
0.00
72+600.000
0.00
0.00
10.00
0.00
0.00
72+620.000
0.00
0.00
10.00
0.00
0.00
72+640.000
0.00
0.00
10.00
0.00
0.00
72+654.982
0.00
0.00
7.49
0.00
0.00
72+660.000
0.00
0.00
2.51
0.00
0.00
72+678.443
0.00
0.00
9.22
0.00
0.00
72+680.000
0.00
0.00
0.78
0.00
0.00
72+700.000
0.00
0.00
10.00
0.00
0.00
72+701.905
0.00
0.00
0.95
0.00
0.00
72+720.000
0.00
0.00
9.05
0.00
0.00
72+739.443
0.00
0.00
9.72
0.00
0.00
72+740.000
0.00
0.00
0.28
0.00
0.00
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 94
"TERRACERAS"
UNIDAD
TERRACERAS
Corte para la formacin de Bermas.
M3
ESTACIN KM.
REA
L1+L2
D/2
72+760.000
0.00
0.00
72+780.000
0.00
72+800.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
0.00
0.00
0.00
10.00
0.00
0.00
0.00
0.00
10.00
0.00
0.00
72+820.000
0.00
0.00
10.00
0.00
0.00
72+840.000
0.00
0.00
10.00
0.00
0.00
72+860.000
0.00
0.00
10.00
0.00
0.00
72+880.000
0.00
0.00
10.00
0.00
0.00
72+900.000
0.00
0.00
10.00
0.00
0.00
72+920.000
0.00
0.00
10.00
0.00
0.00
72+940.000
0.00
0.00
10.00
0.00
0.00
72+960.000
0.00
0.00
10.00
0.00
0.00
72+971.651
0.00
0.00
5.83
0.00
0.00
72+980.000
0.00
0.00
4.17
0.00
0.00
73+000.000
0.00
0.00
10.00
0.00
0.00
73+009.189
0.00
0.00
4.59
0.00
0.00
73+020.000
0.00
0.00
5.41
0.00
0.00
73+032.651
0.00
0.00
6.33
0.00
0.00
73+040.000
0.00
0.00
3.67
0.00
0.00
73+056.112
0.00
0.00
8.06
0.00
0.00
73+060.000
0.00
0.00
1.94
0.00
0.00
73+080.000
0.00
0.00
10.00
0.00
0.00
73+100.000
0.00
0.00
10.00
0.00
0.00
73+120.000
0.00
0.00
10.00
0.00
0.00
73+140.000
0.00
0.00
10.00
0.00
0.00
73+160.000
0.00
0.00
10.00
0.00
0.00
73+180.000
0.00
0.00
10.00
0.00
0.00
73+200.000
0.00
0.00
10.00
0.00
0.00
73+220.000
0.00
0.00
10.00
0.00
0.00
73+240.000
0.00
0.00
10.00
0.00
0.00
73+260.000
0.00
0.00
10.00
0.00
0.00
73+280.000
0.00
0.00
10.00
0.00
0.00
73+300.000
0.00
0.00
10.00
0.00
0.00
73+320.000
0.00
0.00
10.00
0.00
0.00
73+340.000
0.00
0.00
10.00
0.00
0.00
73+360.000
0.00
0.00
10.00
0.00
0.00
73+380.000
0.00
0.00
10.00
0.00
0.00
73+400.000
0.00
0.00
10.00
0.00
0.00
73+420.000
0.00
0.00
10.00
0.00
0.00
73+440.000
0.00
0.00
10.00
0.00
0.00
73+460.000
0.00
0.00
10.00
0.00
0.00
73+480.000
0.00
0.00
10.00
0.00
0.00
73+500.000
0.00
0.00
10.00
0.00
0.00
73+520.000
0.00
0.00
10.00
0.00
0.00
73+540.000
0.00
0.00
10.00
0.00
0.00
73+560.000
0.00
0.00
10.00
0.00
0.00
73+580.000
0.00
0.00
10.00
0.00
0.00
73+600.000
0.00
0.00
10.00
0.00
0.00
73+620.000
0.00
0.00
10.00
0.00
0.00
73+640.000
0.00
0.00
10.00
0.00
0.00
73+660.000
0.00
0.00
10.00
0.00
0.00
73+680.000
0.00
0.00
10.00
0.00
0.00
73+700.000
0.00
0.00
10.00
0.00
0.00
73+720.000
0.00
0.00
10.00
0.00
0.00
73+740.000
0.00
0.00
10.00
0.00
0.00
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 94
"TERRACERAS"
UNIDAD
TERRACERAS
Corte para la formacin de Bermas.
M3
ESTACIN KM.
REA
L1+L2
D/2
73+760.000
0.00
0.00
73+780.000
0.00
73+800.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
0.00
0.00
0.00
10.00
0.00
0.00
0.00
0.00
10.00
0.00
0.00
73+807.617
0.00
0.00
3.81
0.00
0.00
73+820.000
0.00
0.00
6.19
0.00
0.00
73+840.000
0.00
0.00
10.00
0.00
0.00
73+848.283
0.00
0.00
4.14
0.00
0.00
73+860.000
0.00
0.00
5.86
0.00
0.00
73+880.000
0.00
0.00
10.00
0.00
0.00
73+888.950
0.00
0.00
4.47
0.00
0.00
73+900.000
0.00
0.00
5.53
0.00
0.00
73+909.283
0.00
0.00
4.64
0.00
0.00
73+920.000
0.00
0.00
5.36
0.00
0.00
73+940.000
0.00
0.00
10.00
0.00
0.00
73+960.000
0.00
0.00
10.00
0.00
0.00
73+980.000
0.00
0.00
10.00
0.00
0.00
74+000.000
0.00
0.00
10.00
0.00
0.00
74+020.000
0.00
0.00
10.00
0.00
0.00
74+040.000
0.00
0.00
10.00
0.00
0.00
74+060.000
0.00
0.00
10.00
0.00
0.00
74+080.000
0.00
0.00
10.00
0.00
0.00
74+089.272
0.00
0.00
4.64
0.00
0.00
74+100.000
0.00
0.00
5.36
0.00
0.00
74+109.605
0.00
0.00
4.80
0.00
0.00
74+120.000
0.00
0.00
5.20
0.00
0.00
74+140.000
0.00
0.00
10.00
0.00
0.00
74+150.272
0.00
0.00
5.14
0.00
0.00
74+160.000
0.00
0.00
4.86
0.00
0.00
74+180.000
0.00
0.00
10.00
0.00
0.00
74+190.939
0.00
0.00
5.47
0.00
0.00
74+200.000
0.00
0.00
4.53
0.00
0.00
74+220.000
0.00
0.00
10.00
0.00
0.00
74+240.000
0.00
0.00
10.00
0.00
0.00
74+260.000
0.00
0.00
10.00
0.00
0.00
74+280.000
0.00
0.00
10.00
0.00
0.00
74+300.000
0.00
0.00
10.00
0.00
0.00
74+320.000
0.00
0.00
10.00
0.00
0.00
74+340.000
0.00
0.00
10.00
0.00
0.00
74+360.000
0.00
0.00
10.00
0.00
0.00
74+380.000
0.00
0.00
10.00
0.00
0.00
74+400.000
0.00
0.00
10.00
0.00
0.00
74+420.000
0.00
0.00
10.00
0.00
0.00
74+440.000
0.00
0.00
10.00
0.00
0.00
74+457.851
0.00
0.00
8.93
0.00
0.00
74+460.000
0.00
0.00
1.07
0.00
0.00
74+480.000
0.00
0.00
10.00
0.00
0.00
74+498.518
0.00
0.00
9.26
0.00
0.00
74+500.000
0.00
0.00
0.74
0.00
0.00
74+520.000
0.00
0.00
10.00
0.00
0.00
74+539.184
0.00
0.00
9.59
0.00
0.00
74+540.000
0.00
0.00
0.41
0.00
0.00
74+559.518
0.00
0.00
9.76
0.00
0.00
74+560.000
0.00
0.00
0.24
0.00
0.00
74+580.000
0.00
0.00
10.00
0.00
0.00
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 94
"TERRACERAS"
UNIDAD
TERRACERAS
Corte para la formacin de Bermas.
M3
ESTACIN KM.
REA
L1+L2
D/2
74+600.000
0.00
0.00
74+620.000
0.00
74+640.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
0.00
0.00
0.00
10.00
0.00
0.00
0.00
0.00
10.00
0.00
0.00
74+660.000
0.00
0.00
10.00
0.00
0.00
74+680.000
0.00
0.00
10.00
0.00
0.00
74+700.000
0.00
0.00
10.00
0.00
0.00
74+720.000
0.00
0.00
10.00
0.00
0.00
74+740.000
0.00
0.00
10.00
0.00
0.00
74+760.000
0.00
0.00
10.00
0.00
0.00
74+779.360
0.00
0.00
9.68
0.00
0.00
74+780.000
0.00
0.00
0.32
0.00
0.00
74+799.693
0.00
0.00
9.85
0.00
0.00
74+800.000
0.00
0.00
0.15
0.00
0.00
74+820.000
0.00
0.00
10.00
0.00
0.00
74+840.000
0.00
0.00
10.00
0.00
0.00
74+840.360
0.00
0.00
0.18
0.00
0.00
74+860.000
0.00
0.00
9.82
0.00
0.00
74+880.000
0.00
0.00
10.00
0.00
0.00
74+881.027
0.00
0.00
0.51
0.00
0.00
74+900.000
0.00
0.00
9.49
0.00
0.00
74+920.000
0.00
0.00
10.00
0.00
0.00
74+940.000
0.00
0.00
10.00
0.00
0.00
74+960.000
0.00
0.00
10.00
0.00
0.00
74+980.000
0.00
0.00
10.00
0.00
0.00
75+000.000
0.00
0.00
10.00
0.00
0.00
75+020.000
0.00
0.00
10.00
0.00
0.00
75+040.000
0.00
0.00
10.00
0.00
0.00
75+060.000
0.00
0.00
10.00
0.00
0.00
75+080.000
0.00
0.00
10.00
0.00
0.00
75+100.000
0.00
0.00
10.00
0.00
0.00
75+120.000
32.27
32.27
10.00
322.70
322.70
75+140.000
32.76
65.03
10.00
650.30
973.00
75+160.000
40.90
73.66
10.00
736.60
1,709.60
75+180.000
135.53
176.43
10.00
1764.30
3,473.90
75+200.000
279.05
414.58
10.00
4145.80
7,619.70
75+220.000
285.90
564.95
10.00
5649.50
13,269.20
75+240.000
234.72
520.62
10.00
5206.20
18,475.40
75+260.000
234.72
469.44
10.00
4694.40
23,169.80
75+280.000
149.13
383.85
10.00
3838.50
27,008.30
75+300.000
113.16
262.29
10.00
2622.90
29,631.20
75+320.000
57.55
170.71
10.00
1707.10
31,338.30
75+340.000
57.55
115.10
10.00
1151.00
32,489.30
75+360.000
46.73
104.28
10.00
1042.80
33,532.10
75+380.000
39.16
85.89
10.00
858.90
34,391.00
75+400.000
22.29
61.45
10.00
614.50
35,005.50
75+420.000
2.97
25.26
10.00
252.60
35,258.10
75+440.000
0.00
2.97
10.00
29.70
35,287.80
75+460.000
0.00
0.00
10.00
0.00
35,287.80
75+480.000
0.00
0.00
10.00
0.00
35,287.80
75+500.000
0.00
0.00
10.00
0.00
35,287.80
75+520.000
0.00
0.00
10.00
0.00
35,287.80
75+540.000
0.00
0.00
10.00
0.00
35,287.80
75+560.000
0.00
0.00
10.00
0.00
35,287.80
75+580.000
0.00
0.00
10.00
0.00
35,287.80
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 94
"TERRACERAS"
UNIDAD
TERRACERAS
Corte para la formacin de Bermas.
M3
ESTACIN KM.
REA
L1+L2
D/2
75+600.000
0.00
0.00
75+611.738
0.00
75+620.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
0.00
35,287.80
0.00
5.87
0.00
35,287.80
0.00
0.00
4.13
0.00
35,287.80
75+635.122
0.00
0.00
7.56
0.00
35,287.80
75+640.000
0.00
0.00
2.44
0.00
35,287.80
75+658.507
0.00
0.00
9.25
0.00
35,287.80
75+660.000
0.00
0.00
0.75
0.00
35,287.80
75+680.000
0.00
0.00
10.00
0.00
35,287.80
75+700.000
0.00
0.00
10.00
0.00
35,287.80
75+711.122
0.00
0.00
5.56
0.00
35,287.80
75+720.000
0.00
0.00
4.44
0.00
35,287.80
75+740.000
0.00
0.00
10.00
0.00
35,287.80
75+760.000
0.00
0.00
10.00
0.00
35,287.80
75+780.000
0.00
0.00
10.00
0.00
35,287.80
75+800.000
0.00
0.00
10.00
0.00
35,287.80
75+820.000
0.00
0.00
10.00
0.00
35,287.80
75+840.000
0.00
0.00
10.00
0.00
35,287.80
75+860.000
0.00
0.00
10.00
0.00
35,287.80
75+880.000
0.00
0.00
10.00
0.00
35,287.80
75+900.000
0.00
0.00
10.00
0.00
35,287.80
75+920.000
0.00
0.00
10.00
0.00
35,287.80
75+940.000
0.00
0.00
10.00
0.00
35,287.80
75+960.000
0.00
0.00
10.00
0.00
35,287.80
75+980.000
0.00
0.00
10.00
0.00
35,287.80
76+000.000
0.00
0.00
10.00
0.00
35,287.80
76+020.000
0.00
0.00
10.00
0.00
35,287.80
76+040.000
0.00
0.00
10.00
0.00
35,287.80
76+060.000
0.00
0.00
10.00
0.00
35,287.80
76+080.000
0.00
0.00
10.00
0.00
35,287.80
76+100.000
0.00
0.00
10.00
0.00
35,287.80
76+120.000
0.00
0.00
10.00
0.00
35,287.80
76+140.000
0.00
0.00
10.00
0.00
35,287.80
76+160.000
0.00
0.00
10.00
0.00
35,287.80
76+180.000
0.00
0.00
10.00
0.00
35,287.80
76+200.000
0.00
0.00
10.00
0.00
35,287.80
76+220.000
0.00
0.00
10.00
0.00
35,287.80
76+240.000
0.00
0.00
10.00
0.00
35,287.80
76+255.500
0.00
0.00
7.75
0.00
35,287.80
76+260.000
0.00
0.00
2.25
0.00
35,287.80
76+280.000
0.00
0.00
10.00
0.00
35,287.80
76+300.000
0.00
0.00
10.00
0.00
35,287.80
76+320.000
0.00
0.00
10.00
0.00
35,287.80
76+321.961
0.00
0.00
0.98
0.00
35,287.80
76+340.000
0.00
0.00
9.02
0.00
35,287.80
76+351.500
0.00
0.00
5.75
0.00
35,287.80
76+360.000
0.00
0.00
4.25
0.00
35,287.80
76+380.000
0.00
0.00
10.00
0.00
35,287.80
76+381.038
0.00
0.00
0.52
0.00
35,287.80
76+400.000
0.00
0.00
9.48
0.00
35,287.80
76+420.000
0.00
0.00
10.00
0.00
35,287.80
76+440.000
0.00
0.00
10.00
0.00
35,287.80
76+460.000
0.00
0.00
10.00
0.00
35,287.80
76+480.000
0.00
0.00
10.00
0.00
35,287.80
76+500.000
0.00
0.00
10.00
0.00
35,287.80
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 94
"TERRACERAS"
UNIDAD
TERRACERAS
Corte para la formacin de Bermas.
M3
ESTACIN KM.
REA
L1+L2
D/2
76+520.000
0.00
0.00
76+540.000
0.00
76+560.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
0.00
35,287.80
0.00
10.00
0.00
35,287.80
0.00
0.00
10.00
0.00
35,287.80
76+580.000
0.00
0.00
10.00
0.00
35,287.80
76+600.000
0.00
0.00
10.00
0.00
35,287.80
76+620.000
0.00
0.00
10.00
0.00
35,287.80
76+640.000
0.00
0.00
10.00
0.00
35,287.80
76+660.000
0.00
0.00
10.00
0.00
35,287.80
76+680.000
0.00
0.00
10.00
0.00
35,287.80
76+700.000
0.00
0.00
10.00
0.00
35,287.80
76+720.000
0.00
0.00
10.00
0.00
35,287.80
76+740.000
0.00
0.00
10.00
0.00
35,287.80
76+760.000
0.00
0.00
10.00
0.00
35,287.80
76+780.000
0.00
0.00
10.00
0.00
35,287.80
76+800.000
0.00
0.00
10.00
0.00
35,287.80
76+820.000
0.00
0.00
10.00
0.00
35,287.80
76+840.000
0.00
0.00
10.00
0.00
35,287.80
76+860.000
0.00
0.00
10.00
0.00
35,287.80
76+880.000
0.00
0.00
10.00
0.00
35,287.80
76+900.000
0.00
0.00
10.00
0.00
35,287.80
76+920.000
0.00
0.00
10.00
0.00
35,287.80
76+940.000
0.00
0.00
10.00
0.00
35,287.80
76+960.000
0.00
0.00
10.00
0.00
35,287.80
76+980.000
0.00
0.00
10.00
0.00
35,287.80
76+985.245
0.00
0.00
2.62
0.00
35,287.80
76+993.182
0.00
0.00
3.97
0.00
35,287.80
77+000.000
0.00
0.00
3.41
0.00
35,287.80
77+001.118
0.00
0.00
0.56
0.00
35,287.80
77+018.182
0.00
0.00
8.53
0.00
35,287.80
77+020.000
0.00
0.00
0.91
0.00
35,287.80
77+040.000
0.00
0.00
10.00
0.00
35,287.80
77+060.000
0.00
0.00
10.00
0.00
35,287.80
77+080.000
0.00
0.00
10.00
0.00
35,287.80
77+100.000
0.00
0.00
10.00
0.00
35,287.80
77+120.000
0.00
0.00
10.00
0.00
35,287.80
77+140.000
0.00
0.00
10.00
0.00
35,287.80
77+160.000
0.00
0.00
10.00
0.00
35,287.80
77+180.000
0.00
0.00
10.00
0.00
35,287.80
77+200.000
0.00
0.00
10.00
0.00
35,287.80
77+220.000
0.00
0.00
10.00
0.00
35,287.80
77+240.000
0.00
0.00
10.00
0.00
35,287.80
77+260.000
0.00
0.00
10.00
0.00
35,287.80
77+280.000
0.00
0.00
10.00
0.00
35,287.80
77+300.000
0.00
0.00
10.00
0.00
35,287.80
77+320.000
0.00
0.00
10.00
0.00
35,287.80
77+340.000
0.00
0.00
10.00
0.00
35,287.80
77+360.000
0.00
0.00
10.00
0.00
35,287.80
77+380.000
0.00
0.00
10.00
0.00
35,287.80
77+400.000
0.00
0.00
10.00
0.00
35,287.80
77+420.000
0.00
0.00
10.00
0.00
35,287.80
77+440.000
0.00
0.00
10.00
0.00
35,287.80
77+460.000
0.00
0.00
10.00
0.00
35,287.80
77+480.000
0.00
0.00
10.00
0.00
35,287.80
77+500.000
0.00
0.00
10.00
0.00
35,287.80
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 94
"TERRACERAS"
UNIDAD
TERRACERAS
Corte para la formacin de Bermas.
M3
ESTACIN KM.
REA
L1+L2
D/2
77+520.000
0.00
0.00
77+525.218
0.00
77+540.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
0.00
35,287.80
0.00
2.61
0.00
35,287.80
0.00
0.00
7.39
0.00
35,287.80
77+540.234
0.00
0.00
0.12
0.00
35,287.80
77+547.218
0.00
0.00
3.49
0.00
35,287.80
77+554.202
0.00
0.00
3.49
0.00
35,287.80
77+560.000
0.00
0.00
2.90
0.00
35,287.80
77+580.000
0.00
0.00
10.00
0.00
35,287.80
77+600.000
0.00
0.00
10.00
0.00
35,287.80
77+620.000
0.00
0.00
10.00
0.00
35,287.80
77+640.000
0.00
0.00
10.00
0.00
35,287.80
77+647.342
0.00
0.00
3.67
0.00
35,287.80
77+660.000
0.00
0.00
6.33
0.00
35,287.80
77+663.215
0.00
0.00
1.61
0.00
35,287.80
77+679.088
0.00
0.00
7.94
0.00
35,287.80
77+680.000
0.00
0.00
0.46
0.00
35,287.80
77+700.000
0.00
0.00
10.00
0.00
35,287.80
77+713.215
0.00
0.00
6.61
0.00
35,287.80
77+720.000
0.00
0.00
3.39
0.00
35,287.80
77+740.000
0.00
0.00
10.00
0.00
35,287.80
77+760.000
0.00
0.00
10.00
0.00
35,287.80
77+780.000
0.00
0.00
10.00
0.00
35,287.80
77+800.000
0.00
0.00
10.00
0.00
35,287.80
77+820.000
0.00
0.00
10.00
0.00
35,287.80
77+840.000
0.00
0.00
10.00
0.00
35,287.80
77+860.000
0.00
0.00
10.00
0.00
35,287.80
77+880.000
0.00
0.00
10.00
0.00
35,287.80
77+900.000
0.00
0.00
10.00
0.00
35,287.80
77+920.000
0.00
0.00
10.00
0.00
35,287.80
77+940.000
0.00
0.00
10.00
0.00
35,287.80
77+960.000
0.00
0.00
10.00
0.00
35,287.80
77+980.000
0.00
0.00
10.00
0.00
35,287.80
78+000.000
0.00
0.00
10.00
0.00
35,287.80
78+020.000
0.00
0.00
10.00
0.00
35,287.80
78+040.000
0.00
0.00
10.00
0.00
35,287.80
78+060.000
0.00
0.00
10.00
0.00
35,287.80
78+080.000
0.00
0.00
10.00
0.00
35,287.80
78+094.334
0.00
0.00
7.17
0.00
35,287.80
78+100.000
0.00
0.00
2.83
0.00
35,287.80
78+116.175
0.00
0.00
8.09
0.00
35,287.80
78+120.000
0.00
0.00
1.91
0.00
35,287.80
78+126.334
0.00
0.00
3.17
0.00
35,287.80
78+136.493
0.00
0.00
5.08
0.00
35,287.80
78+140.000
0.00
0.00
1.75
0.00
35,287.80
78+160.000
0.00
0.00
10.00
0.00
35,287.80
78+180.000
0.00
0.00
10.00
0.00
35,287.80
78+200.000
0.00
0.00
10.00
0.00
35,287.80
78+220.000
0.00
0.00
10.00
0.00
35,287.80
78+240.000
0.00
0.00
10.00
0.00
35,287.80
78+260.000
0.00
0.00
10.00
0.00
35,287.80
78+280.000
0.00
0.00
10.00
0.00
35,287.80
78+300.000
0.00
0.00
10.00
0.00
35,287.80
78+320.000
0.00
0.00
10.00
0.00
35,287.80
78+340.000
0.00
0.00
10.00
0.00
35,287.80
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 94
"TERRACERAS"
UNIDAD
TERRACERAS
Corte para la formacin de Bermas.
M3
ESTACIN KM.
REA
L1+L2
D/2
78+360.000
0.00
0.00
78+380.000
0.00
78+400.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
0.00
35,287.80
0.00
10.00
0.00
35,287.80
0.00
0.00
10.00
0.00
35,287.80
78+420.000
0.00
0.00
10.00
0.00
35,287.80
78+440.000
0.00
0.00
10.00
0.00
35,287.80
78+460.000
0.00
0.00
10.00
0.00
35,287.80
78+480.000
0.00
0.00
10.00
0.00
35,287.80
78+500.000
0.00
0.00
10.00
0.00
35,287.80
78+520.000
0.00
0.00
10.00
0.00
35,287.80
78+540.000
0.00
0.00
10.00
0.00
35,287.80
78+560.000
0.00
0.00
10.00
0.00
35,287.80
78+580.000
0.00
0.00
10.00
0.00
35,287.80
78+600.000
0.00
0.00
10.00
0.00
35,287.80
78+620.000
0.00
0.00
10.00
0.00
35,287.80
78+640.000
0.00
0.00
10.00
0.00
35,287.80
78+660.000
0.00
0.00
10.00
0.00
35,287.80
78+680.000
0.00
0.00
10.00
0.00
35,287.80
78+700.000
0.00
0.00
10.00
0.00
35,287.80
78+720.000
0.00
0.00
10.00
0.00
35,287.80
78+740.000
0.00
0.00
10.00
0.00
35,287.80
78+760.000
0.00
0.00
10.00
0.00
35,287.80
78+780.000
0.00
0.00
10.00
0.00
35,287.80
78+790.492
0.00
0.00
5.25
0.00
35,287.80
78+796.615
0.00
0.00
3.06
0.00
35,287.80
78+800.000
0.00
0.00
1.69
0.00
35,287.80
78+802.737
0.00
0.00
1.37
0.00
35,287.80
78+811.615
0.00
0.00
4.44
0.00
35,287.80
78+820.000
0.00
0.00
4.19
0.00
35,287.80
78+840.000
0.00
0.00
10.00
0.00
35,287.80
78+860.000
0.00
0.00
10.00
0.00
35,287.80
78+880.000
0.00
0.00
10.00
0.00
35,287.80
78+900.000
0.00
0.00
10.00
0.00
35,287.80
78+920.000
0.00
0.00
10.00
0.00
35,287.80
78+940.000
0.00
0.00
10.00
0.00
35,287.80
78+960.000
0.00
0.00
10.00
0.00
35,287.80
78+980.000
0.00
0.00
10.00
0.00
35,287.80
79+000.000
0.00
0.00
10.00
0.00
35,287.80
79+020.000
0.00
0.00
10.00
0.00
35,287.80
79+040.000
0.00
0.00
10.00
0.00
35,287.80
79+060.000
0.00
0.00
10.00
0.00
35,287.80
79+080.000
0.00
0.00
10.00
0.00
35,287.80
79+097.907
0.00
0.00
8.95
0.00
35,287.80
79+100.000
0.00
0.00
1.05
0.00
35,287.80
79+120.000
0.00
0.00
10.00
0.00
35,287.80
79+133.417
0.00
0.00
6.71
0.00
35,287.80
79+140.000
0.00
0.00
3.29
0.00
35,287.80
79+157.907
0.00
0.00
8.95
0.00
35,287.80
79+160.000
0.00
0.00
1.05
0.00
35,287.80
79+180.000
0.00
0.00
10.00
0.00
35,287.80
79+182.397
0.00
0.00
1.20
0.00
35,287.80
79+200.000
0.00
0.00
8.80
0.00
35,287.80
79+220.000
0.00
0.00
10.00
0.00
35,287.80
79+240.000
0.00
0.00
10.00
0.00
35,287.80
79+260.000
0.00
0.00
10.00
0.00
35,287.80
79+280.000
0.00
0.00
10.00
0.00
35,287.80
79+300.000
0.00
0.00
10.00
0.00
35,287.80
79+320.000
0.00
0.00
10.00
0.00
35,287.80
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 94
"TERRACERAS"
UNIDAD
TERRACERAS
Corte para la formacin de Bermas.
M3
ESTACIN KM.
REA
L1+L2
D/2
79+340.000
0.00
0.00
79+360.000
0.00
79+380.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
0.00
35,287.80
0.00
10.00
0.00
35,287.80
0.00
0.00
10.00
0.00
35,287.80
79+400.000
0.00
0.00
10.00
0.00
35,287.80
79+420.000
0.00
0.00
10.00
0.00
35,287.80
79+440.000
0.00
0.00
10.00
0.00
35,287.80
79+460.000
0.00
0.00
10.00
0.00
35,287.80
79+480.000
0.00
0.00
10.00
0.00
35,287.80
79+500.000
0.00
0.00
10.00
0.00
35,287.80
79+520.000
0.00
0.00
10.00
0.00
35,287.80
79+540.000
0.00
0.00
10.00
0.00
35,287.80
79+560.000
0.00
0.00
10.00
0.00
35,287.80
79+580.000
0.00
0.00
10.00
0.00
35,287.80
79+600.000
0.00
0.00
10.00
0.00
35,287.80
79+620.000
0.00
0.00
10.00
0.00
35,287.80
79+640.000
0.00
0.00
10.00
0.00
35,287.80
79+660.000
0.00
0.00
10.00
0.00
35,287.80
79+680.000
0.00
0.00
10.00
0.00
35,287.80
79+700.000
0.00
0.00
10.00
0.00
35,287.80
79+720.000
0.00
0.00
10.00
0.00
35,287.80
79+740.000
0.00
0.00
10.00
0.00
35,287.80
79+760.000
0.00
0.00
10.00
0.00
35,287.80
79+780.000
0.00
0.00
10.00
0.00
35,287.80
79+800.000
0.00
0.00
10.00
0.00
35,287.80
79+820.000
0.00
0.00
10.00
0.00
35,287.80
79+840.000
0.00
0.00
10.00
0.00
35,287.80
79+860.000
0.00
0.00
10.00
0.00
35,287.80
79+880.000
0.00
0.00
10.00
0.00
35,287.80
79+900.000
0.00
0.00
10.00
0.00
35,287.80
79+920.000
0.00
0.00
10.00
0.00
35,287.80
79+940.000
0.00
0.00
10.00
0.00
35,287.80
79+960.000
0.00
0.00
10.00
0.00
35,287.80
79+980.000
0.00
0.00
10.00
0.00
35,287.80
80+000.000
0.00
0.00
10.00
0.00
35,287.80
80+020.000
0.00
0.00
10.00
0.00
35,287.80
80+040.000
0.00
0.00
10.00
0.00
35,287.80
80+060.000
0.00
0.00
10.00
0.00
35,287.80
80+080.000
0.00
0.00
10.00
0.00
35,287.80
80+100.000
0.00
0.00
10.00
0.00
35,287.80
80+120.000
0.00
0.00
10.00
0.00
35,287.80
80+140.000
0.00
0.00
10.00
0.00
35,287.80
80+160.000
0.00
0.00
10.00
0.00
35,287.80
80+180.000
0.00
0.00
10.00
0.00
35,287.80
80+200.000
0.00
0.00
10.00
0.00
35,287.80
80+220.000
0.00
0.00
10.00
0.00
35,287.80
80+240.000
0.00
0.00
10.00
0.00
35,287.80
80+260.000
0.00
0.00
10.00
0.00
35,287.80
80+280.000
0.00
0.00
10.00
0.00
35,287.80
80+300.000
0.00
0.00
10.00
0.00
35,287.80
80+320.000
0.00
0.00
10.00
0.00
35,287.80
80+340.000
0.00
0.00
10.00
0.00
35,287.80
80+360.000
0.00
0.00
10.00
0.00
35,287.80
80+380.000
0.00
0.00
10.00
0.00
35,287.80
80+400.000
0.00
0.00
10.00
0.00
35,287.80
80+420.000
0.00
0.00
10.00
0.00
35,287.80
80+440.000
0.00
0.00
10.00
0.00
35,287.80
80+460.000
0.00
0.00
10.00
0.00
35,287.80
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 94
"TERRACERAS"
UNIDAD
TERRACERAS
Corte para la formacin de Bermas.
M3
ESTACIN KM.
REA
L1+L2
D/2
80+480.000
0.00
0.00
80+500.000
0.00
80+520.000
REA ACUMULADA
PARCIAL
ACUMULADO
10.00
0.00
35,287.80
0.00
10.00
0.00
35,287.80
0.00
0.00
10.00
0.00
35,287.80
80+540.000
0.00
0.00
10.00
0.00
35,287.80
80+560.000
0.00
0.00
10.00
0.00
35,287.80
80+580.000
0.00
0.00
10.00
0.00
35,287.80
80+600.000
0.00
0.00
10.00
0.00
35,287.80
80+620.000
0.00
0.00
10.00
0.00
35,287.80
80+640.000
0.00
0.00
10.00
0.00
35,287.80
80+660.000
0.00
0.00
10.00
0.00
35,287.80
80+680.000
0.00
0.00
10.00
0.00
35,287.80
80+700.000
0.00
0.00
10.00
0.00
35,287.80
80+720.000
0.00
0.00
10.00
0.00
35,287.80
80+740.000
0.00
0.00
10.00
0.00
35,287.80
80+760.000
0.00
0.00
10.00
0.00
35,287.80
80+780.000
0.00
0.00
10.00
0.00
35,287.80
80+800.000
0.00
0.00
10.00
0.00
35,287.80
80+820.000
0.00
0.00
10.00
0.00
35,287.80
80+840.000
0.00
0.00
10.00
0.00
35,287.80
80+860.000
0.00
0.00
10.00
0.00
35,287.80
80+880.000
0.00
0.00
10.00
0.00
35,287.80
80+900.000
0.00
0.00
10.00
0.00
35,287.80
80+920.000
0.00
0.00
10.00
0.00
35,287.80
80+940.000
0.00
0.00
10.00
0.00
35,287.80
80+960.000
0.00
0.00
10.00
0.00
35,287.80
80+980.000
0.00
0.00
10.00
0.00
35,287.80
81+000.000
0.00
0.00
10.00
0.00
35,287.80
81+020.000
0.00
0.00
10.00
0.00
35,287.80
81+040.000
0.00
0.00
10.00
0.00
35,287.80
81+060.000
0.00
0.00
10.00
0.00
35,287.80
81+080.000
0.00
0.00
10.00
0.00
35,287.80
81+100.000
0.00
0.00
10.00
0.00
35,287.80
81+120.000
0.00
0.00
10.00
0.00
35,287.80
81+140.000
81+160.000
81+180.000
81+200.000
81+220.000
81+240.000
81+260.000
81+280.000
81+300.000
81+320.000
81+340.000
81+360.000
81+380.000
81+400.000
81+420.000
81+440.000
81+460.000
81+480.000
81+500.000
81+520.000
81+540.000
81+560.000
81+580.000
81+600.000
81+620.000
81+640.000
81+660.000
81+680.000
81+700.000
81+720.000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 94
"TERRACERAS"
UNIDAD
TERRACERAS
Corte para la formacin de Bermas.
M3
REA ACUMULADA
ESTACIN KM.
REA
L1+L2
D/2
81+740.000
81+760.000
81+780.000
81+800.000
81+820.000
81+840.000
81+860.000
81+880.000
81+900.000
81+920.000
81+940.000
81+960.000
81+980.000
82+000.000
82+020.000
82+040.000
82+060.000
82+080.000
82+100.000
82+120.000
82+140.000
82+160.000
82+180.000
82+200.000
82+220.000
82+240.000
82+260.000
82+280.000
82+300.000
82+320.000
82+340.000
82+360.000
82+380.000
82+400.000
82+420.000
82+440.000
82+460.000
82+480.000
82+500.000
82+520.000
82+540.000
82+560.000
82+580.000
82+600.000
82+620.000
82+640.000
82+660.000
82+680.000
82+700.000
82+720.000
82+740.000
82+760.000
82+780.000
82+800.000
82+820.000
82+840.000
82+860.000
82+880.000
82+900.000
82+920.000
82+940.000
82+960.000
82+980.000
83+000.000
83+020.000
83+040.000
83+060.000
83+080.000
83+100.000
83+120.000
83+140.000
83+160.000
83+180.000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
PARCIAL
ACUMULADO
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
CONTRATO: 1-C-CE-A-501-W-0-1
OBRA: "MODERNIZACIN MEDIANTE LA CONSTRUCCIN DE TERRACERIAS, OBRAS DE DRENAJE, PAVIMENTO DE CONCRETO ASFLTICO, TRABAJOS
DIVERSOS Y SEALAMIENTOS DEL SUBTRAMO KM. 71+800 AL KM 84+000, CARRETERA: SAN PEDRO - CABO SAN LUCAS, TRAMO: TODOS SANTOS
- CABO SAN LUCAS
CARRETERA: TRANSPENINSULAR BENITO JUREZ
TRAMO: TODOS SANTOS - CABO SAN LUCAS
KILOMETRO: 71+800 AL 84+000
ESTADO BAJA CALIFORNIA SUR
CONTRATISTA CONSTRUCTORA, ARRENDADORA Y MATERIALES S.A. DE C.V.
SUPERVISIN: GESTORA, SUPERVISIN Y SERVICIOS PARA LA CONSTRUCCIN S.A. DE C.V.
GENERADOR DE FINIQUITO
CONCEPTO No. 94
"TERRACERAS"
UNIDAD
TERRACERAS
Corte para la formacin de Bermas.
M3
REA ACUMULADA
ESTACIN KM.
REA
L1+L2
D/2
83+200.000
83+220.000
83+240.000
83+260.000
83+280.000
83+300.000
83+320.000
83+340.000
83+360.000
83+380.000
83+400.000
83+420.000
83+440.000
83+460.000
83+480.000
83+500.000
83+520.000
83+540.000
83+560.000
83+570.105
83+580.000
83+593.182
83+600.000
83+616.259
83+620.000
83+640.000
83+653.182
83+660.000
83+680.000
83+700.000
83+720.000
83+740.000
83+760.000
83+780.000
83+785.000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
5.05
4.95
6.59
3.41
8.13
1.87
10.00
6.59
3.41
10.00
10.00
10.00
10.00
0.00
0.00
0.00
PARCIAL
ACUMULADO
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.80
35,287.8
35,287.8
35,287.8
75+180.000
75+200.000
75+220.000
75+240.000
75+260.000
75+280.000
75+300.000
75+320.000
75+340.000
75+360.000
75+380.000
75+400.000
75+420.000
75+440.000
75+460.000
75+480.000
582.27
859.95
1,010.00
998.27
825.16
675.77
532.90
418.04
380.08
331.84
251.75
226.88
205.89
206.34
268.54
285.33
582.27
1442.22
1869.96
2008.27
1823.43
1500.93
1208.66
950.93
798.11
711.92
583.59
478.63
432.77
412.23
474.88
553.87
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
5822.71
14422.25
18699.57
20082.74
18234.30
15009.27
12086.63
9509.32
7981.14
7119.21
5835.94
4786.34
4327.75
4122.31
4748.81
5538.66
5,822.71
20,244.96
38,944.53
59,027.28
77,261.58
92,270.84
104,357.47
113,866.80
121,847.94
128,967.15
134,803.08
139,589.42
143,917.17
148,039.49
152,788.30
158,326.96