Está en la página 1de 12

HOJA DE METRADOS

VIVIENDA FAMILIAR

PROYECTO:
PROPIETARIO:

ITEM

JOSE LUIS MERMA ARONI

DESCRIPCIN DE PARTIDAS

UND

N
VECES

LARGO ANCHO

ALTO

PARCIAL

TOTAL

01 00 00 00 PRIMER NIVEL
01
01

01 00 00 TRABAJOS PRELIMINARES
01 01 00 LIMPIEZA DE TERRENO

M2

AREA

112.74

112.74

112.74

01

01 02 00 TRAZO Y REPLANTEO

M2

AREA

112.74

112.74

112.74

01
01

01

02 00 00 MOVIMIENTO DE TIERRAS
02 01 00 EXCAVACIN MANUAL
ZAPATAS
Z-1
VIGAS DE CONEXIN
EJE 1-1 y 3-3
EJE A-A,B-B,C-C,D-D
CIMENTACION CORRIDA CC2
02 02 00 ELIMINACION DE MATERIAL EXEDENTE

01

03 00 00 OBRAS DE CONCRETO SIMPLE

01

04 01 00 SOLADO PARA ZAPATAS

M2

Z-1
01

01

01

01
01
01
01

01
01

01

01

M3

98.80

M3

12

1.80

1.80

2.15

83.59

M3
M3
M3
M3

2
4
1
1.25

6.15
2.80
6.56
98.80

0.40
0.40
0.40

1.45
1.45
0.60

7.13
6.50
1.57
123.50

M2

12.00

1.80

1.80

03 02 00 CONCRETO 1:10 +30% P.M. PARA CIMIENTOS CORRIDOS


EJE 1-1 y 3-3
EJE A-A,B-B,C-C,D-D
CC2

M3
M3
M3
M3

2
4
1

12.00
2.80
6.56

0.40
0.40
0.40

0.70
0.70
0.70

6.72
3.14
1.84

03 03 00 CONCRETO SOBRECIMIENTO DE 1:8 CEM-HOR 25% P.M.


EJE 1-1 y 3-3
EJE A-A,B-B,C-C,D-D

M3
M3
M3
M3
M2
M2
M2
M2
M2
M2
M2

2
4
1

12.00
2.80
6.56

0.15
0.15
0.15

0.40
0.40
0.40

1.44
0.67
0.39

CIMENTACION CORRIDA CC2


03 04 00 ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTO
EJE 1-1 y 3-3
EJE A-A,B-B,C-C,D-D
CIMENTACION CORRIDA CC2
EJE 1-1 y 3-3
EJE A-A,B-B,C-C,D-D
CIMENTACION CORRIDA CC2
04 00 00 CONCRETO ARMADO
ZAPATAS f'c= 210 KG/CM2 PARA
04 01 00 CONCRETO
04 01 01 ZAPATAS
Z-1fy=4200 KG/CM2 PARA
ACERO
04 01 02 ZAPATAS
Z-1
5/8"

04
04

04

04

LONGITUD TOTAL
PESO 5/8" = 1.552KG/ML
02 00 VIGAS DE CONEXIN
02 01 CONCRETO f'c= 210 KG/CM2 PARA VIGAS DE CONEXIN
EJE 1-1 y 3-3
EJE A-A,B-B,C-C,D-D
ACERO
02 02 fy=4200 KG/CM2 PARA VIGAS DE CONEXIN
ACERO LONGITUDINAL
EJE 1-1, 3-3
5/8"
EJE A-A, B-B, C-C, D-D
5/8"
ACERO TRANSVERSAL
EJE 1-1, 3-3
3/8"
EJE A-A, B-B, C-C, D-D
3/8"
LONGITUD TOTAL
5/8"
LONGITUD TOTAL
3/8"
PESO 5/8" = 1.552 KG/ML
PESO 3/8" = 0.56 KG/ML
02 03 ENCOFRADO Y DESENCOFRADO PARA VIGAS CONEXIN
EJE 1,3
EJE A, B, C, D

M3
M3
KG
ML
ML
ML
KG
M3
M3
M3
KG

123.50

38.88
38.88
11.69

2.51

88.86
2
4
1
2
4
1

12
2.8
6.56
12.00
2.80
2.80

12.00

1.80

1.4
1.4
1.4
0.80
0.80
0.80

33.60
15.68
9.18
19.20
8.96
2.24

0.60

23.33

23.33
1.80

968.82
1.70
1.70

1.70
1.70

1.552

9
9
624.24
624.24

312.12
312.12
624.24
968.82

2
4

12.00
7.50

0.25
0.25

0.40
0.40

2.40
3.00

12
12

5.40

661.99

ML

n veses
2

largo
15.60

cant.
4.00

124.80

ML

8.90

4.00

142.40

ML
ML
ML
ML
KG
KG
M2
M2
M2

2
4
1
1
1.552
0.56

1.20
1.20
267.20
441.60
267.20
441.60

84.00
50.00

201.60
240.00
267.20
441.60
414.69
247.30
43.20

2
4

12.00
7.50

0.80
0.80

19.20
24.00

HOJA DE METRADOS
PROYECTO:
PROPIETARIO:

ITEM
01
01

01

01
01
01

01

01

01
01

01

01

01
08

08

08

01
01

VIVIENDA FAMILIAR
JOSE LUIS MERMA ARONI

DESCRIPCIN DE PARTIDAS

04 03 00 COLUMNAS
04 03 01 CONCRETO f'c= 210 KG/CM2 PARA COLUMNAS
C-1
04 03 02

04 03 03
04 04 00
04 04 01

ACERO fy=4200 KG/CM2 PARA


COLUMNAS
ACERO
C-1LONGITUDINAL

3/4"
C-1

5/8"
ACERO
C-1TRANSVERSAL

3/8"
LONGITUD TOTAL 3/4"
LONGITUD TOTAL 5/8"
LONGITUD TOTAL 3/8"
PESO 3/4" = 2.50 KG/ML
PESO 5/8" = 1.55 KG/ML
PESO 3/8" = 0.56 KG/ML
ENCOFRADO Y DESENCOFRADO DE COLUMNAS
C-1
VIGAS
CONCRETO f'c= 210 KG/CM2 PARA
VIGAS
EJE 1,2,3
EJE A,B,C,D

ACERO fy=4200 KG/CM2 PARA


04 04 02 VIGAS
ACERO LONGITUDINAL
EJE 1-1, 2-2, 3-3
5/8"
EJE 1-1, 2-2, 3-3
3/4"
EJE A-,A, B-B, C-C , D-D
5/8"
EJE A-,A, B-B, C-C , D-D
3/4"
LONGITUD TOTAL 5/8"
LONGITUD TOTAL 3/4"
ACERO TRANSVERSAL
EJE 1-1, 2-2, 3-3
3/8"
EJE A-A, B-B, C-C ,D-D
3/8"
LONGITUD TOTAL 3/8"
PESO 5/8" = 1.55 KG/ML
PESO 3/4" = 2.50 KG/ML
PESO 3/8" = 0.56 KG/ML
04 04 03 ENCOFRADO Y DESENCOFRADO DE VIGAS
EJE 1,2,3
EJE A,B,C,D
04 05 00 LOSA ALIGERADA
04 05 01 CONCRETO F'c = 210 Kg/cm2
CONCRETO EN VIGUETAS
CONCRETO EN LOSA
04 05 02 ACERO VIGUETAS Y LOSA
VIGUETAS
1/2"
ACERO DE TEMPERATURA
1/4"
LONGITUD TOTAL 1/2"
LONGITUD TOTAL 1/4"
PESO 1/2" = 1.02 KG/ML
PESO 1/4" = 0.25 KG/ML
04 05 03 ENCOFRADO Y DESENCOFRADO LOSA
LOSA

UND

N
VECES

M3
M3

M3
M3
M3

ALTO

PARCIAL

0.50

0.30

largo
5.10
5.10

cant.
6.00
2.00

12
1
1
1
2.26
1.55
0.56

1.50
367.20
122.40
720.00
367.20
122.40
720.00

40.00

12

1.60

3
4

14.60
8.40

4.60

8.28
1,422.79
367.20
122.40
720.00
367.20
122.40
720.00
829.87
189.72
403.20
71.04

3.70

71.04

0.40
0.40

5.26
3.36

8.62
0.30
0.25

KG
ML
ML
ML
ML
ML
ML
ML
ML
ML
KG
KG
KG
M2
M2
M2

1,207.13
n veses
3
3
4
4

largo
15.90
15.90
8.90
8.90

cant.
3.00
3.00
4.00
1.00

3
4

1.30
1.20

84.00
50.00

1.55
2.50
0.56

285.50
178.70
567.60

327.60
240.00
567.60
442.53
446.75
317.86

3
4

14.60
8.40

0.90
0.85

39.42
28.56

30
1

7.50
area

0.10
84.45

143.10
143.10
142.40
35.60
285.50
178.70

67.98

M3

KG
ML
ML

KG
KG
M2

TOTAL

8.28

12
K
G
n veces
ML
12
ML
12
ML
ML
ML
ML
KG
KG
KG
M2
M2

LARGO ANCHO

7.60
0.15
0.05

3.38
4.22
377.19

30
30

8.65
15.00

1.02
0.25

259.50
450.00

area

259.50
450.00
259.50
450.00
264.69
112.50
84.45

04 05 00 ESCALERAS
01 00 00 CONCRETO EN ESCALERAS F'c = 210 Kg/cm2
PRIMER TRAMO
SEGUNDO TRAMO
02 00 00 ENCOFRADO Y DESENCOFRADO EN ESCALERAS
PRIMER TRAMO
SEGUNDO TRAMO
03 00 00 ACERO EN ESCALERAS
PRIMER TRAMO
SEGUNDO TRAMO
PESO 1/2" = 1.02 KG/ML

KG
ML
ML
KG

1
1
1.02

62.00
62.00
124.00

05 00 00 MUROS Y TABIQUES DE ALBAILERIA


05 01 00 MURO DE CABEZA
EJE 1-1, 3-3
EJE A-A
EJE C-C
EJE D-D
EJE 1-3/C-D
- PUERTA
- PUERTA
- PUERTA
- VENTANA

M2
M2
M2
M2
M2
M2
M2
M2
M2

2
1
1
1
1
-2
-1
-1
-1

14.50
6.50
6.50
7.50
7.40
2.20
2.80
0.70
4.00

84.45

84.45

M3

2.50
1
1

AREA=
AREA=

1.00
1.00

1
1

AREA=
AREA=

4.00
4.00

1.25
1.25

1.25
1.25

M2

8.00
4.00
4.00
126.48
62.00
62.00
126.48

120.59
2.80
2.80
2.80
2.80
2.80
2.80
2.80
2.80
1.8

81.20
18.20
18.20
21.00
20.72
-12.32
-7.84
-1.96
-7.20

HOJA DE METRADOS
PROYECTO:
PROPIETARIO:

ITEM

VIVIENDA FAMILIAR
JOSE LUIS MERMA ARONI

DESCRIPCIN DE PARTIDAS
- VENTANA
- VENTANA
- VENTANA
- VENTANA

UND

N
VECES

M2
M2
M2
M2

-1
-1
1
-1

LARGO ANCHO
1.80
3.33
1.05
1.40

ALTO

PARCIAL

1.8
1.8
0.50
0.50

-3.24
-5.99
0.53
-0.70

TOTAL

HOJA DE METRADOS
PROYECTO:
PROPIETARIO:

ITEM
01
01

01

01
01

01

01

01
01

01

01

01
01

01
01
01

01
01

01

VIVIENDA FAMILIAR
JOSE LUIS MERMA ARONI

DESCRIPCIN DE PARTIDAS

UND

N
VECES

LARGO ANCHO

ALTO

PARCIAL

06 00 00 REBOQUES Y ENLUCIDO DE MUROS


06 01 00 TARRAJEO DE MURO INTERIOR
EJE 1-1, 3-3
EJE A-A
EJE C-C
EJE D-D
EJE 1-3/C-D
- PUERTA
- PUERTA
- PUERTA
- VENTANA
- VENTANA
- VENTANA
- VENTANA
- VENTANA

M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2

2
1
1
1
1
-2
-1
-1
-1
-1
-1
1
-1

14.50
6.50
6.50
7.50
7.40
2.20
2.80
0.70
4.00
1.80
3.33
1.05
1.40

2.80
2.80
2.80
2.80
2.80
2.80
2.80
2.80
1.8
1.8
1.8
0.50
0.50

81.20
18.20
18.20
21.00
20.72
-12.32
-7.84
-1.96
-7.20
-3.24
-5.99
0.53
-0.70

06 02 00 TARRAJEO MURO EXTERIORES


EJE 1-1
EJE A-A
- PUERTA
- PUERTA
- PUERTA
- VENTANA
- VENTANA
- VENTANA
- VENTANA

M2
M2
M2
M2
M2
M2
M2
M2
M2

1
1
-2
-1
-1
-1
-1
-1
1

14.50
6.50
2.20
2.80
0.70
4.00
1.80
3.33
1.05

2.80
2.80
2.80
2.80
2.80
1.8
1.8
1.8
0.50

40.60
18.20
-12.32
-7.84
-1.96
-7.20
-3.24
-5.99
0.53

12

1.60

2.80

53.76

06 03 00 TARRAJEO DE SUPERFICIE DE COLUMNAS MEZCLA C:A-1:5


(COLUMNA C-1)
06 04 00 TARRAJEO DE SUPERFICIE DE VIGAS MEZCLA C:A-1:5
EJE 1,2,3
EJE A,B,C,D
06 05 00 VESTIDURA DE DERRAMES A=0.10M, e=1.5CM C:A 1:5
P-1
P-2
P-3
V-1
V-2
V-3
V-4
V-5
06 04 00 CIELO RASOS
CIELO RASO CON MESCLA DE CEMENTO
07 00 00 PISOS Y PAVIMENTOS
07 01 00 CONTRAPISO DE 4"
TIENDA
GARAJE
SS.HH.
VESTUARIO
07 02 00 PISO CEMENTO PULIDO
TIENDA
GARAJE
SS.HH.
VESTUARIO
07 03 00 PISO CEREAMICO 0.30X0.30
SERVICIOS HIGIENICOS
08 00 00 ZOCALOS Y CONTRAZOCALOS
08 01 00 ZOCALOS
TIENDA
GARAJE
VESTUARIO
08 02 00 CONTRAZOCALO
08 02 01 CONTRAZOCALO DE CEMENTO PULIDO
FACHADA
08 02 02 CONTRAZOCALO DE CERAMICO 0.30X0.20
SERVICIOS HIGIENICOS
09 00 00 CARPINTERIA DE MADERA Y METALICA
09 01 00 PUERTA METALICA ENRROLLABLE
P-1
P-2
09 03 00 PUERTA CONTRAPLACADAS
P-4

TOTAL

120.59

20.77

M2
M2
M3
M3
ML
ML
ML
ML
ML
ML
ML
ML
ML

53.76
52.50
3
4

14.60
8.40

0.70
0.65

30.66
21.84

2.80
2.80
2.80
4.00
1.80
3.33
1.05
1.40

5.60
2.80
2.80
4.00
1.80
3.33
1.05
1.40

22.78
2
1
1
1
1
1
1
1

ML
ML

AREA

84.45

84.45

84.45

M2
M2
M2
M2

1
1
1
1

AREA
AREA
AREA
AREA

68.76
22.18
3.30
2.60

68.76
22.18
3.30
2.60

M2
M2
M2
M2

1
1
1
1

AREA
AREA
AREA
AREA

68.76
22.18
3.30
2.60

68.76
22.18
3.30
2.60

M2

AREA

3.30

3.30

ML
ML
ML

1
1
1

29.70
20.60
6.60

96.84

96.84

3.30

56.90
29.70
20.60
6.60

14.20
ML

14.20

M2

7.00

14.20
12.60
1.80

12.60

20.16
M2
M2

2
1

2.20
2.80

2.80
2.80

12.32
7.84

M2

0.70

2.80

1.96

1.96

HOJA DE METRADOS
PROYECTO:
PROPIETARIO:

ITEM

VIVIENDA FAMILIAR
JOSE LUIS MERMA ARONI

DESCRIPCIN DE PARTIDAS

UND

N
VECES

PZA
PAR

1
1

LARGO ANCHO

01
01
01

10 00 00 CERRAJERIA
10 01 00 CERRADURA DE PERILLA CON SEGURO INTERIOR
10 02 00 BISAGRA CAPUCHINA ALUMINIZADA DE 31/2" X 31/2"

01
01

11 00 00 VIDRIOS Y CRISTALES SIMILARES


11 01 00 VIDRIO DE 6MM C/ SISTEMA NOVA
V-1
V-2
V-3
V-4
V-5

M2
M2
M2
M2
M2

1
1
1
1
1

4.00
1.80
3.33
1.05
1.40

12 00 00 PINTURA EN MUROS INTERIORES Y EXTERIORES


12 01 00 PINTURA EN MURO INTERIOR
EJE 1-1, 3-3
EJE A-A
EJE C-C
EJE D-D
EJE 1-3/C-D
- PUERTA
- PUERTA
- PUERTA
- VENTANA
- VENTANA
- VENTANA

M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2

2
1
1
1
1
-2
-1
-1
-1
-1
-1

14.50
6.50
6.50
7.50
7.40
2.20
2.80
0.70
4.00
1.80
3.33

01
01

ALTO

PARCIAL

1.00
1.00

TOTAL

1.00
1.00

190.72
7.20
3.24
5.99
0.53
0.70

1.80
1.80
1.80
0.50
0.50

120.59
2.80
2.80
2.80
2.80
2.80
2.80
2.80
2.80
1.8
1.8
1.8

81.20
18.20
18.20
21.00
20.72
-12.32
-7.84
-1.96
-7.20
-3.24
-5.99

HOJA DE METRADOS
PROYECTO:
PROPIETARIO:

ITEM

VIVIENDA FAMILIAR
JOSE LUIS MERMA ARONI

DESCRIPCIN DE PARTIDAS
- VENTANA
- VENTANA

01

01
01

01
01

12 02 00 PINTURA EN MURO EXTERIORES


EJE 1-1
EJE A-A
- PUERTA
- PUERTA
- PUERTA
- VENTANA
- VENTANA
- VENTANA
- VENTANA
12 03 00 PINTURA EN COLUMNAS
(COLUMNA C-1)
12 04 00 PINTURA EN VIGAS
EJE 1,2,3
EJE A,B,C,D

UND

N
VECES

M2
M2

1
-1

M2
M2
M2
M2
M2
M2
M2
M2
M2

01
01
01
01
01
01

14
14
14
14
14
14

00 00 INSTALACIONES ELECTRICAS
01 00 SALIDA DE TECHO (CENTRO DE LUZ) (INCL. INTERRUPTOR)
02 00 SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE CON PVC
03
FLUORESCENTE CIRCULAR CON PANTALLA TRANSLUCIDA
04
TABLERO GENERAL 12 POLOS
05
TABLERO DE DISTRIBUCION

1.05
1.40

0.50
0.50

0.53
-0.70

1
1
-2
-1
-1
-1
-1
-1
1

14.50
6.50
2.20
2.80
0.70
4.00
1.80
3.33
1.05

2.80
2.80
2.80
2.80
2.80
1.8
1.8
1.8
0.50

40.60
18.20
-12.32
-7.84
-1.96
-7.20
-3.24
-5.99
0.53

12

1.60

2.80

53.76

3
4

14.60
8.40

0.70
0.65

30.66
21.84

TOTAL

53.76

M2
M3
M3

01
01
01
01
01
01
01
01
01
01
01
01
01

01

PARCIAL

M2

UND
UND
UND
UND
ML
ML
ML
ML
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
ML
UND

01

ALTO

20.77

13 00 00 INSTALACIONES SANITARIAS
13 01 00 SALIDA DE DESAGUE EN PVC 2"
SSHH
13 02 00 SALIDA DE DESAGUE EN PVC 4"
SSHH DORMITORIO
13 03 00 TUBERIA DE PVC SAL 4"
TOTAL
13 04 00 TUBERIA DE PVC SAL 2"
TOTAL
13 05 00 YEE DE 4" PVC SAL
13 06 00 REDUCCION DE 4"X2" PVC SAL
13 07 00 YEE 2"X2" PVC SAL
13 08 00 CODO 2"X45 PVC SAL
13 09 00 CODO 4"X45 PVC SAL
13 10 00 SUMIDERO DE BRONCE 2"
13 11 00 REGISTRO DE BRONCE CROMADO 4"
13 12 00 CAJA DE REGISTRO DE 12"X24"
13 13 00 INODORO DE LOSA TANQUE BAJO
13 14 00 LAVATORIO DE LOSA
13 16 00 SALIDA DE AGUA FRIA DE 1/2"
13 17 00 RED DE DISTRIBUCION TUBERIA DE 1/2" PVC-SAP
13 18 00 VALVULA COMPUERTA DE BRONCE ROSCADO DE 1/2"

01

LARGO ANCHO

52.50

1.00
1.00

1.00
1

1.00

33.5

33.50

15.5
3
1
2
2
2
3
1
2
1
1
4
36
3

15.50
3.00
1.00
2.00
2.00
2.00
3.00
1.00
2.00
1.00
1.00
4.00
36.00
3.00

3.00
1.00
2.00
2.00
2.00
3.00
1.00
2.00
1.00
1.00
4.00
36.00
3.00

UND
UND
UND
UND
UND

10
6
10
1
1

10.00
6.00
10.00
1.00
1.00

10.00
6.00
10.00
1.00
1.00

M3
M3

12

0.50

0.30

2.40

4.32

12

0.50

0.30

2.80

5.04

largo
2.80
2.80

cant.
6.00
2.00
25.00

33.50
15.50

02 00 00 00 SEGUNDO NIVEL
02
02
02

02

01

02

02

01 00 00 CONCRETO ARMADO
01 01 00 COLUMNAS
01 01 01 CONCRETO f'c= 210 KG/CM2 PARA COLUMNAS
C-1
ACERO fy=4200 KG/CM2 PARA
01 01 02 COLUMNAS
C-1
ACERO fy=4200 KG/CM2 PARA
04 03 02 COLUMNAS
ACERO
C-1LONGITUDINAL

3/4"
C-1

5/8"
ACERO
C-1TRANSVERSAL

3/8"
LONGITUD TOTAL 3/4"
LONGITUD TOTAL 5/8"
LONGITUD TOTAL 3/8"
PESO 3/4" = 2.50 KG/ML
PESO 5/8" = 1.55 KG/ML
PESO 3/8" = 0.56 KG/ML
01 01 03 ENCOFRADO Y DESENCOFRADO DE COLUMNAS
C-1
C-2
C-3
01 02 00 VIGAS
EJE 1,2,3

4.32
K
G

M3

5.04

K
G
n veces
ML
12
ML
12

811.78

ML
ML
ML
ML
KG
KG
KG

12
1
1
1
2.26
1.55
0.56

1.50
201.60
67.20
450.00
201.60
67.20
450.00

M2
M2
M2
M2

8
1
2

1.20
1.20
1.00

M3

14.60

201.60
67.20
450.00
201.60
67.20
450.00
455.62
104.16
252.00
28.16

0.30

2.20
2.20
2.20

21.12
2.64
4.40

0.40

5.26

8.62

HOJA DE METRADOS
PROYECTO:
PROPIETARIO:

ITEM

VIVIENDA FAMILIAR
JOSE LUIS MERMA ARONI

DESCRIPCIN DE PARTIDAS
EJE A,B,C,D

01

01

01
01

01

01

01
08

08

08

02
02

02
02

02

ACERO fy=4200 KG/CM2 PARA


04 04 02 VIGAS
ACERO LONGITUDINAL
EJE 1-1, 2-2, 3-3
5/8"
EJE 1-1, 2-2, 3-3
3/4"
EJE A-,A, B-B, C-C , D-D
5/8"
EJE A-,A, B-B, C-C , D-D
3/4"
LONGITUD TOTAL 5/8"
LONGITUD TOTAL 3/4"
ACERO TRANSVERSAL
EJE 1-1, 2-2, 3-3
3/8"
EJE A-A, B-B, C-C ,D-D
3/8"
LONGITUD TOTAL 3/8"
PESO 5/8" = 1.55 KG/ML
PESO 3/4" = 2.50 KG/ML
PESO 3/8" = 0.56 KG/ML
04 04 03 ENCOFRADO Y DESENCOFRADO DE VIGAS
EJE 1,2,3
EJE A,B,C,D
04 05 00 LOSA ALIGERADA
04 05 01 CONCRETO F'c = 210 Kg/cm2
CONCRETO EN VIGUETAS
CONCRETO EN LOSA
ACERO
VIGUETAS Y LOSA
04 05 02
VIGUETAS
1/2"
ACERO DE TEMPERATURA
1/4"
LONGITUD TOTAL 1/2"
LONGITUD TOTAL 1/4"
PESO 1/2" = 1.02 KG/ML
PESO 1/4" = 0.25 KG/ML
04 05 03 ENCOFRADO Y DESENCOFRADO LOSA
LOSA

UND

N
VECES

M3

8.40

0.25

n veses
3
3
4
4

largo
15.90
15.90
8.90
8.90

cant.
3.00
3.00
4.00
1.00

3
4

1.30
1.20

84.00
50.00

1.55
2.50
0.56

285.50
178.70
567.60

327.60
240.00
567.60
442.53
446.75
317.86

3
4

14.60
8.40

0.90
0.85

39.42
28.56

30
1

7.50
area

0.10
84.45

30
30

8.65
15.00

1.02
0.25

259.50
450.00

area

84.45

1
1

AREA=
AREA=

1.00
1.00

1
1

AREA=
AREA=

4.00
4.00

LARGO ANCHO

ALTO

PARCIAL

0.40

3.36

KG
ML
ML
ML
ML
ML
ML
ML
ML
ML
KG
KG
KG
M2
M2
M2

1,207.13
143.10
143.10
142.40
35.60
285.50
178.70

67.98

M3

KG
ML
ML

KG
KG
M2

TOTAL

7.60
0.15
0.05

3.38
4.22
377.19
259.50
450.00
259.50
450.00
264.69
112.50
84.45
84.45

04 05 00 ESCALERAS
01 00 00 CONCRETO EN ESCALERAS F'c = 210 Kg/cm2
TERCER TRAMO
CUARTO TRAMO
02 00 00 ENCOFRADO Y DESENCOFRADO EN ESCALERAS
TERCER TRAMO
CUARTO TRAMO
03 00 00 ACERO EN ESCALERAS
TERCER TRAMO
CUARTO TRAMO
PESO 1/2" = 1.02 KG/ML

KG
ML
ML
KG

1
1
1.02

62.00
62.00
124.00

02 00 00 MUROS Y TABIQUES DE ALBAILERIA


02 01 00 MURO DE SOGA
EJE A-A
EJE B-B
EJE C-C
EJE D-D
EJE 1-2/A-C
EJE 1-1,3-3
EJE 2-2
-VENTANA
-VENTANA
-VENTANA
-VENTANA
-VENTANA
-VENTANA

M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2

1
1
1
1
1
1
1
-2
-2
-2
-1
-1
-1

8.20
4.90
5.85
7.50
14.50
13.10
2.50
3.35
1.80
2.00
1.40
2.65
0.50

2.40
2.40
2.40
2.40
2.6
2.4
2.4
1.6
1.6
1.6
0.5
1.4
0.5

19.68
11.76
14.04
18.00
37.70
31.44
6.00
-10.72
-5.76
-6.40
-0.70
-3.71
-0.25

03 00 00 REVOQUES Y ENLUCIDO DE MUROS


03 01 00 TARRAJEO DE MURO INTERIOR
DORMITORIO 01
DORMITORIO 02
DORMITORIO 03
DORMITORIO 04
SS.HH.
COCINA-COMEDOR
COCINA-COMEDOR

M2
M2
M2
M2
M2
M2
M2

1
1
1
1
1
1
-1

13.70
13.60
13.60
12.10
7.55
27.40
27.05

2.60
2.60
2.60
2.60
2.60
1.40
1.40

35.62
35.36
35.36
31.46
19.63
38.36
-37.87

03 02 00 TARRAJEO MURO EXTERIORES


FACHADA FRONTAL
- VENTANA
- VENTANA
- VENTANA
- VENTANA

M2
M2
M2
M2
M2

1
-1
-1
-2
-2

23.50
3.30
3.35
1.80
2.00

2.40
1.6
1.6
1.4
1.4

56.40
-5.28
-5.36
-5.04
-5.60

M3

2.50
1.25
1.25

1.25
1.25

M2

8.00
4.00
4.00
126.48
62.00
62.00
126.48

111.08

157.92

30.71

HOJA DE METRADOS
PROYECTO:
PROPIETARIO:

ITEM

VIVIENDA FAMILIAR
JOSE LUIS MERMA ARONI

DESCRIPCIN DE PARTIDAS
- VENTANA
- VENTANA

01
01

01

01

06 03 00 TARRAJEO DE SUPERFICIE DE COLUMNAS MEZCLA C:A-1:5


(COLUMNA C-1)
06 04 00 TARRAJEO DE SUPERFICIE DE VIGAS MEZCLA C:A-1:5
EJE 1,2,3
EJE A,B,C,D
06 05 00 VESTIDURA DE DERRAMES A=0.10M, e=1.5CM C:A 1:5
P-4
P-5
V-6
V-7
V-8
V-9
V-10
V-11
V-12
V-13
06 04 00 CIELO RASOS
CIELO RASO CON MESCLA DE CEMENTO

UND

N
VECES

M2
M2

-1
-1

LARGO ANCHO

ALTO

PARCIAL

1.40
2.65

0.5
1.40

-0.70
-3.71

12

1.60

2.40

46.08

3
4

14.60
8.40

0.70
0.65

30.66
21.84

2.60
2.60
3.33
3.35
1.80
2.00
1.40
2.65
0.50
3.42

5.20
10.40
3.33
3.35
3.60
4.00
1.40
2.65
0.50
3.42

M2
M2
M3
M3
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML

46.08
52.50

37.85
2
4
1
1
2
2
1
1
1
1

ML
ML

AREA

84.45

84.45

02

04 00 00 PISOS Y PAVIMENTOS

02

04 02 00 PISO CEMENTO PULIDO


DORMITORIO 01
DORMITORIO 02
DORMITORIO 03
DORMITORIO 04
COCINA-COMEDOR
COCINA-COMEDOR

M2
M2
M2
M2
M2
M2

1
1
1
1
1
1

AREA
AREA
AREA
AREA
AREA
AREA

11.45
8.75
10.35
8.45
26.90
32.80

04 03 00 PISO CERAMICO 0.30X0.30


SERVICIOS HIGIENICOS

M2

AREA

3.50

05 00 00 ZOCALOS Y CONTRAZOCALOS
05 01 00 ZOCALOS
DORMITORIO 01
DORMITORIO 02
DORMITORIO 03
DORMITORIO 04
COCINA-COMEDOR
COCINA-COMEDOR

ML
ML
ML
ML
ML
ML

1
1
1
1
1
-1

13.70
13.60
13.60
12.10
27.40
27.05

05 02 00 CONTRAZOCALO
05 02 01 CONTRAZOCALO DE CERAMICO 0.30X0.20
SERVICIOS HIGIENICOS

M2

7.55

02

02
02

02
02

02
02
02

02
02
02
02
02

02
02

06 00 00 CARPINTERIA DE MADERA Y METALICA


06 01 00 PUERTA DE MADERA TABLERO REBAJADO
P-4
06 02 00 PUERTA CONTRAPLACADAS
P-3
P-5
07 00 00 CERRAJERIA
07 01 00 CERRADURA DE PERILLA CON SEGURO INTERIOR
07 02 00 BISAGRA CAPUCHINA ALUMINIZADA DE 31/2" X 31/2"

TOTAL

84.45

184.98
2.60
2.60
2.60
2.60
1.40
1.40

29.77
22.75
26.91
21.97
37.66
45.92
3.50
3.50

53.35
13.70
13.60
13.60
12.10
27.40
-27.05

13.59
1.80

13.59

4.80
M2

1.00

2.40

4.80

M2
M2

2
4

0.70
0.90

2.60
2.60

3.64
9.36

UND
PAR

8
16

08 00 00 VIDRIOS Y CRISTALES SIMILARES


08 01 00 VIDRIO DE 6MM C/ SISTEMA NOVA
V-6
V-7
V-8
V-9
V-10
V-11
V-12
V-13

M2
M2
M2
M2
M2
M2
M2
M2

1
1
2
2
1
2
1
1

3.33
3.35
1.80
2.00
1.40
2.65
0.50
3.42

1.40
1.60
1.60
1.60
0.50
1.40
0.50
1.00

4.66
5.36
5.76
6.40
0.70
7.42
0.25
3.42

09 00 00 PINTURA EN MUROS INTERIORES Y EXTERIORES


09 01 00 PINTURA EN MUROS INTERIORES
DORMITORIO 01
DORMITORIO 02
DORMITORIO 03
DORMITORIO 04
SS.HH.

M2
M2
M2
M2
M2

1
1
1
1
1

13.70
13.60
13.60
12.10
7.55

2.60
2.60
2.60
2.60
2.60

35.62
35.36
35.36
31.46
19.63

13.00

8.00
16.00

8.00
16.00

33.97

157.92

HOJA DE METRADOS
VIVIENDA FAMILIAR

PROYECTO:
PROPIETARIO:

ITEM

JOSE LUIS MERMA ARONI

DESCRIPCIN DE PARTIDAS
COCINA-COMEDOR
COCINA-COMEDOR

02

02
02

09 02 00 PINTURA EN MUROS EXTERIORES


FACHADA FRONTAL
- VENTANA
- VENTANA
- VENTANA
- VENTANA
- VENTANA
- VENTANA

02
02
02
02
02
02
02
02
02
02
02
02

10 00 00 INSTALACIONES SANITARIAS
10 01 00 SALIDA DE DESAGUE EN PVC 2"
SSHH
COCINA
10 02 00 SALIDA DE DESAGUE EN PVC 4"
SSHH
10 03 00 TUBERIA DE PVC SAL 4"
TOTAL
10 04 00 TUBERIA DE PVC SAL 2"
TOTAL
10 05 00 YEE DE 4" PVC SAL
10 06 00 REDUCCION DE 4"X2" PVC SAL
10 07 00 YEE 2"X2" PVC SAL
10 08 00 CODO 2"X45 PVC SAL
10 09 00 CODO 4"X45 PVC SAL
10 10 00 SUMIDERO DE BRONCE 2"
10 11 00 REGISTRO DE BRONCE CROMADO 4"
10 12 00 INODORO DE LOSA TANQUE BAJO
10 13 00 LAVATORIO DE LOSA
10 14 00 SALIDA DE AGUA FRIA DE 1/2"
10 15 00 RED DE DISTRIBUCION TUBERIA DE 1/2" PVC-SAP
10 16 00 VALVULA COMPUERTA DE BRONCE ROSCADO DE 1/2"

02

11 00 00 INSTALACIONES ELECTRICAS

02
02
02
02

11
11
11
11

02
02
02

01
02
03
04

00
00
00
00

SALIDA DE TECHO (CENTRO DE LUZ) (INCL. INTERRUPTOR)


SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE CON PVC
TABLERO GENERAL 12 POLOS
TABLERO DE DIOSTRIBUCION

UND

N
VECES

M2
M2

1
-1

M2
M2
M2
M2
M2
M2
M2

1
-1
-1
-2
-2
-1
-1

LARGO ANCHO

ALTO

PARCIAL

27.40
27.05

1.40
1.40

38.36
-37.87

23.50
3.30
3.35
1.80
2.00
1.40
2.65

2.40
1.6
1.6
1.4
1.4
0.5
1.40

56.40
-5.28
-5.36
-5.04
-5.60
-0.70
-3.71

TOTAL

30.71

UND
UND
UND
UND
UND
ML
ML
ML
ML
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
ML
UND

2.00

6.00

8
2
6
2
2
1
6
2
2
2
8
25.5
4

8.00
2.00
6.00
2.00
2.00
1.00
6.00
2.00
2.00
2.00
8.00
25.50
4.00

2.00
6.00
2.00
2.00
1.00
6.00
2.00
2.00
2.00
8.00
25.50
4.00

UND
UND
UND
UND

14
22
1
1

14.00
22.00
1.00
1.00

14.00
22.00
1.00
1.00

M3
M3

12

0.50

0.30

2.40

4.32

12

0.50

0.30

2.80

5.04

largo
2.80
2.80

cant.
6.00
2.00
25.00

2
2

2.00
2.00

2.00

2.00
6.00
8.00

3 00 00 00 TERCER Y CUARTO NIVEL


02
02
02

02

01

02

02

01

01 00 00 CONCRETO ARMADO
01 01 00 COLUMNAS
01 01 01 CONCRETO f'c= 210 KG/CM2 PARA COLUMNAS
C-1
ACERO fy=4200 KG/CM2 PARA
01 01 02 COLUMNAS
C-1

K
G
M3

ACERO fy=4200 KG/CM2 PARA


04 03 02 COLUMNAS
ACERO
C-1LONGITUDINAL

3/4"
C-1

5/8"
ACERO
C-1TRANSVERSAL

3/8"
LONGITUD TOTAL 3/4"
LONGITUD TOTAL 5/8"
LONGITUD TOTAL 3/8"
PESO 3/4" = 2.50 KG/ML
PESO 5/8" = 1.55 KG/ML
PESO 3/8" = 0.56 KG/ML

5.04

K
G
n veces
ML
12
ML
12

01 01 03 ENCOFRADO Y DESENCOFRADO DE COLUMNAS


C-1
C-2
C-3
01 02 00 VIGAS
EJE 1,2,3
EJE A,B,C,D
ACERO fy=4200 KG/CM2 PARA
04 04 02 VIGAS
ACERO LONGITUDINAL
EJE 1-1, 2-2, 3-3
EJE 1-1, 2-2, 3-3
EJE A-,A, B-B, C-C , D-D
EJE A-,A, B-B, C-C , D-D
LONGITUD TOTAL 5/8"
LONGITUD TOTAL 3/4"

4.32

811.78

ML
ML
ML
ML
KG
KG
KG

12
1
1
1
2.26
1.55
0.56

1.50
201.60
67.20
450.00
201.60
67.20
450.00

M2
M2
M2
M2

8
1
2

1.20
1.20
1.00

M3
M3

3
4

14.60
8.40

0.30
0.25

n veses
3
3
4
4

largo
15.90
15.90
8.90
8.90

cant.
3.00
3.00
4.00
1.00

201.60
67.20
450.00
201.60
67.20
450.00
455.62
104.16
252.00
28.16
2.20
2.20
2.20

21.12
2.64
4.40

0.40
0.40

5.26
3.36

KG
5/8"
3/4"
5/8"
3/4"

ML
ML
ML
ML
ML
ML

8.62

1,207.13
143.10
143.10
142.40
35.60
285.50
178.70

HOJA DE METRADOS
PROYECTO:
PROPIETARIO:

ITEM

01

01
01

01

01

01
08

08

08

02
02

02
02

02

01

04 04 03

04 05 00
04 05 01

04 05 02

04 05 03

VIVIENDA FAMILIAR
JOSE LUIS MERMA ARONI

DESCRIPCIN DE PARTIDAS
ACERO TRANSVERSAL
EJE 1-1, 2-2, 3-3
3/8"
EJE A-A, B-B, C-C ,D-D
3/8"
LONGITUD TOTAL 3/8"
PESO 5/8" = 1.55 KG/ML
PESO 3/4" = 2.50 KG/ML
PESO 3/8" = 0.56 KG/ML
ENCOFRADO Y DESENCOFRADO DE VIGAS
EJE 1,2,3
EJE A,B,C,D
LOSA ALIGERADA
CONCRETO F'c = 210 Kg/cm2
CONCRETO EN VIGUETAS
CONCRETO EN LOSA
ACERO VIGUETAS Y LOSA
VIGUETAS
1/2"
ACERO DE TEMPERATURA
1/4"
LONGITUD TOTAL 1/2"
LONGITUD TOTAL 1/4"
PESO 1/2" = 1.02 KG/ML
PESO 1/4" = 0.25 KG/ML
ENCOFRADO Y DESENCOFRADO LOSA
LOSA

UND

ML
ML
ML
KG
KG
KG
M2
M2
M2

N
VECES

LARGO ANCHO

3
4

1.30
1.20

1.55
2.50
0.56

285.50
178.70
567.60

ALTO

PARCIAL

327.60
240.00
567.60
442.53
446.75
317.86

84.00
50.00

67.98
3
4

14.60
8.40

0.90
0.85

30
1

7.50
area

0.10
84.45

30
30

8.65
15.00

1.02
0.25

259.50
450.00

area

84.45

1
1

AREA=
AREA=

1.00
1.00

1
1

AREA=
AREA=

4.00
4.00

39.42
28.56

M3

KG
ML
ML

KG
KG
M2

7.60
0.15
0.05

3.38
4.22
377.19
259.50
450.00
259.50
450.00
264.69
112.50
84.45
84.45

04 05 00 ESCALERAS
01 00 00 CONCRETO EN ESCALERAS F'c = 210 Kg/cm2
TERCER TRAMO
CUARTO TRAMO
02 00 00 ENCOFRADO Y DESENCOFRADO EN ESCALERAS
TERCER TRAMO
CUARTO TRAMO
03 00 00 ACERO EN ESCALERAS
TERCER TRAMO
CUARTO TRAMO
PESO 1/2" = 1.02 KG/ML

KG
ML
ML
KG

1
1
1.02

62.00
62.00
124.00

02 00 00 MUROS Y TABIQUES DE ALBAILERIA


02 01 00 MURO DE SOGA
EJE A-A
EJE B-B
EJE C-C
EJE D-D
EJE 1-3/A-D
EJE 1-1,3-3
EJE 2-2
-VENTANA
-VENTANA
-VENTANA
-VENTANA
-VENTANA
-VENTANA
-VENTANA
-VENTANA
-VENTANA
-VENTANA

M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2

1
1
1
1
1
1
1
-1
-1
-1
-1
-1
-1
-1
-2
-1
-1

8.20
3.30
5.95
7.50
23.60
13.10
4.40
3.33
2.60
3.15
3.35
2.20
1.40
2.45
0.50
3.42
1.80

2.40
2.40
2.40
2.40
2.6
2.4
2.4
1.6
1.6
1.6
1.6
1.6
0.5
1.4
0.5
1
1.4

19.68
7.92
14.28
18.00
61.36
31.44
10.56
-5.33
-4.16
-5.04
-5.36
-3.52
-0.70
-3.43
-0.50
-3.42
-2.52

03 00 00 REVOQUES Y ENLUCIDO DE MUROS


03 01 00 TARRAJEO DE MURO INTERIOR
DORMITORIO 01
DORMITORIO 02
DORMITORIO 03
SS.HH.
COCINA-COMEDOR
COCINA-COMEDOR
COCINA-COMEDOR
PASADISO

M2
M2
M2
M2
M2
M2
M2
M2

1
1
1
1
1
1
1
1

17.75
15.50
12.90
7.30
22.60
11.75
16.10
12.00

2.60
2.60
2.60
2.60
2.60
2.60
2.60
2.60

46.15
40.30
33.54
18.98
58.76
30.55
41.86
31.20

03 02 00 TARRAJEO MURO EXTERIORES


FACHADA FRONTAL
- VENTANA
- VENTANA
- VENTANA
- VENTANA
- VENTANA
- VENTANA
06 03 00 TARRAJEO DE SUPERFICIE DE COLUMNAS MEZCLA C:A-1:5
(COLUMNA C-1)

TOTAL

M3

2.50
1.25
1.25

1.25
1.25

M2

8.00
4.00
4.00
126.48
62.00
62.00
126.48

129.26

301.34

25.69
M2
M2
M2
M2
M2
M2
M2

1
-1
-1
-2
-2
-1
-1

23.50
3.33
2.60
3.35
2.20
1.40
2.45

2.40
1.4
1.6
1.6
1.6
0.5
1.40

56.40
-4.66
-4.16
-10.72
-7.04
-0.70
-3.43

12

1.60

2.40

46.08

M2

46.08

HOJA DE METRADOS
PROYECTO:
PROPIETARIO:

ITEM
01

01

01

VIVIENDA FAMILIAR
JOSE LUIS MERMA ARONI

DESCRIPCIN DE PARTIDAS

06 04 00 TARRAJEO DE SUPERFICIE DE VIGAS MEZCLA C:A-1:5


EJE 1,2,3
EJE A,B,C,D
06 05 00 VESTIDURA DE DERRAMES A=0.10M, e=1.5CM C:A 1:5
P-3
P-4
P-5
V-6
V-7
V-8
V-9
V-10
V-11
V-12
V-13
V-14
V-15
V-16
06 04 00 CIELO RASOS
CIELO RASO CON MESCLA DE CEMENTO

UND
M2
M3
M3
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML

N
VECES

LARGO ANCHO

ALTO

PARCIAL

0.70
0.65

30.66
21.84

2.60
2.60
2.60
3.33
2.60
3.15
3.35
2.20
1.40
2.45
3.42
0.50
1.80
3.42

7.80
7.80
7.80
3.33
2.60
6.30
6.70
2.20
1.40
2.45
3.42
0.50
1.80
3.42

52.50
3
4

14.60
8.40

57.52
3
3
3
1
1
2
2
1
1
1
1
1
1
1

ML
ML

AREA

84.45

84.45
84.45

02

04 00 00 PISOS Y PAVIMENTOS

02

04 02 00 PISO CEMENTO PULIDO


DORMITORIO 01
DORMITORIO 02
DORMITORIO 03
COCINA-COMEDOR
COCINA-COMEDOR
COCINA-COMEDOR
PASADISO

M2
M2
M2
M2
M2
M2
M2

1
1
1
1
1
1
1

AREA
AREA
AREA
AREA
AREA
AREA
AREA

14.98
11.90
9.22
23.85
11.87
18.15
7.80

04 03 00 PISO CERAMICO 0.30X0.30


SERVICIOS HIGIENICOS

M2

AREA

3.50

05 00 00 ZOCALOS Y CONTRAZOCALOS
05 01 00 ZOCALOS
DORMITORIO 01
DORMITORIO 02
DORMITORIO 03
SS.HH.
COCINA-COMEDOR
COCINA-COMEDOR
COCINA-COMEDOR
PASADISO

M2
M2
M2
M2
M2
M2
M2
M2

1
1
1
1
1
1
1
1

17.75
15.50
12.90
7.30
22.60
11.75
16.10
12.00

05 02 00 CONTRAZOCALO
05 02 01 CONTRAZOCALO DE CERAMICO 0.30X0.20
SERVICIOS HIGIENICOS

M2

7.55

M2

1.00

2.40

7.20

M2
M2

3
3

0.70
0.90

2.60
2.60

5.46
7.02

UND
PAR

9
18

02

02
02

02
02

02
02
02

02
02
02
02
02

02
02

06 00 00 CARPINTERIA DE MADERA Y METALICA


06 01 00 PUERTA DE MADERA TABLERO REBAJADO
P-4
06 02 00 PUERTA CONTRAPLACADAS
P-3
P-5
07 00 00 CERRAJERIA
07 01 00 CERRADURA DE PERILLA CON SEGURO INTERIOR
07 02 00 BISAGRA CAPUCHINA ALUMINIZADA DE 31/2" X 31/2"

TOTAL

254.19
2.60
2.60
2.60
2.60
2.60
2.60
2.60

38.95
30.94
23.97
62.01
30.85
47.19
20.28
3.50
3.50

115.90
17.75
15.50
12.90
7.30
22.60
11.75
16.10
12.00

13.59
1.80

13.59

7.20
12.48

9.00
18.00

08 00 00 VIDRIOS Y CRISTALES SIMILARES


08 01 00 VIDRIO DE 6MM C/ SISTEMA NOVA
V-6
V-7
V-8
V-9
V-10
V-11
V-12
V-13
V-14
V-15
V-16

M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2

1
1
2
2
1
2
1
1
2
1
1

3.33
2.60
3.15
3.35
2.20
1.40
2.45
1.80
1.40
2.45
3.42

1.40
1.60
1.60
1.60
1.60
0.50
1.40
1.40
0.50
0.50
1.00

4.66
4.16
10.08
10.72
3.52
1.40
3.43
2.52
1.40
1.23
3.42

09 00 00 PINTURA EN MUROS INTERIORES Y EXTERIORES


09 01 00 PINTURA EN MUROS INTERIORES
DORMITORIO 01

M2

17.75

2.60

46.15

9.00
18.00

46.54

301.34

HOJA DE METRADOS
VIVIENDA FAMILIAR

PROYECTO:
PROPIETARIO:

ITEM

JOSE LUIS MERMA ARONI

DESCRIPCIN DE PARTIDAS
DORMITORIO 02
DORMITORIO 03
SS.HH.
COCINA-COMEDOR
COCINA-COMEDOR
COCINA-COMEDOR
PASADISO

02

02
02

09 02 00 PINTURA EN MUROS EXTERIORES


FACHADA FRONTAL
- VENTANA
- VENTANA
- VENTANA
- VENTANA
- VENTANA
- VENTANA

02
02
02
02
02
02
02
02
02
02
02
02

10 00 00 INSTALACIONES SANITARIAS
10 01 00 SALIDA DE DESAGUE EN PVC 2"
SSHH
COCINA
10 02 00 SALIDA DE DESAGUE EN PVC 4"
SSHH
10 03 00 TUBERIA DE PVC SAL 4"
TOTAL
10 04 00 TUBERIA DE PVC SAL 2"
TOTAL
10 05 00 YEE DE 4" PVC SAL
10 06 00 REDUCCION DE 4"X2" PVC SAL
10 07 00 YEE 2"X2" PVC SAL
10 08 00 CODO 2"X45 PVC SAL
10 09 00 CODO 4"X45 PVC SAL
10 10 00 SUMIDERO DE BRONCE 2"
10 11 00 REGISTRO DE BRONCE CROMADO 4"
10 12 00 INODORO DE LOSA TANQUE BAJO
10 13 00 LAVATORIO DE LOSA
10 14 00 SALIDA DE AGUA FRIA DE 1/2"
10 15 00 RED DE DISTRIBUCION TUBERIA DE 1/2" PVC-SAP
10 16 00 VALVULA COMPUERTA DE BRONCE ROSCADO DE 1/2"

02

11 00 00 INSTALACIONES ELECTRICAS

02
02
02
02

11
11
11
11

02
02
02

01
02
03
04

00
00
00
00

SALIDA DE TECHO (CENTRO DE LUZ) (INCL. INTERRUPTOR)


SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE CON PVC
TABLERO GENERAL 12 POLOS
TABLERO DE DIOSTRIBUCION

UND

N
VECES

M2
M2
M2
M2
M2
M2
M2

1
1
1
1
1
1
1

M2
M2
M2
M2
M2
M2
M2

1
-1
-1
-2
-2
-1
-1

LARGO ANCHO

ALTO

PARCIAL

15.50
12.90
7.30
22.60
11.75
16.10
12.00

2.60
2.60
2.60
2.60
2.60
2.60
2.60

40.30
33.54
18.98
58.76
30.55
41.86
31.20

23.50
3.33
2.60
3.35
2.20
1.40
2.45

2.40
1.4
1.6
1.6
1.6
0.5
1.40

56.40
-4.66
-4.16
-10.72
-7.04
-0.70
-3.43

TOTAL

25.69

UND
UND
UND
UND
UND
ML
ML
ML
ML
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
ML
UND

UND
UND
UND
UND

3.00
3
3

3.00
3.00

3.00

3.00
18.00
18

18.00

13
3
5
4
7
1
8
3
3
3
12
35
6

13.00
3.00
5.00
4.00
7.00
1.00
8.00
3.00
3.00
3.00
12.00
35.00
6.00

3.00
5.00
4.00
7.00
1.00
8.00
3.00
3.00
3.00
12.00
35.00
6.00

16
25
1
1

16.00
25.00
1.00
1.00

16.00
25.00
1.00
1.00

13.00