NARRATION (VO):

Program title: Introduction to


Lean Tooling

THIS PROGRAM IS AN INTRODUCTION TO LEAN


TOOLING, AND SHOWS YOU HOW IT IS USED
TO CUT COSTS, REDUCE LEAD TIME, AND
IMPROVE QUALITY.

SCENE 5a Wide shot cell

NARRATION (VO):
MANY COMPANIES ARE TURNING TO LEAN
MANUFACTURING TO REACH THE HIGHPERFORMANCE OUTPUT THEIR CUSTOMERS

SCENE 5b parts on rack


Scene 5C show tools hanging up on
boards,

DEMAND.
REGARDLESS OF WHAT TYPE OF
MANUFACTURING YOU DO, MACHINES AND
TOOLING PLAY A CRITICAL ROLE IN YOUR
BUSINESS PERFORMANCE.

SCENE 6

NARRATION:

Waiting for machines in classic


cell

THE BASIC THINKING BEHIND LEAN

Copyright 2002 Society of Manufacturing Engineers


MANUFACTURING PROGRAMS IS THE
ELIMINATION OF WASTE.
6b

ELT2 24.18/24.38

MUCH OF THIS WASTE IS CAUSED BY THE


POOR MANAGEMENT OF TOOLING, INSERTS,
CLAMPS AND GAGES.

SCENE 7

NARRATION

GRAPHIC: The 7 Deadly Wastes


[Build the graphic of the 7
Deadly Wastes]

LEAN MANUFACTURING DEFINES SEVEN WASTES


THAT ARE SO COSTLY THEY ARE KNOWN AS
THE SEVEN DEADLY WASTES. THEY

text:
Seven Deadly Wastes
*SEARCHING AND WAITING,
*TRANSPORT,
*EXCESS INVENTORY,
*OVERPRODUCTION,
*OVERPROCESSING,
*UNNECESSARY MOTION AND
*DEFECTS

INCLUDE:
SEARCHING AND WAITING,
TRANSPORT,
EXCESS INVENTORY,
OVERPRODUCTION,
OVERPROCESSING,
UNNECESSARY MOTION AND
DEFECTS.
LEAN TOOLING HELPS ELIMINATE THESE
SEVEN DEADLY WASTES.

SCENE 8

INTERVIEW
Joe Adams 05:02:16 05:03:24
You can waste a lot of time doing the
hunt and search.

Possible DIS TO: 041408 041432


Shows worker pointing to job
sheet that shows tooling location
then going to get it and finding
it.

If youre going to

have through-put, you dont want people


leaving the cell, you dont want people
wasting their time looking for things,

Copyright 2002 Society of Manufacturing Engineers


you want to make sure if a tool if
its easy to find its also easy to
keep track of, its also in the right
repair.

When you go to use it its

ready to go so you minimize scrap.


minimize loss time searching.

You

And you

can satisfy the customer.


NARRATION

SCENE 9
On screen
The first
the hands
it within

text:
is to have any tool in
of the person who needs
30 seconds.

The second goal is to have any


tool operational in less than 10
minutes from the beginning of a
set-up.

LEAN TOOLING HAS 2 PRIMARY GOALS.


THE FIRST IS TO HAVE ANY TOOL IN THE
HANDS OF THE PERSON WHO NEEDS IT WITHIN
30 SECONDS.
THE SECOND GOAL IS TO HAVE ANY TOOL
OPERATIONAL IN LESS THAN 10 MINUTES
FROM THE BEGINNING OF A SET-UP.

SCENE 10

NARRATION
AN EFFECTIVE WAY TO IMPLEMENT LEAN

Phase 1: Prepare the Project


ELT2 24.49/25.02
ELT2 13.08/19

TOOLING IS BY FOLLOWING A FIVE PHASE


PLAN.
PHASE 1 PREPARES THE PROJECT BY
CREATING A CLEAR VISION OF YOUR GOALS,
GETTING MANAGEMENT SUPPORT, AND FORMING
A STRONG CROSS-FUNCTIONAL TEAM.

SCENE 11

NARRATION
PHASE 2 STUDIES AND MEASURES THE

Phase 2: Study the Problem

Copyright 2002 Society of Manufacturing Engineers


PROBLEM SO THERE IS AN IN-DEPTH
MAN WRITING AT CLASSIC CELL
UNDERSTANDING OF ALL THE ISSUES,
OBSTACLES, AND BARRIERS.
SCENE 12

NARRATION
IN PHASE 3, BEFORE ATTACKING ANY

Phase 3: Apply the 5S System


MARO 10.47.02/19

TOOLING PROBLEMS DIRECTLY, YOU MUST


REMOVE MANY OF THE GENERIC WORKPLACE
PROBLEMS THAT YOU WILL CONFRONT BY
APPLYING THE FIVE S SYSTEM FOR
WORKPLACE ORGANIZATION.

SCENE 13

NARRATION

Phase 4: Standardize Tooling

IN PHASE 4, YOU WILL STANDARDIZE

SMALL BOX OF TOOLS AT LEE BLAKE

TOOLING ACTIVITIES AT THE POINT OF USE


AND THROUGHOUT THE PLANT.

YOU WILL

CREATE NEW DESIGNS FOR TOOL STORAGE AND


TOOL CRIB AT LEE BLAKE

MANAGEMENT, AND IMPLEMENT VISUAL


DISPLAYS AND CONTROLS.

SCENE 14

NARRATION
FINALLY, IN PHASE 5 YOU WILL IMPLEMENT

Phase 5: Stabilize Tooling


SHADOW BOARD AT EATON
ROW OF INSERTS AT K&A

A PLAN TO STABILIZE TOOLING AND SUSTAIN


YOUR GAINS THROUGH AUDITS AND PROBLEM
SOLVING METHODS.

SCENE 15
Phase I: Prepare the Project

SCENE 16

NARRATION

Phase I: Prepare the Project

Copyright 2002 Society of Manufacturing Engineers


- Getting Management Involvement
- Identifying Target Areas
- Forming a Core Implementation
Team
PEOPLE IN OFFICE AT CLASSIC (ELT
REEL 1?

THREE ACTIVITIES OCCUR IN PHASE ONE.


GETTING MANAGEMENT INVOLVEMENT,
IDENTIFYING TARGET AREAS, AND FORMING A
CORE IMPLEMENTATION TEAM.
THE MOST IMPORTANT OF THESE ACTIVITY IS
GETTING MANAGEMENT INVOLVEMENT.

SCENE 17

NARRATION

SHOW Management Commitment


Checklist from book

THE LEAN TOOLING WORKBOOK HAS A LIST OF


10 MANAGEMENT ISSUES YOU CAN USE TO
RATE MANAGEMENT INVOLVEMENT.

WIPE ON FILLED IN VALUES

THE BEST WAY TO USE THIS LIST IS TO


COMPLETE IT AS A GROUP, SO EVERYONE CAN
EVALUATE THE MANAGEMENT COMMITMENT.

SCENE 18

INTERVIEW
Tom Jackson 03:07:08 03:07:
Unless the workers see management
support, that they have upper
management directly participating in
their teams, and supporting their
decisions and helping fund the projects
and helping drive them they feel its
just going to be another flavor of the
day.

SCENE 19

NARRATION

ELT 19.05/13

TO GET STARTED WITH LEAN TOOLING, IT IS


BEST TO SELECT VARIOUS TARGET AREAS FOR

Copyright 2002 Society of Manufacturing Engineers


IMPROVEMENT AND THEN PRIORITIZE THEM.
MARO

10.52.10/21

EACH AREA SHOULD HAVE AN ASSIGNED


CHAMPION WHO HAS TIME AVAILABLE FOR

MARO 10.53.46/59

THESE IMPROVEMENTS. BUT TO BE TOTALLY


SUCCESSFUL WITH A LEAN TOOLING PROGRAM,
IT MUST EVENTUALLY BE IMPLEMENTED
THROUGHOUT THE ENTIRE PLANT.

SCENE 20

NARRATION

WS CELL AT LEE BLAKE

AS AN EXAMPLE, THIS PLANT CHOSE TO


PERFORM LEAN TOOLING ON MOST OF ITS
MACHINE CELLS FIRST.

TOOL CRIB AT LEE BLAKE

THEN IT MOVED THE TOOL CAGE TO THE


CENTER OF THE FACTORY, CHANGED THE

KANBAN CARDS AT LEE BLAKE

LAYOUT, AND STARTED A KANBAN SYSTEM TO


CONTROL TOOLING INVENTORY. THEIR NEXT

QUALITY GAGE AREA AT LEE BLAKE

STEP WAS TO ORGANIZE THE QUALITY


DEPARTMENT AND REMAINING CELLS.

QUALITY PC AREA

WELL-PLANNED CHANGES ALLOWED THIS


COMPANY TO GET THE MOST RETURN FOR ITS

PAN OF CELL AREA AT LEE BLAKE

INVESTMENT, AND CONVINCED SKEPTICAL


MANAGERS AND EMPLOYEES ALIKE OF THE
NEED FOR A TOTAL LEAN TOOLING
TRANSFORMATION.

SCENE 21

NARRATION

PEOPLE TALKING AT CLASSIC

TEAMWORK IS CRUCIAL TO MAKING LEAN


TOOLING SUCCESSFUL.

Copyright 2002 Society of Manufacturing Engineers


LADY AT PC AT EATON, MANAGER TYPE

LEAN TOOLING TEAMS MUST INCLUDE THE


RIGHT PEOPLE.

SCENE 22

TEAM MEMBERS MUST HAVE THE PROPER

MANAGER IN SHOP AT CLASSIC

AUTHORITY AND THE RESOURCES TO MAKE


CHANGES. MEMBERS MUST UNDERSTAND HOW
THE COMPANY GENERATES PROFITS AND HOW

SHIPPING DEPARTMENT

LEAN TOOLING EFFECTS THE BOTTOM LINE.


EACH TEAM MUST ALSO INCLUDE FRONT LINE

MACHINE OPERATOR

PEOPLE WHO ARE CLOSEST TO THE DETAILS.

SCENE 23

NARRATION

ENGINEER AT PC IN THEIR OWN


OFFICE

OCCASIONALLY A TEAM MAY HAVE EXTENDED


MEMBERS OUTSIDE OF THE PRODUCTION
WORKFORCE FROM THE ENGINEERING OR
DESIGN STAFF.

SCENE 24

NARRATION

SLOPPY TOOLING AT MARO ??

NOW THE TEAM IS READY TO STUDY AND


MEASURE TOOLING IN THE TARGET AREA.

SCENE 25
Phase 2: Study the Problem

SCENE 26

NARRATION

Phase 2: Study the Problem

PHASE 2 BEGINS WITH SELECTING A WAY TO

MEASURE THE CURRENT PRODUCTIVITY OF

Select Measures for Tooling


Photograph Current Conditions
Use a Diagnostic Checklist
Write a Target Statement
Post a Project Story Board

YOUR TOOLING.
METHODS SUCH AS PHOTOGRAPHY, A
DIAGNOSTIC CHECKLIST, A TARGET

Copyright 2002 Society of Manufacturing Engineers


STATEMENT, AND A PROJECT STORY BOARD
CAN BE USED TO MEASURE YOUR CURRENT
STATE.
SCENE 27

NARRATION

JOHN DEERE LOOKING FOR TOOLS

BUT THE FOCUS OF PHASE 2 IS ON


MEASURES.
BEGIN YOUR MEASUREMENTS BY LOOKING AT
THE TWO BASIC GOALS OF LEAN TOOLING.
THE FIRST GOAL IS TO HAVE ANY TOOL IN
YOUR PLANT IN THE HANDS OF THE PERSON
WHO NEEDS IT WITHIN 30 SECONDS.
SO YOUR FIRST MEASURE IS HOW LONG IT
TAKES TO GET TOOLS INTO THE HANDS OF
THE PERSON WHO NEEDS THEM.

SCENE 28

NARRATION
THE SECOND GOAL IS TO HAVE ANY TOOL

WESS ASSEMBLING TOOLS

OPERATIONAL IN LESS THAN 10 MINUTES


FROM THE BEGINNING OF SET-UP.

SO THE

SECOND MEASURE IS SET-UP TIME.


SET UP TIME IS MEASURED FROM THE TIME
WS CLASSIC CELL PAN

YOU MADE THE LAST GOOD PART TO THE TIME


YOU MAKE THE NEXT GOOD PART.

ANYTHING

IN BETWEEN IS WASTED MACHINE TIME.


SCENE 29

NARRATION

CU CUTTING TOOLS

ANOTHER GOOD MEASURE IS THE PERCENTAGE

Copyright 2002 Society of Manufacturing Engineers


OF TOTAL REVENUE YOU SPEND ON
PERISHABLE TOOLING.
SCENE 30

NARRATION
OF COURSE, TO REALLY STUDY THE MEASURES

DOWNTIME CHART AT CLASSIC ELT?

YOU HAVE TO STRATIFY THEM, OR BREAK


THEM INTO SMALLER AMOUNTS.

SCENE 32

INTERVIEW: JOE ADAMS 05:03:3505:04:11?


So its easy to quantify the hard cost
of what the tooling is.

Its difficult

to look at the impact of the cost of


what it takes if you cant find it, or
what it costs you if its not in good
repair when you go to use it.[End here]
JOE ADAMS 05:04:19 05:04:35
Is the tool there when I need it? Is it
ready to go? If its not, what was
wrong with it?

Was it lost, was it

misplaced, was it broken?


to capture those costs.

Then we try
What were

trying to do is build a data base of


what that really does cost us when
tools arent in the right place and
arent ready to go.
SCENE 33

NARRATION

500 CUTTER ON THE TABLE AT EATON

BEFORE MAKING ANY CHANGES, TAKE


PHOTOGRAPHS OF THE CURRENT STATE.
THESE PICTURES CAN PROVIDE VISUAL

Copyright 2002 Society of Manufacturing Engineers


DETAILS TO MEASURE EXISTING CONDITIONS
IN THE TARGET AREA.
SCENE 34

NARRATION

Show Lean Tooling Diagnostic


Checklist FROM THE BOOK

WHILE TAKING PHOTOGRAPHS YOU CAN ALSO


APPLY THE LEAN TOOLING DIAGNOSTIC
CHECKLIST.
BY RATING YOUR TARGET AREA IN ALL OF

ELT

2 OR 3?

25.23/45

THE 5 AREAS, YOU WILL GAIN AN IN-DEPTH


UNDERSTANDING OF YOUR CURRENT STATE OF
TOOLING AND A CLEAR LIST OF WHERE
IMPROVEMENTS ARE NEEDED.

SCENE 35

NARRATION

ELT1 25.29/50

IN MOST CASES, THIS IN-DEPTH


EXAMINATION EXPOSES PROBLEMS FEW PEOPLE

ELT1 27.57/

28.11

KNEW ABOUT. SO NOW ITS TIME TO BRING


IT ALL TOGETHER INTO ONE TARGET
STATEMENT.

SCENE 36
MARO 10.46.36/52

THE PURPOSE OF THIS TARGET STATEMENT IS


TO EXPLAIN EXACTLY WHAT THE TEAM IS
SUPPOSED TO ACHIEVE AND HOW THEY WILL
MEASURE IT.

IT SHOULD BE WRITTEN IN

SIMPLE LANGUAGE.
SCENE 37

NARRATION

ON SCREEN TEXT:
Cell A will reduce the amount
of searching and waiting for
tools from 500 hours in March to
200 hours in April. This
reduction will allow the cell to

A GOOD TARGET STATEMENT ALSO TELLS US


THE CURRENT RATE , TARGET RATE, AND WHY
IT IS IMPORTANT TO MET THE TARGET.

10

Copyright 2002 Society of Manufacturing Engineers


meet customer demand.
SCENE 38
MARO 1054.33/48

NARRATION
IN PHASE 2 YOUVE CREATED A FOCUS FOR
LEAN TOOLING AND DEVELOPED AN
UNDERSTANDING OF THE WASTE THAT IS
PRESENT.
THEN ITS TIME TO BEGIN IMPROVEMENT.

SCENE 39
Sub-title: Phase 3: The 5S System
SCENE 40

NARRATION

MARO 11.01.07/19

BEFORE ATTACKING TOOLING DIRECTLY, YOU


NEED TO CLEAN AND ORGANIZE THE WORK
AREA FOLLOWING THE 5S SYSTEM.

THIS

WILL PREPARE THE AREA FOR TOOLING


IMPROVEMENTS.
THE 5S SYSTEM

THE 5S SYSTEM CONSISTS OF 5 ACTIVITIES

SORT
SET IN ORDER
SHINE
STANDARDIZE
SUSTAIN

WITH NAMES THAT BEGIN WITH THE LETTER

SCENE 41

NARRATION

RED TAG AREA AT FORD VISUAL


CONTROLS

SORT INVOLVES SORTING THROUGH THE

S.

THEY STAND FOR SORT, SET-IN-

ORDER, SHINE, STANDARDIZE, AND SUSTAIN.

CONTENTS OF AN AREA AND IMMEDIATELY


REMOVING UNNECESSARY ITEMS TO A HOLDING
AREA.
THIS INCLUDES LARGE ITEMS, SUCH AS OLD

MOVING OVEN
video

FOR Plant layout

EQUIPMENT, AND SMALL ITEMS IN DRAWERS

11

Copyright 2002 Society of Manufacturing Engineers


AND CABINETS.
Elt2

06.51/07.00

THE RULE FOR SORT IS, WHEN IN DOUBT,


MOVE IT OUT.

SCENE 42
01.29.13 01.29.21 Shows
putting away a tool at Lee Blake.

NARRATION
SET-IN-ORDER INVOLVES ARRANGING ITEMS
FOR EASY AND EFFICIENT ACCESS AND USE.

042600 042620 Shows allen


wrenches hanging on side of
machine at Eaton.
DIS TO: 042625 042650 Shows
tools in a drawer at Eaton.

THERE SHOULD BE A PLACE FOR EVERYTHING,


AND EVERYTHING SHOULD BE IN ITS PLACE.

SCENE 43

NARRATION

DIS TO: 021513 021520 Show


top-down shot of a clean cell at
Lee Blake.
DIS TO:
Shows cleaning machine
at Classic Turning.

SHINE MEANS CLEANING EVERYTHING AND


KEEPING IT CLEAN.
THE ESSENCE OF SHINE IS INSPECTION
THROUGH CLEANING.

SCENE 44

NARRATION

DIS TO: 030221 030236 Shows


location for Raw Material at a
cell at Lee Blake.
012730 012742 Designated
parking space at cell for tooling
at Lee Blake.
DIS TO: 040129 040211 Shows
open drawer, then closed drawers
at Eaton.
DIS TO: 040621 040630 Shows
purple cell lines cell outlined
in purple at Eaton.
DIS TO: 040732 040758 Shows
shots of purple color-coded
tooling at machine, with purple
outline of machine at Eaton.
DIS TO: 040758 040823 Shows a
wrench color-coded purple at
Eaton.

STANDARDIZE INVOLVES CREATING

SCENE 45

NARRATION

GUIDELINES FOR KEEPING THE AREA


ORGANIZED, EFFICIENT, AND CLEAN.
THIS INCLUDES VISUAL CONTROLS SUCH AS
LINES, LABELS, SIGNS, AND COLOR CODING.

12

Copyright 2002 Society of Manufacturing Engineers


DIS TO: Show Changeover Standards
Sign from Lee Blake.

SUSTAIN, INVOLVES COMMUNICATION AND


EDUCATION TO ENSURE THAT EVERYONE

SHOW A 5 MINUTE 5S CHECKLIST?


FOLLOWS THE 5S STANDARDS.
SCENE 46

NARRATION
THE 5S SYSTEM LAYS A SOLID FOUNDATION
FOR THE NEXT PHASE OF LEAN TOOLING.

SCENE 47
Sub-title: Phase 4: Standardize
Tooling
SCENE 48

NARRATION

Phase 4: Standardize Tooling


- Draw Area Map
- Create New Standard Operating
Procedures
- Bring Order to Point of Use
Tooling
- Redesign the Workplace
- Implement Visual Controls

IN PHASE FOUR YOULL DRAW AN AREA MAP


TO UNDERSTAND HOW YOUR CURRENT TOOLING
STANDARDS OPERATE. YOULL CREATE NEW
STANDARD OPERATING PROCEDURES FOR
TOOLING, BRING ORDER TO THE POINT OF
USE TOOLING, AND REDESIGN THE WORKPLACE
TO SUPPORT NEW STANDARDS. THEN YOULL
IMPLEMENT VISUAL CONTROLS TO REINFORCE
THE STANDARDS AND THE NEW DESIGN.

SCENE 49

NARRATION

Elt1 09.00/33

THE AREA MAP SHOWS THE POSITION OF ALL


ITEMS AND WORK STATIONS IN THE TARGET
AREA, ESPECIALLY TOOLS AND TOOLING.
THE ARROW DIAGRAM IS DRAWN ON THE AREA
MAP TO SHOW THE FLOW OF ALL ACTIVITY.

Maro 10.59.28/37

AS YOU DRAW YOUR ARROW DIAGRAM, PAY

13

Copyright 2002 Society of Manufacturing Engineers


CLOSE ATTENTION TO WHERE TOOLS ARE
USED, DELIVERED, STORED, MAINTAINED, OR
WALKING AT CLASSIC

REORDERED - AND THE ROUTES THAT ARE


TRAVELED BETWEEN THESE ACTIVITIES.

NEW TOOL STORAGE

LATER, WHEN YOU REDESIGN THE WORKPLACE,


YOU WILL DRAW A PROPOSED DIAGRAM TO
REPLACE THE CURRENT STATE.

SCENE 50
DIS TO: 030236 030300 Shows
good front shot of area map.

INTERVIEW: Tom Jackson 03:03:40 - ?

DIS TO: 030405 030442 Shows


Tom Jackson showing Arrow
Diagram, etc.

Tom Jackson 03:04:05 03:04:35

SCENE 51

NARRATION

DELETED

DELETED

NOW ITS TIME TO CREATE NEW TOOLING


NEAT TOOL STORAGE

STANDARDS. NEW TOOLING STANDARDS


DETERMINE THE BEST AND EASIEST WAY TO

INSERT TOOLING AT CLASSIC (WES)

PERFORM TOOLING ACTIVITIES. THEY ALSO


PROVIDE A FOUNDATION FOR NEW EMPLOYEE
TRAINING.

SCENE 52

NARRATION

?????

FOR LEAN TOOLING, EVERY ACTIVITY MUST


HAVE A STANDARD OPERATIONAL PROCEDURE.

SCENE 53

NARRATION
THE BEST PLACE TO START WHEN CREATING

MACHINE OPERATOR AT LEE BLAKE

STANDARDS FOR TOOLING IS AT THE POINT


OF USE.

RAW STOCK AT LEE BLAKE, PHOTOS

14

Copyright 2002 Society of Manufacturing Engineers


TOOLS AND TOOLING ARE MANAGED
DIFFERENTLY THAN RAW MATERIALS AND
TOOLING IN STORAGE

FINISHED PARTS.
TOOLING NEEDS A STANDARD WAY TO BE

TOOLING CAGE AT LEE BLAKE

RETURNED AFTER USE.


IN ADDITION, STANDARDS ARE NEEDED FOR
HOW TOOLS ARE SENT OUT TO BE REPAIRED
OR SHARPENED.

SCENE 54

NARRATION

WS EATON CELL

THERE ARE FIVE SIMPLE STEPS THAT WILL


BRING YOU BETTER CONTROL OVER YOUR
TOOLS AT THE POINT OF USE.

SCENE 55
SLOPPY TOOLS AT EATON

NARRATION
THE FIRST STEP IS TO REMOVE ALL THE
TOOLS FROM THEIR POINT OF USE, AND
RETURN ONLY WHAT YOU NEED.
AND WHEN YOU DO RETURN THEM, STORE THEM

NEAT TOOLS AT EATON

IN LOGICAL GROUPS SO THEY CAN BE EASILY


LOCATED AND REPLACED.

SCENE 56

NARRATION
NEXT, CREATE VISUAL CONTROLS SO TOOLS

NEATLY LABELED TOOLING

CAN BE LOCATED AND RETURNED QUICKLY.


CLEAR LABELS AND COLOR-CODING WILL HELP
YOU FIND WHAT IS NEEDED, FASTER.

15

Copyright 2002 Society of Manufacturing Engineers

SCENE 57

NARRATION

GAUGING AT EATON (LATE IN TAPE)

THE THIRD STEP IS TO MAKE THE POINT OF


USE DESIGN SO SIMPLE THAT THE WORKER
KNOWS IT BY HEART.
OTHER METHODS INCLUDE PUTTING TOOLS IN

MOVING BETWEEN MACHINES AT LEE


BLAKE

THE ORDER OF PROCEDURE, OR ENLARGING


DIMENSIONS SO TOOLS ARE EASY TO GRAB.

SCENE 58

NARRATION
THE FOURTH STEP FOR POINT OF USE

JOHN DEERE ASSEMBLY AREA

CONTROL IS TO INSTALL RETRACTABLE


TOOLING.

SCENE 59

NARRATION

SNAPPING PARTS TOGETHER (Assembly


tape)

THE FIFTH STEP IS THE ELIMINATION OF


TOOLING.

AT THIS LEVEL YOU TRY TO

ELIMINATE THE NEED FOR A TOOL ENTIRELY.


MACHINE TOOLING AREA AT POWERS
AND SONS SETTING UP TOOLS

YOU WILL OFTEN SEE ELIMINATION EMPLOYED


IN SETUPS WHERE MUCH OF THE WORK IS
PERFORMED PRIOR TO SHUTDOWN, THEREFORE
ELIMINATING THE NEED FOR ANY POINT OF
USE TOOLING.

SCENE 60
ELT2 04.30/43

NARRATION
LEAN TOOLING REQUIRES A NEW WAY OF
LOOKING AT THINGS.

ONE ISSUE TO

CONSIDER IS ELIMINATING PERSONAL


TOOLBOXES TO FREE UP FLOOR SPACE.

16

Copyright 2002 Society of Manufacturing Engineers

SCENE 62

NARRATION

ROLLING TOOL CART AT LEE BLAKE

SINCE MANY TOOLING ACTIVITIES HAPPEN


AWAY FROM THE POINT OF USE, DESIGNING
EFFICIENT METHODS TO MOVE TOOLING IS
IMPORTANT.

SCENE 63

NARRATION
THE FIRST METHOD IS TOOLS ON WHEELS.

GAGE SELECTION AREA AT LEE BLAKE

REGARDLESS OF THE SIZE OF YOUR PLANT OR


ITS TOOLING, YOULL NEED TO DELIVER
SOME TOOLS TO THE POINT OF USE AT
EXACTLY THE RIGHT TIME AND IN GOOD
CONDITION.

PICKING OUT TOOLS AT LEE BLAKE

SINCE LEAN MANUFACTURING MEANS LOWER


RUNS AND MORE CHANGEOVERS, IT ALSO
MEANS MORE ACTIVITY WITH YOUR TOOLING.
AND THAT MEANS YOU NEED EFFICIENT
DELIVERY.

SCENE 67

NARRATION

LEE BLAKE CAGE AREA

ANOTHER EFFECTIVE METHOD IS A TOOLING


SUPERMARKET TO DECENTRALIZE TOOLS AND
MAKE THEM EASY TO LOCATE AND RETURN.

SCENE 68
DIS TO: 040414
[ALTERNATIVE SHOTS IF YOU NEED
THEM - DIS TO: 040334 Shows Kim
DeForest in front of tooling
cabinet.
DIS TO: 040108 040125 Shows
worker coming to cabinet, getting

KIM DEFOREST 04:04:14 04:04:30


A lot of these assembly tools were in
various locations, and you didnt know
where they were located.

Weve since

17

Copyright 2002 Society of Manufacturing Engineers


a tool.
DIS TO: 040129 040211 Shows
open drawer, then closed
drawers.]

taken central storage and put them in


numerical order, and identified all the
tools, in individual locations in the
drawers so theres easier access.

SCENE 70

NARRATION

072529-072545 Shot of tool box up


close at Classic.
072656 Shelves of blue job boxes
at Classic.

ANOTHER DESIGN STRATEGY IS TO MAKE JOB

SCENE 71

INTERVIEW

DIS TO: 072158 Wes at job box,


explaining it.

Wes Shaw 07:21:58 - ?

DIS TO: 072655 072711 Shot of


designated area for boxes.

prepare for special tooling.

BOXES OR KITS OF TOOLING.

What we have here is a job box that we


We keep

these in a designated area so that the


next time the job comes up we can pull
it off the shelf and hopefully have
most of the tooling for the job.

SCENE 72
ELT3 03.38/51

NARRATION
BUT PERHAPS THE LARGEST DESIGN ISSUE IS
THE TOOL ROOM OR TOOL CRIB LAYOUT AND
LOCATION.

020230 Shows Tom Jackson


bringing cart through aisle,
taking tooling off shelf, putting
on cart.

EACH PLANT HAS TO DECIDE WHETHER IT


NEEDS A TOOL CRIB AT ALL, AND IF SO
WHERE IT SHOULD BE LOCATED, AND HOW IT
SHOULD BE LAID OUT.
IF YOU DECIDE TO HAVE A TOOL CRIB, THE
RULE FOR ITS LAYOUT SHOULD BE EASY
ACCESS AND EASY USE.

18

Copyright 2002 Society of Manufacturing Engineers

SCENE 73

NARRATION

PRODUCTION BOARD AT LEE BLAKE

NEW STANDARDS AND REDESIGN WONT WORK


WITHOUT CONTINUED, LONG-TERM CONTROL.
AND THATS THE PURPOSE OF VISUAL
CONTROLS.

SCENE 74
QUALITY BOARD

NARRATION
VISUAL CONTROL FOR TOOLING IS USED TO
COMMUNICATE HOW A JOB IS DONE, WHEN A
TOOL IS NEEDED, WHERE TO STORE TOOLING,
EVEN WHERE ON A MACHINE THAT TOOLING
BELONGS.

MARO

11.13.12/30

TIME WASTED LOOKING FOR TOOLS, TOOLING,


OR INFORMATION CAN BE ELIMINATED WITH
EFFECTIVE VISUAL CONTROLS.

SCENE 75

NARRATION

SIGN ABOUT FLAG AT LEE BLAKE

VISUAL CONTROLS BEGIN WITH LINES,


LABELS, AND SIGNS.

SCENE 76

NARRATION

DIS TO:
Classic Turning parking
space for cart.

THE SIGN MAKES IT CLEAR WHERE TOOLS

SCENE 77

NARRATION

DIS TO: 090110 Sign of blue Cell


F hanging

COLOR-CODING IS ANOTHER EFFECTIVE

SCENE 78

NARRATION

DIS TO: 090033 Close-up shot of


Rack B

AT THE TOOL CRIB THERE ARE RACKS TO

ARE TO BE DELIVERED.

VISUAL CONTROL.

19

Copyright 2002 Society of Manufacturing Engineers


MATCH EACH CELL.
SCENE 80

NARRATION

LIGHT AT EATON BY CNC UNIT

ANOTHER TYPE OF VISUAL CONTROL IS AN


ANDON OR SIGNAL SYSTEM.

SCENE 82

NARRATION

Kanban Card AT LEE BLAKE

BUT PERHAPS THE MOST POWERFUL TOOLING


FOR VISUAL CONTROL IS KANBAN.

SCENE 83

NARRATION
WITH PERISHABLE TOOLS, KANBAN KEEPS

DIS TO: 041815 - 041829 Shows Tom


Walnick showing kanban card and
bins they are dropped in and
drawers they are used in.

TOOLING LEVELS AT STANDARD MINIMUM AND


MAXIMUM LEVELS BECAUSE IT PROVIDES AN
EASY METHOD TO REORDER WHEN TOOLS REACH
MINIMUM LEVELS.

DIS TO: 041836 - 041856 Shows


opening of drawer of new system,
with card in drawer.

WITH NON-PERISHABLE TOOLS, KANBAN CARDS


ARE USED TO RUN AN IN-HOUSE PULL SYSTEM
FOR TOOLING REPAIR AND MAINTENANCE.

SCENE 89

NARRATION

ORGANIZED LEAN TOOLING

YOURE NOW ABOUT READY TO WRAP UP YOUR


LEAN TOOLING PROJECT AND MAKE SURE YOU

SHOW MACHINE CUTTING METAL

CAN MAINTAIN YOUR GAINS.

AND THATS

THE PURPOSE OF PHASE FIVE.


SCENE 90
Sub-title: Phase 5: Stabilize
Tooling
SCENE 91

NARRATION

Phase 5: Stabilize Tooling


- Quarterly Audits

IN PHASE FIVE, LEAN TOOLING IS NO

20

Copyright 2002 Society of Manufacturing Engineers


- Continuous Improvement

LONGER A PROJECT.

IT BECOMES PART OF

EVERYDAY WORK.
EATON CELL WORKING

SO, TO ENSURE THAT YOU MAINTAIN YOUR


LEAN TOOLING FOCUS AND STANDARDS, YOU

TILT OF ORGANIZED TOOLING AT


EATON

SHOULD PERFORM QUARTERLY AUDITS AND


CONTINUE TO WORK ON WAYS TO ELIMINATE
WASTE IN TOOLS AND TOOLING.

SCENE 92
Sub-title: Keys for Success

SCENE 93

NARRATION
EVERY COMPANY IS UNIQUE.

WIDE SHOT OF CLASSIC FACTORY

HOWEVER,

REGARDLESS OF YOUR SIZE, TYPE OF


PRODUCT, OR TOOLING, THERE ARE FOUR
LEAN TOOLING KEYS THAT REMAIN CONSTANT.

SCENE 94

NARRATION

WRITING ON CLIP BOARD

THE FIRST KEY IS MEASUREMENT.

TEXT: MEASUREMENT

SURE YOU CHOOSE YOUR MEASUREMENT

MAKE

CAREFULLY, CONTINUE TO MEASURE, AND


POST THE RESULTS FOR EVERYONE TO SEE.
MEASUREMENT BRINGS FOCUS.
SCENE 95

NARRATION

Text: NO-BLAME ENVIRONMENT

THE SECOND KEY IS A NO-BLAME

TWO PEOPLE LOOKING FOR TOOLS AT


CLASSIC WES AND OTHER GUY

ENVIRONMENT.

REMEMBER THAT IT IS THE

SYSTEM THAT IS AT FAULT NOT THE


PEOPLE. A NO-BLAME ENVIRONMENT BRINGS

21

Copyright 2002 Society of Manufacturing Engineers


PARTICIPATION, ENERGY, AND BUY-IN.
SCENE 96
TOOL BOARD WITH SHADOWS FOR TOOLS

NARRATION
THE THIRD KEY IS THE 5S SYSTEM.

THE 5S

IS A WAY OF THINKING.
THE 5S SYSTEM BRINGS LEAN THINKING TO
THE SHOP FLOOR EVERY DAY.
SCENE 97
PEOPLE TALKING
ELT1
00.17.46 TO 01.17.59

NARRATION
AND THE FOURTH KEY, THE ONE THAT TIES
IT ALL TOGETHER, IS TEAMWORK.
TEAMWORK BRINGS ALL THE NECESSARY
KNOWLEDGE AND SKILLS TOGETHER.

SCENE 98

SCOTT BROKIE 08:06:17 08:06:36


You have to set a focus, you have to
try it, you have to put a goal out
there to try it.

We just wouldnt go